Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutGP Bruce Platform / Unocal
STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2002
FACILITY: GP Bruce Platform
OPERATOR: UNION OIL CO OF
CALIFORNIA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JANUARY 2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 72
4. Flared or vented greater than 1 hour /
1.425
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 15.475
7. Other 0
/
~
TOTAL items 1-7 17.189
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 22.620
Remarks:
I her.hy '12 t~t the f3:~;n~ i. t.... and .orrect to the best of my knowl.dge.
Signature 1&Jtl Q {::f.~/ Title ACCOUNTING SUPERVISOR Date 02/07/2002
1/
V'
*Indicate contribution of each pool to total.
Pool Name Code Percent.
MIDDLE KENAI 280150 75.34
UNDEFINED (GAS) 280500 24.66
................................................"...............................................................
..................................................................................................................................................................................................................................
.................................................................................................................
;.;.:.;.:.;.;.;-;.:.;.:.:.:.:.:.:.;.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.;.:.:.:.:.:.:.:.:.;.:.:.:.:.:.:.;.:.:.;.:.:.:.:.:.:.:.:.:.:.;.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.
.................................................................................................................
i:¡i:¡IIII:ilif=:IIΡ!~::I~lIiil~II~Î!!:¡I::~:::lf:!!i:!i¡:¡¡:i!:i!i¡ii¡¡
1. Safety MCF
2. Lease Use J {:?(' MCF
3. Conserv. Purposes MCF
(wr~ Ol11vJv.: ~!I ~
commiss~ner Date
ILEC "'L.I"LC;/ ð l-
.
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name:
BRUCE PLATFORM
MonthlY ear:
January 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
1/28/2002 11 :00 1/28/2002 23:59 500 N Pigging 'A' line, bleeding gas to OPERATIONAL OTHER: SEE DESC OF EVENT 'A' pipeline between Anna Normal oil field operation. U-SP-LP
reduce pressure. Platform and Bruce Platform
undergoing pigging operation to
remove liquids in line. Platform
Bruce musl flare gas to bleed
down pressure in line to allow
pigging operation to proceed
from Anna to Bruce.
1/29/2002 0:00 1/29/200223:59 384 N Pigging 'A' line, bleeding gas to OPERATIONAL OTHER: SEE DESC OF EVENT 'A' pipeline between Anna Normal oil field operation. U-SP-LP
reduce pressure. Platform and Bruce Platform
undergoing pigging operation to
remove liquids in line. Platform
, Bruce must flare gas to bleed
down pressure in line to allow
pigging operation to proceed
from Anna 10 Bruce.
1130/2002 7:00 1/30/2002 15:30 437 N Pigging 'A' line, bleeding gas to OPERATIONAL OTHER: SEE DESC OF EVENT Pig stuck at base of Bruce in 12 Normal oil field operation. U-SP-LP
reduce pressure. in. diameter sect. of pipe. 'A'
line is 8 in. diameter, pig frozen
aI8-in. diameter causing gas to
blow by pig, unable to move it;
free pig by bleeding down P/L
to remove press. allowing pig to
proceed from Anna to Bruce
1/31/200211:00 1/31/200213:30 104 N Pigging 'A' line, bleeding gas 10 OPERATIONAL OTHER: SEE DESC OF EVENT Pig stuck at base of Bruce in 12 Normal oil field operation. U-SP-LP
reduce pressure. in. diameter sect. of pipe. 'A'
line is 8 in. diameter, pig frozen
at 8-in. diameter causing gas to
blow by pig, unable to move it;
free pig by bleeding down P/L
to remove press. allowing pig to
proceed from Anna to Bruce
Report Date: 2/11/2002
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BRUCE PLATFORM ) UNOCAL ALASKA RESOURCES GRANITE POINT FIELD FEBRUARY 2002
Disposition Volume MCF*
1. Sold 0
.
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 322 ./
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 196
6. Used for lease operations 14,399
7. Other 0
TOTAL items 1 - 7 14,917 /
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 18,808
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature dl¿Þ a"ðj/{;Æ¡ Title ACCOUNTING SUPERVISOR Date 03/08/2002
q 1/
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 73.91
UNDEFINED (GAS) 280500 26.09
.................................................................................................................
