Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutTB Onshore MRF / Unocal STATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2002 FACILITY: TB Onshore Facility MRF OPERATOR: UNION OIL CO OF CALIFORNIA ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION , , Facility Operator Unocal Field(s) Trading Bay UnitlField MonthlY ear of Disposition January 2002 Trading Bay Production Facility Disposition Total Volumes MCF 1. Sold 2,988 2. Reinjected 0 3. Flared or vented less than I hour 0 . "-', , '¿ 4. Flared or vented greater than I hour ~15,881 (Supplemental report required-See 20 AAC 25.235) ,-"i' 5. Pilot and Purge 775 6. Used for lease operations 72,216 7. *Other (Shrinkage) 19,383 TOTAL items 1-7 102,243 8. NGL gas equivalent produced 0 9. Purchased gas From Steelhead & Grayling GGS 2,988 to treat Monopod Oil 10. Transferred from: Monopod, Grayling, King 215,661 Salmon, Steelhead, Dolly Varden II. Transferred to: Dolly Varden 113,418 King Salmon Remarks: 1 hereby certJ.ßt the torej~ng IS true and correct to the best ot my knowledge. Signature: ~ h aé'µ~ Title: Acct. Super. Date: 12-Feb-02 / (/ Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent Monopod 0.60% Dolly Varden 2.23% Grayling 9.34% King Salmon 2.67% Steel head 85.16% Qfficial Use Only - Flaring Authorization> 1 hr. 1. Safety MCF 2. Lease Use MCF 0ffl 3. Conserv. Purposes MCF r_ ¥ ll~ ~U· commissiobr , '1çfo:r Date ,..~ \ALbrT ZJL~''\) L Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 de&1"ees F. Report due by the 20th of the month followmg the month of disposition. Authority 20 AAC 25.235. Excess Flare Log Report Facility Name: TRADING BAY PRODUCTION FACILlT MonthlY ear: January 2002 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 1111020:00 113110224:00 6881 Planned COV's Flared for January Report Date: 2/12/02 Page: 1 of 2 ? ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Unocal Field(s) Trading Bay UnitlField MonthlY ear of Disposition February 2002 Trading Bay Production Facility Disposition Total Volumes MCF 1. Sold 3,588 2. Reinjected 0 3. Flared or vented less than I hour 0 4. Flared or vented greater than I hour 8,762 ,¡ (Supplemental report required-See 20 AAC 25.235) 5. Pilot and Purge 700 6. Used for lease operations , 82,039 7. *Other (Shrinkage) (1,514) " TOTAL items 1-7 93,575 ./ 8. NGL gas equivalent produced 0 9. Purchased gas From Steelhead & GrayIíng GGS 3,588 to treat Monopod Oil 10. Transferred from: Monopod, GrayIíng, King 199,799 Salmon, Steelhead, Dolly Varden 11. Transferred to: Dolly Varden 106,224 King Salmon Remarks: 1 hereby certzat the tor~omg IS ~e and correct to the best 01 my knowledge. Signature: 2(f!Æ,t () (J (fulL Title: Acct. Super. Date: 13-Mar-02 (j (/ Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent Monopod 0.56% Dolly Varden 2.31 % Grayling 9.54% King Salmon 2.58% Steelhead 85.01% Official Use Only - Flaring Authorization> 1 hr. 1. Safety MCF 2. Lease Use f7&1- MCF 3. Conserv. Purposes MCF v~u~.; 1Ç};r/..~ Date lJG1\- 3/2.2.10· Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ~> Excess Flare Log Report Facility Name: TRADING BAY PRODUCTION FACILlT MonthlY ear: Date & Time Event Gas Steps Taken to Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence 2111020:00 2128102 24:00 8762 Planned COV's Flared for February 2002 " " Report Date: 3/12/02 Page: 1 of 4 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Unocal Field(s) Trading Bay UnitlField MonthlY ear of Disposition March 2002 Trading Bay Production Facility Disposition Total Volumes MCF 1. Sold 4,219 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 7,294 ~ (Supplemental report required-See 20 AAC 25.235) 5. Pilot and Purge 775 . 6. Used for lease operations 97,433 " 7. *Other (Shrinkage) (5,777) TOTAL items 1-7 , 103,944 / 8. NGL gas equivalent produced 0 9. Purchased gas From Steelhead & Grayling GGS 4,219 to treat Monopod Oil 10. Transferred from: Monopod, Grayling, King 225,355 Salmon, Steelhead, Dolly Varden 11. Transferred to: Dolly Varden 121,411 King Salmon Remarks: 1 hereby certny tl1at the toregomg IS true ana correct to the best 01 my knowledge. Signature: l1é~ð C¡. \rl{Æ;, .' Title: Acct. Super. Date: 10-Apr-02 Fonn 10-422 Rev, 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent Monopod 0.56% Dolly Varden 2.31% Grayling 10.64% King Salmon '. 2.33% Steelhead 84.15% Official Use Only - Flaring Authorization> 1 hr. 1. Safety MCF 2. Lease Use 7ZQtl MCF 3. Conserv. Purposes MCF C L~ Ûl.4l' ~ 4(~/~r Commissic&r Date ¡dGfr Note: All volumes must be corrected to pressure of 14.65 psi a and to a~~tí<.ìBA F. Report due by the 20t~YœWhe month of disposition. ..' Authority 20 AAC 25.235. AlaskaOiI & Gas Coni. Commissioo Anchorage Excess Flare Log Report Facility Name: TRADING BAY PRODUCTION FACILlT MonthlY ear: Date & Time Event Gas Steps Taken to Begin End , MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence 3111020:00 313110224:00 7294 Planned COV's Flared for March 2002 .. Report Date: 4/8/02 Page: 1 of 4 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Unocal Field(s) Trading Bay UnitlField MonthlYear of Disposition April 2002 Trading Bay Production Facility Disposition Total Volumes MCF 1. Sold 6,567 2. Reinjected 0 3. Flared or vented less than 1 hour 0 /' 4. Flared or vented greater than 1 hour 11,315 (Supplemental report required-See 20 AAC 25,235) 5. Pilot and Purge 750 ./ 6. Used for lease operations 84,360 ,/ 7. *Other (Shrinkage) (4,036) TOTAL items 1-7 98,956 ./" 8. NGL gas equivalent produced 0 9. Purchased gas From Steelhead & Grayling GGS 6,567 to treat Monopod Oil 10. Transferred from: Monopod, Grayling, King 187,918 Salmon, Steelhead, Dolly Varden 11. Transferred to: Dolly Varden 88,962 King Salmon Remarks: 1 nereoy certIty that the toregomg IS true and correct to the best ot my knowledge. Signature: /l.d'1ð. Q, J'k¿tI-v Title: Acct. Super. Date: 13-May-02 { q Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent Monopod - TBF 0.95% Dolly Varden 2.72% Grayling 10.12% King Salmon 1.81 % Steelhead 84.01% Monopod - TBU 0.38% Official Use Only - Flaring Authorization> 1 hr. 1. Safety 1(,3(6 MCF ~ 2. Lease Use MCF 3. Conserv. Purposes MCF ~;'" ~,..::i Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 MC 25.235. Excess Flare Log Report Facility Name: TRADING BAY PRODUCTION FACILlT MonthlY ear: Date & Time Event Gas Steps Taken to Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence 4111020:00 4130102 24:00 8128 Planned COY's Flared for April 2002 OPERATIONAL Work on upgrading Lex Heater, Maintenance. tube bundle replacement. Water quality in battery bank 2 drops, forcing the reinstallation of existing tube bundle and postponement of Lex Heater upgrade, Construction upgrade delayed for one or two months, 418102 8:00 418102 23:59 127 Y Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance, tube bundle replacement. Water quality in battery bank 2 drops. forcing the reinstallation of existing I' tube bundle and postponement of Lex Heater upgrade, Construction upgrade delayed for one or two months, 419102 0:00 419102 23:59 163 Y Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance, tube bundle replacement. Water quality in battery bank 2 drops, forcing the reinstallation of existing tube bundle and postponement of Lex Heater upgrade. Construction 1..