Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutUNOCAL - ANNA PLATFORM ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION ANNA PLATFORM UNOCAL ALASKA RESOURCES I GRANITE POINT FIELD Disposition Volume MCF* 1. Sold o 2. Reinjected 0 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) 0 5. Pilot and Pnrge ~ ~~' ~~ 217 6. Used for lease operations 1 33,416 7.Other ~iaska C)ii & Gas ans. Gommissior~ D nc TOTAL items 1 - 7 rage 33, 633 8. NGL gas equivalent produced o 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 31, 046 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~~, Title ACCOUNTING SUPERVISOR Date 02/14/2001 ear oz Lispo JANUARY 2001 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 100.00 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ~~~~ Form 10-422 Rev. 4195 Excess Flare Log Report Facility Name: ANNA PLATFORM Month/Year: January 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number Report Date: 2/2/01 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION BRUCE PLATFORM UNOCAL ALASKA RESOURCES I GRANITE POINT FIELD ear or liispo JANUARY 2001 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 47 5. Pilot and Purge 217 6. Used for lease operations 16,385 7. Other 0 TOTAL items 1 - 7 16,649 8. NGL gas equivalent produced 0 9. Purchased gas U 10. Transferred from: 0 11. Transferred to: 26,348 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~~~ ~ ~ )0 ~~ Title ACCOUNTING SUPERVISOR Date 02/14/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 70.77 UNDEFINED (GAS) 280500 29.23 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Excess Flare Log Report Facility Name: BRUCE PLATFORM Month/Year: January 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 1/3!01 10:00 1/3/01 12:30 47 N GPTF COMPRESSOR DOWN OPERATIONAL OTHER: U-SP-HP Report Date: 2/2/01 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator field(s) Month/Year of Disposition ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD FEBRUARY 2001 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour o (Supplemental report required- See 20 AAC 25.235) 5. Pilot and Purge 196 6. Used for lease operations __°., ~- `-' .,, . L7 30,958 t ] L../ 7. Other y C'3 Lt~ ~} ~ O ~ TOTAL items 1 - 7 ~ : ~ ~ ® 31,154 ~ ~. 8. NGL gas equivalent produced m ``c 0 9. Purchased gas o 10. Transferred from: 0 11. Transferred to: 26,185 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~~~~ (~ . ~ ~~ Title ACCOUNTING SUPERVISOR Date 03/19/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 100.U0 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ~~ ~J~~d I ~I Excess Flare Log Report Facility Name: ANNA PLATFORM Month/Year: February 2001 __-- Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number Report Date: 3/7/01 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD MARCH 2001 Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name Code Percent 1. Sold o MIDDLE KENAI 280150 100.00 2. Reinjected 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 0 (Supplemental report required- See 20 AAC 25.235) 5. Pilot and Purge 217 6. Used for lease operations 33.218 7.Other 0 TOTAL items 1 - 7 33.435 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 31, 970 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~(E~. -~ ~ ~,~,~; Title ACCOUNTING SUPERVISOR Date 04/06/2001 ~. Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ~"-" D~ 'h~~~ Form 10-422 Rev. 4/95 ALASKA OIL AND GAS. CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD APRIL 2001 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 245 5. Pilot and Purge 210 6. Used for lease operations 32.142 7. Other o TOTAL items 1 - 7 32.598 8. NGL gas equivalent produced o 9. Purchased gas 377 10. Transferred from: o 11. Transferred to: 30.311 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~~~ ~ ~~~,Lt~ Title ACCOUNTING SUPERVISOR Date .05/07/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 100.00 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ',/7s~iY J Excess Fiare Log Report Facility Name: ANNA PLATFORM Month/Year: Apri12001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 4/28/01 6:30 4/28!01 14:00 246 N 4000 HR TURBINE INSPECTION OPERATIONAL