Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutGP Bruce Platform / Unocal
STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2003
FACILITY: GP Bruce Platform
OPERATOR: UNION OIL CO OF
CALIFORNIA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Granite Point
Operator
Unocal Oil and Gas
Bruce Platform
Disposition VolumeMCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease opemtions 16,076
7. Other 0
TOTAL items 1 - 7 16,293
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: Anna Platform 0
GPTF-lEX 6,121
11. Transferred to: GPTF-AB 4,716
Anna Platform 0
Remarks:
I hereb:Q~t the for:{):S true and correct to the best of my knowledge.
. .J... ,jIJ. AAA".A~ T1 {Îud.Jh,f. D 2/11/2003
Signature ',ß/VI (J I . It e: ¿ sat ~Li.f3~...~V1 ate:
II \.1
v
Form 10-422
Rev.4I95
MonthIYear of Disposition
January-03
·Indicate contribution of each pool to total.
PoolNarne Code Percent
Lease 17586 280500 29.41%
Lease 17586 280150 12.46%
Lease 17587 280150 0.55%
Lease 18742 280150 57.58%
ili!ij¡lii¡¡iiili¡¡I¡!ililillilii¡iiiil¡II!!:ilii!lil~~:I~I~illllll~~llìlllllllllilili!IIIIIIIIIIIIIIIIII!11Illiliilll
1. Safety
MCF
2 Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
.
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month follo)l\'ing the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator
Field(s)
Bruce Platform
Unocal Oil and Gas
Granite Point
~
Disposition Volume MCF·
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 196
6. Used for lease opemtions 14,512
7. Other 0
TOTAL items 1 - 7 14,708
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: Anna Platform 0
GPTF-lEX 3,600
11. Transferred to: GPTF-AB 2,944
Anna Platform 0
Remarks:
I hereb~r1:.t the¡Á)~ is true and correct to the best of my knowledge.
Signature ' if ¡ '};1 A/Y/ß dA../ Title: Prod. Acct. Date: 3/14/2003
1/ /1
1/ V
Form 10-422
Rev. 4195
MonthlY ear of Disposition
February-03
.Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 17586 280500 19.59%
Lease 17586 280150 16.17%
Lease 17587 280150 0.76%
Lease 18742 280150 63.48%
:1111111111111:·IIII.II¡IIIII·lil:I:III:lllil¡IIII~~11ÎI~il..~II¡I:~llllllllllllilllll·III!lllillll!j-¡::1111
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
~
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point
Bruce Platform
Unocal Oil and Gas
Disposition Volume MCF·
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 78
4. Flared or vented greater than 1 hour 1,113
(Supplemental report required-oSee 20 AAC 25.235) V
5. Pilot and Purge 217
6. Used for lease opemtions 15,591
7. Other 0
.
TOTAL items 1 - 7 16,999
8. NGL gas equivalent produced 0
9. Purchased gas 1
10. Transferred from: Anna Platform 0
GPTF-LEX 6,289
11. Transferred to: GPTF-AB 3,520
Anna Platform 0
Remarks:
I here:~at the fore7C true and correct t2best of my knowledge.
Signature /j,1 J :!-;, ! M /l /f/J .dJ:.µr Title: Prod. Acct. Date: 4/10/2003
1/ (
, v
Form 10-422
Rev.4/95
MonthlY ear of Disposition
March-03
·Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 17586 280500 35.01%
Lease 17586 280150 13.06%
Lease 17587 280150 0.62%
Lease 18742 280150 51.31%
¡11¡jl:lill·II:liillll!II-¡:lllllllilllillillllr~IIIÎ~~:I~I~~III.I~II~IIIIIIIIIIIII·IIIII.IIIII·I·.:·II:I:I:I.11111
1. Safety
1{ 113 MCF JElL
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
BRUCE PLATFORM
MonthlY ear:
March 2003
Date & Time Event Gas Steps Taken to Equipment Down
Beain End MCF Planned? DescriDtion of Incident Cateaorv Reason Actions Taken Minimize Recurrence MP-2 ID Number
3/5/2003 9:30 3/5/2003 23:59 147 N Compressor shutdown for OPERATIONAL UNSCHEDULED MAINTENANCE Compressor shutdown to repair Compressor bearing caps U-PM-0520
maintenance. bearing caps. Equipmet had to repaired.
be sent offisite for repair. Utilized
downtime to perform 4000 hr
inspection and other routine
maintenance. Retumed facility to
normal operations as soon as
possible.
3/6/20030:01 3/6/2003 23:59 276 N Compressor shutdown for OPERATIONAL UNSCHEDULED MAINTENANCE Compressor shutdown to repair Compressor bearing caps U-PM-Q520
maintenance. bearing caps. Equipmet had to repaired.
be sent offisite for repair. Utilized
downtime to perform 4000 hr
inspection and other routine
maintenance. Retumed facility to
normal operations as soon as
possible.
3f712003 0:01 3f712003 23:59 276 N Compressor shutdown for OPERATIONAL UNSCHEDULED MAINTENANCE Compressor shutdown to repair Compressor bearing caps U-PM-Q520
maintenance. bearing caps. Equipmet had to repaired.
be sent offisite for repair. Utilized
downtime to perform 4000 hr
inspection and other routine
maintenance. Returned facility to
normal operations as soon as
possible.
3/8/20030:01 3/8/2003 15:00 172 N Compressor shutdown for OPERATIONAL UNSCHEDULED MAINTENANCE Compressor shutdown to repair Compressor bearing caps U-PM-Q520
maintenance. bearing caps. Equipmet had to repaired.
be sent offisite for repair. Utilized
downtime to perform 4000 hr
inspection and other routine
maintenance. Returned facility to
normal operations as soon as
possible.
