Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutSR Swanson River LEX - Hilcorp Alaska, LLCState of Alaska AOGCC
Gas Disposition Files
Year: 2017
Facility: SR Swanson River LEX
Operator: Hilcorp Alaska LLC
o(seeinstmctlons)
jected
ed or vented 1 hour or less
ed or vented more than 1 hour (see instr.)
t and Purge
ist Gas
l gas used in lease operations
er (see instructions)AL VOLUME (ITEMS 6.13)
15. NGL Gas Equivalent
16. Purchased gas - Rental Return Gas
17. Transferred from: (Off -lease Gas)
18, Transferred to:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
167,269
192,725
346
2,819
1,745
0
86,355
0
451,259
1,224
18,745
118,098
(73,447)
Reinjected: Production Injected Back into Hemlock 192,725
Included in line 7
Transferred to: Swanson Storage for Injection 73,447
Included in Lina 6 as subject to royalty.
Rental Return: Hemlock Production Sold 18,745
Induded in Line 6; not subject to royalty.
the foregoing is true and correct to the best of my knowledge.
Signature Phu Title
For
pools,
Use
'ftPf�o°co� �1Zve 6, trcti.o��sc:.
pool as a percent
Note: All volumes must be correcte
to pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr,)
10. Pilot and Purge
11. Assist Gas
12. Fuel gas used in lease operations
13. Other (see instructions
as JEM W_
14. TOTAL VOLUME (I 3)
15. NGL Gas Equivalent
16. Purchased gas - Rental Return Gas
17. Transferred from: (Off4ease Gas)
18. Transferred to:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION (, G /
FACILITY REPORT OF PRODUCED GAS DISPnSinnu
as a
167,269
192,725
346
2,8190
1,745
0
86,355
' I �-
0
O�cisl Use Onl
451,259
Authorization >1 hr:iisio
afety
Z 91 -
T
MCF
0
ease Use
MCF
21,745
onservation
MCF
Waste:
MCF
118,098
3-2_�F—/J
Coer Date
(73,447)
Reinjected: Production Injected Back into Hemlock 192,725
included in lire 7
Transferred to: Swanson Storage for Injection 73,447
Included in Line 6 as sWject to royalty.
Rental Return: Hemlock Production Sold 21,745
Included in Litre 6; not subject to royalty.
Signature ,yam Note: All volumes must be corrected
Title Production Analyst to pressure of 14.65 psia and to a
led Name Cortney Dyer temperature of 60o F. Authority 20
Phone 713 289-2881 Date 2/16/2017 AAC25.235.
v'TL-
3/774/1-
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
-
6. Sold
-------- ----
— • I ,'I,umpre pools, ltsr contribution Of each pool as a percent
167,269
of Total Volume.
7. Reinjected
192,725
Pool Name Pool Code Percent
SWANSON RIVER, HEMLOCK
772100 70.59%
N
SWWANS RIVER, HEM FNEK
772105 0.00%
8. Flared or vented 1 hour or less
346
SWANSON RIVER, TYONEK UNDEFINED
UNDEFINED
I D 772500 0.00%
SWANSON RIVER, BELUGA UNDEFINED 772520 0.00%
SWANSON
9. Flared or vented more than 1 hour (see instr.)
2,819
RIVER, STERLING UNDEFINED 772550 29.41%
10. Pilot and Purge
1,745
11. Assist Gas
0
12. Fuel gas used in lease operations
86,355
13. Other (see instructions)'f 't.Ihr70
Official Use Only
_
14. TOTAL VOLUME (ITEMS 6.13)
Authorization he
Safety
MCF
451,259
15. NGL Gas Equivalent
Lease Use
MCF
0
16. Purchased gas - Rental Return Gas
Conservation
MCF
21,745
17. Transferred from: (Off -lease Gas)
Waste:
MCF
Commissioner Date
118,098
18. Transferred to: (73447)
19. Remarks:
Reinjected: Production Injected Back into Hemlock
192,725
' Intluderl in line 7
Transferred to: Swanson Storage for Injection
73,447
' Included in Line 6 as subject to royalty.
Rental Return: Hemlock Production Sold
21,745
' Induderl in Line 6: not subject to royalty.
hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature �A-f+r��.�%.w
Title Production
Analyst Note: All volumes must 7cormetodto pressure of 14.65 psPrinted
Name Cortney Dyer Phone
713-269 2881
temperature of 600 F.
Date 2/16/2017 neck 119
SWANSON RIVER UNIT
Janua -17 Total> i HR: 2019.0
EXCESS VENTING DUE TO
011012017
124250
1330000002
1/4/2017
19:00:00
1.3000
1/5/2017
U
26.9
SHUTDOWN OF VRU COMPRESSOR
EXCESS VENTING NECESSARY UNTIL
CAUSED BY A FROZEN PRESSURE
COMPRESSOR CAN BE RESTARTED.
DRAIN.
EXCESS VENTING DUE TO
01/01/2017
124250
133WD0002
1/4/2017
19:00:00
1:30:00
1/5/2017
U
78
SHUTDOWN OF VRU COMPRESSOR
EXCESS VENTING NECESSARY UNTIL
CAUSED BY A FROZEN PRESSURE
COMPRESSOR CAN BE RESTARTED.
DRAIN.
UPDATED DESCRIPTION: EXCESS
VENTING DUE TO SHUTDOWN OF
-
VRU COMPRESSOR CAUSED BY
01/012017
124251
1330000002
1/11/2017
15:00:00
22:00:00
1/11/2017
U
36.8
MULTIPLE MALFUNCTIONS
EXCESS VENTING NECESSARY UNTIL
INCLUDING WATER PUMP
COMPRESSOR CAN BE RESTARTED,
CAVITATING AND HIGH PRESSURE
SUCTION FROM A FREEZING
COOLING SKID.
EXCESS VENTING DUE TO
01/012017
124250
1330000002
1/19/2017
22:00:00
2:00:00
1/20/2017
U
10.6
SHUTDOWN OFVRU COMPRESSOR
EXCESS VENTING NECESSARY UNTIL
CAUSED BY A FROZEN PRESSURE
COMPRESSOR CAN BE RESTARTED.
DRAIN.
EXCESS VENTING DUE TO
01MIM017
124251
1330000002
1/19/2017
22:00:00
2:00:00
1/20/2017
U
10.6
SHUTDOWN OF VRU COMPRESSOR
EXCESS VENTING NECESSARY UNTIL
CAUSED BYA FROZEN PRESSURE
COMPRESSOR CAN BE RESTARTED.
DRAIN.
EXCESS VENTING DUETO
01/012017
124250
1330000002
1/20/2017
6:15:00
8:30:00
1/20/2017
U
12.0
SHUTDOWN OF VRU COMPRESSOR
EXCESS VENTING NECESSARY UNTIL
CAUSED BY A HIGH JACKET WATER
COMPRESSOR CAN BE RESTARTED.
