Year: 2014
Facility: GP Anna Platform
Operator: HILCORP
Ferguson, Victoria L (DOA)
From: Larry Greenstein <lgreenstein@hilcorp.com>
Sent: Friday, June 27, 2014 10:07 AM
To: Ferguson, Victoria L (DOA)
Cc: Wallace Evans
Subject: RE: Anna Platform/Granite Pt 10-422 April -May/14
Hi Victoria
Here's what happened on the Anna: The'planned flaring' is the procedure used to relieve the excess gas from building up
pressure in the gas pipeline to GPTF. The excess gas was a result of the unscheduled SO of the Anna turbine generator
who's unneeded fuel gas volumes then becomes the extra gas in this line. These two events should have been classified
as unplanned as they resulted from an unscheduledequipment SD. The reference to 'gas eman eing broughtac
up, is when the Anna generator is restarted, the fuel nee a ort the generator becomes the increased gas demand
needed to stop the flaring.
As for the GPP pilot/purge volume changes, new metering is the reason. For a long time the field guys were using a
ca ccuTatecTguessima e o the ow pressure, low rate pilot/purge gas rate. In late March, they installed a new ultrasonic
meter to this 1" supply line and found the actual rate of pilot/purge to be higher than believed. Previously, the rate was
entered in the mid -single digit mcfd range and now it's in the mid -teen mcfd range for pilot/purge which is around a —10
mcf a day increase, hence the —300 mcf increase per month. This is a more accurate measure of the true pilot/purge
volume than was previously understood on the GPP. ~
Since most of the flare/vent info for the 10-422 passes through our air/emissions people, I've included Wally with this e-
mail. He's the 'keeper' of the flare type info for Cook Inlet and would be a great contact for any future gas disposition type
questions. Wally will be preparing the revised May 'Excess Flare Log' for the Anna platform to better explain those two
flare events and will be sending it to you when it's ready.
Hope this e-mail fully explains both of the issues you were interested in understanding.
Larry
From: Ferguson, Victoria L (DOA) [mailto:victoria.ferguson@alaska.gov]
Sent: Thursday, June 26, 2014 3:19 PM
To: Larry Greenstein
Subject: RE: Anna Platform/Granite Pt 10-422 April -May/14
Larry,
Anna Platform: In the May, 2014 10-422 submission both flaring incidents are described as " planned flaring of excess
sales gas that could not be handled at GPTF" with no mention of an unscheduled shutdown of the turbine. The action
taken to minimize volume was "Excess flaring necessary until excess gas was flared and gas demand could be brought
back up." Could you please route this to the person who submits the 10-422 and have them correct the May,
2014 forms to indicate what happened(unscheduled SD of turbine) if that's what occurred?
Granite Point Platform: On the second question, this pertains to Granite Pt Platform: Why is the pilot/purge up to over
400 mcf from a trend of <100 mcf in April/14?
Thanx for addressing these questions.
Victoria
Victoria Ferguson
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave, Ste 100
Anchorage, AK 99501
Work: (907)793-1247
victoria ferauson(a?alaska.cov
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC(, State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Ferguson at (907(793-1247 or Victoria Ferauson®alaska aov
From: Larry Greenstein[mailto:lgreenstein@hilcorp.com]
Sent: Thursday, June 26, 2014 2:30 PM
To: Ferguson, Victoria L (DOA)
Subject: RE: Anna Platform/Granite Pt 10-422 April -May/14
Hi Victoria,
For the first question, on those dates, the AC 2 turbine on the ANNA had unscheduled shutdowns causing the line
pressure going to the GPTF to temporarily reach-190psi which exceeded their set limit of-180psi and the excess gas
was flared to reduce the line pressure. When the turbine was brought back online the flaring ceased. It is true that when
there is only a small amount of excess gas available for sales, it cannot be sold. As this is low pressure gas and there
isn't a compressor small enough at GPTF to boost this pressure up to sales pressure, we end up not being able to sell
these small volumes. Usually Bruce is able to consume the small amounts of excess gas that Anna produces, but when
an Anna turbine goes down (like on those dates), the gas line pressure climbs to where some gas ends up going to flare.
On the second question, I'm a little confused. I show Anna pilot and purge volumes of 1085 in Jan/14, 928 in Feb/14, 976
in Mar/14, 872 in Apr/14 & 1051 in May/14. I don't see the numbers you wrote below.
