Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutGP Bruce Platform - Hilcorp Alaska, LLCState of Alaska AOGCC Gas Disposition Files Year: 2017 Facility: GP Bruce Platform Operator: Hilcorp Alaska LLC   STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number2. 1330000007 Facility Name Bmce Platform 3. Field Granite Point 4. Operator I Hilcorp Alaska LLC 5. Month/Year of Disposition I January -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 87.86% UNDEFINED GAS 280500 12.14% 8. Flared or vented 1 hour or less 45 9. Flared or vented more than 1 hour (see instr.) 1373 10. Pilot and Purge 741 11. Assist Gas 0 12. Fuel gas used in lease operations. 13907 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety22 l37J MCFVTL —7-'// 14. TOTAL VOLUME (ITEMS 6.13) 16066 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 188 Waste: MCF 17. Transferred from: / `Date 18. Transferred to: (Express as a negative #) (721) Commissioner 19. Remarks: Purchased Gas: 188 Tranferred From: Anna Platform 0 Transferred To: Granite Point Tank Farm (COV's and prod gas) (721) 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature2G Title Production Analyst to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Leanne Watkins Phone 713-757-5211 Date 2/20/2017 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate AOGCC Excess Flare Report January -2017 BRUCE PLATFORM - EXPENSE "-. FacilityNo Date Flared Start Time Ending - o Time End Date Planned MCF Description of F ent Action Taken to Minimize Volume 1/1/2017 124250 1330000007 1/3/2017 000.00 1:05.00 1/3/2017 U 38 VRU'S DOWN 6 HOURS. TANKS LOW REMOVING MAKE UP PIPING TO CHECK FOR PRESSURED. MIGHT BE AN OBSTRUCTION IN OBSTRUCTIONS EXCESS FLARING DUE TO SHUTDOWN OF EXCESS FLARING NECESSARY UNTIL 1/1/2017 124250 1330000007 1/4/2017 14:00:00 19:00:00 1/4/2017 P 232 VRU COMPRESSOR FOR REPAIRS INCLUDING REPAIRS COMPLETE AND COMPRESSORS REPLACEMENT OF BOTH TANK AND FWKO RESTARTED. 1/1/2017 124250 1330000007 1/5/2017 0:00:00 1:05:00 1/5/2017 P 125 VRU'S DOWN 10 HRS. MAKE UP LINE IS REMOVING MAKE UP LINE AND CLEANING _ CLOGGING OFF WITH SULFUR OUT DEPOSIT 1/1/2017 124250 1330000007 1/6/2017 0:00:00 1:05:00 1/6/2017 P 154 VRU'S DOWN 15 HRS. MAKE UP LINE IS REMOVED MAKE UP LINE AND CLEANED OUT CLOGGING OFF WITH SULFUR MASSOLEAN AND CHECK VALVES BROUGHT ON 9-86. FLOWING THROUGH TEST EXCESS FLARING NECESSARY UNTIL WELL IS 1/12017 124250 1330000007 1/23/2017 0:00:00 1:05:00 1/23/2017 P 37'. SEPARATOR TO FLARE BROUGHT TO NORMAL AND PUT IN SERVICE. EXCESS FLARING DUE TO WELL 9-86 BEING EXCESS FLARING NECESSARY UNTIL WELL IS 1/1/2017 124250 1330000007 1/242017 0:00:00 17:59:00 1272017 P 768 BROUGHT ONLINE CAUSING FLOW THROUGH BROUGHT TO NORMAL AND PUT IN SERVICE. THE TEST SEPARATOR TO FLARE. EXCESS FLARING DUE TO WELL 9-86 BEING EXCESS FLARING NECESSARY UNTIL WELL IS 1/12017 124250 1330000007 128/2017 18:00:00 23:59:00 128/2017 P 6 BROUGHT ONLINE CAUSING FLOW THROUGH BROUGHT TO NORMAL AND PUT IN SERVICE. THE TEST SEPARATOR TO FLARE. EXCESS FLARING DUE TO WELL 9-86 BEING EXCESS FLARING NECESSARY UNTIL WELL IS 1/12017 124250 1330000007 1/29/2017 0:00:00 23:59:00 1/292017 P 13.. BROUGHT ONLINE CAUSING FLOW THROUGH BROUGHT TO NORMAL AND PUT IN SERVICE. _ THE TEST SEPARATOR TO FLARE. 1,373 Link, Liz M (DOA) From: Loepp, Victoria T (DOA) Sent: Thursday, January 26, 2017 10:44 AM To: AOGCC Reporting (DOA sponsored) Subject: FW: Bruce Platform Flaring (PTD 193-062) From: Schwartz, Guy L (DOA) Sent: Wednesday, January 25, 2017 4:34 PM To: Dan Marlowe <dmarlowe@hilcorp.com> Cc: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov>; Drew Anderson <ananderson@hilcorp.com>; Larry Greenstein <Ig re e n ste i n@ h i l c o r p. co m> Subject: RE: Bruce Platform Flaring (PTD 193-062) Dan, You have approval to flare up to 500 mscf/d for 2 weeks as requested below for well testing and reservoir evaluation. Good luck with this project... Regards, Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Guy Schwartz at (907-793-1226 ) or (Guv.schwartz@alaska aov). From: Dan Marlowe [mailto:dmarlowe@hilcorp.com) Sent: Wednesday, January 25, 2017 4:19 PM To: Schwartz, Guy L (DOA) <guy.schwartz@alaska.gov> Cc: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov>; Drew Anderson <ananderson@hilcorp.com>; Larry Greenstein <Igreenstein(c@ hilcorp.com> Subject: RE: Bruce Platform Flaring I am always happy to help sir! Granite Point State 17586-9 (Bruce 09-86) gas well has been shut-in since September 2006 due to a plugged downhole choke that was installed to control hydrates. We had coil on the platform to service our injection well so took advantage of the opportunity to conduct a CTCO on this well under Sundry 316-595 and had encouraging results. We are planning this testing to quantify and monetize these results. In order to do this we need to define reservoir size and surface facility economics. Currently the GPF field including the onshore facility is net negative for fuel gas requiring us to purchase from CIGGS, so at a minimum we would like to balance that equation. Opportunities 1. Flow up to 200 mcfd to supply Anna & Bruce side of the onshore facility 2. Flow up to 400 mcfd to supply item #1 and the GPP side of the onshore facility and GPP platform 3. Develop additional gas producers within GPF and flow >400 mcfd to supply items #1 & #2 and sell gas into the CIGGS system Let me know if you need any further detail Dan Marlowe Hilcorp Alaska, LLC Operations Engineer Office 907-283-1329 Cell 907-398-9904 Fax 907-283-1315 Email DMarlowephilcorp.com Hilcorp A Company Built on Energy From: Schwartz, Guy L (DOA) [mailto:guy.schwartz@alaska.govl Sent: January 25, 2017 3:52 PM To: Dan Marlowe <dmarlowe@hilcoro.com> Cc: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov>; Drew Anderson <ananderson(c@hilcorp.com> Subject: FW: Bruce Platform Flaring Dan, Can you elaborate on the purpose of the flowtest and recent well history as we discussed over the phone? This will help document the justification for flow testing and flaring for our records. I did not connect this work right away to the recent Coil Tubing FCO............ Thanks, Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Guy Schwartz at (907-7931226) or (Guy.schwartz@alaska aovl. From: Loepp, Victoria T (DOA) Sent: Wednesday, January 25, 2017 3:39 PM To: Schwartz, Guy L (DOA) <guy.schwartz@alaska.gov> Subject: FW: Bruce Platform Flaring From: Drew Anderson [mailto:ananderson@hilcorp.com) Sent: Wednesday, January 25, 2017 3:24 PM To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.aov> Subject: Bruce Platform Flaring Victoria, We began testing Well Br 09-86 on the Bruce Platform on 1/23 and plan to test this well for 14 days while flaring up to 500 mcf/d. We are flaring because we only have "200-250 mcfd capacity in the production system right now and need to both design and evaluate the economics of adding facilities to increase this capacity. The results of the well testing will provide us information we need to design the necessary piping, monitoring systems, dehydration, and compression to get it to the market. Our plan to minimize the amount of flaring necessary is to accelerate testing as much as possible and then chock back the well to our current capacity constraints. Can you please approve this flaring? Contact me at your convenience if you require additional information. Thank you, Drew Drew Anderson, PE PMP I Environmental Specialist =NHilcorp Alaska, LLC anandmon@bilcorp.com P (907)777-8488 1 F (907)777-8560 1 M (907)382-0987 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000007 2. Facility Name Bruce Platform 3. Field Granite Point 4. Operator • Hilcorp Alaska LLC 5. Month/Year of Disposition February -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 86.69% UNDEFINED GAS 280500 13.31% 8. Flared or vented 1 hour or less 1 9. Flared or vented more than 1 hour (see instr.) 273 10. Pilot and Purge 481 11. Assist Gas 0 12. Fuel gas used in lease operations. 12602 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety 7 �- MCF 14. TOTAL VOLUME (ITEMS 6-13) 13357 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 190 Waste: MCF 17. Transferred from: _ Commissioner Date 18. Transferred to: (Express as a negative #) (1126) 19. Remarks: Purchased Gas: 190 Tranferred From: Anna Platform 0 Transferred To: Granite Point Tank Farm (COV's and prod gas) (1126) 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature io�rrss C�� /,7Gim Title Production Analyst to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Leanne Watkins Phone 713-757-5211 Date 3/14/2017 AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate D AOGCC Excess Flare Report February -2017 BRUCE PLATFORM - EXPENSE Date Ending . RptDate OpNo Facility No Flared Start Time Time End Date Planned MCF' Description of Flaring Event Action Taken to Minimize Volume EXCESS FLARING DUE TO SHUTDOWN OF EXCESS FLARING NECESSARY UNTIL 2/1/2017 124250 1330000007 2/15/2017 0:00:00 13-0000 2/15/2017 Y 273 GAS COMPRESSOR AND VRU FOR 13 SCHEDULED MAINTENANCE IS COMPLETE HOURS FOR MAINTENANCE. AND COMPRESSORS ARE RESTARTED 273 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000007 2. Facility Name Bruce Platform 3. Field Granite Point 4. Operator I Hilcorp Alaska LLC 5. MonthNear of Disposition I March -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 95.84% 0 UNDEFINED GAS 280500 4.16/0 8. Flared or vented 1 hour or less 20 9. Flared or vented more than 1 hour (see instr.) 426 10. Pilot and Purge 613 11. Assist Gas 0 12. Fuel gas used in lease operations. 14248 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6.13) 15307 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation La-Z � MCF VT 2 -5/. 16. Purchased gas 161 Waste: MCF 17. Transferred from: 18. Transferred to: (Express as a negative #) (3860) Commissioner Date 19. Remarks: Purchased Gas: 161 Tranferred From: Anna Platform 0 Transferred To: Granite Point Tank Farm (COV's and prod gas) (3860) 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature v.GCQ/1Y126 Title Production Analyst to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Leanne Watkins Phone 713-757-5211 Date 4/20/2017 AAC25.235. Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate AOGCC Excess Flare Report March -2017 BRUCE PLATFORM - EXPENSE EXCESS FLARING DUE TO PRELIMINARY WELL EXCESS FLARING NECESSARY UNTIL WELL 3/1/2017 124250 1330000007 3/15/2017 9:00:00 12:00:00 3/18/2017 P 425 TESTING OF WELL 9-86. TESTING COMPLETE. EXCESS FLARING DUE TO PRODUCTION OF EXCESS FLARING NECESSARY FOR SAFE 3/1/2017 124250 1330000007 3/24/2017 14:00:00 23:59:00 3/24/2017 P 2 WELL 9-86. ONLOADING OF WELL 9-86. 426 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000007 2. Facility Name Bruce Platform 3. Field Granite Point 4. Operator Hilcorp Alaska LLC 5. Month/Year of Disposition April -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold p Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 65.84% UNDEFINED GAS 280500 34.16% 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 514 10. Pilot and Purge 810 11. Assist Gas 0 12. Fuel gas used in lease operations. 7834 13. Other (see instructions) 0 Official Use Only Authorization>1 hr. Safety MCFV rL, (a 1.51) 14. TOTAL VOLUME (ITEMS 6-13) 9158 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas p Waste: MCF 17. Transferred from: G Z 7 17 18. Transferred to: (Express as a negative #) (6288) Commissioner Date 19. Remarks: Purchased Gas: 0 Tranferred From: Anna Platform 0 Transferred To: Granite Point Tank Farm (COV's and prod gas) (6288) 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature t6 �� Title Production Analvst to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Leanne Watkins Phone 713-757-5211 Date 5/19/2017 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate AOGCC Excess Flare Report April -2017 BRUCE PLATFORM - EXPENSE RptDate OpNo ..Ending FacilityNo Date Flared Start Time Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volume - AC GENERATOR DOWN FOR MAINTENANCE. MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/1/2017 0:00:00 2:00:00 4/1/2017 P 67 4000H 4/1/2017 124250 1330000007 4/2/2017 0:00:00 1:30:00 4/2/2017 P 26 EXCESS GAS FROM 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/3/2017 0:00:00 1:30:00 4/3/2017 P 10 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/4/2017 0:00:00 1:30:00 4/4/2017 P 13 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/5/2017 0:00:00 1:30:00 4/5/2017 P 22 EXCESS GAS OFF 9-86 MONITOR PRESSURE AND RATE 4/1/2017 124250 1330000007 4/6/2017 0:00:00 1:30:00 4/6/2017 P 5 EXCESS GAS OFF 9-86 MONITOR PRESSURE AND RATE 4/1/2017 124250 1330000007 41//2017 0:00:00 1:30:00 4/7/2017 P 10 EXCESS