Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutGP TF LEX Plant / Unocal
STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2004
FACILITY: GP TF LEX Plant
OPERATOR: UNOCAL
· /
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Pomt Tank Fann LEX Plant
GPTF-LEX
Operator
Field(s)
Unocal Oil and Gas
Granite Pomt
MonthlY ear of Disposition
Januaty-04
Disposition
Volume MCF*
"Indicate contribution of each pool to total.
I. Sold
to ClOGS
to GPTF-GPP
to GPTF-AB
10,541
o
o
Pool Name
Code
Percent
2. Remjected
o
3. Flared or vented less trum. I hour
1,242
4. Flared or vented greater trum. 1 hour
(SuDDlemental IOJ>ort reauired-See 20 AAC 25.235)
10
v"
5. Pilot and Purge
620
6. Used for lease operations
14,678
7. other (Meter En:or)
-3,144
:~:~:~:~:~:~:~:~i1:i:i:i:i:i:~:~:i:i:i:i:i:i:i:i:i:i:i=;i};iii!{i!i!i!i;i!i;i};i;i;=;i;i;ifii;i;i;i;i;i;i;i;i;i;:;:::;:;:::::::;i;:::;:;:;:;:;:::::i:::::?::;:;:;:i:i=;i;=;:;:;:;:i:;i;ifi{i;
::!~!:!;;;:::::::!:::::!:!:!:::i::;:¡_I!_¡0:i.ili_.r:~:~::i::j::::¡:i::::;;¡::!:!:i:~:j:j:!:¡:
}O MCF
I. Safety
.:::JB-
TOTAL items 1-7
23,947
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. COnsOlV. Purposes
MCF
11. TransfOlI'ed to:
1,829
/7\ A.J' ~
V J¡þ'h~
~ ¿...:¡ ;,cioMr /'
,
:¡(~(/5Z-
10. Transferredftom:
25,776
Remarks: TransfOlI'ed From:
GPTF-GPP
GPTF-AB
Granite Pomt PIt.
Anna Pla((orm
Bruce PlatfOInl
919
1,222
o
9,791
13,844
TransfOlI'ed 111/
/1
GPTF-AB
GPTF-GPP
1,829
o
Title: Prod. Acct.
Date:
2123/2004
Note: All volumes must be COlTected to
pressure of 14.65 psia and to a teraperature of
60 deg¡ees F. Report due by the 20th of the
month following themonth of disposition
Authority 20 AAC 25.235
Signature
7fj {tv
v ~ l/
anu COITectto the best of my knowledge.
I hereby c
Form 10.422
Rw.4I95
..
,
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
Month/Year:
January 2004
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? DescriDtion of Incident Cateaorv Reason Actions Taken Minimize Recurrence MP-2 ID Number
1/11/200413:00 1/11/200417:00 10 N COMPRESSOR HIGH PRESSURE OPERATIONAL UNSCHEDULED MAINTENANCE GAS DISCHARGE LINE TO THAWED OUT GAS
DISCHARGE. CIGGS TIE-IN FROZE DISCHARGE LlNE.
CAUSING UNLOAD OF
COMPRESSOR. STARTED
METHANOL INJECTION AT
GPTF AND NOTIFIED AURORA
TO THAW LINE. RETURN TO
NORMAL OPERATIONS.
Report Date: 2/24/2004
Page: 1 of 1
,
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Granite Point Tank Fann LEX Plant
GPTF-LEX
Operator
Field(s)
UnocalOil and Gas
Granite Pomt
MonthlY ear of Disposition
Febtua1y-04
Disposition
Volume MCP"
"ludic ate contribution of each pool to total.
1. Sold
to ClOGS
to GPTP-GPP
to GPTF-AB
9,895
o
o
Pool Name
Code
Percent
2. Remjected
o
3. Flared or vented less trum. 1 hour
1,154
4. Flared or vented greater trum. 1 hour
ŒUDDlementalIOJ>ortreouired-See 20 AAC 25.235)
33
v
¡/
5. Pilot and Purge
580
6. Used for lease operations
13,057
7. Other (Meter Error)
-4,942
.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.. :.;.:.;:;,;:;:;:;:::;:;:;:;:;:;:;:;:;:;::.;:;.:;:::;:;:;:;:;:;:;:.:;:;:;:;:;:.......................,...........,..........
:::::·~:·~!·:~::.:·:::II:::·::::::¡:·::::!III:I~~·I:i¡_:IÎÌ~I~III¡i¡:¡:¡·¡:;ij!¡I¡:¡I¡:¡!¡!!!!!¡'¡¡¡I¡¡¡
TOTAL items 1 - 7
19,777
I. Safety
33 MCF SB(:'-
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Pwposes
MCF
11. TransfOlI'ed to:
1,490
~ / A ~
~ ~þ/t/ /
~onnfussioner /
'-
/ /A-
4/Y/,/
Dati. .
10. Transfe!1'Od ftom:
21,267
Remarks: Transferred From:
GPTF-GPP
GPTF-AB
Granite Point PIt.
Anna Pla((01Dl
Broce Pla((oInl
1,081
1,420
o
5,434
13,332
Transfelred To:
GPTP-AB
GPTF-GPP
1,490
o
I here~ that th~¿",gOmgf're and COlToct to the best of my knowledge.
sigw.L- ~. ~1M A ~ / Title: Prod. Acct.
II { I
v V
Date:
3119/2004
Note: All volumes must be COlrected to
pressure of 14.65 psia and to a temperature of
60 deg¡ees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4195
....
, .
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlY ear:
February 2004
Date & Time Event Gas Steps Taken to Equipment Down
Beain End MCF Planned? DescriDtion of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
2110/20049:00 2110/2004 13:00 25 N AIR COMPRESSOR OPERATIONAL OTHER: SEE DESC OF EVENT BACK-UP INSTRUMENT AIR RESTARTED AIR
MAINTENANCE. COMPRESSOR FAILED TO COMPRESSOR.
