Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutGp GP Platform / Unocal
STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2004
FACILITY: GP GP Platform
OPERATOR: UNOCAL
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Operator
Granite Point
Granite Point Platfonn
Unocal Oil and Gas
Disposition Volume MCP"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than I hour 499
4. Flared or vented greater than I hour 0
(Supplemental report required-oSee 20 MC 25.235)
5. Pilot and Purge 620
6. Used far lease operations 40,147
7. Other 0
TOTAL items I - 7 41,266
8. NGL gas equivalent produced 0
9. Purchased gas 267
10. Transferred from: 0
II. Transferred to: 51
Remarks: Transferred From: Granite Point PIt. 0
Transferred T1 / ./1 OPTF-LEX 0
OPTF-OPP 51
" / I///
I here~ OJ f I rree! to the best of my knowledge.
/ // /Y -
Signature /1 F II f/V Title: Prod Acct. Date: 2/2312004
/ vi.
Form 10.422
Rev.4/95
MonthN ear of Disposition
January-04
"Indicate contribution of each pool to total.
Pool Name Code Percent
TyonekLease 18761 280150 83.40%
Hemlock Lease 18761 280152 8.84%
Tyonek Lease 374044 280150 1.80010
Tyonek Lease 374045 280150 5.96%
II!.!·!.!··II·I··I:I::I::I¡¡·~··:·¡:II~I~IIIII·~II.~·:1¡111·!I··¡¡¡!.:.I!.III!III!I!¡¡II~li
1. Safety MCP
2. Lease Use MCF
3. Conserv. Purposes MCF
Connnissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 MC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Granite Point Platform
Unocal Oil and Gas
Granite Point
MonthlY ear of Disposition
February-04
1. Sold
o
*Indicate contribution of each pool to total.
Pool Name Code Percent
TyonekLease 18761 280150 82.49%
Hemlock Lease 18761 280152 9.52%
Tyonek Lease 374044 280150 1.86%
TyonekLease 374045 280150 6.14%
Disposition
Volume MCF"
2. Reinjee!ed
o
3. Flared or vented less than 1 hour
278
o
5. Pilot and Purge
580
6. Used far lease operations
35,205
7. Other
o
....................
.......................................... ...........................................
....................... .........................
......................................... ....................................,....................................... .. ..... ....... ..
~:¡::::!:!:!!:::!!!:!:!::::!:!¡¡¡¡¡::¡:¡¡I~~~:I~:~:~:~_:II_:r:¡ì::~:::::::::::~:::!:!!!!:~!:¡¡:¡::¡:::::~.
............
TOTAL items I - 7
36,063
1. Safety
MCF
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
1,027
3. Conserv. Pwposes
MCF
10. Transferred from:
o
11. Transferred to:
100
Commissioner
Date
Remarks: Transferred From:
Granite Point PIt.
o
Transferred To:
GPTF-LEX
GPTF-GPP
o
100
Title: Prod. Acct. Date:
3/19/2004
Note: All volumes must be carree!ed to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 MC 25.235
I her
Form 1D-422
Rev.4I95
..
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
1330000006
2. Facility Name
GRANITE POINT PLATFORM
Disposition
3. Field 4. Operator 5. MonthlYear of Disposition
GRANITE POINT UNOCAL ALASKA March-04
Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
0 Pool Name
18761
0 18761
374044
900 374045
952
620
35,761
0
38,233
0
2,731
0
172
0
0
(172)
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
11. Used for lease operations (specify in Remarks)
12. Other (see instructions)
13. TOTAL VOLUME (ITEMS 6-12)
14. NGL Gas Equivalent
15. Purchased gas
16. Transferred from:
17. Transferred to: (Express as a negative #)
18. Remarks:
Transferred From: Granite Point Platform
Transferred To: GPTF-LEX
GPTF-GPP
Title
Signature
Printed Name
Janet Dormady
Phone 907-263-7946
Pool Code
280150
280152
280150
28015Q
Percent
82.92%
9.20%
1.83%
. 6.05.0/.
~
MCF
50 MCF JߡL-
Production Accountant
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
AAC25.235.
Date
April 20, 2004
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
·
Excess Flare Log Report
Facility Name:
GRANITE POINT PLATFORM
MonthlY ear:
March 2004
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
3/10/20048:15 3/10/200423:59 22 N BRINGING AC GENERATOR OPERATIONAL OTHER: SEE DESC OF EVENT ATTEMPTING TO BRING AC RETURN AC GENERATOR P-SP-LP
BACK ON-LlNE. GENERATOR TO FULL LOAD TO NORMAL OPERATION AT
AFTER BEING DOWN FOR FULL LOAD.O
MAINTENANCE. GENERATOR
NOT TAKING LOAD SO
EXCESS SALES GAS SENT TO
GPTF AND TO FLARE FOR
NECESSARY FACILITY
OPERATIONS. MONITOR AND
BALANCE GAS FLOW AND
PRESSURE BETWEEN GPP
AND GPTF UNTI
3/11/20040:01 3/11/200411:30 26 N BRINGING AC GENERATOR OPERATIONAL OTHER: SEE DESC OF EVENT ATTEMPTING TO BRING AC RETURN AC GENERATOR P-SP-LP
BACK ON-LlNE. GENERATOR TO FULL LOAD TO NORMAL OPERATION AT
AFTER BEING DOWN FOR FULL LOAD.O
MAINTENANCE. GENERATOR
I NOT TAKING LOAD SO
EXCESS SALES GAS SENT TO
GPTF AND TO FLARE FOR
NECESSARY FACILITY
OPERATIONS. MONITOR AND
BALANCE GAS FLOW AND
PRESSURE BETWEEN GPP
AND GPTF UNT
-
3/12/2004 5:00 3/12/2004 22:00 606 Y CENTAUR SHUTDOWN FOR 4000 OPERATIONAL SCHEDULED MAINTENANCE CENTAUR GAS COMPRESSOR 4000 HR INSPECTION ON P-SP-LP
HR INSPECTION NECESSARY SID FOR SCHEDULED CENTAUR GAS
FOR SAFE FACILITY MAINTENANCE. COMPRESSOR.
