Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutMGS Baker Platform / Unocal
STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2003
J3A b:: K'
FACILITY: MGS Platform -
SMGS
OPERATOR: UNION OIL CO OF
CALIFORNIA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JANUARY 2003
~
Disposition Volume MCF*
1. Sold 17.211
2. Reinjected 0
3. Flared or vented less than 1 hour 403
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 217
,
6. Used for lease operations 18.985
7. Other 0
TOTAL items 1 - 7 36.816
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereb~C iCy that the foregoing is true and correct to the best of my knowledge.
Signatur /11) AA /I . j().iV,AM d ß/ / itle PRODUCTION ACCOUNTANT Date 02/11/2003
1/ /I
v U
-
Form 10422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 12.52
B C AND D 524112 8.38
E F AND G 524114 11. 72
UNDEFINED (GAS) 524500 67.38
:111111~1111~~IIII~¡I~I:I~.I¡IIIIIII¡llli:~I¡lili¡1111¡il:~IIIIIII¡
1 . Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlYear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL FiSRYAR¥ 2003 .
Disposition Volume MCF* *Indicate contribution of each pool to total.
Pool Name Code Percent
1. Sold 14.760
A 524110 13.28
2. Reinj ected 0
B C AND D 524112 8.90
3. Flared or vented less than 1 hour 364 E F AND G 524114 12.52
4. Flared or vented greater than 1 hour 42 /UNDEFINED (GAS) 524500 65.30
(Supplemental report required. See 20 AAC 25.235)
5. Pilot and Purge 196
6. Used for lease operations 18.114
7. Other 0
~:~:~:~:i:i:i:i:i:i:}i:i:j:i:i:i:i:i:i:i:i:~:i:~:¡:i:i:i:i:i:i:i:i:i:i:i:i;~:¡:ir:i:i:i:i:i:i:ir:i:i:i:i:i:i:!:!:;:!:;:;:i:i:i:!:!:!:;:;:i:i:i:;:i:;:i:;:;:;:;:;:;=i:i:i:;¡i¡i:;¡i¡;:}i:i:;:i¡;{:i=i=i:i=}i:;:i¡:
TOTAL items 1 -7 33.476 :1::¡¡tlll¡¡I~~¡:II~¡¡t::I~II::III.III:I::¡::¡I¡::¡:¡:¡¡:¡¡,:.1·:11¡1:
1. Safety 4 -z--MCF
8. NGL gas equivalent produced 0
2. Lease Use MCF
9. Purchased gas 10
3. Conserv. Purposes MCF
10. Transferred from: 0 f/aJ7~ ~/I!/o.?
11. Transferred to: 0
Commissioner Date I
Remarks:
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
I here~;r, that the foregoing Is true and correct to the best of my knowledge. 60 degrees F. Report due by the 20th of the
Signat re ',Ü t I- j()j¡1 'vv/ /I '/-Ll month following the month of disposition.
Title PRODUCTION ACCOUNTANT Date 03/12/2003 Authority 20 AAC 25.235
/1 /
Form 10-422Y V
-.:E¡L-
Rev. 4/95
Excess Flare Log Report
Facility Name:
BAKER PLATFORM
Month/Year:
February 2003
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
217/2003 16:40 217/200318:40 42 Y COMPRESSOR SHUTDOWN FOR OPERATIONAL SCHEDULED MAINTENANCE LEAKING SIGHTGLASS FOR COMPRESSOR B-C-0202-1
MAINTENANCE. LUBE OIL DETECTED ON MAINTENANCE.
COMPRESSOR. ENSURE
PROPER PERSONNEL AND
PARTS ON HAND BEFORE
WORK MAINTENANCE BEGAN.
COMPRESSOR SHUTDOWN
WHILE SIGHTGLASS
REPAIRED. RETURN TO
NORMAL OPERA TIONS.
"
Report Date: 3/12/2003
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL MARCH 2003
Disposition Volume MCF*
1. Sold 14.940
2. Reinjected 0
3. Flared or vented less than 1 hour 433
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 19.972
7. Other 0
TOTAL items 1-7 35.562
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I herebyçemv that the foregoing is true and correct to the best of my knowledge.