START RESULTING IN
FACILl1Y WIDE SHUT DOWN.
STARTED PORTABLE AIR
COMPRESSOR WHILE
ELECTRICIAN FLOWN OVER
TO TROUBLESHOOT
PROBLEM. RETURN TO
NORMAL OPERATIONS AS
SOON AS POSSIBLE.
2120/2004 9:00 2120/2004 14:00 8 N VRU DOWN DURING OPERATIONAL UNSCHEDULED MAINTENANCE VRU SHUTDOWN AT GPTF RESTARTEDVRU ONCE
MAINTENANCE AT BRUCE. DURING LOW GAS FLOW GAS AVAILABLE AT GPTF.
FROM BRUCE PLATFORM DUE
TO GAS COMPRESSOR
MAINTENANCE. RESTARTED
GPTF VRU AS SOON AS GAS
WAS AVAILABLE.
Report Date: 3/19/2004
Page: 1 of 2
"
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator ~earOfDj:::-~ /'
Granite Point Tank Farm LEX Plant f
1330000010 GPTF·LEX GRANITE POINT UNOCAL ALASKA March
Disposition Volume MCF 20. For production from multiple pools, list ~l~tion of e~s a ~
Total Volu .
6. Sold 14,160 Pool Name P~<:ode ........-ffercent
-
7. Reinjected /'"
0 ./'
8. Flared or vented 1 hour or less /
1,098 ,/
9. Flared or vented more than 1 hour (see instr.) //
88 /./
10. Pilot and Purge ,,/'
600 "./
,~~ ."
11. Used for lease operations (specify in Remarks) 12,933 ./".
/. Official Use Only
12. Other (see instructions) /'''~-
( 1 Q.¡·354 Authorization > 1 hr: MCF
Safety
13. TOTAL VOLUME (ITEMS 6-12) '-,-s,525 MCF
Lease Use
14. NGL Gas Equivalent 0 MCF
Conservation
15. Purchased gas 0 Waste: MCF
16. Transferred from: 20,100
Commissioner Date
17. Transferred to: (Express as a negative #) (1,575
18. Remarks: ,,,/<
Transferred From: GP1F-GPP // 1,774
GPTF-Þ"B/ 2,259
G~~ Point PIt. 0
".Anna Platform 7,070
Bruce Platform 8,997
.' .'
Transferred To: .,./". GPTF-AB (1,575)
/" GPTF-GPP 0
I hereby celc he foregoing iS~d correct to the best of my knowledge.
I Note: All volumes must be corrected
Signatu A , Á1/ /1", jßr~/jz/ .d.£f~:/ Title Production Accountant to pressure of 14.65 psi a and to a
" / /f- temperature of 600 F. Authority 20
1/ Janet Dormadfv
Printed Name Phone 907-263·7946 Date May 19, 2004 AAC25.235.
Form 10-422 Rev. 212004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1330000010
2. Facility Name
Granite Point Tank Farm LEX Plant
GPTF-LEX
3. Field
4. Operator
5. Month/Year of Disposition
1. Facility Number
Disposition
GRANITE POINT UNOCAL ALASKA March-04
Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
10,380
Pool Name
Pool Code
Percent
7. Reinjected
o
8. Flared or vented 1 hour or less
932
9. Flared or vented more than 1 hour (see instr.)
o
10. Pilot and Purge
480
11. Used for lease operations (specify in Remarks)
14,468
12. Other (see instructions)
-3,391
Authorization >1 hr:
Safety
MCF
13. TOTAL VOLUME (iTEMS 6-12)
22,869
Lease Use
MCF
14. NGL Gas Equivalent
o
Conservation
MCF
15. Purchased gas
o
Waste:
MCF
16. Transferred from:
24,536
17. Transferred to: (Express as a negative #)
Commissioner
Date
1,667
18. Remarks:
Transferred From:
GPTF-GPP
GPTF-AB
Granite Point PIt
Anna Platfonn
Bruce Platfonn
991
1,246
o
6,835
15,464
Transferred To:
GPTF-AB
GPTF-GPP
1,667
o
Printed Name
Janet Dormady
Phone 907·263·7946
Date April 20, 2004
Note: All volumes must be cOffected
to pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
AA C25. 235.
Title
Production Accountant
Form 10-422 Rev. 212004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITIOW--= -
REVISED COpy
--
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthlY ear of Disposition
Granite Point Tank Farm LEX Plant REVISION
1330000010 GPTF-LEX GRANITE POINT UNOCAL ALASKA ADril-04
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 14,160 Pool Name Pool Code Percent
7. Reinjected 0
8. Flared or vented 1 hour or less 1,098
9. Flared or vented more than 1 hour (see instr.) 88
10. Pilot and Purge 600
11. Used for lease operations (specify in Remarks) 2,579
12. Other (see instructions) Official Use Only
0 Authorization >1 hr: MCF
Safety
13. TOTAL VOLUME (ITEMS 6-12) 18,525 MCF
Lease Use
14. NGL Gas Equivalent 0 MCF
Conservation
15. Purchased gas 0 Waste: MCF
16. Transferred from: 18,525
Commissioner Date
17. Transferred to: (Express as a negative #) 0
18. Remarks:
Transferred From: GPTF-GPP 1,853
GPTF-AB 0
Granite Point PIt. 0
Anna Platfonn 7,442
Bruce Platfonn 9,231
I hereby certir: ~e fOregOin~ ~o the best of my knowledge.
h.,o JJ h~ /./, Note: All volumes must be corrected
Signature A Title Production Accountant to pressure of 14.65 psia and to a
(/ V temperature of 600 F. Authority 20
Printed Name Janet Dormady Phone 907-263-7946 Date July 23, 2004 AA C25. 235.
