STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2003
FACILITY: MGS C Platfonn
OPERATOR: XTOENERGYINC
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Operator
Platform "e"
XTO Ener y
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 626
(Supp. rpt. required-See 20AAC25.235)
5. Pilot and purge 1550
6. Used for lease operations 7605
7. Other 0
TOTAL items 1 -7 9781
8. NGL gas equivalent produced 0
9. Purchased gas 22774
10. Transferred from: NlA
11. Transferred to: NlA
Remarks: #9 Purchased Gas was purchased from Unocal.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
February 13,2003 ~
Signature tAJ.J....... , Dist. Admin. Mgr.
Form 10-422
Rev. 4/95
Fields
MonthlYear of Disposition
Jan-2003
Middle Ground Shoal
* Indicate contribution of each pool to total.
Pool Code Percent
"A" Pool 524110 0
"B, C & D" Pool 524112 0
"E, F & G" Pool 524114 100
: :;:;:;:; ::~: ~:~:~:~:~:~: ~:~:~: ~:~:~:~:~:~; ~;~:~~:~:~:~:~:~:~ :~:~ :~:~:~:Q'ff~*'-ø.I fµ~:~ Qþ!Y~fJf:Oi~ijM~ Ammm~~~~~}::~~~~Þ~~~ j~:~ ~~ ~~~: :::::: ...
..
.........................q.....
.................................
................................
.................................
........................
......
1 Safety
fç),b
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Æ~ Þì ~L¿~;y(
Signature
b3/ blo 3
{ ,
Date
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of the month following the month of
disposition. Authority 20 MC 25.235.
Questions may be directed to Bill Miller at (907) 776-2511.
Facility Name: Platform C
Date & Time
Be in End
1/1/0312:00 AM
1/31/0311:59 PM
Event Gas
MCF
626
Planned?
y
Over
1 Hour
Excess Flare Log Report
Descri tion of Incident
y
Safety flare: Pilot fuel gas, watertlood
oxygen stripping tower gas and gas
surges from well "headingØ (gas lift
operations).
Cate or
Operational
Reason
Corrective
Actions Taken
Steps Taken to
Minimize Recurrence
Safety flare
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Operator
Platform "e"
XTO Energy
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 476
(Supp. rpt. required-See 20MC25.235)
5. Pilot and purge 1400
6. Used for lease operations 3705
7. Other 0
TOTAL items 1 - 7 5580
8. NGL gas equivalent produced 0
9. Purchased gas 21622
10. Transferred from: NlA
11. Transferred to: NlA
Remarks: #9 Purchased Gas was purchased from Unocal.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
March 14, 21~~
Signature . , Dist. Admin. Mgr.
Form 10-422
Rev. 4/95
Fields
MonthlYear of Disposition
Feb-2003
Middle Ground Shoal
* Indicate contribution of each pool to total.
Pool Code Percent
"A" Pool 524110 0
/ "B, C & D" Pool 524112 0
"E, F & G" Pool 524114 100
,/
.................. .... ....... ... ..... . . . ............... ........ .................
::þ#I~#(Ø~:ø.ijW:ð:;,#dfflj-Ammm#~#M*tmn .. ......nn .n .. ... "..-
1 Safety Lj. 7Cp MCF
2 Lease Use MCF
3. Conserv. Purposes MCF
S~ ~ ~~ ð:?
{
Date
(f8t?-
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of the month following the month of
disposition. Authority 20 MC 25.235.
Questions may be directed to Bill Miller at (907) 776-2511.
Excess Flare Log Report
Facility Name: Platform C
Date & Time Event Gas Over Corrective Steps Taken to
Beain End MCF Planned? 1 Hour DescriDtion of Incident Cateaory Reason Actions Taken Minimize Recurrence
Safety flare: Waterflood oxygen
stripping tower gas and gas surges from
2/1/03 12:00 AM 2/28/0311:59 PM 476 Y Y well "heading" (gas lift operations). Operational Safety fiare
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Operator
Platform "e"
XTO Energy
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 464
(Supp. rpt. required-See 20MC25.235)
5. Pilot and purge 1550
6. Used for lease operations 2656
7. Other 0
TOTAL items 1 - 7 4670
8. NGL gas equivalent produced 0
9. Purchased gas 22524
10. Transferred from: NlA
11. Transferred to: NlA
Remarks: #9 Purchased Gas was purchased from Unocal.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
April 14, 2003 ~st.Admin.Mgr.
