Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutUNOCAL - DILLON PLATFORMALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JANUARY 2001 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) o 5. Pilot and Purge ~, ~ 217 6. Used for lease operations 5,996 7. Other o ,. TOTAL items 1 - 7 A~!cho~ ae 5,213 8. NGL gas equivalent produced o 9. Purchased gas 9.475 10. Transferred from: o 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature LI~f1~0~~ Title ACCOUNTING SUPERVISOR Date 02/07/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Excess Flare Log Report Facility Name: DILLON PLATFORM Month/Year: January 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number Report Date:. 2/5/01 Page: 1 of 1 ALASKA OIL AND GAS. CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DI; Facility DILLON PLATFORM Operator UNOCAL ALASKA RESOURCES Field(s) MIDDLE GROUND SHOAT Disposition Volume MCF* 1. Sold 0 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 103 5. Pilot and Purge 195 6. Used for lease operations -~ 5,2s9 7. Other ~ ` o Y TOTAL items 1 - 7 ~- =s ~_ ~ 5, 588 8. NGL gas equivalent produced ~ o 9. Purchased gas a,7os 10. Transferred from:. 0 11. Transferred to: o Remarks: I hereby certify~~that the foregoing is true and correct to the best of my knowledge. Signature C~~~ ll. 1J//.~/ Title ACCOUNTING SUPERVISOR Date 03/08/2001 Form 10-422 Rev. 4/95 POSITION Month/Year of Disposition _ FEBRUARY 2001 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Excess Flare Log Report Facility Name: DILLON PLATFORM Month/Year: February 2Q01 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 2/23/01 0:01 2/23/01 12:00 103 Y BLEW DOWN PIPELINE TO SHIP PIG TO EFDF OPERATIONAL SCHEDULED MAINTENANCE D-SP-HP Report Date: 3/7/01.. Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL MARCH 2001 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) 0 5. Pilot and Purge 217 6. Used for lease operations 5,425 7.Other o TOTAL items 1- 7 5,642 8. NGL gas equivalent produced o 9. Purchased gas 9,215 10. Transferred from: o 11. Transferred to: o Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~ ~~ Title ACCOUNTING SUPERVISOR Date 04/06/2001 r Form 10-422 Rev. 4/95 *Indicate contribution of eachpool to total. .Pool Name Code Percent E F AND G .524114 .100.00 Note: Ail volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Excess Flare Log Report Facility Name: DILLON PLATFORM Month/Year: March 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number Report Date: 4/12/01 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL APRIL 2001 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared ar vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 1.342 5. Pilot and Purge zi0 6. Used for lease operations 4.522 7.Other o TOTAL items 1 - 7 6 , 074 8. NGL gas equivalent produced o 9. Purchased gas s,15o 10. Transferred from: o 11. Transferred to: o Remarks: I hereby certify at the fore oing is true and correct to the best of my knowledge. Signature ~ ~ ~~ Title ACCOUNTING SUPERVISOR Date 05/16/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code. Percent E F AND G 524114 100.00 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ~~~ Excess Flare Log Report Facility Name: DILLON PLATFORM Month/Year: April 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 417101 0:01 417/01 23:59 95 N VRU DOWN FOR MAINTENANCE. OPERATIONAL UNSCHEDULED MAINTENANCE COMPRESSOR FAILURE REBUILD COMPRESSOR 4/8/01 0:00 418/01 23:59 192 N VRU DOWN FOR MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE COMPRESSOR FAILURE REBUILD COMPRESSOR 00-00-00 4/9/01 0:00 4/9/01 23:59 192 N VRU DOWN FOR MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE COMPRESSOR FAILURE REBUILD COMPRESSOR 00-00-00 4/10!01 0:01 4/10/01 23:59 192 N VRU MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE COMPRESSOR FAILURE REBUILD COMPRESSOR 00-00-00 4/11/01 0;01 4/11/01 23:59 192 N VRU DOWN FOR MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE COMPRESSOR FAILURE REBUILD COMPRESSOR 00-00-00 4112/01 0:00 4/12/01 23:59 192 N VRU DOWN FOR MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE COMPRESSOR FAILURE REBUILD COMPRESSOR 00-00-00 4/13/01 