Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutTBU Steelhead Platform/Unocal
STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2002
FACILITY: TBU Steelhead Platform
OPERATOR: UNION OIL CO OF
CALIFORNIA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Field(s)
Trading Bay Unit
Steelhead Platfonn - TBU
Operator
Unocal
Disposition Total Volumes MCF
1. Sold 4,504,599
2. Reinjected 0
3. Flared or vented less than 1 hour /
672
4. Flared or vented greater than 1 hour 1 259 /
,
(Supplemental report required-See 20 AAC 25:235)
5. Pilot and Purge 3,042
6. Used for lease operations 162,495
7. *Other (Shrinkage) 0
v
TOTAL items 1-7 4,672,067
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: TBPF 33,672
COY's to TBPF 1,485
Remarks:
1 hereby certny ~~t2:!:!:z IS. ~e ana correct to me best ot my Kllowledge.
Signature: ;:'L . .¿¿h, Title: Acct. Super. Date: 12-Feb-02
6' (/
Form 10-422
Rev. 4/95
MonthlY ear of Disposition
January 2002
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.50%
GGS 520550 99.13%
G Zone 520150 0.34%
WIF 520190 0.03%
Undefmed Zone 520195 0.00%
Official Use. Only - Flaring Authorization> 1 hr.
1. Safety MCF
2. Lease Use / J..-§ý MCF
3. Conserv. Purposes MCF
Gv~ CL~-Á: ~/ :> I,d cr?-
Commiss~er Date
I
'11- ~I"t- ')
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th ofllie month following the
month of disposition.
Authority 20 AAC 25.235.
Excess Flare Log Report
Facility Name:
STEELHEAD PLATFORM
MonthlY ear:
January 2002
Date & Time Event Gas steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
1/8/20023:30 1/8/2002 23:59 778 Y C-13 compressor maintenance. OPERATIONAL SCHEDULED MAINTENANCE Conduct quarterly inspection of C- Planned maintenance.
13 turbine compressor and water
wash. Pre-plan activity, insfJre
appropriate personnel and
equipment are on site prior to
shutdown, perform maintenance,
restart turbine.
1/9/20020:01 1/9/2002 13:00 481 N Compressor C-22T shutdown. OPERATIONAL UNSCHEDULED MAINTENANC aulty scrubber dump valve switch Replace faulty switch.
Unplanned event-compressor repair on C-22T compressor. Unable to
restart C-22T following SI of
system for C-13 maintenance.
Mechanic diagnosed, repairs faulty
scrubber dump valve switch from
parts in inventory, retums facility to
normal operation asap.
,
Report Date: 2/11/2002
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Operator
Unocal
Steelhead Platfonn - TBU
Disposition
Total Volumes MCF
1. Sold
2. Reinjected
3, Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. *Other (Shrinkage)
TOTAL items 1-7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11, Transferred to:
TBPF
COY's to TBPF
Remarks:
lllere5Y certlty9J1t the tore~omg IS !,rue ana correct to the best ot my knowledge.
Signature: IlleÁ~C\.. ^ ðÍ/-A) Title: Acct. Super.
.I U
Form 10-422
Rev. 4/95
4,088,691
24
390/
2,802
147,361
/
4,239,268
14,792
1,521
Date:
Field(s)
Trading Bay Unit
MonthlY ear of Disposition
February 2002
o
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.55%
GGS 520550 99.07%
G Zone 520150 0.36%
WIF .
520190 0.02%
Undefmed Zone 520195 0.00%
o
Official Use Only - Flaring Authorization> 1 hr.
1. ~afety MCF
2. Lease Use 510 MCF
3. Conserv. Purposes MCF
&1'~ Q..J~. it: ,3 /;J- :J~ J-
COmmlSSl er Date
Il./GA-
3/~t..iol..
o
o
o
13-Mar-02
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month followmg the
month of disposition.
Authority 20 AAC 25.235.
