Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutTBU Steelhead Platform / Unocal STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2008
FACILITY: TBU Steelhead Platform
OPERATOR: UNOCAL
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
Trading Bay Unit Trading Bay Unit
1330000025 Steelhead Platform McArthur River Field Unocal Alaska January -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent
of Total Volume.
6. Sold 1,320,232 Pool Name Pool Code Percent
Hemlock 520120 0.67%
7. Reinjected 0 G -Zone 520150 0.43%
West Foreland 520190 0.03%
8. Flared or vented 1 hour or less 131 Undefined Zone 520195 0.00%
GGS 520550 98.87%
9. Flared or vented more than 1 hour (see instr.) 0
10. Pilot and Purge 5,829
11. Used for lease operations (specify in Remarks) 145,265
12. Other (see instructions) 0 Authorization >1 hr: MCF
Safety
13. TOTAL VOLUME (ITEMS] I J 1,471,457 MCF
Lease Use
14. NGL Gas Equivalent FEB 2 0 2008 o Conservation MCF
15. Purchased gas 0 Waste: MCF
AleSui Ot1 6 Um : ;1!. u;. t7tzpr,t7
16. Transferred from:
A6t',u y,c"3 _ 0
Commissioner Date
17. Transferred to: (Express as a negative #) (193,560)
18. Remarks:
Transferred To: TBPF, Dolly, King, TBU A -15 193,236
COV's to TBPF 324
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be
Signature V ail 714 . Title Production Accountant corrected to pressure of 14.65 psia
and to a temperature of 60o F.
Printed Name Mary Indihar Phone 713 -432 -6238 Date 2/12/2008 Authority 20 AAC25 235
Form 10 -422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
Trading Bay Unit Trading Bay Unit
1330000025 Steelhead Platform McArthur River Field Unocal Alaska February -08
Disposition Volume MCF 20. For production from multiple pools, fist contribution of each pool as a percent
of Total Volume.
6. Sold 1,354,517 Pool Name Pool Code Percent
Hemlock 520120 0.66%
7. Reinjected 0 G -Zone 520150 0.40%
West Foreland 520190 0.03%
8. Flared or vented 1 hour or less
1,459 Undefined Zone 520195 0.00 %
GGS 520550 98.91%
9. Flared or vented more than 1 hour (see Instr.)
2,639
10. Pilot and Purge
5,608
11. Used for lease operations (specify in Remarks)
135,990
12. Other (see Instructions)
0 Authorization >1 hr: Safety MCF
13. TOTAL VOLUME (ITEMS 6 -12) 1,500,213 MCF
Lease Use
14. NGL Gas Equivalent
0 Conservation ah 37 MCF
15. Purchased gas 0 Waste: MCF
16. Transferred from:
--a!, . 4 -7-ot
17. Transferred to: (Express as a negative #) Commissioner Date
(170,172)
18. Remarks:
Transferred To: TBPF, Dolly, King, TBU A -15 169,891
COV's to TBPF 281
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/► Note: Al! volumes must be
Signature L i)� I Il . • Title Production Accountant corrected to pressure of 14.65 Asia
and to a temperature of 60o F.
Printed Name Mary Indihar Phone 713 - 432 -6238 Date 3/14/2008 Authnrity 9t? AAC95 22.5
Form 10 -422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Excess Flare Report
Chevron
111110 Month: February Year: 2008
I MO .
STEELHEAD PLATFORM
Steps Taken to
Equipmen ■
Event Gas Minimize Down AP
Reoccurrence Actions Taken
Date & Time
Reason
or -rxd-w- ' i :' ' l' AI;Til:41 0 ,' 1 :!, ,
MCF Planned Description of , ttt , cl , T 1 , ,t 1 ? „ it.,e.ar.:;.r,._:-. ,.. .4k...4if ,.. t.:,..,
Be , - -, .—P : r5t -: - T , IL ' '4 -: ' g-,3L.: Ni' „niv. 7 Ot,_,50rTP:
! ''''..*.l i..:2 , .:17,0 4
Aii-v.z,,,,,:,::"-...-,'.:-:,,,,:, ,- .:,. ,. .:,,1,;,:t . ..::::i' .::.
% I' .4 D. gt
,k,'.F.1":0;`,:t':: ,= t : '?: ' !f r '1 , w e'g`i '.. 1 ' : : e .;...::3:: **Ott4140YOWAri'Sl:'
,,;,:•:2.;,:',.,',,,,,,..,;..f:i0,,V, ,, ! --',, , .. 1 :if ,34., 4' 1 :.;:'. , :?::' , 4 1 : , =.2.3::: .-,;' - 'i' ': -',, : : ' : ;..4 A.,„ , ,,f1,.,„.. t
1
/kTINV41: '' ' '' :,: '1' ' ;'. i i, ;,... ,;;;;;A;S: -, .,',:f„; : , :;: ,:::",;. tlsAwmis,c.AIF:!1..,.,-..,,....,.,...,,,,,,..:.
. ' ''''i;)t ''..-', ':,'-;•.-, : . .- , : '''''. :, ' . E
'-...' :':' 7 . ' •,.-:-.,.:•:-...1.-•-:,'..0:.,:i':::',,,:-%-.,:yrof,,,4-.•„..,:-, .7..,:i..:..k..:,.,.:::::::.:,.:•,,,401701;0iNA014SC-
i
'• :. - ' :,.; ,... :. ,:_.:, .,,•- : • ' - -•,:.::;.',, 2, ' :::.;;;;;:y...': toligoir)r;ei.:;;.,,,:;-:.:...=.:::,,,-",.:42.. .:.,.;;;,,,i....,..::::..,-;.;:,•c:..9:11Por:04;v:'..„.;..4:2,•,,,:,1.,:‘,,,vorok-rhEppyy#5,00:i..,
,.- : -,, ',- - ,1'-',.-;:"•;- ...'''-':,;;::. 7, : -- :::''......*), -,, ,': -., . -. Y” •-•,',•••.' ".'. 17. ' :-. •=7'.' •, -,'::-.',:.,:''';',"_ ',.: ;'' : -2-- : . "''...: , :i g' ':"!:' " .::::'"" c':;.!.-' ijiii.:445)WEtifiS100:,/;:':
., -,'- , , , '.,:-..,..: ,. : , - -, -, ,-....., , .., , - -,,, -,- ... '... ' •::*:..',:::,--.., ::,-,_ - : , , .; , . ;.,:. ; '..- : '.... ,, i. ..'. ,:. . ii;..7 4 ,'..;,?;,. ' ',,::,- ;.:, ,,'`,:f.,:,, -■:., :of-A;;;;;:yop%iar.,-"EIA:;.06.:;,,,
AS POSSIBLE.I
„ . .
UNLOADING SHUT IN OF WELL M-17 00-00-0(
CAUSING 187
NECESSARY TO
02/14/2008 01:43 PM 02/14/2008 04:20 PM M-17 OPERATIONAL ODTEsHcERG:FSEEVE ENT WELL.'
PERFORM
N WELL
WATER UP AND
RESULTING IN MAINTENANCE AND
E
EXCESS FLARING TO ELINE WORK. AFTER
UNLOAD.' COMPLETING ELINE
WORK WELL WATERED
UP AND NEEDED TO BE
UNLOADED BY FLARING.
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.'
•
1 9
*The Begin Date or End Date for this Flare is outside of the report month. The Flare amount shown is for this month only.
