FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JANUARY 2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0 /'
4. Flared or vented greater than 1 hour 0 ./
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 4.375
7. Other 0
TOTAL items 1-7 4.592
8. NGL gas equivalent produced 0
9. Purchased gas 10.248
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is trne and correct to the best of my knowledge.
Signature á!Ø~Q )y¡:£-;&) Title ACCOUNTING SUPERVISOR Date 02/07/2002
// /I
v
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent.
E F AND G 524114 100.00
!/illlll~~iil~~III~li~lil~llliillll~ljililil~i/lilil¡1iiill/liilil/I:i
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Ll-'bn- L, J .....10
.
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
DILLON PLATFORM } UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL FEBRUARY 2002
Disposition Volume MCF*
1. Sold 0
2. Reinj ected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 73 /"
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 196
6. Used for lease operations 4.058
7. Other 0
TOTAL items 1 - 7 4.327 /.
8. NGL gas equivalent produced 0
9. Purchased gns 8.981
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the fore~oing is true and correct to the best of my knowledge.
Signaturedb...ð( {j ~~ ÚJ~ Title ACCOUNTING SUPERVISOR . Date 03/07/2002
.7 //
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
E F AND G 524114 100.00
1:~¡~illllll~ÎII1111~11111111~IIIÎIIIII~I·II~1111111111:1:li~il~1
1. Safety MCF
2. Lease Use '7 3 MCF
3. Conserv. Purposes MCF
G~(1,1v,t ii,¡ :4;;- ð Ie :>-
Commi ~oner Date
w,6Æ-
3/2:>.,/ () L
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
DILLON PLATFORM
Month/Year:
February 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End } MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
2/15/20028:00 2/15/2002 18:00 73 Y Gas compressor shutdown for repair OPERATIONAL SCHEDULED MAINTENANCE Insure appropriate parts. Repair meter. 00-00-00
of buy back meter. personnel and equipment are on
site prior to shutdown of system
to repair buy back meter, repair
meter and return facility to normal
operation as soon as possible.
Report Date: 3/8/2002
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
DILLON PLATFORM . UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL MARCH 2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations ,. 2.429
7. Other 0
TOTAL itemsl-7 2.646
8. NGL gas equivalent produced 0
9. Purchased gas 10.375
10. Transferred from: 0
"
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ¡J ¡};Þ1 01 ¡1,Lwe; Title ACCOUNTING SUPERVISOR Date 04/11/2002
¡¡ ¡
FornI 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
E F AND G 524114 100.00
111:1111~~~II~¡:1111ì:I~IIIIIII:IIIII~llilllll~/II~:11111:1111::1::1:11:/:
1. Safety MCF
2. Lease Use MCF,
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to RECE Vf;[,
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th 0 f the A P R'f Ci
month following the month of disposition. { ,',
Authority 20 AAC 25.235
"'. . _. -"" "-.,,,.
.nl 'oi.Q:Jrl'lm/S$,ün
Anchorage
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL APRIL 2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 210
6. Used for lease operations 4.157
7. Other 0
TOTAL items 1 - 7 4.367
8. NGL gas equivalent produced 0
9. Purchased gas 7.354
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature di{ya#!:} k¿~ Title ACCOUNTING SUPERVISOR Date 05/0712002
II ,/
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
E F AND G 524114 100.00
Illilll'~I.II~~llllili~III~.III'I~II~~IIII·~II!~I1111/~Ii/I¡IIIIII
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
,
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
DILLON PLATFORM
Operator
UNOCAL ALASKA RESOURCES
Field(s)
MIDDLE GROUND SHOAL
MonthlY ear of Disposition
MAY 2002
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
1. Sold
o
E F AND G
524114
100.00
2. Reinjected
o
3. Flared or vented less than 1 hour
o
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
o
5. Pilot and Purge
217
6. Used for lease operations
6.557
7. Other
o
8. NGL gas equivalent produced
o
:111:11'~IIII~ΡII~II~III~IIIIII~II~I¡jlll/I~¡I¡I:/I:li::111111:111111:1
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
TOTAL items 1 - 7
6.774
9. Purchased gas
5.927
10. Transferred from:
o
11. Transferred to:
o
Remarks:
I hereby œrtiJ_p.tifY ~t the foregoin.g is true and correct to the best of my knowledge.
