Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutUNOCAL - BRUCE PLATFORMALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Dispo
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JANUARY 2001
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 47
5. Pilot and Purge 217
6. Used for lease operations 16,385
7. Other D
TOTAL items 1 - 7
16 649
8. NGL gas equivalent produced 0
9. Purchased gas D
10. Transferred from: o
11. Transferred to: 26.348
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~~~ l.L. ~~ ~,{,~, Title ACCOUNTING SUPERVISOR Date 02/14/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 70.77
UNDEFINED (GAS) 280500 29.23
1. Safety ~ ~ MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
~a' ~ 0
Commis ' ner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~~~~
Excess Flare Log Report
Facility Name
BRUCE PLATFORM
Month/Year: January 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
113/01 10:00 113/01 12:30 47 N GPTF COMPRESSOR DOWN OPERATIONAL OTHER: U-SP-HP
Report Date: 2/2/01 Page: 1 of 1
s ,.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD FEBRUARY 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 4,172
5. Pilot and Purge 196
6. Used for lease operations ~ - ~,
t.n 15,191
7.Other ` ~` "' ~
~. :_~ ~ o
TOTAL items 1- 7 =`~
~~ 19.559
8. NGL gas equivalent produced ~ o
9. Purchased gas o
10. Transferred from: o
11. Transferred to: 20,306
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~!~~~ ~,,, ,~D ~.~ Title ACCOUNTING SUPERVISOR Date 03/19/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 61.58
UNDEFINED (GAS) 280500 38,.42
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~li~~~~.
Excess Flare Log Report
Facility Name: BRUCE PLATFORM Month/Year: February 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
2/11/01 0:00 2/11101 23:59 152 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE REPLACE VRU U-SP-PILOT/LP
2/12/01 0:01 2/12/01 23:59 240 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE REPLACE VRU U-SP-PILOT/LP
2/13/01 0:01 2/13/01 23:59 240 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE REPLACE VRU USP-PILOT/LP
2/14/01 0:01 2/14/01 23:59 240 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE REPLACE VRU U-SP-PILOT/LP
2/15/01 0:01 2/15/01 23:59 240 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE REPLACE VRU U-SP-PILOT/LP
2/16/01 0:01 2/16/01 23:59 240 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE REPLACE VRU U-SP-PILOT/LP
2/17/01 0:01 2/17/01 23:59 240 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE REPLACE VRU USP-PILOT/LP
2/18/01 0:01 2/18/01 23:59 240 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE REPLACE VRU U-SP-PILOT/LP
2/19/01 0:01 2/19/01 23:59 240 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE REPLACE VRU U-SP-PILOT/LP
2/20/01 0:01 2/20/01 23:59 240 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE REPLACE VRU U-SP-PILOT/LP
2/21/01 0:01 2/21101 23:59 240 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE REPLACED VRU U-SP-PILOT/LP
2/22/01 0:01 .2/22/01 23:59 240 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE REPLACE VRU U-SP-PILOT/LP
2/23/01 0:01 2/23/01 23:59 240 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE REPLACE VRU USP-PILOTILP
2/24/01 0:01 2/24/01 23:59 240 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE REPLACE VRU U-SP-PILOTlLP
Report Date: 3/7/01 Page: 1 of 1
~ S
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD MARCH 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 734
5. Pilot and Purge 217
6. Used for lease operations 15,392
7.Other o
TOTAL items 1 - 7 16 , 343
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: 0
11. Transferred to: 23,040
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~~j~~~~~/~) Title ACCOUNTING SUPERVISOR Date 04/06/2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 63.09
UNDEFINED (GAS) 280500 36.91
1.5afety
2. Lease Use
3. Conserv. Purposes
..1 :,~ ~; MCF '~ r`'
MCF
MCF
P
Ze ~ ~--
Commis ner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: BRUCE PLATFORM Month/Year: March 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