3/10/2003 0:04 3/10/200321 :00 202 N Gas compressor shutdown for OPERATIONAL OTHER: SEE DESC OF EVENT Gas compressor shutdown due Performed maintenance to gas U-PM-0520
maintenance. to high temperature on de-hi. compressor.
Lines blocked with flanges from
compressor exhaust to de-hi to
perform required maintenance on c-
heat exchanger to glycol system.
Compressor put back online;
facility returned to normal
operations.
Report Date: 4/17/2003
Page: 1 of 2
Excess Flare Log Report
3/13/200314:00 3/13/200323:59 40 N GPTF shut in due to electical OPERATIONAL OTHER: SEE DESC OF EVENT Granite Point Tank Farm shut in GPTF brought back online to U-SP-HP
problems. Bruce unable to ship gas due to electrical problems receive gas from Bruce.
which results in having to flare. caused by strong windstorm
conditions. Gas well was shut in
and casing gas had to be flared.
Retum to normal operations as
soon as possible.
.
Report Date: 4/17/2003
Page: 2 of 2
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Bruce Platform
Unocal Oil and Gas
Granite Point
MonthlYear of Disposition
April-03
Facility
Operator
Disposition Volume MCF· ·Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 Lease 17586 280500 57.76%
3. Flared or vented less than 1 hour 0 Lease 17586 280150 9.07%
/
4. Flared or vented greater than 1 hour 267 V Lease 17587 280150 0.64%
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 210 Lease 18742 280150 32.53%
6. Used for lease opemtions 14,993
7. Other 0 :111111111.11·1111111111111111111111111.1.1111111ill~i¡1~11111.~lllljiijllil:I¡lllljllll·jlljlllll:iillliil!'Iil
TOTAL items 1 - 7 15,470
1. Safety ~7 MCF
8. NGL gas equivalent produced 0
2. Lease Use MCF
9. Purchased gas 0
3. Conserv. Purposes MCF
10. Transferred from: Anna Platform 0 t
GPTF-LEX 8,929 ~- .-/~ :~ ~/Z-31"?
11. Transferred to: QP1F-AB 2,837 Commissioner Date
Anna Platform 0
Remarks:
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby ~~ that the f~ego¡i true and correct to th7' best of my knowledge. month following the month of disposition.
Signatur( A11/!ti f ¡- )~~/J11 ¡J d'./ Authority 20 AAC 25.235
Title: Prod. Acct. Date: 5nJ2003
77 //
1/ IJ
~
Form 10-422
R.....4195
Excess Flare Log Report
Facility Name:
BRUCE PLATFORM
MonthlY ear:
April 2003
Date & Time Event Gas Steps Taken to Equipment Down
Beain End MCF Planned? Description of Incident Cateaorv Reason Actions Taken Minimize Recurrence MP-2 ID Number
4/19/200313:30 4/19/200316:45 53 N GAS COMPRESSOR SHUTDOWN OPERATIONAL UNSCHEDULED MAINTENANCE IT WAS NOT POSSIBLE TO REMOVED ISOLATION U-PM-D520
WHILE PERFORMING SHUT IN ANY WELLS DUE TO BLINDS FROM EXHAUST TO
MAINTENANCE ON SAFETY CONSIDERATIONS. DEHYDRATION SYSTEM
DEHYDRATION SYSTEM. HOWEVER, PROPER HEAT EXCHANGER.I
PERSONNEL, EQUIPMENT
AND PARTS WERE ON-5ITE
AND READY TO GO
IMMEDIATELY AFTER
COMPRESSOR SHUTDOWN.
4/20/2003 13:00 4/20/2003 23:59 181 N GAS COMPRESSOR SHUTDOWN OPERATIONAL UNSCHEDULED MAINTENANCE IT WAS NOT POSSIBLE TO INSTALLED ISOLATION U-PM-D520
WHILE PERFORMING SHUT IN ANY WELLS DUE TO BLINDS FROM
MAINTENANCE ON SAFETY CONSIDERATIONS. COMPRESSOR EXHAUST TO
DEHYDRATION SYSTEM. HOWEVER, PROPER DEHYDRATION SYSTEM
PERSONNEL, EQUIPMENT HEAT EXCHANGER.
AND PARTS WERE ON-SITE
AND READY TO GO
IMMEDIATELY AFTER
COMPRESSOR SHUTDOWN.
4/30/2003 12:30 4/30/2003 14:30 33 N COMPRESSOR SHUTDOWN TO SAFETY UNSCHEDULED MAINTENANCE IT WAS NOT POSSIBLE TO DURING SHUTDOWN, U-PM-0520
REPLACE A LEAKING BLOCK SHUT IN ANY WELLS DUE TO PRESSURE SAFETY VALVE
VALVE ON DISCHARGE PSV. SAFETY CONSIDERATIONS. (PSV) INSPECTION
HOWEVER, PROPER PERFORMED TO AVOID A
PERSONNEL, EQUIPMENT FUTURE SHUTDOWN AND
AND PARTS WERE ON-5ITE FLARING EVENT. LEAKING
AND READY TO GO BLOCK VALVE REPLACED
IMMEDIATELY AFTER ON DISCHARGE PSV.
COMPRESSOR SHUTDOWN.
Report Date: 5/19/2003
Page: 1 of 2
-
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point
Operator
Bruce Platfonn
Unocal Oil and Gas
Djsposition Volume MCF·
1. SoM 0
2. Reinjected 0
3. Flared or vented less than 1 hour 16
4. Flared or vented greater than 1 hour 726 Ý
(SuPD1emental reoort reQuired-See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operntioDS 15,176
7. other 0
TOTAL items 1 - 7 16,135
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferredfrom: 0
11. Transferred to: 10,920
Remarks: TransfeIred From: Anna Platform 0
Transferred To: GPTF-LEX 8,108
GPTF-AB 2,812
Anna Platform 0
I heren ~t the foregj();e and corr~~ the best of my knowledge.
