STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2003
FACILITY: GP TF LEX Plant
OPERATOR: UNION OIL CO OF
CALIFORNIA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Grnnite Point Tank Fann LEX Plant
GPTF-LEX
Grnnite Point
Unocal Oil and Gas
Disposition Volume MCF*
to ClOGS 6,039
1. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than I hour 1,538
4. Flared or vented greater than I hour 0
(Supplemental report required--See 20 MC 25.235)
5. Pilot and Purge 620
6. Used for lease operations 14,045
7. Other (Meter Error) -2,884
TOTAL items I - 7 19,358
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 1,005
GPTF-AB 1,263
10. Transferred from: Grnnite Point PIt. 0
Anna Platform 9,034
Bruce Platform 8,968
GPTF-AB 912
II. Transferred to: GPTF-GPP 0
Remarks:
I hereby certifY that the foregoing is true and correct to the best of my knowledge.
Signature Title: Acct. Supervisor Date: 212812003
Form 10-422
Rev. 4/95
MonthlY ear of Disposition
January-03
*Indicate contribution of each pool to totaL
Pool Name
Code
Percent
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note' All volumes must be corrected to
pressure of14.65 psia and to a temperature of
60 degrees F. Report due by the 20th ofthe
month following the month of disposition.
Authority 20 MC 25.235
,A
r
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Grnnite Point Tank Farm LEX Plant
GPTF-LEX
Grnnite Point
Field( s)
Unocal Oil and Gas
Disposition Volume MCF*
to ClGGS 3,196
1. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than 1 hour 1,174
4. Flared or vented greater than 1 hour 0
(Supplemental report required-oSee 20 MC 25.235)
5. Pilot and Purge 560
6. Used for lease operations 12,752
7. Other (Meter Error) ·387
TOTAL items 1 - 7 17,295
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 1,207
GPTF-AB 1,559
10. Transferred from: Grnnite Point PlI. 0
Anna Platform 10,037
Bruce Platform 5,375
GPTF-AB 883
11. Transferred to: GPTF-GPP 0
Remarks:
I herr~)rtif)r ~a~ th:;ü;ing is true an:zect to the best of my knowledge.
Signa 11 ¡) :1- [; a.1 M1 tJ r /~ Title: Prod Ace!. Date: 3/14/2003
// / /
(J 'J
Form 10-422
Rev. 4/95
MontbIY eat t:Disposition
February-,o~
*Indicate contribution of each pool to totaL
Poo1Narne
Code
Percent
.. ...........,............... ....... ........... .. .. .. ..
:1::i:::i:I.I:'·'·IIIIIIII¡I:III'III¡lllllllllllliI1~11~1~~III.I¡III·IIIII~II¡I·li'II¡I~IIIII·'IIIII·III¡¡I·I¡¡i·
1 Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
~~
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 MC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Unocal Oil and Gas
Grnnite Point
MontbIY ear of Disposition
March-03
Facility
Grnnite Point Tank Farm LEX Plant
GPTF-LEX
Operator
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
to ClGGS
to GPTF-GPP
to GPTF-AB
5,068
o
°
PooINarne
Code
Percent
2. Reinjected
°
3. Flared or vented less than 1 hour
1,390
4. Flared or vented greater than 1 hour
(Supplemental r ort re uired--See 20 AAC 25.235)
o
5. Pilot and Purge
620
6. Used for lease operations
13,357
8. NGL gas equivalent produced
o
..... ........ ....... "........ ............. ..... ............ . .... . ...... ...... .... . ..
..................................................................................................................
...................................................................................................................
.·I·II.II·:I·:I:I:II·IIII·;IIII;I·::I:·II·I.II~~III~~I.1~·~~III.I~I.f·¡~II.III::¡llil:"I·.'I'I·IIII:I;lillllll
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
- -
Commissioner Date
7. Other (Meter Error)
659
TOTAL items 1 - 7
21,094
9. Purchased gas
°
10. Transferred from:
GPTF-GPP
GPTF-AB
Grnnite Point PIt.
Anna Platform
Bruce Platform
GPTF-AB
GPTF-GPP
1,073
1,222
o
12,087
8,268
1,556
o
11. Transferred to:
Remarks:
I hereb
Note: All volumes must be corrected to
pressure of14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Title: Prod. Acc!. Date:
4/14/2003
Fonn 10422
Rev.4I95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
UnocalOil and Gas
Granite Point
MonthlYear of Disposition
April-03
Facility
Grnnite Point Tank Farm LEX Plant
GPTF-LEX
Operator
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
to ClOGS
to GPTF-GPP
to GPTF-AB
7,815
o
o
Pool Name
Code
Percent
2 Reinjected
o
3. Flared or vented less than 1 hour
1,309
4. Flared or vented greater than 1 hour
(Supplemental report required-oSee 20 AAC 25.235)
13
e,/
5. Pilot and Purge
600
6. Used for lease operations
12,431
7. Other (Meter Error)
4,095
.... . .. ... " ........,..... .................... .... .".............. . .