.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.;.:.:.:.:.:.:.:.:.:.:.:.:.;.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.;.:.;.;.:.:.:.:
:11:111~I:il~lilll~·~i:I~llllllllllllil:.~:·.I··i··:i::':'::1:.11:1::
1. Safety MCF
2. Lease Use ~ 2- '- MCF
.
3. Conserv. Purposes MCF
&~ WuL ~If 31:~ )--fð;}-
Commistiðner Date
"-leA-
~ info i..
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
BRUCE PLATFORM
MonthlY ear:
February 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End . MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
2/10/20026:30 2/10/2002 20:00 322 Y Gas compressor shuldown for 4000- OPERATIONAL SCHEDULED MAINTENANCE Insure appropriate personnel Routine mainlenance to safe U-PM-0053
hour inspeclion. and equipment are on site prior and reliable operation.
to shutdown, peñorm inspeclion
and maintenance on
compressor, and return facility
to normal operation as soon as
possible.
Report Date: 3/8/2002
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BRUCE PLATFORM , UNOCAL ALASKA RESOURCES GRANITE POINT FIELD MARCH 2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 660 /'
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations .. 16,877
7. Other 0
TOTAL items 1 - 7 17 . 754 /
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
'.
11. Transferred to: 20,367
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature/!¡ ùÞGlrl¡)" Title ACCOUNTING SUPERVISOR Date 04/12/2002
" {J
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 73.96.
UNDEFINED (GAS) 280500 26.04
. ."
...................,...................................,.................................,.......................
.................................................................................................................
..................................................................................................................
·1··!1111~·I~I:II~I!j.:I.IIII~IIIIIII!:~I!!Î!!:·:I::·::::·::::IIIII!
1 . Safety MCF
2. Lease Use (p ~ 0 MCF
3. Conserv. Purposes MCF
(~U ~ ibJó ~
Commiss ner Date
WGA-
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
BRUCE PLATFORM
MonthlY ear:
March 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
3/24/2002 0:00 3/26/2002 16:00 240 N VRU compressor failure OPERATIONAL UNSCHEDULED MAINTENANCE The Free Waler Knock-Out Vapor RepairVRU. U-SP-LP
Recovery compressor failure due
to bad seal. Repair parts and
personnel flown to platform
expedited to platform. Annual
inspection and maintenance
performed on unit while unit down
for repairs. Return to normal
operation
3/24/2002 0:00 3/26/200216:00 240 N VRU compressor failure OPERATIONAL UNSCHEDULED MAINTENANCE The Free Water Knock-Out Vapor RepairVRU. U-SP-LP
Recovery compressor failure due
to bad seal. Repair parts and
personnel flown to platform c
expedited 10 platform. Annual
inspection and maintenance
performed on unit while unit down
for repairs. Return to normal
operation
3/24/2002 0:00 3/26/2002 16:00 160 N VRU comp'ressor failure OPERATIONAL UNSCHEDULED MAINTENANCE The Free Water Knock-Out Vapor RepairVRU. U-SP-LP
Recovery compressor failure due
to bad seal. Repair parts and
personnel flown to platform
, expedited to platform. Annual
inspection and mainlenance
performed on unit while unit down
for repairs. Return to normal
operation
Report Date: 4/11/2002
Page: 1 of. 1
!6.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD APRIL 2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 210
6. Used for lease operations 15.719
7. Other 0
TOTAL items 1 - 7 15.929
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 20,407
Remarks:
I hereby a t~at the foregoIng Is Ime and correct to the be.. of my knowledge.
Signatur ~e.t~ ~ Q ~ fJ! L,Þl Title ACCOUNTING SUPERVISOR Date 05/07/2002
, "
v
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 75.29
UNDEFINED (GAS) 280500 24.71
11·1¡llli¡lli¡II~I~I~I!lillllllllllll¡;¡III::I·II"II.II¡I¡'~I'II
1. Safety MCF
2. Lease Use MCF
,
3. Conserv. Purposes MCF
.