+ upgrade delayed for one or two months, .- .... ., '':; 41101020:00 4110102 23:59 231 Y Lex heater shut in for maintenance OPERATIONAL UNSCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance 1<;;0. tube bundle replacement. Water quality in battery bank 2 drops, .. forcing the reinstallation of existing f tube bundle and postponement of I~' Lex Heater upgrade. Construction upgrade delayed for one or two months, 41111020:00 4111/02 23:59 339 Y Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance tube bundle replacement. Water quality in battery bank 2 drops, forcing the reinstallation of existing tube bundle and postponement of . Lex Heater upgrade. Construction , " upgrade delayed for one or two months, Report Date: 5/15/02 Page: 1 of 6 Excess Flare Log Report 41121020:00 411210223:59 541 Y Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance tube bundle replacement. Water quality in battery bank 2 drops. forcing the reinstallation of existing tube bundle and postponement of ,.. Lex Heater upgrade, Construction upgrade delayed for one or two months. 4113102 0:00 4113102 23:59 541 Y Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance tube bundle replacement. Water quality in battery bank 2 drops, forcing the reinstallation of existing tube bundle and postponement of Lex Heater upgrade, Construction upgrade delayed for one or two months, ..t 41141020:00 4114102 23:59 418 Y Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance tube bundle replacement. Water e- quality in battery bank 2 drops, V forcing the reinstallation of existing ";. tube bundle and postponement of Lex Heater upgrade. Construction "'i upgrade delayed for one or two I~ months, 41151020:00 411510223:59 399 Y Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance tube bundle replacement. Water quality in battery bank 2 drops, forcing the reinstallation of existing tube bundle and postponement of Lex Heater upgrade, Construction upgrade delayed for one or two months 4116102 0:00 411610223:59 348 N Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance tube bundle replacement. Water quality in battery bank 2 drops, forcing the reinstallation of existing tube bundle and postponement of Lex Heater upgrade. Construction upgrade delayed for one or two months, .t; Report Date: 5/15/02 Page: 2 of 6 Excess Flare Log Report t ~ 41171020:00 4116102 8:00 80 Y Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance tube bundle replacement. Water G quality in battery bank 2 drops, ~~ forcing the reinstallation of existing I" tube bundle and postponement of Lex Heater upgrade. Construction ''ù upgrade delayed for one or two ~ months. Report Date: 5/15/02 Page: 30f6 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Unocal Field(s) Trading Bay UnitlField MonthlYear of Disposition May 2002 Trading Bay Production Facility Disposition Total Volumes MCF 1. Sold 6,882 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hòur 9,359 /' (Supplemental report required-See 20 AAC 25.235) 5. Pilot and Purge 775 6. Used for lease operations 84,010 7. *Other (Shrinkage) (3,854) TOTAL items 1-7 97,172 8. NGL gas equivalent produced 0 9. Purchased gas From Steelhead & Grayling GGS 6,882 to treat Monopod Oil 10. Transferred from: Monopod, Grayling, King 189,658 Salmon, Steelhead, Dolly Varden . 11. Transferred to: Dolly Varden 92,486 King Salmon Remarks: 1l1ereby certl/j~\the t~:1:.r:Jg 1~ tru~ and correct to the best otmy knowledge. Signature: Jt:e..h, '. . ¡l/<-Æ"/ Title: Acct. Super. Date: II-Jun-02 I II Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent Monopod - TBF 1.17% Dolly Varden 3.27% Grayling 11.41 % King. Salmon 2.50% Steelhead 81.29% Monopod - TBU 0.36% Official Use Only - Flaring Authorization> 1 hr. 1. Safety q35'1 MCF 2. Lease Use MCF 3. Conserv. Purposes MCF ~~ ~ I, /6 ~ Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 MC 75.235. Excess Flare Log Report Facility Name: TRADING BAY PRODUCTION FACILIT MonthlY ear: Date & Time Event Gas Steps Taken to Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence 5/11020:00 5/3110224:00 8609 Planned COV's Flared for May 2002 OPERATIONAL Lex heater shut in so that factory Maintenance. required maintenance could be completed. 5129/02 0:00 5129/02 23:59 250 Y Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS Lex heater shut in so that factory Maintenance. to Insulation failure. required maintenance could be completed. r r 5130102 0:00 5/30102 23:59 250 N Lex heater shut In for maintenance do OPERATIONAL NORMAL OPERATIONS Lex heater shut in so that factory Maintenance. to insulation failure. required maintenance could be completed. 5/311020:00 5/3110223:59 250 N Lex heater shut In for maintenance do OPERATIONAL NORMAL OPERATIONS Lex heater shut in so that factory Maintenance. to Insulation failure. required maintenance could be completed. Report Datè: 6/11/02 Page: 1 of 6 ·.... ALASKA OIL AND GAS CONSERV A TION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Unocal Field(s) Trading Bay UnitlField MonthNear of Disposition June 2002 Trading Bay Production Facility Disposition Total Volumes MCF 1. Sold 5,528 2. Reinjected 0 . 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 27,477 ./ (Supplemental report required-See 20 AAC 25.235) 5. Pilot and Purge 750 6. Used for lease operations 68,964 7. *Other (Shrinkage) (4,575) TOTAL items 1-7 98,144 8. NGL gas equivalent produced 0 9. Purchased gas From Steelhead & Grayling GGS 5,528 to treat Monopod Oil . 10. Transferred from: Monopod, Grayling, King 202,595 Salmon, Steelhead, Dolly Varden 11. Transferred to: Dolly Varden 104,451 King Salmon. Remarks: 1 hereby ce~~at the to~gomg IS true ana correct to the pest of my imowledge. Signature: :ïLéh 11 1(71)L~ Title: Acct. Super. Date: I1-Jul-02 tf (j Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent Monopod - TBF 1.02% Dolly Varden 3.24% Grayling 10.63% King Salmon 2.06% Steelhead 82.72% Monopod - TBU 0.32% Official Use Qnly - Flaring Authorization> 1 hr. 1. Safety 21, 471 MCF 2. Lease Use MCF 3. Conserv. Purposes MCF ~~ í/r!ðr Commissio er Date ~- Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by tlte 20th ofthe month following the month of disposition. Authority 20 AAC 25.235. Excess Flare Log Report Facility Name: TRADING BAY PRODUCTION FACILlT MonthlYear: Date & Time Event Gas Steps Taken to Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence 6/11020:00 6130102 24:00 19977 Planned COY's Flared for June 2002 OPERATIONAL Maintenance. 