Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutSR Swanson River LEX / Unocal STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2008
FACILITY: SR Swanson River LEX
OPERATOR: UNOCAL
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000002 Swanson River Swanson River Unit Unocal Alaska Resources January 2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 0 Pool Name Pool Code Percent
Reinjected SWANSON RIVER, HEMLOCK 772100 2.64%
7. Rein j 25,334
SWANSON RIVER, TYONEK UNDEFINED 772500 0.00%
SWANSON RIVER, BELUGA UNDEFINED 772520 3.32%
8. Flared or vented 1 hour or less
993 SWANSON RIVER, STERLING UNDEFINED 772550 2.71%
SWANSON RIVER, GAS STORAGE 772803 91.33%
9. Flared or vented more than 1 hour (see instr.) 0
10. Pilot and Purge 1,085
11. Used for lease operations (sped in Remarks) 66,267
12. Other (see instructions) - ins w �T t 4,173 Authorization >1 hr: MCF
Safety
13. TOTAL VOLUME (ITEMS 6 -12) 97,852 MCF
FEB 2 0 2008 Lease Use
14. NGL Gas Equivalent MCF
Conservation
15. Purchased gas - Rental FaigNittiQU 8 an Cons. Convnisslat 609,018 Waste: MCF
Afichoraw
16. Transferred from: (Off -lease Gas) 29,176
Commissioner Date
17. Transferred to:
18. Remarks: Rental Return Gas: Hemlock Production Sold
0
Gas Storage Sold 609,018
Reinjected: Gas Storage Produced and Reinjected 9,916
Other: Gas Produced and through processing
converted to NGLs and Propane 4,173
I hereby certify that the foregoing is true and correct to the best of my knowledge.
L //) ,� Lie_ Note: All volumes must be corrected to
Signature A , ! / // Title Production Accountant pressure of 14.65 psia and to a
temperature of 60o F, Authority 20
Printed Name Mary Indihar Phone 713 432 -6238 Date 2/12 /2008 AAC25.235.
._
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000002 Swanson River Swanson River Unit Unocal Alaska Resources 2/1 /2008 REVISED
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 0
Pool Name Pool Code Percent
SWANSON RIVER, HEMLOCK 772100 2.82%
7. Reinjected S WANSON RIVER, TYONEK UNDEFINED 772500 0.00%
8. Flared or vented 1 hour or less 374 SWANSON RIVER. BELUGA UNDEFINED 772520 3.71%
SWANSON RIVER, STERLING UNDEFINED 772550 3.15%
9. Flared or vented more than 1 hour (see instr.) 209 SWANSON RIVER, GAS STORAGE 772803 90.31%
10. Pilot and Purge 1,015
11. Used for lease operations (specify in Remarks) 69,998
I,, ,,, ac f ..fit ,: , , -,
12. Other (see Instructions) Authorization >1 hr. Safety 4 MCF
,_ t
13. TOTAL VOLUME (ITEMS 6 -12) 209,606 ` ° MCF
14. NGL Gas Equivalent MAY 5 2008 Lease Use
—
Conservation MCF
15. Purchased gas - Rental Returnis on & Gas Cons. comminorm 420,586 Waste: MCF
16. Transferred from (Off -lease Gas) Andlorage 144,232
aff � / Q S
�f K
17. Transferred to // Commissioner Date
18. Remarks: Rental Return Gas: Hemlock Production Sold 0
Gas Storage Sold 420,586
Reinjected: Gas Storage Produced and Reinjected 18,288
Other: Gas Produced and through processing
converted to NGLs and Propane 4,167
I hereby certify that the foregoing is true and correct to the best of my knowledge.
� � J� Note: All volumes must corrected to
1 �^'f � [
Signature fig- -- 1 - - Title Production Accountant pressure of 14.65 psis /a and to a
(/ temperature of 60o F. Authority 20
Printed Name Mary Indihar Phone 713 432 -6238 Date 5/5/2008 AAC25.235.
e
Chevron Excess Flare Report
Month: February Year; 2008
SWANSON RIVER UNIT
Steps Taken to Equfpmer+�
Date & Time Event Gas Mlnimiize
Down MP
Reoccurrence
Begin End fACF Planned Description of incident Category Reason Actions Taken
02/13/2008 10:00 AM 02/13/2008'01:45 PM 116 Y COMPRESSOR SHUT SAFETY SCHEDULED MONTHLY SHUT DOWN OF GAS RCP -WA(
DOWN TO PERFORM MAINTENANCE PLANNED COMPRESSOR
SCHEDULED MAINTENANCE.' NECESSARY TO
MONTHLY PERFORM
PREVENTATIVE MAINTENANCE.
MAINTENANCE.' PERFORMED MONTHLY
PREVENTATIVE
MAINTENANCE AND
RETURNED EQUIPMENT
TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.
02/16/2008 12:00 PM 02/18/2008 02:00 PM 93 N FACILITY SHUT IN SAFETY OTHER: SEE UNABLE TO SHUT IN OF FACILITY RCP-WA(
DUE TO POWER DESC OF EVENT PREVENT NECESSARY FOR
OUTAGE RESULTING POWER FACILITY OPERATIONS.
IN EXCESS FLARING' OUTAGES.' POWER OUTAGE'
CAUSED ALL
EQUIPMENT TO GO
DOWN. RETURNED ALL
EQUIPMENT TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE-I
.)-0 l j / J C'c"t " a
*Thc Begin Dote is End Date for this Flare is outside of the report month. The Flare amount shown is for this month only.
