Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutMcArthur River TBU ProductionState of Alaska AOGCC Production Files Year: 2013 Field & Pool: MCARTHUR RIVER - TBU Operator: HILCORP STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT NET OIL SALES p Alaska, LLC McArthur River Field f OperatorRegulatory JANUARY 2013 LeaWellsonth FName and Year of Production Wells Produced Pipeline Runs 83 126,406 Closing Inventory Opening Inventory 22,638 Other Adjustments 17,215 (direct or xylene recovered) 0 Total Net Production 131,830 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Signed c�", � Linda Trahan 131,830 2,833,934 1,1 Title Protect Coordinator TOTAL OIL WATER GAS Date: 2/19/2013 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT Submit in tluplipte STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT Name of Operator _ 20 AAC 25.230 HILCORP ALAS FCA. LLC 're,o a roa: i M11,19 Bay Unit Dolly Varden PF, McArthurRi Hemlock ver Feld, Montt and Year. JANUARY 2013 1. Well No. 2 API No. 50.\7,X-XbG�-XK-7p( 3. Type (see 4. field & Pool 5. Method 6. Days in Oper, 7. Avsigg. FTP instruct.) Code (see instruct) pAv (see instruct.) (BBL) (BBL) 10 . GAS— (MCF} (BBL) (BBL) D-01H 50.73320068-00-00 1 520120 5 31 (MCF) D-02ARDH 50.73320069-02-00 1 520120 8 125169 8,643 34 5.2� 267,945 1,065 D-08RDH 50.73320107-01-00 1 520120 2 0 0 0 0 0 p 0 0 D-07RD2 50.733 20117-02-00 1 520120 2 30 3053 g 85 246 750 D-048 50.73320132-01-00 1 520120 2 31 253 22 794 63 63 661 6.012 1,9d4 D-11 50.733-2014D-00-00 i 520720 8 31 195 49 300 162 7,522 9.303 5,014 0.12RDH 50-7332o742-01.00 7 520120 1 0 0 0 0 0 0 0 0 D-06RDH 50.73320147-07-00 1 520120 8 37 105 49 532 14 1,504 16,479 432 D -46H 50.73320165-01-00 1 520120 8 0 0 0 0 0 0 0 4 D-17 50-733-2016MI-00 1 520120 8 0 140 0 0 p 0 0 0 D-d7H 50.73320195-02-00 1 520120 5 0 14 0 0 0 0 0 0 0.20 50-73320203 MW 1 520120 S 31 126 53 4.927 16 7,649 752,736 506 Dd2 50.73320205-01-00 1 520120 8 0 0 0 0 0 0 0 0 0.25RDH 50-73320247-01-00 1 520120 1 0 0 0 0 0 0 0 0 0.271-H 50-733-20274-00-00 1 520120 82.298 20 221115 21003 y1 40.058 870 0-28H 50.73320287-06 00 i 526120 8 0 0 p p 0 0 0 0 0 DdOR0RD 56-73320318-01-00 1 520720 8 1,183 0 0 0 0 0 0 D-43RDH0 50.7332037307-00 1 524120 2 0 0 p p p 0 0 37 778 33 791 33 1.023 5,928 1,078 I hereby certify that the foregoing is We and correct to the best of my knomedge. Printed Name: Linda Trahan 14. Tile: Project Coordinator Signature: Date: 3/52013 Form 10-405 Rev. 042006TOTAL 'cin. 14.011 498,708 11.G00 INSTRUCTIOt•L4 ON RFVFACF Subrret in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT Submit in duplimte STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT of one atnr 20 AAC 25.230 HILCORP ALASKA, LLC � u enu tour.1 mOing Bay Grayling PF, McArthur River Field, Hemlock Month and Year: JANUARY2013 1. Well No. 2. API No. 50.XXX-XXXXX-XX-XX 3. Type (see 4. Field & Pool 5. Method (see 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION instruct) Code instruct.) psig (see 8. OIL instruct) (BBL) 9. WATER (BBL) 10. GAS 11. OIL 12. WATER 13. GAS G-01 RDLH 50-733-20037-01-00 1 520120 (MCF) (BBL) (BBL) (MCF) G-02RD48 50-733-20038-01-00 i 520120 5 2 gt 92 3,366 27 2,837 104,336 838 G-03RD22,488 50-733-20049-01-00 1 520120 8 31 130 72 21 2,234 77,439 640 G-04RDLH 50-733-20050-01-00 1 520120 8 D 0 D 0 0 0 0 p G-06RDLH 50-733-20073-01-00 1 52012p g 0 1,475 0 0 0 0 0 0 G-08RDLH 50-733-20085-01-00 1 520120 8 0 145 0 p 0 0 0 0 G -10R0 50-733-20094-01-00 1 520120 8 0 1,233 0 0 0 0 0 p G-12RD3 50-733-20116-03-00 i 520120 2 0 18 0 0 0 0 0 0 G-73 50.733-20127-00-00 1 520120 2845 31 135 30 9 917 26,180 264 G -07H 50.733-20130-00-00 i 520120 2 31 120 29 711 8 889 22,051 253 G-15RD 50-733-20149-01-00 14,580 520120 8 31 177 182 52 5,656 141,967 1,608 G-17RDH 50-733-20161-07-00 1 520120 2 0 1,302 0 0 0 0 0 0 G-30LH 50-733-20187-00-00 1 520120 889 31 114 10 114 3 312 3,548 G-31 LH 50.733-2019400-00 1 520120 8 01 1830 0 0 0 0 p G-34RDLH 50-733-20213-01-00 1 520120 8 0 380 0 10 0 0 0 p G-20 50-733-20261-00-00 1 520120 2 0I 1000 10 0 0 0 0 G-25 50-733-20288-00-00 1 520120 31 215 146 3,199 42 4,517 99,178 1,287 G-26RD 50-733-20295-01-00 1 520120 8 g p 95 0 0 0 0 0 p G-28RD 5 0.733-20324-01-00 7 520120 5 OL 47310 0 0 0 0 0 31 86 241 6,427 89 7,481 199,225 2,128 1 hereby certify that the foregoing is true and correct to fhe best of my knowledge. Printed Name: Linda Trahan 14 Title: Project Coordinator Signature: Date: 2/192013 Form 10405 Rev. 042006 TOTAL 24,842 673.925 7,108 INSTRUCTIONS ON REVERRF RInF Submit in duplicate I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: "\ Form 10405 Rev. 04/2006 Title: Project Coordinator I 14. Date: 2/19/2013 TOTAL 14,176 (BBL) I (MCF) 1 7,188 Submit in r STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25230 oe Operator: ..ORP ALASKA, LLC Field and Pool: TradingBa Grayling PF, McArthur River Field, West y Foreland Month and Year: JANUARY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field & Pool 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION instruct) Code (seeTOT, instruct.) P iq (see 8. IL 9. WATER 10. GAS 1 OII �W (BB L) (MCF) (BBL)1. 50-733-2019&00-00 1 520190 2 3LW 50-733-20212-00-00 1 520190 31 96 54 1,217 15 2 1,676 31 149 81 _ 1.192 2.1 � GM I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: "\ Form 10405 Rev. 04/2006 Title: Project Coordinator I 14. Date: 2/19/2013 TOTAL 14,176 (BBL) I (MCF) 1 7,188 Submit in r I nereoy cemty that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Form 10-405 Rev. 042006 Title: Project Coordinator Date: 2/192013 NS ON REVERSE SIDE (BBL) I (MCF) 7,112 773 14. STATE OF ALASKA TOTAL 8,129 32,36T.645 ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 ne of Operator: ORP ALASKA, LLC Field a Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: JANUARY 2013 1. Well No. 2. API No. 50•XXX-XXXXX-XX-XX 3. Type (see 4. Field & Pool S. Method 6. Das in O y cer" T FTP DAILY AVG. PRODUCTI instruct.) Code (see sigg' Psst (see OIL 9. WATER instruct.) (8. instruct.) (BBL) (BBL) IRD2G 50-733-20054-07-00 1 520150 5 :RD2G 50.733-20156-02-00 1 520150 31 51 229 36 67 5 'G 50.733-20180-01-00 1 520150 31 101 6 207 t0 8 �G 50-733-20211-00-00 1 520150 5 0 56 0 0 0 RDG 50-733-20254-01-0D 11 5201501 31 56 11 123 1 4 31 so �a Me _ I nereoy cemty that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Form 10-405 Rev. 042006 Title: Project Coordinator Date: 2/192013 NS ON REVERSE SIDE (BBL) I (MCF) 7,112 773 Submit in duplicate 14. TOTAL 8,129 32,36T.645 Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Onerarnr HILCORP ALASKA, LLC nein ana roar wading Bay Unit King Salmon PF, McArthur River Field, Month and Year: Hemlock JANUARY 2013 1. Well No. 2. API No. 50 -XXX -XX -XX 3. Type (see 4. Field & Pool 5. Method 6. Days in Oper. 7. qvg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION instruct) Code (see instruct.) psig (see 8. OIL instruct-) (BBL) 9. WATER 10. GAS 11.OIL 12. WATER 13. GAS (BBL) (MCF) (BBL) (BBL) (MCF) K-01RD2H 50-733-2005401-00 1 520120 5 K-26RD 50.733-20097-Oa00 1 520120 4 31 51 57 142 17 1,778 4,406 517 K-12RD2L 50-733-20156-02-00 1 520120 1 31 191 52 592 13 1,613 18,367 397 K-13RD2 50-733-20157-02-00 1 1 520120 -5-31 31 101 180 Q703 90 5,584 207,800 2,784 K -25H 50-733-20180-01-00 1 520120 8 85 349 10,431 289 10.833 323,363 8,959 K -30H 50-733-20211-00-00 1 520120 5 0 56 0 0 0 0 0 0 K-17 50-733-20248-00-00 1 520120 8 31 56 19 238 13 591 7,388 412 K-18RDH 50-733-20254-01-00 1 520120 4 0 0 0 0 0 0 0 0 K -19H 50-733-20259.00.00 1 520120 5214 31 59 7 291 3 9,008 101 31 75 43 53 57 1,333 1,632 1,779 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan 14. Title: Project Coordinator Signature: -"Zs� Date: 2/192013 Form 10-405 Rev. 0412006 TOTAL 21,947 571.964 14,949 INSTRUCTIONS ON er=viceee cinc Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT ouoma in aupiica[e STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25 230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, G- Zone Month and Year: JANUARY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field 5. Method 8 Pool 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION instruct.) (see Code instruct.) psig (see instruct.) 8. OIL (BBL) 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS (BBL) (MCF) (BBL) (BBL) (MCF) M -25G 50-733-20391-00-00 1 520150 1 31 88 46 405 M-28SG 50-733-20414-00-00 1 520150 1 31 56 1,435 12,556 1,7 1,745 M-29AG 50-733-20428-01-00 1 520150 1 31 82 62 444 10 1,921 13,754 0 i18 2,141 81 3,673 66,36D 2,518 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahaanr�,... Title: Project Coordinator 14. ' Signature: Date: 2/192013 Form 10-405 Rev. 042006 INSTRUCTIONS ON TOTAL 7,029 92,679 4,573 REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT ..r nye 20 AAC 25.230 HILCORPALASKA, LLC neia ana root Irading Bay Unit Steelhead PF, McArthur River Fieltl. GGS Month and Year: JANUARY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field 8 Pool 5. Method 6. Days -,n0p,, 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION instruct.) Code instruct.) psig (see 8. OIL instruct.) (BBL) 9. WATER 10. GAS 11. OIL 12. WATER 73. GAS (BBL) (MCF) (BBL) (BBL) (MCF) M-01 50.733-2038600-00 2 520550 1 31 M-02 50-733-20389-00-00 2 520550 1 28 0 0 993 0 3 30,780 M-13 50-733-20407-00.00 2 520550 1 31 32 0 15 1,592 0 478 49.346 M-14RD 50-733-2040601-00 2 520550 1 31 102 0 13 2,363 0 73,240 M-03 50-73320411-00.00 2 520550 1 31 31 0 0 1,518 0 i 1 47,056 M-05 50-73320413-00.00 2 520550 1 31 45 0 10 3,836 0 301 118,906 M-041,999 50-733-20477-00-00 2 520550 1 31 80 0 7 0 18 61,969 M-19RD 50-73320421-01-00 2 520550 1 31 92 0 0 3.714 0 3 115,124 M-15 50-733-20422-00-00 2 520550 1 31 27 0 0 1,543 0 1d 47,823 M-07 50-733-20435-00-00 2 520550 1 31 70 0 0 4,293 0 6 133,070 32RD3,261 50-733-20462-01-00 2 520550 2 31 34 0 i 0 36 1171,099 M-09 50-733-20476-00-00 2 520550 1 31 207 0 qg3 0 0 15,275 2 M-16RD 50-733-20480-01-00 2 520550 1 31 27 0 0 1,855 0 14 57,516 1V-12 50-733-20505-00-00 2 520550 1 31 72 0 2 2,576 0 51 77,998 M-177,116 50-733-20552-00-00 2 520550 1 31 35 0 0 0 1 34,602 M-18 50-733-2058300-00 2 52 0550 1 31 171 0 0 1'781 0 0 55,223 PA -06 50-733-20585-00-00 2 520550 1 31 111 0 0 3,642 0 1 112,868 M-20 50-733-20587-00-00 2 520550 1 37 103 0 0 2•�7 0 0 69,040 M-10 50.733-20588-00-00 2 520550 1 31 60 0 D 1.550 0 B 48.046 M-11 50.733-20590.00-00 2 520550 1 31 107 D 0 2,479 0 0 76,849 M-021 50.733-2059600.00 2 520550 1 37 107 0 76 2,025 0 2,366 62,768 31 132 0 0 5,167 0 8 16D,170 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan 14. Title: Project Coordinator �C Signature: Date: 2/19/2013 Form 10-405 Rev. 04!2006 INSTRUCTIONS AN RFVFGec cine TOTAL 0 18,974 1,533,517 Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT �, AA. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT Name of Operator: Feld and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, HILCORP ALASKA, LLC West Foreland Month and Year: JANUARY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field 5. Method &Pool 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION Instruct') (see Code instruct.) psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instinct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) M -25W 50-733-20391-00-00 1 520190 1 31 074 810 M -28W 50-733-20414-00-00 1 520190 1 37 0 437 25,111 0 0 14 148 2 434 4,588 73 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda TMhan Title: Project Coordinator 14. Signature:-- Date: 2/19/2013 Form 10-405 Rev. 0412006 INRTGI ICTIr1NC nAl DCl¢�cr wn� TOTAL 870 29.699 73 Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT �A.,,. -- Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT nA 11-1 Name of Operator. HILCORP ALASKA, LLC Field and P001: Trading Bay Grayling PF. McArthur River Field, Hemlock Month and Year: JANUARY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4_ Field & Pool 5. Method 6. Days TUBING PRESS. 7. MAX CASING PRESS, DAILY AVG. INJ. TOTAL MONTHLY INJ. instruct.) Code (see instruct.) in Oper. 8. AVG PSIG PSIG 9. MAX PSIG 10. AV6 11. LIQUID 12. GAS 13. LIQUID 14. GAS PSIG (BBL) (MCF) (BBL) (MCF) G-05RDH 50.733-20060.01-00 4 520720 6 31 3,150 3.715 6U G-09 50-733-20098-00-00 4 520120 6 31 1,950 1.950 1,920 52 8,404 0 260.537 p G-11 50-733-20115-00-00 4 520120 6 31 2,150 2,148 1,892 2,212 0 68,585 0 G -16H 50-733-20162-00.00 4 520120 6 31 2,770 2,085 2,041 0 63,284 0 G-19 50-733-20778-00.00 4 520120 8 2,900 2.860 2,500 2,410 5,057 0 156,756 0 G-14ARDH 50-733-20189-01-00 4 520120 6 0 31 0 0 3:060 3,012 0 0 0 0 0 0 0 G-23RDH 50-733-20269-01-00 4 520120 6 31 900 900 1,800 0 613 0 19,007 0 022H 50-733-20272-00-00 4 520120 6 31 2,500 2.495 2,400 1,784 2,383 14,039 10 1125.207 0 7,767 0 222,192 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan 15. Title: Project Coordinator Signature: C Date: 2/192013 Form 10-406 Rev. 02/2006 Inicrai ir'nnnic nni oc.�ecc �,,.� TOTAL 0 915,568 0 Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25 432 Name Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: Hemlock JANUARY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type 4. Field & Pool 5. Method 6. Days TUBING PRESS. 7 MAX CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. (see (see in Oper. 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) D -45H50.733-20150-01-00 4 520120 8 0 U 0 250 157 0 D-14RD2H 50-733-20159-02-00 4 520120 6 31 0 0 3,275 3,174 428 U U D 0.14RD 50-733-20164-Ot-00 4 520120 6 31 0 0 100 0 13,262 0 024A 50-733-20224-01-00 4 520120 6 31 0 0 75 82 3,238 p 100,381 p D-34ADPN 50-733-20225-01-00 4 520120 6 31 0 0 890 66 1,565 0 48,512 0 D 029RDH 50-733-20292-01-00 4 520120 6 31 0 0 360 656 1,003 0 31,082 0 D-41 50-733-20331-00-00 1 4 5201206 31 0 0 540 284 3,444 0 106,756 0 441 14.752 10 1147,298 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 15. Signature: Date: 2/19/2013 Form 10-406 Rev. 0212006 TOTAL 0 447,291 0 Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25 432 Name R Operator. HILCORP ALASKA, LLC ON Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, ar: MjE Hemlock J13 1. Well No. 2. API No. 60 -XXX -XX -XX 3. Type 4. Fieltl 5. Method 8 Pool 6. Days TUBING PRESS. 7. MAX CASING PDAILY AVG. INJ. TOTAL MONTHLY INJ. (see (see in Oper. 8. AVG PSIG 9. MAX PSIG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct.) code instruct.) PSIG (BBL) (MCF) (BBL) (MCF) K-22 50-733'20271-00.00 4 520120 6 31 2,300 2.253 170 133 9,508 0 K-24RD2H 50-733-20330-02-00 4 520120 8 0 010 120 294,752 0 118 0 0 0 0 1 hereby certify that the foregoing is true and correct to the best of my knovdedge. Printed Name: Linda Trahan Title: Project Coordinator 15. �� Signature: Date: 2/19/2013 Form 10.406 Rev. 0212006 INSTRUCTIONS TOTAL 0 294,752 0 REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT nn AAn n Name Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, HILCORP ALASKA, LLC West Foreland Month and Year: JANUARY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-)((-XX 3. Type (see 4. Field 5. Method &Pool (see 6. Days TUBING PRESS. CASING PRESS, DAILY AVG. INJ. in Oper. 7. MAX 8, AVG PSIG 9. MAX PSIG TOTAL MONTHLY INJ. instruct.) Code instruct.) PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS PSIG (BBL) (MCF) (BBL) (MCF) M-27 W 50-733-20423-00-00 4 520190 8 0 0 0 170 M -30W 50-733-20430-00-00 4 520190 5 31 3,315 2.480 550 108 0 0 550 0 0 661 0 20,486 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 15. Signature: -*Z�75 Date: 21192013 Form 10406 Rev. 02/2006 iMcTai irnnnic n., o11-1 —.,.- TOTAL 0 20,486 0 Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT Name of Operator: 4U C 25.230 HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Vanden PF, McArthur River Field, Month and Year. Hemlock JANUARY 2013 1. Well No. 2. API No. 50-XXX-XXXX(-XX-70( 3. Type (see 4. Fieltl & Paol 5. Methotl 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION instruct.) Code (see instruct.) psig (see 8.OIL instruct.) (BBL) 9. WATER 10. GAS 17.OIL 12. WATER 13. GAS (BSL) (MCF) (BBL) (BBL) (MCF) D -01H 50-733-20068-00-00 1 520120 5 37 0-02ARDH8,641 50.733-20069-02-00 1 520120 8 125 169 34 5,248 267,945 11,065 D-OSRDH 50-733-20107-01-00 1 520120 2 0 0 0 D 0 0 D 0 D-07RD2 50-733-20117-02-00 1 520120 2 30 305 3 8 25 85 246 750 D-048 50 -733 -20732 -01 -DO 1 520120 2 31 309 22 194 63 681 6,012 7,944 0-11 50-733-20140-00-00 1 520120 8 31 238 49 300 162 1,522 9,303 5,014 0-12ROH0 50-733-20142-01-00 1 520120 1 0 0 0 -10579 0 0 0 0 D-D5RDH 50-733-20147-01-00 1 520720 8 31 532 7q 1.504 16,479 432 D46H 50-733-20165-01-00 1 520120 2 0 00 p 0 0 0 0 0-17 50-733-20168-01-00 1 520120 8 0 740 0 0 0 0 D 0 D47H 50.733-2019502-00 1 520120 5 0 00 0 0 0 0 0 0-20 50.733-20203-00-00 1 520120 8 31 129 53 4,927 16 1.649 152.736 506 0-42 50.733 -2020501 -DO 1 520120 8 0 O p 0 0 0 D 0 D-25RDH 50.733-20247-01-00 1 520120 1 0 0 0 0 0 0 0 0 D-27LH 50.733-2027400-00 1 520120 g2.298 20 221115 2,003 4q 40,058 870 D -28H 50-733-20287-00-00 1 520720 8 0 00 0 0 0 0 0 D-40RD 50.733-20318-07-00 1 520120 80 0 1,183 0 0 0 0 0 D-43RDH 50-733-20373-01-00 1 520720 2 D 0 0 091 0 0 0 31 778 33 S3 1,023 5,928 7,018 I hereby certify that the foregoing is true and correct to the best of my knowledgw MkA •� - - - . - Printed Name: Linda Trahan 14. Title: Project Coordinator Signature: Date: 2/192013 Form 10-405 Rev. 04/2006 TOTAL 14,071 498,708 11,600 INSTRI IC.TIf1NS nth AFlrcocc cine Submit in duplicate M STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 HILCORP ALASKA, LLC dela and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field G -Zone Month and Year: JANUARY 2013 1. Well No. D -01G 0-12RDS D -46G D -47G 0.30RD2 D-31RD D-32 D-25RDG0 D-26RD D -27G1,719 D -28G 2. API No. 3. Type 4. Field 5. Method 50.XXX-XXXXX-XX-XX (see & Pool (see Instruct.) Code instruct.) 50.733-20058-00-00 1 520150 5 50-733-20069-02-00 1 520150 8 50.733-20089-01-00 1 520150 2 50.733-20090-02-00 1 520150 2 50-733-20100.01-00 1 520150 50-733-20107-01-00 7 520150 2 50.733-20142-01-00 1 520150 I 1 I31 50-733-20165-01-00 1 520150 2 50-733-20195-02-00 1 520150 5 50-733-20208-02-00 1 520150 2 50-733-20215-01-00 1 520150 2 50-733-20220.00-00 1 520150 8 50.733-20247-01-00 1 520150 1 50-733-20260-01-00 1 520150 2 50-733-20274-00-00 1 520150 8 60-733-20287-00-00 1 520150 8 6. Days in Oper. 31 21 31 31 30 31 31 0 31 0 20 31 0 7. Avg. FTP DAILYPRODUCTION 10. GAS psig (see *(BIBQ(BSL) instruct.) (MCF) 125 7315D-02ARDG 00D-04RD 834 2D-03RD2 158 94D-05RD 203 56D-08RDG 35325 106138 1,513 76 140 41 235 24 129 80 3,285 24 459 0 0 0 187147 669 55 0 0 0 0 221 57 a,066 5 280 55 461 57 0 0 0 0 TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) 2.249° 85 246 750 4,282 46,902 2,343 1,259 7,291 730 2,474 101,824 759 0 4,572 20.730 1,719 0 0 1,132 81,330 97 14,276 1,755 0 0 ° D-43RDG 50-733.20373-01-00 1 520150 2 0 311 1,146 0 178 33 0 1191 0 33 0 11,023 0 15,928 0 1,018 e. U T F F� Y I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Tmhan Title: Project Coordinator 14. Signature: Date: 2/19/2013 Form 10-405 Rev. 0412006 INSTRUCTInNs nu ac�iaoec mno TOTAL 23,478 351,547 12 791 Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT NET OIL SALES Hilcorp Alaska, LLC McArthur River Field FEBRUARY 2013 Name of Operator Regulatory Lease Month and Year of Production Total Wells 116 Total Wells Produced 82 Total Pipeline Runs 117,644 Closing Inventory 22,961 Opening Inventory 22,638 Other Adjustments 0 (direct or xylene recovered) Total Net Production 117,967 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ��117,967 2,541,748 Linda Trahan TOTAL OIL WATER Title Project Coordinator Date: 3/18/2013 GAS STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name Operator: HILCORP ALASKA, LLC Feld and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: G -Zone FEBRUARY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field 8 Pool 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION instruct.) Code (see instruct.) psig (see 8. OIL instruct.) (BBL) 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS (BBL) (MCF) (BBL) (BBL) (MCF) D -01G 50-733-20068-00-00 1 520150 5 28 D-02AROG 50-733-20069-02-00 1 520150 8 163 60 2,063 17 1,690 57,778 477 D-04RD 50-733-20089-01-00 1 520150 2D 0 119 0 0 0 0 0 D-03RD2 50-733-20090-02-00 1 520150 2 13 617 2 41 16 21 529 209 D-05RD 50.733-20100-01-00 1 520150 2 28 172 95 1 3 2,672 0-08RDG 50-733-20107-01-00 1 520150 2 217 48 745 111 4, 3,108 3. D-12RDS 50-733-20142-01-00 1 520150 1 28 225 2 4 34 47 47 98 98 965 D46G 50-733-20165-01-00 1 520150 2 28 108 111 1,188 64 3,116 33,274 1,790 D -47G 5D-733-20195-02-00 1 520150 5 28 181 39 239 46 1'099 6,691 1,286 D-30RD2 50-733-20208-02-00 1 520150 8 28 163 84 3,086 35 2,362 86,411 992 D-31RD0 50-733-20215-01-00 1 520150 2 0 1,051 0 0 0 0 0 0-32 50-733-20220.00-00 1 520150 8 28 166 118 150 13 3'304 4,201 371 D-25RDG 50 -733 -20247 -01 -DO 1 520150 1 0 0 398 0 0 0 0 0 0-26RD 50-733-20260-01-00 1 520150 2 27 110 45,487 5 1,315 148,145 142 D-2 50-733-20274-00.00 7 520150 8 28 216 5 0 222 19 1,396 6,213 544 D -28G 8G 50-733-20287-00.00 1 520150 8 0 56 0 0 0 0 0 0 D43RDG 50-733-20373-01-00 1 520150 2 0 1,187 0 0 0 0 28 256 W 7076 48 829 4,919 783 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan 14. Title: Project Coordinator Signature: kcNz Date: 3/182013 Form 10405 Rev. 04/2006 TOTAL 19.203 352,339 1 INSTRUCTIONS ON REVERSE SIDE Submit t in d in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAc 25 2sn Name of Operator. HILCORP ALASKA, LLC Feld and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, GGS Month and Year: FEBRUARY 2013 1. Well No. 2. API No. 50•XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field &Pod Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP prig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER (BBL) 10. GAS (MCS 11. OIL (BBL) 12. WATER {BBL) 13. GAS (MCS D-18 50-733-20169.00-00 2 520550 8 0 0 0 0 0 0 0 0 I hereby certify that the foregoing is true and correct to the best of my knovAedge. Printed Name: Linda Trahan14. Title: Project Coordinator Signature: —yC Date: 3/18/2013 Form 10-405 Rev. 0x/2006 TOTAL 0 0 0 Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT ?n oar. 9F 91n Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Hemlock Month and Year: FEBRUARY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 8 Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION prig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) D -01H 50-733-20068-00-00 1 520120 5 28 167 141 8,254 40 3,944 1231,110 1,113 D-02ARDH 50-733.20069-02-00 1 520120 8 0 119 0 0 0 0 Jo 0 D-08RDH 50-733-20107-01-00 1 520120 2 28 225 2 4 34 47 198 965 D-07RD2 50-733-20117-02-00 1 520120 2 28353 19 273 92 541 7,653 2,575 D-048 50-733-20132-01-00 1 520120 2 28 166 51 256 86 1,421 7,156 2,402 D-11 50-733-20140-00-00 1 520120 8 0 1,114 0 0 0 0 0 0 D-12RDH 50-733-20142-01-00 1 520120 1 28 108 39 418 12 1,095 11,691 330 D-06RDH 50-733-20147-01-00 1 520120 8 0 0 0 0 0 0 0 0 D -46H 50-733-20165-01-00 1 520120 8 0 181 0 0 0 0 0 0 D-17 50-73320168-01-00 1 520120 8 0 241 0 0 0 0 0 0 D -47H 50-733-20195-02-00 1 520120 5 28 163 56 4,629 24 1,575 129,617 661 D-20 50-733-20203-00-00 1 520120 8 0 0 0 0 0 0 0 0 0-42 50-733-20205-01-00 1 520120 8 0 010 0 0 0 0 0 D-25RDH 50-733-20247-01-00 1 520120 1 27 110 99 2,702 47 2,669 72,967 1,279 D-27LH 50-733-20274-00-00 1 520120 8 0 56 0 0 0 0 0 0 0-28H 50-733-20287-00-00 1 520120 8 0 1,187 0 10 0 0 lo 0 D40RD 50-733-20318-01-00 1 520120 8 0 196 0 10 10 0 Jo 0 D43RDH 50-733.20373-01-00 1 520120 2 28 256 30 1176 128 829 4919 783 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Pnrm �n-ens ao„ nennna Title: Date: Project Coordinator 3/182013 14. TOTAL 12,122 465,211 10,107 ;NSTR V I I iONS ON RE V ENSE Slut Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 GCC 95 230 Name of Operator. Field and Pool: Trading Bay Grayling PF, McArthur River Fieltl, G -Zone Month and Year: HILCORP ALASKA, LLC FEBRUARY 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see & Pool (see prig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) G-01 RD G 50-733-20037-01-00 1 520150 5 28 96 22 189 6 G-RD2 50-733-20049-01-03 1 520150 80 0 0 0 618 2,499 177 0 0 0 10 G-06RDL 50-733-20073-01-00 1 520150 228 95 56 788 14 1,575 22,050 385 G -07G 50-733-20130-00-00 1 520150 2 25 154 11 233 3 264 6,820 65 G-17RDG 50-733-20161-01-00 1 520150 2 28 113 6 101 2 178 G -32G 50-733-20198-00700 1 520150 2 281 116'104 2.719 25 2,908 2,837 45 G-33SG 50-733-20212-00-00 1 520150 8 0 1,33210 0 76,131 714 G 021RD 50-733-20267-01-00 1 520150 2 281 113142 0 0 0 0 201 110 11.181 5,635 290 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan14. Title: Project Coordinator "4D K Signature: Date: 3/18/2013 Form 10-405 Rev. 04/20nR TOTAL 6,724 114,974 1,fi76 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 1n AAIn Name of Operator: `.v rnV GJ.LJV Field and Pool: Trading Bay Grayling PF, McArthur River Field, GGS Month HILCORP ALASKA, LLC and Year. FEBRUARY 2013 1. Well No. 2. API No. 50-XXXXX-XX-7(X 3, Type (see 4. Field 5. Method &Pool 6. Days in Oper. 7. Avg. FTP DAILY AV PR DU TION TO ALM NTHLY PR DUCTION instruct.) Code instruct.) psiy (see 8. OIL instinct.) (BBL) 9. WATER 10. GAS (BBL) 11. OIL 12. WATER 13. GAS (MCF) (BBL) (BBL) (MCF) G -14S 50733-20146-00-00 2 520550 1 291 160 0 In G-18DPNS 50.733-2016090.00 2 520550 1 28 138 0 1,067 0 0 29,885 0 457 0 0 12,789 I hereby certify that the foregoing is true and correct to the best of my knowledge. Primed Name: Linda Trahan Title: Project Coordinator 14. 't)C Signature: Date: 3/182013 Form 10-405 Rev. 0412006 INFTRI ICTIr1NC nu oc�A-nem c,nv TOTAL 0 0 42,677 Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT gn AAc, 9s 9zn Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Feld, Hemlock Month and Year: FEBRUARY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 8 Pool Code 5. Method (see instruct.) 6. Days iniOper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) G-01RDLH G-02RD G-03RD2 G-04RDLH G-06RDLH G-08RDLH 50-733-20037-01-00 50-733-20038-01-00 50-733-20049-01-00 50-733-20050-01-00 50-733-20073-01-00 50-733-20085-01-00 1 1 1 1 1 1 520120 520120 520120 520120 520120 520120 5 2 8 8 8 10 8 0 48 98 123 52 0 0 1,485 0 185 0 1,240 0 3,642 1,270 0 0 0 0 23 13 0 0 0 0 2,744 1,463 0 0 0 0 101989 35,573 0 0 0 0 649 360 0 0 0 0 G-10RD G-12RD3 G-13 G -07H G-15RD G-17RDH G-30LH G-31 LH G-34RDLH G-20 G-25 G-26RD G-28RD 50-733-20094-07-00 50-733-20116-03-00 50-733-20127-00-00 50-733-20130-00-00 50-733-20149-01-00 50-733-20161-01-00 50-733-20187-00-00 50-733-20194-00-00 50-733-20213-01-00 50-733-20261-00-00 50-733-20288-00-00 50-733-20295-01-00 50-733-20324-01-00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 520120 520120 520120 520120 520120 520120 520120 520120 520120 520120 520120 520120 520120 1 8 2 2 1 2 8 2 8 8 8 2 8 8 5 1 0 27 28 25 0 28 0 0 0 28 0 0 281 0 0 0 1,711 32 953 134 36 725 154 201 4,423 0 0 0 113 14 134 195 0 0 980 0 0 617 0 0 199 132 3,039 95 0 0 513 0 0 86 295 6,211 0 B 9 49 0 4 0 0 0 32 0 0 72 0 854 999 5,013 0 394 0 0 0 3,684 0 0 8,251 0 25,730 20,303 110,587 0 3,761 0 0 0 85,098 0 0 173,912 0 213 246 1,230 0 99 0 0 0 903 0 0 12,024 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature: �C Date: 3/18/2013 Form 10-405 Rev. O4l2nna TOTAL 23,403 556,954 5,725 ., -RUC, IONS ON REVERSE aiDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT gn AAr- qs qzn Name of Operator. Field and Pod: Trading Bay Grayling PF, McArthur River Feld, West Month and Year. HILCORP ALASKA, LLC Foreland FEBRUARY 2013 1, Well No. 2. API No. 3. Type 4. Field 5. Method S. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 50.XXX-XXXXX-XX-XX (see & Pool (see psig (see S. OIL 9. WATER 10. GAS 11.01E 12. WATER 13. GAS instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) G -32W 50.733-20198-00-00 1 520190 2 28 116 65 1,351 116 11.813 137938 1445 G33LW 50-733-20212-00-00 1 520190 228 147 95 1,140 24 2,653 31,916 660 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan14. Title: Project Coordinator Signature: —. Date: 3/182013 Form 10-405 Rev. 0412ho(i TOTAL 4.485 69,754 1,106 —.1— vn nmvmnx alum Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator HILCORP ALASKA, LLC Field an Pad: Trading Bay Unit King Salmon PF, McArthur River Field, G -Zone Month and Year: FEBRUARY 2013 t. Well No. 2. AN No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 8 Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) K-01RD2G 50-733-2005401-00 1 520150 5 28 52149 60 74 4,175 1,398 2.072 K-12RD2G 50-733-20156-02-00 1 520150 5 28 100 6 210 13 157 5,876 369 K -25G 50-733-20180-01-00 1 520150 8 0 56 0 0 0 0 0 0 K -30G 50733-20211-00-00 1 520150 5 27 54 23 26 5 612 712 142 K-18RDG 50733-20254-01-00 1 1 15201501 4 1 281 62,22 387 12 610 10,826 350 I hereby cerOfy that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda 7rahan Title: Project Coordinator 74. Signature: — �� C Date: 3/18/2013 Form 1n -4n5 Rev M»Mla TOTAL 5,554 18,872 2,933 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Kslg Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC GGS FEBRUARY 2013 1. Well No. 2. API No. 3. Type 4. Field 15. Method 1 6. Days in Oper. 7: Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTI N 8. OIL 9. WATER 10. GAS 11.011- 12. WATER 13. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see instruct) Code in instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) K-05 50-733.20092.00.00 2 520550 8 0 0 0 0 0 10 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Tdle: Project Coordinator 14. Signature: �9C Date: 3/182013 TOTAL 0 0 0 11451 KUU I IUN3 UN KtVhKSt- SIIJE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25230 Name of Operator: HILCORP ALASKA LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Feld, Hemlock Month and Year. FEBRUARY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Feld 8 Pool Code S. Method (see instruct.) 6. Days In Oper. 7. Avg. FTP DAILY AVG. PRODUCTION prig (see S. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (68L) (MCF) K-01 R02H 50-733-20054-01-00 1 520120 5 28 52 37 200 18 1,044 5,590 518 K-26RD 50-733-20097-04-00 1 520120 4 28 129 53 494 12 1,477 13,828 343 K-12RD21- 50-733-20156-02-00 1 520120 1 28 100 181 6,786 119 5,072 190,001 3,322 K-13RD2 5D-733-20157-02-00 1 520120 5 28 86 321 9,868 193 9,001 276,306 5,412 K -25H 50-733-20180.01-00 1 520120 8 1 0 56.0 0 0 0 0 0 K -30H 50.733-20211-00-00 1 520120 5 281 54130 11,363 148 1827 138.152 1,334 K-17 5D-73320248-00-00 1 520120 8 01"1 0 0 0 0 0 0 0 K-ISRDH 50-73320254-01-00 1 520120 4 28 62 9 167 5 263 4,669 151 K -19H 50-73320259-00-00 1 520120 5 281 66129 2,662 113 13,600 174,537 13,168 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda 7rahan Signature: TNe: Date: Project Coordinator 3/1812013 4. TOTAL 21,284 603,083 14,249 Orr. 10-405 Rev. 04,2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25 230 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year. HILCORP ALASKA, LLC West Foreland FEBRUARY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field & Pool 5. Method 6. Days in Oper. 7. Avg. FTPr_,_,AVG.DAILY PRODUCTION TOTAL MONTHLY PRODUCTION O9. WATER 10.GAS 11.OIL 12.WATER 13. GAS (see psig (see instruct.) Code instruct.) instruct) (BB(BBL) (MCF) (BBL) (BBL) (MCF) K -30W 50-733-20211-00-00 1 520180 5 28 54 [9 18 12 1266 1221 143 1 hereby Certify that the foregoing is true and Correct to the best of my knowledge. Printed Name: Linda Trahan14. Title: Project Coordinator a,�� Signature: - 1'C Date: 3/182013 Form 10-405 Rev. 04/2006 ... _ _ TOTAL 266 221 43 wV I NIYO Vry KCVCKSC JIuC Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25 230 Name of Operator: H ILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field. G. Month and Year: Zone FEBRUARY 2013 1. Well No. 2. API No. 50.XXX-XXXXX-XX-XX 3. Type (see 4. Field 8 Pool 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION instruct) Code instruct.) psig (see 8. OIL instruct.) (BBL) 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS (BBL) (MCF) (BBL) (BBL) (MCF) M -25G 50-733-20391-00-00 1 520150 1 22 72 34 264 M-28SG 50.733-2041400-00 1 520150 1 28 19 749 749 5,814 q2g M -29A G 50-733-20428-01-00 1 520150 1 81 41 354 354 5 9,924 140 318 50 -733 -20457 -02 -OS 1 520150 5 28 0 134 73 3,739 55,730 2,044 3 0 52 1,300 75 156 3,899 44 1 hereby certify that the foregoing is We and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature: - Date: 3/18/2013 Form 70-405 Rev. 04/2006 irvsTai irrinvc .,., o�.,'.,..� ......- TOTAL 5,795 75,368 2,654 V,�"v Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25 230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, GGS Month and Year: FEBRUARY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTIONTOTAL psig (see 8. OIL 9. WATER 1 10. GAS instruct.) (BBL) (BBL) (MCF) MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) M-01 M-02 M-13 M-14RD M-03 M-05 M-04 M-19RD M-15 50-733-20388-00-00 50-733-20389-00-00 50-733-20407-00-00 50-733-20408-01-00 50-733-20411-00-00 50-733-20413-00-00 50-733-20417-00-00 50-733-20421-01-00 50-733-20422-00-00 50-733-20435-DO-OO 50-733-20462-01-00 2 2 2 2 2 2 2 2 2 2 2 520550 520550 520550 1 520550 520550 520550 520550 520550 520550 520550 520550 1 1 1 1 1 1 1 1 1 1 8 28 28 28 28 28 28 28 28 28 28 0 24 0 28 0 100 0 30 0 45 0 78 0 89 0 23 0 67 0 32 0 112 0 2 16 10 1 11 1 1 1 1 2 0 986 7,584 2,103 1,504 3,750 1,871 3.787 1,518 4,260 3,217 0 0 0 0 0 0 D 0 0 0 0 0 52 440 268 23 295 14 16 16 18 56 0 27,603 44,351 58,883 42,099 105,008 52,385 106,048 42,515 119,275 90,086 0 RM4-12 M-10 M-11 M-021 50-733-20476-00-00 50-733-20480.01-00 50-733-20505-00-00 50-733.20552-00-00 50-733-20583-00-00 50-733-20585-00-00 50-733-20587-00-00 50-733-20588-00-00 50-733-20590-00-00 50-733-20598-00-00 2 2 2 2 2 2 2 2 2 2 1 520550 520550 520550 520550 520550 520550 520550 520550 520550 520550 1 1 1 1 1 1 1 1 1 1 28 28 28 28 28 28 28 28 281 281 24 0 1 49 0 1 25 0 1 159 0 0 109 0 0 99 0 5 57 00 104 0 1 104.0 67 12710 0 1,789 2,809 912 1,681 3,553 1,731 1,440 2,861 1,889 5,022 0 0 0 0 0 0 0 0 0 0 28 21 21 5 1 129 4 18 11,880 3 50,098 78,655 25,549 x7,078 gg,gg6 48,464 40,316 80,112 52,889 1140,616 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan14. Title: Project Coordinator Signature: �� Date: 3/182013 Form 1005 Rev. 040008 TOTAL 0 3,306 1,357,527 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAr 25 23n Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Hemlock Month and Year: FEBRUARY 2013 1. Well No. 2. API No. 5D-XXXXX-XX-XX 3. Type (see instmcL) 4. Field 8 Pool Code 5. Method instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) M -25H 50-733-20391-00-00 M -28H 50-733-20414-00-00 M -29A H 50-733-20428-01-00 31B 50.733.20457-02-05 1 1 1 1 520120 520120 520120 520120 1 1 1 5 24 28 28 2 0 0 90 0 112 82 312 312 1,743 64 1,006 23 4,644 170 7,798 88 2,694 2,305 8,725 624 41,821 28,159 130,038 15,596 1,532 650 4,770 175 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature: — �� Date: 3/1812013 Form 1ndn5 Rav ndl9nna TOTAL 14,348 215,614 7,127 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 9A AAr nC nen Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year. West Foreland FEBRUARY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type 4. Feld 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION (see instruct.) & Pool (see Code instruct.) psig (see instruct.) 8. OIL (BBL) S. WATER 10, GAS 11. OIL 12. WATER 13. GAS (BBL) (MCF) (BBL) (BBL) (MCF) M -25W 50-733-20391.00.00 1 520190 1 28 012 587 0 M -28W 50-733-2041400-00 1 520190 1 231 322 16,435 0 019 1118 1 260 3,313 33 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature:— R9� Date: 3/1812013 Form 10.405 Rev. 04/2006 inicror �rnnue �... .,�.,c.,..