Page 18 of 21
„ Excess Flare Report
Month: February Year: 2008
STEELHEAD PLATFORM Continued
Steps Taken to
Date & Time Event Gas Minimize Dow M e .
MP Down M •
Begin E MCF punned Descnptjon f Incident C R
Reoccurrence Actions Taken
Be y > ,.. ; , _. ,,.. .,� - ..,..,�<,.. . .rx. �,s + , ,Planned - - : ' ' ='k _ ^, x i ':, .;. , - £ ,::>a e ',, --., a: :61
z , y . :: 0 :: ” a : � -. — i .-. < n r:., ,1,4 # :, ' F F , o � :j �_r s , 7 tfa . : a e v e� rre " O Lz A' t., ',,.,;A. 0= f
y ,: ,i„ ! .f. 1 Y . 4� ;, 3 � ; ' �,R' . — N 46,;:. � � � � M r .. ' r x .� ,. �"'' �3.:: :,.g'�y �+k ,�, ''" ..r`�y�: a �, . � r - � - � y , �,." -' � t�Fr) 't _ F:Sh`r . .;zx, x �." r�w=$` .,.z, �.� .,.>; , . rC•;
;`t" , # Y. - eyt,::%„ r � :.y^" ,' •. . i < sf A.. rs.s "1 , S•„ t: xt '' ' 's u h. ' x a �� . 'w'.'�'.'e ., s drt
,r, o, :t; .. „ £, °4 �`' v �. #;s;: - .r. � , : u:,..rr::,s'r , a %.., t o-f n +.: :.;,,'+�•-- "� :
r ... ,..:.+ S . , a .. r: "-,;� ti "S„ ., _,. y ..,.c,. - „• �" . p � � `'f: � �f7::: ,_� a' b: r
sf- +k.
_ S > , ; `s "•� .:3 . <�„ w� #�ri�;'i';:._:': ws, \n >:: "w�rt:, `"'�.,."
.,, , yrz , J ::
_
. � , - . . , .. . - .k..,, „ :':, .:. .,:� N} ,, "il N�J ,
T
Ill
•
!�' V � �fE fr � ' y �� (�(�•
: 1}
:i.f %
.O �;
s li4
i4 '
:.::„.-,,,,..i;,..c..,.. •.
, , 1
r, 9'J� }
A[ji 'I
(r :
e .
+ n
1r 4� A
y : '
M1 .
U
; 'l�il " .�RlN
r. �
- "n Y:,r
.f
y.:-
• l•
° tj 6
.
�- i
, t
�� A
02/17/2008 12:00 PM 02/17/2008 04:30 PM 343 N WELL M -17 SHUT IN OPERATIONAL OTHER: SEE UNLOADING SHUT IN OF WELL M -17 00-00-0(
CAUSING WELL TO DESC OF EVENT WELL.' NECESSARY TO
WATER UP AND PERFORM
RESULTING IN MAINTENANCE AND
EXCESS FLARING TO ELINE WORK. AFTER
UNLOAD.' COMPLETING ELINE
WORK WELL WATERED
UP AND NEEDED TO BE
UNLOADED BY FLARING.
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.
*The Begin Date or End Date for this Flare is outside of the report month. The Flare amount shown is for this month only.
Page 19 of 21
. ,
Chevron Excess Flare p
Month: Februar Year: Re 2008 ort
STEELHEAD PLATFORM Continued
Steps Taken to
Equipment
Date & Time Event Gas Minimize
Down MP -'
Begin End MGF Planned Descnptwn of Incident Category Reason 1 Ce n
F ;_ `' k {r l k o - L Reoccurrence Actions Take
a �` 4 ' ' ''':''`V !00(
C
`'` .. - ..; , - � TQ � ; p� S � : � �'' .�E N T '' 4:[x. E , � ;Y � �
P AR
N
WEIER,FJP AND.
�ITEf11l'A1VC+E -A
,_ •
G£55 ��4RING. ELIN 9�� ?A, _:•�•.. •},ry.
-G NI. Y I
�- M
.3. 4
w r:: ; P „: , ..E ,D
f, Nt ' I!
_
. lC,
� t '_ —
n' {f t4
- r te
... ,. .,. ..: ._r .. , :_ . ., .. .. -.,. - ,tVl ... ..., .. ,: : „, w ' e.:y�,X. - eye,..
Vry „v
t
' t
r
i,
, A , f , .
�:
F ,S=
— � .fl'f1�Qt
- F .., , _e , . .. . ..- . . ,. "r+`. -r ...., ,r -,, , =ii �, +meac` ` ik ` ".:
... .. . r ,
2 5 �.+ C T � j R "•• -
+ ' iMF
, .
u
i
:
0 08 12: PM 02 HUT IN OPE RATIONAL BLOW DOWN UNLOADING
02/19/2008 8 05:00 PM 584 Y WELL M 17 E S " '
SH I OF WELL M -17 0 0 -00 -0(
CAUSING WELL TO WELL WELL. NECESSARY TO
WATER UP AND PERFORM
RESULTING IN MAINTENANCE AND
EXCESS FLARING TO E A C WORK. G AFTER
UNLOAD. MPETIN ELINE
WORK WELL WATERED
UP AND NEEDED TO BE
UNLOADED BY FLARING.
RETURNED TO NORMAL
L
OPERATIONS AS SOON
AS POSSIBLE./
/ /l0_i
*The Begin Date or End Date for this Flare is outside of the report month, The Flare amount shown is for this month only.
Page 20 of 21
1 „p ,r
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT.OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field • 4. Operator 5. Month/Year of Disposition
Trading Bay Unit Trading Bay Unit
1330000025 Steelhead Platform McArthur River Field Unocal Alaska March -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent
of Total Volume.
6. Sold
1,514,608 Pool Name Pool Code Percent
Hemlock 520120 0.62%
7. Reinjected
0 G -Zone 520150 0.38%
8. Flared or vented 1 hour or less West Foreland 520190 0.03%
8 Undefined Zone 520195 0.00%
GGS 520550 98.98%
9. Flared or vented more than 1 hour (see instr.) 1,689
10. Pilot and Purge
5,710
11. Used for lease operations (specify in Remarks)
144,026
12. Other (see instructions) 0
Authorization >1 hr: MCF
Safety
13. TOTAL VOLUME (ITEMS 6 -12) 1,666,041 MCF
Lease Use /
14. NGL Gas Equivalent rfiv
0 Conservation f ' ' ' ' t 3 MCF
15. Purchased gas 0
W aste: MCF
16. Transferred from: 0 i c - `‘.:,7 17. Transferred to: (Express as a negative #) 4/
C r --- iL 72-
m issioner Date
(187,215)
18. Remarks:
Transferred To: TBPF, Dolly, King, TBU A -15 186,846
cov's to TBPF 369
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�j,, Note: All volumes must be
Signature IV!.. �LA._ Title Production Accountant corrected to pressure of 14.65 psia
and to a temperature of 60o F.
