Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutGP TF LEX Plant / Unocal
STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2002
FACILITY: GP TF LEX Plant
OPERATOR: UNION OIL CO OF
CALIFORNIA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Farm LEX Plant
GPTF-LEX
Granite Point
Unocal Oil and Gas
Disposition Volwne MCF-
to CIGGS 35,816
I. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
/
3. Flared or vented less than I hour 1,224
./
4. Flared or vented greater than I hour 0
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 620
6. Used for lease operations /'
12,844
7. Other (Meter Error) 3,243
TOTAL items I - 7 53,747
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 2,532
GPTF-AB 2,836
10. Transferred ITom: Granite Point PIt. 558
Anna Platform 26,662
Bruce Platform . 22,620
GPTF-AB 1,461
II. Transferred to: GPTF-GPP 0
Remarks:
I hereby c¿:zt ~e foregoing i~d correct to the best of my knowledge.
Signature . 'leA Q ~ /liz:; Title: Acet. Supervisor Date: 2/7/02
t/ 1/
Form 10-422
Rev. 4/95
MonthlY ear of Disposition
January-02
"Indicate contribution of each pool to total.
Pool Name
Code
Percent
Official Use Only -- Flaring Authorization> I hr
I. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Connnissioner Date .
"I( lL.tClI-\ 7.-12-<; I" ~
r
Note: All volwnes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Farm LEX Plant
GPTF-LEX
Granite Point
Operator
Unocal Oil and Gas
Disposition Volume MCF·
to CIGGS 35,229
I. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than I hour 1,205
" "
4. Flared or vented greater than I hour 65
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 560
6. Used for lease operations 12,278
7. Other (Meter Error) 1,911
TOTAL items I - 7 51,248 ./
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 2,126
GPTF-AB 2,426
10. Transferred from: Granite Point Pit. 2,132
Anna Platform 26,912
Bruce Platform 18,808
GPTF-AB 1,156
II. Transferred to: GPTF-GPP 0
Remarks:
I hereby ceriZhe foregOi;g iS1 and :orrec~ to the best of my knowledge.
Signature ~:A- O. '£7M Title: Acct. Supervisor Date: 3/812002
~ (/
Month/Year of Disposition
February-02
·Indicate contribution of each pool to total.
Pool Name
Code
Percent
Official U ~ Only -" Flaring Authorization > I hr
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
I. Safety MCF
2. Lease Use 1v5 MCF ~ <1A-
1)2..'2, /, ...
3. Conserv. Purposes MCF
3!d-d-}O.J..-
Date .
/'
Fonn 10-422
Rev. 4195
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlY ear:
February 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MÇF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
2/1/20023:00 2/1/2002 16:00 24 Y GPTF compressor shutdown pending OPERATIONAL SCHEDULED MAINTENANCE Gas shipment to GPTF suspended Routine maintenance to safe
restart of Anna compressor. while Anna compressor and reliable operation.
undergoing scheduled
maintenance. return facility to
normal operation as soon as
possible following maintenance.
2/3/20027:00 2/3/2002 10:00 30 N Elecbical short in frick controls caused OPERATIONAL UNSCHEDULED MAINTENANCE Diagnose problem, repair unit as Repair unit.
a shut down of AIB program. quickly as possible to restore
power and return facility to normal
operation.
2/21/20029:00 2/21/2002 14:00 11 N VRU down. VRU booster compressor OPERATIONAL UNSCHEDULED MAINTENANCE Diagnose problem, replace Replace pressure transmitter. T-H-3420
pressure transmitter failure. transmitter from parts in inventory,
and return facility to normal
operation as soon as possible.
Report Date: 3/8/2002
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Farm LEX Plant
GPTF-LEX
Granite Point
U nocal Oil and Gas
Disposition Volume MCF*
to CIGGS 34,982
I. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Rei'1iected 0
3. Flared or vented less tlJa1l I hour 1,265 /
4. Flared or vented greater than I hour 50 /'
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 615
6, Used for lease operations 13,622
"
7. Other (Meter Error) 869
TOTAL items I - 7 ". 51,403 /
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 2,223
GPTF"AB 2,464
10. Transferred from: Granite Point PIt. 414
Anna Platform 27,351
Bruce Platform 20,367
GPTF-AB 1,416
II. Transferred to; GPTF-GPP 0
Remarks;
I hereby c~;t tile foregoing iSÃ;d eorrect to the best of my knowledge.