SCHEDULED MAINTENANCE MAINTENANCE DONE AS QUICKLY AS POSSIBLE Report Date: 5/2/01 Page: 1 of 1 R~~~I~~tl..J ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION JUN 1 9 2001 Alaska Oil & Gas Cons. r'acility Operator Field(s) Month/Year of Disposition nc orage ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD MAY 2001 Disposition Volume MCF* 1. Sold o 2. Reinjected p 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report requirel! -See 20 AAC 25.235) 300 5. Pilot and Purge 217 ti. Used for lease operations 34,607 7. Other p TOTAL items 1 - 7 35,124 8. NGL gas equivalent produced o 9. Purchased gas 7 10. Transferred from: 0 11. Transferred to: 31, 502 Remarks: I hereby certify t~/hat the f'o~regoing is true and correct to the best of my knowledge. 5ignature~~~.-~~~ l~ ,[ YJU~ Title ACCOUNTING SUPERVISOR Date 06/07/2001 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI ~ 280150 100.00 1. Safety. ~ ~ ~ .MCF 2. Lease Use MCF 3. Conserv. Purposes MCF A nn .,, 'wtiw~ l~ `~ 7' ~ / o ~- Commi ner Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 I!"~°L Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: ANNA PLATFORM Month/Year: May 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 1D Number 5/21/01 10:00 5/21101 17:00 300 N CHANGED OUT FWKO VRU OPERATIONAL UNSCHEDULED MAINTENANCE VIBRATION DUE TO MECHANICAL PROBLEM, POSSIBLE BEARING, IN VRU CHANGED OUT VRU WITH A BACKUP UNIT THAT IS KEPT ONBOARD. OLD UNIT WILL BE RECONDITIONED AND KEPT ONBOARD. REMOVED B-206 INSTALLED A-204. Report Date: 6/13/01 Page: 1 of 2 ~~ ~~~® ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION ANNA PLATFORM UNOCAL ALASKA RESOURCES I GRANITE POINT FIELD Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) 200 5. Pilot and Purge 210 6. Used for lease operations 34, 245 7. Other o TOTAL items 1 - 7 34,655 8. NGL gas equivalent produced o 9. Purchased gas 0 10. Transferred from: o 11. Transferred to: 27,s12 Remarks: I hereby certif hat the for going is true and correct to the best of my knowledge. Signatn ~~~ ~/~~j Title ACCOUNTING SUPERVISOR Date 07/17/2001 JUL 2 0 2001 Alaska Qil & Gas Cons. Commission 'ear of lllspo JUNE 2001 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 100.00 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 3/~~ Form 10-422 l/ v Rev. 4/95 Excess Flare Log Report Facility Name: ANNA PLATFORM Month/Year: June 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 6/7/01 19:00 6/7/01 23:59 200 N BLOWN SURGE PROTECTOR. GA,S COMPRESSOR DOWN, TRIGGERED BY GENERATOR OPERATIONAL OTHER: SEE DESC OF EVENT TROUBLE SHOT GENERATOR PROBLEM IMMEDIATELY INITIATE REPAIRS AND REPLACEMENT OF SURGE A-PM-0540 Report Date: 7/18/01 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DI; Facility ANNA PLATFORM Operator UNOCAL ALASKA RESOURCES Field(s) GRANITE POINT FIELI Disposition Volume MCF* 1. Sold o 2. Reinjected 0 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 668 5. Pilot and Purge 217 6. Used for lease operations 36,070 7.Other o TOTAL items 1- 7 36, 955 8. NGL gas equivalent produced o 9. Purchased gas 113 10. Transferred from: o 11. Transferred to: 29, 737 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. 5ignature~~~jy n.~~Q~ Title ACCOUNTING SUPERVISOR Date 08109!2001 Form 10-422 Rev. 4/95 POSITION Month/Year of Disposition JULY 2001 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 100.00 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 3i,~~- Excess Flare Log Report Facility Name: ANNA PLATFORM Month/Year: July 2001 Date 8 ~ Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 7/7/01 1:00 7/7101 17:00 668 Y LEAKING PIPELINE VALVE OPERATIONAL SCHEDULED MAINTENANCE PRE-PLANNED VALVE REPLACEMENT PROCEDURES, CONDUCT PRE-WORK MEETING WITH WORK CREW, ENSURE ALL PERSONNEL, EQUIPMENT AND TOOLS TO REPLACE VALVE ARE ON-SITE. REPLACE VALVE AND RETURN FACILITY TO NORMAL OPERATIONS AS SOON AS POSSIBLE. REPLACE VALVE. Report Date: 8/15/01 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD AUGUST 2001 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) 60 5. Pilot and Purge 217 6. Used for lease operations 34,409 7.Other o TOTAL items 1 - 7 34,686 8. NGL gas equivalent produced o 9. Purchased gas 17 10. Transferred