Date
Form 10-422 Rev. 212004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
"í'
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthlYear of Disposition
Granite Point Tank Farm LEX Plant
1330000010 GPTF·LEX GRANITE POINT UNOCAL ALASKA April"()4
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 14,160 Pool Name Pool Code Percent
7. Reinjected 0
8. Flared or vented 1 hour or less 1,098
9. Flared or vented more than 1 hour (see instr.) 88 1/
10. Pilot and Purge 600
11. Used for lease operations (specify in Remarks) 12,933
12. Other (see instructions) Official Use Only
(10,354 Authorization > 1 hr: MCF
Safety 00
13. TOTAL VOLUME (ITEMS 6·12) 18,525 MCF
C'I "} !'MJ :s 4 ~[; ¡.IIIIII ~ F"O ~se Use
14. NGL Gas Equivalent I . I 0 ~ ~E . MCF
I.-
\J '... !U~ lm!~ ~ ervatlon
15. Purchased gas .. ~~ .....---.-..
. I 0 Wape: ,/"'"" r /1 ./ MCF/
16. Transferred from: "7--645 -U'1 tv' ~ 'V µ/~ ~/f,.çW
20,100 - Y'Vl
{ ./ \ Co.¢ssione~ / D~ /
17. Transferred to: (Express as a negative #) (1,575) - , ,
18. Remarks:
Transferred From: GPTF-GPP 1,774
GPTF-AB 2,259 RËCË/VËp
Granite Point PIt 0
Anna Platform 7,070
Bruce Platform 8,997 MAY 2 4 2004 .
Transferred To: GPTF-AB (1,575) Alaska Off & " "
GPTF-GPP 0 {,1m S. r. ,It"~
Anchorage ""
I hereby certify aregOing is true and correct to the best of my knowledge. Note: All volumes must be corrected
Signature ~' ~.....c. .- AI L ~ Title Production Accountant to pressure of 14.65 psia and to a
V r.¡ temperature of 600 F. Authority 20
Printed Name Janet Dormady Phone 907·263·7946 Date May 21,2004 AAC25.235.
-:J.£t2-
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
....
4}
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlY ear:
April 2004
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Cateaorv Reason Actions Taken Minimize Recurrence MP-2 ID Number
4123120044:00 4/2312004 20:00 88 N shut down VRU and Ariel OPERATIONAL SCHEDULED MAINTENANCE Sent gas back to Anna Platfonn Started compressors as soon
Compressor during compressor as wort< was complete on the
inspection/maintenance Anna Platfonn
Report Date: 5/19/2004
Page: 1 of 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthlYear of Disposition
Granite Point Tank Farm LEX Plant REVISION 2
1330000010 GPTF-LEX GRANITE POINT UNOCAL ALASKA Mav-04
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 12,766 Pool Name Pool Code Percent
7. Reinjected 0
8. Flared or vented 1 hour or less 999
9. Flared or vented more than 1 hour (see instr.) 0
10. Pilot and Purge 620
11. Used for lease operations (specify in Remarks) 12,311
12. Other (see instructions) Official Use Only
0 Authorization >1 hr: MCF
Safety
13. TOTAL VOLUME (ITEMS 6-12) 26,696 MCF
Lease Use
14. NGL Gas Equivalent 0 MCF
Conservation
15. Purchased gas 0 Waste: MCF
16. Transferred from: 26,696
Commissioner Date
17. Transferred to: (Express as a negative #) 0
18. Remarks:
Transferred From: GPTF-GPP 5,930
GPTF-AB 0
Granite Point PIt. 0
Anna Platfonn 7,066
Bruce Platfonn 13,700
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Production Accountant to pressure of 14.65 psi a and to a
temperature of 600 F. Authority 20
Printed Name Janet Dormady Phone 907-263-7946 Date July 1,2004 AAC25.235.
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthN ear of Disposition
Granite Point Tank Farm LEX Plant
1330000010 GPTF-LEX GRANITE POINT UNOCAL ALASKA Mav-04
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 12,647 Pool Name Pool Code Percent
7. Reinjected 0
8. Flared or vented 1 hour or less 999
9. Flared or vented more than 1 hour (see instr.) 0
10. Pilot and Purge 620
11. Used for lease operations (specify in Remarks) 13,165
12. Other (see instructions) Official Use Only
(735\ Authorization >1 hr: MCF
Safety
13. TOTAL VOLUME (ITEMS 6-12) 26,696 MCF
Lease Use
14. NGL Gas Equivalent 0 MCF
Conservation
15. Purchased gas 0 Waste: MCF
16. Transferred from: 26,696
Commissioner Date
17. Transferred to: (Express as a negative #) 0
18. Remarks:
Transferred From: GPTF-GPP 6,049
GPTF-AB 0
Granite Point PIt 0 SµPERSEDED
Anna Platform 7,023
Bruce Platfonn 13.624
(tt~ °1
I hereby certify aregOing is ~d correct to the best of my knowledge.
n~1 'AJ.. ~A.o·~ð 1-/ Note: All volumes must be co"ected
Signature . U __ ./VVI {L Title Production Accountant to pressure of 14.65 psia and to a
Printed Name C/ U temperature of 600 F. Authority 20
Janet Dormady Phone 907-263-7946 Date June 8, 2004 AA C25. 235.
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthN ear of Disposition
Granite Point Tank Farm LEX Plant
1330000010 GPTF-LEX GRANITE POINT UNOCALALASKA June-Q4
Disposition Volume MCF 20. For production from multiple pools. list contribution of each pool as a percent of
Total Volume.
6. Sold 6,800 Pool Name Pool Code Percent
7. Reinjected 0
8. Flared or vented 1 hour or less 785
9. Flared or vented more than 1 hour (see instr.) 0
10. Pilot and Purge 600
11. Used for lease operations (specify in Remarks) 13,144
12. Other (see instructions) Official Use Only
0 Authorization >1 hr: MCF
Safety
13. TOTAL VOLUME (ITEMS 6-12) 21,329 MCF
Lease Use
14. NGL Gas Equivalent 0 MCF
Conservation
15. Purchased gas t'\ Waste: MCF
v
16. Transferred from: 21,329
Commissioner Date
17. Transferred to: (Express as a negative #) 0
18. Remarks:
Transfened From: GPTF-GPP 5,431
GPTF-AB 0
Granite Point PIt 759
Anna Platfonn 6,941
Bruce Platfonn 8,198
I hereby cert~G he foregoing ~nd correct to the best of my knowledge.