OPERATIONS. EXCESS GAS
FLARED DURING SID AND WHILE
BRINGING GAS LIFT WELLS
BACK ON-LINE. WELL SPIKES
AND BLOWDOWN OF WELLS
FOLLOWING SID TO RETURN TO
NORMAL OPERATIONS.
..... 3/13/20047:30 3/13/2004 8:45 124 Y BLOW DOWN WELL 44-14. OPERATIONAL BLOW DOWN WELL BLOW DOWN WELL 44-14 ADJUST AND OPTIMIZE P-SP-HP
FOLLOWING CENTAUR SID TO WELL PRODUCTION.
RETURN FACILITY TO
NORMAL OPERATIONS.
~ 3/13/2004 22:30 3/13/2004 23:59 123 Y BLOW DOWN WELL 11-13.1 OPERATIONAL BLOW DOWN WELL BLOW DOWN WELL 11-13 ADJUST AND OPTIMIZE P-SP-HP
FOLLOWING CENTAUR SID TO WELL PRODUCTION.
RETURN FACILITY TO
- NORMAL OPERATIONS.
3/22/2004 10:05 3/22/2004 15:00 10 N WELL SPIKES. OPERATIONAL WELL SPIKES ATTEMPT TO STABILIZE AND ADJUST AND OPTIMIZE P-SP-LP
ADJUST GAS LIFT WELLS. WELL PRODUCTION.
FLARING OF MINIMAL EXCESS
GAS NECESSARY FOR SAFE
FACILITY OPERATIONS.
Report Date: 4/21/2004
Page: 1 of 2
Excess Flare Log Report
3/23/200413:00 3/23/2004 17:00 7 N WELL SPIKES. OPERATIONAL WELL SPIKES ATTEMPT TO STABILIZE AND ADJUST AND OPTIMIZE P-SP-LP
ADJUST GAS LIFT WELLS. WELL PRODUCTION.
FLARING OF MINIMAL EXCESS
GAS NECESSARY FOR SAFE
FACILITY OPERATIONS.
3/25/2004 11 :00 3/25/2004 15:00 7 N WELL SPIKES. OPERATIONAL WELL SPIKES ATTEMPT TO STABILIZE AND ADJUST AND OPTIMIZE P-SP-LP
ADJUST GAS LIFT WELLS. WELL PRODUCTION.
FLARING OF MINIMAL EXCESS
GAS NECESSARY FOR SAFE
FACILITY OPERATIONS.
3126/200410:00 3/26/2004 17 :00 17 N WELL SPIKES. OPERATIONAL WELL SPIKES ATTEMPT TO STABILIZE AND ADJUST AND OPTIMIZE P-SP-LP
ADJUST GAS LIFT WELLS. WELL PRODUCTION.
FLARING OF MINIMAL EXCESS
GAS NECESSARY FOR SAFE
FACILITY OPERATIONS.
3/27/2004 11 :00 3/27/200414:00 6 N WELL SPIKES. OPERATIONAL WELL SPIKES ATTEMPT TO STABILIZE AND ADJUST AND OPTIMIZE P-SP-LP
ADJUST GAS LIFT WELLS. WELL PRODUCTION.
FLARING OF MINIMAL EXCESS
GAS NECESSARY FOR SAFE
FACILITY OPERATIONS.
3/27/2004 15:00 3/27/2004 17:00 4 N WELL SPIKES. OPERATIONAL WELL SPIKES ATTEMPT TO STABILIZE AND ADJUST AND OPTIMIZE P-SP-LP
ADJUST GAS LIFT WELLS. WELL PRODUCTION.
FLARING OF MINIMAL EXCESS
GAS NECESSARY FOR SAFE
FACILITY OPERATIONS.
Report Date: 4/21/2004
Page: 2 of 2
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
o
Pool Name
18761
18761
374044
374045
1. Facility Number
1330000006
2. Facility Name
GRANITE POINT PLATFORM
Disposition
3. Field 4. Operator
GRANITE POINT UNOCAL ALASKA
Volume MCF 20. For production from multiple pools, list contrib
Total Volume.
nthlYear of Disposition
March-04
ion of each pool. as a percent
1,186 Waste:
0
317
0
0
(317)
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
683
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
600
11. Used for lease operations (specify in Remarks)
36,338
12. Other (see instructions)
13. TOTAL VOLUME (ITEMS 6-12)
14. NGL Gas Equivalent
15. Purchased gas
~.",
16. Transferred from:
17. Transferred to: (Express as a negative #)
18. Remarks: "
Transferred From: Granite Pqi/1(Platfonn
"
Transferred To:ßPTF-LEX
",/
0' GPTF-GPP
/....
'~:"::9=;t;4Y~~læge.
Printed Name Janet Donnady
Title
Phone 907-263-7946
Form 10-422 Rev. 2/2004
o
Percent
..3~:92%
9.20%
1.83%
6.05%
o
o
Safety
,p""."
,.,ø'.'
Lease Use
MCF
Conservation
MCF
MCF
Commissioner
Date
Production Accountant
Note: All volumes must be cOffected
to pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
AA C25. 235.