from: 0 11. Transferred to: 30,379 Remarks: I hereby certify that the foregoi~n~g i/s~true and correct to the best of my knowledge. Signature ~~ Title ACCOUNTING SUPERVISOR Date 09/10/2001 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 100.00 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ;~~(- r orm i u-vcc Rev. 4/95 Excess Flare Log Report Facility Name: ANNA PLATFORM Month/Year: August 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 8/2/01 8:00 8/2/01 20:00 60 Y TAKE VRU DOWN FOR MAINTENANCE. NEW VALVES AND BEARINGS OPERATIONAL SCHEDULED MAINTENANCE Routine maintenance. Pre- planned maintenance work, insured necessary personnel, equipment, and tools are on IocaGon, perform maintenance work and return facility to normal operation as soon as possible. Scheduled routine maintenance. Report Date: 9/6/2001 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD SEPTEMBER2001 Disposition Volume MCF* 1. Sold o 2. Reinjected 'i. o 3. Flared or vented less than 1 hour ~ o 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) o 5. Pilot and Purge 210 6. Used for lease operations 33,607 7.Other o TOTAL items 1 - 7 33,817 8. NGL gas equivalent produced o 9. Purchased gas o 10. Transferred from: o 11. Transferred to: 30,264 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~ ~ ~ / Title ACCOUNTING SUPERVISOR Date 10/05/2001 Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 100.00 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Rev. 4/95 Excess Flare Log Report Facility Name: ANNA PLATFORM Month/Year: September 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number Report Date: 10/4/2001 Page: 1 of 1 • ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility ANNA PLATFORM Operator UNOCAL ALASKA RESOURCES Field(s) GRANITE POINT FIELD Month/Year of Disposition OCTOBER 2001 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold o Pool Name Code Percent 2 MIDDLE KENAI - 280150 100.00 . Reinjected o 3. Flared or vented less than 1 hour D ' 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 6,42 5 Pil nd P r t 217 . ge o a u 6. Used for lease operations 32,995 ~, 7. Other o t ` TOTAL items 1 - 7 ,; v ~.~ ~. %.:; v a 6 39 614 ~$t' ~~~ ~~;~J1aL,~ .~.xt1:Q~lt~t~!~E1I:«;:.:~. 113".>:.;:.>::::::: 1 5afet MCF ~,~ ~ _ 8 i l NGL t d d ,~;.~;:;;~, = o ~ . y . en gas equ va pro uce n~h~r~ca~, 2. Lease Use ( ~p ~ MCF ~ 9. Purchased gas 437 3. Conserv. Purposes MCF 10. Transferred from: o . dd 11. Transferred to: 24,943 ~ ~ ~^ ~4 ~~~ ~ Commis ' ner Date R k emar s: Note: All volumes must be corrected to I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~~ 7 Title ACCOUNTING SUPERVISOR Date 11/09/2001 pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Form 10-422 Rev. 4/95 Excess Fiare Log Report Facility Name: ANNA PLATFORM Month/Year: October 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 10/3/2001 7:00 10/3/2001 18:00 435 Y Gas line SI for P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of riser will allow Flare gas to bleed common line common P/L. Pre-plan activity, routine insertion of smart pig for between Bruce 8 Anna, install dser for ensure proper personnel & , pipeline inspection. Riser insertion of smart pig, conduct P/L equipmentare on-site, install riser installation is a one-time event. inspection. on Bruce Platform, conduct inspection & return facility to normal operation ASAP. Advance notice given to AOGCC on 1013/01. 10/8/2001 7:00 10/8/2001 23:59 673 Y Gas line SI for P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of dserwill allow Flare gas to bleed common line common P/L. Pre-plan activity, routine insertion of smart pig for between Bruce 8 Anna, install riser for ensure proper personnel & pipeline inspection. Riser insertion of smart pig, conduct P/L equipment are on-site, install dser installation is a one-time event. inspec8on. on Bruce Platform, conduct inspection 8 return facility to normal operation ASAP. Advance notice given to AOGCC on 10/3/01. 