Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutSR Swanson River LEX - Hilcorp Alaska, LLCState of Alaska AOGCC Gas Disposition Files Year: 2017 Facility: SR Swanson River LEX Operator: Hilcorp Alaska LLC     o(seeinstmctlons) jected ed or vented 1 hour or less ed or vented more than 1 hour (see instr.) t and Purge ist Gas l gas used in lease operations er (see instructions)AL VOLUME (ITEMS 6.13) 15. NGL Gas Equivalent 16. Purchased gas - Rental Return Gas 17. Transferred from: (Off -lease Gas) 18, Transferred to: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 167,269 192,725 346 2,819 1,745 0 86,355 0 451,259 1,224 18,745 118,098 (73,447) Reinjected: Production Injected Back into Hemlock 192,725 Included in line 7 Transferred to: Swanson Storage for Injection 73,447 Included in Lina 6 as subject to royalty. Rental Return: Hemlock Production Sold 18,745 Induded in Line 6; not subject to royalty. the foregoing is true and correct to the best of my knowledge. Signature Phu Title For pools, Use 'ftPf�o°co� �1Zve 6, trcti.o��sc:. pool as a percent Note: All volumes must be correcte to pressure of 14.65 psia and to a temperature of 600 F. Authority 20 6. Sold 7. Reinjected 8. Flared or vented 1 hour or less 9. Flared or vented more than 1 hour (see instr,) 10. Pilot and Purge 11. Assist Gas 12. Fuel gas used in lease operations 13. Other (see instructions as JEM W_ 14. TOTAL VOLUME (I 3) 15. NGL Gas Equivalent 16. Purchased gas - Rental Return Gas 17. Transferred from: (Off4ease Gas) 18. Transferred to: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION (, G / FACILITY REPORT OF PRODUCED GAS DISPnSinnu as a 167,269 192,725 346 2,8190 1,745 0 86,355 ' I �- 0 O�cisl Use Onl 451,259 Authorization >1 hr:iisio afety Z 91 - T MCF 0 ease Use MCF 21,745 onservation MCF Waste: MCF 118,098 3-2_�F—/J Coer Date (73,447) Reinjected: Production Injected Back into Hemlock 192,725 included in lire 7 Transferred to: Swanson Storage for Injection 73,447 Included in Line 6 as sWject to royalty. Rental Return: Hemlock Production Sold 21,745 Included in Litre 6; not subject to royalty. Signature ,yam Note: All volumes must be corrected Title Production Analyst to pressure of 14.65 psia and to a led Name Cortney Dyer temperature of 60o F. Authority 20 Phone 713 289-2881 Date 2/16/2017 AAC25.235. v'TL- 3/774/1- STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION - 6. Sold -------- ---- — • I ,'I,umpre pools, ltsr contribution Of each pool as a percent 167,269 of Total Volume. 7. Reinjected 192,725 Pool Name Pool Code Percent SWANSON RIVER, HEMLOCK 772100 70.59% N SWWANS RIVER, HEM FNEK 772105 0.00% 8. Flared or vented 1 hour or less 346 SWANSON RIVER, TYONEK UNDEFINED UNDEFINED I D 772500 0.00% SWANSON RIVER, BELUGA UNDEFINED 772520 0.00% SWANSON 9. Flared or vented more than 1 hour (see instr.) 2,819 RIVER, STERLING UNDEFINED 772550 29.41% 10. Pilot and Purge 1,745 11. Assist Gas 0 12. Fuel gas used in lease operations 86,355 13. Other (see instructions)'f 't.Ihr70 Official Use Only _ 14. TOTAL VOLUME (ITEMS 6.13) Authorization he Safety MCF 451,259 15. NGL Gas Equivalent Lease Use MCF 0 16. Purchased gas - Rental Return Gas Conservation MCF 21,745 17. Transferred from: (Off -lease Gas) Waste: MCF Commissioner Date 118,098 18. Transferred to: (73447) 19. Remarks: Reinjected: Production Injected Back into Hemlock 192,725 ' Intluderl in line 7 Transferred to: Swanson Storage for Injection 73,447 ' Included in Line 6 as subject to royalty. Rental Return: Hemlock Production Sold 21,745 ' Induderl in Line 6: not subject to royalty. hereby certify that the foregoing is true and correct to the best of my knowledge. Signature �A-f+r��.�%.w Title Production Analyst Note: All volumes must 7cormetodto pressure of 14.65 psPrinted Name Cortney Dyer Phone 713-269 2881 temperature of 600 F. Date 2/16/2017 neck 119 SWANSON RIVER UNIT Janua -17 Total> i HR: 2019.0 EXCESS VENTING DUE TO 011012017 124250 1330000002 1/4/2017 19:00:00 1.3000 1/5/2017 U 26.9 SHUTDOWN OF VRU COMPRESSOR EXCESS VENTING NECESSARY UNTIL CAUSED BY A FROZEN PRESSURE COMPRESSOR CAN BE RESTARTED. DRAIN. EXCESS VENTING DUE TO 01/01/2017 124250 133WD0002 1/4/2017 19:00:00 1:30:00 1/5/2017 U 78 SHUTDOWN OF VRU COMPRESSOR EXCESS VENTING NECESSARY UNTIL CAUSED BY A FROZEN PRESSURE COMPRESSOR CAN BE RESTARTED. DRAIN. UPDATED DESCRIPTION: EXCESS VENTING DUE TO SHUTDOWN OF - VRU COMPRESSOR CAUSED BY 01/012017 124251 1330000002 1/11/2017 15:00:00 22:00:00 1/11/2017 U 36.8 MULTIPLE MALFUNCTIONS EXCESS VENTING NECESSARY UNTIL INCLUDING WATER PUMP COMPRESSOR CAN BE RESTARTED, CAVITATING AND HIGH PRESSURE SUCTION FROM A FREEZING COOLING SKID. EXCESS VENTING DUE TO 01/012017 124250 1330000002 1/19/2017 