Signature A I~..I' AJ. "..U.h h.L Note: All volumes must be corrected
Title Production Accountant to pressure of 14.65 psia and to a
Printed NameJl (j temperature of 600 F. Authority 20
Janet Dormady Phone 907-263-7946 Date July 20, 2004 AAC25.235.
Form 10-422 Rev. 212004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthlY ear of Disposition
Granite Point Tank Farm LEX Plant
1330000010 GPTF-LEX GRANITE POINT UNOCAL ALASKA Julv-04
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 15,454 Pool Name Pool Code Percent
7. Reinjected 0
8. Flared or vented 1 hour or less 753
9. Flared or vented more than 1 hour (see Instr.) 0
10. Pilot and Purge 620
11. Used for lease operations (specify in Remarks) 12,636
12. Other (see instrudions) Official Use Only
0 Authorization :>1. hr: MCF
Safety
13. TOTAL VOLUME (ITEMS 6-12) 29,463 MCF
Lease Use
14. NGL Gas Equivalent 0 MCF
Conservation
15. Purchased gas 0 Waste: MCF
16. Transferred from: 29.463
Commissioner Date
17. Transferred to: (Express as a negative #) 0
18. Remarks:
Transfem:d From: GPTF-GPP 2,681
GPTF-AB 0
Granite Point Pit 3,666
Anna Platfonn 11 ,429
Bruce Platfonn 11,687
IJ¿.
A J f'~
I hereby certify that t r e and corred to the best of my kno~~'šH~"- ~~ IA
,. '/ '///, DANN u::.~ . Note: All volumes must be corrected
signature¿( Y /Iv - Title Production Accountant to pressure of 14.65 psia and to a
'V/, AUG 2, 0 2004 temperature of 600 F. Authority 20
Printed Name Janet Dormady Phone 907-263-7946 Date Auaust 20, 2004 AA C25. 235.
Form 10-422 Rev. 212004
INSTRUCTIONS ON REVERSE SIDE
~I"U'1"Iit in n,.nJl"'ofc
.....rI
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
1330000010
2. Facility Name
Granite Point Tank Farm LEX Plant
GPTF-LEX
3. Field
4. Operator
5. MonthlYear of Disposition
Disposition
GRANITE POINT UNOCAL ALASKA Auaust-04
Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
18. Remarks:
Transferred From:
GPTF-GPP
GPTF-AB
Granite Point Pit.
Anna PJatfonn
Bruce Platfonn
13,271 Pool Name Pool Code Percent
0
778
49 ¡/
620
12,717
Official Use Only
0 Authorization >1 hr: 4'1 MCF ,.:J~
Safety
27,435 MCF
Lease Use
0 MCF
~ ~rvation
---
0 WaF/é: / 1 A r .// ~ MCF"
\.. / flff/ VfA ~h.ßA /
27,435 I'll. / V7
1/ 1:omjJili!!Sioner '-- I Datel ,
0 -
5,054
0
1,016
10,768
10,598
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
11. Used for lease operations (specify in Remarks)
12. Other (see instructions)
13. TOTAL VOLUME (ITEMS 6-12)
14. NGL Gas Equivalent
15. Purchased gas
16. Transferred from:
17. Transferred to: (Express as a negative #)
I hereby r· r"fffiJIthe foregoing is truÄ)d correct to the best of my knowledge.
Signat )fJ,N;;/- /IV M.MÅ A o;.~ " I _
/1 .0 -. -WI
Ponted Nam{{ Janet Dormady "r-_.. Phone
vc-.r .I. 0 ¿U04
"iitl'"
'..... ,
Production Accountant
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
AAC25.235.
907-263-7946 Date September 15,2004
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
.if6
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlY ear:
August 2004
Date & Time Event Gas Steps Taken to Equipment Down
Beain End MCF Planned? Description of Incident Cateaorv Reason Actions Taken Minimize Recurrence MP·2 ID Number
8/11/2004 6:30 8/11/2004 18:30 49 N ARIEL COMPRESSOR DOWN OPERATIONAL OTHER: SEE DESC OF EVENT MARATHON OIL CO. PUMPED RESTARTED COMPRESSOR 00-00-00
DUE TO HIGH SECOND STAGE METHANOL INTO CIGGS GAS AND RETURNED TO
DIFFERENTIAL PRESSURE LINE AT GPTF TIE IN (GPTF NORMAL OPERATIONS AS
CAUSED BY METHANOL BEING 21and 22) TO UNFREEZE LINE SOON AS POSSIBLE.
PUMPED INTO CIGGS GAS LlNE. CAUSING ARIEL
COMPRESSOR TO UNLOAD.
ONCE LINE WAS CLEARED
ARIEL COMPRESSOR WAS
RESTARTED.
-
Jañ-
Report Date: 9/16/2004
Page: 1 of 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1330000010
2. Facility Name
Granite Point Tank Farm LEX Plant
GPTF·LEX
3. Field
4. Operator
5. MonthlYear of Disposition
1. Facility Number
Disposition
GRANITE POINT UNOCAL ALASKA September-04
Volume MCF 20. For production from multiple pools. list contribution of each pool as a percent of
Total Volume.
6. Sold
18. Remarks:
Transferred From:
GPTF-GPP
GPTF-AB
Granite Point PIt.