Signat ¡ e /hA1 Þ! A ¡j-~_ /11'/1 /.R, ~Title PRODUCTION ACCOUNTANT Date 04/11/2003
// " /1
- V
Form 10 422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 14.58
B C AND D 524112 9.85
E F AND G 524114 13.87
UNDEFINED (GAS) 524500 61. 70
'111.1.111¡lill~¡ÎIIIIIII·II~III~IIIII~lllilllllll1111¡lljllllll
1 . Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
- --
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL APRIL 2003
Disposition Volume MCF*
1. Sold 13.683
2. Reinjected 0
3. Flared or vented less than 1 hour 390
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 210
6. Used for lease operations 18.677
7. Other 0
TOTAL items 1 - 7 32.960
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
SignaturÚ/I/! p l-iJ ß~m.ø ~£/ Title PRODUCTION ACCOUNTANT Date 05/16/2003
1/ /
II V
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 14.58
B C AND D 524112 9.77
E F AND G 524114 13.60
UNDEFINED (GAS) 524500 62.05
1:11..IIII~~!II~~I!II~III.lllllllllllt~III~.1111111111:i¡IIII.11
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL MAY 2003
Disposition Volume MCF* *Indicate contribution of each pool to total.
Pool Name Code Percent
1. Sold 12.360
A 524110 14.54
2. Reinjected 0
B C AND D 524112 9.74
3. Flared or vented less than 1 hour 433 E F AND G 524114 13.65
4. Flared or vented greater than 1 hour 55 0./ UNDEFINED (GAS) 524500 62.07
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 19.808
7. Other 0 illl!IIII.IIIIIIII~¡I.::IIIII¡III.·~I.I!I¡¡I::.::I::·i:~:.:¡.
TOTAL items 1 - 7 32.873
1. Safety 55'MCF
8. NGL gas equivalent produced 0
2. Lease Use MCF
9. Purchased gas 41
3. Conserv. Purposes MCF
10. Transferred from: 0 !~ 7 jJd5
11. Transferred to: 0
Co';:lIlissioher .
Date
Remarks:
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
I hereby certify that the foregoing is true and correct to the best of my knowledge. 60 degrees F. Report due by the 20th of the
'el11L/-,£JffiÆ1¡jj ¿ month following the month of disposition.
Signatu Title PRODUCTION ACCOUNTANT Date 06/09/2003 Authority 20 AAC 25.235
Ii (
Form lO-422V "-../
3p-
Rev. 4/95
Excess Flare Log Report
Facility Name:
BAKER PLATFORM
Month/Year:
May 2003
Date & Time Event Gas Steps Taken to Equipment Down
Beain End MCF Planned? DescriDtion of Incident Cateaorv Reason Actions Taken Minimize Recurrence MP-2 ID Number
5/18/2003 9:30 5/18/200315:30 55 N ENTIRE FIRE AND GAS SYSTEM OPERATIONAL OTHER: SEE DESC OF EVENT CUT BACK ON THE ANNULlS REPAIRED LEAKING VALVE B-SP-LP
SHUT IN DUE TO LEAK GAS ON WELLS TO.MINIMIZE IN THE FIRE WATER
DETECTED BY PRESSURE FLARING WHILE FIRE AND SYSTEM.
SENSOR ALARM IN FIRE WATER GAS SYSTEMS WERE DOWN.
SYSTEM. PROPER PERSONNEL AND
PARTS ON HAND TO
PERFORM MAINTENANCE.
Report Date: 6/20/2003
Page: 1 of 1
OaK.". May t lare b vent
Subject: Baker May Flare Event
Date: Tue, 22 Jul2003 14:27:02 -0800
From: "Shehata, Danny" <dannys@unocal.com>
To: "McMains, Stephen E -AOGCC" <Steve_McMains@admin.state.ak.us>
Steve,
The 2 flare events on 5/17 and 5/18 of less than an hour are not connected to the over an hour event of 55mcf on
5/18, this was confirmed with field operations. If you have any additional concerns about the flare events please just
give me a call.