Let me know if I misread your questions, but this is what I've come up with so far
Larry
From: Ferguson, Victoria L (DOA) rmailto:victoria.ferguson(alalaska.gov]
Sent: Thursday, June 26, 2014 10:48 AM
To: Larry Greenstein
Subject: Anna Platform/Granite Pt 10-422 April -May/14
Larry,
A couple of questions:
1. Please explain event on 5/17/14 and 5/20/14 where excess flaring occurred because of excess sales gas. Is sales
gas being flared because it can't be sold?
2. Why is the pilot/purge up to over 400 mcf from a trend of <100 mcf in April/14?
Thanx,
Victoria
Victoria Ferguson
Senior Petroleum Engineer
State of Alaska
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
1330000005
2. Facility Name
Anna Platform
3. Field
Granite Point
4. Operator
I Hilcorp Alaska LLC
5. Month/Year of Disposition
I January -14
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
MIDDLE KENAI OIL 280150 100.00%
8. Flared or vented 1 hour or less
20
9. Flared or vented more than 1 hour (see instr.)
170
10. Pilot and Purge
1085
11. Assist Gas
0
12. Fuel gas used in lease operations.
29626
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
/ a
MCF
14. TOTAL VOLUME (ITEMS 6-13)
30901
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
7746
Waste:
MCF
17. Transferred from:
0
n
Commissioner Dale
18. Transferred to: (Express as a negative #)
(367)
19. Remarks: Purchased Gas: 7746 '
Tranferred From: 0
Transferred To: Bruce Platform & Granite Point Tank Farm (COV's an, (367)
Fuel used by Drilling Rig (Purchased and Prod): 9397
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
(GJ Note: All volumes must be corrected
Signature G""'"O y Title Production Analyst to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Leanne Prolz Phone 713.757-5211 Date 2 /1 912 01 4 AAC25.235.
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Anna Platform
lanuary-14
170
EXCESS FLARING DUE TO
EXCESS FLARING DUE TO
EXCESS FUEL IN THE GAS
EXCESS FUEL IN THE GAS LINE
LINE FEEDING THE
FEEDING THE TURBINE. THE
1/1/2014
124250
1330000005
1/13/2014
0:00:00
23:59:00
1/13/2014
U
14
TURBINE. THE TURBINE
TURBINE WAS DOWN, EXCESS
WAS DOWN, EXCESS GAS
GAS COULD NOT BE SOLD OR
COULD NOT BE SOLD OR
FED INTO THE TURBINE.
FED INTO THE TURBINE.
EXCESS FLARING DUE TO
EXCESS FLARING DUE TO
DRILLING TURBINE BEING
DRILLING TURBINE BEING
1/1/2014
124250
1330000005
1/14/2014
0:00:00
23:59:00
1/14/2014
U
70
OFFLINE FOR REPAIRS.
OFFLINE FOR REPAIRS.
BELLOWS ON THE
BELLOWS ON THE EXHAUST
EXHAUST WERE BLOWN
WERE BLOWN OUT.
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
CONDENSATE IN THE
UNTIL THE CONDENSATE COULD
CONTROLLER CAUSING
BE REMOVED FROM THE
1/1/2014
124250
1330000005
1/17/2014
0:00:00
23:59:00
1/17/2014
U
7
THE FLARE METER TO
CONTROLLER.
READ A FLARE VOLUME
WHEN NO GAS WAS
MOVING THROUGH THE
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
ISSUES RESULTING FROM
UNTIL THE METER COULD BE RE -
CONDENSATE IN THE
CALIBRATED.
CONTROLLER. FLARE
1/1/2014
124250
1330000005
1/1812014
0:00:00
23:59:00
1/18/2014
U
4
METER WAS READING
VOLUMES THAT THE
FLARE WASN'T
PRODUCING LEADING TO A
POSSIBLE METER ERROR.
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
ISSUES RESULTING FROM
UNTIL THE METER COULD BE RE -
CONDENSATE IN THE
CALIBRATED.
CONTROLLER. FLARE
1/1/2014
124250
1330000005
1/19/2014
0:00:00
23:59:00
1/19/2014
U
5
METER WAS READING
VOLUMES THAT THE
FLARE WASN'T
PRODUCING LEADING TO A
POSSIBLE METER ERROR.
FLARING DUE TO
EXCESS FLARING NECESSARY
SHUTDOWN OF RIG 428
UNTIL REPAIRS WERE
1/1/2014
124250
1330000005
1/2712014
5:00:00
10:00:00
1/28/2014
U
70]EXCESS
GAS TURBINE BECAUSE
COMPLETED AND ENGINE COULD
1
OF MECHANICAL AND FUEL
Iqc
BE RESTARTED AND BROUGHT
RACK QNI IMF
170
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number2.
