Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutUNOCAL - KING SALMON PLTFRMALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit January 2001 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 9,918 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 159 5. Pilot and Purge 186 6. Used for lease operations 108,298 7. *Other (Shrinkage) 42,427 TOTAL items 1-7 160,988 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TsPF 80,125 11. Transferred to: Cov's to TsPF 1,564 Remarks: ere y cerh t t e ore om is tru//e//an^ correct to a est o my owe ge. Signature: U~ Title: Acct Date: 13-Feb-O1 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 76.30% GGS 520550 0.00% G Zone 520150 22.89% W/F 520190 0.81 Official Use Only- Flaring.. Authorization > 1 hr. 1. Safety , " j "l MCF 2. Lease Use MCF 3. Conserv. Purposes MCF b ,. ~ ~ o y Commissi er Date ~~ f~~Z Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: KING SALMON PLATFORM Month/Year: January 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 1!5/01 19:00 1/5/01 23:59 121.67 N PRODUCTION S/D CAUSED BY HIGH LEVEL ON DEAERATOR TOWER OPERATIONAL OTHER: productlon shutdown on a high high level on deaerator, cleared level and started equipment back Cleared alarm and started platform back up. Repaired high level alarm. L-PM-0670 1/19/01 15:30 1/19/01 17:00 36.95 N _ EXCESS FLARE, PRODUCTION SHUTDOWN DUR TO PLC GLITCH OPERATIONAL UNSCHEDULED MAINTENANCE START PLATFORM CLEARED ALARMS AND RESTARTED PLATFORM FIXED PLC Report Date: 2/6/01 Page: 1 of 1 ~~ ~.. ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GA5 DISPOSITION Facility Operator Field(s) Month/Year of Disposition Kin Salmon Platform - TBU Unocal Tradin Ba Unit Februar 2001 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 137 4. Flared or vented greater than 1 hour (Sup lemental report re wired-See 20 AAC 25.235) 7,207 5. Pilot and Purge 168 6. Used for lease operations 108,746 7. *Other (Shrinkage) 39,212 TOTAL items 1-7 155,470 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 84,387 l 1. Transferred to: Cov's to TBPF 1,487 Remarks: I hereby certify t he for go g is true and correct to the best of my know a ge. Jtgnature: _ '1'~tle: Acc . , ~her• llate: U2S-Mar-Ul *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 73.07% GGS 520550 . 0.00% G Zone 520150 25.60% W/F 520190 1.33% Official Use.Only -Flaring Atlthoxizaton > 1 hr. 1. Safety MCF 2. Lease Use ~, ~~ ~ MCF 3. Conserv. Purposes MCF ~:~ 1 v`Vvti ~ ~ li ~ C~ 11 d' ~ Commis' er ~; /~ Date tvote: Au votumes must de corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. iteport due by the 'LUth of the month Yollowtng the month of dtsposrtion. Authortt 'LU AAt; "L5."L'S5. /~ ~ Form 10-422 Rev. 4/95 ,_~ Excess Flare Log Report Facility Name: KING SALMON PLATFORM Month/Year: February 2009 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 2/9/01 17:30 2/9/01 19:30 99.67 N solar york shutdown OPERATIONAL UNSCHEDULED MAINTENANCE repaired versa valve, restarted compressor L-PM-0670 2/11/01 0:00 2/11/01 23:59 37 N SOLAR YORK SHUTDOWN OPERATIONAL UNSCHEDULED MAINTENANCE L-PM-0670 Report Date: 3/9/01 Page: 1 of 3 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit March 2001 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 8,747 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 1,081 5. Pilot and Purge 186 6. Used for lease operations 143,439 7. *Other (Shrinkage) 32,222 TOTAL items 1-7 185,675 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 108,896 11. Transferred to: Cov's to TBPF 2,698 Remarks: ere y certt y tf,/t` t e ore mg/'is true an correct tote est o my owe ge. Signature: ; L~-c: 'L~~~%! Title: Acct. Super. Date: 10-Apr-O1 *Indicate contribution of each. pool to total. Pool Name Code Percent Hemlock 520120 73.10% GGS 520550 0.00% G Zone 520150 25.40% W/F 520190 1.50% 'Official Use Only -Flaring Authorization> 1 hr. !- 1. Safety f~ t ~ ~ ~ MCF >-~v~„' 2. Lease Use "~'~ ~ MCF 3. Conserv. Purposes MCF Commissi er Date ~~~~ Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: KING SALMON PLATFORM Month/Year: March 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 3/5/01 11:01 3/5/01 13:25 44 N SN shut down for 90 day maintenance OPERATIONAL SCHEDULED MAINTENANCE Scheduled Mainfanince Performed maintenance and returned to service L-PM-0670 3/7/01 10:00 3!7101 12:00 1037 N Instrumentation malfunction, high pressure flare controller SAFETY OTHER: Repaired insturrnent Report Date: 4/6/01 Page: 1 of 3 ALASKA OIL AND GA5 CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit Apri12001 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 5,488 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 0 5. Pilot and Purge 180 6. Used for lease operations 123,755 7. *Other (Shrinkage) 29,589 TOTAL items 1-7 159,012 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 94,323 1 L Transferred to: Cov's to TBPF 2,410 Remarks: ere y certt t t t e oregom is tr~uef an correct tote est o my owe ge. Signature: ~//~ Title: Acct. Super. Date: 14-May-O1 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 74.99% GGS 520550 0.00% G Zone 520150 23.20% W/F 520190 1.81 Official Use Only -Flaring Authorization > 1 hr. 1. Safety „ 1VICF 2. Lease Use .r t .'' '~,r~' MCF i 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit May 2001 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected p 3. Flared or vented less than 1 hour 5,297 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 0 5. Pilot and Purge ` 186 6. Used for lease operations 127,580 7. *Other (Shrinkage) 56,075 TOTALitems 1-7 189,138 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 91,233 11. Transferred to: Cov's to TBPF 2,114 Remarks: ere y cerh t t e oregomg is true an correc tote est o my owe ge. Signature: ~ -~~~ f1 ~ ~ ~- ~ ~~~'~ Title: Acct. Steer. Date: 11-Jun-O1 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 72.37% GGS 520550 0.00% G Zone 520150 26.07% W/F 520190 1.56% Official Use Only -Flaring Authorization ~ l hr. 1. Safety -'MCF 2. Lease Use ~!