Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutMGS Dillon Platform / Unocal STATE OF AIASKA AOGCC GAS DISPOSITION FILES YEAR: 2002 FACILITY: MGS Dillon Platform- SMGS OPERATOR: UNION OIL CO OF CALIFORNIA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) MonthlY ear of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JANUARY 2002 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 /' 4. Flared or vented greater than 1 hour 0 ./ (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 217 6. Used for lease operations 4.375 7. Other 0 TOTAL items 1-7 4.592 8. NGL gas equivalent produced 0 9. Purchased gas 10.248 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is trne and correct to the best of my knowledge. Signature á!Ø~Q )y¡:£-;&) Title ACCOUNTING SUPERVISOR Date 02/07/2002 // /I v Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent. E F AND G 524114 100.00 !/illlll~~iil~~III~li~lil~llliillll~ljililil~i/lilil¡1iiill/liilil/I:i 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Ll-'bn- L, J .....10 . Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) MonthlY ear of Disposition DILLON PLATFORM } UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL FEBRUARY 2002 Disposition Volume MCF* 1. Sold 0 2. Reinj ected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 73 /" (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 196 6. Used for lease operations 4.058 7. Other 0 TOTAL items 1 - 7 4.327 /. 8. NGL gas equivalent produced 0 9. Purchased gns 8.981 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the fore~oing is true and correct to the best of my knowledge. Signaturedb...ð( {j ~~ ÚJ~ Title ACCOUNTING SUPERVISOR . Date 03/07/2002 .7 // Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 1:~¡~illllll~ÎII1111~11111111~IIIÎIIIII~I·II~1111111111:1:li~il~1 1. Safety MCF 2. Lease Use '7 3 MCF 3. Conserv. Purposes MCF G~(1,1v,t ii,¡ :4;;- ð Ie :>- Commi ~oner Date w,6Æ- 3/2:>.,/ () L Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Excess Flare Log Report Facility Name: DILLON PLATFORM Month/Year: February 2002 Date & Time Event Gas Steps Taken to Equipment Down Begin End } MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 2/15/20028:00 2/15/2002 18:00 73 Y Gas compressor shutdown for repair OPERATIONAL SCHEDULED MAINTENANCE Insure appropriate parts. Repair meter. 00-00-00 of buy back meter. personnel and equipment are on site prior to shutdown of system to repair buy back meter, repair meter and return facility to normal operation as soon as possible. Report Date: 3/8/2002 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) MonthlY ear of Disposition DILLON PLATFORM . UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL MARCH 2002 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 217 6. Used for lease operations ,. 2.429 7. Other 0 TOTAL itemsl-7 2.646 8. NGL gas equivalent produced 0 9. Purchased gas 10.375 10. Transferred from: 0 " 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ¡J ¡};Þ1 01 ¡1,Lwe; Title ACCOUNTING SUPERVISOR Date 04/11/2002 ¡¡ ¡ FornI 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 111:1111~~~II~¡:1111ì:I~IIIIIII:IIIII~llilllll~/II~:11111:1111::1::1:11:/: 1. Safety MCF 2. Lease Use MCF, 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to RECE Vf;[, pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th 0 f the A P R'f Ci month following the month of disposition. { ,', Authority 20 AAC 25.235 "'. . _. -"" "-.,,,. .nl 'oi.Q:Jrl'lm/S$,ün Anchorage ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) MonthlY ear of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL APRIL 2002 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 210 6. Used for lease operations 4.157 7. Other 0 TOTAL items 1 - 7 4.367 8. NGL gas equivalent produced 0 9. Purchased gas 7.354 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature di{ya#!:} k¿~ Title ACCOUNTING SUPERVISOR Date 05/0712002 II ,/ Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 Illilll'~I.II~~llllili~III~.III'I~II~~IIII·~II!~I 1111 /~I i /I¡IIIIII 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF , Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility DILLON PLATFORM Operator UNOCAL ALASKA RESOURCES Field(s) MIDDLE GROUND SHOAL MonthlY ear of Disposition MAY 2002 Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name Code Percent 1. Sold o E F AND G 524114 100.00 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required - See 20 AAC 25.235) o 5. Pilot and Purge 217 6. Used for lease operations 6.557 7. Other o 8. NGL gas equivalent produced o :111:11'~IIII~ΡII~II~III~IIIIII~II~I¡jlll/I~¡I¡I:/I:li::111111:111111:1 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date TOTAL items 1 - 7 6.774 9. Purchased gas 5.927 10. Transferred from: o 11. Transferred to: o Remarks: I hereby œrtiJ_p.tifY ~t the foregoin.g is true and correct to