Page 21 of 21
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000002 Swanson River Swanson River Unit - Unocal Alaska Resources February 2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
6. Sold 0 Total Volume.
Pool Name Pool Code Percent
133,843 SWANSON RIVER, HEMLOCK 772100 4.18%
7. Reinjected SWANSON RIVER, TYONEK UNDEFINED 772500 0.00%
8. Flared or vented 1 hour or less 291 SWANSON RIVER, BELUGA UNDEFINED 772520 5.11%
SWANSON RIVER, STERLING UNDEFINED 772550 4.34%
•
9. Flared or vented more than 1 hour (see instr.) 209 SWANSON RIVER, GAS STORAGE 772803 86,37%
10. Pilot and Purge 1,015
11. Used for lease operations (specify in Remarks) 92,237 -
12. Other (see instructions) 4,167 Authorization >1 hr: , ,.. MCF
— Safety - D-„0
13. TOTAL VOLUME (ITEMS 6 -12) 231,762
Lease Use MCF
14. NGL Gas Equivalent
Conservation MCF
15. Purchased gas - Rental Return Gas 420,586
Wast MCF
16. Transferred from: (Off-lease Gas) 144,232 l / F 4 ,,-o$
17. Transferred to: Commissioner Date
18. Remarks: Rental Return Gas: Hemlock Production Sold 0
Gas Storage Sold 420,586
Reinjected: Gas Storage Produced and Reinjected 18,288
Other: Gas Produced and through processing
converted to NGLs and Propane 4,167
'1 hereby certify that the foregoing is true and correct to the b st of my knowledge.
(� � M Note: All volumes must be corrected to
Signature / `� Cr 1�j I" l , Title Production Accountant pressure of 14.65 psis and to a
temperature of 600 F. Authority 20
Printed Name Mary Indihar Phone 713 432 -6238 Date 3/14/2008 AA C25.235.
Ar ' 4
•
chevron Ex s Flare R eport
Mil Month: ces February Year: 2008
SWANSON RIVER UNIT
Steps Taken to
Date &Time Event Gas Minimize
Down Me-
Down MP -^
9 Cription of I ncident C ategory Reason Reoccurrence Actions aken t∎
Be ui End PJICF Planned Des
.. ..:, ...:: -a .., ..: ; : b .. y .': ..= r'a, .. ,c .r, ry a' r: d;w: Y- i }' +"" - c n r 7 ' -
sA t ?, Y . t ra .x4.« � as � r a d „ " z �., ,�. � :INf�(
ons
. L Y / . g, . Y • t Y , .. Y L 3 1 . t .1 : r ,. . o n 3 tip a ,1"..,,,,b, r �'� ' �l "�.:;; '' .
.i., � 1 •m �.t l° ,,aK.c ,.� °.d . :sd 'M7 : =' t J A:� i , � � .a:D., ..F *. "� �A , ; . � � " r ',"C t>`x:`.w "; " r`,-m`'' :i-
�',, �.. .,.• :J't. ,11M " l.i. ^.. - , ".. °-r dMn -a.. ', ,� s a'. 4 w<'s ,.. {. :,.i'. 1F: `T -i•`, ; % '`
,. : :.:., r. .., x � ..... „x .. �t:ac ,. S ,�r`.a .e > r. :�' h '
., 7"f, ,A1•..., -m.. wrs+rrf". .. <a : 'P � ,.x :: r 35�.?:`y,.'�'
. � xa �( ([lyY _
/ 1_x
`Y,- r., �ryy,
'v:.:..r` ..i:.,. _ . y r, �.r wti`�:
r.
.
5.;.
i::'s' 1
,l 3.
-Frs
ri Vi a:•
, i
� � _ Y I � _
. -rt'
:
wv,.. , , .,. r , ,.. a , s 1e.,:. .......... . ... ...: .. ,; a ;�� ,, �. m s�3i" ,_�,. 'r ,
yy; 3 � __
r„e :z
ire
:4
: "gin:' - .;i;.. Ck�„ ' -
..f
f .,
3u..
. °ice , i�.. • YF�.
.W
.. .. , ,.. , .: :.. .... a .. a5�6
ni E;1
\: i
rE4'
- at N
vs :�, r `� � tVl "tV: H
. t' a ` rc' � wk
.. - , r��t• posy
C ry. .: d '
,.., .. .. a _.. ..r. .r. :..',-_. ,,. .k `-:',` \W .'., a6. .,;'i' -: -•, ^F''.: , i'si:' z� : - ��'' ".E:. :. , '.�,. � .. :::r."
,N'r:
:
r
?r f
@ CCi'
.Y:;
r.:.:., it �'
i' 'At3i" a�� °_:
T�
r.:.r s
KIEQ�E (P�'NE
�Ft Ql�. N T' :.
:
aii:..
y �;. • O,'ERf!' t� i�� �k 5 � ;1 ' � t�t�
,b•
. r
1 • 02!18/2008 12:00 PM 02/18!2008 02:00 PM 93 N FACILITY SHUT IN SAFETY
DESC OF EVENT
POWER
OTHER: SEE - ,,...,, UNABLE
TO SHUT IN O FACILITY RCP -WAC
•
DUE TO POWER PREVENT NECESSARY FOR
OUTAGE RESULTING FACILITY OPERATIONS.
IN EXCESS FLARING.' OUTAGES.' POWER OUTAGE
CAUSED ALL
EQUIPMENT TO GO
DOWN.