22:00:00 2:00:00 1/20/2017 U 10.6 SHUTDOWN OFVRU COMPRESSOR EXCESS VENTING NECESSARY UNTIL CAUSED BY A FROZEN PRESSURE COMPRESSOR CAN BE RESTARTED. DRAIN. EXCESS VENTING DUE TO 01MIM017 124251 1330000002 1/19/2017 22:00:00 2:00:00 1/20/2017 U 10.6 SHUTDOWN OF VRU COMPRESSOR EXCESS VENTING NECESSARY UNTIL CAUSED BYA FROZEN PRESSURE COMPRESSOR CAN BE RESTARTED. DRAIN. EXCESS VENTING DUETO 01/012017 124250 1330000002 1/20/2017 6:15:00 8:30:00 1/20/2017 U 12.0 SHUTDOWN OF VRU COMPRESSOR EXCESS VENTING NECESSARY UNTIL CAUSED BY A HIGH JACKET WATER COMPRESSOR CAN BE RESTARTED. TEMPERATURE EXCESS VENTING DUE TO 01/012017 124252 1330000002 1/21/2017 3:00:00 7:15:00 1/21/2017 U 227 SHUTDOWN OF VRU COMPRESSOR EXCESS VENTING NECESSARY UNTIL CAUSED BY A FROZEN PRESSURE COMPRESSOR CAN BE RESTARTED. DRAIN. UPDATED DESCRIPTION: EXCESS 01/01/2017 124250 1330000002 1/22/2017 0:15:0013:30:00 TING DUE TO SH DTO E VENTI NG IS 1/22/2017 U 70.1 VRUTCOMPRESOR DUE HUGH UNTIL COMPRESSOR CAXCESS N BEY DISCHARGE PRESSURE CAUSED BY A RESTARTED. FROZEN COOLER. EXCESS VENTING DUE TO SHUTDOWN OF THE VRU 01/01/2017 124252 13300000021/26/2017 20:30:00 23:59:00 1/26/2017 COMPRESSOR CAUSING A VENT EX CESS VENTING NECESARYUNTIL U 18.4 FROM THE BULK OIL TANK DUE TO REPAI IS CAN BE MADE AND THE FREEZING OF INSTRUMENT AIR AND EQUIPMENT RESTARTED. TOTAL PLANT SHUTDOWN, UPDATED DESCRIPTION: EXCESS 01/01/2017 124250 1330000002 3/26/2017 20:30:00F DUE TO P NT EXCESSVENTING NECESSARY A 23:59:00 1/26/2037 U 520.0 SHIUTDOWN DUE TONG LOW OLETE IL REPAIRS CAN BE MADE AND HE PRESSURE IN THE COMPRESSORS EQUIPMENTRESI-ARTED. AFTER THE INSTRUMENT AIR FR02E. SWANSON RIVER UNIT Janw -17 Taal>I HR: 2819.0 UPDATED DESCRIPTION: EXCESS VENTING DUE TO SHUTDOWN OF 01/01/201] 124253 1330000002 1/2]/201] 0:00:00 ]:00:00 1/2]/201] THE VRU COMPRESSOR CAUSING A EXCESSVENTING NECESSARY UNTIL V 3].S VENT THE BULK OIL TANK DUE REPAIRS CAN BE MADE AND THE FREEZING TO FREEZING OF INSTRUMENT AIR EQUIPMENT RESTARTED. AND TOTAL PLANT SHUTDOWN. UPDATED DESCRIPTION: EXCESS 01/01/2017 120250 1330000002 1/27/2017 0.0100 FLARING DUE TO COMPLETE PLANT EXCESS VENTING NECESSARY UNTIL ]:00:00 1/27/201] U 1444.6 SHUTDOWN DUE TO LOW OIL REPAIRS CAN BE MADE AND THE PRESSURE IN THE COMPRESSORS EQUIPMENT RESTARTED. AFTER THE INSTRUMENT AIR FROZE. UPDATED DESCRIPTION: EXCESS VENTING DUE TO SHUTDOWN OF Oi/01I2017 126253 1330000002 1/2]/201] 7:00:00 23:59:00 1/27/201] VRU COMPRESSOR FOR EXCESS VENTING NECESSARY UNTIL U 90.7 UNSCHEDULED MAINTENANCE ASA REPAIRS CAN BE MADE AND THE RESULT OF A BAD BEARING OR EQUIPMENT RESTARTED. POSSIBLE BROKEN VANE. UPDATED DESCRIPTION: EXCESS 01/01/2017 124250 1330000002 1/28/2017 0:00:00 23:59:00 1/28/2017 VENTING FROM TK -22 CAUSED BY EXCESS VENTING NECESSARY UNTILREPAIRS U 327.5 VRU SHUTDOWN FOR CAN BE MADE AND THE UNSCHEDULEDMAINTENANCE. EQUIPMENT RESTARTED. EXCESS UNTING 01/01/201] 124254 133W00002 1/29/2017 0:00:00 23:59:00 1/29/2017 FROMT-22CAUSEDB BY VENTINGFROMDOW EXCESS VENTING NECESSARY UNTIL U 127.5 VRU SHUTDOWN FOR FOR REPAIRS CAN BE MADE AND THE UNSCHEDULED MAINTENANCE. EQUIPMENT RESTARTED. UPDATED DESCRIPTION: EXCESS 01/01/2017 124250 1330000002 1/30/2017 0:00:00 23:59:00 1/30/2017 VENTING FROM TK -22 CAUSED BY EXCESS VENTING NECESSARY UNTIL U 127.5 VRUSHUTDOWN FOR REPAIRS CAN BE MADE AND THE UNSCHEDULED MAINTENANCE. MAINTENANCE. EQUIPMENT RESTARTED. UPDATED DESCRIPTION: EXCESS Ot/01I201] 124254 1330000002 1/31,/2017 0:00:00 23:59:00 1/31/201] VENTING F BY EXCESS VENTING NECESSARY UNTIL U 127.5 UTDOWNFORED VRU SHUTDOWN FOR REPAIRS CAN BE MADE AND THE UNSCHEDULED MAINTENANCE. EQUIPMENT RESTARTED. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 6. Sold - -•• - ••• �u. rui Prociucoon trom multiple pools, list contribution of each pool as a pen 176,251 of Total Volume. 7. Reinjected Pool Name Pool Code Percy 193,341 SWANSON RIVER, HEMLOCK 772100 71.7, 8. Flared or vented 1 hour or less SWANSON RIVER, HEM F/STERLING UNDEF 772105 234 SWANSON RIVER, TYONEK UNDEFINED 0.00 772500 9. Flared or vented more than 1 hour (see instr.) SWANSON RIVERBELUGA UNDEFINED , 0.00 772520 0.00 454 SWANSON RIVER, STERLING UNDEFINED 77255D 10. Pilot and Purge 282E 1,464 11. Assist Gas 0 12. Fuel gas used in lease operations 79,758 13. Other (see instructions) 0 Official Use Drill 14. TOTAL VOLUME (ITEMS 6-13) Authorization >l hr: Safety MCF 451,502 C ✓ 15. NGL Gas Equivalent Lease Use MCF 0 16. Purchased gas - Rental Return Gas Conservation MCF 16,600 17. Transferred from: (Off -lease Gas) Waste: MCF 18. Transferred to: 110,706 a� 1-9-17 19. Remarks: (111'181) Date Reinjected: Production Injected Back into Hemlock 193,341 Volume in Line 6 subject to royalty. 58,907 'Volume NOT subject to royalty. 