1330000005
Facility Name
Anna Platform
3. Field
Granite Point
4. Operator
I Hilcorp Alaska LLC
5. Month/Year of Disposition
I February -14
Disposition
Volume MCF
20. For produclion from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
MIDDLE KENAI OIL 280150 100.00°
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
227
10. Pilot and Purge
928
11. Assist Gas
0
12. Fuel gas used in lease operations.
24768
13. Other (see instructions)
0
Official Use Only
Authorization >i hr.
Safety
2-7-
MCF
14. TOTAL VOLUME (ITEMS 6.13)
25923
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
6268
Waste:
MCF
17. Transferred from:
0
_
Commissioner Date
18. Transferred to: (Express as a negative #)
(824)
19. Remarks: Purchased Gas: 6268
Tranferred From: 0
Transferred To: Bruce Platform & Granite Point Tank Farm (COV's an- (824)
Fuel used by Drilling Rig (Purchased and Prod): 7998
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Production Analyst to pressure of 14.65 Asia and to a
temperature of 60o F. Authority 20
Printed Name Leanne Protz Phone 713-757-5211 Date 3/20/2014 AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
VLF
6125-1 V4 -
Anna Platform
February -14
'RptDate
OpNo
FacilityNo
Date Flared
StartTime
Ending Time
End Date
Planned
- MCF
Description of Flaring Event
Action Taken to Minimize V`
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
RIG 428 CENTAUR
UNTIL PARTS COULD BE SHIPPED
2/1/2014
124250
1330000005
2/1/2014
8:00:00
16:00:00
2/4/2014
U
187
MAINTENANCE ON
IN FROM OUT OF STATE AND THE
DRILLING TURBINE #1
COOLER FAN COULD BE
BECAUSE OF A LUBE OIL
REPAIRED.
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
2/1/2014
124250
1330000005
2/21/2014
21:30:00
23:45:00
2/21/2014
U
31
PRODUCTION SHUT IN
UNTIL REPAIRS COULD BE MADE
BECAUSE OF A PLC
AND PRODUCTION BROUGHT
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
HIGH ANNULUS PRESSURE
UNTIL WELLS COULD BE
2/1/2014
124250
1330000005
2/22/2014
0:01:00
3:00:00
2/22/2014
U
9
ON WELLS AFTER
BROUGHT BACK ONLINE AND
PRODUCTION SHUT IN.
OPERATING UNDER NORMAL
rnwnrTinmq
227
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
1330000005
2. Facility Name
Anna Plaif",
3. Field
Granite Point
4. Operator
I Hilcorp Alaska LLC
5. Month/Year of Disposition
I March -14
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
MIDDLE KENAI OIL 280150 100.00
8. Flared or vented 1 hour or less
31
9. Flared or vented more than 1 hour (see instr.)
49
10. Pilot and Purge
976
11. Assist Gas
0
12. Fuel gas used in lease operations.
21732
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
G/ 9
`
MCF
14. TOTAL VOLUME (ITEMS 6.13)
22788
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
1920
Waste:
MCF
17. Transferred from:
0
/
Commissioner Date
18. Transferred to: (Express as a negative #)
(3991)
19. Remarks: Purchased Gas: 1920
Tranferred From: 0
Transferred To: Bruce Platform & Granite Point Tank Farm (COV's an, (3991)
Fuel used by Drilling Rig (Purchased and Prod): 3301
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
f %Note:
Signature Fiai�ii�u _ 'e�s� Title Production Analyst
All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
AAC25.235.
Printed Name Leanne Prolz Phone 713-757-5211 Date 4/21/2014
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
U1'r
0, 31
Anna Platform
March-14
ndinjj4Vre:I
,end Date`,'..
EXCESS FLARING DUE TO EXCESS FLARING NECESSARY
INCREASING THE LOW UNTIL WIND DIED DOWN AND
6
PRESSURE FLARE PURGE FLARE PURGE RATE COULD BE
3/1/2014
124250
1330000005
3/1112014
0:00:00
20:30:00
3/11/2014
P
RATE TO COMPENSATE RETURNED TO NORMAL.
FOR HIGH WINDS.
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
INCREASING THE LOW
UNTIL WIND DIED DOWN AND
PRESSURE FLARE PURGE
FLARE PURGE RATE COULD BE
3/1/2014
124250
1330000005
3/12/2014
0:00:00
23:69:00
3/1812014
P
43
RATE TO COMPENSATE
RETURNED TO NORMAL.
FOR HIGH WINDS.