Date
May 19, 2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
~,";.._w_...~~
FACILITY REPORT OF PRODUCED GAS DISPOSITION
REVISED COP'r'
JÆl...A "-~-
Date
1. Facility Number
2. Facility Name
1330000006
GRANITE POINT PLATFORM
Disposition
3. Field 4. Operator 5. MonthNear of Disposition
REVISION
GRANITE POINT UNOCAL ALASKA A ril-04
Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
o
Pool Name
18761
18761
374044
374045
Pool Code
280150
280152
280150
280150
Percent
82.92%
9.20%
1.83%
6.05%
7. Reinjected
o
8. Flared or vented 1 hour or less
683
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
600
11. Used for lease operations (specify in Remarks)
36,338
12. Other (see instructions)
Authorization >1 hr:
Safety
MCF
o
13. TOTAL VOLUME (ITEMS 6-12)
37,621
Lease Use
MCF
14. NGL Gas Equivalent
o
Conservation
MCF
15. Purchased gas
1,186
Waste:
MCF
16. Transferred from:
o
17. Transferred to: (Express as a negative #)
Commissioner
Date
2,071
. 18. Remarks:
Transferred From: Granite Point Platform
o
Transferred To: GPTF-LEX
GPTF-GPP
o
(2,071 )
Signature
Title
Production Accountant
I hereby certify
Printed Name
Phone 907·263·7946
Date
July 23, 2004
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
AAC25.235.
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
1330000006
2. Facility Name
GRANITE POINT PLATFORM
Disposition
3. Field 4. Operator 5. MonthlYear of Disposition
GRANITE POINT UNOCAL ALASKA A ril-04
Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
o
Pool Name
18761
18761
374044
374045
Pool Code
280150
280152
280150
280150
Percent
82.92%
9.20%
1.83%
6.05%
7. Reinjected
o
8. Flared or vented 1 hour or less
683
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
600
11. Used for lease operations (specify in Remarks)
36,338
12. Other (see instructions)
o
Authorization >1 hr:
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
37,621
Lease Use
MCF
14. NGL Gas Equivalent
o
Conservation
MCF
15. Purchased gas
1,186
Waste:
MCF
16. Transferred from:
o
17. Transferred to: (Express as a negative #)
Commissioner
Date
18. Remarks:
Transferred From: Granite Point Platfonn
o
317
Transferred To: GPTF-LEX
GPTF-GPP
o
(317)
Printed Name
Janet Dormady
Phone 907-263-7946
Date
May 21, 2004
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
AAC25.235.
Signature
Title
Production Accountant
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
..
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
1330000006
2. Facilio/ Name
GRANITE POINT PLATFORM
Disposition
3. Field 4. Operator 5. MonthlYear of Disposition
GRANITE POINT UNOCAL ALASKA Ma -04
Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0 Pool Name Pool Code Percent
18761 280150 82.92%
0 18761 280152 9.20%
374044 280150 1.83%
730 374045 280150 6.05%
7. Reinjected
8. Flared or vented 1 hour or less
10. Pilot and Purge
9. Flared or vented more than 1 hour (see instr.)
11. Used for lease operations (specify in Remarks)
36,874
0 .Jéir
38,392 MCF
Lease Use
0 MCF
Conservation Ibß
450 MCF
0
12. Other (see instructions)
13. TOTAL VOLUME (ITEMS 6-12)
14. NGL Gas Equivalent
15. Purchased gas
16. Transferred from:
17. Transferred to: (Express as a negative #)
18. Remarks:
Transferred From: Granite Point Platform
o
Transferred To: GPTF-LEX
GPTF-GPP
o
(3,021 )
Printed Name
Phone 907-263-7946
Date
June 8, 2004
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
AA C25. 235.
Title
Production Accountant
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
Excess Flare Log Report
Facility Name:
GRANITE POINT PLATFORM
MonthlY ear:
May 2004
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? DescriDtion of Incident Cateaorv Reason Actions Taken Minimize Recurrence MP-2 ID Number
5/1/2004 1 :00 5/1/20043:00 168 N RETURN WELLS TO NORMAL OPERATIONAL BLOW DOWN WELL UNLOADING GP 50 AND 51 TO NORMAL OIL FIELD
OPERATION AFTER NO FLOW FLARE AFTER NO FLOW TEST OPERATION.
TEST. COMPLETED.
'"
Report Date: 6/8/2004
Page: 2 of 2
STATE OF ALASKA
LASKA OIL AND GAS CONSERVATION COMMISSION
FACILITREPORT OF PRODUCED GAS DISPOSITION
GRANITE POINT UNOCAL ALASKA June-04
Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Pool Code
280150
280152
280150
280150
1. Facility Number
2. Facility Name
3. Field
1330000006 GRANITE POI T PLATFORM
Disposition
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
648
9. Flared or vented more than 1 hour (see instr.)
1,469
10. Pilot and Purge
600
11. Used for lease operations (specify in Remarks)
33,499
12. Other (see instructions)
13. TOTAL VOLUME (ITEMS 6-12)
36,216
14. NGL Gas Equivalent
15. Purchased gas
1,601
16. Transferred from:
17. Transferred to: (Express as a negative #)
3,621 )
18. Remarks:
Transferred From: Granite Point Platform
Transferred To: GPTF-LEX
GPTF-GPP
(759)
(2,862)
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature
Phone 907-263-7946
Title
Printed Name
Form 10-422 Rev. 2/2004
4. Operator
5. MonthlYear of DispoSition
o
Pool Name
18761
18761
374044
374045
Percent
82.92%
9.20%
1.83%
6.05%
o
o
o
o
o
Production Accountant
Note: All volumes must be cQrrected
to pressure of 14.65 psia and to a
temperature of 600 F_ Authority 20
AAC25.235.
Date
July 20, 2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
Excess Flare Log Report
Facility Name: GRANITE POINT PU TFORM Month/Year: June 2004
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
6/8/20040:00 6/8/2004 23:59 342 Y COMPRESSOR SHUTDOWN FOR OPERATIONAL SCHEDULED MAINTENANCE SHUTDOWN COMPRESSOR INSPECTION AND P·PM-1270
SCHEDULED MAINTENANCE. FOR 400 HOUR INSPECTION MAINTENANCE.