134,434 Transferred to: Swanson Storage for Injection Total 111,181 Volume in Une 6 subject to myaM/. 33,872 'Volume NOT subject tc royalty. 77,309 Rental Return: Hemlock Production Sold - To Enstar 45,245 InGutled in Line 6; NOT subject to royalty. hereby certify that the foregoing is true and correct to the best of my knowledge. Signature_ tn"Auw 2241W Title Production Analyst Note: All volumes must be correcte Printed Name Cortney Dyer to pressure of 14.65 Pala and to a Phone 713-289-2881 temperature of 600 F. Authority 20 nate _ 02/01/2017 124250 1330000002 2/2/2017 0:00:00 23:59:00W2/14/2017 2/20/2017 U 27. 02/012017 124250 133000X002 2/3/2017 0:00:00 23:59:00U 2/20/2017 U 127. 02/012017 124251 1330000002 2/4/2017 0:00:00 10:00:00 2/22/2017 2/24/2017 U 53.3 02MI12017 124250 1330000002 2/14/201] 1:30:00 13:45:00 2/27/2017 U 65.4 02/012017 1124251 11330000002 I 2/17/2017 I 9:00:00 I 11:00:00 I 2/17/2017 I U I 13.5 02/012017 I 124250 11330000002 I 2/18/2017 I 14:30:00 I 16:00:00 I 2/18/2017 I U I 7.8 02/012017 124252 1330000002 2/20/2017#3:30:00 MAINTENANCE. EQUIPMENT RESTARTED. 6:30:00 2/20/2017 U 16.3 02/01/2017 124250 1330000002 2/20/201 UPDATED DESCRIPTION: EXCESS 13:00:00 2/20/2017 U 14.9 02/01/2017 02/012017 124252 124250 1330000002 1330000002 2/22/201 2/24/2017 8:45:00 9:45:00 10:45:00 2/22/2017 2/24/2017 U U 8.5 10.7 02/012017 124253 1330000002 2/27/2017 10:30:00 12:00:00 2/27/2017 U 7.8 Toeal> 1 HR: 454.0 UPDATED DESCRIPTION: EXCESS IVENTING CAUSED BY VRU EXCESS VENTING NECESSARY UNTIL SHUTDOWN FOR UNSCHEDULED REPAIRS CAN BE MADE AND THE MAINTENANCE. EQUIPMENT RESTARTED. UPDATEDDESCRIPTION: CESS VENTING CAUSED By VRU EXCESS VENTING NECESSARY UNTIL SHUTDOWN FOR UNSCHEDULED REPAIRS CAN BE MADE AND THE MAINTENANCE. EQU IPMENT RESTARTED. UPDATED DESCRIPTION: EXCESS VENTING CAUSED BY VRU EXCESS VENTING NECESSARY UNTIL SHUTDOWN FOR UNSCHEDULED REPAIRS CAN BE MADE AND THE MAINTENANCE. EQU IPMENT RESTARTED. UPDATED DESCRIPTION: EXCESS EXCESS VENTING NECESSARY UNTIL VENTING DUE TO SHUTDOWN OF FIELD 150 PRESSURE SUBSIDED AND VRU COMPRESSOR CAUSED BY HIGH VRU COMPRESSOR CAN BE FIELD 1504 PRESSURE. RESTARTED. EXCESS VENTING DUE TO EXCESS VENTING NECESSARY UNTIL SHUTDOWN OF VRU COMPRESSOR PRESSURE DRAIN IS UNPLUGGED DUE TO A PLUGGED OR FROZEN WITH METHANOL AND TRI-PLEX AND PRESSURE DRAI N. COMPRESSOR BROUGHT BACK ONLINE. EXCESS VENTING DUE TO EXCESS VENTING NECESSARY U NTIL SHUTDOWN OFVRU COMPRESSOR PRESSURE DRAIN IS UNPLUGGED DUETOA PLUGGED OR FROZEN WITH METHANOLANDTRI-PLEX AND PRESSURE DRAIN. COMPRESSOR BROUGHT BACK ONLINE. EXCESS VENTING DUE TO SHUTDOWN OF VRU COMPRESSOR EXCESS VENTING NECESSARY UNTIL CAUSED BY A HIGH 2ND STAGE UNIT IS COOLED AND VRU CAN BE JACKET WATER TEMPERATURE RESTARTED. EXCESS VENTING DUE TO SHUTDOWN OF VRU COMPRESSORFCAN G NECESSARY UNTIL DUE TO HIGH 2ND STAGE SUCTION. CAN BE RESTARTED. EXCESS VENTING DUE TO SHUTDOWN OF VRU COMPRESSOR IS NECESSARY UNTIL DUE TO FROZENDISCHARGE. CAN BE RESTARTED.EXCESS VENTING DUE TO SHUTDOWN OFVRU COMPRESSOR IS NECESSARY UNTIL ASSOCIATED WITH REROUTING LEX COMPRESSOR CAN BE RESTARTED. FEED, EXCESS VENTING DUE TO SHUTDOWN OFVRU COMPRESSOR EXCESS VENTING IS NECESSARY UNTIL CAUSED BY FREEZING OF THE COMPRESSOR CAN BE RESTARTED. COOLER. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000002 2. Facility Name Swanson River 3. Field Swanson River Unit 4. Operator I HILCORP ALASKA LLC 5. Momh/Year of Disposition I March 2017 Disposition Volume MCF 20. For production from multiple pools, list contribution of Total Volume. of each pool as a percent 6. Sold 262,599 Pool Name Pool Code Percent 7. Reinjected 144,262 SWANSON RIVER, HEMLOCK 772100 75.70% SWANSON RIVER, HEM F/STERLING UNDEF 772105 0.00% 8. Flared or vented 1 hour or less 508 SWANSON RIVER, TYONEK UNDEFINED 772500 0.00% SWANSON RIVER, BELUGA UNDEFINED 772520 0.06% 9. Flared or vented more than 1 hour (see instr.) 192 SWANSON RIVER, STERLING UNDEFINED 772550 24.30% 10. Pilot and Purge 1,088 11. Assist Gas 0 12. Fuel gas used in lease operations 95,784 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety l 2— MCF 14. TOTAL VOLUME (ITEMS 6.13) 504,433 Lease Use MCF 15. NGL Gas Equivalent 1,217 Conservation MCF 16. Purchased gas -Rental ReturnGas 182,215 Waste: MCF 17. Transferred from: (Off-lease Gas) 194.998 m Is loner Da` — ! 18. Transferred to: (10,990) Note: All volumes must be corrected Analyst to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Date 4/19/2017 AAC25.235. 19. Remarks: Reinjected: Production Injected Back into Hemlock 144,262 Volume in Line 6 subject to royalty. 39,786 • Volume NOT subject to royalty. 104,476 Transferred to: Swanson Storage for Injection Total 10,990 • Volume in Line 6 subject to royalty. 