Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutUNOCAL - DILLON PLATFORMALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JANUARY 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) o
5. Pilot and Purge ~, ~ 217
6. Used for lease operations 5,996
7. Other o
,.
TOTAL items 1 - 7 A~!cho~ ae 5,213
8. NGL gas equivalent produced o
9. Purchased gas 9.475
10. Transferred from: o
11. Transferred to: 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature LI~f1~0~~ Title ACCOUNTING SUPERVISOR Date 02/07/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
E F AND G 524114 100.00
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name: DILLON PLATFORM Month/Year: January 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
Report Date:. 2/5/01 Page: 1 of 1
ALASKA OIL AND GAS. CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DI;
Facility
DILLON PLATFORM Operator
UNOCAL ALASKA RESOURCES Field(s)
MIDDLE GROUND SHOAT
Disposition Volume MCF*
1. Sold 0
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 103
5. Pilot and Purge 195
6. Used for lease operations -~ 5,2s9
7. Other ~ ` o
Y
TOTAL items 1 - 7 ~- =s
~_ ~ 5, 588
8. NGL gas equivalent produced ~ o
9. Purchased gas a,7os
10. Transferred from:. 0
11. Transferred to: o
Remarks:
I hereby certify~~that the foregoing is true and correct to the best of my knowledge.
Signature C~~~ ll. 1J//.~/ Title ACCOUNTING SUPERVISOR Date 03/08/2001
Form 10-422
Rev. 4/95
POSITION
Month/Year of Disposition
_ FEBRUARY 2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
E F AND G 524114 100.00
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name: DILLON PLATFORM
Month/Year: February 2Q01
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
2/23/01 0:01 2/23/01 12:00 103 Y BLEW DOWN PIPELINE TO SHIP
PIG TO EFDF OPERATIONAL SCHEDULED MAINTENANCE D-SP-HP
Report Date: 3/7/01.. Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL MARCH 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) 0
5. Pilot and Purge 217
6. Used for lease operations 5,425
7.Other o
TOTAL items 1- 7 5,642
8. NGL gas equivalent produced o
9. Purchased gas 9,215
10. Transferred from: o
11. Transferred to: o
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~ ~~ Title ACCOUNTING SUPERVISOR Date 04/06/2001
r
Form 10-422
Rev. 4/95
*Indicate contribution of eachpool to total.
.Pool Name Code Percent
E F AND G .524114 .100.00
Note: Ail volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name: DILLON PLATFORM Month/Year: March 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
Report Date: 4/12/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL APRIL 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared ar vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 1.342
5. Pilot and Purge zi0
6. Used for lease operations 4.522
7.Other o
TOTAL items 1 - 7 6 , 074
8. NGL gas equivalent produced o
9. Purchased gas s,15o
10. Transferred from: o
11. Transferred to: o
Remarks:
I hereby certify at the fore oing is true and correct to the best of my knowledge.