49
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
1330000005
2. Facility Name
Anna Platform
3. Field
Granite Point
4. Operator
I Hilcorp Alaska LLC
5. Month/Year of Disposition
April -14
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
MIDDLE KENAI OIL 280150 100.007%
8. Flared or vented 1 hour or less
1
9. Flared or vented more than 1 hour (see instr.)
11
10. Pilot and Purge
892
11. Assist Gas
0
12. Fuel gas used in lease operations.
18981
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
J
MCF
14. TOTAL VOLUME (ITEMS 6-13)
19885
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
82
Waste:
MCF
17. Transferred from:
0
%p - Z q-1
Commissioner Date
18. Transferred to: (Express as a negative #)
(5350)
19. Remarks: Purchased Gas: 82
Tranferred From: 0
Transferred To: Bruce Platform & Granite Point Tank Farm (COV's ant (5350)
Fuel used by Drilling Rig (Purchased and Prod): 0
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
//� �
signature `""'ry�D7" `' Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Leanne Protz Phone 713-757-5211 Date 5/20/2014
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
April -14
wnnn r[auvI III
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
SHUTDOWN OF THE VRU
UNTIL MAINTENANCE COULD BE
COMPRESSOR FOR
COMPLETED AND THE UNIT
11
SCHEDULED
COULD BE BROUGHT BACK
4/1/2014
124250
1330000005
4/8/2014
13:30:00
14:40:00
4/8/2014
P
PREVENTATIVE
ONLINE.
MAINTENANCE. OIL WAS
ADDED AND THE FILTERS
11
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSMON
1. Facility Number
1330000005
2. Facility Name
Anna Platform
3. Field
Granite Point
4. Operator
Hilcorp Alaska LLC
5. MonthNear of Disposition
I May -14
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
MIDDLE KENAI OIL 280150 100.007
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
1087
10. Pilot and Purge
1051
11. Assist Gas
0
12. Fuel gas used in lease operations.
20408
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
0
MCF
14. TOTAL VOLUME (ITEMS 6-13)
22546
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
572
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #)
(3061)
19. Remarks: Purchased Gas: 572
Tranferred From: 0
Transferred To: Bruce Platform & Granite Point Tank Farm (COV's an( (3061)
Fuel used by Drilling Rig (Purchased and Prod): 0
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature n'»irie i,�rfw Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Leanne Protz Phone 713.757-5211 Date 6/18/2014
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
p! -f
Mav-14
3087
Vh �C� �c�v I1°cl 5i�
r—�5 �Gt ✓
f v ✓ b l'✓t C
EXCESS FLARING DUE TO
EXCESS FLAING NECESSARY
UNSCHEDULED
UNTIL EXCESS GAS COULD BE
SHUTDOWN OF SOLAR AC
FLARED AND AC#2 BROUGHT
5/1/2014
124250
1330000005
5/9/2014
16:00:00
23:59:00
5/9/2014
U
25
#2 COMPRESSOR. GPTF
BACK ONLINE.
COULD NOT HANDLE THE
EXCESS GAS
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
A 4000 HOUR
UNTIL THE MAINTENANCE COULD
5/1/2014
124250
1330000005
5/10/2014
0:00:00
23:59:00
5/11/2014
U
142
MAINTENANCE ON AC #3.
BE COMPLETED ON AC #3.
GPTF WAS NOT ABLE TO
U
EXCESS FLARING D TO
FLARING OF EXC S
EXCESS FLARING NECESSARY
UNTIL EXCESS GAS WAS FLARED
5/1/2014
124250
1330000005
5/17/2014
0:00:00
23:59:00
5/18/2014
11
,r
81
SALES GAS THAT WAS
AND GAS DEMAND COULD BE
/
NOT ABL OBE HANDLED
BROUGHT BACK UP.
EXC G DUE TO
EXCESS FLARING NECESSARY
///
FLARING IF EX
UNTIL EXCESS GAS WAS FLARED
5/1/2014
124250
1330000005
5/20/2014
0:00:00
23:59:00
5/21/2014
,v
133
SALES GAS TH AS
AND GAS DEMAND COULD BE
NOT ABLE BE H NDLED
BROUGHT BACK UP.