..................................................................................................................
.....................................................................................................................................................................................................................................
...................................................................................................................
..................................................................................................................
::::::::::::::::::::::::::::::::::::::::::::::II!i:"~~:1~:~:III.¡§¡î:¡~¡I::¡:¡:::::::¡::::¡¡:¡:::¡:¡::::::::::::
:::::::::::::::::::::::::::::::::::::::::::::::::::::::;:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::;::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
TOTAL items 1 - 7
26,263
1. Safety
\ ~ MCF ::JBP-
8. NGL gas equivalent produced
o
2 Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from:
GPTF-GPP
GPTF-AB
Grnnite Point PIt.
Anna Platform
Bruce Platform
GPTF-AB
GPTF-GPP
1,842
2,189
o
12,656
10,793
1,217
o
i~.~
ComnusslOner
G/Zro3
11. Transferred to:
Date
Remarks:
I here~~ that the f~ego~ true and correct to t~e best of my knowledge.
Signa~ /0 f{jljL 0< VJrÇ /f11 a ~if.f J Title: Prod Acct.
'j f /
.J
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Date:
5m2003
Fonn 10-422
Rev.4/95
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlY ear:
April 2003
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
4m2003 20:00 4m2003 23:00 5 N Ariel compressor valve positioner OPERATIONAL OTHER: SEE DESC OF EVENT Restarted Ariel and VRU Replaced ariel compressor 00-00-00
switch failed shutting down the compressors as soon as switch positioner switch.
compressors. was replaced. Unable to shutin
any wells due to safety
considerations. Proper
personnel, parts and equipment
were on hand to perform
maintenace as soon as
compressors went down.
4/13/200320:00 4/13/200322:00 8 N Compressors second stage OPERATIONAL OTHER: SEE DESC OF EVENT Restarted Ariel and VRU Forced switch in programming 00-00-00
equalizing valve posltioner switch compressors as soon as force logic to avoid future flaring until
failed shutting down the was put in place. Unable to shutin physical repairs can be made.
compressor. any wells due to safety
considerations. Proper
personnel, parts and equipment
were on hand to perform
maintenace as soon as
compressors went down.
Report Date: 5/19/2003
Page: 1 of 2
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Grnnite Point Tank Fann LEX Plant
GPTF-LEX
Grnnite Point
Field(s)
Unocal Oil and Gas
Disposition Volume MCF·
to CIGGS 9,511
1. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than 1 hour 1,313
4. Flared or vented greater than 1 hour 0
(SuDDlementalreoort reauired-See 20 AAC 25.235)
5. Pilot and Purge 620
6. Used for lease operations 8,815
7. Other (Meter Error) -1,914
TOTAL items 1 -7 18,345
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 19,544
11. TransfOITed ta: 1,199
Remarks: TransfOlTed From: GPTF-GPP 1,467
GPTF-AB 1,722
Granite Point PIt. 0
Anna PlatfOIDl 6,970
Bruce PlatfOlm 9,385
TransfOlTed To: GPTF-AB 1,199
GPTF-GPP 0
I htl that the forego"Æt true and caIreCt to the best of my knowledge.
Signa AA ,7·.ß- ,I'){ ,,1 'AA 1:1 /¡J". Title: Prod. Acct. Date: 6/1012003
1/ ( T
V 'J
Form 10-422
Rev.4I95
MonthlY ear of Disposition
May-03
·lndicate contnDution of each pool ta total.
Pool Name
Code
Percent
il·~:·~··::~~i~'~'.·:~·'.I..¡I·:···::·:::~II~II~'III~.·.IÎI~II·.:I¡¡.'!II..I":·..'.':II:..I..:II·.::i
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be CO!Tected to
pressure of 14.65 psia and to a temp013ture of
60 degrees F. Report due by the 20th of the
month following the moIrth of disposition.
Authority 20 AAC 25.235
,......
'..
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Fann LEX Plant
OPTF-LEX
Operator
Fie1d(s)
Unoca1 Oil and Gas
Granite Point
MonthlYear of Disposition
June-03
Disposition Volume MCF· ·Indicate contribution of each pool to total.
to ClOGS 11,887
1. Sold to OPTF-GPP 0 Pool Name Code Pen:ent
to OPTF-AB 0
2. Reinjected 0
3. Flared or vented less than 1 hour 1,257
4. Flared or vented greater than 1 hour 41 ",V
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 600
..~,
6. Used for lease operations 10,345 -
7. Other (Meter En'or) -91 .1111111111111111111~''·li:¡·:·I:I¡:·~III~I.~~~.I'I:~1~I.~I~III:···:·:IIII~I·II·I:¡I·~:~:I~:I~~.~~'
TOTAL items 1 -7 24,039 4-l
1. Safety MCF
8. NOL gas equivalent produced 0
2. Lease Use MCF
9. Purcbased gas 0
3. Conserv. Pmposes MCF
10. Transferred ftom: 24,983 /J ..., J /
~L ./.~~ P//B/ð;>
I!. TransfelTed to: 944 I F Co~onE Date
;'
Remarks: TransfeITed From: OPTF-GPP 1,956 ,/
OPTF-AB 2,354
Granite Point PIt 0
Anna Platform 10,727
Bruce PlatfOIm 9,946
TransfOlTed To: OPTF-AB 944
OPTF-GPP 0
Note: All volumes must be COlTected to
I herebfit the foregoin~~ and correct to the best of my knowledge. pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
Signature ~... A..t-" N.IA¡ A~. - Title: Prod. month following the month of disposition.