Printed Name Mary Indihar Phone 713 -432 -6238 Date 4/14/2008 Authority 91 AAC95 935
Form 10 -422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Excess Flare Report
Chevron
111100 Month: March Year: 2008
STEELHEAD PLATFORM
Steps Taken to
Equipmeni
•
Date & Time Event Gas
Minimize Down MP-
Begin End
MCF Planned Description of Incident Category Reason
Reoccurrence Actions Taken
03/01/2008 01:30 PM 03/01/2008 04:00 PM 37 N VAPOR RECOVERY OPERATIONAL OTHER: SEE COMPLETED
UNIT C-22 SHUT RECOVERY UNIT C-22
SHUT DOWN OF VAPOR H-C-0221
DESC OF EVENT FLARE TIE-IN.I R
DOWN FOR NECESSARY FOR
CONSTRUCTION TO FACILITY OPERATIONS
COMPLETE FLARE IN ORDER TO
TIE-IN.I COMPLETE FLARE
TIE-IN. RETURNED
EQUIPMENT TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.I
03/03/2008 02:00 AM 03/03/200803:05 AM 8
N . V0014 RECOVERY NOMA FIELD SHUTDOWN OF VAPOR H-C-0221
UNIT C 22 ,, • . 7
&WY= DEpubR.:AmNT-p;(:::y177...m.!y.„..e UNIT c 22.
DOWN DUE TO LOAD NECESSARY FOR
SHED AFTER FLARE :,-FweortroPERATidNs:J:
TIqq!t fl ,
RETURNED EQUIPMENT
: • '460,412,
OPERAT AS SOON
AS POSSIBLE.I
•
03/06/2008 04:00 PM 03/06/2008 09:00 PM 47 Y UNLOADING WATER OPERATIONAL OTHER: SEE NORMAL FIELD WELL M-2 FLARING 00-00-CC
FROM WELL M-2 TO DESC OF EVENT OPERATIONS.' NECESSARY FOR
RETURN TO FACILITY OPERATIONS
PRODUCTION, IN ORDER TO UNLOAD
RESULTING IN WATER. RETURNED TO
NORMAL OPERATIONS
EXCESS FLARING.'
AS SOON AS POSSIBLE.I
03/07,2008 01:00 AM 03/07/2008 02:00 PM 96 :004070(
• Y OPERATIONAL ::YANttEl%MsAR-F
FROM WELL M-2 TO
40- OF EVENT
RETURN TO . : - Aq1LiTY:::0FgRATIONP
pRRE0vLitUTC041-01017; „ ,*s1:0,t,f3ATPRNPRTP
AS POSSIBLE.I
Page 16 of 17
J .
Chevron Excess Flare Report
11110 Month: March Year: 2008
4 10
STEELHEAD PLATFORM Continued
Steps Taken to
Equipmen
Date & Time Event Gas Minimize Down MP-.
Begin End MCF Planned Description of Incident Category Reason Reoccurrence Actions Taken � ..
03/09/2008 07:00 AM 03/09/2008 08:30 AM 1461 N C-12 GAS OPERATIONAL BLOW DOWN REPLACED SHUT DOWN OF C -12
COMPRESSOR SHUT WELL COMPRESSOR GAS COMPRESSOR
DOWN DUE TO TEMPERATURE NECESSARY TO
TEMPERATURE PROBE.' PERFORM
MALFUNCTION. TROUBLESHOOTING
AND REPAIRS.
DISCOVERED A FAULTY
TEMPERATURE PROBE
AND REPLACED IT.
RETURNED TO NORMAL
OPERATIONS AS SOON
AS POSSIBLE.
LETING SHUT DO OF G R; " WN -22 H - PM - 02
DESG OF EVENT TIE - . r . ...:
EAWATER/COOLING . INS.
03/18/2008 07:25 AM 03!1812008 06:00 PM 40 Y C - SHUT DOWN TO OPERATIONAL OTHE
INSTALL �: ,.
, EC FOR
SEPiU1/_ .. i V IAI' � i7ENANCE IN
WATER ORDER .TQINsTALL;;
SEAV1rA1`ER/COpLING
W AT EXCHANG
RETURNED EltIUIPM
. .
OPERATIONS A$:500N ...
AS' POSSIBLE.I
r ., .', r, I ` b s /�,�
Page 17 of 17
I
.4
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
Trading Bay Unit Trading Bay Unit
1330000025 Steelhead Platform McArthur River Field Unocal Alaska April -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent
6. Sold of Total Volume.
1,429,519 Pool Name Pool Code Percent
Hemlock 520120 0.61%
7. Reinjected
0 G -Zone 520150 0.38%
8. Flared or vented 1 hour or less West Foreland 520190 0.03%
145 Undefined Zone 520195 0.00%
GGS 520550 98.99%
9. Flared or vented more than 1 hour (see Instr.) 527
10. Pilot and Purge
5,066
11. Used for lease operations (specify in Remarks) 138,693
12. Other (see instructions) ='i� - � �
RE pf 0 Authorization >1 hr. Safeiy MCF
13. TOTAL VOLUME (ITEMS 6 -12) €J� 1,573,950 n
Lease Use �.��� MCF �.���
r
14. NGL Gas Equivalent MAY 2 3 2008
0 Conservation MCF
15. Purchased gas
0 Waste: MCF
Alaska Oli A Malt c� Commission
16. Transferred from: Anchorage
0 � F // /��r
' "I' a/ 6 -(p - ®V
Commissioner Date
17. Transferred to: (Express as a negative #) (183,918)
18. Remarks:
Transferred To: TBPF, Dolly, King, TBU A -15 183,612
cov's to TBPF 306
I hereby certify that the foregoing is true and correct to the best of my knowledge.
( �� � ..�,"-A Note: All volumes must be
/ '
Signature / ' I l� Title Production Accountant corrected to pressure of 14.65 psia
and to a temperature of 60o F.
Printed Name Mary Indihar Phone 713 - 432 -6238 Date 5/12/2008 Authority 20 AACRS 235
Form 10-422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Chevron Excess Flare Report
Month: April Year: 2008
STEELHEAD PLATFORM
Steps Taken to
Eguipmen
Date & Time Event Gas Minimize .
Down MP -
Begin End MCF Planned Description of Incident Category Reason Reoccurrence Actions Taken
04/20/2008 12:00 AM 04/20/2008 03:00 AM 527 N FLARING OF EXCESS OPERATIONAL OTHER: SEE FIRE AND GAS EXCESS FLARING WAS 00 -00 -0(
GAS DUE TO AN DESC OF EVENT PANELS WERE NECESSARY TO
EMERGENCY PLANT INSPECTED MAINTAIN SAFE
SHUT DOWN WITHOUT ANY WORKING CONDITIONS
BELIEVED TO BE FAILURES UNTIL THE PLANT
CAUSED BY A GLITCH NOTED. NO COULD BE RESTARTED.
IN THE FIRE AND GAS EXPLANATION THE PLANT WAS
PANELS. DEFINITE OF THE SHUT RESTARTED AS
CAUSE COULD NOT DOWN COULD QUICKLY AS POSSIBLE
BE DETERMINED. I BE TO MINIMIZE FLARING.
DETERMINED. I
Page 15 of 18
it
•
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED G AS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
Trading Bay Unit " Trading Bay Unit
1330000025 Steelhead Platform McArthur River Field Unocal Alaska May -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent
of Total Volume.
6. Sold 1,282,333 . Pool Name Pool Code Percent
Hemlock 520120 0.64%
7. Reinjected 0 G -Zone 520150 0.39%
West Foreland 520190 0.03%
8. Flared or vented 1 hour or less 569 Undefined Zone 520195 0.00%
GGS 520550 98.95%
9. Flared or vented more than 1 hour (see Instr.) 2 621
10. Pilot and Purge 5,683
11. Used for lease operations (specify in Remarks) 134 378
12. Other (see instructions) h
Autorizat(on >1 he
O Safety -� ' MCF . tt l i U 4
13. TOTAL VOLUME (ITEMS 6 -12) 1,425 584 MCF
Lease Use
14. NGL Gas Equivalent •
Conservation MCF
15. Purchased gas O Waste: MCF
16. Transferred from: , / g. - Q
Commissioner Date
17. Transferred to: (Express as a negative #)
( 174,275 )
18. Remarks:
Transferred To: TBPF, Dolly, King, TBU A -15 173,933
COV's to TBPF 342
I hereby certify that the foregoing is true and correct to the best of my knowledge.