Signature
Form 10-422
Rev. 4/95
Fields
Month/Year of Disposition
Mar-2003
Middle Ground Shoal
* Indicate contribution of each pool to total.
Pool Code Percent
"A" Pool 524110 0
"B, C & D" Pool 524112 0
/ "E, F & G" Pool 524114 100
Qijí~ì~IØ~§ijWtfi~#~WM¡Wffl@~~1.AAØ(:iJJr; , ..
........ .. ...
..... ......... ..... .
1 Safety 4b4- MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Si~ h~Ol 573/o"<¡
. (
Date
J&e-.
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of the month following the month of
disposition. Authority 20 MC 25.235.
Questions may be directed to Bill Miller at (907) 776-2511.
Excess Flare Log Report
Facility Name: Platform C
Date & Time Event Gas Over Corrective Steps Taken to
Beain End MCF Planned? 1 Hour Description of Incident Cate!lorv Reason Actions Taken Minimize Recurrence
Safety flare: Watertlood oxygen
stripping tower gas and gas surges from
3/1/0312:00 AM 3/31/03 11 :59 PM 464 Y Y well "heading" (gas liff operations). Operational Safety flare
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Operator
Fields
Platform "e"
XTO Energy
Middle Ground Shoal
MonthlYear of Disposition
Apr-2003
* Indicate contribution of each pool to total.
Disposition Volume MCF*
Pool Code Percent
1. Sold 0
2. Reinjected 0 "A'~ Pool 524110 0
3. Flared or vented less than 1 hour 0 "B, C & D" Pool 524112 0
4. Flared or vented greater than 1 hour 812 / "E, F & G" Pool 524114 100
(Supp. rpt. required-See 20MC25.235)
5. Pilot and purge 1500
6. Used for lease operations 6869
7. Other 0 ::::::::::::::iÞ#iç'¡¡¡Ø~~QijW~:f¡#Ii)t¡l#mm~ffim.:åtl¡i¡ ................................................
...............------------......................
................................................
.................--..------......................
................................................
................................................
.............................................
...............--------------..............
1. Safety <6l Z MCF
TOTAL items 1 -7 9181
2. Lease Use MCF
8. NGL gas equivalent produced 0
3. Conserv. Purposes MCF
9. Purchased gas 19092
10. Transferred from: NlA I!-o-,I!,- -<---t. . 6/2...J¿O~
...-
Signature Date
11. Transferred to: NlA
Remarks: #9 Purchased Gas was purchased from Unocal.
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature
I hereby certify that the foregoing is true and correct to the best of my knowledge. of 60 degrees F. Report due by the 20th of the month following the month of
May 14, 200~ ,....JL *~~, disposition. Authority 20 MC 25.235.
Signature I Dist. Admin. Mgr.
!Sߡe-
Form 10-422
Rev.4/95
Questions may be directed to Bill Miller at (907) 776-2511.
Excess Flare Log Report
Facility Name: Platform C
Date & Time Event Gas Over Corrective Steps Taken to
Benin End MCF Planned? 1 Hour Description of Incident Category Reason Actions Taken Minimize Recurrence
Safety ftare: Wafertlood oxygen
stripping tower gas and gas surges from
4/1/03 12:00 AM 4/30103 11 :59 PM 812 Y Y well "heading" (gas lift operations). Operational Safely flare
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
XTO Energy
Platform "e"
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 690
(Supp. rpt. required-See 20MC25.235)
:>. ....¡101 ana purge 1550
6. Used for lease operations 3592
7. Other 0
TOTAL items 1 - 7 5831
8. NGL gas equivalent produced 0
9. Purchased gas 23471
10. Transferred from: NlA
11. Transferred to: NlA
Remarks: #9 Purchased Gas was purchased from Marathon.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
June 11, 2003
Signature l ~l~ Cl ~DiSt. Admin. Mgr.
Form 10-422
Rev. 4/95
Fields
MonthlYear of Disposition
May-2003
Middle Ground Shoal
* Indicate contribution of each pool to total.
Pool Code Percent
"A' Pool 524110 0
"B, C & D" Pool 524112 0
0/ "E, F & G" Pool 524114 100
AWffiffiMmm:~:jibtn:({{:
......................
