AOGCC
GAS DISPOSITION FILES
YEAR: 2002
FACILITY: TB Onshore Facility MRF
OPERATOR: UNION OIL CO OF
CALIFORNIA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
, ,
Facility
Operator
Unocal
Field(s)
Trading Bay UnitlField
MonthlY ear of Disposition
January 2002
Trading Bay Production Facility
Disposition Total Volumes MCF
1. Sold 2,988
2. Reinjected 0
3. Flared or vented less than I hour 0
. "-',
, '¿
4. Flared or vented greater than I hour ~15,881
(Supplemental report required-See 20 AAC 25.235)
,-"i'
5. Pilot and Purge 775
6. Used for lease operations 72,216
7. *Other (Shrinkage) 19,383
TOTAL items 1-7 102,243
8. NGL gas equivalent produced 0
9. Purchased gas From Steelhead & Grayling GGS 2,988
to treat Monopod Oil
10. Transferred from: Monopod, Grayling, King 215,661
Salmon, Steelhead, Dolly Varden
II. Transferred to: Dolly Varden 113,418
King Salmon
Remarks:
1 hereby certJ.ßt the torej~ng IS true and correct to the best ot my knowledge.
Signature: ~ h aé'µ~ Title: Acct. Super. Date: 12-Feb-02
/ (/
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
Monopod 0.60%
Dolly Varden 2.23%
Grayling 9.34%
King Salmon 2.67%
Steel head 85.16%
Qfficial Use Only - Flaring Authorization> 1 hr.
1. Safety
MCF
2. Lease Use
MCF
0ffl
3. Conserv. Purposes
MCF
r_ ¥
ll~ ~U·
commissiobr ,
'1çfo:r
Date
,..~
\ALbrT
ZJL~''\) L
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 de&1"ees F.
Report due by the 20th of the month followmg the
month of disposition.
Authority 20 AAC 25.235.
Excess Flare Log Report
Facility Name:
TRADING BAY PRODUCTION FACILlT
MonthlY ear:
January 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
1111020:00 113110224:00 6881 Planned COV's Flared for January
Report Date: 2/12/02
Page: 1 of 2
?
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Operator
Unocal
Field(s)
Trading Bay UnitlField
MonthlY ear of Disposition
February 2002
Trading Bay Production Facility
Disposition Total Volumes MCF
1. Sold 3,588
2. Reinjected 0
3. Flared or vented less than I hour 0
4. Flared or vented greater than I hour 8,762 ,¡
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 700
6. Used for lease operations , 82,039
7. *Other (Shrinkage) (1,514)
"
TOTAL items 1-7 93,575 ./
8. NGL gas equivalent produced 0
9. Purchased gas From Steelhead & GrayIíng GGS 3,588
to treat Monopod Oil
10. Transferred from: Monopod, GrayIíng, King 199,799
Salmon, Steelhead, Dolly Varden
11. Transferred to: Dolly Varden 106,224
King Salmon
Remarks:
1 hereby certzat the tor~omg IS ~e and correct to the best 01 my knowledge.
Signature: 2(f!Æ,t () (J (fulL Title: Acct. Super. Date: 13-Mar-02
(j (/
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
Monopod 0.56%
Dolly Varden 2.31 %
Grayling 9.54%
King Salmon 2.58%
Steelhead 85.01%
Official Use Only - Flaring Authorization> 1 hr.
1. Safety MCF
2. Lease Use f7&1- MCF
3. Conserv. Purposes MCF
v~u~.; 1Ç};r/..~
Date
lJG1\-
3/2.2.10·
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
~>
Excess Flare Log Report
Facility Name:
TRADING BAY PRODUCTION FACILlT
MonthlY ear:
Date & Time Event Gas Steps Taken to
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence
2111020:00 2128102 24:00 8762 Planned COV's Flared for February 2002
"
"
Report Date: 3/12/02
Page: 1 of 4
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Operator
Unocal
Field(s)
Trading Bay UnitlField
MonthlY ear of Disposition
March 2002
Trading Bay Production Facility
Disposition Total Volumes MCF
1. Sold 4,219
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 7,294 ~
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 775
.
6. Used for lease operations 97,433
"
7. *Other (Shrinkage) (5,777)
TOTAL items 1-7 , 103,944 /
8. NGL gas equivalent produced 0
9. Purchased gas From Steelhead & Grayling GGS 4,219
to treat Monopod Oil
10. Transferred from: Monopod, Grayling, King 225,355
Salmon, Steelhead, Dolly Varden
11. Transferred to: Dolly Varden 121,411
King Salmon
Remarks:
1 hereby certny tl1at the toregomg IS true ana correct to the best 01 my knowledge.
Signature: l1é~ð C¡. \rl{Æ;, .' Title: Acct. Super. Date: 10-Apr-02
Fonn 10-422
Rev, 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
Monopod 0.56%
Dolly Varden 2.31%
Grayling 10.64%
King Salmon '. 2.33%
Steelhead 84.15%
Official Use Only - Flaring Authorization> 1 hr.
1. Safety MCF
2. Lease Use 7ZQtl MCF
3. Conserv. Purposes MCF
C L~ Ûl.4l' ~ 4(~/~r
Commissic&r Date
¡dGfr
Note: All volumes must be corrected to pressure
of 14.65 psi a and to a~~tí<.ìBA F.
Report due by the 20t~YœWhe
month of disposition. ..'
Authority 20 AAC 25.235.
AlaskaOiI & Gas Coni. Commissioo
Anchorage
Excess Flare Log Report
Facility Name:
TRADING BAY PRODUCTION FACILlT
MonthlY ear:
Date & Time Event Gas Steps Taken to
Begin End , MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence
3111020:00 313110224:00 7294 Planned COV's Flared for March 2002
..
Report Date: 4/8/02
Page: 1 of 4
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Operator
Unocal
Field(s)
Trading Bay UnitlField
MonthlYear of Disposition
April 2002
Trading Bay Production Facility
Disposition Total Volumes MCF
1. Sold 6,567
2. Reinjected 0
3. Flared or vented less than 1 hour 0 /'
4. Flared or vented greater than 1 hour 11,315
(Supplemental report required-See 20 AAC 25,235)
5. Pilot and Purge 750 ./
6. Used for lease operations 84,360 ,/
7. *Other (Shrinkage) (4,036)
TOTAL items 1-7 98,956 ./"
8. NGL gas equivalent produced 0
9. Purchased gas From Steelhead & Grayling GGS 6,567
to treat Monopod Oil
10. Transferred from: Monopod, Grayling, King 187,918
Salmon, Steelhead, Dolly Varden
11. Transferred to: Dolly Varden 88,962
King Salmon
Remarks:
1 nereoy certIty that the toregomg IS true and correct to the best ot my knowledge.