TEMPERATURE
EXCESS VENTING DUE TO
01/012017
124252
1330000002
1/21/2017
3:00:00
7:15:00
1/21/2017
U
227
SHUTDOWN OF VRU COMPRESSOR
EXCESS VENTING NECESSARY UNTIL
CAUSED BY A FROZEN PRESSURE
COMPRESSOR CAN BE RESTARTED.
DRAIN.
UPDATED DESCRIPTION: EXCESS
01/01/2017
124250
1330000002
1/22/2017
0:15:0013:30:00
TING DUE TO SH DTO
E VENTI NG IS
1/22/2017
U
70.1
VRUTCOMPRESOR DUE HUGH
UNTIL COMPRESSOR CAXCESS
N BEY
DISCHARGE PRESSURE CAUSED BY A
RESTARTED.
FROZEN COOLER.
EXCESS VENTING DUE TO
SHUTDOWN OF THE VRU
01/01/2017
124252
13300000021/26/2017
20:30:00
23:59:00
1/26/2017
COMPRESSOR CAUSING A VENT
EX CESS VENTING NECESARYUNTIL
U
18.4
FROM THE BULK OIL TANK DUE TO
REPAI IS CAN BE MADE AND THE
FREEZING OF INSTRUMENT AIR AND
EQUIPMENT RESTARTED.
TOTAL PLANT SHUTDOWN,
UPDATED DESCRIPTION: EXCESS
01/01/2017
124250
1330000002
3/26/2017
20:30:00F
DUE TO P NT
EXCESSVENTING NECESSARY A
23:59:00
1/26/2037
U
520.0
SHIUTDOWN DUE TONG
LOW OLETE IL
REPAIRS CAN BE MADE AND HE
PRESSURE IN THE COMPRESSORS
EQUIPMENTRESI-ARTED.
AFTER THE INSTRUMENT AIR FR02E.
SWANSON RIVER UNIT Janw -17 Taal>I HR: 2819.0
UPDATED DESCRIPTION: EXCESS
VENTING DUE TO SHUTDOWN OF
01/01/201]
124253
1330000002
1/2]/201]
0:00:00
]:00:00
1/2]/201]
THE VRU COMPRESSOR CAUSING A
EXCESSVENTING NECESSARY UNTIL
V
3].S
VENT THE BULK OIL TANK DUE
REPAIRS CAN BE MADE AND THE
FREEZING
TO FREEZING OF INSTRUMENT AIR
EQUIPMENT RESTARTED.
AND TOTAL PLANT SHUTDOWN.
UPDATED DESCRIPTION: EXCESS
01/01/2017
120250
1330000002
1/27/2017
0.0100
FLARING DUE TO COMPLETE PLANT
EXCESS VENTING NECESSARY UNTIL
]:00:00
1/27/201]
U
1444.6
SHUTDOWN DUE TO LOW OIL
REPAIRS CAN BE MADE AND THE
PRESSURE IN THE COMPRESSORS
EQUIPMENT RESTARTED.
AFTER THE INSTRUMENT AIR FROZE.
UPDATED DESCRIPTION: EXCESS
VENTING DUE TO SHUTDOWN OF
Oi/01I2017
126253
1330000002
1/2]/201]
7:00:00
23:59:00
1/27/201]
VRU COMPRESSOR FOR
EXCESS VENTING NECESSARY UNTIL
U
90.7
UNSCHEDULED MAINTENANCE ASA
REPAIRS CAN BE MADE AND THE
RESULT OF A BAD BEARING OR
EQUIPMENT RESTARTED.
POSSIBLE BROKEN VANE.
UPDATED DESCRIPTION: EXCESS
01/01/2017
124250
1330000002
1/28/2017
0:00:00
23:59:00
1/28/2017
VENTING FROM TK -22 CAUSED BY
EXCESS VENTING NECESSARY UNTILREPAIRS
U
327.5
VRU SHUTDOWN FOR
CAN BE MADE AND THE
UNSCHEDULEDMAINTENANCE.
EQUIPMENT RESTARTED.
EXCESS
UNTING
01/01/201]
124254
133W00002
1/29/2017
0:00:00
23:59:00
1/29/2017
FROMT-22CAUSEDB
BY
VENTINGFROMDOW
EXCESS VENTING NECESSARY UNTIL
U
127.5
VRU SHUTDOWN FOR
FOR
REPAIRS CAN BE MADE AND THE
UNSCHEDULED MAINTENANCE.
EQUIPMENT RESTARTED.
UPDATED DESCRIPTION: EXCESS
01/01/2017
124250
1330000002
1/30/2017
0:00:00
23:59:00
1/30/2017
VENTING FROM TK -22 CAUSED BY
EXCESS VENTING NECESSARY UNTIL
U
127.5
VRUSHUTDOWN FOR
REPAIRS CAN BE MADE AND THE
UNSCHEDULED MAINTENANCE.
MAINTENANCE.
EQUIPMENT RESTARTED.
UPDATED DESCRIPTION: EXCESS
Ot/01I201]
124254
1330000002
1/31,/2017
0:00:00
23:59:00
1/31/201]
VENTING F BY
EXCESS VENTING NECESSARY UNTIL
U
127.5
UTDOWNFORED
VRU SHUTDOWN FOR
REPAIRS CAN BE MADE AND THE
UNSCHEDULED MAINTENANCE.
EQUIPMENT RESTARTED.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
6. Sold
- -•• - •••
�u. rui Prociucoon trom multiple pools, list contribution of each pool as a pen
176,251
of Total Volume.
7. Reinjected
Pool Name
Pool Code Percy
193,341
SWANSON RIVER, HEMLOCK
772100 71.7,
8. Flared or vented 1 hour or less
SWANSON RIVER, HEM F/STERLING UNDEF
772105
234
SWANSON RIVER, TYONEK UNDEFINED
0.00
772500
9. Flared or vented more than 1 hour (see instr.)
SWANSON RIVERBELUGA UNDEFINED
,
0.00
772520 0.00
454
SWANSON RIVER, STERLING UNDEFINED
77255D
10. Pilot and Purge
282E
1,464
11. Assist Gas
0
12. Fuel gas used in lease operations
79,758
13. Other (see instructions)
0
Official Use Drill
14. TOTAL VOLUME (ITEMS 6-13)
Authorization >l hr:
Safety
MCF
451,502
C
✓
15. NGL Gas Equivalent
Lease Use
MCF
0
16. Purchased gas - Rental Return Gas
Conservation
MCF
16,600
17. Transferred from: (Off -lease Gas)
Waste:
MCF
18. Transferred to:
110,706
a�
1-9-17
19. Remarks:
(111'181)
Date
Reinjected: Production Injected Back into Hemlock
193,341
Volume in Line 6 subject to royalty.
