FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
BAKER PLATFORM
Operator
UNOCAL ALASKA RESOURCES
Field(s)
MIDDLE GROUND SHOAL
MonthlY ear of Disposition
JANUARY 2002
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
100
Pool Name Code Percent
A 524110 16.20
B C AND D 524112 10.92
E F AND G 524114 51. 09
UNDEFINED (GAS) 524500 21. 79
2. Reinjected
0
419 ./
0 /
3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 2S.23S)
5. Pilot and Purge
TOTAL items 1 - 7
217
28.841
0
29.577 /"
0
1. 078
0
0
11111111~!!IIf:IIIII:I~I:I;IIIIIIIIII~JIIIIII~II!~~¡111·I!II!IIII·!IIII!II
1. Safety MCF
6. Used for lease operations
7. Other
8. NGL gas equivalent produced
2. Lease Use
MCF
9. Purchased gas
3. Conserv. Purposes
MCF
10. Transferred from:
11. Transferred to:
Commissioner
Date
Remarks:
IVL
~
I hereby cert)J.. t~at. the foregoing is true and currect to the hest of my ImOwled. ge.
Signature //[1 /hO ~ [{4~ Title ACCOUNTING SUPERVISOR Date
1/ I
V V
02/07/2002
)~I L"'i.rv ~
.
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
BAKER PLATFORM
Operator
UNOCAL ALASKA RESOURCES
)
Disposition
1. Sold
2. Reinjected
.
3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 2S.23S)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
Field(s)
MIDDLE GROUND SHOAL
MonthlY ear of Disposition
FEBRUARY 2002
Volume MCF*
19.377
19.951
378
196
4.779
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature dlt.AO ~{7!~
II 1/
Title
ACCOUNTING SUPERVISOR
Forlll10-422
Rev. 4/95
o
o
o
o
o
o
o
Date
03/07/2002
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 28.01
B C AND D 524112 19.09
E F AND G 524114 50.37
UNDEFINED (GAS) 524500 2.53
IIIIIIIIIIII~IIII!:!~III;IIIII:IIIIIIIII~IIIIIIIIIIIIII!111!I!illlll
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
BAKER PLATFORM
Operator
UNOCAL ALASKA RESOURCES
Field(s)
MIDDLE GROUND SHOAL
MonthlY ear of Disposition
MARCH 2002
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
85
Pool Name Code Percent
A 524110 33.18
B C AND D 524112 22.61
E F AND G 524114 44.21.
2. Reinjected
3. Flared or vented less than 1 hour
0
477 ~.
6.620 /
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge
217
6. Used for lease operations
'0
11.027
7. Other
o
04/11/2002
II¡I!IIIIII~IIII~III~!II;.IIIII~IIIJIIIII~III~~III!II!1111:11111111111
1. Safety (PS7+ MCF
2. Lease Use 'Ie, MCF
3. Conserv. Purposes MCF
blL1.J.. ~~ f(Yt/o,
Comm ioner Date
" ... . -II.. ..
,tJ" Ir WI .;o- M
Note: All volumes must be corrected to ...--
pressure of 14.65 psia and to a temperatur~ ~R 1 '7 '"'i
60 degrees F. Report due by the 20th of th~ . . L
month following the month of disposition.
Authority 20 AAC 25.235 AlaskaOil&GasCom
W<íA-
,
TOTAL items 1-7
18.426 ./
8. NGL gas equivalent produced
o
9. Purchased gas
8.815
10. Transferred from:
o
0.
11. Transferred to:
o
Remarks:
E"""D
",,-)
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature dløcJ 1i/~ Title ACCOUNTING SUPERVISOR Date
Oen.
Ul..
Gomrniss\c¡r!
II 1/
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name:
BAKER PLATFORM
MonthlY ear:
March 2002
'-\
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
3/20/2002 8:00 3/20/2002 9:30 46 y Gas compressor shutdown. OPERATIONAL SCHEDULED MAINTENANCE Insure appropriate personnel and Routine maintenance to safe B-C-0202-1
equipment are on site prior to and reliable operation.
shutdown, perform inspection and
maintenance on compressor, and
return facility to normal operation
as soon as possible.
