Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutMoquawkie / Aurora Gas LLC
STATE OF AIASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2003
FACILITY: Moquawkie
OPERATOR: AURORA GAS LLC
- .~ ... :..-
.-
----
.
.
..
.
.
...--
ALASK;\. OIL AND GAS CO;\JSER\lATION COMMJSSI0N
FACILITY REPORT OF PRODUCED GAS DISPOSITION
FJciiity Operator Fie/d(s) MOC1úVY ear of Dísposition
Moquawkie No. 1 Aurora Gas, LLC Moquawkie - Undefined !November 2003
TOTAL ¡¡ems I ~ 7
0
0
0
2,690
0
0
0
2 690
·fndicatc contribution of each pool to fowl.
Pool Name Code Percent
MQq1dawkie - 528500 100.00
Undefined
Disposition
Volume MCF*
J. Sold
2. ReinjectC(Î
J. Hued or venled less 111an 1 bour
4. Flared or vcnted greater than 1 hour
(Supplo:mc::¡J.al rcpOO n:qujreJ--Scc 20 AAC 2J.2Jj)
5. Pilo! and Purge
9. Purchasw gas
i¡£[if:~y1;®i~~fB;ffi~w&#ffiif:;t~f
1. Safety MCF
..
1. Lease Use MCF
J. Co C1&e rv. Purposes MCF
ColD.1lUssjooer Dale
.
6. Used for lease ope[~tions
7. Oilier
8. NGL gas equivalent produced
10. Trans[errcrl from:
1 . Tr~lOsfem:.::J Ie:
J.Jld :o~llo Ih~ OC$t cf my \r.cw!edse:.
Note: .All 'IoJ WTIe.s must be CCTT::-:ted [0
pressure c[ 14.6.5 psia aDd to a lempef"J.rur~ :)f
60 de~s F. Report due by tile 20th of (he
month foJ1avfÌllg the month of disposiùon.
Auiliority 20 A.AC 25.135.
R.emaÜ.s:Conducted 4 point Open-Flow Potential test for 15 hours on
11/24 03.
Tille Vice President Dale__L2/J.8/03
Fonn 10-4 _
R<v. ¡'?5
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) MonlhfYear of Disposiûon
Morruawkie No. 1 Aurora Gas. LLC Moquawkie-Undefined December 2003
Disposilion
Volume MCF*
*Jndicate contribution of each pool to total.
± 1. Sold
o
Pool Name
Code Percent
2. Reinjected
Moquawkie -
o
3. Flared or vented less than I hour
o
4. Flared or vented greater than] hour
(Supplemental report required-See 20 AAC 25.235)
o
5. Pilot and Purge
o
6. Used for lease operations
o
:~þ~~~i:V~~:~~~+~~~~:Ä~~8#~~~:~~:~::::
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
7. Other
o
TOTAL items ] - 7
o
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
I]. Transferred to;
Remarks: Well is shut-in, waiting on construction of gathering
. .
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Signature
Tille Vice PresidentDate: 1/19/04
Form 10-42
Rev. 4195