3,277 • Volume NOT subject to royalty. 7,713 Rental Return: Hemlock Production Sold - To Enstar 162,215 • Included in Line 6; NOT subject to royalty. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature +r-a,7ii�y�re Title Production Printed Name Cortney Dyer Phone 713-289-2881 SWANSON RIVER UNIT March -17 Total � 1 HR: 1420 UPDATED DESCRIPTION: EXCESS 03/01/2017 124250 1330000002 3/4/2017 4:00:00 11:00:00 3/4/2017 U 42.0 DUENECESSARY THE VRU 31ST NG STAG E COOOLRIC4�I NG A SHUTDOWN OF THE VRU TF HE COOLERESSI5 THAWED AND HEL COMPRESSOR IS RESTARTED. COMPRESSOR. 03101/2017 124250 133000002 3/6/2017 43000 15:00:00 3/6/2017 P 827 UPDATED DESCRIPTION: EXCESS VENTING DUE TO SHUTDOWN OF VRU COMPRESSOR DUE TO A FROZEN EXCESS VENTING NECESSARY UNTIL THE PRESSURE DRAIN IS THAWED PRESSURE DRAIN. AND THE COMPRESSOR RESTARTED. 0310112017 124251 1330000002 3/20/2017 0:00:00 16:00:00 3/20/2017 U 27.0 EXCESS VENTING DUE TO SHUTDOWN OF VRU COMPRESSOR EXCESS VENTING NECESSARY UNTIL DUE TO PLANT ESD. COMPRESSOR CAN BE RESTARTED. 03/01/2017 124250 1330000002 3/20/2017 - 11:30:00 14:30:00 3 20 201] / / U 4.0 EXCESS VENTING DUE TO SHUTDOWN OF K-11 COMPRESSOR EXCESS VENTING NECESSARY UNTIL DUE TO PLANT ESD. COMPRESSOR CAN BE RESTARTED. 03/01/2017 124251 133DODD002 3/20/2017 11:30:00 1430:00 320/201] / U 4.0 EXCESS VENTING DUE TO SHUTDOWN OF K-12 COMPRESSOR EXCESS VENTING NECESSARY UNTIL DUE TO PLANT ESD, COMPRESSOR CAN BE RESTARTED. 03/0112017 124250 133000002 3/20/2017 11:30:00 14:30:00EXCESS 3/20/2017 U 4.0 SHUTDOWN OENTING14 DUE TO OESSOR EXCESS VENTING NECESSARY UNTIL DU E TO PLANT ESD. COMPRESSOR CAN BE RESTARTED. 03/0112017 124252 1330000002 3/20/2017 11:30:00 14:30:003/20/201] U 7.9 EXCESS VENTING DUE TO SHUTDOWN OF K-17 COMPRESSOR EXCESS VENTING NECESSARY UNTIL DUE TO PLANT ESD. COMPRESSOR CAN BE RESTARTED. 03/01/2017 124250 1330000002 3/20/2017 11:30:00 14:30:00 3 20 201] / / U 7.9 EXCESS VENTING DUE TO SHUT DOWN OF PM PLANT DUE TO EXCESS VENTI NG NECESSARY UNTIL PLANT ESD. PM PLANT UNITS CAN BE RESTARTED. 03/01/2017 124252 1330000002 3/28/2017 18:30:00 23:59:00 3/28/2017 U 32.5 EXCESS VENTING DUE TO SHUTDOWN OF VRU COMPRESSOR EXCESS VENTING NECESSARY UNTIL FIELD 150# PRESSURE ALLOWED FOR DUE TO HIGH FIELD 150# GAS. THE RESTART OF THE VRU COMPRESSOR. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 6. Sold 301,501 7. Reinjected 294,070 8. Flared or vented 1 hour or less 221 9. Flared or vented more than 1 hour (see instr.) 212 10. Pilot and Purge 1,103 11. Assist Gas 0 12. Fuel gas used in lease operations 89,174 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6.13) 686,281 15. NGL Gas Equivalent 1,099 16. Purchased gas - Rental Return Gas 92,759 7. 1:] Transferred from: (Off -lease Gas) 53,552 18. Transferred to: (190,204) Reinjected: Production Injected Back into Hemlock Volume in Line 6 subject to royalty. Volume NOT subject to royalty (Hemlock H). Transferred to: Swanson Storage for Injection Total ' Volume in Line 6 subject to royalty. Volume NOT subject to royalty (Hemlock H). Rental Return: Hemlock Production Sold - To Enstar Included in Line 6; NOT subject to royalty. certify that the foregoing is true and correct to the best of my knowledge. Signature-on-fney.rW 294,070 48,988 190,204 31,679 158,525 92,759 20. For pools, list Use /Z C/ri as a percent V Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 SWANSON RIVER UNIT April-17 Total> 1 HR: 2120 EXCESS VENTING DUE TO 04101/2017 124250 1330000002 4/2/2017 11:15:00 12:30:00 4/2/2017 SHUTDOWN OF THE VRU EXCESS VENTI NG NECESSARY U NTIL p 7.2 COMPRESSOR TO INSTALL A VRU COM PRESSOR CAN BE VARIABLE SPEED FAN ON THE VRU. RESTARTED. 04/0112017 124250 1330000002 4/3/2017 1:30:00 EXCESS VENTING DU E TO EXCESS VENTI NG NECESSARY U NTIL 3:00:00 4/3/2017 U 8.8 SHUTDOWN OF VRU COMPRESSOR VRU COMPRESSOR CAN BE DUE TO HIGH 150N PRESSURE. RESTARTED. EXCESS VENTING DUE TO SHUTDOWN OF VRU COMPRESSOR IN 04/01/2017 124251 1330000002 4/7/2017 9:00:00 12:30:00 4/7/2017 ORDER TO ADJUST THE INTERNAL EXCESS VENTING NECESSARY UNTIL U 207 RELIEFS ON BOTH VRU LIQUID VRU COMPRESSOR CAN BE PUMPS FOR IST AND 2ND STAGE RESTARTED. SCRUBBERS. UPDATED DESCRIPTION: EXCESS VENTING DUE TO SHUTDOWN OF VRU COMPRESSOR CAUSED BY 04/D1/2017 124250 13WDO0002 4/8/2017 5:00:00 15:00:00 4/8/2017 FREEZING OF THE PRESSURE DRAIN CESS VENTING NECESSARY UNTIL U 59.8 LINE. WHILETHAWINGTHE PRESSURE DRAIN LINE THAWED AND PRESSURE DRAIN LINE, A VARIABLE COMPRESSOR RESTARTED. SPEED CONTROLLER FOR THE COOLING FAN WAS INSTALLED. UPDATED DESCRIPTION: EXCESS 04/01/2017 124251 133DOOD002 4/9/2017 11:00:00 18:00:00 4/9/2017 VENTING DUE TO SHUTDOWN OF EXCESS VENTING NECESSARY UNTIL U 422 VRU COMPRESSOR CAUSED BY PROGRAMMING ISSUE FIXED AND PROGRAMMING ISSUES. COMPRESSOR 15 RESTARTED. 