Signature laM 0 ,/.{*J Title: Acct. Supervisor Date; 4112/2002
/ (/
Form 10-422
Rev. 4195
Month/Year of Disposition
March-02
·Indicate contribution of each pool to total.
Pool Name
Code
Percent
Official Use Only -- Flaring Authorization > I hr
I. Safety MCF
2. Lease Use 60 MCF µ6k-
3. Conserv. Purposes MCF
~/~/6Y
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlY ear:
March 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End ,MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
3/3/2002 23:00 3/4/2002 5:00 10 N VRU SHUT DOWN FOR UNKONW OPERATIONAL UNSCHEDULED MAINTENANCE RESTARTED AS SOON AS IT LOOKING INOT ALARM T-H-3420
REASON WITH NO ALARM WAS FOUND NOT RUNNING PROGRAMMING
3/12/2002 16:00 3/13/2002 6:00 10 N ARIEL & VRU DOWN. SENDING OPERATIONAL UNSCHEDULED MAINTENANCE HAD TO SHUT DOWN T-H-3420
GAS BACK TO ANNA PLATFORM COMPRESSORS
3/12/200216:00 3/13/20026:00 5 N ARIEL & VRU DOWN. SENDING OPERATIONAL UNSCHEDULED MAINTENANCE HAD TO SHUT DOWN T-H-3420
GAS BACK TO ANNA PLATFORM COMPRESSORS
3/23/2002 22:00 3/24/2002 2:00 20 N ARIEL & VRU SHUTDOWN. POWER OPERATIONAL UNSCHEDULED MAINTENANCE Flew out an electrician and TIMELY WORK, DONE T-H-3420
TRANSFORMER FAILED CAUSING installed a replacement transforme
A COMPLETE FACII.ITY
SHUTDOWN
3/23/2002 22:00 3/24/2002 2:00 5 N ARIEL & VRU SHUTDOWN. POWER OPERATIONAL UNSCHEDULED MAINTENANCE Flew out an electrician and '. TIMELY WORK, DONE í-H-3420
TRANSFORMER FAILED CAUSING installed a replacemént transforme
A COMPLETE FACII.ITY
SHUTDOWN
f..
,
Report Date: 4/11/2002
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION ,COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Parm LEX Plant
GPTF-LEX
Operator
Granite Point
Unocal Oil and Gas
Disposition Volume MCp·
to CIGGS 29,191 /'
I. Sold to GPTP-GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than I how: 1,069 ,/
4, Flared or vented greater than I hour 52 ¡./
(Supplemental report required-See 20 AAC 25.235)
5. Pilot aod Purge 600 ./
6. Used for lease operations 12,257 /
7. Other (Meter Error) 4,531
TOTAL items I - 7 47,700 ,/
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 2,676
GPTF-AB 3,366
10. Transferred from: Granite Point PIt. 0
Anna Platform 23,703
Bruce Platform 19,221
GPTF-AB 1,266
II. Transferred to: GPTP-GPP 0
Remarks:
I hereby certify that the foregoing ~~e and con;:ct to the best of my knowledge.
Signature 4hh Q 'I.Þ'¿~ Title: Ace!. Supervisor Date: 51712002
{/ U
Form 10-422
Rev. 4/95
Month/Year of Disposition
April-02
·Indicate contribution of each pool to total.
Pool Name
Code
Percent
Official Use Only -: Flaring Authorization> I hr
I. Safety
,,:>-z.....
.-Ip6r
MCF S.&z-
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Ca1
&/t<JJó~:
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees P. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlY ear:
April 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
4/10/20020:00 4/10/200223:59 38 N Ariel and VRU shutdown, air OPERATIONAL UNSCHEDULED MAINTENANCE Starter transformer failure causes Replace starter transformer. T-H-3420
compressor down due to 2nd stage shutdown, Investigate problem,
high differential pressure. discover faulty starter transformer,
fly electrician to facility, install new
starter transformer, and retum
facility to normal operation as soon
as possible.
4/11/20020:00 4/11/200223:00 14 N Ariel and VRU shutdown, air OPERATIONAL UNSCHEDULED MAINTENANCE Starter transformer failure causes Replace starter transformer. T-H-3420
compressor down due to 2nd stage shutdown. Investigate problem,
high differential pressure. discover faulty starter transformer,
fly electrician to facility, install new
starter transformer, and return
facility to normal operation as soon
as possible.