Signature: /l.d'1ð. Q, J'k¿tI-v Title: Acct. Super. Date: 13-May-02
{ q
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
Monopod - TBF 0.95%
Dolly Varden 2.72%
Grayling 10.12%
King Salmon 1.81 %
Steelhead 84.01%
Monopod - TBU 0.38%
Official Use Only - Flaring Authorization> 1 hr.
1. Safety
1(,3(6 MCF
~
2. Lease Use
MCF
3. Conserv. Purposes
MCF
~;'" ~,..::i
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 MC 25.235.
Excess Flare Log Report
Facility Name:
TRADING BAY PRODUCTION FACILlT
MonthlY ear:
Date & Time Event Gas Steps Taken to
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence
4111020:00 4130102 24:00 8128 Planned COY's Flared for April 2002 OPERATIONAL Work on upgrading Lex Heater, Maintenance.
tube bundle replacement. Water
quality in battery bank 2 drops,
forcing the reinstallation of existing
tube bundle and postponement of
Lex Heater upgrade, Construction
upgrade delayed for one or two
months,
418102 8:00 418102 23:59 127 Y Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance,
tube bundle replacement. Water
quality in battery bank 2 drops.
forcing the reinstallation of existing
I' tube bundle and postponement of
Lex Heater upgrade, Construction
upgrade delayed for one or two
months,
419102 0:00 419102 23:59 163 Y Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance,
tube bundle replacement. Water
quality in battery bank 2 drops,
forcing the reinstallation of existing
tube bundle and postponement of
Lex Heater upgrade. Construction
1..+ upgrade delayed for one or two
months,
.-
....
.,
'':; 41101020:00 4110102 23:59 231 Y Lex heater shut in for maintenance OPERATIONAL UNSCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance
1<;;0. tube bundle replacement. Water
quality in battery bank 2 drops,
.. forcing the reinstallation of existing
f tube bundle and postponement of
I~' Lex Heater upgrade. Construction
upgrade delayed for one or two
months,
41111020:00 4111/02 23:59 339 Y Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance
tube bundle replacement. Water
quality in battery bank 2 drops,
forcing the reinstallation of existing
tube bundle and postponement of .
Lex Heater upgrade. Construction
, " upgrade delayed for one or two
months,
Report Date: 5/15/02
Page: 1 of 6
Excess Flare Log Report
41121020:00 411210223:59 541 Y Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance
tube bundle replacement. Water
quality in battery bank 2 drops.
forcing the reinstallation of existing
tube bundle and postponement of
,.. Lex Heater upgrade, Construction
upgrade delayed for one or two
months.
4113102 0:00 4113102 23:59 541 Y Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance
tube bundle replacement. Water
quality in battery bank 2 drops,
forcing the reinstallation of existing
tube bundle and postponement of
Lex Heater upgrade, Construction
upgrade delayed for one or two
months,
..t 41141020:00 4114102 23:59 418 Y Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance
tube bundle replacement. Water
e- quality in battery bank 2 drops,
V forcing the reinstallation of existing
";. tube bundle and postponement of
Lex Heater upgrade. Construction
"'i upgrade delayed for one or two
I~ months,
41151020:00 411510223:59 399 Y Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance
tube bundle replacement. Water
quality in battery bank 2 drops,
forcing the reinstallation of existing
tube bundle and postponement of
Lex Heater upgrade, Construction
upgrade delayed for one or two
months
4116102 0:00 411610223:59 348 N Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance
tube bundle replacement. Water
quality in battery bank 2 drops,
forcing the reinstallation of existing
tube bundle and postponement of
Lex Heater upgrade. Construction
upgrade delayed for one or two
months,
.t;
Report Date: 5/15/02
Page: 2 of 6
Excess Flare Log Report
t
~ 41171020:00 4116102 8:00 80 Y Lex heater shut in for maintenance OPERATIONAL SCHEDULED MAINTENANCE Work on upgrading Lex Heater, Maintenance
tube bundle replacement. Water
G quality in battery bank 2 drops,
~~ forcing the reinstallation of existing
I" tube bundle and postponement of
Lex Heater upgrade. Construction
''ù upgrade delayed for one or two
~ months.
Report Date: 5/15/02
Page: 30f6
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Operator
Unocal
Field(s)
Trading Bay UnitlField
MonthlYear of Disposition
May 2002
Trading Bay Production Facility
Disposition Total Volumes MCF
1. Sold 6,882
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hòur 9,359 /'
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 775
6. Used for lease operations 84,010
7. *Other (Shrinkage) (3,854)
TOTAL items 1-7 97,172
8. NGL gas equivalent produced 0
9. Purchased gas From Steelhead & Grayling GGS 6,882
to treat Monopod Oil
10. Transferred from: Monopod, Grayling, King 189,658
Salmon, Steelhead, Dolly Varden .
11. Transferred to: Dolly Varden 92,486
King Salmon
Remarks:
1l1ereby certl/j~\the t~:1:.r:Jg 1~ tru~ and correct to the best otmy knowledge.
Signature: Jt:e..h, '. . ¡l/<-Æ"/ Title: Acct. Super. Date: II-Jun-02
I II
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
Monopod - TBF 1.17%
Dolly Varden 3.27%
Grayling 11.41 %
King. Salmon 2.50%
Steelhead 81.29%
Monopod - TBU 0.36%
Official Use Only - Flaring Authorization> 1 hr.
1. Safety
q35'1 MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
~~
~ I, /6 ~
Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 MC 75.235.
Excess Flare Log Report
Facility Name:
TRADING BAY PRODUCTION FACILIT
MonthlY ear:
Date & Time Event Gas Steps Taken to
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence
5/11020:00 5/3110224:00 8609 Planned COV's Flared for May 2002 OPERATIONAL Lex heater shut in so that factory Maintenance.
required maintenance could be
completed.