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 MC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Operator
Field(s)
Bruce Platform
Unocal Oil and Gas
Granite Point
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 22
4. Flared or vented greater than 1 hour 0
(Supplemental report required-oSee 20 AAC 25 .235)
5. Pilot and Purge 217
6. Used for lease operations 16,474
7. Other 0
TOTAL itelDS 1 - 7 16,713
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: Anna Platform 0
GPTF-LEX 15,774
11. Transterred to: GPTF-AB 1,754
Anna Platform 0
Remarks:
I hereby certify at the foregoing is ~~~d correct to the best of my knowledge.
Sign:aturea&/~4 '/t~'j Title: Acc!. Supervisor Date: 6/11/2002
;j ð
Form 10422
Rev. 4/95
Month/Year of Disposition
May-02
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 17586 280500 26.07%
Lease 17586 280150 8.94%
Lease 17587 280150 0.74%
Lease 18742 280150 I 64.25 %
Official Use Only - Flaring Authorization> 1 hr
I. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Connnissioner Date
Note: All volumes must be corrected to
presSure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point
Operator
Bruce Platfonn
Unocal Oil and Gas
Disposition Volume MCF*
I. Sold 0
2. Reinjected 0
3. Flared or vented less than I hour 0
4. Flared or vented greater than I hour 131 ,/
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 210
6. Used for lease operations 16,299
7. Other 0
TOTAL items 1-7 16,640
8. NGL gas equivalent produced 0
9. Purchased gas 0
"
10. Transferred from: Anna Platfonn 0
GPTF-LEX 15,255
II. Transferred to: GPTF-AB 2,236
Anna PIatfonn 0
Remarks:
I hereby cert~;e foregoing is.:1 and correct to the best of my knowledge.
/ ./J. ~Ài
Signature£¡I1 /" ( , 'J!.t.+..... i Title: Ace!. Supervisor Date: 7/8/02
11' (j
Form 10-422
Rev. 4/95
MonthlYear of Disposition
June-02
"Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 17586 280500 25.18%
Lease 17586 280150 5.85%
Lease 17587 280150 0.70%
Lease 18742 280150 68.27%
Official Use Only -- Flaring Authorization> I hr
I. Safety
131 MCF ~
2. Lease Use
MCF
3. Conserv. Purposes
MCF
1/I/(JJ--'
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th ofthe
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
BRUCE PLATFORM
MonthlY ear:
June 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
6/4/2002 10:00 6/4/2002 11 :30 34 Y Gas compressor shut down for 1200 OPERATIONAL SCHEDULED MAINTENANCE With gas compressor down for Maintenance. U..sP-HP
hour inspection maintenance, VRU also goes
offline routing gas to flare.
Inspection was pre-planned to
ensure that proper personnel,
equipment and parts were on-site.
Conducted inspection and returned
facility tõ nonnal operation.
6/8120027:15 6/8/2002 16:45 97 N Gas compressor shut down for OPERATIONAL UNSCHEDULED MAINTENANCE Oil leak found in gas compressor. Maintenance. U-SP-PILOT/HP
unscheduled maintenance With gas compressor down for
maintenance, VRU also goes
offline routing gas to flare. Oil leak
was identified, gas compressor
and VRU shut down, repairs
Immediately conducled, and facility
returned 10 nonnal operation.
Report Date: 7/11/2002
Page: 1 of 1
,..-
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point
Operator
Bruce Platform
Unocal Oil and Gas
Disposition Volume MCF"
I. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than I hour 818
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 15,926
7. Other 0
TOTAL items 1 - 7 16,961
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: Anna Platform 0
GPTF-LEX 14,858
II. Transferred to: GPTF-AB 1.966
Anna Platform 0
Remarks:
I hereby cer~ the foregoing is true and correct to the best of my knowledge.