�� � O � � ct v► Note: All volumes must be
Signature RM� Title Production Accountant corrected to pressure of 14.65 psia I and to a temperature of 60o F.
Printed Name Mary Indihar Phone 713 -432 -6238 Date 6/12/2008 Ai thrtrity 20 AAC25 235
Form 10 -422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Chevron Excess Flare Report
Month: May Year: 2008
STEELHEAD PLATFORM
Steps Taken to
Equiptnen
Date & time Event Gas Minimize
Down MP -.
Begin End MCF Planned Description of Incident Category Reason Reoccurrence Actions Taken
05/14/2008 01:00 AM 05/14/2008 04:00 AM 1062 Y FLARING EXCESS OPERATIONAL BLOW DOWN SCHEDULED EXCESS FLARING 00-00-0(
GAS DUE TO THE WELL MAINTENANCE. NECESSARY FOR
PLANNED SAFETY AND FACILITY
SHUTDOWN OF THE OPERATIONS WHILE
ENTIRE PLATFORM PERFORMING PLANNED
FOR SCHEDULED MAINTENANCE
MAINTENANCE. PLATFORM INIDE.I
STORED GAS HAD TO
BE VENTED TO THE
FLARE.'
05/16/2008 04:00 PM 05/16/2008 06:00 PM 396 Y FLARING EXCESS OPERATIONAL NORMAL SCHEDULED EXCESS FLARING H -C -12
GAS DUE TO THE OPERATIONS RESTART OF NECESSARY TO
STARTUP OF THE THE ENTIRE START -UP
MAIN PLATFORM. I COMPRESSOR 12
TRANSPORT /SALES DURING THE START -UP
GAS COMPRESSOR OF THE ENTIRE
(COMPRESSOR 12) PLATFORM AFTER IT
DURING THE WAS SHUT -DOWN FOR
PLANNED START -UP MAINTENANCE
OF THE ENTIRE PURPOSES. I
PLATFORM.
I OM 2,621
u
Page 7 of 11
Chevron Excess Flare Report
IWO Month: May Year: 2008
I WO
STEELHEAD PLATFORM Continued
Steps Taken to
Equipmenm
Date & Time Event Gas Minimize
Down MP -•
Begin End MCF Planned Description of Incident Category Reason Reoccurrence Actions Taken
05/20/2008 12:00 AM 05/20/2008 11:00 PM 269 Y FLARING EXCESS OPERATIONAL SCHEDULED SCHEDULED EXCESS FLARING H -C-022
GAS DUE TO THE MAINTENANCE MAINTENANCE. I NECESSARY TO MAKE
SHUTDOWN OF REPAIRS TO
COMPRESSOR 22 COMPRESSOR 22 AND
(LOW PRESSURE TO PROVIDE ENOUGH
FORMATION GAS COOL WATER TO
COMPRESSOR)TO MAINTAIN OPERATIONS. I
PERFORM PLANNED
MAINTENANCE ON
THE COOLING
WATER/SEAWATER
EXCHANGERS. THE
COMPRESSOR
COOLS WATER FOR
THE ENTIRE
PLATFORM.
05/21/2008 12:00 AM 05/21/2008 11:59 PM 391 Y FLARING EXCESS OPERATIONAL NORMAL SCHEDULED EXCESS FLARING H -C -022
GAS DUE TO THE OPERATIONS MAINTENANCE. I NECESSARY TO MAKE
SHUTDOWN OF REPAIRS TO
COMPRESSOR 22 COMPRESSOR 22 AND
(LOW PRESSURE TO PROVIDE ENOUGH
FORMATION GAS COOL WATER TO
COMPRESSOR)TO MAINTAIN OPERATIONS.
PERFORM PLANNED
MAINTENANCE ON
THE COOLING
WATER/SEAWATER
EXCHANGERS. THE
COMPRESSOR
COOLS WATER FOR
THE ENTIRE
PLATFORM.
Page 8 of 11
i i
Chevron Excess Flare Report
Month: May Year: 2008
STEELHEAD PLATFORM Continued
Steps Taken to
Equipmen
Minimize
Date & Time Event Gas
Down MP -.
Begin End MCF Planned Description of Incident Category Reason Reoccurrence Actions Taken
05/23/2008 10:30 AM 05/23/2008 06:30 PM 503 N FLARING EXCESS OPERATIONAL OTHER: SEE REPLACED EXCESS FLARING 00-00 -0(
GAS DUE TO AN DESC OF EVENT FUSE. I NECESSARY TO MAKE
UNPLANNED REPAIRS TO THE
SHUTDOWN OF THE EMERGENCY FIRE AND
PLATFORM AFTER A GAS PANEL.
FUSE IN THE
EMERGENCY FIRE
AND GAS PANEL WAS
BLOWN DURING
ROUTINE
MAINTENANCE. A
SMALL PIECE OF FOIL
WAS DROPPED
DURING THE
REPAIRS WHICH
SHORTED THE FUSE.
Page 9 of 11
•
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY 'REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
Tradin6 Bay Unit Trading Bay Unit
1330000025 Steelhead Platform McArthur River Field Unocal Alaska June -08
. Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent
of Total Volume.
6. Sold
1,434,225 Pool Name Pool Code Percent
Hemlock 520120 0.61%
7. Reinjected 0 G -Zone 520150 0.35%
West Foreland 520190 0.02%
8. Flared or vented 1 hour or less
i 65 Undefined Zone 520195 0.00%
GGS 520550 99.01%
9. Flared or vented more than 1 hour (see Instr.)
i
10. Pilot and Purge 4,273
i
11. Used for lease operations (specify in Remarks)
139,525
12. Other (see instructions) IMIIIIIIIIIIIIIIIIIMIMIMIIIIIIIIIIIMIIIMI
0 Authorization >1 hr. Safety MCF /�
13. TOTAL VOLUME (ITEMS 6 -12) 7
1,578,154 MCF
Lease Use
14. NGL Gas Equivalent
0 MCF
Conservation
15. Purchased gas
0 Waste: MCF
d i
16. Transferred from: 0 ���� / l E — 6
r-- Commissioner 4_, Date
17. Transferred to: (Express as a negative #) (178,375)
18. Remarks:
Transferred To: TBPF, Dolly, King, TBU h -15 178,094
COV's to TBPF I 281
1 hereby certify that the foregoing is true and correct tc the best of my knowledge.
{� , Note: All volumes must be
' ar Signature : i 7 4� ,� Title Production Accountant corrected to pressure of 14.65 psia
and to a temperature of 60o F.
Printed Name Mary Indihar Phone 713 - 432 -6238 Date 7/14/2008 Authority 9Q AA(7,25 925
Form 10-422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
i
A fir.
Chevron Excess Flare Report
RIO Month: June Year: 2008
STEELHEAD PLATFORM
Steps Taken to
Date & Time Event Gas Minimize Equipmen
M Reo ccurrence Down MP -.