58,907
'Volume NOT subject to royalty.
134,434
Transferred to: Swanson Storage for Injection Total
111,181
Volume in Une 6 subject to myaM/.
33,872
'Volume NOT subject tc royalty.
77,309
Rental Return: Hemlock Production Sold - To Enstar
45,245
InGutled in Line 6; NOT subject to royalty.
hereby certify that the foregoing is true
and correct to the best of my knowledge.
Signature_ tn"Auw 2241W
Title Production Analyst Note: All
volumes must be correcte
Printed Name Cortney Dyer
to pressure of 14.65 Pala and to a
Phone 713-289-2881
temperature of 600 F. Authority 20
nate _
02/01/2017
124250
1330000002
2/2/2017
0:00:00
23:59:00W2/14/2017
2/20/2017
U
27.
02/012017
124250
133000X002
2/3/2017
0:00:00
23:59:00U
2/20/2017
U
127.
02/012017
124251
1330000002
2/4/2017
0:00:00
10:00:00
2/22/2017
2/24/2017
U
53.3
02MI12017
124250
1330000002
2/14/201]
1:30:00
13:45:00
2/27/2017
U
65.4
02/012017 1124251 11330000002 I 2/17/2017 I 9:00:00 I 11:00:00 I 2/17/2017 I U I 13.5
02/012017 I 124250 11330000002 I 2/18/2017 I 14:30:00 I 16:00:00 I 2/18/2017 I U I 7.8
02/012017
124252
1330000002
2/20/2017#3:30:00
MAINTENANCE. EQUIPMENT RESTARTED.
6:30:00
2/20/2017
U
16.3
02/01/2017
124250
1330000002
2/20/201
UPDATED DESCRIPTION: EXCESS
13:00:00
2/20/2017
U
14.9
02/01/2017
02/012017
124252
124250
1330000002
1330000002
2/22/201
2/24/2017
8:45:00
9:45:00
10:45:00
2/22/2017
2/24/2017
U
U
8.5
10.7
02/012017
124253
1330000002
2/27/2017
10:30:00
12:00:00
2/27/2017
U
7.8
Toeal> 1 HR: 454.0
UPDATED DESCRIPTION: EXCESS
IVENTING CAUSED BY VRU EXCESS VENTING NECESSARY UNTIL
SHUTDOWN FOR UNSCHEDULED REPAIRS CAN BE MADE AND THE
MAINTENANCE. EQUIPMENT RESTARTED.
UPDATEDDESCRIPTION: CESS
VENTING CAUSED By VRU
EXCESS VENTING NECESSARY UNTIL
SHUTDOWN FOR UNSCHEDULED
REPAIRS CAN BE MADE AND THE
MAINTENANCE.
EQU IPMENT RESTARTED.
UPDATED DESCRIPTION: EXCESS
VENTING CAUSED BY VRU
EXCESS VENTING NECESSARY UNTIL
SHUTDOWN FOR UNSCHEDULED
REPAIRS CAN BE MADE AND THE
MAINTENANCE.
EQU IPMENT RESTARTED.
UPDATED DESCRIPTION: EXCESS
EXCESS VENTING NECESSARY UNTIL
VENTING DUE TO SHUTDOWN OF
FIELD 150 PRESSURE SUBSIDED AND
VRU COMPRESSOR CAUSED BY HIGH
VRU COMPRESSOR CAN BE
FIELD 1504 PRESSURE.
RESTARTED.
EXCESS VENTING DUE TO
EXCESS VENTING NECESSARY UNTIL
SHUTDOWN OF VRU COMPRESSOR
PRESSURE DRAIN IS UNPLUGGED
DUE TO A PLUGGED OR FROZEN
WITH METHANOL AND TRI-PLEX AND
PRESSURE DRAI N.
COMPRESSOR BROUGHT BACK
ONLINE.
EXCESS VENTING DUE TO
EXCESS VENTING NECESSARY U NTIL
SHUTDOWN OFVRU COMPRESSOR
PRESSURE DRAIN IS UNPLUGGED
DUETOA PLUGGED OR FROZEN
WITH METHANOLANDTRI-PLEX AND
PRESSURE DRAIN.
COMPRESSOR BROUGHT BACK
ONLINE.
EXCESS VENTING DUE TO
SHUTDOWN OF VRU COMPRESSOR
EXCESS VENTING NECESSARY UNTIL
CAUSED BY A HIGH 2ND STAGE
UNIT IS COOLED AND VRU CAN BE
JACKET WATER TEMPERATURE
RESTARTED.
EXCESS VENTING DUE TO
SHUTDOWN OF VRU COMPRESSORFCAN
G NECESSARY UNTIL
DUE TO HIGH 2ND STAGE SUCTION.
CAN BE RESTARTED.
EXCESS VENTING DUE TO
SHUTDOWN OF VRU COMPRESSOR
IS NECESSARY UNTIL
DUE TO FROZENDISCHARGE.
CAN BE RESTARTED.EXCESS
VENTING DUE TO
SHUTDOWN OFVRU COMPRESSOR
IS NECESSARY UNTIL
ASSOCIATED WITH REROUTING LEX
COMPRESSOR CAN BE RESTARTED.
FEED,
EXCESS VENTING DUE TO
SHUTDOWN OFVRU COMPRESSOR EXCESS
VENTING IS NECESSARY UNTIL
CAUSED BY FREEZING OF THE
COMPRESSOR CAN BE RESTARTED.
COOLER.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1.
Facility Number
1330000002
2. Facility Name
Swanson River
3. Field
Swanson River Unit
4. Operator
I HILCORP ALASKA LLC
5. Momh/Year of Disposition
I March 2017
Disposition
Volume MCF
20. For production from multiple pools, list contribution
of Total Volume.
of each pool as a percent
6.
Sold
262,599
Pool Name
Pool Code Percent
7.
Reinjected
144,262
SWANSON RIVER, HEMLOCK
772100 75.70%
SWANSON RIVER, HEM F/STERLING UNDEF
772105 0.00%
8.
Flared or vented 1 hour or less
508
SWANSON RIVER, TYONEK UNDEFINED
772500 0.00%
SWANSON RIVER, BELUGA UNDEFINED
772520 0.06%
9.
Flared or vented more than 1 hour (see instr.)
192
SWANSON RIVER, STERLING UNDEFINED
772550 24.30%
10.
Pilot and Purge
1,088
11. Assist Gas
0
12. Fuel gas used in lease operations
95,784
13.
Other (see instructions)
0
Official Use Only
Authorization >1 hr:
Safety
l 2—
MCF
14. TOTAL VOLUME (ITEMS 6.13)
504,433
Lease Use
MCF
15. NGL Gas Equivalent
1,217
Conservation
MCF
16.