Excess Flare Log Report
Facility Name:
STEELHEAD PLATFORM
MonthlYear:
February 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
2/412002 0:00 2/4/2002 5:30 158 N C-12 Down for Bore scope inspection. OPERATIONAL SCHEDULED MAINTENANCE Planned maintance of G-12 with Maintance to insure equipment
C-13 was handling all the gas which necessary equipment and was operating effectively.
created a high suction pressure into C personnel on board. Returned to
13 causing C-22T to shut down. normal operations ASAP.
2/16/200212:30 2/1612002 19:30 232 Y C-22T compressor shutdown for OPERATIONAL SCHEDULED MAINTENANCE Insure appropriate personnel and Routine maintenance to safe H-PM-022
scheduled maintenance. equipment are on site prior to and reliable operation.
shutdown, perform inspection and
maintenance on compressor, and
retum facility to normal operation
as soon as possible.
.
Report Date: 3/8/2002
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Field(s)
Trading Bay Unit
Steelhead Platfonn - TBU
Operator
Unocal
Disposition Total Volumes MCF
1. Sold 4,116,100
2. Reinjected 0
3. Flared or vented less than 1 hour 512
4. Flared or vented greater than 1 hour 2,404 /
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 2,841
6. Used for lease operations 158,961
7. *Other (Shrinkage) 0
TOTAL items 1-7 4,280,818 /
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: TBPF 30,138
COY's to TBPF 1,479
Remarks:
I hereby certm~ ~.e}ob~(j IS true and correct to the best ot my knoWledge.
Signature: .é!e.fð<.f)l ( t.'AJ Title: Acct. Super. Date: 1O-Apr-02
I t
Form 10-422
Rev. 4/95
MonthlY ear of Disposition
March 2002
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.52%
GGS 520550 99.08%
G Zone 520150 0.38%
WIF ... 520190 0.02%
Undefmed Zone 520195 0.00%
Official Use Only - Flaring Authorization> 1 hr.
1. Safety MCF
2. Lease Use 2-tfOt./ MCF
3. Conserv. Purposes MCF
~~~U~ 41 )-1/oY
Date
tdGlt
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Excess Flare Log Report
Facility Name:
STEELHEAD PLATFORM
Month/Year:
March 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End , MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
3/27/023:00 3/27/0223:59 780 N ESP failure caused the need to move OPERATIONAL OTHER: SEE DESC OF EVENT Installed valves on C·22T to more With new valves installed the
well over to gas lift. C·22T gas to sales instead of to flare. compressor will be able to
compressor was unable to move all handle the amount of lift gas
the gas to sales during the initial being passed to sales and
switch in operations. flaring will not be necessary.
3/29/02 17:00 3/29/02 23:59 781 N While performing maintenance on C- OPERATIONAL BLOW DOWN WELL C-12 compressor was brough By having the necessary
12 compres$orwell M-13 loaded up back into service. Well m-13 was equipment and personnel on
with water necessitating the need to unloaded to flare and brough back board the maintenance of the
unload the well. on like as soon as possible to compressor was performed in
normal operation. a timely manner.
3/30/02 0:00 3/30/02 8:30 843 N Well M-13 heading. OPERATIONAL BLOW DOWN WELL
..
Report Date: 4/10102
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Operator
Unocal
Field(s)
Trading Bay Unit
Steelhead Platfonn - TBU
Disposition Total Volumes MCF
1. Sold 3,775,224
2. Reinjected 0
3. Flared or vented less than 1 hour 203 /
.
4. Flared or vented greater than 1 hour 2,404 r,/
(Supplemental report required-See 20 AAC 25.235)
/
5. Pilot and Purge 2,026 ~
6. Used for lease operations 149,428 /
.
7. *Other (Shrinkage) 0
TOTAL items 1-7 3,929,285 .,/
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: TBPF 6,476
COY's to TBPF 1,245
Remarks:
Tl1ere5Y certify that the toregomg IS true and correct to the best 01 my knowledge.
Signature: ;; iLJ,/JCì. ~l/¡J;) Title: Acct. Super. Date: 13-May-02
.... I (f
Form 10-422
Rev. 4/95
MonthlY ear of Disposition
April 2002
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.46%
GGS 520550 99.04%
G Zone 520150 0.49%
WIF 520190 0.01%
Undefmed Zone 520195 0.00%
Official Use Only - Flaring Authorization> 1 hr.