04/01/2017 124250 1330000002 4/19/2017 0:OO:ODEXCESS I NG DUETO EXCESS VENTING 8:30:00 4/19/2017 U 25.5 SHUTDOWN OF VRU allSED BY IST VRU CAN BE RESTARTED IN MANUAL AND 2ND STAGE VFD FAULT. MODE. 04/01/2017 124252 1330DD0002 4/21/201) EXCESS VENTING DUE TO EXCESS VENTING NECESSARY UNTIL 1:30:00 3:00:00 4/21/2017 U 8.8 SHUTDOWN OF VRU COMPRESSOR RPMS FOR ISTAND 2ND STAGE ARE DUE TO IST STAGE VFD FAULT. LOWERED AND COMPRESSOR CAN BE RESTARTED. 04/01/201] 124250 1330000002 4/25/2017 0:00:00 6:30:00 EXCESS VENTING NECESSARY 4/25/201]U 39.1 SHUTDOWN OF VRU COMPRESSOR UNTIL DUE TO HIGH ISDN PRESSURE. COMPRESSOR CAN BE RESTARTED. Name 6. Sold 7. Reinjected 8. Flared or vented 1 hour or less 9. Flared or vented more than 1 hour (see instr.) 10. Pilot and Purge 11. Assist Gas 12. Fuel gas used in lease operations 13. Other (see instructions) 14. TOTAL VOLUME (ITEMS 6-13) 15. NGL Gas Equivalent (mcf) 16. Purchased gas - Rental Return Gas 17. Transferred from: (Off -lease Gas) 18. Transferred to: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Reinjected: Production Injected Back into Hemlock Volume in Line 6 subject to royalty. Volume NOT subject to royalty (Hemlock H). Transferred to: Swanson Storage for Injection Total Volume in Lim 6 subject to royalty. Volume NOT subject to royalty (Hemlock H). Rental Return: Hemlock Production Sold - To Enstar Included in Line 6: NOT subiert m m—I. orume muF 360,621 LU. For production from multiple pools, list contribution of each of Total Volume. pool as a percent Pool Name Pool Code Percent 197,903 SWANSON RIVER, HEMLOCK 772100 86.06% SWANSON RIVER, HEM F/STERLING UNDEF 772105 0.00% 139 SWANSON RIVER, TYONEK UNDEFINED 772500 0.00% SWANSON RIVER, BELUGA UNDEFINED 772520 0.00% 41 SWANSON RIVER, STERLING UNDEFINED 772550 13,94% 954 0 88,266 0 Official Use Onl 647,924 5,697 297,991 :AuthoriZatio:n>1:hr: Safety it �1 Lease Use Conservation MCF Waste: MCF 180,506 (10,194) _ / mmissionejrr~_— -7-2D 7^ p^f ,� ( 7 /ate ( 197,903 29,614 10,194 1,526 8,668 297,991 --"Y "^ ' ­ ,v,=yUI„y lb nue ono correct to the best of my knowledge. Signature 4S" Note: All volumes must be correcte Title Production Analyst to pressure of 14.65 pals and to a ted Name CortneY 0Yer temperature of 600 F. Authority 20 SWANSON RIVER UNIT M-1-17 Total> 1 HR: 41.0 05/01/2017 124250 1330000002 5/4/2017 7:15:009:15:00 5/4/20ll U 11.6 EXCESS VENTING DUETO SHUTDOWN OF VRU COMPRESSOR EXCESS VENTING NECESSARY UNTIL THE VRU COMPRESSOR CAN BE DUE TO HIGH 150 PRESSURE. RESTARTED. 05/01/2017 124250 1330000002 5/5/2017 5:15:00 6:45:00 55/201] / U 8.5 EXCESS VENTING DUE TO SHUTDOWN OF VRU COMPRESSOR EXCESS VENTING NECESSARY UNTIL AIR IS BLED OUT, LUBE PUMPS ARE FROM LOW LUBE FLOW, PRIMED AND VRU COMPRESSOR IS RESTARTED, EXCESS VENTING NECESSARY UNTIL 05/01/2017 124251 1330000002 5/14/2017 9:15:00 10:45:00 5/14/201) U 8.5 EXCESS VENTING DUE TO SHUTDOWN OF VRU'COMPRESSOR ON HIGH 150 PRESSURE. COMPRESSOR IS RESTARTED, EXCESS VENTING DUETO 05/01/2017 124250 1330000002 5/16/2017 23:00:00 1:00:00SHUTDOWN 517/201] / U 6.2 OF THE VRU COMPRESSOR ON HIG H DISCHARGE EXCESS VENTING NECESSARY UNTIL PRESSURE CAUSED BY HIGH 1500 GAS COMPRESSOR IS RESTARTED. FROM BRINGI NG ON A WELL. EXCESS VENTING. DUE TO 05/01/201] 124251 1330000002 5/16/2017 23:00:00 1:00:00SHUTDOWN 51]201] / / U 6.2 OF THE VRU COMPRESSOR ON HIGH DISCHARGE EXCESS VENTING NECESSARY UNTIL PRESSURE CAUSED BY HIGH 1500 GAS COMPRESSOR IS RESTARTED. FROM BRINGING ON A W ELL. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 6. Sold 78,879 7. Reinjected 360,310 8. Flared or vented 1 hour or less 585 9. Flared or vented more than 1 hour (see instr.) 112 10. Pilot and Purge 1,134 11. Assist Gas ed in lease operations 105,819 rinstructions) EOthe0 0 LUME (ITEMS 6-13)546,839 quivalent (mcf) 5,987 .urcased gas - Rental Return Gas 475,537 17. Transferred from: (Off -lease Gas) 24,377 18. Transferred to: (65,278) Reinjected: Production Injected Back into Hemlock • Volume in Line 6 subject to royalty. Volume NOT subject to royalty (Hemlock H). Transferred to: Swanson Storage for Injection Total Volume in Line 6 subject to royalty. Volume NOT subject to royalty (Hemlock H). Rental Return: Hemlock Production Sold - To Enstar Inclucied in Line 6; NOT subject to royalty t the foregoing Is true and correct to the best of my knowledge. 