Purchased gas -Rental ReturnGas
182,215
Waste:
MCF
17.
Transferred from: (Off-lease Gas)
194.998
m Is loner
Da` — !
18.
Transferred to:
(10,990)
Note: All volumes must be corrected
Analyst to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Date 4/19/2017 AAC25.235.
19. Remarks:
Reinjected: Production Injected Back into Hemlock 144,262
Volume in Line 6 subject to royalty. 39,786
• Volume NOT subject to royalty. 104,476
Transferred to: Swanson Storage for Injection Total 10,990
• Volume in Line 6 subject to royalty. 3,277
• Volume NOT subject to royalty. 7,713
Rental Return: Hemlock Production Sold - To Enstar 162,215
• Included in Line 6; NOT subject to royalty.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature +r-a,7ii�y�re Title Production
Printed Name Cortney Dyer Phone 713-289-2881
SWANSON RIVER UNIT
March -17 Total � 1 HR: 1420
UPDATED DESCRIPTION: EXCESS
03/01/2017
124250
1330000002
3/4/2017
4:00:00
11:00:00
3/4/2017
U
42.0
DUENECESSARY
THE
VRU 31ST NG STAG E COOOLRIC4�I NG A
SHUTDOWN OF THE VRU
TF
HE COOLERESSI5 THAWED AND HEL
COMPRESSOR IS RESTARTED.
COMPRESSOR.
03101/2017
124250
133000002
3/6/2017
43000
15:00:00
3/6/2017
P
827
UPDATED DESCRIPTION: EXCESS
VENTING DUE TO SHUTDOWN OF
VRU COMPRESSOR DUE TO A FROZEN
EXCESS VENTING NECESSARY UNTIL
THE PRESSURE DRAIN IS THAWED
PRESSURE DRAIN.
AND THE COMPRESSOR RESTARTED.
0310112017
124251
1330000002
3/20/2017
0:00:00
16:00:00
3/20/2017
U
27.0
EXCESS VENTING DUE TO
SHUTDOWN OF VRU COMPRESSOR
EXCESS VENTING NECESSARY UNTIL
DUE TO PLANT ESD.
COMPRESSOR CAN BE RESTARTED.
03/01/2017
124250
1330000002
3/20/2017
-
11:30:00
14:30:00
3 20 201]
/ /
U
4.0
EXCESS VENTING DUE TO
SHUTDOWN OF K-11 COMPRESSOR
EXCESS VENTING NECESSARY UNTIL
DUE TO PLANT ESD.
COMPRESSOR CAN BE RESTARTED.
03/01/2017
124251
133DODD002
3/20/2017
11:30:00
1430:00
320/201]
/
U
4.0
EXCESS VENTING DUE TO
SHUTDOWN OF K-12 COMPRESSOR
EXCESS VENTING NECESSARY UNTIL
DUE TO PLANT ESD,
COMPRESSOR CAN BE RESTARTED.
03/0112017
124250
133000002
3/20/2017
11:30:00
14:30:00EXCESS
3/20/2017
U
4.0
SHUTDOWN OENTING14 DUE TO
OESSOR
EXCESS VENTING NECESSARY UNTIL
DU E TO PLANT ESD.
COMPRESSOR CAN BE RESTARTED.
03/0112017
124252
1330000002
3/20/2017
11:30:00
14:30:003/20/201]
U
7.9
EXCESS VENTING DUE TO
SHUTDOWN OF K-17 COMPRESSOR
EXCESS VENTING NECESSARY UNTIL
DUE TO PLANT ESD.
COMPRESSOR CAN BE RESTARTED.
03/01/2017
124250
1330000002
3/20/2017
11:30:00
14:30:00
3 20 201]
/ /
U
7.9
EXCESS VENTING DUE TO
SHUT DOWN OF PM PLANT DUE TO
EXCESS VENTI NG NECESSARY UNTIL
PLANT ESD.
PM PLANT UNITS CAN BE RESTARTED.
03/01/2017
124252
1330000002
3/28/2017
18:30:00
23:59:00
3/28/2017
U
32.5
EXCESS VENTING DUE TO
SHUTDOWN OF VRU COMPRESSOR
EXCESS VENTING NECESSARY UNTIL
FIELD 150# PRESSURE ALLOWED FOR
DUE TO HIGH FIELD 150# GAS.
THE RESTART OF THE VRU
COMPRESSOR.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
6.
Sold
301,501
7.
Reinjected
294,070
8.
Flared or vented 1 hour or less
221
9.
Flared or vented more than 1 hour (see instr.)
212
10.
Pilot and Purge
1,103
11. Assist Gas
0
12. Fuel gas used in lease operations
89,174
13.
Other (see instructions)
0
14.
TOTAL VOLUME (ITEMS 6.13)
686,281
15.
NGL Gas Equivalent
1,099
16.
Purchased gas - Rental Return Gas
92,759
7.
1:]
Transferred from: (Off -lease Gas)
53,552
18.
Transferred to:
(190,204)
Reinjected: Production Injected Back into Hemlock
Volume in Line 6 subject to royalty.
Volume NOT subject to royalty (Hemlock H).
Transferred to: Swanson Storage for Injection Total
' Volume in Line 6 subject to royalty.
Volume NOT subject to royalty (Hemlock H).
Rental Return: Hemlock Production Sold - To Enstar
Included in Line 6; NOT subject to royalty.
certify that the foregoing is true and correct to the best of my knowledge.
Signature-on-fney.rW
294,070
48,988
190,204
31,679
158,525
92,759
20. For
pools, list
Use
/Z
C/ri
as a percent
V
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
SWANSON RIVER UNIT
April-17 Total> 1 HR: 2120
EXCESS VENTING DUE TO
04101/2017
124250
1330000002
4/2/2017
11:15:00
12:30:00
4/2/2017
SHUTDOWN OF THE VRU
EXCESS VENTI NG NECESSARY U NTIL
p
7.2
COMPRESSOR TO INSTALL A
VRU COM PRESSOR CAN BE
VARIABLE SPEED FAN ON THE VRU.
RESTARTED.
04/0112017
124250
1330000002
4/3/2017
1:30:00
EXCESS VENTING DU E TO
EXCESS VENTI NG NECESSARY U NTIL
3:00:00
4/3/2017
U
8.8
SHUTDOWN OF VRU COMPRESSOR
VRU COMPRESSOR CAN BE
DUE TO HIGH 150N PRESSURE.
RESTARTED.
EXCESS VENTING DUE TO
SHUTDOWN OF VRU COMPRESSOR IN
04/01/2017
124251
1330000002
4/7/2017
9:00:00
12:30:00
4/7/2017
ORDER TO ADJUST THE INTERNAL
EXCESS VENTING NECESSARY UNTIL
U
207
RELIEFS ON BOTH VRU LIQUID
VRU COMPRESSOR CAN BE
PUMPS FOR IST AND 2ND STAGE
RESTARTED.