EQUIPMENT TO NORMAL
RETURNED ALL
EQU
OPERATIONS AS SOON
AS POSSIBLE.'
, ..Q4J , ..4 0- 7<--'
--- + 92-4j9 -- i - viT
*The Begin Date o End Date for this Flare is outside of the report month. The Flare amount shown is for this month only.
Page 21 of 21
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000002 Swanson River Swanson River Unit Unocal Alaska Resources 3/1/2008 REVISED
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 0
Pool Name Pool Code Percent
7. Reinjected 239,190 SWANSON RIVER, HEMLOCK 772100 13.53%
SWANSON RIVER, TYONEK UNDEFINED 772500 0.0010
6. Flared or vented 1 hour or less 64 SWANSON RIVER, BELUGA UNDEFINED 772520 24.76%
SWANSON RIVER. STERLING UNDEFINED 772550 18.32%
9. Flared or vented more than 1 hour (see lnstr.) 0 SWANSON RIVER, GAS STORAGE 772803 43.40%
10. Pilot and Purge 1.
11. Used for lease operations (specify in Remarks) 80,096
12. Other (see instructions) ‘'‘ D 2,145 Y � ::: a " j, ' ° ta.0 ititttl ft194 M ; .. ". . "
Authorization >1 hr: Safety MCF
13. TOTAL VOLUME (ITEMS 6 -12) 322,580 MCF
Lease Use
14. NGL Gas Equivalent MAY •. 5 2008 MCF
Conservation
15. Purchased gas - Rental Return Gas 31,770 Waste: MCF
16. Transferred from: (Off -lease Gas) AffiChOrage 271,108
17. Transferred to: Commissioner Date
18. Remarks: Rental Return Gas: Hemlock Production Sold 0
Gas Storage Sold 31,770
Reinjected: Gas Storage Produced and Reinjected 4,353
Other: Gas Produced and through processing
converted to NGLs and Propane 2,145
I hereby certify that the foregoing is true and correct tot a best of my knowledge.
t % �} i Note: All volumes must be corrected to
Signature at' `Y''t Title Production Accountant pressure of 14.65 psis and to a
( J temperature of 60o F. Authority 20
Printed Name Mary Indihar Phone 713 432 -6238 Date 5/5/2008 AA C25.235.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000002 Swanson River Swanson River Unit Unocal Alaska Resources April 2008
Diseosition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
0 Total Volume.
6. Sold Pool Name Pool Code Percent
7. Reinjected 281 471 SWANSON RIVER, HEMLOCK 772100 22.50%
SWANSON RIVER, TYONEK UNDEFINED 772500 0.00%
8. Flared or vented 1 hour or less 1,429 SWANSON RIVER, BELUGA UNDEFINED 772520 27.20%
SWANSON RIVER, STERLING UNDEFINED 772550 15.48%
9. Flared or vented more than 1 hour (see instr.) 3,571 SWANSON RIVER, GAS STORAGE 772803 34.82%
10. Pilot and Purge 1,050
11. Used for lease operations (specify in Remarks) l 1 `f� 78,122
�
12. Other (see instructions) 1,557
Authorization >1 hr: Safety MCF
13. TOTAL VOLUME (ITEMS 6 -12) 367,200 L e ase Use j c . - f MCF
14. NGL Gas Equivalent MAY 2 3 2008 ' r
Conservation MCF
15. Purchased gas - Rental Return Gas Al on 8, c ons Commission 18,912
Waste: MCF
16. Transferred from: (Off -lease Gas) 326,423 / t - / _&8
_ %7 L , "_.,.. , ...f. K rP
17. Transferred to: Commissioner Date
18. Remarks: Rental Return Gas: Hemlock Production Sold 0
Gas Storage Sold 18,912
Reinjected: Gas Storage Produced and Reinjected 1,871
Other: Gas Produced and through processing
converted to NGLs and Propane 1,557
I hereby certify that the foregoing is true and correct to the best of my knowledge.
(� Note: All volumes must be corrected to
Signature • 1.Y 4 -+2__ Title Production Accountant pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Mary Indihar Phone 713 432 -6238 Date 5/13/2008 AAC25.235.
Chevron Excess Flare Report
Month: April Year: 2008
SWANSON RIVER UNIT
Steps Taken to
Date & Time Event Gas Minimize Dow M e .
MCF Reoccurrence Dow MP- .