1. Safety 2404 MCF Ý
,
2. Lease Use MCF
3. Conserv. Purposes MCF
.
~¡u;* ;{Pk!c~
Commis 1 ner
f1fl-
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Excess Flare Log Report
Facility Name:
STEELHEAD PLATFORM
Month/Year:
April 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
4/4/02 4:45 4/4/02 14:30 1504 N C22T compressor down, battery OPERATIONAL UNSCHEDULED MAINTENANCE Excess formation gas to flare Maintenance. H-PM-022
back up problems. following shut down of C22T
compressor. Recharge backup
battery, restart C22T, return to
normal operations as soon as
possible.
4/5/02 14:00 4/5/0215:15 203 N C22T compressor down, fuel gas OPERATIONAL UNSCHEDULED MAINTENANCE Excess formation gas to flare Maintenance. H-PM-022
modifications. following shut down of C22T
compressor. Make fuel gas
modifications, restart C22T,
return to normal operations as
soon as possibie.
4/13/02 9:00 4/13/02 13:00 697 N Inlet scrubber valve repair OPERATIONAL UNSCHEDULED MAINTENANCE Replace bad level switch on inlet Maintenance. H-PM-022
scrubber, make repairs from
inventory on hand, retum to
normal operations as soon as
possible.
Report Date: 5/14/02
Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
"
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Operator
Unocal
Field(s)
Trading Bay Unit
Steelhead Platfonn - TBU
Disposition Total Volumes MCF
1, Sold 3,208,150
2. Reinjected 0
3. Flared or vented less than 1 hour 137
4. Flared or vented greater than 1 hour 1,878 ./
(Supplemental report required-See 20 AAC 25,235)
5. Pilot and Purge 1,964
6. Used for lease operations 143,786
7. *Other (Shrinkage) 0
TOTAL items 1-7 3,355,915
8. NGL gas equivalent produced 0
9. Purchased gas 0
10, Transferred from: 0
11. Transferred to: TBPF 7,297
COY's to TBPF 1,327
Remarks:
1 hereby certlI~ me toreg~~g IS true ana correct to me best 01 my knOWledge.
Signature: .. "L{ltJ/L 1/7(.{h Title: Acct. Super. Date: II-Jun-02
I f/
Form 10-422
Rev. 4/95
MonthlY ear of Disposition
May 2002
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0,52%
GGS 520550 99.12%
G Zone 520150 0.35%
WIF 520190 0.01%
Undefmed Zone 520195 0.00%
Official Use Only - Flaring Authorization> 1 hr.
1. Safety 137ß MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
~~~ ~I¡foY
, . Date
CWR-
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Excess Flare Log Report
Facility Name:
STEELHEAD PLATFORM
MonthlY ear:
Date & Time Event Gas Steps Taken to
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence
5/23/02 5:00 5/23/0213:00 1260 N WC22T compressor down for OPERATIONAL SCHEDULED MAINTENANCE ESP failure requires use of lift gas Parts and crew were all on
maintenanÇ$ causing no means system to produce well. Plans are hand to minimize down time.
available to repressurize lift gas for in place to replace the ESP by the Maintenance.
reinjection. Return lift gas must be end of July. Quarterly
routed to flare while G-22T down. maintenance was conducted on
C22T, unit restared and platform
returned to normal operations as
soon as possible.
5/31/020:00 5/31/0223:59 618 N During well testing fluctuations In OPERATIONAL OTHER: SEE DESC OF EVENT Compressor lrain adjusted to avoid Normal 011 field operations.
upstream pressure caused G-22T exceeding mixlmum compressor
compressor to exceed capacity. capacity.
resulting in excess gas being sent to
flare.
I I
Report Date: 6/11/02
Page: 1 of 4
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Steelhead Platfonn - TBU
Operator
Unocal
Field(s)
Trading Bay Unit
MonthlY ear of Disposition
June 2002
Facility
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235)
2,706
v
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.60%
GGS 520550 99.03%
G Zone 520150 0.35%
WIF 520190 0.02%
Undefmed Zone 520195 0.00%
Disposition
Total Volumes MCF
1. Sold
3,402,583
2. Reinjected
o
3, Flared or vented less than 1 hour
82
5. Pilot and Purge
2,193
8. NGL gas equivalent produced
o
Official Use Only - Flaring Authorization> 1 hr.