5129/02 0:00 5129/02 23:59 250 Y Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS Lex heater shut in so that factory Maintenance.
to Insulation failure. required maintenance could be
completed.
r r
5130102 0:00 5/30102 23:59 250 N Lex heater shut In for maintenance do OPERATIONAL NORMAL OPERATIONS Lex heater shut in so that factory Maintenance.
to insulation failure. required maintenance could be
completed.
5/311020:00 5/3110223:59 250 N Lex heater shut In for maintenance do OPERATIONAL NORMAL OPERATIONS Lex heater shut in so that factory Maintenance.
to Insulation failure. required maintenance could be
completed.
Report Datè: 6/11/02
Page: 1 of 6
·....
ALASKA OIL AND GAS CONSERV A TION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Operator
Unocal
Field(s)
Trading Bay UnitlField
MonthNear of Disposition
June 2002
Trading Bay Production Facility
Disposition Total Volumes MCF
1. Sold 5,528
2. Reinjected 0
.
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 27,477 ./
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 750
6. Used for lease operations 68,964
7. *Other (Shrinkage) (4,575)
TOTAL items 1-7 98,144
8. NGL gas equivalent produced 0
9. Purchased gas From Steelhead & Grayling GGS 5,528
to treat Monopod Oil .
10. Transferred from: Monopod, Grayling, King 202,595
Salmon, Steelhead, Dolly Varden
11. Transferred to: Dolly Varden 104,451
King Salmon.
Remarks:
1 hereby ce~~at the to~gomg IS true ana correct to the pest of my imowledge.
Signature: :ïLéh 11 1(71)L~ Title: Acct. Super. Date: I1-Jul-02
tf (j
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
Monopod - TBF 1.02%
Dolly Varden 3.24%
Grayling 10.63%
King Salmon 2.06%
Steelhead 82.72%
Monopod - TBU 0.32%
Official Use Qnly - Flaring Authorization> 1 hr.
1. Safety 21, 471 MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
~~ í/r!ðr
Commissio er Date
~-
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by tlte 20th ofthe month following the
month of disposition.
Authority 20 AAC 25.235.
Excess Flare Log Report
Facility Name:
TRADING BAY PRODUCTION FACILlT
MonthlYear:
Date & Time Event Gas Steps Taken to
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence
6/11020:00 6130102 24:00 19977 Planned COY's Flared for June 2002 OPERATIONAL Maintenance.
6111020:00 611102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance.
to insulation failure. shut down so that factory required
maintenance can be completed.
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas !,!ormally burned by
Lex heater and currenly being
flared is sour,
612102 0:00 612102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance.
to insulation failure, shut down so that factory required
maintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally burned by
Lex heater and currenly being
flared is sour.
.
613102 0:00 613102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance.
to insulation failure. shut down so that factory required
maintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally burned by
Lex heater and currenly being
flared is sour.
614102 0:00 614102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance,
to insulation failure shut down so that factory required
maintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally burned by
Lex heater and currenly being
flared is sour.
Report Date: 7/12/02
Page: 1 of 14
Excess Flare Log Report
615102 0:00 615102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance.
to insulation failure shut down so that factory required
maintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally bumed by
Lex heater and currenly being
flared is sour.
616102 0:00 616102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance,
to insulation failure, shut down so that factory required·
Il'!¡¡intenance can be completed.
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally bumed by
Lex heater and currenly being
flared is sour.
617102 0:00 617102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance,
to insulation failure. shut down so that factory required
maintenance can be completed.
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally bumed by
Lex heater and currenly being
flared is sour.
618102 0:00 618102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance.
to insulation failure, shut down so that factory required
maintenance can be completed.
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally bumed by
Lex heater and currenly being
flared is sour,
6191020:00 619102 23:59 , 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance.
to insulation failure. shut down so that factory required
maintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally bumed by
Lex heater and currenly being
flared is sour,
Report Date: 7/12/02
Page: 2 of 14
Excess Flare Log Report
61101020:00 6110102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance.
to insulation failure, shut down so that factory required
maintenance can be completed.
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally bumed by
Lex heater and currenly being
flared is sour.
61111020:00 611110223:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance,
to insulation failure. shut down so that factory required
-- rT).aintenance can be completed.
Work is proceeding 7 days a week
with completion anticipated by rnid-
August. Gas normally burned by
Lex heater and currenly being
flared is sour.
61121020:00 6112102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance.
to insulation failure. shut down so that factory required
maintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally burned by
Lex heater and currenly being
flared is sour,
61131020:00 6113102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance,
to insulation failure, shut down so that factory required
maintenance can be completed.
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally burned by
Lex heater and currenly being
flared is sour.
6114/02 0:00 611410223:59 ~ 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance.
, . to insulation failure. shut down so that factory required
maintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally burned by
Lex heater and currenly being
flared is sour.
Report Date: 7/12/02
Page: 3 of 14
Excess Flare Log Report
6115102 0:00 6115/02 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reportedin May, Lex heater Maintenance,
to insulation failure, shut down so that factory required
maintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally burned by
Lex heater and currenly being
flared is sour,
61161020:00 6116102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance,
to insulation failure, shut down so that factory required
maintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally burned by
Lex heater and currenly being
flared is sour,
6117/020:00 611710223:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance.
to insulation failure, shut down so that factory required
maintenance can be completed.
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally burned by
Lex heater and currenly being
flared is sour,
6/181020:00 6/1810223:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May. Lex heater Maintenance.
to insulation failure, shut down so that factory required
maintenance can be completed.
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally burned by
Lex heater and currenly being
flared is sour,
6119102 0:00 6119102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance.
to insulation failure. shut down so that factory required
maintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally burned by
Lex heater and currenly being
flared is sour,
Report Date: 7/12/02
Page: 4 of 14
Excess Flare Log Report
6120102 0:00 6120102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance,
to insulation failure, shut down so that factory required
maintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas nonnally bumed by
Lex heater and currenly being
flared is sour.
61211020:00 612110223:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance.
to insulation failure. shut down so that factory required
-- m,aintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas nonnally bumed by
Lex heater and currenly being
flared is sour,
6122/02 0:00 6122102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance,
to insulation failure. shut down so that factory required
maintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas nonnally bumed by
Lex heater and currenly being
flared is sour.