0:00 4/13/01 23:59 192 N VRU MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE COMPRESSOR FAILURE REBUILD COMPRESSOR 00-00-00 4/14/01 0:00 4/14/01 23:59 95 N VRU MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE COMPRESSOR FAILURE REBUILD COMPRESSOR 00-00-00 Report Date: 5/7/01 Page: 1 of 1 ~~c~rv~~ ALASKA OIL AND GAS CONSERVATION COMMISSION ,JUN 1 9 2001 FACILITY REPORT OF PRODUCED GAS DISPOSITION AI ons. Commission Facility Operator Field(s) Month/Year of Disposition Arch age DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL MAY. 2001 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hoar o 4. Flared or vented greater than 1 hour (Sopplemeotal report regnire¢ -See 20 AAC 25.235) 2,090 5. Pilot and Purge 217 6. Used for lease operations 4.737 7. Other o TOTAL items 1- 7 7.044 8. NGL gas equivalent produced o 9. Purchased gas 7,901 10. Transferred from: o 11. Transferred to: o Remarks: I hereby certify that the fo"re~going is true and correct to the best of my knowledge. Signature ~~~~~ ~ .L,~ ~'rf, Title ACCOUNTING SUPERVISOR Date 06/07/2001 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G t 524114 100.00 1. Safety MCF 2. Lease Use a D ~ (~ MCF 3. Conserv. Purposes MCF ry~r~r 6 ~ ~~ AV Q ~/ Commis ~ ner ~ Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ~~~~~ Form 10-422 V Rev. 4/95 Excess Flare Log Report Facility Name: DILLON PLATFORM Month/Year: May 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 5/7/01 14:00 5/7/01 18:00 32 N VRU. MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE BAD SEAL REPAIRED SEAL 00-00-00 5/15/01 16:59 5/15101 23:59 30 N VRU RECYCLE VALVES R & R. OPERATIONAL UNSCHEDULED MAINTENANCE REPAIRING VALVES. REPAIRING VALVES. 00-00-00 5/16/01 12:30 5/16/01 17:00 50 N VRU MAINTENANCE OPERATIONAL UNSCHEDULED MAINTENANCE REPAIRING RECYCLE VALVES. RECYCLE VALVES 00-00-00 REPAIRED. 5H 7/01 12:00 5/17/01 23:59 60 N GAS COMPRESSOR MAINT. . OPERATIONAL UNSCHEDULED MAINTENANCE NEW GAS VALVES R AND R VRU COMPRESSOR 5/18101 0:00 5/18/01 23:59 188 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY BEING VAPOR RECOVERY BEING 00-00-00 REPAIRED REPAIRED 5/19/01 0:00 5/19/01 23:59 168 N PLATFORM SHUT IN AND VAPOR OPERATIONAL UNSCHEDULED MAINTENANCE PLATFORM BACK ON AND PLATFORM BACK ON AND 00-00-00 RECOVERY REPAIRS VAPOR RECOVERY BEING VAPOR RECOVERY BEING REPAIRED REPAIRED 5!20/01 0:00 5120/01 23:59 183 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY BEING VAPOR RECOVERY BEING 00-00-00 REPAIRED REPAIRED 5/21!01 0:00 5/21/01 23:59 521 N VAPOR RECOVERY DOWN AND OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY REPAIRS VAPOR RECOVERY 00-00-00 BLEEDING PIPELINE AND PREPARING "D" LINE FOR REPAIRS AND PREPARING HYDROTEST "D" LINE FOR HYDROTEST 5/22/01 0:00 5/22/01 23:59 162 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY BEING VAPOR RECOVERY BEING 00-00-00 REPAIRED REPAIRED 5/23/01 0:00 5/23/01 23:59 185 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY BEING VAPOR RECOVERY BEING 00-00-00 INSTALLED INSTALLED 5/24/01 0:00 5124/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY BEING VAPOR RECOVERY BEING 00-00-00 INSTALLED INSTALLED 5/25/01 0:00 5!25/01 23:59 185 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY BEING VAPOR RECOVERY BEING 00-00-00 INSTALLED INSTALLED 5/26/01 0:00 5/26/01 15:59 128 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY BACK VAPOR RECOVERY BEING 00-00-00 ONLINE AT 4:OOPM INSTALLED Report Date: 6/1/01 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION I DILLON PLATFORM I UNOCAL ALASKA RESOURCES I MIDDLE GROUND SHOAL Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 5,099 5. Pilot and Purge 210 6. Used for lease operations 924 7. Other o TOTAL items 1 - 7 6.233 8. NGL gas equivalent produced o 9. Purchased gas 12,120 10. Transferred from: o 11. Transferred to: o Remarks: I hereby certify that the~flore oing/i's true and correct to the best of my knowledge. Signature/~~~,~j l ./' l/~ Title ACCOUNTING SUPERVISOR Date 07/06/2001.. Form 10-422 Rev. 4/95 JUL ~ 0 2001 Aiaska Oil & Gas Cons. Commission 'ear or liispo JUNE 2001 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 ~ 1. Safety ~ MCF 12. Lease Use I ~ ~ ~ ~ MCF 3. Conserv. Purposes MCF I r', 4y~ 6 Y Commi Toner Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ~ ~ ~~i Excess Flare Log Report Facility Name: DILLON PLATFORM Month/Year: June 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 6/2/01 0:00 6/2/01 23:59 120 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE SENDING IN FOR REPAIRS First attempted to repair unit. Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. 613101 0:00 6/3/01 23:59 185 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY SENT IN First attempted to repair unit. FOR REPAIRS Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/4/01 0:00 6/4/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit ORDER Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/5/01 0:00 6/5/01 23:59 178 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit 00-00-00 ORDER Determined old VRU cant be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/6/01 0:01 616/01 23:59 178 N VRU DOWN FOR REPAIR OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit. 00-00-00 ORDER Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite. order and shipping. 6/7/01 0:00 6/7/01 23:59 178 N V.R.U. DOWN FOR REPAIR OPERATIONAL UNSCHEDULED MAINTENANCE NEW V.R.U. ON ORDER First attempted to repair unit AWAITING REPLACEMENT Determined old VRU cant be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/8/01 0:00 6/8!01 23:59 178 N VRU DOWN NEW COMPRESSOR OPERATIONAL UNSCHEDULED MAINTENANCE AWAITING NEW VRU First attempted to repair unit ON ORDER COMPRESSOR Determined old VRU canR be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/9/01 0:00 6/9/01 23:59 178 N V.R.U. DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW V.R.U. ORDERED First attempted to repair unit. Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. Report Date: 7/18/01 Page: 1 of 4 Excess Flare Log Report Facility Name: DILLON PLATFORM Month/Year: June 2001 Date 8 r Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 6/10/01 0:00 6/10/01 23:59 178 N V.R.U. DOWN FOR REPAIRS OPERATIONAL UNSCHEDULED MAINTENANCE NEW COMPRESSOR ON ORDER First attempted to repair unit. Determined old VRU cant be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/11/01 0:00 6/11/01 23:59 178 N V.R.U. OUT OF COMMISION TEMP. OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW V.R.U. First attempted to repair unit. COMPRESSOR Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/12/01 0:00 6/12/01 23:59 178 N V.R.U. DOWN OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW COMPRESSOR First attempted to repair unit. Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/13/01 0:00 6!13/01 23:59 178 N V.R.U. OUT OF COMMISION OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW COMPRESSOR First attempted to repair unit FOR V.R.U. Determined old VRU can't be ~ be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/14/01 0:00 6/14/01 23:59 178 N V.R.U. OUT OF COMMISION OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW COMPRESSOR First attempted to repair unit. Determined old VRU pn't be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/15/01 0:00 6/15/01 23:59 178 N V.R.U. OUT OF COMMISION OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW COMPRESSOR First attempted to repair unit. Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite oMer and shipping. 6/16/01 0:00 6/16/01 23:59 178 N V.R.U. OUT OF COMMISIION OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW COMPRESSOR First attempted to repair unit. Determined old VRU can't be be repaired; new unit needed. Ober new VRU, expedite order and shipping. 6/17/01 0:00 6/17/01 23:59 178 N V.R.U. DOWN FOR REPAIRS OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW COMPRESSOR First attempted to repair unit. Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. Report Date: 7/18/01 Page: 2 of 4 Excess Flare Log Report Facility Name: DILLON PLATFORM Month/Year: June 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned/ Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 6/18/01 0:00 6118/01 23:59 178 N V.R.U. OUT OF COMMISION OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW COMPRESSOR First attempted to repair unit. FOR V.R.U. Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/19/01 0:00 6/19/01 23:59 178 N VAPOR RECOVERY REMOVED OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit. ORDER Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/20/01 0:00 6/20/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE VAPOR RECOVERY ON ORDER First attempted to repair unit Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/21/01 0:00 6/21/01 23:29 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit. ORDER Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/22/01 0:00 6/22/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit. ORDER Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/23/01 0:00 6/23/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit. ORDER Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/24/01 0:00 6/24/01 23:59 172 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit ORDER Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6125/01 0:00 6125/01 23:59 172 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE ORDERED NEW VAPOR First attempted to repair unit. RECOVERY Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. Report Date: 7/18/01 Page: 3 of 4 Excess Flare Log Report Facility Name: DILLON PLATFORM Month/Year: June 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 6/26/01 0:00 6/26/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit. ORDER Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/27/01 0:00 6/27/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit ORDER Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6/28/01 0:00 6/28/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit. ORDER Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite orcler and shipping. 6/29/01 0:00 6/29/01 23:59 178 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit ORDER Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. 6130/01 0:00 6/30!01 23:59 176 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE NEW VAPOR RECOVERY ON First attempted to repair unit. ORDER Determined old VRU can't be be repaired; new unit needed. Order new VRU, expedite order and shipping. Report Date: 7/18/01 Page: 4 of 4 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL JULY 2001 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25,235) 3,455 5. Pilot and Purge 217 6. Used for lease operations 21 7. Other o TOTAL items 1- 7 3.693 8. NGL gas equivalent produced o 9. Purchased gas 12,851 10. Transferred from: o 11. Transferred to: o Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature /i~~~ (L .uG//~ Title ACCOUNTING SUPERVISOR Date 08/10/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ~V' ~N l~ Excess Flare Log Report Facility Name: DILLON PLATFORM Month/Year: July 2001 Date 8 Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 711/01 0:00 7/1/01 23:59 114 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit Awaiting arrival of new VRU throughout July. VRU replaced 8112/01, returned to normal ops. 7!2/01 0:01 7!2/01 23:59 147 N VAPOR RECOVERY DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit. Awaitng arrival of new VRU throughout July. VRU replaced 8/12/01, returned to normal ops. 7/3/01 0:01 713/01 23:59 139 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Derision made to install new VRU. Request expedited shipment of replacement unit Awaiting artival of new VRU throughout July. VRU replaced e/12/01, returned to normal ops. 7/4/01 0:01 7/4/01 23:59 116 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit Awaiting arrival of new VRU ihroughoutJuly. VRU replaced 8112/01, returned to normal ops. 7/5101 0:01 7/5!01 23:59 111 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Derision made to install new VRU. Request expedited shipment of replacement unit Awaiting arriva(of new VRU lhroughoutJuly. VRU replaced 8/12/01, returned to nomral ops. Report Date: 8/15/01 Page: 1 of 7 Excess Flare Log Report 7/6/01 0:01 7/6/01 23:59 111 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to insfali new VRU. Request expedited shipment of replacement unit. Awaiting arrival of new VRU throughout July. VRU replaced 8/12/01, rehimed to nom~al ops. 7/7/01 0:01 7/7/07 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Derision