EXC FLARING VE TO
EXCESS FLARING NECESSARY
THE VRU COMPRE _OR
UNTIL THE MAINTENANCE AND
BEING DOWN FO
INSPECTION COULD BE
E
124250
1330000005
5/22/2014
0:00:00
23:59:00
5/23/2014
p
706
SCHEDULED
COMPLETED AND THE
MAINTENANCE DAN
COMPRESSOR BROUGHT BACK
3087
Vh �C� �c�v I1°cl 5i�
r—�5 �Gt ✓
f v ✓ b l'✓t C
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
1330000005
2. Facility Name
Anna Platform
3. Field
Granite Point
4. Operator
Hilcorp Alaska LLC
5. Month/Year of Disposition
I June -14
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
MIDDLE KENAI OIL 280150 100.00%
8. Flared or vented 1 hour or less
176
9. Flared or vented more than 1 hour (see instr.)
53
10. Pilot and Purge
1126
11. Assist Gas
0
12. Fuel gas used in lease operations.
21499
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
-j
MCF
14. TOTAL VOLUME (ITEMS 6-13)
22854
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
29
Waste:
MCF
17. Transferred from:
0
4A—! -J -/(C'J/
Commissioner Date
18. Transferred to: (Express as a negative #)
(2921)
19. Remarks: Purchased Gas: 29
Tranferred From: 0
Transferred To: Bruce Platform & Granite Point Tank Farm (COV's ani (2921)
Fuel used by Drilling Rig (Purchased and Prod): 0
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature `-'""' Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 Asia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Leanne Protz Phone 713-757-5211 Date 7/19/2014
Form
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
'7
lune -14
53
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
SHUTDOWN OF THE#2
UNTIL SEALS COULD BE
BINGHAM PUMP DRIVE
REPLACED.
6/1/2014
124250
1330000005
6/19/2014
1:30:00
18:30:00
6/19/2014
U
53
FOR UNSCHEDULED
MAINTENANCE TO
REPLACE THE INBOARD
53
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
CArn 1Tv RGPnRT nF PRODUCED GAS DISPOSITION
AUG 2 2 2014
AOGCC
1. Facility Number 2. Facility Name
1330000005 Anna Platform
Disposition
3. Field
Granite Point
Volume MCF
4. Operator 5. Month/Year of Disposition
Hilcorp Alaska LLC I July -14
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
MIDDLE KENAI OIL 280150 100.00%
7. Reinjected
0
8. Flared or vented 1 hour or less -
29
9. Flared or vented more than 1 hour (see insir.)
274
10. Pilot and Purge
1093
11. Assist Gas
0
12. Fuel gas used in lease operations.
21797
Official Use Only
13. Other (see instructions)
0
Authorization >1 hr:
Safety
%'a ✓�
MCF
14. TOTAL VOLUME (ITEMS 6.13)
23193
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
� �- I
MCF
16. Purchased gas
464
Waste:
MCF
t�-•�` 1 T ��
Commissioner Date
17. Transferred from:
0
18. Transferred to: (Express as a negative #)
(4---
19, Remarks: Purchased Gas: 464
Tranferred From: 0
Transferred To: Bruce Platform & Granite Point Tank Farm (COV's an, (4283)
Fuel used by Drilling Rig (Purchased and Prod): 0
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature '=""'`' Title Production AnalVst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Leanne Protz Phone 713-757-5211 Date 8/20/2014
Fnrm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
VLr-
WQ114
11LP
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
rnr-u rry D=DnPT nP aRnnucEn GAS DISPOSITION
AUG 2 2 2014
A0GGG
1. Facility Number 2. Facility Name
1330000007 Bruce Platform
Disposition
3. Field
Granite Point
Volume MCF
4. Operator 5. Month/Year of Disposition
Hilcorp Alaska LLC I July -14
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
MIDDLE KENAI OIL 280150 100.00%
7. Reinjected
°
UNDEFINED GAS 280500
B. Flared or vented 1 hour or less
152
9. Flared or vented more than 1 hour (see instr.)
550
10. Pilot and Purge
703
11. Assist Gas
0
12. Fuel gas used in lease operations.
11924
Official Use Only
13. Other (see instructions)
Authorization >1 hr:
14. TOTAL VOLUME (ITEMS 8.13)
110,5,
Lease Use15.
aMCFSafety
NGL Gas Equivalent
Conservation16.
Purchased gas
Waste:
Commissioner Date
17. Transferred from:
44
18. Transferred to: (Express as a negative #)
(1130)
19. Remarks: Purchased Gas: 35
Tmnferred From: Anna Platform 44
Transferred To: Granite Point Tank Farm (COV's and prod gas) (1130)
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
//�
�. /
Signature—ZI-2'�" Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Leanne Protz Phone 713-757-5211 Date 8/20/2014
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
v4F
914//1
AUG 2 2 2014
STATE OF ALASKA AOGCC
ALASKA OIL AND GAS CONSERVATION COMMISSION
rmmf%ni ir%cn r.ec nISPOSITION
RMno INSTRUCTIONS ON REVERSE SIDE
"L -F,
f14fK
AOGCC Excess Flare Report
Month: July Year: 2014
MECEIVE®
AUG 22 2�2a014
AOGCC
Excess flaring neressary until the pipeline could be repairetl
Excess flaring tlue m valve work on the pipeline
between Arm, Bruce and Granite point Tank
Operational
Other: See Description
Pipeline Maintenance.
and flow could be restarted.
