Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutUNOCAL - BAKER PLATFORMALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JANUARY 2001 Disposition Volume MCF* 1. SOId 56,365 2. Reinjected 0 3. Flared or vented less than 1 hour 462 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) o 5. Pilot and Purge m, ,-~: ~ ~, ; ~ 217 6. Used for lease operations 32,922 7. Other o }, TOTAL items 1 - 7 Anch race x9,966 8. NGL gas equivalent produced o 9. Purchased gas 0 10. Transferred from: o 11. Transferred to: D Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~~~ ~~,~/~ Title ACCOUNTING SUPERVISOR Date 02/07/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. .Pool Name Code Percent A 524110 7.90 B C AND D 524112 6.08 E F AND G 524114 16.34 UNDEFINED (GAS) 524500 69.68 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ,~, ... ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL FEBRUARY 2001 Disposition Volume MCF* 1. Sold 51,095 2. Reinjected D 3. Flared or vented less than 1 hour 43s 4. Flared or vented greater than 1 hour o (Supplemental report required- See 20 AAC 25.235) 5. Pilot and Purge ~~ 196 Via, }_ ~= 6. Used for lease operations ~" ~ } ~: 30,429 e~ ~; 7. Other ~ .~ ~~ 0 ~, TOTAL items 1- 7 `~; ~ ~ ~ s2, i5s u~ 8. NGL gas equivalent produced ~~ o 9. Purchased gas 0 10. Transferred from: o 11. Transferred to: o Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ,~G~J Title ACCOUNTING SUPERVISOR Date 03/08/2001 *Indicate contribution of each pool to total. Pool Name Code Percent A 524110 7.45 B C AND D 524112 5.32 E F AND G 524114 13.94 UNDEFINED (GAS) 524500 73.29 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Forru 10-422 _ Rev. 4/95 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION I BAKER PLATFORM I UNOCAL ALASKA RESOURCES I MIDDLE GROUND SHOAL Disposition Volume MCF* 1. SOId 49,838 2. Reinjected o 3. Flared or vented less than 1 hour 434 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) o 5. Pilot and Purge 217 6. Used for lease operations 30,769 7.Other o TOTAL items 1 - 7 81,258 8. NGL gas equivalent produced o 9. Purchased gas o 10. Transferred from: o 11. Transferred to: o Remarks: I hereby certify that the foregoing is true and .correct to the best of my knowledge. Signature ~,~~~%~ ~. ~~~~~ Title ACCOUNTING SUPER4ISOR Date 04/06/2001 Form 10-422 Rev. 4/95 ear or Ulspo MARCH 2001 *Indicate contribution of each pool to total. Pool Name Code Percent A 524110 4.77 B C AND D 524112 3.84 E F AND G 524114 11.15 UNDEFINED (GAS) 524500 80.24 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DI; Facility BAKER PLATFORM Operator UNOCAL ALASKA RESOURCES Field(s) MIDDLE GROUND SHOAT Disposition Volume MCF* 1. SOId 36,636 2. Reinjected o 3. Flared or vented less than 1 hour 457 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) o 5. Pilot and Purge 210 6. Used for lease operations 33,473 7. Other o TOTAL items 1 - 7 70, 776 8. NGL gas equivalent produced o 9. Purchased gas o 10. Transferred from: o 11. Transferred to: o Remarks: { I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature /~ ~~~~ ~ l! p/~~ Title .ACCOUNTING SUPERVISOR Date 05/11/2001 Form 10-422 Rev. 4/95 POSITION Month/Year of Disposition _ APRIL 2001 *Indicate contribution of each pool to total. Pool Name Code Percent A 524110 7.23 B C AND D 524112 6.69 E F AND G 524114 16.97 UNDEFINED (GAS) 524500 69.11 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 R~CEI\/E® ALASKA OIL AND GAS CONSERVATION COMMISSION JUN 1 9 2001 FACILITY REPORT OF PRODUCED GAS DISPOSITION Alaska Oil & Gas Cons. Commission Facility Operator Field(s) Month/Year of Dispositio orage BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL MAY 2001 Disposition Volume MCF* 1. Sold 32,187 2. Reinjected o 3. Flared or vented less than 1 hour - 511 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 96 5. Pilot and Purge 217 6. Used for lease operations 34,183 7. Other o TOTAL items 1- 7 