SCRUBBERS.
UPDATED DESCRIPTION: EXCESS
VENTING DUE TO SHUTDOWN OF
VRU COMPRESSOR CAUSED BY
04/D1/2017
124250
13WDO0002
4/8/2017
5:00:00
15:00:00
4/8/2017
FREEZING OF THE PRESSURE DRAIN
CESS VENTING NECESSARY UNTIL
U
59.8
LINE. WHILETHAWINGTHE
PRESSURE DRAIN LINE THAWED AND
PRESSURE DRAIN LINE, A VARIABLE
COMPRESSOR RESTARTED.
SPEED CONTROLLER FOR THE
COOLING FAN WAS INSTALLED.
UPDATED DESCRIPTION: EXCESS
04/01/2017
124251
133DOOD002
4/9/2017
11:00:00
18:00:00
4/9/2017
VENTING DUE TO SHUTDOWN OF
EXCESS VENTING NECESSARY UNTIL
U
422
VRU COMPRESSOR CAUSED BY
PROGRAMMING ISSUE FIXED AND
PROGRAMMING ISSUES.
COMPRESSOR 15 RESTARTED.
04/01/2017
124250
1330000002
4/19/2017
0:OO:ODEXCESS
I NG DUETO
EXCESS VENTING
8:30:00
4/19/2017
U
25.5
SHUTDOWN OF VRU allSED BY IST
VRU CAN BE RESTARTED IN MANUAL
AND 2ND STAGE VFD FAULT.
MODE.
04/01/2017
124252
1330DD0002
4/21/201)
EXCESS VENTING DUE TO
EXCESS VENTING NECESSARY UNTIL
1:30:00
3:00:00
4/21/2017
U
8.8
SHUTDOWN OF VRU COMPRESSOR
RPMS FOR ISTAND 2ND STAGE ARE
DUE TO IST STAGE VFD FAULT.
LOWERED AND COMPRESSOR CAN BE
RESTARTED.
04/01/201] 124250 1330000002
4/25/2017
0:00:00
6:30:00
EXCESS VENTING NECESSARY
4/25/201]U
39.1
SHUTDOWN OF VRU COMPRESSOR
UNTIL
DUE TO HIGH ISDN PRESSURE.
COMPRESSOR CAN BE RESTARTED.
Name
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
11. Assist Gas
12. Fuel gas used in lease operations
13. Other (see instructions)
14. TOTAL VOLUME (ITEMS 6-13)
15. NGL Gas Equivalent (mcf)
16. Purchased gas - Rental Return Gas
17. Transferred from: (Off -lease Gas)
18. Transferred to:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Reinjected: Production Injected Back into Hemlock
Volume in Line 6 subject to royalty.
Volume NOT subject to royalty (Hemlock H).
Transferred to: Swanson Storage for Injection Total
Volume in Lim 6 subject to royalty.
Volume NOT subject to royalty (Hemlock H).
Rental Return: Hemlock Production Sold - To Enstar
Included in Line 6: NOT subiert m m—I.
orume muF
360,621
LU. For production from multiple pools, list contribution of each
of Total Volume.
pool as a percent
Pool Name
Pool Code
Percent
197,903
SWANSON RIVER, HEMLOCK
772100
86.06%
SWANSON RIVER, HEM F/STERLING UNDEF
772105
0.00%
139
SWANSON RIVER, TYONEK UNDEFINED
772500
0.00%
SWANSON RIVER, BELUGA UNDEFINED
772520
0.00%
41
SWANSON RIVER, STERLING UNDEFINED
772550
13,94%
954
0
88,266
0
Official Use Onl
647,924
5,697
297,991
:AuthoriZatio:n>1:hr:
Safety
it
�1
Lease Use
Conservation
MCF
Waste:
MCF
180,506
(10,194)
_ /
mmissionejrr~_—
-7-2D
7^ p^f ,� ( 7
/ate (
197,903
29,614
10,194
1,526
8,668
297,991
--"Y "^ ' ,v,=yUI„y lb nue ono correct to the best of my knowledge.
Signature 4S" Note: All volumes must be correcte
Title Production Analyst to pressure of 14.65 pals and to a
ted Name CortneY 0Yer temperature of 600 F. Authority 20
SWANSON RIVER UNIT
M-1-17 Total> 1 HR: 41.0
05/01/2017
124250
1330000002
5/4/2017
7:15:009:15:00
5/4/20ll
U
11.6
EXCESS VENTING DUETO
SHUTDOWN OF VRU COMPRESSOR
EXCESS VENTING NECESSARY UNTIL
THE VRU COMPRESSOR CAN BE
DUE TO HIGH 150 PRESSURE.
RESTARTED.
05/01/2017
124250
1330000002
5/5/2017
5:15:00
6:45:00
55/201]
/
U
8.5
EXCESS VENTING DUE TO
SHUTDOWN OF VRU COMPRESSOR
EXCESS VENTING NECESSARY UNTIL
AIR IS BLED OUT, LUBE PUMPS ARE
FROM LOW LUBE FLOW,
PRIMED AND VRU COMPRESSOR IS
RESTARTED,
EXCESS VENTING NECESSARY UNTIL
05/01/2017
124251
1330000002
5/14/2017
9:15:00
10:45:00
5/14/201)
U
8.5
EXCESS VENTING DUE TO
SHUTDOWN OF VRU'COMPRESSOR
ON HIGH 150 PRESSURE.
COMPRESSOR IS RESTARTED,
EXCESS VENTING DUETO
05/01/2017
124250
1330000002
5/16/2017
23:00:00
1:00:00SHUTDOWN
517/201]
/
U
6.2
OF THE VRU
COMPRESSOR ON HIG H DISCHARGE
EXCESS VENTING NECESSARY UNTIL
PRESSURE CAUSED BY HIGH 1500 GAS
COMPRESSOR IS RESTARTED.
FROM BRINGI NG ON A WELL.
EXCESS VENTING. DUE TO
05/01/201]
124251
1330000002
5/16/2017
23:00:00
1:00:00SHUTDOWN
51]201]
/ /
U
6.2
OF THE VRU
COMPRESSOR ON HIGH DISCHARGE
EXCESS VENTING NECESSARY UNTIL
PRESSURE CAUSED BY HIGH 1500 GAS
COMPRESSOR IS RESTARTED.
FROM BRINGING ON A W ELL.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
6.
Sold
78,879
7.
Reinjected
360,310
8.
Flared or vented 1 hour or less
585
9.
Flared or vented more than 1 hour (see instr.)
112
10.
Pilot and Purge
1,134
11.