Also we will drop off the TBU and TBF AOGCC reports either today or first thing tomorrow morning. The other
reports should arrive, at the latest, by tomorrow afternoon.
Danny Shehata
Unocal Alaska
Anchorage Accounting
909 W 9th Ave
Anchorage, AK 99501
Phone: 907263-7617
Fax: 907263-7607
1 of 1
7/28/2003 9:50 AM
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JUNE 2003
Disposition Volume MCF* *Indicate contribution of each pool to total.
Pool Name Code Percent
1. Sold 10.346
A 524110 13.60
2. Reinjected 0
B C AND D 524112 9.11
3. Flared or vented less than 1 hour 500 E F AND G 524114 13.01
4. Flared or vented greater than 1 hour 215 UNDEFINED (GAS) 524500 64.28
(Supplemental report required - See 20 AAC 25.235) ... ,
',-
5. Pilot and Purge 210 -
6. Used for lease operations 18.790
7. Other 0
11·111111.1~1111~·I~III.IIIIÎlllil¡II~"IIIIII"I·"IIII"!1111·
TOTAL items 1 - 7 30.061
.
1. Safety Z I~MCF
8. NGL gas equivalent produced 0
2. Lease Use MCF
9. Purchased gas 24
3. Conserv. Purposes MCF
10. Transferred from: 0 ~~ ~t(p)
11. Transferred to: 0 com~oer
Date
Remarks:
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
I hereby certify that the foregoing is true and correct to the best of my knowledge. 60 degrees F. Report due by the 20th of the
SignaturdAÆIJ ~jl{41tA k.Title PRODUCTION ACCOUNTANT Date month following the month of disposition.
07/18/2003 Authority 20 AAC 25.235
L.
r -4 V V
ðB,e-
Fo mlO 22
Rev. 4/95
Excess Flare Log Report
Facility Name:
BAKER PLATFORM
MonthlYear:
June 2003
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? DescriDtion of Incident Cateaorv Reason Actions Taken Minimize Recurrence MP-2 ID Number
6/30/2003 0:01 6/30/200323:59 215 Y SHUTTING IN PLATFORM. OPERATIONAL OTHER: SEE DESC OF EVENT PLATFORM BEING PLANNED SHUT-IN OF 00-00-00
SHUTDOWN FOR ENTIRE PLATFORM TO
LIGHTHOUSE MODE CEASE PRODUCTION.
OPERATIONS. ALL WELLS
SYSTEMA TICALL Y BEING
SHUT-IN. CUT BACK ON TANK
AND PRODUCTION UNIT
MAKE UP GAS.
-
,
Report Date: 7/17/2003
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JULY 2003
Disposition Volume MCF*
1. Sold 9.584
2. Reinjected 0
3. Flared or vented less than 1 hour 224
4. Flared or vented greater than 1 hour 388
(Supplemental report required - See 20 MC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 5.994
7. Other 0
TOTAL items 1 - 7 16.407
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby C ffy I~I Ihe foregoing is ,Ime and correct 10 the best of my knowledge.
Signatur ~/~1 f'flí\f) ft,tIM /'1 d ./1) Title PRODUCTION ACCOUNTANT Date 08114/2003
( /"
Form 10-422 1/ 'J
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
UNDEFINED (GAS) 524500 100.00
¡·¡IIIIIII~IIII'¡·~.lï..IIIIIIIIII.~.II¡"I...1.111..I·¡··~·II.
1.'Sn~ 10Q ~~ 3 138 MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
:::!Jo~ 117/03
Date . /
Note: All volumes must be corrected to
pre~sute of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
BAKER PLATFORM
MonthlYear:
July 2003
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? DescriDtion of Incident Cateaorv Reason Actions Taken Minimize Recurrence MP-2 ID Number
7/1/20030:01 7/1/200323:59 264 N SHUTTING IN PLATFORM. OPERATIONAL OTHER: SEE DESC OF EVENT PLATFORM BEING PLANNED SHUT-IN OF 00-00-00
SHUTDOWN FOR ENTIRE PLATFORM TO
LIGHTHOUSE MODE CEASE PRODUCTION.