Signature ~ pß M tl Ì1c..t?A Title: Acc!. Supervisor Date: 8nI'2IXJ2
(/ (/
Form 1Q.422
Rev. 4195
MonthfYear of Disposition
July-02
"Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 17586 280500 44.39%
Lease 17586 280150 7.76%
Lease 17587 280150 0.90%
Lease 18742 280150 46.95%
Official Use Only - Flaring Authorization> I hr
I. Safety
8\ß
JßP-
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
GA
~
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
BRUCE PLATFORM
MonthlY ear:
July 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
7/23/0221:30 7/23/0223:59 28 N Vapor recovery unit down because of OPERATIONAL UNSCHEDULED MAINTENANCE Original caused believed to be Problem assessed and 00-00-00
pressure build up. failure of high pressure switch. corrected as quickly as
Technician contacted and possible.
switch recalibrated.
Determination make that
pressure buildup had occurred
elsewhere in the lines.
Pressure relieved and facility
reIumed Io normal operations.
7/24/020:00 7/24/0221:00 232 N Vapor recovery unit down because of OPERATIONAL UNSCHEDULED MAiNTENANCE Original caused believed to be Problem assessed and 00-00-00
pressure build up. failure of high pressure swilch. corrected as quickly as
Technician contacted and possible.
swilch recallbrated.
Determination make that
pressure buildup had occurred
elsewhere in the lines.
Pressure relieved and facility
reIumed to normal operations.
7/30/02 8:30 7/30/0223:59 228 Y SI gas compressor and VRU down for OPERATIONAL SCHEDULED MAINTENANCE The SI gas compressor and Maintenance. U-PM-0052
8,000 hour Inspection. VRU were taken offline 10
conduct an 8,000 hour
inspection. The inspection was
compleled 8/2 as scheduled,
with parts adn personnel on
hand and faciltiy reIumed to
normal operations.
7/31/020:00 7/31/0211:59 330 Y SI gas compressor and VRU down for OPERATIONAL SCHEDULED MAINTENANCE The SI gas compressor and Maintenance. U-PM-0053
8,000 hour inspection. VRU were taken offline to
conduct an 8,000 hour
inspection. The inspection was
completed 8/2 as scheduled,
with parts adn personnel on
hand and faciltiy reIumed to
normal operations.
Report Date: 8/15/02
Page: 1 of 2
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator
Field(s)
Bruce Platfonn
U nocal Oil and Gas
Granite Point
Disposition Volume MCF*
J. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 3,042 V
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 16,919
7. Other 0
TOTAL items I -7 20,178
8. NGL gas equivalent produced 0
9. Purchased gas II
10. Transferred from: Anna Platfonn 0
GPTF-LEX 10,946
1 J. Transferred to: GPTF-AB 1,579
Anna Platfonn 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ./J &- ~ 4 Q., ~p tJ~ Title: Ace!. Supervisor Date: 9/9/'2002
t7 0
Form 10-422
Rev. 4195
MonthlY ear of Disposition
August-02
"Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 17586 280500 17.48%
Lease 17586 280150 9.03%
Lease 17587 280150 0.64%
Lease 18742 280150 72.85%
Official Use Only - Flaring Authorization> 1 hr
1. Safety
3,o4LMCF ::ß,2-
2. Lease Use
MCF
3. Conserv. Purposes
MCF
\lj2slo;>.-
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
mouth following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
BRUCE PLATFORM
Month/Year:
August 2002
Date & Time vent Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
8/1/2002 0:00 8/1/2002 17:00 187 Y VRU down for 8000 hr. Inspection. OPERATIONAL SCHEDULED MAINTENANCE The SI gas compressor and VRU Annual inspection. U-PM-D053
laken offline for 8,000 hour
inspection. Inspection completed
August 1 as scheduled, with parts
and personnel on hand, and facility
returned 10 nOl111al operation.
8/14/20028:00 8/14/200223:59 265 Y Gas line to shore shuldown for repairs OPERATIONAL SCHEDULED MAINTENANCE Repair denied secI. gas pn from Repair Pipeline. U-SP-HP
Bruce/Anna to shore, flare
fonnation gas during repairs. SII
plaIfol111 gas well to minimize vol.
of gas flared. Ensure all personnel
& equip. on site prior to Initiating
SlI, repair pipeline, return to nonnal
operation.