Accl Date: 711012003 Authority 20 AAC 25.235
// 1'/
" .....,
;j'Bp-
Form 10-422
Rev. 4195
,.
'""
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlYear:
June 2003
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Cateaorv Reason Actions Taken Minimize Recurrence MP-2 ID Number
6/3/2003 11 :00 6/3/2003 23:59 6 N ARIEl AND VRU COMPRESSORS OPERATIONAL OTHER: SEE DESC OF EVENT PIPELINE PIGGING TO NORMAL OilFIELD
SHUTDOWN. REDUCE LIQUIDS IN GAS LINE OPERATIONS.
BETWEEN ANNA & BRUCE.
lOSS OF GAS FROM ANNA
PLATFORM REQUIRED GPTF
COMPRESSORS TO BE
SHUTDOWN. RETURN TO
NORMAL OPERATIONS AS
SOON AS POSSIBlE.
6/7/2003 7:00 6/7/200312:00 35 y COMPRESSORS SHUTDOWN OPERATIONAL SCHEDULED MAINTENANCE SCHEDULED VESSEL SCHEDULED
DURING MAINTENANCE. INSPECTIONS AND REMOVAL MAINTENANCE.
OF BLINDS. COMPRESSORS
SHUTDOWN DURING
MAINTENANCE AND ARIEl
2ND STAGE VENT OPENED.
RETURN TO NORMAL
OPERATIONS AS SOON AS
POSSIBlE. .-.-
~-
"
Report Date: 7/17/2003
Page: 1 of 1
-v
Form 10-422
Rw.4I95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Pacility
Grnnite Point Tank POIDl LEX Plant
GPI'P-LEX
Grnnite Point
MonthlY ear of Disposition
July-03
Unoca1 Oil and Gas
Disposition Volume MCP" "Indicate contribution of each pool to total.
to ClOGS 13,273
1. Sold to GPTP-GPP 0 Pool Name Code Percent
to GPTP-AB 0
2. Reinjected 0
3. Flared or vented less than 1 hour 2,071
4. Flared or vented greater than 1 hour 830 V
(Supplemental report reqWred-See 20 MC 25.235)
5. Pilot and Purge 620
6. Used for lease operations 9,026
7. Otber (Meter Etror) 2,562 ·1:ill¡·:··I:....:.:.I·.II··:..::¡·¡·~ii!lill~~IIII~I.1111~¡~:I¡¡¡::¡¡:·~:¡·::III:·I¡i:!:il.I.¡¡¡·¡I·:
TOTAL items I -7 28,382 Ð30
1. Safety MCF
8. NGL gas equivalent produced 0
2. Lease Use MCF
9. Purchased gas 0
3. ConsetV. Putposes MCF
10. Transfecred from: 29,250 ~.
ðrn..~~~ Z~¿j 2' r
11. Transferred to: 868 DÍ!e /
/
Remarks: Transferred From: GPI'F-GPP 2,174
GPI'F-AB 2,773
Granite Point PIt 0
Anna Platfonn 8,365
Bruce Platfonn 15,938
TransfetTed To: GPI'F-AB 868
GPI'F-GPP 0
Note: .All volumes must be COlreCted to
,-----..... pressure of 14.65 psia and to a temperature of
I herebt certify ~tthe fOre;Oing~and c01reCt to Zt of my knowledge. 60 degrees F. Report due by the 20th of the
month following the month of disposition.
Signature ~I?) A'l.rf- i -5/ ff'uJ..A ' Title: Prod. Accl Date: 8n 12003 Authority 20 MC 25.235
" " ! il
\J
~p-
L-"
-.
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlY ear:
July 2003
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Cateaorv Reason Actions Taken Minimize Recurrence MP-2 ID Number
7/2212003 13:00 7/25/2003 15:00 20 Y ARIEL AND VRU COMPRESSORS OPERATIONAL OTHER: SEE DESC OF EVENT PIPELINE PIGGING TO NORMAL OILFIELD
SHUTDOWN FOR PIPELINE REDUCE LIQUIDS IN GAS LINE OPERATIONS &
PIGGING IN CHAK PIPELINE (I.E., BETWEEN ANNA & BRUCE. MAINTENANCE.
GAS LINE FROM ANNNBRUCE). GAS FLOW SHUT OFF TO
CHAK PIPELINE TO PERFORM
PIGGING. LOSS OF GAS FLOW
FROM ANNAlBRUCE
PLATFORM REQUIRED GPTF
COMPRESSORS TO BE
SHUTDOWN. RETURN TO
NORMAL OPERATIONS.