Begin End P!anned Description of Incident Category Reason Actions Taken
06/28/2008 07:00 AM 06/28/2008 10:00 AM 66 N FLARING EXCESS OPERATIONAL OTHER: SEE REPLACED A FLARING NECESSARY H -PM -02
GAS DUE TO AN DESC OF EVENT BAD FUSE IN TO DETERMINE THE
UNPLANNED THE CAUSE OF THE
SHUTDOWN OF PROGRAMMABL COMPRESSOR 22
COMPRESSOR 22. I E LOGIC SHUTDOWN WHILE
CONTROL. I TYING -IN THE NEW
COMPRESSOR
PACKAGE TO THE
PLATFORM COOLING
SYSTEM.
o y
Page 9 of 9
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
Trading Bay Unit Trading Bay Unit
1330000025 Steelhead Platform McArthur River Field Unocal Alaska July -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent
of Total Volume.
6. Sold 1,431,348 Pool Name Pool Code Percent
Hemlock 520120 0.67%
7. Reinjected
0 G -Zone 520150 0.39%
8. Flared or vented 1 hour or Tess West Foreland 520190 0.03%
433 Undefined Zone 520195 0.00%
9. Flared or vented more than 1 hour (see Instr.) GGS 520550 98.91%
0
10. Pilot and Purge
4,184
11. Used for lease operations (specify in Remarks)
144,855
12. Other (see instructions) 0 Authorization >1 hr. MCF
Safety
13. TOTAL VOLUME (ITEMS 6 -12)
1,580,820 MCF
Lease Use
14. NGL Gas Equivalent
0 MCF
Conservation
15. Purchased gas
0 Waste: MCF
16. Transferred from: 0
Commissioner Date
17. Transferred to: (Express as a negative #)
(184,690)
18. Remarks:
Transferred To: TBPF, Dolly, King, TBU A -15 184,482
COV's to TBPF 208
I hereby certify that the foregoing is true and correct to the best of my knowledge.
C,y► Note: All volumes must be
Signature 7 vl- Title Production Accountant corrected to pressure of 14.65 psis
/ and to a temperature of 60o F.
Printed Name Mary Indihar Phone 713 - 432 -6238 Date 8/14/2008 Authirifv 90 AAt^95 935
Form 10-422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
Trading Bay Unit Trading Bay Unit
1330000025 Steelhead Platform McArthur River Field Unocal Alaska August -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent
of Total Volume.
6. Sold
1,433,738 Pool Name Pool Code Percent
Hemlock 520120 0.79%
7. Reinjected
0 G -Zone 520150 0.44%
West Foreland 520190 0.03%
8. Flared or vented 1 hour or less
52 Undefined Zone 520195 I 0.00%
GGS 520550 98.73%
9. Flared or vented more than 1 hour (see instr.) 1,144
10. Pilot and Purge
4,350
11. Used for lease operations (specify in Remarks)
116,892
12. Other (see instructions) a'
0 Authorization >1 hr: MCF *
Safety // c {� 1
13. TOTAL VOLUME (ITEMS 6 -12) I l — T
1,556,176 MCF
Lease Use
14. NGL Gas Equivalent
0 MCF
Conservation
15. _ Purchased gas
0 Waste: MCF
16. Transferred from:
0
17. Transferred to: (Express as a negative #)
Commissioner Date
(169,614)
18. Remarks:
Transferred To: TBPF, Dolly, King, TBU A -15 169,427
COV's to TBPF 187
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
� //�/ n ' Note: All volumes must be
Signature 76241 7v! t,d, // s (_i Title Production Accountant corrected to pressure of 14.65 psia
and to a temperature of 60o F.
Printed Name Mary Indihar Phone 713- 432 -6238 Date 9/11/2008 Authority 21) AAC25 935
Form 10-422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
•
•
Excess Flare Report
Chevron
Month: August Year: 2008
I MO.
10
STEELHEAD PLATFORM
Steps Taken to
Equipmeni
Minimize
Down NIP •
Event Gas
Date & Time
MAINTENANCE. Reason ,,, ._. ..,,,,....,•,,...73.,.0§„.6.s,.FLAik -07,• .; ...- • ::;c1q,
End MCF Pia nned Description i ot In cirtent_ ,. C , ategory ,,, , , ,... ,z- i;,,,,,tit : , ,, , rifir, t. ...tOsi R ; ° ;: u :.... r p e 1 75 62 , .,,..,.:,.....,:: 001 '''''. : 7 -
Begin ,,., ., .0, dtts
., it: .',-:: .5- .:•'.VV-146 -",:,"-:,-tirt..,971f,----,.1,-".:,,,,::::‘,Y,',,.-",f.:,g:.• "',-tiik:.f..";itiAiNz.- .....,itieg.§§,N ..., • .:
-., ,.. ,---• i ,, :7: '-. 7r-''''''''i';',';:l0i:'1:'er:"'l'P.' . , , :• . . , ': , :".,'' ; :' ;Y ' :: '''''' '• ' ":, '- ,-:' .' ... z , .., , r... ,- ...;.: , .....- „- -tio kpkessuRE
, • , :opielt611012.0' . *'!'"; , .. , -TiT!:.. ! .-.' ,...••,---- '.- -- ------ T ' ', • .:';,::. - •. - ..;;; -, :..04k - 19 - 114:' •- •- r.Z,'•:-.':''..:,, r •. . " ' ' . ... '. :' : ' /''' 1 . '''' ' . " ' ' iACK ' ■
PURGING OF ThE ' r ON-AFTER
: . •T : • • , •T .. ,,, .p.rolN9
. ' . • '•• ' • • ' ' • . .: „ . : : • '. ''' '• • ' '••-••••'■••,,.. 06104W0A:10*40:.'5:...'•:• •'•:• ..• • • , • ' • , ' :'• ' , : • _ • ' , • '•' • :
■
. ■ ,
■
„ , ■
, •
ON-LINE BRI NGING ri;PA61C PERFORMING
''. r ' ' '.' . ' • ' f : • ' . .. r ' Hc : • : . , SCHEDULED ..
■
• •
, .
•
• • • • MAINTENANCE. I
SCHEDULED
, . , .• • r '. ' ' ' ' :. '. ''''. ' " :: '.':' -AfTP3 ....'••.--- -...-- -: ' '' . ■ ■ „ . ,
I •
10fifINO:141,0 ,,,;,. . , , ' • ... ' .. .. . ■ . .. : . • 5 . ,, ' , ' ' , ?, ' : ' ' : . , I , ' ':,,. , ■ ,:‘,. .
I ■ „
. ■ I
. .
. . ■ ,
. . .
...
. ..
EXCESS FLARING H-C-0221
DUE TO THE
08/15/2008 12:54 AM 08/15/2008 02•.34;M 23 ''. "61644E: I 1:51:gRlk+14ENA i. UN UNSCHEDULED
UNPLANNED
MAINTENANCE . MAINTENANCE. I GNEECNEESRASATR0YR_UC AND
SHUTDOWN OF C-22 COMPRESSOR
GENERATOR-C COULD BE STARTED
CAUSING A LOAD BACK UP. I
SHED ON THE OIL
SIDE THAT
S1-IUTDO1NN THE C-22
COMPRESSOR AND
" D":' EXCESS FLARING - , , ...1-1
,;, , Y ' /AT- PLTA.... 9° -- 1 1'. G 1. -,,,.-,', oPtkArqN4...,/,',A3LoW,ORVR.;;',;:-e,:---..,:•,04P.P.RTY.TIA-Tr•,..:.•..k
i- do.'Aiktiiii,:ijkit THE
A 10 ' 464 -, " ' -- -; 1. ' , , • i' E .......,..,•• ....- "54,, OPERATIONAL k -' ,:.:::'..:::::.-:,.',.. z ,, I" _.,- 1
- . , , , ..7. -. .,-.„.„', : .