3/2/01 10:00 3/2/01 13:00 35 N Shut Gas compressor down to work
on DeHy OPERATIONAL SCHEDULED MAINTENANCE U-PM-0053
3/8/01 17:30 3/8/01 23:59 38 N VRU OILER FAILURE OPERATIONAL UNSCHEDULED MAINTENANCE
3/7/01 0:01 3/7/01 18:00 113 N VRU OILER FAILURE OPERATIONAL UNSCHEDULED MAINTENANCE
3/21/01 10:30 3/21/01 22:00 480 N A LINE TO TEST SEPERATOR TO
FLARE TO REC PIG OPERATIONAL OTHER: FLARED ANNA'S GAS U-SP-HP
3/29/01 9:00 3/29/01 11:30 68 N GPTF S/I WHILE WE PIGGED
ANNA'S LINE OPERATIONAL SCHEDULED MAINTENANCE USP-HP
Report Date: 4/5/01 Page: 1 of 1
?~ l
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
BRUCE PLATFORM
UNOCAL ALASKA RESOURCES ~ GRANITE POINT FIELD
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour D
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 793
5. Pilot and Purge 210
6. Used for lease operations 15,988.
7.Other D
TOTAL items 1- 7 16 991 `
,
8. NGL gas equivalent prodaced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 23,387
Remarks:
I hereby certify that the for going is true and correct to the best of my knowledge.
Signature j~~.~i9Q.. ~~ Title ACCOUNTING SUPERVISOR Date 05/07/2001
k'orm 10-422
Rev. 4/95
APRIL 2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 63.22
UNDEFINED (GAS). 280500 36.78
1.5afety MCF
2. Lease Use ~ ~ 3 MCF
3. Conserv. Purposes MCF
'Y , ~ 6:Z-
Commi ner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~;~~~,
~ r
Excess Flare Log Report
Facility Name: BRUCE PLATFORM Month/Year: April 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 1D Number
4/18/01 5:00 4/18/01 23:59 578 Y Sll FOR DENY BYPASS OPERATIONAL SCHEDULED MAINTENANCE ENSTALLED BYPASS U-PM-0053
4/19/01 0:01 4119!01 21:30 215 Y FWKO VRU DOWN FOR
MAINTENANCE OPERATIONAL SCHEDULED MAINTENANCE MAINT. COMPLETE VRU BACK
ON LINE. U-SP-LP
Report Date: 5/4/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I BRUCE PLATFORM I UNOCAL ALASKA RESOURCES I GRANITE POINT FIELD
Disposition Volume MCF*
1.5o1d o
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(SupplenKOtal report nquire~l -See 20 AAC 25.235) 494
5. Pilot and Purge 2v
6. Used for lease operations 16, 901
7.Other o
TOTAL items 1- 7 17,612
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: o
11. Transferred to: 23,180
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~~ n ~o~J,~~ Title ACCOUNTING SUPERVISOR Date 06/07/2001
Form 10-422
Rev. 4/95
'ear of Disposition
MAY 2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 65.12
UNDEFINED (GAS) 280500 34.88
1. Safety
2. Lease Use
3. Conserv. Purposes
~.
Commis' er
~'o y
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name: BRUCE PLATFORM Month/Year: May 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
5121/01 6:30 5!21/01 13:30 137 Y QUARTERLY MAINTENANCE ON
GAS COMPRESSOR OPERATIONAL SCHEDULED MAINTENANCE SHUT DOWN ENGINE,
CHANGED FILTER,
PERFORMED INTERNAL WASH
ON TURBINE BLADES. NECESSARY PERSONNEL
AND EQUIPMENT ONBOARD.
INFORMED GPFT OF START
AND END TIME OF
MAINTENANCE: U-PM-0053
5/31/01 15:00 5/31/01 23:30 357 N GAS COMPRESSOR FAILURE.
PLUGGED LURE LINES CAUSED
UNIT TO AUTOMATICALLY SHUT
DOWN. (SAFETY FEATURE) OPERATIONAL UNSCHEDULED MAINTENANCE MECHANIC WAS CALLED IN TO
CLEAN LINES.
` MECHANIC CALLED TO
CLEAN LINES. U-PM-0053
Report Date: 6/13/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JUNE 2001
Disposition Volume MCF*
L Sold o
2. Reinjected o
3. Flared or vented less than 1 hour 60
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235 0
5. Pilot and Purge 210
6. Used for lease operations 16,020
7. Other o
TOTAL items 1 - 7 16,290
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: 0
11. Transferred to: 24,711
Remarks:
I hereby certi that the fo egoing is true and correct to the best of my knowledge.
Signat a ~~ ~ ~~~ Title_ ACCOUNTING SUPERVISOR Date 07/17/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 69.75
UNDEFINED (GAS) 280500 30.25
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name: BRUCE PLATFORM
Month/Year: June 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 1D Number
Report Date: 7/9/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JULY 2001
Disposition Volume MCF* *Indicate contribution of each pool to total.