7/22l200313:00 7/25/2003 15:00 135 Y ARIEl AND VRU COMPRESSORS OPERATIONAL OTHER: SEE DESC OF EVENT PIPELINE PIGGING TO NORMAL OilFIELD
SHUTDOWN FOR PIPELINE REDUCE LIQUIDS IN GAS LINE OPERATIONS &
PIGGING IN CHAK PIPELINE (I.E., BETWEEN ANNA & BRUCE. MAINTENANCE.
GAS LINE FROM ANNNBRUCE). GAS FLOW SHUT OFF TO
CHAK PIPELINE TO PERFORM
PIGGING. LOSS OF GAS FLOW
FROM ANNNBRUCE
PLATFORM REQUIRED GPTF
COMPRESSORS TO BE
SHUTDOWN. RETURN TO
NORMAL OPERATIONS.
7/22l2003 13:00 7/25/2003 15:00 295 Y ARIEl AND VRU COMPRESSORS OPERATIONAL OTHER: SEE DESC OF EVENT PIPELINE PIGGING TO NORMAL OILFIELD
SHUTDOWN FOR PIPELINE REDUCE LIQUIDS IN GAS LINE OPERATIONS &
PIGGING IN CHAK PIPELINE (I.E., BETWEEN ANNA & BRUCE. MAINTENANCE.
GAS LINE FROM ANNNBRUCE). GAS FLOW SHUT OFF TO
CHAK PIPELINE TO PERFORM
PIGGING. LOSS OF GAS FLOW
FROM ANNAlBRUCE
PLATFORM REQUIRED GPTF
COMPRESSORS TO BE
SHUTDOWN. RETURN TO
NORMAL OPERATIONS.
7/22l2003 13:00 7/25/200315:00 199 Y ARIEL AND VRU COMPRESSORS OPERATIONAL OTHER: SEE DESC OF EVENT PIPELINE PIGGING TO NORMAL OilFIELD
SHUTDOWN FOR PIPELINE REDUCE LIQUIDS IN GAS LINE OPERATIONS &
PIGGING IN CHAK PIPELINE (I.E.. BETWEEN ANNA & BRUCE. MAINTENANCE.
GAS LINE FROM ANNNBRUCE). GAS FLOW SHUT OFF TO
CHAK PIPELINE TO PERFORM
PIGGING. LOSS OF GAS FLOW
FROM ANNA/BRUCE
PLATFORM REQUIRED GPTF
COMPRESSORS TO BE
SHUTDOWN. RETURN TO
NORMAL OPERATIONS.
Report Date: 8/14/2003
Page: 1 of 2
,- .
Excess Flare Log Report
7/29/200310:30 7/30/2003 8:00 119 Y ARIEl AND VRU COMPRESSORS OPERATIONAL OTHER: SEE DESC OF EVENT PLANNED MAINTENANCE TO NORMAL OilFIELD
SHUTDOWN FOR PIPELINE BLOW DOWN CHAK GAS LINE OPERATIONS &
PIGGING IN CHAK PIPELINE (I.E., FOR PIGGING/INSPECTION MAINTENANCE.
GAS LINE FROM ANNAlBRUCE). WORK. ARIEl AND VRU
COMPRESSORS SHUT DOWN
AT GPTF DUE TO lOW GAS
FLOW. BALANCE OF GAS
PROCESSED AT GPTF
ROUTED TO FLARE.
RESTARTED COMPRESSORS
AS SOON AS PIGGING
COMPlETED.
7/29/200310:30 7130/2003 8:00 62 Y ARIEl AND VRU COMPRESSORS OPERATIONAL OTHER: SEE DESC OF EVENT PLANNED MAINTENANCE TO NORMAL OilFIELD
SHUTDOWN FOR PIPELINE BLOW DOWN CHAK GAS LINE OPERATIONS &
PIGGING IN CHAK PIPELINE (I.E., FOR PIGGING/INSPECTION MAINTENANCE.
GAS LINE FROM ANNA/BRUCE). WORK. ARIEl AND VRU
COMPRESSORS SHUT DOWN
AT GPTF DUE TO lOW GAS
FLOW. BALANCE OF GAS
PROCESSED AT GPTF
ROUTED TO FLARE.
RESTARTED COMPRESSORS
AS SOON AS PIGGING
COMPlETED.
Report Date: 8/14/2003
Page: 2 of 2
þ
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Fann LEX Plant
GPTF-LEX
Operator
Field(s)
Unocal Oil and Gas
Granite Point
MonthlY ear of Disposition
August-Œ
Disposition
Volume MCF"
"Indicate contribution of each pool to total.