Anna Platform
Bruce Platform
9,755 Pool Name Pool Code Percent
0
1,042
203 ../
600
11 ,488
Official Use Only
0 Authorization >1 hr. MCF SM-
Safety 'ZD3
23,088 ~e}se MCF
0 /II. rfervation . MCF
~ ,
0 'Jfas'þ: , II J .~ / ~F
I I/.;fJ~ /.,,(-zß/ ðCf
23,088 ,
\.../ , Comyrissi\w:v' I Df/e I
0 '-" I
5,748
0
0
7,772
9,568
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
11. Used for lease operations (specify in Remarks)
12. Other (see instructions)
13. TOTAL VOLUME (ITEMS 6-12)
14. NGL Gas Equivalent
15. Purchased gas
16. Transferred from:
17. Transferred to: (Express as a negative #)
I hereby ce~i t the foregoin'dQ9 is true and correct to the þ'est.œ.my 1910w~!te. d -
J ¡,?Janet L. uorma Y
Signa re ~~ dJ.J.. AA¿ A d'h Title
V OCT 1 S 2004
Printed Name Janet Dormady Phone
907-263·7946
Date
October 18, 2004
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
~ temperature of 600 F. Authority 20
AA C25. 235.
Production Accountant
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
'"
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
Month/Year:
September 2004
Date & Time Event Gas Steps Taken to Equipment Down
Beain End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
913/2004 0:00 91312004 23:59 150 N THE GAS PIPELINE WAS OPERATIONAL UNSCHEDULED MAINTENANCE THE ANNA PLATFORM SHUT GAS PIPELINE OPERATIONS
SHUTDOWN FOR REPAIRS. DOWN THE GAS PIPELINE WERE PLACED ON
FOR REPAIRS. THERE WAS STANDBY UNTIL REPAIRS
NO GAS AVAILABLE TO RUN WERE SAFELY COMPLETED.
THE PLANT. NORMAL OPERATIONS
RESUMED FOLLOWING
REPAIRS.
9/4/2004 6:00 9/412004 16:00 5 N AN UPGRADE TO THE VAPOR OPERATIONAL UNSCHEDULED MAINTENANCE THE VRU WAS SHUT DOWN. THE MAKEUP GAS WAS
RECOVERY SYSTEM NEWLY RECONFIGURED VRU SHUTDOWN TO THE TANKS.
(INSTALLATION OF NEW PIPING) PIPING WAS INSTALLED. INST ALLA TION OF VRU
NECESSITATED AN ASSOCIATED CONNECTING TANKS PIPING WAS
NEED FOR FLARING. 103,104,105.' ACCOMPLISHED QUICKLY
TO ENSURE SAFETY AND
OPERATIONAL EFFICIENCY.
9/6120047:00 9/6/2004 11 :00 23 N THE GASLlNE WAS VENTED TO 0 OPERATIONAL UNSCHEDULED MAINTENANCE THE GASLlNE WAS THE NEW PIG RECEIVER,
PSI.I DEPRESSURIZED TO PIPING AND VALVES WERE
FACILITATE REPAIRS INSTALLED USING SAFTEY
INCLUDING INSTALLATION OF PRECAUTIONS TO ENSURE
A NEW PIG RECEIVER AND ALL REPAIRS WERE MADE
ASSOCIATED PIPINGNALVES. AS QUICKLY AS POSSIBLE.
9/1212004 22:50 9/1212004 23:59 6 N LACK OF GAS FROM ANNA OPERATIONAL UNSCHEDULED MAINTENANCE THE ARIEl AND VRU ANNA OPERATORS WERE
PLATFORM CAUSED THE CHAK COMPRESSORS WERE NOTIFIED OF THE
GAS LINE PRESSURE SHUTDOWN AS THERE WAS CONDITIONS AND ASKED
PRESSURE TO FALL OFF. THIS INSUFFICIENT GAS TO REPAIR THEIR GAS
EVENT RESULTED IN A LACK OF AVAILABLE TO SUSTAIN SYSTEM.
GAS FROM CHAK. FACILITY OPERATIONS AND
TO ALLOW ANNA PLATFORM
TO INITIATE REPAIRS.
9/1312004 0:00 9/13120041:10 17 N LACK OF GAS FROM ANNA OPERATIONAL UNSCHEDULED MAINTENANCE THE ARIEL AND VRU ANNA OPERA TORS WERE
PLATFORM CAUSED THE CHAK COMPRESSORS WERE NOTIFIED OF THE
GAS LINE PRESSURE SHUTDOWN AS THERE WAS CONDITIONS AND ASKED
PRESSURE TO FALL OFF. THIS INSUFFICIENT GAS TO REPAIR THEIR GAS
EVENT RESULTED IN A LACK OF AVAILABLE TO SUSTAIN SYSTEM.
GAS FROM CHAK. FACILITY OPERATIONS AND
TO ALLOW ANNA PLATFORM
TO INITIATE REPAIRS.
~~ JOp ~ÿ
{}~... IJJ V2( 04
IL'1J ¡J
Report Date: 10/18/2004
Page: 1 of 1
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
1330000010
2. Facility Name
Granite Point Tank Farm LEX Plant
GPTF·LEX
3. Field
4. Operator
5. MonthlYear of Disposition
Disposition
GRANITE POINT UNOCAL ALASKA October-04
Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
9,017
Pool Name
Pool Code
Percent
7. Reinjected
o
8. Flared or vented 1 hour or less
1,159
145 /
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
620
11. Used for lease operations (specify in Remarks)
12,434
12. Other (see instructions)
Official Use Only
o
Authorization >1 hr:
Safety
MCF
wL42-
13. TOTAL VOLUME (ITEMS 6-12)
14-5
23,375
14. NGL Gas Equivalent
o
~e Use
~ ~ ~ervation
W¡t€te: / ...1 ./) /
l /~Vvt{ _
l / \>mmis~er
MCF
15. Purchased gas
o
MCF
.
/ I~F
l¥zJ/ ø'f
I Dte ,
I
16. Transferred from:
23,375
17. Transferred to: (Express as a negative #)
o
18. Remarks:
Transferred From:
GPTF-GPP
GPTF-AB
Granite Point PIt.