67,194 8. NGL gas equivalent produced o 9. Purchased gas o 10. Transferred from: o 11. Transferred to: o Remarks: I hereby certify that the forego/ing is true and correct to the best of my knowledge. Signature ~~~~~ ~ ,~(/~ Title ACCOUNTING SUPERVISOR Date 06/07/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code .Percent A ~ 524110 8.18 B C AND D 524112 8.54 E F AND G 524114 18.53 UNDEFINED (GAS) 524500 64.75 1. Safety C~ ~ MCF 2. Lease Use MCF 3. Conserv. Purposes MCF oa Commis i ner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ~- )~`~ Excess Flare Log Report Facility Name: BAKER PLATFORM Month/Year: May 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 5/9/0112:30 5/9101 16:00 96 Y Scheduled Annual Maintenance. Shut down VRU and gas compressorfor annual safety inspection of relief valves. OPERATIONAL SCHEDULED MAINTENANCE Releif valves were remved and pressure tested for accuracy. Any inaccurate valves were cleaned, reset, and retested. Accurate valves were reinstalled; any valves failing the pressure test after cleaning are to be removed from service. ~ Relief vavle testing is mandated maintenance. To minimize downtime, a portable relief valve testing unit is taken to the facilities. This Conex unit aws authorized under the Nations Board VR Testing Program and put into service in the spring of 200E B-C-0202-2 Report Date: 6/14/01 Page: 1 of 2 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION BAKER PLATFORM UNOCAL ALASKA RESOURCES I MIDDLE GROUND SHOAL Disposition Volume MCF* 1. SOId 36 , 572 2. Reinjected o 3. Flared or vented less than 1 hour 436 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) 120 5. Pilot and Purge 210 6. Used for lease operations 25,820 7. Other 0 TOTAL items 1- 7 63,158 8. NGL gas equivalent produced o 9. Purchased gas o 10. Transferred from: o 11. Transferred to: 0 Remarks: I hereby certify hat the fore ing is true and correct to the best of my knowledge. Signatur ~/,~;~ ~ Title ACCOUNTING SUPERVISOR Date 07/05/2001 Form 10-422 Rev. 4/95 RC~~~ V ~~ JUL 2 0 2001 Alaska Oil & Gas Cons. Commission ear of Llspo JUNE 2001 *Indicate contribution of each pool to total. Pool Name Code Percent A 524110 8.46 B C AND D 524112 8.80 E F AND G 524114. 19.07 UNDEFINED (GAS) 524500 63.67 1. Safety MCF 12. Lease Use I ~ ~ MCF 3. Conserv. Purposes MCF ~, Commiss er Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 J ~3/~ _~ Excess Flare Log Report Facility Name: BAKER PLATFORM Month/Year: June 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 6/17/01 8:00 6/17/01 11:00 120 N Scheduled Maintenance. Maintenance on the gas compressor coupling. OPERATIONAL UNSCHEDULED MAINTENANCE Replaced isolation valve upstream of compressor. Plan maintenance work, ensure all personnel, equipment and tools to pertonn maintenance are on-site. Repair and return to normal operation as soon as possible. B-C-0202-2 Report Date: 7/18/01 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JULY 2001 Disposition Volume MCF* 1. SOId 37,995 2. Reinjected o 3. Flared or vented less than 1 hour 462 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) 34 5. Pilot and Purge 217 6. Used for lease operations 24,395 7. Other o TOTAL items 1 - 7 63,103 8. NGL gas equivalent produced o 9. Purchased gas o 10. Transferred from: 0 11. Transferred to: o Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ' Title ACCOUNTING SUPERVISOR Date 08/07/2001 *Indicate contribution of each pool to total. Pool Name Code Percent A 524110 8.34 B C AND D 524112 8.67 E F AND G 524114 18.85 UNDEFINED (GAS) 524500 64.14 1: Safety MCF 2. Lease Use J~ MCF 3. Conserv. Purposes MCF P. ~ / Commis ner ) Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ~uv~v ~r ~ Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: BAKER PLATFORM Month/Year: July 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 7/24/01 0:01 7/24/01 20:45 34 Y Productlon/Compressors SI for valve repair and tank