61231020:00 6123102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance.
to insulation failure, shut down so that factory required
maintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas nonnally bumed by
Lex heater and currenly being
flared is sour,
6124102 0:00 6124102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance.
to insulation failure. shut down so that factory required
maintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas nonnally burned by
Lex heater and currenly being
flared is sour,
Report Date: 7/12/02
Page: 5 of 14
Excess Flare Log Report
6125102 0:00 6125102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS LAs reported in May, Lex heater Maintenance,
to insulation failure, shut down so that factory required
maintenance can be completed.
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally burned by
Lex heater and currenly being
flared is sour.
6126102 0:00 6126102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May. Lex heater Maintenance,
to insulation failure. shut down so that factory required
maintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally burned by
Lex heater and currenly being
flared is sour,
6127102 0:00 612710223:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May. Lex heater Maintenance.
to insulation failure. shut down so that factory required
maintenance can be completed.
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally burned by
Lex heater and currenly being
flared is sour.
6128102 0:00 6128102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May. Lex heater Maintenance.
to insulation failure, shut down so that factory required
maintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally burned by
Lex heater and currenly being
flared is sour.
6129102 0:00 6129102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance.
'. to insulation failure, shut down so that factory required
maintenance can be completed.
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally burned by
Lex heater and currenly being
flared is sour.
Report Date: 7/12/02
Page: 6 of 14
Excess Flare Log Report
6130102 0:00 6130102 23:59 250 N Lex heater shut in for maintenance do OPERATIONAL NORMAL OPERATIONS As reported in May, Lex heater Maintenance,
to insulation failure. shut down so that factory required
maintenance can be completed,
Work is proceeding 7 days a week
with completion anticipated by mid-
August. Gas normally bumed by
Lex heater and currenly being
flared is sour,
Report Date: 7/12/02
Page: 7 of 14
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Operator
Unocal
Field(s)
Trading Bay UnitlField
MonthlY ear of Disposition
July 2002
Trading Bay Production Facility
Disposition Total Volumes MCF
1. Sold 4,366
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 34,164
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 775
6. Used for lease operations 65,374
-
7. *Other (Shrinkage) (4,337)
TOTAL items 1-7 100,342
8. NGL gas equivalent produced 0
9. Purchased gas From Steelhead & Grayling GGS 4,366
to treat Monopod Oil
10. Transferred from: Monopod, Grayling King 204,621
Salmon, Steelhead, Dolly Varden
11. Transferred to: Dolly Varden 104,278
King Salmon
Remarks:
1 hereby certity that the toregomg IS true and correct to the best ot my knowledge.
Signature: ~crÌJt!{¡.~.J Title: Acct. Super. Date: 09-Aug-02
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
Monopod - TBF 1.02%
Dolly Varden 2.95%
Grayling 10.21%
King Salmon 1.63%
Steelhead 83.82%
Monopod - TBU 0.36%
Official Use Only - Flaring Authorization> 1 hr.
1. Safety 34 I/:,4 MCF ~
2. Lease Use MCF
3. Conserv. Purposes MCF
(au...~ Q,AJ, ~ 0¡1(~(. ;;)-
Commls ner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 MC 25.235.
Excess Flare Log Report
Facility Name:
TRADING BAY PRODUCTION FACILIT
Month/Year:
July 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence Mp·2 ID Number
7/1102 0:00 7/3110223:59 26414 Y COV's Flared fur July
7/1/020:00 7/1/0223:59 250 Y Lex heater shut down fur OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months. Lex Maintenance, R·H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work is proceeding
seven days a week with
completion anticipsted by mid-
August. Note: Gas normally
bumed by Lex heater and
CUffentiy being nared IS sour
712/020:00 7/2/0223:59 250 Y Lex heater shut down fur OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance. R·H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
clØTentfy being nared Is sour
7131020:00 7/3/0223:59 250 Y Lex heater shut down fur OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work is proceeding
seven days a week with
completion anticipated by mid-
- August. Note: Gas normally
bumed by Lex heater and
currentiy being nared Is sour
7/41020:00 7/4/02 23:59 250 Y Lex heater shut down fur OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance. R-H-3030
maintenance. heater shut down fur factory
required maintenance to be
completed. Work is proceeding
seven days a week with
completion anticipsted by mid-
August. Note: Gas normally
burned by Lex heater and
currentiy being nared is sour
7/5102 0:00 7/5/02 23:59 250 Y Lex heater shut down fur OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, lex Maintenance. R-H-3030
maintenance. heater shut down fur factory
required maintenance to be
completed. Work is proceeding
seven days a week with
completion anticipsted by mid-
August. Note: Gas normally
burned by Lex heater and
clØTentiy being nared Is sour
7/61020:00 7/6/0223:59 250 Y Lex heater shut down fur OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months. Lex Maintenance. R-H-3030
maintenance. heater shut down fur factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currentfy being nared Is sour
Report Dale: 8/12102
Page: 1 of 5
Excess Flare Log Report
7171020:00 7f710223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currentiy being flared Is sour
7/8/020:00 7/8/0223:59 250 Y lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed. Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currenOy being flared is sour
7/9102 0:00 71910223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currently being flared Is sour
7/101020:00 7/10102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-303Q
maintenance. heater shut down for factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
- completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currenUy being flared Is sour
7/11/020:00 7/1110223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed. Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
bumed by Lex heater and
currently being flared Is sour
7/12/020:00 7/12/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months. Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
bumed by Lex heater and
currenUy being flared Is sour
7/13/020:00 7/13/0223:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currently being flared is sour
Report Date: 8/12102
Page: 2 of 5
Excess Flare Log Report
7/14/020:00 7/14/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed. Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currenUy being flared Is sour
7/151020:00 7/1510223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months. Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currently being flared is sour
7/16/020:00 7/16102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currently befng flared is sour
7/171020:00 7/1710223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months. Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
- completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currently being flared is sour
7/16102 0:00 7/18/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas oormally
burned by Lex heater and
currentiy being flared is sour
7/19102 0:00 7/1910223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas oormally
burned by Lex heater and
currenOy being flared is sour
7/201020:00 7120102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance, R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas oormally