3/22/2002 5:00 3/22/2002 23:59 588 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Gas compressor seized. Complete Major overhaul of compressor. B-C-0202-1
overhaul required. Additional
personnel. mechanics and
electrician, flown to platform to
conduct overhaul, all parts and
equipment necessary for overhaul
expedited to platform. Oyerhaul
complete 4/8, retum to operation
3/23/20020:01 3/23/2002 23:59 622 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Gas compressor seized. Complete Major overhaul of compressor. B-C-0202-1
overhaul required. Additional
personnel, mechanics and
... electrician, flown to platform to
conduct overhaul, all parts and
equipment necessary for overhaul
expedited to platform. Overhaul
complete 4/8. retum to operation
,
3/24/20020:01 3/24/2002 23:59 630 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Gas compressor seized. Complete Major overhaul of compressor. B-C-0202-1
overhaul required. Additional
personnel. mechanics and
'\ electrician, flown to platform to
conduct overhaul, all parts and
equipment necessary for overhaul
expedited to platform. Overhaul
complete 4/8, return to operation
3/25/2002 0:00 3/25/2002 23:59 630 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Gas compressor seized. Complete Major overhaul of compressor. B-C-0202-1
overhaul required. Additional
personnel, mechanics and
electrician, flown to platform to
conduct overhaul. all parts and
equipment necessary for overhaul
expedited to platform. Overhaul
complete 4/8, retum to operation
"h
'"
l\
\;'
\:
'\
~
~...
\}
~
"'-.
'-.J
Report Date: 4/11/2002
Page: 1 of 3
Excess Flare Log Report
3/26/2002 0:00 3/26/2002 23:59 679 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Gas compressor seized. Complete Major overhaul of compressor. B-C-0202-1
overhaul required. Additional
personnel, mechanics and
electrician, flown to platform to
conduct overhaul, all parts and
, equipment necessary for overhaul
expedited to platform. Overhaul
complete 4/8, return to operation
3/27/20020:01 3/27/200223:59 679 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Gas compressor seized. Complete Major overhaul of compressor. B-C-0202-1
I overhaul required. Additional
i· personnel, mechanics and
electrician, flown to platform to
conduct overhaul, all parts and
equipment necessary for overhaul
, '. expedited to platform. Overhaul
complete 4/8, return to operation
-'
.J I
3/28/2002 0:00 3/28/2002 23:59 600 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Gas compressor seized. Complete Major overhaul of compressor. B-C-0202-1
\ overhaul required. Additional
\' personnel, mechanics and .
electrician, flown to platform to
conduct overhaul, all parts and
\' equipment necessary for overhaul
'-. ... expedited to platform. Overhaul
~- complete 4/8, return to operation
1\: 3/29/2002 0:01 3/29/2002 23:59 723 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Gas compressor seized. Complete Major overhaul of compressor. B-C-0202-1
overhaul required. Additional
'.......~, personnel, mechanics and
~~. electrician, flown to platform to
conduct overhaul, all parts and
equipment necessary for overhaul
expedited to platform. Overhaul
complete 4/8, return to operation
3/30/2002 0:00 3/30/2002 23:59 .723 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Gas compressor seized. Complete Major overhaul of compressor. B-C-0202-1
overhaul required. Additional
personnel, mechanics and
electrician, flown to platform to
conduct overhaul, all parts and
equipment necessary for overhaul
expedited to platform. Overhaul
complete 4/8, return to operation
Report Date: 4/11/2002
Page: 2 of 3
Excess Flare Log Report
j\
'"'>
~
3/31/20020:01 3/31/200223:59 700 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Gas compressor seized. Complete Major overhaul of compressor. B-C-0202-1
overhaul required. Additional
personnel, mechanics and
electrician, flown to platfonn to
conduct overhaul, all parts and
, equipment necessary for overhaul
expedited to platfonn. Overhaul
complete 4/8, return to operation
,
."