1. Sold
to ClOGS
to GPTF-GPP
to GPTF-AB
6,376
o
o
Pool Name
Code
Percent
2. Reinjected
o
3. FlaIed or vented less than 1 hour
968
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235)
77
~v
5. Pilot and Purge
620
6. Used for leæe operations
4,055
7. Other (Meter Error)
-868
¡.:I~.~:~..lli:I·¡i.i¡::¡¡II¡II:·I¡:::I::I~II~~~I:~I.:~1.~I~II:I:¡·"i·ilil·I¡¡II¡:II:I¡I¡:III!II·!1
77 MCF
1. Safety
~I',--
TOTAL items 1 - 7
11,228
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Pwposes
MCF
10. Transferred from:
11,757
11. TrnnsfOlTed to:
529
17---~¿:'~
Commissioner
/~~ 4)7
DJte . ../
Remarks: TransfOlTed From:
GPTF-GPP
GPTF-AB
Granite Point Pit.
Anna Platfonn
Broce Platfonn
1,416
1,789
o
2,385
6,167
TransfOlTed To:
GPTF-AB
GPTF-GPP
529
o
I hereby c~t the fore!\lin~ We and con-ect to tJy best of my knowledge.
sigushl k A A I C¡-?ilJ µ AM # d,lA_ Title: Prod. Acct.
1/ v(/~ /1
II U
Date:
9/1912003
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form1D-422
Rev. 4/95
,
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlY ear:
August 2003
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
8/14/200312:00 8/14/2003 16:00 27 Y VRU AND ARIEL COMPRESSORS OPERATIONAL OTHER: SEE DESC OF EVENT PLANNED SHUTDOWN OF NORMAL OilFIELD
SHUT DOWN FOR UPCOMING VRU AND ARIEl OPERATIONS &
BRUCE PIPELINE RISER WORK. COMPRESSOR. BLOW DOWN MAINTENANCE.
CHAK PIPELINE (I.E., GAS
LINE FROM ANNA/BRUCE)
FOR RISER REPLACEMENT
ON BRUCE PLATFORM.
8/15/2003 7:00 8/15/200310:00 50 Y VRU AND ARIEL COMPRESSORS OPERATIONAL OTHER: SEE DESC OF EVENT PLANNED SHUTDOWN OF NORMAL OilFIELD
SHUT DOWN FOR UPCOMING VRU AND ARIEl OPERATIONS &
BRUCE PIPELINE RISER WORK. COMPRESSOR. BLOW DOWN MAINTENANCE.
CHAK PIPELINE (I.E.. GAS
LINE FROM ANNA/BRUCE)
FOR RISER REPLACEMENT
ON BRUCE PLATFORM.
.'
Report Date: 9/22/2003
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Fann LEX Plant
GPTF-LEX
Unocal Oil and Gas
Granite Point
MonthlY ear of Disposition
September-03
Disposition Volume MCF" "Indicate contribution of each pool to total.
to CIGGS 4,969
1. Sold to GPTF-GPP 0 Pool Naxne Code Percent
to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less !ban 1 hour 812
4. Flared or vented greater !ban 1 hour 13 £/¡
(Suvv1ementa!report required-See 20 AAC 25.235)
5. Pilot and Purge 600
6. Used for lease opelations 4,057
7. Otbor (Metor Ezror) -2,670 ··.I::¡I.I¡lill::I.IIII:¡:¡¡···I¡·¡·:¡I~~.II:i·.I.!\i:1:··\·:·::··II·III·¡¡I\¡:¡I.'~::I'iil.l·
TOTAL items 1 -7 7,781
1. Safety \ 3> MCF
8. NGL gas equivalent produced 0
2. Lease Use MCF
9. Purchased gas 0
3. Consetv. Pulposes MCF
10. Transferred from: 8,454 ..", 0
l .I Y)Jh~ /I/¡/) / '{
11. 'I'Iansfetred to: 673 onec/ D~", I -
Remarks: Transferred From: GPTF-GPP 744
GPTF-AB 986
Granite Point PIt. 0
Anna PlatfOlIIl 2,363
Bruce PlatfOlIIl 4,361
Transfetred To: GPTF-AB 673
GPTF-GPP 0
Note: All volumes must be COIrected to
/~ that tbe f~Mtme and COITect to !pe best of my knowledge. pressure of 14.65 psia and to a temperature of
I heret certif 60 degrees F. Report due by the 20tb oftbe
S' /1 J, F #->. Jðd ,( /?A A dÍ'/ / Title: Prod. montb following the moníb of clisposition.
'gna Ace!. Date: 10120/2003 Authority 20 AAC 25.235
I/' ( -
V V
~
Form 10-422
Rw..tI95
,',
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
Month/Year:
September 2003
Date & Time Event Gas Steps Taken to Equipment Down
Beain End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
9/19/20037:00 9/19/2003 10:00 13 Y ARIEl AND VRU COMPRESSORS OPERATIONAL OTHER: SEE DESC OF EVENT PLANNED MAINTENANCE FOR NORMAL OilFIELD
SHUTDOWN FOR PIPELINE PIGGING/INSPECTION WORK OPERATIONS &
PIGGING IN CHAK PIPELINE (I.E., AFTER CONVERSION OF MAINTENANCE.