Signaturè .! J /J ..;- 1 . M II /i . ~ / Title: Prod. Ace!. Date: 6/1012003
1/ ?r
~ V
Form 1D-422
Rev. 4195
MonthiYear of Disposition
May-03
·Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 17586 280500 45.25%
Lease 17586 280150 11.50%
Lease 17587 280150 0.60"/0
Lease 18742 280150 42.64%
.:¡·:I·i¡:::~:jl::¡··:I:II:::::::.:I:I:·IIII~.I:II~111111:~:III:~I·:I:·:::::¡:i¡:¡¡i:¡I:.I·:¡·~¡·::·i
1. Safety
ì~ MCF ~,a.-
2. Lease Use
MCF
3. Conserv. Putposes
MCF
Z/3¡/3
e /
Note: All volumes must be corrected to
pressure of 14.65 psia and to a tempernture of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
BRUCE PLATFORM
MonthN ear:
May 2003
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? DescriDtion of Incident Cateaorv Reason Actions Taken Minimize Recurrence MP-2 ID Number
5/21/2003 17:30 5/21/2003 23:59 150 Y GPTF GAS COMPRESSORS SAFETY SCHEDULED MAINTENANCE PRESSURE VESSEL GPTF GAS PRESSURE U-SP-HP
SHUTDOWN FOR SCHEDULED INSPECTION AT VESSEL
MAINTENANCE. GAS PIPELINE GPTF. BRUCE UNABLE TO INSPECTIONS/MAINTENANC
CONNECTS BRUCE WITH GPTF. SEND GAS TO GPTF DURING E COMPLETED AS SOON AS
BALANCE OF BRUCE GAS EVENT. GPTF RETURN TO POSSIBLE. BRUCE BACK TO
ROUTED TO FLARE. NORMAL OPERATIONS AS NORMAL OPERATIONS
SOON AS POSSIBLE. ONCE GAS ABLE TO
RESUME THROUGH
PIPELINE TO GPTF.
5/22/20030:01 5/22/2003 23:59 175 Y GPTF GAS COMPRESSORS SAFETY SCHEDULED MAINTENANCE PRESSURE VESSEL GPTF GAS PRESSURE U-SP-HP
SHUTDOWN FOR SCHEDULED INSPECTION AT VESSEL
MAINTENANCE. GAS PIPELINE GPTF. BRUCE UNABLE TO INSPECTIONS/MAINTENANC
CONNECTS BRUCE WITH GPTF. SEND GAS TO GPTF DURING E COMPLETED AS SOON AS
BALANCE OF BRUCE GAS EVENT. GPTF RETURN TO POSSIBLE. BRUCE BACK TO
ROUTED TO FLARE. NORMAL OPERATIONS AS NORMAL OPERATIONS
SOON AS POSSIBlE. ONCE GAS ABLE TO
RESUME THROUGH
PIPELINE TO GPTF.
5/23/20030:01 5/23/2003 23:59 166 Y GPTF GAS COMPRESSORS SAFETY SCHEDULED MAINTENANCE PRESSURE VESSEL GPTF GAS PRESSURE U-SP-HP
SHUTDOWN FOR SCHEDULED INSPECTION AT VESSEL
MAINTENANCE. GAS PIPELINE GPTF. BRUCE UNABLE TO INSPECTIONSIMAINTENANC
CONNECTS BRUCE WITH GPTF. SEND GAS TO GPTF DURING E COMPLETED AS SOON AS
BALANCE OF BRUCE GAS EVENT. GPTF RETURN TO POSSIBLE. BRUCE BACK TO
ROUTED TO FLARE. NORMAL OPERATIONS AS NORMAL OPERATIONS
SOON AS POSSIBlE. ONCE GAS ABLE TO
RESUME THROUGH
PIPELINE TO GPTF.
5/24/20030:01 5/24/2003 23:59 165 Y GPTF GAS COMPRESSORS SAFETY SCHEDULED MAINTENANCE PRESSURE VESSEL GPTF GAS PRESSURE U-SP-HP
SHUTDOWN FOR SCHEDULED INSPECTION AT VESSEL
MAINTENANCE. GAS PIPELINE GPTF. BRUCE UNABLE TO INSPECTlONS/MAINTENANC
CONNECTS BRUCE WITH GPTF. SEND GAS TO GPTF DURING E COMPLETED AS SOON AS
BALANCE OF BRUCE GAS EVENT. GPTF RETURN TO POSSIBLE. BRUCE BACK TO
ROUTED TO FLARE. NORMAL OPERATIONS AS NORMAL OPERATIONS
SOON AS POSSIBlE. ONCE GAS ABLE TO
RESUME THROUGH
PIPELINE TO GPTF.
5/25/20030:01 5/25/2003 10:00 70 Y GPTF GAS COMPRESSORS SAFETY SCHEDULED MAINTENANCE PRESSURE VESSEL GPTF GAS PRESSURE U-SP-HP
SHUTDOWN FOR SCHEDULED INSPECTION AT VESSEL
MAINTENANCE. GAS PIPELINE GPTF. BRUCE UNABLE TO INSPECTIONSIMAINTENANC
CONNECTS BRUCE WITH GPTF. SEND GAS TO GPTF DURING E COMPLETED AS SOON AS
BALANCE OF BRUCE GAS EVENT. GPTF RETURN TO POSSIBLE. BRUCE BACK TO
ROUTED TO FLARE. NORMAL OPERATIONS AS NORMAL OPERATIONS
SOON AS POSSIBlE. ONCE GAS ABLE TO
RESUME THROUGH
PIPELINE TO GPTF.