� .....� T OTAL 563 19,747 33 +.. ��v � �-- UN KL V CASE S.DE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT gn AAn gr qzn Name of Operator: Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Month and Year: HILCORP ALASKA, LLC Field, Hemlock FEBRUARY 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION T07AL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see &Pool (see psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) A 015R02 50-733-20105-02-00 1 520120 1 28 0 123 1,646 9 3,436 46,085 240 A 027RD 50-733-20246-01-00 1 520120 1 28 0 28 70 10 1785 1278 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan14. rive: Project Coordinator Signature: - Date: 311812013 TOTAL 4,220 46,363 240 Form 10-405 Rev. 04/2006 •.. �.... w.0 vn'�vo a awc Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25 432 Name of Operator. Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zone Month and Year. HILCORP ALASKA, LLC FEBRUARY 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. 7• MAX 8. AVG PSIG 9. MAX P 1 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct.) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) I (MCF) G -16G 50-733-20162-00-004 520150 8 28 2,900 2,482 2,450 2,111 202 0 5,653 0 G-23RDG 50-733.20269-01-00 4 520150 6 27 900 665 1,800 1,594 1,809 10 148,830 10 I hereby certify that the foregoing is We and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 5. Signature: Date: 3/182013 C.,..., �nanc oe., nnnnnc TOTAL 0 54,483 0 iNS RUC r NNS ON REVtmsE Slut Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 9n AAC 95 439 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, Hemlock Month and Year. FEBRUARY 2013 1. Well No. 2. API No. 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct) 6. DaysNM in Oper.AX UBING PRESS. 8. AVG PSIG IG CASING PRESS. 9. MAX PSIG 10. AVG PSIG DAILY G. INJ. 11. LIQUID 12. GAS (BBL) (MCF) TOTAL MONTHLY M..50-XXX-XXXXX-XX-XX 13. LIQUID 14. GAS (BBL) (MCF) G-05RDH 50-733-20060-01-00 4 520120 6 271 3,140 2,433 340 56 16,937 0 187,302 0 G-09 50-733-20098-00-00 4 520120 6 27 1,950 1,711 1,950 1,673 2,199 0 59,366 0 G-11 50-733-20115-00-00 4 520120 6 271 2,150 1,887 2,150 1,878 1,698 0 45,839 0 GASH 50-733-20162-00-00 4 520120 6 28 2,900 2,482 2,450 2.111 4,386 0 122,818 0 G-19 50-733-20178-00-00 4 520120 8 0 010 0 0 0 0 0 0 G-14ARDH 50-733-20189-01-00 4 520120 6 27 3,000 2,306 0 0 509 0 13,744 0 G-23RDH 50-733-20269-01-00 4 520120 6 27 900 696 11,800 1,594 3,449 0 93,119 0 022H 50-733-20272-00-00 4 520120 6 27 2,500 1,878 2,420 2,123 6,411 0 173,096 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: �c P-�n�na oe., nmonnc ...___.. Title: Project Coordinator Date: 3/182013 15. TOTAL 0 695,283 0 IUNJ UN KEVEHSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator. Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Month and Year: HILCORP ALASKA. LLC Foreland FEBRUARY 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 50-XXX-XXXXX-XX-XX (see & Pod (see in Oper. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) G-14ARDW 50-733-20189-01-00 4 5201a271 3,00011 635 0 0 4,422 0 119,393 0 G-36ROH 50-733-20218.07-00 4 520190 8 0 0 0 370 353 0 0 0 0 G-040SH 50-733-20412-00-00 4 520190 6 27 2,050 1,688 2,000 7, 147 11,647 0 44,456 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 5. Signature: Date: 3/1812013 TOTAL 0 163,649 0 ,I.. n... .,m. INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25 432 Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, G -Zone Month and Year: FEBRUARY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 8 Pool Code 5. Method (see insbuct.) 6. Days in Oper. TUBING PRESS. 7. MAX 8. AVG PSIG PSIG I CASING PRESS. 9. MAX PSIG 10. AVG PSIG DAILY AVG. INJ. 11. LIQUID 12. GAS (BBL) (MCF) TOTAL MONTHLY INJ. 13. LIQUID 14. GAS (BBL) (MCF) D009ROG 50-733-20131-01-00 4 520150 8 0 0 0 0 0 0 0 0 0 D-06RDG 50-733-20147-01-00 D 045G 50-733-20150-01-00 D 024AG 50-733-20224-01-00 D 029RDG 50-733-20292-01-00 4 4 4 4 520150 1 520150 520150 520150 6 8 6 6 28 0 28 28 2,740 2,702 250 250 3,450 3,405 3,300 3,250 500 280 160 270 387 195 74 240 3,712 0 392 502 0 0 0 0 103,941 0 10,983 14,055 0 0 0 0 I hereby certify that the foregoing is We and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 15. Signature: sl�llz Date: 3/1812013 Form 10406 Rev. n2/?n(Y. ,.,....., ............ ..-. _, ____ _ TOTAL 0 128.979 0 Wut Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Hemlock Month and Year. FEBRUARY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 8 Pool Code 5. Method (see instruct.) 6. Days in Oper. TUBING PRESS. 7- MAX 8. AVG PSIG PSIG CASING PRESS. 9. MAX PSIG 10. AVG PSIG DAILY AVG. INJ. 11. LIQUID 12. GAS (BBL) (MCF) TOTAL MONTHLY INJ. 13. LIQUID 14. GAS (BBL) (MCF) D 009RDH 50-733-20131-01-00 4 520120 8 0 0 0 0 0 0 0 0 0 D -45H 50-733-20150-01-00 4 520120 8 0 250 250 280 195 0 0 0 0 D-15RD2H 50-733-20159-02-00 4 1 520120 6 28 3,200 3,200 3.250 3,230 466 0 13,054 0 D-14RD 50-733-20164-01-00 4 520120 6 28 3,250 3,238 100 82 3.231 0 90,465 0 024A 50-733-20224-01-00 4 520120 6 28 3,450 3,405 160 74 1,569 0 63,934 0 D-34ADPN 50-733-20225-01-00 4 520120 6 1 251 3,450 3,071 11,040 705 1,008 0 25,209 0 D 029RDH 50-733-20292-01-00 4 520120 6 28 3,300 3,250 270 240 3,430 0 96,040 0 D-41 50-733-20331-00-00 4 520120 1 6 1 28 3,350 3,311 470 409 4,563 10 1127,767 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Tr4han Signature: Title: Project Coordinator Date: 3/182013 15. TOTAL 0 396,469 0 rNSTRuu I IVNS VN KtVtWt 51Ut Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAr 95 d-17 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA LLC G -Zone FEBRUARY 2013 1. Well No. 2. API No. 3. Type 4. Field5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 50-XXX•XXXXX-XX-XX (see &Pool (see in Cper. Z NIAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct.) Code instruct.) PSIG PSIG (BBL) (MCF) I (BBL) 1 (MCF) 1 K-24RD2G 50.733-20330-02.00 4 520150 8 01 010 1145 1138 10 10 10 10 I hereby certify that the foregoing is We and correct to the best of my knowledge. Printed Name: Linda Trehan Title: Project Coordinator 5. Signature: %C)1<7 Date: 3/18/2013 Fnrm tfLdM. Du•. Mr9nM. TOTAL 0 0 0 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 90 AAc 9t; aa9 Name of Operator. Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA LLC Hemlock FEBRUARY 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days I TUBING PRESS. CASING PRESS IDAILY AVG. INJ. TOTAL MONTHLY INA. 50-XXX-XXXXX-XX-XX (see 8 Pool (see in Oper. 7• MAX 8. AVG P51G 9. MAX PSIG 10. AVG 11. LIQUID 12. GA 13. LIQUID 14. GAS instruct.) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) K-22 50-733.20271-00-00 4 520120 6 28 2,340 2,316 190 148 9,739 0 272,699 0 K-24RD2H 50.733-20330.02.00 4 520120 8 0 10 2 145 1138 10 10 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Primed Name: LirMa Trahan Title: Project Coordinator 15. �1J� Signature: Date: 3/182013 Fnrcn'I f1.dnR P—M/�nnR TOTAL 0 272,699 0 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 2S 4'42 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, G- Month and Year: HILCORP ALASKA, LLC Zone FEBRUARY 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 50 -XXX -XX -XX -XX (see Pool (see in Oper. 7. MAX 8. AVG PSIG g. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct.) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) M-27 G 50-733-20423-00-00 4 520160 6 211 2,851 2,806 345 214 1,665 0 46,629 0 M -30G 50-733-20430-00-00 4 520150 6 28 2,252 2,238 1,050 771 673 0 18,843 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 5. Signature: �� Date: 3/182013 TOTAL 0 65,472 0 INOI KUU I TUNS ON KtVLKJt JIUt Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA. LLC Hemlock FEBRUARY 2013 1. Well No. 2. API No. 3. Type 4. Field S. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 50 -X -X XX-XXXXXX-XX (see instruct.) & Pool Code (see instruct) in Oper. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG 1 11. LIQUID PSIG (BBL) 72. GAS (MCF) 13. LIQUID (BBL) 1 14. GAS (MCF) M-27 H 50-733-20423-00-00 4 520120 6 1 28 2,851 2,806 1345 1214 13,886 10 108,801 16 M -30H 50-733-20430.00-00 1 4 520120 6 1 281 2,252J2,238 11,050 1771 18,649 10 1242,185 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 5. Signature: Date: 3/18/2013 TOTAL 0 350,986 0 Form 1 u-4ua Rev. uwzuLrd INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator. Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA LLC West Foreland FEBRUARY 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. I CASING PRESS. I DAILY AVG. [NJ. I TOTAL MONTHLY INJ. 50-XXX-XXXXX-XX-XX (see 8 Pod (see 1 in Open 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct.) Code instruct.) PSIG 1 PSIG (BBL) I (MCF) I (BBL) (MCF) M-27 W 50-733.20423-00-00 4 520190 8 0 0 0 345 214 0 D 0 0 M -30W 50-73320430-00-00 4 .5201901 6 1 281 2,252 2,238 11.050 1771 1574 10 116,072 10 1 hereby certify that the foregoing is true and correct to the best of my knovAedge. Printed Name: Linda Trahan True: Project Coordinator 5. Signature: �� , Date: 311812013 TOTAL 0 16,072 0 Form lusun Rev. uzizuuc INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25 432 Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Field, Hemlock Month and Year. FEBRUARY 2013 1. well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field 5. Method & Pod 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. in Oper. 7. MAX 8. AVG PSI 9. TOTAL MONTHLY INJ. instruct.) (see Code instruct.) MAX PSIG PSIG 10. AVG 11. LIQUID 72. GAS 13. LIQUID t4. GAS PSIG (BBL) (MCF) (BBL) (MCF) A-29RD I 50-733-20245-01-00 4 520120 fi 27 2,000 2.000 2,050 2,014 7,802 0 210,665 0 I hereby certify that the foregoing is true and correct to the best of my knovAedge. Printed Name: Linda Trahan Title: Project Coordinator 15. Signature: Date: 31182013 Form 10406 Rev. 0212006 rucror irrrnwie nu ems. �....� .....� T07AL 0 210,865 0 ,�– – --- — �` LKSE ""` Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT NFT rlll CAI FC GvNSQX Hilcorp Alaska, LLC McArthur River Field MARCH 2013 Name of Operator Rogulatory Lease Month and Year of Production Total Wells 116 Total Wells Produced 84 Total Pipeline Runs 125,812 Closing Inventory 24,992 Opening Inventory 22,961 Other Adjustments 0 (direct or xylene recovered) Total Net Production 127,843 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signec�� ���0.✓ Linda Trahan TOTAL Title Project Coordinator Date: 9/2 312 01 3 127,843 OIL 2,914,699 1,528,1 WATER GAS of Operator: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 HILCORP ALASKA, LLC dela and row: Trading Bay Unit Dolly Varden PF, McArthur River Field, G -Zone Month and Year: MARCH 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. F id & Pool 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION instruct) Code (see Instruct.) psig (see B. OIL instruct.) (BBL) 9. WATER 10, GAS 71. OIL 12. WATER 13. GAS (BBL) (MCF) (BBL) (BBL) (MCF) D-01 G 50-733-20068-00-00 1 520150 5 31 D-02ARDG .50-733-20069-02-00 1 520150 8 148 65 2,027 18 2,015 62,822 qg5 D-04RD 50-733-20089.01-00 7 520750 2 0 0 0 0 0 0 0 0 0.03RD2 50-733-20090-02-00 1 520150 2 11 1,180 2 46 77 21 501 188 ND 50-733-20100-01-00 1 520150 2 37 185103 1 103.7� 30 303 N 50-733-20107-01-00 1 520150 2 31 163 48 150 10-8- 1,499 4,663 3,356 2RDG D-12RD G 50-733-20142-01-00 1 520150 7 31 204 3 6 22 81 198 693 046 G 50-733-20165-01-00 7 520150 8 31 110 123 1,117 56 3,821 34,613 1,743 D47 G 50-733-2019502-00 7 520150 5 0 182 0 p 0 0 0 0 D-30RD2 50-733.20208-02-00 1 520150 8 25 166 81 2,752 30 2,014 68,795 751 D-31RD 50-733-20275-Ot-00 1 520150 2 0 1,119 0 p 0 0 0 p D-32 50-733-20220-00-00 1 520150 8 31 248142 188 53 4,406 5,840 1,657 0.25RDG 50-733-20247.01-00 1 520150 1 0 0 0 D 0 0 0 0 D-26RD 50-733-20260-01-00 1 520150 2 31 121 38 4,544 5 1,175 140, 855 157 D-27 G 50-733-20274-00-00 1 520150 8 31 215 57 170 16 1,763 5,267 484 D-28 G 50-733-20267-00.00 1 520150 8 0 57 0 p 0 0 0 0 D43RDG 50-733-20373-01-00 1 520150 2 0 1,233 0 0 0 0 0 0 37 177 33 177 27 1.010 5,490 825 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda�Tralhh-ann 14. Title: Project Coordinator "1l Signature: Date: 9/2312013 Form 10405 Rev. 0412006 TOTAL 217,989 329,075 10,642 INSTRI ICTIl1NS not oeveoec e.,� Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT on eer x 23A Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: GGS MARCH 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS (see 8 Pool (see psig (see instruct.) Cade instruct.) instruct.) (BBL) (BBL) 1 (MCF) (BBL) (BBL) (MCF) D-18 50-733-20169-00-00 2 520550 8 01 0 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. rTN Signature: — Date: 9/23/2013 Form 10-405 Rev. 04/2006 __ ____ _ _ TOTAL 0 0 0 N I R V411 V NS ON RC VCRJC 50E Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25 230 Name of Operator: Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock MARCH 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7- Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) D-01 H 50-733-20068-00-00 1 520120 5 31 148 152 8,106 37 4,702 251,286 1,132 D-02ARD H 50-733-20069-02-00 1 520120 8 0 0 0 0 0 D-08RD H 50-733-20107-01-00 1 520120 2 31 204 3 6 22 0 0 0 D-07RD2 50.733-20117-02-00 1 520120 -2-31 368 25 254 81 198 693 0-48 50.733-20132-01-00 1 520920 -2-31 -2041-45 120 772 7,870 3,706 296 89 1,387 9,190 2,774 D-11 50.733-20140-00.00 1 520120 8 0 1,193 0 0 0 0 D-12RD H 50.733-20142-01-00 1 520120 1 31 110 43 392 10 1,343 0 12,161 0 321 D-06RD H 50-733-20147-01-00 1 520120 8 -0-0 0 0 0.46 H 50-733-20165-01-00 1 520120 8 0 179 0 0 0 0 0 0 0 0.17RD 50-733-20188-01-00 1 520120 231 186 1 117 7 0 20 0 0 D47 H 50-733-20195-02-00 1 520120 5 25 166 53 4,072 20 1,325 3,632 101,811 206 D-20 50.733-20203-00.00 1 520120 8 0 0,0 0 494 D-42 50-733-20205-01-00 1 520120 8 0 5 0 0 0 0 0 D-25RD H 50-733-20247-01-00 1 520120 1 31 121 77 0 7238 0 46 0 0 0 D-27 H 50-733-20274-00-00 1 520120 8 0 2,385 69,376 1,415 57 0 0 0 0 0 0 D-28 H 50-733-20287-00-00 1 520120 8 0 1,233 0 0 0 D-40RD 50.733-20318.01-00 1 520120 8 0 240 0 0 0 0 0 0 D -43RD H50-733-20373-01-00 1 520120 2 31 177 33 0 0 0 177 127 1,010 5,490 825 1 hereby certify that the foregoing is true and correct to the best of my knov4edge. Printed Name: Linda Trahan14- Title: Project Coordinator Signature: - �C Dale: 9123/2013 TOTAL 13,026 461,015 11,565 Fort 10405 Rev. 041200 V. ; 10.43 ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25 230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zone Month and Year: MARCH 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION (see 8 Pool (see psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) G-01RDG 50-733-20037-01-00 1 520150 5 31 103 39 1,087 4 1,202 33,690 114 G-03RD2G 50-733-20149-01-03 1 520150 8 0 0 0 0 G-06RDS 50-733-20073-01-00 1520150 2 31 95 65 822 0 7 0 10 10 G-07 G 50.733-20130-00-00 1 520150 2 12 0 12 239 2,017 25,468 227 G-17RD G 50-733-20161-01-00 1 520150 2 31 10818 114 1 149 2,870 17 G-32 G 50-733-20198-00-00 1 520150 2 31 152 109 3,147 1 12 238 3,521 28 G -33S 50-733-20212-00-00 1 520150 8 0 1,314 0 0 -i -T 3,393 971556 382 G-21RD 50-733-20267-01-00 1 520150 2 311 193149 0 0 201 6 1,514 16,219 171 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan14. Title: Project Coordinator Signature: �C Date: 9123/2013 Form 10-405 Rev. 0412006 �.��r�,,..r,..... ,....._..^.,.._ _. TOTAL 8,514 169,325 938 -1111w vry mmvmmac aiuc Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25 230 Name of Operator: HILCORP ALASKA, LLC Field an Pool: Trading Bay Grayling PF, McArthur River Field, GGS Month and Year: MARCH 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see Instruct.) 6. Days in Oper. 7. Avg. FTP psig (see8. instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION OIL 9. WATER 10. GAS (BBL) (BBL) (MCF) 11.011- (BBL) 1 12. WATER 13. GAS (BBL) (MCF) G -14S 50-733-20146-00-00 G-1 8S 50-733-20160-80-00 2 2 520550 520550 1 1 31 31 14810 163 10 0 375 0 160 0 0 10 11,616 0 4974 1 hereby certify that the foregoing is true and correct to the best of my knowledge, Printed Name: Linda Trahan14. Title: Project Coordinator Signature: � Date: 8/ =013 Form 10-405 Rev 0d17nnF TOTAL 0 0 16,590 IRJIRUU 1I VIVJ VIV Kmv=KJt JIUC Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 HILCORP ALASKA, LLC ries and cool: Trading Bay Grayling PF, McArthur River Field, Hemlock Month and Year: MARCH 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field & Pool 5. Method 6. Days In Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION instruct.) Code (see instruct.) psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) G-01 RDLH 50-733-20037-01-00 1 520120 5 31 G -03RD 50-733-20038-01-00 1 520120 2 52116 3.260 14 13,606 1101.071 426 G-03RD2 H 50-733-20049-01-00 1 520120 6 31 112 60 1,372 7 1,873 42,543 228 G-04RD H 50-733-20050 -01-00 1 520120 8 0 0 0 0 p 0 0 0 G-06RDL 50-733-20073-01-00 1 520120 8 0 1,490 0 0 0 0 0 0 G-08RDL 50.733-20085-01-00 1 520120 8 0 208 0 0 0 0 0 0 G-10RD 50.733-20094-01-00 1 520120 8 0 1,243 0 0 0 0 0 0 G-12RD3 50.733-20116.03.00 1 520120 8 0 17 0 0 p 0 0 0 G-13 50-733-20127-00-00 1 520720 2 0 3,055 0 p p 0 0 0 G-07 H 50.733-20130-00-00 1 520120 2 31 136 32 687 4 7 21,298 111 G-15RD 50-733-20149-01-00 1 520120 8 12 0 236 4,544 54,523 319 G-17RD H 50-733-20161-01-00 1 520120 2 0 1,300 0 0 0 0 G -30L 50-733-20187-00-00 1 520120 8 31 108 17 151 4,667 61 G -34R 50-733-20194-00.00 —1-520-120 1 0 1820 0 0 0 G-34RDL 50-733-20213-01-00 1 520120 8 25 440 5 633 N4.07j392,403 20,815 13 20 50-733-20261-00.00 1 520120 2 0 1.426 0 0 0 031345131 G-25 50-733-20288-00-00 1 520120 8 2,981 3 459 W-133-20295-01-00 1 520120 8 0 95 0 0 0G-26RD 0 G•28RD 50-733-20324-Oi-00 1 520120 5 0 520 0 0 31 318 6249 193,730 1,100 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan 14. Title: Project Coordinator Signature: Date: 9/2312013 Form 10-005 Rev. 04/2006 mieTo� irTinvc n TOTAL 23,844 531.050 2,778 — I-- — —° '"" Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 9n AAC 9S 94r1 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Month and Year: HILCORP ALASKA, LLC Foreland MARCH 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 50-XXXXX-XX-XX (see &Pool psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) 1 3-32 W 50-733-20198-00-00 1 520190 2 31 151168 11,664 18 12.115 48,487 238 G -33L 50-733-20212-00-00 1 520190 2 31 128193 1,051 11 2,896 32,585 Ji328 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature: qzs�- Date: 9/23/2013 TOTAL 5,011 81,072 566 Form 10405 Rev. Odr'lhnR INSTRUCTIONS ON REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 �kAC 25 230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: G -Zone MARCH 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION (see & Pool (see psig (see 8. OIL 9. WATER 10. GAS 11.0IL 12. WATER 13. GAS instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) K-01RD2G 50-733-20054-01-00 1 520150 5 31 51 155 42 68 4,817 11,296 2,108 K-121RD2 G 50-733.20156-02-00 1 520150 5 31 99 4 191 12 110 K-25 G 50-733-20180-01-00 1 520150 1 1 55 16 0 5,931 367 K-30 G 50-733-20211-00-00 1 520150 5 31 60 14 26 14 7 16 0 14 K-18RD G 50-733-2025401-001 520150 4 311 66112 431 813 203 187 113 367 5,784 415 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan14. Title: Project Coordinator Signature: 'tom Date: 91232013 Form 10-405 Rev. 042006,,,.... ,... .._..____ _.__ TOTAL 5,741 13,825 3,107 i IONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC oa 230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: GGS MARCH 2013 1. Well No. 2. API No. 5Q-XXX-XXXXX-XX-XX 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10. GAS 11.011 12. WATER 13. GAS (see & Pool (see psig (see Instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) K-05 50-733-20092-00-00 2 520550 8 0 0 0 0 0 0 0 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature: Date: 9232013 Form 10.405 Rev. 042008 TOTAL 0 0 0 —I,..,., nv,vo v" nwcnoc aIue Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 2n vnrt 9r 9an Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock MARCH 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code Instruct.) instruct.) (BBL) (BBL) 1 (MCF) (BBL) (BBL) 1 (MCF) K-01RD2 H 50-733-20054-01-00 1 520120 5 31 52 39 167 17 1,204 5,186 527 K-26RD 50-733-20097-04-001 520120 4 29 99 42 273 23 1,218 7,909 677 K-12RD21- 50-733-20156-02-00 1 520120 1 31 94 115 6,186 107 3,559 191,780 3,303 K-13RD2 50-733-20157-02-00 1 620120 5 31 85 374 9,646 171 11,587 299,025 5,291 K-25 H 50-733-20180-01-00 1 520120 1 1 60149 0 45 49 0 45 K-30 H 50-733-20211-00-00 1 520120 5 31 55 16 1,701 49 485 52,737 1,521 K-17 50-733-20248-00-00 1 520120 8 01 010 0o 0 K-18RD H 50-733.20254-01-00 1 520120 4 26 4115 76 8 129 0 2,025 0 1145 K-19 H 50-733-20259-00-00 1 520120 5 311 55 170 13,184 1120 15,258 198,707 13,733 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan14. Title: Project Coordinator Signature: Date: 9/2312013 TOTAL 23,489 657,369 15,241 Form 10-405 Rnv nbl9nnfi •o, RUC I iONS Oii RtvERSE bi V G Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 90 AAr. 9r, Zan Name of Operator. Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland MARCH 2013 1. Well No. 2. API No. 3. Type4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see & Pool psig (see 8.OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct) Code instruct.) instruct,) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) K-30 W 50-733-20211-00-00 1 1 520190 5 31 55 6 8 2 1175 1236 158 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature: G Date: 9/23/2013 Fnrm ln-nngee., Amore TOTAL 175 236 56 INS l HUU i IONS UN HEVEHSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Hama of Operator: Field and Pool: Tratling Bay Un�Steelhead�McArlhur�Fleld, Month and Year: P ALASKA, LLC Zone MARCH 2013 1. Well No. 2. API No. 3. Type 4. Fieltl 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS Instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) 1 (MCF) 1 M-25 G50.733-20391-00-00 1 520150 1 1 12 0 23 206 16 281 12,471 1187 M-28 G 50-733-20414-00-00 1 1 520150 1 131 87 28 348 6 876 10,802 171 M-29AG 50-733-20428A1-00 1 520150 1 31 0 91 1,938 62 2,807 60,088 1,924 M -31B G 50-733-20457-02-05 1 520150 1 5 30 134 65 2,283 40 1,942 168,505 11,191 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: LinpdaTra—han Title: Project Coordinator 4. Signature: Date: 9/23/2013 TOTAI- 5,906 141,865 3,473 Fnrm 1n-dnS Am. nehnrN II101KUU 11VIN� VIA KLVCKJt JIUC Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT nn aer 0c non Name Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River HILCORP ALASKA, LLC Field, GGS Month and Year: MARCH 2013 1. Well No, 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS Instruct.) Code Instruct.) Instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) 1 (MCF) M-01 50-733-20388-00-00 2 520550 1 31 22 0 1 956 M-02 50-733-20389-00-00 2 520550 1 31 25 0 0 27 29,639 M-13 50-733-20407-00-00 2 520550 1 31 16 1,557 0 481 48,258 M-14RD 50 -733 -20408 -01 -OD 2 520550 131 100 0 9 2,137 0 287 66,234 M-03 50-733-20411-00-00 2 520550 1 31 30 0 2 1,489 0 52 46,153 M-05 50-733-20413-00-00 2 520550 1 4510 10 3,630 0 306 112,535 M-04 50-733-20417-00-00 2 520550 1 31 75 0 0 11,808 0 2 56,045 M-19RD 50-733-20421-01-00 2 520550 1 31 80 0 1 13,812 0 42 118,185 M-15 50-733-20422-00-00 2 520550 1 31 22 01 1,530 0 32 47,419 M-07 50 -733 -20435 -00 -OD 2 520550 1 31 87 0 1 4,168 0 19 129,201 M-32RD 50-733-20462-01-00 2 520550 8 31 0 0 1 3,062 0 40 94,933 0 109 0 0 0 0 0 0 M-09 50-733-20476-00-00 2 520550 1 31 23 0 0 W16RD 50-733-20480-01-00 2 520550 1 31 1,692 0 10 52,438 M-12 50-733-20505-00-00 2 520550 1 48 0 0 2,816 0 13 87,303 M-17 50-733-20552-00-00 2 520550 1 31 21 0 1 795 0 43 24,652 M-18 50-733-20583-00-00 2 520550 1 31 150 0 0 1,537 0 19 47,654 M-06 50-733-20585-00-g0 2 520550 1 31 911 0 0 3,435 0 1 106,477 M-20 50-733-20587-00.00 2 520550 1 31 98 0 2 1,673 0 72 51,878 M-10 50-733-20588-00-00 2 520550 1 31 56 0 0 1,333 0 0 41,310 M-11 0-7 533-20590-00-00 2 520550 1 31 104 0 0 2,858 0 5 88,591 M-27 50-733-20598-00-00 2 520550 1 31 10310 59 1,739 0 1,838 53,910 all 121 0 0 4,817 0-0 149,323 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. LOS Signature: - Date: 9/232013 Form 10405 Rev. 042006 TOTAL 0 3,278 1,452,136 """" "" ^`"`^""""� Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC or; oan Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year. Hemlock MARCH 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTPDAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) M-25 H50-733-20391-00-00 1 520120 1 12 0 711,254 48 855 15,049 570 M-28 H 50-733-20414-00-00 1 520120 1 31 0 57 987 26 1,752 30,605 794 M -29A H 50-733-20428-01-00 1 520120 1 31 94 211 4,523 145 6,551 140,206 4,490 M-31BH 50-733-20457-02-05 1 520120 5 30 134259 9,134 159 7,767 274,020 4,704 1 hereby certify that the foregoing is true and correct to the best of my knovAedge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature:— �� Date: 9/23/2013 Form 10-405 Rev. 04/2006 TOTAL 16,925 459,879 10,618 „m i nwV I141VJ U11 RCVLKt t 31Ut Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 2S.23n Name of Operator: Field and Pool: Trading Bay Unit Sleelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland MARCH 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION -1 -TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see &Pool (see psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code instruct.) Instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) M-25 W 50-733-20391-00-00 1 520190 1 31 0 7 412 10 221 12,765 0 1 M-28 W 50-733-20414-00-00 1 520190 11 31 016 1116 11 1198 13,601 140 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 4 Signature: "DIZ Date: 9232013 Fnrm 1e.dr15 Ovo lUrvnro TOTAL 419 16,388 40 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 90 AAc 95 93n Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit TRU - MRF Mon0pod, McArthur River Month and Year: Field, Hemlock MARCH 2013 7. Well No. 2. API No. 3. Type 4. Field 5. MethedF6Dasy in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see & Pool (sae psig (see 8. OIL 9. WATER I GAS 11. OIL 12- WATER 13- GAS I Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) A-15RD2 50-733-20105-02-00 1 520120 1 1 311 127 i 1031,614 14 3,189 50,043 425 A-27RD 50-733-20246-01-00 1 520120 1 311 77120 110 10 1615 1301 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan14- Title: Protect Coordinator Signature: Date: 9!2312013 Form 10-405 Rev- 0412006 TOTAL 3,804 50,344 425 —11•—, I� W1, nwonor=awc Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25 432 Name of Operator: Field and Pool: Trading Bay Grayling PF. McArthur River Field, G -Zone Month and Year: HILCORP ALASKA, LLC MARCH 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct.) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) G-16 G50-733-20162-00-00 4 520150 6 31 2,900 2,869 2,500 2,441 225 0 6,971 0 G -23RD G 50-733-20269-01-00 4 520150 6 31 900 892 1,800 1,792 1,809 0 56,087 10 I hereby cenify that the foregoing is true and correct to the best of my knov4edge. Printed Name: Linda Trahan Title: Project Coordinator 15. Signature: — R`X Date: 92312013 Form 10-406 Rev. 02/2008 _ _ TOTAL 0 63,058 0 w, n�� nVIYJ Vry RMvamoc JJun Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25 432 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, Hemlock Month and Year: HILCORP ALASKA, LLC MARCH 2013 1. Well No. 2. API No. 3. Type Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 50-XXX-XXXXX-XX-XX (see 7Field5. (see in Oper. 7. MAIC 6.AVGPSIG 9. MAXPSIG 10.AVG 11, LIQUID 12.GAS 13.LIQUID 14. GAS instruct.)instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) G-05RD H 50-733-20060-01-00 4 520120 6 311 3,150 3,107 100 78 8,026 0 G-09 50-733-20098-00-00 4 520120 6 31 1,9501,928 1,940 1,896 2,302 0 248,8(19 71,371 0 0 G-11 50-733-20115-00-00 4 520120 6 31 2,150 2,143 2,150 2,111 1,641 0 50,881 0 G-12RD350-733-20116-03-00 4 1 520120 6 31 0 0 1,500 375 4,721 0 146,354 0 G-16 H 50-733-20162-00-00 4 520120 6 31 2,900 2,869 2,500 2,441 4,886 0 751,462 0 G-19 50-733-20178-00-00 4 520120 B 0 1 0 0 0 0 0 G-14ARDH 50-733-20189-01-00 4 520720 6 31 3,050 2,988 0 0 613 0 0 0 0 G -23RD H 50-733-20269-01-00 4 520120 6 31 900 892 1,800 1,792 3,450 0 19,000 0 G-22 H 50-733.20272-00-00 4 520120 6 31 2,510 2,501 2,450 2,424 6,730 0 106,957 208,634 0 0 I hereby certify [hat the foregoing is true and correct to the best of my knoWedge. Printed Name: Linda Trahan15. Title: Project Coordinator �%� Signature:.. Dale: 9/23/2013 TOTAL 0 1,003,0.68 0 Form 10-406 Rev. 09/9nn6 ...,...... RAYS ON REvFR5F Slut Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT Olt AA( 06 A00 Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Month and Year. Foreland MARCH 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY [NJ. (see & Pool (see in Oper. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct.) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) G-14ARD W 50-733-20189-01-00 4 520190 6 31 270 270 0 0 4,770 0 G-36RD H 50-733-20216-01-00 4 520190 8 0 0 0 330 147,873 0 G -40S 50-733-20412-00-00 4 520190 6 29 2,000 2,000 2,000 316 1,862 0 0 0 0 1,554 0 45,070 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan15. Title: Project Coordinator Signature: Date: 9/23/2013 Form 10-406 Rev. 0212006 sic,-�, ,..-.,... ., ,.., ..�.,.- TOTAL 0 192,943 0 -•,-,— . 11 alum Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT gn Aar. 9r a19 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, G -Zone Month and Year: MARCH 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 50-XXXXX-XX-XX (see &Pool (see :(Q:)peTr.7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 17. LIQUID 12. GAS 13. LIQUID 14. GAS instruct.) Cotle instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) D-09RD G 50-733-20131-Oi-00 4 520150 8 0 0 0 0 D-06RD G 50-733-20147-01-00 4 520150 6 31 2,780 2,743 570 0 514 0 3,271 0 10 0 99,527 0 D-45 G 50-733-20150-01-00 4 520150 6 4 3,400 7,300 250 182 498 0 1,992 0 0 D -2 4A G 50-733-20224-01-00 4 520150 6 31 3,450 3,390 Igo 179 331 D-29RDG 50-733-20292-07-00 4 520150 6 31 3.3003248 Sun ase eto 0 � 10,274 0 I hereby certify that the foregoing is true and correct to the best of my Knowledge. Printed Name: Linda Trahan15, Title: Project Coordinator Signature: Date: 9/23/2013 TOTAL 0 124,744 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAr OC neo Name or Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Hemlock Month and Year: MARCH 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field & Pool S. Method 6. Days TUBING PRESS, 7- MAX CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. (see in Opel'. 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS Instruct.) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) D-09RD H 50-733-20131-01-00 4 520120 8 0 0 0 0 0 0-45 H 50-733-20150-01-00 4 520120 6 4 3,400 1,300 250 182 0 609 0 0 0 0 D-15RD2 H 50-733-20159-02.00 4 520120 6 31 3,220 3,181 3,250 3,231 324 2,435 0 D-14RD 50-733-20164-01-00 4 520120 6 31 3,325 3,247 100 95 0 10,052 0 D -24A H50-733-20224-01-00 4 520120 6 31 3,450 3,395 90 79 2,749 0 85,232 0 0-34A H 50-733-20225-01-00 4 520120 8 0 800 344 750 697 1,328 0 41,098 0 D-29RD H 50-733-20292-01-00 4 520120 6 31 3,300 3,246 390 254 0 2,855 00 0 0 D-41 50-733-20331-00-00 4 520120 6 31 3,350 3,303 500 88,498 0 439 4,069 0 126,133 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 15. Signature: '�r� Dale: 9/23/2013 Form 10-406 Rev. 02/2008 TOTAL 0 353,448 0 . • 11- v" RCVCRJC JNC Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25 432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, G -Zone Month and Year: MARCH 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (seein instruct.) 6. Days Oper. I TUBING PRESS. 7. MAX 8. AVG PSIG PS CASING PRESS. 9. MAX PSIG 10. AVG PSIG I DAILY AVG. INJ. 11. LIQUID 12. GAS (BBL) (MCF) ITOTAL MONTHLY 13. LIQUID (BBL) INJ. 14. GAS (MCF) K-24RD2 G 50-733-20330-02-00 4 520150 8 01 010 1142 1135 10 10 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan15. Title: Project Coordinator Signature: "'OC Date: 9/23/2013 Form 10.406 Rev_ 07Mnna TOTAL 0 0 0 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 51n AAr. 9r AA9 Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF. McArthur River Field, Hemlock Month and Year: MARCH 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 5. Method & Pool (see Cade instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10, AVG PSIG I 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) K-22 50-733-20271-00-00 4 520120 6 29 2,360 1,952 960 187 8,085 0 234,459 0 K-24RD2 H 50-733-20330-02-00 4 520120 8 0 10 2 142 135 0 0 0 0 I hereby certify that the foregoing Is true and correct to the best of my knoviledge. Printed Name: Linda Trahan15. Title: Project Coordinator Signature: �C Dale: 912312013 Fnrm 1n,ms Rnv rorgnna TOTAL 0 234,459 0 uva 1 KUU I IUNS UN KCVtK6t tllUl, Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAG 25.432 Name of Operator. Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, G- Month and Year: HILCORP ALASKA, LLC Zone MARCH 2013 1. Well No. 2. API No. 3. Type 4. Field S. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7, MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. instruct.) Code Instruct.) PSG PSIG (BBL) (MCF) I (BBL) (MCF) I M-27 G 50-733-20423-00-00 4 520150 6 31 2,753 1,989 550 332 1,052 10 32,598 10 M-30 G 50-733-20430-00-00 4 520150 6 31 2,618 2,429 900 768 780 10 24,183 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 15 Signature: Dale: 9123/2013 TOTAL 0 56,781 0 orm 10-406 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT on AAr oc ., Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Hemlock Month and Year: MARCH 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field 5. Method & Pool 6. Days TUBING PRESS. CASING PRESS. 7. DAILY AVG. INJ. TOTAL MONTHLY INJ. (see in Oper. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11, LIQUID 12. GAS 13. LIQUID 14. GAS instruct.) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) M-27 H 50-733-20423.00-00 4 520120 6 31 2,753 1,989 550 332 2,454 0 78,062 0 M-30 H 50-733-20430-00-00 4 520120 6 31 2,618 2,429 900 768 10,026 0 310,821 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 15. Signature: :!KX Date: 9232013 Form 10-406 Rev. 0212006 TOTAL 0 388,883 0 IONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland MARCH 2013 1. Well No. 2. API No. 3. Type 4. Field S. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 50-XXX-XXXXX-XX-XX (see & Pool (see I in Oper. 7• MAX 8. AVG PSIG 9. MAX PSIG 70. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct.) Code Instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) M-27 W 50-733-20423-00-00 4 520190 8 0 010 550 332 10 0 10 jo M-30 W 50-733-20430-00-004 520190 6 31 2,618 2,429 900 768 665 0 20,627 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 5. Signature: M Date: 91232013 TOTAL 0 20,627 0 INS T RUC I IONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25 432 Name of Operator. Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Month and Year: HILCORP ALASKA, LLC Field, Hemlock MARCH 2013 1, Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. W. TOTAL MONTHLY W.50-XXX-XXXXX-XX-XX (see & Pool is in Oper.F 7 MAX 18. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct) Code instruct.) PSIG I PSIG (BBL) (MCF) 1 (BBL) 1 (MCF) A-29RD 1 50-733-20245-01-00 4 520120 6 311 2,050 2,017 2,100 2,033 7,792 lo 1241,559 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Tmhan Title: Project Coordinator 15. Signature: Date: 912 312 01 3 TOTAL 0 241,559 0 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL. AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT NFT nil cnl 1=c Hilcorp Alaska, LLC 1McArthur River Field APRIL 2013 Name of Operator Regulatory Lease Month and Year of Production Total Wells 115 Total Wells Produced 78 Total Pipeline Runs 121,150 ng Inventory 27,181 ing Inventory 24,992 Adjustments 0 t or xylene recovered) Net Production 123,339 hereby certify that the foregoing is true and correct to the best of my knowledge. Signed,-�`"� _ 123,339 2,824,133 1; Liindnaa Trahan TOTAL OIL WATER GAS Title Project Coordinator Date: 9/23/2013 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25 230 Name of Operator. HILCORP ALASKA, LLC 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct.) Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: G -Zone APRIL 2013 4. Fleld 5. Method 6. Days In Oper. 7. Avg. FTP DAILY AVG- PRODUCTION & Pool (see psig (see 8. OIL 9. WATER 10. GAS Code Instruct.) Instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 1 12. WATER 13. GAS (BBL) (BBL) (MCF) D-01 G 50-733-20068-00-00 1 520150 5 30 124 87 1,810 5 2,607 154.294 157 D-02ARD G 50-733-20069-02-00 1 520150 8 0 110 0 0 0 0 D-04RD 50.733-20089-01-00 1 520150 2 19 983 2 37 12 32 0 0 D-03RD2 50-733-20090-02-00 1 520150 2 30 140 111 3 00 894 228 D-05RD 50-733-20100.01-00 1 520150 2 30 179 44 126 3,329 76 2,411 D-08RD G 50.733-20107-01-00 1 520150 _ 2 15 53 1,330 3,780 1,594 645 2 6 8 36 90 123 D-12RDG 50-733-20142-01-00 1 520150 1 30 110120 1,207 146 3,603 13e.025 1,390 D-46 G 50-733-20165-01-00 1 1 520150 2 30 145 36 204 18 1,084 16,107 226 D-47 G 50-733-20195-02-00 1 520150 5 5 118 17 534 5 67 2,671 26 D-30RD2 50-733-20208-02-00 1 520150 1 0 1,325 0 0 0 D-31RD 50-733-20215-01-00 t 520150 2 30 148 129 176 44 0 3,870 0 5,268 g 1,318 D-32 50-733-20220-00-00 1 520150 8 0 010 0 0 D-25RD G 50-733-20247-'31-00 1 520150 1 _ 30 108 21 1,687 5 0 633 0 50,624 0 148 D-26RD 50-733.20260-01-00 1 520150 2 30 224 41 150 601,216 4,469 1,814 D-27 G 50-733-20274-00-00 1 520150 A_ 0 75 0 0 0 D -28G 50-733-20287-00-00 1 520150 8 0 1,230 0 0 0 0 10 D -43RD G 50-733-20373-01-00 1 520150 2 30 177 31 10 153 14 1010 924 4,597 0 424 I hereby certify that fie foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan14. Title: Project Coordinator qQC Signature: Dale: 9Y1312013 Form 10-405 Rev. 0412008 TOTAL 18,752 168,715 9,857 INSTRUCTIONS ON REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field. Month and Year: HILCORP ALASKA, LLC GGS APRIL 2013 1. Well No. 2. API No. 3. Type 4. Fleld 5. Methotl6. Days In Oper. 7. Avg. FTP I DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see & Pool (sae pslg (see I 8.OIL V. WATER 10. GAS 11. OIL 12. WATER 13. GAS Instruct-) Code instinct.) instruct.) (BBL) (BBL) (MCF) (BBL) (B3L) (MCF) 0-18 50-733-20169-00-00 2 520550 8 0 36710 0 0 0 n n I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Form 10-405 Rev. 0412006 Title: Project Coordinator Date: 9/23/2013 NS ON REVFRSF SIriF 14. TOTAL I� I STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 7n AAl 1. � Name of Operator: HILCORP ALASKA, LLC �v /Y�V GJ.LJV Field and Pool: Trading Bay Unit Dolly*PFF,ur River Field, Hemlock Month and Year: APRIL 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field & Pool 5. Method 6. Days In Op DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION instruct.) Code ins uct.) 8. OIL (BBL) 9. WATER (BBL) 10. GAS (MCF) 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) 0.01 H 50-733.2006800.001 520120 5 9203 7,239 12 D-02ARD H 50-733-20069-02-00 1 520120 800 6,084 - 217,175 H 50-733-20107-0100 1 520120 2 0 0 0 0D-08RD D-07RD2 W-733-20117-02-00 1 520120 2 682 2 8 8 36 90 123 0.48 50-733-20132-01-00 1 520120 7. 30 224 56 427 107 1,673 12,799 3,207 D-11 50-733-20140-00-00 1 520120 8 30 i48 43 236 107 1,299 7,080 3,219 D-12RD H 50-733-20142-01-00 1 520120 1 0 1,370 0 0 0 0 0 0 D-O6RD H 50.733-20147-01-00 1 520120 8 _ 30 110 42 422 9 1,266 12,657 256 D-46 H 50-733-20165-01-00 1 520120 8 ---0-0---- 0 0 0 0 0 D 0 0 0.17RD 50.733-20168-01-00 1 520120 2_ 30 0 0 0 0 0 0 D-47 H 50-733-20195-02-00 1 520120 5 185 3 362 43 82 10,874 1,275 0.20 50-733-20203-00-00 1 520120 8 5 118 12 801 3 58 4,007 17 D-42 50-733-20205-01-00 1 520120 -8_ 0 0 0 0 0 0 0 0 0 D-25RD H 50-733.20247-07-00 1 520120 1 30 0 0 0 0 0 0 0 D-27 H 50-733-20274-00.00 1 520120 8 108 43 631 44 1,286 24,934 1,332 0.28 H 50-733-20287-00-00 1 520120 8 0 0 75 0 0 0 0 0 0 D-40RD 50-733-20318.01-00 1 520120 8 1,230 0 0 0 0 0 0 D -43RD H 50-733-20373-01-00 1 520120 2 0 30 339 0 0 0 9 0 0 176 31 153 14 924 4,597 424 I hereby certify that t 1e foregoing is true and correct to the best of my knov4edge Printed Name: Linda Trahan Title: Project Coordinator 14. Signature: _ �C Date: 9/23/2013 Form 10.Rev. 0412006 iueroi ,....� TOTAL 12,709 294,213 10,220405 Submit In duplicate STATE OF ALASKA ALASKA OIL AND CAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 2171 AAc Pa 9 -In Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zona Month and Year: APRIL 2013 1. Well No. 2. API No. 50-XXXXX-:{X-XX 3. Type (see Instruct.) 4. Field &Pool Code 5. Method (see instruct.) 6. Days in Oper. 7, Avg. FTP DAILY AVG. PRODUCTION pslg (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) G-01 RD 50-733-20037-01-00 1 520150 5 30 10452 1,013 8 1,564 30,377 252 G-03RD2 G 50-733-20049-01-03 1 520150 8 0 0 0 0 0 0 0 0 G-06RDS 50-733-20073-01.00 1 520150 2 30 115 104 1,094 19 3,116 32,809 574 G-07 G 50-733-20130.00-00 1 520150 8 0 0 0 0 0 0 0 0 G-17RDG 50-733-20161-01-00 1 1 520150 2 30 10611 119 2 321 3,581 59 G-32 G 50-733-20198-00-00 1 1 520150 2 _ 301 175 144 3,300 26 4,315 98,993 793 G- 50-733-20212-00.00 1 520150 8 0 1,292 0 0 0 0 0 0 G -21R 50-733-20287-01-00 1 520150 2 301 106166 1159 112 11,984 14,771 362 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature:_ _ Date: 912312013 _ Fnrm 1r -ere o—nuonn¢ ...___..__. _.._ _. TOTAL 11,300 170,530 2,040 IN51 KUOI IONS ON REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, GGS Month and Year. APRIL 2013 1. Well No. 2. API No. 50-XXX-XXXXX•XX-XX 3. Type (see instruct.) 4. Field 5. Method & Pool (see Code instinct) 6. Days in Oper. 1 7. Avg. FTP psig (see instruct.) I DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8.OIL 9. WATER 10. GAS (BBL) (BBL) (MCF) 11.011 (BBL) 12. WATER (BBL) I 13. GAS (MCF) G -14S 50-733-20146-00-00 2 520550 1 30 162 0 0 7450 0 22,338 G -18S 50-733-20160-90-00 2 520550 1 30 147 0 0 319 0 0 8,565 I hereby certify that the foregoing Is true and correct to the best, of my knowledge. Printed Name: Linda 7rahan Title: Project Coordinator 14. Signature: 4-S)c _ _ Dale: 9/23!2013 Fnrm 1M1605 D-1nnlOnnC TOTAL 0 0 31,903 INSTRUCTIONS ON REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 nor` 2F 230 Name of Operator. HILCORP ALASKA, LLC Field and Pcol: Trading Bay Grayling PF,VcAr McArthur River Field, Hemlock Month and Year:. APRIL 2013 1. Well No, 2. API No. 50-XXX-XXXXX-XX-XX 3. Type 4. Field & 5. Metho[i 6. Days 11 Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION (see instruct.) Pool Code (see instruct.) psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS Instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) 1 (MCF) G-01 RDLH 50-733-20037-01-00 1 520120 5 30 52156 3,038 31 I G-02RD50.73320038-01-00 1 520120 2 30 4,692 191,130 1944 0-03RD2 H 50-733-20049-Ot-00 1 520120 8 111 84 1,495 15 2,509 44,864 461 G-04RD H 50-733-200.50-01-00 1 520120 8 0 0 0 0 0 0 0 0 0 G-06RDL 50-733.20073-01-00 1 520120 8 0 1,485 0 0 0 0 0 0 G-06RDL 50.733-20085-01-00 1 520120 8 0 823 0 0 0 0 0 0 G-10RD 50.733-20094-01-00 1 520120 8 1,197 0 0 0 0 0 D G-13 50.733-20127-00-00 1 520120 ?__ 0 30 0 0 0 0 0 0 0 G-07 H 50-733-20130-00-00 1 520120 8 126 33 554 6 992 16,620 182 G-15RD 50-733-20149-01-00 1 520120 _ 8 0 0 0 0 0 0 0 0 0 G-17RD H 50.733-20161-01-00 1 520120 2 30106 1,290.0 0 0 0 0 0 G -30L 50-733-20187-00-90 1 520120 8 24 158 4 712 4,747 130 G -31L 50 -733 -20194 -DO -00 1 520120 --30-1797 1 0 190 0 0 0 0 p g G-34RDL 50-733-20213-01-00 1 520120 8 484 1 120 14,514 21 G-20 50-733-20261-00-00 1 520120 2 0 1,346 0 0 0 0 0 0 G-25 50-733-20288-00-00 1 520120 8 30 248 152 2,714 28 4,573 81,430 841 G-26RD 50-733-20295-01-00 1 520120 —8----0 0 92 0 0 D 0 0 G-28RD 50-733-20324-01-00 1 520120 5 30 570 00 0 0 0 0 0 88 342 5,963 63 10,258 178,893 1,881 I hereby certify that t'1e foregoing is true and correct to the best of my knovaledge. Printed Name: Linda Tmhan Title: Project Coordinator 14. Signature: �� Date: 9/23/2013 Form 10-405 Rev. 04!2006 TOTAL 23,856 432,198 4,461 _ —.11– I--- .' c Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 9n AAr OC nOn Name of Operator: HILCORP ALASKA, LLC Field a Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Fleid, Month and Year. APRIL 2013 _G-Zo 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type 4. Field 5. Method 6. Days in Oper. 7, Avg, FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION (see & Pool (see psig (see 8.OIL 9. WATER 10. GAS 11. OIL 12. WATER 13, GAS instruct) Code instruct,) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) K-01RD2 G 50-733-20054-01-00 W1211132 1 520150 5_ 30 52 120 37 76 3,609 1,113 2,290 G 50-733-20156-02-00 1 520150 5 30 62 5 151 12 K-25 G 50-733-20180-61-00 i 520150 8 0 50 0 135 4,542 354 K-30 G 50-733-20211-00-00 1 520150 5 30 52 21 0 436 0 3 0 0 p K-18RD G 50-733-20254-01-00 1 i 152015014 171 643 13,D83 105 1 304 340 11 160 5,787 181 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: _ Linda Trahan _ Title: Project Coordinator 14. Signature: �� Date: 9/23/2013 Form 10-405 Rev. 0412008 inieroir-..., .,...�.....-....._ TOTAL 4,448 24,525 2,931 .., I-- �'""`"""" """ Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Hing Salmon PF, McArthur River Field, . GGS Month and Year: APRIL 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field & Pool 5. Method (see 6. Days in Oper. 7. Avg. FTP psig (seerl DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION . OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code Instruct.) instruct.)BBL) (BBL) (MCF) (BBL) (BBL) (MCF) K-05 50-733-20092-00-00 2 520550 8 01 0 10 10 10 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Primed Name: Linda Trahan Title: Project Coordinator 4. Signature: _ Date: 9/23/2013 Cnrrn AILA/1C Da... (IA YfnnC TOTAL 0 0 0 INS I RUC I TUNS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 ane 25 230 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock APRIL 2013 1. Well No. 2. API No 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see & Pool (see pslg (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS Instruct.) Code Instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) K-01 RD2 H 50-733-20054-01-00 1 520120 5 30 54 30 149 19 904 K-26RD 50-733-20097-04-00 1 520120 4 30 106 37 530 4,460 574 K-12RD2L 50.733-20156-02-00 1 520120 1 30 26 1,118 15,907 772 K-13RD2 50-733-20157-32-00 1 520120 5 99 146 4,895 106 4,377 146,856 3,189 30 84 300 8,274 179 9,005 248,207 5,384 K-25 H 50-733-20180-01-00 1 5201201 8 0 55 0 0 0 K-30 H 50-733-20211-00-00 1 520120 5 _ 30 68 37 844 45 0 1,105 0 25,323 0 1,365 K-17 50-733-20248-00-00 1 520120 8 0 0 0 0 K-18RD H 50-733-20254-01-00 1 520120 4 17 0 2 146 0 5 0 0 0 K-19 H50-733-20259-00-00 1 520120 5 30 28 134 21,305 128 28 14,007 2,480 639,158 78 13,852 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan _ Title: Project Coordinator 14. Signature: Rc)s__ Date: 9/2312013 Form 10-005 Rev. 04!2006 TOTAL 20,643 1,082,392 15,213 ;N. ;;,.w i;UN3 UN RFiERSE SiDF Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25 230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit K)ng Salmon PF, McArthur River Field, Month and Year: West Foreland APRIL 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 8. Days In Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-:{X-XX (see &Pool (see psig (see 8. OIL 9. WATER 10. GAS 11.0IL 12, WATER 13. GAS instruct) Code Instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) K-30 W 50-733.202 i 1.00-00 1 520180 5 30 6819 127 1 261 3,798 30 I hereby certify that the foregoing Is true and correct to the best of my knowledge. Printed Name: Linda Trahan14. _ Title: Project Coordinator Signature: _ Date: 9/23/2013 -- Form 10.405 Rev. 04/2009 —" �. �.. TOTAL 261 3,798 30 wU uvrvo ON RC VERSE SWC Suomit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 9n AAr nc nen Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 eer oc oon Name of Operator: HILCORP ALASKA, LLC 1. Well No. 2. API No. 50-XXX-XXXXX-:{X-XX 3. Type (see Instruct.) Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, GGS Month and Year: APRIL 2013 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION & Pool (see psig (see 8.OIL 9. WATER 10. GAS Code instruct.) instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11.OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) M-01 5D-733-20388-00-00 2 520550 1 30 21 g 1 942 M-02 50-733-20389-00-00 2 520550 1 30 25 0 12 0 24 28,251 M-13 50-733-20407-00-00 2 520550 1 30 104 0 1,517 0 367 45,516 M•14RD 50-733-20408-Ot-00 2 520550 1 30 30 0 8 2,189 0 249 65,667 M-03 50-733-20411-00-00 2 52D550 1 30 45 0 0 7 1,474 0 9 44,230 M-05 50-733.20413-00-00 2 520550 1� 30 75 3,467 0 213 103,999 M-04 50-733-20417-00-00 2 520550 1 1 30 0 80 0 0 1,754 0 2 52,625 M-19RD 50-733-20421-01-00 2 520550 1 30 21 0 1 3,689 0 16 110,672 M-1550-733.20422-00-00 2 520550 1 30 85 0 1 1,482 0 15 44,471 M-07 50-733-20435-00-00 2 520550 1 30 30 0 0 4,037 0 13 121,10.5 M-32RD 50-733-20462-01-00 2 520550 _ 8 0 D 3,058 0 5 91,746 111 0 0 0 0 0 0 M-09 50-733.20476-00-00 2 520550 1 30 21 0 0 1,622 M-16RD 50-733-20480-01-00 2 520550 1'-. 30 457 3 0 0 48,672 M-12 50 -733 -20505 -00 -DO 2 520550 1 30 21 2,625 0 96 84,735 M-17 50-733-20552-00-00 2 5205511 1 30 0 125 0 0 705 0 7 21,143 M-18 50-733-20583-00-00 2 520550 1 --30-1087- 0 1,581 0 5 47,419 M-06 50-733-20585-00-00 2 520550 1 0 3,366 0 10 100,996 M-20 50-733-20587-00-00 2 520550 1 30 98 0 3 1,328 0 85 139,830 M-10 _ 30 54 0 0 1,246 0 0 37,389 50-733-20588-00-00 2 520550 1 30 105 0 0 2,848 0 0 M-11 50-733-20590-00-00 2 520550 1 30 103 0 49 1,588 0 65,432 M-21 50-733-20598-00-00 2 520550 _ 1 301 11910 O 1,455 47,637 14,288 10 10 128,643 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan _ Title: Project Coordinator 14. Signature:- Date: 9/2312013 Form 10-405 Rev. 04/2006 TOTAL 0 2,574 1,350,178 -.F--II-I "-..,,�"`'���," Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 90 AlAC ar non Name Operator: HILCOR Field and Pool: Trading Bay Unit Sleethead PF, McArthur River Field, Month P ALASKA, SLC Hemlock and Year: APRIL 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field 5. Method & Pool 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION (see Cotle instruGJ psig (see 8. O=WATERAS Instruct) (BBF) 11.OIL 72.WATER 13.GAinsWclJ (BBL) (BBL) (N,CF)M-25 H 50-733-20391-00-00 1 520120 8 000M-28 H 50-733-20414-00-00 1 520120 i 30 H 50-733-20428-01-00 1 520120 0 49M-29A31B M-316 H 50-733-2D457-02-05 1 520120 5 30 93 2036,093 127,817 5266 30 124 2838,490 254,315 5,712 1 hereby certify that the foregoing is True and cerrecl to the best of my kncwledge. Printed Name: Linda Trahan 14. Title: Project Coordinator Signature:. Date: 9/23/2013 Form 10-405 Rev. 0412006TOTAL mrcroi innne,c .,., R,-..� 16,039 402,391 11,339 •���• •�•vw v,v nCY CRJC JIUC Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION M014THLY PRODUCTION REPORT 20 AA! 99 !4n Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay UnR Steelhead PF, McArthur River Field, Month and Year: West Foreland APRIL 2013 1. Well No. 2. API N. 50-XXX-XXXX}; XX -XX 3. Type 4. Field 5. Method & 8. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION B. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13.GAS (see Pcol (see p"g (see instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) M-25 W 50-733-20391.00-00 1 52019D 8 01 010 10 -28 W 50-733-24M 14 -OC -OD 1 52019D 8 0 10 10 10 10 1 010 10 10 10 10 0 I hereby certify that the foregoing is trua and correct to the best of my knowledge. Printed Name: Linda TTrrachaann Title: Project Coordinator 14. Signature: �-'\ _ Date: 9/2312013 Form 10-405 Rev. 04/2006 NST., TOTAL 0 0 0 CTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 90 AAr 9.r 9 -nn Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Field, Hemlock Month and Year: APRIL 2013 1. Well No. 2. API No. 50-XXX-XXXXX.-XX-XX 3. Type (see instruct) 4. Field 5. Method & Pool (see Code instruct.) 6. Days in Oper. 7. Avg. FTP psig (see Instruct) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 5. OIL 9. WATER (BBL) (BBL) 10. GAS (MCF) 11, OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) A-15RD2 50-733-20105-02-00 1 520120 1 28 130107 1,379 14 2,992 38,610 399 A-27RD 50-733-20246-01-00 1 520120 1 28 80 18 18 10 515 232 0 I hereby certify that the foregoing Is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature:. �C Date: 9123/2013 Fnrm 1n1n5 Rcv nnnnru...___..__._ __ _ TOTAL 3,508 38,842 399 ,,No I MuU I Kim ON KCVCKJt SIUt Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zone Month and Year; APRIL 2013 1. Well No. 2. API No. 50-XXX-XXXX);-XX-XX 3. Type (see instruct.) 4. Field 5. Method & Pcol (see Code instruct.) 6. Days In Oper. TUBING PRESS, I ING PRESS, DAILYAVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX. PSIG 10. AVG 11. LIQUID PSIG (BBL) 12. GAS (MCF) 13. LIQUID (BBL) I 14. GAS (MCF) G-16 G 50.733-20162-00-00 4 520150 6 30 2,900 2,897 2,450 12,422 216 126,476 10 G-23RDG 50-73320269-01-00 4 520150 6 30 850 850 11,800 11,800 11,701 10 151,041 10 I hereby certify that the foregoing is tae and correct to the best of my knowledge. Printed Name: Linda Trahan Title:5. Project Coordinator _ Signature: C Date: 923!2013 c,..,.. In_nnA o.,.. minnn TOTAL 0 57,518 0 INSTRUCTIONS ON REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25 432 Name or Operator: HILCORP ALASKA, SLC Field and Pool: Trad;ng Bay Gray ing PF, McArthur River Field, Hemlock Month and Year: APRIL 2013 1. Well No. 2. API No 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (sae instruct.) 6. Days in Open TUBING PRESS. PSIG 7. MAX 8. AVG PSIG[2,4050 I CASING PRESS. X PSIG 10. AVG PSIG DAILY AVG. INJ. 11. LIQUID 12. GAS (BBL) (MCF) TOTAL MONTHLY INJ. 13. LIQUID 14. GAS (BBL) (MCF) G-05RD H 50-733-20060-01-00 4 520120 6 30 3,200 3,173 97 7,379 0 221,381 0 G-09 50-733-20098-00-00 4 520120 6 30 1,950 1,950 1,900 2,314 0 69,417 0 G-11 50-733-20115-00-00 4 520120 6 30 2,150 2,150 2,134 1,372 0 41,166 0 G-12RD3 50-733-20116-03-00 4 520120 6_ 26 3,200 2,388 555 2,971 0 77,250 0 G-16 H 50.733-20162-00-00 4 520120 6 30 2,900 2,897 2,422 4,690 0 140,711 0 G-19 50-733-20178-00-00 4 520120 8 0 0 0 0 D 0 0 0 0 G-14ARD H 50-733-20189-01-00 4 520120 6 30 3,000 3,000 0 0 488 0 14,649 0 G -23RD H 50-73320269-01-00 4 52012() 6 30 850 850 1,800 1,800 3,244 0 97,335 0 G-22 H 50-733-20272-00-00 4 520120 6 30 2,500 2,500 2,500 2,460 222 0 6,647 0 I hereby certify that the foregoing is true and correct to the best of my knovdedge. Printed Name: Linda Trahan Signature: SO!,- _ Fnrm 1n -AM Ra.. ngil nm ...___.. Title: Protect Coordinator Date: 9!2312013 5 TOTAL 0 668,555 0 IONS ON REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Foreland Month and Year: APRIL 2013 1. Well No. 2. API No.3. 50-XXX-XXXX:(-XX-XX Type (see Instruct.) 4. Field 5. Method & Pool (sae Code instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY [NJ. 7, MAX PSIG B. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID PSIG (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) G-14ARD W 50-733-20189-01-00 4 520190 6 30 325 325 0 0 3,850 0 115,485 0 G-36RD H 50-733-20216-01A0 4 520190 8 0 0 0 290 276 0 0 0 0 G -40S 50.733-20412-00-00 4 520190 6 0 400 182 400 385 0 0 0 0 1 hereby certify that the foregoing is Ne and correct to the best of my knowledce. Printed Name: Linda Trahan Signature: Title: Project Coordinator Dale: 9/23/2013 5. TOTAL 0 115,485 0 orm 10.406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator. Field and Pool: Trading Bay Unit Dally Varden PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC G -Zone APRIL 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY W. 50-XXX-XXXXX-XX-XX (see & Pool (see In Oper. 7- MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct.) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) D-09RD G 50-733-20131-01-00 4 520150 6 8 2,060 1,588 2,050 574 35 0 279 0 D-06RD G 50-733-20147-01-00 4 520150 6 30 2,820 2,754 640 525 3,378 0 101,353 0 D-45 G 50-733-20150-01-00 4 520150 6 ^ 30 3,400 3,370 _ 280 125 443 0 13,288 0 D -24A G 50-733-20224-01-00 4 520150 6 30 3,450 3,423 190 91 337 0 10,118 0 D-29RD0 50-733-20252-01-00 4 520150 6 30 3,350 3,287 300 223 443 0 13,280 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahar, Title: Project Coordinator Signature: _ __ Date: 9/23/2013 TOTAL 0 138,318 0 Form 10-406 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Hemlock Month and Year: APRIL 2013 1. Well No. 2, API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instmct.) 4. Field & Pool Code 5. Metnod (see inslrucL) 6. Days in Oper. TUBING PRESS. 7. MAX 8. AVG PSIG PSIG CASING PRESS. 9. MAX PSIG 10. AVG PSIG DAILY AVG. INJ. 11. LIQUID 12. GAS (BBL) (MCF) TOTAL MONTHLY INJ. 13. LIQUID 14. GAS (BBL) (MCF) D-09RD H 50-733-20131-01-00 4 520120 6 8 2,050 1,588 2,050 574 198 0 1,581 0 D-45 H 50-733-20150-01-00 4 520120 6 30 3,400 3,302 280 125 541 0 16,241 0 0-15RD2H 50-733-20159-02-00 4 520120 6 30 3,220 3,145 3,250 3,180 389 0 11,674 0 0-14RD 50-733-20164-01-00 4 520120 6 30 3,350 3,301 100 95 2,918 0 87,550 0 D -24A H 5D-733-20224-01-00 4 520120 6 323,450 3,358 190 91 1,349 0 40,474 0 D -34A H 50-733-20225-01-00 4 520120 8 1 01 010 11,010 1955 10 10 0 0 D- 29RD H 50-733-20292-01-00 4 520120 8 30 3,350 3,253 300 223 3,025 0 90,747 0 D41 50-733-20331-00-00 4 1 520120 6 30 3,350 3,248 1630 1400 14,379 0 131,370 10 I hereby certify that the foregoing is tue and correct to the best of my knowledce. Printed Name: Linda Trahan Signature: `� Title: Project Coordinator Date: 9123r2013 _ 15. TOTAL 0 379,637 0 INS 1 RUC I IONS ON REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CONIMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator. Field and Poo': Trading Bay Unit King Salman PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC G -Zone APRIL 2013 1. Well No. 2. API No.3- 50-XXX-XXXXX-XX-XX Type (see Instruct.) 4. Field & Pool Code 5. Method (see Instruct.) 6. Days in Oper. TUBING PRESS- CASING PRESS. DAILY AVG- INJ- TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) K-24RD2 G 50-73320330-02-00 4 520150 8 01 010 1125 1123 0 10 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan _ Title: Project Coordinator 5. Signature: Date: 9/23/2013 TOTAL 0 0 0 orm iu-nuc Rev. uzrzuuo INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 99 Aa0 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: and Hemlock APRIL 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILYAVG. INJ. TOTAL MONTHLY INJ. 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct.) Code Instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) K-22 50-733-20271-00-00 4 520120 6 21 2,350 2,300 260 151 9,787 10 205,537 0 _ K-24RD2 H 50-733-20330-02-00 4 520120 8 0 0 0 125 123 0 0 0 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 15. Signature: �� Date: 9/2 312 01 3 Form 10-406 Rev. 02/2006 ,.,ire, ,,.,-,,,,,� ,,., .,�, ,� TOTAL 0 205,537 0 �,�., Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Fieldand Pool: Trading Bay Unit Steelhead PF, McArthur River Field, G- Month and Year: HILCORP ALASKA, LLC Zone APRIL 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct.) 4. Field 5. Method 8 Pool (see Code Instruct) 6. Days in O. I TUSING PRESS. I CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11.2. (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) M -27G 50-733-20423-00-00 4 5201601 6 301 2,642 1 2,280 380 1273 1,164 0 134,908 10 M-30 G 50-733-2043)-00-00 4 520150 8 30 2,575 2,418 1990 1754 1776 0 23,279 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 15. Signature: Date: 9!23/2013 TOTAL 0 58,187 0 Form 10-406 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKO, OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock APRIL 2013 1. Well No. 2. API No. 3. Type 4. Field S. .Method 6. Days TUBING PRESS. I CASING PRESS. DAILY AVG. [NJ. TOTAL MONTHLY INJ. 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIOLID 14. GAS instruct.) Code instinct.) PSIG PSIG (BBL) {MCF) (BBL) (MCF) M-27 H 50-733-20423-00-00 4 520120 6 30 2,672 2,307 380 273 2,715 0 81,452 0 M-30 H 50-733-20430-00-00 4 520120 6 30 2,575 2,418 990 1754 9,974 10 299,205 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda99T��rahan Title: Project Coordinator 15. Signature: `yC Date: 91232013 TOTAL 0 380,657 0 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25 432 Name of Operator: HILCORP ALASKA, LLC Field and Poo.: Trading Bay Unit Steelhead PF, McArthur River Field, West Fore,and Month and Year: APRIL 2013 1. Well No. 2. API No. 3. Type 50 -XXX xXXXX-XX-XX (see instruct.) 4. Field 5. Method 6. Days & Pool I,see in Oper. Code instrucA.) I TUBING PRESS, CASING PRESS. I DAILY AVG. INJ. TOTAL MONTHLY [NJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) M-27 W 50-733-20423-00-00 1 4 520190 8 0 0 0 380 273 0 0 0 0 M-30 W 50-733-2043400-00 4 520190 6 30 2,57612,418 990 17,54 1669, 0 19 ASR n I hereby certify, that the foregoing Is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Form 10-406 Rev. 0212006 Title: Project Coordinator 15. Date: 0/23/2013 I TOTAL I REVERSE SIDE 19,856 _ 0 Submit STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Month and Year: HILCORP ALASKA, LLC Field, Hemlock APRIL 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see in Oyer. instruct.) Code Instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) A-29RD 50-733-20245-01.00 4 520120 8 30 2,100 2,100 2,100 12,058 17.850 10 235,490 10 I hereby certify that the foregoing is true and correct to the best of my krowiedge. Printed Name: Linda Trahan Title: Project Coordinator 15. Signature: _ Date: 9123/2013 _ TOTAL 0 235,490 0 v,o" Fvvuo r<ev. ucr<uuo INSTRUCTIONS ON REVERSE SIDE Submit in duplicate (corp Alaska, LLC me of Operator tal Wells tal Wells Produced tal Pipeline Runs Closing Inventory Opening inventory Other Adjustments (direct or xylene recovered) Net Production STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT NET OIL SALES McArthur River Field Regulatory Lease 115 78 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed��� Linda Trahan Title Troject Coordinator Date: 9/23/2013 126,323 MAY 2013 Month and Year of Production 27,752 27,181 0 126,894 126,894 2,892,960 1,427 TOTAL OIL WATER GAS STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT !)n AAr it o)zn Name of Operator: Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC G -Zone MAY 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see B. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) D-01 G 50-733-2006MO-00 1 520150 5 31 123 76 2,267 11 2,354 70,273 343 D-02ARD G 50-733-20069-02-00 1 520150 8 0 727 0 0 D-04RD 50-733-20089-01-00 1 520150 2 3 989 2 39 0 15 0 0 0 D-03RD2 50-733-20090-02-00 1 520150 2 31 165113 4 5 116 46 D-05RD 50-733-20100-01-00 1 520150 2 31 69 3,497 111 2,127 D-08RDG 07.01-00 50-733-20192 1 520150 2 178 47 134 66 1,469 4,163 2,055 2, 28 1,102 0 2 3 11 45 D -12R0 G 50-733-20142-01-00 1 520150 1 31 107 139 1,448 62 4,313 44,880 1,909 D-46 G 50-733-20165-01-00 1 520150 2 31 130 50 276 0 D-47 G 50-733-20195-02-00 1 520150 1 8 0 113FO 1,550 8,556 0 D-30RD2 50-733-20208-02-00 1 520150 8 0 1,340 0 0 0 0 0 0 0 D-31RD 50-733-20215-01-00 1 520150 2 31 170 142 208 0 51 0 0 0 D-32 50-733-20220-00-00 1 520150 8 -0-429 4,400 6,458 1,589 0 0 0 0 0 0 D-25RDG 50-733-20247-01-00 1 520150 1 31 116 22 1,831 6 679 D-26RD 50-733-20260-01-00 1 520150 2 31 222 59 194 56,747 189 D-27 G 50-733-20274-00-00 1 520150 8 0 55 1,832 6,029 9,713 74 0 0 0 0 0 0 D -28G 50-733-20287-00-00 1 520150 8 01 1,216 0 0 D -43RD G 50-733-20373-01-00 1 520150 2 31 155136 0 0 0 0 206 40 1 ,101 6,388 1,245 1 hereby certify that the foregoing is true and correct to the best of my knovAedge. Printed Name: Linda Trahan14. Title: Project Coordinator �C Signature: Date: 9/23/2013 Form 10-405 Rev. 04/2006 TOTAL 21,209 203,765 11,309 -I RV V I,VIVJ UN REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT OA AAl. Nc Name of Operator: r -v MV GJ.GJV Field and Pool: Trading Bay Unit Dolly Verde�PF,McAxthur River Field, HILCORP ALASKA, LLC GGS Month and Year: MAY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field 5. Method 8 Pool 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION instruct.) (see Cotle instruct.) psig (sea 6, OIL Instrua) (BBL) 9. WATER (BBL) 10. GAS (MCF) 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) D-18 60-733-20169-00.00 2 520550 6 0 37710 10 0 0 0 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan 14. Title: Project Coordinatoror 9..,.... `- Signature: '� Date: 912312013 Form 10.405 Rev. 04/2006 ,..__ TOTAL 0 0 0 Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25 230 Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Hemlock Month and Year: MAY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION (see & Pool (see psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code Instruct.) Instruct.) (BBL) I (BBL) (MCF) (BBL) (BBL) I (MCF) 1 D-01 H--- 50-733-20068-00-00 1 520120 5 31 - 125 176 9,031 26 5,471 1279.955 1798 0.02ARD H 50-733-20069-02-00 7 520120 8 0 127 0 0 3-08RD H 50-733-20107-01-00 7 520120 2 27 858 0 2 0 0 0 0 D-07RD2 50-733-20117-02-00 1 520120 2 29 298125 715 3 97 10 43 89 D-48 50-733-20132-01-00 1 520120 2 31 3,626 20,731 7822 D-11 50-733-20140-00-00 1 520120 B 188 40 260 113 1,236 8,065 3,512 0 1,241 0 0 0 0 0 0 0-12RD H 50-733-20142-01-00 1 520120 1 31 107 49 509 11 D -46H H 50-733-20147-01-00 1 520120 8 0 1,515 15,769 352 D-46 H 50-733-20165-01-00 1 520120 8 0 0 0 0 0 0 0 0 D-17RD 50-733.20168-01-00 1 520120 2 31 0 0 178 1 0 0 7-7-5 D-47 H 50-733-20195-02-00 1 520120 8 5t4 140 41 15,943 4,348 0-20 50-733-20203-00-00 1 520120 8 0 0 114 0 0 0 0 0 0 D-42 50-733-20205-01-00 1 520120 8 0 0 0 0 0 0 0 0 D-25RD H 50-733-20247-01-00 1 520120 1 31 0 0 0 0 0 0 0 D-27 H 50-733-20274-00-00 1 520120 8 116 44 902 55 1,378 27,950 1,701 D-28 H 50-733-20287-00-00 1 520120 B 0 0 74 0 0 0 0 0 0 D-40RD 50-733-20318-01-00 1 520120 8 0 1,2160 0 0 0 0 0 D -43RD H 50-733-20373-01-00 1 520120 2 31 385 0 0 0 0 0 0 153 36 206 40 1,101 6,386 1,245 I hereby certify that the foregoing is We and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature: A-uz Date: 912=013 Form 94405 Rev. 04/2006 TOTAL 14,379 374,842 14,865 ^`"`^"` �"" Submitin duplicate uplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 eel` au Von Name R Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF. McArthur River Field, G -Zone Month and Year. MAY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type 4. Field 5. Method 8. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION (see 8 Pool (see psig (see 8. OIL 9. WATER 10. GAS 1t. OIL 12. WATER 73. GAS instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) G-01 RD 50-733-20037-01-00 1 520150 5 31 10249 1,228 5 G-03RD2 G 50-733-20049-01-03 1 520150 1 6 1,524 38,068 157 G-06RDS 50-733-20073-01-00 1 520150 2 29 67 5 69 0 29 411 0 (507 G 50-733-20130-00-00 1 520150 2 138 99 7,408 12 2,885 40,820 352 G-17RD G 50-733-20161-01-00 1 520150 2 21 25 80 6 169 1 129 3,547 14 G-32 G50-733-20198-00-00 1 520150 2 477 7 133 1 175 3,313 22 G -33S 50-733-20212-00-00 1 520150 8 31 95 135 3,730 77 4,199 175,634 513 G-21RD 50-733-20267-01-00 1 520150 2 0 1,307 0 0 0 0 0 0 31 102 73 209 9 2,256 6,491 277 1 hereby certify that the foregoing is true and correct to the best or my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature: �.' Date: 9123/2013 Form 10-405 Rev. 04/2006 TOTAL 11,198 208,285 1,336 .-- 1-1—MY RCVCRJC JIUC Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 2n Aar. 9s 91n Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, GGS Month and Year: MAY 2013 1. Well No. 2. API No. 3. Type (see 4. Field & Pool Code 5. (pslg insinstruct.) =Days 7. Avg, FTP (see DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION50-XXX-XXXXX-XX-XX 8. OWATER (BBL) (BBL) (MCF) (BBL) (BBL) 13.GASinstruct.) (MCS G-148 50-733-20146.00-00 G -18S 50-733-20160-90-00 2 2 520550 520550 i 1 111 31 1591n 158 0 I0 571 0 244 0 0 0 0 17,695 7,577 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan14. Title: Project Coordinator Signature: - � Date: 9/2312013 Form 10dnF Rev naMw1R ....._.-..__ TOTAL 0 0 25,272 IONS ON REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25 230 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, Hemlock HILCORP ALASKA, LLC Month and Year: MAY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUC710N (see instruct.) & Pool Code (see instruct.) psig (see 8.OIL 9. WATER 10. GAS 11. OIL 12, WATER 13. GAS instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) G-OtRDLH 50-733-20037-01-00 1 520120 5 31 51 148 3,684 19 G-02RD 60-733-20038-01-00 1 520120 2 4,573 114,205 589 G-03RD'L H 50-733-20049-01-00 1 520120 8 16 91 85 1,956 10 1,365 31,289 166 G-O4RD H 50-733-20050-01-00 1 520120 8 0 0 0 D 0 0 0 0 G-06RDL 50-733-20073-01-00 1 520120 8 0 0 0 0 0 0 0 0 G-08RDL 50-733-20085-01-00 1 520120 8 0 1,208 0 0 0 0 0 0 G-10RD 50-733-2009401-00 1 520120 8 0 -0-0 7,200 0 0 0 0 0 0 G-13 50-733-20127-00-00 1 520120 2 20 0 0 p 0 0 0 G -07H 50-733.20130.00-00 1 520120 2 469 30 659 4 592 13,172 73 G-15RD 50-733-20149-01-00 i 520120 8 21 79116 3,209 1A 2,442 67,384 301 G-17RD H 60-733-20161-01-00 1 520120 2 0 1,280 0 0 0 0 0 G -30L 50-733-20187-00-00 1 520120 8 25 -0-194 458 16 176 2 2 388 4,392 48 G -31L 50-733-20194-00-00 1 520120 1 18 0 0 0 D 0 0 G-34RDL 50-733-20213-01-00 1 520120 8 561 2 480 0 39 8,647 4 G-20 50-733-20261-00-00 1 520120 2 0 7,300 0 0 0 0 0 0 G-25 50-733-20288-00-00 1 520120 B 31 256 155 3,314 19 14,802 102,733 587 G-26RD 50-733-20295-01-00 1 520120 8 0 0 96 0 0 0 0 0 0 G-28RD 50-733-20324-01-00 1 520120 5 590 0 0 0 0 0 0 31 31 92 9 7,117 139 19,880 220,618 11,208 1 hereby certify that the foregoing is We and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature: - A� Date: 9123/2013 Form 10-405 Rev. 04/2006 IIJCTOI I11 TOTAL 24,080 562,439 2,975 t in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 J%C oc non Name R Operator: HILCORP ALASKA, LLC Field and Pool: PF, McArthur River Field, West Month and Year: Foreland MAY 2013 1. Well No. 2. API No. 50.XXX-XXXXX-XX-XX 3. Type 4. Field 5. Meper. 76.Days 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10.GAS 11. OIL 12.WATER 13.GAS (see R Pool (sepsig (see instruct.) Code instruinstruct.) (BBL) (BBL) (MCF) (BBL) (BBL) I (MCF) G-32 W 50.733-20198-00-00 1 520190 231 96 84 1,854 10 2,618 57,471 320 G -33L 50-733-20212-00-00 1 520190 2 31 226 95 1,174 12 2,942 38,392 1359 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature:— �� Date: 9/232013 Farm 10-405 Rev. 04/2005 INS TOTAL 5,560 93,863 678 TRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 9n AAc 9s pan Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Feld,t G -Zone ar: 1. Well No. 2. API No. 50 -XXX -XX -XX -XX 3. Type (see instruct.) 4. Fieltl & Pool Code 5. Method (see instruct.) 