NECESSARY FOR SAFE
OPERATIONS. PIPING
REPLACED AT THE SAME
TIME TO A VOID ADDITIONAL
SHUTDOWN.
6/9/20040:01 6/9/2004 20:00 697 Y OMPRESSOR SHUTDOWN FOR OPERATIONAL WELL SPIKES SHUTDOWN COMPRESSOR INSPECTION AND P-PM·1270
SCHEDULED MAINTENANCE. FOR 400 HOUR INSPECTION MAINTENANCE.
NECESSARY FOR SAFE
OPERATIONS. PIPING
REPLACED AT THE SAME
TIME TO AVOID ADDITIONAL
SHUTDOWN.
6/10/20040:01 6/10/2004 16:00 122 N COMPRESSOR SHUTDOWN FOR OPERATIONAL WELL SPIKES SHUTDOWN COMPRESSOR INSPECTION AND P-SP-PILOTILP
SCHEDULED MAINTENANCE. FOR 400 HOUR INSPECTION MAINTENANCE.
NECESSARY FOR SAFE
OPERATIONS. PIPING
REPLACED AT THE SAME
TIME TO AVOID ADDITIONAL
SHUTDOWN.
6/12/2004 8:00 6/121200416:00 287 N OMPRESSOR SHUTDOWN DUE OPERATIONAL UNSCHEDULED MAINTENANCE COMPRESSOR WAS STARTED P-PM-1510
o A POWER OUT AGE. AND LOADED AFTER POWER
WAS RETURNED.
6/16/2004 12:15 6/181200414:15 21 Y TURBINE SHUT DOWN FOR 4000 OPERATIONAL SCHEDULED MAINTENANCE TURBINE WATER WASH TURBINE WAS RESTARTED P-PM-1510
rtoUR PREVENTIVE COMPLETED TO PREVENT AND RETURNED TO
MAINTENANCE. CARBON BUILDUP AND NORMAL OPERATIONS.
THEREFORE ALLOW ENGINE
TO RUN MORE EFFICIENTL Y.
'líl?
" 'if I
I
Report Date: 7/20/2004
Page; 1 of 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthlYear of Disposition
1330000006 GRANITE POINT PLATFORM GRANITE POINT UNOCAL ALASKA Julv-04
Disposition Volume MCF 20. For production from multiple pools, fist contribution of each pool as a percent of
Total Volume.
6. Sold 0 Pool Name Pool Code Percent
18761 280150 82.92%
7. Reinjected 0 18761 280152 9.20%
374044 280150 1.83%
8. Flared or vented 1 hour or less 641 374045 280150 6.05%
9. Flared or vented more than 1 hour (see ¡nstr.) 91 ./
10. Pilot and Purge 620
11. Used for lease operations (specify in Remarks) 35,784
_~~~·:f<... '~'" " . . i'~."';~~
12. Other (see instructions) .-
0 Authorization >1 hr: q, MCF
Safety
13. TOTAL VOLUME (ITEMS 6-12) 37,136 MCF
Lease Use
14. NGL Gas Equivalent 0 / MCF
Conservation
15. Purchased gas .-
10 WastY 7 1:7 h MCF
16. Transferred from: 0 77~ ~ '1 ft/ tJf/
-r- 11 .-"
17. Transferred to: (Express as a negative #) 17 -- :::COmmissioner I l1"ate I
(6,562\
18. Remarks:
Transferred From: Granite Point Platfonn 0
TœMfuned To, ~~ (3,666)
~ - PP (2.896)
~/ / '/
I hereby c ~ ~d correct to~H[~~"f.A
Signature /f Á t, Note: All volumes must be cOffected
'/f/ --
_ ^ ^ ",,,n. Title Production Accountant to pressure of 14.65 psia and to a
í AU \J .II '11 ,"UUT temperature of 600 F. Authority 20
Printed Name Janet Dormady Phone 907·263·7946 Date August 20, 2004 AAC25.235.
~
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
Excess Flare Log Report
Facility Name:
GRANITE POINT PLATFORM
MonthlYear:
July 2004
Date & Time Event Gas Steps Taken to Equipment Down
Beain End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
7/1/200422:00 7/1/200423:59 28 N VAPOR RECOVERY UNIT OPERATIONAL UNSCHEDULED MAINTENANCE SHUTDOWN VAPOR INSPECTION AND 00-00-00
SHUTDOWN FOR RECOVERY UNIT TO REPAIR MAINTENANCE.'
MAINTENANCE. COOLANT LINE LEAK.'
7/212004 0:00 7/212004 1 :30 27 N VAPOR RECOVERY UNIT OPERATIONAL UNSCHEDULED MAINTENANCE SHUTDOWN VAPOR VAPOR RECOVERY UNIT 00-00-00
SHUTDOWN FOR RECOVERY UNIT TO REPAIR WAS RESTARTED AND
MAINTENANCE. COOLANT LINE LEAK.( RETURNED TO NORMAL
OPERATIONS.(D
7/312004 0:00 7/312004 2:15 36 N VAPOR RECOVERY UNIT OPERATIONAL UNSCHEDULED MAINTENANCE SHUTDOWN VAPOR VAPOR RECOVERY UNIT 00-00-00
SHUTDOWN FOR RECOVERY UNIT TO REPAIR WAS RESTARTED AND
MAINTENANCE., A SECOND COOLANT LINE RETURNED TO NORMAL
LEAK. OPERATlONS.(D
Report Date: 8/20/2004
Page: 1 of 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000006 GRANITE POINT PLATFORM GRANITE POINT UNOCAL ALASKA August-04
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold 0 Pool Name Pool Code Percent
GRANITE PT, MIDDLE KENAI OIL 280150 85.37%
7. Reinjected 0 GRANITE PT, HEMLOCK UNDEF OIL 280152 14.63%
8. Flared or vented 1 hour or less 567
9. Flared or vented more than 1 hour (see ¡nstr.) 0
10. Pilot and Purge 620
11. Used for lease operations (specify in Remarks) 36,465
: "':: ,: '.. . ,.,., 'Qf'fic@,:\..!~~ Qnly. . " .
