Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Milne Point Central / BP
STATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2006 FACILITY: Milne Point Central OPERATOR: BP EXPLORATION 1. Facility Number 0290000024 IMitne 12. Fscaty Name Point Central 3 Field Milne Point 4. Operator IBP J Jan 5 ww of Disposition - 2006 Disposition Volume MCF 20. For production from multiple pools, 1st contribution of sect pool as a percent of Total Volute. a. Sold 19 351 Pod Name Pool Cods Percerd 7 Reinjected 723,738 Kupanik 525100 55.87% Schrader 525140 42.53% 8 Flared or vented 1 rout or less 1,263 ✓ Sag River 525150 1.60% Ugnu 525160 0.00% 9. Flared or vexed more than 1 four (see Instr.) 6,747 10. Pilot and Purge 3,566 It Uted for base operators (specify in Remarks) 305,010 12. Other (see Y13tr11ctions) 0 Authorization >1 hr Sa .:. fety / 6,747 MCF 13. TOTAL VOLUME (fTEMS 6-12) 1,059,675 Lease Use MCF 14 NOL Gas Equivalent Conservation MCF 15. Purdssed gas Waste. MCF 18. Transferred from: 6:2 4 7L . 3 ramniaaioner Dale 17. Transferred to: (Express as a repave e) 18 Remarks: Block 6 Is fuel gas sold to Milne Point Pipeline Co.; Block 11 is a6 other fuel gas (305,010 midi and assist gas (0 comet). Milne Point uses alt for assist gas with the vertical flare and produced gas with the horizontal flare. The vertical flare was used all month. i hereby certify that the foregoing is true and correct to the best of my knoMedgs. Manager, Production Taxes and Royalties Signature lAc `- rid Alaska Note: All must corrected to pressure re of of 1 14.65 psis and to a temperature of 80o F. Authority 20 MC25.235. Printed Name Bernard W. Hajny Prone (007)564 -5028 on Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit In Duplicate Start Date/Time End Date/Time Minutes Flare MCF Assist MCF Incident/Cause Description RanedlatIon Taken Unplanned Less than 1 Hour 01-Jan-06 2:03 01 -Jan-06 2:14 11 46.43 0.00 01-Jan-06 2:28 01- Jan-06 2:31 3 1.32 0.00 01- Jan -013 3:13 01 -Jan-08 3:37 24 3215 0.00 01- Jan-06 3:40 01 -Jan-06 3:46 6 4.29 0.00 01- Jan-06 4:16 01- Jan-06 4:23 7 7.33 0.00 01- Jan-06 13:31 01 -Jan-06 13:34 3 1.98 0.00 01- Jan-06 13:37 01 -Jan-06 13:45 8 11.44 0.00 01-Jan-06 13:46 01- Jan-06 13:48 2 1.30 0.00 01- Jan-06 13:50 01 -Jan-06 13:53 3 2.05 0.00 01- Jan-06 13:56 01- Jan -06 14:00 4 1.96 0.00 01- Jan-06 14:08 01- Jan-06 14:16 8 3.86 0.00 01- Jan-06 14.34 01- Jan-06 14:38 4 1.87 0.00 01- Jan-06 14.40 01- Jan-06 1444 4 1.61 0.00 01-Jan-06 16:36 01 -Jan-06 16:39 3 2.38 0.00 01- Jan-06 16:55 01- Jan -06 16:59 4 1.28 0.00 02-Jan-06 15:40 02- Jan-06 15:45 5 5.87 0.00 02-Jan-06 15:51 02 -Jan-06 15:56 5 1.93 0.00 02 -Jan-06 15:58 02 -Jan-06 16:41 43 77.49 0.00 02- Jan-06 16:44 02-Jan-06 17:06 22 30.19 0.00 02- Jan-06 17:09 02 -Jan-06 17:25 16 19.87 0.00 02- Jan-06 17:31 02 -Jan-08 17.40 9 29.05 0.00 02-Jan-06 17:43 02 -Jan-06 17:52 9 24.35 0.00 02- Jan-06 17:53 02- Jan - 0618:16 23 54.30 0.00 02- Jan-06 19:06 02 -Jan-06 19:07 1 0.32 0.00 02- Jan-06 19:20 02 -Jan-06 19:26 6 9.44 0.00 03- Jan-06 12:12 03 -Jan-06 12:13 1 0.32 0.00 03-Jan-06 12:14 03 -Jan-06 12:24 10 17.48 0.00 03-Jan-06 12:29 03 -Jan-06 12:30 1 0.32 0.00 04-Jan-06 5:17 04-Jan -06 5:22 5 10.71 0.00 05- Jan-06 18:02 05 -Jan-06 18:04 2 4.30 0.00 05- Jan-06 18:06 05 -Jan-06 18:08 2 8.59 0.00 BP Exploration Milne Point Unit Flare Incident Details 1/1/2006 - 1/31/2006 Page 1of Start Data)Tim. End DaterTime Minutes Flare MCF Assist MCF Incident'Cause Description Ramadiation Taken 05- Jan-06 18:18 05 -Jan-06 18:19 1 0.36 0.00 05-Jan-08 18:32 05 -Jan-06 18:33 1 0.80 0.00 05 -Jan-06 18:44 05 -Jan-06 18:44 1 0.32 0.00 06 -Jan-06 14:41 06 -Jan-06 14:42 1 0.65 0.00 06- Jan-06 16:39 06- Jan-06 16:40 1 0.99 0.00 06-Jan-06 16:44 06- Jan-06 16:45 1 0.67 0.00 06- Jan -C6 22:34 08-Jan -06 22:52 18 130.96 0.00 07- Jan-06 17:59 07 -Jan-06 18:00 1 0.64 0.00 07-Jan-08 18:03 07- Jan-06 18:04 1 0.33 0.00 07 -Jan-06 18:05 07- Jan-06 18:06 1 0.30 0.00 08-Jan-06 6:56 08- Jan-06 6:58 2 0.61 0.00 08- Jan-06 10:59 08 -Jan-06 11:20 21 48.63 0.00 08Jan 06 13:34 08 -Jan-06 13:42 8 17.93 0.00 09- Jan -06 1:18 09- Jan-06 1:19 1 0.69 0.00 09 -Jan-06 3:54 09 -Jan-06 3:55 1 0.67 0.00 09-Jan-08 18:29 09 -Jan-06 18:41 12 8.11 0.00 09- Jan-06 16 :43 09Jan06 16:43 1 0.33 0.00 09-Jan-06 16:47 09- Jan-06 16:50 3 1.33 0.00 09-Jan-06 17:01 09 -Jan-06 17:25 24 16.79 0.00 09 -Jan-06 17:29 09-Jan -06 17 33 4 2.77 0.00 09-Jan-06 17:34 09 -Jan-06 17:36 2 0.65 0.00 09-Jan-06 17 :37 09-Jan-06 18:08 31 20.94 0.00 09-Jan-06 18:16 09- Jan - 0618:56 40 30.87 0.00 09- Jan-06 18:58 09- Jan-06 18:59 1 0.61 0.00 09- Jan-06 19:08 09 -Jan-06 19:09 1 0.62 0.00 09- Jan-06 19:12 09 -Jan-06 19:13 1 0.67 0.00 09- Jan-06 19:14 09-Jan-06 19:15 1 0.65 0.00 09- Jan-06 19:18 09- Jan-06 19:22 6 3.29 0.00 09-Jan-06 19:23 09-Jan-06 19:34 11 5.14 0.00 09- Jan-06 19:35 09 -Jan-06 19:36 1 0.64 0.00 09- Jan-06 19:37 09- Jan-06 19:41 4 1.87 0.00 09- Jan-06 19:48 09- Jan-06 19:48 1 0.33 0.00 Milne Point Unit Flare Incident Details 1/1/2006 - 1/31/2006 BP Exploration Pape 2 of Start Datefiime End DatetTims Minutes Flare MCF Assist MCF Incident/Cause Description Rsmsdlation Taken 09- Jan-06 19:49 09 -Jan-06 19:50 1 0.31 0.00 09- Jan -06 20:07 09 -Jan-06 20 14 7 4.63 0.00 09 20:15 09 -Jan-06 20:19 4 2.29 0.00 09-Jan-06 20:21 09 -Jan-06 20:27 6 4.25 0.00 09- Jan -06 20:29 09- Jan-06 20:32 3 1.40 0.00 09- Jan-06 20:37 09- Jan-06 20:39 2 0.65 0.00 10- Jan-06 12:14 10- Jan-06 12:30 16 17.24 0.00 10 Jan-06 12:41 10 -Jan-06 12:45 4 1.30 0.00 10 12:48 10 -Jan-06 12:49 1 0.30 0.00 10-Jan-08 12:50 10 -Jan-06 12:51 1 0.32 0.00 10- Jan-06 12:59 10 -Jan-06 13:05 6 3.73 0.00 10-Jan-06 13 18 10- Jan-06 13:26 8 13.78 0.00 10 -Jan-06 13:29 10 -Jan-06 13:31 2 0.62 0.00 10 13:56 10- Jan-06 13:56 1 0.30 0.00 10- Jan-06 14:02 10-Jan-06 14:06 4 2.87 0.00 10-Jan-06 14:09 10 -Jan-06 14:13 4 1.26 0.00 10-Jan-06 14:14 10- Jan-06 14:15 1 0.32 0.00 10 - Jan - 06 14:17 10 -Jan-06 14:27 10 13.94 0.00 10 Jan - 0614:45 10 14:48 3 0.96 0.00 10-Jan-06 15:03 10 -Jan-06 15:04 1 0.31 0.00 10 -Jan -06 15:09 10 -Jan-06 15:22 13 12.95 0.00 10-Jan-06 15 :29 10- Jan-06 15 :31 2 0 9 0.00 10-Jan-06 15:48 10 -Jan-06 15:55 7 3.55 0.00 10- Jan-06 16:17 10 -Jan-06 16:21 4 3.33 0.00 10-Jan-06 16:24 10 - Jan - 06 16:29 5 7.01 0.00 10- Jan-06 17:12 10 -Jan-06 17:21 9 8.05 0.00 10- Jan-06 19:06 10 -Jan-06 19:17 11 12.02 0.00 11-Jan-06 2:49 11- Jan-06 2:58 9 7.93 0.00 11-Jan-06 3:14 11- Jan-06 3:21 7 10.71 0.00 11-Jan-06 3:37 11-Jan-06 3:48 9 15.81 0.00 11 3:49 11- Jan-06 156 7 8.60 0.00 11-Jan-06 4:14 11- Jan-06 4 :18 4 1.90 0.00 ti BP Exploration Milne Point Unit Flare Incident Details 1/1/2006 - 1/31/2006 Page 3 of 6 Start Datelime End Date!Time Minutes Flare MCF Assist MCF Incident /Cause Description Remediation Taken 11- Jan-06 420 11 -Jan-06 4 25 5 2.21 0.00 11- Jan-06 4:28 11- Jan-06 4:50 22 20.76 0.00 11 -Jan-06 5:07 11- Jan-06 5 1 4 8.33 0.00 11-Jan-06 5:15 11- Jan-06 5:20 5 6.07 0.00 11- Jan-06 6:55 11 -Jan-06 7:31 36 53.62 0.00 11- Jan-06 7:33 11- Jan-06 7.45 12 16.76 0.00 11-Jan-06 7:47 11- Jan-06 7:51 4 1.60 0.00 11- Jan-06 7:53 11- Jan-06 7:55 2 0.33 0.00 11- Jan-06 8:01 11 -Jan-06 8:13 12 15.27 0.00 11-Jan-06 8:22 11 -Jan-06 8:57 35 50 32 0.00 11 -Jan-06 9:16 11 -Jan-06 9:25 9 6.09 0.00 11 -Jan-06 9:29 11 -Jan-06 9:41 12 21.05 0.00 11- Jan-06 9:55 11- Jan-06 10:02 7 7 4 0.00 11-Jan-06 10:03 11 -Jan-06 10:03 1 0.31 0.00 11- Jan-06 10 18 11 -Jan436 1025 7 11.79 0.00 11-Jan-06 10:27 11- Jan-06 10:31 4 1.89 0.00 11- Jan-06 10:33 11 -Jan-06 10:45 12 18.05 0.00 11- Jan-06 10:59 11- Jan-06 11:02 3 2.70 0.00 11-Jan-06 11:05 11- Jan-06 11:08 3 2.58 0.00 11- Jan-06 13:41 11- Jan-06 13:48 7 29.00 0.00 13-Jan-06 10:52 13- Jan-06 10:53 1 0.63 0.00 13 -Jan -06 12:01 13 -Jan-06 12:24 23 24.32 0.00 13- Jan-06 12:27 13- Jan-06 12:29 2 0.30 0.00 13 -Jan -06 12:30 13- Jan-06 12:31 1 0.63 0.00 13- Jan-O6 12:37 13 -Jan-06 12:38 1 0.32 0.00 13- Jan-06 12:45 13- Jan-06 12:46 1 0.31 0.00 13 -Jan-06 12:50 13- Jan -06 13:12 22 31.17 0.00 13 -Jan -06 13:13 13 -Jan-06 13.15 2 0.33 0.00 13- Jan -06 16.42 13 -Jan-06 16:47 5 2.20 0.00 13- Jan-06 17:00 13- Jan-06 17:02 2 0.31 0.00 13-Jan-06 17:03 13- Jan -06 17:08 5 3.01 0.00 13- Jan-06 17:18 13- Jan-06 17:19 1 0.31 0.00 BP Exploration Milne Point Unit Flare Incident Details 1/1/2006 - 1/31/2006 Page 4 of 6 Start DaterTime End Date/Time Minutes Flare MCF Assist MCF Incident/Cause Description Rstn diation Taken 13- Jan-06 17:31 13 -Jan-06 17 1 0 3 0.00 13- Jan-06 18:03 13- Jan-06 18:06 3 0 9 0.00 13- Jan-06 18:23 13- Jan-06 18:24 1 0.61 0.00 13-Jan-06 18:30 13 -Jan-06 18:33 3 128 0.00 13- Jan-06 18:50 13- Jan -06 18:50 1 0.31 0.00 14- Jan-06 7:09 14- Jan-06 7:09 1 0.30 0.00 14- Jan-06 14:49 14 -Jan-06 14:54 5 6.16 0.00 14-Jan-06 2224 14- Jan-06 2225 1 0.31 0.00 15- Jan-06 4:11 15 -Jan-06 4:11 1 0.33 0.00 15-Jan-06 5:18 15 -Jan-06 5:23 5 2.18 0.00 15 -Jan-06 16:18 15 -Jan-06 16:19 1 0.32 0.00 15-Jan-08 17 15- Jan-06 17:39 2 0 6 0.00 15- Jan-06 11312 15- Jan-06 18 16 4 2.01 0.00 15- Jan-06 19.22 15 -Jan-06 19:30 8 8.18 0.00 15- Jan -06 20:17 15 -Jan-06 20:26 9 7.17 0.00 15-Jan-06 21:48 15-Jan-06 21:48 1 0.31 0.00 15- Jan-06 22:10 15 -Jan-06 22:13 3 1.23 0.00 16- Jan-08 3:51 18-Jan -06 3:52 1 0.32 0.00 16-Jan-06 8:19 16- Jan-06 8:19 1 0.32 0.00 21-Jan-06 3:18 21-Jan-08 3:19 1 1.24 0.00 21-Jan-06 3:29 21 -Jan-06 3:30 1 0.32 0.00 21-Jan 8:32 21 Jan-06 8:34 2 0.62 0.00 21- Jan-06 8:42 21 -Jan-06 8:42 1 0.33 0.00 21-Jan-06 8:47 21- Jan-06 8:47 1 0.33 0.00 21 9 21 Jan 9:33 1 0.33 0.00 21- Jan-06 9:51 21- Jan-O6 9:52 1 0.31 0.00 21-Jan-06 10:01 21-Jan-06 10:02 1 0.33 0.00 21-Jan-08 10:11 21- Jan-06 10:11 1 0.31 0.00 21 -Jan-06 10:32 21 -Jan-06 10:33 1 0.32 0.00 21- Jan-06 10:45 21 -Jan-06 10:46 1 0.31 0.00 21-Jan-06 1058 21- Jan-06 10:59 1 0.34 0.00 21-Jan-06 11:11 21 -Jan-06 11:11 1 0.33 0.00 Milne Point Unit Flare Incident Details 1/1/2006 - 1/31/2006 BP Exploration Page 5 o16 Unplanned Greater than 1 Hour I 08- Jan-06 9:17 08- Jan-06 10:56 99 970.09 0.00 Discovered gas leaks on Gas Lift Compressor (C- 5511A) from valve covers on the #3 cylinder. Shut down compressor to repair gas leaks. Shut4n 1 gas lift welts to mitigate flaring. Repeal were completed. Compressor was restarted and flaring ended. 08- Jan-06 11:20 08- Jan-06 13:31 11 - Jan - 06 6'.51 131 89 1,162.77 149.84 0.00 0.00 After fixing gas leaks on the A machine, discovered several gas leaks on the Gas Lift Compressor (C from valve covers on the #4 cylinder. Shut down compressor to repair gas leaks. Had to flare off the slug catcher since too much gas was coming in from the wells to the slug catcher Shut -in 7 gas lift welts and 5 high gas production wells to mitigate flaring. Repairs wets competed. Compressor was restarted and flaring ended, Welts Group shut In several wells, but In Otis case it took longer than one hour to respond and acOOmpish. 