Signature ~ ~ ~~ Title ACCOUNTING SUPERVISOR Date 05/16/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code. Percent
E F AND G 524114 100.00
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~~~
Excess Flare Log Report
Facility Name: DILLON PLATFORM Month/Year: April 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
417101 0:01 417/01 23:59 95 N VRU DOWN FOR MAINTENANCE. OPERATIONAL UNSCHEDULED MAINTENANCE COMPRESSOR FAILURE REBUILD COMPRESSOR
4/8/01 0:00 418/01 23:59 192 N VRU DOWN FOR MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE COMPRESSOR FAILURE REBUILD COMPRESSOR 00-00-00
4/9/01 0:00 4/9/01 23:59 192 N VRU DOWN FOR MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE COMPRESSOR FAILURE REBUILD COMPRESSOR 00-00-00
4/10!01 0:01 4/10/01 23:59 192 N VRU MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE COMPRESSOR FAILURE REBUILD COMPRESSOR 00-00-00
4/11/01 0;01 4/11/01 23:59 192 N VRU DOWN FOR MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE COMPRESSOR FAILURE REBUILD COMPRESSOR 00-00-00
4112/01 0:00 4/12/01 23:59 192 N VRU DOWN FOR MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE COMPRESSOR FAILURE REBUILD COMPRESSOR 00-00-00
4/13/01 0:00 4/13/01 23:59 192 N VRU MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE COMPRESSOR FAILURE REBUILD COMPRESSOR 00-00-00
4/14/01 0:00 4/14/01 23:59 95 N VRU MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE COMPRESSOR FAILURE REBUILD COMPRESSOR 00-00-00
Report Date: 5/7/01 Page: 1 of 1
~~c~rv~~
ALASKA OIL AND GAS CONSERVATION COMMISSION ,JUN 1 9 2001
FACILITY REPORT OF PRODUCED GAS DISPOSITION
AI ons. Commission
Facility Operator Field(s) Month/Year of Disposition Arch age
DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL MAY. 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hoar o
4. Flared or vented greater than 1 hour
(Sopplemeotal report regnire¢ -See 20 AAC 25.235) 2,090
5. Pilot and Purge 217
6. Used for lease operations 4.737
7. Other o
TOTAL items 1- 7 7.044
8. NGL gas equivalent produced o
9. Purchased gas 7,901
10. Transferred from: o
11. Transferred to: o
Remarks:
I hereby certify that the fo"re~going is true and correct to the best of my knowledge.
Signature ~~~~~ ~ .L,~ ~'rf, Title ACCOUNTING SUPERVISOR Date 06/07/2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
E F AND G t 524114 100.00
1. Safety MCF
2. Lease Use a D ~ (~ MCF
3. Conserv. Purposes MCF
ry~r~r 6 ~
~~ AV Q ~/
Commis ~ ner ~ Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~~~~~
Form 10-422 V
Rev. 4/95
Excess Flare Log Report
Facility Name: DILLON PLATFORM Month/Year: May 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
5/7/01 14:00 5/7/01 18:00 32 N VRU. MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE BAD SEAL REPAIRED SEAL 00-00-00
5/15/01 16:59 5/15101 23:59 30 N VRU RECYCLE VALVES R & R. OPERATIONAL UNSCHEDULED MAINTENANCE REPAIRING VALVES. REPAIRING VALVES. 00-00-00
5/16/01 12:30 5/16/01 17:00 50 N VRU MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE REPAIRING RECYCLE VALVES. RECYCLE VALVES 00-00-00
REPAIRED.
5H 7/01 12:00 5/17/01 23:59 60 N GAS COMPRESSOR MAINT. . OPERATIONAL UNSCHEDULED MAINTENANCE NEW GAS VALVES R AND R VRU
COMPRESSOR
5/18101 0:00 5/18/01 23:59 188 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY BEING VAPOR RECOVERY BEING 00-00-00
REPAIRED REPAIRED
5/19/01 0:00 5/19/01 23:59 168 N PLATFORM SHUT IN AND VAPOR OPERATIONAL UNSCHEDULED MAINTENANCE PLATFORM BACK ON AND PLATFORM BACK ON AND 00-00-00
RECOVERY REPAIRS VAPOR RECOVERY BEING VAPOR RECOVERY BEING
REPAIRED REPAIRED
5!20/01 0:00 5120/01 23:59 183 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY BEING VAPOR RECOVERY BEING 00-00-00
REPAIRED REPAIRED
5/21!01 0:00 5/21/01 23:59 521 N VAPOR RECOVERY DOWN AND OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY REPAIRS VAPOR RECOVERY 00-00-00
BLEEDING PIPELINE AND PREPARING "D" LINE FOR REPAIRS AND PREPARING
HYDROTEST "D" LINE FOR HYDROTEST
5/22/01 0:00 5/22/01 23:59 162 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY BEING VAPOR RECOVERY BEING 00-00-00
REPAIRED REPAIRED
5/23/01 0:00 5/23/01 23:59 185 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY BEING VAPOR RECOVERY BEING 00-00-00
INSTALLED INSTALLED
5/24/01 0:00 5124/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY BEING VAPOR RECOVERY BEING 00-00-00
INSTALLED INSTALLED
5/25/01 0:00 5!25/01 23:59 185 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY BEING VAPOR RECOVERY BEING 00-00-00
INSTALLED INSTALLED
5/26/01 0:00 5/26/01 15:59 128 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY BACK VAPOR RECOVERY BEING 00-00-00
ONLINE AT 4:OOPM INSTALLED
Report Date: 6/1/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I DILLON PLATFORM I UNOCAL ALASKA RESOURCES I MIDDLE GROUND SHOAL
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 5,099
5. Pilot and Purge 210
6. Used for lease operations 924
7. Other o
TOTAL items 1 - 7 6.233
8. NGL gas equivalent produced o
9. Purchased gas 12,120
10. Transferred from: o
11. Transferred to: o
Remarks:
I hereby certify that the~flore oing/i's true and correct to the best of my knowledge.