GAS OFF 9-86 MONITOR PRESSURE AND RATE 4/1/2017 124250 1330000007 4/8/2017 0:00:00 1:30:00 4/8/2017 P 11 EXCESS GAS OFF 9-86 MONITOR PRESSURE AND RATE 4/1/2017 124250 1330000007 4/9/2017 0:00:00 1:30:00 4/9/2017 P 10 EXCESS GAS OFF 9-86 MONITOR PRESSURE AND RATE 4/1/2017 124250 1330000007 4/10/2017 0:00:00 1:30:00 4/10/2017 P 8 EXCESS GAS OFF 9-86 MONITOR PRESSURE AND RATE 4/1/2017 124250 1330000007 4/11/2017 0:00:00 1:30:00 4/11/2017 P 8EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/12/2017 0:00:00 1:30:00 4/12/2017 P 9 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/13/2017 0:00:00 1:30:00 4/1312017 P 1g EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/14/2017 0:00:00 1:30:00 4/14/2017 P 11 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/15/2017 0:00:00 1:30:00 4/15/2017 P 10 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/16/2017 0:00:00 1:30:00 4/16/2017 P 4 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/17/2017 0:00:00 1:30:00 4/17/2017 P 5 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/18/2017 0:00:00 1:30:00 4/18/2017 P 8 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/19/2017 0:00:00 1:30:00 4/19/2017 P 18 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/20/2017 0:00:00 1:30:00 4/20/2017 P 18 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/21/2017 0:00:00 1:30:00 4/21/2017 P 23 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/22/2017 0:00:00 1:30:00 4/22/2017 P 19 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/23/2017 0:00:00 1:30:00 4/23/2017 P 24 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/24/2017 0:00:00 1:30:00 4/24/2017 P 19 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/25/2017 0:00:00 1:30:00 4/25/2017 P 22 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/26/2017 0:00:00 1:30:00 4/26/2017 P 30 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/27/2017 0:00:00 1:30:00 4/27/2017 P 25 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/28/2017 0:00:00 1:30:00 4/28/2017 P 20 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/29/2017 0:00:00 1:30:00 4/29/2017 P 26 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 4/1/2017 124250 1330000007 4/30/2017 0:00:00 1:30:00 4/30/2017 P 22 EXCESS GAS OFF 9-86 MONITOR EQUIPMENT 513 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000007 2. Facility Name Bruce Platform 3. Field Granite Point 4. Operator Hilcorp Alaska LLC 5. MonthNear of Disposition May -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 75.18% UNDEFINED GAS 280500 24.82% 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 108,5 10. Pilot and Purge 819 11. Assist Gas 0 12. Fuel gas used in lease operations. 12132 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety / Q 8 MCF VT -L-- ' 14. TOTAL VOLUME (ITEMS 6-13) 14036 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 39 Waste: MCF 17. Transferred from: P -7 , -� _ ! 18. Transferred to: (Express as a negative #) (3983) Commissioner Date 19. Remarks: Purchased Gas: 39 Tranferred From: Anna Platform 0 Transferred To: Granite Point Tank Farm (COV's and prod gas) (3983) 1 hereby certify that the foregoing is�/tjrue and correct to the best of my knowledge. volumes must Signature C`t/�Lr(a •', ejzle Title Production Analyst Neto pressure of 14.65 pslh'a and to aed temperature of 60o F. Authority 20 Printed Name Olivia Hunte Phone 713-289-2979 Date 6/19/2017 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate AOGCC Excess Flare Report May -2017 BRUCE PLATFORM - EXPENSE M Date Ending pNo Facility No Flared Start Time Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volume EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE 5/1/2017 124250 1330000007 5/1/2017 0:00:00 1:30:00 5/1/2017 Y 15 FROM WELL 9-86. WELL OPERATION. EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE 5/1/2017 124250 1330000007 5/2/2017 0:00:00 1:30:00 5/2/2017 Y 29 FROM WELL 9-86. WELL OPERATION. 5/1/2017 124250 1330000007 5/3/2017 0:00:00 2:00:00 5/3/2017 Y 39 EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE FROM WELL 9-86. WELL OPERATION. 5/1/2017 124250 1330000007 5/4/2017 0:00:00 1:30:00 5/4/2017 Y 23 EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE FROM WELL 9-86. WELL OPERATION. 5/1/2017 124250 1330000007 5/5/2017 0:00:00 1:30:00 5/5/2017 Y Y4 EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE OFF WELL 9-86. WELL OPERATION. 5/1/2017 124250 1330000007 5/6/2017 0:00:00 1:30:00 5/6/2017 Y 19 EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE OFF WELL 9-86. WELL OPERATION. 5/1/2017 124250 1330000007 5/7/2017 0:00:00 1:30:00 5/7/2017 Y 21 EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE FROM WELL 9-86. WELL OPERATION. 5/1/2017 124250 1330000007 5/8/2017 0:00:00 1:30:00 5/8/2017 Y 25 EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE FROM WELL 9-86. WELL OPERATION. 5/1/2017 124250 1330000007 5/9/2017 00000 1:3000 5/9/2017 Y 19 EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE FROM WELL 9-86. WELL OPERATION. 5/1/2017 124250 1330000007 5/10/2017 0:00:00 1:30:00 5/10/2017 Y 24 EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE FROM WELL 9-86. WELL OPERATION. 5/1/2017 124250 1330000007 5/11/2017 0:00:00 1:30:00 5/11/2017 Y 25 EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE FROM WELL 9-86. WELL OPERATION. 5/1/2017 124250 1330000007 5/12/2017 0:00:00 1:30:00 5/12/2017 Y 22 EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE FROM WELL 9-86. WELL OPERATION. 5/1/2017 124250 1330000007 5/13/2017 0:00:00 1:30:00 5/13/2017 Y 17 EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE FROM WELL 9-86. WELL OPERATION. 5/1/2017 124250 1330000007 5/14/2017 0:00:00 1:30:00 5/14/2017 Y 23 EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE FROM WELL 9-86. WELL OPERATION. 5/1/2017 124250 1330000007 5/15/2017 0:00:00 1:30:00 5/15/2017 Y 26 EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE FROM WELL 9-86. WELL OPERATION. 5/1/2017 124250 1330000007 5/16/2017 0:00:00 1:30:00 5/16/2017 Y 23 EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE FROM WELL 9-86. WELL OPERATION. EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE 5/1/2017 124250 1330000007 5/17/2017 8:00:00 23:30:00 5/17/2017 Y 264 FROM WELL 9-86 AND SHUT IN OF WELL OPERATION AND IS NECESSARY EQUIPMENT. UNTIL EQUIPMENT IS BROUGHT BACK ONLINE. EXCESS FLARING DUE TO EXCESS GAS EXCESS FLARING NECESSARY FOR SAFE 5/1/2017 124250 1330000007 5/18/2017 0:00:00 23:30:00 5/18/2017 Y 242 FROM WELL 9-86 AND EQUIPMENT SHUT- WELL OPERATION. IN. 5/1/2017 124250 1330000007 5/19/2017 0:00:00 1:30:00 5/19/2017 Y 15 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. WELL OPERATION. 