Report Date: 6/20/2003
Page: 1 of 2
~
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Bruce P1atfonn
Unocal Oil and Gas
Granite Point
MonthlY ear of Disposition
Joo...03
Facility
Operator
1. Sold
o
·Indicate contribution of each pool to total.
Pool Name Code Pereent
Lease 17586 280500 27.68%
Lease 17586 280150 15.68%
Lease 17587 280150 0.65%
Lease 18742 280150 55.99%
-,
,
Disposition
Volume MCF·
2. Reinjected
o
3. Flared or vented less than 1 hour
o
5. Pilot and Purge
210
6. Used for lease operations
14,678
7. Other
o
1111111111·11¡11:·:I·:·::j::II:I·::I:I·:::lì~IIII:I:I:~II.~I~·II·II.::..I.::.:::::.:II·I::::::::·:I·I
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
TOTAL items 1-7
14,888
8. NGL gas equivalent produced
o
9. Purchased gas
o
10. Transfened from:
o
11. Transferred to:
10,887
Remarks:
Transferred From:
Anna Platfonn
o
Transfened To:
GPTF-LEX
GPTF-AB
Anna Platfonn
8,289
2,598
o
Tille: Prod. Acct Date:
7/10/2003
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4195
....
....
Form1()..422
Rev. 4195
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator
Field(s)
MontblYear of Disposition
luly-03
Bruce Platfonu
Unoca1 Oil and Qa<¡
Granite Point
Disposition Volume MCF· ·Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 Lease 17586 280500 60.81%
3. Flared or vented less than 1 hour 0 Lease 17586 280150 7.03%
4. Flared or vented greater than 1 hour 80 Lease 17587 280150 0.45%
(Supplemental report required-See 20 MC 25.2351
5. Pilot and Purge 217 Lease 18742 280150 31.71%
6. Used for lease operations 15,085
7. Other 0 1111·:III.IIIII·::I·I~·I·":·:.::~:I:~:·~·illlillll:..1·~·I·I:IIII·I·::II~::::~::::~:.:I·III::~illl
TOTAL items 1 -7 15,382 ~O
1. Safety MCF
8. NGL gas equivalent produced 0
2. Lease Use MCF
9. Purchased gas 0
3. Conserv. Pwposes MCF
10. Transferred from: 0 lC~i¿ it!? r!/a/o
~4¿,' 5
11. Transferred to: 17,827 Commiss~ Date ,
Remarks: Transferred From: Anna Platform 0
Transferred To: GPTF-LEX 14,420
GPTF-AB 3,407
Anna P1atfonn 0
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
I hereby ~.the foregoin~~;orrect to the best '?,fmy knowledge. 60 degrees F. Report due by the 20th of the
SignaJ" /¡/( I' f l / I.~~ / Vv I .¡' Lr' Title: Prod. mo¡¡th following the month of disposition.
Ace!. Date: 8n12003 Authority 20 MC 25.235
Ii I
/ ' .__.J
./
Sb.e-
"
J>
".
Excess Flare Log Report
Facility Name:
BRUCE PLATFORM
MonthNear:
July 2003
Date & Time Event Gas Steps Taken to Equipment Down
Beain End MCF Planned? DescriDtion of Incident Cateaorv Reason Actions Taken Minimize Recurrence MP-2 ID Number
7/29/200311:15 7/29/200321:30 80 Y PIPELINE PIGGING IN CHAK OPERATIONAL OTHER: SEE DESC OF EVENT PIPELINE SHUT-IN NORMAL OilFIELD U-SP-HP
PIPELINE (I.E.. GAS LINE FROM TEMOPORARll Y TO BLOW OPERATIONS &
ANNA/BRUCE TO GPTF). DOWN CHAK GAS LINE FOR MAINTENANCE.
PIGGING/INSPECTION WORK.
GAS WEll S/I AT BRUCE TO
MINIMIZE FLARE DURING
PIPELINE SHUT-IN.
COMPLETE PIGGING
OPERATIONS AND RETURN
TO NORMAL OPERATIONS.
Report Date: 8/14/2003
Page: 1 of 1
r-
-.,. ~
Form 10.422
Rev. 4195
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator
Fie1d(s)
MonthlY ear of Disposition
August-03
Bruce P1atfonn
Unocal Oil and Gas
Granite Point
·Indicate contribution of each pool to toW.
Pool Name Code Percent
Lease 17586 280500 17.75%
Lease 17586 280150 14.00%
Lease 17587 280150 0.52%
Lease 18742 280150 67.73%
Disposition
Volume MCF·
1. Sold
2. Reinjected
o
3. Flared or vented less than 1 hour
1,788
5. Pilot and Purge
217
6. Used for lease Opet3tions
14,619
7. Other
o
::·ii.il::llllili:ill:·:i:i¡ilil:il.:::·:·!I~I!I~.II~·.1~~íll!~I~lli:llilllllllllilllilili:111111111111111I
TOTAL items 1 -7
16,624
8. NGL gas equivalent produced
1. Safety /798 MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
~~ /(1153
Comnns oner Date
o
9. Purchased gas
10. Transfecred wm:
o
11. Transfezred to:
8,452
Remæ:ks:
Transferred From:
Anna P1atfoml
o
Transfecred To:
GPTF-LEX
QPTF-AB
Anna PlatfOml
5,286
3,166
o
Note: All voJnmes must be corrected to
pressure of 14.65 psia and to a tempet31ure of
60 degrees F. Report due by the 20th of the
JIlOnth following the month of disposition.