Pool Name Code Percent
1. Sold o
MIDDLE KENAI 280150 71.95
2. Reinjected o
UNDEFINED (GAS) 280500 28.05
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour o
(Supplemental report required- See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 15,681
7.Other o
TOTAL items 1- 7 15,898
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: o
11. Transferred to: 25,225
ac,,,a. a+~:
I hereby certi that the f regoing is true and correct to the best of my knowledge.
Signature Title ACCOUNTING SUPERVISOR Date 08/09/2001
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~(d~ ~,
~'~ `
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: BRUCE PLATFORM Month/Year: July 2001
Date & Time Event Gas Steps Taken to Equipment Down
Be in End MCF Planned? Descri tion of Incident Cate o Reason Actions Taken Minimize Recurrence MP-2 ID Number
Report Date: 8/2/2001 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD AUGUST 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour 8
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 537
5. Pilot and Pnrge _ 217
6. Used for lease operations 15,7os
7. Other o
TOTAL items 1 - 7 ~ 16, 470
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: o
11. Transferred to: -_ 24, 017
Remarks:
I hereby certif~y~~//th1hat the//fl1oregoing is true and correct to the best of my knowledge.
Signature /~~c~~C~ll~~~ Title ACCOUNTING SUPERVISOR Date 09/10/2001
Form 10-422
Rev. 4/95
Commis~i er Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name: BRUCE PLATFORM Month/Year: August 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident ~ Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
819/01 7:00 8/9/01 19:00 293 Y Preplanned maintenance work,
replace bad gas piping. OPERATIONAL SCHEDULED MAINTENANCE By-pass gas well 9-86 to minimize
volume of gas to be flared. Preplan
pipe replacement work, conduct
prework meeting w/work crew,
ensure that all personnel, equip., &
tools to install the piping were
onsite, replace pipe& return to
normal operations asap Install new pipe. U-PM-0053
8/29/01 11:00 8/29/01 18:00 244 N GAS COMPRESSOR DOWN FOR
MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE Compressor shut down upon
sensing increase in oil use.
Repairs initiated immediately,
bearing seals replaced. Facility
returned to normal operations as
soon as possible. Repair Compressor. U-PM-0053
Report Date: 9/6/2001 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT-FIELD SEPTEMBER2001
Disposition Volume MCF*
1. Sold o
2. Reinjected ~
~Y . o
3. Flared or vented less than 1 hour ~ 0
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 0
5. Pilot and Purge 210
6. Used for lease operations 16,064
7. Other 0
TOTAL items 1 - 7 16,274
8. NGL gas equivalent produced O
9. Purchased gas o
10. Transferred from: b
11. Transferred to: 23, l05
Remarks:
I hereby certify t'h~at the foregoing is true and correct to the best of my knowledge.
Signature..-~.' ~.~ ~'~"G Title ACCOUNTING SUPERVISOR Date 10/05/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 72.43
UNDEFINED (GAS) 280500 27.57
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
a
3 ~~~
Excess Flare Log Report
Facility Name: BRUCE PLATFORM
Month/Year: September 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
Report Date: 10/4/2001 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition.
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD OCTOBER 2001
Disposition Volume MCF*
1. Sold O
2. Reinjected o
3. Flared or vented less than 1 hour 0 '
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) 279
5. Pilot and Purge 217
6. Used for lease operations 16,164
7. Other o
TOTAL items 1 - 7 16,660
S. NGL gas equivalent produced o
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 20,495
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~ ~ ~~~~~) Title ACCOUNTING SUPERVISOR Date 11/09/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI _ 280150 72.33
UNDEFINED (GAS) 280500 27.67
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name: BRUCE PLATFORM
Month/Year: October 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
10/3/2001 6:30 10/3/2001 17:30 17 Y Gas line SI for P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of riser for insertion 00-00-00
Install riser for insertion of smart pig. common pipeline. Pre-plan activity; on smart pig for pipeline
Scheduled Maintenance - P/L ensure proper personnel & inspection. Riser installation is
inspection work. equipment are on-site, install riser, a one-time event
& return facility to normal
operations ASAP. Advance notice
given to AOGCC on 10/3/01.
10/8/2001 10:00 10/8/2001 11:30 10 Y Gas line SI for P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Flare all sales gas to bleed down Installation of riser for insertion 00-00-00
Install riser for insertion of smart pig. common pipeline. Pre-plan activity; on smart pig for pipeline
Scheduled Maintenance - P/L ensure proper personnel 8 inspection. Riser installation is
inspection work. equipment are on-site, install riser, a one-time event
8 return facility to normal
operations ASAP. Advance notice
given to AOGCC on 10/3/01.