Anna Platfonn
Bruce Platfonn
5,522
o
o
8,673
9,180
Jãñêf L Dormady
I hereby ce7~ify tt! he foregoing is true and correct to the best of my knowledge.
: J... .L '/LI~. ,...£/ NOV 1 9 2004
Slgnatu Title Production Accountant
tY' (j
Printed Name Janet Dormady Phone 907-263-7946 Date November 18, 2004
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
AAC25.235.
Form 10-422 Rev. 212004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
;
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlY ear:
October 2004
Date & Time Event Gas Steps Taken to Equipment Down
Beain End MCF Planned? DescriDtion of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
1017120043:00 1017120045:00 30 Y VRU COMPRESSOR SHUT DOWN OPERATIONAL SCHEDULED MAINTENANCE BLOW DOWN ON GP GAS PERFORMED SCHEDULED
FOR SCHEDULED LINE NECESSARY FOR PREVENTATIVE
MAINTENANCE. MAINTENANCE ON MAINTENANCE·I
COMPRESSOR BEFORE
BEGINNING SMART PIGGING
PROJECT. PULLED DOWN
GAS LINE WITH ARIEL
COMPRESSOR TO 150 PSI
BEFORE GOING TO FLARE.
10/14/2004 14:00 10/14/2004 23:59 10 N ANNA PLATFORM EXPERIENCED OPERATIONAL UNSCHEDULED MAINTENANCE ANNA PRODUCTION WAS THIS EVENT WAS
A PIPELINE SHUTDOWN COMPLETELY SHUTDOWN NECESSARY TO MAKE
STOPPING FLOW TO GRAN ITE DUE TO A HOLE IN A VESSEL. REPAIRS ON ANNA
POINT TANK FARM. THUS, IT WAS NOT POSSIBLE PLATFORM. NO ACTIONS
TO OPERATE THE GAS TAKEN TO PREVENT
COMPRESSOR AND VAPOR REOCCURANCE.
RECOVERY UNIT
COMPRESSOR WITHOUT GAS
FROM ANNA. FLARING
CONTINUED UNTIL REPAIRS
ON THE ANNA PLATFORM
WERE COMPLETED.
10/15/2004 0:05 10/15/20048:00 24 N ANNA PLATFORM EXPERIENCED OPERATIONAL UNSCHEDULED MAINTENANCE ANNA PRODUCTION WAS THIS EVENT WAS
A COMPLETE PRODUCTION COMPLETELY SHUTDOWN NECESSARY TO MAKE
SHUTDOWN STOPPING GAS DUE TO A HOLE IN A VESSEL. REPAIRS ON ANNA
FLOW TO GRANITE POINT TANK THUS. IT WAS NOT POSSIBLE PLATFORM. NO ACTIONS
FARM. TO OPERATE THE GAS TAKEN TO PREVENT
COMPRESSOR AND VAPOR REOCCURANCE·I
RECOVERY UNIT
COMPRESSOR WITHOUT GAS
FROM ANNA. FLARING
CONTINUED UNTIL REPAIRS
ON THE ANNA PLATFORM
WERE COMPLETED.
10/27/200413:00 10/28/2004 9:00 49 N CHECK VALVE FROM VRU BLOW OPERATIONAL UNSCHEDULED MAINTENANCE NECESSARY MAINTENANCE VAPOR RECOVERY UNIT
CASE PARTIALLY STUCK OPEN AND REPAIRS TO THE CHECK BLOW CASE CHECK VALVE
CYCLING GAS AND LIQUIDS VALVE WAS COMPLETED. WAS PULLED APART AND
BACK AND FORTH VENTING AWAITING THE BRUCE DEBRIS WAS CLEANED.
EXCESS GAS TO FLARE. THE PLATFORM TO RESUME
BRUCE PLATFORM WAS ALSO NORMAL OPERATIONS.
DOWN AT THIS TIME FOR
SCHEDULED MAINTENANCE.
10/28/20047:00 10/28/2004 23:59 27 N VAPOR RECOVERY UNIT DOWN OPERATIONAL UNSCHEDULED MAINTENANCE PREVENTATIVE PERFORMED PREVENTIVE
DUE TO THE BRUCE PLATFORM MAINTENANCE WAS MAINTENANCE.
BEING SHUTDOWN FOR )añ~d;¡ PERFORMED TO THE VRU
SCHEDULED MAINTENANCE. CHECK VALVES AND
EQUIPMENT WHILE THE
NO 2004 BRUCE PLATFORM WAS
DOWN FOR SCHEDULED
MAINTENANCE.
Report Date: 11/19/2004
Page: 1 of 2
-
'"
Excess Flare Log Report
10/29/20040:05 10/30/200423:59 5 N VAPOR RECOVERY UNIT DOWN OPERATIONAL UNSCHEDULED MAINTENANCE FACILITY OPERATIONS WERE PERFORMED
DUE TO THE BRUCE PLATFORM ON STANDBY UNTIL PREVENTATIVE
BEING SHUTDOWN FOR MAINTENANCE WAS MAINTENANCE.
SCHEDULED MAINTENANCE. COMPLETED AT BRUCE
PLATFORM. THE VRU WAS
STARTED AS QUICKLY AND
SAFELY AS POSSIBLE WHEN
GAS WAS A V AILABLE AND
NORMAL OPERATIONS
RESUMED.