11 - Jan - 06 5:22 11- Jan-06 11:09 11 -Jan-06 13:24 135 207.31 0.00 A communication card in a Programmable Logic Controller (PLC) in Module 54 failed. Lost as gas compression. Emergency Shut Down (ESD) L-pad, E-pad, 13-pad. K-ped, and S to reduce flaring. Once the card was replaced and new fuse installed, regained compression and the flaring stopped. 8,534 barrels of o8 production was deferred today whit well pads shut -in, power restored, lines thawed, and rompressor restarted. 13- Jan-06 8:51 13- Jan-06 10:51 120 406.02 0.00 Power turbine 0801 went down. The instrument air to the fuel shutdown valve (W -5682) inadvertently closed. This caused a power load shed that dropped off half of Milne's gas compression , several web pads, and all water injection, 13- Jan-06 10:56 13 -Jan-06 11:59 63 76 48 0.00 Compressor did not initially restart when bringing wells back on from incident which began this morning at 8:51A.M. ongoing. 13 -Jan -06 19:04 13- Jan -06 20 15 71 288.74 0.00 Final surge in flaring while bringing wells back on-One and restarting compressor from incident which began this morning at 8:51A.M. Compressor restarted. Work request has been submitted and facility engineer is working the issues. 21- Jan-06 4:20 21- Jan-06 8:22 y 242 3.488.30 0.00 Mod 55 Gas Plant shutdown due to (reeling level transmitters and the malfunction of a shutdown valve automation. Start DatelTime End Dat&Time Minutes Flare MCF Assist MCF IncidentiCausa Description Remediatlon Taken 21- Jan-06 11:25 21 -Jan-06 1125 1 0.31 0.00 23-Jan-06 16:06 23 -Jan-06 16:11 A 5 4.69 0.00 24- Jan-06 15:52 24- Jan-06 15.53 1 0.30 0.00 28- Jan -06 10:33 28- Jan-06 10:34 1 0.35 0.00 BP Exploration Unplanned Less than 1 Hour Total: Unplanned Greater than 1 Hour Total: 1,263.80 6,747.55 Total Flared Volume (MCF): 8,011.35 0.00 0.00 Milne Point Unit Flare Incident Details 1/1/2006- 1/31/2006 • of Events: 163 # of Events: 8 0.00 # of Events: 171 Page 6 of 6 1. Facility Number 0290000024 2. Faaity Name Milne Point Central 3. Field Milne Point la Operator 15 . Month/Year of Disposition I BP I Feb - 2006 Disposition Vofwna MCF / / 20. For production from multlpe pools, 1st contribution of each pool as a percent of Total Volume. 8. Son 15,235 Pool Name Pod Code Percent 7. Reinletbd 487,411 Kuparuk 525100 60.90°/ Schrader 525140 36.94% 8. Flared or vented , hour or less 4,159 Sag River 525150 2.16% Ugnu 525160 0.00% 9. Flared or vented more than 1 how (see Instr.) 38,378 10. Pilot and Purge 3,324 11. Used for lease operatbce (spedfy in Remarks) 241,376 Authorization ,, hr 5— 3g, 3 I0 12. Omer (see instructions) 0 13. TOTAL VOLUME (rrEMS 5-12) 789,883 Lease Use MCF 10. NGL Gas Equivalent Conservation mCF 15. Purchased gas Waste: MCF 18. Transferred from: 4 C missi Dan on& 17. Transferred to: (Express as a negati ve e) 18. Renmrka: Block 6 is fuel Ras sold to Mine Point Pipeline Co.; Block I 1 u all other fuel gas (241,376 ntsct and assist gas (0 mach). Milne Point uses air for assist gas with the vertical flare and produced gas with the horizontal Bare. The vertical flare was used all mouth. I hereby certify that me foregoing is true and correct to Inc best or my knowledge_ Manager, Production Taxes and Royalties Signature � (� f�� title Alaska Note: All volumes must be corrected to pressure of 14.65 psis end to e temperature of 60o F. Authority 20 AAC25.235. Printed Nome Bernard W. Haply Phone (907)564 -5028 Date 3//42.0d ` • Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Start Date/Time End Date/Time Minutes Flare MCF Assist MCF Incident/Cause Description Remediatlon Taken Unplanned Less than 1 Hour 01- Feb-06 6:28 01 -Feb-06 6:29 1 0.31 0.00 01 Feb 7:30 01- Feb-06 7:37 7 4.78 0.00 01- Feb-06 7:58 01- Feb-06 8:01 3 2.32 0.00 01 Feb 11:29 01 Feb 11:32 3 1.31 0.00 02 - Feb - 06 12:46 02 - Feb - 06 12:57 11 9.78 0.00 02- Feb-06 13:23 02- Feb-0813:26 3 0.62 0.00 02 -Feb-06 13:33 02 -Feb-06 13:35 2 0.61 0.00 02 -Feb-06 13:58 02- Feb-06 14:04 6 7.43 0.00 02- Feb-06 14:16 02-Feb-06 14:43 27 39.30 0.00 02- Feb-O6 14:44 02-Feb-06 14:48 4 1.28 0.00 04- Feb-06 13:19 04-Feb-06 13:22 3 2.08 0.00 04 -Feb-06 14:13 04-Feb -06 14:14 1 0.33 0.00 04- Feb-06 15:37 04- Feb-06 15:37 1 0.31 0.00 04 - 06 15:57 04 Feb 15:58 1 0.32 0.00 04- Feb-06 17:51 04-Feb -06 17:56 5 2.51 0.00 04- Feb-06 18:04 04-Feb-06 18:09 5 2.96 0.00 04 -Feb-06 18:10 04-Feb-06 18:13 3 0.64 0.00 04- Feb-08 19:04 04-Feb-06 19:10 6 3.69 0.00 04 -Feb-06 19:15 04-Feb-06 19:19 4 1.24 0.00 04- Feb-06 19:19 04-Feb -06 19:21 2 1.34 0.00 08- Feb-06 15:14 08 -Feb-06 15:15 1 1.03 0.00 08 -Feb-06 15:18 08- Feb-06 15:19 1 0.33 0.00 08- Feb-06 15:21 08- Feb-06 15:21 1 0.65 0.00 10- Feb-06 6:59 10 -Feb-06 7:02 3 3.54 0.00 11 - Feb - 06 13:59 11 Feb 14:06 7 8.82 0.00 11 -Feb-06 17:37 11 -Feb-06 17:37 1 0.32 0.00 13 -Feb-06 16:12 13- Feb-06 1615 3 2.07 0,00 13 -Feb-06 16:16 13- Feb-06 16.25 9 4.22 0.00 17- Feb-06 15:16 17-Feb-06 15:19 3 0.95 0.00 17 -Feb-06 15:25 17 -Feb-06 15.42 17 13.67 0.00 17 -Feb-06 15:57 17 -Feb-06 18:36 39 66.58 0.00 by 0 BP Exploration Milne Point Unit Flare Incident Details 2/1/2006 - 2/28/2006 Page 1 of 6 Start Date/Time End Dat&Time Minutes Flare MCF Assist MCF Incident/Cause Description Remsdiation Taken 17- Feb-06 17:32 17 -Feb-06 17 - .33 1 0.31 000 17 -Feb-06 17:33 17 -Feb-06 17:35 2 0.32 0.00 17- Feb-06 17:39 17- Feb-06 17:44 5 1.89 0.00 17 -Feb-06 18:29 17- Feb-06 18:37 8 7.73 0.00 17- Feb-06 18:41 17 -Feb-06 18:42 1 0.31 0.00 17- Feb-06 18:44 17 -Feb-06 18:45 1 0.34 0.00 17 -Feb-06 19:56 17 -Fe0-06 20:04 8 7.67 0.00 17 -Feb-06 20:25 17 -Feb-06 20:32 7 294 0.00 17- Feb-06 22:32 17- Feb-06 22:32 1 0.32 0.00 17- Feb-06 22:33 17 -Feb-06 22:42 9 9.17 0.00 17 -Feb-06 23:31 17 -Feb-06 23:42 11 12.51 0.00 17 -Feb-06 23:50 17- Feb-06 23:59 9 9.74 0.00 18 -Feb-06 0:00 18- Feb-06 0:01 1 0.03 0.00 18 -Feb-06 0:22 18- Feb-06 0:22 1 0.30 0.00 18- Feb-06 0:42 18- Feb-06 0:45 3 1.28 0.00 18 -Feb-06 1:01 18-Feb -06 1:12 11 7.11 0.00 18-Feb-06 1:28 18- Feb-06 1:40 14 11.49 0.00 18 -Feb-06 1:56 18- Feb-06 2:02 6 1.88 0.00 18-Feb -08 2:03 18 -Feb-06 2:03 1 0.32 0.00 18- Feb-06 2:04 18 -Feb-06 2:29 25 27.54 0.00 18- Feb-08 3:14 18- Feb-06 3:31 17 19.54 0.00 18 -Feb-06 4:33 16- Feb-06 4:34 1 0.31 000 18- Feb-06 4:59 18 -Feb-06 5:04 5 1.90 0.00 18 -Feb-06 5:09 18 -Feb-06 5:19 10 10.84 0.00 1B - Feb - 06 6:05 16 - Feb - 06 6:11 6 5.13 0.00 18- Feb-06 6:16 18-Feb -06 6:26 10 6.37 0.00 18- Feb-06 7:08 18 -Feb-08 7:25 17 16.65 0.00 18- Feb-06 7:27 18- Feb-06 7:29 2 0.64 0.00 19- Feb-06 2:12 19 -Feb-06 2:13 1 3.52 0.00 19 -Feb-06 2:14 19 -Feb-06 2:52 38 113.71 0.00 19 -Feb-06 2:53 19- Feb-06 3:29 38 109.93 0.00 22- Feb -06 20:29 22 -Feb-06 21:02 33 91.02 0.00 BP Exploration Milne Point Unit Flare Incident Details 2/1/2006 - 2/28/2006 Page 2 of 8 Start Date/Tim* End Date/Time Minutes Flan MCF Assist MCF Incident/Cause Description RemSIation Taken 22- Feb-06 21:03 22 -Feb-06 22 :03 80 136.94 0.00 22- Feb -06 22:05 22- Fe0-06 22:16 11 25.66 0.00 22- Feb -06 22:21 22 -Feb-06 22:40 19 36.38 0.00 22 Fob 22:41 22 Feb 23:11 30 62.91 0.00 22 - Feb - 06 23:14 22 Feb 23:42 28 51.32 0.00 22 Feb 23:42 22 Feb 23:56 14 34.96 0.00 23 0:00 23 - Feb - 06 0:26 26 60.72 0.00 23 - Feb - 08 0:27 23 - Feb - 06 040 13 32.85 0.00 23 Feb 0:42 23 - Feb - 06 0:50 8 18.91 0.00 23 Feb 0:54 23- Feb-06 1:42 48 93.46 0.00 23-Feb-06 1:45 23- Feb-06 2:02 17 22.38 0.00 23 Feb 2:04 23-Feb-06 2:13 9 31.30 0.00 23- Feb-06 2:44 23- Feb-06 2 4 1.26 0.00 23- Feb-06 3:00 23- Feb-06 3 :06 6 225 0.00 23- Feb-06 3:06 23 - Feb - 06 3:09 3 0.97 0.00 23 -Feb-06 3:22 23 -Feb-06 3:25 3 1.27 0.00 23- Feb-06 4:03 23- Feb-06 4:04 1 0.31 0.00 23 -Feb-06 4:18 23-Feb-06 4:21 3 1.64 0.00 23 - Feb-06 4:29 23 - Feb - 06 4:32 3 0.93 0.00 23 - Feb - 06 4:50 23 - Feb - 06 4:51 1 0.31 0.00 23 -Feb-06 5:11 23 -Feb-06 5:15 4 1.68 0.00 23- Feb-06 5:20 23 -Feb-06 5:30 10 8.76 0.00 23 -Feb-06 5:33 23 -Feb-06 5:39 6 4 41 0.00 23 - Feb - 06 5:43 23 - Feb - 06 5:50 7 3.67 0.00 23 -Feb-06 6:05 23 -Feb-06 6:06 1 0.62 0.00 23 Feb 8:07 23 Feb-06 6:10 3 1.25 0.00 23 - Feb - 06 6:13 23 Feb 6:14 1 0.31 0.00 23 Feb 6:17 23 -Feb-06 6:19 2 0.62 0.00 23 -Feb-06 6:21 23- Feb-06 6:34 13 6.76 0.00 23 -Feb-06 6:36 23- Feb-06 6:37 1 0.30 0.00 23 -Feb-06 6:52 23- Feb-06 6:57 5 2.18 0.00 23- Feb-06 7:15 23 -Feb-06 7:16 1 0.31 0.00 BP Exploration Milne Point Unit Flare Incident Details 2/1/2006 - 2/28/2006 Pepe 3 of 6 Stet DateTme End Daterme Minutes Flare MCF Assist MCF Incident /Cause Description Renlediation Taken 23- Feb-06 7.44 23 -Feb-06 7:45 1 0.31 0.00 23- Feb-06 8:13 23- Feb-06 8:16 3 0.93 0.00 23-Feb -06 8:47 23- Feb-06 9:09 22 8.88 0.00 23- Feb-06 9:48 23 -Feb-06 9:55 7 2.58 0.00 23 -Feb-08 9:59 23- Feb-06 10:00 1 0.35 0.00 23 -Feb-06 10:51 23- Feb-06 10:52 1 0.33 0.04 23- Feb-06 10.52 23- Feb-06 10:55 3 0.63 0.00 23- Feb-06 11:08 23- Feb-06 11:38 28 37.25 0.00 23- Feb-06 11:36 23 -Feb-06 11:38 2 0.63 0.00 23- Feb-06 11:39 23 -Feb-06 11 :41 2 0.63 0.00 23- Feb-06 11:44 23 -Feb-06 11:46 2 3.98 0.00 23 -Feb-06 11:51 23 -Feb-06 12:04 13 31.07 0.00 23- Feb-06 13:19 23- Feb-06 13:20 1 2.27 0.00 23- Feb-06 14:31 23 -Feb-06 14:35 4 3.65 0.00 23- Feb-06 14:36 23- Feb-06 14:37 1 0.94 0.00 23 -Feb-06 15:37 23 -Feb-06 15:38 1 0.31 0.00 23 -Feb-06 18:00 23- Feb-06 16:06 8 3.61 0.00 23- Feb-06 16:11 23- Feb-06 16:12 1 0.31 0.00 23 - Feb - 06 16:15 23 Feb 16:19 4 1.72 0.00 23 -Feb-06 16:19 23 -Feb-06 16:21 2 0.93 0.00 23 -Feb-08 16:49 23 -Feb-06 16:50 1 0.71 0.00 23-Feb-06 16:58 23 -Feb-06 17:00 2 3.35 0.00 23 Feb 17:07 23 - Feb - 06 17:10 3 4.84 0.00 23- Feb-06 17:11 23- Feb -08 17:14 3 2.60 0.00 23 -Feb-06 17:17 23- Feb-06 17:22 5 3.39 0.00 23- Feb-06 17:23 23 -Feb-06 17:28 5 4.11 0.00 23- Feb-06 17:32 23 -Feb-06 17:33 1 0.31 C.00 23 -Feb-06 17:41 23- Feb-06 17:43 2 1.31 0.00 23 -Feb-06 17:48 23- Feb-06 17:51 5 1.91 0.00 23 -Feb-06 17:55 23- Feb-06 17:59 4 3.56 0.00 23- Feb-06 18:04 23- Feb-06 18:06 2 1.32 0.00 23- Feb-06 18:06 23- Feb-06 18:13 7 8.61 0.00 BP Exploration Milne Point Unit Flare Incident Details 2/1/2006 - 2/28/2006 Page 4 ol 6 Start Data/Time End Date/Time Minutes Flare MCF Assist MCF incident/Cause Description Remediatlon Taken 23 -Feb-06 18:21 23 -Feb-06 18:25 4 1.61 0.00 23- Feb-06 18:28 23 -Feb-06 18:38 6 21.13 0.00 23- Feb -06 20:45 23 -Feb-06 20:46 1 0.32 0.00 24- Feb-06 1:50 24- Feb-06 1:52 2 2.80 0.00 24 -Feb-06 2:11 24 -Feb-06 2:12 1 0.31 0.00 24 -Feb-06 2:19 24-Feb-06 2:21 2 0.83 0.00 24 -Feb-06 2:28 24- Feb-06 2:31 3 1.54 0.00 24- Feb-06 3:10 24 -Feb-06 3:10 1 0.30 0.00 24 -Feb-06 3:51 24- Feb-06 3:52 1 0.31 0.00 24- Feb-06 4:02 24- Feb-06 4:02 1 0.33 0.00 24- Feb-06 4:29 24- Feb-06 4:32 3 2.94 0.00 24- Feb-06 4:42 24 -Feb-06 4:42 1 0.31 0.00 24- Feb-06 4:44 24 -Feb-06 4:46 2 0.97 0.00 24- Feb-06 5:37 24- Feb-06 540 3 1.27 0.00 24- Feb-06 5:44 24 -Feb-06 5:50 6 2.55 0.00 24- Feb-06 5:57 24- Feb-06 6:00 3 1.27 0.00 24-Feb-003 6:19 24- Feb-06 6:21 2 0.31 0.00 24- Feb-06 6:22 24- Feb-06 6:25 3 1.71 0.00 24- Feb-06 7:06 24-Feb-08 7:07 1 0.64 0.00 24 -Feb-06 7:08 24- Feb-06 7:13 5 4.30 0.00 24- Feb-06 7:48 24- Feb -06 7:49 1 0.30 0.00 24 -Feb-06 8:09 24- Feb-06 8:09 1 0.30 0.00 24- Feb-06 8:16 24- Feb-06 8:21 5 2.21 0.00 24- Feb-06 14:35 24 -Feb-06 14:35 1 0.30 0.00 24- Feb-06 1912 24 Feb 19 - .13 1 0.32 0.00 25 -Feb-06 4:47 25- Feb-06 4:47 1 0.32 0.00 25 -Feb-06 18:29 25 -Feb-06 18:34 5 5.97 0.00 25 -Feb-06 18:40 25-Feb-06 18:41 1 0.97 0.00 25-Feb-06 19:39 25 -Feb-06 1942 3 2.06 0.00 c� BP Exploration Unplanned Less than 1 Hour Total: Unplanned Greater than 1 Hour 1,511.20 0.00 Milne Point Unit Flare Incident Details 2/1/2006 - 2/28/2006 0 of Events: 156 Page 5 of 6 Planned Greater than 1 Hour I 19- Feb-06 4:02 19- Feb-06 23:59 1197 8 16226 0.00 Gas compression system shutdown for planned Compressor work. Planned event. 