]/6/148:00
]/]/1423:00
135.0
Y Farm.
Excess flaring necessary until wells could be completely
Excess flaring due to bleeding of shut in wells
Operational
Other: See Description
Well Malmenance.
bleed out and brought back under normal conditions.
]/22/140:00
]/23/1419:15
79.0
Y annulus for no flow tests.
Excess flaring necessary until No Flow Test could be
Excess flaring due to blow down of Well 50 for no
Operational
Blow Down Well
Well Maintenance.
completed and well brought back under normal conditions.
]/29/1414:00
]/29/1423:59
26.0
Y flow test.
Excess flaring necessary until Na Flow Test could be
6cessfWringduetoblowdownof Wells]and50
Operational
Blow Down Well
Well Maintenance,
completed and wells brought back under normal conditions.
]/30/14]:00
]/30/1415:00
18.0
y for no Bow test.
Excess flaring necessary until No Flow Test could be
Excess flaring due to blow down of Wells], 23,
Operational
Blow ownwall
Well Maintenance.
completed and wells brought back under normal conditions
]/31/140:00
]/31/1420:00
16.0
Y and 50 for no flow test.
Total >1 Hour:
274.0
BRUCE PLATFORM
Excess flaring necessary until liquids unloading could be
Excess flaring due to blow dowoof Wells GP -land
Operational
Blow Down Well
Well Maintenance.
ntl well work wasfnishetl.
completed an-
]/5/1419:00
]/5/1423:59
52.0
Y GP -2 for coming no flaw test s.
.1
Excess flaring necessary until the pipeline could be repaired
Excess flaring due m valve work on the pipeline
between Anna. Bruce and Granite Paint Tank
Bruce
Operational
Other: See Description
Pipeline Main,a' a.
and flow could be restarted.
]/6/140:01
]/]/1419:00
ggg,p
y
Total >3 Hour:
550.0
GRANITE POINT PLATFORM
Excess flaring necessary until No Flow Test could be
•
Excess Flaring due to bleeding of Well 31-14 for no
Operational
Blow Down Well
Well Maintenance.
completed and well brought back under normal conditions
]/2/149:00
]/3/1423:00
73.0
Y flowtesting.
Excess flaring necessary until the well injection rate could
Exss flarindue m well heading on multiple
ceg
Operational
Well Spikes
Well Maintenance.
be adjusted.
3fi.0
N wells and multiple start ups and shutdowns of
]/10/140:30
]/10/14930
Generator q2.
Excess flaring necessary until well injection rate could
Excess flaring due to well heading on multiple
multiple shutdowns of
Operational
Well Spikes
Well Maintenance.
st
be adjusted.
]/11/1412:31
]/11/1415:32
20.0
N wells and
nertorups
#2.
Generator g2.
Excess flaring necessary until liquids unloading could be
Excessflaring dueto blow down of Well 32-13
Operational
Blow Down Well
Well Maintenance.
completed and well work was finished.
]/25/14]:30
]/25/1410:50
222.0
Y aker coil Lubin work.
Total >1 Hour:
351.0
SWANSON RIVER UNIT
Excess venting necessary until the compressor cooled an,
Now
Exttssvenlingduammght: lemn.nerhutdown
gent
Other See Description
Compressor Restart.
restarted.
]/2V1q 36:15
]/21/1418:30
8.2
N of Com rex!:
Excess venting necessary until the comprersorcooled ani
Excess Venting due m high temperature shutdown
gent
Other: See Description
Compressor Restart.
restarted.
]/22/1414:30
]/22/1416:30
].3
N of Compressor% -22.