GAS LINE FROM ANNA/BRUCE). CHAK PIPELINE BACK TO GAS
SERVICE FOllOWING BRUCE
RISER WORK. ARIEl AND VRU
COMPRESSORS SHUT DOWN
AT GPTF DUE TO lOW GAS
FLOW. BALANCE OF GAS
PROCESSED AT GPTF
ROUTED TO FLARE.
Report Date: 10/20/2003
Page: 1 of 1
?
Form 1 Q.422
Rev. 4195
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Gnmite Point Tank Fann LEX Plant
GPTF-LEX
Gnmite Point
MonthlY ear of Disposition
October-03
Unocal Oil and Gas
Disposition
Volume MCF'
'Indicate contribution of each pool to total,
1. Sold
to CIGGS
to GPTF-GPP
to GPTF-AB
Percent
11,923
o
o
Pool Name
Code
2. Reinjected
o
3. Flared or vented less than I hour
1,484
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 MC 25.235)
....1./
115
5. Pilot and Purge
620
6. Used for lease, operntions
12,089
1. Other (Meter Em>r)
......................................... ...............,..
,. ..................................... ....
::!:\:\:\j\j\:\::::::::::!\\¡::'::::::'::~I~tl~~¡I'\~:~1:~II~li¡~II""" ... ........
-4,330
....
....
...
..'
......
.....
TOTAL items 1 -1
21,901
1. Safety II ~ MCF ;[BP--
2. Lease Use MCF
3. Conserv. Pwposes MCF
/,;\ / .A -
'/ )# ~J /2/ /1-,'-" /~
ioner Dfue e.
8. NGL gas equivalent produced
o
9. Purchssed gas
o
10. Transfened from:
23,140
11. Transferred to:
1,239
Remarks: TransfelTed From:
GPTF-GPP
GPTF-AB
Gnmite Point PIt.
Anna Platform
Bruce PlatfOlm
1,596
2,089
o
5,520
13,935
TransfelTed To:
GPTF-AB
GPTF-GPP
1,239
o
I here~ that the ~reørg is we and, C-;l0lTec to the best of my knowledge.
,(, );:jfJ·:~/¡J¡j AU/? '.. ~
Si . ¡;' If IIIY">/M'/lId ~ Title: Prod. Acct. Date:
11- , ~ (
[/ '..,j
Note: All volumes must be COlTected to
pressure of 14.65 psia and to a tempernture of
60 degrees F. Report due by the 20th of the
month following the IIlOIlth of disposition.
Authority 20 MC 25.235
1J/1812003
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlY ear:
October 2003
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Cateaorv Reason Actions Taken Minimize Recurrence MP-2 ID Number
10/8/200316:00 10/9/2003 16:00 10 Y VRU SHUTDOWN FOR OPERATIONAL SCHEDULED MAINTENANCE BliNDING OF TK-102 FOR VRU RESTARTED UPON
SCHEDULED MAINTENANCE.¡ CLEANING REQUIRED COMPLETION OF TK 102
SHUTDOWN OF VRU. CLEANING.
RETURN TO NORMAL
OPERATIONS AS SOON AS
POSSIBLE.
10/8/200316:00 10/9/2003 16:00 15 Y VRU SHUTDOWN FOR OPERATIONAL SCHEDULED MAINTENANCE BliNDING OF TK-102 FOR VRU RESTARTED UPON
SCHEDULED MAINTENANCE.I CLEANING REQUIRED COMPLETION OF TK 102
SHUTDOWN OF VRU. CLEANING.
RETURN TO NORMAL
OPERATIONS AS SOON AS
POSSIBLE.
10/10/20034:00 10/10/200323:00 17 Y SHUTDOWN VRU AND ARIEL OPERATIONAL SCHEDULED MAINTENANCE GPTF SENDING GAS TO ANN,., GPTF COMPRESSOR AND
COMPRESSOR DURING ANNA PLATFORM DURING VRU RESTARTED UPON
INSPECTION. COMPRESSOR INSPECTION COMPLETION OF
THERE. GPTF VRU AND ARIEL COMPRESSOR
COMPRESSOR SHUTDOWN MAINTENANCE AT ANNAl
DURING MAINTENANCE.
10/11/20038:00 10/12/200311:00 10 N SHUTDOWN VRU AND ARIEL OPERATIONAL UNSCHEDULED MAINTENANCE GPTF SENDING GAS TO ANN,., GPTF COMPRESSOR AND
COMPRESSOR DURING ANNA PLATFORM DURING VRU RESTARTED UPON
INSPECTION. COMPRESSOR INSPECTION COMPLETION OF
THERE. GPTF VRU AND ARIEL COMPRESSOR
COMPRESSOR SHUTDOWN MAINTENANCE AT ANNAl
DURING MAINTENANCE.