20-Feb-06 0:00 20- Feb-06 23:59 1439 10,663.90 0.00 Gas compression system shutdown for planned compressor work. Planned event 21 -Feb-08 0:00 21- Feb-06 23:59 1439 11.362.80 0 -00 Gas compression system shutdown for planned compressor work. Planned event 22 -Feb-06 0:00 22 -Feb-06 20:27 1227 7,711.73 0.00 Continuation of planned event. Compressor work ongoing. Planned event. Planned Less than 1 Hour I 23 -Feb-06 16:50 23 -Feb-06 16:51 1 879.19 0.00 As pan of the compressor repair, the slug catcher was backed -up with pressurized gas, so BP opened the flare vent off of the slug catcher to relieve the pressure as part of bringing the compressors back on -line. Three short bursts between 16:51 -17:03 23- Feb-06 12:08 23 -Feb-06 16:53 23 -Feb-06 16:55 2 881.30 0.00 We shut -in the high gas wells, several ESP's, Jet pumps, and gas lift webs. The maintenance team made the needed repairs, and we got oft the Oars. 23- Feb-06 17:00 23- Feb-06 17:03 3 888.12 0.00 Start Date/Time End Date/Time Minutes Flare MCF Assist MCF Incident/Causs Description Remediation Taken 23- Feb-06 12:08 23 -Feb-06 13.13 477.06 0.00 The flaring was necessary for facility operations. C- 5501/11A8B had to be started up and shut down due to gas leaks on the cylinders, faulty RTD on oil temperature switch and a bad motor on the Gas Lift coder. During this time, we had to flare. We shut -in the high gas wells, several ESP's, Jet pumps, and gas lift webs. The maintenance team made the needed repairs, and we got oft the Oars. BP Exploration Unp lanned Greater than 1 Hour Total: Planned lass than 1 Hour Total: Planned Greater than 1 Hour Total: Total Flared Volume (MCF): 477.06 2,648.61 0.00 0.00 37,900.69 42,537.58 0.00 Milne Point Unit Flare Incident Details 2/1/2006 - 2/28/2006 I of Events: 1 it of Events: 3 ft of Events: 4 0.00 a of Events: 164 Page 6 of 6 1. Fy Number ttaet 0290000024 2. Fealty Name Milne Point Central 3. Field Milne Point 4. Operator 5. Month/ Vern of DMpoallbn l SP Mar-2006 Disposition Volume MCF ✓ 20. For production from multiple pods, kr contribution of each pod as • percent of Total Volume. 6, Spy 19,567 Pod Name Pod Code Perant 7 Realjected 588,329 Kuparuk 525100 64.36% Schrader 525140 35.16% e. Flared or vented 1 hour or less 292 Sag River 525150 0.47% 0.00% Ugnu 525160 9. Flared or vented more than 1 thou (see Nntr.) 137 ,/ I0. Pilot and Purge 3,787 11. Used for base operations (specify in Remarks) 306,751 .. ._- 12. Ogler (see Instructions) 0 Authorization >1 M: safety (37 MCF 13. TOTAL VOLUME (tTEIAS 6-12) 916 863 Lease Use MCF it NOL Gas Equivalent Carfln MCF 15. Purchased gas Waste MCF 18. Transferred from: / all" O I w�fw._ /f 7 5-2-3-0 miasbMr Date 17. Transferred to: (Express as a negative a) 18. Remarks: Block 6 is fuel gas sold to Milne Point Pipeline Co.; Block 11 is all other fuel gas (306,751 lnscil and assist gas (0 nsct). Milne Point uses air for assist gas with the vertical flue and produced gas with the horizontal flare. The vertical flare was used all month. 1 hereby certify that the foregoing is true and nerd t Ut of my knowledge_ Manager, Production Taxes and Royalties Signature Tine Alaska Note: All volumes must be corrected to pressure of 14.65 psis end to a temperature of 60o F. Authority 20 AAC25.235. ,/ 6 AA / Printed Name Bernard W. Hajny P Phone �e ne (907)564-5028 Date Y 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Form 10-422 Rev. 1/2004 Submit in Duplicate Start DateRime End Date/Time Minutes Flare MCF Assist MCF Incident/Cause Description Remediation Taken Unplanned Less than 1 Hour 10 -Mw-06 17:26 10 -Mar-06 17:33 7 5.78 0.00 10 -Mar-06 2326 10 -Mar-06 23:36 10 12.48 0.00 10- Mar-06 2338 10 -Mar-06 23:42 4 1.28 0.00 10- Mar -06 23 10 -Mar-06 23:57 2 0.33 0.00 11- Mar-06 0:04 11- Mar-06 0:14 10 1522 0.00 11 -Mar-06 0:17 11 -Mar-06 027 10 19.43 0.00 11 -Mar-06 1:04 11 -Mar-06 1:05 1 0.64 0.00 11- Mar-06 1:21 11 -Mar-06 1:32 11 14.96 0.00 11 -Mar-06 1:51 11 -Mar-06 1:53 2 0.63 0.00 11 -Mar-06 2:05 11- Mar-06 2:30 25 15.30 0.00 11 -Mar-06 3:25 11- Mar-06 3:28 3 1.28 0.00 11 -Mar-06 4:28 11- Mar-06 4:33 5 1.60 0.00 11 -Mar-06 6:31 11 -Mar-06 6:38 7 6.38 0.00 14 -Mar-06 14:00 14 -Mar-06 14:04 4 1.95 0.00 18-Mar-06 9:25 18 -Mar-06 9:26 1 0.31 0.00 18- Mar-06 16:11 18 -Mar-06 16:24 13 17.69 0.00 18- Mar-06 16:29 18 -Mar-06 16:34 5 2.72 0.00 19 -Mar-06 14:18 19 -Mar-06 14:19 1 0.33 0.00 20- Mar-06 17:53 20 -Mar-06 18:02 9 3.17 0.00 20 -Mar-06 18:05 20- Mar-06 18:38 33 63.84 0.00 20-Mar-06 18:39 20-Mar-06 19:25 46 80.89 1'- 0.00 -- 21 -Mar-06 2:24 21 -Mar-06 2:25 1 0.33 0.00 21 -Mar-06 2:27 21- Mar-06 2:27 1 0.31 0.00 22- Mar-06 8:28 22 -Mar-06 8:30 2 2.02 0.00 22 -Mar-06 8:48 22 -Mar-06 8:50 2 0.63 0.00 22 -Mar -06 9:00 22- Mar-06 9:01 1 0.31 0.00 22- Mar-06 9:03 22 -Mar-06 9:10 7 3.65 0.00 25 -Mar-06 0:03 25 -Mar-06 0:18 15 17.36 0.00 30 -Mar-06 1:24 30 -Mar-06 1:25 1 0.30 0.00 30 -Mar-06 1:26 30-Mar-06 1:27 1 0.35 0.00 30 -Mar-06 19:28 30- Mar-06 19:29 1 0.33 0.00 by 0 BP Exploration Milne Point Unit Flare Incident Details 3/1/2006 - 3/31/2006 Page 1 at 2 Unplanned Greater than 1 Hour 1 25 -Mar-06 0:19 25 -Mar-06 2:04 105 I 137.03 I 0.00 Gas injection compressor shutdown due to low lubrication supply pressure. Repaired lubrication supply pump and returned compressor to service. 1 Remediafton Taken 1 Start DaterTime I End Dat&Time I Minutes I Flare MCF I Assist MCF I Incident/Cause Description 291.82 0.00 8 of Events: 31 BP Exploration Unplanned Lass than 1 Hour Total: Unplanned Greater than 1 Hour Total: Total Flared Volume (MCF): 137.03 428.85 0.00 0.00 Milne Point Unit Flare Incident Details 3/1/2006 - 3/31/2006 *of Events: 1 8 of Events: 32 Page 2 of 2 Facility Number 0290000024 (1. 2. Feeley Name Milne Point Central 3 Field Milne Point Mon e. Operator Month/Year d Disposition IBP Apr -2006 Disposition Volume MCF 20. For production from multiple pool. let contribution of earn pool as • percent of Total VoenN. 8. Solo 18,629 Pod Name Pool Code Percent 7. Reelected 520,990 Kuparuk 525100 65.44% Schrader 525140 34.56% e. Flared or vented 1 dour or less 3 , 6 9 Sag River 525150 0.00% Upnu 525160 0.00% hall (see katr.) 2,422 1! 9. Fired or vented more than 1 lo. Prot and Purge 3,656 ✓ 11. Used for lase operations (specify in Remarks) 290,842 ,• 12. Other (ass instructional 0 Authorization >1 hr. Safety I 4 MCF 13. TOTAL VOLUME (ITEMS 612) 836.888 Leans Use MCF 14. NGL Gas EquNaMnt Conservation MCF 15. Purchased gas Waste. MCF 1e. Transferred from: 7—/4 OL ise rorler Date gig,, 17. Transferred to: (Express u s negative a) 18. Remads: Block 6 is fuel gas sold to Milne Point Pipeline Co.: Mock 11 is all other fuel gas (290,842 mscf) and assist gas (0 mscf). Milne Point uses air for assist gas with the vertical flare and produced gas with the horizontal flare. The vertical flare was used all month. thereby certify that the to a true and bast d my knowledge. Manager, Production Taxes and Royalties Signature Tae Alaska Note: All volumes must be corrected to pressure of 14.85 psis and to e temperature of 60o F. Authority 20 AAC25.235. Printed Name Bernard W. Hajny Phone (907)564 -SO28 Date 6 46 • er Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate JD� Start Date/Time End Date/Time I Minutes ( Flare MCF Assist MCF Incident/Cause Description rtemediation Taken Unplanned Less than 1 Hour 01 - Apr - 06 15:19 01 Apr 15:24 5 1.26 0.00 01 15:24 01 - Apr - 06 15:26 2 0.61 0.00 01 -Apr-06 20:36 01- Apr -06 20:37 1 0.31 0.00 02 -Apr-06 3:14 02- Apr-06 3:16 4 2.96 0.00 02 -Apr-06 3:30 02- Apr-06 3:41 11 8.17 0.00 02 -Apr-06 3:42 02 -Apr-06 3156 14 12.75 0.00 02 -Apr-06 4:12 02- Apr-06 4:23 11 12.30 0.00 02 -Apr-06 4:58 02- Apr-06 4:58 1 0.32 0.00 02 -Apr-06 4:59 02- Apr-06 5:01 2 0.62 0.00 02- Apr-06 5:07 02- Apr-06 5:07 1 0.31 0.00 024pr-06 5:08 02- 4.-06 5:16 8 5.15 0.00 02 -Apr-06 5:25 02 -Apr-06 5:27 2 0.65 0.00 02- Apr-06 5:28 02- Apr-06 5:33 5 2.95 0.00 02 -Apr-06 5:34 02- Apr-06 5:37 3 0.93 0.00 02-Apr-06 5:41 02- Apr -06 5:42 1 0.32 0.00 02-Apr-06 5:43 02- Apr-06 6:00 11 21.30 0.00 02 -Apr-06 6:09 02 -Apr-06 6:15 6 11.27 0.00 02-Apr-06 6:16 02 -Apr-06 6:16 1 0.31 0.00 02 -Apr-06 6:17 02 -Apr-06 6:26 9 12.05 0.00 02 -Apr-06 6:27 02 -Apr-06 6:38 9 9.64 0.00 02-Apr-06 6:37 02-Apr-06 6:39 2 0.63 0.00 02 - Apr - 06 6:44 02 Apr 7:02 18 23.91 0.00 02 Apr 7:18 02 Apr - 06 7:24 6 5.12 0.00 02 -Apr-06 7:25 02- Apr-06 7:26 1 0.33 0.00 02-Apr-06 7:27 02 -Apr-08 7:28 1 0.33 0.00 02 12:23 02 Apr-0612:28 5 3.27 0.00 02 20:58 02 - Apr - 06 20:59 1 0.31 0.00 02 -Apr-06 21:00 02- A0r-06 21:01 1 0.33 0.00 06- Apr-06 17:06 06 -Apr-06 17:13 7 10.78 0.00 06- Apr-06 17:43 06-Apr-06 17:49 6 4.34 0.00 15-Apr-06 14:31 15- Apr-06 14:35 4 1.29 0.00 BP Exploration Milne Point Unit Flare Incident Details 4/1/2006 - 4/30/2006 Page 1 of 2 Start Date/Time End Date/Time Minutes Flan MCF Assist MCF Incident/Cause Description Homedlation Taken 18 - Apr 12:04 18- Apr-06 12:05 1 0.30 0.00 0.00 Turbine Generator shut down on high vibration alarm, caused by a spike on the vibraton probe from the use of a radio in the Base vicinity. 18 -Apr-06 12:07 18- Apr -06 12:08 1 0.31 0.00 23 -Apr-06 16:26 23 -Apr-06 16:27 1 0.69 0.00 24 Apr 6:58 24 Apr - 06 6:59 1 0.31 0.00 24 - Apr - 06 7:00 24 Apr 7:00 1 0.32 0.00 24 - Apr - 06 9:17 24 Apr 9:48 31 191.75 0.00 27 -Apr-06 14:40 27- Apr -06 14:40 1 0.33 0.00 Unplanned Gnats than 1 Hour 01 -Apr-06 8:56 01 -Apr-06 15:06 370 1,605.33 0.00 PU -0801 Turbine Generator shut down on high vibration alarm was caused by spike on vibration probe on the generator driven end. Other possibility the vibration probe being slightly loose. No outstanding indications of why vibration spike occulted. Maintenance team called out to troubleshoot and assist with re -start. Maintenance cleared the turbine generator alarms. AN compressors and associated equipment put back on line and flaring stopped. 15 -Apr-06 9:43 15 -Apr-06 13:45 242 816.85 0.00 Turbine Generator shut down on high vibration alarm, caused by a spike on the vibraton probe from the use of a radio in the Base vicinity. The maintenance team was called out to troubleshoot the turbine shutdown and assist with re BP Exploration Unplanned Less than 1 Hour Total: Unplanned Greater than 1 Hour Total: Total Flared Volume (MCF): 348.82 2,422.18 2,771.00 0.00 0.00 0.00 Milne Point Unit Flare Incident Details 4/1/2006 - 4/30/2006 a of Events: 38 a or Events: 2 / of Events: 40 Page 2of2 1. Faclity Number 12 Facility Name I Milne Point Central 3. Field Milne Point 0. Operator 5. MarxtVYear d Disposition IBP May -2006 Disposition Volume MCF 20. For production from multiple pools, 1st contribution of each poet as a percent of Total Volume. 