Signature Z¿¿i:ø a~;dÆ/ Title ACCOUNTING SUPERVISOR Date
// //
V v
06/0612002
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ForlU 10-422
Rev. 4/95
Dillon tlaring
Subject: Dillon flaring
Date: Fri, 21 Jun 2002 12:53:06 -0700
From: "Johnston, David W -Contract" <johnstond@unocal.com>
To: '"winton_aubert@adrnin.state.ak.us''' <winton _ aubert@adrnin.state.ak.us>,
"McMains, Stephen E -Vendor" <Steve _ McMains@adrnin.state.ak.us>
CC: "Bounds, Janet G" <boundsj@unocal.com>,
"Gould, Stephanie AD -Contract" <goulds@unocal.com>
Winton, Steve
FYI, Dillon Platform is installing some new process flow lines. This will require shutting down the gas compressor
for a few hours each day while the work progresses. The compressor will be shut down only as needed to
complete the work. Some flaring of gas will occur during those periods that the compressor is down.
Dave Johnston
lofl
6/21/20022:33 PM
·'.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JUNE 2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 110 ../
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 210
6. Used for lease operations 6.205
7. Other 0
TOTAL items 1 - 7 6.525
8. NGL gas equivalent produced 0
9. Purchased gas 5.065
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ø PJ 11 ~.~'..k) Title ACCOUNTING SUPERVISOR Date 07/08/2002
1/ /1
" v
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
E F AND G 524114 100.00
:IIIIIIIIII~~/II~II~III~IIIIII~II~I¡I/II//~IIII~IIIIIIIlli/IIIIIII!:~/1
1 . Safety J I 0 MCF
2. Lease Use MCF
3. Conserv. Purp oses MCF
(Qp¡. ~ ~J ( fo ;r
comm~one Date
::JBf-
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:
DILLON PLATFORM
MonthlY ear:
June 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
6/19/200210:00 6/19/200215:00 45 Y Vapor recovery unit (VRU) down for OPERATIONAL SCHEDULED MAINTENANCE VRU offline to install new MAINTENANCE 00-00-00
maintenance production piping. AOGCC notified
by email 6/21/02 to Winton Aubert.
Gas compressor offline only as
needed to complete install. Install
completed as scheduled, w/parts &
personnel on hand, facility retumed
to nonnal operation
6/20/2002 9:00 6/20/200214:00 65 Y Gas compressor and VRU OPERATIONAL SCHEDULED MAINTENANCE Gas compressor & VRU offline to Maintenance 00-00-00
maintenance install new production spools.
AOGCC notified email 6/21/02 to
Winton Aubert. Gas compo offline
only as needed to complete install.
Install completed as scheduled,
w/parts & personnel on hand.
retumed to nonnal operations
Report Date: 7/11/2002
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JULY 2002
Disposition Volume MCF*
1. Sold 0
2. Reinj ected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 6.145
7. Other 0
TOTAL items 1 - 7 6.362
8. NGL gas equivalent produced 0
9. Purchased gas 5.488
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature dkrð- (] ~úAj Title ACCOUNTING SUPERVISOR Date 08/0712002
v f/
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
E F AND G 524114 100.00
!¡IIIIII!ilf,J11Iililll~III!II~I¡II,I~I~iillll~III;~/111II/Iilil·lill/:iiil
1 Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL AUGUST 2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 6.698
7. Other 0
TOTAL items 1 ~ 7 6.915
8. NGL gas equivalent produced 0
9. Purchased gas 6.186
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature dh..h1(l ÀI7I JA Title ACCOUNTING SUPERVISOR Date 09/09/2002
/1 /I
v
Form 10-422
Rev. 4195
*Indicate contribution of each pool to total.
Pool Name Code Percent
E F AND G 524114 100.00
1·:I·llllli~·II~¡lilf.:lllllìil·II~i·IIIIII·.I·:·I·I·III~'III
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
DILLON PLATFORM
Operator
UNOCAL ALASKA RESOURCES
Field(s)
MIDDLE GROUND SHOAL
MonthlY ear of Disposition
SEPTEMBERZ002
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
1. Sold
o
E F AND G
524114
100.00
2. Reinj ected
o
3. Flared or vented less than 1 hour
o
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235)
o
5. Pilot and Purge
210
6. Used for lease operations
6.386
7. Other
o
:liilllll/I~~III~II~I:IIIII:IIIII~IIIII~II¡lllliilllllli:II//IIli~
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
TOTAL items 1-7
6.596
8. NGL gas equivalent produced
o
9. Purchased gas
7.401
10. Transferred from:
o
11. Transferred to:
o
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature @/ /A. (j.~~ Title ACCOUNTING SUPERVISOR Date'
I ({
v
10/08/2002
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4195
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
DILLON PLATFORM
Operator
UNOCAL ALASKA RESOURCES
Field(s)
MIDDLE GROUND SHOAL
MonthlY ear of Disposition
OCTOBER 2002
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
Pool Name
Code
Percent
o
2. Reinjected
E F AND G
524114
100.00
o
3. Flared or vented less than 1 hour
o
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
806
/
'.