C::j
Report Date: 4/11/2002
Page: 3 of 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL APRIL 2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 409 ,./
4. Flared or vented greater than 1 hour 5.207 ../
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 210
6. Used for lease operations 10.785 ,/
7. Other 0
TOTAL items 1 - 7 16.611 ../
8. NGL gas equivalent produced 0
9. Purchased gas 9.295
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature d~~tfI< Q. :j[7(#; Title ACCOUNTING SUPERVISOR Date 05/07/2002
/1 go
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 34.73
B C AND D 524112 23.22
E F AND G 524114 42.05
:::;:::::::::::::::;:::::::::;:::::::::;:::;:;:::::;:::;:;:;:;:::::::::::;:::::::::::;:;:;:::::;:;:::;:::;:::::;:;:::::;:::::::::::::::::::::::::::::::::::::::::::::;:;:;:;:::::::::::::::::;:::::::::::.' ..............
::·:·II'I.IIf:IIII~!I~!!I~.::I~'I~[IIII!:I:·I.!·III!I··1·1·1:·1:11·:··:i=
1. Safety ..- MCF .~
:>, 'Z..o7
2. Lease Use MCF
3. Conserv. Purposes MCF
¿,IIO(ð~
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
BAKER PLATFORM
MonthlY ear:
April 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
4/1/20020:01 4/1/200223:59 700 N Gas compressor failure SAFETY UNSCHEDULED MAINTENANCE Continuation of event begun Major overhaul of compressor.
3/22/02. Gas compo seizes,
resulting in major break down &
requires complete overhaul.
Additional personnel, mechanics &
electrician flown to platfonn to
conduct overhaul & expedited all
parts & equip. needed for overhaul.
4/2/20020:01 4/2/2002 23:59 700 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Continuation of event begun Major overhaul of compressor.
3/22/02. Gas compo seizes,
resulting In major break down &
rèquires complete overhaul.
Additional personnel, mechanics &
electrician flown to platfonn to
conduct overhaul & expedited all
parts & equip. needed for overhaul.
4/3/2002 0:01 4/3/2002 23:59 650 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Continuation of event begun Major overhaul of compressor.
3/22/02. Gas compo seizes,
resulting in major break down &
requires complete overhaul.
Additional personnel, mechanics &
electrician flown to platfonn to
conduct overhaul & expedited all
parts & equip. needed for overhaul.
4/4/2002 0:01 4/4/2002 23:59 600 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Continuation of event begun Major overhaul of compressor.
3/22102. Gas compo seizes,
resulting in major break down &
requires complete overhaul.
Additional personnel, mechanics &
electrician flown to platfonn to
conduct overhaul & expedited all
parts & equip. needed for overhaul.
4/5/2002 0:01 4/5/2002 23:59 630 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Continuation of event begun Major overhaul of compressor.
3/22/02. Gas compo seizes, ,
resulting in major break down &
requires complete overhaul.
Additional personnel, mechanics &
electrician flown to platfonn to
conduct overhaul & expedited all
parts & equip. needed for overhaul.
Report Date: 5/15/2002
Page: 1 of 2
Excess Flare Log Report
4/6/20020:01 4/6/2002 23:59 635 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Continuation of event begun Major overhaul of compressor.
3/22/02. Gas compo seizes,
resulting In major break down &
requires complete overhaul.
Additional personnel, mechanics &
electrician flown to platform to
conduct overhaul & expedited all
parts & equip. needed for overhaul.
4f7120020:01 4f712002 23:59 640 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Continuation of event begun Major overhaul of compressor.
3/22/02. Gas compo seizes,
resulting in major break down &
requires complete overhaul.
Additional personnel, mechanics &
electrician flown to platform to
conduct overhaul & expedited all
parts & equip. needed for overhaul.
4/8/2002 0:00 4/8/2002 16:30 446 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Continuation of event begun Major overhaul of compressor. 00-00-00
3/22102. Gas compo seizes,
resulting in major break down &
requires complete overhaul.