8. Sold 18,422 Pool Name Pod Coda Percent 7. Reklseted 544,811 Kuparuk 525100 64.39% Schrader 525140 34.04% 8. Flared or vended 1 hour or less 571 ✓ Sag River 525150 1.58% Ugnu 525180 0.00% 9. Flared or vented more tram 1 taxi (see irm.) 1,580 10. Plot and Purge 3,766 11. Used for base operations (specify in Remarks) 277,942 - .. 12. oiler (see instructions) 0 Authorization >1 hr: Safely f sYJ�O f MCF 13. TOTAL VOLUME (ITEMS 612) 847,092 Lease Use MCF 14. NGl Gas Equivalent Conservation MCF 15. Purchased cos Waste: MCF 16. Transferred from: �� Ca r Da7'/IX/40 17. Transferred to' E . (Express as a negative a) 1a Remarks. Block 6 b fuel gas sold to Milne Point Pipeline Co.; Block 11 is all other fuel gas (277,942 mscf) and assist gas (0 mac). Milne Point Ines sir for assist gas with the vertical Bare and produced gas with the horizontal flare. The vertical flare was used all month. 1 hereby certify that the foregoing is true • Carr- . . . best of my knowledge. /� Manager, Production Taxes and Royalties *mature /�� / /`- . 4411 Tate Alaska Note: All volumes must be corrected to pressure of 14.65 pala and to • temperature of 600 F. Alrtltority 20 AAC25.235. Printed Name Bernard W. Najny Phone (907)564-5028 CNN l / y -duo algh Form 10-422 Rev. 1 /2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Start DateITims End Date/Time Minutes Flare MCF Assist MCF incident/Cause Description Remedlatlon Taken Unplanned Less than 1 Hour I , ,+ 03- May -06 10:59 03 -May-06 11:00 1 0.30 0.00 03 -May -06 11:00 03 -May-06 11:26 26 12.56 0.00 04- May-06 6:41 04 -May-06 6:42 1 031 0.00 05 -May-06 10:52 05- May-06 11:21 29 209.33 0.00 06- May -06 20:43 06 -May -06 21:32 49 116.04 0.00 07 -May-06 11:23 07- May-06 11:36 13 3.80 0.00 09- May-06 15:56 09- May-06 16:18 22 49 22 0.00 09- May-06 16:32 09 -May-06 17:10 38 48.24 0.00 09- May-06 19:00 09- May-06 19:12 12 33.29 0.00 10- May 7:58 10 - May - 06 7:59 1 0.32 0.00 10 -May-06 10:38 10- May-06 10:51 13 4.17 0.00 10 -May-06 10:56 10 -May-06 10:58 2 0.96 0.00 11 -May-06 8:14 11- May-06 8:15 1 3.18 0.00 13 -May -06 23:48 13 - May-06 23:59 11 0.02 0.00 14 -May-06 0:00 14 -May-06 0:04 4 2.58 0.00 14- May-06 12:04 14- May-06 12:10 6 3.91 0.00 14 -May-06 12:11 14 -May-06 12:27 16 16.39 0.00 14 -May-06 12:30 14- May-06 12:35 5 3.40 0.00 14 -May-06 12:41 14 -May-06 12:43 2 1.32 0.00 14- May-06 12:55 14 -May-06 13:01 6 3.94 0.00 14- May-06 13:01 14 -May-06 13:03 2 0.92 0.00 14- May-06 13:11 14 -May-06 13:12 1 0.96 0.00 14- May-06 15:51 14- May-06 15:52 1 0.61 0.00 14- May-08 17:42 14 -May-06 17:55 13 28.87 0.00 26- May-06 18:16 26 -May-06 18:17 1 0.32 0.00 30- May-06 13:36 30-May-06 13:40 4 2.71 0.00 30- May-06 13:47 30 -May-06 13:51 4 1.63 0.00 30- May-06 2228 30 -May-08 22:48 18 6.32 0.00 31 -May-06 10:20 31 -May-06 10:21 1 0.30 0.00 31- May-06 10:21 31 -May-06 11:04 43 14.87 0.00 BP Exploration Unplanned Lass than 1 Hour Total: 570.78 0.00 Milne Point Unit Flare Incident Details 5/1/2006 - 6/1/2006 If of Events: 30 Page 1 of 2 Start Dat&Tlme 1 End DatafTlme Minutes Flare MCF Assist MCF Incident/Cause Description 1 _ _ _ _ Wrnedtadon Talon Unplanned Greats than 1 Hour 09- May-06 12:32 09-May -06 15:47 195 51825 0.00 07 Power turbine Shutdown at 12:34 on a fire and gas malfunction, bad shed haif of the gas compression The fire and gas system was checked and repairs made. The 0701 turbine generator was started and all gas compression put back on line. Flaring stopped 11 - May - 06 8:16 11 - May - 06 9:27 71 260.83 0.00 We found a bad gas leak on C551113, at the bcatbn where the trabon tubing ran into the # 1 cylinder. We shutdown the compressor for repairs, The maintenance team was called out b repair the gas leak on trabon system. We shut -in the following gas lift wells: 8 3, 4.9.15,18,21,22, and C 7,9,3,21.22 to mitigate the Bang. There was no black smoke event 14 -May-06 7:32 14 -May-06 12:03 271 799.68 0.00 gas leak on C551 IA. Compressor was shut down for repairs, and a switchgear problem was discovered. We shut -in the following gas lift wens: 6 3, 4,815.16,21,22, and C 7,9.3,21,22 plus the following wells :C 14,26 H7, F 6.9,13,22,53,65.87 L3,6,28,25117 E30,32 335 and J26 to mitigate Me flaring. Compressor and switchgear were repaired. BP Exploration Unplanned Greater than 1 Hour Total: Total Flared Volume (MCF): 1,579.76 2 150 54 0.00 Milne Point Unit Flare Incident Details 5/1/2006 - 6/1/2006 # of Events: 3 0.00 # of Events: 33 Page 2of2 1. Facitly Number 0290000024 2. FeCaty Name Milne Point Central 1 Field Milne Point 4. Operator 15. SP IJun Mon1M'ear d Disposition -2006 Disposition Volume MCF 20. For production from multiple pools. met contribution of each pool as* percent of Total Vaene. 6. sae 17,197 Pool Name Pod Cole Percent 58.68% 7. Reinjeced 496,615 Kuparuk 525100 Schrader 525140 40.42% & Flared or vented 1 flour or lase 1,288 Sag River 525150 0.90% Ugnu 525160 0.00% 9 Flared ot vented more than 1 nour (see 4e.( 1,244 ' / 10. Peot and Purge 3,629 11. Used for lease operations (speafy h Remar 259.715 s' :.�._ 12. Oversee instructions) 0 Authorization >11v: Safety 1 � MCF 13. TOTAL VOLUME (ITEMS 6-12) 781,688 Lear Use MCF 14. NGL Gas Equivalent Conservation MCF 15. Purchased OS Waste' MCF Transferred from: ��� 810-6‘ mfeme0 ex (Express as • negative e) 17. Transferred le. Remarks Block 6 Lc fuel gas sold to Mum Point Pipeline Co.; Block 11 Is all other fuel gas 1259,7151uscf) and assist gas t0 mach). Milne Point uses air for assist gas with the vertical flare and produced gas with the horizontal flare. The vertical flare was used all month. I hereby csrhiy that Ne foregoing is true a the best of my kmawbdpe. Manager, Production Taxes and Royalties Sepulture J_p Tine Alaska Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. 1 Printed Name Bemard W. Hajny Phone 007)564 -502a Data �� -e)la Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Start DateTme End DateTme Minutes Flare MCF Assist MCF Incident/Cause Description Remedlaeon Taken 1 4 Unplanned Less than 1 Hour 05-Jun-06 2:41 05- Jun-06 3:07 26 173.78 0.00 06-Jun-06 14:11 06 -Jun-06 14:17 6 6.87 0.00 09- Jun-06 16:22 09-Jun-06 16:32 10 8.78 0.00 09- Jun-06 16:32 09- Jun-06 16:39 7 2.86 0.00 09-Jun-06 18:43 09 -Jun-06 19:22 39 158.58 0.00 09-Jun-06 19:23 09-Jun-06 19:56 33 96.22 0.00 09- Jun-06 19:57 09 -Jun-06 20:53 56 177.78 0.00 10Jun4)6 0:19 10-Jun-06 0:27 8 17.09 0.00 10-Jun-06 0:33 10 -Jun-06 0:43 10 32.06 0.00 10Jun -06 0:48 10 -Jun-06 0:53 5 4.73 0.00 10- Jun-06 10:55 10 -Jun-06 11:06 11 4.47 0.00 10- Jun-06 11:08 10 -Jun-06 11:08 1 0.31 0.00 14-Jun-06 14:13 14 -Jun-06 14:14 1 0.33 0.00 17- Jun-06 18:26 17- Jun-06 18:37 11 21.08 0.00 17-Jun-06 18:56 17 -Jun-06 18:58 2 0.94 0.00 17-Jun-06 19:02 17 -Jun-06 19:05 3 2.01 0.00 17- Jun-06 19:08 17 -Jun-06 19:11 3 1.94 0.00 17-Jun-06 19:13 17- Jun-06 19:15 2 2.05 0.00 17- Jun-06 19:29 17- J1in-06 19:33 4 1.28 0.00 17 -Jun-06 19:39 17 -Jun-06 19:41 2 0.67 0.00 17 -Jun-06 19:57 17 -J1n-06 19:59 2 0.95 0.00 17-Jun-06 20:02 17- Jun-06 20:04 2 0.96 0.00 17-Jun-06 20:07 17 -Jun-06 20:10 3 0.93 0.00 17-Jun-06 20:18 17 -Jun-06 20:21 3 1.29 0.00 17- Jun -06 20:28 17 -Jun-06 20:29 1 0.32 0.00 17 -Jun-08 20:35 17- Jun -06 20:36 1 0.61 0.00 17-Jun-06 20:42 17 -Jun-06 20:45 3 0.63 0.00 17- Jun -06 20:56 17 -Jun-06 20:56 1 0.33 0.00 17 21:09 17 - Jun - 06 21:10 1 0.63 0.00 17-Jun-06 21:17 17 -Jun-06 21:21 4 1.26 0.00 17-Jun-06 21:35 17 -Jun-06 21:35 1 0.31 0.00 BP Exploration Milne Point Unit Flare Incident Details 6/1/2006 - 6/30/2006 Page 1 of 3 Start DateTim* End Date/Time Minutes Flan MCF Assist MCF Incident/Cause Description Remediation Taken 17-Jun-06 21:36 17-Jun-06 21:38 2 0.95 0.00 17-Jun-06 21:44 17-Jun-06 21:46 2 0.82 0.00 17-Jun-06 21:53 17 -J1M-06 21:56 3 0.98 0.00 17 -Jun-06 22:04 17- Jun-06 22:07 3 0.95 0.00 17-Jun-06 22:14 17 -Jun-06 22:17 3 0.65 0.00 17- Jun -08 22 17-Jun-06 22:27 2 0.63 0.00 17-Jun-06 22:37 17 -Jun-06 2238 1 0.63 0.00 21-Jun-06 18:43 21 -Jim-06 18:49 6 8.25 0.00 21-Jun-06 20:13 21-Jun-06 20:20 7 8.15 0.00 22-Jun-06 12:14 22 -Jun-06 1222 8 9.34 0.00 22-Jun-06 12:25 22-Jun-06 12:32 7 8.27 0.00 22-Jun-06 12:38 22 -Jun-06 13:15 37 47.38 0.00 22- Jun-06 14:09 22-Jun-06 14:18 9 9.02 0.00 22-Jun-06 14:22 22 -Jun-06 14:28 6 10.70 0.00 22 -Jun-06 14:30 22 -Jun-06 14:36 6 5.21 0.00 22- Jun-06 16:13 22 -Jun-06 16:14 1 0.63 0.00 22-Jun-08 16:28 22 -Jun-06 16:30 2 0.63 0.00 22-Jun-06 16:32 22- Jun-06 16:34 2 0.61 0.00 22-Jun-06 16:55 22 -Jun-06 16:55 1 0.32 0.00 22- Jun-06 18:17 22-Jun-06 18 :25 8 3.46 0.00 25-Jun-06 14:55 25- Jim-06 15.31 36 377.46 0.00 25-Jun-06 15:33 25- Jun-06 15:42 9 26.01 0.00 27- Jun-06 7:57 27- Jun-06 8:00 3 2.89 0.00 27- Jun-06 20:23 27- Jun-06 20:31 8 17.50 0.00 27- Jun -06 22:53 27-Jun-06 23:00 7 10.11 000 27- Jun -06 23:04 27- Jun-06 23:14 10 10.29 0.00 27-Jun-06 23:14 27- Jun-06 23:21 7 4.38 0.00 Unplanned Greater than 1 Hour I 09-Jun-06 20:56 09- Jun-06 22:54 118 245.91 0.00 C-5501 B gas compressor's S lube supply system failed. Functional checks following two repairs revealed continued failure. Frost Engineering tech was brought in to troubleshoot and repair the cl lube supply system. BP Exploration Unplanned Less than 1 Hour Total: 1,288.05 0.00 Milne Point Unit Flare Incident Details 6/1/2006 - 6/30/2006 • of Events: 58 Page 2 o13 Stan DateMims End DateTme Minutes Flan MCF Assist MCF Incident/Cause Description Rsmediafion Taken 21- Jun-06 15:29 21 -Jun-06 17:57 148 541.00 0.00 Alarm in control room showed a'Fiield Push Button Emergency Shutdown Alarm. No one shut down the unit using local ESD's, Technicians did find a loose win to the PLC panel. Repairs were completed and unit returned to service. Production wells were shut -in to control Raring and electrical load on poorer grid. Resulted in a loss production for the day of 1000 bit. 27- Jun-06 8:01 27- Jun-06 10:31 150 457.47 0.00 C-550113 gas lift compressor shutdown. 10 Gas lift wens and 4 ESP wells shut in. No black snake events. The problem was a broken MI electrical cable. Once the compressor was repaired and started, the wells were brought back into production. BP Exploration Unplanned Greater than 1 Hour Total: Total Flared Volume (MCF): 1,244.37 2,532.42 0.00 Milne Point Unit Flare Incident Details 6/1/2006 - 6/30 /2006 e of Events: 3 0.00 a of Events: 61 Page 3 of 3 1. Fealty Number 0290000024 2. Facility Name Milne Point Central 1 Field Milne Point 4. °panne( 5. Monayvear of Disposition BP Jul -2006 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Trial Volume. 