10/11/20038:00 10/12/2003 11 :00 7 N SHUTDOWN VRU AND ARIEL OPERATIONAL UNSCHEDULED MAINTENANCE GPTF SENDING GAS TO ANN,., GPTF COMPRESSOR AND
COMPRESSOR DURING ANNA PLATFORM DURING VRU RESTARTED UPON
INSPECTION·I COMPRESSOR INSPECTION COMPLETION OF
THERE. GPTF VRU AND ARIEL COMPRESSOR
COMPRESSOR SHUTDOWN MAINTENANCE AT ANNAl
DURING MAINTENANCE.
10/17/20039:00 10/17/200315:00 10 N SHUTDOWN VRU AND ARIEL OPERATIONAL OTHER: SEE DESC OF EVENT VRU MAINTENANCE ON ANNA GPTF COMPRESSOR AND
COMPRESSOR DURING ANNA CAUSED SHORTAGE OF GAS VRU RESTARTED UPON
MAINTENANCE WORK. TO OPERATE GPTF COMPLETION OF
COMPRESSORS. GPTF VRU COMPRESSOR
AND ARIEL COMPRESSORS MAINTENANCE AT ANNA. I
SHUTDOWN DURING
MAINTENANCE AT ANNA
10/20/200314:00 10/20/2003 16:30 30 N SHUT DOWN VRU AND ARIEL OPERATIONAL OTHER: SEE DESC OF EVENT VOLUME OF liQUIDS GAS liNE PIGGING
"-1 COMPRESSOR DURING ENCOUNTERED WHILE COMPLETED.
PIPEliNE PIGGING. PIGGING THE GAS liNE
REQUIRED GOING TO FLARE.
VRU AND COMPRESSOR
DOWN. RETURN TO NORMAL
OPERATIONS AS SOON AS
POSSIBLE.
Report Date: 11/18/2003
Page: 1 of 5
Excess Flare Log Report
10/24/20039:00 10/24/200314:00 16 Y SHUTDOWN VRU AND ARIEL OPERATIONAL SCHEDULED MAINTENANCE COPMRESSOR GPTF COMPRESSOR AND
COMPRESSOR DURING ANNA MAINTENANCE ON ANNA VRU RESTARTED UPON
MAINTENANCE WORK. CAUSED SHORTAGE OF GAS COMPLETION OF
TO OPERATE GPTF COMPRESSOR
COMPRESSORS. GPTFVRU MAINTENANCE AT ANNA.l
AND ARIEL COMPRESSORS
SHUTDOWN DURING
MAINTENANCE AT ANNA.
Report Date: 11/18/2003
Page: 2 of 5
,.-
..
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Farm LEX Plant
GPTF-LEX
Field(s)
Unocal Oil and Gas
Granite Point
MonthlY ear of Disposition
November-03
Disposition Volume MCF* *lndicate contribution of each pool to total.
to CIGGS 9,594
1. Sold to GPTF-GPP 0 Pool Name Code Percent
to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less tban 1 hour 1,364
4. Flared or vented greater than I hour 164 vi
(Supplemental report required-See 20 MC 25.235)
5. Pilot and Purge 600
6. Used for lease operations 13,221
7. Other (Meter Etror) -3,500 ·¡I:III¡¡¡:I:I·¡I:I:lllilllllll¡III:.¡illl~:I·~I.¡.J'~II··:¡I:II¡I~I:¡:·II¡IIIII:·I·I'I'IIIIIII
TOTAL items I -1 21,449
1. Safety Ib4- MCF
8. NGL gas equivalent produced 0
2. Lease Use MCF
9. Purchased gas 0 ~:;nsJ7t
# MCF
10. Transferred from: 23,146
í llí./" /~~/ I / 7 /( 'J-
11. TransfeIred to: 1,697 èei ~oner / tOOe /
", I I
Remarks: Transferred From: GPTF-OPP 951
OPTF-AB 1,297
Granite Point Plt. 0
Anna Platform 1,543
Bruce PlatfoIIIl 13,355
TransfeIred To: OPTF-AB 1,691
GPTF-OPP 0
Note: All volumes must be coITOCted to
Irtl~~,~&e and c7 tbe best of my knowledge. pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th oftbe
month following the month of disposition.
Si 11 , 1..- Title: Prod. Acc!. Date: 12118/2003 Authority 20 MC 25.235
1/ /1
V U
$p-
Form 10..422
Rev. 4/95
"
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthN ear:
November 2003
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Cateaorv Reason Actions Taken Minimize Recurrence MP-2 ID Number
11/17/20038:00 11/17/200316:00 24 Y VRU AND ARIEL COMPRESSOR OPERATIONAL SCHEDULED MAINTENANCE SHUTDOWN VRU AND ARIEL PIPELINE PIGGING
SHUTDOWN DURING PIPELINE COMPRESSOR TO DECREASE COMPLETED AND PIG
PIGGING. DOWNSTREAM PRESSURE RECOVERED
TO ASSIST IN PIG MOVEMENT SUCCESSFULL Y.I
DURING PIPELINE PIGGING.
RETURN TO NORMAL
OPERATIONS AS SOON AS
POSSIBLE.