burned by Lex heater and
currently being flared Is sour
Report Date: 8112102
Page: 3 of 5
Excess Flare Log Report
7/21/02 0:00 7/2110223:59 250 Y Lex heater shut down lor OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down lor factory
required maintenance to be
completed. Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
bumed by Lex heater and
currently being flared Is sour
7122102 0:00 7/22/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down lor factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
bumed by Lex heater and
currenUy being flared is sour
7/23/02 0:00 7/23/0223:59 250 Y Lex heater shut down lor OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months. Lex Maintenance. R-H-3030
maintenance. healer shut down lor factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currently being flared is sour
7/241020:00 7/24102 23:59 250 y Lex heater shut down lor OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down lor factory
required maintenance to be
completed. Work is proceeding
seven days a week with
- completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currently being flared Is sour
7/25102 0:00 7/2510223:59 250 Y Lex heater shut down lor OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months. Lex Maintenance. R-H-3030
maintenance, heater shut down for factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currently being ftared Is sour
7/26/020:00 7/26/0223:59 250 y Lex heater shut down lor OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down lor factory
required maintenance to be
completed. Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currently being flared Is sour
7/27102 0:00 7/27/0223:59 250 y Lex heater shut down lor OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down lor factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currenUy being flared Is sour
Report Date: 8/12102
Page: 4 of 5
Excess Flare Log Report
7/281020:00 7/28/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed. Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
bumed by Lex heater and
currently being flared Is sour
7/29/020:00 7/29/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed. Work IS proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currently being flared Is sour
7/30102 0:00 7/3010223:59 250 Y Lex heater shut down for OPERATIONAL OTHER: SEE DESC OF EVENT As reported In prior months. Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Wor1< Is proceeding
seven days a week with
completion anticipated by mid-
August, Note: Gas normally
burned by Lex heater and
currently being flared Is sour
7/311020:00 7/31102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Wor1< Is proceeding
seven days a week with
- completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currently being flared is sour
Report Date: 8112102
Page: 5 of 5
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Operator
Unocal
Field(s)
Trading Bay UnitlField
MonthlY ear of Disposition
August 2002
Trading Bay Production Facility
Disposition Total Volumes MCF
1. Sold 3,974
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 36,999 ¡,. /
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 775
6. Used for lease operations 60,617
7. *Other (Shrinkage) (456)
TOTAL items 1-7 101,909
8. NGL gas equivalent produced 0
9. Purchased gas From Steelhead & Grayling GGS 3,974
to treat Monopod Oil
10. Transferred from: Monopod, Grayling, King 234,476
Salmon, Steelhead, Dolly Varden
11. Transferred to: Dolly Varden, King Salmon 132,567
Monopod
Remarks:
1 hereby certJ.~ that the 10regomg IS true ana correct to the best 01 my talOWleage.
Signature: ;2{Stl:; 2lC' [J~ Title: Acct. Super. Date: II-Sep-02
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
Monopod - TBF 1.27%
Dolly Varden 2.95%
Grayling 12.24%
King Salmon 1.70%
Steelhead 81.37%
Monopod - TBU 0.48%
Official Use Only - Flaring Authorization> 1 hr.
1. Safety 3(" '(ClCf MCF ~
2. Lease Use MCF
3. Conserv. Purposes MCF
Cíw ' ~'~~Æ'/ ItLI()~
com~ner b Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Excess Flare Log Report
Facility Name;
TRADING BAY PRODUCTION FACILlT
MonthlYear:
August 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP·2 ID Number
8/11020:00 8/3110223:59 28223 Y COV's Flared for August
8/1102 0:00 8/1/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currenUy being flared is sour
8/2102 0:00 8/3/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance, R-H-017
maintenance. heater shut down for factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
compieUon anticipated by rnld-
August Note: Gas normally
burned by Lex heater and
currenUy being flared Is sour
8/3/02 0:00 8/3/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030
maintenance, heater shut down for factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
completion anticipated by mld-
August Note: Gas normally
burned by Lex heater and
currenUy being flared Is sour
8/4102 0:00 8/4102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030
maintenance, heater shut down for factory
required maintenance to be
completed. Work Is proceeding
seven days a week with
completion anticipated by mld-
August. Note: Gas normally
burned by Lex heater and
currenUy being flared Is sour
8/5102 0:00 8/5102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030
maintenance, heater shut down for factory
required maintenance to be
completed. Work Is proceeding
seven days a week with
completion anticipated by mld-
August. Note: Gas normally
burned by Lex heater and
currenUy being flared is sour
Report Date: 9/16/02
Page: 1 of 6
Excess Flare Log Report
8/6102 0:00 8/6/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
completion anticipated by mld-
August. Note; Gas normally
bumed by Lex heater and
currently being flared is sour
817102 0:00 817/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed. Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note; Gas normally
bumed by Lex heater and
currenUy being flared is sour
8/8102 0;00 8/8102 23;59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance, R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed. Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
bumed by Lex heater and
currenUy being flared is sour
8/9102 0:00 81910223:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
bumed by Lex heater and
culTllf1tiy being flared is sour
8/10/02 0:00 8/10102 23;59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currentiy being flared is sour
8/10/02 10;00 8/10102 13;00 46 Y Inspect gas line from Grayling OPERATIONAL NORMAL OPERATIONS Blow down line, flare gas at Pipeline inspections.
Platform to shore. Trading Bay while inspection is
being conducted. Run cleaning
pig through line, All necessary
personnel and equipment on
site, Une returned to normal
operations.
Report Date: 9/16/02
Page: 2 of 6
Excess Flare Log Report
8111102 0:00 8/11102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030
maintenance, heater shut down for factory
required maintenance to be
completed, Work is proceeding
seven days a week with
completion anticipated by mld-
August. Note: Gas normally
burned by Lex heater and
currently being flared is sour
8/11/0220:50 8/1110223:10 675 y Inspect gas line from Grayling OPERATIONAL NORMAL OPERATIONS Blow down line, 'flare gas at Pipeline inspection. 00.00.00
Platform to shore. Trading Bay while inspection is
being conducted, Run Cleaning
pig through line. All necessary
personnel and equipment on
site. Line returned to normal
operations,
8/12102 0:00 8/12102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed. Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas nonnally
burned by Lex heater and
currently being flared is sour
8/12102 0:00 8/1210223:59 74 Y Inspect gas line from Grayling OPERATIONAL NORMAL OPERATIONS Blow down line, flare gas at Pipeline Inspection,
Platform '0 shore, Trading Bay while Inspection is
being conducted. Run Cleaning
pig through line, All necessary
personnel and equipment on
site, Line returned to normal
operations.