Signature/~~~,~j l ./' l/~ Title ACCOUNTING SUPERVISOR Date 07/06/2001..
Form 10-422
Rev. 4/95
JUL ~ 0 2001
Aiaska Oil & Gas Cons. Commission
'ear or liispo
JUNE 2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
E F AND G 524114 100.00
~ 1. Safety ~ MCF
12. Lease Use I ~ ~ ~ ~ MCF
3. Conserv. Purposes
MCF I
r', 4y~ 6 Y
Commi Toner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~ ~ ~~i
Excess Flare Log Report
Facility Name: DILLON PLATFORM Month/Year: June 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
6/2/01 0:00 6/2/01 23:59 120 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE SENDING IN FOR REPAIRS First attempted to repair unit.
Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
613101 0:00 6/3/01 23:59 185 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY SENT IN First attempted to repair unit.
FOR REPAIRS Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/4/01 0:00 6/4/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit
ORDER Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/5/01 0:00 6/5/01 23:59 178 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit 00-00-00
ORDER Determined old VRU cant be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/6/01 0:01 616/01 23:59 178 N VRU DOWN FOR REPAIR OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit. 00-00-00
ORDER Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite. order
and shipping.
6/7/01 0:00 6/7/01 23:59 178 N V.R.U. DOWN FOR REPAIR OPERATIONAL UNSCHEDULED MAINTENANCE NEW V.R.U. ON ORDER First attempted to repair unit
AWAITING REPLACEMENT Determined old VRU cant be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/8/01 0:00 6/8!01 23:59 178 N VRU DOWN NEW COMPRESSOR OPERATIONAL UNSCHEDULED MAINTENANCE AWAITING NEW VRU First attempted to repair unit
ON ORDER COMPRESSOR Determined old VRU canR be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/9/01 0:00 6/9/01 23:59 178 N V.R.U. DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW V.R.U. ORDERED First attempted to repair unit.
Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
Report Date: 7/18/01 Page: 1 of 4
Excess Flare Log Report
Facility Name: DILLON PLATFORM
Month/Year: June 2001
Date 8 r Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
6/10/01 0:00 6/10/01 23:59 178 N V.R.U. DOWN FOR REPAIRS OPERATIONAL UNSCHEDULED MAINTENANCE NEW COMPRESSOR ON ORDER First attempted to repair unit.
Determined old VRU cant be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/11/01 0:00 6/11/01 23:59 178 N V.R.U. OUT OF COMMISION TEMP. OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW V.R.U. First attempted to repair unit.
COMPRESSOR Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/12/01 0:00 6/12/01 23:59 178 N V.R.U. DOWN OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW COMPRESSOR First attempted to repair unit.
Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/13/01 0:00 6!13/01 23:59 178 N V.R.U. OUT OF COMMISION OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW COMPRESSOR First attempted to repair unit
FOR V.R.U. Determined old VRU can't be
~ be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/14/01 0:00 6/14/01 23:59 178 N V.R.U. OUT OF COMMISION OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW COMPRESSOR First attempted to repair unit.
Determined old VRU pn't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/15/01 0:00 6/15/01 23:59 178 N V.R.U. OUT OF COMMISION OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW COMPRESSOR First attempted to repair unit.
Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite oMer
and shipping.
6/16/01 0:00 6/16/01 23:59 178 N V.R.U. OUT OF COMMISIION OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW COMPRESSOR First attempted to repair unit.
Determined old VRU can't be
be repaired; new unit needed.
Ober new VRU, expedite order
and shipping.
6/17/01 0:00 6/17/01 23:59 178 N V.R.U. DOWN FOR REPAIRS OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW COMPRESSOR First attempted to repair unit.
Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
Report Date: 7/18/01 Page: 2 of 4
Excess Flare Log Report
Facility Name: DILLON PLATFORM Month/Year: June 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned/ Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
6/18/01 0:00 6118/01 23:59 178 N V.R.U. OUT OF COMMISION OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW COMPRESSOR First attempted to repair unit.
FOR V.R.U. Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/19/01 0:00 6/19/01 23:59 178 N VAPOR RECOVERY REMOVED OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit.
ORDER Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/20/01 0:00 6/20/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY ON ORDER First attempted to repair unit
Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/21/01 0:00 6/21/01 23:29 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit.
ORDER Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/22/01 0:00 6/22/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit.
ORDER Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/23/01 0:00 6/23/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit.
ORDER Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/24/01 0:00 6/24/01 23:59 172 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit
ORDER Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6125/01 0:00 6125/01 23:59 172 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW VAPOR First attempted to repair unit.
RECOVERY Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
Report Date: 7/18/01 Page: 3 of 4
Excess Flare Log Report
Facility Name: DILLON PLATFORM
Month/Year: June 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
6/26/01 0:00 6/26/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit.
ORDER Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/27/01 0:00 6/27/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit
ORDER Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6/28/01 0:00 6/28/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit.
ORDER Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite orcler
and shipping.
6/29/01 0:00 6/29/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit
ORDER Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
6130/01 0:00 6/30!01 23:59 176 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit.
ORDER Determined old VRU can't be
be repaired; new unit needed.
Order new VRU, expedite order
and shipping.
Report Date: 7/18/01 Page: 4 of 4
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JULY 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25,235) 3,455
5. Pilot and Purge 217
6. Used for lease operations 21
7. Other o
TOTAL items 1- 7 3.693
8. NGL gas equivalent produced o
9. Purchased gas 12,851
10. Transferred from: o
11. Transferred to: o
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature /i~~~ (L .uG//~ Title ACCOUNTING SUPERVISOR Date 08/10/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
E F AND G 524114 100.00
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~V' ~N
l~
Excess Flare Log Report
Facility Name: DILLON PLATFORM Month/Year: July 2001
Date 8 Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
711/01 0:00 7/1/01 23:59 114 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting arrival of new VRU
throughout July. VRU replaced
8112/01, returned to normal ops.
7!2/01 0:01 7!2/01 23:59 147 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit.
Awaitng arrival of new VRU
throughout July. VRU replaced
8/12/01, returned to normal ops.
7/3/01 0:01 713/01 23:59 139 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Derision made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting artival of new VRU
throughout July. VRU replaced
e/12/01, returned to normal ops.
7/4/01 0:01 7/4/01 23:59 116 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting arrival of new VRU
ihroughoutJuly. VRU replaced
8112/01, returned to normal ops.
7/5101 0:01 7/5!01 23:59 111 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Derision made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting arriva(of new VRU
lhroughoutJuly. VRU replaced
8/12/01, returned to nomral ops.
Report Date: 8/15/01 Page: 1 of 7
Excess Flare Log Report
7/6/01 0:01 7/6/01 23:59 111 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to insfali
new VRU. Request expedited
shipment of replacement unit.