10/7!2001 0:00 10/7/2001 23:59 874 Y Gas line SI for P/L inspec8on work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of dser will allow Flare gas to bleed common line common P/L. Pre-plan activity, routine inser8on of smart pig for between Bruce & Anna, install dser for ensure proper personnel 8 pipeline inspec8on. Riser insertion of smart pig, conduct P/L equipment are on-site, install dser installa8on is a one-time event inspection. on Bruce Platform, conduct inspec8on & return facility to normal operation ASAP. Advance notice given to AOGCC on 1013/01. 10/8/2001 0:00 10/8/2001 23:59 991 Y Gas line SI for P/L inspec8on work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of dser wilt allow Flare gas to bleed common line common P/L. Pre-plan activity, rou8ne insertion of smart pig for between Bruce & Anna, install dser for ensure proper personnel 8 pipeline inspection. Riser insertion of smart pig, conduct P/L equipment are on-site, install dser installation is a one-8me event. inspection. on Bruce Platform, conduct inspec8on 8 return faality to normal opertion ASAP. Advance notice given to AOGCC on 10/3/01. Repott Date: 11/9/2001 Page: 1 of 2 Excess Flare Log Report 10/9/2001 0:00 10/9/2001 23:59 1025 Y Gas line SI for P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of riser will allow Flare gas to bleed common line common P/L. Pre-plan activity, routine insertion of smart pig for between Bruce & Anna, install riser for ensure proper personnel & pipeline inspection. Riser insertion of smart pig, conduct P/L equipment are on-site, install riser installation is a one-time event. inspection. on Bruce Platform, conduct inspection 8 return facility to normal operation ASAP. Advance notice given to AOGCC on 10/3!01. 10/10/2001 0:00 10/10/2001 23:59 949 Y Gas line SI for P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of riser will allow Flare gas to bleed common line common P/L. Pre-plan activity, routine insertion of smart pig for between Bruce & Anna, install riser for ensure proper personnel 8 _ pipeline inspection. Riser insertion of smart pig, conduct P/L equipment are on-site, install riser installation is a one-time event. inspection. on Bruce Platform, conduct inspection 8 return facility to normal operation ASAP. Advance notice given to AOGCC on 10/3/01. 10/11/2001 0:00 10/11/2001 23:59 977 Y Gas line SI for P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of riser will allow Flare gas to bleed common line common P/L. Pre-plan activity, routine insertion of smart pig for between Bruce & Anna, install riser for ensure proper personnel & pipeline inspection. Riser insertion of smart pig, conduct P/L equipment are on-site, install riser installation is a one-time event. inspection. on Bruce Platform, conduct inspection 8 return facility to normal operation ASAP. Advance notice given to AOGCC on 10/3!01. 10/12/2001 0:00 10/12/2001 9:00 378 Y Gas line SI for P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of riser will allow Flare gas to bleed common line common P/L. Pre-plan activity, routine insertion of smart pig for between Bruce 8 Anna, install riser for ensure proper personnel & pipeline inspection. Riser insertion of smart pig, conduct P/L equipment are on-site, install riser installation is a one-time event. inspection. on Bruce Platform, conduct inspection & return facility to normal operation ASAP. Advance notice given to AOGCC on 10/3/01. Report Date: 11/9/2001 Page: 2 of 2 02/20/2002 17:00 FAg ~~ _.._. . ;: -'-- J ~~; .= ;.:- _ •.°' ' . r .,,.y • ~~... ~M-• F~~' ~ i~ .L ~: : _. _ Y,_ •. = .. .: , .c ,. ;. .•. y,... f ~~`J`• ~ . _ ~__ _ ~ .,~' 'til, . `..~ r4 ' . ,•. - ~. •. .~` • /. , ,/ ; r i~,.a=.,1~••-~I-+II... ,r _.•, ~ ~ ;?, ,vyti•,"`,,: •'', ,1,y\ f ~~ ~ ~,. /;• ~~ ,~, ., M~ \~~ ~F~ I .,, I ' • t~ .. •1...1.. ...'• :'.' ~.. _ ~~ :J r ,..: ~ ~~ . .,- '~ Lfi' ~ ~ ~ f •~, \~ ~\ .7 l,_ r. ~ ti~ ..... .'•..,,~ i _ .. .~x~'P y. -i;•. -• ~r Vy ;~~~ :1 [7j 002/008 ~' T'., JQ 1 _ __ _... . ~,.. .... ,~ _ ~.~_ '.~ ... i • .~ ~~. . ij, _ „i i. j .. !~ .,"v ~,• •~I Ik\~ 4y,f f Yr i yam"`.. ~ ~ I~~/1 • ~`..