11/20/2003 14:00 11/20/200319:00 14 N VRU SHUTDOWN AT GPTF OPERATIONAL OTHER: SEE DESC OF EVENT GPTF SENDING GAS TO GPTF VRU RESTARTED
DURING BRUCE COMPRESSOR BRUCE DURING THEIR UPON COMPLETION OF
INSPECTION. COMPRESSOR INSPECTION. COMPRESSOR INSPECTION
LACK OF GAS AT GPTF AT BRUCE.
CAUSED SHUTDOWN OF
VRU. SHUT OFF MAKE-UP
GAS TO THE VRU.
RESTARTED VRU AS SOON
AS POSSIBLE.
11/24/2003 16:00 11/25/2003 23:59 66 Y GAS COMPRESSOR AND VRU OPERATIONAL OTHER: SEE DESC OF EVENT CHAK GAS PIG STUCK IN PIPELINE PIGGING
SHUTDOWN DURING PIPELINE PIPELINE DURING PIGGING. COMPLETED AND PIG
PIGGING. SHUTDOWN COMPRESSOR RECOVERED
AND VRU, BLOW DOWN SUCCESSFULL Y.I
GASLlNE TO CHANGE THE
LINE DIFFERENTIAL TO
RETRIEVE PIG. RETURN TO
NORMAL OPERATIONS.
11/24/2003 16:00 11/25/200323:59 17 Y GAS COMPRESSOR AND VRU OPERATIONAL OTHER: SEE DESC OF EVENT CHAK GAS PIG STUCK IN PIPELINE PIGGING
SHUTDOWN DURING PIPELINE PIPELINE DURING PIGGING. COMPLETED AND PIG
PIGGING·I SHUTDOWN COMPRESSOR RECOVERED
AND VRU, BLOW DOWN SUCCESSFULL Y.
GASLlNE TO CHANGE THE
LINE DIFFERENTIAL TO
RETRIEVE PIG. RETURN TO
NORMAL OPERATIONS.I
11/28/200321:00 11/28/2003 23:59 31 N GAS COMPRESSOR AND VRU OPERATIONAL OTHER: SEE DESC OF EVENT CHAK GAS PIG STUCK IN COMPRESSOR VAlVES
SHUTDOWN FOR MAINTENANCE PIPELINE CAUSING GAS REPAIRED AND PIGGING
DURING PIPELINE PIGGING. SURGES. SHUTDOWN COMPLETED.
COMPRESSOR AND VRU AND
REPAIRED COMPRESSOR
VALVES. BLOW DOWN
GASLlNE TO CHANGE THE
LINE DIFFERENTIAL TO
RETRIEVE PIG. RETURN TO
NORMAL OPERA TIONS.I
11/29/2003 14:00 11/29/2003 17:00 12 N SHUTDOWN VRU AT GPTF DUE OPERATIONAL OTHER: SEE DESC OF EVENT VRU SHUTDOWN AT GPTF VRU RESTARTED ONCE
TO COMPRESSOR DURING LOW GAS FLOW GAS AVAILABLE AT GPTF.I
MAINTENANCE PROBLEMS AT FROM ANNA AND BRUCE DUE
ANNA AND BRUCE PLA TFORMS. TO COMPRESSOR
PROBLEMS. RESTARTED
GPTF VRU AS SOON AS GAS
WAS AVAILABLE.'
Report Date: 12/18/2003
Page: 1 of 4
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Faun LEX Plant
GPTF·LEX
Operator
Granite Point
Unocal Oil and Gas
Disposition Volume MCF'
to CIGGS II,329
I. Sold to GPTF·GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than 1 hour 1,333
4. Flared or vented greater than 1 hour 0
(Supplomental report required-See 20 AAC 25.235)
5. Pilot and Purge 620
6. Used for lease operntions 13,879
7. Other (Meter Ettor) -3,354
TOTAL items I - 7 23,807
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferredftom: 25,474
1 I. TransfeIred to: 1,667
Remarks: TransfelTed From: GPTF-GPP 908
GPTF-AB 1,184
Granite Point PIt. 0
Anna Platform 9,372
Bl1ICe Platfonn 14,010
TransfeIred To: GPTF-AB 1,667
GPTF-GPP 0
I ~rë"k~tthe f¡;;(f;, and COlTect:lbest of my kno\Vled~.
Signa 'M J I)). A.-A A.h Title: Prod. Acct. Date: 112012004
II rl
, V
Form10.422
Rev.4I95
MonthlY ear of Disposition
December-03
'Indicate contribution of each pool to total.
Pool Name
Code
Percent
·11:111¡111·1·1·1~¡I..lili:I¡¡··:i:I'¡I¡·III¡ìi~I:I·.1~11!jl~illll¡I¡I~:I¡:··¡II:·II¡III·¡¡i¡¡¡!¡¡¡¡1
I. Safety MCF
2. Lease Use MCF
3. Conserv. Pwposes MCF
Commissioner Date
Note: All volumes must be cOIreCted to
pressure of 14.65 psia and to a tempernture of
60 degms F. Report cine by the 20th of the
month following the month of disposition.
Authority 20 AAC 15.235