made to install new VRU. Request expedited shipment of replacement unit Awaiting artival of new VRU throughout July. VRU replaced 8/12/01, returned to normal ops. 7/8/01 0:01 7/8/01 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit Awaiting arrival of new VRU throughout July. VRU replaced 8/12/01, returned to normal ops. 7/9/01 0:01 7/9/01 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit Awaiting artival of new VRU throughout July. VRU replaced 8/12/01, returned to normal ops. 7/10/01 0:01 7/10/01 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit Awaiting arrival of new VRU throughout Juiy. VRU replaced 8/12/01, returned to normal ops. Report Date: 8/15/01 Page: 2 of 7 Excess Flare Log Report 7/11/01 0:01 7/11/01 23:59 112 N VRU Down OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit Awaitng arrival of new VRU throughout July. VRU replaced 8!12/01, returned to normal ops. 7/12!01 0:01 7/12/01 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit. Awaiting artival of new VRU throughout July. VRU replaced 8/12/01, returned to nornal ops. 7/13/01 0:01 7/13/01 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit Awaiting arrival of new VRU throughout July. VRU replaced 8112/01, returned to normal ops. 7/14/01 0:01 7/14/01 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit Awaiting artival of new VRU throughout July. VRU replaced 8/12/01, returned to normal ops. 7!15101 0:01 7/15/01 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Inldally attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacementvnit Awaiting arrival of new VRU throughout July. VRU replaced 8/12/01, returned to nomral ops. Report Date: 8/15/01 Page: 3 of 7 Excess Flare Log Report 7!16!01 0:01 7/16/01 23:59 112 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit. Awaiting arrival of new VRU throughout July. VRU replaced 8112/01, returned to normal ops. 7!17/01 0:01 7/17/01 23:59 104 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit Awaiting arrival of new VRU throughout July. VRU replaced 8/12/01, returned to normal ops. 7/18/01 0:01 7/18/01 23:59 104 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit. Awaitlng arrival of new VRU throughout July. VRU replaced 8/12/01, returned to nomtai ops. 7119101 0:01 7/19/01 23:59 105 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00.00 VRU, determined repair not possible. Deasion made tornstall ' new VRU. Request expedited shipment of replacement unit. Awaitlng arrival of new VRU throughout July. VRU replaced 8!12101, returned t0 normal ops. 7/20/01 0:01 7/20/01 23:59 105 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit Awaiting artival of new VRU throughout July. VRU replaced 6/12/01, returned to nomral ops. Report Date: 8/15/01 Page: 4 of 7 Excess Flare Log Report 7/21/01 0:01 7/21/01 23:59 105 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipmert of replacement unit. Awaiting arrival of new VRU throughout July. VRU replaced 8/12/01, returned to normal ops. 7/22/01 0:01 7/22/01 23:59 87 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit Awaiting arival of new VRU throughout July. VRU replaced 8/12/01, returned to normal ops. 7/23/01 0:01 7/23/01 23:59 104 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE IniBally attempted to repair existing Order new VRU. 00-00-00 VRU, detemrined repair not passible. Dedsion made to install new VRU. Request expedited shipment of replacement unit Awaiting arival of new VRU throughout July. VRU replaced 8/12/01, returned to normal ops. 7/24/01 0:01 7/24/01 23:59 103 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Dedsion made to install new VRU. Request expedited shipment of replacement unit Awaiting arrival of new VRU throughout July. VRU replaced 8/12/01, returned to normal ops. 7/25/01 0:01 7/25101 23:59 92 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00.00.00 VRU, determined repair not possible. Dedsion made to install new VRU. Request expedited shipment of replacement unit Awaiting arrival of new VRU throughout July. VRU replaced 8/12/01, returned to normal ops. Report Date: 8/15/01 Page: 5 of 7 Excess Flare Log Report 7/26/01 0:01 7/26/01 23:59 106 