8. Sold 12,327 . Pod Name Pod Code Percent 7. R led 365,301 Kuparuk 525100 58.17% Schrader 525140 41.35% 8. Flared or vented 1 Hour or lest 2,773 ,� Sag River 525150 0.49% Ugnu 525160 0.00% 9. Flared or vented more than 1 hour (see ire.) 5,053 Y 10 Pilot and Purge 2,848 v 11. Used for lease operations (spealy in Remarks) 184,444 12. Other (see irabuctions) 0 Authorization >1 hr Safety 5053 13. TOTAL VOLUME (ITEMS 6-12) 572,746 Lease Use MCF 14. NGL Gas Equivalent Conservation MCF 15. Pu:rased gas Waste'. MCF 17. Transferred fops: 1 O c Debt � 17. Transferred to: (Express as a negative e) 18. Remarks: Block 6 is fuel gas sold to Milne Point Pipeline Co.; Block 11 is all other fuel gas ( 84,444 nncf) and assist gas (0 mecf). Milne Point uses air for assist gas with the vertical flare and produced gas with the horizontal flare. The vertical flare was used all month. l hereby certify that the foregoing is true and correct to the best of my knowledge. �" /4./1.(. ,(_ Manager, Production Taxes and Royalties 5gnatue it Tale Alaska Note: All volumes must be corrected to pressure of 14.65 pale and to a temperature of 60o F. Authority 20 MC25.235. Primed Name Bernard W. Hajny Phone (907)564 -5028 Dare 8/14/24e4 Form 10-422 Rev. 1 /2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Jg Start Date/lime End Date/Time Minutes Flare MCF Assist MCF IncidenVCause Description Renlediatlon Taken Unplanned Less than 1 Hour OIJul06 19:49 01-Jul-06 20:00 11 57.66 0.00 04 -Ju1-06 16:48 04-JuI-06 16:50 2 26.54 0.00 04 -Jul-06 17:28 04-Jut-06 18 49 66.81 0.00 04-Jul-06 20:32 04- Ju1-06 20:35 3 0.94 0.00 04 -Ju1-06 20:49 04 -Jul-06 21.40 51 117.28 0.00 05-Jul-06 0:00 05- Ju1-06 0:35 35 291.49 0.00 05-Jul-06 0:39 05 -Jul-06 0.43 4 2.69 0.00 05- Ju1-06 0:46 05 -JS-06 0:53 7 2.48 0.00 05- Ju1-06 1:11 05-Jul-06 1:32 21 80.80 0.00 05-Jul-06 223 05-Jul-06 3:14 51 382.19 0.00 07 -Ju1-06 12:17 07 -Ju1-06 12:51 34 253 01 0.00 07-Jul-06 12:54 07 -Ju1-06 12:58 4 5.11 0.00 07-Jul-06 13:02 07- Ju1-06 13:06 4 5.31 0.00 09Ju106 12:53 09-Jul-06 13:37 44 279.49 0.00 09-Jul-043 13:44 09 -Jul-06 14:06 22 149.61 0.00 14 -Jul-06 8:49 14 -Jul-06 9:03 14 23.48 0.00 14 -Ju1-06 9:35 14 -Jul-06 9:37 2 1.73 0.00 18-Jul-06 13:53 18-Jul-06 14:01 8 6.86 0.00 18 -Ju1-06 14:04 18-Jul-06 14:19 15 13.84 0.00 18-Jul-06 14:24 18 -Ju1-06 14:30 6 7.81 0.00 18-Jul-06 14:41 18- Ju1-06 14:47 6 6.61 0.00 19 - Ju1 - 06 11:29 19 Ju1 11:41 12 22.33 0.00 19- Ju1-06 14:11 19-Jul-06 14:12 1 0.35 0.00 19-Jul-06 14:13 19-Jul-06 14:16 3 1.34 0.00 19-Jul-06 14:16 19-Jul-06 14:19 3 0.61 0.00 19 -Jul-06 14:20 19-Jul-06 14:21 1 0.33 0.00 19-Jul-06 14:22 19-Jul-06 14:23 1 0.34 0.00 19 -Ju1-06 14:25 19- Ju1-06 14:26 1 0.31 0.00 19- Jul-06 14:26 19-Jul-06 14:28 2 0.38 0.00 19-Jul-06 14:29 19-Jul-06 14:37 8 18.70 0.00 19- Ju1-06 14:38 19 -Jul-06 14:42 4 1.40 0.00 BP Exploration Milne Point Unit Flare Incident Details 7/1/2006 - 8/1/2006 Page 1 of 5 Start Date/Time End Date/Time Minutes Flare MCF Assist MCF Incident/Cause Description Remediaton Taken 19- J01-06 14:44 19-Jul-06 14.46 2 0.73 0.00 19Ju1-06 14:46 19- Ju1-06 14:48 2 0.33 0.00 19-Jul-06 14:52 19- Ju1-06 15:07 15 25.02 0.00 19 -Ju1-06 15:08 19 -Jut-06 15:13 5 1.75 0.00 19-Jul-06 15:16 19 -Ju1-06 15:21 5 3.88 0.00 19- Ju1-06 15:26 19Ju406 15:29 3 0.97 0.00 19 -Ju1-06 15:33 19- Ju1-06 15:34 1 0.31 0.00 19 - Ju1 - 06 15:34 19 - Jul - 06 15:43 9 9.46 0.00 19 -Jul-06 15:44 19- Ju1-06 15:57 13 10.31 0.00 19Ju106 17:57 19 -Jul-06 18:06 9 4.34 0.00 19-Jul-06 18:09 19- Ju1-06 18:10 1 0.32 0.00 19 - Ju1 - 06 18:10 19 -Ju1-06 18:15 5 1.88 0.00 19-Jul-06 18:21 19- Ju1-06 1822 1 0.64 0.00 19 -Ju1-06 18:23 19-Jul -DO 18:28 5 2.07 0.00 19-Jul-06 18:29 19-Jul-06 18:33 4 2.11 0.00 19 -Ju1-06 18:36 19- Ju1-06 18:38 2 0.67 0.00 19-Jul-06 18:41 19- Ju1-06 18:41 1 0.31 0.00 19 -Ju1-06 18:42 19- Ju1-06 18 2 0.64 0.00 19- Jul-06 18:44 19 -Ju1-06 18:51 7 2.44 0.00 19-Jul-06 18:52 19 -Jul-06 18:55 3 1.04 0.00 19 -Ju1-06 18:57 19- Ju4-06 18:58 1 0.65 0.00 19 -Ju1-06 19:04 19 -Ju1-06 19:05 1 0.38 0.00 19 -Jul-06 19:06 19- Jul-06 19:07 1 0.31 0.00 19 19:08 19 - Jut - 06 19:15 7 2.78 0.00 19 - Ju1 - 06 19:17 19 -Ju1-06 19:18 1 0.42 0.00 - 19- Ju1-06 19:21 19-Jul-08 19:28 7 3.45 0.00 19 19:30 19 Ju1 19:31 1 0.36 0.00 19 -Ju1-06 19:36 19- Ju1-06 19:39 3 0.67 0.00 19 -Ju1-06 19:39 19 - JS - 06 19: 1 0.37 0.00 19 -Ju1-06 19:41 19- Ju1-06 19:45 4 1.36 0.00 19 - Ju1 - 06 19:48 19 Ju1 19:49 1 0.35 0.00 19-Jul-06 19:56 19 -Jul-06 19:57 1 0.37 0.00 by c� BP Exploration Milne Point Unit Flare Incident Details 7/1/2006 - 8/1/2006 Page 2 of 5 Start Datsfl ime End DateRims Minutes Flare MCF Assist MCF Incident/Cause Description Renwdlation Taken 19 -Ju1-08 20:01 19-Jul-06 20:08 7 2.81 0.00 19Ju1-06 20:11 19 -Jul-06 20:14 3 1.04 0.00 19- Jut-06 20:18 19 -Ju1-06 20:21 3 1.48 0.00 19- Ju1-06 20:23 19 -Ju4-06 20:24 1 0.37 0.00 19Ju1 -06 20:25 19 Ju1 2028 3 1.02 0.00 19-Jul-06 20:35 19 -Ju1-06 20:41 6 3.46 0.00 19 Ju1 20:56 19 - Ju1 - 06 20:57 1 0.67 0 - 00 19 21:01 19- Jul 21:04 3 0.71 0.00 19 Ju1 21:21 19 Ju1 22:01 40 19.62 0.00 19-Jul-06 22:08 19 -Jut-06 22:12 4 1.03 0.00 19 -Ju1-06 22:13 19-Jul-06 22:15 2 0.71 0.00 19 -Ju1-06 22 :17 19- Jul-06 22:24 7 4.71 0.00 20 Ju1 0:00 20 0:37 37 20 25 0.00 20- Jul-06 3:48 20 -Jul0$ 3:46 1 0.34 0.00 27 -Ju1-06 1:18 27- Ju1-06 1:32 16 10.08 0.00 27 2:17 27 Jul 2:19 2 2.85 0.00 27 - Ju1 - 06 2:19 27 Ju1 2:23 4 3.45 0.00 27 Ju1 12:40 27 13:00 20 100.13 0.00 27 -Ju1-06 1306 27 -Ju1-06 13:08 2 1.69 0.00 27- Ju1-06 1308 27-Jul-06 13:53 45 238.75 0.00 27 13:57 27 Ju1 14:22 25 79.86 0.00 27-Jul-06 15:43 27- Ju1-06 15:55 12 17.44 0.00 27Jul06 20:09 27- Ju1-06 20:12 3 1.31 0.00 27- Jut-06 2023 27- Ju1-06 20:27 4 2.59 0.00 27-Jul-08 2111 27 -Jul06 21:18 7 6.47 0.00 27 -Ju1-06 21:21 27- Ju1-06 21:24 3 2.08 0.00 27 21:25 27 21:29 4 1.58 0.00 27- Jul-06 21:46 27-Jul-06 21:55 9 1145 0.00 27-Jul-06 22:04 27-Jul-06 22:05 1 0.31 0.00 27-Jul-08 22:15 27-Jul-06 22:19 4 0.98 0.00 27-Jul-06 2222 27- Jul -06 22:24 2 0.94 a- 0.00 27-Jul-06 22:28 27- Jul -06 22:47 19 21.01 0.00 BP Exploration Milne Point Unit Flare Incident Details 7/1/2006 - 8/1/2006 Page 3 of 5 Start DaterTime End Date/Time Minutes Flare MCF Assist MCF Incident/Cause Description Rerrrediation Taken 27 -Ju1-06 22:53 27-Jul-06 22:53 1 0.32 0.00 27-Jul-06 22:55 27- Jul-06 22:59 4 1.60 0.00 28-Jul-06 0:08 26-Jul-06 0:09 1 0.32 0.00 28 -Ju1-06 0:13 28 -Jul-06 0:39 26 19.37 0.00 28 -Jul-06 0:42 28 -Ju1-06 0:45 3 093 0.00 28 -Ju1-06 0:46 28-Jul -06 0:50 4 1.59 0.00 28-Jul-06 23:40 28- Ju$-06 23:41 1 0.33 0.00 29 -JuI-06 13:38 29-Jul-06 13:39 1 0.30 0.00 29-Jul-06 13:49 29- Jul-06 13:55 6 2.16 0.00 30- Ju1-06 15:12 30-Jul-06 15:13 1 1.53 0.00 30JuI-06 15:53 30- JuI-06 15:54 1 0.70 0.00 30 -Jul-06 15:55 30- Jul-06 15:56 1 0.33 0.00 30-Jul-06 16:16 30- Ju4-06 16:18 2 0.65 0.00 30-Jul-06 16:19 30- Ju1-06 16:20 1 0.32 0.00 30 -Ju1-06 22:20 30-Jul-06 23:10 50 175.74 0.00 30- Jul-06 23:10 30- Ju1-06 23:21 11 26.33 0.00 31Ju1 -06 9:14 31 -Jut-06 9:25 11 14.45 0.00 31 -Jut-06 9:26 31 -Jul-06 9:28 2 0.96 0.00 31 -Ju1-06 9:32 31-Jul-06 9:48 16 19.09 0.00 31 -Jul-06 9:52 31- Ju1-06 9:57 5 4.18 0.00 31-Jul-06 10:10 31- Ju1-06 10:20 10 15.14 0.00 31-Jul-06 10:25 31- JU1-06 10:45 20 12.85 0.00 31-Jul-06 11:39 31 -Jul-06 11:43 4 1.57 0.00 31-Jul-06 11:51 31-Jul-06 11:56 5 2.32 0.00 BP Exploration Unplanned Lass than 1 Hour Total: 2,772.78 0.00 Milne Point Unit Flare Incident Details 7/1/2006 - 8/1/2006 • of Events: 119 Unplanned Greater than 1 Hour 01 -Ju1-06 12:57 01J4-06 15.25 148 945.85 0.00 C-Pad tripped electrically causing the IWAG gas compressors to shutdown and the C pad wells to dose. Wells were shut in to mitigate the flaring: 83,4,9,15,16,21,22, ail C pad wells, S3,12. H7,G18. J26. L6.3.28 and F94.9.87.18. No black smoke. The problem was repaired. The compressor was started and the welt were brought back Into production. Page 4of5 Start Date/Time End Date/Time Minutes Flare MCF Assist MCF Incident/Cause Description Rsmediation Taken 04- Jui-06 21:40 04- Ju1-06 23:59 139 95584 0.00 At approx 16:47 hours on July 4. 2006, we had a level % shutdown that shut -in plant,fiekl,and power. We found the problem loose wire on shutdown device on terminal strip. We started bringing the plant back on line at 21:40 hours The maintenance team was called out to investigate the shutdown..,. There were no black snake events. The problem was repaired. The flaring was caused by bringing back up the plant and field from a zero state to normal operation. The operations and maintenance team worked together 10 start up plant and coned other problems with startup. 27 -Jut-06 2:23 27- Jul-D8 7:08 285 535.44 0.00 The 4 greater than 1 hr flaring events on 7/27 are a result of starting up plant and equipment after a complete turnaround. 27-Jul-08 7:08 27-Jul-06 12:38 330 1,199.72 0.00 The 4 greater than 1 hr flaring events on 7/27 am a result of starting up plant and equipment after a complete tumaround. The operations and maintenance tears waked together to start up plant and correct other problems with startup. 27-Jul-06 14:24 27- Jul-06 15:42 78 364.24 0.00 The 4 greater than 1 hr flaring events on 7/27 are a result of starting up plant and equipment after a complete turnaround. The 4 greater than 1 hr flaring events on 7/27 are a result of starting up plant and equipment after a complete turnaround. The operations and maintenance team waked together to start up plant and correct other problems with startup. The operations and maintenance team worked together to start up plant and correct other problems with startup. 27-Jul-06 15:56 27-Jul-06 19:23 207 570.83 0.00 Planned Greater than 1 Hour 19 -Jul-06 12:59 19 -Jul06 14:10 71 92.31 0.00 These flaring events were the result of bringing the field down to a safe state for shutdown by de- pressuring all CFP vessels and pipelines. 19-Jul-06 16:02 19- Jul -06 17:55 113 88 244.83 143.70 0.00 0.00 These flaring events were the result of bringing the frees down to a safe state for shutdown by de-pressuring all CFP vessels and pipelines. These flaring events were the result of bringing the field down to a safe state for shutdown by de- pressuring all CFP vessels and pipelines. 19-Jul-06 22:31 19 -Jul06 2359 BP Exploration Unplanned Greater than 1 Hour Total: 4,571.92 Planned Greater than 1 Hour Total: Total Flared Volume (MCF): 480.84 7,825.53 0.00 0.00 Milne Point Unit Flare Incident Details 7/1/2006 - 8/1/2006 0 of Events: 6 0 of Events: 3 0.00 # of Events: 128 Page 5of5 1 Facility Number 0290000024 2 Facery Name Milne Point Central 3. Front Milne Point 14. Operator BP 15. Mondrian' 0t Dhp0711gn Aug - 2006 Disposition Volume MCF 20. For production from multiple pools, ltet contribution of each pool as • percent of Total Volume. 