the best of my knowledge. Signature Z¿¿i:ø a~;dÆ/ Title ACCOUNTING SUPERVISOR Date // // V v 06/0612002 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ForlU 10-422 Rev. 4/95 Dillon tlaring Subject: Dillon flaring Date: Fri, 21 Jun 2002 12:53:06 -0700 From: "Johnston, David W -Contract" <johnstond@unocal.com> To: '"winton_aubert@adrnin.state.ak.us''' <winton _ aubert@adrnin.state.ak.us>, "McMains, Stephen E -Vendor" <Steve _ McMains@adrnin.state.ak.us> CC: "Bounds, Janet G" <boundsj@unocal.com>, "Gould, Stephanie AD -Contract" <goulds@unocal.com> Winton, Steve FYI, Dillon Platform is installing some new process flow lines. This will require shutting down the gas compressor for a few hours each day while the work progresses. The compressor will be shut down only as needed to complete the work. Some flaring of gas will occur during those periods that the compressor is down. Dave Johnston lofl 6/21/20022:33 PM ·'. ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) MonthlY ear of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JUNE 2002 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 110 ../ (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 210 6. Used for lease operations 6.205 7. Other 0 TOTAL items 1 - 7 6.525 8. NGL gas equivalent produced 0 9. Purchased gas 5.065 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ø PJ 11 ~.~'..k) Title ACCOUNTING SUPERVISOR Date 07/08/2002 1/ /1 " v Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 :IIIIIIIIII~~/II~II~III~IIIIII~II~I¡I/II//~IIII~IIIIIIIlli/IIIIIII!:~/1 1 . Safety J I 0 MCF 2. Lease Use MCF 3. Conserv. Purp oses MCF (Qp¡. ~ ~J ( fo ;r comm~one Date ::JBf- Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Excess Flare Log Report Facility Name: DILLON PLATFORM MonthlY ear: June 2002 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 6/19/200210:00 6/19/200215:00 45 Y Vapor recovery unit (VRU) down for OPERATIONAL SCHEDULED MAINTENANCE VRU offline to install new MAINTENANCE 00-00-00 maintenance production piping. AOGCC notified by email 6/21/02 to Winton Aubert. Gas compressor offline only as needed to complete install. Install completed as scheduled, w/parts & personnel on hand, facility retumed to nonnal operation 6/20/2002 9:00 6/20/200214:00 65 Y Gas compressor and VRU OPERATIONAL SCHEDULED MAINTENANCE Gas compressor & VRU offline to Maintenance 00-00-00 maintenance install new production spools. AOGCC notified email 6/21/02 to Winton Aubert. Gas compo offline only as needed to complete install. Install completed as scheduled, w/parts & personnel on hand. retumed to nonnal operations Report Date: 7/11/2002 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) MonthlY ear of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JULY 2002 Disposition Volume MCF* 1. Sold 0 2. Reinj ected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 217 6. Used for lease operations 6.145 7. Other 0 TOTAL items 1 - 7 6.362 8. NGL gas equivalent produced 0 9. Purchased gas 5.488 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature dkrð- (] ~úAj Title ACCOUNTING SUPERVISOR Date 08/0712002 v f/ Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 !¡IIIIII!ilf,J11Iililll~III!II~I¡II,I~I~iillll~III;~/111II/Iilil·lill/:iiil 1 Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) MonthlY ear of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL AUGUST 2002 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 217 6. Used for lease operations 6.698 7. Other 0 TOTAL items 1 ~ 7 6.915 8. NGL gas equivalent produced 0 9. Purchased gas 6.186 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature dh..h1(l ÀI7I JA Title ACCOUNTING SUPERVISOR Date 09/09/2002 /1 /I v Form 10-422 Rev. 4195 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 1·:I·llllli~·II~¡lilf.:lllllìil·II ~i·IIIIII·.I·:·I·I·III~'III 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility DILLON PLATFORM Operator UNOCAL ALASKA RESOURCES Field(s) MIDDLE GROUND SHOAL MonthlY ear of Disposition SEPTEMBERZ002 Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name Code Percent 1. Sold o E F AND G 524114 100.00 2. Reinj ected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) o 5. Pilot and Purge 210 6. Used for lease operations 6.386 7. Other o :liilllll/I~~III~II~I:IIIII:IIIII~IIIII~II¡lllliilllllli:II//II li~ 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date TOTAL items 1-7 6.596 8. NGL gas equivalent produced o 9. Purchased gas 7.401 10. Transferred from: o 11. Transferred to: o Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature @/ /A. (j.~~ Title ACCOUNTING SUPERVISOR Date' I ({ v 10/08/2002 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Form 10-422 Rev. 4195 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility DILLON PLATFORM Operator UNOCAL ALASKA RESOURCES Field(s) MIDDLE GROUND SHOAL MonthlY ear of Disposition OCTOBER 2002 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold Pool Name Code Percent o 2. Reinjected E F AND G 524114 100.00 o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required - See 20 AAC 25.235) 806 / '. 