10/10/2001 8:15 10/10/2001 18:15 124 Y Gas line SI for P/L inspection work.
Conduct P/L inspection. Scheduled OPERATIONAL SCHEDULED MAINTENANCE SI gas well, flare all sales gas to
bleed down common pipeline. Pre- Pipeline inspection will help
insure continued safe 00-00-00
Maintenance - P/L inspection work. plan activity; ensure proper operations.
personnel & equipment are on-site,
conduct P/L inspection, & return
facility to normal operations ASAP.
10/11/2001 0:01 10/11/2001 4:00 88 Y Gas line S! for P/L inspection work.
Conduct P/L inspection. Scheduled OPERATIONAL SCHEDULED MAINTENANCE SI gas well, flare all sales gas to
bleed down common pipeline. Pre- Pipeline inspection will help
insure continued safe 00-00-00
Maintenance - P/L inspection work. plan activity; ensure proper operations.
personnel 8 equipment are on-site,
conduct P/L inspection, 8 return
faality to normal operations ASAP.
10/21/2001 8:30 10/21/2001 11:00 40 N Repairs on gas compressor. OPERATIONAL UNSCHEDULED MAINTENANCE Repair leaking oil filter seal, U-PM-0053
mechanic immediately diagnoses
problem, initiates repairs with parts
in inventory, returns facility to
normal operation ASAP.
Report Date: 11/9/2001 Page: 1 of 1
Anna, Bruce flaring
Subject: Anna, Bruce flaring
Date: Wed, 3 Oct 2001 16:37:25 -0700
From: "Johnston, David W -Contract" <johnstond@unocal.com>
To: "McMains, Stephen E -Vendor" <Steve_McMains@admin.state.ak.us>
CC: "Bounds, Janet G" <boundsj@unocal.com>
Steve,
Unocal asked that I give you a heads up concerning an increase in flaring on
Anna and Bruce platforms. The two platforms are shutting down their common
gas line in order to install blind flanges on the Bruce Platform. The
flanges will then allow a short section of gas line to be removed so that a
riser can be installed for accepting smart pigs for pipe inspection. The
shutdown time is expected to be about 12-16 hours. Only formation gas will
be flared, and will be limited to that volume remaining in the line that
cannot be used for fuel. Unocal will report the actual volume flared on the
10-422 report for October.
Give a call should you have any questions.
Dave Johnston
263-7627
1 of 1 10/3/01 3:42 PM
ALASKA OIL AND. GAS CONSERVATION COMMISSION
FACILITY. REPORT OF PRODUCED GAS DISPOSITION
Facility
BRUCE PLATFORM Operator
UNOCAL ALASKA RESOURCES Field(s)
GRANITE POINT FIELD Month/Year of Disposition
NOVEMBER 2001
Disposition Volume MCF* *Indicate contribution of each pool to total.
1. Sold
o Pool Name Code Percent
MIDDLE KENAI - 280150 71.81
2. Reinjected o
UNDEFINED (GAS)
280500
28.19
3. Flared or vented less than 1 hour ~°o
4. Flared or vented greater than 1 hour
uired -See 20 AAC 25
235)
lemental re
e
S
t 0
.
por
q
(
upp
r
P
5. Pilot and
urge 210
6. Used for lease operations 15,644
7
Other o
.
TAL items 1 - 7
TO 15 854 '
.
Safet
1 MCF
d .
y
8. NGL gas equivalent produce o
2. Lease Use
MCF
9. Purchased gas o
3. Conserv. Purposes
MCF
10. Transferred from: o
11. Transferred to: 22.743
Commissioner Date
Remarks:
Note: All volumes must be corrected to
I hereby certify that the foregoing is true and correct to the best of my knowledge.
g ,/~~~ ~~ ~
Si nature C ~ ~ . r ~ Title. ACCOUNTING SUPERVISOR Date 12/07/2001 pressure of 14.65 psia and to a temperature of
6o degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
BRUCE PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD DECEMBER 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour 7
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) o
5. Pilot and Purge 217
6. Used for lease operations 17,636
'7.Other o
TOTAL items 1 - 7 17,860
S. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: o
11. Transferred to: 20,264
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~~~ ~/~G Title ACCOUNTING SUPERVISOR Date 01/14/2002
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
fool Name Code Percent
MIDDLE KENAI 280150 72.41
UNDEFINED (GAS). 280500 27.59
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235