......--..............
......................
.........
....................
.......--.............
...... ...............
bQo MCF ~fZ-
2. Lease Use MCF
3. Conserv. Purposes MCF
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of the month following the month of
disposition. Authority 20 MC 25.235.
Questions may be directed to Bill Miller at (907) 776-2511.
Excess Flare Log Report
Facility Name: Platform C
Date & Time Event Gas Over Corrective Steps Taken to
Beain End MCF Planned? 1 Hour DescriDtlon of Incident Cateaorv Reason Actions Taken Minimize Recurrence
Safety flare: Waferflood oxygen
stripping tower gas and gas surges from
5/1/0312:00 AM 5/31/03 11 :59 PM 690 Y Y well MheadingØ (gas lift operations). Operational Safety flare
.
·Þ
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Operator
Platform "e"
XTO Ener
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 830
(Supp. rpt. required-See 20MC25.235)
5. Pilot and purge 1500
6. Used for lease operations 4918
7. Other 0
TOTAL items 1 - 7 721
8. NGL gas equivalent produced 0
9. Purchased gas 22036
10. Transferred from: NlA
11. Transferred to: NlA
Remarks: #9 Purchased Gas was purchased from Marathon.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
July 14, 2003 a~
Signature ~ .', Dist. Admin. Mgr.
Form 10-422
Rev. 4/95
Fields
MonthlYear of Disposition
Jun-2003
Middle Ground Shoal
* Indicate contribution of each pool to total.
Pool Code Percent
"A" Pool 524110 0
"B, C & D" Pool 524112 0
"E, F & G" Pool 524114 100
..,.
::::::::t:(::::::::::tttt::::::Þ#,~¡ilª~:øijWWfìijð¡mAmmmM:1@6:;¡;jbf;::ttti
1. Safety
... P'
............-
....................... .
.----...................
........................
. ......................
<330
MCF
~
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Date
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of the month following the month of
disposition. Authority 20 MC 25.235.
Questions may be directed to Bill Miller at (907) 776-2511.
."
Excess Flare Log Report
Facility Name: Platform C
Date & Time Event Gas Over Corrective Steps Taken to
Bealn End MCF Planned? 1 Hour DescriDtion of Incident Cateaorv Reason Actions Taken Minimize Recurrence
Safety flare: Watertlood oxygen
stripping tower gas and gas surges from
6/1/0312:00 AM 6/30103 11 :59 PM 830 Y Y well 'heading' (gas lift operafions). Operational Safety flare
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator
Platform "e"
XTO Energ
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 1325
(Supp. rpt. required-See 20MC25.235)
5. Pilot and purge 1550
6. Used for lease operations 9999
7. Other 0
TOTAL items 1 -7 "'J 12874
8. NGL gas equivalent produced 0
9. Purchased gas '" 18017
10. Transferred from: NlA
11. Transferred to: NlA
Remarks: #9 Purchased Gas was purchased from Marathon.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
August 14,2003 tî.~
Signature I "'--I'. , Dist. Admin. Mgr.
Form 10-422
Rev. 4/95
j...,) t.ite '
W~
J~ 2
8/}
~
A /Y¡ CP
~~4
Fields
MonthlYear of Disposition
Jul-2003
Middle Ground Shoal
* Indicate contribution of each pool to total.
Pool Code Percent
"A' Pool 524110 0
"B, C & D" Pool 524112 0
/ "E, F & G" Pool 524114 100
.......
~~t}ttttt~~ç~,((tö~lJffli(~j~f~iflijj)~~@tjiij~~ffjijj~fflitjft _...~....
..........
....... .....
.........
. . . . . . . . . . . . . . . . . . . . . . . . .
.........................
.......................................,
..............
.........
...........h. ....
.........
·........h......
.................
1 Safety
MCF
t32-.,
(
~.~
2. Lease Use
MCF
3. Conserv. Purposes
MCF
I~./ ~J~
Signature
7//0/0'3
D~te /
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of the month following the month of
disposition. Authority 20 MC 25.235.
~~
.,
Questions may be directed to Bill Miller at (907) 776-2511.
~.
?
..