Authority 20 AAC 25.235
Title: Prod. Acc!' Date:
9/1912003
"
- ,,"
Excess Flare Log Report
Facility Name:
BRUCE PLATFORM
MonthNear:
August 2003
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
8/14/200313:00 8/14/200320:00 72 Y GAS PIPELINE SHUT-IN FOR GP OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
#2 RISER WORK. EXTENDED MAINTENANCE RISER NO SMOKE READER
PERIOD DURING BRUCE AVAILABLE AT TIME OF
PIPELINE GP #2 RISER FLARE.
REPLACEMENT. SHUT IN
WELL #9 AND LOWERED GAS
COMPRESSOR DISCHARGE
TO CUT BACK ON THE
FLARE.
8/15/2003 7:30 8/15/200323:59 90 Y GAS PIPELINE SHUT-IN FOR GP OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
#2 RISER WORK. EXTENDED MAINTENANCE RISER
PERIOD DURING BRUCE
PIPELINE GP #2 RISER
REPLACEMENT. SHUT IN
WELL #9 AND LOWERED GAS
COMPRESSOR DISCHARGE
TO CUT BACK ON THE
FLARE.
8/16/20030:01 8/16/200323:59 113 Y GAS PIPELINE SHUT-IN FOR GP OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
#2 RISER WORKI EXTENDED MAINTENANCE RISER.
PERIOD DURING BRUCE
PIPELINE GP #2 RISER
REPLACEMENT. SHUT IN
WELL #9 AND LOWERED GAS
COMPRESSOR DISCHARGE
TO CUT BACK ON THE
FLARE.
8/17/20030:01 8/17/200323:59 112 Y GAS PIPELINE SHUT-IN FOR GP OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
#2 RISER WORK EXTENDED MAINTENANCE RISER
PERIOD DURING BRUCE
PIPELINE GP #2 RISER
REPLACEMENT. SHUT IN
WELL #9 AND LOWERED GAS
COMPRESSOR DISCHARGE
TO CUT BACK ON THE
FLARE.
8/18/20030:01 8/18/200323:59 112 Y GAS PIPELINE SHUT-IN FOR GP OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
#2 RISER WORKI EXTENDED MAINTENANCE RISER.
PERIOD DURING BRUCE
PIPELINE GP #2 RISER
REPLACEMENT. SHUT IN
WELL #9 AND LOWERED GAS
COMPRESSOR DISCHARGE
TO CUT BACK ON THE
FLARE.
Report Date: 9/22/2003
Page: 1 of 3
Excess Flare Log Report
8/19/20030:01 8/19/200323:59 112 Y GAS PIPELINE SHUT-IN FOR GP OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
#2 RISER WORK. EXTENDED MAINTENANCE RISER
PERIOD DURING BRUCE
PIPELINE GP #2 RISER
REPLACEMENT. SHUT IN
WELL #9 AND LOWERED GAS
COMPRESSOR DISCHARGE
TO CUT BACK ON THE
FLARE.
8/20/2003 0:01 8/20/2003 23:59 112 Y GAS PIPELINE SHUT-IN FOR GP OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
#2 RISER WORK. EXTENDED MAINTENANCE RISER
PERIOD DURING BRUCE
PIPELINE GP #2 RISER
REPLACEMENT. SHUT IN
WELL #9 AND LOWERED GAS
COMPRESSOR DISCHARGE
TO CUT BACK ON THE
FLARE.
8/21/20030:01 8/21/2003 23:59 112 Y GAS PIPELINE SHUT-IN FOR GP OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
#2 RISER WORK. EXTENDED MAINTENANCE RISER
PERIOD DURING BRUCE
PIPELINE GP #2 RISER
REPLACEMENT. SHUT IN
WELL #9 AND LOWERED GAS
COMPRESSOR DISCHARGE
TO CUT BACK ON THE
FLARE.
8/22/20030:01 8/22/2003 23:59 96 Y GAS PIPELINE SHUT-IN FOR GP OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
#2 RISER WORK. EXTENDED MAINTENANCE RISER.
PERIOD DURING BRUCE
PIPELINE GP #2 RISER
REPLACEMENT. SHUT IN
WELL #9 AND LOWERED GAS
COMPRESSOR DISCHARGE
TO CUT BACK ON THE
FLARE.
8/23/20030:01 8/23/2003 23:59 96 Y GAS PIPELINE SHUT-IN FOR GP OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
#2 RISER WORK. EXTENDED MAINTENANCE RISER
PERIOD DURING BRUCE
PIPELINE GP #2 RISER
REPLACEMENT. SHUT IN
WELL #9 AND LOWERED GAS
COMPRESSOR DISCHARGE
TO CUT BACK ON THE
FLARE.
8/24/20030:01 8/31/200323:59 95 Y GAS PIPELINE SHUT-IN FOR GP OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
#2 RISER WORK. EXTENDED MAINTENANCE RISER
PERIOD DURING BRUCE
PIPELINE GP #2 RISER
REPLACEMENT. SHUT IN
WELL #9 AND LOWERED GAS
COMPRESSOR DISCHARGE
TO CUT BACK ON THE
FLARE.
Report Date: 9/22/2003
Page: 2 of 3
Excess Flare Log Report
........
0:::
[..L.
("f")
<::>
<::>
C\J
I
--
("f")
I
E-
o
o
S1241Z<:G3 0:01 813'12003 2:3:59 !J( Y GAS PiPeliNE SHUT -I~f FOR GP OPERA TlC»I"L SCHEDUlED MAINTENANCE GAS PIPEUNESHUT-IN FOR REPLACE BRUCE P'PELINE 1I.sp.,¡tf>
Ifl RISER WORKI EXTENDED MAINTENANCE RISER.!