A i mnria.f4i.39.1? ,, ,:'„ , : ,, , ,, -;:r. . ::?.. -,,...: 'ik,76. • 1M04,40 • • ,::,4 ..„e4,14_,,;;.,,,4.,,,,,,,,:,&,.ph14.-_':..:z ,,,,';',.;..::,,,,%1:4)
°, 141V . - . . , ....',.. .,.. ,,..r
MALFUNCTION 014,9400§t9MP,#' ....-!:117!....,7(.7.,..:','TiT.:1:•:-•':';',„.1:4--,:;:',TT:'.':::::.,...'v':'.4i:VI'Ao.i.:Mig-.1.,.&09!ttP.5.fitth'..-iN?,,.5'::::,.:;-:..?"•:-.-,;.,'''7,--:,,''-,::::::*.'.''',',•..-•,-,-•--..-',:-:.'-''z,.:','-'g..-..-..„,E,'•,'" ' ' • •-..,,,I;j7 ;. - - 2.. . .••
' . .:;.-: .:T., : , ..j.','• •;::::,-;:-..,,,',::.:-;T:T;'..:,T,i, -',..-,,••;•:!,,..r....--..,....,:::::,-,-.TT.T-i.,i?4,J,,N ''''' TT .,. , .;!: - :':--• ,,,,, .:.:.•77. , ••-•• .•••;,.'.. • - . ,. .. , -' '
.,.,; . . - ,. -; "T•-•••••:;.:• .'. .- , .-.,,....- .. : -, • - '.- ....-,:--•-•-;', '' ......--- . - ''' ' '. ' ' ' ' • ' ' '" ' '' • ' '-' ; . - ' . ' ' r '' - , -
• ,.
,...: SCRUBBE :;•;-,...7.0f,14 .: .; -., 2. .-. ;• -. , .
• ..
, '''''•-'''• - ' , 1.000:114AWATEF.t . ANP. - - ..- ,' .- . . : • - - .. ., .. •
•
.•
,... ,..,, ••
• -
. . . ..
•
. „. .
•
,-.
• .
. • . ,
. .
. .
. , .
.: ' ' . • L - .2 '•• •.'. - ' '-• '' ',":''..: tdi.04 ' ' :: -,.. ''.':-',,- . ,.:. ., , .:,. , 1",, , .- . _ ,',-,..„;' .. -, • „
. . , .
•
. . „
6 Hutoovv4Prow . :::... , ... ,-. . , r..... - „ -- ;.....'„'„.' . ; -........, -.„, -',,.--.. . . .... . ..:, ,:-.: . . : i .. - - • .. . , ..
: .
ikgii ...„..,.,..-.., .:,. -- 2.:....'. .-..-. . , ,. - •.. -,....- . • ----.---; ..•• ....• .. .. • .. . . .
' - ..',:' .• n" ''''•' ' - ' .: '''.''' . '•';'..''..6 . 0.0104:1'.'T"' , '.':'.''';'' L'T.:';' i' ''" • . -', - '-,- - - -' - . - - . - . - - ' -
. , ..,
. . .
. •
. . .
- .. , ..
. . ..
. . .
. , .
.. .
Page 5 of 7
• , -
ac Excess Flare Report
evron
Month: August Year: 2008
11 10.
Steps Taken to
Eguipmeni
STEELHEAD PLATFORM Continued
Minimize
Down MP-
Event Gas
Reoccurrence Actions Taken
Date & Time
Reason
MCF Planned Description of Incident Category
SCHEDULED EXCESS FLARING H
End
OPERATIONAL OTHER: SEE
Begin
Y EXCESS FLARING
08/21/2008 08:00 AM 08/21/2008 12:00 PM 89
DESC OF EVENT TEST OF NEW NECESSARY AFTER
DUE TO THE
SHUT-DOWN OF SOLAR COMPRESSOR C-13
COMPRESSOR C-13 TURBINE. WAS SHUT-DOWN.
AFTER TESTING THE
NEW SOLAR
TURBINE. 1 ,
004
A • W E LL , ... , • ._..-;:., E
:, i$0§pflAft!!4G . ,.„ .. • '
90 , : ' ' ' . T:w,:7 )^1 SPIKES wp.L.Tip
-, :1/4 , :: : : - :::/.;:,,,.'' ,, ; ,,! : ,..-: -..,,,,,,,:..-A.: jNiitti-, - 404.4 WRyMI.EOIL
.,, • . • • • ,
08125/2008 12:00 FM :00/P10••98 06:00 PM ' ', r04, titttAit;;;; f' : ,:„ .,' . -:, '...,:: ? ,..;,:..:66§iiiAikji4,.:,,..,.*0104li 10 BE
!•-,:,----- :•.,:',-:::,'-' .z' , . - ',-, : - , -, - . : : -,..- ,. . ,• J ,- ' - i - ,1'::' , . ,, :. , .=•-:- •-:- -•:-:-:;.-3::,,tAAt-Tad:iktkekO •01; -. -;-. --...:,1.-'.=47;.,-,?•1-.;2j-f- i• ' .: :--.--: .giiliT-Ikl'=';':' • ''..'i, ' - .. .: ' ' ' •
.: ', -----*--: i-, ,-,=:. -,,,, , :- . , ,-,-, •;-", -. '‘..'-:'• ' -' , ''' '' ' • -'L.-‘ i ' ' - - :•:-'''''''-'6..';'"-''''''A • ' = .--.'-'''''"' ''''''''''' ' • ''''''''' SCH FLARING ' FLARING EXCESS GAS H
;„ ,, :,-;:;'.,:::::-,:,:::','-;,'- ':::' ' • ..•-• ., ..:-... ••' .. -•.: . ' • :. •' • .•'. •2 , .•-•;. • r. - •,' - .' '• 'r l'r?N'''':':':'•'--.•‘; 4'411P41. • ' • ' OPERATIONAL SCHEDULED
08/30;209801:00 PM 08/30/2008 11:59 PM 312 Y D EX U C E E T S O S T F H LA E FLARING
MAINTENANCE MAINTENANCE. • PLANNED HUARSYDTURDWNIONG
PLANNED 1 LA
SHUT-DOWN OF OF COMPRESSOR C-22B
COMPRESSOR C-228 IN ORDER TO SHUT-IN
WHILE WORK WAS OIL WELL M-32.1
BEING PERFORMED
TO SHUT-IN OIL WELL
SS S .. • :1-1-9-0221
, . ,11"...3?..:1....,..--vi,i
..---ka OPERATIONAL O
:' - •,.; S CHEDULED AP
r ::•'.' =.::: .. ,-' • 1 .....:-.,." ,:',.'-:=•.•. ;
6148 30 AM • .- 61 - :,'''''.•; i':•••'''''Y•''-: '''' ' '''f,?ff'. = ''-1;'''''" 'C'' i r:','--', 04 PA S OAR)'":;0"...:'''.-:14T.:.:L -'.:' --', ' '.•' . .