Awaiting arrival of new VRU
throughout July. VRU replaced
8/12/01, rehimed to nom~al ops.
7/7/01 0:01 7/7/07 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Derision made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting artival of new VRU
throughout July. VRU replaced
8/12/01, returned to normal ops.
7/8/01 0:01 7/8/01 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting arrival of new VRU
throughout July. VRU replaced
8/12/01, returned to normal ops.
7/9/01 0:01 7/9/01 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting artival of new VRU
throughout July. VRU replaced
8/12/01, returned to normal ops.
7/10/01 0:01 7/10/01 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting arrival of new VRU
throughout Juiy. VRU replaced
8/12/01, returned to normal ops.
Report Date: 8/15/01 Page: 2 of 7
Excess Flare Log Report
7/11/01 0:01 7/11/01 23:59 112 N VRU Down OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit
Awaitng arrival of new VRU
throughout July. VRU replaced
8!12/01, returned to normal ops.
7/12!01 0:01 7/12/01 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit.
Awaiting artival of new VRU
throughout July. VRU replaced
8/12/01, returned to nornal ops.
7/13/01 0:01 7/13/01 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting arrival of new VRU
throughout July. VRU replaced
8112/01, returned to normal ops.
7/14/01 0:01 7/14/01 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting artival of new VRU
throughout July. VRU replaced
8/12/01, returned to normal ops.
7!15101 0:01 7/15/01 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Inldally attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacementvnit
Awaiting arrival of new VRU
throughout July. VRU replaced
8/12/01, returned to nomral ops.
Report Date: 8/15/01 Page: 3 of 7
Excess Flare Log Report
7!16!01 0:01 7/16/01 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit.
Awaiting arrival of new VRU
throughout July. VRU replaced
8112/01, returned to normal ops.
7!17/01 0:01 7/17/01 23:59 104 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting arrival of new VRU
throughout July. VRU replaced
8/12/01, returned to normal ops.
7/18/01 0:01 7/18/01 23:59 104 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit.
Awaitlng arrival of new VRU
throughout July. VRU replaced
8/12/01, returned to nomtai ops.
7119101 0:01 7/19/01 23:59 105 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00.00
VRU, determined repair not
possible. Deasion made tornstall
' new VRU. Request expedited
shipment of replacement unit.
Awaitlng arrival of new VRU
throughout July. VRU replaced
8!12101, returned t0 normal ops.
7/20/01 0:01 7/20/01 23:59 105 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting artival of new VRU
throughout July. VRU replaced
6/12/01, returned to nomral ops.
Report Date: 8/15/01 Page: 4 of 7
Excess Flare Log Report
7/21/01 0:01 7/21/01 23:59 105 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipmert of replacement unit.
Awaiting arrival of new VRU
throughout July. VRU replaced
8/12/01, returned to normal ops.
7/22/01 0:01 7/22/01 23:59 87 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting arival of new VRU
throughout July. VRU replaced
8/12/01, returned to normal ops.
7/23/01 0:01 7/23/01 23:59 104 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE IniBally attempted to repair existing Order new VRU. 00-00-00
VRU, detemrined repair not
passible. Dedsion made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting arival of new VRU
throughout July. VRU replaced
8/12/01, returned to normal ops.
7/24/01 0:01 7/24/01 23:59 103 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Dedsion made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting arrival of new VRU
throughout July. VRU replaced
8/12/01, returned to normal ops.
7/25/01 0:01 7/25101 23:59 92 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00.00.00
VRU, determined repair not
possible. Dedsion made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting arrival of new VRU
throughout July. VRU replaced
8/12/01, returned to normal ops.
Report Date: 8/15/01 Page: 5 of 7
Excess Flare Log Report
7/26/01 0:01 7/26/01 23:59 106 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting arival of new VRU
throughout July. VRU replaced
8/12101, relumed to normal ops.