8. Days in Oper. 7. Avg. FTP DAICTION psig (see 8. OIL 10. GAS instruct.) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) K-01 RD2G 50.733-20054-01-00 G 50-733-20156-02-00 K-25 G 50-733-20180.01-00 K-30 G 50-733-20211-00-00 K-18RD G 50-733.20254-01-00 1 1 1 1 1 520150 520150 520150 520150 520150 1 5 5 8 5 4 31 31 0 31 311 54124 95 4 50 0 56 12 016 1414 487 79 0 4 111 3,841K-12RD2 0 383 1173 0 15,083 112,826 0 110 1332 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan14. Title: Project Coordinator Signature: Date: 1/212014 FOnn 10-405 Rev_ 04/200R TOTAL 4,520 35,627 3,251 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT OA AAIB Oc Oen Name Operator: LV �nV LJ.LJU Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, R HILCORP ALASKA, LLC GGS Month and Year. MAY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field 5. Method & Pool 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION instruct.) (see Code instruct.) psig (see &. OIL instruct.) (BBL) 9. WATER 10. GAS 11 -OIL 12. WATER 13. GAS (BBL) (MCF) (BBL) (BBL) (MCF) K-05 50-733-20092-00-00 2 520550 8 01 0 0 10 10 10 0 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan 14. Title: Project Coordinator Signature: �C Dale: 912 312 01 3 Form 10-405 Rev. 04/2006 inicroi irrvir lc ., l .,�.,�...... ....... TOTAL 0 0 0 Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Hemlock Month and Year. MAY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct-) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 1 12. WATER 13. GAS (BBL) (BBL) (MCF) K-01 RD2H 50-733-2005401-00 1 520120 5 31 5431 238 20 960 7,379 611 K-26RD 50-733-20097-04-00 1 520120 4 30 90 72 90 42 2,167 2,689 1,255 K-12RD2L 50-733-20156-02-00 1 520120 1 31 95 129 6,125 106 3,985 189,877 3,281 K-13RD2 50733-20157-02-00 1 520120 5 31 87 285 9,809 174 8,822 304,093 5,397 K-25 H 50733-2018001-00 1 520120 8 1 0 50 0 0 0 0 0 0 K-30 H 50733-20211.0000 1 520120 5 31 56 21 942 46 658 29,193 1,433 K-17 50733-20248-00.00 1 520120 8 0 0 0 0 jo 0 0 10 K-18RD H 50733-20254-01-00 1 520120 4 31 25 2 177 15 74 5,497 1142 K-19 H L50733-20259-0000 1 520120 5 31 29 162 4,631 131 5,012 143,555 4,062 I hereby certify, that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Signature: Title: Date: Project Coordinator 1/2/2014 4. TOTAL 21,679 682,283 16,181 urrn ra-auo Rev. 04cu06 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 mer 25 onn Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading B�Ulyftitl<ingalmon PF, McArthur River Fieltl, MOMh and Year: West Foreland MAY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field & Pool 5. Me}hod 6.. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION Instruct.) Code (see instruct.) psig (see 8.OIL 9. WATER 10. GPS 11. OIL 12. WATE—R 13. GAS instruct.) (BBL) (BeL) (MCF) (BBL) (BBL) (MCF) K-30 W 50.733.20211-00-00 1 520190 1 5 311 5615 1141 1156 14,379 31 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan14. Title: Project Coordinator �m Signature: ' ` Date: 1/2/2014 Form 10-405 Rev. 04/2006 _ TOTAL 156 4,379 31 ...� ,..�..� vn n.vQr Qm alum Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25 230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, G- Month and Year: Zone MAY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type 4. Field 5. Method 6. Days In Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION (see 8 Pool (see psig (see 8.OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code instruct.) Instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) M-25 G 50-733-20391-00-00 1 520150 8 0 0 0 10 M-28 G 50-733.20414-00-00 1 520150 1 31 —8470— 10 0 10 IT— M-29AG 50-733-20426-01-00 1 520150 1 31 1380 112 63011,777 1364 M -31B G 50-733-20457-02-05 1 520150 5 0 71 2,199 64 2,190 68,161 1,998 31 125 74 12,581 148 2,285 180,011 11,494 I hereby certify that the foregoing is true and correct to the best of my knowledge, Printed Name: Linda Trahan Title: Project Coordinator 14_ Signature: ql;z�;Izl Date: 923/2013 Form 10-405 Rev. 042008_.__ TOTAL 5,104 159,949 3,856 Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 9n nn(.)r 9zn Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, GGS Month and Year: MAY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTIONTOTAL prig (see 8- OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) M-91 M-02 M-13 M-14RD M-03 M-05 M-04 M-19RD M-15 M-07 M-32RD M-09 M-16RD M-12 M-17 M-18 M-06 M-20 M-10 M-11 M-21 50-733-20388-00-00 50-733-20389-00-00 50-733-20407-00-00 50.733-20408-01-00 50-733-20411-00-00 50-733-20413-00-00 50733-20417-00-00 50-733-20421-01-00 50733-20422-00-00 50-733-20435-00-00 50-733-20462-01-00 50-733-20476-00-00 50-733-2048001-00 50-733-20505-00-00 50-733-20552-00-00 50733-20583-00-00 60-733-20585-00-00 50-733-20587-00-00 50-733-20588-00-00520550 50-733-20590-00-00 50733-20598.00-00 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 520550 520550 520550 520550 520550 520550 520550 520550 520550 520550 520550 520550 520550 520550 520550 520550 520550 520550 520550 520550 1 1 1 1 1 1 1 1 1 1 1 8 1 131 1 1 1 1 1 1 1 1 31 31 31 31 31 31 31 31 31 31 0 31 31 31 31 3198 31 31 31 31 22 0 24 0 103 0 0 0 45 0 75 0 80 0 22 0 65 00 30 0 583 0 22 0 46 0 22 0 112,0 106 0 0 53 0 103 0 103 0 119 0 0 14 8 0 9 0 0 0 0 0 0 0 1 0 1 4 0 0 53 1909 1,4% 2,047 1,423 3,209 1,668 3,864 1,447 3,877 3,027 10 11,541 2,650 753 1,510 31568 1,274 1,136 2,351 1,451 13,710 0 3 0 1242 0 0 0 6 0 0 0 0 5 0 0 0 0 0 0 0 2 0 34 0 0 0 16 0 138 0 0 0 0 0 1,632 0 0 28,189 46,378 63,471 44,115 99,479 51,720 119,789 44,862 120,173 93,843 0 47,760 82,183 23,341 46,799 110,611 39,496 35,228 72,891 144,971 1114,999 I hereby certify that the foregoing is true and correct to the best of my knovAedge. Printed Name: Linda Tmhan14. Title: Project Coordinator %C Signature: Date: 9123/2013 Form 10-005 1M Rwv. nd/9a ....._....__._.. _ T OTAL 0 2 ,784 1,330,275 VIN KcVcKae sue Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT On AAr OC OOn Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: Hemlock MAY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type 4. Fleltl & Pool 5. Methotl 6. Days in Oper. 7. Avg, FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS (see Instruct.) Code (see instruct.) psig (see instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) M-25 H 50-733-20391-00-00 1 520120 8 0 0 0 0 M-28 H 60-733-20414-00-00 1 520120 1 31 0 41 0 1,076 55 0 1,259 100 33,368 1,691 M -29A 50-733-20428-01-00 1 520120 1 31 96 15,130 1150 5,109 159,042 4,662 M -31B H SD -733-20457-02-05 1 520120 5 31 124 295 110,324 1193 9,138 320,043 15,976 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature: Date: 9/232013 Form 10-405 Rev. 0412006 IN TOTAL 15,507 512,453 12,328 STRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 9n AAP OC oon Name Operator: HILCORP ALASKA, LLC 1. Well No. 2. API No.3. 50-XXX-XXXXX-XX-XX M-25 W 50-733-20391-00-00 M-28 W 50-733-20414-00-00 Type (see instruct.) 1 1 Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: West Foreland MAY 2013 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUC &Pool (see TION psig (see 8. OIL 9. WATER 10. GAS instruct.) instruct.) (BBL) (BBL) (MCF) 520190 8 0 0 0 0 0 520190 8 0 0 0 0 0 TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) 0 g 0 0 0 p I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature: � Dale: 9123=13 Form 10-405 Rev. 0412006 TOTAL 0 0 0 ,..,w vn ncvMnoe arut Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25 230 Name of Operator: Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Month and Year: HILCORP ALASKA, LLC Field, Hemlock MAY 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 1 7. Avg. FTP DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see 8 Pool (see psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code Instruct.) inslmct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) A-15RD2 50-733-20105-02-00 1 520120 1 31 160196 11,677 149 2,988 51,980 1,513 A -27R0 50-733-2024601-00 1 520120 1 31 80117 110 10 Isis 1312 10 I hereby certify that the foregoing is We and correct to the best of my knowledge. Printed Name: Linda Trahan14, Title: Project Coordinator Signature: Dale: 9/23/1013 TOTAL 3,503 52,292 1,513 Form 10405 Rev ndl9nna .-..._..... _ IONS ON REVERSE SIUt Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT in AA/ A1C ., Name Operator: HILCORP ALASKA, LLC av MV GJ.-rJG Field and Pool: Trading Bay Grayling PF, McArthur River Fleld, G -Zone Month and Year: MAY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field 5. Method & Pool 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. (see in Oper. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 1 3.T LIQUID 14. GAS instruct.) Code Instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) G-16 G 50-733-20162-00.00 4 520150 6 31 2,900 2,898 2,500 2,454 229 0 7,107 G -23RD G 50-733.20269-01-00 4 520150 6 31900 900 1,800 1,710 0 1,733 0 53,720 0 I hereby certify that the foregoing is We and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 15. Signature:. "�C Date: 9/232013 Form 10.406 Rev. 02/2006 INSTRUCTIONS TOTAL 0 60,828 () ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25 132 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, Hemlock Month and Year: HILCORP ALASKA, LLC MAY 2013 1. Well No. 2. API No. 3. Type 4. Field S. Method 6. Days TUBING PRESS, CASING PRESS. DAILY AVG. INJ, TOTAL MONTHLY INJ. 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct.) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) G-05RD H 50 -733 -20060 -01 -OD 4 520120 6 31 3,200 3,158 105 101 - 259 0 G-09 50-733-20098-00-00 4 520120 6 31 0 0 1,900 1,900 176 0 8,031 0 G-11 50-733-20115-00-00 4 520120 -6-31 2,150 2,150 2,150 2,117 47 0 5,449 0 712RD3 50-733-20116-03-00 4 520120 6 8 3,150 1,217 1,000 257 2,502 0 1,454 0 G-16 H 50-733-20162-00-00 4 520120 6 31 2,900 2,898 2,500 2,454 4,981 0 20,019 154,426 0 G-19 50-733-20178-00-00 4 520120 8 0 0 0 0 0 0 G-14ARD H 50-733-20189-01-00 4 1 520120 6 31 0 00 0 0 0 0 0 G -23RD H 50-733-20269-01-00 4 520120 6 31 900 900 1,800 1,710 598 3,305 0 18,548 0 G-22 H 50 -733 -20272 -OD -00 4 520120 8 31 2,500 2,500 12,500 0 102,443 0 2,488 6,223 0 192,909 0 1 hereby certify that the foregoing Is true and correct to the best of my knowledge. Printed Name: Linda Trahan15, Title: Project Coordinator Signature: -kv;� Date: 9/232013 TOTAL 0 503,279 0 Form 10-406 Rev. 022008 Un rccvcnst slut Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT gn AAc 9F da9 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Foreland Month and Year: MAY 2013 1. Well No. 2- API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 5. Method & Pool (see Code instruct.) 6, Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 1 12. GAS 73. LIQUID (MCF) (BBL) 14. GAS (MCF) G-14ARD W 50.733-20189-01-00 G-36RD H 50-733-20216-01-00 4 4 520190 6 520190 6 31 0 340 0 325 0 0 260 0 247 4,619 0 0 0 143,180 0 0 0 G -40S 50-733-20412-00-00 4 520190 8 0 0 0 380 380 10 10 0 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan15. Title: Protect Coordinator Signature: Y\ Date: 9123/2013 n.dnR Fnrm 1Rm. n9ronne TOTAL 0 143,180 0 IIVJ I KUU I IUNS UN KEVhKSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 90 Aar, 9S d79 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: G -Zone MAY 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. I TOTAL MONTHLY INJ. 50-XXX-XXXXX-XX-XX (see &Pool (seein Oper. 7• MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct.) Cade in PSIG PSIG (BBL) (MCF) (BBL) (MCF) D-09RD G 50-733-20131-01-01) 4 520150 8 20 2,300 2,100 2,050 1,276 35 0 706 0 D-06RD G 50-733-20147-01-00 4 520150 6 28 2,820 2,778 920 757 3,069 0 85,931 0 D�5 G 50-733-20150-01-00 4 520950 6 31 3,400 3,333 320 218 446 0 13,820 0 6-24AG 50 -733 -20224 -01 -OD 4 520150 6 30 3,450 3,421 150 123 367 0 10.817 0 D-29RD G 50-733-20292-01-00 4 520150 6 31 3,300 3,269 560477 436 0 13,528 0 1 hereby cedify that the foregoing is true and correct to the best of my knovAedge. Printed Name: Linda Trahan15. Title: Project Coordinator �C Signature: Dale: 91232013 Form 10-406 Rev. 022006 ,.,ter......,.., TOTAL 0 124,801 0 ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAr 9G A10 Name Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: Hemlock MAY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type 4. Field 5. Method 6. Days TUBING PRESS., CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. (see & Pool (see in Oper. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct.) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) D-09RD H 50-733-20131-01-00 4 520120 6 20 2,300 2,100 2,050 1,276 169 0 3,383 10 045 50-733-20150-01-00 4 520120 6 31 3,46F3,326 320 218 545 0 16,891 0 D-15RD2 H 50-733-20159-02-00 4 520120 8 28 3,200 3,170 3,250 3,216 359 0 10,048 O D -14R0 50-733-20164-01-00 4 520120 6 27 3,350 3,294 180 133 3,017 0 81,457 0 D -24A H 50-733-20224-01-00 4 520120 8 30 3,450 3,401 150 123 1,442 0 43,266 0 D -34A H 50-733-20225-01-00 4 520120 8 0 0 0 960 859 0 D-29RD H 50-733-20292-01-00 4 520120 6 31 3,300 3,254 560 417 2,982 0 0 0 92,440 0 0 D-41 50-733-20331-00-00 4 520120 6 30 3,400 3,311 850 616 4,167 0 125,023 0 I hereby certify that the foregoing Is true and correct to the best of my knowledge. Printed Name: Linda Trahan Tille: Project Coordinator 15. Signature: !%C Date: 9/232013 Form 10-006 Rev. 022008,.- TOTAL 0 372,509 0 ..,,,.w,,.n.o vry n.vcrtx OFUL Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, G -Zone Month and Year: MAY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type 4. Field & 5. Method 6. Days—TVA—X--TB TUBING PRESS. T CASING PRESS. DAfLY AVG. INJ. TOTAL MONTHLY INJ. (see Pool (see in Oper. MAX 6. AVG PSIG 9. MAX PSIG 10. AVG 12. GAS 13. LIQUID 14. GAS instruct.) Code instruct.) PSIG PSIG ;(;BBL); (MCF (BBL) (MCF) K-24RD2 G 50-733-20330-02-00 4 520150 8 0 0 0 0 0 0 1 hereby certify that the foregoing is titre and correct to the best of my knov4edge. Printed Name: Linda Trahan Title: Project Coordinator 15. Signature: nc�� Dale: 9123/2013 Form 10406 Rev. 02/2006 inicroi TOTAL 0 0 0 Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 90 AAC 99 AQO Name of Operator: HILCORP ALASKA, LLC Field and �TradingBay Unif King Salmon PF, McArthur River Field, Hemlock Month antl Year: MAY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. TypeF (see eld 5. Method 6. Days TUBING PRESS. 7. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. ool (see in Oper. MAX 8. AVG PSIG 9. N1AX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS Instruct)de Instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) K-22 50-733-20271-00-004 520120 6 26 2,450 2,074 600 365 8,310 0 216,064 0 K-24RD2 H 50-733-20330-02-00 4 520120 8 0 0 0 }35 122 10 0 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 15. Signature: Date: 9/232013 Form 10-406 Rev. 022006 TOTAL 0 216,064 0 RUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 90 AA(. 9F d39 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Sleelhead PF, McArthur River Field, G- Zone Month and Year: MAY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 5. Method & Pool (see Code instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. I DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG B. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (88L) 14. GAS (MCF) M-27 G 50-733-20423.00-00 4 520150 6 29 2,7132 2,702 420 335 1,444 0 41,865 0 M -30G 50-733-20430-00-00 4 520150 6 29 2,4582,390 1,050 907 764 0 22,(60 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Protect Coordinator 5. Signature: �C Date: 9/23/2013 Fnrm 1 rl_A fUZ Deu nvonnc ... ___.. __. _ TOTAL 0 64,025 0 IND KUU I IUN9 UN KtVtMjL SOF Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 Aar ou neo Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: Hemlock MAY 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Methotl 6. Daysr7. UBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper.AX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13LIQUID 14GAS inslruG.)Code instruct.) G PSIG (BBL) (MCF) (BBL) (MCF) M-27 H 50 -733 -20423 -00 -DO 4 520120 6 29 2,762 2,698 420 335 11,388 In In,,685 M-30 H 50-733-20430-00-00 4 520120 6 31 2,458 2,390 1,050 907 9,188 D 214,819 0 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan15. Title: Project Coordinator Signature: — 7!M Dale: 9123/2013 Form 10-406 Rev. 0212006 TOTAL 0 382,504 0 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF. McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland MAY 2013 I. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 5. Method & Pool (see Code instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7- MAX PSIG 1 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 118,901 1 14. GAS (MCF) M-27 W 50-733-20423-00.00 4 520190 8 0 010 420 335 0 0 0 0 M-30 W 50-733-20430-00-00 4 520190 8 31 2,458 2,390 1,050 907 610 0 0 I hereby certify that the foregoing Is We and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 15. Signature: Date: 9232013 TOTAL 0 18,901 0 Form 10-406 Rev. 022006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25 432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit TRU - MRF Monopod. McArthur River Field, Hemlock Month and Year: MAY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Fleltl 5. Method &Pool 6. Days TUBING PRESS. CASING PRESS. T- DAILY AVG. INJ. TOTAL MONTHLY INJ. (see in Oper. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct.) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) A-29RD 50-733-20245-01-00 4 520120 6 31 2,025 2,025 2,025 2,003 7,800 0 241,810 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan 15. Title: Project Coordinator Signature: A� Date: 9/23/2013 Form 10-406 Rev, 0212006......- TOTAL 0 241,810 0 "' "�'"� �'" �`"""` J1U4 Submit in duplicate Hilcorp Alaska, LLC Name of operator Total Wells Total Wells Produced Total Pipeline Runs Closing Inventory Opening Inventory Other Adjustments (direct or xylene recovered) Net Production STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT NET OIL SALES McArthur River Field Regulatory Lease 115 77 hereby certify that the foregoing is true and correct to the best of my knowledge, Signed.~�rp Linda Trahan Date: 912 312 01 3 Title Project Coordinator 129,600 23,249 27,752 0 9"1'a--3, JUNE 2013 Month and Year of Production 125,096 TOTAL OIL 125,096 2,722,246 1,1 WATER GAS STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, G -Zone Month and Year: JUNE 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct.) 4. Field & Pool Code 5. Method (see instruct.) B. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) D-01 G 50.733-20068-00-00 1 520150 5 30 130 55 2,379 10 1,653 71,376 297 D-02ARD G 50-733-20069-02-00 1 520150 8 0 0 0 0 0 0 0 0 D-04RD 50-733-20089-01-00 1 1 520160 2 1 1,068 1 17 4 1 17 4 D-03RD2 50-733-20090-02-00 1 520150 2 30 157 136 2 25 4,076 63 764 D-05RD 50-733-20100.01-00 1 520150 2 1 30 178 52 141 39 1,563 4,241 1,163 D-08RD G 50-733-20107-01-00 1 520150 2 5 1,08812 7 19 9 37 43 D-12RD G 50-733-20142-01-00 1 520150 1 30 110 144 1,466 42 4,308 43,977 1,252 D-46 G 50-733-20165-01-00 1 520150 2 30 133 53 271 32 1,601 8,133 969 D-47 G 50-733-20195-02-00 1 520150 8 0 113 0 0 0 0 0 0 D-30RD2 50-733-20208-02-00 1 520150 8 0 721 0 0 0 0 0 0 D-31RD 50-733-20215-01-00 1 520150 2 30 170 145 208 27 4,341 6,247 801 0-32 50-733-20220-00-00 1 520150 8 0 708 0 0 0 0 0 0 D-25RD G 50-733-20247-01-00 1 520150 1 1 14 146 7 1,522 5 104 21,311 169 D-26RD 50-733-20260-01-00 1 520150 2 30 226171 1373 16 2,122 11,196 477 D-27 G 50-733-20274-00-00 1 5201508 21 7510 0 0 0 0 0 D-28 G 50.733-20287-00-00 1 520150 8 0 1,196 0 0 0 0 0 0 D -43RD G 50.733.20373-01-00 1 520150 2 301 153132 1200 127 971 6,003 811 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: QI-11Z Title: Date: Project Coordinator 9/232013 14. TOTAI. 20,749 172,601 6,650 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA. LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, GGS Month and Year: JUNE 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see Instruct.) I DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 8.OIL (BBL) 9. WATER (BBL) 10. GAS (MCF) 11.01E 12. WATER (BBL) (BBL) 13. GAS (MCF) D-16 50-733-20169-00-00 2 520550 a 0 231 0 10 10 0 0 10 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda TTrrahan Title: Project Coordinator Signature: y� Date: 9/23/2013 TOTAL 0 0 0 Form 10-405 Rev. 042006 INSTRUCTIONS ON REVERSE SIDE Suomi in uupncare STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Hemlock Month and Year: JUNE 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) D-01 H 50-733-20068-00-00 1 520120 5 30 128 129 9,517 23 3,858 285,503 694 D-02ARD H 50-733-20069-02-00 1 520120 8 0 0 0 0 0 0 0 0 D-08RD H 50-733-20107-01.00 1 520120 2 4 970 1 6 7 6 23 27 D-07RD2 50-733-20117-02-00 1 520120 2 30 205 146 595 79 4,369 17,846 2,360 D-48 50-733-20132-01-00 1 520120 2 1 30 176,44 291 96 1,328 8,744 2,869 D-11 50-733-20140-00-00 1 520120 8 0 0 0 0 0 0 0 0 D-12RD H 50-733-20142-01-00 1 520120 1 30 111 50 515 8 1,514 15,451 231 D-06RD H 50-733-20147-01-00 1 520120 8 0 0 0 0 0 0 0 0 D46 H 50-733-20166-01-00 1 520120 8 0 0 0 0 0 0 0 0 D-17RD 50-733-20188-01-00 1 520120 2 30 220 14 683 89 405 20,497 2,659 D-47 H 50-733-20195-02-00 1 520120 8 0 113 0 0 0 0 0 0 D-20 50-733-20203-00-00 1 520120 8 0 0 0 0 0 0 0 0 0-02 50-733-20205.01-00 1 520120 8 1 0 010 0 10 0 0 0 D-25RD H 50-733-20247-01-00 1 520120 1 14 152 15 750 44 210 10,496 620 D-27 H 50-733-20274-00-00 1 520120 8 0 75 0 0 0 0 0 0 D-28 H 50-733-20287-00-00 1 520120 8 0 1,196 0 0 0 0 0 0 0-40RD 50-733-20318-01-00 1 520120 8 0 380 0 0 0 0 0 0 D -03RD H 50-733-20373-01-00 1 520120 2 30 152 32 200 27 971 6,003 811 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: �-'� Title: Date: Project Coordinator 9/23/2013 14. TOTAL 12,661 364,564 10,271 Form 10-405 Rev. 0412005 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zone Month and Year: JUNE 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct) 4. Field & Pool Code 6. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 1 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL. MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) G-01RDG 50-733-20037-01-00 1 520150 5 30 10355 1,299 22 1,656 38,972 658 G-03RD2 G 50-733-20049-01-03 1 520150 1 4 82 14 417 7 54 1,668 26 G-06RDS 50-733-20073-01-00 1 520150 2 30 96 88 1,416 42 2,649 42,484 1,263 G-07 G 50-733-20130-00-00 1 520150 2 25 113 4 89 2 105 2,221 45 G-17RD G 50-733-20161-01-00 1 520150 2 30 256 9 162 4 278 4,861 133 G-32 G 50-733-20198-00-00 1 520150 2 30 95 162 3,744 76 4,856 112,309 1295 G -33S 50-733-20212-00-00 1 520150 8 01 1'31110 0 10 10 0 0 G-21RD 50-733-20267-01-00 1 520150 1 2 1 51 826160 149 128 1302 1743 J 142 I hereby certify that the foregoing is true and correct to the best of my knovAedge. Printed Name: Linda Trahan Signature: Title: Date: Project Coordinator 9/23/2013 14. TOTAL 91897 203,256 4,563 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, GGS Month and Year: JUNE 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct) 4. Field S. Method & Pool (see Code instruct.) 6. Days In Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION a. OIL 9. WATER I (BBL) (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER 1 (BBL) 13. GAS (MCF) G -14S 50-733-20146-00-00 2 520550 i1 30 136 0 0 3,258 0 0 97,726 G -18S 50-733-20160-90-00 2 520550 1 30 160 0 0 425 0 0 112.750 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: a� Date: 9Y13I2013 TOTAL 0 0 110,477 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, Hemlock Month and Year: JUNE 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG, PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) G-01RDLH 50-733-20037-01-00 1 520120 5 30 52 165 3,894 82 4,963 116,833 2,466 G-02RD 50-733-20038-01-00 1 520120 8 0 0 0 0 0 0 0 0 G-03RD2 H 50-733-20049-01-00 1 520120 8 0 0 0 0 0 0 0 0 G-04RD H 50-733-20050.01-00 1 520120 8 0 0 0 0 0 0 0 0 G-06RDL 50-733-20073-01-00 1 520120 8 0 1,317.0 0 0 0 0 0 G-08RDL 50-733-20085-01-00 1 520120 8 0 1,200 0 0 0 0 0 0 GAORD 50-733-20094-01-00 1 520120 8 0 0 0 0 0 0 0 0 G-13 50-733-20127-00-00 1 520120 2 1 381 8 163 4 8 163 4 G-07 H 50-733-20130.00-00 1 520120 2 25 113 80 1,688 38 1,993 42,195 950 G-15RD 50-733-20149-01-00 1 1 520120 8 0 1,280 0 0 0 0 0 0 G-17RD H 50-733-20161-01-00 1 520120 2 30 266 20 215 10 611 6,443 293 G -30L 50-733-20187-00-00 1 520120 8 0 200 0 0 0 0 0 0 G -31L 50-733-20194-00-00 1 520120 1 1 6 1.20713 502 1 16 3,010 6 G-34RDL 50-733-20213-01-00 1 520120 8 0 1,315 0 0 0 0 0 0 G-20 50.733-20261-00-00 1 520120 2 30 307128 2,174 61 3,839 65,217 1,824 G-25 50-733-20288-00-00 1 520120 8 0 103 0 0 0 0 0 0 G-26RD 50-733-20295-01-00 1 520120 8 0 604 0 0 0 0 0 0 G-28RD 50-733-20324-01-00 1 520120 5 30 88 402 7,520 190 12,071 225,587 5,709 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Title: Date: Project Coordinator 9/232013 14. TOTAL 23,501 459,447 11,253 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Month and Year: HILCORP ALASKA, LLC Foreland JUNE 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psg (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL (BBL) I 9. WATER (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER 13. GAS (BBL) (MCF) G-32 W 50-733-20198-00-00 1 520190 2 30 95 101 1,861 48 3,027 55,818 1,431 G -33L 50-733-20212-0000 1 520190 2 30 118 93 1,092 44 2,777 32,767 1,311 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: -IkM Date: 9/23/2013 TOTAL 5,805 88.565 2.742 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, G -Zone Month and Year: JUNE 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see Instruct) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) K-01RD2G 50-733-20054-01-00 1 520150 5 30 52 125 62 79 3,750 1,849 2,383 K-12RD2 G 50-733-20156.02-00 1 520150 5 30 86 4 194 12 123 5,824 361 K-25 G 50-733-20180-01-00 1 520150 8 0 52 0 0 0 0 0 0 K-30 G 50-733-20211-00-00 1 520150 5 30 54 16 488 3 491 14,640 91 K-18RD G 50-733-20254-01-00 1 520150 A 301 0 6 423 11 189 12,678 329 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: �nlzl Title: Date: Project Coordinator 923(2013 14. TOTAL 4,552 34,981 3,183 Form 10.405 Rev. 042006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC GGS JUNE 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8.OIL 9. WATER 10. GAS 1. OIL 12. WATER 13. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see (BBL) (BBL) (MCF) (BBL) 1 (BBL) 1 (MCF) instruct.) Code instruct.) Instruct.) K-05 50-733-20092-00-00 1 2 520550 1 8 01 010 10 10 10 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature:R Date: 912312013 TOTAL D 0 0 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Subillir III dupu� STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Hemlock Month and Year: JUNE 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) K-01RD2 H 50-733-20054-01-00 1 520120 5 30 52 31 247 20 937 7,398 596 K-26RD 50-733-20097-04-00 1 520120 4 30 125 86 106 51 2,586 3,189 1,529 K-12RD21- 50-733-20156-02-00 1 1 520120 1 30 86132 6,277 108 3,972 188,303 3,245 K-13RD2 50-733-20157-02-00 1 520120 5 30 86 327 10,124 182 9,805 303,721 5,448 K-25 H 50-733-20180.01-00 1 520120 8 1 0 62,0 0 0 10 0 0 K-30 H 50-733-20211-00-00 1 520120 5 301 54128 944 39 845 28,335 1,177 K-17 50-733-20248-00-00 1 520120 8 0 0 0 0 0 0 0 0 K-18RD H 50-733-2025401-00 i J520120 4 30 0 3 181 5 81 5,434 141 K-19 H 50-733-20259-00-00 1 520120 5 30 28 181 3,739 1136 5,441 1112,178 14,076 1 hereby certify that the foregoing Is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: �� Title: Date: Project Coordinator 9123/2013 14. TOTAL 23,667 648,556 16,211 Form 10.405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, West Foreland Month and Year: JUNE 2013 1. Well No. 2. API No.3. 50-XXX-XXXXX-XX-XX Type (see Instruct,) 4. Field & Pool Code 5. Method (see instruct) 6, Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION B. OIL (BBL) 9. WATER (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) K-30 W 50-733-20211-00-00 1 520190 5 30 54 7 1142 11 200 14.250 26 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: qv;� Dale: 91232013 TOTAL 200 4,250 28 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in cupncare STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, G- Zone Month and Year: JUNE 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days In Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10. GAS (BBL) (BBL) (MCF) 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) M-25 G 50-733-20391-00-00 1 520150 8 0 0 0 0 0 0 0 0 M-28 G 50-733-20414-00-00 1 520150 1 30 85 20 331 8 613 9.922 239 M-29AG 50-733-20428-01-00 1 520150 1 30 0 71 2,224 67 2,138 66,720 2,023 M -316G 50-733-20457-02-05 1 520150 5 30 124 80 2,636 49 2,391 79,086 1,474 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: tlz�R Dale: 9123/2013 TOTAL 5,142 155,727 3,736 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Sleelhead PF, McArthur River Field, GGS Month and Year: JUNE 2013 1. Well No. 2. API No. 5GXXX-XXXXX-XX-XX 3- Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg, FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 1 12. WATER 13. GAS (BBL) (BBL) (MCF) M-01 50.733-20386-00-00 2 520550 1 30 40 0 0 827 0 0 24,816 M-02 50-733-20389-00-00 2 520550 1 30 37 0 12 1,427 0 363 42,816 M-13 50-733-20407-00-00 2 1 520550 1 30 133 0 6 1,826 0 169 54,778 M-14RD 50.733-20408-01.00 2 520550 1 30 38 0 0 1,329 0 0 39,882 M-03 50-733-20411-00-00 2 520550 1 1 30 54,0 10 2,757 0 288 82,698 M-05 50-733-20413-00-00 2 520550 1 6 131 0 0 369 0 0 2,213 M-04 50-733-20417-00-00 2 520550 1 11 149 0 0 658 0 0 7,233 M-19RD 50-733-20421-01-00 2 520550 1 30 34 0 0 1,387 0 15 41,602 M-15 50-733-20422-00-00 2 520550 1 30 75 0 0 3,645 0 1 109,345 M-07 50-733-20435.00-00 2 520550 1 30 47 0 0 2,796 0 0 83,875 M-32RD 50-733-20462-01-00 2 520550 8 0 691 0 0 0 0 0 0 M-09 50-733-20476-00-00 2 520550 1 30 34 0 0 1,518 0 i 45,547 M-16RD 50-733-20480-01-00 2 520550 1 1 27 15810 0 12,0111 0 0 54,297 M-12 50-733-20505-00-00 2 520550 1 30 38 0 2 475 0 65 14,249 M-17 50-733-20552-00-00 2 520550 1 30 105 0 0 953 0 0 28,587 M-18 50-733-20583-00-00 2 520550 1 30 138 0 0 3,054 0 1 91,609 M-06 50-733-20585-00-00 2 520550 1 30 129 0 2 1,037 0 48 31,115 M-20 50-733-20587-00-00 2 520550 1 30 56 0 0 996 0 10 29,866 M-10 50-733-20588-00-00 2 520550 i 30 114 0 0 2,031 0 9 60.943 M-11 50-733-20590-00-00 2 520550 t 30 1160 28 1,280 0 853 38.407 M-21 50-733-20598.00-00 2 520550 1 2 14010 0 352 0 10 1703 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: SOC Title: Date: Project Coordinator 9/23/2013 14. TOTAL 0 1,812 884,582 Form 10405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator. Field and Pool: Trading Bay Unit Sleelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock JUNE 2013 1. Well No. 2. API No. 3. Type 4. Field S. Method 6. Days in Oper. 7. Avg. FTPDAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see 8. OIL 9. WATER 10, GAS 11. OIL 12. WATER 13. GAS Instruct) Code instruct.) Instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) M-25 H 50-733-20391-00-00 1 520120 8 0 0 0 0 0 0 0 0 M-28 H 50-733-20414-00-00 1 520120 1 30 0 41 939 37 1,229 28,172 1,114 M -29A H 50-733-20428-01-00 1 520120 1 30 97 166 5,178 157 4,979 155,355 4,711 M -31B H 50-733-20457-02-05 1 520120 5 30 124 319 10,545 197 9,562 316,342 5,895 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: �� Date: 9123/2013 TOTAL 15,771 499,869 11,720 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland JUNE 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 1 10. GAS 11. OIL 12. WATER 13. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see instruct.) Code instruct) instmct.) (BBL) (BBL) 1 (MCF) (BBL) (BBL) 1 (MCF) M-25 W 50-733-20391-00-00 1 520190 8 0 212 00 0 0 0 M-28 W 50-733-20414-00-00 1 520190 8 0 0 0 0 0 0 10 10 I hereby cenity that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: %;ZR Date: 9/232013 TOTAL 0 0 0 Form 10-405 Rev. 042006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zone Month and Year: HILCORP ALASKA, LLC JUNE 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) G-16 G 50-733-20162-00-00 4 520150 6 30 2,900 2,888 2,5002,378 217 0 6,524 0 G -23RD G 50-733-20269-01-00 4 520150 6 30 li00 442 1,800 1,571 1,824 0 54,723 0 I hereby certify that the foregoing is true and correct to the best of my knov4edge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: Dale: 9/23/2013 TOTAL 0 61,246 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, Hemlock Month and Year: JUNE 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct.) 4. Field & Pool Code 5, Method (see Instruct.) 6. Days in Op,, TUBING PRESS. 7. MAX 8. AVG PSIG PSIG CASING PRESS. 9. MAX PSIG 10. AVG PSIG DAILY AVG. INJ. 11. LIQUID 12. GAS (BBL) (MCF) TOTAL MONTHLY ]NJ. 13. LIQUID 14. GAS (BBL) (MCF) G-05RD H 50-733-20060-01-00 4 520120 6 30 3,200 3,193 200 149 7,514 0 225,416 0 G-09 50-733-20098-00-00 4 520120 6 30 1,950 1,950 2,000 1,919 89 0 2,662 0 G-11 50-733-20115-00-00 4 520120 6 0 2,150 2,150 2,150 2,105 0 0 0 0 G-12RD3 50-733-20116-03-00 4 1 520120 6 8 3,150 1,027 1,200 188 1,939 0 15,512 0 G-16 H 50-733-20162-00-00 4 520120 6 30 2,900 2,890 2,500 2,378 4,725 0 141,740 0 G-19 50-733-20178-00-00 4 520120 8 0 0 0 0 10 10 10 10 0 G-14ARD H 50-733-20189-01-00 4 520120 6 30 0 0 0 lo 1657 lo 119,696 0 G -23RD H 50-733-20269-01-00 4 520120 6 30 900 438 1,800 1,571 3,813 0 108,390 0 G-22 H 50-733-20272-00-00 4 520120 6 30 2,500 2,500 2,500 2,492 5,742 0 172,256 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: LindapTraMhan Signature: Title: Project Coordinator Date: 912 312 01 3 15. TOTAL 0 685,672 0 Form 10-006 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25A32 Name of Operator. Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Month and Year: HILCORP ALASKA, LLC Foreland JUNE 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct.) 4. Field & Pool Code 5. Method (see ins(mct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8, AVG PSIG 9. MAX PSIG 10. AVG 11, LIQUID PSIG (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) G-14ARD W 50.733-20189-01-00 4 520190 6 30 00 0 0 5,056 0 151,673 0 G-36RDH 50-733-20216-01-00 4 520190 8 0 00 230 214 0 0 0 0 G40S 50-733-20412-00-00 4 520190 8 0 0 0 390 381 0 0 0 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: `� Date: 9/23/2013 TOTAL 0 151,673 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC G -Zone JUNE 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. I CASING PRESS. I PSIG 9. MAX PSIG 10. AVG DAILY AVG. INJ. I 11. LIQUID 12. GAS TOTAL MONTHLY INJ. 13. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. 7. MAX a. AVG PSIG PSIG (BBL) (MCF) (BBL) (MCF) instruct.) Code instruct.) D-09RDG 60-733-20131-01-00 4 520150 8 0 700 233 1.400 259 0 0 0 0 D-06RD G 50-733-20147-01-00 4 520150 6 28 3,300 3,223 930 647 3,927 0 109,963 0 D -45G 50-733.20150-01-00 4 1 520150 6 30 3,425 3,396 480 355 371 0 11,139 0 D-24AG W-733-20224-01-00 4 520150 6 30 3,490 3,445 280 219 345 0 10,338 0 D-29RD G 50-733-20292-0i-00 4 1 520150 6 28 3,260 3,255 840 684 16 0 457 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: �� Date: 9/232013 TOTAL 0 131,898 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE amu .""• "' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Hemlock Month and Year: JUNE 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. TUBING PRESS. 7. MAX 6. AVG PSIG PSIG CASING PRESS. 