360,310 46,984 313,326 65,278 8,513 56,765 11,826 Signature_ q 100W Title Use as a //--.6-17 ii -6-17 tote: All volumes must be correcte to pressure of 14.65 psia and to a temperature of 600 F. Authority 20 SWANSON RIVER UNIT " %-DaEe O No Facil" No' "-" "pAT¢Flazzd'" Jwro-07 ToFal> I HR: 112.0 06/01/201]124250 1330000002 6/23/2017 8:00:00 15:00:00 6/23/2017 P DATED 99.1 UPVENTNGEDUE ITOI LIQUIDSE� E IQUIDSEUNLOADING COMP ETEIL UNLOADING OF WELL 213-15. AND WELL BROUGHT BACK ONLINE. O6/01I2017 124250 1330000002 6/25/201] 8:45:00 10:30:00 6/25/2017 U 129 EXCESS VENTING DUE TO PM PLANT EMERGENCY SHUTDOWN CAUSING EXCESS VENTING NECESSARY UNTIL A SHUTDOWN OF THE VRU COMPRESSOR CAN BE RESTARTED. COMPRESSOR. 6. Sold 7. Reinjected 8. Flared or vented 1 hour or less 9. Flared or vented more than 1 hour (see instr.) 10. Pilot and Purge 11. Assist Gas 12. Fuel gas used in lease operations 13. Other (see instructions) 14. TOTAL VOLUME (ITEMS 6.13) 15. NGL Gas Equivalent (mcf) 16. Purchased gas - Rental Return Gas 17. Transferred from: (Off -lease Gas) 18. Transferred to: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 75,912 393,947 393 0 1,087 0 109,684 0 581,023 5,955 475,537 14,409 (63,986) SOLD SRU Field to Enstar (royalty -bearing) 1,568 SRU Field to Enstar (non -royalty H Sand) 10,358 SRU to Storage (roya(ty- bearing) 8,425 SRU to Storage (non•royality H Sand) 55,561 REINJECTED SRU Royalty -Bearing REINJ back into Hemlock 51,879 SRU Non -Royalty H Sand REINJ back to Hemlock 342,068 cernoy mat me loregoing is true and correct to the best of my knowledge. Signature 616&-g .04.p Title Lease Use TRANSFERRED TO Incl. Line 6 Sold/Ing to Storage TRANS FROM Storage/Accl Gas Injected into Hemlock H 63,986 14,409 as a tote: All volumes must be correcte, to pressure of 14.65 psta and to a temperature of 600 F. Authority 20 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 1. V r RC1V I yr rRuuuctu I"Ab UISPOSITION Facility Number 2. Facility Name 1330000002 Swanson River 3. Field 4. Operator Swanson River Unit HILCORP ALASKA LLC 5. Month/Year of Disposition I Disposition Volume MCF August 2017 20. For production from multiple pools, list contribution of 6. Sold 120,196 of Total Volume each pool as a percent 7. Reinjected ol Name Pool Code Percent 349,645 RIVER, HEMLOCK 772100 89.38% HEM F/STERLING UNDEF 772105 0.00% 8. Flared or vented 1 hour or less 620 , TYONEK UNDEFINED §SM 772500 0.00% R, BELUGA UNDEFINED 772520 0.00% 9. Flared or vented more than 1 hour (see instr.) 1 057 , STERLING UNDEFINED 772550 10.62% 10. Pilot and Purge 1,012 11. Assist Gas 0 12. Fuel gas used in lease operations 109,207 13. Other (see instructions) 0 Official Use Only 14. TOTAL VOLUME (ITEMS 6-13) Authorization;hr:Safety MCF V G `J 581,937 15. NGL Gas Equivalent (mcf) Lease Use MCF 5,268 16. Purchased gas -Rental Return Gas Conservation MCF 475,537 Waste: MCF 17. Transferred from: (Off -lease Gas) 74,125 ,/ —17 18. Transferred to: (112,720) Commissioner Date 19. Remarks: SOLD SRU Field to Enstar (royalty -bearing) 878 TRANSFERRED TO Incl. Lire 6 Sold/Inj to Storage 112,720 SRU Field to Enstar (non -royalty H Sand) 6,598 SRU to Storage (royalty. bearing) 13,236 TRANS FROM Storege/Acq Gas Inlected into Hemlock H 74,125 SRU to Storage (non -royalty H Sand) 99,484 REINJECTED SRU Royalty -Bearing REIN) back into Hemlock 41,069 SRU Non -Royalty H Sand REIN) back to Hemlock 308,776 1 hereby certify that the foregoing is true and correct to the best of knowledge. my Signature c�a-eu�y .uw Note: All volumes must be corrected Title Production Analyst to pressure of 14.65 psia and to a Printed Name Cortne Der temperature of 60o F. Authority 20 Phone 713-289-2881 Date 9/19/2017 AAC25.235. L/ / SWANSON RIVER UNIT _7 Au ust-17 Total > 7 HR: 7067.0 EXCESS VENTING DUE TO 08/01/2017 124250 1330000002 8/5/2017 17:45:00 19:15:00 SHUTDOWN OFVRU COMPRESSOR 8/5/201] U 10.3 CAUSED BY HIGH 150 PRESSURE EXCESS VENTING NECESSARY UNTIL FROM SHUTDOWN OF K-13 COMPRESSOR CAN BE RESTARTED. COMPRESSOR. UPDATED DESCRIPTION: EXCESS FLARING DUE TO SHUTDOWN OF K- 08/01/2017 724250 7330000002 8/9/2017 17:00:00 18:45:00 6/9/2017 13 COMPRESSOR ON A HOT VALVE, K- 18 COMPRESSOR DUE TO A BAD EXCESSFIARINGNECESSARYUNTILK- U 9973 POWER CYLINDER BEARING, AND K- 13 COMPRESSOR IS STARTED UP AND 15 COMPRESSOR DUE TO A BAD PIGGING IS CURTAILED. BEARING TRIP DURING PIGGING OF 1570. 08/01/2017 124251 1330000002 8/9/2017 UPDATED DESCRIPTION: EXCESS 17:00:00 23:59:00 8/9/201] U 494 VENTING DUE TO SHUTDOWN OF EXCESS VENTING NECESSARY FOR THE VRU COMPRESSOR ON A IST SAFE SHUTDOWN OF COMPRESSOR. STAGE VFO FAULT. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 6. Sold 415 7. Reinjected- Includes Transferred From, Gas. See Remarks 23,753 8. Flared or vented 1 hour or less 27 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 9 11. Assist Gas 0 12. Fuel gas used in lease operations 876 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6-13)' Includes Transferred 25,080 15. NGL Gas Equivalent 0 16. Purchased gas - Transferred from SRF 0 17. Transferred from: (Off -lease Gas) 1,310 18. Transferred to: (405) Reinjectedlfransferr Swanson River Field: ed From: 23,311 Other 15708: 442 'Total Included in Line 7: 23,753 8. 