Report Date: 5/14/2002
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Farm LEX Plant
GPTF-LEX
Granite Point
Operator
Unocal Oil and Gas
Disposition Volwne MCF·
to CIGGS 30,712
I. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than I hour 1,517
4. Flared or vented greater than I hour 0
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 620
6. Used for lease operations 11,583
7. Other (Meter Error) 4,139
TOTAL items I - 7 48,571
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 3,366
GPTF-AB 3,985
10. Transferred rrom: Granite Point PIt. 0
Anna Platform 25,424
Bruce Platform 16,904
GPTF-AB 1,108
II. Transferred to: GPTF-GPP 0
Remarks:
I hereb:Æt the foregoing iXe and COIT~t to the best of my knowledge.
Signatu 0 ~ a I d~) Title: Acct. Supervisor Date: 6/7/02
1/ .//
Form 10-422
Rev. 4/95
MonthlY ear of Disposition
May-02
·Indicate contribution of each pool to total.
Pool Name Code Percent
I
Official Use Only -- Flaring Authorization> I hr
,
I. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the mouth of disposition.
Authority 20 AAC 25.235
...
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Farm LEX Plant
GPTF-LEX
Field(s)
Operator
Unocal Oil and Gas
Granite Point
Disposition Volume MCF"
to CIGGS 27,297
I. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than I hour 1,348
4. Flared or vented greater than I hour 18 ./
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 600
6. Used for lease operations 10,315
7. Other (Meter Error) 6,645
TOTAL items 1-7 46,223
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF'GPP 3,766
GPTF-AB 4,575
10. Transferred ftom: Granite Point PIt. 0
Anna Platform 22,589
Bruce Platform 16,159
GPTF-AB 866
II. Transferred to: GPTF-GPP 0
Remarks:
I hereby certify that ~e foregoing is ~e,,:d correct ~o the best of my knowledge.
Signature dLMt !1.;¡:úd:.J Title: Acct. Supervisor Date: 7/8/02
/1 II
Form 1 (}"422
Rev. 4/95
MonthlY ear of Disposition
June-02
"Indicate contribution of each pool to total.
.
Pool Name Code Percent
~-
Official Use Only -- Flaring Authorization> I hr
I. Safety
IB
MCF
~
2. Lease Use
MCF
3. Conserv. Purposes
MCF
rfllo y
Date
Note: All volwnes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlY ear:
June 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
6/3/200221:00 6/3/2002 23:59 16 N VRU compressor shut down OPERATIONAL UNSCHEDULED MAINTENANCE Control panel failure resulted VRU Maintenance
Compressor SI. After shut down
VRU would not restart. Loose
connection was found & secured to
correct failure. Other connections
were checked & secured. Normal
opera1ions resumed.
~,
.
.
Report Date: 7/11/2002
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Farm LEX Plant
GPTF-LEX
Granite Point
Unocal Oil and Gas
Disposition Volume MCF·
to CIGGS 27,624
I. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than I hour 1,310
4. Flared or vented greater than I hour 0
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 620
6. Used for lease operations 10,527
.'
7. Other (Meter Error) 8,127
TOTAL items 1-7 48,208
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 3,607
GPTF-AB 4,799
10. Transferred /Tom: Granite Point Pit. 0
Anna Platform 24,596
Bruce Platform 15,740
GPTF-AB 534
II. Transferred to: GPTF-GPP 0
Remarks:
I bereby certify that the foregoing ~ correct to the best of my knowledge.
¿2L~7 ~) Date: 8n12oo2
Signature Title: Ace!. Supervisor
Fonn 10-422
Rev. 4195
MonthlYear of Disposition
July-02
·Indicate contribution of each pool 10 total.
Pool Name
Code
Percent
Official Use Only -- Flaring Authorization> I hr
I. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Conunissioner Date
Note: All volumes must be corrected 10
pressure of 14.65 psia and 10 a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Farm LEX Plant
GPTF-LEX
Operator
Field(s)
Unocal Oil aod Gas
Granite Point
Disposition Volume MCF·
to CIGGS 21,983
1. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than I hour 1,015
4. Flared or vented greater than I hour 137 V'
(Supplemental report required-See 20 AAC 25.235)
5. Pilot aod Purge 480
6. Used for lease operations 7,510
7. Other (Meter Error) 4,492
TOTAL items I - 7 35,617
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 2,760
GPTF-AB 3,514
10. Transferred from: Granite Point PIt. 0
Anna Platform 18,524
Bruce Platform 11,612
GPTF-AB 793
11. Transferred to: GPTF-GPP 0
Remarks:
I hereby 4:at the fOreg~,iS true aod correct to the best of my knowledge.