Begin End Planned Description of Incident Category Reason Actions Taken
..,u' � . ..d.._ ..., � �,.. .� w , r a t- w a .�, t r ,--m*. ,.m as , -
04 O DUE
/ 008 r8:34 PM• r4 or i i r ;... - "1 I ; A � y(, , l wi: H ; , h ,, .,.., n ., RING RC
TOATI s S
PLAN - . MA�Is'rEflANpE Q 7HE Y•FOR
NECESSAR
UN ;:: .. . -• , . . . . ;
:. ; ,; . .,; :PIS 3 IN THE ,
PACtLITY
O S SA D
HE TY AN
SHUT -p0m4; - TyE.,, ' :' - _'K-S ENGINE.I: OPERATIONS UNTIL THE
K- ENGINE CAUSED ' . _'r FACILITY WAS ABLE TO
BY.T HE.FAILU ECSE.A OBTAIN. THE
COUPLE '00 PISTONS. REPLACEMENT PISTONS
THAT REQUIRED :' AND REPAIR THE
REPLACEM ENGINE.I
04/03/2008 12:00 AM 04/03/2008 11:59 PM 186 N EXCESS FLARING SAFETY UNSCHEDULED REPLACEMENT EXCESS FLARING -RCP -WA(
DUE TO AN MAINTENANCE OF THE NECESSARY FOR
UNPLANNED PISTONS IN THE SAFETY AND FACILITY
SHUT -DOWN OF THE K-8 ENGINE.' OPERATIONS UNTIL THE
K -8 ENGINE CAUSED FACILITY WAS ABLE TO
BY THE FAILURE OF A OBTAIN THE
COUPLE OF PISTONS REPLACEMENT PISTONS
THAT REQUIRED AND REPAIR THE
REPLACEMENT.' ENGINE.I
04/04/2008 12:00 AM 04/04/2008 11:59 PM 316 N EXCESS FLARING SAFETY UNSCHEDULED REPLACEMENT EXCESS FLARING •RCP -WA(
DUE TO AN MAINTENANCE, OF THE NECESSARY FOR
UNPLANNED PI IN THE SAFETY AND FACILITY
SHUT -QQWN OF THE
0 ENGINE.;I OPERATIONS UNTIL THE
K - 8 ° GINS OAU$EO FAOIUTY WAS ABLE TO
i r
sz
Q Ft1 =P •
' € T T
C ' EN P IS O
t:.
M S
T a �ZE W f'
fi.
I.
ANDREPAIR THE
REPL.ACEMENit: °` ,'.'' -,. , ENGINE.I
�f7 t lrtr>M" // I/�
Page 16 of 18
Chevron Excess Flare Report
Month: April Year: 2008
SWANSON RIVER UNIT Continued
Steps Taken to
Date & Time Event Gas Minimize
Down Men
MCF Reoccurrence Down MP -•
Begin End Planned Description of Incident Category Reason Actions Taken
04/05/2008 12:00 AM 04/05/2008 11:59 PM 596 N EXCESS FLARING SAFETY UNSCHEDULED REPLACEMENT EXCESS FLARING .RCP-WAC
DUE TO AN MAINTENANCE OF THE NECESSARY FOR
UNPLANNED PISTONS IN THE SAFETY AND FACILITY
SHUT -DOWN OF THE K -8 ENGINE.I OPERATIONS UNTIL THE
K-8 ENGINE CAUSED FACILITY WAS ABLE TO
BY THE FAILURE OF A OBTAIN THE
COUPLE OF PISTONS REPLACEMENT PISTONS
THAT REQUIRED AND REPAIR THE
REPLACEMENT. ENGINE.I
:.;, . ;,;. .. ..L:,.,a- at:..•;,;..:. REPLACEMENT EXCESS FLARING .RCP-WAC
•SAFETY'. .
04/06/2008 12:00 AM 04/06/2008 19:59 PM 559 N . DUB Tt7f � L�ARING ,. , , , , , ,
,.` " MAINTENANCE : OF THE- NNECESSAI Y,FOR
. U, P AlogR. _ =r - PISTONS 1411 SAFETYAND FACILITY
SH -D )WIV OF TH
K EP
�';` �. �• . _.. -B ENGINE I OPERATIONS UNTIL THE
•
J<-8 ; ;O gSEP . :' - , ' ' FACILITY WAS ABLE TO
BiTI EFAIL UREO A•. - OBTAIN THE
COUPLE,OFP ,O,
' ISTONS REPLACEMENT PISTONS
THAT REQUIRED _ :- AND REPAIR THE
REPLACEMEI!IT,I : _ _ . '? ENGINE.
04/07/2008 12:01 AM 04/07/2008 11:59 PM 652 N EXCESS FLARING SAFETY UNSCHEDULED REPLACEMENT EXCESS FLARING RCP-WA(
DUE TO AN MAINTENANCE OF THE NECESSARY FOR
UNPLANNED PISTONS IN THE SAFETY AND FACILITY
SHUT -DOWN OF THE K-8 ENGINE.I OPERATIONS UNTIL THE
K-8 ENGINE CAUSED FACILITY WAS ABLE TO
BY THE FAILURE OF A OBTAIN THE
COUPLE OF PISTONS REPLACEMENT PISTONS
THAT REQUIRED AND REPAIR THE
REPLACEMENT.' ENGINE.)
Page 17 of 18
II . -.."..
Oievron Excess Flare Report
640 Month: April Year: 2008
4 1 0
SWANSON RIVER UNIT Continued
Steps Taken to
Equipmen
Date & Time Event Gas Minimize
Down MP-.
Begin End MCF Planned Description of Incident Category Reason Reoccurrence Actions Taken
64/68/2608 12:teAM - '64168r108 41 ig9 Piv ' ' 65 N ' -• 'EkOW:#0.4ii: C --- AT,' •:. ' ' 145: ..- 14:01:.A4ovot•it , odto FLARING ROP-WAL
DUE *6 AN - '' ' '. ' ' .:: • ' MAINTENANCE ' . " OF THE NECESSARY FOR
UNPLA NNED ' • : : ' , . , , • ' PISTONS IN THE SAFETY AND FACILITY
SHUT POWN OF THE 1(-8 ENGINP.I OPERATIONS UNTIL THE
K-S ENGINE CAUSED FACILITY WAS ABLE TO
, •
BY,THEOAOMO:i* . - . ., ..: , ..
OBTAIN THE
COUPEOP:PfSIONS: .. •.}: - .. . _ -` .. . • ' . -- . REP PISTONS
.