6. Sort 17,053 Pool Name Pool Code Percent 7 Reinjected 553,120 Kuparuk 525100 68.34% Schrader 525140 31.66% a. Flared or vented 1 tour or less 1,179 Sag River 525150 0.00% Ugnu 525160 0.00% 9. Flared or vented more than 1 hour (see sea.) , 1,217 10. Riot and Purge 3,397 ✓ 11. Used for base operations (spncily In Remarks) 255.835 12. Other (see instructions) 0 Authorization >1 rr: Safety i Z MCF 13. TOTAL VOLUME STEMS 6-12) 831,801 Lease Use MCF 14. NGL Gas Equivalent Conservation MCF 15. Purchased gas Waste: MCF 18. Transferred from: / 1 �/ /0 -/U O.rY, 17. Trs trail to: (Frees as a negative m) 18. Remarks Block 6 is fuel gas sold to Milne Point Pipeline Co.; Block 11 is all other fuel gas (255,496 mscf) and assist gas (339 meet. Milne Point uses air for assist gas with the vertical flare and produced gas with the horizontal flare. The vertical flare was used 8/1 -8/29 and the horizontal flare was used 8(30.8/31. 1 hereby certify tat the foregoing is true d RCS id the best of my knowledge. Manager, Production Taxes and Royalties rigs Alaska Note: All volumes must be corrected to pressure of 14.55 pale end to s temperature of 600 F. Authority 20 AAC25235. Sgrrture Printed Nr / ne Bernard W. Iiajny Phone (907)594.5028 Date -/J Q 0 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate zrara- Start Date/Time End Date/Time Minutes Flare MCF Assist MCF Incident/Cause Description Rimedia lon Taken Unplanned Less than 1 Hour 02- Aug-06 17 47 02- Aug-06 17:49 2 0.98 0.00 04 -Aug-06 22:06 04-Aug-06 22:07 1 0.64 0.00 04 -Aug-06 22:17 04-Aug-06 22:22 5 189 0.00 04-Aug -06 22:39 04-Aug-06 22:52 13 18.67 0.00 04 -Aug-06 23:04 04-Aug-06 23:12 8 11.06 0.00 04- Aug-06 23:14 04-Au9-06 23:15 1 0.32 0.00 04 -Aug-06 23:30 04- Aug -06 23:40 10 11.29 0.00 05 -Aug-06 1:15 05 -Aug-06 1:23 8 9.51 0.00 05 -Aug-06 9:26 05 -Aug-06 9:29 3 4.95 0.00 05- Aug -06 10:27 05 -Aug-06 10:28 1 0.66 0.00 05 -Aug-06 21:27 05 -Aug-06 21:28 1 0.93 0.00 05 -Aug-06 21:36 05 -Aug-06 21:41 5 4.00 0.00 06- Aug-06 7:59 06 -Aug-06 8:04 5 3.37 0.00 06 -Aug-06 23:12 06 -Aug-06 23:13 1 1.27 0.00 18 -Aug-06 6:00 18 -Aug-06 6:08 8 4.62 0.00 21 -Aug-06 10:03 21 -Aug-06 10:03 1 0.72 0.00 21- Aug-06 10:04 21- Aug-06 10:27 23 82.24 0.00 21- Aug-06 14:45 21- Aug-06 15:04 19 60.26 0.00 21 -Aug-06 15:35 21- Aug-06 15:35 1 0.31 0.00 21- Aug-06 16:15 21 -Aug-06 16:15 1 0.31 0.00 21 -Aug-06 16:39 21- Aug-06 16:39 1 0.30 0.00 21 -Aug-06 16:40 21- Aug-06 16:45 5 1.89 0.00 21 -Aug-06 19:14 21- Aug-06 19:22 8 2.85 0.00 22- Aug-06 10:34 22- Aug-06 10:40 6 3.28 0.00 22 -Aug-06 10:49 22 -Aug-06 10:59 10 8.34 0.00 22 -Aug-06 11:13 22 -Aug-06 11:38 25 62.51 0.00 22- Aug-06 11:45 22- Aug-06 11:59 14 16.48 0.00 22 -Aug-06 12:04 22-Aug-06 12:12 8 8.77 0.00 22 -Aug-06 12:30 22 -Aug-06 12 41 11 2520 0.00 22 -Aug-06 12.42 22- Aug-06 12:43 1 0.32 0.00 22 -Au9-06 13:25 22- Aug-06 13:26 1 0.31 0.00 8P Exploration Milne Point Unit Flare Incident Details 8/1/2006 - 8/31/2006 Page 1 of 3 Start Dat&Time End Date/Time Minute Flare MCF Assist MCF j Incident/Cause Description R.ONdiation Taken 22 -Aug-06 15:03 22- Aug-06 15:25 22 71.02 0.00 22- Aug-06 15:34 22-Aug-06 15:35 1 0.31 0.00 22- Aug-06 16:59 22 -Aug-06 17:21 22 32 27 0.00 22 -Aug-06 19:17 22 -Aug-06 19:48 29 15.73 0.00 22- Aug -06 20:46 22 -Aug-06 20:48 2 0.92 0.00 22- Aug -06 22:06 22 -Aug-06 22:07 1 0.30 0.00 22- Aug-06 22:21 22- Aug -06 22:41 20 13.18 0.00 22 -Aug-06 22 :43 22- Aug -06 22:43 1 0.30 0.00 22- Aug-06 22:52 22 -Aug-06 23:09 17 12.98 0.00 23 -Aug-06 7:55 23 -Aug-06 8:04 9 16.24 0.00 23 -Aug-06 818 23- Aug-06 8:24 6 2.17 0.00 23 -Aug-06 8:35 23- A09-06 8:52 17 15.69 0.00 23- Aug-06 9:11 23- Aug-06 9:17 6 2.16 0.00 23 -Aug-06 9:19 23- Aug-06 9:22 3 0.97 0.00 23 -Aug-06 9:33 23- Aug-06 9:41 8 13.09 0.00 23 - Aug - 06 12:45 23 - Aug - 06 13:29 44 82.26 0.00 23 -Aug-06 13:39 23- Aug -06 14:15 36 38.67 0.00 23- Aug-06 14:25 23 -Aug-06 14:31 6 4.61 0.00 23 -Aug-06 14:43 23 -Aug-06 14:46 3 1.36 0.00 23- Aug-06 14:51 23- Aug-06 15:39 48 85.33 0.00 23 - Aug - 06 15.44 23 - Aug - 06 15:46 2 1.48 0.00 23 -Aug-06 15:54 23 -Aug-06 15:56 2 0.62 0.00 23- Aug-06 15:59 23- Aug-06 16:00 1 0.31 0.00 23 -Aug-06 16:48 23 -Aug-06 16:50 2 2.10 0.00 25 -Aug-06 21:56 25 -Aug-06 21:58 2 0.61 0.00 26 -Aug-06 3:15 26- Aug-06 3:17 2 0.62 0.00 26 -Aug-06 3:22 26- Aug-06 3:22 1 1 0.31 0.31 0.00 r 0.00 26 -Aug-06 3:24 26 -Aug-06 3:25 26- Aug-06 4:40 26 -Au9-06 4:43 3 0.94 0.00 26 -Aug-06 9:49 26 -Aug-06 9:51 2 0.61 0.00 27- Aug-06 15:56 27 -Aug-06 15:56 1 0.32 0.00 27- Aug-06 16:00 27-Aug-06 16:13 13 13.90 0.00 BP Exploration Milne Point Unit Flare Incident Details 8/1/2006 - 8/31/2006 Page 2 of 3 Start DatefTime End Date/Time Minutes Flare MCF Assist MCF Incident/Cause Description Remediatlon Taken 27-Aug-06 16:15 27- AUg-06 1617 2 0.62 0.00 0.00 w 27 -Aug-06 16:22 27- Aug-06 16:24 2 0.96 0.00 27 -Aug06 16:26 27 -Aug-06 16:29 3 1.28 0.00 27- Aug-O6 16:44 27 -Aug-06 16 4 1.61 0.00 27- Aug-06 17.10 27-Aug-06 17:11 1 0.30 0.00 27-Aug-06 17:14 27- Aug-06 17:16 2 0.63 0.00 27- Au9-06 18:15 27 -Aug-06 18:16 1 0.31 0.00 27 -Aug-06 18:30 27- Aug-06 18:40 10 10.87 0.00 30 -Aug-06 7.26 30- 7ug-06 7:28 2 3.90 0.00 30- Aug-06 7:29 30 -Aug-06 8:20 51 375 42 0.00 30 -AugO6 17:15 30-Aug-06 17:16 1 0.99 0.38 Unplanned Greater than 1 Hour I 06 -Aug-06 20:48 06 -AugO6 21:59 71 971.30 0.00 Both Gas lilt compressors shutdown, 07/08 turbines switched to diesel, and several well pads shut -in from bad shed. This caused a greater Man 1 hr flaring event. We shut-in gas lift wells on B and C pad, to mitigate flaring. 22 -Aug-06 9:13 22 -Aug-06 10:29 76 245.52 0.00 08 Turbine shutdown due to a card failure causing a partial bad shed of the plant and field. Load shed shut in Tract 14, B, E, and K Pads. Shut - In gas lift wets an B end C pad, b mitigate flaring. no black smoke. BP Exploration Unplanned Less than 1 Hour Total: 1,178.83 Unplanned Greater than 1 Hour Total: Total Flared Volume (MCF}: 1,216.83 2,395.66 0.38 0.00 Milne Point Unit Flare Incident Details 8/1/2006 - 8/31/2006 a of Events: 74 8 of Events: 2 0.38 8 of Events: 76 Page 3 of 3 1. Facility Number 0290000024 2 Facility Name Milne Point Central 3. Fiero Milne Point 4 Operator 5. Month/tsar 01 Disposition BP Sep -2006 Dlspoaltbn Volume MCF ✓ ` ,24 20. For production from multiple pools, sat contribution of each pod as • percent ot TOW Volume. e. Sold 17,180 Pod Mime Pool Cods Percent 7. Reinjected 493,633 Kuparuk 525100 72.04% Schrader 525140 28.62% 8 Flared or vented 1 her or lea 1,095 ✓ Sag River 525150 1.34% Ugnu 525160 0.00% 9 Flared cc vented more than 1 hour (see Instr.) 1,257 t, 10. Pilot and Pugs 5,635 11. Used for lease operatbns (specify in Remarks) 251,837 12. Omer (tree instructions) 0 Authorization >1 Nt Sef ( Z� t 7 MCF 13. TOTAL VOLUME (ITEMS 612) 770,637 Lava Use 14. NGL Gas Equivalent Conservation MCF 15. Purchased gas Waste: MCF 17 Transferred from: Or�r(^j).1e' /2 / 48� C ' t t 7 Transferred to: (Eaprea as a negative s) 18. Remarks: Block 6 is fuel gas sold to Milne Point Pipeline Co.; Block l l is all other fuel gas {251,195 ntscf) and assist gas (42 uncf). Milne Point urea air for assist gas with the vertical flare and produced gas with the horizontal flare- The vertical flare was used 9/2 - 9/30 and the horizonal flare was used 9/1. I hereby certify that the foregoing is true a ba M best at of my krovA e. edg / fie Manager, Production Taxes and Royalties Signettre p Tim Alaska Note: All volumes must be corrected to pressure of 14.65 psis and to a temperatur of 60o F. Authority 20 AAC25.235. �LLL//// /O /� Printed Name Bernard W. Hajny Phone (907)5645028 Date 1 / cc, Form 10-422 Rev. 1 /2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Start DaterTime End DaterTime Minutes Flan MCF Assist MCF Incident/Cause Description Remediatlon Taken Unplanned Lass than 1 Hour 01- Sep-06 851 01 -Sep-06 8 :53 2 1.37 0.00 01- Sep-06 9:20 01 -Sep-06 9:24 4 0.93 0.00 01 -Sep-06 19:07 01- Sep-06 19:08 1 0.32 0.00 03 -569-06 2:54 03 -Sep-06 2:55 1 0.30 0.00 03 - 56p - 08 2:56 03 -Sep-06 2:58 2 0.64 0.00 03-Sep-06 10:18 03 -Sep-06 10:20 2 0.62 0.00 03 - Sep - 06 13:09 03- Sep-06 13:34 25 21.40 0.00 03 -Sep-06 15:13 03 -Sep-06 1515 2 0.94 0.00 03- Sep-06 15:17 03- Sep-06 15:23 6 2.88 0.00 03 -Sep-06 15:24 03- Sep-06 15:25 1 0.94 0.00 03 21:26 03 - Sep - 06 21:27 1 0.30 0.00 03 -Sep-06 21:27 03 -Sep-06 21:28 1 0.32 0.00 04 -569-06 16:03 04 -Sep-06 16:09 6 4.65 0.00 04 Sep 16:10 04- Sep -06 16:16 8 4.92 0.00 05 -Sep-06 17:24 05 - Sep 17:27 3 21.80 0.00 05-Sep-06 17:30 05- Sep-06 17:55 25 75.92 0.00 05 -Sep-06 17:57 05-Sep -06 18:01 4 9.80 0.00 05- Sep-06 18:04 05- Sep-06 18:31 27 91.06 0.00 05-Sep-06 19:43 05- Sep -06 20:06 23 82.55 0.00 05 -Sep-06 20:06 05- Sep -06 20:17 11 18.31 0.00 05 -Sep-06 21:03 05- Sep-06 21:25 22 26.80 0.00 05 -Sep-06 21:46 05-Sep-06 21:47 1 0.61 0.00 06 - 569 - 06 17:15 06 -Sep-06 17:24 9 8.83 0.00 06 17:27 - rte 06-Sep-06 17:57 30 24.99 0.00 06-Sep-08 18:00 06 -Sep-06 18:14 14 10.71 0.00 07-Sep-06 1005 07- Sep-06 10:06 1 0.31 0.00 07 -569-06 1008 07 -Sep-06 10:18 10 17.63 0.00 07 -Sep-08 1021 07- Sep-06 10:27 8 2.57 0.00 07- Sep-08 1029 07- Sep-06 10:30 1 0.31 0.00 07 Sep-06 22:58 07 -Sep-06 22:59 1 0 0.00 08- Sep-06 1:46 08 -Sep-06 1:47 - 1 0.3 1 0.00 Milne Point Unit Flare Incident Details 9/1/2006 - 9/30/2006 BP Exploration Page 1 of 5 Start Date/Time End Date/Time Minutes Flare MCF Assist MCF Incident/Cause Description Remedlatlon Taken 09- Sep-06 0:35 09- Sep-06 0:42 7 49.56 0.00 09 -Sep-06 043 09- Sep-06 048 3 1.98 0.00 L 14 -Sep-06 15'.04 14- Sep -06 15:06 2 1.03 0.00 14 -Sep-06 15:08 14 -Sep-06 15:11 3 1.27 0.00 17 -Sep-06 14:23 17 -Sep-06 15:01 38 117.56 0.00 17 -Sep-06 15:04 17 -Sep-06 15:05 1 0.33 0.00 20 -Sep-06 19:08 20 -Sep-06 19:10 2 0.30 0.00 21- Sep-06 12:49 21 -Sep-06 12:53 4 2.93 0.00 21-Sep-06 12:56 21 -Sep-06 13:23 27 6026 0.00 21 -Sep-06 13:23 21- Sep-06 13:59 36 109.31 0.00 21 -Sep-06 14:02 21 -Sep-06 14:52 50 134.71 0.00 21 -Sep-06 14:54 21 -Sep-06 14:58 4 6.50 0.00 21 -Sep-06 15:00 21- Sep-06 15:01 1 0.66 0.00 23- Sep-06 12:33 23- Sep -06 12:37 4 2.47 0.00 23 -Sep-06 12:49 23- Sep-06 12:50 1 0.63 0.00 23 -Sep-06 12:51 23 -Sep-06 12:52 1 0.30 0.00 23-Sep-06 13:19 23- Sep-06 13:23 4 1.58 0.00 23 -Sep-06 13:29 23- Sep-06 13:51 22 20.36 0.00 23 -Sep-06 14:08 23 -Sep-06 14:08 1 0.30 0.00 23-Sep-06 14:09 23 -Sep-06 14:10 1 0.33 0.00 23 -Sep-06 15:51 23- Sep-06 15:53 2 0.96 0.00 23 -Sep-06 16:06 23 -Sep-06 16:09 1 0.31 0.00 23 -Sep-06 1646 23- Sep-06 1648 2 0.32 0.00 23- Sep-06 17:04 23 -Sep-06 17:07 3 2.83 0.00 23 -Sep-06 17:51 23- Sep -06 17:55 4 1.57 0.00 23 -Sep-06 18:57 23 -Sep-06 18:59 2 0.64 0.00 23 Sep 19:50 23 Sep-06 19:51 1 0.32 0.00 23- Sep-06 22:13 23- Sep -06 22:15 2 0.85 0.00 23 Sep-06 22:41 23 - Sep - 22:41 1 0.31 0.00 24- Sep-06 1:31 24 -Sep-06 1:33 2 0.63 0.00 24 -Sep-06 2:32 24 -Sep-06 2:33 1 0.64 0.00 24 -Sep-06 3:13 24 - Sep - 06 3:14 1 0.62 0.00 BP Exploration Milne Point Unit Flare Incident Details 9/1/2006 - 9/30/2006 Page 2 of 5 Start Date/Time End Date/Time Minutes Flare MCF Assist MCF Incident /Cause Description Remediadon Taken 24 -Sep-06 4:40 24- Sep-06 4:42 2 0.63 0.00 24- Sep-06 8:36 24 -Sep-06 8:37 1 0.31 0.00 24 -Sep-06 8:57 24 -Sep-06 8:58 1 0.64 0.00 24 -Sep-06 12:08 24 -Sep-06 12:09 3 095 0.00 24 -Sep-06 1424 24 -Sep-06 14:25 1 0.31 0.00 