Excess Flare Log Report
Facility Name: Platform C
Date & Time Event Gas Over Corrective Steps Taken to
Begin End MCF Planned? 1 Hour Description of Incident Category Reason Actions Taken Minimize Recurrence
Safety flare: Waterflood oxygen
stripping tower gas and gas surges from
7/1/0312:00 AM 7/31/0311:59 PM 1325 Y Y well "heading" (gas lift operafions). Operational Safety flare
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
XTO Ener y
Platform "e"
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 836
(Supp. rpt. required-See 20MC25.235)
5. Pilot and purge 1550
6. Used for lease operations 6138
7. Other 0
TOTAL items 1 - 7 8523
8. NGL gas equivalent produced 0
9. Purchased gas 19939
10. Transferred from: NlA
11. Transferred to: NlA
Remarks: #9 Purchased Gas was purchased from Marathon.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
September 15, 2003 ~
Signature (~ , Dist. Admin. Mgr.
Form 10-422
Rev. 4/95
Fields
MonthlYear of Disposition
Aug-2003
Middle Ground Shoal
* Indicate contribution of each pool to total.
Pool Code Percent
"A" Pool 524110 0
"B, C & D" Pool 524112 0
1/ "E, F & G" Pool 524114 100
....
:::t::nmmm¡¡lø~q¡WHt.M~ijfflfAmmmªmw*tl~Þ(((:::ni(:: .. .. .. .. .. .. ..
... ..... ............ ...........
1 Safety 336 MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
~ ~¿tZrl-~ /{/~ ~
Date
~
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of the month following the month of
disposition. Authority 20 MC 25.235.
Questions may be directed to Bill Miller at (907) 776-2511.
Excess Flare Log Report
Facility Name: Platform C
Date & Time Event Gas Over Corrective Steps Taken to
Be!in End MCF Planned? 1 Hour Description of Incident Cate!ory Reason Actions Taken Minimize Recurrence
Safety flare: Watertlood oxygen
stripping tower gas and gas surges from
8/1/0312:00 AM 8/31/0311:59 PM 836 Y Y well "heading' (gas lift operations). Operational Safely flare
;
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Middle Ground Shoal
Operator
Fields
MonthlYear of Disposition
Sep-2003
Platform "e"
XTO Ener y
* Indicate contribution of each pool to total.
Disposition
Volume MCF*
1. Sold
Pool Code Percent
0
0 "A" Pool 524110
0 "B, C & D" Pool 524112
1011 V "E, F & G" Pool 524114
.
1500
6554
2. Reinjected
3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supp. rpt. required-See 20AAC25.235)
5. Pilot and purge
6. Used for lease operations
..
... ::'::::::::Þ.ff¡M¡~j:º~'ø#W:MWm6.iAWiAAii¡1@.Wii't¡:ijK((::::::(:(::::::: .....
7. Other
...................
...................
...................
...................
...................
.............--....
...................
...................
o
1. Safety
TOTAL items 1 - 7
9065
2. Lease Use
8. NGL gas equivalent produced
o
3. Conserv. Purposes
9. Purchased gas
19251
10. Transferred from:
}J '\ rr~7/~~
NlA ('-J (j'þ/--?' /"
ý s(gn'i:ì~re
NlA
L!/lcJ/.3
Date
11. Transferred to:
Remarks: #9 Purchased Gas was purchased from Marathon.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
October 14, 2003
Signature ll. ~ a Wc....~DiSt. Admin. Mgr.
Form 10-422
Rev. 4/95
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of the month following the month of
disposition. Authority 20 MC 25.235.
Questions may be directed to Bill Miller at (907) 776-2511.
......
1011
o
o
100
..
......
..........
....
........
MCF -<'n
\..J:!:)V'
MCF
MCF
·
Excess Flare Log Report
Facility Name: Platform C
Date & Time Event Gas Over Corrective Steps Taken to
Bellin End MCF Planned? 1 Hour Description of Incident Catellorv Reason Actions Taken Minimize Recurrence
Safety flare: Waterflood oxygen
stripping tower gas and gas surges from
9/1/03 12:00 AM 8/31/0311:59 PM 1011 Y Y well "heading" (gas lift operations). Operational Safely flare
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Operator
Platform "e"
XTO Energy
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 1441
(Supp. rpt. required-See 20MC25.235)
5. Pilot and purge 1550
6. Used for lease operations 9035
7. Other 0
TOTAL items 1 - 7 12027
8. NGL gas equivalent produced 0
9. Purchased gas 17782
10. Transferred from: N/A
11. Transferred to: N/A
Remarks: #9 Purchased Gas was purchased from Marathon.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
February 1(,2~(j./~
Signature 1 J J. , ist. Admin. Mgr.