9. 10. 12. Other 15706 (Acq Gas for Lease Uses): 0 8.9 10.12. Storage Production for Lease Uses 912 from multiple pools, Use Injected into Storage 23,294 Storage Inv. 3,076,561 Transferred To: 405 'SRU Field (Hemlock) for Injection. Incl. Line 6.: c iuny mar me roregoing is true and correct to the best of my knowledge. Signature 94 Ar—e-" Title Production Analyst as a ote: All volumes must be corrected to Pressure of 14.65 psis and to a temperature of 600 F. Authority 20 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 6. --- -- - - Sold uure ,.,.,r 37,649 cu. ror prcoucnon nom multiple pools, list contribution of each pool as a percent of Total Volume. Pool Name Pool Code Percent 7. Reinjected 384,817 SWANSON RIVER, HEMLOCK 772100 87.52% 8. Flared or vented 1 hour or less 62 SWANSON RIVER, HEM F/STERLING UNDEF 772105 0,00% SWANSON RIVER, TVONEK UNDEFINED 772500 0.01% 9. Flared or vented more than 1 hour (see instr.) 1,120 SWANSON RIVER, BELUGA UNDEFINED 772520 0.00% SWANSON RIVER, STERLING UNDEFINED 772550 12.46% 10. Pilot and Purge 1,046 11. Assist Gas 0 12. Fuel gas used in lease operations 109,031 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: '# Safety () MCF 14. TOTAL VOLUME (ITEMS 6.13) 533,725 15. NGL Gas Equivalent (mcf) 4,759 Lease Use MCF 16. Purchased gas -Rental Return Gas 491,645 Conservation MCF Waste: MCF 17. Transferred from: (Off -lease Gas) 46,317 Commissioner J 2 19 _ / p Date Q 18. Transferred to: (27837) 19. Remarks: Reinjected: Production Injected Back into Hemlock ` Volume in Line 6 subject to royalty. ` Volume NOT subject to royalty (Hemlock H). Transferred to: Swanson Storage for Injection Total ` Volume in Line 6 subject to royalty. ` Volume NOT subject to royalty (Hemlock H). Rental Return: Hemlock Production Sold - To Enstar Included in Line 6; NOT subject to royalty. 384,817 53,734 331,083 27,837 3,887 23,950 8,442 Note: All volumes must be corrected Analyst to pressure of 14.65 psia and to a temperature of 60o F. Authority 28 Date 1112112017 AAC25.235. hereby certify that the foregoing is true and correct to the best of my knowledge. Signature_ Az"r w Title Production Printed Name Cortney Dyer Phone 713-289-2881 10/01/2017 1 124250 1 133DODM02I 10/27/2017 I 12:15:00I 13:50:00 1 10/27/2017 I U I 9937 I SHURTNG DUE TO TOWEROUAGE FLA 10/01/20171 124211 1 1111010002 10/27/2017 12:15:00 15:45:00 10/27/2017 U 25.1 EXCESSVENINGDUETO SHUTDOWN OF VRU COMPRESSOR DUE TO HEA POWER OUTAGE. EXCESS FLARING NECESSARY UNTIL PIANTAND FIELD CAN DE RESTARTED. EXCESS VENTING NECESSARY UNTIL COMPRESSOR CAN BE RESTARTED. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 1330000002 2. Facility Name Swanson River 3. Field Swanson River Unit 4. Operator I HILCORP ALASKA LLC 5. MonthlYear of Disposition November 2017 Disposition Volume MCF - Volume in Line 6 subject to royalty. 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 87.905 Pool Name Pool Code Percent 7. Reinjected 361,877 SWANSON RIVER, HEMLOCK 772100 89.78% SWANSON RIVER, HEM F/STERLING UNDEF 772105 0.00% 8. Flared or vented 1 hour or less 183 SWANSON RIVER, TYONEK UNDEFINED 772500 0.03% SWANSON RIVER, BELUGA UNDEFINED 772520 0.00% 9. Flared or vented more than 1 hour (see instr.) 130 SWANSON RIVER, STERLING UNDEFINED 772550 10.19% 10. Pilot and Purge 1,023 11. Assist Gas 0 12. Fuel gas used in lease operations 107,627 13. Other (see instructions) 0 Official Use Onl Authorization>1 hr: 44�(lb/(r[ l L Y Safety Cf MCF 14. TOTAL VOLUME (ITEMS 6-13) 558,745 Lease Use Z/ MCF 15. NGL Gas Equivalent (mcf) 4,877 Conservation MCF 16. Purchased gas -Rental ReturnGas 493,959 Waste: MCF 17. Transferred from: (Off-lease Gas) 67,742/C 7�Q o'er mml55lonen —b j ' �•' 18. Transferred to: tat 896) Reinjected: Production Injected Back into Hemlock 361,877 • Volume in Line 6 subject to royalty. 41,959 ' Volume NOT subject to royalty (Hemlock Hy 319,91 Transferred to: Swanson Storage for Injection Total 42,896 - Volume in Line 6 subject to royalty. 4,975 • Volume NOT subject to royaky (Hemlock HI. 37,921 Rental Return: Hemlock Production Sold - To Enstar 39,792 • Included in Lire 6; NOT subject to royalty. certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature .aif+t��r �%u Title Production Analyst to pressure of 14.65 psis and to a Ictl klomn r..e..e•, n..e. _. _ _ temperature of 60o F. Authority 20 RptDate OpNo 124250 FacilityNo 1330000002 Date Flared 11/5/2017 Start TimeTTime 11:00:00 Planned U MCF 9 Description of Flaring Event EXCESS VENTING DUE TO SHUT11/17/2017 COMPRESSOR DDUE TO OWN OF THE HIGH SYSTEM PRESSURE CAUSED BY THE POWER BUMP. Action Taken to Minimize Volume EXCESS VENTING NECESSARY UNTIL COMPRESSOR IS RESTARTED. EXCESS VENTING NECESSARY UNTIL SCHEDULED MAINTENANCE IS COMPLETE AND COMPRESSOR IS RESTARTED. 