24 -Sep-06 15:00 24- Sep-06 15:01 1 0.32 0.00 24- Sep-06 1542 24-Sep-06 1544 2 0.62 0.00 24 -Sep-06 16:16 24 -Sep-06 16:18 2 1.78 0.00 24-Sep-06 17:01 24 -Sep-06 17:02 1 0.63 0.00 24 -Sep-06 20:10 24- Sep-06 20.13 3 1.57 0.00 24 -Sep-06 20:42 24- Sep-06 20:43 1 0.32 0.00 24 -Sep-06 21:26 24 -Sep-06 21:28 2 0.64 0.00 24 -Sep-06 22:08 24 -Sep-06 22:11 3 0.96 0.00 25 -Sep-06 3:02 25- Sep-06 3:02 1 0.31 0.00 25 -Sep-06 4:10 25 -Sep-06 4:11 1 0.31 0.00 25 -Sep-06 4:17 25 -Sep-06 4:20 3 0.96 0.00 25- Sep-06 5:49 25 -Sep-06 5:53 4 1.57 0.00 25 -Sep-06 5:56 25- Sep-06 6:18 22 28.51 0.00 25- Sep-06 6:23 25- Sep-06 6:25 2 0.83 0.00 25 -Sep-06 6:37 25- Sep-06 6:40 3 1.28 0.00 25-Sep-06 6:43 25 -Sep-06 6:47 4 2.24 0.00 25 -Sep-06 6:55 25-Sep -06 6:59 4 1.25 0.00 25-Sep-06 7:33 25- Sep-06 7:37 4 1.24 0.00 25 -Sep-06 8:11 25 -Sep-06 8:15 4 1.89 0.00 25-Sep-06 9 25-Sep-06 9:50 4 1.30 0.00 25 -Sep-06 9:51 25-Sep -06 9:52 1 0.31 0.00 25 -Sep-06 10.04 25-Sep-06 10:05 1 0.31 0.00 25- Sep-06 17:01 25 -Sep-06 17:08 7 7 35 0.00 25 -Sep-06 17:25 25- Sep -06 17:44 19 18.69 0.00 25 17:45 25 17:54 9 8.32 0.00 26 - Sep - 06 0:43 26 - Sep - 06 0:44 1 0.31 0.00 27 Sep-00 7:51 27 - Sep - 06 7:52 1 0.31 0.00 BP Exploration Milne Point Unit Flare Incident Details 9/1/2006 - 9/30/2006 Page 3 of 5 Start DatelTims End Date/Tims Minutes Flan MCF Assist MCF Incident/Cause Description Remediation Taken 28- Sep-06 18:42 28-Sep-06 19:02 20 8.66 0.00 28 -Sep-06 19:03 28 -Sep-06 19:04 1 0.62 0.00 28 -Sep-06 19:05 28 -Sep-06 19:09 4 1.62 0.00 28 -Sep-06 19:09 28- Sep-06 19:11 2 0.64 0.00 28 -Sep-06 19:12 28- Sep-06 19:14 2 0.65 0.00 28 -Sep-06 19:14 28 -Sep-06 19:16 2 0.62 0.00 28 -Sep-06 19:17 28 -Sep-06 19:19 2 0.63 0.00 28 -Sep-06 19:19 28 -Sep-06 19:22 3 0.96 0.00 28 - Sep - 06 19:22 28 - Sep - 06 19:24 2 0.e3 0.00 28 -Sep-06 19:34 28 -Sep-06 19:40 6 2.27 0.00 28- Sep-06 19:42 28 -Sep-06 19 1 0.31 0.00 28 -Sep-06 19:54 28 -Sep-06 20:03 9 2.56 0.00 28 -Sep-06 21:22 28- Sep-06 21 :23 1 0.61 0.00 28 -Sep-06 21:26 28- Sep-06 21:29 3 1.25 0.00 28 -Sep-06 21:36 28- Sep-06 21:37 1 0.63 0.00 28 -Sep-06 21:38 28 -Sep-06 22:14 36 12.03 0.00 28- Sep -06 22 :14 28- Sep-06 22:15 1 0.31 0.00 28 - Sep-06 22:27 28 -Sep-06 22:29 2 1.26 0.00 28 -Sep-06 22:49 28-Sep-06 22:53 4 1.30 0.00 28 -Sep-06 22:54 28 -Sep-06 22:57 3 0.64 0.00 28-Sep-06 22:57 28- Sep-06 22:59 2 0.62 0.00 28-Sep-06 23:00 28- Sep-06 23:05 5 1.89 0.00 28 -Sep-06 23:05 28 -Sep-06 23:06 1 0.62 0.00 28 -Sep-06 23:06 28 -Sep-06 23:11 5 1.87 0.00 28 -Sep-06 23:12 28 -Sep-06 2322 10 3.45 0.00 28 -Sep-06 23:22 28 -Sep-06 23:31 9 2.85 0.00 28 -Sep-06 23:32 28 -Sep-06 23:33 1 0.31 0.00 29 -Sep-06 1:04 29-Sep -06 1:05 1 0.71 0.00 29 -3ep-06 1:26 29 -Sep-06 1:26 1 0.32 0.00 29 Sep 1:35 29 - Sep - 06 1:36 1 0.65 0.00 29 -Sep-06 1:37 29 -Sep-06 1:40 3 0.93 0.00 29 -Sep-06 2:48 29 -Sep-06 2:50 2 0.64 0.00 BP Exploration Milne Point Unit Flare Incident Details 9/1/2006 - 9/30/2006 Pape 40( Unplanned Greater than 1 Hour ` 03 -Sep-06 13 03- Sep-06 15:12 g 6118 0.00 Lisle B injection compressor shutdown due to a blown fuse. This fuse was blown as a result of the Electrical Inspection (ELSI) being performed. NOT to starting up the k mpressar, the maintenance crew had to change out the valves in #2 cylinder. The operations and maintenance team changed out blown fuse then the valves #2 cylinder. There were no black smoke events. Production was cut to get gas rates down and to mitigate flaring. C1, 3, 5, 7, 9, 21, 22A, and 43 were shut in. 03 - Sep - 06 15:26 03 - Sep - 06 21:15 349 1.194.00 0.00 There was a field shutdown due to pigging operations on the 24' C -Pad production line. The gas slug after the pig was received swept the line which resulted In a Slugcatcher Hi/Hi alarm. Start the plant up and bong One Mb back oM Start Dater time 1 End Dateffims Minutes 1 Flare MCF I Assist MCF f IncidentiCause Description Remediatton Taken BP Exploration Unplanned Less than 1 Hour Total: Unplanned Greater than 1 Hour Total: Total Flared Volume (MCF): 1,095.10 1,257.18 2,352.28 0.00 0.00 Milne Point Unit Flare Incident Details 9/1/2006 - 9/30/2006 IS of Events: 127 # of Events: 2 0.00 # of Events: 129 Page 5 of 5 7,000 6,000 5,000 m 4,000 LL 3,000 2,000 1,000 MPU Pilot -Purge 0 0 0 0 0 0 0i. 0 0 0^ 0 0 ` ' o9 <19 0 0 `L 0 0L 0 00 0 0'5 0 00 0 0`5 0 0 D% 0 0 b 0 0 A 0 0A 0 00 0 00 0 00 0 00 0 06 0 06 0 06 0 06 \0 bi . c K I 0 \ b. . C N t x 1 � \ c \ t i p' \ ,p N pfd .� \ o N bi A NO Month s Pilot P �e 11 -( - oce Installed second location for purge gas in 4/2005 RE: Facility Rpt Subject: RE: Facility Rpt From: "Fiedler, Anne M" <Anne.Fiedler@bp.com> Date: Mon, 13 Nov 2006 08:58:37 -0900 TO: Stephen hgmains to iik: Hello Steve, Here's what i found out. Let me know if you need more information. Anne Fiedler BP Volume Accounting 564 -5826 564 -4094 (fax) Yes we did replace the meter on our flare pilot purge line. We were having problems with our flare going out during plant upset /flaring events. BP engineering was consulted along with the flare manufacturer (Corona). Operations was directed to increase the purge to the flare in order to maintain a safe flame condition. Meter size was increased to ensure accurate measurement of the flare gas, We are well under the allowable permitted flare pilot purge volume at this time. Original Message From: Stephen Mcmains (mailto:steve mcmains®admin.state.ak.usJ Sent: Wednesday, November 08, 2006 10:54 AM To: Fiedler, Anne M Subject: Facility Rpt Ann, Milne Pt is your facility right? After Jim review the Sept report a significant increase is noticed in the pilot purge volume. Can you contact someone and get an explanation for this increase. Previous months had 3000 to 3550 mcf and now the increase to 5635 mcf. Steve I of I . I 1/13/2006 9:32 AM 1 Facility Number 0290000024 2. Facility Name Milne Point Central 3. Field Milne Point 4. Operator I 8P 5. MgaMYnt d OWou&ton Oct - 2006 Dlspositlon Volume MCF 20. For production from multiple pools, fat antrbudon or each pool as • percent or Total Vokme. 6. Sold 17288 pout Name pod Coda swam 7. nonrated 373,136 Kuparuk 525100 82.71% Schrader 525140 15.47% 8. Flared or vented 1 hour or less 735 Sag River 525150 1.82% Ugnu 525160 0.00% 9. Flared or vented mom than 1 how (see kstr.) 0 10. Plot and Purge 5,287 1 t. used to base operations (specify N Remarks) 260,708 12. Other (see irstrtadors) 0 Authorization >1 hr: Safety MCF 13. TOTAL VOLUME (ITEMS 6-12) 657,152 Lrae Uee MCF 14. NGL Gas Equivalent Conservation MCF 15. Purchased gas Waste: MCF 16. Transferred from: Commissioner ate 17. Transferred to: (Express as a negative in 18 Remarks. Block 6 is fuel gas sold to Milne Point Pipeline Co.; Block 11 is all other fuel gas (260,706 mscf) and assist gas (0 nisi). Mime Point uses air for assist gas with the vertical flare and produced gas with the horizontal flare. The vertical Bare was used this month. 1 Mreby canny that tM f %sgoing 5 true and •• act 10 the best d my knowledge. Manager, Production Taxes and Royalties Signature AP The Alaska Note: All volumes must be corrected to pressure of 14.85 pale and to a temperature of 600 F. Authority 20 AAC25.235. Printed Name Bemard W. Rainy Phone (907)5645028 Date /j4 //n - 817 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Start Date/Time End Date/ Time Minutes Flare MCF Assist MCF [ Incident /Cause Description RentediatIon Taken Unplanned Less than 1 Hour 08- 08-06 11:06 08- 08-06 11:07 t 0.33 0.00 08-08-06 16:41 08 -08-06 16.41 1 0.31 0.00 08 -08-06 16:42 08 -08-06 16:42 1 0.31 0.00 08 -08-06 17:15 08 -08-06 17:16 1 0.74 0.00 08-08-06 17:24 08- 08-06 17:24 1 0.62 0.00 08 -08-06 17:39 08 -08-06 18:05 26 12.95 0.00 08 -08-06 18:25 08 -08-06 18:29 4 1.97 0.00 08.08-06 18:52 08 -Oct-06 18:53 1 0.31 0.00 08 -08-06 18:55 08- Oct-06 18:56 1 0.31 0.00 08-08-06 18:56 08- 08-06 18:57 1 0.31 0.00 08 -08-06 18:59 08-Oct -06 18:59 1 0.32 0.00 08-08-06 19:11 08- 08-06 19:14 3 1.59 0.00 08 -08-06 19:28 08 -08-06 19:31 3 1.63 0.00 08 -08-06 19:35 08 -08-06 19:38 3 1.55 0.00 08 -08-06 19:42 08 -08-06 19:46 4 1.99 000 08-08-06 19:54 08- 08-06 19:57 3 1.22 0.00 08 -08-06 20:10 08.08-06 20:16 6 2.56 0.00 06-Oct-06 20:21 08 -08-06 20:27 6 3.72 0.00 10 -08-06 13:13 10 -08-06 13:16 3 2.82 0.00 10 -08-06 13:18 10 -08-06 13 23 132.00 0.00 15-Oct-06 11:39 15 -08-06 11:42 3 2.81 0.00 15 -08-06 11.43 15- Oct -06 12:12 29 124 42 0.00 15 -08-06 1216 15 -08.06 12:42 26 47.14 0.00 15-Oct -06 12.47 15 -08-06 12 48 1 0.32 0.00 15-08-06 13:51 15-08 -06 13.59 8 3.49 0.00 15 -08-06 14:55 15-0d-06 15:00 5 3.04 0.00 15 -08-06 15:14 15 -08-06 15:26 12 8.79 0.00 15-08 -06 15:40 15 -08-06 15:42 2 1.01 0.00 19 -08-06 11:11 19 -08-06 11:11 1 0.31 0.00 21 -08-06 12:24 21 -Oct-06 12:27 3 2.01 0.00 21.08 -06 12:30 21-08 -06 12:31 1 0.33 0.00 BP Exploration Milne Point Unit Flare Incident Details 10/1/2006 - 10/31/2006 Page 1 of 4 Start Date/Time End DateTme Minutes Flare MCF Assist MCF Incident/Cause Description Remediatlon Taken 21 -Oct-06 12:41 21- Oct-06 1244 3 0.96 0.00 21-Oct-06 12:50 21-Oct-06 12:53 3 0.93 0.00 21- 06-0612:58 21.06- 0613:02 4 2.28 0.00 21 -06-06 13:07 21 -06-06 13:11 4 1.55 0.00 21 -06-0613:20 21 -06-06 13:24 4 1.59 0.00 21-06-06 13:30 21 -06-06 13:34 4 1.86 0.00 21-08-06 13:45 21-Oct-06 13 46 1 0.32 0.00 21 -06-06 13:46 21- Oct -06 13:48 2 0.63 0.00 21-06-06 13:58 21 -06-06 14:03 5 1.29 0.00 21 -06-06 14:11 21- Oct -06 14:20 9 3.52 0.00 21.06-06 1425 21 -06-06 14:28 3 1.24 0.00 21-Oct-06 14:43 21 -Oct-06 14:48 5 2.61 0.00 21 -06-06 15:35 21 -Oct-06 15:38 3 1.24 0.00 21-08-06 15:41 21- Oct-06 15:52 11 4.51 0.06 21 -06-06 15:56 21 -08-06 16:02 6 3.17 0.00 21 -Oct-06 16:04 21-Oct-06 16:09 5 2.26 0.00 21-06-06 16:27 21 -08-06 16:30 3 0.97 0.00 21-06-0617:55 21-06-06 17:59 4 1.56 0.00 22 -08-06 7:49 22 -08-06 7:52 3 1.94 0.00 22- 0ct-06 8:14 22- 08.06 8:16 2 0.93 0.00 22 -06.06 8:29 22 -06-06 8:35 6 2.53 0.00 22 -06-06 9:07 22.06-06 9:08 1 0.62 0.00 22 -06-06 9:10 22 -08-06 9 4 1.94 0.00 22 -08-06 9:19 22-06-06 9:28 9 5.13 0.00 22-06 -06 9:31 22-0d-06 9:33 2 0.95 0.00 22-08 -06 9:34 22 -06-06 9:35 1 0.31 0.00 22 -0d-06 9:40 22 -08-06 9:53 13 6.13 0.00 22-08 -06 10:04 22-08 -06 1069 5 1.65 0.00 22- 06.06 10:29 22 -06-06 10:29 1 0.33 0.00 22 -06-06 10:47 22-06.06 1049 2 0.64 0.00 22-06-06 10:57 22 -06 -06 10:59 2 0.65 0.00 22-06-06 11:21 22 -06-06 11:26 5 1.92 0.00 BP Exploration Milne Point Unit Flare Incident Details 10/1/2006 - 10/31/2006 Page 2 of 4 Start Date/Time End Date/Tims Minutes Flare MCF Assist MCF Incident/Cause Description Re nsdiatlon Taken 22 - Oct - 06 11:28 22 11:35 7 2.56 0.00 22 11:40 22 - 00 - 06 11:41 1 0.32 0.00 22 - 00 - 06 12:27 22 12:31 4 0.95 0.00 22- 01-06 22 3 0.97 0.00 22 12:55 22 Oct 13:01 6 2.84 0.00 22 13:05 22 - 00 - 06 13:10 5 2.93 0.00 22.00 13:17 22 - 00 - 06 13:29 12 6.44 0.00 22 13:36 22 0c2 1347 9 5.20 0.00 22-00-06 13:54 22-00 -06 13:59 5 1.93 0.00 22 -00-06 14:07 22- 00-06 1411 4 1.60 0.00 . 