8/15/20020:01 8/151200223:59 359 Y Gas line to shore shuldown for repairs. OPERATIONAL SCHEDULED MAINTENANCE Repair dented secI. gas pn from Repair pipeline. U-SP-PILOT/HP
Bruce/Anna to shore, flare
fOl111ation gas during repairs. SII
plaIfoI111 gas well to minimize vol.
of gas flared. Ensure all personnel
& equip. on site prior to Initiating
S/I, repair pipeline, return to nOl111al
operation.
8/16/20020:01 8/16/2002 23:59 354 Y Gas line to shore shuldown for repairs. OPERATIONAL NORMAL OPERATIONS Repair dented secI. gas pn from Repair pipeline. U-SP-HP
Bruce/Anna to shore, flare
formation gas during repairs. SII
plaIfol111 gas well to minimize vol.
of gas flared. Ensure all personnel
& equip. on site prior to Initiating
SII, repair pipeline, return to nOl111al
operation.
8/17/20020:01 8/17/200223:59 334 Y Gas line to shore shutdown for repairs. OPERATIONAL SCHEDULED MAINTENANCE Repair dented secI. gas pn from Repair pipeline. U-SP-HP
Bruce/Anna to shore, flare
fonnation gas during repairs. 511
plaIfol111 gas well to minimize vol.
of gas flared. Ensure all personnel
& equip. on site prior to initiating
SII, repair pipeline, return to nOl111al
operation.
Report Date: 9/17/2002
Page: 1 of 2
·
Excess Flare Log Report
8/18/2002 0:01 8/18/200223:59 358 Y Gas line to shore shutdown for repairs. OPERATIONAL NORMAL OPERATIONS Repair denied sect. gas pn from Repair pipeline. U-SP-HP
Bruce/Anna to shore, flare
formation gas during repairs. 511
platform gas well to minimize vol.
of gas flared. Ensure all personnel
& equip. on site prior to initiating
5/1, repair pipeline, retum to normal
operation.
8/19/20020:00 8/19/200223:59 310 Y Gas line to shore shutdown for repairs. OPERATIONAL SCHEDULED MAINTENANCE Repair dented sect. gas pn from Repair pipeline. U-SP-HP
Bruce/Anna to shore, flare
formation gas during repairs. 5/1
platform gas well 10 minimize vol.
of gas flared. Ensure all personnel
& equip. on site prior to initiating
511, repair pipeline, retum to normal
operation.
8/20/2002 0:00 8/20/2002 23:59 316 Y Gas line to shore shutdown for repairs. OPERATIONAL SCHEDULED MAINTENANCE Repair dented sect. gas pn from Repair pipeline. U-SP-HP
Bruce/Anna 10 shore, flare
formation gas during repairs. 511
platform gas well to minimize vol.
of gas flared. Ensure all personnel
& equip. on site prior 10 initiating
SlI, repair pipeline, return to normal
operation.
8/21/20020:00 8/21/200223:59 320 Y Gas line to shore shutdown for repairs. OPERATIONAL SCHEDULED MAINTENANCE Repair dented sect. gas pn from Repair Pipeline. U-SP-HP
Bruce/Anna to shore, flare
formation gas during repairs. 511
platform gas well to minimize vol.
of gas flared. Ensure all personnel
& equip. on site prior to initiating
SlI, repair pipeline, return 10 normal
operation.
8/2212002 0:00 8/2212002 18:00 239 Y Gas line to shore shutdown for repairs. OPERATIONAL SCHEDULED MAINTENANCE Repair dented sect. gas pn from Repair Pipeline. U-SP-HP
Bruce/Anna to shore, flare
formation gas during repairs. SI1
platform gas well to minimize vol.
of gas flared. Ensure all personnel
& equip. on site prior to initiating
SlI, repair pipeline, return to normal
operation.
Report Date: 9/17/2002
Page: 2 of 2
Bruce Platform
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Field(s)
Month/Year of Disposition
September-02
U nocal Oil and Gas
Granite Point
Disposition Volume MCF" "Indicate contribution of each pool to total.