.'-ft L ,,'. .:,,,:..- - .,:: ,. ' r . ' L , '■ :' ', . :. . , ' . ' ,,,i1i) REPAIR THE
. .
, .
REFLA(EIE :' ",' .:;'•2:: - - ."- : --, :'; :.", ' ' -'' ; -:-: ' - .:,.::: :.-. ' .,. - . ' ENGINE)
. . .
. .
04/09/2008 12:00 AM 04/09/2008 05:00 PM 596 N EXCESS FLARING SAFETY UNSCHEDULED REPLACEMENT EXCESS FLARING •RCP-WAL
DUE TO AN MAINTENANCE OF THE NECESSARY FOR
UNPLANNED PISTONS IN THE SAFETY AND FACILITY
SHUT-DOWN OF THE K-8 ENGINE.) OPERATIONS UNTIL THE
K-8 ENGINE CAUSED FACILITY WAS ABLE TO
BY THE FAILURE OF A OBTAIN THE
COUPLE OF PISTONS REPLACEMENT PISTONS
THAT REQUIRED AND REPAIR THE
REPLACEMENT.) ENGINE.)
04/17/2008 09:00 AM 04/17/2008 03:00 PM 6 T EXCESS ?AS FLARED'. SAFETY BLOW DOWN PLANNED EXCESS FLARING WAS S-SP-2-1
DUE TO THE 216. ' • WELL MAINTENANCE.) NECESSARY FOR
TANK. SETTING . SAFETY AND FACILITY
. . . :
HAVING SEEN 'TAKEN. - - . ' . ' ' - : - ', , , OPERATIONS WF,Ilt-E
. . . .. „, . , „ .. ...: _.
, • ' OS* fj.0R:': '-:- ' :-, - . .- -: ',-: - '• ' •' :• :: '' : -': ' - - -'-::::: • ' :: ' .Ti-iE”:215 TANK SETTING
. . $040:f0D. • r, • :' :' • ": ' 1 :' • ''-- r' - - ' ' ' :'''=`. :',' '- '' , ' -' ' - ' WA6 ' •
NtAINTeNAN'OLI ' . - .--‘ ' . '-:' , ... : -- - ' ,...,:' ... ' ::- . : . REOULAtt.'
. . . .
..
, , • - . ,
MAINTENANCE.)
Page 18 of 18
I
4
•
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000002 Swanson River Swanson River Unit Unocal Alaska Resources May 2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
6. Sold 0 Total Volume.
Pool Name Pool Code Percent
7. Reinjected 519,986 SWANSON RIVER, HEMLOCK 772100 16.16%
SWANSON RIVER, TYONEK UNDEFINED 772500 0.00%
8. Flared or vented 1 hour or less 28 SWANSON RIVER, BELUGA UNDEFINED 772520 18.98%
_ SWANSON RIVER, STERLING UNDEFINED 772550 8.19%
9. Flared or vented more than 1 hour (see Instr.) 436 SWANSON RIVER GAS STORAGE 772803 56.67%
10. Pilot and Purge 1,085
11. Used for lease operations (specify in Remarks) 80,169
12. Other (see instructions) 1,624 ,
Authorization >1 hr. Safety ''� 6.: MCF,,, L VI
13. TOTAL VOLUME (ITEMS 6 -12) 603,328 MCF
Lease Use
14. NGL Gas Equivalent
Conservation MCF
15. Purchased gas - Rental Return Gas ° 24,041 Waste: _ MCF
16. Transferred from: (Off -lease Gas) 583,010 / / -9
Lam.. L/� �. /i a.r
Commis loner Date
17. Transferred to:
18. Remarks: Rental Return Gas: Hemlock Production Sold 0
Gas Storage Sold 24,041
Reinjected: Gas Storage Produced and Reinjected 1,097
Other: Gas Produced and through processing
converted to NGLs and Propane 1,624
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected to
Signature_ . 111-1-4-- Title Production Accountant pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
Printed Name Mary Indihar Phone 713 432 -6238 Date 6/17/2008 AAC25.235.
Chevron Excess Flare Report
Month: May Year: 2008
SWANSON RIVER UNIT
Steps Taken to
Equipmen
Date & Time Event Gas Minimize
Down MP -.
Begin End MCF Planned Description of Incident Category Reason Reoccurrence Actions Taken
05/10/2008 01:30 PM 05/10/2008 05:30 PM 69 N FLARING EXCESS SAFETY UNSCHEDULED RESTART OF SHUT DOWN OF THE RCP -WA(
GAS DUE TO AN MAINTENANCE K-8 AND K -22 COMPRESSORS WAS
EMERGENCY WHEN AMBIENT NECESSARY UNTIL THE
SHUT -DOWN OF K-8 TEMPERATURE K -8 AND K -22
AND K -22 GAS S COOLED COMPRESSORS COULD
COMPRESSORS. K -8 DOVVN.I BE COOLED DOWN AND
AND K -22 BROUGHT BACK
COMPRESSORS ONLINE.
OVERHEATED WHILE
RECYCLING GAS TO
REMAIN
OPERATIONAL WHILE
THE LIQUID
EXTRACTION PLANT
WAS DOWN DUE TO
COLD FUEL
TEMPERATURES.'