Form 10-422
Rev. 4/95
Fields
MonthNear of Disposition
Oct-2003
Middle Ground Shoal
* Indicate contribution of each pool to total.
Pool Code Percent -,"'-
"A" Pool 524110 0
"B, C & 0" Pool 524112 0
IV' "E, F & G" Pool 524114 100
1. Safety 1,441 MCF (]Bf--
2. Lease Use MCF
3. Conserv. Purposes MCF
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of the month following the month of
disposition. Authority 20 MC 25.235.
Questions may be directed to Bill Miller at (907) 776-2511.
Excess Flare Log Report
Facility Name: Platform C
Date & Time Event Gas Over Corrective Steps Taken to
Beain End MCF Planned? 1 Hour Description of Incident Cateaorv Reason Actions Taken Minimize Recurrence
Safety flare: Watertlood oxygen
stripping tower gas and gas surges from
101110312:00 AM 10/31/0311:59 PM 1310 Y Y well "heading" (gas 11ft operations). Operational Safety flare
'-
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Operator
Platform "e"
XTO Energy
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 1419
(Supp. rpt. required-See 20AAC25.235)
5. Pilot and purge 1500
6. Used for lease operations 7408
7. Other 0
TOTAL items 1 - 7 10327
8. NGL gas equivalent produced 0
9. Purchased gas 17788
10. Transferred from: N/A
11. Transferred to: N/A
Remarks: #9 Purchased Gas was purchased from Marathon.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
February 19, r;~
Signature J. , Dist. Admin. Mgr.
Form 10-422
Rev. 4/95
Fields
MonthlYear of Disposition
Nov-2003
Middle Ground Shoal
* Indicate contribution of each pool to total.
Pool Code Percent
"A" Pool 524110 0
"B, C & D" Pool 524112 0
,./ "E, F & G" Pool 524114 100
1. Safety \1-/1 MCF <:rßt'!--
2. Lease Use MCF
3. Conserv. Purposes MCF
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of the month following the month of
disposition. Authority 20 AAC 25.235.
Questions may be directed to Bill Miller at (907) 776-2511.
..
Excess Flare Log Report
Facility Name: Platform C
Date & Time Event Gas Over Corrective Steps Taken to
Begin End MCF Planned? 1 Hour DescriDtion of Incident Cateaorv Reason Actions Taken Minimize Recurrence
Safety flare: Waterllood oxygen
stripping tower gas and gas surges from
11/1/03 12:00 AM 11/30/03 11 :59 PM 1419 Y Y well "heading" (gas lift operations). Operational Safety flare
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Operator
Platform "e"
XTO Energy
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 775
(Supp. rpt. required-See 20MC25.235)
5. Pilot and purge 1550
6. Used for lease operations 6439
7. Other 0
TOTAL items 1 - 7 8764
8. NGL gas equivalent produced 0
9. Purchased gas 21427
10. Transferred from: N/A
11. Transferred to: N/A
Remarks: #9 Purchased Gas was purchased from Marathon.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
February 19, 2~4 II DA __1..~ I
Signature II ' ~, , Dist. Admin. Mgr.
Form 10-422
Rev.4/95
Fields
MonthNear of Disposition
Dec-2003
Middle Ground Shoal
* Indicate contribution of each pool to total.
Pool Code Percent
"A" Pool 524110 0
"8, C & D" Pool 524112 0
"E, F & G" Pool 524114 100
./
1. Safety
7'7:{ MCF GB¡z-
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of the month following the month of
disposition. Authority 20 MC 25.235.
Questions may be directed to Bill Miller at (907) 776-2511.
Excess Flare Log Report
Facility Name: Platform C
Date & Time Event Gas Over Corrective Steps Taken to
Begin End MCF Planned? 1 Hour DescriDtion of Incident CategorY Reason Actions Taken Minimize Recurrence
Safety flare: Waterflood oxygen
stripping tower gas and gas surges from
12/1/0312:00 AM 12/31/03 11 :59 PM 775 Y Y well "heading" (gas 11ft operations). Operational Safety flare