Signature' 7hø:1 ~'I",/,l¿') Title: Acct. Supervisor Date: 919/2002
1Ií/ ......-
Fonn 10-422
Rev. 4195
Month/Year of Disposition
August-02
·Indicate contribution of each pool to total.
Pool Name
Code
Percent
Official Use Only "" Flaring Authorization > I hr
I. Safety
\'37
MCF 0ß.2-
2. Lease Use
MCF
3. Conserv. Purposes
MCF
~\uf()~
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlY ear:
August 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
8/14/20026:00 6/14/200220:00 137 Y Repair Chak pipeline (I.e., gas line OPERATIONAL SCHEDULED MAINTENANCE Replace dented section of Chak Repair pipeline.
from Bruce/Anna). pipeline. Shut down GPTF
compressors, generators, blow
down line & flare gas on Tank
Fann side of repair. Ensure all
personnel and equipment on site
prior to initiating repairs. Return to
nnnn"l nn..""ti
Report Date: 9/17/2002
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Farm LEX Plant
GPTF-LEX
U nocal Oil and Gas
Granite Point
MonthlYear of Disposition
September -02
Disposition Volume MCF· ·Indicate contribution of each pool to total.
to CIGGS 24,488
I. Sold to GPTF-GPP 0 Pool Name Code Percent
to GPTF-AB 0
2. Reinjected 0
/
3. Flared or vented less than I hour 1,377 '"
/
4. Flared or vented greater than I hour 10 II
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 600
6. Used for lease operations 12,292
7. Other (Meter Error) 2,441
Official Use Only -- Flaring Authorization> I hr
TOTAL items 1 -7 41,208
I. Safety Jt) ~MCF
I
8. NGL gas equivalent produced 0
2. Lease Use MCF
9. Purchased gas 0
3. Couserv. Purposes MCF
GPTF-GPP 2,587
GPTF-AB 3,294
10. Transferred from: Granite Point PIt. 0
Anna Platform 19,948 (fìJA^A ~
Bruce Platform 16,309 tß:J¿ '¿,W I ~~ ;y/~;y
GPTF-AB 930
11. Transferred to: GPTF-GPP 0 Commìssionef \ 1\ Date
v '-'
Remarks:
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby ce~~ the foregoing i~rrec~ to the best of my knowledge. month following the month of disposition.
Signature h fa. c¡. ~ Title: Acct. Supervisor Authority 20 AAC 25.235
Date: 10/812002
/I (/
.J'&e-
Form 10-422
Rev. 4195
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlY ear:
September 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
9/25/200214:00 9/25/200217:00 10 Y ISOLATION OF TANK 101 FOR OPERATIONAL SCHEDULED MAINTENANCE SHUT DOWN VRU FOR
CLEANING BLINDING OF GAS LINES TO
TANK 101
Report Date: 10/4/2002
Page: 1 of 1
, ~
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Farm LEX Plant
GPTF-LEX
Unocal Oil and Gas
Granite Point
MonthlY ear. of Disposition
October -02
Disposition Volume MCF· ·Indicate contribution of each pool to total.
to CIGGS 21,465
I. Sold to GPTF-GPP 0 Pool Name Code Percent
to GPTF-AB 0
2. Reinjected °
3. Flared or vented less than I hour 1,616
v
4. Flared or vented greater than I hour 28 v
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 620
6. Used for lease operations 13,097
7. Other (Meter Error) -2,174
Official Use Only - Flaring Authorization> I hr
.
TOTAL items 1-7 34,652
I. Safety '2<'3 MCF
8. NGL gas equivalent produced 0
2. Lease Use MCF
9. Purchased gas 0
3. Conserv. Purposes MCF
GPTF-GPP 2,299
GPTF-AB 3,016
10. Transferred from: Granite Point PIt. 0
Anna Platform 15,354 ~-:r".¡J.· ';)1"
Bruce Platform 15,006 ! ~r?:>It):;V
GPTF-AB 1,023
II. Transferred to: GPTF-GPP 0 Date
v
Remarks:
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby cert~t the for:goi?g is ~ and ~orrect ~ the best of my knowledge. month following the month of disposition.