`~ ,i ,,. s4 ~~- Anna, Bruce flaring Subject: Anna, Bruce flaring Date: Wed, 3 Oct 2001 16:37:25 -0700 From: "Johnston, David W -Contract" <johnstond@unocal.com> To: "McMains, Stephen E -Vendor" <Steve_McMains@admin.state.ak.us> CC: "Bounds, Janet G" <boundsj@unocal.com> Steve, Unocal asked that I give you a heads up concerning an increase in flaring on Anna and Bruce platforms. The two platforms are shutting down their common gas line in order to install blind flanges on the Bruce Platform. The flanges will then allow a short section of gas line to be removed so that a riser can be installed for accepting smart pigs for pipe inspection. The shutdown time is expected to be about 12-16 hours. Only formation gas will be flared, and will be limited to that volume remaining in the line that cannot be used for fuel. Unocal will report the actual volume flared on the 10-422 report for October. Give a call should you have any questions. Dave Johnston 263-7627 1 of 1 10/3/01 3:43 PM ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility ANNA PLATFORM Operator UNOCAL ALASKA RESOURCES Field(s) GRANITE POINT FIELD Month/Year of Disposition NOVEMBER 2001 Disposition Volume MCF* *Indicate contribution of each pool to total. 1 Sold o Pool Name Code Percent . MIDDLE KENAI - 280150 100.00 2. Reinjected 0 3. Flared or vented less than 1 hour o ~ 4. Flared or vented greater than 1 hour d S 20 AAC 25 235 t i ~, ~1,~159 V requ re - ee . ) (Supplemental repor 5. Pilot and Purge 210 6. Used for lease operations ~ ~ ~ ~ ip ~ ~~ ~~ 31, ool Other 7 o . <:u::>:::::> ' ' `'' TOTAL items 1 - 7 2 280 ' "4#~f`~i> 1~~ .~!inl .;:. Fl~r : ">;i~tik~:~-~at~u......7.. hr............ .::::.y::. ~:::.: ~ ::..:::::::::.::::.::::::.::. ~:::.::::::::.:::.:.: ~:::::. .............................................................................................................. Safet 1 MCF / (~ ~ . ~; . y ~ 8. NGL gas equivalent produced o 2. Lease Use MCF 9. Purchased gas 388 3. Conserv. Purposes MCF 10. Transferred from: o ~ Z6 ~ 11. Transferred to: 27,625 D Commissioner Date z Remarks: Note: All volumes must be corrected to I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ,`~ ,, „~ ~ ' Title ACCOUNTING SUPERVISOR Date .12/07/2001 pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: ANNA PLATFORM Month/Year: November 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 1117!2001 14:00 11/7/2001 23:59 353 N Pipeline shut down to remove liquids, flared gas to bleed line. Unplanned event, liquids in line. OPERATIONAL UNSCHEDULED MAINTENANCE Chak line shut down to remove liquids in line, shut down Chak compressors for pigging operation to Gear line, flare all sales gas to bleed down pipeline. Return all facility to normal operation a3 soon as possible. Normal procedure. 11/8/2001 0:00 11/8/2001 10:00 378 N Pipeline shut down to remove liquids, flared gas to bleed line. Unplanned event, liquids in line. OPERATIONAL UNSCHEDULED MAINTENANCE Chak line shut down to remove Liquids in line, shut down Chak compressors for pigging operation to clear line, flare all sales gas to bleed down pipeline. Return all facility to normal operation as soon as possible. Norval procedure. 11/14/2001 t2:00 11/14/2001 21:00 338 N Retrieve pig from pipeline from pigging operations on 11/7-11/8. Unplanned event, liquids in line. OPERATIONAL UNSCHEDULED MAINTENANCE Flare all sales gas to bleed down pipeline for pig retrieval. Push pig back to platform for retrieval. Pre- plan work; ensure proper personnel and equipment are on- site, push pig back to platform and retrieve, return facility to normal operation as soon Retrieve pig from pipeline. ASP-HP Report Date: 12/12/2001 Page: 1 of 1 ALASKA OIL AND GAS, CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition ANNA PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD DECEMBER 2001 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold o Pool Name Code Percent MIDDLE KENAI 280150 100.00 Z. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour 0 (Supplemental report required- See 20 AAC 25.235) 5. Pilot and Purge 217 6. Used for lease operations 33,984 7.Other o TOTAL items 1 - 7 34 201 1. Safety \ MCF 8. NGL gas equivalent produced o 2. Lease Use MCF 9. Purchased gas i 3. Conserv. Purposes MCF 10. Transferred from: o ~~ a 11. Transferred to: 28,311 missioner Date Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~~ I~~~,~IrF:G Title ACCOUNTING SUPERVISOR Date 01/14/2002 Form 10-422 Rev. 4/95 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235