Additional personnel, mechanics &
electrician flown to platform to
conduct overhaul & expedited all
parts & equip. needed for overhaul.
4/9/2002 1 :00 4/9/20027:00 162 N Gas compressor failure. SAFETY UNSCHEDULED MAINTENANCE Continuation of event begun Major overhaul of compressor.
3/22102. Gas compo seizes,
resulting in major break down &
requires complete overhaul.
Additional personnel, mechanics &
electrician flown to platform to
conduct overhaul & expedited all
parts & equip. needed for overhaul.
4/22/2002 10:00 4/2212002 12:00 44 Y Compressor shutdown. OPERATIONAL SCHEDULED MAINTENANCE Change piping on compressor, Replace power manifold 00-00-00
replace power manifold compressor controller.
compressor controller. Insure
appropriate personnel and
equipment are on site prior to
shutdown, perform work and return
facility to normal operation as soon
as possible. >
Report Date: 5/15/2002
Page: 2 of 2
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL MAY 2002
Disposition Volume MCF*
1. Sold 2.167
2. Reinjected 0
3. Flared or vented less than 1 hour 465
4. Flared or vented greater than 1 hour 1.203 ./
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 20.493
7. Other 0
TOTAL items 1 - 7 24.545
8. NGL gas equivalent produced 0
9. Purchased gas 5.701
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I herebYra that the fïregoiog is true and correct to the best of my Imowledge.
Signatur r¿ 6../1 a A ¿;~ bib Title ACCOUNTING SUPERVISOR Date 06/06/2002
.., /I
. ~
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 ~8.96
B C AND D 524112 12.70
E F AND G 524114 23.36
UNDEFINED (GAS) 524500 44.98
11111111:1111'1111f:lli.¡IJ¡III!II:I~i·I~~.:I¡·I!I·~I¡1::I¡¡:·¡
1. Safety I 2-0 ~ MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
bn~t ~J I I ò ';}.-
Date
..:IEf2-
Note:. All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
BAKER PLATFORM
MonthlY ear:
May 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
5/20/2002 0:01 5/20/200216:30 786 Y Blow down Well-14 aflerworkover. OPERATIONAL SCHEDULED MAINTENANCE Workover was done to install Maintenance. B-5P-HP
velocity string. The well was
brought back on line as soon as
possible after blow down.
5/22/2002 0:00 5/22/2002 21 :00 417 N Compressor shutdown. Power failure. OPERATIONAL UNSCHEDULED MAINTENANCE #4 AC was heating up requiñng Quarteñy maintenance B-G-0599
flushing cooler and cleaning of Ute conducted, cooler flushed and
intakes. Roving maintenance was intakes cleaned.
brought from the King Salmon
Platfonn to expedite repairs..
I I
,
Report Date: 6/11/2002
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JUNE 2002
Disposition Volume MCF*
1. Sold 18.279
2. Reinj ected 0
3. Flared or vented less than 1 hour 390
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 210
6. Used for lease operations 20,290
7. Other 0
TOTAL items 1 - 7 39.169
8. NGL gas equivalent produced 0
9. Purchased gas 26
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature 46 V1/2Ì)C/l,A) Title ACCOUNTING SUPERVISOR Date 07/08/2002
/I
7
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 14.09
B C AND D 524112 9.36
E F AND G 524114 15.73
UNDEFINED (GAS) 524500 60.82
!:!1111'11111~1111!11~111;111111~1~11~I~íllllil~III~~11!:llilliillllllllllll
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JULY 2002
Disposition Volume MCF*
1. Sold 16,399
2. Reinjected 0
3. Flared or vented less than 1 hour 412
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 25.826
7. Other 0
TOTAL items 1 - 7 42.854
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~gka~ Title ACCOUNTING SUPERVISOR Date 08/07/2002
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 15.06
B C AND D 524112 10.09
E F AND G 524114 14.16
UNDEFINED (GAS) 524500 60.69
11111111111~1111111~'IIf,II!II~III¡Jlllii~III~II!I:I:i:1'1:1111111111
1 Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL AUGUST 2002