5/1/2017 124250 1330000007 5/20/2017 0:00:00 1:30:00 5/20/2017 Y 24 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. WELL OPERATION. 1,085 AOGCC Excess Flare Report May -2017 BRUCE PLATFORM - EXPENSE Date Ending ' Wate OpNo Facility No Flared Start Time Time End Date Planned MC _^ Description_of Flaring Event coon Taken to Minimize Volume EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 5/1/2017 124250 1330000007 5/21/2017 0:00:001:30:00 5/21/2017 Y 33 UP OF PIPELINE. WELL OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 5/1/2017 124250 1330000007 5/23/2017 0:00:00 1:30:00 5/23/2017 Y 5 UP OF PIPELINE. WELL OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 5/1/2017 124250 1330000007 5/24/2017 0:00:00 1:30:00 5/24/2017 Y 5 UP OF PIPELINE. WELL OPERATION. CESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 5/1/2017 124250 1330000007 5/26/2017 0:00:00 1:30:00 5/26/2017 Y 6 UP OF PIPELINE. WELL OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 5/1/2017 124250 1330000007 5/27/2017 0:00:00 1:30:00 5/27/2017 Y 21 UP OF PIPELINE. WELL OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 5/1/2017 124250 1330000007 5/29/2017 0:00:00 1:30:00 5/29/2017 Y 12 UP OF PIPELINE. WELL OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 5/1/2017 124250 1330000007 5/30/2017 0:00:00 1:30:00 5/30/2017 Y 23 UP OF PIPELINE. WELL OPERATION. CESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 5/1/2017 124250 1330000007 5/31/2017 0:00:00 1:30:00 5/31/2017 Y 59 UP OF PIPELINE. WELL OPERATION. 1,085 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000007 2. Facility Name Bruce Platform 3. Field Granite Point 4. Operator Hilcorp Alaska LLC 5. MonthNear of Disposition I June -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 75.44% UNDEFINED GAS 280500 24.56% 8. Flared or vented 1 hour or less 332 9. Flared or vented more than 1 hour (see instr.) 718 10. Pilot and Purge 758 11. Assist Gas - 0 12. Fuel gas used in lease operations. 12569 13. Other (see instructions) 0 Official Use Only Authorization>1 hr: Safety 7-18 MCF 14. TOTAL VOLUME (ITEMS 6-13) 14377 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: / lP 18. Transferred to: (Express as a negative #) (3554 Commissioner Date 19. Remarks: Purchased Gas: 0 Tranferred From: Anna Platform 0 Transferred To: Granite Point Tank Farm (COV's and prod gas) (3554) I hereby certify that the foregoing istrueand correct �to the best of my knowledge. Ul[tia ._7ltrnle Note: All volumes must be corrected Signature - Title Production Analyst to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Olivia Hunte Phone 713-289-2979 Date 7/20/2017 AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate 10117114 RptDate 6/112017 6/1/2017 6/1/2017 6/1/2017 6/112017 6/1/2017 6/1/2017 6/1/2017 6/1/2017 6/1/2017 6/1/2017 6/1/2017 6/1/2017 6/1/2017 6/1/2017 AOGCC Excess Flare Report June -2017 BRUCE PLATFORM - EXPENSE MCF Description of Flaring Event Action Taken to Minimize Volume EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 130 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 76 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 91 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 46 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 20 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 16 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 18 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 0 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 51 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 60 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 34 UP OF PIPELINE. PIPELINE OPERATION. 26 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 41 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 53 UP OF PIPELINE. PIPELINE OPERATION. 54 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 718 Date Ending OpNo FacilityNo Flared Start Time Time End Date Planned 124250 1330000007 6/1/2017 00000 30000 6/1/2017 Y 124250 1330000007 6/2/2017 0:00:00 2:00:00 6/2/2017 Y 124250 1330000007 6/3/2017 0:00:00 2:00:00 6/3/2017 Y 124250 1330000007 6/4/2017 0:00:00 1:30:00 6/4/2017 Y 124250 1330000007 6/5/2017 000:00 2:30:00 6/5/2017 Y 124250 1330000007 6/6/2017 0:00:00 4:30:00 6/6/2017 Y 124250 1330000007 6/8/2017 0:00:00 2:30:00 6/8/2017 Y 124250 1330000007 6/10/2017 0:00:00 2:00:00 6/10/2017 Y 124250 1330000007 6/17/2017 10:00:00 12:00:00 6/17/2017 Y 124250 1330000007 6/18/2017 0:00:00 3:30:00 6/18/2017 Y 124250 1330000007 6/26/2017 0:00:00 2:00:00 6/26/2017 U 124250 1330000007 6/27/2017 0:00:00 3:00:00 6/27/2017 Y 124250 1330000007 6/28/2017 0:00:00 3:00:00 6/28/2017 Y 124250 1330000007 6/29/2017 0:00:00 2:30:00 6/29/2017 Y 124250 1330000007 6/30/2017 0:00:00 4:00:00 6/30/2017 Y MCF Description of Flaring Event Action Taken to Minimize Volume EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 130 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 76 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 91 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 46 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 20 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 16 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 18 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 0 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 51 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 60 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 34 UP OF PIPELINE. PIPELINE OPERATION. 26 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 41 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 53 UP OF PIPELINE. PIPELINE OPERATION. 54 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 718 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000007 2. Facility Name Bruce Platform 3. Field Granite Point 4. Operator Hilcorp Alaska LLC 5. Month/Year of Disposition July -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 79.64% UNDEFINED GAS 280500 20.36% 8. Flared or vented 1 hour or less 32 9. Flared or vented more than 1 hour (see instr.) 