rJaííër9t(Ff0ï§áèIY
NoWí~004
Report Date: 11/19/2004
Page: 2 of 2
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthlY ear of Disposition
Granite Point Tank Farm LEX Plant
1330000010 GPTF·LEX GRANITE POINT UNOCAL ALASKA November-04
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 8,048 Pool Name Pool Code Percent
7. Reinjected 0
8. Flared or vented 1 hour or less 1,190
9. Flared or vented more than 1 hour (see instr.) 3
10. Pilot and Purge 600
11. Used for lease operations (specify in Remarks) 8,566
12. Other (see instructions) Official Use Only
0 Authorization >1 hr: MCF
Safety -3
13. TOTAL VOLUME (ITEMS 6-12) 18,407 ~e Use MCF
14. NGL Gas Equivalent /7ìJ
0 ~servation MCF
15. Purchased gas 'J ~
0 ( Waste: / 1ðI./.. // / MCF~
16. Transferred from: 18,407 / /1V/¿~ /-/I-IJ~
( ./ Compissioner . Date
17. Transferred to: (Express as a negative #) 0 -- ./
18. Remarks:
Transferred From: GPTF-GPP 3,807
GPTF-AB 0
Granite Point PIt. 0
Anna Platfonn 7,390
Bruce Platfonn 7,210
I hereby certG ~e foregoinÆnd correct to the best ~HYí~wlt~geDormady
',hpj-J ~~/Vvl¡; k n....,.. n _ nM ;ritle Note: All volumes must be corrected
Signature A Production Accountant to pressure of 14.65 psia and to a
Plinted Namf Janet DormaQ u¡:;,.... LJ " IIIlI.. temperature of 600 F. Authority 20
Phone 907-263-7946 Date December 17, 2004 AAC25.235.
S.&:L
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
· <
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
Month/Year:
November 2004
Date & Time Event Gas Steps Taken to Equipment Down
Beain End MCF Planned? Description of Incident Cateaory Reason Actions Taken Minimize Recurrence MP-2 ID Number
11/24/2004 3:00 11/24/2004 10:00 3 N VAPOR RECOVERY UNIT DOWN OPERATIONAL UNSCHEDULED MAINTENANCE AWAITED ANNA PLATFORM THIS EVENT WAS 00-00-00
DUE TO LACK OF GAS BECAUSE TO PERFORM NECESSARY NECESSARY TO MAKE
OF ANNA PLATFORM BEING REPAIRS AND GAS FLOW TO REPAIRS ON ANNA
SHUTDOWN FOR REPAIRS. BE RESTORED FOR VAPOR PLATFORM. NO ACTIONS
RECOVERY UNIT TO BE TAKEN TO PREVENT
RETURNED TO NORMAL REOCCURANCE.
OPERATIONS.
r"'~l'I"\r\ _1.-
-C !. lJ../
æ c- 2 0 2004
V
Report Date: 12/16/2004
Page: 1 of 1
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthlYear of Disposition
Granite Point Tank Farm LEX Plant
1330000010 GPTF·LEX GRANITE POINT UNOCAL ALASKA December-05
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 5,850 Pool Name Pool Code Percent
7. Reinjected 0
8. Flared or vented 1 hour or less 1,078
9. Flared or vented more than 1 hour (see instr.) 139 II
10. Pilot and Purge 620 .¡
11. Used for lease operations (specify in Remarks) -0,
8,533
12. Other (see instructions) Official Use Only
0 Authorization >1 hr: MCF
Safety 131
13. TOTAL VOLUME (ITEMS6-12) 16,220 ~use MCF
14. NGL Gas Equivalent /'~I
0 cor}ervation MCF
15. Purchased gas
0 )l'Jaste: / 1./ ~I ¿ MCý /.
16. Transferred from: 16,220 ( / j ~ ~£//(ß
.......
17. Transferred to: (Express as a negative #) \..../ ~issioner / oak
0
18. Remarks:
TransfeJTed From: GPTF-GPP 4,143
GPTF-AB 0
Granite Point PIt. 0
Anna Platfonn 6,318
Bruce Platfonn 5,759
I hereby certify G þregoing is true a~ correct to the best <j!~fWl~geDormady
Signature jÞ..l.lll.J- d)~~d,~ 1..1 n ^ I'\I'\,,,'::¡ïtle Note: All volumes must be corrected
Production Accountant to pressure of 14.65 psia and to a
(j" ..... a() .JMJ'I AI v LUUJ temperature of 600 F. Authority 20
Printed Name Janet Dorma Phone 907-263-7946 Date January 20, 2005 AAC25.235.
(JU.
Form 10-422 Rev. 212004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlY ear:
December 2004
Date & Time Event Gas , Steps Taken to Equipment Down
Beain End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
121212004 8:00 121212004 17 :00 48 Y ARIEL AND VAPOR RECOVERY OPERATIONAL SCHEDULED MAINTENANCE SHUTDOWN OF ARIEL AND NORMAL FIELD
UNIT COMPRESSORS VAPOR RECOVERY UNIT OPERA TIONS.
SHUTDOWN DUE TO GAS COMPRESSORS NECESSARY
PIPELINE PIGGING PROJECT FOR FACILITY OPERATIONS.
FROM BRUCE TO ANNA. PIGGING GAS PIPELINE FROM
BRUCE TO ANNA COMPLETED
AND EQUIPMENT RETURNED
TO NORMAL OPERATIONS AS
SOON AS POSSIBLE.
1214/2004 4:00 1214/2004 18:00 10 Y ARIEL AND VAPOR RECOVERY OPERATIONAL SCHEDULED MAINTENANCE SHUTDOWN OF ARIEL AND NO PREVENTATIVE
UNIT COMPRESSORS VAPOR RECOVERY UNIT ACTIONS TAKEN.
SHUTDOWN DUE TO ANNA COMPRESSORS NECESSARY
PERFORMING MAINTENANCE FOR ANNA TO INSPECT AND
ON GAS COMPRESSOR PERFORM PREVENTATIVE
TURBINE. MAINTENANCE ON GAS
COMPRESSOR TURBINE.
ONCE MAINTENANCE WAS
COMPLETED COMPRESSORS
WERE RETURNED TO NORMAL
OPERATIONS.