Tnml n Hour:
15.4
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
RECEIVED
SEP 19 2014
AOGCC
1. Facility Number
1330000005
2. FacilityName
Anna Platform
3. Field
Granite Point
4. Operator
Hilcorp Alaska LLC
5. MonthNear of Disposition
I August -14
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
MIDDLE KENAI OIL 280150 100.00%
8. Flared or vented 1 hour or less
480
9. Flared or vented more than 1 hour (see instr.)
243
10. Pilot and Purge
1165
11. Assist Gas
0
12. Fuel gas used in lease operations.
19165
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
Z ¢ 3
MCF
14. TOTAL VOLUME (ITEMS 6-13)
21053
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
907
Waste:
MCF
17. Transferred from:
0
Commissioner Date
18. Transferred to: (Express as a negative #)
(2195)
19. Remarks: Purchased Gas: 907
Tranferred From: 0
Transferred To: Bruce Platform & Granite Point Tank Farm (COV's an, (2195)
Fuel used by Drilling Rig (Purchased and Prod): 0
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ^"''-' `" Title Production Analvst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
Printed Name Leanne Protz Phone 713-757-5211 Date 9/18/2014
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
v�—
/b/�(14
.s.
kRFFI
RECEIVE®
SEP 19 2014
243
GC�
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
BLOWDOWN OF WELL 23
UNTIL NO -FLOW TEST COULD BE
30000005
8/1/2014
0:01:00
11:00:00
8/1/2014
P
6
FOR NO -FLOW TESTING.
COMPLETED AND WELL
78/l/2014124250
BROUGHT BACK TO NORMAL
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
BLOW DOWN OF WELL #11
UNTIL NO -FLOW TEST COULD BE
30000005
8/3/2014
14:30:00
17:00:00
8/6/2014
P
93
FOR NO -FLOW TESTING.
COMPLETED AND WELL
BROUGHT BACK UNDER NORMAL
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
BLEEDING OF WELL 4 AND
UNTIL NO -FLOW TEST
8/1/2014
124250
1330000005
8/10/2014
0:01:00
23:59:00
8/10/2014
P
5
WELL 35 FOR NO -FLOW
COMPLETED AND WELLS
TESTING.
BROUGHT BACK TO NORMAL
EXCESS FLARING DUE TO
EXCESS FLARING DUE TO A
A DECREASED USE OF
DECREASED USE OF FUEL GAS
FUEL GAS BECAUSE OF
BECAUSE OF UNSCHEDULED
8/1/2014
124250
1330000005
8/17/2014
0:01:00
23:59:00
8/17/2014
U
139
UNSCHEDULED
SHUTDOWN OF#1 BINGHAM TO
SHUTDOWN OF #1
TAKE TK#3 OUT OF SERVICE.
BINGHAM TO TAKE TK#3
243
GC�
RECEIVED
STATE OF ALASKA OCT 2 1 2014
ALASKA OIL AND GAS CONSERVATION COMMISSION AOGCC
r A /%ll iry o00n01T r%M Dprnni irFn rAR DISPOSITION
Form 10-422 Rev. 512009
INSTRUCTIONS ON REVERSE SIDE SUDmIL in uuynca,c
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
RECEIVED
NOV 18 2.014
1. Facility Number
1330000005
2. Facility Name
Anna Platform
3. Field
Granite Point
4. Operator
Rilcorp Alaska LLC
5. Month/Year of Disposition
October -14
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
MIDDLE KENAI OIL 280150 100.00%
8. Flared or vented 1 hour or less
128
9. Flared or vented more than 1 hour (see instr.)
84
10. Pilot and Purge
1078
11. Assist Gas
0
12. Fuel gas used in lease operations.
22300
13. Other (see instructions)
0
Official Use Only
Authorization >1 hr.
Safely
/ 2 g
MCF
14. TOTAL VOLUME (ITEMS 6.13)
23590
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
127
Waste:
MCF
17. Transferred from:
0
n
-2s
Y1 -2-15--
Commissioner Date
18. Transferred to: (Express as a negative #)
(3940)
19. Remarks: Purchased Gas: 127
Tranferred From: 0
Transferred To: Bruce Platform & Granite Point Tank Farm (COV's an. (3940)
Fuel used by Drilling Rig (Purchased and Prod): 48
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature /""""�'•� Title Production Analyst to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Leanne Watkins Phone 713-757-5211 Date 11/17/2014 AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
VTI -
/41111¢
Anna Platform
October -14
RECEIVED
NOV 18 2014
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
FIREWATER KNOCKOUT
UNTIL PCV COULD BE REPLACED.