I. Sold 0 Pool Name Code Percent
2. Reinjected 0 Lease 17586 280500 27.00%
3. Flared or vented less than I hour 0 Lease 17586 280150 9.65%
4. Flared or vented greater than I hour 426 ,1/ Lease 17587 280150 0.51%
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 210 Lease 18742 280150 62.84%
6. Used for lease operations 16,214
7. Other 0
Official Use Only -- Flaring Authorization> I hr
TOTAL items I - 7 16,850
I. Safety 4 ~ MCF
8. NGL gas equivalent produced 0
2. Lease Use MCF
9. Purchased gas 0
3. Conserv. Purposes MCF
10. Transferred from: Anna Platform 0 rfJ '^A
GPTF-LEX 14,486 rßuJ.¿.' ~æ/ /ò--l '>/0 Y
II. Transferred to: GPTF-AB 2,604 Cornrniss¡l:,~er /\ Date
Anna Platform 0
Remarks:
Note: All volumes must be corrected to
pressure of 14,65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certi~,the foregoing is je and correct to the best of my knowledge. month following the month of disposition.
Authority 20 AAC 25.235
Signature 7 ¿'44 () t1 / .2.>k~ Title: Acct. Supervisor Date: 10/8/2002
C/ //
Form 10-422
Rev. 4195
5"&-
Excess Flare Log Report
Facility Name:
BRUCE PLATFORM
Month/Year:
September 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
9/1/2002 8:30 9/1/2002 15:30 177 N Gas compressor and vapor recovery OPERATIONAL UNSCHEDULED MAINTENANCE The SI gas compressor and VRU Replaced bleed valve. U-PM-Q053
unit (VRU) shul taken offline due to the presence of
an oil leak. A mechanic was called
out and found oil in the turbine
bleed valve. The bleed valve was
replaced and the units returned to
service.
·l'I8fiÐoo 0 ~3 9/4/2002 8:55 15 Y Gas compressor and VRU taken OPERATIONAL SCHEDULED MAINTENANCE The SI gas compressor and VRU Scheduled Maintenance. U-SP-LP
or- '-I. ?.. ro offline for 4,000 hr inspection. taken offline for 4,000 hour
07:15 inspection. Inspection completed
as scheduled and VRU units
aligned. Facility returned 10 normal
operations.
91712002 7 :00 91712002 23:59 234 Y Gas compressor and vapor recovery OPERATIONAL SCHEDULED MAINTENANCE The SI gas compressor and VRU Replace bleed valve. U-PM-0053
unit (VRU) shut down. taken offline due 10 the presence of
an oil leak. A seal associated with
the bleed valve was found to be
leaking and was replaced and the
units returned to service.
Report Date: 10/8/2002
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Bruce Platform
Unocal Oil and Gas
Granite Point
MonthlYear of Disposition
October -02
Facility
Operator
Disposition Volume MCF* *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reil\iected 0 Lease 17586 280500 27.00%
3. Flared or vented less than I hour 0 Lease 17586 280150 9.65%
4. Flared or vented greater than 1 hour 62 .....'" Lease 17587 280150 0.51%
(Supplemental report required--See 20 AAC 25.235)
5. Pilot aod Purge 217 Lease 18742 280150 62.84%
6. Used for lease operations 16,935
7. Other 0
Official, Use Only -- Flaring Authorization> I hr
TOTAL items I - 7 17,214
1. Safety 6 Z- MCF
8. NGL gas equivalent produced 0
2. Lease Use MCF
9. Purchased gas 0
3. Conserv. Purposes MCF
10. Transferred from: Anna Platform 0 &1~'
GPTF-LEX 12,754 ,[\.10,.1 "~~ lðJl?;'/ C)-,
II. Transferred to: GPTF-AB 3,682 Conmùsstdper () Date
AlUla Platform 0
Remarks:
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certithe foregoing. is,X; cor:ect :0 the best of my knowledge. month following the month of disposition.