1217/200416:00 1217/200418:00 5 N ARIEL AND VAPOR RECOVERY OPERATIONAL UNSCHEDULED MAINTENANCE SHUTDOWN OF ARIEL AND NO ACTIONS TAKEN TO
UNIT COMPRESSORS VAPOR RECOVERY UNIT PREVENT
SHUTDOWN DUE TO LOSS OF COMPRESSORS CAUSED BY REOCCURANCE_
GAS FROM ANNA. INSUFFICIENT GAS FLOW
FROM ANNA TO SUSTAIN
FACILITY OPERATIONS. ONCE
APPROPRIATE GAS FLOW
RESUMED, COMPRESSORS
WERE RETURNED TO NORMAL
OPERATIONS.
1219/2004 21 :00 1219/2004 23:59 4 N VAPOR RECOVERY UNIT OPERATIONAL UNSCHEDULED MAINTENANCE SHUTDOWN OF VAPOR THIS EVENT WAS
COMPRESSOR SHUTDOWN RECOVERY UNIT NECESSARY TO MAKE
DUE TO BRUCE PLATFORM COMPRESSOR NECESSARY REPAIRS ON BRUCE
SHUTDOWN OF GAS FOR BRUCE PLATFORM TO PLATFORM. NO ACTIONS
COMPRESSOR FOR TROUBLESHOOT AND REPAIR TAKEN TO PREVENT
MAINTENANCE. GAS COMPRESSOR. AWAITING REOCCURANCE.
BRUCE TO COMPLETE
MAINTENANCE AND REPAIRS.
12/10/20040:01 12110/2004 23:59 16 N VAPOR RECOVERY UNIT OPERATIONAL UNSCHEDULED MAINTENANCE SHUTDOWN OF VAPOR THIS EVENT WAS
COMPRESSOR SHUTDOWN RECOVERY UNIT NECESSARY TO MAKE
DUE TO BRUCE PLATFORM COMPRESSOR NECESSARY REPAIRS ON BRUCE
SHUTDOWN OF GAS FOR BRUCE PLATFORM TO PLATFORM. NO ACTIONS
COMPRESSOR FOR TROUBLESHOOT AND REPAIR TAKEN TO PREVENT
MAINTENANCE. GAS COMPRESSOR. AWAITING REOCCURANCE.
BRUCE TO COMPLETE
MAINTENANCE AND REPAIRS.
~. - --- L _1.-
JU' ~:~~OO5
Report Date: 1/11/2005
Page: 1 of V
Excess Flare Log Report
Facility Name:
GRANITE POINT TANK FARM
MonthlY ear:
December 2004
Date & Time Event Gas Steps Taken to Equipment Down
Bealn End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
12111/20040:01 12111/200415:00 8 N VAPOR RECOVERY UNIT OPERATIONAL UNSCHEDULED MAINTENANCE SHUTDOWN OF VAPOR THIS EVENT WAS
COMPRESSOR SHUTDOWN RECOVERY UNIT NECESSARY TO MAKE
DUE TO BRUCE PLATFORM COMPRESSOR NECESSARY REPAIRS ON BRUCE
SHUTDOWN OF GAS FOR BRUCE PLATFORM TO PLATFORM. NO ACTIONS
COMPRESSOR FOR TROUBLESHOOT AND REPAIR TAKEN TO PREVENT
MAINTENANCE. GAS COMPRESSOR. AWAITED REOCCURANCE.
BRUCE TO COMPLETE
MAINTENANCE AND REPAIRS,
AND RETURNED TO NORMAL
OPERATIONS AS SOON AS
POSSIBLE.
1211212004 10:00 121121200416:00 3 N VAPOR RECOVERY UNIT OPERATIONAL UNSCHEDULED MAINTENANCE SHUTDOWN OF VAPOR THIS EVENT WAS
COMPRESSOR SHUTDOWN RECOVERY UNIT NECESSARY TO MAKE
DUE TO BRUCE PLATFORM COMPRESSOR NECESSARY REPAIRS ON BRUCE
SHUTDOWN OF GAS FOR BRUCE PLATFORM TO PLATFORM. NO ACTIONS
COMPRESSOR FOR REPAIRS. PERFORM REPAIRS ON GAS TAKEN TO PREVENT
COMPRESSOR. AWAITED REOCCURANCE.
BRUCE TO COMPLETE
REPAIRS, AND RETURNED TO
NORMAL OPERATIONS AS
SOON AS POSSIBLE
12129/20040:01 12129/2004 23:59 17 N VAPOR RECOVERY UNIT OPERATIONAL UNSCHEDULED MAINTENANCE SHUTDOWN OF VAPOR THIS EVENT WAS
COMPRESSOR SHUTDOWN RECOVERY UNIT NECESSARY TO MAKE
DUE TO BRUCE PLATFORM COMPRESSOR NECESSARY REPAIRS ON BRUCE
SHUTDOWN OF GAS FOR BRUCE PLATFORM TO PLATFORM. NO ACTIONS
cOMPRESSOR FOR REPAIRS. TROUBLESHOOT AND REPAIR TAKEN TO PREVENT
GAS COMPRESSOR. ON REOCCURANCE
STAN BY AWAITING BRUCE TO
COMPLETE MAINTENANCE
AND REPAIRS.
12130/2004 0:01 12130/200423:59 28 N VAPOR RECOVERY UNIT OPERATIONAL UNSCHEDULED MAINTENANCE SHUTDOWN OF VAPOR THIS EVENT WAS
COMPRESSOR SHUTDOWN RECOVERY UNIT NECESSARY TO MAKE
DUE TO BRUCE PLATFORM COMPRESSOR NECESSARY REPAIRS ON BRUCE
SHUTDOWN OF GAS FOR BRUCE PLATFORM TO PLATFORM. NO ACTIONS
COMPRESSOR FOR REPAIRS. TROUBLESHOOT AND REPAIR TAKEN TO PREVENT
GAS COMPRESSOR. AWAITED REOCCURANCE.
BRUCE TO COMPLETE
REPAIRS, AND RETURNED TO
NORMAL OPERATIONS AS
SOON AS POSSIBLE.
Jañeyt: 'OµrrnadV
j
T ~ 2GGS
J~tf
Report Date: 1/11/2005
Page: 2off./