22 -00-06 14.16 22- Oct-06 1418 2 062 0.00 22 -00-06 14.20 22-Oct-06 14131 11 4.26 0.00 22 -00-06 14:42 22- 00-06 14:48 6 3.24 0.00 22-0d- 0614 22-00-06 14:52 2 0.94 0.00 22-00 -06 20:44 22 -00-06 20:51 7 5.80 0.00 23-00-06 16:35 23- 01-0616:39 4 18.36 0.00 23 -00-06 19:13 23-00-06 19:15 2 1.79 0.00 23 00 20:12 23 - 00 - 06 20:14 2 0.91 0.00 23 - 00 - 06 20:24 23 -00-06 20:28 4 0.92 0.00 23 -00-06 20:29 23-00-06 20:30 1 0.30 0.00 23-00-06 20:44 23 -00-06 20:47 3 1.41 0.00 23-00-06 21:04 23 -00-06 21:05 1 0.31 0.00 23 -00-06 21:52 23- Oct-06 21:52 1 0.32 0.00 24 1:41 24 00 1:42 1 0.31 0.00 24-00 -06 1:58 24- Oct-06 2:00 2 2.05 0.00 24 -00-06 2:13 24 -00-06 2:15 2 1.30 0.00 29 -00-06 1:30 29-00-06 1:31 1 0.35 0.00 29-00-06 1:31 29 - 00 - 06 1:31 1 0.80 0.00 29 - 00 - 06 1:31 29 - 00 - 06 1:31 I 1 1.81 000 29 -00-06 1:32 29.00 -06 1:32 1 5.18 0.00 29 -00-06 1:32 29 -00-06 192 1 9 8 0.00 29 - 00 - 06 1:32 29.00 - 06 1.33 1 16.38 0.00 BP Exploration Milne Point Unit Flare Incident Details 10/1/2006 - 10/31/2006 Page 3 of 4 Start Dat&Time 1 End Date/Time Minutes Flare MCF Assist PACE Incident/Cause Description Ramedfation Taken 29 -Oct-06 1:33 129- 0c106 1:33 1 810 000 0.68 0.00 29- 06-06 1:33 29 -06-06 1:34 1 5.03 0.00 2.36 0.00 29-06-06 1:34 29-06-06 1:34 1 2.75 0.00 2.15 0.00 29 -Oct-06 1:34 29 -06-06 1:34 1 1.89 0.00 4.05 0.00 29 1:34 29 - 06 - 06 1:35 1 1.05 0.00 2.63 0.00 29-Oct-06 1:35 29-06-06 1:35 1 0.37 0.00 1.80 0.00 29 -06-06 2:14 29 -06-06 2:19 5 19.66 0.00 30 -06-06 14:37 30 -06-06 14:41 4 2.78 0.00 30-Oct-06 14:42 30 -Oct-06 15 :09 27 105.60 0.00 30 -06-06 15:10 30 -06.06 15:23 13 26 53 0.00 30 -Oct-06 15:25 30- 06-06 1640 15 19.20 0.00 130 -Oct-06 1545 30 -Oct-06 15:52 7 4.37 0.00 Planned Less than 1 Hour I 19-06-06 7:09 19- Oct-06 7:11 2 1.68 0.00 19 -Oct-06 7:11 19 -06-06 7:12 1 0.68 0.00 19-Oct -06 7:26 19-Oct-06 7:28 2 2.36 0.00 19- Oct-03 7:33 19-06-06 7:35 2 2.15 0.00 19- Oct-06 9:39 19 -06-06 9:43 4 4.05 0.00 19.06-06 9:44 19- Oct-06 9:47 3 2.63 0.00 19 -06-06 9:49 19 -06-06 9:51 2 1.80 0.00 BP Exploration Unplanned less than 1 Hour Total: Planned Less than 1 Hour Total: Total Flared Volume (MCF): 719.66 15.36 733.02 0.00 0.00 0.00 Milne Point Unit Flare Incident Details 10/1/2006 - 10/31/2006 1 of Events: 107 R of Everts: at of Events: 114 Page 4 of 4 1. Facility Maher 2. Facility Name Milne Point Central 3. Feld Milne Point 4. Operator BP 5. taorMNesr of Disposition Nov -2006 DIsposnbn Volume MCF 20. For production from mttipb pods. 1st contribution of each pod as a percent of Total Volume. 8. Sold 16,673 Pod Nana Pool Code Percent 7. Reinjected 264,571 Ktlparuk 525100 82.72% Schrader 525140 15.22% 8. Flared or versed t flour or tees 988 Sag River 525150 2.06% Ugnu 525160 0.00% 9. Fired or vented more than 1 hour (sae instr.) 0 10. Pilot and Purge 3,880 it used to lease operations (speciry In Ra arks) 251,409 12. Omar (see instruction) 0 Authorization >1 M: Safety MCP 13. TOTAL VOLUME (ITEMS 6-12) Lease Use MCF 14. NGL Gas Equivalent CanleaNSaan MCF 15. Pvdased gas Waste: MCF 18. Transferred from: Commiseiaar Date 17. Transferred to: (Express as a negative 4) 18. Remarks: Block 6 is fuel gas sold to Milne Point Pipeline Co.; Block 11 is all other fuel gas ( 251,409 mace and assist gas (0 mecf). Mime Point uses air for assist gas with the vertical flare and produced gas with the horbontal (Inc. The vertical Bare was used this mouth. I hereby certify that the egolry Signature is are d to the hest d my Imariledge. Manager, Production Taxes and Royalties Title Alaska Note: All volumes must be corrected to pressure of 14.85 psia and to a temperature of 60o F. Authority 20 AAC25.235. q Printed Name Bernard W. Hajny phone (807)584 -5029 Date /02 - / U f° _ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Form 10-422 Rev. 1/2004 Submit in Duplicate Start DatsRime End Datsmms Minute Flan MCF Assist MCF MeidantiCause Description 1 _ Remadiation Taken Unplanned Less than 1 Hour - - -� 04 - Nov - 06 17:35 04 - 06 17:49 14 28.16 0.00 06 -Nov-06 8:21 06- Nov-06 8:24 3 2.09 0.00 06 -Nov-06 8:28 06 -Nov-06 8:32 4 1.58 0.00 06 - Nov - 06 8:36 06 Nov 8:39 3 2.04 0.00 06 - Nov - 06 9:05 06 Nov 9:09 4 1.55 0.00 06 - Nov - 06 9:14 06 - 06 9:17 3 0.95 0.00 06 -Nov-06 9:24 06 -Nov-08 9:29 5 2.22 0.00 06 -Nov-06 9:31 06 -Nov-06 9:33 2 1.01 0.00 06 Nov-06 12:11 06 - 12.14 3 2.13 0.00 06 -Nov-06 12:24 06 -Nov-06 12 :25 1 0.32 0.00 06 -Nov-06 12:25 06- Nov -06 12:30 5 2.23 0.00 06- 1ov-06 12:31 06- Nov -06 12 1 0.61 0.00 11 44ov-06 14:04 11- Nov-06 14:21 17 15.63 0.00 16 -Nov-06 13:15 16 -Nov-06 13:19 4 25.73 0.00 16 -Nov-06 15:12 16 -Nov-06 15:15 3 2.80 0.00 16 - Nov - 06 15:37 16 - Nov - 06 15:40 3 1 9 0.00 16 - Nov - 06 16:38 16- Nov 16:38 1 0.31 0.00 16 Nov 16 16:58 2 0.63 0.00 16 -Nov-06 20:01 16 -Nov -06 20:03 2 2.29 0.00 16 -4ov-06 20:20 16 -Nov-06 20:26 6 18.65 0.00 16 Nov 20:41 16 Nov - 06 20:41 1 0.35 0.00 17 -Nov-06 3:37 17 -Nov-06 3:42 5 9.76 0.00 17 -Nov-06 3:50 17- Nov-06 4:06 16 43.70 0.00 17- Nov-06 4:45 17- Nov-06 4:51 6 2.25 0.00 17- Nov-06 5:02 17- Nov -06 5:06 4 1.96 0.00 17 -Nov-06 5:41 17- Nov -06 5:47 6 18.88 0.00 17 -Nov-06 8:20 17-Nov-06 8:24 4 1.25 0.00 17- Nov-06 9:07 17- Nov-06 911 4 31.31 0.00 17- Nov-06 20:54 17- Nov -06 20:58 4 15.48 0.00 17 - Nov - 06 21:07 17- Nov-06 21:11 4 6.98 0.00 17- Nov-06 21:22 17- Nov-06 21:24 2 1.71 0.00 Milne Point Unit Flare Incident Details 11/1/2006 - 11/30/2006 BP Exploration Page 1 of 3 Start Date/Time End DatelTime Minutes Flare MCF Assist MCF Incident/Cause Description Ramsdlation Taken 17- Nov-06 21:36 17- Nov -06 21:38 2 1.35 0.00 17 -Nov-06 22:06 17- Nov -06 22:07 1 0.65 0.00 18- Nov-06 0:15 18- Nov -06 0:16 1 0.33 0.00 18 -Nov-06 10:28 18- Nov-06 10:29 1 0.30 0.00 18 -Nov-06 10:29 18 -Nov-06 10:52 23 18.20 0.00 18 -Nov-06 11:22 18 -Nov-06 11:24 2 1.68 0.00 19 -Nov-06 10:02 19 -Nov-06 10:06 4 2.69 0.00 19- Nov-06 14:29 19- Nov-06 14:35 6 2.90 0.00 19 -Nov-06 14:35 19- Nov-06 14:41 6 2.24 0.00 19- Nov-06 14:44 19- Nov-06 14:45 1 0.33 0.00 19- Nov-06 14:46 19 -Nov-06 14:47 1 0.34 0.00 19- Nov-06 18:57 19 -Nov-06 19:01 4 2.97 0.00 19 -Nov-06 19:10 19- Nov -06 19:12 2 4.65 0.00 22- Nov-0616:33 22- Nov -06 16:35 2 2.71 0.00 22 -Nov-06 16:43 22- Nov -06 1648 5 23.24 0.00 2244ov-06 18:49 22- Nov-06 16:50 1 0.66 0.00 22 -Nov-08 16:51 22- Nov-06 16:51 1 0.36 0.00 22 44ov-06 16:53 22- Nov-06 16:59 6 20.00 0.00 22- Nov-06 17:02 22- Nov-06 17:34 32 179.31 0.00 22 Nov 17:37 22 Nov 17:48 11 53.91 0.00 22 - Nov - 06 17:54 22 Nov 18:02 8 26.54 0.00 22 Nov 18:08 22 - Nov - 06 18:15 7 20 52 0.00 2244ov-06 18:23 22 -Nov-06 18:30 7 15.29 0.00 22 -Nov-06 18:38 22 -Nov-06 18:43 5 5.90 0.00 22-Nov-06 19:09 22 -Nov-06 19:13 4 12.77 0.00 22 -Nov-06 19:55 22- Nov-06 19:58 3 2.55 0.00 23 -Nov -06 2:59 23- Nov-06 3:47 48 192.52 0.00 23 -Nov-06 3:52 23 -Nov-06 3:57 5 20.79 0.00 23 -Nov-06 3:59 23- Nov-06 4:16 17 45.83 0.00 23 -Nov-06 4:21 23 -Nov-06 4:27 6 17.68 0.00 23 -Nov-06 4:31 23- Nov-06 4:36 5 1865 0.00 23- Nov -06 4:40 23- Nov-06 4 4 8 23.31 0.00 BP Exploration Milne Point Unit Flare Incident Details 11/1/2006 - 11/30/2006 Page 2 of 3 bP t� Start Date/Time I End Date/Time I Minutes I Flare MCF I Assist MCF I Incident/Cause Description 1 Rsmedlation Taken 1 BP Exploration Unplanned Less than 1 Hour Total: Total Flared Volume (MCF): 968.28 968.28 0.00 Milne Point Unit Flare Incident Details 11/1/2006- 11/30/2006 8 of Events: 63 0.00 0 of Events: 63 Page 3of3 1. Fatly Number j2. 0290000024 Facility Milne Point Central 3. Feb Milne Point 14, Operator BP (5. Month/Veer d depoeNlorl Dec -2006 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pod as a percent of Total Vokne. e. Solo 17.730 Pool Name Pad Cods Patent 7 Reinjected 321 7) Kuparuk 525100 82.63% Schrader 525140 15.34% 8. Flared or vented 1 tour or less 235 Sag River 525150 2.03% Ugnu 525160 0.00% 9. Flared or vented more Man 1 hour (see Mtr.) 0 10. Not and Purge 4 032 11. Used for base operations (specify in Remarks) 271,914 12 Other (see instructions) 0 Authorization >1 t7) Safety MCF 13. TOTAL VOLUME (ITEMS 612) 614,946 Lease Use MCF 14. NGL Gas Equivalent Comnvalion MCF 15. Purdesed gas Waste: MCF 16. Transferred from: Commissioner Dabs 17. Transferred to: (Express as a negative a) 18. Smirks: Block 6 is fuel vertical al Blare gas sold to Milne Point Pipeline Co.; Block 11 is all other fuel gas (271,914 mscq and asa)st gas (0 mod). Alike Point uses air for assist gas with the and produced gas with the horizontal flare. The vertical flare was used this month. I hereby artily that the sgarq is true the seat of my knowledge. f Manager, Production Taxes and Royalties Signature / --' rite Alaska Note: All volumes must be corroded ro preasuro of 14.65 qla and ro a temperature of 60o F. Authorlly 20 AAC25.235. Printed Name Bernard W. Hajny Phone (907)564-5028 Date / /P 7 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Stan Dats7Time End Date/Time Minutes Flan MCF Assist MCF j Incident/Cause Description Rsmediation Taken Unplanned Less than 1 Hour 06 -Dec-06 12:54 06-Dec-06 12:55 1 4.43 0.00 06-Dec-0612:58 06- Dec-06 13:02 6 3.68 0.00 06- Dec-06 13:04 06- Dec-06 13:04 1 0.32 0.00 06- Dec-06 13:10 06 -Dec-06 13:18 8 8.08 0.00 06-Dec -06 13:21 06- Dec-06 13:37 16 13.76 0.00 06- Dec-06 13:39 06-Dec-06 13:54 15 987 0.00 06- Dec-06 14:09 06- Dec-06 14:16 7 5.15 0.00 06 -Dec-06 14:19 06- Dec -06 14:24 5 1.90 0.00 06 -Dec-06 14:27 06- Dec -06 14:34 7 3.55 0.00 06 -Dec-06 14:35 06- Dec-06 14:39 4 1.56 0.00 06 -Dec-06 14:46 06 -Dec-06 14:52 6 3.24 0.00 06 -Dec-06 14:55 06 -Dec-06 15:01 6 2.25 0.00 06 -Dec-06 15:05 06- Dec-06 15:11 8 2.98 0.00 06 -Dec-06 15:20 06- Dec-06 15:21 1 0.31 0.00 06- Dec-06 15:24 06-Dec-06 15:26 2 0.96 0.00 06 -Dec-06 15:39 06 -Dec-06 15:44 5 4.44 0.00 12 -Deo-06 17:49 12 -Dec-06 17:53 4 1.24 0.00 12- Dec-06 17:53 12 -Dec-06 17:55 2 0.83 0.00 14 -Dec-06 17:31 14 -Dec-06 17:33 2 0.62 0.00 15 -Dec-06 9:35 15- Dec-06 9:36 1 0.32 0.00 17 -Dec-06 20:09 17- Dec-06 20:15 6 2.23 0.00 17 -Dec-06 20:18 17- Dec -06 2020 2 0.65 0.00 18 -Dec-06 10:04 18-Dec-06 10:06 2 0.30 0.00 24- Dec-06 0:04 24 -Dec-06 0:10 6 6.05 0.00 24- Dec-06 0:12 24- Dec-06 0:19 7 19.36 0.00 24 -Dec-06 0:27 24- Dec -06 0:32 5 26.27 0.00 24 -Dec-06 0:39 24- Dec-06 0:43 4 22.19 0.00 24 -Dec-06 1:05 24- Dec-06 1:10 5 9.09 0.00 24 -Dec-06 1:18 24 -Dec-06 1:22 4 15.80 0.00 24 -Dec-06 1141 24- Dec-06 1:45 4 19.57 0.00 24 -Dec06 2:34 24 -Dec-06 2:40 6 10.72 0.00 Milne Point Unit Flare incident Details 12/1/2006 - 12/31/2006 BP Exploration Page 1 02 Start Data/Time End DateRms Minutes Flan MCP Assist MCP IncidentlCaus• Description Renwdlation Taken 25- Dec-06 6:20 25 -Dec-06 6:21 1 0.31 0.00 25 -Dec-06 7:59 25-Dec -06 8:00 1 0.65 0.00 25 -Dec-06 11:11 25-Dec-C6 11:12 1 0.31 060 25 -Dec-06 14:21 25 -Dec-06 14:22 1 1.58 0.00 29- Dec-06 7:58 29 -Dec-06 8:48 50 , 30.74 0.00 BP Exploration Unplanned Lase than 1 Hour Total: Total Fined Volume (PACE): 234.90 234.90 0.00 Milne Point Unit Flare Incident Details 12/1/2006 - 12/31/2006 9 of Events: 36 0.00 i of Events: 36 Page 2 of 2