8/13/02 0:00 8/13102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months. Lex Maintenance, R-H-3030
maintenance, heater shut down for factory
required maintenance to be
completed. Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currently being flared is sour
8/141020:00 8/14/02 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
burned by Lex heater and
currently being flared is sour
Report Date: 9/16/02
Page: 3 of 6
Excess Flare Log Report
8/14/02 12:20 8/14/02 14:30 231 y Inspect gas line from Grayling OPERATIONAL NORMAL OPERATIONS Blow down line, flare gas at Pipeline inspection.
Platfo011 to shore, Trading Bay while inspection is
being conducted, Run cleaning
pig through line, All necessary
personnel and equipment on
site, Line retumed to nOO11al
operations.
8/151020:00 8115/02 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030
maintenance, heater shut down for factory
required maintenance to be
completed. Work is proceeding
seven days a week with
completion anticipated by mid-
August Note: Gas nonnally
bumed by Lex heater and
currenUy being flared is sour
8/16102 0:00 8/16/02 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance, R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed. Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas nonnally
bumed by Lex heater and
currently being flared is sour
8/17102 0:00 8/1710223:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance. R-H-3030
maintenance, heater shut down for factory
required maintenance to be
completed, Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas nonnally
bumed by Lex heater and
currently being flared is sour
8/18/02 0:00 8/18/02 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030
maintenance, heater shut down for factory
required maintenance to be
completed, Work is proceeding
seven days a week with
compleUon anticipated by mld-
August. Note: Gas nOO11ally
bumed by Lex heater and
currently being flared is sour
8/19/02 0:00 8/19102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work is proceeding
seven days a week with
completion anticipated by mid-
August Note: Gas nOO11ally
bumed by Lex heater and
currently being flared is sour
Report Date: 9/16/02
Page: 4 of 6
Excess Flare Log Report
8/20102 0:00 8/20/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030
maintenance, heater shut down for factory
required maintenance to be
completed. Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas nonnally
bumed by Lex heater and
currently being flared is sour
8/211020:00 8/21/0223:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed. Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas nonnally
bumed by Lex heater and
currently being flared Is sour
8/22102 0:00 8/22102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior l1'10nths, Lex Maintenance, R-H-3030
maintenance, heater shut down for factory
required maintenance to be
completed, Work is proceeding
seven days a week with
completion antidpated by mid-
August. Note: Gas nonnally
bumed by Lex heater and
currently being flared is sour
8/23102 0:00 8/23102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed. Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas normally
bumed by Lex heater and
currently being flared is sour
8/24/02 0:00 8/24102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030
maintenance, heater shut down for factory
required maintenance to be
completed, Work is proceeding
seven days a week with
completion anticipated by mld-
August. Note: Gas normally
bumed by Lex heater and
currently being flared is sour
8/25102 0:00 8/25102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance, R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed. Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas nonnally
bumed by Lex heater and
currently being flared is sour
Report Date: 9/16/02
Page: 5 of 6
Excess Flare Log Report
8/26102 0:00 8/26/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas nonnally
bumed by Lex heater and
currenUy being flared is sour
8/271020:00 8/27/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030
maintenance, heater shut down for factory
required maintenance to be
completed. Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas nonnally
bumed by Lex heater and
currenUy being flared is sour
8/28/02 0:00 8/28/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance, R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed. Work is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas nonnally
bumed by Lex heater and
currenUy being flared is sour
8/29102 0:00 8/29102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported In prior months, Lex Maintenance, R-H-3030
maintenance, heater shut down for factory
required maintenance to be
completed. Work is proceeding
seven days a week with
completion anticipated by mid-
August, Note: Gas normally
bumed by Lex heater and
currently being flared Is sour
8130/02 0:00 8130102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months, Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed. Work is proceeding
seven days a week with
compleUon anticipated by mid-
August. Note: Gas nonnally
bumed by Lex heater and
currently being flared is sour
8/311020:00 8/31/0223:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE As reported in prior months. Lex Maintenance. R-H-3030
maintenance. heater shut down for factory
required maintenance to be
completed, Work Is proceeding
seven days a week with
completion anticipated by mid-
August. Note: Gas nonnally
bumed by Lex heater and
currenUy being flared is sour
Report Date: 9/16/02
Page: 6 of 6
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Operator
Unocal
Field(s)
Trading Bay UnitlField
MonthlY ear of Disposition
September 2002
Trading Bay Production Facility
Disposition Total Volumes MCF
1. Sold 3,475
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 18,610
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 750
6. Used for lease operations 53,558
7. *Other (Meter Difference) 2,685
TOTAL items 1-7 79,078
8. NGL gas equivalent produced 0
9. Purchased gas From Steelhead & Grayling GGS 3,475
to treat Monopod Oil
10. Transferred from: Monopod, Grayling, King 199,094
Salmon, Steelhead, Dolly Varden
11. Transferred to: Dolly Varden, King Salmon 120,016
Monopod
Remarks:
1 ~erebY certl~ Ie ~oregom~_.true a~d co)'ect to the best ot.my knowledge.
SIgnature: ;/ Þ1 (j, t~~ TItle: Acct. Super. Date: 16-0ct-02
/I II
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
Monopod - TBF 1.34%
Dolly Varden 2.96%
Grayling 11.28%
¡/ King Salmon 1.32%
Steelhead 82.73%
Monopod - TBU 0.37%
Official Use Only - Flaring Authorization> 1 hr.
1. Safety
12> "'OMCF
I
~
2. Lease Use
MCF
3. Conserv. Purposes
MCF
lð/,,y!oy
Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Excess Flare Log Report
Facility Name:
TRADING BAY PRODUCTION FACILlT
MonthlYear:
September 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
911/020:00 9/30/02 23:59 15050 Y COV's Flared for September
9/1/02 0:00 9/1/0223:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance. R-H-3030
maintenance. maintenance/system upgrade.
Note: Sour gas is burned in Lex
heater.
9121020:00 912102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance, R-H-3030
maintenance. maintenance/system upgrade.
Note: Sour gas is burned in Lex
heater.
9/3/020:00 9/3/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance, R-H-3030
maintenance. maintenance/system upgrade,
Note: Sour gas is bumed in Lex
heater.