.. 'POT -:. ?•,-•.. •-,' '.',.;::: - ..1,:".':. ":::, .., eipip.tfie i-:;: .:: .... -,',,-,• 46
. .. ,„,,,,,„,,,, : , : - , ,,, i , g; , , , 5„ ,,,, ;.; -, 2::. , '.: , !.:I--.:, , . , ... - A - 101005 SHUT-DOWN
• , ••
•.--:-.,,.:•-,-..,..,..: ,.-, 'r,•::. .,... ; . ..- .:,:•;• ;-, ;•-: - ,...,,,.,,,r: •,...,,.:: . . ,..', ..„,,, • ...,-..••••:-,--,..:,:tvi,),(40.:,;,.:,..:.,Vq , .; - ":',:,. ; ;Y:?; ; '‘).: : ,''' ' ' ,, T..,::':' ,,11,t!-!-.;,:,;.,.-; :?. ' : ", 7 .0 ..-P 3
Viitkr 0# ?:1 .: ...... . • .:r• .- ,:.r- , . '.,--- --:••-• -"titk to
...::. :::,,'1';'::' ..1 ,:., :,. . . - ,, •• . -...:: y'rs,...: .., ,,,, .":•':::•,:. . ,:,'_•• ,,,:, ' • ,..: 6:Aget-e$0:orii°,6*-10 ik.6k
7,:p.', .' ' ' ':::".::::"i, •-•,.:.,',..,,,- ,.". • • •-• • .', : ,,,,: ,- '' .,:::-."..: ' - ' ,.a r ,A....ii i
-'' ":1' - 1 ..:. - .=.: ''' ::. - - - - f :'- ---" - ' 1'..: ': - :',:: •.- ' '::- '-,:•:: ''.- ':. . :.:',‘.:1:. niiiiimiikoAr'' ::'-': ',:: . ' -=';•'- '''..-,--'-''-- .''' . - • ..,„.., _. • .
• -, .•... ..:
•
' • - •-• - - - - .:-- .-!-_:•`• : -
BEING PERFORMED : '...': -. :. - - -. • .:' • . . . . . .
t661:10:1=lici bitystEk3, . - „..:, ,,-_.. . : ,. , . . .• .. . ..
• :.'n4- .- -1 — ' . • .
9'Af/of
Ms2rr
Page 6 of 7
s
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
Trading Bay Unit Trading Bay Unit
1330000025 Steelhead Platform McArthur River Field Unocal Alaska September -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent
of Total Volume.
6. Sold _ 1,350,276 Pool Name Pool Code I Percent
Hemlock 520120 0.42%
7. Reinjected 0 G -Zone 520150 0.33%
West Foreland 520190 0.03%
8. Flared or vented 1 hour or less 321 Undefined Zone 520195 0.00%
GGS 520550 99.22%
9. Flared or vented more than 1 hour (see Instr.) 307
10. Pilot and Purge 4,026
11. Used for lease operations (specify in Remarks)
113 X 798
d1 i . - gat
12. Other (see instructions)
0 Authorization >1 hr: MCF
Safety Cj l ��
13. TOTAL VOLUME (ITEMS 6 -12) 1,468,728 6 (/ MCF
Lease Use
14. NGL Gas Equivalent
0 Conservation MCF
7
15. Purchased gas - /
0 Waste: MCF
16. Transferred from: �� // 2 - O 6t
ommissioner Date
17. Transferred to: (Express as a negative #)
(186,843)
18. Remarks:
Transferred To: TBPF, Dolly, King, TBU A -15 186,634
COV's to TBPF 209
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be
Signature 111. ¼J-'4' Title Production Accountant corrected to pressure of 14.65 psia
and to a temperature of 60o F.
Printed Name Mary Indihar Phone 713 -432 -6238 Date 10/13/2008 Authnrity 20 AAl^ ?5 235
Form 10 -422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Chevron Excess Flare Report
Month: September Year: 2008
111 10
STEELHEAD PLATFORM
Steps Taken to
Equipmen
Date & Time Event Gas Minimize
Down MP- •
Begin End MCF Planned Description of Incident Category Reason Reoccurrence Actions Taken
09/11/2008 03 :45 PM 09/11/2008 11:45 PM 90 Y EXCESS FLARING OPERATIONAL ALARM TESTS SCHEDULED EXCESS FLARING H -C -0221
DUE TO PLANNED INSPECTION. 1 NECESSARY DURING
SHUTDOWN OF SCHEDULED FIRE AND
COMPRESSOR 22 GAS INSPECTION. 1
FOR FIRE AND GAS
INSPECITONS. 1
09/25/2008 05:30 PM 09/25/2008 07:00 PM 217 Y EXCESS FLARING OPERATIONAL WELL TEST SCHEDULED EXCESS FLARING 00 -00-0(
DUE TO SCHEDULED MAINTENANCE.' NECESSARY FOR
UNLOADING OF SAFETY WHILE WATER
WATER FROM GAS WAS UNLOADED FROM
WELL M-3.1 GAS WELL M-3.1
/01.3°7
AV/
Vof
Page 3 of 3
f w a
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
Trading Bay Unit Trading Bay Unit
1330000025 Steelhead.Platform McArthur River Field Unocal Alaska October -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent
6. Sold of Total Volume.
1,330,959 Pool Name Pool Code Percent
7. Reinjected
Hemlock 520120 0.45%
0 G -Zone 520150 0.35%
8. Flared or vented 1 hour or less
West Foreland 520190 0.03%
554 Undefined Zone 520195 0.00%
GGS 520550 99.17%
9. Flared or vented more than 1 hour (see instr.) 1,824
10. Pilot and Purge
4,353
11. Used for lease operations (specify in Remarks) 119,633
12. Other (see instructions) 0
Authorization >1 hr. MCF
13. TOTAL VOLUME (ITEMS 6 -12) Safety / �2� ��)
1,457,323 Lease Use MCF '"` /'"'
14. NGL Gas Equivalent
0 Conservation MCF
15. Purchased gas
0 Waste: MCF
16. Transferred from: d
d .-
Commissioner Date ,
17. Transferred to: (Express as a negative #) (213,446)
18. Remarks:
Transferred To: TBPF, Dolly, King, TBU A -15 213,171
COV's to TBPF 275
•
!hereby certify that the foregoing is true and correct to the best of my knowledge.
,n�- Note: All volumes must be
(����
Signature ` " ! / y Title Production Accountant corrected to pressure of 14.65 psia
and to a temperature of 60o F.
Printed Name Mary Indihar Phone 713 -432 -6238 Date 11/17/2008 Authority 20 AAC2S 225
1
Form 10 -422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
K t
•
Chevron Excess Flare Report
Month: October Year: 2008
STEELHEAD PLATFORM
Steps Taken to
Date & Time Event Gas Minimize Eguipmeni
MCF Reoccurrence Down MP -.
Begin End Planned Description of Incident Category Reason Actions Taken
10/27/2008 12:00 AM 10/27/2008 11:59 PM 271 Y Excess flaring due to OPERATIONAL NORMAL Maintenance on. Flaring necessary to H -C -13
start up of gas OPERATIONS C-12 delayed two assure safety during start
compressor C -13. more days. up of large compressor.
Retumed to Start up necessary to take
normal C -12 out of service for
operation. routine maintenance.
10/30/2008 07:30 AM 10/30/2008 07:00 PM 1553 Y , Excess flaring due to OPERATIONAL SCHEDULED C-12 retumed to Flaring necessary to H-C -12
start up of C -12. MAINTENANCE normal assure safety during start
operation. up of large compressor.
Start up necessary to
return to normal
operations after
completion of
maintenance on C -12.
rat, 18.4-1
i fyir 11 4R/O?
Page 7 of 7
a
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
Trading Bay Unit Trading Bay Unit
1330000025 Steelhead Platform McArthur River Field Unocal Alaska November -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool es a percent
of Total Volume.
6. Sold
1,408,754 Pool Name Pool Code Percent
7. Reinjected
Hemlock 520120 0.51%
0 G -Zone 520150 0.36%
8. Flared or vented 1 hour or less West Foreland 520190 0.03%
141 Undefined Zone 520195 0.00%
GGS 520550 99.09°
9. Flared or vented more than 1 hour (see instr.) 748
10. Pilot and Purge
4,252
1
11. Used for lease operations (specify in Remarks) = 1
125,694 I
12. Other (see instructions)
0 Authorization >1 hr. Safety MCF /I
Y�
13. TOTAL VOLUME (ITEMS 6 -12) 1,539,589 / MCF
Lease Use
14. NGL Gas Equivalent
0 Conservation MCF
15. Purchased gas -I
0 Waste: MCF 1
16. Transferred from: 0
d /°-----6,7Z--7,--■----
Commissioner Date
17. Transferred to: (Express as a negative #) (200,466) (((
18. Remarks:
Transferred To: TBPF, Dolly, King, TBU A -15 200,179 ,
COV's to TBPF 287
j
I
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
N
.stn � Note: All volumes must be L fil Signature ct1Z. / ! r t Title Production Accountant corrected to pressure of 14.65 psia
(/ and to a temperature of 60o F. i
Printed Name Mary indihar Phone 713- 432 -6238 Date 12/11/2008 Authnrity 2n AAC,25 935
Form 10-422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Chevron Excess Flare Report
Month: November Year: 2008
STEELHEAD PLATFORM
Steps Taken to
Date & Time Event Gas Minimize E MP - .
MCF Reoccurrence Down MP - .
Begin End Planned Description of Incident Category Reason Actions Taken
11/04/200812: 00 AM 11/04/200811; 59 PM 643 N `"EXCaS'FLARING OPPERATMAL' ,()ThiER:':SEE ` REPLACED EXCCSSFLARING HC -12
DUE TO LOSS OF DESC - OF EVENT BOTH PRIMARY NECESSARY WHILE
POWER TO THE PLC AND POWER WAS RESTORED
(PROLOGIC SECONDARY AND THE
COMPUTER) POWER COMPRESSORS COULD
CAUSING THE SUPPLIES TO BE RESTARTED. I
COMPRESSORS TO THE PLC. 1
SMUT DOWN: I
11/05/2008 05:25 PM 11/05/2008 11:59 PM 44 N EXCESS FLARING OPERATIONAL UNSCHEDULED ATTEMPTED TO EXCESS FLARING H-C -0221
DUE TO A FAULTY MAINTENANCE START NECESSARY UNTIL
CYCLE VALVE ON COMPRESSOR COMPRESSOR C22 -B
COMPRESSOR C -22B C -22A WITHOUT COULD BE RESTARTED.
CAUSING OIL SIDE SUCCESS.
UPSET AND MECHANICS
SHUTDOWN OF THE • ARE WORKING
COMPRESSOR. 1 TO DETERMINE
CAUSE OF THE
FAULTY VALVE
IN C-22B. 1
11/06/200806:00 PM 11/06/2008 11:59 PM 55 N EXCESS FLARING OPERATIONAL OTHER: SEE STARTED -UP EXCESS FLARING H -C -0221
DUE TO A FAULTY DESG OF EVENT COMPRESSOR NECESSARY UNTIL
CYCLE VALVE ON C-22A AND COMPRESSOR C -22A
COMPRESSOR 'C -22B CURRENTLY COULD BE RESTARTED
CAUSING,OIL SIDE WORKING TO TO REPLACE C -22B. 1
t)PSET REPAIR CYCLE
SHUTDOWN OF THE VALVE ON
COMPRESSOR. I COMPRESSOR
C-22B. I
/3 7Y 8
) ,31 ' 6Ad
Page 2 of 2
E T
1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition ' ' .
Trading Bay Unit Trading Bay Unit
1330000025 Steelhead Platform McArthur River Field Unocal Alaska December -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent
of Total Volume.
6. Sold
1,532,292 Pool Name Pool Code Percent
7. Reinjected Hemlock 520120 0.35%
0 G -Zone 520150 0.14%
8. Flared or vented 1 hour or less West Foreland 520190 0.03%
262 Undefined Zone 520195 0.00%
GGS 520550 99.48%
9. Flared or vented more than 1 hour (see Instr.) 3,408
J
10. Pilot and Purge 3,763
11. Used for lease operations (specify in Remarks)
128,237
12. Other (see instructions) A-,, :;,
Q Authorization >1 hr. Safety n MCF _ ,4 4l
13. TOTAL VOLUME (ITEMS 6 -12) 1,667,962 MCF f
Lease Use 1
14. NGL Gas Equivalent
Q MCF
1
Conservation
15. Purchased gas Q Waste: JMCF
16. Transferred from: o AW ' �''— 2 _ 3 - D ,' •
Commissioner Date •
17. Transferred to: (Express as a negative #) (202,964)
18. Remarks:
Transferred To: TBPF, Dolly, King, TBU A -15 202,779 i
COV's to TBPF 185
•
I hereby certify that the foregoing is true and correct to the best of my knowledge.
! qq /" /> Note: All volumes must be
Signature r 4 1 .`1. ,�lJ`71- 1- 44 -- Title Production Accountant corrected to pressure of 14.65 psia 1
and to a temperature of 60o F. 1
Printed Name Mary Indihar Phone 713- 432 -6238 Date 1/12/2009 Authnrity 90 AA 1 25 225
Form 10-422 Rev. 2/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Chevron Excess Flare Report
1110 Month: December Year: 2008
STEELHEAD PLATFORM
Steps Taken to
Date 8 Time Event G,ti Minimize Equiprneni
Down MP
Beyin End M(-I• Planned Desciihtivn et Incident Category K•ason Reoccurrence ActionsTaken
12/14/2008 07:00 AM 12/14/2008 08:30 AM 202 N EXCESS FLARING OPERATIONAL UNSCHEDULED UNSCHEDULED EXCESS FLARING H -PM -02
DUE TO AN MAINTENANCE MAINTENANCE.1 NECESSARY WHILE
UNPLANNED UNPLANNED
SHUTDOWN OF • MAINTENANCE WAS
COMPRESSOR -22 TO PERFORMED ON •
REPAIR A BROKEN COMPRESSOR-22.1
GAUGE.
12/20/2008 12:00 AM 12/20/2008 11:59 PM 3206 Y EXCESS FLARING OPERATIONAL OTHER: SEE WELL EXCESS FLARING 00 -00-0(
DUE TO DESC OF EVENT MAINTENANCE NECESSARY TO
COMPRESSOR 22 SCHEDULED.' COMPENSATE FOR
NOT BEING ABLE TO EXTRA GAS FLOW THAT
HANDLE THE EXTRA COMPRESSOR 22
GAS FLOW DURING COULD NOT HANDLE
AN ATTEMPT TO GAS DURING AN ATTEMPT TO
LIFT OIL WELL M -29.1 GAS LIFT OIL WELL
M -29.1
+ r ef °�
10'1MT ��� ° �
Page 5 of 6