7/27/01 0:01 7/27/01 23:59 117 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit.
Awaiting artival of new VRU
throughout July. VRU replaced
8/12/01, returned to normal ops.
7/28/01 0:01 7/28/01 23:59 105 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible.. Decision made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting arival of new VRU
throughout July. VRU replaced
8/12/01, returned to normal ops.
7/29/01 0:01 7/29/01 23:59 118 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initally attempted to repair existng Order new VRU. 00-00-00
VRU, determined repair not
possible: Dedston made to install
new VRU. Request expedited
shipment of replacement unit
Awaiting arrival of new VRU
throughout July. VRU replaced
8/12/01, returned to nomwi ops.
7/30/01 0:01 7/30/01 23:59 121 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Ober new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit.
Awaiting arrival of new VRU
throughout July. VRU replaced
8/12/01, returned to normal ops.
Report Date: 8/15/01 Page: 6 of 7
Excess Flare Log Report
7/31/01 0:01 7/31/01 23:59 121 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit.
Awaiting-arrival of new VRU
throughout July. VRU replaced
8/12/01', returned to normal ops.
Report Date: 8/15/01 Page: 7 of 7
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL AUGUST 2001
Disposition Volume MCF* *Indicate contribution of each pool to total.
Pool Name Code Percent
1. Sold o
E F AND G 524114 100.00
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour 1.404
(Supplemental report required -See 20 AAC 25.235)
5. Pilot and Purge 217
6. Used for lease operations 3,011
7 Other o
TOTAL items l - 7 4, 632
8. NGL gas equivalent produced o
9. Purchased gas s,636
10. Transferred from: o
11. Transferred to: o
1\ClllAl 1~J.
I hereby certify t/h7a~t~t~he foregoi/ng is true and correct to the best of my knowledge.
Signature /,~~~,Q ~/~.,~~ Title ACCOUNTING SUPERVISOR Date 09/10/2001
Form 10-422
Rev. 4/95
1. Safety ~ MCF
12. Lease Use I ~~~~ MCF
3. Conserv. Purposes MCF
~r ~ 3 ~~
Commi ner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~„/~,J
'0
~ I~ ~,/
Excess Flare Log Report
Facility Name: DILLON PLATFORM Month/Year: August 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
B/1/01 0:01 S/1/01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted t0 repair existing Replace VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit.
VRU replaced August 12, 2001,
return to normal operations.
8/2/01 0:01 8/2/01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit.
VRU replaced August 12, 2001,
return to normal operations.
8/3/01 0:01 8/3/01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit
VRU replaced August 12, 2001,
return to normal operations.
8/4/01 0:01 8/4/01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit.
VRU replaced August 12, 2001,
return to normal operations.
8/5/01 0:01 8/5/01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipmentof replacement unit
VRU replaced August 12, 2001,
return to normal operations.
Repott Date: 9/6/2001 Page: 1 of 3
Excess Flare Log Report
8/8/01 0:01 8/6/01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit.
VRU replaced August 12, 2001,
return to hormal operations.
8/7/01 0:01 8/7/01 23:59 121 N VRU down, waiting replacement OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit.
VRU replaced August 12, 2001,
return to normal operations.
8/8/01 0:01 8/8/01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit.
VRU replaced August 12, 2001,
return to normal operations.
8/9/01 0:01 8/9!01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit
VRU replaced August 12, 2001,
return to nomal operations.
8/10/01 0:01 8/10!01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit.
VRU replaced August 12, 2001,
return, to normal operations.
8/11/01 0:01 8/11/01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit
VRU replaced August 12, 2001,
• return to normal operations.
Report Date: 9!6/2001 Page: 2 of 3
Excess Flare Log Report
8/12/01 0:01 8/12/01 12:00 73 N VRU down, waiting replacement OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00
VRU, determined repair not
possible. Decision made to install
new VRU. Request expedited
shipment of replacement unit.
VRU replaced August 12, 2001,
return to normal operations.