9. MAX PSIG 10. AVG PSIG DAILY AVG. INJ. 11. LIQUID 12. GAS (BBL) (MCF) TOTAL MONTHLY INJ. 13. LIQUID 14. GAS (BBL) (MCF) 0-09RD H 50-733-20131-01-00 4 520120 8 0 700 300 1,400 259 0 0 0 0 0-45 H 50-733-20150-01-00 4 520120 6 30 3,425 3,369 480 355 454 0 13,615 0 D-15RD2 H 50-733-20159-02-00 4 520120 6 28 3,200 3,172 3,250 3,210 348 0 9,745 0 D-14RD 50-733-20164-01-00 4 520120 6 28 3,350 3,329 320 236 2,825 0 79,102 0 D -24A H 50-733-20224-01-00 1 4 520120 6 30 3,490 3,440 280 219 1,378 0 41,353 0 0-34A H 50-733.20225.01-00 4 520120 8 fi 0 0 800 724 0 0 0 0 D-29RD H 50-733-20292-01-00 4 520120 6 28 3,350 3,293 840 684 112 0 3,123 10 D-41 50-733-20331-00-00 4 520120 6 28 3,400 3,324 1900 10 I hereby certify that the foregoing Is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: �C Title: Project Coordinator Date: 912312013 15. TOTAL 0 263,441 0 Foran 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 2n AAr 25432 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC G -Zone JUNE 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days I TUBING PRESS. 11 CASING PRESS. DAILY AVG. INJ, TOTAL MONTHLY INJ. 10. AVG 11. LIQUID 12. GAS t3. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. 7- MAX 8. AVG PSIG 9. MAX PSIG PSIG PSIG (BBL) (MCF) (BBL) (MCF) 1 1 instruct.) Code Insirucl.) K-24RD2 G 50-733-20330-02-00 1 4 520150 F -81 ol 0 0 130 115 0 0 0 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: %QC Date: 91232013 _ _ TOTAL 0 0 C..f.�if 0 in A. mlinvfn Form 10-406 Rev. 022006 INSTRUCTIONS ON REVERSE SIDE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock JUNE 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY 11 J. 50-XXX-XXXXX-XX-XX (see & Pool is in Oper. 7- MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS Instruct.) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) K-22 50-733-20271-00-00 4 520120 6 29 2,3501.645 450 376 9.343 0 270,945 0 K-24RD2 H 50-733-20330-02-00 4 520120 8 0 0 0 130 115 0 0 0 10 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: ca C Dale: 9123/2013 TOTAL 0 270,945 0 Form 10-406 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE zuomn in oupricare STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Sleelhead PF, McArthur River Field, G- Zone Month and Year: JUNE 2013 1. WellNo. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 5. Method & Pool (see Code instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7 -MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. G 11. LIQUID PSIG (BBL) 12. GAS (MCF) 13. LIQUID 14. GAS (BBL) (MCF) M -27G 50-733-20423-00-00 4 520150 6 30 2,731 2,482 240 1140 1,265 0 37,935 0 M-30 G 50-733-20430-00-00 4 520150 6 30 2,530 2,459 1650 1498 1762 0 22,850 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: 14� Date: 9232013 TOTAL 0 60,785 0 Form 10-406 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE submit in aupiicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAr. . 9S AR2 Name of Operator: REVERSE Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock JUNE 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. PSIG 9. MAX PSIG 10. AVG DAILY AVG. INJ. 11. LIQUID 12. GAS TOTAL MONTHLY INJ. 13. LIQUID 14. GAS 50.XXX-XXXXX-XX-XX (see &Pool (see in Oper. 7. MAX 8. AVG PSIG PSG (BBL) (MCF) (BBL) (MCF) instruct.) Code instruct.) M-27 H 50-733-20423-00-00 4 520120 6 30 2,731 2,462 240 140 2,951 0 88,515 0 M-30 H 50-733-20430-00-00 4 520120 6 30 2,530 2,459 650 498 9,790 0 293,690 0 1 hereby certify that the foregoing is true and correct to the best of my knowfedge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: 540,;;z Date: 9/2312013 TOTAL 0 382,205 0 .__._..__.. Ruhmif in dunlirate Form 10-406 Rev. 0212006 INST RUG IONS ON REVERSE SIDE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Sleelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland JUNE 2013 _ 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. 9. MAX PSIG 1D. AVG DAILY AVG. INJ. 11. LIQUID 12. GAS TOTAL MONTHLY INJ. 13. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see &Pool (see in Oper. 7. MAX PSIG 8. AVG PSIG PSIG (BBL) (MCF) (BBL) (MCF) instruct.) Code instruct.) M-27 W 50-733-20423-00-00 4 520190 8 01 010 1240 1140 0 0 0 0 M-30 W 50-733-20430-00-00 4 520190 16350 1498 1650 0 18.490 0 I hereby certify that the foregoing is true and correct 10 the hest of my knowledge. 15. Printed Name: Linda Tmhan Title: Project Coordinator Signature: Dale: 9123/2013 TOTAL 0 19,490 0 C, •Fmif in dunlln�fa Form 10-006 Rev. 0212006 INSTRUCTIONS ON RLVERSE Slue STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Month and Year. HILCORP ALASKA, LLC Field, Hemlock JUNE 2013 1. Well No. 2. API No. 3. Type (see 4. Field & Pool S. Method (see 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY W.50-XXX-XXXXX-XX-XX 7. MAX &. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS Instruct) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) A-29RD 50733-20245-01-00 4 520120 6 30 1,9001,900 12,100 11,996 17.564 10 1226,621 0 1 hereby certify that the foregoing Is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 15. Signature: � Dale: 9/23/2013 1226.621 TOTAL 0 0 Form 10-406 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT NET OIL SALES Hilcorp Alaska, LLC McArthur River Field IJULY 2013 Name of Operator Regulatory Lease Month and Year of Production Total Wells 115 Total Wells Produced 74 Total Pipeline Runs 137,107 Closing Inventory 19,782 Opening Inventory 23,248 Other Adjustments 0 (direct or xylene recovered) Total Net Production 133,641 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signev .e��no�va 133,641 91,489 1,075,057 �L��inndCCCa Trahan TOTAL OIL WATER GAS Title Project Coordinator Date: 912312013 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, G -Zone Month and Year: JULY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct.) 4. Field & Pool Code 5. Method (see Instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13, GAS (BBL) (BBL) (MCF) D-01 G 50-733-20068-00-00 1 520150 5 31 127 50 72 11 1,546 2,219 339 D-02ARD G 50-733-20069-02-00 1 520150 8 0 0 0 0 0 0 0 0 D-04RD 50-733-20089-01-00 1 520160 8 0 1,254 0 0 0 0 0 0 D-03RD2 50-733-20090-02-00 1 520150 2 31 148 158 0 18 4,910 2 557 D-05RD 50-733-20100-01-00 1 520150 2 30 269.47 4 35 1,418 128 1,057 D-08RD G 50-733-20107-01-00 1 520150 0 0 1,340 0 0 10 0 0 0 D-12RD G 50-733-20142-01-00 1 520150 1 31 103 165 42 45 5,110 1,303 1,388 0-46 G 50-733-20165-01-00 1 520150 2 30 140 48 8 51 1,426 254 1,521 D-47 G 50-733-20195-02-00 1 520150 8 0 105 0 0 0 0 0 0 D-30RD2 50-733-20206-02-00 1 520150 8 0 1,167 0 0 0 0 0 0 D-31RD 50-733-20215-01-00 1 520150 2 31 158 122 a 13 3,770 234 389 D-32 50-733-20220-00-00 1 520150 8 0 1,008 0 0 0 0 0 0 D-25RDG 50-733-20247-01-00 1 520150 1 1 271 10018 33 3 491 889 83 D-26RD 50-733-20260-01-00 1 520150 2 31 254 52 18 25 1,607 589 787 D-27 G 50-733-20274-00-00 1 520150 8 0 75 0 0 0 0 0 0 D -28G 50-733-20287-00-00 1 520150 8 0 1,032 0 0 10 0 0 0 D -03RD G 50-733-20373-01-00 1 520150 2 31 148 32 16 127 983 190 835 1 hereby certify that the foregoing is true and correct to the best of my knovbedge. Printed Name: Linda Trahan Signature: R-txl Title: Date: Project Coordinator 9/232013 14. TOTAL 21,261 5,789 6,956 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC GGS JULY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 8 Pool Code 5. Method (see instruct.) 6. Days In Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 1 9. WATER (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) DA8 50-733-20169-00-00 2 520550 6 0 75 0 0 0 0 10 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trrahcannc Title: Project Coordinator Signature: Date: 9/23/2013 TOTAL 0 0 0 Form 10-405 Rev. 04/2005 INSTRUCTIONS ON REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Vanden PF, McArthur River Field, Hemlock Month and Year: JULY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION prig (see 8. OIL 9. WATER 10. GAS Instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) D-01 H 50-733-20068-00-00 1 520120 5 31 134 116 286 25 3,606 8,877 790 D-02ARD H 50.733-20069-02-00 1 520120 8 0 0 0 0 0 0 0 0 D-08RD H 50-733-20107-01-00 1 520120 8 0 1,255 0 0 0 0 0 0 D-07RD2 50-733-20117-02.00 1 520120 2 31 221 96 18 82 2,982 558 2,531 0-48 50-733-20132-01-00 1 520120 2 1 31 161 39 12 103 1,221 376 3,184 D-11 50-733-20140-00-00 1 520120 8 0 695 0 0 10 0 10 0 D-12RD H 50-733-20142-01-00 1 520120 1 31 105 58 15 18 1,795 458 256 0-06RD H 50-733-20147-01-00 1 520120 8 0 0 0 0 0 0 0 0 D-46 H 50-733-20165-01-00 1 520120 8 0 0 0 0 0 0 0 0 D-17RD 50-733-20168-01-00 1 520120 2 31 256 44 39 1D9 1,368 1,204 3,390 D-47 H 50-733-20195-02-00 1 520120 8 0 106 0 0 0 0 0 0 D-20 50-733-20203-00-00 1 520120 8 0 0 0 0 0 0 0 0 D-42 50-733-20205-01-00 1 520120 8 1 0 010 0 0 0 0 0 0-25RD H 50-733-20247-01-00 1 520120 1 27 90137 16 28 997 438 749 D-27 H 5D-733-20274-00-00 1 520120 8 0 75 0 0 0 0 0 0 D-28 H 50-733-20287-00-00 1 1 620120 8 0 1,032 0 0 0 0 0 10 D40RD 50-733-20318-01-00 1 520120 8 0 373 0 0 10 0 0 10 0 -43RD H 50-733-20373-01-00 1 520120 2 31 183 32 16 127 983 190 1835 I hereby certify that the foregoing Is true and correct to the best of my knowledge. Printed Name: Linda Tmhan Signature: Title: Date: Project Coordinator 91232013 14. TOTAL 12,952 12,101 11.735 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zone Month and Year: JULY 2013 1- Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) G-01 RD G 50-733-20037-01-00 1 520150 5 23 132 50 43 20 1.140 984 455 G-03RD2 G 50-733-20049-01-03 1 520150 1 13 105 16 16 7 202 203 97 G-06RDS 50-733-20073-01-00 1 520150 2 31 100 98 51 46 3,045 1,570 1,439 G-07 G 50-733-20130-00-00 1 520150 2 31 142 2 1 1 67 45 29 G-17RDG 50-733-20161-01-00 1 1 520150 2 95 88 9 5 4 130 74 63 G-32 G50-733-20198-00-00 1 520150 2 31 91 169 127 80 5,243 3,938 2,488 G -33S 50 -733 -20212 -DO -00 1 520150 8 0 1,26510 0 0 0 10 0 G-21RD 50-733-20267-01-00 1 1 520150 1 2 1 301 599196 18 146 12,883 1234 1,368 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: I'm Title: Date: Project Coordinator 9123/2013 14. TOTAL 12,710 7,046 5,939 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator. Field and Pool: Trading Bay Grayling PF, McArthur River Field, GGS Month and Year: HILCORP ALASKA, LLC JULY 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days In Oper. 7. Avg. FTP GAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION WATER 10. GAS 11.OIL 12. WATER 13. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see 8.OIL (BBL) 9. (BBL) (MCF) (BBL) (BBL) (MCF) instruct.) Code instruct) instruct.) G-145 50-733-20146-00-00 2 520550 131 14212 0 3,318 0 0 102,844 G -18S 50-733-20160-90-00 2 520550 1 31 170 0 0 290 0 0 8,984 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: Date: 9/23/2013 TOTAL 0 0 111,829 C. �6...;,;_A ... ;-4. Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE �U�••^• ••• ��r•••^••� STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION l 1� J�y r i J��� �:T��Z�I� rL��l�►��'l�li�� 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, Hemlock Month and Year: JULY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field S Pool Code 5. Method (see Instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11 OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) G-Ot ROLH 50-733-20037-01-00 1 520120 5 23 66149 128 74 3,421 2,951 1,707 G-02RD 50-733-20038-01-00 1 520120 2 16 101 161 168 76 2,569 2,694 1,221 G-03RD2 H 50-733-20049-01-00 1 520120 8 0 0 0 0 0 0 0 0 G-04RD H 50-733-20050-01-00 1 520120 8 0 0 0 0 0 0 0 0 G-06RDL 50-733-20073-01-00 1 520120 8 1 0 1,300 0 0 0 0 0 0 G-08RDL 50-733-20085-01-00 1 520120 8 0 1,150 0 0 10 0 10 0 G-10RD 50-733-20094-01-00 1 520120 8 0 0 0 0 0 0 0 0 G-13 50-733-20127-00-00 1 520120 8 0 620 0 0 0 0 0 0 G-07 H 50-733-20130-00-00 1 520120 2 31 142 41 28 19 1,276 857 598 G-15RD 50-733.20149.01-00 1 520120 8 0 1,293 0 0 0 0 0 0 G-17RD H 50-733-20151-01-00 1 520120 2 15 86 19 7 9 287 98 138 G -30L 50-733-20187-00-00 1 520120 8 0 199 0 0 0 0 0 0 G -31L 50-733-20194-00-00 1 520120 1 1 22 72913 16 1 55 345 22 G-34RDL 50-733-20213-01-00 1 520120 8 0 1,346 0 0 10 10 10 0 G-20 50-733-20261-00-00 1 520120 2 31 223 127 68 50 3,932 2,113 1,875 G-25 50-733-20288-00-00 1 520120 8 0 111 0 0 0 0 10 0 G-26RD 50-733-20295-01-00 1 520120 8 0 610 0 0 0 0 D 0 G-28RO 50-733-20324-01-00 1 520120 5 31 85 360 237 171 11,150 17,341 5,287 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Title: Date: Project Coordinator 9/232013 14. TOTAL 22,691 16,398 10,848 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Month and Year: HILCORP ALASKA, LLC Foreland JULY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code S. Method (see instruct.) 6. Days in Oper. 7. Avg, FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER (BBL) (BBL) 10. GAS (MCF) 11.OIL 12. WATER (BBL) (BBL) 13. GAS (MCF) G-32 W 50-733-20198-00-00 1 520190 2 31 91 105 6350 3,268 1,957 1,551 G33L 50-733-20212-00-00 1 520190 2 31 10486 35 40 2,651 1,080 1,250 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: Date: 9/232013 TOTAL 5,919 3,037 2,802 Form 10405 Rev. 042006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC G -Zone JULY 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code instruct.) inslrucL) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) K-01 RD2 G 50-733-20054-01-00 1 520150 5 31 33 131 2 81 4,067 59 2,502 K-12RD2 G 50-733-20156-02-00 1 520150 5 31 82 5 6 12 148 175 357 K-25 G 50-733-20180-01-00 1 520150 8 0 25 0 0 0 0 0 0 K-30 G 50-733-20211-00-00 1 520150 5 31 52 12 12 3 360 379 79 K-18ROG 50-733-2025401-00 7 520150 4 1 31 0,6 13 12 182 409 387 I hereby certify that the foregoing is true and correct to the best of my knovAedge. 14. Printed Name: Linda Trahan Title: Project Coordinator �C Signature: Date: 9!23/2013 TOTAL 4,757 1,021 3,325 Form 10-405 Rev. 0412005 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator. Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year. HILCORP ALASKA, LLC GGS JULY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Melhod (see instruct.) 6. Days In Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER 1 (BBL) 10. GAS 1 (MCF) 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) K-05 50-733-20092-00-00 2 520550 8 10 10 10 10 I hereby certify that the foregoing Is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Tire: Project Coordinator Signature: Date: 9/2372013 TOTAL 0 0 0 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Hemlock Month and Year: JULY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION prig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) K-01RD2 H 50-733-20054-01-00 1 520120 5 31 33 33 8 20 1,017 234 625 K-26RD 50-733-20097-04-00 1 520120 4 31 70 73 34 18 2,260 1,045 571 K-12RD2L 50-733-20156-02-00 1 520120 1 31 82 154 182 104 4,775 5,648 3,216 K-13RD2 50-733-20157-02-00 1 520120 5 31 85 388 330 207 12,042 10,233 6,404 K-25 H 60-733-20180-01-00 1 1 520120 8 1 0 26,0 0 0 0 0 0 K-30 H 50.733-20211-00-00 1 520120 5 3152 20 24 33 619 733 1,032 K-17 50-733-20248-00-00 1 520120 8 0 0 0 0 0 0 10 0 K-18RD H 50-733-20254-01-00 1 520120 4 31 013 6 5 78 175 166 K-19 H 50-733-20259-00.00 1 520120 1 5 1 311 26116; 117 149 5,217 3.638 14.619 1 hereby cattily that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Title: Date: Project Coordinator 9/23/2013 14. TOTAL 26,002 21,705 16,633 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland JULY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method 1 (see instruct.) 6. Days in Oper. 7. Avg. FTP prig (see instruct.) I DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 6. OIL (BBL) 9. WATER I (BBL) 10. GAS I (MCF) 11. OIL (BBL) 12. WATER (BBL) I 13. GAS (MCF) K-30 W 50-733-20211-00-00 1 520190 5 31 5315 14 1 1 146 1110 123 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: �� Date: 9/2 312 01 3 TOTAL 146 110 23 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, G- Zone Month and Year: JULY 2013 1. Well No. 2. AN No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see Instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER instruct.) (BBL) (BBL) TOTAL MONTHLY PRODUCTION 10. GAS (MCF) 11. OIL 12. WATER (BBL) (BBL) 13. GAS (MCF) M-25 G 50-733-20391-00-00 1 520150 8 0 0 0 0 0 0 0 0 M-28 G 50-733-20414-00-00 1 520150 1 31 80 24 8 3 746 260 106 M-29AG 50.733-20428-01-00 1 520150 1 31 0 76 68 70 2,345 2,111 2,160 M-31BG 50-733-20457-02-05 1 520150 5 31 118 78 86 47 2,430 2,658 1,444 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: �� Date: 9123/2013 TOTAL 5,521 5,028 3,711 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Subnut In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Sleelhead PF, McArthur River Field, GGS Month and Year: JULY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) M-01 50-733-20388-00-00 2 520550 1 31 48 0 0 827 0 0 25,641 M-02 50-733-20389-00-00 2 520550 1 31 39 0 0 1,369 0 10 42,454 M-13 50-733-20407-00-00 2 520550 1 31 135 0 0 1,817 0 5 56,335 M-14RD 50-733-20408-01-00 2 520550 1 31 46 0 0 1,304 0 0 40,409 M-03 50-733-20411-00-00 2 520550 1 31 53,0 D 2,881 0 9 89,309 M-05 50-733-20413-00-00 2 520550 1 28 135 0 0 127 0 10 765 M-04 50-733-20417-00-00 2 520550 1 30 145 0 0 1768 0 10 23,637 M-19RD 50-733-20421-01-00 2 520550 1 31 38 0 0 1,453 0 0 45,036 M-15 50-733-20422-00-00 2 520550 1 31 81 0 0 3,515 0 0 108,978 M-07 50-733-20435-00-00 2 520550 1 31 47 0 0 2,778 0 0 86,110 M-32RD 50-733-20462-01-00 2 520550 8 0 1,028 0 0 0 0 0 0 M-09 50-733-20476-00-00 2 520550 1 31 38 0 0 1,588 0 0 49,242 M-16RD 50-733.20480.01.00 2 520550 1 27 166 0 0 2,062 0 0 155,686 M-12 50-733-20505-00-00 2 520550 1 21 120 0 0 516 0 3 11o,828 M-17 50-733-20552-00-00 2 520550 1 26 131 0 D 732 0 3 19,024 M-18 50-733-20583-00-00 2 520550 1 31 143 0 0 2,919 0 0 90,482 M-06 50-733-20585-00-00 2 520550 1 31 129 0 0 1,008 0 1 31,236 M-20 50-733-20587-0000 2 520550 1 25 80 0 0 393 0 3 9,814 M-10 50-733-20588-00-00 2 520550 1 31 105 0 0 2,110 0 1 65,410 M-11 50-733-20590-00-00 2 520550 1 319 107 0 1 1,270 0 23 39,370 M-21 50-733-20598-00-00 2 520550 1 162 0 D 3 10 0 23 1 hereby certify that the foregoing Is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: 1*ibC Title: Date: Project Coordinator 9123/2013 14. TOTAL 0 58 869,789 Farm 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Sleelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock JULY 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS Instruct.) Code Instruct.) Instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) M-25 H 50-733-20391-00-00 1 520120 8 0 00 0 0 0 0 0 M-28 H 50.733-20414-00-00 1 520120 1 31 0 48 24 16 1,498 738 496 M-29AH 50-733-20428-01-00 1 520120 1 31 93176 158 162 5,453 4,908 5,023 M -31B H 60-733-20457-02-05 1 520120 5 31 118 314 343 186 9,720 10,631 5,778 I hereby certify that the foregoing is true and correct to the best of my knov ledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: Date: 9/1312013 TOTAL 16,671 16,278 11,297 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Sleelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland JULY 2013 1. wen No. 2. API No. 3. Type 4. Field 5. Methotl 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8.OIL 9. WATER 10. GAS 11.OfL 12. WATER 13. GAS 50-XXX-xxxxx-XX-XX (see & Pool (see psig (see instruct.) Code instruct.) instruct.) (BBL) IS (MCF) (BBL) (BBL) (MCF) M-25 W 50-733-20391-00-00 1 520190 8 0 0 0 0 0 ioi2 0 M-28 W 50-733-20414-00-00 1 520190 8 0 0 0 0 0 0 0 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: �C Date: 9/232013 TOTAL 0 0 0 Form 10405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Month and Year: HILCORP ALASKA, LLC Field, Hemlock JULY 2013 1. Well No. 2. API No. 50.XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 5. Method 8 Pool (see Code instruct.) 6. Days in Oper. 7. Avg. FTP prig (see Instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER (BBL) (BBL) 10, GAS (MCF) 11. OIL (BBL) 12. WATER 13. GAS (BBL) (MCF) 1171 A-15RD2 50-733-20105-02-00 1 520720 1 31 161 146 94 8 4,522 2,807 A-27RD 50-733-20246-01-00 1 520120 1 311 63 16 0 0 489 110 0 I hereby certify that the foregoing is true and correct to the best of my knovAedge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: Date: 92311013 TOTAL 5,010 2,917 171 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zone Month and Year: HILCORP ALASKA, LLC JULY 2013 1. Well No. 2, API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 5. Method &Pool (see Code instruct.) 6. Days In Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. 70TAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) G-16 G 50-733-20162.00-00 4 520150 6 31 2,900 2,900 2,500 2,483 231 0 7,167 0 G -23RD G 50-733-20269-01-00 4 520150 8 0 1,800 900 0 0 0 0 0 10 I hereby certify that the foregoing Is true and correct to the best of my knowledge. 15. Printed Name: Linda Tmhan Title: Project Coordinator Signature: � Date: 9/2312013 TOTAL 0 7,167 0 Form 10A06 Rev. 0212008 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, Hemlock Month and Year: JULY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct) 4. Field & Pool Code 5. Method (see instruct.) 6. DaysTUBING in Oper. PRESS. 7. MAX 8. AVG PSIG PSIG I CASING PRESS. 9. MAX PSIG 10. AVG PSIG DAILY AVG. INJ. 11. LIQUID 12. GAS (BBL) (MCF) TOTAL MONTHLY INJ. 13. LIQUID 14. GAS (BBL) (MCF) G-05RD H 50-733-20060-01-00 4 520120 6 31 3,200 3,200 420 257 7,054 0 218,685 0 G-09 50-733-20098-00-00 4 520120 6 31 1,950 1,933 1,950 1,098 2,557 0 79,256 0 G-11 50-733-20115-00-00 4 520120 6 31 2,150 2,143 2,150 2,130 1,411 0 43,734 0 G-12RD3 50-733-20116-03-00 4 520120 8 0 100 33 20 6 0 0 0 0 G-16 H 50-733-20162-00-00 4 520120 6 31 2,900 2,900 2,500 2,483 5,023 0 155,725 0 G-19 50-73320178-00-00 4 520120 22 0 0 0 0 0 0 0 0 G-14ARD H 50-733-20189-01-00 4 520120 6 31 3,000 3,000 220 29 597 0 18,506 0 G -23RD H 50-733-20269-01-00 4 520120 8 01 1,800 900 0 10 10 10 10 10 G-22 H 50-733-20272-00-00 4 1 520120 1 6 1 311 2,500 2,500 12.500 12,500 15,372 10 1166,540 10 I hereby certify that the foregoing Is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Q� Title: Project Coordinator Dale: 9/23/2013 15. TOTAL 0 682,446 0 Form 10406 Rev. 0272006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Foreland Month and Year: JULY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. I TOTAL MONTHLY INJ- 7, MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) G-14ARD W 50.733-20189-Dt-00 4 520190 6 31 280 280 220 29 4,574 0 141,790 0 G-36RD H 50-733-20216-01-00 4 520190 8 0 0 0 200 197 0 0 0 0 G -40S 50-733-20412-00-00 4 520190 8 0 400 400 380 377 0 0 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda T�rahaann Signature: Tille: Project Coordinator Dale: 9/23/2013 15. TOTAL 0 141,790 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Dolly Vanden PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC G -Zone JULY 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days7. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14, GAS instruct.) Code instruct.) PSIG I (BBL) (MCF) 1 (BBL) (MCF) D-09RD G 50-733-20131-01-00 4 520150 8 0 0 0 300 219 0 0 10 0 0-06RD G 50.733-20147-01-00 4 520150 6 31 3,300 3,276 890 750 4,159 0 128,914 0 D-46 G 50-733-20150-01-00 4 520150 6 31 3,450 3,406 530 445 340 0 10,527 0 D-24AG 50-733-20224-Ot-00 4 1 520150 6 31 3,500 3,456 440 347 397 0 12,306 0 D-29RD G 50-733-20292-01 0 4 520150 6 31 3,300 3,292 920 652 592 0 18,353 0 1 hereby certify that the foregoing is true and correct to the hest of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator �C Signature: Date: 9/2312013 TOTAL 0 170,101 0 Form 10-406 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Hemlock Month and Year: JULY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field S Pool Code 5. Method (see instruct.) 6. Days in Oper- TUBING PRESS. 7. MAX 8. AVG PSIG PSIG CASING PRESS. 9. MAX PSIG 10. AVG PSIG DAILY AVG. INJ. 11. LIQUID 12. GAS (BBL) (MCF) TOTAL MONTHLY INJ. 13. LIQUID 14. GAS (BBL) (MCF) D-09RD H 50-733-20131-01-00 4 520120 8 0 350 261 300 219 0 0 0 0 D-45 H 50.733-20150-01-00 4 520120 6 31 3,450 3,408 530 445 415 0 12,866 0 D-15RD2H 50-733-20159-02-00 4 520120 6 31 3,200 3.100 3,250 3,224 363 0 11,242 0 0-14RD 50-733-20164-01-00 4 520120 6 31 3,350 3,331 500 398 2,775 0 86,016 0 D -24A H50-733-20224-01-00 4 520120 6 31 3,500 3,450 440 347 1,586 0 49,226 0 D -34A H 50-733-20225-01-00 4 520120 8 0 0 0 700 612 0 10 0 0 D-29RD H 50-733-20292-01-00 4 1 520120 1 6 311 3,300 3,281 1920 1662 12,986 10 192,569 10 D-41 50-733-20331-00-00 4 520120 1 6 1 311 3,358 1700 1584 14,177 10 1129,472 10 I hereby certify that the foregoing is true and correct to the best of my knowledge - Printed Name: Linda Trahan Signature! �� Title: Project Coordinator Date: 9/132013 15. TOTAL 0 381,390 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator; Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC G -Zone JULY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see Instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. W. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) K-24RD2 G 50-733-20330-02-00 4 520150 8 01 010 1105 103 10 10 10 I hereby Certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Mile: Project Coordinator 15. Signature: Date: 9123/2013 TOTAL 0 D 0 Form 10.406 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Hemlock Month and Year: JULY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct.) 4. Field 5. Method 8 Pool (see Cade instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MON THLY INJ. 7. MAX PSIG 8. AVG PSIG 1 9. MAX PSIG 1 10. AVG 1 PSIG 11. LIQUID 1 (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) K-22 50.733.20271-00-004 520120 6 30 2,500 2,468 660 544 9,808 ll 294,233 0 K-24RD2 H 50-733-20330-02-00 4 520120 a 0 010 105 103 0 0 0 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: uz Date: 912312013 TOTAL 0 294,233 0 Form 10406 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE Submit in aupauare STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, MCAnhuf River Field, G- Month and Year: HILCORP ALASKA, LLC Zone JULY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct) 4. Field & Pool Code 5. Method (see insWct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY ]NJ, 7. MAX PSIG B. AVG PSI(3 9. MAX PSIG 10. AVG I PSIG 11. LIQUID I (BBL) 12. GAS (MCF) 13, LIQUID (BBL) 14. GAS (MCF) M -27G 50-733.20423.00-00 4 520150 6 311 2,5032,349 390293 1,137 0 35,247 0 M-30 G 50-733-2043MO.00 4 520150 8 31 2,530 2,435 900 725 794 0 24,625 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature:. �� Date: 92311013 TOTAL 0 59,872 0 Form 10-406 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock JULY 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. 7- MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. instruct.) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) M-27 H 50-733-20423-00-00 4 520120 6 31 2,503 2,349 390 293 2,653 0 82,243 0 M-30 H 50-733-20430-00-00 4 520120 6 31 2,530 2,435 900 725 10,210 0 316,502 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: s'OC Date: 9123/2013 TOTAL 0 398,745 0 Form 10-406 Rev. 0212006 INSTRUCTIONS QN RLVLKbt bot, STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, West Foreland Month and Year: JULY 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 5. Method & Pool (see Code instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. 1 TOTAL MONTHLY [NJ. 7, MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUIDi (BBL) 14. GAS (MCF) M-27 W 50-733-20423-00-00 4 520190 8 0 0 0 390 293 0 0 0 0 M-30 W 50-733-20430-00-00 4 520190 6 31 2,530 2,435 900 725 678 0 21,004 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: '�> 7 Date: 9/23/2013 TOTAL 0 21,004 0 Form 10-406 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE Submit in auplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator. Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Month and Year: HILCORP ALASKA, LLC Field, Hemlock JULY 2013 1. Weil No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. DaysrPMAXTUBING in Oper.. PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 8.AVGPSIG9.MAXPSIG SIG 10.AVG PSIG 11.LIQUID (BBL) 12.GAS (MCF) 13.LIQUID (BBL) 14.GAS (MCF) A-29RD 50-733-20245-01-00 4 520120 6 31 2,060 2,003 12,075 11,998 17,190 10 1222.884 10 I hereby certify that the foregoing is true and correct to the best of my knmiedge. 15. Printed Name: Linda Trahan Title: Project Coordinator 1222.884 Signature: ems, Date: 923/2013 TOTAL 0 0 Form 10-406 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT NET OIL SALES RECEIVED SEP 2 4 2013 A0GC r Hilcorp Alaska, LLC McArthur River Field AUGUST 2013 Name of Operator Regulatory Lease Month and Year of Production Total Wells 115 Total Wells Produced 72 Total Pipeline Runs 145,452 Closing Inventory 12,931 Opening Inventory 19,782 Other Adjustments 0 (direct or xylene recovered) Total Net Production 138,601 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signee:!!R,m. � ¢� 138,601 2,719,897 1,254,200 Linda Trahan TOTAL OIL WATER GAS Title Project Coordinator Date: 911 812 01 3 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, G -Zone Month and Year: AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) D-01 G 50-733-20068-00-00 1 520150 5 31 125 61 2,090 13 1,882 64,804 408 D-02ARD G 50-733-20069-02-00 1 1 520150 8 0 0 0 0 0 0 0 0 D-04RD 50-733-20089-01-00 1 520150 8 0 1,180 0 0 0 0 0 0 D-03RD2 50-733-20090-02-00 1 520150 2 31 158169 2 10 5,232 70 323 D-05RD 50-733-20100-01-00 1 520150 2 31 169136 136 15 1,122 4,204 1463 D-08RD G 50-733-20107-01-00 1 520150 8 0 1,245 0 0 0 0 0 0 D-12RD G 50-733-20142-01-00 1 520150 1 31 100 188 1,283 47 5,817 39,778 1,471 D-46 G 50-733-20165-01-00 1 520150 2 31 130 42 275 44 1,309 8,516 1,349 D47 G 50-733-20195-02-00 1 520150 8 0 103 0 0 0 0 0 0 D-30RD2 50-733-20208-02-00 1 520150 8 0 826 0 0 0 0 0 0 D-31RD 50-733-20215-01-00 1 520150 2 31 160 105 177 13 3,259 5,473 416 0-32 50-733-20220-00-00 1 520150 8 0 223 0 0 0 0 0 0 D-25RD G 50-733-20247-01-00 1 520150 1 1 31 86 12 1,087 15 1382 33,711 143 D-26RD 50-733-20260-01-00 1 520150 2 31 278 45 394 15 1,383 12,227 466 D-27 G 50-733-20274-00-00 1 520150 8 0 0 0 0 0 0 0 0 D-28 G 50-733-20287-00-00 1 520150 8 1 0 417 0 0 0 10 0 0 D43RD G 50-733-20373-01-00 1 1 1 520150 2 1 31 152 33 180 19 11,030 7569 1594 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Title: Date: Project Coordinator 9/18/2013 14. TOTAL 21,417 174,353 5,632 Form 10405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, GGS Month and Year: AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field &Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER I (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) D-18 50-733-20169-00-00 2 520550 8 1 0 11310 10 10 10 0 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda TTrraahan Title: Project Coordinator Signature: '"` Date: 9/18/2013 TOTAL 0 0 0 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Hemlock Month and Year: AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) D-01 H 50-733-20068-00-00 1 520120 5 31 121 141 8,339 31 4,379 258,519 949 D-02ARD H 50-733-20069-02-00 1 1 520120 8 0 0 0 0 0 0 0 0 D-08RD H 50-733-20107-01-00 1 520120 8 0 1,230 0 0 0 0 0 0 D-07RD2 50-733-20117-02-00 1 520120 2 31 176111 470 83 3,427 14,578 2,587 D-48 50-733-20132-01-00 1 520120 2 31 199122 387 98 686 11,983 3,034 D-11 50-733-20140-00-00 1 520120 8 0 121 0 0 0 0 0 0 D-12RD H 50-733-20142-01-00 1 520120 1 31 105 66 450 9 2,038 13,938 270 0-06RD H 50-733-20147-01-00 1 520120 8 0 0 0 0 0 0 0 0 D-46 H 50-733-20165-01-00 1 520120 8 0 0 0 0 0 0 0 0 D-17RO 50-733-20168-01-00 1 520120 2 31 294 24 1,028 126 729 31,870 3,908 D-47 H 50-733-20195-02-00 1 520120 8 0 108 0 0 0 0 0 0 0-20 50-733-20203-00-00 1 520120 8 0 0 0 0 0 0 0 0 D-42 50-733-20205-01-00 1 520120 8 0 510 0 0 0 0 0 D-25RD H 50-733-20247-01-00 1 520120 1 31 94 25 534 41 773 16,559 1,280 D-27 H 50-733-20274-00-00 1 520120 8 0 0 0 0 0 0 0 0 D-28 H 50-733-20287-00-00 1 520120 8 0 417 0 0 0 0 0 0 D-40RD 50-733-20318-01-00 1 1 1 520120 8 0 298 0 0 0 0 0 0 D -43RD H 50-733-20373-01-00 1 1 1 520120 2 31 154 33 179 19 1,028 5,554 592 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: "S�s'. Title: Date: Project Coordinator 9/18/2013 14. TOTAL 13,059 353,003 12,621 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zone Month and Year: AUGUST 2013 1. Well No. 2, API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) G-01 RD 50-733-20037-01-00 1 520150 5 9 12516 1,064 7 141 9,577 62 G-03RD2 G 50-733-20049-01-03 1 520150 8 0 0 0 0 0 0 0 0 G-06RDS 50-733-20073-01-00 1 520150 2 29 187 82 1,164 43 2,375 33,767 1,245 G-07 G 50-733-20130-00-00 1 520150 2 29 165 1 30 1 43 875 20 G-17RD G 50-733-20161-01-00 1 520150 2 241 6716 106 3 137 2,541 74 G-32 G 50-733-20198-00-00 1 520150 1 2 1 31 89 183 3,780 96 5,662 117,194 2,963 G -33S 50-733-20212-00-00 1 520150 8 0 1,251 0 10 10 10 10 10 G-21 RD 50-733-20267-01-00 1 520150 1 2 1 291 333106 1276 156 13,087 18,012 11,620 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: 'kc�K Title: Date: Project Coordinator 9/18/2013 14. TOTAL 11,445 171,966 5,984 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, GGS Month and Year: HILCORP ALASKA, LLC AUGUST 2013 1. Well No. 2.API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG, PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER I (BBL) 10. GAS 1 (MCF) 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) G -14S 50-733-20146-00-00 1 2 520550 1 1 1 301 172 0 0 3,205 0 0 96,154 G -18S 50-733-20160-90-00 2 520550 1 29 93 0 0 347 0 0 10,065 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: 'DK Date: 9/18/2013 TOTAL 0 0 106,220 Form 10405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, Hemlock Month and Year: AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) G-01RDLH 50-733-20037-01-00 1 520120 5 9 63 47 3,192 26 423 28,732 233 G-02RD 50-733-20038-01-00 1 1 520120 2 31 119158 5,286 83 4,911 163,861 2,570 G-03RD2 H 50-733-20049-01-00 1 520120 8 0 0 0 0 0 0 0 0 G-04RD H 50-733-20050-01-00 1 520120 8 0 1,493 0 0 0 0 0 0 G-06RDL 50-733-20073-01-00 1 520120 8 0 1,29510 0 0 0 0 0 G-08RDL 50-733-20085-01-00 1 520120 8 0 1,047 0 0 0 0 0 0 G-10RD 50-733-20094-01-00 1 520120 8 0 0 0 0 0 0 0 0 G-13 50-733-20127-00-00 1 520120 8 0 899 0 0 0 0 0 0 G-07 H 50-733-20130-00-00 1 520120 2 29 165 28 574 15 814 16,633 427 G-15RD 50-733-20149-01-00 1 1 520120 8 0 1,300 0 0 0 0 0 0 G-17RD H 50-733-20161-01-00 1 520120 2 24 68 13 140 7 303 3,368 162 G -30L 50-733-20187-00-00 1 520120 8 0 191 0 0 0 0 0 0 G-31 L 50-733-20194-00-00 1 520120 8 0 91710 0 0 10 0 0 G-34RDL 50-733-20213-01-00 1 520120 8 0 1,186 0 0 0 0 0 10 G-20 50-733-20261-00-00 1 520120 2 29 430156 2,327 82 4,512 67,487 12,371 G-25 50-733-20288-00-00 1 520120 8 0 119 0 0 0 0 0 12 G-26RD 50-733-20295-01-00 1 520120 8 0 613 0 0 0 0 0 0 G-28RD 50-733-20324-01-00 1 1 1 520120 5 31 84 418 7,192 219 12,954 222,944 16,781 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Title: Date: Project Coordinator 9/18/2013 14. TOTAL 23,916 503,026 12,543 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION •i:ri �-�i z•1.1R �•"IM40O :A -M 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Month and Year: HILCORP ALASKA, LLC Foreland AUGUST 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) 50-XXX-XXXXX-XX-XX (see instruct.) & Pool (see Code instruct.) psig (see instruct.) G-32 W 50-733-20198-00-00 1 520190 2 31 89 114 1,876 60 3,525 58,167 1,845 G -33L 50-733-20212-00-00 1 520190 2 29 23 3101 818 53 2,915 23,733 1,533 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: !S�s, Date: 9/18/2013 TOTAL 6,439 81,900 3,378 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, G -Zone Month and Year: AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) K-01 R02 G 50-733-20054-01-00 1 520150 5 31 55 164 56 70 5,087 1,738 2,174 K-12RD2 G 50-733-20156-02-00 1 520150 5 31 85 5 170 11 167 5,262 356 K-25 G 50-733-20180-01-00 1 520150 8 0 48 0 0 0 0 0 0 K-30 G 50-733-20211-00-00 1 520150 5 31 58 12 375 3 368 11,638 82 K-18RD G 50-733-20254-01-00 1 1 520150 4 311 016 401 13 201 12,428 394 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: !