1290 10. Pilot and Purge 835 11. Assist Gas 0 12. Fuel gas used in lease operations. 13531 13. Other (see instructions) 0 Official Use Only Authorization>1 hr. Safety /2-0/0 MCF 14. TOTAL VOLUME (ITEMS 6.13) 15688 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 74 Commissioner Date 18. Transferred to: (Express as a negative #) (1244) 19. Remarks: Purchased Gas: 0 Tranferted From: Anna Platform 74 Transferred To: Granite Point Tank Farm (COV's and prod gas) (1244) 1 hereby certify that the foregoing is true and correct to the best of my knowledge. signature l4/�lff2 lL12fP Title Production Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Olivia Hunte Phone 713-289-2979 Date 8/18/2017 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate VTL t' r7-ll7- AOGCC Excess Flare Report July -2017 BRUCE PLATFORM - EXPENSE Date Ending RptDate OpNo FacilityNo Flared Start Time Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volume 7/1/2017 124250 1330000007 7/1/2017 1.00:00 3:30:00 7/1/2017 Y 46 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE _ UP OF PIPELINE. PIPELINE OPERATION. 7/1/2017 124250 1330000007 7/2/2017 3:00:00 14:00:00 7/2/2017 Y 61 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 7/1/2017 124250 1330000007 7/3/2017 10:30:00 16:00:00 7/3/2017 Y 69 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 7/1/2017 124250 1330000007, 7/4/2017 4.30.00 8:30:00 7/4/2017 Y 73 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 7/1/2017 124250 1330000007 7/5/2017 9:00:00 12:30:00 7/5/2017 Y 52 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO SHUTDOWN OF EXCESS FLARING NECESSARY UNTIL 7/1/2017 124250 1330000007 7/6/2017 8:00:00 16:00:00 7/6/2017 Y 166 THE GAS COMPRESSOR FOR TURBINE COMPRESSOR IS RESTARTED. WASH. EXCESS FLARING DUE TO THE EXCESS FLARING NECESSARY UNTIL THE 7/1/2017 124250 1330000007 7/7/2017 8:30:00 15:30:00 7/7/2017 Y 69 SHUTDOWN OF THE GAS COMPRESSOR COMPRESSOR IS RESTARTED. FOR TURBINE WASH. 7/1/2017 124250 1330000007 7/8/2017 15:00:00 20:00.00 7/8/2017 Y 45 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 7/1/2017 124250 1330000007 7/9/2017 6:00:00 15:30:00 7/9/2017 Y 79 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 7/1/2017 124250 1330000007 7/10/2017 9:00:00 16:00:00 7/10/2017 Y 54 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE _ UP OF PIPELINE. PIPELINE OPERATION. 7/1/2017 124250 1330000007 7/11/2017 3:00:00 10:00:00 7/11/2017 Y 33 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 7/1/2017 124250 1330000007 7/1212017 200000 23:30:00 7112/2017 Y 49 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 7/1/2017 124250 1330000007 7/13/2017 18:00:00 20:30:00 7/13/2017 Y 53 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 7/1/2017 124250 1330000007 7/14/2017 5:30:00 13:00:00 7/14/2017 Y 47 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO SHUTDOWN OF EXCESS FLARING NECESSARY UNTIL 7/1/2017 124250 1330000007 7/15/2017 5:00:00 17:00:00 7/15/2017 Y 85 THE AC GENERATOR FOR SCHEDULED SCHEDULED MAINTENANCE IS MAINTENANCE ON THE HRU. COMPLETED AND THE AC IS BROUGHT BACK ONLINE. 7/1/2017 124250 1330000007 7/16/2017 12:30:00 17:00:00 7/16/2017 Y 46 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 7/1/2017 124250 1330000007 7/17/2017 10:30:00 16:00:00 7/17/2017 Y 55 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 7/1/2017 124250 1330000007 7/18/2017 2:00.00 5.30:00 7/18/2017 Y 36 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 7/1/2017 124250 1330000007 7/19/2017 3:00:00 11:30:00 7/19/2017 Y 14 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 7/1/2017 124250 1330000007 7/20/2017 70000 930.00 7/20/2017 Y 26 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. �I RptDate 7/1/2017 7/1/2017 7/1/2017 7/1/2017 7/1/2017 7/1/2017 7/1/2017 AOGCC Excess Flare Report July -2017 BRUCE PLATFORM - EXPENSE MCF Description of Flaring Event Action Taken to Minimize Volume 12 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 8 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE, PIPELINE OPERATION. 6 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION, 4 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 34 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 58 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 10 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 1,290 Date Ending OpNo FacifityNo Flared Start Time Time End Date Planned 124250 1330000007 7/21/2017 7:00:00 12:30:00 7/21/2017 Y 124250 1330000007 7/22/2017 1:30:00 5:00:00 7/22/2017 Y 124250 1330000007 7/24/2017 20:00:00 22:30:00 7/24/2017 Y 124250 1330000007 7/25/2017 0.00:00 3:30:00 7/25/2017 Y 124250 1330000007 7/26/2017 0:00:00 1:59:00 7/26/2017 Y 124250 1330000007 7/27/2017 6:00:00 12.0000 7/28/2017 Y 124250 1330000007 7/30/2017 2:30:00 12:30:00 7/30/2017 Y MCF Description of Flaring Event Action Taken to Minimize Volume 12 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 8 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE, PIPELINE OPERATION. 6 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION, 4 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 34 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 58 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 10 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 1,290 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000007 2. Facility Name Bruce Platform 3. Field Granite Point 4. Operator Hilcorp Alasta LLC 5. Month/Year of Disposition August -17 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 70.79% UNDEFINED GAS 280500 29.21% 8. Flared orvented 1 houror less 54 9. Flared or vented more than 1 hour (see insir.) 