Assist Gas
ed in lease operations
105,819
rinstructions)
EOthe0
0
LUME (ITEMS 6-13)546,839
quivalent (mcf)
5,987
.urcased
gas - Rental Return Gas
475,537
17.
Transferred from: (Off -lease Gas)
24,377
18.
Transferred to:
(65,278)
Reinjected: Production Injected Back into Hemlock
• Volume in Line 6 subject to royalty.
Volume NOT subject to royalty (Hemlock H).
Transferred to: Swanson Storage for Injection Total
Volume in Line 6 subject to royalty.
Volume NOT subject to royalty (Hemlock H).
Rental Return: Hemlock Production Sold - To Enstar
Inclucied in Line 6; NOT subject to royalty
t the foregoing Is true and correct to the best of my knowledge.
360,310
46,984
313,326
65,278
8,513
56,765
11,826
Signature_ q 100W Title
Use
as a
//--.6-17 ii -6-17
tote: All volumes must be correcte
to pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
SWANSON RIVER UNIT
" %-DaEe
O No
Facil" No' "-"
"pAT¢Flazzd'"
Jwro-07
ToFal> I HR:
112.0
06/01/201]124250
1330000002
6/23/2017 8:00:00
15:00:00 6/23/2017 P
DATED
99.1 UPVENTNGEDUE ITOI LIQUIDSE�
E IQUIDSEUNLOADING COMP ETEIL
UNLOADING OF WELL 213-15.
AND WELL BROUGHT BACK ONLINE.
O6/01I2017
124250
1330000002
6/25/201]
8:45:00
10:30:00
6/25/2017
U
129
EXCESS VENTING DUE TO PM PLANT
EMERGENCY SHUTDOWN CAUSING
EXCESS VENTING NECESSARY UNTIL
A SHUTDOWN OF THE VRU
COMPRESSOR CAN BE RESTARTED.
COMPRESSOR.
6. Sold
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge
11. Assist Gas
12. Fuel gas used in lease operations
13. Other (see instructions)
14. TOTAL VOLUME (ITEMS 6.13)
15. NGL Gas Equivalent (mcf)
16. Purchased gas - Rental Return Gas
17. Transferred from: (Off -lease Gas)
18. Transferred to:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
75,912
393,947
393
0
1,087
0
109,684
0
581,023
5,955
475,537
14,409
(63,986)
SOLD SRU Field to Enstar (royalty -bearing)
1,568
SRU Field to Enstar (non -royalty H Sand)
10,358
SRU to Storage (roya(ty- bearing)
8,425
SRU to Storage (non•royality H Sand)
55,561
REINJECTED SRU Royalty -Bearing REINJ back into Hemlock
51,879
SRU Non -Royalty H Sand REINJ back to Hemlock
342,068
cernoy mat me loregoing is true and correct to the best of my knowledge.
Signature 616&-g .04.p Title
Lease Use
TRANSFERRED TO Incl. Line 6 Sold/Ing to Storage
TRANS FROM Storage/Accl Gas Injected into Hemlock H
63,986
14,409
as a
tote: All volumes must be correcte,
to pressure of 14.65 psta and to a
temperature of 600 F. Authority 20
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
1.
V r RC1V I yr rRuuuctu I"Ab UISPOSITION
Facility Number 2. Facility Name
1330000002 Swanson River
3. Field 4. Operator
Swanson River Unit HILCORP ALASKA LLC
5. Month/Year of Disposition
I
Disposition
Volume MCF
August 2017
20. For production from multiple pools, list contribution of
6.
Sold
120,196
of Total Volume
each pool as a percent
7.
Reinjected
ol Name
Pool Code Percent
349,645
RIVER, HEMLOCK
772100 89.38%
HEM F/STERLING UNDEF
772105 0.00%
8.
Flared or vented 1 hour or less
620
, TYONEK UNDEFINED
§SM
772500 0.00%
R, BELUGA UNDEFINED
772520 0.00%
9.
Flared or vented more than 1 hour (see instr.)
1 057
, STERLING UNDEFINED
772550 10.62%
10.
Pilot and Purge
1,012
11.
Assist Gas
0
12. Fuel gas used in lease operations
109,207
13.
Other (see instructions)
0
Official Use Only
14.
TOTAL VOLUME (ITEMS 6-13)
Authorization;hr:Safety
MCF V
G `J
581,937
15.
NGL Gas Equivalent (mcf)
Lease Use
MCF
5,268
16.
Purchased gas -Rental Return Gas
Conservation
MCF
475,537
Waste:
MCF
17.
Transferred from: (Off -lease Gas)
74,125
,/
—17
18.
Transferred to:
(112,720)
Commissioner
Date
19.
Remarks:
SOLD SRU Field to Enstar (royalty -bearing)
878
TRANSFERRED TO Incl. Lire 6 Sold/Inj to Storage
112,720
SRU Field to Enstar (non -royalty H Sand)
6,598
SRU to Storage (royalty. bearing)
13,236
TRANS FROM Storege/Acq Gas Inlected into Hemlock H
74,125
SRU to Storage (non -royalty H Sand)
99,484
REINJECTED SRU Royalty -Bearing REIN) back into Hemlock
41,069
SRU Non -Royalty H Sand REIN) back to Hemlock
308,776
1 hereby certify that the foregoing is true and correct to the best of knowledge.
my
Signature c�a-eu�y .uw
Note: All volumes must be corrected
Title Production Analyst
to pressure of 14.65 psia and to a
Printed Name Cortne Der
temperature of 60o F. Authority 20
Phone 713-289-2881
Date 9/19/2017
AAC25.235.
L/ /
SWANSON RIVER UNIT
_7
Au ust-17 Total > 7 HR: 7067.0
EXCESS VENTING DUE TO
08/01/2017
124250
1330000002
8/5/2017
17:45:00
19:15:00
SHUTDOWN OFVRU COMPRESSOR
8/5/201]
U
10.3
CAUSED BY HIGH 150 PRESSURE
EXCESS VENTING NECESSARY UNTIL
FROM SHUTDOWN OF K-13
COMPRESSOR CAN BE RESTARTED.
COMPRESSOR.
UPDATED DESCRIPTION: EXCESS
FLARING DUE TO SHUTDOWN OF K-
08/01/2017
724250
7330000002
8/9/2017
17:00:00
18:45:00
6/9/2017
13 COMPRESSOR ON A HOT VALVE, K-
18 COMPRESSOR DUE TO A BAD
EXCESSFIARINGNECESSARYUNTILK-
U
9973
POWER CYLINDER BEARING, AND K-
13 COMPRESSOR IS STARTED UP AND
15 COMPRESSOR DUE TO A BAD
PIGGING IS CURTAILED.
BEARING TRIP DURING PIGGING OF
1570.