9/41020:00 9/4102 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance, R-H·3030
maintenance. maintenance/system upgrade,
Note: Sour gas is burned in Lex
heater.
9/5/02 0:00 9/5/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance, R-H-3030
maintenance. maintenance/system upgrade,
Note: Sour gas is burned in Lex
heater,
Report Date: 10/16/02
Excess Flare Log Report
9/6/02 0:00 9/6/0223:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance. R-H-3030
maintenance. maintenance/system upgrade.
Note: Sour gas is bumed in Lex
heater,
9f7102 0:00 9f7102 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance. R-H-3030
maintenance. maintenance/system upgrade,
Note: Sour gas is bumed in Lex
heater.
9/8102 0:00 91810223:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance, R-H-3030
maintenance. maintenance/system upgrade,
Note: Sour gas is bumed in Lex
heater.
9/9/02 0:00 9/9/02 23:59 250 Y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance, R-H-3030
maintenance. maintenance/system upgrade,
Note: Sour gas Is bumed in Lex
heater.
9/10/02 0:00 9/1010223:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance. R-H-3030
maintenance, maintenance/system upgrade.
Note: Sour gas is bumed in Lex
heater.
9/111020:00 9/11/02 23:59 250 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance, R-H-3030
maintenance, maintenance/system upgrade,
Note: Sour gas is bumed in Lex
heater,
Report Date: 10/16/02
Excess Flare Log Report
9/12/020:00 9/12/02 23:59 250 y Lex heater shut in for maintenance, OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance. R-H-3030
maintenance/system upgrade,
Note: Sour gas is bumed in Lex
heater,
9/131020:00 9/13/0223:59 199 Y Lex heater shut down for OPERATiONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance. R-H-3030
maintenance. maintenance/system upgrade,
Note: Sour gas is bumed In Lex
heater,
9/14102 0:00 9/14102 23:59 157 y Lex heater shut down for OPERATIONAL SCHEDULED MAINTENANCE Lex heater shut down for Scheduled maintenance. R-H-3030
maintenance. maintenance/system upgrade.
Note: Sour gas is bumed in Lex
heater,
91151020:00 9/15/02 23:59 156 Y Lex heater shut down for OPERATIONAL SCHEDULED MAiNTENANCE Lex heater shut down for Scheduled maintenance, R-H-3030
maintenance. maintenance/system upgrade,
Note: Sour gas is bumed in Lex
heater,
9/29102 6:00 9/29102 23:59 10 Y Bleeding down gas system to install OPERATIONAL SCHEDULED MAINTENANCE Upgrading wiring into the new Maintenance.
new UP systems, preseperatlon PLC control panel.
Preplanning allowed to all
equipment and personnel to be
available for completJon of project.
9/30/02 0:00 9130/02 12:00 38 N Pre-seperatJon control system failure, OPERATIONAL UNSCHEDULED MAINTENANCE New pre-separatJon controls Repair,
installed were not fUnctioning
properly, Utilized Instrument
Technician to diagnose problem
and repair, Adjustments made
and retumed to nonnai
operations,
Report Date: 10/16/02
"
/
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Operator
Unocal
Field(s)
Trading Bay UnitlField
MonthlY ear of Disposition
October 2002
Trading Bay Production Facility
Disposition Total Volumes MCF
1. Sold 2,724
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 3,146 v
(Supplemental report required-See 20 AAC 25.235) V
5. Pilot and Purge 775
6. Used for lease operations 48,953
7. *Other (Meter Difference) 1,817
TOTAL items 1-7 57,415
8. NGL gas equivalent produced 0
9. Purchased gas From Steelhead & Grayling GGS 2,724
to treat Monopod Oil
10. Transferred from: Monopod, Grayling, King 197,866
Salmon, Steelhead, Dolly Varden
11. Transferred to: Dolly Varden, King Salmon 140,451
Monopod
Remarks:
1 hereby certIty v~t the t0j;0mg'fs true and correct to the best ot my knowledge.
Signature: á~¡t{ Q, (d/rJ Title: Acct. Super. Date: ll-Nov-02
777
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percént
Monopod - TBF 0.87%
Dolly Varden 2.56%
Grayling 11.31%
King Salmon 0.94%
Steelhead 84.06%
Monopod - TBU 0.27%
Offici&1 Us~ Only - Flaring Authorization> 1 hr.
1. Safety 3.'44, MCF
2. Lease Use MCF
3. Conserv. Purposes' MCF
~~~ '1~(~rO~
Commis~n~ Date
.:f'~
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
"
Excess Flare Log Report
Facility Name:
TRADING BAY PRODUCTION FACILlT
MonthlYear:
October 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Descñption of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
1011/02 0:00 10/31/0223:59 3146 Y COV's Flared for October
,
Report Date: 11/12/02
Page: 1 of 6
REVISED COPY'
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
'=-.
Date
~-,....,.,-.._;~
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthNear of Disposition
Trading Bay Production Facility Trading Bay Unit REVISION
1330000000 Tradina Bav Onshore Facilitv MRF McArthur River Field Unocal Alaska November-02
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent
of Total Volume.
6. Sold 2,553 Pool Name Pool Code Percent
7. Reinjected 0
8. Flared or vented 1 hour or less 0
9. Flared or vented more than 1 hour (see instr.) 5,126
10. Pilot and Purge 750
11. Used for lease operations (specify in Remarks) 50,113
12. Other (see instructions) .':: ' .'s: ~~F'" ';:;;/&:::,ê;.
Shrinkaae (160' Authorization >1 hr: Safety MCF
13. TOTAL VOLUME (ITEMS 6-12) 58,382 MCF
Lease Use
14. NGL Gas Equivalent 0 MCF
Conservation
15. Purchased gas 3,298 Waste: MCF
16. Transferred from: 210,895
17. Transferred to: (Express as a negative #) Commissioner Date
(152,513'
'HI. KemarKS:
Purchased Gas: From Steelhead & Grayling GGS 2,553
to treat Monopod Oil Revision: Per agreement reached between Forest Oil and
From Forest Oil 745 Alaska DNR. Forest Oil Gas Received through M7100 at
TSPF is to be shown as a gas purchase and not a transfer
Transferred From: Monopod, Grayling, King 210,895 of gas.