05/21/2008 04:30 PM 05/21/2008 06:00 PM 45 N FLARING EXCESS SAFETY UNSCHEDULED RESTARTED EXCESS FLARING •RCP -WA(
GAS DUE TO THE MAINTENANCE THE K-8 WHEN NECESSARY UNTIL THE
EMERGENCY THE AMBIENT K-8 COMPRESSOR
SHUT -DOWN OF THE TEMPERATURE COULD BE COOLED
K -8 COMPRESSOR. COOLED DOWN AND BROUGHT
THE GAS STREAM DOWN. BACK ONLINE.'
INTO THE LEX PLANT
WAS LEAN CAUSING
THE K -B
COMPRESSOR TO
OVERHEAT.'
a\ d �3
moll() L9/12_ 0 ` 6 .
b� Page 10 of 11
Chevron Excess Flare Report
Month: May Year: 2008
1 00
SWANSON RIVER UNIT Continued
Steps Taken to
Equipment
Date & Time Event Gas Minimize
Down MP -.
Begin End MCF Planned Description of Incident Category Reason Reoccurrence Actions Taken
05/22/2008 07:45 AM 05/22/2008 03:45 PM 112 Y FLARING EXCESS SAFETY SCHEDULED SCHEDULED EXCESS FLARING •R -WA(
GAS DUE TO MAINTENANCE MAINTENANCE. NECESSARY DURING
SCHEDULED NO CERTIFIED PREVENTATIVE
PREVENTATIVE METHOD 9 MAINTENANCE ON THE
MAINTENANCE ON READER WAS K-8 COMPRESSOR.'
THE K -8 AVAILABLE TO
COMPRESSOR.) OBSERVE THE
FLARE EVENT.
05/27/2008 08:45 AM 05/27/2008 07:15 PM 210 Y FLARING EXCESS SAFETY SCHEDULED SCHEDULED EXCESS FLARING .RCP-WAC
GAS DUE TO A MAINTENANCE MAINTENANCE. NECESSARY TO
SCHEDULED NO CERTIFIED PERFORM
SHUTDOWN AND METHOD 9 MAINTENANCE ON THE
DEPRESSURIZATION READER WAS K-8 COMPRESSOR.
OF THE K-8 AVAILABLE TO
COMPRESSOR TO OBSERVE THE
REPAIR THE VALVES FLARE EVENT.
IN METER 113.1
Page 11 of 11
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000002 Swans River Swanson River Unit Unocal Alaska Resources June 2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
0 Total Volume.
6. Sold Pool Name Pool Code Percent
7. Reinjected 170,323 SWANSON RIVER, HEMLOCK 772100 13.42%
SWANSON RIVER, TYONEK UNDEFINED 772500 32.84%
SWANSON RIVER, BELUGA UNDEFINED 772520 16.58%
8. Flared or vented 1 hour or less 403 SWANSON RIVER, STERLING UNDEFINED 772550 31.83%
SWANSON RIVER, GAS STORAGE 772803 5.33%
9. Flared or vented more than 1 hour (see Instr.) 1 0 -
1
10. Pilot and Purge 1,050
11. Used for lease operations (specify in Remarks) 69,242
12. Other (see instructions) 4,000
Authorization >1 hr: Safety MCF
• 13. TOTAL VOLUME (ITEMS 6 -12) 245,018 MCF
Lease Use
14. NGL Gas Equivalent .
Conservation MCF
15. Purchased gas - Rental Return Gas 7,802 Waste: MCF
16. Transferred from: (Off -lease Gas) 172,024
17. Transferred to: Commissioner Date
i
18. Remarks: Rental Return Gas: Hemlock Production S Id 3,493
1 Gas Storage Sold 4,309
Reinjected: Gas Storage Producediand Reinjected 0
Other: Gas Produced and thr ugh processing
converted to NGLs an Propane 4,000
I hereby certify that the foregoing is true and correct to the best of y knowledge.
Note: Al! volumes must be corrected to
Signature t Title Production Accountant pressure of 14.65 Asia and to a
temperature of 60o F. Authority 20
Printed Name Mary Indihar I Phone 713 432 -6238 Date 7/14/2008 AAC25.235.
t
•
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000002 Swanson River Swanson River Unit Unocal Alaska Resources July 2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
6. Sold 1,213 Total Volume.
Pool Name Pool Code Percent
7. Reinjected 85,661 SWANSON RIVER, HEMLOCK 772100 11.88%
SWANSON RIVER, TYONEK UNDEFINED 772500 52.52%
8. Flared or vented 1 hour or less 8 SWANSON RIVER, BELUGA UNDEFINED 772520 10.77%
SWANSON RIVER, STERLING UNDEFINED 772550 24.83%
9. Flared or vented more than 1 hour (see instr.) 0 SWANSON RIVER, GAS STORAGE 772803 0.00%
10. Pilot and Purge 1,085
11. Used for lease operations (specify in Remarks) 83,099
12. Other (see instructions) 4,253 Authorization >1 hr: Safety MCF
13. TOTAL VOLUME (ITEMS 6 -12) 175,319
Lease Use MCF
14. NGL Gas Equivalent
Conservation MCF
15. Purchased gas - Rental Return Gas 0 Waste: MCF
16. Transferred from: (Off -lease Gas) 52,741
17. Transferred to:
Commissioner Date
18. Remarks: Rental Return Gas: Hemlock Production Sold 0
Gas Storage Sold 0
Reinjected: Gas Storage Produced and Reinjected 0
Other: Gas Produced and through processing
converted to NGLs and Propane 4,253
I hereby certify that the foregoing is true and correct to the best of my knowledge.