1. Safety 2'70~ MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
~~ <l/ðY
Date
~
6. Used for lease operations
152,344
7. *Other (Shrinkage)
o
TOTAL items 1-7
3,559,908
9. Purchased gas
o
10. Transferred from:
o
11. Transferred to:
TBPF
COY's to TBPF
23,001
3,041
-
Remarks:
I hereby certlI~~t the tc.oreg~mg IS true ana correct to the best 01 my Kllowleage.
Signature: tfi¿J!j/1 /1.A ,jl~ Title: Acct. Super.
~ U
Date:
II-Jul-02
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name:
STEELHEAD PLATFORM
MonthlY ear:
Date & Time Event Gas Steps Taken to
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence
6/1/02 0:00 6/1/02 23:59 751 y C22T compressor down for OPERATIONAL OTHER: SEE DESC OF EVENT Unable to repressurize lift and Maintenance.
maintenance due to bad valves. formation gas for reinjection due to
compressor maintenance,
therefore gas sent to flare. All
necessary material was available
to make the necessary valve
repairs ASAP.
6/8/02 12:00 6/8/02 14 :00 254 N C22T compressor down for OPERATIONAL OTHER: SEE DESC OF EVENT Instrumentation problems resulted Maintenance.
unscheduled maintenance due to in C22T sht down. Problem with
faulty relay on C22T required relay was identified, relay replaced,
replacement. unit restared and platform returned
to normal opreations. Parts and
crew were on hand to minimize
down time.
6/12/02 12:50 6/12/0216:50 598 N C22A down to install valves on OPERATIONAL OTHER: SEE DESC OF EVENT New compressors (C22A&B) were Installation of C22B.
companion compressor. being installed to replace existing
C22T compressor. During the
installation of valves for C22B. All
necessary equipment and
personnel on board to
maintenance. Returned to normal
operations asap.
6/27/02 15:00 6/27/0222:00 1103 N M-13 unloaded to flare due to watering OPERATIONAL NORMAL OPERATiONS M-13 watered up. Flow was Normal oil field operations.
up. diverted to separator with resulting
flare. After water removed,
production retumed to normal.
Report Date: 7/12/02
Page: 1 of 4
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Operator
Unocal
Field( s)
Trading Bay Unit
Steelhead Platfonn - TBU
Disposition Total Volumes MCF
1. Sold 3,349,458
2. Reinjected 0
3, Flared or vented less than 1 hour 1,847
4. Flared or vented greater than 1 hour 3,938
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 1,478
6. Used for lease operations 156,503
,
7. *Other (Shrinkage) 0
TOTAL items 1-7 3,513,224
8. NGL gas equivalent produced 0
9, Purchased gas 0
10, Transferred from: 0
11. Transferred to: TBPF 3,005
COY's to TBPF 3,236
Remarks:
1 hereby certlty tllat the toregomg IS true and correct to the best ot my knowledge.
Signature: !l¡!¿/tl?f ÌJ.tj/t.-k; Title: Acct. Super. Date: 09-Aug-02
/J
Form 10-422
Rev. 4/95
MonthlY ear of Disposition
July 2002
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.33%
GGS 520550 99.39%
G Zone 520150 0.26%
WIF 520190 0.01%
Undefmed Zone 520195 0,00%
Official Use Only - Flaring Authorization> 1 hr.
1. Safety 3,Q3ß MCF :It
2, Lease Use MCF
3. Conserv. Purposes MCF
CM"",,^ 1k.J,,,L 'J.'f q/ '
I~(r. :Y
Commissi~r Date
13.12-
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month followmg the
month of disposition.
Authority 20 AAC 25.235.
Excess Flare Log Report
Facility Name:
STEELHEAD PLATFORM
MonthlY ear:
Date & Time Event Gas Steps Taken to
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence
7/3102 10:00 7/3/0217:30 1849 N Flared M-1 gas well to unload water. OPERATIONAL BLOW DOWN WELL M-1 watered up. Flow diverted to Normal field operations.
separator, with resulting flare, to
unload water. As soon as water
was removed, production retumed
to normal.
7/6/020:00 7/6/02 2:30 1257 Y Well M-28 heading after shutdown. OPERATIONAL WELL SPIKES Well brought back into proudction. Normal operations.
7/7/020:00 7/7/02 1 :01 832 N Well M-29 converted to gasfli~ well OPERATIONAL WELL SPIKES A second reciprocal compressor Additional compressor brought
heading. was brought online to recover flow. online to handle gas flow.
-
Report Date: 8/15/02
Page: 1 of 4
'...
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Steelhead Platfonn - TBU
Operator
Unocal
Field(s)
Trading Bay Unit
MonthlY ear of Disposition
August 2002
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235)
1,592
.,/'
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.56%
GGS 520550 98.98%
G Zone 520150 0.44%
WIF 520190 0.02%
Undefmed Zone 520195 0.00%
Disposition
Total Volumes MCF
1. Sold
2,596,729
2. Reinjected
o
3. Flared or vented less than 1 hour
2,147
5. Pilot and Purge
2,093
7. *Other (Shrinkage)
o
OfficiållJse Only - Flaring Authorization> 1 hr.
1. Safety i ¡ S"q -z..,MCF
"-'
2. Lease Use MCF
3. Conserv, Purposes MCF
~~ {1LV~ \v} K !é~
Commiss~er Date
~
6. Used for lease operations
122,792
TOTAL items 1-7
2,725,353
8. NGL gas equivalent produced
o
9. Purchased gas
o
10. Transferred from:
o
11. Transferred to:
TBPF, Dolly, King, TBU A-IS
COY's to TBPF
22,954
3,461
Remarks:
Signature:
Title: Acct. Super.
Date:
16-Sep-02
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 de~rees F.
Report due by the 20th of the month followmg the
month of disposition.
Authority 20 AAC 25,235.
Form 10-422
Rev. 4/95
..
Excess Flare Log Report
Facility Name:
STEELHEAD PLATFORM
MonthlYear:
Date & Time Event Gas Steps Taken to
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence
8/2102 2:00 8/2102 23:59 448 N C-13 compressor shut down due to OPERATIONAL UNSCHEDULED MAINTENANCE Replace temperature control card Multiple start attempts on C-13/
low suction speed. from parts in inventory, restart M-29 heading
compressor and retrun to normal
operations as soon as possible.
8/3/020:00 8/3/02 23:59 217 N Well M-29 heading. OPERATIONAL WELL SPIKES Add back pressure, manually Routine oil field operations.
adjust choke, stabilize well and
retrun to normal operations.
8/121020:00 8/1210223:59 86 N Well M-29 heading. OPERATIONAL WELL SPIKES Add injection pressure, stabilize Routine oil field operations.
well production,retrun to normal
operations.
8/22102 18:30 8/22102 22:30 220 N Well M-28 Heading. OPERATIONAL WELL SPIKES Adjust well production until Normal operations.
stablizlned, return to normal
operations.
8/23/020:00 8/23/024:00 182 N Well M-28 and M-29 heading. OPERATIONAL WELL SPIKES Adjust well production until Normal operations.
stabilized, return to normal
operations.
8/31/02 9:45 8/31/02 16:00 439 N Well M-13 shut down due to loading OPERATIONAL WELL SPIKES Unload water from well, flare gas Normal operations.
with water. until well production stabilizes,
return to normal operations.
Report Date: 9/16/02
Page: 1 of 4
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Operator
Unocal
Field(s)
Trading Bay Unit
Steelhead Platfonn - TBU
Disposition Total Volumes MCF
1. Sold 2,827,703
2. Reinjected 0
3. Flared or vented less than 1 hour 309
4. Flared or vented greater than 1 hour 16,601
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 2,638
6. Used for lease operations 139,401
7. *Other (Shrinkage) 0
TOTAL items 1-7 2,986,652
8. NGL gas equivalent produced 0
9. Purchased gas 0
10, Transferred from: 0
11. Transferred to: TBPF, Dolly, King, TBU A-IS 17,179
COY's to TBPF 2,114
Remarks:
1 hereby certlÌ~l~r/or,egomg ~.~e a~d correct to the best ot my knowledge.
Signature:fß /-;,O~ é~ Title: Acct. Super. Date: 15-0ct-02
7/ //
Form 10-422
Rev. 4/95
MonthlY ear of Disposition
September 2002
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.55%
GGS 520550 99.02%
G Zone 520150 0.40%
WIF 520190 0.02%
Undefmed Zone 520195 0,00%
Official Use Only - Flaring Authorization> 1 hr.
..
1, Safety 16w( MCF
f
2, Lease Use MCF
3. Conserv. Purposes MCF
~~M~ "1, :r lú~
Date
COmmlSS er
~
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month followmg the
month of disposition.
Authority 20 AAC 25.235.
Excess Flare Log Report
Facility Name:
STEELHEAD PLATFORM
MonthIYear:
Date & Time Event Gas Steps Taken to
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence
9/17/02 16:00 9/17/0221:00 406 N Oil system shut down on wells M-28 OPERATIONAL WELL SPIKES Repaired PY031A flow Control Replace and repaired valves.
and M-29. Valve and replaced the manual
block valve upstream of it. Slowly
stabilized Wells M-28 & M-29.
9/18/0216:00 9/18/0223:59 102 N Changed out GL valve on M-29. Had OPERATIONAL SCHEDULED MAINTENANCE Changed out gas lift valve and bled Routine oil field operations.
to bleed off CSG. off casing head gas.
9/19/02 0:00 9/19/02 2:00 158 N Changed out gas lift valve on M-29. OPERATIONAL NORMAL OPERATIONS Changed out gas lift valveand bled Routine oil field operations.
off casing head gas.
9/21/029:00 9/21/02 23:59 135 N Blewdown C-13 compressor. OPERATIONAL NORMAL OPERATIONS C-13 blowdown and bleeding off Routine oil field operations.
Lubricators to prepare wireline
work on M-16, M-5 and M-1.
9/23/0221 :00 9/23/02 23:59 1551 N Lifting M-16 with N-2 and Oil well M-28 OPERATIONAL NORMAL OPERATIONS Prior to bringing M-16 back on the Routine oil field operations.
heading. well was unloaded until all water
was lifted and M-28 well was
9/24/02 3:30 9/24/02 23:59 8705 Y Unloading well M-16 OPERATIONAL OTHER: SEE DESC OF EVENT norfõ clinging well back on line Routine oil field operations.
unloaded well until all water was
lifted.
9/25/02 0:00 9/25/0214:00 5544 Y Unloading well M-16 OPERA Tl.ONAL OTHER: SEE DESC OF EVENT Prior to bringing well back on line Routine oil field operations.
unloaded all water from the well.
Report Date: 10/16/02
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Operator
Unocal
Field(s)
Trading Bay Unit
Steelhead Platfonn - TBU
Disposition Total Volumes MCF
1. Sold 3,271,080
2. Reinjected 0
3, Flared or vented less than 1 hour 1,328
4. Flared or vented greater than 1 hour 0
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 2,418
,
6. Used for lease operations 143,761
7. *Other (Shrinkage) 0
TOTAL items 1 ~ 7 3,418,587
8, NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: TBPF, Dolly, King, TBU A-IS 39,978
COY's to TBPF 982
Remarks:
1 hereby cert~}he tOŒO~:fIS true and correct to the best otmy knowledge.
Signature: ~I &..h ,J~~~) Title: Acct. Super. Date: ll-Nov-02
tI {/
Form 10-422
Rev. 4/95
MonthN ear of Disposition
October 2002
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0,32%
GGS 520550 99.41%
G Zone 520150 0.26%
W/F 520190 0.01%
Undefmed Zone 520195 0.00%
OfficjalUse.Only ~.Flaring.Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
"
3. Conserv, Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthlYear of Disposition
Trading Bay Unit Trading Bay Unit Revision
1330000025 Steelhead Platform McArthur River Field Unocal Alaska November-02
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent
of Total Volume.
6. Sold 3,076,141 Pool Name Pool Code Percent
Hemlock 520120 0.47%
7. Reinjected 0 GGS 520550 99.20%
G-Zone 520150 0.31%
8. Flared or vented 1 hour or less 353 West Foreland 520190 0.02%
9. Flared or vented more than 1 hour (see instr.) Undefined Zone 520195 0.00%
0
10. Pilot and Purge 3,427
11. Used for lease operations (specify in Remarks) 145,240
{~. '.':''':',',.", .d. .:", .,.. > ",.. ...
12. Other (see instructions) :~:"
0 Authorization >1 hr: Safety MCF
13. TOTAL VOLUME (ITEMS 6-12) 3,225,161 MCF
Lease Use
14. NGL Gas Equivalent 0 MCF
Conservation
15. Purchased gas .'
0 Waste: MCF
16. Transferred from: 0
17. Transferred to: (Express as a negative #) Commissioner Date
(39,975)'
18. Remarks:
Revision: Per agreement reached between Forest Oil
Transferred To: TBPF, Dolly, King, TBU A-IS 38,865 and Alaska DNR. Forest Oil Gas Received through
COY's to TBPF 1,110 M7100 at TBPF is to be shown as a gas purchase and
not a transfer of gas,
I hereby certify that the fOreg~Jrue and correct to the best of my knowledge.
uO~ 'M.. ð/ Janet L. Dormady Note: All volumes must be
Signatu ''/A 4 .UA ¡;, /'- Title Production Accountant corrected to pressure of 14.65 psia
Printed Name ':DormadY 0 DEC 2 2 2004 and to a temperature of 600 F.
Phone 907-263-7946 Date 12/22/2004 . ?n IJ Jj r')¡:; ?~¡:¡
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
FACiliTY REPORT OF PRODUCED GAS DISPosITro'r'~=bate
!?1EVISED COPY'
...- ..-.-
Form 10-422 Rev. 2/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
ALASKA OIL AND GAS CONSERV A TION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility
Operator
Unocal
Steelhead Platform - TBU
Disposition
MonthlY ear of Disposition
November 2002
o
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.47%
GGS 520550 99.20%
G Zone 520150 0.31%
WIF 520190 0.02%
Undefined Zone 520195 0.00%
Total Volumes MCF
1. Sold
2. Reinjected
3. Flared or vented less than I hour
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. *Other (Shrinkage)
TOTAL items 1-7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
TBPF, Dolly, King, TBU A-IS
COY's to TBPF
Remarks:
~lgnature:
Form 10-422
Rev. 4/95
3,076,622
3,427
145,240
3,225,642
38,384
1,110
353
o
o
1. Safety
MCF
2. Lease Use
MCF
o
3. Conserv. Purposes
MCF
o
o
Commissioner
Date
Vate:
l'wte: All vOlUmes must be correctea to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Keport due by the 2Uth ot the month tOllowmg the
month ot dISposItIOn.
Authonty 2U AAC 25,235.
16- Vec-U2
1. Facility Number 2. Facility Name 3: Field 4. Operator 5. MonthlYear of Disposition
Trading Bay Unit Trading Bay Unit Revision
1330000025 Steel head Platform McArthur River Field Unocal Alaska December-02'
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent
of Total Volume.
6. Sold 3,103,970 Pool Name Pool Code
Percent
7. Reinjected Hemlock 520120 0.64%
0 GGS 520550 99:02%
G-Zone 520150 0.30%
8. Flared or vented 1 hour or Jess 5,682 West Foreland 520190 0.03%
9. Flared or vented more than 1 hour (see instr.) Undefined Zone 520195 0.00%
0
10. Pilot and Purge 4,494
11. Used for lease operations (specify in Remarks) 146678
kf::'h,'·':'.. ,,:::',::? . H). ..4 it;.·.· ··~I~f!ipi~~~~!1~~ñJý::,;:,. ',:'è:~~~/~ . ,'to;it I: ·'~M;'>J
12. Other (see instructions) ~:::~...,.:;;,~ ' .
0 Authorization >1 hr: Safety MCF
13, TOTAL VOLUME (ITEMS 6-12) 3,260 824 MCF
Lease Use
14. NGL Gas Equivalent 0 MCF
Conservation
15. Purchased gas 0 Waste: MCF
16. Transferred from: 0
Commissioner Date
17. Transferred to: (Express as a negative #) (31,053)
18. Remarks:
Transferred To: TBPF, Dolly, King, TBU A-IS 30,196 Revision: Per agreement reached between Forest Oil and
COY's to TBPF 857 Alaska DNR. Forest Oil Gas Received through M71 00 at
rSPF is to be shown as a gas purchase and not a transfer of
IQas.
I h,reby œrtr' th, tore,o., . bu' oed """'" I<> th, b," 01 my knowl"'".· .,
In _1. £¡¡t). IJ Janet l. Dormady Note: All volumes must be
Signature Title Production Accountant corrected to pressure of 14.65 psia
~v a DEC 2 2 2004 and to a temperature of 600 F,
Printed Name Janet Dormadv Phone 907-263-7946 Date 12/22/2004 - ')() l! l! - -
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITIÖI\f .
REViSED COPY'
........-'~...-_."..--
Date
Fnrm 10-4?? RAv_ ?/?004
INSTRUCTIONS ON REVERSE SlOE
Ruhmit In DIJDlicate
, -
..--
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Steelhead Platfonn - TBU
Operator
Unocal
.
Fie1d(s)
Trading Bay Unit
MonthlY ear of Disposition
December 2002
Facility
2. Reinjected
o
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 0.64%
GGS 520550 99.02%
G Zone 520150 0.30%
WIF 520190 0.03%
Undefmed Zone 520195 0.00%
Disposition
Total Volumes MCF
1. Sold
3,103;978
..,...
3. Flared or vented less than 1 hour
57
4, Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235)
5,625
5. Pilot and Purge
4,494
o
OffipÜl¡ Use Qnly~· IqarjngAuthorization > 1 hr.
1 Safety I5; f, 25 MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
,
,
~~ . ¥ ~a!o3
Commis~er ,
Date
~~
6, Used for lease operatio~
146,678
TOTAL items 1-7
3,260,832
8. NGL gas equivalent produced
o
9, Purchased gas
o
10. Transferred from:
o
11. Transferred to:
TBPF, Dolly, King, TBU A-IS
COY's to TBPF
30,189
857
Remarks:
:
Title: Acct. Mgr.
Date:
16-Jan-03
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of60 de~rees F.
Report due by the 20th of the month followmg the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name:
STEELHEAD PLATFORM
MonthlY ear:
December 2002
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
12/10/20026:30 12/10/200216:30 1958 y C-13 Compressor shutdown during OPERATIONAL BLOW DOWN WELL Compressor C· 13 shutdown for Performed semi-annual
scheduled maintenance. semi-annual maintenance. M-13 maintenance on C-13
routed to flare during compressor.
: maintenance. Maintenance
completed as scheduled, with
parts and personnel on hand, and
facility returned to normal
operations as soon as possible.
12/11/2002 0:00 12/11/200218:00 3645 Y C-12 Compressor shutdown during OPERATIONAL SCHEDULED MAINTENANCE Compressor C-12 shutdown for Performed quarterly
scheduled maintenance. quarterly maintenance. M-13 maintenance on C-12
routed to flare during compressor.
maintenance. Maintenance
completed as scheduled, with
parts and personnel on hand, and
facility returned to normal
operations as soon as possible.
12/13/200216:15 12/13/200223:59 22 y ESP shutdown for malntenance. OPERATIONAL NORMAL OPERATIONS ESP shutdown while well M-29 Maintenance and
was converted to Gas Lift troubleshooting performed on
Troubleshooting on ESP. ESP.
Maintenance completed on ESP
and facility retumed to normal
operations as soon as possible.
Report Date: 1/21/2003
Page: 1 of 2