~/d6i:~' ;1¿~~' Authority 20 AAC 25.235
Date: 111712002
Signature L, é.-:-( ,/ Title; Acct. Supervisor
V'
~IL-
Fonn 10-422
Rev. 4/95
'. .).
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlYear:
October 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
10/24/2002 14:00 10/24/200215:30 8 Y Plant was accidently shut down during OPERATIONAL SCHEDULED MAINTENANCE
gas detector calibration.
10/25/2002 3:00 10/25/200216:00 9 Y Anna platfonn compressor shut down OPERATIONAL SCHEDULED MAINTENANCE
for maintenance.
10/30/200215:00 10/30/200221:00 11 Y Anna platfonn planned riser OPERATIONAL SCHEDULED MAINTENANCE
inspection.
Report Date: 11/7/2002
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Farm LEX Plant
GPTF-LEX
Unocal Oil and Gas
Granite Point
MonthlYear of Disposition
November -02
Disposition Volume MCF· ·Indìcate contribution of each pool to total.
to CIGGS 15,555
I. Sold to GPTF-GPP 0 Pool Name Code Percent
to GPTF-AB 0
2. Reil\iected 0
3. Flared or vented less than I hour 1,407
4. Flared or vented greater than I hour 17 V
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 600
6. Used for lease operations 12,808
7. Other (Meter Error) -664
Official Use Only - Flaring Authorization> I hr
TOTAL items 1-7 29,723
I. Safety \7 MCF
8. NGL gas equivalent produced 0
2. Lease Use MCF
9. Purchased gas 0
3. Conserv. Purposes MCF
GPTF-GPP 1,929
GPTF-AB 2,496
10. Transferred from: Granite Point Pit. 0
Anna Platform 14,717 (\ ~
Bruce Platform 11,505 \ 4M".. tCt LI,I'ÄÆ,
GPTF-AB 924
II. Transferred to: GPTF-GPP 0 Commiss~r 1\ Date
V"
Remarks:
Note: All volumes must be corrected to
pressure of 14,65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certi~fOregOing is true and correct to the best of my knowledge. month following the month of disposition.
Signature Y'/ ~ () ..1 '- / ~ ,./ ) Title: Ace!. Supervisor Authority 20 AAC 25.235
Date: 12/1012002
/1 /I
....
8&z....
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlY ear:
November 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
11/13/20027:00 11/13/200222:00 9 N Purged air from Tank 101 to put SAFETY UNSCHEDULED MAINTENANCE Safety. Purge air from Tank 101. Restarted Anel and VRU
back into service. Shut down VRU compressor to compressors as soon as line
pull slip blinds and purge tank. pigging completed,
11/14/20029:00 11/14/200213:00 6 N Anna/Bruce shut off gas flow to pig OPERATIONAL UNSCHEDULED MAINTENANCE Anna/Bruce pipeline pigging. Restarted Anel and VRU
gas line between platforms. Shut down Ariel and VRU compressors as soon as line
compressors due to low gas flow. pigging completed.
Report Date: 12/6/2002
Page: 1 of 1
1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Farm LEX Plant
GPTF-LEX
Granite Point
Unocal Oil and Gas
Disposition Volume MCF*
--
to CIGGS 6,017 I
1. Sold to GPTF·GPP 0
to GPTF-AB 0
2. Reinjected 0 ~ ~....
3. Flared or vented less than I hour 1,478
4. Flared or vented greater than I hour 0
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 620
6. Used for lease operations 13,518
7. Other (Meter Error) -1,133
TOTAL items I - 7 20,500
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 1,006
GPTF-AB 1,272
10. Transferred ftom: Granite Point PIt. 0
Anna Platform 11,362
Bruce Platfomt 7,842
GPTF-AB 982
II. Transferred to: GPTF-GPP 0
Remarks:
I herehy certify that the foregoing is true and correct to the hest of my knowledge.
Signature ~ I ~ Title: Acct. Supervisor Date: 1110/03
Form 1G-422
Rev. 4/95
MonthlYear of Disposition
December-02
·Indicate contribution of each pool to total.
Pool Name
Code
Percent
I. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Noí;: All v9lumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
mo,;,th following the month of disposition.
Authority 20 AAC 25.235