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit Awaiting arival of new VRU throughout July. VRU replaced 8/12101, relumed to normal ops. 7/27/01 0:01 7/27/01 23:59 117 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit. Awaiting artival of new VRU throughout July. VRU replaced 8/12/01, returned to normal ops. 7/28/01 0:01 7/28/01 23:59 105 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible.. Decision made to install new VRU. Request expedited shipment of replacement unit Awaiting arival of new VRU throughout July. VRU replaced 8/12/01, returned to normal ops. 7/29/01 0:01 7/29/01 23:59 118 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initally attempted to repair existng Order new VRU. 00-00-00 VRU, determined repair not possible: Dedston made to install new VRU. Request expedited shipment of replacement unit Awaiting arrival of new VRU throughout July. VRU replaced 8/12/01, returned to nomwi ops. 7/30/01 0:01 7/30/01 23:59 121 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Ober new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit. Awaiting arrival of new VRU throughout July. VRU replaced 8/12/01, returned to normal ops. Report Date: 8/15/01 Page: 6 of 7 Excess Flare Log Report 7/31/01 0:01 7/31/01 23:59 121 N VRU DOWN OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Order new VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit. Awaiting-arrival of new VRU throughout July. VRU replaced 8/12/01', returned to normal ops. Report Date: 8/15/01 Page: 7 of 7 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL AUGUST 2001 Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name Code Percent 1. Sold o E F AND G 524114 100.00 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour 1.404 (Supplemental report required -See 20 AAC 25.235) 5. Pilot and Purge 217 6. Used for lease operations 3,011 7 Other o TOTAL items l - 7 4, 632 8. NGL gas equivalent produced o 9. Purchased gas s,636 10. Transferred from: o 11. Transferred to: o 1\ClllAl 1~J. I hereby certify t/h7a~t~t~he foregoi/ng is true and correct to the best of my knowledge. Signature /,~~~,Q ~/~.,~~ Title ACCOUNTING SUPERVISOR Date 09/10/2001 Form 10-422 Rev. 4/95 1. Safety ~ MCF 12. Lease Use I ~~~~ MCF 3. Conserv. Purposes MCF ~r ~ 3 ~~ Commi ner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ~„/~,J '0 ~ I~ ~,/ Excess Flare Log Report Facility Name: DILLON PLATFORM Month/Year: August 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number B/1/01 0:01 S/1/01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted t0 repair existing Replace VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit. VRU replaced August 12, 2001, return to normal operations. 8/2/01 0:01 8/2/01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit. VRU replaced August 12, 2001, return to normal operations. 8/3/01 0:01 8/3/01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit VRU replaced August 12, 2001, return to normal operations. 8/4/01 0:01 8/4/01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit. VRU replaced August 12, 2001, return to normal operations. 8/5/01 0:01 8/5/01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipmentof replacement unit VRU replaced August 12, 2001, return to normal operations. Repott Date: 9/6/2001 Page: 1 of 3 Excess Flare Log Report 8/8/01 0:01 8/6/01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit. VRU replaced August 12, 2001, return to hormal operations. 8/7/01 0:01 8/7/01 23:59 121 N VRU down, waiting replacement OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit. VRU replaced August 12, 2001, return to normal operations. 8/8/01 0:01 8/8/01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit. VRU replaced August 12, 2001, return to normal operations. 8/9/01 0:01 8/9!01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit VRU replaced August 12, 2001, return to nomal operations. 8/10/01 0:01 8/10!01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit. VRU replaced August 12, 2001, return, to normal operations. 