1184 10. Pilot and Purge 822 11. Assist Gas 0 .n Authorization >1 hr MCF Safety ���t�- MCF ✓%-L-' MCF O Lease Use15. Conservation 12. Fuel gas used in lease operations 12841 13. Other (we instructions) 0 14. TOTAL VOLUME (ITEMS 6-13) 14900 NGL Gas Equivalent 0 16. Purchased gas 0 Waste: MCF 17. Transferred from: 477 Commissioner ( Date 18. Transferred to:(Expressasa negativett) (1560) 19. Remark Purchased Gas 0 Tranferred From: Anna Platform 477 Transferred To: Granite Point Tank Farm (COV's and prod gas) (1560) 1 hereby certify that the foregoingiss�truue and correct to the best of my knowledge. Signature t�/l[rllL. lLI2fP Note: All Mum asmustbacorrectedto Title Production Analyst pressure of 14.65 psia and to a Printed temperature of60oF. Authority 20 Name Olivia Hunte Phone 713-289-2979 Date 9/8/2017 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate r/tt [TI AOGCC Excess Flare Report August -2017 BRUCE PLATFORM - EXPENSE _ _... We We D -Ending F aled Flared E Time End Date Planned MCF Description of Flaring Event. Action Taken to Minimize Volume 8/1/2017 124250 1330000007 8/1/2017 19:00:00 23:00:00 8/1/2017 Y 18 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 8/1/2017 124250 1330000007 8/3/2017 5:30:00 20:00:00 8/3/2017 Y 81 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 8/1/2017 124250 1330000007 8/4/2017 1:00:00 15:30:00 8/4/2017 Y 99 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 8/1/2017 124250 1330000007 8/5/2017 2:00:00 21:00:00 8/5/2017 Y 103 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 8/1/2017 124250 1330000007 8/6/2017 6:30:00 15:00:00 8/6/2017 Y 62 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 8/1/2017 124250 1330000007 8/7/2017 13:00:00 22:30:00 8/7/2017 Y 26 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 8/1/2017 124250 1330000007 8/8/2017 0:00:00 50000 8/8/2017 Y 23 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 8/1/2017 124250 1330000007 8/9/2017 0:00:00 33000 8/9/2017 Y j 21 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 8/1/2017 124250 1330000007 8/1012017 0:00:00 3:30:00 8/10/2017 Y - EXCESS FLARING DUE TO PRESSURING 49 EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 8/1/2017 124250 1330000007 8/11/2017 0:00:00 2:30:00 8/11/2017 Y 30 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 8/1/2017 124250 1330000007 8/12/2017 0:00:00 3:00:00 8/12/2017 Y 35 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE _.__._... UP OF PIPELINE. PIPELINE OPERATION. 8/1/2017 124250 1330000007 8/13/2017 0:00:00 3:30:00 8/13/2017 Y 32 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE __,._.. UP OF PIPELINE. _ PIPELINE OPERATION. 8/1/2017 124250 1330000007 8/14/2017 0:00:00 4:00:00 8/14/2017 Y 43 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. _ PIPELINE OPERATION. 8/1/2017 124250 1330000007 8/15/2017 6:30.00 160000 8/15/2017 Y 50 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO SHUTDOWN OF EXCESS FLARING NECESSARY UNTIL 8/1/2017 124250 1330000007 8/16/2017 9:00:00 22:30:00 8/16/2017 Y 281 GAS COMPRESSOR AND VIRUS TO INSTALL WORK IS COMPLETE AND COMPRESSORS NEW PIPING ON 9-86 PRODUCTION STRING CAN BE RESTARTED. AND VRU DISCHARGE LINE. EXCESS FLARING DUE TO SHUTDOWN OF EXCESS FLARING NECESSARY UNTIL 8/1/2017 124250 1330000007 8/17/2017 15:00:00 193000 8/17/2017 Y 115 SOLAR TURBINE COMPRESSOR FOR SCHEDULED MAINTENANCE IS COMPLETE SCHEDULED MAINTENANCE. AND COMPRESSOR IS RESTARTED. 8/1/2017 124250 1330000007 8/18/2017 6:00:00 8:30:00 8/18/2017 Y 7 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION, 8/1/2017 124250 1330000007 8/19/2017 3:30:00 7:00:00 8/19/2017 Y 18 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 8/1/2017 124250 1330000007 8/20/2017 10:30:00 12:00:00 8/20/2017 Y 2 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 8/1/2017 124250 1330000007 8/21/2017 0:30:00 4:00:00 8/21/2017 Y 14 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. AOGCC Excess Flare Report August -2017 BRUCEPLATFORM- EXPENSE Ending Time End Date Planned Date 8/22/2017 Y 4:30:00 8/23/2017 Y Flared Start Time 8/1/2017 124250 1330000007 8/22/2017 0:00:00 8/26/2017 8/1/2017 124250 1330000007 8/23/2017 0:00:00 8/28/2017 8/1/2017 124250 1330000007 8/24/2017 0:00:00 8/1/2017 124250 1330000007 8/25/2017 0:00:00 8/1/2017 124250 1330000007 8/26/2017 2:00:00 8/1/2017 124250 1330000007 8/27/2017 0.0000 8/1/2017 124250 1330000007 8/28/2017 0:00:00 AOGCC Excess Flare Report August -2017 BRUCEPLATFORM- EXPENSE Ending Time End Date Planned 3:00:00 8/22/2017 Y 4:30:00 8/23/2017 Y 3:00:00 8/24/2017 Y 3:30:00 8/25/2017 Y 6:30:00 8/26/2017 Y 2:30:00 8/27/2017 Y 3:00:00 8/28/2017 Y MCF Description of Flaring Event Action Taken to Minimize Volume 3 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 7 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 9 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 15 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 13 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 27 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 0 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 1,184 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000007 2. Facility Name Bruce Platform 3. Field Granite Point 4. Operator Hilcorp Alaska LLC 5. Month/Yearof Dispostion September -17 Disposition Volume MCF 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 74.50% UNDEFINED GAS 280500 25.50% 8. Flared or vented 1 hour or less 1 9. Flared or vented more than 1 hour (see instr.) 596 10. Pilot and Purge 760 11. Assist Gas 0 12. Fuel gas used in lease operations 12769 13. Other (see instructions) 0 Official Use Only Authorization >1 hr � Safety MCF MCF 14. TOTAL VOLUME (ITEMS 6.13) 14127 Leap Use `q 7 16 71 15, NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from 0 Commissioner Date 18. Transferred to: (Expressase negative #) 75051 19. Remarks Purchased Gas 0 Tranferred From: Anna Platform 0 Transferred To: Granite Point Tank Farts (COV's and prod gas) 1X05: I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes mustbe corrected to Signature t"fllCtlQ •_/177/7fP Title Production Analyst pressure of 14.65 psia and to a Pnnted temperatureof60oF. Authority 20 Name Olivia Hunte Phone 713-289-2979 Date 10/18/2017 AAC25.235. Forth 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate tDate ONo Facilit NoE9114/2017 lared Start Time End rime End Date' 'MCF Description OF FlaringEvents Adion Taken In minimize Volume 9/1/2017 124250 133000000701] 29090 79000 9/9/2017 Y 41.3 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 9/V2017 124250 1330000007017 10000 300:00 9110/2017 Y 39.3 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 9/1/2017 124250 1330000007017 30000 73000 91122017 Y 11.7 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 9/1/2017 124250 13300000072017 100000 150000 9/131201] Y 32.4 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 91112017 124250 133000000]017 190000 230000 9/142017 Y 9.2 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 91112017 124250 13300000072017 80000 11:30:00 9115/2017 Y 30.9 