PERIOO DURING BRUCE
PIPELINE GP If¿ RISER
REPLACEMENT. SHIJT;U
WELL #!I AND LO'I'iERED GAS
COMPRESSOR DISCHARGE
TO CUT BACK ON THE
flARE.'
ß'24120C\3 D:Dt 8I"31i2C(3 23:59 93 Y GAS PIPEL1NE SHUT·IN FCR COP OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT..N FOR REPLACE BRUCE PIPEUNE U.sP-HP
1f2 RISER WORK. EXTENDED 'MINTI;NANC£ RISER.
PERfOD DURING BRUCE
PIPELINE GP #2 RISER
REPlACEMENT. SHUT IN
WELL #9 AND LOWERED C-AS
CQ\IPRE&SOR DISCHARGE
TO CUT BACK or~ THE
FLARE.
81'24,.2003 &.01 813'12003 23:59 ~ Y GAS PIPELINE SHUT -IN FOR GP OPERATIONAL SCHEfll1l.ED MAINTENANCE GAS PIPeliNE SHUT·IN FOR REPLJ..CE BP.tICEP!PEUNE -U-SP-HP
/!'2 RISER WC.p.x.: EXJENDED WdN1ENANCE RI$ER.
PERIOD DURING BRUCE
PIPEliNE GP Ir2 RISER
REPlACEMENT. SHUT IN
WELL !¥!lAND lOWERED GAS
COMPRESSOR DJSCHARGE
TO CUT BACK ON THE
FLARE]
8/24/2003 0:01 8131.0'200323:59 98 Y GAS PIPELINE SHUT -IN FOR GP CPERA TlC»IAl SCHEDULED MAINTENANCE GAÆ! PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE IJ-SP-HP
It2 RISER WORK. EXTENOED MAII'ITENANCE RISER
PERIOD DURING BRUCE
PIPELINE GP #2 RISER
REPLACEIltEI'IT. SHUT IN
WElt. mJ AND LOWERED GAS
COMPRESSOR DISCHARGE
TO CUT BACK ON THE
fLARE.
8124...2003 D:01 8,'3112003 23:59 9B V GAS PIPELINE SHUT·IN FOR GJ> QPEAA TIONAL SCHEDULED MAINTÐ'AHCE GAS PIPEUHE SHUT-IN FCR REPLACE BRUCE PIPEUt.!;E U.sP·HP
:f2 RISER WORK. EXTENDED MAJNTENANCE RISER
PERIOD DURING BRUCE
PIPEUNE GP #2 RISER
REPlACEMENT_ SHUT iH
WelL 119 AHD lOW:ERED GAS
COMPRESSOR DISCHARGE
TO CUT BACK eN THE
FLAAE.j
8I24121JG3 (I:Ot 8.'3112003 23'59 95 Y GAS PIPEUNE SHIIT·IN FCR GP OPERA TJONAL SCHEDULED MAINTENANCE G\S PIPELINE SHUT-IN FOR REPLACE 8Rl1CE PIPELINE U-SP-HP
#2 RISER WORX. EXTENOEO MAINTENANCE RISfR.
P1:RJOO DURJNG BRUCE
PIPELINE GP #2 RISER
REPLACEMENT. SHUT IN
WEll mJ AND LOWERED GAS
COMPRESSOR DISCHARGE
TO CUT BACK ON ìHE
FLARE
a:¡
<::>
a...
r-
<::>
co
r-
("f")
co
C\J
r-
<::>
0:>
Ó
:z:
:x:
<I:
[..L.
:3
:z:
0:::
-I
[..L.
...c:
.....
co
-I
<I:
o
o
:z:
::;:.
::¡:=
<I:
("f")
("f")
a:¡
<::>
Report Date: 10/3112003
Page: 3 of a
Excess Frare Log Report
0:::
[.1...
{'0
=
=
N
I
..........
('0
I
E--
o
o
1Y24/1OC<3 <ktll I!I3\,'ZOOG 23:59 95 Y GAS PIPELJNE SHUT -IN FOR GP OPERA nCNAL SCH EDULEO IMINTENANCE GAS PIPeLINE SHUT -IN ¡::CR REPLACE BRUCE PIPEUNE U.sP-HP
#2 RISER WORK·I EXT~DED I'\tAINTEHANCE RlSER·1
PER!CQ DURING BRUCE
PIPELINE GP ii2 RISER
REPLACEMENT. SHUT IN
WELL 1/9 AND LOWERED GAS
CCì\fPRESWR DISCHARGE
TOClH8ACK ON ìHE
FlARE.
I
0)
=
a...
r-
=
CQ
r-
('0
CQ
N
r-
=
0)
c:5
:z:
:x:
<t::
[.1...
::3:
:z:
0:::
,........
[.1...
.-e:
CQ
,........
<t::
o
o
:z:
:::::>
:E:
<t::
{'0
{'0
co
=
Report Date: 10/31j2003
Page: 4 ot 6
~ J,.- ~.,.
....-
Form 10-422
RIIV.4I95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Pie1d(s)
Montb!Y ear of Disposition
September-03
Operator
Unocal Oil and Gas
Bruce Platfonn
Granite Pomt
Disposition
Volume MCp·
·Indicate contribution of each pool to total.
L Sold
o
Pool Name Code Pen:ent
Lease 17586 280500 18.69%
Lease 17586 280150 13.44%
/
v/ Lease 17587 280150 0.50%
Lease 18742 280150 67.37%
2. Reinjected
o
3. Flared or vented less than 1 hour
o
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235)
1,757
5. Pilot and Purge
210
6. Used for lease operations
13,984
7. Other
::·:··:·::,.::··.··i....I.·,.III.I::llilll~IIIIII!I.·~·~II,.lllliliil:I·I~·:·::::¡·:·::··:··:····
o
TOTAL items 1 -7
15,951
1. Safety
11'75 7 MCF ::ߡJ-
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
10. Transfened ftom:
3. Conserv. Putposes
.............