12. Other (see instructions) ,',. '. ....., .'.
0 Authorization >1 hr: MCF
Safety
13. TOTAL VOLUME (ITEMS 6-12) 37,652 MCF
Lease Use
14. NGL Gas Equivalent 0 MCF
Conservation
15. Purchased gas 604 Waste: MCF
16. Transferred from: 0
17. Transferred to: (Express as a negative #) Commissioner Date
(4,052)
18. Remarks:
Transferred From: Granite Point Platform 0
Transferred To: GPTF-LEX (1,016)
GPTF-GPP (3,036)
_I. "':
I ""eby œn~ ij fue [0,..","9 . true '0' conect to the b kbliw .",..
Signature nAJI ,~ 1~.J... hili /J J h ~EP 1 & 2004 Note: All volumes must be corrected
Title Production Accountant to pressure of 14.65 psía and to a
~ Janet gmadY temperature of 600 F. Authority 20
Printed Name Phone 907·263·7946 Date September 16, 2004 AAC25.235.
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
\
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthfYear of Disposition
1330000006 GRANITE POINT PLATFORM GRANITE POINT UNOCAL ALASKA SeDtember-04
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 0 Pool Name Pool Code Percent
18761 280150 82.92%
7. Reinjected 0 18761 280152 9.20%
374044 280150 1.83%
8. Flared or vented 1 hour ór les5 573 374045 280150 6.05%
9. Flared or vented more than 1 hour (see Instr.) 2,377
10. Pilot and Purge 600
11. Used for lease operations (specify in Remarks) 33,572
.."".. . .:.:.,. >~cΡifrt:Js'~'.~ñ(Y: ... . .
. '"
12. Other (see instructions) .. .
0 Authorization >1 hr: MCF
Safety l,Z '-'I
13. TOTAL VOLUME (ITEMS 6-12) 37,122 MCF
~ Lease Use 115<'"
14. NGL Gas Equivalent ,
0 ~ Conservation MCF
15. Purchased gas 3,054 I~ste: I .f V/ '~ I I MCF
16. Transferred from: 0 _/~~ ~~ /t/J/or/
17. Transferred to: (Express as a negative #) V iCer'fimissioner I T Dare
(2,358'
18. Remarks:
Transferred From: Granite Point PlatfOlm 0
Transferred To: GPTF-LEX 0
GPTF-GPP (2,358)
I """,by œ~ t "a f""'go;;~:ru. eod "",act to ... best P.tJQ!<l<oowled~. d
')-, ..1 .. AI Janet L. orma y Note: All volumes must be corrected
Signatu ~A ./' 'V V . n h Title Production Accountant to pressure of 14.65 psia and to a
!(..2 UL I 1 ð LUU4 temperature of 600 F. Authority 20
Printed Nam Janet ormady Phone 907·263·7946 Date October 18, 2004 AAC25.235.
~
~,A!-
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
..
Excess Flare Log Report
Facility Name:
GRANITE POINT PLATFORM
MonthlY ear:
September 2004
Date & Time Event Gas Steps Taken to Equipment Down
Beain End MCF Planned? Description of Incident Cateaol"Y Reason Actions Taken Minimize Recurrence MP-2 ID Number
9/8/2004 6:30 9/8/2004 10:30 507 Y GAS LIFT COMPRESSOR OPERATIONAL SCHEDULED MAINTENANCE GAS LIFT COMPRESSOR PERFORMED SCHEDULED P-PM-1270
SHUTDOWN FOR REPAIRS. SHUTDOWN DOWN FOR PREVENTATIVE
SCHEDULED PREVENTATIVE MAINTENANCE AND
MAINTENANCE AND REPAIRS. REPAIRS AND PLANNED .
ALSO PLANNED GAS LINE GAS LINE PIPING
PIPING MODIFICATIONS MODIFICATIONS
WERE MADE FOR UPCOMING NECESSARY TO MAINTAIN
SMART PIG PROJECT. FACILITY OPERATIONS.
COMPRESSOR RETURNED TO
NORMAL OPERATIONS AS
SOON AS POSSIBLE.
9/9/20040:01 9/912004 23:59 309 Y ALL WELLS WERE SHUT-IN IN OPERATIONAL OTHER: SEE DESC OF EVENT NO-FLOW TESTS WERE WELLS PASSED NO-FLOW 00-00-00
PREPARATION FOR REQUIRED BY AOGCC. ONCE TESTS. WELLS WILL LIKELY
PREVENTATIVE MAINTENANCE TESTS WERE COMPLETED NOT BE REQUIRED TO BE
SHUTDOWN TO FACILITATE WELLS WERE RETURNED TO SHUT-IN FOR THIS TYPE OF
CONTINUED FACILITY NORMAL OPERATIONS AS EVENT AGAIN.
OPERATIONS. WELLS 13-13 AND SOON AS POSSIBLE.
GP-54 WERE LEFT SHUT-IN AND
SUBSEQUENTLY BLOWN DOWN
TO FLARE TO COMPLETE NO-
FLOW TESTS.
9/11/2004 14:00 9/11/2004 19:00 405 N GAS LIFT COMPRESSOR OPERATIONAL UNSCHEDULED MAINTENANCE SHUTDOWN TO REPAIR REPAIRED GAS LIFT P-PM·1270
SHUTDOWN FOR NECESSARY PROBLEM WITH SPARGING COMPRESSOR TO BE ABLE
MAINTENANCE AND REPAIRS. AIR TO THE GAS LIST TO SPARGE AIR.
COMPRESSOR. RETURNED
TO NORMAL OPERATIONS AS
~ SOON AS POSSIBLE.