deaning. OPERATIONAL SCHEDULED MAINTENANCE PLANNED VALVE REPAIR AND TANK CLEANING PROCEDURES,CONDUCTPRE- WORK MEETING WITH WORK CREW, ENSURE ALL PERSONNEL, EQUIPMENT AND TOOLS TO REPAIR VALVE AND CLEAN TANK ARE ON-SITE. REPLACE VALVE, CLEAN TANK AND RETURN FACILITY TO NORMAL OPERATIONS ASAP. REPAIR VALVE, CLEAN TANK. Report Date: 8/15/01 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL AUGUST 2001 Disposition Volume MCF* 1. Sold 35,458 2. Reinjected o 3. Flared or vented less than 1 hour 436 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) o 5. Pilot and Purge 217 6. Used for lease operations 32,032 7. Other o TOTAL items 1- 7 68,143 8. NGL gas equivalent produced o 9. Purchased gas o 10. Transferred from: o 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature~~~,A.~ ~ ,~G~ Title ACCOUNTING SUPERVISOR Date 09/10/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent A 524110 8.97 B C AND D 524112 7.86 E F AND G 524114 17.63 UNDEFINED (GAS) 524500 65.54 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL SEPTEMBER2001 Disposition Volume MCF* 1. Sold 27.294 2. Reinjected ~~. o 3. Flared or vented less than 1 hour 433 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) 3s 5. Pilot and Purge 210 6. Used for lease operations 29.659 7. Other 0 TOTAL items 1 - 7 57.634 8. NGL gas equivalent produced o 9. Purchased gas o 10. Transferred from: O 11. Transferred to: o Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature / Title ACCOUNTING SUPERVISOR Date 10/05/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent A 524110 7.54 B C AND D 524112 8.09 E F AND G 524114 23.97 UNDEFINED (GAS) 524500 60.40 1. Safety ~ MCF 2. Lease Use .a3s(aYs`ti~~ MCF 3. Conserv. Purposes ~ MCF ~ ~~.~ jzl~~~~ Commis ' ner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Excess Flare Log Report Facility Name: BAKER PLATFORM Month/Year: September 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident. Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 9/5/01 0:01 9/5/01 2:00 38 N PRODUCTIONlCOMPRESSORS SI - ELECTRICAL PROBLEMS OPERATIONAL UNSCHEDULED MAINTENANCE Electrical/computer problem diagnosed by electrician, unit repaired and facility returned to normal operations as soos as possible. Electrical/computer module repaired. B-C-0202-2 ~Y. Report Date: 10/12/2001 Page: 1 of 1 9 ~ _. ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION racmry operator r>ie><a~s~ Iviontn/Year of lilsposltion BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL OCTOBER 2001 Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name Code Percent 1. SOId 30,130 A 524110 8.02 2. Reinjected o B C AND D 524112 4.04 3. Flared or vented less than 1 hour 425 E F AND G 524114 24.14 4. Flared or vented greater than 1 hour 490 ~ UNDEFINED (GAS) 524500 63:80 (Supplemental report required- See 20 AAC 25.235) 5. Pilot and Purge 217 6. Used for lease operations ~, ,,... Y 29,262 '`~, x_. ,., x 7.Other o E. ,~~ ~sf~i~3:~~::~3:~::: t3!3n?Y>::»~.~.~r~in~~#~:~itat~~;:;;.;:7.:~!~r::.;>;:;:>:::;;:. ... TOTAL items 1 - 7 60 524 ` ~ ~,.~~; 1. Safety MCF 8. NGL gas equivalent produced ~r~oh~r~Q~ o 2. Lease Use ~~~' MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: o ~q ~ P lJN`~UV W~-LUVK.I ~ I ~- 11. Transferred to: o Comm s inner Date Remarks: Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of I hereby certify that the foregoing is true and correct to the best of my knowledge.. 