(� _ Note: All volumes must be corrected to
Signature n �.X�Y�G Title Production Accountant pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Mary Indihar Phone 713 432 -6238 Date 8/14/2008 AAC25.235.
. ir..
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000002 Swanson River Swanson River Unit Unocal Alaska Resources August 2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
0 Total Volume.
6. Sold Pool Name Pool Code Percent
7. Reinjected 64 170 SWANSON RIVER, HEMLOCK 772100 20.09%
SWANSON RIVER, TYONEK UNDEFINED 772500 36.53%
8. Flared or vented 1 hour or less 35 SWANSON RIVER, BELUGA UNDEFINED 772520 9.80%
SWANSON RIVER, STERLING UNDEFINED 772550 33.03%
9. Flared or vented more than 1 hour (see instr.) 558 SWANSON RIVER, GAS STORAGE 772803 0.55%
10. Pilot and Purge 1,085
11. Used for lease operations (specify in Remarks) 83,181
12. Other (see instructions) 4,581 - i Safety
Authorization >1 hr: � MCF
13. TOTAL VOLUME (ITEMS 6 -12) 153,610
Lease Use MCF
14. NGL Gas Equivalent MCF
Conservation
15. Purchased gas - Rental Return Gas 0 Waste: MCF
16. Transferred from: (Off -lease Gas) 65,787 P ' 7"'. 10 -2-8 - 8
17. Transferred to: Commissioner Date
18. Remarks: Rental Return Gas: Hemlock Production Sold 0
Gas Storage Sold 0
Reinjected: Gas Storage Produced and Reinjected 484
Other: Gas Produced and through processing
converted to NGLs and Propane 4,581
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�
n Note: All volumes must be corrected to
Signature / 2 _ Title Production Accountant pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
Printed Name Mary Indihar Phone 713 432 -6238 Date 9/11/2008 AA C25.235.
Chevron Excess Flare Report
Month: August Year: 2008
SWANSON RIVER UNIT
Steps Taken to
Equipmen
Date & Time Event Gas
Minimize
Down MP-.
Begin End MCF Planned Description of Incident Category Reason Reoccurrence Actions Taken
08/04/2008 09:30 PM 08/04/2008 11:00 PM 558 N FLARING EXCESS SAFETY OTHER: SEE THE EXCESS FLARING S - SP - 15C
GAS DUE TO A HIGH DESC OF EVENT COMPRESSORS NECESSARY FOR
TUBEWALL AT THE SAFETY WHILE THE LEX
TEMPERATURE IN PRESSURE PLANT AND PRESSURE
THE THERMINOL MAINTENANCE MAINTENANCE PLANT
HEATER WHICH PLANT WERE COMPRESSORS WERE
INTERRUPTED THE RESTARTED RESTARTED AFTER AN
TEMPERATURE AND THE LEX UNPLANNED
CONTROL TO THE PLANT WAS SHUTDOWN. 1
LEX PLANT CAUSING BROUGHT BAK
IT TO SHUT DOWN UP AS QUICKLY
AND IN TURN AS POSSIBLE.1
CAUSED 2 LARGE
COMPRESSORS AT
THE PRESSURE
MAINTENANCE PLANT
TO SHUT DOWN.
9 /igk
Page 7 of 7
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000002 Swanson River Swanson River Unit Unocal Alaska Resources September 2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
6. Sold 2,198
Total Volume.
Pool Name Pool Code Percent
7. Reinjected 29 457 SWANSON RIVER, HEMLOCK 772100 39.72%
SWANSON RIVER, TYONEK UNDEFINED 772500 7.57%
8. Flared or vented 1 hour or less 0 SWANSON RIVER, BELUGA UNDEFINED 772520 0.00%
SWANSON RIVER, STERLING UNDEFINED 772550 47.77%
9. Flared or vented more than 1 hour (see instr.) 0 SWANSON RIVER, GAS STORAGE 772803 4.94% '
10. Pilot and Purge 1,050
11. Used for lease operations (specify in Remarks) 74,061
12. Other (see instructions) 4,646
Authorization >1 hr: Safety MCF
13. TOTAL VOLUME (ITEMS 6 -12) 111,412 MCF
Lease Use
14. NGL Gas Equivalent
Conservation MCF
15. Purchased gas - Rental Return Gas 0 Waste: MCF
16. Transferred from: (Off -lease Gas) 54,786
17. Transferred to: Commissioner Date
18. Remarks: Rental Return Gas: Hemlock Production Sold 0
Gas Storage Sold 0
Reinjected: Gas Storage Produced and Reinjected 600
Other: Gas Produced and through processing
converted to NGLs and Propane 4,646
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Ili �� Title Production Accountant Note: Al! volumes must be corrected to
Signature f V I pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Mary Indihar Phone 713 432 -6238 Date 10/14/2008 AAC25.235.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year'of Disposition
1330000002 Swanson River Swanson River Unit Unocal Alaska Resources October 2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 18,052 Pool Name • Pool Code _ Percent
7. Reinjected 27 725 SWANSON RIVER, HEMLOCK 772100 10.40%
SWANSON RIVER, TYONEK UNDEFINED 772500 0.01%
8. Flared or vented 1 hour or less 152 SWANSON RIVER, BELUGA UNDEFINED _ 772520 4.71%
SWANSON RIVER, STERLING UNDEFINED 772550 7.49%
9. Flared or vented more than 1 hour (see instr.) 0 SWANSON RIVER, GAS STORAGE 772803 77.39%
10. Pilot and Purge 1,085
•
11. Used for lease operations (specify in Remarks) 80,185 -
12. Other (see instructions) 4,331
Authorization >1 hr: Safety MCF
:13. TOTAL VOLUME (ITEMS 6 -12) 131,530 MCF
Lease Use
14. NGL Gas Equivalent
Conservation MCF
!15. Purchased gas - Rental Return Gas 138,646 Waste: MCF
16. Transferred from: (Off -lease Gas) 38,267
17. Transferred to:
Commissioner Date
18. Remarks: Rental Return Gas: Hemlock Production Sold 0
Gas Storage Sold 138,646
Reinjected: Gas Storage Produced and Reinjected 22,785
Other: Gas Produced and through processing
converted to NGLs and Propane 4,331
I hereby certify that the foregoing is true and correct to the best of my knowledge.