9/29/2004 9 :40 9/29/2004 19: 1 0 ~I) Y PIPELINE SHUT-IN FOR OPERATIONAL OTHER: SEE DESC OF EVENT GAS LINE SHUT-IN PERFORMED PIGGING ON 00-00-00
SCHEDULED SMART PIGGING TEMPORARILY TO PERFORM PIPELlNE.
NECESSARY TO FACILITATE NECESSARY SMART PIGGING.
CONTINUED FACILITY EXTENSIVE PLANNING AND
OPERATIONS. ALL GAS BEING PIPING CHANGES HAVE BEEN
USED TO PUSH THE PIG FROM COMPLETED TO ENSURE
GPTF TO GPP MUST BE PIGGING GOES SMOOTHLY.
FLARED. RETURNED TO NORMAL
OPERATIONS AS SOON AS
POSSIBLE.
_Î ""
9130/2004 0:01 9/30/2004 18: 1 0 ~ LJ Y FLARING OCCURRED WHILE OPERATIONAL SCHEDULED MAINTENANCE THE EFFORT WAS PIGGING IS A NECESSARY 00-00-00
PIPING MODIFICATIONS AND PREPLANNED TO MINIMIZE ACTION TAKEN TO ENSURE
PIGGING NECESSARY TO DOWNTIME AND REDUCE SAFE AND CONTINUOUS
ENSURE SAFE AND FLARING. OPERATIONS. THESE ARE
CONTINUOUS OPERATIONS USUALLY PLANNED
WERE CONDUCTED. ACTIONS THAT WILL
RESULT IN FLARING.
~ / .
~vtr,... 1. .
~ .'L.--
. '~"""':t ^^, ~
U· l.U\I"t
Report Date. 10/18/2004
Page: 1 of 1
..~
Flare Events Less Than 1 Hour
Facility Name:
GRANITE POINT PLATFORM
MonthlY ear:
September 2004
Date & Time Event Gas Steps Taken to Equipment Down
Description of Incident Reason Actions Taken Minimize
Beain End MCF Planned? CategorY Recurrence Mp·2 ID Number
9/1/2004 12:00 9/1/2004 12:20 11 N OPERATIONAL NORMAL OPERATIONS
9/212004 12:00 9/2/2004 12:10 5 N OPERATIONAL NORMAL OPERATIONS
91312004 12:00 9/3/200412:46 66 N OPERATIONAL NORMAL OPERATIONS
9/4/2004 12:00 9/4/2004 12:35 29 N OPERATIONAL NORMAL OPERATIONS
9/5/2004 12:00 9/5/2004 12:20 17 N OPERATIONAL NORMAL OPERATIONS
9/612004 15:30 9/6/2004 16:00 16 N OPERATIONAL WELL SPIKES
917120047:20 91712004 6:00 11 N OPERATIONAL WELL SPIKES
9/10/200422:00 9/10/200423:00 94 N OPERATIONAL BLOW DOWN WELL
9/12/2004 11:00 9/12/2004 11 :46 13 N OPERATIONAL WELL SPIKES
9/13/200411:00 9/13/2004 11:47 13 0 OPERATIONAL NORMAL OPERATIONS
9/14/2004 1 t :00 9/14/200411:45 13 N OPERATIONAL NORMAL OPERATIONS
9/15/200411:00 9/15/2004 11 :30 13 N OPERATIONAL NORMAL OPERATIONS
9/16/2004 10:00 9/16/2004 10:45 14 Y OPERATIONAL NORMAL OPERATIONS
9/17/200410:45 9/17/2004 11 :30 14 Y OPERATIONAL NORMAL OPERATIONS
9/16/200413:00 9/16/200413:45 15 N OPERATIONAL NORMAL OPERATIONS
9/19/200411:00 9/19/200411:50 19 N OPERATIONAL NORMAL OPERATIONS
9/20/2004 11 :00 9/20/2004 11 :40 13 N OPERATIONAL WELL SPIKES
Report Date: 10/18/2004
1 of 6
,.
Flare Events Less Than 1 Hour
Facility Name:
GRANITE POINT PLATFORM
MonthlY ear:
September 2004
Date & Time Event Gas Steps Taken to Equipment Down
Description of Incident Reason Actions Taken Minimize
Beain End MCF Planned? Category Recurrence Mp·2 ID Number
9/20/2004 13:30 9/20/2004 14: 1 0 10 N OPERATIONAL WELL SPIKES
9/21/200412:00 9/2112004 12:30 12 N OPERATIONAL WELL SPIKES
9122/2004 15: 15 9/22/2004 15:30 7 N OPERATIONAL WELL SPIKES
9/2312004 13:00 9/23/2004 13:45 15 N OPERATIONAL WELL SPIKES
9/24/2004 12:30 9/24/2004 13: 15 14 N OPERATIONAL WELL SPIKES
9/25/2004 10:00 9/25/2004 10:45 20 N OPERATIONAL WELL SPIKES
9/25/2004 12:00 9/25/2004 12:30 11 N OPERATIONAL WELL SPIKES
9/25/2004 17:00 9/25/200417:30 28 N OPERATIONAL OTHER: SEE OESC OF EVENT High pressure shore line due to P-SP-HP
gas compressor shut down at tank
farm.
9/25/2004 18:00 9/25/2004 18:15 20 N OPERATIONAL OTHER: SEE DESC OF EVENT Adjusted flare control valve down P-SP-HP
after slart up @ Tank Farm
9/26/2004 13: 15 9/26/2004 14:00 15 N OPERATIONAL WELL SPIKES
9/27/20049:00 9/27/20049:45 17 N OPERATIONAL NORMAL OPERATIONS
9/28/2004 12:00 9/28/2004 12:30 26 N OPERATIONAL NORMAL OPERATIONS
Report Date: 10/18/2004
20f6
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
2. Facility Name
3. Field
4. Operator
5. MonthlYear of Disposition
1330000006
GRANITE POINT PLATFORM
Disposition
GRANITE POINT UNOCAL ALASKA October-04
Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
o
Pool Name
18761
18761
374044
374045
Pool Code
280150
28015:;!