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION9/11201] 124250 1330000007017 133000 1]:00'.00 9/162017 V 28.8 E%CESS FLARING DUE TO PRESSURING UP OF PIPELINE EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 9112017 124250 133000000701] 10:00:00 17:00:00 9117/2017 Y 26.4 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 9112017 124250 13300000072017 113000 15:00:00 9/18/2017 Y 28.3 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 9/12017 124250 1330000007 9/192017 1 0:00:00 33090 W19120171 Y 18.2 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 9/12017 1124250113MOM007 920/2017 00000 23000 92012017 Y 21.0 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 9/1/2017 124250 1330000007 9212017 00000 4:00:00 9/21201] Y 30.2 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 9/12017 124250 1330000007 9222017 00000 2:30:00 9/22201] Y 30.1 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 9/1/2017 124250 1330000007 923/2017 00000 70000 9232017 Y 88.5 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 9/1/2017 124250 1330000007 924/2017 00000 23000 924201] Y 41.7 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. E%CESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 9112017 124250 1331MMM7 92512017 00000 7:30:00 9252017 Y 17.2 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 9112017 124250 1330000007 9262017 2.3000 80000 926/2017 Y 18.5 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 9/12017 124250 1330000007 9/2]2017 110000 17:0000 927/2017 Y 13.0 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 9/1201] 124250 1330000007 9282017 7:00:00 13:00:00 928/2017 V 16.5 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 9!12017 124250 133000000] 91292017 8:30:00 10:30:00 929/2017 V 30.4 E%CESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 9/12017 124250 133000000] 9/30201] 1:30:00 6:30:00 9/30/201] Y 22.4 EXCESS FLARING DUE TO PRESSURING UP OF PIPELINE. EXCESS FLARING NECESSARY FOR SAFE PIPELINE OPERATION. 596 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000007 2. Facility Name Bruce Platform 3. Field Granite Point 4. Operator Hilcorp Alaska LLC 5. MonthlYear of Disposition October -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 71.56% UNDEFINED GAS 280500 28.44% 8. Flared or vented 1 hour or less 2 9. Flared or vented more than 1 hour (see instr.) 508 10. Pilot and Purge 824 11. Assist Gas 0 12. Fuel gas used in lease operations. 14438 13. Other (see instructions) 0 Official Use Only MCF Authorization >1 hr. /fb/� I (, Safety 14. TOTAL VOLUME (ITEMS 6-13) 15772 Lease Use 50% MCF 15. NGL Gas Equivalent p Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 I2,8 _I Commissioner Date 18. Transferred to: (Express as a negative #) (1179) 19. Remarks: Purchased Gas: 0 Tranferred From: Anna Platform 0 Transferred To: Granite Point Tank Farm (COV's and prod gas) (1179) 1 hereby certify that the foregoing is true and correct to the best of my knovdedge. signature �l trltl %7.2lLttff' Title Production Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Olivia Hunte Phone 713-289-2979 Date 11/14/2017 AAC25.235. Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate AOGCC Excess Flare Report October -2017 BRUCE PLATFORM - EXPENSE _ _ fig Sfarf'fi1111111111me End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volume 10/1/2017 124250 1330000007 10/1/2017 33000 14:00:00 10/1/2017 Y 23 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 10/1/2017 124250 1330000007 10/2/2017 3'.3000 6:30:00 10/2/2017 Y 20 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 10/1/2017 124250 1330000007 10/3/2017 1:0000 7:00:00 10/3/2017 Y 39 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/412017 3:30:00 9:30:00 10/4/2017 Y 18 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE _ UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/5/2017 3:30:00 8:30:00 10/5/2017 Y 23 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE _ UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/6/2017 1:00:00 10:00:00 10/6/2017 Y 18 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/7/2017 0:00:00 33000 10/7/2017 Y 23 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/8/2017 33000 11:00:00 10/8/2017 Y 19 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/9/2017 0:00:00 40000 10/9/2017 Y 26 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/10/2017 2:30:00 93000 10/10/2017 Y 19 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/11/2017 5:30:00 143000 10/11/2017 Y 20 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/12/2017 4:30.00 7:30:00 10/12/2017 Y 20 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/13/2017 90000 21:30:00 10/13/2017 Y 41 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/14/2017 70000 18:30:00 10/14/2017 Y 13 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/15/2017 6:30:00 14:00:00 10/15/2017 Y 8 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/16/2017 15:30:00 19:00:00 10/16/2017 Y 14 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE — UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/22/2017 0:00:00 2:30:00 10/22/2017 Y 9 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/23/2017 0:00:00 30000 10/23/2017 Y 7 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/24/2017 0:00:00 30000 10/24/2017 Y 15 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/25/2017 2:00:00 60000 10/25/2017 Y 16 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/26/2017 3:00:00 100000 10/26/2017 Y 22 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION 10/1/2017 124250 1330000007 10/27/2017 7:30:00 13:30:00 10/27/2017 Y 21 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION AOGCC Excess Flare Report October -2017 BRUCE PLATFORM - EXPENSE 10/1/2017 124250 1330000007 10/28/2017 7:30:00 PIPELINE OPERATION 16:30:00 10/28/2017 Y 10/1/2017 124250 1330000007 10/29/2017 3:30:00 PIPELINE OPERATION 17:00:00 10/29/2017 Y 10/1/2017 124250 1330000007 10/30/2017 6:00:00 9:30:00 10/30/2017 Y 10/1/2017 124250 1330000007 10/31/2017 3:30:00 7:00:00 10/31/2017 Y MCF Description of flaring Event EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 23 UP OF PIPELINE. PIPELINE OPERATION EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 12 UP OF PIPELINE. PIPELINE OPERATION EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 18 UP OF PIPELINE. PIPELINE OPERATION EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 22 UP OF PIPELINE. PIPELINE OPERATION 508 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000007 2. Facility Name Brace Platform 3. Field Granite Point 4. Operator Hilcorp Alaska LLC 5. MonthNearof Disposition November -17 Disposition Volume MCF 20. Forproduction fromnultiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 77.37% UNDEFINED GAS 280500 22.63% 8. Flared or vented 1 hour or less 3 9. Flared or vented more than 1 hour (see instr.) 