11/17/2017 124250 1330000002 11/18/2017 12:30:00 17:00:00 11/18/2017 P 32 EXCESS VENTING DUE TO SHUTDOWN OF VRU COMPRESSOR TO ADJUST THE PITCH OF THE FAN BLADE. 11/17/2017 124251 1330000002 11/27/2017 7:30:00 19:00:00 11/27/2017 P 89 EXCESS VENTING DUE TO SHUTDOWN OF VRU COMPRESSOR TO INSTALLER A COOLER BYPASS SPOOL PIECE. EXCESSVRU COMPRESSOR CAN ENTIL VENTING NECESSARY RESTARTED. 130 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 6. Sold 87,905 • Volume in Litre 6 subject to royalty. of Total Volume. ol Name Pool Code 7. Reinjected 361,877 RIVER, HEMLOCK 772100 HEM F/STERLING UNDEF 772105 S. Flared or Vented 1 hour or less 183 , TYONEK UNDEFINED 772500 ®RIVER, , BELUGA UNDEFINED 772520 9. Flared or vented more than 1 hour (see instr.) 130 STERLING UNDEFINED 772550 certify that the foregoing is true and correct to the best of my knowledge. 10. Pilot and Purge 1,023 Title Productio 11. Assist Gas 0 12. Fuel gas used in lease operations 107,627 13. Other (see instructions) 0 Official UseOnl Authorization >1 hr: - Safety 14. TOTAL VOLUME (ITEMS 6.13) 558,745 15. NGL Gas Equivalent (mcf) 4,877 Lease Use 16. Purchased gas -Rental Return Gas 493,959 Conservation . Waste: 17. Transferred from: (Off -lease Gas) 67,742 s L Commissioner 18. Transferred to: (42,896) Reinjected: Production Injected Back into Hemlock 361,877 • Volume in Litre 6 subject to royalty. 41,959 • Volume NOT subject to royalty (Hemlock H). 319,91 Transferred to: Swanson Storage for Injection Total 42,896 Volume in Line 6 subject to royalty. 4,975 Volume NOT subject to royalty (Hemlock H). 37,921 Rental Return: Hemlock Production Sold - To Enstar 39,792 - Inckroed in Line 6; NOT subject to royalty. certify that the foregoing is true and correct to the best of my knowledge. Signature 4.-4t V A51" -as Title Productio as a MCF lote: All volumes must be correctei to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. SWANSON RIVER UNIT November -1] Total > 1 HR: 130.0 EXCESS VENTING DUE TO 11/17/2017 124250 1330000002 11/5/2017 1100:00 12:15:00WN 11/5/2017 U 8.5 OF THE VRU COMPRESSOR O DUETO HIGH SYSTEM EXCESS VENTING NECESSARY UNTIL PRESSURE CAUSED BY THE POWER COMPRESSOR IS RESTARTED. BUMP. EXCESS VENTING NECESSARY UNTIL SCHEDULED MAINTENANCE IS it/1]/2017 124250 1330000002 11/18/2017 12:30:00 17:00:00 11/18/2017 P 32.3 EXCESS VENTING DUE TO SHUTDOWN OF VRU COMPRESSOR TO ADIUSTTHE PITCH OF THE FAN COMPLETE AND COMPRESSOR IS BLADE. RESTARTED. R wit k, t >y A STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 6. Sold 111,852 7. Reinjected 361,972 8. Flared or vented 1 hour or less 956 9. Flared or vented more than 1 hour (see instr.) 192 10. Pilot and Purge 1,152 11. Assist Gas 0 12. Fuel gas used in lease operations 107,751 13. Other (see instructions) 0 14. TOTAL VOLUME (ITEMS 6-13) 583,875 15. NGL Gas Equivalent (mcf) 3,686 16. Purchased gas - Rental Return Gas 499,828 17. Transferred from: (Off -lease Gas) 76,474 18. Transferred to: (84.089) Reinjected: Production Injected Back into Hemlock 361,972 ' Volume in Line 6 subjed to royalty. 52,104 `Volume NOT subject to royalty (Hemlock H). 309,868 Transferred to: Swanson Storage for Injection Total 84,089 • Volume in Line 6 subject to royalty. 12,107 ' Volume NOT subject to royalty (Hemlock H). 71,982 Rental Return, Hemlock Production Sold - To Enstar 23,765 ' Included in Line 6: NOT subject to nryaby. certify that the foregoing is true and correct to the best of my knowledge. Signature-s>,fecy .tT%un Title Productir production gmmD Use pool as a tote: All volumes must be correctei to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235. SWANSON RIVER UNIT R tDete Na Fatil' NO Date Flaw Start Time Enoina Time FSE Date December-17 Piannetl Total> 1 HR: 192.0 MCF Description of Flarog Lvenf Action Taken to Mid mize.Volum 121012017 124250 1330000002 12/1/2017 110000EXCESS 14:30:00 V ENTI NO OU MSHUTDOWN EXCESS VENTING NECESSARY 12/1/2017 U 24.2 OUTAGE RESULTING UNTIL OF VRU COMPRESSOR, COMPRESSOR CAN BE RESTARTED, UPDATED DESCRIPTION: EXCESS 12/01/2017 124250 1330000002 12/13/2017 0:00:00 23:59:0 12/13/2017 U 158.4 VENTING DUE TO UNSCHEDULED EXCESS VENTING NECESSARY UNTIL SHUTDOWN OF K-17 COMPRESSOR COMPRESSOR CAN BE RESTARTED. 17 TIMES THROUGHOUT THE DAY. EXCESS VENTING DUE TO FOUR 12101201] 124251 1330000002 12/14/2017 0:30:00 5:00:00 12/14/2017 P 93 SHUTDOWNS OF K-18 COMPRESSOR EXCESS VENTING NECESSARY FOR AND SWAPPING TO K-17 SAFE SWAPPING OF COMPRESSORS. COMPRESSOR.