Salmon, Steelhead, Dolly Varden
Transferred To: Dolly Varden, King Salmon 152,513
Monopod
I he,eby r at the foregoing is true and correj~~è~ ~~t ';ôrmød¥ge.
lIt..In ~f5 !J\)MlJh/ ...1""(" " Q ')nf\A Note: All volumes must be
Signatu Title Production Accountant corrected to pressure of 14.65 psia
Printed a ¥ (J U¡:'V ., - -~ and to a temperature of 600 F.
Name net Dormady Phone 907-263-7946 Date 12/22/2004 ?n iliIr'?¡:; ?~¡:;
form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
. t
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Trading Bay Production Facility
Operator
Unocal
Field(s)
Trading Bay UnitlFie1d
MonthlY ear of Disposition
November 2002
2. Reinjected
o
*Indicate contribution of each pool to total.
Pool Name Code Percent
Monopod - TBF 0.63%
Dolly Varden 2.70%
Grayling 11.64%
. King Salmon 0.91%
Steelhead 83.79%
Monopod - TBU 0.33%
Disposition
Total Volumes MCF
1. Sold
2,648
3. Flared or vented less than 1 hour
o
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25,235)
5,126
5. Pilot and Purge
750
7. *Other (Meter Difference)
50,763
8. NGL gas equivalent produced
o
Official Use Only - Flaring Authorization> 1 hr.
1. Safety 51Z-þ MCF
I
2. Lease Use MCF
3. Conserv. Purposes MCF
~~Jat I )q ( C~
Commis~oner . Date
J'3L
6. Used for lease operatio
(161 )
TOTAL items 1-7
59,126
9. Purchased gas
From Steelhead & Grayling GGS
to treat Monopod Oil
Monopod, Grayling, King
Salmon, Steelhead, Dolly Varden
Forest Oil
2,648
10. Transferred from:
216,403
11. Transferred to:
Dolly Varden, King Salmon
Monopod
157,277
Remarks:
Signature:
Title: Acct. Super.
Date:
18-Dec-02
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name:
TRADING BAY PRODUCTION FACILlT
Month/Year:
November 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
11/1/020:00 11/30/0223:59 5126 Y COV's Flared for November
Report Date: 12/16/02
Page: 1 of 6
REVISED COpy
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
"'1
4>.A
~
Date
1. 'Facility Number 2... Facility Name 3. Field'.,,; 4;. Operator 5, MonthlYear of Díspositioñ'
TraÎJing Bay Production Facility Trading Bay Unit ,~;r~;t , , , REVISION
Tradina Bav Onshore Facilitv MRF McArthur River Field . ·.·..t-..nffi;· ;"1..: "
1330000000 Unocal Alaska December~ . 2
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percen,t.
of Total Volume.
6. Sold 2,771 Pool Name . Pool Code' ;', "'þ'èrëent ,
. ............
7. Reinjected ,.......
0 .,
".
8. Flared or vented 1 hour or less 0
. '.
9. Flared or vented more than 1 hour (see instr.) 2,409
10. Pilot and Purge 775
.'.
11. Used for lease operations (specify in Remarks) 49,306
12. Other (see instructions) rr ,5;; \,,';, ':"!i;'.,:" ·''::.\;.:k .
Shrinkage . . (6,406 Authorization >1 hr: Safety MCF
13. TOTAL VOLUME (ITEMS 6-12) 48,855 MCF
Lease Use
14. NGL Gas Equivalent . .
0 Conservation MCF
15. Purchased gas 7,055 Waste: MCF,
. '.
16. Transferred from: 196,347
Commissioner Date
17. Transferred to: (Express ~s,a. negative #) .' (147,492
1 ö. Keman~s:
Purchased Gas; From Steelhead'& GraylingGGS 2,771
. " to treat Monopod Oil ,. 4,284 Revision; Per agree!r~nt rea?~ed between Fore,s10il and
From Forest Oil . AlaskiiïDNR. FðrestOii'G8s"Received through M7100 at
. TBPF is to tie shown as a gas purchase and not a transfer
Transferred From: Monòpod, Grayling, King 196.347 of gas.
Salmon, Steelhead. Dolly Varden
Transferred To: Dolly Varden, King Salmon 147,492
Monopod
I h_y a:e fO"''''',;o: true and oonoct 10 !he ,..t Of my k"""'ed¡f,
1)-, .øi Al Jañët l. Dorma Y Note: All volumes must be
Signa ,'~_ AAAA /J Title Production Accountant corrected to pressure of 14.65 psi8¡,
pri~~:··· U DEC2 Z 2004 and to a temperáture bf 600 F.
Na Janet Dormady Phone 907-263-7946 Date 12/22/2004 II. ?() A A ,..,,"" ?~,&;
.,,'
. \ .';",
,".
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE'
Submit in Duolicate -
\ .
A
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Operator
Unocal
Trading Bay Production Facility
Disposition
Total Volumes MCF
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. *Otlter (Meter Difference)
TOTAL items 1-7
8. NGL gas equivalent produced
9. Purchased gas
From Steelhead & Grayling GGS
to treat Monopod Oil
Monopod, Grayling, King
Salmon, Steelhead, Dolly Varden
Forest Oil
10. Transferred from:
11. Transferred to:
Dolly Varden, King Salmon
Monopod
Signature:
Title: Acct. Mgr.
Form 10-422
Rev. 4/95
2,448
..,,,
2,409
53,912
(6,406)
53,138
2,448
234,127
180,988
Date:
Field(s)
Trading Bay UnitlField
MonthlY ear of Disposition
December 2002
o
*Indicate contribution of each pool to total.
Pool Name Code Percent
Monopod - TBF 0.70%
Dolly Varden 2.47%
Grayling 11.13%
king Salmon 1.40%
Steelhead 84.04%
Monopod - TBU 0.26%
o
./'
775
Flaring Authorization> 1 hr:
1. Safety
~ 411 MCF
.~
2. Lease Use
MCF
o
3. Conserv. Purposes
MCF
~.~~
~" ....
1,o/~3
Date
,,'
16-Jan-03
/ ,. Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
montlt of disposition.
Authority 20 AAC 25.235.
, .
Excess Flare Log Report
Facility Name:
TRADING BAY PRODUCTION FACILlT
MonthlYear:
December 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
12111020:00 1213110223:59 2409 y COY's Flared for December
--
..,..
.
" ,.
Report Date: 1/16/03
Page: 1 of 1