520 10. Pilot and Purge 750 11. Assist Gas 0 12. Fuel gas used in lease operations 14861 13. Other (see instructions) 0 Authorization >1 hr: Safety (� toLeap UseZ Conservation MCF 14. TOTAL VOLUME (HEMS 6-13) 16134 5' MCF 15. NGL Gas Equivalent 0 MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 100 18. Transferred to: (Expressasa negative #) (781) Commissoner Date 19. Remaft Purchased Gas: 0 Tmnfered From: Anna Platform 100 Transferred To: Granite Point Tank Farts (COV'sand prod gas) (781) 1 hereby certify that the foregoing is true and correct to the best of my Imowledge. 0Note: All volumes mustbe corrected to Signature l[r[[G• len& Title Production Analyst pressure of 14.65 psia and to a Printed temperature of60oF. Authority 20 Name Olivia Hunte Phone 713-289-2979 Date 12/20/2017 AAC25.235. Forth 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate AOGCC Excess Flare Report November -2017 BRUCE PLATFORM - EXPENSE 11/1/2017 124250 1330000007 11/1/2017 2:30:00 EXCESS FLARING NECESSARY FOR SAFE 6:00:00 11/1/2017 Y 11/1/2017 124250 1330000007 11/2/2017 3:00:00 EXCESS FLARING NECESSARY FOR SAFE 11-..0000 11/2/2017 Y 11/1/2017 124250 1330000007 11/3/2017 6:00:00 EXCESS FLARING NECESSARY FOR SAFE 10:00:00 11/3/2017 Y 11/1/2017 124250 1330000007 11/4/2017 9:00:00 EXCESS FLARING NECESSARY UNTIL 12:00:00 11/4/2017 Y 11/1/2017 124250 1330000007 11/5/2017 13:00:00 16:30:00 11/5/2017 Y 11/1/2017 124250 1330000007 11/6/2017 5:00:00 UP OF PIPELINE. 12:00:00 11/6/2017 Y 11/1/2017 124250 1330000007 11/7/2017 140000 21:30:00 11/7/2017 Y 11/1/2017 124250 1330000007 11/8/2017 8:00:00 EXCESS FLARING NECESSARY FOR SAFE 12:00:00 11/8/2017 V 11/1/2017 124250 1330000007 11/9/2017 4:00:00 EXCESS FLARING NECESSARY FOR SAFE 9:00:00 11/9/2017 Y 11/1/2017 124250 1330000007 11/10/2017 14:00:00 19:30:00 11/10/2017 Y 11/1/2017 124250 1330000007 11/11/2017 8:00:00 12:00:00 11/11/2017 Y 11/1/2017 124250 1330000007.11/12/2017 80000 11:00:00 11/12/2017 Y 11/1/2017 124250 1330000007 11/13/2017 2:00:00 6:00:00 11/13/2017 Y 11/1/2017 124250 1330000007 11/14/2017 000:00 2:00:00 11/14/2017 Y 11/1/2017 124250 1330000007 11/15/2017 2:00:00 4:00:00 11/15/2017 Y 11/1/2017 124250 1330000007 11/16/2017 1:00:00 5:00:00 11/16/2017 Y 11/1/2017 124250 1330000007 11/17/2017 2:00:00 4:00:00 11/17/2017 Y 11/1/2017 124250 1330000007 11/18/2017 200:00 4:00:00 11/18/2017 Y 11/1/2017 124250 1330000007 11/20/2017 1:00:00 4:00:00 11/20/2017 Y ription of Flaring Event Action Taken to Minimize Volume 21 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 19 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 15 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 16 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 33 UP OF PIPELINE. PIPELINE OPERATION. 81 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 87 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO SHUTDOWN OF EXCESS FLARING NECESSARY UNTIL 92 THE SOLAR POWER TURBINE FOR MAINTENANCE IS COMPLETE AND SCHEDULED MAINTENANCE. TURBINE IS RESTARTED. 5 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 6 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 4 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 3 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 7 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 10 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 14 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 8 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 19 UP OF PIPELINE. PIPELINE OPERATION. EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE 17 UP OF PIPELINE. PIPELINE OPERATION. 13 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. AOGCC Excess Flare Report November -2017 BRUCE PLATFORM - EXPENSE r ETtlme ® RptDate� ' � 111ityflo Flared Start Time Entl Date Pla _,I ;_ n Taken to Minimize Volume 11/1/2017 124250 1330000007 11/21/2017 15.00.00 21 00.00 11/21/2017 Y 9 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 11/1/2017 124250 1330000007 11/22/2017 3:00:00 5:00:00 11/22/2017 Y 18 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 11/1/2017 124250 1330000007 11/23/2017 11:00:00 16:00:00 11/23/2017 Y 23 EXCESS FLARING DUE TO PRESSURING EXCESS FLARING NECESSARY FOR SAFE UP OF PIPELINE. PIPELINE OPERATION. 520 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000007 2. FacilName Bruce Platform 3. Field Granite Point 4. Operator Hilcorp Alaska LLC 5.ity Month/Year of Disposition December -17 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 MIDDLE KENAI OIL 280150 76.71% UNDEFINED GAS 280500 23.29% 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 194 10. Pilot and Purge 609 11. Assist Gas 0 12. Fuel gas used in lease operations. 15142 13. Other (see instructions) 0 - Authorization >1 hr: /�// 3�I"f Only Safety MCF 14. TOTAL VOLUME (ITEMS 6-13) 15945 Lease Use 4 y MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 1 Waste: MCF 17. Transferred from: 298/ / 2 _ --� Q c�.—y`_ .7 Ltee 18. Transferred to: (Express as a negative #) (1746) Commissioner Dat 19. Remarks: Purchased Gas: 1 Tranferred From: Anna Platform 298 Transferred To: Granite Point Tank Farm (COV's and prod gas) (1746) 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected SignatureVl trl2 7.Lfr1�8 Title Production Analyst to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Olivia Hunte Phone 713-289-2979 Date 1/15/2018 AAC25.235. Form 10-422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate 194 AOGCC Excess Flare Report December-2017 BRUCE PLATFORM-EXPENSE Ending F iJiiyNe Date Flared Start Time Time E4d Date Planned MCF K#glum EXCESS SS FLARING DUE TO SHUTDOWN OF EXCESS FLARING NECESSARY UNTIL 12/1/2017 1 124250 11330000007 12/6/2017 8:00:00 14:30:00 12/6/2017 Y 194 GAS COMPRESSOR AND VRU COMPRESSOR SCHEDULED MAINTENANCE IS COMPLETED I FOR SCHEDULED MAINTENANCE. AND COMPRESSORS ARE RESTARTED. 194