08/01/2017
124251
1330000002
8/9/2017
UPDATED DESCRIPTION: EXCESS
17:00:00
23:59:00
8/9/201]
U
494
VENTING DUE TO SHUTDOWN OF
EXCESS VENTING NECESSARY FOR
THE VRU COMPRESSOR ON A IST
SAFE SHUTDOWN OF COMPRESSOR.
STAGE VFO FAULT.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
6.
Sold
415
7.
Reinjected- Includes Transferred From, Gas. See Remarks
23,753
8.
Flared or vented 1 hour or less
27
9.
Flared or vented more than 1 hour (see instr.)
0
10.
Pilot and Purge
9
11.
Assist Gas
0
12.
Fuel gas used in lease operations
876
13.
Other (see instructions)
0
14.
TOTAL VOLUME (ITEMS 6-13)' Includes Transferred
25,080
15.
NGL Gas Equivalent
0
16.
Purchased gas - Transferred from SRF
0
17.
Transferred from: (Off -lease Gas)
1,310
18.
Transferred to:
(405)
Reinjectedlfransferr Swanson River Field:
ed From: 23,311
Other 15708: 442
'Total Included in Line 7: 23,753
8. 9. 10. 12. Other 15706 (Acq Gas for Lease Uses): 0
8.9 10.12. Storage Production for Lease Uses 912
from multiple pools,
Use
Injected into Storage 23,294
Storage Inv. 3,076,561
Transferred To: 405
'SRU Field (Hemlock) for Injection. Incl. Line 6.:
c iuny mar me roregoing is true and correct to the best of my knowledge.
Signature 94 Ar—e-" Title Production Analyst
as a
ote: All volumes must be corrected to
Pressure of 14.65 psis and to a
temperature of 600 F. Authority 20
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
6.
--- -- - -
Sold
uure ,.,.,r
37,649
cu. ror prcoucnon nom multiple pools, list contribution of each pool as a percent
of Total Volume.
Pool Name
Pool Code Percent
7.
Reinjected
384,817
SWANSON RIVER, HEMLOCK
772100 87.52%
8.
Flared or vented 1 hour or less
62
SWANSON RIVER, HEM F/STERLING UNDEF
772105 0,00%
SWANSON RIVER, TVONEK UNDEFINED
772500 0.01%
9.
Flared or vented more than 1 hour (see instr.)
1,120
SWANSON RIVER, BELUGA UNDEFINED
772520 0.00%
SWANSON RIVER, STERLING UNDEFINED
772550 12.46%
10.
Pilot and Purge
1,046
11. Assist Gas
0
12. Fuel gas used in lease operations
109,031
13.
Other (see instructions)
0
Official Use Only
Authorization >1 hr:
'#
Safety
()
MCF
14. TOTAL VOLUME (ITEMS 6.13)
533,725
15. NGL Gas Equivalent (mcf)
4,759
Lease Use
MCF
16.
Purchased gas -Rental Return Gas
491,645
Conservation
MCF
Waste:
MCF
17.
Transferred from: (Off -lease Gas)
46,317
Commissioner
J 2 19 _ / p
Date Q
18. Transferred to:
(27837)
19.
Remarks:
Reinjected: Production Injected Back into Hemlock
` Volume in Line 6 subject to royalty.
` Volume NOT subject to royalty (Hemlock H).
Transferred to: Swanson Storage for Injection Total
` Volume in Line 6 subject to royalty.
` Volume NOT subject to royalty (Hemlock H).
Rental Return: Hemlock Production Sold - To Enstar
Included in Line 6; NOT subject to royalty.
384,817
53,734
331,083
27,837
3,887
23,950
8,442
Note: All volumes must be corrected
Analyst to pressure of 14.65 psia and to a
temperature of 60o F. Authority 28
Date 1112112017 AAC25.235.
hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature_ Az"r w Title Production
Printed Name Cortney Dyer Phone 713-289-2881
10/01/2017 1 124250 1 133DODM02I 10/27/2017 I 12:15:00I 13:50:00 1 10/27/2017 I U I 9937 I SHURTNG DUE TO TOWEROUAGE
FLA
10/01/20171 124211 1 1111010002 10/27/2017 12:15:00 15:45:00 10/27/2017 U 25.1 EXCESSVENINGDUETO
SHUTDOWN OF VRU COMPRESSOR
DUE TO HEA POWER OUTAGE.
EXCESS FLARING NECESSARY UNTIL
PIANTAND FIELD CAN DE
RESTARTED.
EXCESS VENTING NECESSARY UNTIL
COMPRESSOR CAN BE RESTARTED.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
1330000002
2. Facility Name
Swanson River
3. Field
Swanson River Unit
4. Operator
I HILCORP ALASKA LLC
5. MonthlYear of Disposition
November 2017
Disposition
Volume MCF
- Volume in Line 6 subject to royalty.
20. For production from multiple pools, list contribution of each pool as a percent
of Total Volume.
6. Sold
87.905
Pool Name Pool Code Percent
7. Reinjected
361,877
SWANSON RIVER, HEMLOCK 772100 89.78%
SWANSON RIVER, HEM F/STERLING UNDEF 772105 0.00%
8. Flared or vented 1 hour or less
183
SWANSON RIVER, TYONEK UNDEFINED 772500 0.03%
SWANSON RIVER, BELUGA UNDEFINED 772520 0.00%
9. Flared or vented more than 1 hour (see instr.)
130
SWANSON RIVER, STERLING UNDEFINED 772550 10.19%
10. Pilot and Purge
1,023
11. Assist Gas
0
12. Fuel gas used in lease operations
107,627
13. Other (see instructions)
0
Official Use Onl
Authorization>1 hr:
44�(lb/(r[
l L Y
Safety
Cf
MCF
14. TOTAL VOLUME (ITEMS 6-13)
558,745
Lease Use
Z/
MCF
15. NGL Gas Equivalent (mcf)
4,877
Conservation
MCF
16. Purchased gas -Rental ReturnGas
493,959
Waste:
MCF
17. Transferred from: (Off-lease Gas)
67,742/C
7�Q
o'er mml55lonen —b j ' �•'
18. Transferred to:
tat 896)
Reinjected: Production Injected Back into Hemlock
361,877
• Volume in Line 6 subject to royalty.
41,959
' Volume NOT subject to royalty (Hemlock Hy
319,91
Transferred to: Swanson Storage for Injection Total
42,896
- Volume in Line 6 subject to royalty.
4,975
• Volume NOT subject to royaky (Hemlock HI.