��= Title: Date: Project Coordinator 9/18/2013 14. TOTAL 5,823 31,066 3,005 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Suomit in aupi tate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC GGS AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) K-05 50-733-20092-00-00 2 520550 8 1 0 010 10 10 0 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: Date: 9/182013 TOTAL 0 0 0 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Hemlock Month and Year: AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) K-01 RD2H 50-733-20054-01-00 1 520120 5 31 5541 224 18 1,272 6,952 543 K-26RD 50-733-20097-04-00 1 520120 4 31 75 68 1,217 15 2,100 37,729 468 K-12RD21- 50-733-20156-02-00 1 520120 1 31 85 174 5,488 103 5,387 170,128 3,204 K-13RD2 50-733-20157-02-00 1 520120 5 31 85 411 10,065 210 12,747 312,020 6,512 K-25 H 50-733-20180-01-00 1 1 1 520120 8 0 28 0 0 0 0 0 0 K-30 H 50-733-20211-00-00 1 520120 5 31 58 20 727 34 633 22,525 1,066 K-17 50-733-20248-00-00 1 520120 8 0 0 0 0 0 0 0 0 K-18RD H 50-733-20254-01-00 1 520120 4 31 0 3 1172 5 86 5,326 169 K-19 H 50-733-20259-00-00 1 520120 5 31 28 186 113,563 151 5,755 110,467 4,685 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: ms�' Title: Date: Project Coordinator 9/18/2013 14. TOTAL 27,980 665,146 16,648 Form 10-405 Rev. 04/2006 INS I F<UU I IUNS UN KtvEKSE Siut -•• •• •• STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER (BBL) 10. GAS 1 (MCF) 11. OIL (BBL) 12. WATER 1 (BBL) 13. GAS (MCF) K-30 W 1 50-733-20211-00-00 1 520190 5 31 58 5 109 1 1150 13,379 123 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: Date: 9/18/2013 TOTAL 150 3,379 23 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, G- Zone Month and Year: AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER (BBL) (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) M-25 G 50-733-20391-00-00 1 520150 8 0 0 0 0 0 0 0 0 M-28 G 50-733-20414-00-00 1 1 520150 1 31 83 43 459 9 1,330 14,220 264 M-29AG 50-733-20428-01-00 1 520150 1 31 0 74 1,866 45 2,284 57,857 1,388 M-31BG 50-733-20457-02-05 1 520150 5 31 118 78 2,588 47 2,413 80,216 1,453 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: S?K Title: Date: Project Coordinator 9/18/2013 14. TOTAL 6,027 152,293 3,105 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, GGS Month and Year: AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY psig (see 8. OIL instruct.) (BBL) AVG. PRODUCTION 9. WATER 10. GAS (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) M-01 50-733-20388-00-00 2 520550 1 31 50 0 0 820 0 0 25,410 M-02 50-733-20389-00-00 2 520550 1 31 39 0 13 1,314 0 411 40,741 M-13 50-733-20407-00-00 2 520550 1 31 133 0 5 1,801 0 154 55,832 M-14RD 50-733-20408-01-00 2 520550 1 31 44 0 1 1,336 0 29 41,401 M-03 50-733-20411-00-00 2 520550 1 31 5210 8 2,893 0 252 89,693 M-05 50-733-20413-00-00 2 520550 1 20 119 0 0 1,429 0 0 28,576 M-04 50-733-20417-00-00 2 520550 1 25 127 0 0 3,123 0 0 78,087 M-19RD 50-733-20421-01-00 2 520550 1 31 36 0 0 1,441 0 7 44,683 M-15 50-733-20422-00-00 2 520550 1 31 70 0 0 3,811 0 6 118,132 M-07 50-733-20435-00-00 2 520550 1 31 59 0 0 2,746 0 0 85,140 M-32RD 50-733-20462-01-00 2 520550 8 0 1,240 0 0 0 0 0 0 M-09 50-733-20476-00-00 2 520550 1 31 42 0 0 1,452 0 0 45,009 M-16RD 50-733-20480-01-00 2 520550 1 31 13810 0 2,596 0 0 80,464 M-12 50-733-20505-00-00 2 520550 1 31 35 0 3 801 0 80 24,843 M-17 50-733-20552-00-00 2 520550 1 23 153 0 0 532 0 0 12,225 M-18 50-733-20583-00-00 2 1 520550 1 31 136 0 0 2,843 0 1 188,132 M-06 50-733-20585-00-00 2 520550 1 31 128 0 2 1,069 0 63 33,152 M-20 50-733-20587-00-00 2 520550 1 24 71 0 5 331 0 110 7,934 M-10 50-733-20588-00-00 2 520550 1 31 107 0 0 1,868 0 7 57,921 M-11 50-733-20590-00-00 2 520550 1 31 106 0 18 1,212 0 572 37,566 M-21 50-733-20598-00-00 2 520550 1 1 191 14010 10 14,172 10 0 79,270 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature:, Title: Date: Project Coordinator 9/18/2013 14. TOTAL 0 1,691 1,074,208 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Hemlock Month and Year: AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER 13. GAS (BBL) (MCF) M-25 H 50-733-20391-00-00 1 520120 8 0 0 0 0 0 0 0 0 M-28 H 50-733-20414-00-00 1 1 520120 1 31 0 86 1,300 40 2,659 40,289 1,228 M -29A H 50-733-20428-01-00 1 520120 1 31 93 172 4,355 104 5,330 135,001 3,238 M -31B H 50-733-20457-02-05 1 520120 5 31 118 311 10,350 187 9,652 320,863 5,811 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Title: Project Coordinator Date: 9/18/2013 14. TOTAL 17,641 496,154 10,277 Form 10405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 5. Method & Pool (see Code instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER (BBL) (BBL) 10. GAS (MCF) 11. OIL (BBL) 1 12. WATER 1 13. GAS (BBL) (MCF) M-25 W 50-733-20391-00-00 1 520190 1 8 1 01 0 0 0 0 10 0 10 M-28 W 50-733-20414-00-00 1 1 1 520190 1 8 01 0 0 0 0 10 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature: ��� Date: 9/18/2013 TOTAL 0 0 0 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Month and Year: HILCORP ALASKA, LLC Field, Hemlock AUGUST 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see instruct.) Code instruct.) instruct.) (BBL) (BBL) I (MCF) (BBL) (BBL) (MCF) A-15RD2 50-733-20105-02-00 1 520120 1 31 188 150 2,770 9 4,635 85,882 1271 A-27RD 50-733-20246-01-00 1 1 1 520120 1 1 291 6512 11 110 68 38 1287 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature: ��� Date: 9/18/2013 TOTAL 4,703 85,921 557 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zone Month and Year: HILCORP ALASKA, LLC AUGUST 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days RESS. TUBING P CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. instruct.) Code instruct.) PSIG I PSIG (BBL) I (MCF) (BBL) (MCF) G-16 G 50-733-20162-00-00 4 520150 1 6 1 301 2,900 2,086 12,500 12,222 1214 10 6,416 0 G -23RD G 50-733-20269-01-00 4 1 520150 1 8 1 01 010 10 10 10 10 0 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 15. Signature: Date: 9/182013 TOTAL 0 6,416 0 orm 10-406 Rev. 02i2(m INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, Hemlock Month and Year: AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. TUBING PRESS. 7. MAX 8. AVG PSIG PSIG CASING PRESS. 9. MAX PSIG 10. AVG PSIG DAILY AVG. INJ. 11. LIQUID 12. GAS (BBL) (MCF) TOTAL MONTHLY INJ. 13. LIQUID 14. GAS (BBL) (MCF) G-05RD H 50-733-20060-01-00 4 520120 6 31 3,200 2,314 600 385 5,786 0 179,380 0 G-09 50-733-20098-00-00 4 520120 6 31 1,950 1,221 1,950 1,722 2,154 0 66,761 0 G-11 50-733-20115-00-00 4 520120 6 31 2,150 1,310 2,150 1,886 1,370 0 42,471 0 G-12RD3 50-733-20116-03-00 4 520120 8 0 0 0 0 0 0 0 0 0 G-16 H 50-733-20162-00-00 1 4 520120 1 6 1 301 2,900 1,944 2,500 2,222 4,543 0 136,278 0 G-19 50-733-20178-00-00 4 520120 1 8 1 0 0 0 10 10 10 0 0 0 G-14ARD H 50-733-20189-01-00 4 520120 6 1 211 3,000 1,627 500 I 152 I 328 0 16,878 10 G -23RD H50-733-20269-01-00 4 520120 1 8 1 01 010 0 0 0 0 10 10 G-22 H 50-733-20272-00-00 4 520120 6 31 2,500 1,283 2,500 2,221 5,042 0 1156,315 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: AlhC- Title: Project Coordinator Date: 9/18/2013 5. TOTAL 0 588,082 0 umi 0-406 Rev. 02i2vu6 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25 439 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Foreland Month and Year: AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. TUBING PRESS. I CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) G-14ARD W 50-733-20189-01-00 4 520190 6 21 290 285 1500 1152 4,085 0 85,795 0 G-36RD H 50-733-20216-01-00 4 520190 8 0 010 1200 1195 0 0 0 0 G -40S 50-733-20412-0050 4 520190 8 0 400 400 360 360 0 0 0 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Title: Project Coordinator Date: 9/18/2013 5 TOTAL 0 85,795 0 ""' INS I RUC I IONS VN KtVtKSt SIUE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, G -Zone Month and Year: AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. in Oper. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS PSIG PSIG (BBL) (MCF) (BBL) (MCF) D-09RD G 50-733-20131-01-00 4 520150 8 0 0 0 300 275 0 0 0 0 D-06RD G 50-733-20147-01-00 4 1 520150 6 31 3,300 2,983 890 772 3,542 0 109,801 0 0-45 G 50-733-20150-01-00 4 520150 6 31 3,450 3,306 620 588 216 0 6,711 0 D-24AG 50-733-20224-01-00 4 520150 6 31 3,450 3,133 440 386 282 0 8,755 0 D-29RDG 50-733-20292-01-00 4 520150 1 6 31 3,300 3,125 580 447 509 0 15,771 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: t'^'1 Title: Project Coordinator Date: 9/18/2013 15. TOTAL 0 141,038 0 Form 10-405 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Vanden PF, McArthur River Field, Hemlock Month and Year: AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. TUBING PRESS. 7. MAX 8. AVG PSIG PSIG CASING PRESS. 9. MAX PSIG 10. AVG PSIG DAILY AVG. INJ. 11. LIQUID 12. GAS (BBL) (MCF) TOTAL MONTHLY INJ. 13. LIQUID 14. GAS (BBL) (MCF) D-09RD H 50-733-20131-01-00 4 520120 8 0 350 321 300 275 0 0 0 0 D45 50-733-20150-01-00 4 520120 6 31 3,450 3,196 620 588 262 0 8,131 0 D-15RD2 H 50-733-20159-02-00 4 520120 6 31 3,200 3,028 3,250 3,080 306 0 9,473 0 D-14RD 50-733-20164-01-00 4 520120 6 31 3,375 3,096 690 449 1,888 0 58,538 0 D -24A H 50-733-20224-01-00 4 520120 6 31 3,450 3,105 440 386 1,120 0 34,715 0 D -34A H 50-733-20225-01-00 4 520120 1 8 01 010 560 1 517 0 0 10 0 D-29RD H 1 50-733-20292-01-00 4 520120 1 6 311 3,300 2,967 580 11 12,297 10 171,216 0 D41 1 50-733-20331-00-00 1 4 520120 1 6 1 311 3,375 3,094 1700 1582 13,280 10 1101,680 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: lt:-K Title: Project Coordinator Date: 9/18/2013 15. TOTAL 0 283,753 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC G -Zone AUGUST 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days I TUBING PRESS. I CASING PRESS. DAILY AVG. INJ. I TOTAL MONTHLY INJ. F7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. PSIG PSIG (BBL) (MCF) (BBL) 1 (MCF) instruct.) Code instruct.) K-24RD2 G 50-733-20330-02-00 1 4 520150 1 8 01 010 105 96 0 0 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: R�kg Date: 9/18/2013 TOTAL 0 0 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON KtvtKSE SIDE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Op,,. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) K-22 50-733-20271-00-00 4 520120 6 0 2,525 2,308 950 475 0 0 0 0 K-24RD2 H 50-733-20330-02-00 4 1 520120 8 0 0 0 105 96 0 0 0 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Li�nddca�Tcraahan Title: Project Coordinator Signature: Date: 9/18/2013 TOTAL 0 0 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, G- Month and Year: HILCORP ALASKA, LLC Zone AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. TUBING PRESS.I CASING PRESS. I DAILY AVG. INJ. I TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX 'b](31 10. AVG I PSIG 11. LIQUID I (BBL) 12. GAS 1 (MCF) 13. LIQUID (BBL) 14. GAS (MCF) M -27G 50-733-20423-00-00 4 520150 1 6 1 241 2,636 1,767 1,130 635 1,115 0 26,751 0 M -30G 50-733-20430-00-00 4 520150 6 31 2,863 2,495 1,150 1,006 689 0 21,345 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: Dale: 9/18/2013 TOTAL 0 48,096 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock AUGUST 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 1 10. AVG I PSIG 11. LIQUID 1 (BBL) 12. GAS 1 (MCF) 13. LIQUID 1 (BBL) 14. GAS (MCF) M-27 H 50-733-20423-00-00 4 520120 6 24 2,636 1,835 1,130 635 12,721 065,299 0 M-30 H 50-733-20430-00-00 4 520120 6 31 2,863 2,495 1,150 1,006 8,850 0 274,348 0 1 hereby cerliy that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: ~� Date: 9/18/2013 TOTAL 0 339,647 0 Form 10-406 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, West Foreland Month and Year: AUGUST 2013 1. Well No. 2.API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 18.AVGPSIG19.MAXPSIG1 10. AVG PSIG 11. LIQUID (BBL) 12. GAS 1 (MCF) 13. LIQUID 1 (BBL) 14. GAS (MCF) M-27 W 50-733-20423-00-00 4 520190 8 21010 0 0 1,130 635 0 0 0 0 M-30 W 50-733-20430-00-00 4 520190 6 31 2,863 2,484 1,150 1,006 587 0 18,206 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: Date: 9/18/2013 TOTAL 0 18,206 0 Form 10406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 enc 95 432 Name of Operator: Field and Pool: Trading Bay Unit TRU - MRF Mon opod, McArthur River Month and Year: HILCORP ALASKA, LLC Field, Hemlock AUGUST 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days I TUBING PRESS. CASING PRESS. PSIG 9. MAX PSIG 10. AVG DAILY AVG. INJ. 11. LIQUID 12. GAS TOTAL MONTHLY INJ. 13. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see &Pool (see in Oper. 7. MAX 8. AVG PSIG PSIG (BBL) (MCF) (BBL) (MCF) instruct.) Code instruct.) A-29RD 50-733-20245-01-00 1 4 520120 6 1 311 2,075 2,030 12,075 12,065 17,307 10 1226,519 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: LindaaTrraahhan Title: Project Coordinator Signature: -QK an Dale: 9/18/2013 TOTAL 0 226,519 0 Suhmit in duplicate Form 10-406 Rev. 02/2006 n i nus. i iONS ON nw=no= ��� STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT NET OIL SALES Hilcorp Alaska, LLC McArthur River Field SEPTEMBER 2013 Name of Operator Regulatory Lease Month and Year of Production Total Wells 116 Total Wells Produced 73 Total Pipeline Runs 131,277 Closing Inventory 22,215 Opening Inventory 12,931 Other Adjustments 0 (direct or xylene recovered) Total Net Production 140,561 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Linda D Trahan TOTAL Title Production Project Coordinator Date: 10/17/2013 [0111 140,561 2,684,229 1,333,759 WATER GAS STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and G -Zone Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: SEPTEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP prig (see instruct.) DAILY 8. OIL (BBL) AVG. PRODUCTION 9. WATER 10. GAS (BBL) (MCF) TOTAL MONTHLY 11. OIL (BBL) PRODUCTION 12. WATER 1 13. GAS (BBL) (MCF) D-01 G 50-733-20068-00-00 1 520150 5 30 130 69 1,991 27 2,070 59,740 816 D-02ARD G 50-733-20069-02-00 1 520150 8 0 0 0 0 0 0 0 0 D-04RD 50-733-20089-01-00 1 520150 2 2 1,1481 17 7 2 34 14 D-03RD2 50-733-20090-02-00 1 520150 2 30 171 102 1 78 3,054 32 2,333 D-05RD 50-733-20100-01-00 1 520150 2 30 195 56 149 93 11,681 4,482 2,775 D-08RDG 50-733-20107-01-00 1 520150 2 4 1,2731 4 9 4 16 34 D-12RD G 50-733-20142-01-00 1 520150 1 30 110 166 1,312 76 4,970 39,372 2,267 D-46 G 50-733-20165-01-00 1 520150 2 30 0 43 246 53 1,288 7,369 11,579 D-47 G 50-733-20195-02-00 1 520150 8 0 64 0 0 0 0 0 0 D-30RD2 50-733-20208-02-00 1 520150 8 0 974 0 0 0 0 0 0 D-31RD 50-733-20215-01-00 1 520150 2 30 183128 191 207 3,846 5,737 6,210 D-32 50-733-20220-00-00 1 520150 8 0 505 0 0 0 0 0 0 D-25RDG 50-733-20247-01-00 1 520150 1 17 97 10 889 4 1178 15,112 66 D-26RD 50-733-20260-01-00 1 520150 2 28 322 50 405 43 1,401 11,327 1,204 D-27 G 50-733-20274-00-00 1 520150 8 0 0 0 0 0 0 20 D-28 G 50-733-20287-00-00 1 520150 8 0 83810 10 0 0 0 15 D -43RD G 50-733-20373-01-00 1 520150 2 30 161139 1210 13 1,160 16,308 1397 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Title: Date: Project Coordinator 10/9/2013 14. TOTAL 19,654 149,529 17.696 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC GGS SEPTEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 8& Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) I DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION U. OIL (BBL) 9. WATER (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) D-18 50-733-20169-00-00 2 520550 8 0 1,12710 10 10 10 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: 'gKiz Date: 10/9/2013 TOTAL 0 0 0 Form 10405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Hemlock Month and Year: SEPTEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) D-01 H 50-733-20068-00-00 1 520120 5 30 130 161 7,965 63 4,830 238,961 1,904 D-02ARD H 50-733-20069-02-00 1 520120 8 0 0 0 0 0 0 0 0 D-08RD H 50-733-20107-01-00 1 520120 2 5 1,273 1 4 8 5 19 40 D-07RD2 50-733-20117-02-00 1 520120 2 30 173 109 480 113 3,270 14,408 3,378 D48 50-733-20132-01-00 1 520120 2 30 168 48 336 104 11,432 10,074 3,132 D-11 50-733-20140-00-00 1 520120 8 0 115 0 0 0 0 0 0 D-12RD H 50-733-20142-01-00 1 520120 1 30 110 58 461 14 1,746 13,834 418 D-06RD H 50-733-20147-01-00 1 520120 8 0 0 0 0 0 0 0 0 046 H 50-733-20165-01-00 1 520120 8 0 0 0 0 0 0 0 0 D-17RD 50-733-20168-01-00 1 520120 2 30 308 25 998 182 757 29,946 5,470 D47 H 50-733-20195-02-00 1 520120 8 0 63 0 0 0 0 0 0 0-20 50-733-20203-00-00 1 520120 8 0 0 0 0 0 0 0 0 D-42 50-733-20205-01-00 1 520120 8 0 0 0 0 0 0 0 0 D-25RD H 50-733-20247-01-00 1 520120 1 17 97 21 438 35 1361 17,443 598 D-27 H 50-733-20274-00-00 1 520120 8 0 0 0 10 0 0 0 0 D-28 H 50-733-20287-00-00 1 520120 8 0 838 0 0 0 0 0 0 D40RD 50-733-20318-01-00 1 520120 8 0 0 0 0 0 0 0 0 D43RD H 50-733-20373-01-00 1 520120 2 30 161 39 1210 13 1,160 6,308 1397 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: �� Title: Date: Project Coordinator 10/9/2013 14. TOTAL 13,562 320,992 15,337 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zone Month and Year: SEPTEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 8 Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION I psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) G-01 RD 50-733-20037-01-00 1 520150 5 30 11517 1,200 7 517 36,007 212 G-03RO2 G 50-733-20049-01-03 1 520150 1 3 0 19 570 9 56 1,710 27 G-06RDS 50-733-20073-01-00 1 520150 2 30 91 93 1,132 46 2,805 33,955 1,367 G-07 G 50-733-20130-00-00 1 520150 2 30 126 2 31 1 54 931 24 G-17RD G 50-733-20161-01-00 1 520150 8 0 910 0 0 0 0 0 G-14ARD G 50-733-20189-01-00 1 520150 5 22 82 0 227 0 0 4,990 0 G-32 G 50-733-20198-00-00 1 520150 2 30 94 177 13,550 86 15,323 106,494 2,587 G -33S 50-733-20212-00-00 1 520150 8 0 1,255 0 0 0 10 0 0 G-21RD 50-733-20267-01-00 1 520150 2 30 101 138 344 67 14,152 10,329 2,018 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Title: Date: Project Coordinator 10/9/2013 14. TOTAL 12,906 194,415 6,235 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, GGS Month and Year: HILCORP ALASKA, LLC SEPTEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP I DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS 50-XXX-XXXXX-XX-XX (see instruct.) & Pool (see Code instruct.) psig (see instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) G -14S 50-733-20146-00-00 2 520550 1 30 139 0 0 3,313 0 0 99,384 G -18S 50-733-20160-90-00 2 520550 1 30 16510 0 138 0 0 4,129 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: �— — Date: 10/9/2013 TOTAL 0 0 0..A. 103,512 4I.. A. —1;—+n Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, Hemlock Month and Year: SEPTEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) G-01RDLH 50-733-20037-01-00 1 520120 5 30 57 52 3,601 27 1,550 108,020 795 G-02RD 50-733-20038-01-00 1 520120 2 30 129 195 5,932 95 5,837 177,975 2,836 G-03RD2 H 50-733-20049-01-00 1 520120 8 0 0 0 0 0 0 0 0 G-04RD H 50-733-20050-01-00 1 520120 8 0 1,483 0 0 0 0 0 0 G-06RDL 50-733-20073-01-00 1 520120 8 0 1,242 0 0 0 0 0 0 G-08RDL 50-733-20085-01-00 1 520120 8 0 989 0 0 0 0 0 0 G-10RD 50-733-20094-01-00 1 520120 8 0 15 0 0 0 0 0 0 G-13 50-733-20127-00-00 1 520120 8 0 1,246 0 0 0 0 0 0 G-07 H 50-733-20130-00-00 1 520120 2 30 126 34 590 17 1,027 17,689 499 G-15RD 50-733-20149-01-00 1 520120 8 0 1,298 0 0 0 0 0 0 G-17RD H 50-733-20161-01-00 1 520120 8 0 9 0 0 0 0 0 0 G -30L 50-733-20187-00-00 1 520120 8 0 180 0 0 0 0 0 0 G-31 L 50-733-20194-00-00 1 520120 8 0 183 0 0 0 10 0 0 G-34RDL 50-733-20213-01-00 1 520120 8 0 466 0 0 0 0 0 0 G-20 50-733-20261-00-00 1 520120 2 30 235 208 2,537 101 6,228 76,106 3,026 G-25 50-733-20288-00-00 1 520120 8 0 119 0 0 0 0 0 0 G-26RD 50-733-20295-01-00 1 520120 8 0 617 0 0 0 0 100 G-28RD 50-733-20324-01-00 1 1 520120 5 30 87 454 7,831 221 13,614 234,929 6,619 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: 1�- Title: Date: Project Coordinator 10/9/2013 14. TOTAL 28,256 614,719 13,775 Form 10405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Month and Year: HILCORP ALASKA, LLC Foreland SEPTEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) instruct.) Code instruct.) instruct.) G-32 W 50-733-20198-00-00 1 520190 2 30 94 111 1,764 54 3,318 52,928 1,613 G -33L 50-733-20212-00-00 1 520190 2 30 117134 895 65 4,033 26,843 1,957 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: Date: 10/9/2013 TOTAL 7,351 79,771 3,570 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE UUMIL III STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC G -Zone SEPTEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) K-01 RD2G 50-733-20054-01-00 1 520150 5 30 55122 57 66 3,648 1,701 1,994 K-12RD2 G 50-733-20156-02-00 1 520150 5 30 79 5 164 11 161 4,905 316 K-25 G 50-733-20180-01-00 1 520150 8 0 50 0 0 0 0 0 0 K-30 G 50-733-20211-00-00 1 520150 5 30 54 11 328 3 339 9,836 87 K-18RD G 50-733-20254-01-00 1 1 520150 8 01 0 0 0 0 0 0 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: Date: 10/92013 TOTAL 4,148 16,442 2,398 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC GGS SEPTEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER I 10. GAS (BBL) (MCF) 11. OIL 1 (BBL) 12. WATER 1 (BBL) 13. GAS (MCF) K-05 50-733-20092-00-00 1 2 520550 8 0 010 0 0 0 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: Date: 10/9/2013 TOTAL 0 0 0 Form 10405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Hemlock Month and Year: SEPTEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) K-01 RD2H 50-733-2005401-00 1 520120 5 30 55 30 227 17 912 6,803 499 K-26RD 50-733-20097-04-00 1 520120 4 30 67 51 1,114 45 1,538 33,414 1,364 K-121RD21- 50-733-20156-02-00 1 520120 1 30 79 174 5,287 95 5,210 158,604 2,848 K-131RD2 50-733-20157-02-00 1 520120 5 30 84 313 10,071 186 9,398 302,121 5,592 K-25 H 50-733-20180-01-00 1 1 520120 1 8 1 01 50 0 0 0 0 0 0 K-30 H 50-733-20211-00-00 1 520120 1 5 1 3ol 54 19 635 38 582 19,038 1,136 K-17 50-733-20248-00-00 1 520120 1 8 1 01 0 0 0 0 0 0 0 K-18RD H 50-733-20254-01-00 1 520120 1 8 1 01 010 10 0 0 0 0 K-19 H 50-733-20259-00-00 1 1520120 1 5 1 301 30 337 13,245 143 10,096 197,347 14,296 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: �� Title: Date: Project Coordinator 10/9/2013 14. TOTAL 27,735 617,328 15,734 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland SEPTEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER 13. GAS (BBL) (MCF) K-30 W 50-733-20211-00-00 1 1 520190 5 30 54 5 95 1 1138 12.856 125 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator 14. Signature: Dale: 10/9/2013 TOTAL 138 2,856 25 Form 10405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Sleelhead PF, McArthur River Field, G- Zone Month and Year: SEPTEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field &Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10. GAS (BBL) (BBL) (MCF) 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) M-25 G 50-733-20391-00-00 1 520150 8 0 0 0 0 0 0 0 0 M-28 G 50-733-20414-00-00 1 520150 1 30 84 35 465 19 1,060 13,943 585 M-29AG 50-733-20428-01-00 1 520150 1 30 0 72 1,819 55 2,155 54,580 1,661 M-31BG 50-733-20457-02-05 1 520150 5 30 116 82 2,555 50 2,470 76,642 1,500 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda TTraah^an Title: Production Project Coordinator Signature: .9y1D Date: 10/17/2013 TOTAL 5,685 145,164 3,745 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON HtvtHSt Slut STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, GGS Month and Year: SEPTEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY psig (see 8. OIL instruct.) (BBL) AVG. PRODUCTION 9. WATER 10. GAS (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) M-01 50-733-20388-00-00 2 520550 1 30 26 0 0 866 0 0 25,986 M-02 50-733-20389-00-00 2 520550 1 30 29 0 14 1,354 0 429 40,631 M-13 50-733-20407-00-00 2 1 520550 1 30 107 0 7 1,865 0 200 55,944 M-14RD 50-733-20408-01-00 2 520550 1 30 37 0 0 1,382 0 13 41,458 M-03 50-733-20411-00-00 2 520550 1 30 51 0 10 3,001 0 288 190,032 M-05 50-733-20413-00-00 2 520550 1 30 107 0 0 1,602 0 0 148,066 M-04 50-733-20417-00-00 2 520550 1 30 92 0 0 3,695 0 0 110,850 M-19RD 50-733-20421-01-00 2 520550 1 30 25 0 0 1,396 0 9 41,890 M-15 50-733-20422-00-00 2 520550 1 30 73 0 0 3,685 0 0 110,557 M-07 50-733-20435-00-00 2 520550 1 30 45 0 0 2,922 0 0 87,671 M-32RD 50-733-20462-01-00 2 1 520550 8 0 794 0 0 0 0 0 0 M-09 50-733-20476-00-00 2 520550 1 30 24 0 0 1,443 0 0 43,276 M-16RD 50-733-20480-01-00 2 520550 1 30 129 0 0 2,618 0 0 78,554 M-12 50-733-20505-00-00 2 520550 1 30 38 0 2 525 0 47 115,741 M-17 50-733-20552-00-00 2 520550 1 12 460 0 0 132 0 4 1,587 M-18 50-733-20583-00-00 2 520550 1 30 112 0 0 2,935 0 2 88,060 M-06 50-733-20585-00-00 2 520550 1 30 111 0 4 999 0 105 29,973 M-20 50-733-20587-00-00 2 520550 1 30 62 0 2 619 0 51 18,566 M-10 50-733-20588-00-002 520550 1 30 71 0 1 2,147 0 32 64,421 M-11 50-733-20590-00-00 2 520550 1 1 1 301 105 0 11 1,153 0 331 34,590 M-21 50-733-20598-00-00 2 520550 1 30 131 0 0 3,662 0 1 109,870 1 hereby certify that the foregoing is true and correct to the best of my Printed Name: Linda aDDcTrrahan Signa knowledge. Title: Date: Production Project Coordinator 10/17/2013 14. TOTAL 0 1,512 1,137,724 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock SEPTEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field & Pool 5. Method (see 6. Days in Oper. 7. Avg. FTP psig (see DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) M-25 H 50-733-20391-00-00 1 520120 8 0 0 0 0 0 0 0 0 M-28 H 50-733-20414-00-00 1 520120 1 30 0 71 1,317 91 2,119 39,504 2,718 M-29AH 50-733-20428-01-00 1 520120 1 30 94 168 4,245 129 5,029 127,352 3,875 M -31B H 50-733-20457-02-05 1 520120 5 30 116 329 10,219 200 9,881 306,567 6,000 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: Rt< Date: 10/9/2013 TOTAL 17,029 473,424 12,593 Form 10405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland SEPTEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see 4. Field 5. Method & Pool (see 6. Days in Oper. 1 7. Avg. FTP psig (see DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) I (BBL) 1 (BBL) (MCF) M-25 W 50-733-20391-00-00 1 5201908 1 01 010 10 10 0 0 10 M-28 W 50-733-20414-00-00 1 1 520190 8 1 01 010 10 10 10 0 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: Date: 10/9/2013 TOTAL 0 0 0 Form 10405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT P8T.yk1*xi8) Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Field, Hemlock Month and Year: SEPTEMBER 2013 1. Well No. 2. API No. 50 -XX _)(X 3. Type (see instruct.) 4. Field 5. Method & Pool (see Code instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER (BBL) (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER 13. GAS (BBL) (MCF) A-15RD2 50-733-20105-02-00 1 1 520120 1 28 144144 2,430 37 4,038 68,046 1,046 A-27RD 50-733-20246-01-00 1 520120 1 30 77 2 1 12 59 33 370 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Project Coordinator Signature: k!!:< Date: 10/9/2013 TOTAL 4,097 68,078 1,416 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in uupncere STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zone Month and Year: HILCORP ALASKA, LLC SEPTEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. 7. MAX PSIG PSIG (BBL) (MCF) (BBL) (MCF) instruct.) Code instruct.) G-16 G 50-733-20162-00-00 4 520150 6 30 2,900 1,933 2,525 2,500 219 0 6,563 0 G -23RD G 50-733-20269-01-00 4 520150 8 0 0 0 0 0 0 0 0 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: LindaeTrrah�a-n Title: Project Coordinator Signature: v1 Date: 10/9/2013 TOTAL 0 6,563 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in uupIIWW STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, Hemlock Month and Year: SEPTEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. TUBING PRESS. 7. MAX 8. AVG PSIG PSIG CASING PRESS. 9. MAX PSIG 10. AVG PSIG DAILY AVG. INJ. 11. LIQUID 12. GAS (BBL) (MCF) TOTAL MONTHLY INJ. 13. LIQUID 14. GAS (BBL) (MCF) G-05RD H 50-733-20060-01-00 4 520120 6 30 3,200 3,200 305 293 7,456 0 223,668 0 G-09 50-733-20098-00-00 4 520120 6 30 1,950 1,950 1,950 1,950 2,692 0 80,762 0 G-11 50-733-20115-00-00 4 520120 6 30 2,150 2,150 2,150 2,112 66 0 1,974 0 G-12RD3 50-733-20116-03-00 4 520120 8 0 0 0 70 3 0 0 0 0 G-16 H 50-733-20162-00-00 4 520120 6 30 2,900 2,900 2,525 2,500 4,753 0 142,598 0 G-19 50-733-20178-00-00 4 520120 8 0 0 0 0 0 0 0 0 0 G-14ARD H 50-733-20189-01-00 4 520120 6 0 160 53 74 18 0 0 0 0 G -23RD H 50-733-20269-01-00 4 520120 8 0 0 0 0 0 0 0 0 0 G-22 H 50-733-20272-00-00 4 520120 6 29 2,500 2,500 2,450 12,344 5,025 10 145,721 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: %c< Title: Project Coordinator Date: 10/9/2013 15. TOTAL 0 594,723 io Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Foreland Month and Year: SEPTEMBER 2013 1. Well No. 2. API No. 3. Type 50-XXX-XXXXX-XX-XX (see instruct.) 4. Field 5. Method 6. Days & Pool (see in Oper. Code instruct.) TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSI' 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) G-14ARD W 50-733-20189-01-00 4 520190 6 0 280 113 74 18 0 0 0 0 G-36RD H 50-733-20216-01-00 4 520190 8 0 0 0 190 181 0 0 0 0 G -40S 50-733-20412-00-00 4 520190 8 0 0 0 360 359 0 0 0 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Project Coordinator Signature: Date: 10/9/2013 15. TOTAL 0 0 0 Form 10-406 Rev. 0212006 INSTRUCTIONS ON HEVtKSt SIUt STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC G -Zone SEPTEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. 7- MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. instruct.) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) D-09RD G 50-733-20131-01-00 4 520150 8 0 0 0 300 1298 0 0 0 0 D-06RD G 50-733-20147-01-00 4 520150 6 30 3,300 2,979 760 582 3,396 0 101,868 0 D45 G 50-733-20150-01-00 4 j 520150 6 30 3,050 2,981 650 484 260 0 7,797 0 D-24AG 50-733-20224-0200 4 520150 6 30 3,460 3,091 380 279 294 0 8,821 0 D-29RD G 50-733-20292-01-00 4 520150 6 30 3,320 2,992 400 1233 563 0 16,879 0 1 hereby certify that the foregoing is true and correct to thebest of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: gor, Date: 10/9/2013 TOTAL 0 135,365 0 A.Ii.nlia Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock SEPTEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. 7 MAX 8. AVG PSIG CASING PRESS. 9. MAX PSIG 10. AVG DAILY AVG. INJ. 11. LIQUID 12. GAS TOTAL MONTHLY INJ. 13. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. PSIG PSIG (BBL) (MCF) (BBL) 1 (MCF) instruct.) Code instruct.) D-09RD H 50-733-20131-01-00 4 520120 8 0 350 350 300 298 0 0 0 10 D-45 H 50-733-20150-01-00 4 520120 6 30 3,050 2,983 650 484 318 0 9,530 10 D-15RD2 H 50-733-20159-02-00 4 520120 6 30 3,050 3,013 3,200 3,058 307 0 9,224 10 D-14RD 50-733-20164-01-00 4 520120 6 30 3,400 3,061 420 324 2,160 0 64,800 0 D -24A H 50-733-20224-01-00 4 520120 6 30 3,460 3,091 380 279 1,176 0 35,284 0 D -34A H 50-733-20225-01-00 4 520120 8 0 010 500 445 0 0 0 0 D-29RD H 50-733-20292-Ot-00 4 520120 6 301 3,320 2,990 1400 1233 12,563 0 76,892 0 D-41 50-733-20331-00-00 4 520120 6 30 3,375 3,035 570 338 3,522 0 105,673 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: Date: 10/9/2013 TOTAL 0 301,403 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE 61UL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC G -Zone SEPTEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. I CASING PRESS. I DAILY AVG. INJ. I TOTAL MONTHLY INJ. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS 50 -)(XX -XX -XX (see &Pool (see in Oper. 7 MAX FG 8. PSIG (BBL) (MCF) (BBL) (MCF) instruct.) Code instruct.) K-24RD2 G 50-733-20330-02-00 4 520150 1 8 01 010 1100 92 10 0 0 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: Date: 10/9/2013 TOTAL 0 0 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE U.M.L 11. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Hemlock Month and Year: SEPTEMBER 2013 1. Well No. 2. API No. 50 -XXX -XX -XX -XX 3. Type (see instruct.) 4. Field &Pool Code 5. Method (see instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID 14. GAS (BBL) (MCF) K-22 50-733-20271-00-00 4 520120 6 30 2,510 2,350 440 209 9,379 0 281,356 0 K-24RD2 H 50-733-20330-02-00 4 520120 8 0 10 3 100 92 0 0 0 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: tM Date: 10/9/2013 TOTAL 0 281,356 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON KtVtRSt SIUL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, G- Zone Month and Year: SEPTEMBER 2013 1. Well No. 2. API N0. 3. Type 50-XXX-XXXXX-XX-XX (see instruct.) 4. Field 5. Method & Pool (see Code instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY Ni. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG I PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) M -27G 50-733-20423-00-00 4 520150 6 27 2,865 2,374 1,000 1509 11,712 10112 18 0 M-30 G 50-733-20430-00-00 4 520150 6 30 2,530 1,952 1,250 1,071 552 0 16,557 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: Date: 10/9/2013 TOTAL 0 62,775 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE z�uomn in oupucare STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock SEPTEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. I CASING PRESS. I DAILY AVG. INJ. TOTAL MONTHLY INJ. T MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. instruct.) Code instruct.) PSIG PSIG (BBL) I (MCF) (BBL) (MCF) M-27 H 50-733-20423-00-00 1 4 520120 6 27 2,865 12,373 1,000 509 13,994 10 107,842 10 M-30 H 50-733-20430-00-00 1 4 520120 6 30 2,E 11,071 17,093 10 212,802 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: �C Date: 10/9/2013 TOTAL 0 320,644 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland SEPTEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX 8, AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. PSIG PSIG (BBL) (MCF) (BBL) (MCF) instruct.) Code instruct.) M-27 W 50-733-20423-00-00 4 520190 8 0 0 0 1,000 509 0 0 0 0 M-30 W 50-733-20430-00-00 4 520190 6 30 2,530 1,952 1,250 1,071 471 0 14,122 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Project Coordinator Signature: Avzl Date: 10/9/2013 TOTAL 0 14,122 0 6,Fmi1 in dunlinnlu Form 10-406 Rev. 02/2006 INJ 1 KUU I IUNJ UN REVERSE JIUC STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Field, Hemlock Month and Year: SEPTEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Melhod (see instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. T MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) A-29RD 50-733-20245-01-00 4 520120 6 301 2,075 2,004 12,100 12,038 7,557 0 226,706 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Traah,a�n Title: Project Coordinator y Signature:s� Date: 10/9/2013 TOTAL 0 226,706 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in dupucate Hilcorp Alaska, LLC Name of operator Total Wells Total Wells Produced Total Pipeline Runs Closing Inventory Opening Inventory Other Adjustments (direct or xylene recovered) Net Production STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT NET OIL SALES McArthur River Field Regulatory Lease is 11 70 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed r `�.