OPERATIONS. ALL WELLS
SYSTEMA TICALL Y BEING
SHUT-IN. CUT BACK ON TANK
AND PRODUCTION UNIT
MAKE UP GAS.
7/2120030:01 7/21200323:59 124 N SHUTTING IN PLATFORM. OPERATIONAL OTHER: seE DESC OF EVENT PLATFORM BEING PLANNED SHUT-IN OF 00-00-00
SHUTDOWN FOR ENTIRE PLATFORM TO
LIGHTHOUSE MODE CEASE PRODUCTION.
OPERATIONS. ALL WELLS
SYSTEMA TICALL Y BEING
SHUT-IN. CUT BACK ON TANK
AND PRODUCTION UNIT
MAKE UP GAS.'
Report Date: 8/14/2003
Page: 1 of 1
,
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL AUGUST 2003
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 0
6. Used for lease operations 250
7. Other 0
TOTAL items 1 - 7 250
8. NGL gas equivalent produced 0
9. Purchased gas 5.375
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby~!. that the foregoing i. true and correct to the hest of my Irnowledge.
/' /;0V; 1
Signatu fA/?' /. I ~ /1/1/1£1 /1Íú Title PRODUCTION ACCOUNTANT Date 09/18/2003
l
Form 10-422 \...J
Rev. 4/95
!)
*Indicate contribution of each pool to total.
Pool Name Code Percent
UNDEFINED (GAS) 524500 100.00
11111111111~lllltll~III~.IIIIIIIIIIII~IIIII:illlllllll1,:::llllj
1 Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 0
6. Used for lease operations 0
7. Other 0
TOTAL items 1-7 0
8. NGL gas equivalent produced 0
9. Purchased gas 991
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
i~ sJ2 .
Signatur J;p¡ J_ t! f/. ¿1J1..y A,. ;/./ Title PRODUCTION ACCOUNTANT Date 10/16/2003
7/ I
Form 10-422 J'
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL SEPTEMBER2003
*Indicllte contribution of each pool to total.
Pool Name Code Percent
1111:.III~ÎIII~!i~III~.I.II¡I,II~IIIIIIIIII!!IIIII~1111III
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL OCTOBER 2003
*Indicate contribution of each pool to total.
Pool Name Code Percent
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 0
6. Used for lease operations 0
7. Other 0
TOTAL items 1 - 7 0
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I here~fy that the :oregoing is tme aDd correct to the hest of my knowledge.
Signatu 'û ¡J I-Æ.£IÞ~ d ú~ Title PRODUCTION ACCOUNTANT Date 11/17/2003
./ I
v V
-
Form 10 422
Rev. 4/95
:i:¡illl/¡I~~¡ill~::~:II~.iillllll~~illl¡~i:lli:¡ililllIII/IIII/ill:/
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL NOVEMBER 2003
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 0
6. Used for lease operations 0
7. Other 0
TOTAL items 1 - 7 0
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I her~l; rtify lhal the foregoIng Is true and 'nrrect 10 the hest 01 my knowledg~
Signa '144JI d~~A/ Lf h./ Title PRODUCTION ACCOUNTANT Date 12/18/2003
, I
Form 10-422 V
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
11:111.III~illl¡II~II.I.II~IIII~~I¡IIIII!!11111111111111/1
1 Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Disposition Volume MCF*
1. Sold 0
2. Reinj ected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 0
6. Used for lease operations 0
7. Other 0
TOTAL items 1-7 0
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I here7C that the foregoing Is true and correct to the best of my knowledge.
Signatu ~ A-f, 1/IÞ'vtM A LI Title PRODUCTION ACCOUNTANT Date 01120/2004
II ~I
Form 10-42Zll U
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL DECEMBER 2003
*Indicate contribution of each pool to total.
Pool Name Code Percent
11111.111~~III~I~llli.II.'I·I··illlIIIII¡IIII¡1111III1I
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Rev. 4/95