I(J~
/(þcú
MCF
o
11. Transfetred to:
6,495
C:~ioner
Remarks:
Transfetred Prom:
Alma Platfonn
o
Transfened To:
GPTF-LEX
GPTF-AB
Anna Platform
3,273
3,222
o
I hereby~that the fore~omg A true and correct t1fbest of my knowledge.
Signature'-- k.f ^ I ,/-;;(U. M />/1A" /, - Title: Prod. Ace!. Date:
1/ /1
V
Note: All volumes must be cOIrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
monlh following the month of disposition.
Authority 20 AAC 25.235
1012012003
.,
Excess Flare Log Report
Facility Name:
BRUCE PLATFORM
MonthlY ear:
September 2003
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
9/1/20030:01 9/1/200323:59 99 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
RISER WORK. MAINTENANCE DURING RISER
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE.
9/2/20030:01 9/212003 23:59 96 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
RISER WORK. MAINTENANCE DURING RISER
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE.
9/3/20030:01 9/3/2003 23 :59 96 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
RISER WORK. MAINTENANCE DURING RISER
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE.
9/4/20030:01 9/4/2003 23:59 99 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
RISER WORK. MAINTENANCE DURING RISER.
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE.I
9/5/20030:01 9/5/2003 22:30 76 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
RISER WORK. I MAINTENANCE DURING RISER
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE.
9/6/2003 0:01 9/6/2003 23:59 50 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
RISER WORK. MAINTENANCE DURING RISER
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE.
917/20030:01 9/7/200323:59 99 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
RISER WORK. MAINTENANCE DURING RISER
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE.
Report Date: 11/5/2003
Page: 1 of 6
Excess Flare Log Report
9/8/2003 0:01 9/8/2003 23:59 99 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
RISER WORK. MAINTENANCE DURING RISER I
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE.
9/9/20030:01 9/9/2003 23:59 102 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
RISER WORK. MAINTENANCE DURING RISER
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE.
9/10/20030:01 9/10/200323:59 100 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
RISER WORK. MAINTENANCE DURING RISER I
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE.
9/11/20030:01 9/11/200323:59 101 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
RISER WORK. MAINTENANCE DURING RISER I
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE.
9/12/20030:01 9/12/2003 23:59 99 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
RISER WORK. I MAINTENANCE DURING RISER.
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE. I
9/13/20030:01 9/13/2003 23:59 100 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-PILOT/HP
RISER WORK. MAINTENANCE DURING RISER
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE.
Report Date: 11/5/2003
Page: 2 of 6
-
Excess Flare Log Report
9/14/20030:01 9/14/200323:59 101 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
RISER WORK. MAINTENANCE DURING RISER
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE.I
9/15/20030:01 9/15/200323:59 102 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-LP
RISER WORK. MAINTENANCE DURING RISER.
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE.I
9/16/20030:01 9/16/200323:59 101 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-PILOT/HP
RISER WORK. MAINTENANCE DURING RISER
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE.I
9/17/20030:01 9/17/200323:59 102 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
RISER WORK. MAINTENANCE DURING RISER
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE. I
9/18/20030:01 9/18/2003 23:59 100 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
RISER WORK. MAINTENANCE DURING RISER
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE.
9/19/20030:01 9/19/2003 6:00 35 Y GAS PIPELINE SHUT-IN FOR OPERATIONAL SCHEDULED MAINTENANCE GAS PIPELINE SHUT-IN FOR REPLACE BRUCE PIPELINE U-SP-HP
RISER WORK. MAINTENANCE DURING RISER
BRUCE RISER
REPLACEMENT. SHUT IN
WELL #9. LOWERED GAS
COMPRESSOR DISCHARGE
TO REDUCE FLARE. I
Report Date: 11/5/2003
Page: 3 of 6
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator
Field(s)
Bruce PlatfoIDl
Unoca! Oil and Gas
Granite Point
Disposition Volume MCF·
1. Sold 0
2. Reinjected 0
3. Flared orvented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Suoolemental reoort reauired-See 20 AAC 25.2351
5. Pilot and Purge 217
6. Used for lease operations 15,950
7. Other 0
TOTAL items I - 7 16,167
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
II. Trnnsfen:ed ta: 16,340
Remarks: Transfen:ed Fram: Anna P1atfonn 0
Transferred To: GPTF-LEX 11,100
GPTF-AB 5,240
Anna Platfonn 0
1 her::~tJat the forego~:d carr~t to the best afmy knowledge.
SignaU (j ...,t-- /;41 d' /~ / Title: Prod. Acc!. Date: 1lI18f2003
/1 r /
v '"./
Form 1 0-422
Rev.4I95
MonthlY ear af Disposition
October-03
*Indicate contribution of each pool to total.
Pool Name Code Percent
Lease 17586 280500 25.64%
Lease 17586 280150 12.32%
Lease 17587 280150 0.54%
Lease 18742 280150 61.51%
!:I:::!·I:¡:¡:¡:·:i:i:i:i·¡:!·!.::!:¡:!·:~[t'II~II:~:~I~III!!~::~!·::!:¡!:......::·..::·
1. Safety
MCF
2. Lease Use
MCF
3. Canserv. Pwposes
MCF
Commissioner
Date
Nate: All volumes must be carrected to
prassure of 14.65 psia and to a tempeIature af
60 degrees F. Report due by the 20th afthe
month following the month af disposition.
Authority 20 AAC 25.235
¥"
.....