Report Date: 9/6/2001 Page: 3 of 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL SEPTEMBER2001
Disposition Volume MCF*
1. Sold o
2. Reinjected
`Y . 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hoar
(Supplemental report required -See 20 AAC 25.235) o
5. Pilot and Purge 210
6. Used for lease operations 5.090
7. Other o
TOTAL items i - 7 5.300
8. NGL gas equivalent produced o
9. Purchased gas 2,971
10. Transferred from: o
11. Transferred to: o
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~, ~ ~, Title ACCOUNTING SUPERVISOR Date 10/05/2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
E F AND G 524114 100.00
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority ZO AAC 25.235
norm > u-azz
Rev. 4/95
Excess Flare Log Report
Facility Name: DILLON PLATFORM
Month/Year: September 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
Report Date: 10/4/2001 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL OCTOBER 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour o
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) o
5. Pilot and Purge 217
6. Used for lease operations s . ~ 4,537
~~.~°
7. Other
~~ ~% ` " s ' o
TOTAL items 1 - 7 ,~, S. 0958k~.~~'
GitOraQt? 4, 754
8. NGL gas equivalent produced o
9. Purchased gas 7,619
10. Transferred from: o
11. Transferred to: o
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature /.~~CG~i~ ~~/l ,,,~~ Title ACCOUNTING SUPERVISOR Date 11/08/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
E F AND G - 524114 100.00
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
DILLON PLATFORM Operator
UNOCAL ALASKA RESOURCES Nield(s)
MIDDLE GROUND SHOAL Montri/Year of li> poslilon
NOVEMBER 2001
Disposition Volume MCF* *Indicate contribution of each pool to total.
1
ld
S
0 Pool Name ~ Code Percent
.
o
E F AND G - 524114 .100.00
Z. Reinjected O
3. Flared or vented less than 1 hour D
4. Flared or vented greater than 1 hour o
(Supplemental report regaired -See 20 AAC 25.235)
`
' ~
`~° "`°
~ ~
~
5. Pilot and Purge ~ 210
6. Used for lease operations 4,517
7
Oth D
.
er
.,
,,:.;~ _.
.. .
~'`~?
»
>
'
~~ `'
. 's?t~~'
TOTAL items 1 - 7
a
4
727 - ~~ ~~i.:)::#~s~~Y[~>~'.~?aK.i?ii
............. .::::::;;. <
?><
::mss<
>`
i#~a~atn~;:;;:;~.;~!~`::::;;:;:;:;:
::::::::;:;:::::::::::::::;::::::::::::.~.._:.~:::::::::.
, 1
Safety MCF
.
8. NGL gas equivalent produced D
2. Lease Use
MCF
9. Purchased gas 9,4$7
3. Conserv. Purposes
MCF
10. Transferred from: D
11. Transferred to: 0
Commissioner Date
Remarks:
Note: All volumes must be corrected to
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~ ~ c~w ,~a ~/ Title ACCOUNTING SUPERVISOR Date 12/07/2001 pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: DILLON PLATFORM Month/Year: November 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
Report Date: 12/12/2001 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL DECEMBER 2001
Disposition. Volume 111CF*
1. Sold o
2. Rcin,jected 0
3. Flared or vented less than 1 hoar o
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) o
5. Pilot and Purge 217
6. Used for lease operations 4,o7s
7.Other o
TOTAL items 1 - 7 4,295
8. NGL gas equivalent prodaced o
9. Purchased gas 10, 576
10. Transferred from: 0
11. Transferred to: o
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~L ~ Title ACCOUNTING SUPERVISOR Date 01/09/2002
Form 10-422
Rev. 4/95
r']udicate contribution of es~ch pool to Cotal.
Fool Name Code Percent
E F AND G 524114 100.00
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Facility Name:
Month/Year: December 2001
DILLON PLATFORM
Excess Flare Log Report
Date 8~ Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
Report Date:. 1/2/2002 Page: 1 of 1