5. Pilot and Purge
217
6. Used for lease operations
6.295
7. Other
o
i:lllllt~IIII~Jilltli~/III.II~llllilllll~I/I/I/11111111111'/1/·1111
1. Safety 80Ço MCF ~-
TOTAL items 1-7
7.318
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
8.479
3. Conserv. Purposes
MCF
10. Transferred from:
o
l;j/ 3J6 Y
Date
11. Transferred to:
o
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~/tfr:. ,~.JðJ.J ~) Title ACCOUNTING SUPERVISOR Date
.# II
11/1312002
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4195
Excess Flare Log Report
Facility Name:
DILLON PLATFORM
MonthlY ear:
October 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
10/11/20022:00 10/11/200223:59 161 N Gas Compressor automatically shut OPERATIONAL UNSCHEDULED MAINTENANCE Gas compressor was Replace several valves on gas
down due to multiple valves automatically shut down due to compressor.
requiring maintenance. several valves overheating.
Proper personnel, equipment.
and parts had to be brought
onsite to properly replace the
valves. Facilities returned to
nonnal operations as soon as
possible.
10/12/20020:00 10/12/200223:59 170 N Gas Compressor automatically shut OPERATIONAL UNSCHEDULED MAINTENANCE Gas compressor was Replace several valves on gas
down due to multiple valves automatically shut down due to compressor.
requiring maintenance. several valves overheating.
Proper personnel, equipment.
and parts had to be brought
onsile to properly replace the
valves. Facilities returned to
nonnal operations as soon as
possible.
10/13/2002 0:00 10/13/200223:59 176 N Gas Compressor automatically shut OPERATIONAL UNSCHEDULED MAINTENANCE Gas compressor was Replace several valves on gas
down due to multiple valves automatically shut down due to compressor.
requiring maintenance. several valves overheating.
Proper personnel, equipment,
and parts had to be brought
onsite to properly replace the
valves. Facilities returned to
nonnal operations as soon as
possible.
10/14/20020:00 10/14/200223:59 176 N Gas Compressor automatically shut OPERATIONAL UNSCHEDULED MAINTENANCE Gas compressor was Replace several valves on gas
down due to multiple valves automatically shut down due to compressor.
requiring maintenance. several valves overheating.
Proper personnel, equipment,
and parts had to be brought
onsite to properly replace the
valves. Facilities returned to
nonnal operations as soon as
possible.
Report Date: 11/13/2002
Page: 1 of 2
Excess Flare Log Report
10/15/20020:00 10/15/200211:30 123 N Gas Compressor automatically shut OPERATIONAL UNSCHEDULED MAINTENANCE Gas compressor was Replace several valves on gas
down due to multiple valvs requiring automatically shut down due to compressor.
maintenance. several valves overheating.
Proper personel, equipment,
and parts had to be brougl)t
onsite to properly replace the
valves. Facilities returned to
noraml operations as soon as
possible.
Report Date: 11/1.3/2002
Page: 2 of 2
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonthlY ear of Disposition
DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL NOVEMBER 2002
Disposition Volume MCF*
1. Sold 0
2. Reinj ected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 210
6. Used for lease operations 6.688
7. Other 0
TOTAL items 1 - 7 6.898
8. NGL gas equivalent produced 0
9. Purchased gas 10.141
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature~ n1.)~ø~ Title ACCOUNTING SUPERVISOR Date 12110/2002
/1 //
v
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
E F AND G 524114 100.00
................................................................. .. ... .. ..
..,-...........'.......................................................................'.'..................................................... ..............................................................
:·:.:IIf,~II!I~tilll/·~IIII!I!I~lllïfr!·I!I~:I!II!I·il:I:III/~J!/Iiilil
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
.
Facility Operator ;Fietd(s) MonthlY ear of Disposition
DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL DECEMBER 2002
Disposition -. Volume MÇF,*
1. Sold 0
-~~...
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 1. 593
7. Other 0
TOTAL items 1 - 7 1. 810
8. NGL gas equivalent produced 0
,
9. Purchased gas 21. 862
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~ 1'"2 Title ACCOUNTING SUPERVISOR Date 01/09/2003
Form 10-422
Rev. 4195
*Indicate contribution of each pool to total.
Pool Name Code Percent
E F AND G 524114 100.00
11·11111111~~III~I~~i·I~.IIIIIIIIIIII~I/II/llllllillll111111/111
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purpòses MCF
Commissioner Date
/" ,.
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC25.235