37,921
Rental Return: Hemlock Production Sold - To Enstar
39,792
• Included in Lire 6; NOT subject to royalty.
certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature .aif+t��r �%u Title Production Analyst to pressure of 14.65 psis and to a
Ictl klomn r..e..e•, n..e. _. _ _
temperature of 60o F. Authority 20
RptDate
OpNo
124250
FacilityNo
1330000002
Date Flared
11/5/2017
Start TimeTTime
11:00:00
Planned
U
MCF
9
Description of Flaring Event
EXCESS VENTING DUE TO
SHUT11/17/2017
COMPRESSOR DDUE TO OWN OF THE HIGH
SYSTEM PRESSURE CAUSED
BY THE POWER BUMP.
Action Taken to Minimize Volume
EXCESS VENTING NECESSARY UNTIL
COMPRESSOR IS RESTARTED.
EXCESS VENTING NECESSARY UNTIL
SCHEDULED MAINTENANCE IS
COMPLETE AND COMPRESSOR IS
RESTARTED.
11/17/2017
124250
1330000002
11/18/2017
12:30:00
17:00:00
11/18/2017
P
32
EXCESS VENTING DUE TO
SHUTDOWN OF VRU
COMPRESSOR TO ADJUST
THE PITCH OF THE FAN
BLADE.
11/17/2017
124251
1330000002
11/27/2017
7:30:00
19:00:00
11/27/2017
P
89
EXCESS VENTING DUE TO
SHUTDOWN OF VRU
COMPRESSOR TO INSTALLER
A COOLER BYPASS SPOOL
PIECE.
EXCESSVRU COMPRESSOR CAN ENTIL
VENTING NECESSARY
RESTARTED.
130
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
6. Sold
87,905
• Volume in Litre 6 subject to royalty.
of Total Volume.
ol Name Pool Code
7. Reinjected
361,877
RIVER, HEMLOCK 772100
HEM F/STERLING UNDEF 772105
S. Flared or Vented 1 hour or less
183
, TYONEK UNDEFINED 772500
®RIVER,
, BELUGA UNDEFINED 772520
9. Flared or vented more than 1 hour (see instr.)
130
STERLING UNDEFINED 772550
certify that the foregoing is true and correct to the best of my knowledge.
10. Pilot and Purge
1,023
Title Productio
11. Assist Gas
0
12. Fuel gas used in lease operations
107,627
13. Other (see instructions)
0
Official UseOnl
Authorization >1 hr:
-
Safety
14. TOTAL VOLUME (ITEMS 6.13)
558,745
15. NGL Gas Equivalent (mcf)
4,877
Lease Use
16. Purchased gas -Rental Return Gas
493,959
Conservation .
Waste:
17. Transferred from: (Off -lease Gas)
67,742
s
L Commissioner
18. Transferred to:
(42,896)
Reinjected: Production Injected Back into Hemlock
361,877
• Volume in Litre 6 subject to royalty.
41,959
• Volume NOT subject to royalty (Hemlock H).
319,91
Transferred to: Swanson Storage for Injection Total
42,896
Volume in Line 6 subject to royalty.
4,975
Volume NOT subject to royalty (Hemlock H).
37,921
Rental Return: Hemlock Production Sold - To Enstar
39,792
- Inckroed in Line 6; NOT subject to royalty.
certify that the foregoing is true and correct to the best of my knowledge.
Signature 4.-4t V A51" -as
Title Productio
as a
MCF
lote: All volumes must be correctei
to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
AAC25.235.
SWANSON RIVER UNIT
November -1] Total > 1 HR: 130.0
EXCESS VENTING DUE TO
11/17/2017
124250
1330000002
11/5/2017
1100:00
12:15:00WN
11/5/2017
U
8.5
OF THE VRU
COMPRESSOR O
DUETO HIGH SYSTEM
EXCESS VENTING NECESSARY UNTIL
PRESSURE CAUSED BY THE POWER
COMPRESSOR IS RESTARTED.
BUMP.
EXCESS VENTING NECESSARY UNTIL
SCHEDULED MAINTENANCE IS
it/1]/2017
124250
1330000002
11/18/2017
12:30:00
17:00:00
11/18/2017
P
32.3
EXCESS VENTING DUE TO
SHUTDOWN OF VRU COMPRESSOR
TO ADIUSTTHE PITCH OF THE FAN
COMPLETE AND COMPRESSOR IS
BLADE.
RESTARTED.
R
wit
k, t
>y A
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
6.
Sold
111,852
7.
Reinjected
361,972
8.
Flared or vented 1 hour or less
956
9.
Flared or vented more than 1 hour (see instr.)
192
10.
Pilot and Purge
1,152
11. Assist Gas
0
12. Fuel gas used in lease operations
107,751
13.
Other (see instructions)
0
14.
TOTAL VOLUME (ITEMS 6-13)
583,875
15.
NGL Gas Equivalent (mcf)
3,686
16.
Purchased gas - Rental Return Gas
499,828
17.
Transferred from: (Off -lease Gas)
76,474
18.
Transferred to:
(84.089)
Reinjected: Production Injected Back into Hemlock
361,972
' Volume in Line 6 subjed to royalty.
52,104
`Volume NOT subject to royalty (Hemlock H).
309,868
Transferred to: Swanson Storage for Injection Total
84,089
• Volume in Line 6 subject to royalty.
12,107
' Volume NOT subject to royalty (Hemlock H).
71,982
Rental Return, Hemlock Production Sold - To Enstar
23,765
' Included in Line 6: NOT subject to nryaby.
certify that the foregoing is true and correct to the best of my knowledge.
Signature-s>,fecy .tT%un
Title Productir
production
gmmD
Use
pool as a
tote: All volumes must be correctei
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.
SWANSON RIVER UNIT
R tDete
Na
Fatil' NO
Date Flaw
Start Time
Enoina Time
FSE Date
December-17
Piannetl
Total> 1 HR:
192.0
MCF
Description of Flarog Lvenf
Action Taken to Mid mize.Volum
121012017
124250
1330000002
12/1/2017
110000EXCESS
14:30:00
V ENTI NO OU
MSHUTDOWN
EXCESS VENTING NECESSARY
12/1/2017
U
24.2
OUTAGE RESULTING
UNTIL
OF VRU COMPRESSOR,
COMPRESSOR CAN BE RESTARTED,
UPDATED DESCRIPTION: EXCESS
12/01/2017
124250
1330000002
12/13/2017
0:00:00
23:59:0
12/13/2017
U
158.4
VENTING DUE TO UNSCHEDULED
EXCESS VENTING NECESSARY UNTIL
SHUTDOWN OF K-17 COMPRESSOR
COMPRESSOR CAN BE RESTARTED.
17 TIMES THROUGHOUT THE DAY.
EXCESS VENTING DUE TO FOUR
12101201]
124251
1330000002
12/14/2017
0:30:00
5:00:00
12/14/2017
P
93
SHUTDOWNS OF K-18 COMPRESSOR
EXCESS VENTING NECESSARY FOR
AND SWAPPING TO K-17
SAFE SWAPPING OF COMPRESSORS.
COMPRESSOR.