5. Pilot and Purge 217 6. Used for lease operations 6.295 7. Other o i:lllllt~IIII~Jilltli~/III.II~llllilllll~I/I/I/11111111111'/1/·1111 1. Safety 80Ço MCF ~- TOTAL items 1-7 7.318 8. NGL gas equivalent produced o 2. Lease Use MCF 9. Purchased gas 8.479 3. Conserv. Purposes MCF 10. Transferred from: o l;j/ 3J6 Y Date 11. Transferred to: o Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~/tfr:. ,~.JðJ.J ~) Title ACCOUNTING SUPERVISOR Date .# II 11/1312002 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Form 10-422 Rev. 4195 Excess Flare Log Report Facility Name: DILLON PLATFORM MonthlY ear: October 2002 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 10/11/20022:00 10/11/200223:59 161 N Gas Compressor automatically shut OPERATIONAL UNSCHEDULED MAINTENANCE Gas compressor was Replace several valves on gas down due to multiple valves automatically shut down due to compressor. requiring maintenance. several valves overheating. Proper personnel, equipment. and parts had to be brought onsite to properly replace the valves. Facilities returned to nonnal operations as soon as possible. 10/12/20020:00 10/12/200223:59 170 N Gas Compressor automatically shut OPERATIONAL UNSCHEDULED MAINTENANCE Gas compressor was Replace several valves on gas down due to multiple valves automatically shut down due to compressor. requiring maintenance. several valves overheating. Proper personnel, equipment. and parts had to be brought onsile to properly replace the valves. Facilities returned to nonnal operations as soon as possible. 10/13/2002 0:00 10/13/200223:59 176 N Gas Compressor automatically shut OPERATIONAL UNSCHEDULED MAINTENANCE Gas compressor was Replace several valves on gas down due to multiple valves automatically shut down due to compressor. requiring maintenance. several valves overheating. Proper personnel, equipment, and parts had to be brought onsite to properly replace the valves. Facilities returned to nonnal operations as soon as possible. 10/14/20020:00 10/14/200223:59 176 N Gas Compressor automatically shut OPERATIONAL UNSCHEDULED MAINTENANCE Gas compressor was Replace several valves on gas down due to multiple valves automatically shut down due to compressor. requiring maintenance. several valves overheating. Proper personnel, equipment, and parts had to be brought onsite to properly replace the valves. Facilities returned to nonnal operations as soon as possible. Report Date: 11/13/2002 Page: 1 of 2 Excess Flare Log Report 10/15/20020:00 10/15/200211:30 123 N Gas Compressor automatically shut OPERATIONAL UNSCHEDULED MAINTENANCE Gas compressor was Replace several valves on gas down due to multiple valvs requiring automatically shut down due to compressor. maintenance. several valves overheating. Proper personel, equipment, and parts had to be brougl)t onsite to properly replace the valves. Facilities returned to noraml operations as soon as possible. Report Date: 11/1.3/2002 Page: 2 of 2 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) MonthlY ear of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL NOVEMBER 2002 Disposition Volume MCF* 1. Sold 0 2. Reinj ected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 210 6. Used for lease operations 6.688 7. Other 0 TOTAL items 1 - 7 6.898 8. NGL gas equivalent produced 0 9. Purchased gas 10.141 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature~ n1.)~ø~ Title ACCOUNTING SUPERVISOR Date 12110/2002 /1 // v Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 ................................................................. .. ... .. .. ..,-...........'.......................................................................'.'..................................................... .............................................................. :·:.:IIf,~II!I~tilll/·~IIII!I!I~lllïfr!·I!I~:I!II!I·il:I:III/~J!/Iiilil 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION . Facility Operator ;Fietd(s) MonthlY ear of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL DECEMBER 2002 Disposition -. Volume MÇF,* 1. Sold 0 -~~... 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 217 6. Used for lease operations 1. 593 7. Other 0 TOTAL items 1 - 7 1. 810 8. NGL gas equivalent produced 0 , 9. Purchased gas 21. 862 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~ 1'"2 Title ACCOUNTING SUPERVISOR Date 01/09/2003 Form 10-422 Rev. 4195 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 11·11111111~~III~I~~i·I~.IIIIIIIIIIII~I/II/llllllillll111111/111 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purpòses MCF Commissioner Date /" ,. Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC25.235