8/11/01 0:01 8/11/01 23:59 121 N VRU down, waiting replacement. OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit VRU replaced August 12, 2001, • return to normal operations. Report Date: 9!6/2001 Page: 2 of 3 Excess Flare Log Report 8/12/01 0:01 8/12/01 12:00 73 N VRU down, waiting replacement OPERATIONAL UNSCHEDULED MAINTENANCE Initially attempted to repair existing Replace VRU. 00-00-00 VRU, determined repair not possible. Decision made to install new VRU. Request expedited shipment of replacement unit. VRU replaced August 12, 2001, return to normal operations. Report Date: 9/6/2001 Page: 3 of 3 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL SEPTEMBER2001 Disposition Volume MCF* 1. Sold o 2. Reinjected `Y . 0 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hoar (Supplemental report required -See 20 AAC 25.235) o 5. Pilot and Purge 210 6. Used for lease operations 5.090 7. Other o TOTAL items i - 7 5.300 8. NGL gas equivalent produced o 9. Purchased gas 2,971 10. Transferred from: o 11. Transferred to: o Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~~, ~ ~, Title ACCOUNTING SUPERVISOR Date 10/05/2001 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G 524114 100.00 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority ZO AAC 25.235 norm > u-azz Rev. 4/95 Excess Flare Log Report Facility Name: DILLON PLATFORM Month/Year: September 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number Report Date: 10/4/2001 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL OCTOBER 2001 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour o 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) o 5. Pilot and Purge 217 6. Used for lease operations s . ~ 4,537 ~~.~° 7. Other ~~ ~% ` " s ' o TOTAL items 1 - 7 ,~, S. 0958k~.~~' GitOraQt? 4, 754 8. NGL gas equivalent produced o 9. Purchased gas 7,619 10. Transferred from: o 11. Transferred to: o Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature /.~~CG~i~ ~~/l ,,,~~ Title ACCOUNTING SUPERVISOR Date 11/08/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent E F AND G - 524114 100.00 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility DILLON PLATFORM Operator UNOCAL ALASKA RESOURCES Nield(s) MIDDLE GROUND SHOAL Montri/Year of li> poslilon NOVEMBER 2001 Disposition Volume MCF* *Indicate contribution of each pool to total. 1 ld S 0 Pool Name ~ Code Percent . o E F AND G - 524114 .100.00 Z. Reinjected O 3. Flared or vented less than 1 hour D 4. Flared or vented greater than 1 hour o (Supplemental report regaired -See 20 AAC 25.235) ` ' ~ `~° "`° ~ ~ ~ 5. Pilot and Purge ~ 210 6. Used for lease operations 4,517 7 Oth D . er ., ,,:.;~ _. .. . ~'`~? » > ' ~~ `' . 's?t~~' TOTAL items 1 - 7 a 4 727 - ~~ ~~i.:)::#~s~~Y[~>~'.~?aK.i?ii ............. .::::::;;. < ?>< ::mss< >` i#~a~atn~;:;;:;~.;~!~`::::;;:;:;:;: ::::::::;:;:::::::::::::::;::::::::::::.~.._:.~:::::::::. , 1 Safety MCF . 8. NGL gas equivalent produced D 2. Lease Use MCF 9. Purchased gas 9,4$7 3. Conserv. Purposes MCF 10. Transferred from: D 11. Transferred to: 0 Commissioner Date Remarks: Note: All volumes must be corrected to I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~~ ~ c~w ,~a ~/ Title ACCOUNTING SUPERVISOR Date 12/07/2001 pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: DILLON PLATFORM Month/Year: November 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number Report Date: 12/12/2001 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition DILLON PLATFORM UNOCAL ALASKA RESOURCES MIDDLE GROUND SHOAL DECEMBER 2001 Disposition. Volume 111CF* 1. Sold o 2. Rcin,jected 0 3. Flared or vented less than 1 hoar o 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) o 5. Pilot and Purge 217 6. Used for lease operations 4,o7s 7.Other o TOTAL items 1 - 7 4,295 8. NGL gas equivalent prodaced o 9. Purchased gas 10, 576 10. Transferred from: 0 11. Transferred to: o Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~~L ~ Title ACCOUNTING SUPERVISOR Date 01/09/2002 Form 10-422 Rev. 4/95 r']udicate contribution of es~ch pool to Cotal. Fool Name Code Percent E F AND G 524114 100.00 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Facility Name: Month/Year: December 2001 DILLON PLATFORM Excess Flare Log Report Date 8~ Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number Report Date:. 1/2/2002 Page: 1 of 1