Signature / &:k7' Q . ¿b Title: Acc!. Supervisor Date: Authority 20 AAC 25.235
I1m2002
~ (/
:I~
Form 1Q..422
Rev.4195
Excess Flare Log Report
Facility Name:
BRUCE PLATFORM
MonthlY ear:
October 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
10/8/2002 10:10 10/8/2002 13:40 62 N Maintenance on Gas compressor and OPERATIONAL OTHER: SEE DESC OF EVENT Roving maintenance on board to Oil leaks fixed and Lube pump U-SP-LP
VRU lubrication pump. peñorm work in most expeditious replaced on VRU.
manner to minimize flare.
.
Report Date: 11/7/2002
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISS~V~SED COP')( ~
FACILITY REPORT OF PRODUCED GAS DISPOSITION ~ ~ {~ .
Unocal Oil and Gas
Granite Point
Bruce Platform
Disposition Volume MCF"
I. Sold 0
2. Reinjected 0
3. Flared or vented less than] hour 41
4. Flared or vented greater than] hour 0
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 210
6. Used for lease operations 16,055
7. Other 0
TOTAL items I - 7 16,306
.
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: Anna Platfonn 0
GPTF-LEX 9,468
II. Transferred to: GPTF-AB 3.685
Anna Platfonn 0
Remarks:
I hereby certify that the fOregOin~ ~e and correct t~ the best of my knowledge.
Signature /1// A {l I//.b~; Title: Ace!. Supervisor Date: 12/30/2002
/I I
..
Form 10-422
Rev.4/95
MonthlY ear of Disposition
November-02
REVISION
"Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 17586 280500 24.56%
Lease 17586 280150 10.70%
Lease 17587 280]50 0.54%
Lease 18742 280150 64.20%
Official Use Only -- Flaring Authorization> I hr
I. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Á
,)
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point
Operator
Bruce Platform
Unocal Oil and Gas
Disposition Volume MCF·
1
I. Sold 0
2. Reinjected 0 '.
.,...
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 110 ¡/
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 17,770
7. Other 0
TOTAL items I - 7 18,097
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred ftom: Anna Platform 0
GPTF-LEX 5,640
II. Transferred to: GPTF-AB 3,769
Anna PlatfOInl 0
Remarks:
1 hereby certifY that the foregoing is true and correct to the best of my knowledge.
Signature - /¿- ~ Title: Acct. Supervisor Date: 1/10/03
Form 10-422
Rev. 4195
MonthlY ear of Disposition
December-02
·Indicate contribution of each pool to total.
,Pool Name Code Percent .
Lease 17586 280500 24.88%
Lease 17586 280150 11.27%
Lease 17587 280150 0.52%
Lease 18742 280150 63.33%
I. Safety
1/ 0 MCF :jß(2-
MCF
MCF
2. Lease Use
3. Conserv. Purposes
aftoh3
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 d~grees F. Report due by the 20th of the
month folfowing the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
BRUCE PLATFORM
MonthlYear:
December 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? DescrlDtion of Incident Cateaorv Reason Actions Taken Minimize Recurrence MP-2 ID Number
12/512002 14:00 12/512002 23:59 65 N Gas compressor and VRU down for OPERATIONAL SCHEDULED MAINTENANCE Gas compressor and vapor Peñormed maintenance on U-SP-HP
malnlenance. recovery unR shutdown for Compressor and VRU.
malnlenance and 10 replace
: bearings. Gas Well 9 shut In to
minimize flare. Maintenance
completed as soon as parts
arrived and faclllIy returned to
normaloperations.
12/612002 0:01 12/61200213:00 45 N Gas compressor and VRU down for OPERATIONAL SCHEDULED MAINTENANCE Gas compressor and vapor Peñormed malnlenance on U-SP-LP
malntenance. recovery unll shuIdown for Compressor and VRU.
maintenance and 10 replace
,- bearings. Gas Well 9 shut In 10
, minimize flare. Maintenance
compleled as soon as parts
arrived and faclllly returned to
normaloperations.
.'
Report Date: 1/21/2003