60 degrees F. Report due by the 20th of the month following the month of disposition. Signature ~~' Title ACCOUNTING SUPERVISOR Date 11/08/2001 Authority 20 AAC 25.235 Form 10-422 Rev. 4/95 Excess Flare. Log Report Facility Name: BAKER PLATFORM Month/Year: October 2001 Date 8~ Time Event Ga's Steps Taken to Equipment Down Begin End MCF Planned? DescMption of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 10!5/2001 0:01 10!5!2001 14:30 102 Y . Pipeline pigging with Smart pig. Flared excess casing gas while pipeline was SI form smart pigging on the "J" tube on the Dillon. OPERATIONAL SCHEDULED MAINTENANCE 10/7/2001 7:30 10/7/2001 23:59 95 Y Pipeline pigging with Smart pig. Flared excess casing gas while pipeline was SI form smart pigging on the "J" tube on the Baker. OPERATIONAL SCHEDULED MAINTENANCE 00-00-00 10/8/2001 0:00 10/8/2001 23:59 145 Y Shut in gas pipeline for riser inspection. Pipeline pigging with Smart pig. Flared excess casing gas while pipeline was SI form smart pigging on the "J" tube on the Baker. OPERATIONAL SCHEDULED MAINTENANCE Shut in gas well to promote buming of cesinghead gas. Thus eliminating more flared gas. Kept gas compresor running to maintain fuel gas pressure. Pipeline riser inspection. 00-00-00 1019/2001 0:00 10/9/2001 23:59 148 Y Sales pipeline SI for riser inspection. Pipeline pigging with Smart pig. Flared excess casing gas while pipeline was SI form smart pigging on the "J" tube on the Baker. OPERATIONAL SCHEDULED MAINTENANCE PUT BACK IN SERVICE - 00-00-00 Report Date: 11/3/2001 Page: 1 of 1 •. ` :_''~• ,, , !.. ~•' '%~ •.f~ ~'... •~. 3 ~~ "ti . ~ ~ .' .ti V •. ,, .. i., ' ' ' .; ' ' '~. ...:. _ ,- ,. .., r . ....,. .~ ....; .L _ __ •~ , .. ." " _ ~. ; .. ..- ;. •. .,. _ •~ i ' i '. .. .,. ... .. . •,.:• - , _... ~. _. .. .;. ~' •. .. .. __- - pi's S; .. i ~""~..:_ '.I _ .~.~ ~ ,. I .. ..~ .• '' . ., ,.. .. _ . .~.~Y- _ ~.. i .i , 1 ~M1'~~ i ,• .. : ~ .:.. :. ~ •' . - _y'C 4- 1:' "' • .. ... ,. , r - ! ~~ '. .. , ._:• ` .,,.• ~, +`+ ,. ~. • ,+ ~ y,, ~ •• ...~ r, •.,. -- ~ . .:~" i •`..,• ; +M1 ••• , -... '..., ~.. ~ , '•"-. .. .ti-_ .. '••-•.'- ~tiy' .. _ ~~ ~`~ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) onth/Year of Disposition BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL NOVEMBER 2001 Disposition Volume MCF* 1. Sold 21.9s7 2. Reinjected o 3. Flared or vented less than 1 hour 418 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) 109 5. Pilot and Purge 5 ~~, ' ~~ ,; ~~n, ~° 210 ..~ . 6. Used for lease operations 31,612 7. Other o TOTAL items 1 - 7 ~~~~'w'~ ~~~~ 54,336' 8. NGL gas equivalent produced o 9. Purchased gas 20 10. Transferred from: o 11. Transferred to: o Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~~,~~ f~ ~ ~,/ ,~ Title ACCOUNTING SUPERVISOR Date 12/07/2001 1~'orm 10-422 *Intlicate contribution of each pool to total. Pool Name Code Percent A - 524110 7.77 B C AND D 524112 3.91 E F AND G 524114 23.79 UNDEFINED (GAS) 524500 64.53 Rev. 4/95 Excess Flare Log Report Facility Name: BAKER PLATFORM Month/Year: November 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 11/30/01 12;00 11/30/01 17:00 109 N Blow down well #14 to remove water from tubing string. Retum well to production. OPERATIONAL BLOW DOWN WELL Plan well work required to remove water from tubing string, ensure proper personnel and equipment are on-site, blow down well to remove water, return well to production as soon as possiblg. Routine well work. Report Date: 12/17/01 Page: 1 of 2 .. ._, ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition BAKER PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL DECEMBER 2001 Dispositiali Volume 1VICF'~ 1. Sold 6,318 2. Reinjected o 3. Flared or vented less than 1 hour 458 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) o 5. Pilot and Purge 217 6. Used for lease operations 32,052 7. Other 0 TOTAL items 1 - 7 39, 045 8. NGL gas equivalent produced o 9. Purchased gas 0 10. Transferred from: o 11. Transferred to: o Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature t ? , ~, Title ACCOUNTING SUPERVISOR Date O1/o9/200Z Form 10-422 ~ v Rev. 4/95 *Indicate contribution of each pool to total fool-Name Code Percent A 524110 11.04 B C AND D 524112 6.50 E F AND G 524114 33.51 UNDEFINED (GAS) 524500 48.95 1. Safety MCF 2. Lease Use I \`~"V MCF 3. Conserv. Purposes ~ \ MCF ~~ -G~'G cti...,-~.- missioner Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the. month of disposition. Authority 20 AAC 25.235