Disposition Volume MCF*
1. Sold 13.873
2. Reinj ected 0
3. Flared or vented less than 1 hour 386
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 27.297
7. Other 0
TOTAL items 1 - 7 41.773
8. NGL gas equivalent produced 0
9. Purchased gas 8
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature C:MJr;t, §. Jçj/~ Title ACCOUNTING SUPERVISOR Date 09/09/2002
// '/
Forlll10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 14.98
,
B C AND D 524112 10.06
E F AND G 524114 14.15
UNDEFINED (GAS) 524500 60.81
III·IIIII:I~IIIIIII~·.I;.IIIIIIIIIII·~·II~.·I·"··II..I1111·11111
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
BAKER PLATFORM
Operator
UNOCAL ALASKA RESOURCES
Field(s)
MIDDLE GROUND SHOAL
MonthlY ear of Disposition
SEPTEMBER2002
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
2. Reinjected
o
Pool Name Code Percent
A 524110 16.26
B C AND D 524112 10.90
E F AND G 524114 15.34
UNDEFINED (~) 524500 57.50
1. Sold
12,298
3. Flared or vented less than 1 hour
373
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
o
5. Pilot and Purge
210
6. Used for lease operations
26.390
7. Other
o
!!I!IIIIIIII~IIIIIII~III;.IIII~IIIIJ!IIII~IIIIIIIIIIII:111:111:1111!:
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
TOTAL items 1-7
39.271
8. NGL gas equivalent produced
o
9. Purchased gas
o
10. Transferred from:
o
11. Transferred to:
o
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ¡J // Mn ~t1 Ú~ Title ACCOUNTING SUPERVISOR Date!
/I rl
10/08/2002
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
...
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL OCTOBER 2002
Disposition Volume MCF*
1. Sold 17 . 252
2. Reinjected 0
3. Flared or vented less than 1 hour 403
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 20.954
7. Other 0
TOTAL items 1 - 7 38.826
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of ~y knowledge.
Signature &./-1 Q })/<,I.;.o.0 Title ACCOUNTING SUPERVISOR Date 11/07/2002
,I /1
....
Form 10-422
Rev. 4/95
*Indicatecontribution of each pool to total.
Pool Name Code Percent
A 524110 17.86
B C AND D 524112 11.96
E F AND G 524114 16.32
UNDEFINED (GAS) 524500 .53.86
1IIIIIIIill~I:IIIII~III.IIIIIIIIIJIIIII~IIIIIIIIIIII:1111::III:I:il
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL NOVEMBER 2002
Disposition Volume MCF*
1. Sold 17.530
2. Reinjected 0
3. Flared or vented less than 1 hour 390
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 210
6. Used for lease operations 18.604
7. Other 0
TOTAL items 1-7 36.734
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I herehy certify that the fore;;;; trne and correct to the best of my Imowledge.
Signature /J k //J () ~ Title ACCOUNTING SUPERVISOR Date 12/10/2002
u //
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 13.19
B C AND D 524112 8.84
E F AND G 524114 11.51
UNDEFINED (GAS) 524500 66.46
1!11!1111~11!1~~ill!II~III~IIIII~I~IIIJJIIIIII~111111111111111111111111111
1 Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
'-....
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
.
Facility Operator Fi~ld(s) ~onthIY ear of Disposition
BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL DECEMBER 2002
Disposition - Volume MCF¡*
1. Sold 17,250
.,... "
2. Reinjected 0
~
3. Flared or vented less than 1 hour 410
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.23S)
5. Pilot and Purge 217
6. Used for lease operations 19,130
7. Other 0
TOTAL items 1 - 7 37.007
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature "K- '?- Title ACCOUNTING SUPERVISOR Date 01/09/2003
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
A 524110 12.50
B C AND D 524112 8.37
E F AND G 524114 11.60
UNDEFINED (GAS) 524500 67.53
..
;
illlllll.II~I·III.:~III~.illlllll.I.I~IIIIIII·:III·111·Iillilll
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
/,.
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235