280150
280150
Percent
61.42%
29.76%
2.05%
6.78%
7. Reinjected
o
8. Flared or vented 1 hour or less
543
6,696 0/
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
567
11. Used for lease operations (specify in Remarks)
27,830
12. Other (see instructions)
o
.... ..' ............... .............. .;<" ····J···ø:mªjårl)~JfOl1ly .
Authorization >1 hr:
.......
Safety
',b~f,...
.,.......
MCF
0Ae-
13. TOTAL VOLUME (ITEMS 6-12)
35,636
14. NGL Gas Equivalent
o
Lease Use
'""
// ~ lonservation
W¥te: / IA /" /j "
l / rYl;J( ~
V ~mmissiòñër
MCF
MCF
16. Transferred from:
o
.
/ / MCF
¡-:-íJí 6Cf
/ I Date
15. Purchased gas
6,942
17. Transferred to: (Express as a negative #)
(2,482)
18. Remarks:
Transferred From: Granite Point Platform
o
Transferred To: GPTF-LEX
GPTF-GPP
o
(2,482)
-
I hereby cert~'fy jhe foregoing is true and correct to taJl1et ollJ1Y
J... . .ÁJ I _ ß/J .......11
Signatu //J~~u. -~1I6IÃ."''''A NIIV 192004
Printed NaP JanetarmadY
Phone 907·263·7946
Date November 18, 2004
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
AAC25.235.
Title
Production Accountant
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
Excess Flare Log Report
Facility Name:
GRANITE POINT PLATFORM
MonthlY ear:
October 2004
Date & Time Event Gas Steps Taken to Equipment Down
Beain End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
10/4/2004 10:00 10/4/2004 23:00 1288 Y SHUTDOWN PIPELINE AND ALL OPERATIONAL OTHER: SEE DESC OF EVENT PIPELINE SHUT-IN NORMAL PLANNED
EQUIPMENT FOR SMART PIG NECESSARY FOR FACILITY OPERATIONAL
OPERATIONS. OPERATIONS TO PERFORM MAINTENANCE.
SMART PIG (CLEANING) JOB.
CONTINOUS EFFORTS ARE
BEING MADE TO COMPLETE
PROJECT AND RETURN TO
NORMAL OPERATIONS AS
SOON AS POSSIBLE.
10/5/20040:01 10/5/200423:59 1889 Y SHUTDOWN PIPELINE AND ALL OPERATIONAL OTHER: SEE DESC OF EVENT PIPELINE SHUT-IN NORMAL PLANNED
EQUIPMENT FOR ONGOING NECESSARY FOR FACILITY OPERATIONAL
SMART PIG OPERATIONS. OPERATIONS TO PERFORM MAINTENANCE.
SMART PIG (CLEANING) JOB.
CONTINOUS EFFORTS ARE
BEING MADE TO COMPLETE
PROJECT AND RETURN TO
NORMAL OPERATIONS AS
SOON AS POSSIBLE.
10/6/20040:01 10/612004 23:59 2457 Y SHUTDOWN PIPELINE AND ALL OPERATIONAL OTHER: SEE DESC OF EVENT PIPELINE SHUT-IN NORMAL PLANNED
EQUIPMENT FOR ONGOING NECESSARY FOR FACILITY OPERATIONAL
SMART PIG OPERATlONS. OPERATIONS TO PERFORM MAINTENANCE.
SMART PIG (CLEANING) JOB.
CONTINOUS EFFORTS ARE
BEING MADE TO COMPLETE
PROJECT AND RETURN TO
NORMAL OPERATIONS AS
SOON AS POSSIBLE.
10f712004 0:01 10/7/2004 23:59 442 Y SHUTDOWN PIPELINE AND ALL OPERATIONAL OTHER: SEE DESC OF EVENT PIPELINE SHUT-IN NORMAl. PLANNED
EQUIPMENT FOR ONGOING NECESSARY FOR FACILITY OPERATIONAL
SMART PIG OPERATIONS. OPERATIONS TO PERFORM MAINTENACE·I
SMART PIG (CLEANING) JOB.
CONTINOUS EFFORTS ARE
BEING MADE TO COMPI.ETE
PROJECT AND RETURN TO
NORMAL OPERATIONS AS
SOON AS POSSIBLE. JOB
FINISHED 10/9/04, NO
FLARING OCCURED ON 10/8
OR10/9.
10/10/20041:30 10/10/2004 ·23:59 344 Y BLOWING DOWN WELLS TO OPERATIONAL BLOW DOWN WELL BLOWING DOWN WELLS NORMAL FIELD P-PM-1270
RESTORE FLOWING. NECESSARY FOR FACILITY OPERATION.
OPERATIONS TO RESTORE
WELLS TO NORMAL
OPERATIONS AFTER SMART
~ JOB WAS COMPLETED.
. ...
Janr:::~ormaay
N ~ ~4
Report Date: 11/19/2004 I~ .L.~ '"uu· Page: 1 of 2
~
Excess Flare Log Report
10/26/2004 22:25 10/26/200423:59 138 N WELL GP-51 AND 32-13 SHUT IN OPERATIONAL BLOW DOWN WELL BLOWING DOWN WELLS WIRELlNE WAS INSPECTED 00-00-00
FOR INSPECTION OF NECESSARY FOR AND REQUIRES FURTHER
WIRELlNE.it's mike's INSPECTIONS AND REPAIRS. MAINTENANCE.