����� ✓ Linda D. Trahan Title Project Coordinator Date: 11/812013 OCTOBER 2013 Month and Year of Production 139,193 23,926 22,215 0 140,905 140,905 TOTAL OIL 2,740,770 1,387, WATER GAS STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading G -Zone Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.; 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct,; (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) D-01 G 50-733-20068-00-00 1 520150 5 31 121 75 1,962 15 2,324 60,809 456 D-02ARD G 50-733-20069-02-00 1 520150 8 0 0 0 0 0 0 0 0 D-04RD 50-733-20089-01-00 1 520150 _ 8 0 1,225 0 0 0 0 0 0 D-03RD2 50-733-20090-02-00 1 520150 2 31 117 91 4 39 2,823 129 1,205 D-05RD 50-733-20100-01-00 1 520150 _ 2 31 170 53 128 92 1,646 3,953 2,849 D-08RD G 50-733-20107-01-00 1 520150 _ 8 0 1,407 0 0 0 0 0 0 D-12RD G 50-733-20142-01-00 1 520150 1 31 106 189 1,403 64 5,856 43,487 1,981 D-46 G 50-733-20165-01-00 1 520150 2 31 143 41 233 62 1,265 7,214 1,917 D-47 G 50-733-20195-02-00 1 520150 8 0 0 0 0 0 0 0 0 D-30RD2 50-733-20208-02-00 1 520150 8 0 963 0 0 0 0 0 0 D-31RD 50-733-20215-01-00 1 520150 2 31 183 135 203 321 4,179 6,285 9,962 D-32 50-733-20220-00-00 1 520150 8 0 673 0 0 0 0 0 0 D-25RD G 50-733-20247-01-00 1 520150 8 0 133 0 0 0 0 0 10 D-26RD 50-733-20260-01-00 1 520150 2 _ 31 302 49 429 29 1,511 13,296 898 D-27 G 50-733-20274-00-00 1 520150 8 0 0 0 0 0 0 0 0 D-28 G 50-733-20287-00-00 1 520150 8 _ 0 0 0 10 0 0 0 0 D -43RD G 50-733-20373-01-00 1 520150 2 31 154 45 223 30 1,401 6,909 943 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Signature:: _ Title: Date: Project Coordinator 11/8/2013 14. TOTAL 21,005 142,081 20,211 Form 10405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC GGS OCTOBER 2013 1. Well No. 2. API No. 50 -XXX -)(XXX FType 4. Field 8 Pool Code 5. Methoc (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER (BBL) 10. GAS (MCF) 11.OIL (BBL) 12. WATER 13. GAS (BBL) (MCF) D-18 50-733-20169-00-00 2 520550 8 0 0 0 10 10 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Title: Project Coordinator 14. Signature: R'C—C Date: 11/8/2013 TOTAL 0 0 0 Form 10-405 Rev. 04/2006 INS T RUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Hemlock Month and Year: OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-)CX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) D-01 H 50-733-20068-00-00 1 520120 5 31 121 175 7,846 34 5,424 243,237 1,063 D-02ARD H 50-733-20069-02-00 1 520120 8 0 0 0 0 0 0 0 0 D-08RD H 50-733-20107-01-00 1 520120 8 _ 0 1,407 0 0 0 0 0 0 D-07RD2 50-733-20117-02-00 1 520120 2 31 193103 481 165 3,186 14,905 5,129 D-48 50-733-20132-01-00 1 520120 2 31 185 43 375 171 11,332 11,622 5,296 D-11 50-733-20140-00-00 1 520120 8 0 0 0 0 0 10 0 10 D-12RD H 50-733-20142-01-00 1 520120 1 31 106 66 493 12 12,057 15,279 1365 D-06RD H 50-733-20147-01-00 1 520120 8 0 0 0 0 0 0 0 10 D46 H 50-733-20165-01-00 1 520120 8 0 0 0 0 0 0 0 10 D-17RD 50-733-20168-01-00 1 520120 2 31 295 25 969 176 782 30,045 5,453 D-47 H 50-733-20195-02-00 1 520120 8 _ 0 0 0 0 0 0 0 0 D-20 50-733-20203-00-00 1 520120 8 0 0 0 0 0 0 0 0 D-42 50-733-20205-01-00 1 520120 8 0 0 0 0 0 0 0 0 D-25RD H 50-733-20247-01-00 1 520120 8 0 133 0 0 0 0 0 0 D-27 H 50-733-20274-00-00 1 520120 8 _ 0 0 0 0 0 0 0 D-28 H 50-733-20287-00-00 1 520120 8 _ _ 0 0 0 0 0 0 0 D-40RD 50-733-20318-01-00 1 520120 8 0 0 0 0 0 $1.401 0 0 D -43RD H 50-733-20373-01-00 1 520120 2 31 154 45 223 30 6,909 1943 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Signature: \. — Title: Date: Project Coordinator 11/8/2013 14. TOTAL 14,182 321,997 18,250 orm 10-405 Rev. 04/2006 INS RUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zone Month and Year: OCTOBER 2013 1. Well No. 2. API No.� 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.; 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10, GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) G-01 RD G 50-733-20037-01-00 1 520150 5 31 107 24 1,166 9 742 36,161 288 G-03RD2 G 50-733-20049-01-03 1 520150 8 0 0 0 0 0 0 0 0 G-06ROS 50-733-20073-01-00 1 520150 2 30 187 81 1,108 38 12,443 33,248 1,148 G-07 G 50-733-20130-00-00 1 520150 2 7 80 2 27 1 12 187 5 G-17RD G 50-733-20161-01-00 1 520150 2 14 54 5 118 3 75 1,651 37 G-14ARD G 50-733-20189-01-00 1 520150 5 _ 1 31 128 0 473 0 0 14,654 0 G-32 G 50-733-20198-00-00 1520150 2 31 90 180 3,684 85 5,572 114,208 2,627 G -33S 50-733-20212-00-00 1 520150 8 0 1,27910 10 0 0 0 0 G-21 RD 50-733-20267-01-00 1 520150 2 30 313 118 321 55 3,527 9,616 1,660 I hereby certify that the foregoing is true and correct to the best of my knowledge Printed Name: Linda D. Trahan Signature:` __ Title: Date: Project Coordinator 11/8/2013 14. TOTAL 12,370 209,725 5,765 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in aupiicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION (REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, GGS Month and Year: HILCORP ALASKA, LLC OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER (BBL) (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER 13. GAS (BBL) (MCF) G -14S 50 -733 -20146 -CO -00 2 520550 1 31 152 0 0 3,068 0 0 95,109 G -18S 50 -733 -20160 -SO -00 2 520550 1 31 96 0 10 208 0 0 16,454 1 hereby certify that the foregoing is true and correct to the best of my knovledge. 14. Printed Name: Linda D. Trahan Title: Project Coordinator Signature: �`��� _ Date: 11/8/2013 TOTAL 0 0 101,563 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLYPRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, Hemlock Month and Year: OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Methcd (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) G-01 RDH 50-733-20037-01-00 1 520120 5 31 10772 3,499 35 2,226 108,482 1,079 G-02RD 50-733-20038-01-00 1 520120 2 31 131 190 6,033 93 5,895 187,026 2,878 G-03RD2 H 50-733-20049-01-00 1 520120 8 0 0 0 0 0 0 0 0 G-04RD H 50-733-20050-01-00 1 520120 8 0 1,500 0 0 0 0 0 0 G-06RDL 50-733-20073-01-00 1 520120 8 0 1,290 0 0 0 0 0 0 G-08RDL 50-733-20085-01-00 1 520120 8 _ 0 964 0 0 0 10 0 0 G-10RD 50-733-20094-01-00 1 520120 8 0 15 0 0 0 0 0 0 G-13 50.733-20127-00-00 _ 1 520120 8 0 1,099 0 0 0 0 0 0 G-07 H 50-733-20130-00-00 1 520120 2 7 80 32 508 15 225 3,558 104 G-15RD 50-733-20149-01-00 1 520120 8 0 1,305 0 0 0 0 0 0 G-17RD H 50-733-20161-01-00 1 520120 2 14 54 12 156 6 165 2,188 81 G -30L 50-733-20187-00-00 1 520120 8 0 188 0 0 0 0 0 0 G-31 L 50-733-20194-00-00 1 520120 1 19 571 2 425 1 38 8,078 15 G-34RDL 50-733-20213-01-00 1 520120 8 0 654 0 0 10 10 10 0 G-20 50-733-20261-00-00 1 520120 2 26 377173 2,340 82 4,494 60,835 2,123 G-25 50-733-20288-00-00 1 520120 8 0 119 0 0 0 0 0 0 G-26RD 50-733-20295-01-00 1 520120 8 0 605 0 0 0 10 0 0 G-28RD 50-733-20324-01-00 1 520120 5 31 99 409 7,856 193 112,677 243,549 15,987 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Signature: � Title: Date: Project Coordinator 11/8/2013 14. TOTAL 25,720 613,717 12,268 Form 10405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Foreland Month and Year: OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 5. Method & Pool (see Code instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) G-32 W 50-733-20198-00-00 1 520190 2 31 - 91 112 11,831 122 3,473 56,762 1,638 G -33L 50-733-20212-00-00 1 520190 2 30 334131 843 59 3,918 25,288 11784 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda D. Trahan Title: Project Coordinator Signature: Date: 11/8/2013 TOTAL 7,391 82,050 3,422 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE submit in bupiicace STATE OF ALASKA ALASKA OIL AND CAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, G -Zone Month and Year: OCTOBER 2013 1. Well No. 2. API No. 50-XXXXX-XX-XX 3. Type (see instruct.) 4. Field &Pool Code 5. Method (sae instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10. GAS (BBL) (BBL) (MCF) 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) K-01 RD2G 50-733-20054-01-00 1 520150 5 31 63 106 60 78 3,284 1,854 2,430 K-12RD2 G 50-733-20156-02-00 1 520150 5 31 82 4 146 10 128 4,528 300 K-25 G 50-733-20180-01-00 1 520150 8 0 44 0 0 0 0 0 0 K-30 G 50-733-20211-00-00 1 520150 5 31 58 14 313 4 434 9,709 122 K-18RD G 50-733-20254-01-00 1 520150 8 01 0 0 10 0 10 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge Printed Name: Linda D. Trahan Signature: ��C Title: Project Coordinator _ Date: 111812013 14. TOTAL 3,846 16,091 2,852 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in aupiicare STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, GGS Month and Year: OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-.XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER I (BBL) 10. GAS 1 (MCF) 11. OIL 1 (BBL) 12. WATER (BBL) 13. GAS (MCF) K-05 1 50-733-20092-00-00 2 520550 8 0 0 0 0 0 0 10 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda D..Trahan Title: Project Coordinator Signature: a. _ Date: 11/8/2013 TOTAL 0 0 0 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Tradirg Bay Unit King Salmon PF, McArthur River Field, Hemlock Month and Year: OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) K-01 RD2H 50-733-2005401-00 1 520120 5 31 6326 239 20 821 7,418 607 K-26RD 50-733-20097-04-00 1 520120 4 31 78 54 1,167 34 1,661 36,178 1,047 K-12RD21- 50-733-20156-02-00 1 520120 1 31 82 134 4,722 87 4,139 146,391 2,598 K-13RD2 50-733-20157-02-00 1 520120 5 31 93 324 10,408 213 10,032 322,640 6,503 K-25 H 50-733-20180-01-00 1 1 520120 1 8 1 01 44 0 0 0 10 0 0 K-30 H 50-733-20211-00-00 1 1 520120 1 5 1 311 57124 606 51 1746 18,791 1,585 K-17 50-733-20248-00-00 1 520120 8 0 0 0 0 0 0 0 0 K-18RD H 50-733-20254-01-00 1 520120 8 0 0 0 0 0 0 0 0 K-19 H 50-733-20259-00-00 1 520120 _ 5 31 36 281 3,372 158 8,702 104,523 4,907 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Signature: Title: - Date: Project Coordinator 11/8/2013 14. TOTAL 26,101 635,940 17,447 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, West Foreland Month and Year: OCTOBER 2013 1. Well No.2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER (BBL) I 13. GAS (MCF) K-30 W 50-733-20211-00-00 1 520190 5 31 5716 91 1176 12,819 135 1 hereby certify that the foregoing is true and correct to the best of my knowledge. ^ Printed Name: Linda D. Trahan Title: Project Coordinator 4. Signature:_ �C�_ _ Date: 11/8/2013 TOTAL 176 2,819 35 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND CAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, G- Zone Month and Year: OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) M-25 G 50-733-20391-00-00 1 520150 8 0 0 0 0 0 0 0 0 M-28 G 50-733-20414-00-00 1 520150 1 31 84 33 384 23 1,009 11,893 724 M-29AG 50-733-20428-01-00 1 520150 _ 1 31 0 90 1,769 65 2,792 54,835 2,022 M-31BG 50-733-20457-02-05 1 520150 _ 5 31 11980 2,602 56 2,483 80,656 1,726 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Signature: ��` Title: Project Coordinator _ Date: 11/8/2013 14. TOTAL 6,284 147,384 4,471 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, GGS Month and Year. OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY psig (see 8. OIL instruct.) (BBL) AVG. PRODUCTION 9. WATER 10. GAS (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) M-01 50 -733 -20388 -CO -00 2 520550 1 31 24 0 0 865 0 0 26,800 M-02 50-733-20389-c0-00 2 520550 1 31 25 0 14 1,344 0 447 41,652 M-13 50 -733 -20407 -CO -00 2 520550 _ 1 31 95 0 6 2,035 0 186 63,077 M-14RO 50-733-20408-C1-00 2 520550 1 31 30 0 0 1,331 0 0 41,271 M-03 50 -733 -20411 -CO -00 2 520550 1 1 31 40 0 9 3,050 10 291 94,541 M-05 50 -733 -20413 -CO -00 2 520550 1 31 75 0 0 1,658 0 3 51,385 M-04 50 -733 -20417 -CO -00 2 520550 1 31 80 0 0 3,577 0 0 110,894 M-19RD 50-733-20421-01-00 2 520550 1 31 23 0 0 1,311 0 1 40,632 M-15 50-733-20422-00-00 2 520550 1 31 0 0 1 3,613 0 22 112,016 M-07 50-733-20435-00-00 2 520550 1 31 30 0 0 2,799 0 0 86,776 M-32RD 50-733-20462-01-00 2 520550 8 0 299 0 0 0 0 0 0 M-09 50-733-20476-00-00 2 520550 1 31 23 0 0 1,397 0 1 43,306 M-16RD 50-733-20480{1-00 2 520550 1 _ 31 124JO 1 2,583 10 16 80,064 M-12 50-733-20505-00-00 2 520550 1 31 22 0 13 689 0 96 21,369 M-17 50-733-20552-C•0-00 2 520550 1 3 644 0 1 0 0 3 0 M-18 50-733-20583-00-00 2 520550 1 31 100 0 0 2,995 0 1 92,849 M-06 50-733-20585-00-00 2 520550 1 31 94 0 4 1,011 0 110 31,344 M-20 50-733-20587-00-00 2 520550 1 31 49 0 2 680 0 54 21,078 M-10 50 -733 -20588 -CO -00 2 520550 1 _ 31 57 0 0 2,440 0 11 175,627 M-11 50-733-20590-00-00 2 5205501 31 102 0 10 1,119 0 324 34,683 M-21 50-733-20598-00-00 2 520550 1 31 125 0 0 13,300 10 11 1102,291 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Signature: �'v� Title: Date: Project Coordinator 11/8/2013 14. TOTAL 0 1,568 1,171,656 Form 10405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Tradirg Bay Unit Steelhead PF, McArthur River Field, Hemlock Month and Year: OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER (BBL) (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) M-25 H 50-733-20391-00-00 1 520120 8 0 0 0 0 0 0 0 0 M-28 H 50-733-20414-00-00 1 520120 _ 1 31 0 65 1,087 109 2,019 33,697 3,365 M -29A H 50-733-20428-01-00 1 520120 1 31 94 210 4,127 152 6,514 127,949 4,717 M -31B H 50-733-20457-02-05 1 520120 _ 5 _ 31 119 320 10,407 223 9,933 322,624 6,903 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Signature: `t2 , Title: Project Coordinator Date: 1118/2013 14. TOTAL 18,466 484,270 14,985 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland OCTOBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP I DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) M-25 W 50-733-20391-00-00 1 520190 8 21 210 0 0 0 0 0 M-28 W 50-733-20414-00-00 11 520190 1 8 _ 0 0 0 0 0 0 0 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda D. Trahan Title: Project Coordinator Signature: _ Date: 11/8/2013 TOTAL 0 0 0 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Field, Hemlock Month and Year: OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 5. Method & Pool (see Code instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER (BBL) (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) A-15RD2 50-733-20105-02-00 1 520120 1 31 213156 2,666 407 4,832 82,661 12,619 A-27RD 50-733-20246-01-00 1 520120 1 31 7317 15 73 530 467 12,248 1 hereby certify that the foregoing is true and correct to the best of my knowledge 14. Printed Name: Linda D. Trahan Title: Project Coordinator Signature: �` Date: 11/8/2013 TOTAL 5,362 83,128 14,867 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in cupucate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zone Month and Year: HILCORP ALASKA, LLC OCTOBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. 11%J.TOTAL MOM-HLY INJ. 7. MAX 8. AVG PSI G 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. instruct.) Code inslruct.j PSIG PSIG (BBL) (MCF) (BBL) (MCF) G-16 G 50-733-20162-00-00 4 520150 6 31 J 2,900 2,9002,500 2,471 221 0 6,847 0 G -23RD G 50-733-20269-01-00 4 520150 8 o 0 0 0 0 0 0 0 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda D. TT�rahan Title: Project Coordinator Signature: _ Date: 11/8/2013 TOTAL 0 6,847 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submil in STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, Hemlock Month and Year: OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS PSIG PSIG (BBL) (MCF) (BBL) (MCF) G-05RD H 50-733-20060-01-00 4 520120 6 31 3,200 3,200 280 234 7,391 10 229,120 10 G-09 50-733-20098-00-00 4 520120 6 31 1950, 1950, 1,950 1,917 1,946 10 60,325 0 G-11 50-733-20115-00-00 4 1 520120 6 1 31 2,150 2,150 2,150 2,128 2,922 10 90,581 0 G-12RD3 50-733-20116-03-00 4 520120 8 0 0 0 70 63 0 0 0 0 G-16 H 50-733-20162-00-00 4 520120 6 31 2,900 2,900 2,500 2,471 4,799 0 148,771 0 G-19 50-733-20178-00-00 4 520120 8 0 0 0 0 0 0 0 0 0 G -23RD H 50-733-20269-01-00 4 520120 8 j 0 0 0 0 0 0 0 0 0 G-22 H 50-733-20272-00-00 4 520120 6 30 2,500 2,500 2,500 2,459 5,589 0 167,683 0 G-29RD H 50-733-20374-01-00 4 520120 8 1 0 0 0 0 0 0 0 0 D I hereby certify that the foregoing is true and correct to the best of my ''Knowledge. Printed Name: Linda D. Trahan Signature: 'SOC' � _ Title: Project Coordinator Date: 11/8/2013 15. TOTAL 0 696,480 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS UN HEvERSt SIDE ^ •• ^ ��r••w•� STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Foreland Month and Year: OCTOBER 2013 1. Well No. 2. API No. 3. Type 50-XXX-XXXXX-XX-XX (see instruct.) 4. Field & Pool Code 5. Method 6. Days (see in Oper. instruct.) TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG FSIG I 9. MAX PSIG r 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) G-36RD H 50-733-20216-01-00 4 520190 8 0 0 0 175 166 0 0 0 0 G -40S 50-733-20412-00-00 4 520190 8 0 400 400 350 343 0 0 0 0 I hereby certify that the foregoing is true and co•rect to the best of my knowledge. 15. Printed Name: Linda D. Trahan Title: Project Coordinator Signature: . — Date: 11/8/2013 TOTAL 0 0 0 Form 10-406 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, G -Zone Month and Year: OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.; 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. in Oper. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS PSIG PSIG (BBL) (MCF) (BBL) (MCF) D-09RD G 50-733-20131-01-00 4 520150 8 0 0 0 600 355 0 0 0 0 D-06RD G 50-733-20147-01-00 4 520150 6 31 3,400 3,350 560 484 5,182 0 160,632 0 D-45 G 50-733-20150-01-00 4 520150 6 31 3,450 3,425 950 357 390 0 12,096 0 D -24A G 50-733-20224-01-00 6 31 3,500 3,483 240 215 406 0 12,575 0 D-29RD G 50-733-20292-01-00 __±_+520150 4 520150 6 31 3,330 3,313 160 108 688 0 121,335 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Signature: �` _ Title: Project Coordinator Date: 11/8Y[013 15. TOTAL 0 206,638 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Hemlock Month and Year: OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 8 Pool Code 5. Method (see instruct.) 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. in Oper. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS PSIG PSIG (BBL) (MCF) (BBL) (MCF) D-09RD H 50-733-20131-01-00 4 520120 8 0 350 333 600 355 0 0 0 0 D-45 H 50-733-20150-01-00 4 520120 6 31 3,450 3,425 950 357 477 0 14,783 0 D-15RD2 H 50-733-20159-02-00 4 520120 6 31 3,200 3,163 3,225 3,176 343 0 10,621 0 D-14RD 50-733-20164-01-00 4 520120 6 31 3,450 3,415 280 242 3,108 0 96,363 0 D -24A H 50-733-20224-01-00 4 520120 6 31 3,500 3,483 240 215 1,623 10 150,299 0 D -34A H 50-733-20225-01-00 4 520120 80 0 0 425 358 0 0 0 0 D-29RD H 50-733-20292-01-00 4 520120 6 31 3,330 3,313 160 108 3,135 0 97,194 0 D-41 50-733-20331-00-00 1 4 520120 6 1 31 3,400 3,380 250 195 4,626 10 1143,419 0 1 hereby certify that the foregoing is true and corect to the best of my knowledge. Printed Name: Linda D. Trahan Signature:` _ Title: Project Coordinator Date: 11/8/2013 15. TOTAL 0 412,679 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLYINJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, G -Zone Month and Year: OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. DaysTUBING in Oper. PRESS. III CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG I PSIG 11. LIQUID I (BBL) 12. GAS I (MCF) 13. LIQUID (BBL) 14. GAS (MCF) K-24RD2 G 50-733-20330-C2-00 4 520150 8 01 95 10 10 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda D. Trahan Title: Project Coordinator Signature: � AM Date: 11/8/2013 TOTAL 0 0 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 911 AAr. 9r A19 Name of Operator: Field and Pool: Tracing Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock OCTOBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. 7 MAX 8. AVG PSIG 9. MAX PSIG 10. AVG DAILY AVG. INJ. 11. LIQUID 12. GAS TOTAL MONTHLY INJ. 13. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. PSIG ?SIG (BBL) (MCF) (BBL) (MCF) instruct) Code instruct.; K-22 50-733-20271-00-00 4 520120 6 31 2,650 2,455 510 72 10,091 0 312,820 0 K-24RD2 H 50-733-20330-02-00 4 520120 8 0 1015 105 95 0 0 0 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda D. Trahan Tide: Project Coordinator Signature: —__ Date: 11/8/2013 TOTAL 0 312,820 0 Submit in duplicate Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, G- Month and Year: HILCORP ALASKA, LLC Zone OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX ,'(X -XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) M-27 G 50-733-20423-00-00 4 520150 6 31 3,553 3,056 550 452 2,701 0 122,729 0 M-30 G 50-733-20430-00-00 4 520150 6 31 2,867 2,495 1,250 1,054 972 0 30,124 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda D. Trahan Title: Project Coordinator A5sr—\ Signature: _ Date: 11/8/2013 TOTAL 0 113,853 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock OCTOBER 2013 1. Well No. 2. API No. 3. Type 50-XXX-XXXXX-XX-XX (see instruct.) 4. Field & Pool Code 5. Method 6. Days (see in Oper. instruct) TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. _ 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG I PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) M-27 H 50-733-20423-00-00 4 520120 6 31 3,553 2,943 550 452 6,302 0 195,367 0 M-30 H 50-733-20430-00-00 4 520120 6 31 2,867 2,497 1,250 1,054 12,490 0 387,182 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda D. Title: Project Coordinator ccTrra�ahan Signature: -�`d✓� Date: 11/8/2013 TOTAL 0 582,549 0 Form 10406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 5. Method & Pool (see Code instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY W. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) M-27 W 50-733-20423-00-00 1 4 520190 8 0 0 0 550 1452 0 0 0 0 M-30 W 50-733-20430-00-00 1 4 520190 6 31 2,867 2,497 1,250 11,054 829 0 25,694 0 I hereby certify that the foregoing is true end correct to the best of my knowledge. 15. Printed Name: LindaD�Tr-ahan Title: Project Coordinator Signature: Date: 11/8/2013 TOTAL 0 25,694 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION (MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Field, Hemlock Month and Year: OCTOBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. I TUBING PRESS. CASING PRESS. IDAILY AVG. INJ. TOTAL MONTHLY INJ. 7 . MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) A-29RD 50-733-20245-01-00 1 4 520120 6 1 301 2,050 2,033 12,400 12,184 18,040 10 241,195 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda D. Trahan Title: Project Coordinator Signature: �pC Date: 11/8/2013 TOTAL 0 241,195 0 c..v,...:t :.. dui ..li—te Form 10406 Rev. 0212006 INSTRUCTIONS UN REVERSE SIDE "•'•""'•. r""•'•" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT NET OIL SALES tctVt1vtu DEC 2 7 2013 AOGCC Hilcorp Alaska, LLC McArthur River Field NOVEMBER 2013 Name of Operator Regulatory Lease Month and Year of Production Total Wells 116 Total Wells Produced 73 Total Pipeline Runs 137,661 Closing Inventory 16,493 Opening Inventory 23,926 Other Adjustments 0 (direct or xylene recovered) Total Net Production 130,228 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed .N� \�oSt� 130,228 2,690,102 1,239, Linda D. Trahan TOTAL OIL WATER GAS Title Proiect Coordinator Date: 12/13/2013 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, G -Zone Month and Year: NOVEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) D-01 G 50-733-20068-00-00 1 520150 5 30 128 59 1,947 14 1,768 58,416 428 D-02ARD G 50-733-20069-02-00 1 520150 8 0 0 0 0 0 0 0 0 D-04RD 50-733-20089-01-00 1 520150 8 0 1,260 0 0 0 0 0 0 D-03RD2 50-733-20090-02-00 1 520150 2 30 125 96 5 25 2,880 163 742 D-05RD 50-733-20100-01-00 1 520150 2 30 146 53 132 58 1,594 3,961 1,745 0-08RD G 50-733-20107-01-00 1 520150 8 0 1,330 0 0 0 0 0 0 D-12RD G 50-733-20142-01-00 1 520150 1 30 103 160 1,471 42 4,808 44,127 1,268 D-46 G 50-733-20165-01-00 1 520150 2 30 0 39 1217 30 1,175 6,507 891 D -47G 50-733-20195-02-00 1 520150 5 19 113 90 2,797 29 1,707 53,143 556 D-30RD2 50-733-20208-02-00 1 1 520150 8 0 985 0 0 0 0 0 10 D-31RD 50-733-20215-01-00 1 520150 2 30 140112 172 40 3,357 5,170 1,199 D-32 50-733-20220-00-00 1 520150 8 0 700 0 0 0 0 0 0 D-25RD G 50-733-20247-01-00 1 520150 8 1 0 260 0 0 0 10 0 0 D-26RD 50-733-20260-01-00 1 520150 2 1 30 297 44 415 10 1,311 12,456 313 D-27 G 50-733-20274-00-00 1 520150 8 0 0 0 0 0 0 0 0 D -28G 50-733-20287-00-00 1 520150 8 0 1,045 0 0 0 0 0 0 D -43RD G 50-733-20373-01-00 1 520150 2 30 220 43 193 25 1,277 5,787 764 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Signature: �C Title: Date: Project Coordinator 12/13/2013 14. TOTAL 19,877 189,731 7,906 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC GGS NOVEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER I (BBL) 10. GAS 1 (MCF) 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) D-18 50-733-20169-00-00 2 520550 8 01 1 0 10 10 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda D. Trahan Title: Project Coordinator Signature: `�71 Date: 12/13/2013 TOTAL 0 0 0 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Hemlock Month and Year: NOVEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) D-01 H 50-733-20068-00-00 1 520120 5 30 131 138 7,789 33 4,126 233,665 999 D-02ARD H 50-733-20069-02-00 1 520120 8 0 0 0 0 0 0 0 0 D-08RD H 50-733-20107-01-00 1 520120 8 0 1,330 0 0 0 0 0 0 D-07RD2 50-733-20117-02-00 1 520120 2 30 167110 387 76 3,307 11,601 2,293 D-48 50-733-20132-01-00 1 520120 2 30 157 59 1311 40 1,778 9,315 1,215 D-11 50-733-20140-00-00 1 520120 8 0 0 0 0 0 0 0 0 D-12RD H 50-73320142-01-00 1 520120 1 30 103 56 517 8 1,689 15,504 234 D-06RD H 50-733-20147-01-00 1 520120 8 0 0 0 0 0 0 0 0 D46 H 50-733-20165-01-00 1 520120 8 0 0 0 0 0 0 0 0 D-17RD 50-733-20168-01-00 1 520120 2 30 278 20 928 123 606 27,852 3,686 D47 H 50-733-20195-02-00 1 520120 5 19 113 60 4,196 20 1,138 79,715 371 D-20 50-733-20203-00-00 1 520120 8 0 0 0 0 0 0 0 0 D42 50-733-20205-01-00 1 520120 8 0 0 0 10 0 0 0 0 D-25RD H 50-733-20247-01-00 1 520120 8 0 260 0 0 0 0 0 0 D-27 H 50-733-20274-00-00 1 520120 8 0 0 0 0 0 0 0 0 D-28 H 50-733-20287-00-00 1 520120 8 0 1,045 0 0 0 0 0 0 D40RD 50-733-20318-01-00 1 520120 8 0 0 0 0 0 0 0 10 D43RD H 50-733-20373-01-00 1 520120 2 30 220 43 193 25 1,277 5,787 1764 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Signature:y� Title: Date: Project Coordinator 12/13/2013 14. TOTAL 13,921 383,440 9,560 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, G -Zone Month and Year: NOVEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. W. TOTAL MONTHLY INJ. in Oper. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS PSIG PSIG (BBL) (MCF) (BBL) (MCF) D-09RD G 50-733-20131-01-00 4 520150 8 0 0 0 600 150 0 0 0 0 D-06RD G 50-733-20147-01-00 4 520150 6 30 3,400 3,350 560 435 3,561 0 106,839 0 D-45 G 50-733-20150-01-00 4 520150 6 5 3,450 1,225 900 406 219 0 1,096 0 D-24AG 50-733-20224-01-00 4 520150 6 30 3,500 3,417 260 208 351 0 10,524 0 D-29RDG 50-733-20292-01-00 4 520150 6 30 3,325 3,325 200 89 640 0 19,198 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Signature: Title: Project Coordinator Date: 12/13/2013 15. TOTAL 0 137,658 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Hemlock Month and Year: NOVEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. TUBING PRESS. 7. MAX 8. AVG PSIG PSIG CASING PRESS. 9. MAX PSIG 10. AVG PSIG DAILY AVG. INJ. 11. LIQUID 12. GAS (BBL) (MCF) TOTAL MONTHLY [NJ. 13. LIQUID 14. GAS (BBL) (MCF) 0-09RD H 50-733-20131-01-00 4 520120 8 0 600 392 600 150 0 0 0 0 D-45 H 50-733-20150-01-00 4 520120 6 5 3,450 950 900 406 315 0 1,576 0 D-15RD2 H 50-733-20159-02-00 4 520120 6 30 3,200 3,200 3,250 3,098 300 0 6,992 0 D-14RD 50-733-20164-01-00 4 520120 6 30 3,425 3,413 300 233 2,791 0 83,735 0 D -24A H 50-733-20224-01-00 4 520120 6 30 3,500 3,417 260 208 1,403 0 42,097 0 D -34A H 50-733-20225-01-00 4 520120 1 8 1 01 010 1300 1275 10 10 10 0 D-29RD H 50-733-20292-01-00 4 520120 1 6 1 301 3,325 3,325 1200 189 12,915 10 187,460 0 D-41 50-733-20331-00-00 4 520120 1 6 1 301 3,400 3,369 1360 1185 14,345 10 1130,345 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D.Trahan Signature: Title: Project Coordinator Date: 12/13/2013 15. TOTAL 0 354,204 0 Form 10406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zone Month and Year: NOVEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION prig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 1 12, WATER 13. GAS (BBL) (BBL) (MCF) G-01 RD 50-733-20037-01-00 1 520150 5 28 112 31 1,139 13 856 31,886 370 G-03RD2 G 50-733-20049-01-03 1 520150 8 0 0 0 0 0 0 0 0 G-06RDS 50-733-20073-01-00 1 520150 2 30 107 88 1,256 45 2,648 37,688 1,360 G-07 G 50-733-20130-00-00 1 520150 2 15 92 0 20 0 6 296 3 G-17RD G 50-733-20161-01-00 1 520150 2 1 28 75 8 167 4 215 4,680 113 G-14ARDG 50-733-20189-01-00 1 520150 5 20 1351 1,593 1 26 31,870 16 G-32 G 50-733-20198-00-00 1 520150 2 28 91 131 3,558 68 3,676 99,637 1,890 G -33S 50-733-20212-00-00 1 520150 8 0 1,11210 10 0 10 0 G-21 RD 50-733-20267-01-00 1 520150 2 30 193133 1340 166 13,999 110,209 1,976 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Signature: �IvzDate: Title: Project Coordinator 12/13/2013 14. TOTAL 11,426 216,266 5,729 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE buomit in oupucate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, GGS Month and Year: HILCORP ALASKA, LLC NOVEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 8. OIL 9, WATER (BBL) (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER 13. GAS (BBL) (MCF) G -14S 50-733-20146-00-00 2 520550 1 301 15210 10 2,958 0 0 88,735 G -18S 50-733-20160-90-00 2 520550 1 30 16010 0 578 0 0 17,329 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda D. Trahan Title: Project Coordinator �C Signature: Date: 12/13/2013 TOTAL 0 0 106,064 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, Hemlock Month and Year: NOVEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY 8. OIL (BBL) AVG. PRODUCTION 9. WATER 10. GAS (BBL) (MCF) TOTAL MONTHLY 11. OIL (BBL) PRODUCTION 12. WATER 13. GAS (BBL) (MCF) G-01 RD H 50-733-20037-01-00 1 520120 5 28 112 92 3,416 50 2,568 95,659 1,388 G-02RD 50-733-20038-01-00 1 520120 2 28 124 199 5,828 102 5,570 163,190 2,861 G-03RD2 H 50-733-20049-01-00 1 520120 8 0 0 0 0 0 0 0 0 G-04RD H 50-733-20050-01-00 1 520120 8 0 1,500 0 0 0 0 0 0 G-06RDL 50-733-20073-01-00 1 520120 8 0 1,214 0 0 0 0 0 0 G-08RDL 50-733-20085-01-00 1 520120 8 0 960 0 0 0 0 0 0 G-10RD 50-733-20094-01-00 1 520120 8 0 15 0 0 0 0 0 0 G-13 50-733-20127-00-00 1 520120 2 2 1,004 22 507 11 44 1,015 23 G-07 H 50-733-20130-00-00 1 520120 2 15 92 8 375 4 118 5,626 59 G-15RD 50-733-20149-01-00 1 520120 8 0 568 0 0 0 0 0 0 G-17RD H 50-733-20161-01-00 1 520120 2 28 75 17 222 9 477 6,204 249 G -30L 50-733-20187-00-00 1 520120 8 0 190 0 0 0 0 0 0 G -31L 50-733-20194-00-00 1 520120 1 15 443 2 488 1 30 7,319 13 G-34RDL 50-733-20213-01-00 1 520120 8 0 893 0 0 0 0 0 0 G-20 50-733-20261-00-00 1 520120 2 28 212170 12,441 88 4,761 68,362 2,452 G-25 50-733-20288-00-00 1 520120 8 0 117 0 0 0 0 0 10 G-26RD 50-733-20295-01-00 1 520120 8 0 0 0 0 0 0 0 0 G-28RD 50-733-20324-01-00 1 520120 5 30 83 372 17,439 191 11,154 223,173 15,730 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda �D.. Trahan Signature:yC Title: Date: Project Coordinator 12/13/2013 14. TOTAL 24,723 570,547 12,774 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Month and Year: HILCORP ALASKA, LLC Foreland NOVEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTPDAILY psig (see instruct.) AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL g. WATER 10. GAS 1 (BBL) (BBL) (MCF) 11. OIL I (BBL) 12. WATER 1 13. GAS (BBL) (MCF) G-32 W 50-733-20198-00-00 1 520190 2 28 91 82 11,769 1 42 12,29249,520 1,179 G -33L 50-733-20212-00-00 1 520190 2 30 128 111 928 57 3,339 27,855 1,720 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda DrrTrahan Title: Project Coordinator Signature: �•` Date: 12/13/2013 TOTAL 5,631 77,375 2,899 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zone Month and Year: HILCORP ALASKA, LLC NOVEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY G. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID 1 (BBL) 14. GAS (MCF) 50-XXX-XXXXX-XX-XX (see instruct.) & Pool (see in Oper. Code instruct.) G-16 G 50-733-20162-00-00 4 520150 6 30 2,900 2,175 2,500 1,996 152 0 4,545 10 G -23RD G 50-733-20269-01-00 4 520150 8 0 010 0 0 0 0 0 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda D. Trahan Title: Project Coordinator Signature: Date: 12/13/2013 TOTAL 0 4,545 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, Hemlock Month and Year: NOVEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Ober. TUBING PRESS. 7. MAX 8. AVG PSIG PSIG CASING PRESS. 9. MAX PSIG 10. AVG PSIG DAILY AVG. INJ. 11. LIQUID 12. GAS (BBL) (MCF) TOTAL MONTHLY INJ. 13. LIQUID 14. GAS (BBL) (MCF) G-05RD H 50-733-20060-01-00 4 520120 6 25 3,200 2,489 500 181 5,899 0 147,486 0 G-09 50-733-20098-00-00 4 520120 6 24 1,950 1,200 1,950 1,593 1,661 0 39,870 0 G-11 50-733-20115-00-00 4 520120 6 23 2,150 1,715 2,150 1,628 2,187 0 50,310 0 G-12RD3 50-733-20116-03-00 4 520120 8 0 0 0 60 54 0 0 0 0 G-16 H 50-733-20162-00-00 4 520120 6 30 2,900 2,175 2,500 1,996 3,292 0 98,760 0 G-19 50-733-20178-00-00 4 520120 8 1 01 010 10 10 10 10 10 0 G -23RD H 50-733-20269-01-00 4 520120 8 012 0 0 0 0 0 0 0 G-22 H 50-733-20272-00-00 4 520120 6 24 2,500 1,667 2,450 2,006 4,882 0 117,177 0 G-29RD H 50-733-20374-01-00 4 520120 8 1 01 010 10 10 10 10 10 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: LindaD. Trahan Signature: Title: Project Coordinator Date: 12/13/2013 15. TOTAL 0 453,603 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Month and Year: HILCORP ALASKA, LLC Foreland NOVEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days I TUBING PRESS. CASING PRESS. I DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG PSIG I 11. LIQUID (BBL) I 12. GAS (MCF) I 13. LIQUID (BBL) 14. GAS (MCF) 50-XXX-XXXXX-XX-XX (see instruct.) & Pool (see in Oper. Code instruct.) G-36RD H 50-733-20216-01-00 4 5201901 8 1 01 010 1170 1140 10 10 10 10 G -40S 50-733-20412-00-00 4 1 520190 1 6 1 51 2,000 759 11,920 1546 11,002 10 15,012 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda D. Trahan Title: Project Coordinator Signature: �1, Date: 12113/2013 TOTAL 0 5,012 0 Form 10-406 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC G -Zone NOVEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) K-01 RD2G 50-733-20054-01-00 1 520150 5 30 66119 65 95 3,564 1,946 2,855 K-12RD2 G 50-733-20156-02-00 1 520150 5 30 87 4 151 10 127 4,542 309 K-25 G 50-733-20180-01-00 1 520150 8 0 17 0 0 0 0 0 0 K-30 G 50-733-20211-00-00 1 520150 5 13 64 15 295 5 196 3,837 71 K-18RD G 50-733-20254-01-00 1 520150 8 01 010 0 0 0 0 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda D. Trahan Title: Project Coordinator �C Signature: Date: 12113/2013 TOTAL 3,887 10,325 3,235 Form 10405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, GGS Month and Year: NOVEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) I DAILY AVG. PRODUCTION I OTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER I (BBL) 10. GAS (MCF) 11. OIL 1 (BBL) 12. WATER 1 (BBL) 13. GAS (MCF) K-05 50-733-20092-00-00 2 520550 8 0 010 10 0 10 10 0 I hereby cerliy that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda D. Trra^han Title: Project Coordinator � Signature: \ Dale: 12/13/2013 TOTAL 0 0 0 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE buomit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Hemlock Month and Year: NOVEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) K-01 RD2 H 50-733-20054-01-00 1 520120 5 30 66 30 259 24 891 7,784 714 K-26RD 50-733-20097-04-00 1 1 520120 4 30 82 63 153 52 1,903 4,578 1,561 K-12RD21- 50-733-20156-02-00 1 520120 1 30 87137 4,895 93 14,105 146,845 2,784 K-13RD2 50-733-20157-02-00 1 520120 5 30 95 333 10,409 227 9,978 312,285 6,810 K-25 H 50-733-20180-01-00 1 520120 8 0 17 0 0 0 0 0 0 K-30 H 50-733-20211-00-00 1 520120 5 13 65 26 571 70 336 7,427 1916 K-17 50-733-20248-00-00 1 520120 8 0 0 0 0 0 0 0 Jo K-18RD H 50-733-20254-01-00 1 520120 8 0 010 10 0 0 0 0 K-19 H 50-733-20259-00-00 1 520120 5 30 37 255 13,391 142 7,661 101,716 14,261 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Signature: Q`Z�C Title: Date: Project Coordinator 12/13/2013 14. TOTAL 24,874 580,634 17,046 Form 10405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland NOVEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER (BBL) I 10. GAS (MCF) 11. OIL (BBL) 1 12. WATER 1 13. GAS (BBL) (MCF) 50-XXX-XXXXX-XX-XX (see instruct.) & Pool Code (see instruct.) psig (see instinct.) K-30 W 50-733-20211-00-00 1 520190 5 13 65 6 186 2 80 11,114 120 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda D. Trahan Title: Project Coordinator Signature: >h Date: 12/13/2013 TOTAL 80 1,114 20 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC G -Zone NOVEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 1 9. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 1 14. GAS (MCF) 50-XXX-XXXXX-XX-XX (see instruct.) & Pool Code (see instruct.) in Oper. K-24RD2 G 50-733-20330-02-00 4 520150 8 0 0 0 110 195 10 0 0 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Title: Project Coordinator 5. Signature: Date: 1 211 312 01 3 TOTAL 0 0 0 Form 10-406 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock NOVEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS instruct.) Code instruct.) PSIG PSIG (BBL) (MCF) (BBL) (MCF) K-22 50-733-20271-00-00 4 520120 6 30 2,700 2,690 200 85 10,894 0 326,829 0 K-24RD2 H 50-733-20330-02-00 4 520120 8 0 20 3 110 95 0 10 0 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Title: Project Coordinator 5. Signature: Date: 12/13/2013 TOTAL 0 326,829 0 Grp„ i., M ncv. vci'uuv INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, G- Month and Year: HILCORP ALASKA, LLC Zone NOVEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) 50-XXX-XXXXX-XX-XX (see instruct.) & Pool (see psig (see Code instruct.) instruct.) M-25 G 50-733-20391-00-00 1 520150 8 0 0 0 0 0 0 0 0 M -28G 50-733-20414-00-00 1 1 520150 1 30 81 31 384 36 923 11,505 1,094 M-29AG 50-733-20428-01-00 1 520150 1 30 0 82 1,571 81 2,452 47,125 2,430 M -31B G 50-733-20457-02-05 1 520150 5 30 115 67 2,531 64 2,008 75,927 1,929 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda D. Trahan Title: Project Coordinator Signature: Date: 12/13/2013 TOTAL 5,383 134,557 5,453 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Sleelhead PF, McArthur River Field, GGS Month and Year: NOVEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY psig (see 8. OIL instruct.) (BBL) AVG. PRODUCTION 9. WATER 10. GAS (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) M-01 50-733-20388-00-00 2 520550 1 30 31 0 1 856 0 15 25,693 M-02 50-733-20389-00-00 2 1 520550 1 30 48 0 14 1,337 0 409 40,110 M-13 50-733-20407-00-00 2 520550 1 30 136 0 6 1,960 0 183 58,809 M-14RD 50-733-20408-01-00 2 520550 1 30 39 0 0 1,336 0 0 40,078 M-03 50-733-20411-00-00 2 520550 1 24 38 0 9 2,337 0 214 56,086 M-05 50-733-20413-00-00 2 520550 1 30 87 0 0 1,531 0 4 45,920 M-04 50-733-20417-00-00 2 520550 1 30 89 0 0 3,338 0 2 100,136 M-19RD 50-733-20421-01-00 2 520550 1 30 27 0 0 1,365 0 0 40,960 M-15 50-733-20422-00-00 2 520550 1 30 73 0 1 3,308 0 24 99,236 M-07 50-733-20435-00-00 2 520550 1 30 42 0 0 2,712 0 4 81,372 M-32RD 50-733-20462-01-00 2 520550 8 0 703 0 0 0 0 0 0 M-09 50-733-20476-00-00 2 520550 1 30 26 0 0 1,394 0 6 41,806 M-16RD 50-733-20480-01-00 2 520550 1 30 144 0 11 2,447 10 28 73,404 M-12 50-733-20505-00-00 2 520550 1 30 29 0 1 407 0 35 12,220 M-17 50-733-20552-00-00 2 520550 1 22 675 0 1 0 0 23 0 M-18 50-733-20583-00-00 2 520550 1 30 129 0 0 2,763 0 0 82,885 M-06 50-733-20585-00-00 2 520550 1 30 121 0 4 944 0 120 28,315 M-20 50-733-20587-00-00 2 520550 1 30 60 0 3 578 0 79 17,329 M-10 50-733-20588-00-00 2 520550 1 301 65 0 0 2,260 0 2 67,809 M-11 50-733-20590-00-00 2 520550 1 301 125 0 9 960 0270 28,814 M-21 50-733-20598-00-00 2 520550 1 30 14310 0 3,165 0 0 94,961 1 hereby certify that the foregoing is true and correct to the best of my Printed Name: Linda D. Trahan Signature: knowledge. Title: Date: Project Coordinator 12/13/2013 14. TOTAL 0 1,417 1,035,943 Form 10405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Hemlock Month and Year: NOVEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10. GAS 11. OIL (BBL) (BBL) (MCF) (BBL) 12. WATER 13. GAS (BBL) (MCF) M-25 H 50-733-20391-00-00 1 520120 8 0 0 0 0 0 0 0 0 M-28 H 50-733-20414-00-00 1 1 520120 1 30 0 62 1,087 169 1,846 32,598 5,083 M -29A H 50-733-20428-01-00 1 520120 1 30 87 191 3,665 189 5,721 109,959 5,670 M-318 H 50-733-20457-02-05 1 520120 5 30 115 268 10,124 257 8,034 303,708 7,717 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Signature: slvC Title: Date: Project Coordinator 12/13/2013 14. TOTAL 15,601 446,265 18,470 Form 10405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland NOVEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER (BBL) (BBL) 1 10. GAS (MCF) 1 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) M-25 W 50-733-20391-00-00 1 520190 8 01 010 10 10 10 0 10 M-28 W 50-733-20414-00-00 1 520190 1 8 1 01 010 10 10 10 0 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda D. Trahan Title: Project Coordinator 14. Signature: Date: 1 211 312 01 3 TOTAL 0 0 0 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Sleelhead PF, McArthur River Field, G- Month and Year: HILCORP ALASKA, LLC Zone NOVEMBER 2013 1. Well No. 2. API No. 3. Type 50-XXX-XXXXX-XX-XX (see instruct.) 4. Field 5. Method 6. Days & Pool (see in Oper. Code instruct.) TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG 10. AVG I PSIG 11. LIQUID 1 (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) M-27 G 50-733-20423-00-00 4 520150 6 30 3,545 2,821 500 3612,374 0 71,222 0 M-30 G 50-733-20430-00-00 4 520150 6 30 3,017 2,586 1,150 866 684 0 20,516 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda D. Trahan Title: Project Coordinator �� Signature: Date: 12/13/2013 TOTAL 0 91,738 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock NOVEMBER 2013 1. Well No.2. API No, 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 8. AVG PSIG 9. MAX PSIG i 10. AVG PSIG I 11. LIQUID (BBL) 12. GAS (MCF) I 13. LIQUID (BBL) 14. GAS (MCF) 50-XXX-XXXXX-XX-XX (see instruct.) & Pool (see in Oper. Code instruct.) M-27 H 50-733-20423-00-00 1 4 520120 1 6 1 301 3,545 2,821 1500 1361 15,650 10 1169,488 10 M-30 H 50-733-20430-00-00 1 4 1 520120 1 6 1 301 3,017 2,586 11,150 1866 18,965 10 1268,938 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda D. Trahan Title: Project Coordinator Signature:— --Rjl�K- Date: 12/13/2013 TOTAL 0 438,426 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland NOVEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. I CASING PRESS. I DAILY AVG. INJ. I TOTAL MONTHLY INJ. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see in Ober. instruct.) Code instruct.) PSIG PSIG I (BBL) I (MCF) (BBL) 1 (MCF) M-27 W 50-733-20423-00-00 4 520190 1 8 1 01 010 1500 1361 10 10 10 10 M-30 W 50-733-20430-00-00 4 1 520190 1 6 1 301 3,017 2,586 11,150 1866 1615 10 118,436 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda D. Trahan Title: Project Coordinator Signature: Date: 12/13/2013 TOTAL 0 18,436 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Month and Year: HILCORP ALASKA, LLC Field, Hemlock NOVEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER (BBL) I 10. GAS (MCF) 1 11. OIL (BBL) 12. WATER (BBL) I 13. GAS (MCF) 50-XXX-XXXXX-XX-XX (see instruct.) & Pool (see psig (see Code instruct.) instruct.) A-15RD2 50-733-20105-02-00 1 520120 1 301 177 137 12,591 1419 14,099 177,739 12,565 A-27RD 50-733-20246-01-00 1 1 520120 1 301 74124 123 150 1726 1692 11,509 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda D. Trahan Title: Project Coordinator R:Z)C, Signature: Date: 12/13/2013 TOTAL 4,825 78,431 14,075 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Month and Year: HILCORP ALASKA, LLC Field, Hemlock NOVEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7. MAX PSIG 1 8. AVG PSIG 9. MAX PSIG-1 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) A-29RD 50-733-20245-01-00 4 520120 6 30 2,100 2,019 2,200 12,136 8,255 0 247,658 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda D. Trahan Title: Project Coordinator Signature: Date: 12/13/2013 TOTAL 0 247,658 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate to acv �E W STATE OF ALASKA JAN 2 3 2014 ALASKA OIL AND GAS CONSERVATION COMMISSIAMCC h MONTHLY PRODUCTION REPORT NET OIL SALES Hilcorp Alaska, LLC McArthur River Field DECEMBER 2013 Name of Operator Regulatory Lease Month and Year of Production Total Wells 116 Total Wells Produced 72 Total Pipeline Runs 140,669 Closing Inventory 16,024 Opening Inventory 16,493 Other Adjustments 0 (direct or xylene recovered) Total Net Production 140,201 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signe Linda rahan Title Production Project Coordinator Date: 1116/2014 140,201 2,884, 231 1,297, 066 TOTAL OIL WATER GAS STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field. G -Zone Month and Year: DECEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Methotl (see instruct.) fi. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION '11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) D-01 G 50-733-20068-00-00 1 520150 5 31 125 59 1,873 14 1,820 58,049 425 D-02ARD G 50-733-20069-02-00 1 520150 8 0 0 0 0 0 0 0 0 D-04RD 50-733-20089-01-00 1 520150 8 0 1,240 0 0 0 0 0 0 D-03RD2 50-733-20090-02-00 1 520150 2 31 120108 3 25 3,363 91 766 D-05RD 50-733-20100-01-00 1 520150 2 31 103 52 140 38 1,610 4,349 1,175 D-08RD G 50-733-20107-01-00 1 520150 2 3 670 2 5 9 5 16 28 D-12RD G 50-733-20142-01-00 1 520150 1 31 100 146 1,381 47 4,536 42,815 1,461 D-46 G 50-733-20165-01-00 1 520150 2 31 0 39 228 27 11,209 7,081 851 D-47 G 50-733-20195-02-00 1 520150 5 31 133 123 2,831 20 3,819 87,774 627 D-30RD2 50-733.20208-02-00 1 520150 8 0 890 0 0 0 0 0 0 D-31RD 50-733-20215-01-00 1 520150 2 31 147 96 157 0 2,978 4,868 6 D-32 50-733.20220-00-00 1 520150 8 0 687 0 0 0 0 0 10 D-25RD G 50-733-20247-01-00 1 520150 8 1 0 60 0 0 0 0 0 0 D-26RD 50-733-20260-01-00 1 520150 2 31 286 54 382 16 1,684 11,852 490 D-27 G 50-733-20274-00-00 1 520150 8 0 00 0 0 0 0 0 0-28 G 50-733-20287-00-00 1 520150 8 01 0 0 0 0 0 0 0 D -43RD G 50-733-20373-01-00 1 520150 2 31 145 39 191 24 1,209 5,928 736 1 hereby certify that the foregoing is true and comet to the best of my knowledge. Printed Name: Linda Trahan Signature: Title: Date: Production Project Coordinator 1/16/2014 14. TOTAL 22,231 222,622 6,566 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE aurone m uupucarc STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC GGS DECEMBER 2013 1, Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct.) 4. Field 8 Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP pslg (see inslmct.) I DAILY AVG, PRODUCTION I TOTAL MONTHLY PRODUCTION 6. OIL (BBL) 1 9. WATER (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER (BBL) 13. GAS (MCF) D-18 50-733-20169-W-00 2 520550 8 01 010 10 0 0 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Tills: Production Project Coordinator Signature: Dale: 1/16/2014 _ TOTAL 0 0 0 Form 10-405 Rev, 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Hemlock Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field. Month and Year: DECEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct.) 4. Field & Pool Code 5. Method (see Instruct.) 6. Days In Oper. 7. Avg. FTP psig (see instruct.) DAILY 8. OIL (BBL) AVG, PRODUCTION 9. WATER 10. GAS (BBL) (MCF) TOTAL MONTHLY 11. OIL (BBL) PRODUCTION 12.. WATER 13. GAS (BBL) (MCF) D-01 H 50-733.20068-00-00 1 520120 5 31 125 137 7,490 32 4,246 232,195 992 D-02ARD H 50-733-20069-02-00 1 520120 8 0 0 0 0 0 0 0 0 0-08RD H 50-733-20107-01-00 1 520120 2 3 670 2 5 9 5 16 28 D-07RD2 50-733-20117-02-00 1 520120 2 31 163 116 458 26 3,590 14,198 810 D-48 50-733-20132-01-00 1 520120 2 1 31 193 59 309 96 1,826 9,570 2,968 D-11 50-733-20140-00-00 1 520120 8 0 120 0 0 0 0 0 10 D-12RD H 50-733-20142-01-00 1 520120 1 31 100 51 485 9 1,594 15,043 269 0-06RD H 50-733-20147-01-00 1 520120 8 0 0 0 0 0 0 0 0 D-46 H 50-733-20165-01-00 1 520120 8 0 0 0 0 0 0 0 0 D-17RD 50-733-20168-01-00 1 520120 2 31 242 23 915 140 712 28,372 4,343 D-47 H 50-733-20195-02-00 1 520120 5 31 133 82 4,247 13 2,546 131,661 418 D-20 50-733-20203-00-00 1 520120 8 0 0 0 10 0 10 0 0 D-42 50-733-20205-01-00 1 520120 8 1 0 0 0 0 0 0 0 0 D-25RD H 50-733-20247-01-00 1 520120 8 0 60 0 0 0 0 0 10 D-27 H 50-733-20274-00-00 1 520120 8 0 0 0 0 0 0 0 0 D-28 H 50-733-20287-00-00 1 520120 8 0 0 0 0 0 0 0 0 D-40RD 50-733-20318-01-00 1 520120 8 0 0 0 0 0 0 0 0 D -43RD H 50-733-20373-01-00 1 520120 2 31 145 39 191 24 1,209 5,928 736 1 hereby certify that the foregoing Is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Title: Dale: Production 1 /1 612 01 4 Project Coordinator 14. TOTAL 15,727 436,984 10,564 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zane Month and Year: DECEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct.) 4. Field & Pool Code 5. Method (see Instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 1 9. WATER 10. GAS instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) G-01RD G 50-733.20037-01-00 1 520150 5 17 154 36 1,350 15 609 22,949 257 G-03RD2 G 50-733-20049-01-03 1 520150 8 0 to 0 0 0 0 0 0 G-06RDS 50-733-20073-01-00 1 520150 2 31 103 93 1,443 46 2,883 44,731 1,435 G-07 G 50-733-20130-00-00 1 520150 2 31 160 1 27 0 29 842 14 G-17RD G 50-733.20161-01-00 1 520150 2 1 31 74 8 4 260 5,170 129 G-14ARDG 50-733-20189-01-00 1 520150 5 31 11315 2 145 43,748 62 G-32 G 50-733-20198-00-00 1 520150 2 31 89 137 t158 69 4,252 123,685 2,131 G -33S 50-733-20212-00-00 1 520150 8 0 1,24510 0 0 0 0 G-21RD 50-733-20287-01-00 1 520150 2 31 100 144 4,470 112,491 11.804 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Title: Dale: Production Project Coordinator 1/162014 14. TOTAL 12,648 253,614 5.832 Form 10-405 Rev, 042006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, GGS Month and Year: HILCORP ALASKA, LLC DECEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct.) 4. Field & Pool Code 5. Method (see Instruct.) 6. Days in Oper. 7. Avg. FTPDAILY psig (see instruct.) AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 6. OIL (BBL) 9. WATER 10. GAS (BBL) (MCF) 11. OIL (BBL) 12. WATER 13. GAS (BBL) (MCF) G -14S 50-733-20146-00-00 2 520550 1 31 145 00 2,984 0 0 92,514 G -18S 50-733-20160-90-00 2 520550 1 31 70 0 0 480 0 0 14,869 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: L-innda�Trahan Title: Production Project Coordinator Signature: y� Dale: 1/16/2014 TOTAL 0 0 107,383 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 c�-1 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Grayling PF, McArthur River Field, Hemlock Month and Year: DECEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code S. Method (see Instruct.) 6. Days In Oper. 7. Avg. FTP pslg (see instruct.) DAILY 8. OIL (BBL) AVG. PRODUCTION 9. WATER 10. GAS (BBL) (MCF) TOTAL MONTHLY 11. OIL (BBL) PRODUCTION 12. WATER 13. GAS (BBL) (MCF) G-011 RD H 50-733-20037-01-00 1 520120 5 17 154 107 4,050 57 1,827 68,846 964 G-02RD 50-733-20038-01-00 1 520120 2 31 135 208 6,209 104 6,438 192,464 3,222 G-03RD2 H 50-733-20049-01-00 1 520120 8 0 7 0 0 0 0 0 0 G-04RD H 50-733-20050-01-00 1 520120 8 0 1,470 0 0 0 0 0 0 G-06RDL 50-733-20073-01-00 1 520120 8 1 0 1,200 0 0 0 0 0 0 G-08RDL 50-733.20085-01-00 1 520120 8 0 930 0 0 0 0 0 0 G-10RD 50-733-20094-01-00 1 520120 8 0 0 0 0 0 0 0 0 G-13 50-733-20127-00-00 1 520120 2 19 698 17 373 8 330 7,081 161 G-07 H 50-733-20130-00-00 1 520120 2 31 160 18 516 9 555 15,996 286 G-15RD 50-733-20149-01-00 1 520120 8 0 235 0 0 0 0 0 0 G-17RD H 50-733-20161-01-00 1 520120 2 31 74 19 221 9 575 6,854 283 G -30L 50-733-20187-00-00 1 520120 8 0 185,0 0 0 0 0 0 G -31L 50-733-20194-00-00 1 520120 1 1 21 154 12 499 6 261 10,471 123 G-34RDL 50-733-20213-01-00 1 520120 8 0 1,202 0 0 0 0 0 0 G-20 50-733-20261-00-00 1 520120 2 31 200 189 2,663 95 5,857 82,555 2,936 G-25 5D-733-20288-00-00 1 1 520120 8 0 108 0 0 0 0 0 0 G-26RD 50-733-20295-01-00 1 520120 8 0 605 0 0 0 0 0 D G-28RD 50-733-20324-01-00 1 520120 5 25 87 409 7,496 205 10,237 187,392 5,133 1 hereby certify [hal the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: Title: Date: Production 1/16/2014 Project Coordinator 14. TOTAL 26,079 571,659 13,108 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Month and Year HILCORP ALASKA, LLC Foreland DECEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) G. Days in Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY TOTAL PRODUCTION 8. OIL 9. WATER (BBL) (BBL) 10. GAS (MCF) (BBL) WATER 13. GAS (BBL) (MCF) G-32 W 50-733-20198-00-00 1 520190 2 31 2212 1,983 43 2,651 61,472 1,329 G -33L 50-733-20212-00-00 1 520190 2 31 113 106 1,009 53 3,271 31,278 1,637 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Production Project Coordinator Signature: -RIINC Date: 1/16/2014 TOTAL 5,922 92,750 2,965 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, G -Zone Month and Year: DECEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct.) 4. Field & Pool Code 5, Method (see instruct.) 6. Days In Oper. 7. Avg. FTP psig (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) K-01RD2 G 50-733-20054-01-00 1 520150 5 31 58 116 69 67 3,586 2,133 2,006 K-12RD2 G 50-733-20156-02.00 1 520150 5 31 76 4 147 9 137 4,572 272 K-25 G 50-733-20180-01-00 1 520150 8 0 0 0 0 0 0 0 0 K-30 G 50-733-20211-00-00 1 520150 8 0 46 0 0 0 0 0 0 K-18RD G 50-733-20254-01-00 1 1 520150 1 8 1 0 0.0 0 0 0 0 0 I hereby certify that the foregoing is true and correct to the best of my knovAedge. Printed Name: Linda Trahan Signature: �� Title: Date: Production Project Coordinator 1/16/2014 14. TOTAL 3,724 ]6.706 2,338 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 t Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC GGS DECEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see Instruct.) DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 8. OIL (BBL) 9. WATER 10. GAS (BBL) (MCF) 11. OIL (BBL) 12. WATER (88L) 13. GAS (MCF) K-05 50-733-20092-00-00 2 520550 8 0 110 0 0 10 10 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Production Project Coordinator �� Signature: Date: 1/16/2014 TOTAL 0 0 0 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 r Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Hemlock Month and Year: DECEMBER 2013 1, Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct.) 4. Field & Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION psig (see 8. OIL 9. WATER 1 10. GAS Instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12, WATER 13. GAS (BBL) (BBL) (MCF) K-01RD2 H 50-733-20054-01-00 1 520120 5 31 58 29 275 17 897 8,533 517 K-26RD 50-733-20097-04-00 1 520120 4 31 87 69 412 33 2,132 12,779 1,025 K-12RD21- 50-733-20156-02-00 1 520120 1 31 76 143 4,769 79 4,433 147,842 2,448 K-13RD2 50-733-20157-02-00 1 520120 5 31 87 374 10,226 172 11,606 317,005 5,323 K-25 H 50-733-20180-01-00 1 1 520120 8 1 0 0 0 0 0 0 0 0 K-30 H 50-733-20211-00-00 1 520120 8 0 46102 0 0 0 0 K-17 50-733-2024800-00 1 520120 8 0 010 0 0 10 0 0 K-18RD H 50-733-20254-01-00 1 520120 8 0 0 0 0 0 0 0 0 K-19 H 50-733-20259-00-00 1 520120 5 31 32 219 13,505 J 129 16.779 1108.656 13,997 I hereby certify that the foregoing is true and correct to the best of my knov4edge. Printed Name: Linda Trahan Signature: _ _ \, Title: Dale: Production Project Coordinator 1/1 612 01 4 14. TOTAL 25,846 594,814 13,309 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit In duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland DECEMBER 2013 1. Well No, 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 0. WATER 10. GAS 11.011- 12. WATER 13. GAS 50-XXX-XXXXX-XX-XX (see R Pool (see psig (see instruct.) Code instruct.) instruct.) (88L) (BBL) (MCF) (BBL) (BBL) (MCF) K-30 W 1 50-733-20211-00-00 1 520190 8 01 4610 10 10 10 I hereby cerlify that the foregoing Is true and correct to the best of my knowledge. Printed Name: Linda Trahan Title: Production Project Coordinator 4. Signature: Date: 1/16/2014 TOTAL 0 0 0 Form iu-nus Rev. 0420u6 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Sleelhead PF, McArthur River Field, G- Month and Year: HILCORP ALASKA, LLC Zone DECEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days in Oper. 7, Avg. FTP DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 50-XXX-XXXXX-XX-XX (see & Pool (see psig (see 8. OIL 9. WATER 10. GAS 11. OIL 12. WATER 13. GAS instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) M-25 G 50-733-20391-00-00 1 520150 8 0 0 0 0 0 0 0 0 M-28 G 50-733-20414-00-00 1 520150 1 31 84 32 427 42 991 13,230 1,289 M-29AG 50-733-20428-01-00 1 520150 1 31 0 86 1,681 84 2,675 52,101 2,610 M-31BG 50-733-20457-02-05 1 520150 5 31 11474 2.666 69 2,294 82,640 2,128 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: LindaaTra�han Title: Production Project Coordinator $D Signature: ` Dale: 1/16/2014 TOTAL 5,961 147,971 6,027 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Sleelhead PF, McArthur River Field, GGS Month and Year: DECEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct.) 4. Field & Pool Cade 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP psig (see Instruct.) DAILY AVG. PRODUCTION 8. OIL 9. WATER 10. GAS (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) M-01 50-733-20388-00-00 2 520550 1 31 24 0 0 848 0 6 26,293 M-02 50-733-20389-00-00 2 520550 1 31 26 0 16 1,335 0 487 41,390 M-13 50-733-20407-00-00 2 520550 1 31 104 0 7 2,019 0 225 62,586 M-14RD 50-733-20408-01-00 2 520550 1 31 30 0 1 1,286 0 17 39,853 M-03 50-733-20411-00-00 2 520550 1 1 31 25.0 12 2,475 0 363 76,716 M-05 50-733-20413-00-00 2 520550 1 31 75 0 1 1,563 0 22 48,447 M-04 50-733-20417-00-00 2 520550 1 31 80 0 0 3,458 0 2 107,200 M-19RD 50-733-20421-01-00 2 520550 1 31 25 0 1 1,311 0 18 40,644 M-15 50-733-20422-00-00 2 520550 1 31 0 0 0 3,326 0 0 103,105 M-07 50-733-20435-00-00 2 520550 1 31 30 0 0 2,723 0 3 84,412 M-32RD 50-733-20462-01-00 2 520550 8 0 415 0 0 0 0 0 0 M-09 50-733-20476-00-00 2 520550 1 31 24 0 0 1,318 0 4 40,843 M-16RD 50-733-20480-01-00 2 520560 1 1 31 139 0 1 2,389 10 29 74,063 M-12 50 -733 -20505 -OD -00 2 520550 1 31 23 0 0 0 13 18,806 M-17 50 -733 -20552 -OD -00 2 520550 1 20 363 0 1 0 19 1,096 M-18 50-733-20583-00-00 2 520550 1 31 137 0 0 0 0 81,807 M-06 50-733-20585-00-00 2 520550 1 31 85 0 6 N2,341O 0 189 26,366 M-20 50-733-20587-00-00 2 520550 1 31 47 0 0 0 4 17,607 M-10 50-733-20588-00-00 2 520550 1 31 58 0 0 0 72,582 M-11 50.733-20590.00-00 2 520550 1 31 136 0 0 0 9 31,900 M-21 50-733-20598-00-00 2 520550 1 31 120 0 0 , 0 0 96,875 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Linda Trahan Signature: `� Title: Date: Production Project Coordinator 1/16/2014 14. TOTAL 0 1,412 1,092,591 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Sleelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock DECEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 8 Pool Code 5. Method (see instruct.) 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION I psig (see 8. OIL 9. WATER 10. GAS Instruct.) (BBL) (BBL) (MCF) TOTAL MONTHLY PRODUCTION 11. OIL 12. WATER 13. GAS (BBL) (BBL) (MCF) M-25 H 50-733-20391-00-00 1 520120 8 0 0 0 0 0 0 0 0 M-28 H 50-733-20414-00-00 1 520120 1 31 0 64 1,209 193 1,983 37,484 5,990 M-29AH 50-733-20428-01-00 1 520120 1 31 90 201 3,922 196 6,242 121,569 6,089 M -31B H 50-733-20457-02-05 1 520120 5 31 114 296 10,663 275 9,176 330,562 8,513 I hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Production Project Coordinator Signature: IRC'N Date: 1/162014 TOTAL 17,401 489,615 20,592 Form 10-405 Rev. 0412006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION �r1j MONTHLY PRODUCTION REPORT C 20 AAC 25.230 Name of Operator: Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland DECEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 8 Pool Code 5. Method (see Instruct.) 6. Days in Oper. 7. Avg. FTP psiq (see instruct.) DAILY AVG. PRODUCTION TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER (BBL) (BBL) 10. GAS (MCF) 11. OIL (BBL) 12. WATER 13. GAS (BBL) (MCF) M-25 W 50-733-20391-00-00 1 520190 8 0 0 0 10 0 0 0 0 M-28 W 50-733-2041400-00 1 520190 8 0 0 0 10 0 0 0 0 1 hereby certify that the foregoing is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Production Project Coordinator Signature: sk�>C�' Dale: 1/16/2014 TOTAL 0 0 0 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY PRODUCTION REPORT 1 20 AAC 25.230 Name of Operator. Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Month and Year: HILCORP ALASKA, LLC Feld, Hemlock DECEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5, Method 6. Days in Oper. 7. Avg. FTP DAILY AVG. PRODUCTION I TOTAL MONTHLY PRODUCTION 8. OIL 9. WATER 10. GAS 11.01E 12. WATER 13. GAS 50-XXX-XXXXX-XX-XX (see &Pool (see psig (see instruct.) Code instruct.) instruct.) (BBL) (BBL) (MCF) (BBL) (BBL) (MCF) A-15RD2 50-733-20105-02-00 1 520120 1 31 179119 2,100 1224 13.697 65.088 6,956 A-27RD 50-733-20246-01-00 1 1 520120 1 31 74 31 126 1285 1966 1798 18,835 I hereby certify that the foregoing Is true and correct to the best of my knowledge. 14. Printed Name: Linda Trahan Title: Production Project Coordinator Signature: Date: 1/16/2014 TOTAL 4,662 65,884 15,792 Form 10-405 Rev. 04/2006 INSTRUCTIONS ON REVERSE SIDE �uomit in oupncate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC G -Zone DECEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 8. Days TUBING PRESS. CASING PRESS. DAILY G. INJ. TOTAL MONTHLY INJ. 13. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID PSIG (BBL) 12. GAS (MCF) (BBL) (MCF) Instruct.) Code instruct.) PSIG D-09RD G 50-733-20131-01-00 4 520150 8 01 0 0 0 0 0 0 0 0 D-06RD G 50-733-20147-01-00 4 520150 6 301 3,300 3.225 340 172 3,476 0 104,282 0 D-45 G 50-733-20150-01-00 4 520150 8 01 450 375 0 0 0 0 0 0 D -24A G 50-733-20224-01-00 4 520150 6 301 3,500 3,370 170 140 373 0 11,179 0 D-29RD G 50-733-20292-01-00 4 520150 6 r 30 3,300 2,560 0 0 677 0 20.321 0 I hereby certify that the foregoing is true and correct to the best of my knovAedge. 15. Printed Name: Linda Trahan Title: Production Project Coordinator �C Signature: Date: 1116/2014 "TOTAL 0 135,782 0 Form 10-408 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE U.M. "' ""✓"��" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Dolly Varden PF, McArthur River Field, Hemlock Month and Year: DECEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 8 Pool Code 5. Method (see Instruct.) 6. Days in Oper. TUBING PRESS. I 7• MAX 8. AVG PSIG PSIG CASING PRESS. 9. MAX PSIG 10. AVG PSIG DAILY AVG. INJ. 12. GAS (MCF) TOTAL MONTHLY INJ. 13. LIQUID 14. GAS (BBL) (MCF) D-09RD H 50-733-20131-01-00 4 520120 8 0 0K3,333 0 0 0 0 0 D-45 H 50-733-20150-01-00 4 520120 8 0 4500 0 0 0 0 P2710 D-15RD2 H 50-733-20159-02-00 4 520120 6 30 3,2003,250 3,160 8,124 0 D-14RD 50-733-20164-01-00 4 520120 6 30 3,4000 0 0 82,003 0 D -24A H 50-733-20224-01-00 4 520120 6 30 3,500170 140 0 44,716 0 D-34AH 50-733-20225-01-00 4 520120 8 0 00 0 0 0 0 0 D-29RD H 50-733-20292-01-00 4 520120 B 30 3,3000 0 3,086 0 92,575 0 D-41 50-733-20331-00-00 4 520120 6 30 3,4000 0 4,908 0 147.253 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name: Liinda� Trahan Signature:yC Title: Production Project Coordinator Dale: 1/1612014 15. TOTAL 0 374,671 0 Form 10-406 Rev. 0212006 INSTRUCTIONS ON NtvtNSE SIDE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT' j 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, G -Zone Month and Year: DECEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field 8 Po Code 5. Method (see instruct.) 8. Days In Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7 -MAX PSIG B. AVG PSIG 0. MAX PSIG 10. AVG PSIG 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL} 14. GAS (MCF} K-24RD2 G 50.733-20330-02-00 4 520150 8 C 0 0 5 14 0 10 0 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trrahan Title: Production Project Coordinator Signature: �� Dale: 1/16/2014 TOTAL 0 0 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT ,)n nnr.. gr A19 , Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, G -Zone Month and Year: HILCORP ALASKA, LLC DECEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method 8. Days TUBING PRESS. CASING PRESS. PSIG 8. MAX PSIG 10. AVG DAILY AVG. INJ. 11. LIQUID 12. GAS TOTAL MONTHLY INJ. 13. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see &Pool (see in Oper. 7 MAX 8. AVG PSIG PSIG (BBL) (MCF) (BBL) (MCF) Instruct.) Code instruct.) G-16 G 50-733-20162-00-00 4 520150 6 30 2,900 2,844 12.420 2.378210 0 6,308 0 G -23RD G 50-733-20269-01-00 4 520150 8 0 010 16 15 0 0 0 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Production Project Coordinator Signature: �� Date: 1/16/2014 0 TOTAL 0 6,308 ___..__._.._ _.. _...._...,.- -I-- Submit In duolicale Form 10-406 Rev. 022006 INS RUUI IONS ON REVERSE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT nN AAS nC AlO Form 10-406 Rev. 0212006 1NS ^"" "1— — """"" Field and Pool: Trading Bay Grayling PF, McArthur River Field. Hemlock Month and Year: Name of Operator: DECEMBER 013 HILCORP ALASKA, LLC TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days 7 MAX B. AVG PSIG 9. MAX PSIG 10P.SVC'G 11.(LBIBL;ID 1(MCF) 13(BBL) ID 1(MCF)S 50-XXX•XXXXX-XX-XX (see & Pool (see In Oper. PSIG instruct.) Code instruct.) G-05RD H 50-733-20060-01-00 4 520120 6 31 3,200 3,000 0 0 2,053 0 0 G-09 50-733-20098-00-00 4 520120 6 31 1,950 1,913 1,950 1,892 ,348 0 G-11 50-733-2011"0-00 4 520120 6 31 2,150 2,132 124 122 ,118 0 G-12RD3 50-733-20116-03-00 4 520120 8 0 0 0 50 39 MO_ 37,051 0 G-16 H 50-733-20162-00-00 4 520120 6 30 2,900 2,850 2,420 2,376 0G G-19 50-733-20178.00-00 4 520120 8 0 0 0 0 0 0G-22 -23RD H 50-733-20269-01-00 4 520120 8 0 0 0 16 15 95,502 0 H 50-733-20272.00-00 4 520120 6 31 �2.60CC 2,456 4 3 0 0 G-29RD H 50-733.20374-01-00 4 520120 8 0 0 0 0 0 0 I hereby certify that the foregoing Is true arta correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Production Project Coordinator Signature: �C Date: 1/16/2014 TOTAL 0 728,072 0 in duplicate vvcoeo eino Submit Form 10-406 Rev. 0212006 1NS ^"" "1— — """"" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT I 20 AAr 26 432 Name of Operator: Field and Pool: Trading Bay Grayling PF, McArthur River Field, West Month and Year: HILCORP ALASKA, LLC Foreland DECEMBER 2013 1. Well No, 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. 7. MAX 8. AVG PSIG CASING PRESS. 9. MAX PSIG 10. AVG DAILY AVG. INJ. 11. LIQUID 12. GAS TOTAL MONTHLY 13,LIQUID INJ. 14. GAS 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper. PSIG PSIG I (BBL) (MCF) (BBL) (MCF) instruct.) Code instruct.) G-36RD H 50-733-20216-Ot-00 4 520190 8 0 0 0 2 1 0 0 0 0 G -40S 50-733-20412-00-00 4 520190 6 16 2,000 1,567 750 712 2,147 0 34,353 D I hereby certify [hal the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Production Project Coordinator Signature:y\ Dale: 1/16/2014 TOTAL 0 34,353 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON KtVtKSt sut STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 2171 AAc 2s 432 -- Name of Operator: REVERSE Field and Pool: Trading Bay Unit King Salmon PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC Hemlock DECEMBER 2013 1. Well No. 2. API No. 3. Type 4. Field 5. Method B. Days UBING PRESS. PSIG CASING PRESS. 9. MAX PSIG 10. AVG DAILY AVG. INJ. 11. LIQUID 12. GAS TOTAL MONTHLY INJ. 13. LIQUID 14. GAS 50-XXX-XXXXX-XX-XX (see &Pool (see in Oper.r-7�1'�AX 8. AVG SIG PSIG (BBL) (MCF) (BBL) (MCF) instruct.) Code instruct.) K-22 50-733-20271-00-00 4 520120 6 30 2,725 2,698 0 0 10,839 0 325,157 0 K-24RD2 H 50-733-20330-02-00 4 520120 8 0 010 5 4 0 0 0 0 I hereby certify that the foregoing Is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Production Project Coordinator Signature:, Date: 1116/2014 TOTAL 0 325,157 0 _. Cuhmll In Kunliraln Form 10-406 Rev. 02/2006 INS I KUU I IUN. UN REVERSE SZE STATE OF ALASKA — ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25 432 Form 10-406 Rev. 0212006 INSTRUCTIONS nuc i IONS ON REVERSE SIDE Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, G- Month and Year: Name of Operator: DECEMBER 2013 HILCORP ALASKA, LLC Zone 1. Well No. 2. API No. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. AVG PSIG 9. MAX PSIG 1 i t.(LBIB LIQUID i(MC TOTAL MONTHLY INJ. 13.(BLIQUID 1(MC 50-XXX-XXXXX-XX-XX (see & Pool (see in Oper, 7� MAX 8. 'S PSIG PS GG 'S Instruct.) Code Instruct.) M-27 G 50-733-20423.00-00 4 520150 6 31 185 180 2,389 0 74,070 0 M-30 G 50-733-20430-00-00 4 520150 6 31 —3,33912,790 3,040 2,735 100 92 643 0 19,919 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Production Project Coordinator Signature: �� Date: 1/16/2014 TOTAL 0 93,989 0 ...___..__._.._ ..-....-..r....� ..,..� Submit in duplicate Form 10-406 Rev. 0212006 INSTRUCTIONS nuc i IONS ON REVERSE SIDE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit Steelhead PF, McArthur River Field, Hemlock Month and Year: DECEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see Instruct.) 4. Field 5. Method & Pool (see Code instruct.) 6. Days In Oper. 1 TUB fNG PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. 7• MAX SIG 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID PSIG (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) M-27 H 50-733-20423-00-00 4 520120 8 31 3,339 2,790 185 180 5,575 0 172,830 10 M-30 H 50-733-20430-00-00 4 520120 6 31 3,040 2,735 Iiuu luz 8,258 0 256,012 jo I hereby cerlify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Production Project Coordinator Signature: Dale: 11162014 TOTAL 0 428,842 0 Form 10.406 Rev. 0212006 INSTRUCTIONS ON REVERSE SIDE auurrur ill uup iUdLU STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 Name of Operator: Field and Pool: Trading Bay Unit Sleelhead PF, McArthur River Field, Month and Year: HILCORP ALASKA, LLC West Foreland DECEMBER 2013 1. Well N0. 2. API N0. 3. Type 4. Field 5. Method 6. Days TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INA. 7. MAX 8. AVG PSIG 9. MAX PSIG 10. AVG 11. LIQUID 12. GAS 13. LIQUID 14. GAS 50 -XXX -XX -XX -XX (see & Pool (see in Oper. PSIG PSIG (BBL) (MCF) (BBL) (MCF) instruct) Code instruct.) M-27 W 50-733-20423-00.00 4 520190 8 0 0 0 185 180 D 0 0 0 M-30 W 50-733-20430-00-00 4 520190 6 31 3,040 2,735 100 92 548 0 16,969 0 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Production Project Coordinator Signature: _�, Dale: 1/16/1014 TOTAL 0 16.989 0 Form 10.406 Rev, 0212006 INSTRUCTIONS ON REVERSE SIDE Submit in duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION s MONTHLY INJECTION REPORT + �� 20 AAC 25.432 Name of Operator. HILCORP ALASKA, LLC Field and Pool: Trading Bay Unit TRU - MRF Monopod, McArthur River Field, Hemlock Month and Year: DECEMBER 2013 1. Well No. 2. API No. 50-XXX-XXXXX-XX-XX 3. Type (see instruct.) 4. Field & Pool Cade S. Method (see instruct.) 6. Days in Oper. TUBING PRESS. CASING PRESS. DAILY AVG. INJ. TOTAL MONTHLY INJ. T MAX PSIG 8. AVG PSIG 9. MAX PSIG 10.A PSI 11. LIQUID (BBL) 12. GAS (MCF) 13. LIQUID (BBL) 14. GAS (MCF) A-29RD 50-733-20245-Ot-00 4 520120 6 24 2,0001,950 10 lo 18.010 10 1192,240 10 I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Printed Name: Linda Trahan Title: Production Project Coordinator Rc. Signature: C Date: 1/1612014 TOTAL 0 192,240 0 Form 10-406 Rev. 02/2006 INSTRUCTIONS ON REVERSE SIDE Submit in oup icate