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator
Field(s)
Bruce P1atfonn
Unoc.1 Oil and Gas
Otanite Point
MonthlY ear of Disposition
November-03
Disposition
Volume MCF*
·Indicate contribution of each pool to total.
1. Sold
435
Pool Name Code Percent
Lease 17586 280500 29.44%
Lease 17586 280150 11.69%
Lease 17587 280150 0.53%
Lease 18742 280150 58.34%
2. Reinjected
3. Flared or vented less than 1 hour
5. Pilot and Purge
210
6. Used for lease operations
14,672
7. other
.....:...:::::::::::::;:::;:;:::;:::::;:::;:;:;:;:;:::::::::::::::::::;:::::::::::::::::;:::;:;:;:;:;:::::;:::::::;:::::::::::::::::::::: ........................................
.....:.:.:.:.:.:.:.:.:.:.:.:.:.;.;.:.:.:.:.:.:.:.;.:.;.:.;.;.;.;.;.;.;.;.;.;.;.;.:.:.;.....;.;.;.;.;.;.;.;.:.;.:.:.:.:.:.:.:.:.:.:.:.:.:.:....., '. ........................................
::::::::::::::::;:::::::::::::i:::::::::::.I~~j~:Î:.__f:~:li:;:::·:':::·:::::::::::::::::::::::::;:
TOTAL items 1 - 7
15,317
1. Safety 435 MCF 3fL.
0
2. Lease Use MCF
70
MCF
8. NGL gas equivalent produced
9. Purchased gas
Remarks:
Transfened From:
Anna Platfonn
70
10. Transferred from:
11. Transferred to:
15,549
Transferred To:
GPTF-LEX
GPTF-AB
Anna Platfonn
10,227
5,322
o
Signa
Title: Prod. Ace!. Date:
12/1812003
Note: AU volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10..422
RoY. 4/95
,
#
Excess Flare Log Report
Facility Name:
BRUCE PLATFORM
MonthlY ear:
November 2003
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Cateaorv Reason Actions Taken Minimize Recurrence MP-2 ID Number
11/19/200311:00 11/19/200323:59 131 Y GAS COMPRESSOR AND VRU OPERATIONAL SCHEDULED MAINTENANCE GAS COMPRESSOR AND VRU SCHEDULED 8000 HR U-PM-D520
SHUTDOWN FOR DOWN FOR SCHEDULED 8000 INSPECTION,
MAINTENANCE. HR INSPECTION ON PREVENTATIVE
COMPRESSOR RETURN TO MAINTENANCE.
NORMAL OPERATIONS AS
SOON AS POSSIBLE.I
11/20/20030:01 11/20/200318:00 198 Y GAS COMPRESSOR AND VRU OPERATIONAL SCHEDULED MAINTENANCE GAS COMPRESSOR AND VRU SCHEDULED 8000 HR U-PM-0520
SHUTDOWN FOR DOWN FOR SCHEDULED 8000 INSPECTION -
MAINTENANCE. HR INSPECTION ON PREVENTATIVE
COMPRESSOR. RETURN TO MAINTENANCE.
NORMAL OPERATIONS AS
SOON AS POSSIBLE.
11/21/2003 13:00 11/21/200319:00 66 N GAS COMPRESSOR DOWN OPERATIONAL UNSCHEDULED MAINTENANCE GAS COMPRESSOR REPAIRED GLYCOL U-PM-D520
DURING DEHYDRATOR SHUTDOWN TO WORK ON CIRCULATING PUMPS ON
MAINTENANCE. DEHYDRATOR GLYCOL DEHYDRATOR
PUMPS. REPAIRED GLYCOL
CIRCULATING PUMPS SINCE
REBOILER WAS
OVERHEATING. RETURN TO
NORMAL OPERA TIONS.
11/27/200321 :40 11/27/200323:25 40 N PLATFORM SHUT-IN DUE TO AC OPERATIONAL OTHER: SEE DESC OF EVENT AC GENERATOR BATIERY REPLACED BATIERIES IN U-PM-D052
GENERATORBATIERY FAILURE RESULTED IN AC GENERATOR
FAILURE. PLATFORM SHUT-IN.
REPLACED BAD BATTERIES
IN GENERATOR AND
RETURNED FACILITY TO
NORMAL OPERATIONS AS
SOON AS POSSIBLE.
Report Date: 12/17/2003
Page: 1 of 4
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Operator
Fi.ld(s)
Bruce Platfonn
Unocal Oil and Gas
Granite Point
Disposition Volume MCF·
1. Sold 0
2. Reinjected 0
3. FJared or vented less than I hour 0
4. FJared or vented greater than 1 hour 0
(SUpplemental revort reouned-See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operatioDS 16,121
7. Other 0
TOTAL items I - 7 16,338
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. TransfelTed to: 16,182
Remarks: TrnnsfClTed From: AnnaPlatlhnn 0
Transferred To: GPTF-LEX 10,717
GPTF-AB 5,465
Anna Platfonn 0
I hereby :r1: fore~~ and correct to the best of my knowledge.
Signature J7)-/ ¡) ",1... A A A /1 r ./.,/ Title: Prod. Ace!. Date: 112012004
/T r7
1/ V
Form 10-422
Rav.4I95
MonthlY ear of Disposition
December-03
·Indicate contribution of each pool to total.
Pool Name Code Pen:ent
Lease 17586 280500 29.03%
Lease 17586 280150 12.41%
Lease 17587 280150 0.50%
Lease 18742 280150 58.06%
···:·I·:llill·I·:··I·II:::I··liIJjjJ!I·IIIJI~~III.!.~:~IIII.:IIIIII:iilill·"llillil·I::I:.I·11
1. Safety MCF
2. Lease Use MCF
3. CODS""'. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
DlOIrth following the month of disposition.
Authority 20 MC 2S.235