BLOW DOWN WELL 32-13 TO
RETURN BACK TO NORMAL
OPERATIONS. FOUND WELL
GP-51 TUBING PARTED AND
WILL REMAIN SHUT IN UNTIL
REPAIRS CAN BE MADE.l
10/27/20040:01 10/27/2004 1 :30 138 N WELLS SHUT-IN FOR OPERATIONAL BLOW DOWN WELL WELL GP-51 SHUT IN FOR REPLACED SAFE;TY AND P-SP-HP
NECESSARY MAINTENANCE AND WIRELlNE REPAIRS. WELLS ORIFACE VALVES ON
REPAIRS. WELL GP13-13, GP13-13 AND GP32-13 SHUT- WELLS GP32-13 AND GP13-
REPLACED SUBSURFACE IN DUE TO LEAKING VALVES. 13. WELL GP-51 REQUIRES
SAFETY VAI.VE. WELL GP32-13, FURTHER MAINTENANCE.
REPLACED ORIFACE VALVE. NO FLARING TO OCCUR
WELL GP-51 SHUTDOWN PAST 10/27.1
WAITING FOR DRILLING
DERRICK/SNUBBING UNIT TO
PULl. ENTIRE TUBING STRING
AND REPAIR/REPLACE.
Report Date: 11/19/2004
[fa~imãdy
~004
E 2;:~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACiliTY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000006 GRANITE POINT PLATFORM GRANITE POINT UNOCAL ALASKA November-04
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 0 Pool Name Pool Code Percent
18761 280150 66.58%
7. Reinjected 0 18761 280152 22.62%
374044 280150 2.51%
8. Flared or vented 1 hour or less 1,543 374045 280150 8.30%
9. Flared or vented more than 1 hour (see instr.) 144 v
10. Pilot and Purge 600
11. Used for lease operations (specify in Remarks) 31,619
__u
12. Other (see instructions) ),x'f';;;, . ::.>,,:.'.'c": .:.:<'. ··;~ttf!@h.\JK~'f~,j¡\íY~~,::·: """; ":Ei~'é;~
0 Authorization >1 hr: MCF
Safety {4Lr
13. TOTAL VOLUME (ITEMS 6-12) 33,906 MCF
/?\~
14. NGL Gas Equivalent \ease Use
0 ¢onservation MCF
15. Purchased gas ~
6,457 II Waf/e: //1 /h / MCF
I..J ~~ I-/I-OS
16. Transferred from: 0
./ --
\.....,../ ~ þommissioii'm""' Date
17. Transferred to: (Express as a negative #) (1,099'
18. Remarks:
Transferred From: Granite Point Platform 0
Transferred To: GPTF-LEX 0
GPTF-GPP (1,099)
I ""eW cem: rJ;;:;goiOg ;, !rue sod ""''''''' In the "'1a'1i:;¡: "t':"t18"rmaclÿ
Signature rfJ".J. AAA A .1 hI 1"Ir-.... n ... .......... Title Note: All volumes must be corrected
Production Accountant to pressure of 14.65 psia and to a
Printed Name 1/ U LlI.. '" tfJ V LUU.,. temperature of 600 F. Authority 20
Janet Dormady Phone 907-263-7946 Date December 17,2004 AAC25.235.
5hz..
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
Excess Flare Log Report
Facility Name:
GRANITE POINT PLATFORM
MonthlYear:
November 2004
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
11/17/2004 16:50 11/17/200418:30 23 N FIRE ALARM SYSTEM WAS OPERATIONAL BLOW DOWN WELL UPGRADE ON FIRE ALARM UPGRADED FIRE ALARM P-SP-HP
BEING UPGRADED WHEN A SYSTEM NECESSARY FOR SYSTEM.
FALSE ALARM OCURRED FACILITY OPERATIONS.
CAUSING THE CENTAUR PRESSURED ALL LIFT WELLS
COMPRESSOR TO SHUTDOWN. AND BLEW DOWN TO
REINSTATE PRODUCTION
AFTER EMERGENCY SHUT
DOWN OCURRED.
11/21/200421 :45 11/21/200423:59 121 N BLOW DOWN WELL 32-13 TO OPERATIONAL BLOW DOWN WELL BLOWING DOWN WELL 32-13 NORMAL FIELD P-SP-HP
PLACE BACK INTO NECESSARY TO RETURN OPERATIONS.
PRODUCTION. WELL TO NORMAL
OPERATIONS AFTER
WIRELlNE WORK WAS
COMPLETED.
Jane~ vr: bjormad~ '
- I . ,.--
IPO .~ ZUU4
'V
Report Date: 12/16/2004
Page: 1 of 1
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
2. Facility Name
3. Field
4. Operator
5. MonthlYear of Disposition
1330000006
GRANITE POINT PLATFORM
Disposition
GRANITE POINT UNOCAL ALASKA December-OS
Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
o
Pool Name Pool Code Percent
18761 280150 77.40%
18761 280152 10.75%
374044 280150 2.75%
374045 280150 9.10%
7. Reinjected
o
8. Flared or vented 1 hour or less
216
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
620
11. Used for lease operations (specify in Remarks)
34,190
12. Other (see instructions)
o
Authorization >1 hr:
MCF
Safety
13. TOTAL VOLUME (ITEMS 6-12)
35,026
MCF
Lease Use
14. NGL Gas Equivalent
o
MCF
Conservation
15. Purchased gas
4,131
Waste:
MCF
16. Transferred from:
o
17. Transferred to: (Express as a negative #)
Commissioner
Date
(1,122)
18. Remarks:
Transferred From: Granite Point Platform
o
Transferred To: GPTF-LEX
GPTF-GPP
o
(1,122)
I hereby certify that the foregoing is true and correct to the best of m¥JSR~fdt:· Dormady
Signature ~./j- ¡[)~4 JAN 2 0 2~
Printed Name T Janet DtLadY Phone 907-263-7946
Date
January 20, 2005
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
AAC25.235.
Production Accountant
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate