Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutUNOCAL - ANNA PLATFORM
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
ANNA PLATFORM
UNOCAL ALASKA RESOURCES I GRANITE POINT FIELD
Disposition Volume MCF*
1. Sold o
2. Reinjected 0
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) 0
5. Pilot and Pnrge ~
~~'
~~ 217
6. Used for lease operations 1 33,416
7.Other
~iaska C)ii & Gas
ans. Gommissior~ D
nc
TOTAL items 1 - 7 rage
33, 633
8. NGL gas equivalent produced o
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 31, 046
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~, Title ACCOUNTING SUPERVISOR Date 02/14/2001
ear oz Lispo
JANUARY 2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~~~~
Form 10-422
Rev. 4195
Excess Flare Log Report
Facility Name: ANNA PLATFORM Month/Year: January 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
Report Date: 2/2/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
BRUCE PLATFORM
UNOCAL ALASKA RESOURCES I GRANITE POINT FIELD
ear or liispo
JANUARY 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 47
5. Pilot and Purge 217
6. Used for lease operations 16,385
7. Other 0
TOTAL items 1 - 7 16,649
8. NGL gas equivalent produced 0
9. Purchased gas U
10. Transferred from: 0
11. Transferred to: 26,348
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~~ ~ ~ )0 ~~ Title ACCOUNTING SUPERVISOR Date 02/14/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 70.77
UNDEFINED (GAS) 280500 29.23
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name: BRUCE PLATFORM Month/Year: January 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
1/3!01 10:00 1/3/01 12:30 47 N GPTF COMPRESSOR DOWN OPERATIONAL OTHER: U-SP-HP
Report Date: 2/2/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator field(s) Month/Year of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD FEBRUARY 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour o
(Supplemental report required- See 20 AAC 25.235)
5. Pilot and Purge 196
6. Used for lease operations __°.,
~- `-' .,,
.
L7
30,958
t ]
L../
7. Other
y C'3
Lt~ ~} ~
O
~
TOTAL items 1 - 7 ~ : ~ ~ ® 31,154
~ ~.
8. NGL gas equivalent produced m
``c
0
9. Purchased gas o
10. Transferred from: 0
11. Transferred to: 26,185
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~~~ (~ . ~ ~~ Title ACCOUNTING SUPERVISOR Date 03/19/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.U0
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~~
~J~~d
I ~I
Excess Flare Log Report
Facility Name: ANNA PLATFORM
Month/Year: February 2001
__--
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
Report Date: 3/7/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD MARCH 2001
Disposition Volume MCF* *Indicate contribution of each pool to total.
Pool Name Code Percent
1. Sold o
MIDDLE KENAI 280150 100.00
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required- See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 33.218
7.Other 0
TOTAL items 1 - 7 33.435
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 31, 970
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~(E~. -~ ~ ~,~,~; Title ACCOUNTING SUPERVISOR Date 04/06/2001
~.
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~"-" D~
'h~~~
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS. CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD APRIL 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 245
5. Pilot and Purge 210
6. Used for lease operations 32.142
7. Other o
TOTAL items 1 - 7 32.598
8. NGL gas equivalent produced o
9. Purchased gas 377
10. Transferred from: o
11. Transferred to: 30.311
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~~ ~ ~~~,Lt~ Title ACCOUNTING SUPERVISOR Date .05/07/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
',/7s~iY
J
Excess Fiare Log Report
Facility Name: ANNA PLATFORM
Month/Year: Apri12001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
4/28/01 6:30 4/28!01 14:00 246 N 4000 HR TURBINE INSPECTION OPERATIONAL SCHEDULED MAINTENANCE MAINTENANCE DONE AS
QUICKLY AS POSSIBLE
Report Date: 5/2/01 Page: 1 of 1
R~~~I~~tl..J
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
JUN 1 9 2001
Alaska Oil & Gas Cons.
r'acility Operator Field(s) Month/Year of Disposition nc orage
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD MAY 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected p
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report requirel! -See 20 AAC 25.235) 300
5. Pilot and Purge 217
ti. Used for lease operations 34,607
7. Other p
TOTAL items 1 - 7 35,124
8. NGL gas equivalent produced o
9. Purchased gas 7
10. Transferred from: 0
11. Transferred to: 31, 502
Remarks:
I hereby certify t~/hat the f'o~regoing is true and correct to the best of my knowledge.
5ignature~~~.-~~~ l~ ,[ YJU~ Title ACCOUNTING SUPERVISOR Date 06/07/2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI ~ 280150 100.00
1. Safety. ~ ~ ~ .MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
A
nn .,,
'wtiw~ l~ `~ 7' ~ / o ~-
Commi ner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
I!"~°L
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name:
ANNA PLATFORM
Month/Year: May 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 1D Number
5/21/01 10:00 5/21101 17:00 300 N CHANGED OUT FWKO VRU OPERATIONAL UNSCHEDULED MAINTENANCE VIBRATION DUE TO
MECHANICAL PROBLEM,
POSSIBLE BEARING, IN VRU CHANGED OUT VRU WITH A
BACKUP UNIT THAT IS KEPT
ONBOARD. OLD UNIT WILL
BE RECONDITIONED AND
KEPT ONBOARD. REMOVED
B-206 INSTALLED A-204.
Report Date: 6/13/01 Page: 1 of 2
~~ ~~~®
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
ANNA PLATFORM
UNOCAL ALASKA RESOURCES I GRANITE POINT FIELD
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) 200
5. Pilot and Purge 210
6. Used for lease operations 34, 245
7. Other o
TOTAL items 1 - 7 34,655
8. NGL gas equivalent produced o
9. Purchased gas 0
10. Transferred from: o
11. Transferred to: 27,s12
Remarks:
I hereby certif hat the for going is true and correct to the best of my knowledge.
Signatn ~~~ ~/~~j Title ACCOUNTING SUPERVISOR Date 07/17/2001
JUL 2 0 2001
Alaska Qil & Gas Cons. Commission
'ear of lllspo
JUNE 2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
3/~~
Form 10-422 l/ v
Rev. 4/95
Excess Flare Log Report
Facility Name: ANNA PLATFORM Month/Year: June 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
6/7/01 19:00 6/7/01 23:59 200 N BLOWN SURGE PROTECTOR. GA,S
COMPRESSOR DOWN,
TRIGGERED BY GENERATOR OPERATIONAL OTHER: SEE DESC OF EVENT TROUBLE SHOT GENERATOR
PROBLEM IMMEDIATELY INITIATE
REPAIRS AND
REPLACEMENT OF SURGE A-PM-0540
Report Date: 7/18/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DI;
Facility
ANNA PLATFORM Operator
UNOCAL ALASKA RESOURCES Field(s)
GRANITE POINT FIELI
Disposition Volume MCF*
1. Sold o
2. Reinjected 0
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 668
5. Pilot and Purge 217
6. Used for lease operations 36,070
7.Other o
TOTAL items 1- 7 36, 955
8. NGL gas equivalent produced o
9. Purchased gas 113
10. Transferred from: o
11. Transferred to: 29, 737
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
5ignature~~~jy n.~~Q~ Title ACCOUNTING SUPERVISOR Date 08109!2001
Form 10-422
Rev. 4/95
POSITION
Month/Year of Disposition
JULY 2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
3i,~~-
Excess Flare Log Report
Facility Name: ANNA PLATFORM Month/Year: July 2001
Date 8 ~ Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
7/7/01 1:00 7/7101 17:00 668 Y LEAKING PIPELINE VALVE OPERATIONAL SCHEDULED MAINTENANCE PRE-PLANNED VALVE
REPLACEMENT PROCEDURES,
CONDUCT PRE-WORK
MEETING WITH WORK CREW,
ENSURE ALL PERSONNEL,
EQUIPMENT AND TOOLS TO
REPLACE VALVE ARE ON-SITE.
REPLACE VALVE AND RETURN
FACILITY TO NORMAL
OPERATIONS AS SOON AS
POSSIBLE. REPLACE VALVE.
Report Date: 8/15/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD AUGUST 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) 60
5. Pilot and Purge 217
6. Used for lease operations 34,409
7.Other o
TOTAL items 1 - 7 34,686
8. NGL gas equivalent produced o
9. Purchased gas 17
10. Transferred from: 0
11. Transferred to: 30,379
Remarks:
I hereby certify that the foregoi~n~g i/s~true and correct to the best of my knowledge.
Signature ~~ Title ACCOUNTING SUPERVISOR Date 09/10/2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
;~~(-
r orm i u-vcc
Rev. 4/95
Excess Flare Log Report
Facility Name: ANNA PLATFORM Month/Year: August 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
8/2/01 8:00 8/2/01 20:00 60 Y TAKE VRU DOWN FOR
MAINTENANCE. NEW VALVES AND
BEARINGS OPERATIONAL SCHEDULED MAINTENANCE Routine maintenance. Pre-
planned maintenance work,
insured necessary personnel,
equipment, and tools are on
IocaGon, perform maintenance
work and return facility to normal
operation as soon as possible. Scheduled routine
maintenance.
Report Date: 9/6/2001 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD SEPTEMBER2001
Disposition Volume MCF*
1. Sold o
2. Reinjected
'i. o
3. Flared or vented less than 1 hour ~ o
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) o
5. Pilot and Purge 210
6. Used for lease operations 33,607
7.Other o
TOTAL items 1 - 7 33,817
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: o
11. Transferred to: 30,264
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~ ~ ~ / Title ACCOUNTING SUPERVISOR Date 10/05/2001
Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 100.00
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Rev. 4/95
Excess Flare Log Report
Facility Name: ANNA PLATFORM Month/Year: September 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
Report Date: 10/4/2001 Page: 1 of 1
•
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
ANNA PLATFORM Operator
UNOCAL ALASKA RESOURCES Field(s)
GRANITE POINT FIELD Month/Year of Disposition
OCTOBER 2001
Disposition Volume MCF* *Indicate contribution of each pool to total.
1. Sold
o Pool Name Code Percent
2 MIDDLE KENAI - 280150 100.00
. Reinjected o
3. Flared or vented less than 1 hour D '
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 6,42
5
Pil
nd P
r
t 217
.
ge
o
a
u
6. Used for lease operations 32,995
~,
7. Other o
t `
TOTAL items 1 - 7 ,;
v ~.~ ~. %.:; v a 6
39 614
~$t' ~~~ ~~;~J1aL,~ .~.xt1:Q~lt~t~!~E1I:«;:.:~. 113".>:.;:.>:::::::
1
5afet MCF
~,~ ~ _
8
i
l
NGL
t
d
d ,~;.~;:;;~, =
o
~ .
y
.
en
gas equ
va
pro
uce n~h~r~ca~, 2. Lease Use (
~p ~ MCF
~
9. Purchased gas 437
3. Conserv. Purposes
MCF
10. Transferred from: o
.
dd
11. Transferred to:
24,943 ~ ~
~^ ~4 ~~~ ~
Commis ' ner Date
R
k
emar
s:
Note: All volumes must be corrected to
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~ 7 Title ACCOUNTING SUPERVISOR Date 11/09/2001 pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4/95
Excess Fiare Log Report
Facility Name: ANNA PLATFORM Month/Year: October 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
10/3/2001 7:00 10/3/2001 18:00 435 Y Gas line SI for P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of riser will allow
Flare gas to bleed common line common P/L. Pre-plan activity, routine insertion of smart pig for
between Bruce 8 Anna, install dser for ensure proper personnel & , pipeline inspection. Riser
insertion of smart pig, conduct P/L equipmentare on-site, install riser installation is a one-time event.
inspection. on Bruce Platform, conduct
inspection & return facility to
normal operation ASAP. Advance
notice given to AOGCC on
1013/01.
10/8/2001 7:00 10/8/2001 23:59 673 Y Gas line SI for P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of dserwill allow
Flare gas to bleed common line common P/L. Pre-plan activity, routine insertion of smart pig for
between Bruce 8 Anna, install riser for ensure proper personnel & pipeline inspection. Riser
insertion of smart pig, conduct P/L equipment are on-site, install dser installation is a one-time event.
inspec8on. on Bruce Platform, conduct
inspection 8 return facility to
normal operation ASAP. Advance
notice given to AOGCC on
10/3/01.
10/7!2001 0:00 10/7/2001 23:59 874 Y Gas line SI for P/L inspec8on work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of dser will allow
Flare gas to bleed common line common P/L. Pre-plan activity, routine inser8on of smart pig for
between Bruce & Anna, install dser for ensure proper personnel 8 pipeline inspec8on. Riser
insertion of smart pig, conduct P/L equipment are on-site, install dser installa8on is a one-time event
inspection. on Bruce Platform, conduct
inspec8on & return facility to
normal operation ASAP. Advance
notice given to AOGCC on
1013/01.
10/8/2001 0:00 10/8/2001 23:59 991 Y Gas line SI for P/L inspec8on work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of dser wilt allow
Flare gas to bleed common line common P/L. Pre-plan activity, rou8ne insertion of smart pig for
between Bruce & Anna, install dser for ensure proper personnel 8 pipeline inspection. Riser
insertion of smart pig, conduct P/L equipment are on-site, install dser installation is a one-8me event.
inspection. on Bruce Platform, conduct
inspec8on 8 return faality to
normal opertion ASAP. Advance
notice given to AOGCC on
10/3/01.
Repott Date: 11/9/2001 Page: 1 of 2
Excess Flare Log Report
10/9/2001 0:00 10/9/2001 23:59 1025 Y Gas line SI for P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of riser will allow
Flare gas to bleed common line common P/L. Pre-plan activity, routine insertion of smart pig for
between Bruce & Anna, install riser for ensure proper personnel & pipeline inspection. Riser
insertion of smart pig, conduct P/L equipment are on-site, install riser installation is a one-time event.
inspection. on Bruce Platform, conduct
inspection 8 return facility to
normal operation ASAP. Advance
notice given to AOGCC on
10/3!01.
10/10/2001 0:00 10/10/2001 23:59 949 Y Gas line SI for P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of riser will allow
Flare gas to bleed common line common P/L. Pre-plan activity, routine insertion of smart pig for
between Bruce & Anna, install riser for ensure proper personnel 8 _ pipeline inspection. Riser
insertion of smart pig, conduct P/L equipment are on-site, install riser installation is a one-time event.
inspection. on Bruce Platform, conduct
inspection 8 return facility to
normal operation ASAP. Advance
notice given to AOGCC on
10/3/01.
10/11/2001 0:00 10/11/2001 23:59 977 Y Gas line SI for P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of riser will allow
Flare gas to bleed common line common P/L. Pre-plan activity, routine insertion of smart pig for
between Bruce & Anna, install riser for ensure proper personnel & pipeline inspection. Riser
insertion of smart pig, conduct P/L equipment are on-site, install riser installation is a one-time event.
inspection. on Bruce Platform, conduct
inspection 8 return facility to
normal operation ASAP. Advance
notice given to AOGCC on
10/3!01.
10/12/2001 0:00 10/12/2001 9:00 378 Y Gas line SI for P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of riser will allow
Flare gas to bleed common line common P/L. Pre-plan activity, routine insertion of smart pig for
between Bruce 8 Anna, install riser for ensure proper personnel & pipeline inspection. Riser
insertion of smart pig, conduct P/L equipment are on-site, install riser installation is a one-time event.
inspection. on Bruce Platform, conduct
inspection & return facility to
normal operation ASAP. Advance
notice given to AOGCC on
10/3/01.
Report Date: 11/9/2001 Page: 2 of 2
02/20/2002 17:00 FAg
~~
_.._. . ;:
-'-- J
~~;
.= ;.:- _
•.°' ' .
r .,,.y
• ~~... ~M-• F~~'
~ i~ .L
~: :
_. _
Y,_
•. =
..
.: ,
.c
,. ;.
.•.
y,...
f
~~`J`• ~ . _ ~__ _ ~ .,~' 'til, . `..~ r4 ' .
,•.
- ~. •. .~`
• /. , ,/ ; r i~,.a=.,1~••-~I-+II... ,r _.•, ~ ~ ;?, ,vyti•,"`,,: •'', ,1,y\
f ~~
~ ~,. /;•
~~ ,~, .,
M~ \~~
~F~
I .,, I '
•
t~
.. •1...1.. ...'• :'.'
~.. _
~~
:J
r
,..: ~ ~~
. .,-
'~
Lfi' ~ ~ ~ f •~,
\~ ~\
.7 l,_
r.
~ ti~ .....
.'•..,,~ i _ ..
.~x~'P y.
-i;•.
-• ~r
Vy ;~~~
:1
[7j 002/008
~' T'.,
JQ
1 _ __ _... . ~,.. ....
,~
_ ~.~_
'.~
...
i
• .~
~~.
. ij, _
„i i. j ..
!~ .,"v
~,• •~I
Ik\~ 4y,f f Yr
i yam"`..
~ ~ I~~/1
• ~`..`~
,i
,,. s4
~~-
Anna, Bruce flaring
Subject: Anna, Bruce flaring
Date: Wed, 3 Oct 2001 16:37:25 -0700
From: "Johnston, David W -Contract" <johnstond@unocal.com>
To: "McMains, Stephen E -Vendor" <Steve_McMains@admin.state.ak.us>
CC: "Bounds, Janet G" <boundsj@unocal.com>
Steve,
Unocal asked that I give you a heads up concerning an increase in flaring on
Anna and Bruce platforms. The two platforms are shutting down their common
gas line in order to install blind flanges on the Bruce Platform. The
flanges will then allow a short section of gas line to be removed so that a
riser can be installed for accepting smart pigs for pipe inspection. The
shutdown time is expected to be about 12-16 hours. Only formation gas will
be flared, and will be limited to that volume remaining in the line that
cannot be used for fuel. Unocal will report the actual volume flared on the
10-422 report for October.
Give a call should you have any questions.
Dave Johnston
263-7627
1 of 1 10/3/01 3:43 PM
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
ANNA PLATFORM Operator
UNOCAL ALASKA RESOURCES Field(s)
GRANITE POINT FIELD Month/Year of Disposition
NOVEMBER 2001
Disposition Volume MCF* *Indicate contribution of each pool to total.
1
Sold
o Pool Name Code Percent
.
MIDDLE KENAI - 280150 100.00
2. Reinjected 0
3. Flared or vented less than 1 hour o ~
4. Flared or vented greater than 1 hour
d
S
20 AAC 25
235
t
i ~,
~1,~159
V
requ
re
-
ee
.
)
(Supplemental repor
5. Pilot and Purge 210
6. Used for lease operations ~ ~ ~ ~ ip ~ ~~ ~~ 31, ool
Other
7 o
. <:u::>:::::>
'
'
`''
TOTAL items 1 - 7
2 280 ' "4#~f`~i> 1~~
.~!inl .;:. Fl~r
:
">;i~tik~:~-~at~u......7.. hr............
.::::.y::. ~:::.: ~ ::..:::::::::.::::.::::::.::. ~:::.::::::::.:::.:.: ~:::::.
..............................................................................................................
Safet
1 MCF
/ (~ ~
. ~;
.
y
~
8. NGL gas equivalent produced o
2. Lease Use
MCF
9. Purchased gas 388
3. Conserv. Purposes
MCF
10. Transferred from: o
~ Z6
~
11. Transferred to: 27,625 D
Commissioner Date
z
Remarks: Note: All volumes must be corrected to
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ,`~ ,, „~ ~ ' Title ACCOUNTING SUPERVISOR Date .12/07/2001 pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: ANNA PLATFORM
Month/Year: November 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
1117!2001 14:00 11/7/2001 23:59 353 N Pipeline shut down to remove
liquids, flared gas to bleed line.
Unplanned event, liquids in line. OPERATIONAL UNSCHEDULED MAINTENANCE Chak line shut down to remove
liquids in line, shut down Chak
compressors for pigging operation
to Gear line, flare all sales gas to
bleed down pipeline. Return all
facility to normal operation a3 soon
as possible. Normal procedure.
11/8/2001 0:00 11/8/2001 10:00 378 N Pipeline shut down to remove
liquids, flared gas to bleed line.
Unplanned event, liquids in line. OPERATIONAL UNSCHEDULED MAINTENANCE Chak line shut down to remove
Liquids in line, shut down Chak
compressors for pigging operation
to clear line, flare all sales gas to
bleed down pipeline. Return all
facility to normal operation as soon
as possible. Norval procedure.
11/14/2001 t2:00 11/14/2001 21:00 338 N Retrieve pig from pipeline from
pigging operations on 11/7-11/8.
Unplanned event, liquids in line. OPERATIONAL UNSCHEDULED MAINTENANCE Flare all sales gas to bleed down
pipeline for pig retrieval. Push pig
back to platform for retrieval. Pre-
plan work; ensure proper
personnel and equipment are on-
site, push pig back to platform and
retrieve, return facility to normal
operation as soon Retrieve pig from pipeline. ASP-HP
Report Date: 12/12/2001 Page: 1 of 1
ALASKA OIL AND GAS, CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD DECEMBER 2001
Disposition Volume MCF* *Indicate contribution of each pool to total.
1. Sold o Pool Name Code Percent
MIDDLE KENAI 280150 100.00
Z. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour 0
(Supplemental report required- See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 33,984
7.Other o
TOTAL items 1 - 7 34 201
1. Safety \ MCF
8. NGL gas equivalent produced o
2. Lease Use MCF
9. Purchased gas i
3. Conserv. Purposes MCF
10. Transferred from: o
~~ a
11. Transferred to: 28,311 missioner Date
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~ I~~~,~IrF:G Title ACCOUNTING SUPERVISOR Date 01/14/2002
Form 10-422
Rev. 4/95
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235