.� Note: All volumes must be corrected to
Signature /'1 , Title Production Accountant pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Mary indihar Phone 713 432 -6238 Date 11/17/2008 AAC25.235.
VIII
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000002 Swanson River Swanson River Unit Unocal Alaska Resources November 2008
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
6. Sold 0 Total Volume.
Pool Name — Pool Code Percent
7. Reinjected 4 628 SWANSON RIVER, HEMLOCK 772100 4.64%
_ SWANSON RIVER, TYONEK UNDEFINED 772500 0.49%
8. Flared or vented 1 hour or less 17 SWANSON RIVER, BELUGA UNDEFINED 772520 1.62%
SWANSON RIVER, STERLING UNDEFINED 772550 2.71%
9. Flared or vented more than 1 hour (see instr.) 0 SWANSON RIVER, GAS STORAGE 772803 90.54%
10. Pilot and Purge 1,050 - --I
11. Used for lease operations (specify in Remarks) 80,965
12. Other (see instructions) 4,057
Authorization >1 hr: Safety MCF
13. TOTAL VOLUME (ITEMS 6 -12) 90,717 --
Lease Use MCF •
14. NGL Gas Equivalent
Conservation MCF
15. Purchased gas - Rental Return Gas 462,741 Waste: MCF
16. Transferred from: (Off-lease Gas) 7,213
17. Transferred to: Commissioner Date
18. Remarks: Rental Return Gas: Hemlock Production Sold 0
Gas Storage Sold 462,741
Reinjected: Gas Storage Produced and Reinjected 31,812
Other: Gas Produced and through processing
converted to NGLs and Propane 4,057
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected to
Signature / ? . �J�d Title Production Accountant pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Mary Indihar Phone 713 432 -6238 Date 12/11/2008 AAC25.235.
o i
1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000002 Swanson River Swanson River Unit Unocal Alaska Resources December 2008 .
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
6. Sold 0 Total Volume.
Pool Name Pool Code Percent
7. Reinjected 18,857 SWANSON RIVER, HEMLOCK 772100 1.51%
SWANSON RIVER, TYONEK UNDEFINED 772500 3.23%
6. Flared or vented 1 hour Or less 68 SWANSON RIVER, BELUGA UNDEFINED 772520 1.54%
SWANSON RIVER, STERLING UNDEFINED 772550 2.73%
9. Flared or vented more than 1 hour (see instr.) 24 SWANSON RIVER, GAS STORAGE 772803 91.00%
i
10. Pilot and Purge 1,085
11. Used for lease operations (specify in Remarks) 88,967
12. Other (see instructions) 4,354 '1
1 itf3'il
Authorization >1 hr: Safety ti a, zi MCF 7
13. TOTAL VOLUME (ITEMS 6-12) 113,355 MCF
Lease Use
14. NGL Gas Equivalent MCF
Conservation
15. Purchased gas - Rental Return Gas 773,425 Waste: _ MCF
,_2..e,44
16. Transferred from: (Off -lease Gas) 18,130
a.V----67P 17. Transferred to:
Commissioner Date
18. Remarks: Rental Return Gas: Hemlock Production Sold 0
Gas Storage Sold 773,425
Reinjected: Gas Storage Produced and Reinjected 17,042
Other: Gas Produced and through processing
converted to NGLs and Propane 4,354
I hereby certify that-the foregoing is true and correct to the best of my knowledge. 1
C. f)4 4417 0 A Note: All volumes must be corrected to
Signature / �' 1t / n ti-- Title Production Accountant pressure of 14.65 psia and to a I ;
temperature of 60o F. Authority 20
Printed Name Mary lndihar Phone 713 432 -6238 Date 1/12/2009 AAC25.235
Chevron Excess Flare Report
Month: December Year: 2008
SWANSON RIVER UNIT
Steps Taken to
Date ,S Time Lye in Gas Minimize Equipmem
Begin End MCF Reoccurrence Down MP-
J Planned Descnp inn ut Incident Category Redson Actions Taken
12/27/2008 05:40 PM 12/27/2008 06:50 PM 24 N EXCESS FLARING SAFETY OTHER: SEE . UNSCHEDULED • EXCESS FLARING .RCP
DUE TO A BAD GAS DESC OF EVENT MAINTENANCE.1 NECESSARY WHILE
HEAD AT COMPRESSOR PLANT 10
COMPRESSOR PLANT
•
GAS HEAD COULD BE
10 CAUSING AN REPAIRED. 1
EMERGENCY
SHUTDOWN. 1
•
•
iu i I 1 4
Page 6 of 6
•