10/1/2014
124250
1.33E+09
1012612014
0:00:00
23:59:00
10/27/2014
U
84.0
PCV LEAK WHICH CAUSED
EXCESS GAS TO FLARE.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
RECEIVED
DEC 24 2014
AOGCC
1. Facility Number
1330000005
2. Facility Name
Anna Platform
3. Field
Granite Point
4. Operator
Hilcorp Alaska LLC
5. Month/Year of Disposition
November -14
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
MIDDLE KENAI OIL 280150 100.00%
8. Flared or vented 1 hour or less
192
9. Flared or vented more than 1 hour (see instr.)
290
10. Pilotand Purge
965
11. Assist Gas
0
12. Fuel gas used in lease operations.
21551
13. Other (see instructions)
0
Official Use Only
Authorization>1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-13)
22998
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
141
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #)
(4915)
Commissioner Date
19. Remarks: Purchased Gas: 141
Tranferred From: 0
Transferred To: Bruce Platform & Granite Point Tank Farm (COV's ani (4915)
Fuel used by Drilling Rig (Purchased and Prod): 39
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
12"Note: All volumes must be corrected
Signature Title Production Analyst to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Leanne Watkins Phone 713-757-5211 Date 12/19/2014 AAC25.235.
Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
✓Tr-
I/fl/Is
Anna Platform
November -14
290.0
E C E if E®
DEE 2 4 7.014
AOGCC
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
SHUTDOWN OF THE VRU
UNTIL THE MAINTENANCE
11/1/2014
124250
1.33E+09
11/5/2014
9:15:00
11:15:00
11/5/2014
P
98
FOR SCHEDULED
COULD BE COMPLETED AND THE
MAINTENANCE TO
VRU STARTED BACK UP.
CHANGE THE LUBE OIL
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
LEAKING FROM THE FWKO
UNTIL VALVE COULD BE FOUND
11/1/2014
124250
1.33E+09
11/8/2014
0:01:00
23:59:00
11/8/2014
U
43
PSV CAUSED BY
AND PROPERLY SEATED. PLAN
UNSEATED PRESSURE
Rri FASF VAI VF
TO REPLACE THE PSV.
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
UNSCHEDULED
UNTIL #2 BINGHAM COULD BE
SHUTDOWN OF THE #2
BROUGHT BACK ONLINE.
11/1/2014
124250
1.33E+09
11/10/2014
0:00:00
13:30:00
11/10/2014
U
34
BINGHAM WHICH CAUSE
THE UNUSED GAS TO
BACK UP AND GO TO
1PI Apr
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
SCHEDULED SHUTDOWN
UNTIL THE INSPECTION ON THE
11/1/2014
124250
1.33E+09
11/20/2014
2:00:00
15:45:00
11/20/2014
P
14
OF #2 BINGHAM
#2 BINGHAM COULD BE
COMPRESSOR FOR 4000
COMPLETED AND COMPRESSOR
HOUR INSPECTION.
BROUGHT BACK ONLINE.
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
SCHEDULED SHUTDOWN
UNTIL INSPECTION OF THE #1
11/1/2014
124250
1.33E+09
11/21/2014
2:15:00
13:15:00
11/21/2014
P
80
OF#1BINGHAM
BINGHMA COULD BE
COMPRESSOR FOR 4000
COMPLETED AND COMPRESSOR
HOUR INSPECTION.
BROUGHT BACK ONLINE.
EXCESS FLARING DUE TO
EXCESS FLARING NECESSARY
BACK PRESSURE VALVE
UNTIL LEAK COULD BE
11/1/2014
124250
1.33E+09
11/29/2014
0:01:00
23:59:00
11/29/2014
U
21
LEAKS FROM FWKO
REPAIRED AND FWKO BROUGHT
AFTER PRODUCTION
BACK ONLINE.
290.0
E C E if E®
DEE 2 4 7.014
AOGCC
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
1330000005
2. Facility Name
Anna Platform
3. Field
Granite Point
4. Operator
Hilcorp Alaska LLC
5. Month/Year of Disposition
December -14
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name Pool Code Percent
7. Reinjected
0
MIDDLE KENAI OIL 280150 100.00%
8. Flared or vented 1 hour or less
4
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
918
11. Assist Gas
0
12. Fuel gas used in lease operations.
21142
13. Other (see instructions)
0
Official Use Only
authorization >7 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-13)
22064
Lease Use
MCF
15. NGL Gas Equivalent
0
Conservation
MCF
16. Purchased gas
56
Waste:
MCF
17. Transferred from:
0
18. Transferred to: (Express as a negative #)
(5126)
Commissioner Date
19. Remarks: Purchased Gas: 56
Tranferred From: 0
Transferred To: Bruce Platform & Granite Point Tank Farm (COV's ani (5126)
Fuel used by Drilling Rig (Purchased and Prod): 11
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature ,rCQ/1L12G a Title Production Analyst to pressure of 14.65 psis and t0 a
temperature of 60o F Authority 20
Printed Name Leanne Watkins Phone 713-757-5211 Date 1/16/2015 AAC25.235.