6111020:00 611102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance. to insulation failure. shut down so that factory required maintenance can be completed. Work is proceeding 7 days a week with completion anticipated by mid- August. Gas !,!ormally burned by Lex heater and currenly being flared is sour, 612102 0:00 612102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance. to insulation failure, shut down so that factory required maintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally burned by Lex heater and currenly being flared is sour. . 613102 0:00 613102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance. to insulation failure. shut down so that factory required maintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally burned by Lex heater and currenly being flared is sour. 614102 0:00 614102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance, to insulation failure shut down so that factory required maintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally burned by Lex heater and currenly being flared is sour. Report Date: 7/12/02 Page: 1 of 14 Excess Flare Log Report 615102 0:00 615102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance. to insulation failure shut down so that factory required maintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally bumed by Lex heater and currenly being flared is sour. 616102 0:00 616102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance, to insulation failure, shut down so that factory required· Il'!¡¡intenance can be completed. Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally bumed by Lex heater and currenly being flared is sour. 617102 0:00 617102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance, to insulation failure. shut down so that factory required maintenance can be completed. Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally bumed by Lex heater and currenly being flared is sour. 618102 0:00 618102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance. to insulation failure, shut down so that factory required maintenance can be completed. Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally bumed by Lex heater and currenly being flared is sour, 6191020:00 619102 23:59 , 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance. to insulation failure. shut down so that factory required maintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally bumed by Lex heater and currenly being flared is sour, Report Date: 7/12/02 Page: 2 of 14 Excess Flare Log Report 61101020:00 6110102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance. to insulation failure, shut down so that factory required maintenance can be completed. Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally bumed by Lex heater and currenly being flared is sour. 61111020:00 611110223:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance, to insulation failure. shut down so that factory required -- rT).aintenance can be completed. Work is proceeding 7 days a week with completion anticipated by rnid- August. Gas normally burned by Lex heater and currenly being flared is sour. 61121020:00 6112102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance. to insulation failure. shut down so that factory required maintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally burned by Lex heater and currenly being flared is sour, 61131020:00 6113102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance, to insulation failure, shut down so that factory required maintenance can be completed. Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally burned by Lex heater and currenly being flared is sour. 6114/02 0:00 611410223:59 ~ 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance. , . to insulation failure. shut down so that factory required maintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally burned by Lex heater and currenly being flared is sour. Report Date: 7/12/02 Page: 3 of 14 Excess Flare Log Report 6115102 0:00 6115/02 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reportedin May, Lex heater Maintenance, to insulation failure, shut down so that factory required maintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally burned by Lex heater and currenly being flared is sour, 61161020:00 6116102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance, to insulation failure, shut down so that factory required maintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally burned by Lex heater and currenly being flared is sour, 6117/020:00 611710223:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance. to insulation failure, shut down so that factory required maintenance can be completed. Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally burned by Lex heater and currenly being flared is sour, 6/181020:00 6/1810223:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May. Lex heater Maintenance. to insulation failure, shut down so that factory required maintenance can be completed. Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally burned by Lex heater and currenly being flared is sour, 6119102 0:00 6119102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance. to insulation failure. shut down so that factory required maintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally burned by Lex heater and currenly being flared is sour, Report Date: 7/12/02 Page: 4 of 14 Excess Flare Log Report 6120102 0:00 6120102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance, to insulation failure, shut down so that factory required maintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas nonnally bumed by Lex heater and currenly being flared is sour. 61211020:00 612110223:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance. to insulation failure. shut down so that factory required -- m,aintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas nonnally bumed by Lex heater and currenly being flared is sour, 6122/02 0:00 6122102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance, to insulation failure. shut down so that factory required maintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas nonnally bumed by Lex heater and currenly being flared is sour. 61231020:00 6123102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance. to insulation failure, shut down so that factory required maintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas nonnally bumed by Lex heater and currenly being flared is sour, 6124102 0:00 6124102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance. to insulation failure. shut down so that factory required maintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas nonnally burned by Lex heater and currenly being flared is sour, Report Date: 7/12/02 Page: 5 of 14 Excess Flare Log Report 6125102 0:00 6125102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS LAs reported in May, Lex heater Maintenance, to insulation failure, shut down so that factory required maintenance can be completed. Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally burned by Lex heater and currenly being flared is sour. 6126102 0:00 6126102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May. Lex heater Maintenance, to insulation failure. shut down so that factory required maintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally burned by Lex heater and currenly being flared is sour, 6127102 0:00 612710223:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May. Lex heater Maintenance. to insulation failure. shut down so that factory required maintenance can be completed. Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally burned by Lex heater and currenly being flared is sour. 6128102 0:00 6128102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May. Lex heater Maintenance. to insulation failure, shut down so that factory required maintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally burned by Lex heater and currenly being flared is sour. 6129102 0:00 6129102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance. '. to insulation failure, shut down so that factory required maintenance can be completed. Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally burned by Lex heater and currenly being flared is sour. Report Date: 7/12/02 Page: 6 of 14 Excess Flare Log Report 6130102 0:00 6130102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance, to insulation failure. shut down so that factory required maintenance can be completed, Work is proceeding 7 days a week with completion anticipated by mid- August. Gas normally bumed by Lex heater and currenly being flared is sour, Report Date: 7/12/02 Page: 7 of 14 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Unocal Field(s) Trading Bay UnitlField MonthlY ear of Disposition July 2002 Trading Bay Production Facility Disposition Total Volumes MCF 1. Sold 4,366 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 34,164 (Supplemental report required-See 20 AAC 25.235) 5. Pilot and Purge 775 6. Used for lease operations 65,374 - 7. *Other (Shrinkage) (4,337) TOTAL items 1-7 100,342 8. NGL gas equivalent produced 0 9. Purchased gas From Steelhead & Grayling GGS 4,366 to treat Monopod Oil 10. Transferred from: Monopod, Grayling King 204,621 Salmon, Steelhead, Dolly Varden 11. Transferred to: Dolly Varden 104,278 King Salmon Remarks: 1 hereby certity that the toregomg IS true and correct to the best ot my knowledge. Signature: ~crÌJt!{¡.~.J Title: Acct. Super. Date: 09-Aug-02 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent Monopod - TBF 1.02% Dolly Varden 2.95% Grayling 10.21% King Salmon 1.63% Steelhead 83.82% Monopod - TBU 0.36% Official Use Only - Flaring Authorization> 1 hr. 1. Safety 34 I/:,4 MCF ~ 2. Lease Use MCF 3. Conserv. Purposes MCF (au...~ Q,AJ, ~ 0¡1(~(. ;;)- Commls ner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 MC 25.235. Excess Flare Log Report Facility Name: TRADING BAY PRODUCTION FACILIT Month/Year: July 2002 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence Mp·2 ID Number 7/1102 0:00 7/3110223:59 26414 Y COV's Flared fur July 7/1/020:00 7/1/0223:59 250 Y Lex heater shut down fur OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months. Lex Maintenance, R·H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work is proceeding seven days a week with completion anticipsted by mid- August. Note: Gas normally bumed by Lex heater and CUffentiy being nared IS sour 712/020:00 7/2/0223:59 250 Y Lex heater shut down fur OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance. R·H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and clØTentfy being nared Is sour 7131020:00 7/3/0223:59 250 Y Lex heater shut down fur OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work is proceeding seven days a week with completion anticipated by mid- - August. Note: Gas normally bumed by Lex heater and currentiy being nared Is sour 7/41020:00 7/4/02 23:59 250 Y Lex heater shut down fur OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance. R-H-3030 maintenance. heater shut down fur factory required maintenance to be completed. Work is proceeding seven days a week with completion anticipsted by mid- August. Note: Gas normally burned by Lex heater and currentiy being nared is sour 7/5102 0:00 7/5/02 23:59 250 Y Lex heater shut down fur OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, lex Maintenance. R-H-3030 maintenance. heater shut down fur factory required maintenance to be completed. Work is proceeding seven days a week with completion anticipsted by mid- August. Note: Gas normally burned by Lex heater and clØTentiy being nared Is sour 7/61020:00 7/6/0223:59 250 Y Lex heater shut down fur OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months. Lex Maintenance. R-H-3030 maintenance. heater shut down fur factory required maintenance to be completed, Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currentfy being nared Is sour Report Dale: 8/12102 Page: 1 of 5 Excess Flare Log Report 7171020:00 7f710223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currentiy being flared Is sour 7/8/020:00 7/8/0223:59 250 Y lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed. Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currenOy being flared is sour 7/9102 0:00 71910223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currently being flared Is sour 7/101020:00 7/10102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-303Q maintenance. heater shut down for factory required maintenance to be completed, Work Is proceeding seven days a week with - completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currenUy being flared Is sour 7/11/020:00 7/1110223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed. Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally bumed by Lex heater and currently being flared Is sour 7/12/020:00 7/12/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months. Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally bumed by Lex heater and currenUy being flared Is sour 7/13/020:00 7/13/0223:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currently being flared is sour Report Date: 8/12102 Page: 2 of 5 Excess Flare Log Report 7/14/020:00 7/14/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed. Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currenUy being flared Is sour 7/151020:00 7/1510223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months. Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currently being flared is sour 7/16/020:00 7/16102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currently befng flared is sour 7/171020:00 7/1710223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months. Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work Is proceeding seven days a week with - completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currently being flared is sour 7/16102 0:00 7/18/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas oormally burned by Lex heater and currentiy being flared is sour 7/19102 0:00 7/1910223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas oormally burned by Lex heater and currenOy being flared is sour 7/201020:00 7120102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance, R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas oormally burned by Lex heater and currently being flared Is sour Report Date: 8112102 Page: 3 of 5 Excess Flare Log Report 7/21/02 0:00 7/2110223:59 250 Y Lex heater shut down lor OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down lor factory required maintenance to be completed. Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally bumed by Lex heater and currently being flared Is sour 7122102 0:00 7/22/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down lor factory required maintenance to be completed, Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally bumed by Lex heater and currenUy being flared is sour 7/23/02 0:00 7/23/0223:59 250 Y Lex heater shut down lor OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months. Lex Maintenance. R-H-3030 maintenance. healer shut down lor factory required maintenance to be completed, Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currently being flared is sour 7/241020:00 7/24102 23:59 250 y Lex heater shut down lor OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down lor factory required maintenance to be completed. Work is proceeding seven days a week with - completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currently being flared Is sour 7/25102 0:00 7/2510223:59 250 Y Lex heater shut down lor OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months. Lex Maintenance. R-H-3030 maintenance, heater shut down for factory required maintenance to be completed, Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currently being ftared Is sour 7/26/020:00 7/26/0223:59 250 y Lex heater shut down lor OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down lor factory required maintenance to be completed. Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currently being flared Is sour 7/27102 0:00 7/27/0223:59 250 y Lex heater shut down lor OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down lor factory required maintenance to be completed, Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currenUy being flared Is sour Report Date: 8/12102 Page: 4 of 5 Excess Flare Log Report 7/281020:00 7/28/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed. Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally bumed by Lex heater and currently being flared Is sour 7/29/020:00 7/29/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed. Work IS proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currently being flared Is sour 7/30102 0:00 7/3010223:59 250 Y Lex heater shut down for OPERATIONAL OTHER: SEE DESC OF EVENT As reported In prior months. Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Wor1< Is proceeding seven days a week with completion anticipated by mid- August, Note: Gas normally burned by Lex heater and currently being flared Is sour 7/311020:00 7/31102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Wor1< Is proceeding seven days a week with - completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currently being flared is sour Report Date: 8112102 Page: 5 of 5 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Unocal Field(s) Trading Bay UnitlField MonthlY ear of Disposition August 2002 Trading Bay Production Facility Disposition Total Volumes MCF 1. Sold 3,974 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 36,999 ¡,. / (Supplemental report required-See 20 AAC 25.235) 5. Pilot and Purge 775 6. Used for lease operations 60,617 7. *Other (Shrinkage) (456) TOTAL items 1-7 101,909 8. NGL gas equivalent produced 0 9. Purchased gas From Steelhead & Grayling GGS 3,974 to treat Monopod Oil 10. Transferred from: Monopod, Grayling, King 234,476 Salmon, Steelhead, Dolly Varden 11. Transferred to: Dolly Varden, King Salmon 132,567 Monopod Remarks: 1 hereby certJ.~ that the 10regomg IS true ana correct to the best 01 my talOWleage. Signature: ;2{Stl:; 2lC' [J~ Title: Acct. Super. Date: II-Sep-02 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent Monopod - TBF 1.27% Dolly Varden 2.95% Grayling 12.24% King Salmon 1.70% Steelhead 81.37% Monopod - TBU 0.48% Official Use Only - Flaring Authorization> 1 hr. 1. Safety 3(" '(ClCf MCF ~ 2. Lease Use MCF 3. Conserv. Purposes MCF Cíw ' ~'~~Æ'/ ItLI()~ com~ner b Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Excess Flare Log Report Facility Name; TRADING BAY PRODUCTION FACILlT MonthlYear: August 2002 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP·2 ID Number 8/11020:00 8/3110223:59 28223 Y COV's Flared for August 8/1102 0:00 8/1/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currenUy being flared is sour 8/2102 0:00 8/3/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance, R-H-017 maintenance. heater shut down for factory required maintenance to be completed, Work Is proceeding seven days a week with compieUon anticipated by rnld- August Note: Gas normally burned by Lex heater and currenUy being flared Is sour 8/3/02 0:00 8/3/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030 maintenance, heater shut down for factory required maintenance to be completed, Work Is proceeding seven days a week with completion anticipated by mld- August Note: Gas normally burned by Lex heater and currenUy being flared Is sour 8/4102 0:00 8/4102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030 maintenance, heater shut down for factory required maintenance to be completed. Work Is proceeding seven days a week with completion anticipated by mld- August. Note: Gas normally burned by Lex heater and currenUy being flared Is sour 8/5102 0:00 8/5102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030 maintenance, heater shut down for factory required maintenance to be completed. Work Is proceeding seven days a week with completion anticipated by mld- August. Note: Gas normally burned by Lex heater and currenUy being flared is sour Report Date: 9/16/02 Page: 1 of 6 Excess Flare Log Report 8/6102 0:00 8/6/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work Is proceeding seven days a week with completion anticipated by mld- August. Note; Gas normally bumed by Lex heater and currently being flared is sour 817102 0:00 817/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed. Work is proceeding seven days a week with completion anticipated by mid- August. Note; Gas normally bumed by Lex heater and currenUy being flared is sour 8/8102 0;00 8/8102 23;59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance, R-H-3030 maintenance. heater shut down for factory required maintenance to be completed. Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally bumed by Lex heater and currenUy being flared is sour 8/9102 0:00 81910223:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally bumed by Lex heater and culTllf1tiy being flared is sour 8/10/02 0:00 8/10102 23;59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currentiy being flared is sour 8/10/02 10;00 8/10102 13;00 46 Y Inspect gas line from Grayling OPERATIONAL NORMAL OPERATIONS Blow down line, flare gas at Pipeline inspections. Platform to shore. Trading Bay while inspection is being conducted. Run cleaning pig through line, All necessary personnel and equipment on site, Une returned to normal operations. Report Date: 9/16/02 Page: 2 of 6 Excess Flare Log Report 8111102 0:00 8/11102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030 maintenance, heater shut down for factory required maintenance to be completed, Work is proceeding seven days a week with completion anticipated by mld- August. Note: Gas normally burned by Lex heater and currently being flared is sour 8/11/0220:50 8/1110223:10 675 y Inspect gas line from Grayling OPERATIONAL NORMAL OPERATIONS Blow down line, 'flare gas at Pipeline inspection. 00.00.00 Platform to shore. Trading Bay while inspection is being conducted, Run Cleaning pig through line. All necessary personnel and equipment on site. Line returned to normal operations, 8/12102 0:00 8/12102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed. Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas nonnally burned by Lex heater and currently being flared is sour 8/12102 0:00 8/1210223:59 74 Y Inspect gas line from Grayling OPERATIONAL NORMAL OPERATIONS Blow down line, flare gas at Pipeline Inspection, Platform '0 shore, Trading Bay while Inspection is being conducted. Run Cleaning pig through line, All necessary personnel and equipment on site, Line returned to normal operations. 8/13/02 0:00 8/13102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance, R-H-3030 maintenance, heater shut down for factory required maintenance to be completed. Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currently being flared is sour 8/141020:00 8/14/02 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally burned by Lex heater and currently being flared is sour Report Date: 9/16/02 Page: 3 of 6 Excess Flare Log Report 8/14/02 12:20 8/14/02 14:30 231 y Inspect gas line from Grayling OPERATIONAL NORMAL OPERATIONS Blow down line, flare gas at Pipeline inspection. Platfo011 to shore, Trading Bay while inspection is being conducted, Run cleaning pig through line, All necessary personnel and equipment on site, Line retumed to nOO11al operations. 8/151020:00 8115/02 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030 maintenance, heater shut down for factory required maintenance to be completed. Work is proceeding seven days a week with completion anticipated by mid- August Note: Gas nonnally bumed by Lex heater and currenUy being flared is sour 8/16102 0:00 8/16/02 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance, R-H-3030 maintenance. heater shut down for factory required maintenance to be completed. Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas nonnally bumed by Lex heater and currently being flared is sour 8/17102 0:00 8/1710223:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030 maintenance, heater shut down for factory required maintenance to be completed, Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas nonnally bumed by Lex heater and currently being flared is sour 8/18/02 0:00 8/18/02 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030 maintenance, heater shut down for factory required maintenance to be completed, Work is proceeding seven days a week with compleUon anticipated by mld- August. Note: Gas nOO11ally bumed by Lex heater and currently being flared is sour 8/19/02 0:00 8/19102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work is proceeding seven days a week with completion anticipated by mid- August Note: Gas nOO11ally bumed by Lex heater and currently being flared is sour Report Date: 9/16/02 Page: 4 of 6 Excess Flare Log Report 8/20102 0:00 8/20/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030 maintenance, heater shut down for factory required maintenance to be completed. Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas nonnally bumed by Lex heater and currently being flared is sour 8/211020:00 8/21/0223:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed. Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas nonnally bumed by Lex heater and currently being flared Is sour 8/22102 0:00 8/22102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior l1'10nths, Lex Maintenance, R-H-3030 maintenance, heater shut down for factory required maintenance to be completed, Work is proceeding seven days a week with completion antidpated by mid- August. Note: Gas nonnally bumed by Lex heater and currently being flared is sour 8/23102 0:00 8/23102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030 maintenance. heater shut down for factory required maintenance to be completed. Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas normally bumed by Lex heater and currently being flared is sour 8/24/02 0:00 8/24102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030 maintenance, heater shut down for factory required maintenance to be completed, Work is proceeding seven days a week with completion anticipated by mld- August. Note: Gas normally bumed by Lex heater and currently being flared is sour 8/25102 0:00 8/25102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance, R-H-3030 maintenance. heater shut down for factory required maintenance to be completed. Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas nonnally bumed by Lex heater and currently being flared is sour Report Date: 9/16/02 Page: 5 of 6 Excess Flare Log Report 8/26102 0:00 8/26/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas nonnally bumed by Lex heater and currenUy being flared is sour 8/271020:00 8/27/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030 maintenance, heater shut down for factory required maintenance to be completed. Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas nonnally bumed by Lex heater and currenUy being flared is sour 8/28/02 0:00 8/28/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030 maintenance. heater shut down for factory required maintenance to be completed. Work is proceeding seven days a week with completion anticipated by mid- August. Note: Gas nonnally bumed by Lex heater and currenUy being flared is sour 8/29102 0:00 8/29102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance, R-H-3030 maintenance, heater shut down for factory required maintenance to be completed. Work is proceeding seven days a week with completion anticipated by mid- August, Note: Gas normally bumed by Lex heater and currently being flared Is sour 8130/02 0:00 8130102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed. Work is proceeding seven days a week with compleUon anticipated by mid- August. Note: Gas nonnally bumed by Lex heater and currently being flared is sour 8/311020:00 8/31/0223:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months. Lex Maintenance. R-H-3030 maintenance. heater shut down for factory required maintenance to be completed, Work Is proceeding seven days a week with completion anticipated by mid- August. Note: Gas nonnally bumed by Lex heater and currenUy being flared is sour Report Date: 9/16/02 Page: 6 of 6 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Unocal Field(s) Trading Bay UnitlField MonthlY ear of Disposition September 2002 Trading Bay Production Facility Disposition Total Volumes MCF 1. Sold 3,475 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 18,610 (Supplemental report required-See 20 AAC 25.235) 5. Pilot and Purge 750 6. Used for lease operations 53,558 7. *Other (Meter Difference) 2,685 TOTAL items 1-7 79,078 8. NGL gas equivalent produced 0 9. Purchased gas From Steelhead & Grayling GGS 3,475 to treat Monopod Oil 10. Transferred from: Monopod, Grayling, King 199,094 Salmon, Steelhead, Dolly Varden 11. Transferred to: Dolly Varden, King Salmon 120,016 Monopod Remarks: 1 ~erebY certl~ Ie ~oregom~_.true a~d co)'ect to the best ot.my knowledge. SIgnature: ;/ Þ1 (j, t~~ TItle: Acct. Super. Date: 16-0ct-02 /I II Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent Monopod - TBF 1.34% Dolly Varden 2.96% Grayling 11.28% ¡/ King Salmon 1.32% Steelhead 82.73% Monopod - TBU 0.37% Official Use Only - Flaring Authorization> 1 hr. 1. Safety 12> "'OMCF I ~ 2. Lease Use MCF 3. Conserv. Purposes MCF lð/,,y!oy Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Excess Flare Log Report Facility Name: TRADING BAY PRODUCTION FACILlT MonthlYear: September 2002 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 911/020:00 9/30/02 23:59 15050 Y COV's Flared for September 9/1/02 0:00 9/1/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance. R-H-3030 maintenance. maintenance/system upgrade. Note: Sour gas is burned in Lex heater. 9121020:00 912102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance, R-H-3030 maintenance. maintenance/system upgrade. Note: Sour gas is burned in Lex heater. 9/3/020:00 9/3/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance, R-H-3030 maintenance. maintenance/system upgrade, Note: Sour gas is bumed in Lex heater. 9/41020:00 9/4102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance, R-H·3030 maintenance. maintenance/system upgrade, Note: Sour gas is burned in Lex heater. 9/5/02 0:00 9/5/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance, R-H-3030 maintenance. maintenance/system upgrade, Note: Sour gas is burned in Lex heater, Report Date: 10/16/02 Excess Flare Log Report 9/6/02 0:00 9/6/0223:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance. R-H-3030 maintenance. maintenance/system upgrade. Note: Sour gas is bumed in Lex heater, 9f7102 0:00 9f7102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance. R-H-3030 maintenance. maintenance/system upgrade, Note: Sour gas is bumed in Lex heater. 9/8102 0:00 91810223:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance, R-H-3030 maintenance. maintenance/system upgrade, Note: Sour gas is bumed in Lex heater. 9/9/02 0:00 9/9/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance, R-H-3030 maintenance. maintenance/system upgrade, Note: Sour gas Is bumed in Lex heater. 9/10/02 0:00 9/1010223:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance. R-H-3030 maintenance, maintenance/system upgrade. Note: Sour gas is bumed in Lex heater. 9/111020:00 9/11/02 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance, R-H-3030 maintenance, maintenance/system upgrade, Note: Sour gas is bumed in Lex heater, Report Date: 10/16/02 Excess Flare Log Report 9/12/020:00 9/12/02 23:59 250 y Lex heater shut in for maintenance, OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance. R-H-3030 maintenance/system upgrade, Note: Sour gas is bumed in Lex heater, 9/131020:00 9/13/0223:59 199 Y Lex heater shut down for OPERATiONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance. R-H-3030 maintenance. maintenance/system upgrade, Note: Sour gas is bumed In Lex heater, 9/14102 0:00 9/14102 23:59 157 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance. R-H-3030 maintenance. maintenance/system upgrade. Note: Sour gas is bumed in Lex heater, 91151020:00 9/15/02 23:59 156 Y Lex heater shut down for OPERATIONAL SCHEDULED MAiNTENANCE Lex heater shut down for Scheduled maintenance, R-H-3030 maintenance. maintenance/system upgrade, Note: Sour gas is bumed in Lex heater, 9/29102 6:00 9/29102 23:59 10 Y Bleeding down gas system to install OPERATIONAL SCHEDULED MAINTENANCE Upgrading wiring into the new Maintenance. new UP systems, preseperatlon PLC control panel. Preplanning allowed to all equipment and personnel to be available for completJon of project. 9/30/02 0:00 9130/02 12:00 38 N Pre-seperatJon control system failure, OPERATIONAL UNSCHEDULED MAINTENANCE New pre-separatJon controls Repair, installed were not fUnctioning properly, Utilized Instrument Technician to diagnose problem and repair, Adjustments made and retumed to nonnai operations, Report Date: 10/16/02 " / ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Unocal Field(s) Trading Bay UnitlField MonthlY ear of Disposition October 2002 Trading Bay Production Facility Disposition Total Volumes MCF 1. Sold 2,724 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 3,146 v (Supplemental report required-See 20 AAC 25.235) V 5. Pilot and Purge 775 6. Used for lease operations 48,953 7. *Other (Meter Difference) 1,817 TOTAL items 1-7 57,415 8. NGL gas equivalent produced 0 9. Purchased gas From Steelhead & Grayling GGS 2,724 to treat Monopod Oil 10. Transferred from: Monopod, Grayling, King 197,866 Salmon, Steelhead, Dolly Varden 11. Transferred to: Dolly Varden, King Salmon 140,451 Monopod Remarks: 1 hereby certIty v~t the t0j;0mg'fs true and correct to the best ot my knowledge. Signature: á~¡t{ Q, (d/rJ Title: Acct. Super. Date: ll-Nov-02 777 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percént Monopod - TBF 0.87% Dolly Varden 2.56% Grayling 11.31% King Salmon 0.94% Steelhead 84.06% Monopod - TBU 0.27% Offici&1 Us~ Only - Flaring Authorization> 1 hr. 1. Safety 3.'44, MCF 2. Lease Use MCF 3. Conserv. Purposes' MCF ~~~ '1~(~rO~ Commis~n~ Date .:f'~ Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. " Excess Flare Log Report Facility Name: TRADING BAY PRODUCTION FACILlT MonthlYear: October 2002 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Descñption of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 1011/02 0:00 10/31/0223:59 3146 Y COV's Flared for October , Report Date: 11/12/02 Page: 1 of 6 REVISED COPY' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION '=-. Date ~-,....,.,-.._;~ 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthNear of Disposition Trading Bay Production Facility Trading Bay Unit REVISION 1330000000 Tradina Bav Onshore Facilitv MRF McArthur River Field Unocal Alaska November-02 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 2,553 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 5,126 10. Pilot and Purge 750 11. Used for lease operations (specify in Remarks) 50,113 12. Other (see instructions) .':: ' .'s: ~~F'" ';:;;/&:::,ê;. Shrinkaae (160' Authorization >1 hr: Safety MCF 13. TOTAL VOLUME (ITEMS 6-12) 58,382 MCF Lease Use 14. NGL Gas Equivalent 0 MCF Conservation 15. Purchased gas 3,298 Waste: MCF 16. Transferred from: 210,895 17. Transferred to: (Express as a negative #) Commissioner Date (152,513' 'HI. KemarKS: Purchased Gas: From Steelhead & Grayling GGS 2,553 to treat Monopod Oil Revision: Per agreement reached between Forest Oil and From Forest Oil 745 Alaska DNR. Forest Oil Gas Received through M7100 at TSPF is to be shown as a gas purchase and not a transfer Transferred From: Monopod, Grayling, King 210,895 of gas. Salmon, Steelhead, Dolly Varden Transferred To: Dolly Varden, King Salmon 152,513 Monopod I he,eby r at the foregoing is true and correj~~è~ ~~t ';ôrmød¥ge. lIt..In ~f5 !J\)MlJh/ ...1""(" " Q ')nf\A Note: All volumes must be Signatu Title Production Accountant corrected to pressure of 14.65 psia Printed a ¥ (J U¡:'V ., - -~ and to a temperature of 600 F. Name net Dormady Phone 907-263-7946 Date 12/22/2004 ?n iliIr'?¡:; ?~¡:; form 10-422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate . t ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Trading Bay Production Facility Operator Unocal Field(s) Trading Bay UnitlFie1d MonthlY ear of Disposition November 2002 2. Reinjected o *Indicate contribution of each pool to total. Pool Name Code Percent Monopod - TBF 0.63% Dolly Varden 2.70% Grayling 11.64% . King Salmon 0.91% Steelhead 83.79% Monopod - TBU 0.33% Disposition Total Volumes MCF 1. Sold 2,648 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25,235) 5,126 5. Pilot and Purge 750 7. *Other (Meter Difference) 50,763 8. NGL gas equivalent produced o Official Use Only - Flaring Authorization> 1 hr. 1. Safety 51Z-þ MCF I 2. Lease Use MCF 3. Conserv. Purposes MCF ~~Jat I )q ( C~ Commis~oner . Date J'3L 6. Used for lease operatio (161 ) TOTAL items 1-7 59,126 9. Purchased gas From Steelhead & Grayling GGS to treat Monopod Oil Monopod, Grayling, King Salmon, Steelhead, Dolly Varden Forest Oil 2,648 10. Transferred from: 216,403 11. Transferred to: Dolly Varden, King Salmon Monopod 157,277 Remarks: Signature: Title: Acct. Super. Date: 18-Dec-02 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: TRADING BAY PRODUCTION FACILlT Month/Year: November 2002 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 11/1/020:00 11/30/0223:59 5126 Y COV's Flared for November Report Date: 12/16/02 Page: 1 of 6 REVISED COpy STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION "'1 4>.A ~ Date 1. 'Facility Number 2... Facility Name 3. Field'.,,; 4;. Operator 5, MonthlYear of Díspositioñ' TraÎJing Bay Production Facility Trading Bay Unit ,~;r~;t , , , REVISION Tradina Bav Onshore Facilitv MRF McArthur River Field . ·.·..t-..nffi;· ;"1..: " 1330000000 Unocal Alaska December~ . 2 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percen,t. of Total Volume. 6. Sold 2,771 Pool Name . Pool Code' ;', "'þ'èrëent , . ............ 7. Reinjected ,....... 0 ., ". 8. Flared or vented 1 hour or less 0 . '. 9. Flared or vented more than 1 hour (see instr.) 2,409 10. Pilot and Purge 775 .'. 11. Used for lease operations (specify in Remarks) 49,306 12. Other (see instructions) rr ,5;; \,,';, ':"!i;'.,:" ·''::.\;.:k . Shrinkage . . (6,406 Authorization >1 hr: Safety MCF 13. TOTAL VOLUME (ITEMS 6-12) 48,855 MCF Lease Use 14. NGL Gas Equivalent . . 0 Conservation MCF 15. Purchased gas 7,055 Waste: MCF, . '. 16. Transferred from: 196,347 Commissioner Date 17. Transferred to: (Express ~s,a. negative #) .' (147,492 1 ö. Keman~s: Purchased Gas; From Steelhead'& GraylingGGS 2,771 . " to treat Monopod Oil ,. 4,284 Revision; Per agree!r~nt rea?~ed between Fore,s10il and From Forest Oil . AlaskiiïDNR. FðrestOii'G8s"Received through M7100 at . TBPF is to tie shown as a gas purchase and not a transfer Transferred From: Monòpod, Grayling, King 196.347 of gas. Salmon, Steelhead. Dolly Varden Transferred To: Dolly Varden, King Salmon 147,492 Monopod I h_y a:e fO"''''',;o: true and oonoct 10 !he ,..t Of my k"""'ed¡f, 1)-, .øi Al Jañët l. Dorma Y Note: All volumes must be Signa ,'~_ AAAA /J Title Production Accountant corrected to pressure of 14.65 psi8¡, pri~~:··· U DEC2 Z 2004 and to a temperáture bf 600 F. Na Janet Dormady Phone 907-263-7946 Date 12/22/2004 II. ?() A A ,..,,"" ?~,&; .,,' . \ .';", ,". Form 10-422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE' Submit in Duolicate - \ . A ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Unocal Trading Bay Production Facility Disposition Total Volumes MCF 1. Sold 2. Reinjected 3. Flared or vented less than 1 hour 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 5. Pilot and Purge 6. Used for lease operations 7. *Otlter (Meter Difference) TOTAL items 1-7 8. NGL gas equivalent produced 9. Purchased gas From Steelhead & Grayling GGS to treat Monopod Oil Monopod, Grayling, King Salmon, Steelhead, Dolly Varden Forest Oil 10. Transferred from: 11. Transferred to: Dolly Varden, King Salmon Monopod Signature: Title: Acct. Mgr. Form 10-422 Rev. 4/95 2,448 ..,,, 2,409 53,912 (6,406) 53,138 2,448 234,127 180,988 Date: Field(s) Trading Bay UnitlField MonthlY ear of Disposition December 2002 o *Indicate contribution of each pool to total. Pool Name Code Percent Monopod - TBF 0.70% Dolly Varden 2.47% Grayling 11.13% king Salmon 1.40% Steelhead 84.04% Monopod - TBU 0.26% o ./' 775 Flaring Authorization> 1 hr: 1. Safety ~ 411 MCF .~ 2. Lease Use MCF o 3. Conserv. Purposes MCF ~.~~ ~" .... 1,o/~3 Date ,,' 16-Jan-03 / ,. Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the montlt of disposition. Authority 20 AAC 25.235. , . Excess Flare Log Report Facility Name: TRADING BAY PRODUCTION FACILlT MonthlYear: December 2002 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 12111020:00 1213110223:59 2409 y COY's Flared for December -- ..,.. . " ,. Report Date: 1/16/03 Page: 1 of 1