~l MCF 3. Conserv. Purposes MCF Commissioner .Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 ALASKA OIL AND GAS. CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit June 2001 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 10,717 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 0 5. Pilot and Purge 180 6. Used for lease operations ~ 121,969 7. *Other (Shrinkage) 50,430 TOTAL items 1-7 183,296 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 84,346 11. Transferred to: COV's to TBPF 2,161 Remarks: ere y cem t at t e oregq ng i~s~true an correct tote est o my owe ge. Signature: !/. Title; Acct. Super. Date: 10-Jul-O1 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 69.08% GGS 520550 0.00% G Zone 520150 30.60% W/F 520190 0.32% Official Use Only -Flaring Authorization> 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit July 2001 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 24,694 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 861 5. Pilot and Purge 186 6. Used for lease operations 111,351 7. *Other (Shrinkage) 91,881 TOTAL items 1-7 228,973 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 52,575 11. Transferred to: Cov's to TBPF 3,775 Remarks: ere y cerh t t e oregot is true an correct tote est o my owe ge. Signature: Title: Acct. Surer. Date: 13-Aug-O1 *Indicate contribution of each pool to total. Poo] Name Code Percent Hemlock 520120 75.38% GGS 520550 0.00% G Zone 520150 24.02% W/F 520190 0.60% Official Use Only -Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use ~~ ~ MCF 3. Conserv. Purposes MCF P 7 Commis i ner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. 3,~~~m- Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: KING SALMON PLATFORM Month/Year: July 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 7/7/01 12:30 7/7/01 14:00 66.06 N Solar York load shed caused by unexpedted shutdown Air Compressor #1. OPERATIONAL OTHER: SEE DESC OF EVENT Immediately respond to shutdown of AC#1, restart unit and return faclllty to normal operation as soon as possible. Maintenance work on AC#1. L-PM-0670 7/13/01 9:50 7/13/01 17:00 271.5 N Solar York shutdown for scheduled maintenance. OPERATIONAL SCHEDULED MAINTENANCE Planned water wash of Solar York, conduct pre-work meeting with work crew, ensure all personnel, equipment and tools to perform maintenance work are on-site. Warer wash unit and return facility to normal operations ASAP. Planned maintenance work. 7/1/01 0:00 7/31/01 23:59 3204 Y COV's to Flare for July OPERATIONAL UNSCHEDULED MAINTENANCE Immediately repair controller, return facility to normal operations as aeon as possible. Clean controller. Report Date: 8/15101 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit August 2001 Disposition Total Volumes MCF 1. Sold p 2. Reinjected p 3. Flared or vented less than 1 hour 16,357 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 0 5. Pilot and Purge 186 6. Used for lease operations 107,178 7. *Other (Shrinkage) 91,173 TOTAL items 1-7 214,894 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 41,665 11. Transferred to: cov's to TBPF 4,841 Remarks: ere y cem y t e oregoi g is a an correct tote est o my owe ge. Signature: ~ Title: Acct. Surer. Date: 12-Sep-01 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 75.51 GGS 520550 0.00% G Zone 520150 23.89% W/F 520190 0.60% Official. Use Only -Flaring. Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit September 2001 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour ~ ~ - 27,187 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 947 5. Pilot and Purge 180 6. Used for lease operations 99,119 7. *Other (Shrinkage) 82,873 TOTAL items 1-7 210,306 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 51,604 11. Transferred to: Cov's to TBPF 2,632 Remarks: ere y certt tat a oregom is true an correct tote est o my owe ge. Signature: ~ - ~~ Title: Acct. Surer. Date: 16-Oct-01 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 73.95% GGS 520550 0.00% G Zone 520150 25.15% W/F 520190 0.90% Official Use Only -Flaring Authorization > 1 hr. 1. Safety Gj, (~ MCF 1 2. Lease Use MCF 3. Conserv. Purposes MCF ~i'~.~,~., ~cz,~i~` ~ o~ o Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: KING SALMON PLATFORM Month/Year: September 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-21D Number 9/9/2001 4:00 /13/2001 17:30 /15/2001 0:01 9/9/2001 11:00 /13/2001 23:59 /15/2001 15:00 287 04.47 56 N N N Testing Procedures, platform shutdown. Testing Shut Down Procedures. Platform shut down. Pressure test pipeline. Y. Platform startup. Pressure test pipeline. OPERATIONAL PERATIONAL PERATIONAL UNSCHEDULED MAINTENANCE NSCHEDULED MAINTENANCE NSCHEDULED MAINTENANCE Platform shut down for 4 hour; to test procedures, plarform returned to normal operations as soon as possible. Platform Shut down to pressure test oil line. All production shut-in, flaring limited to gas volume in system. Production brought back on line, spiking wells, excess gas flared until production system stabilizes, Training event to ensure safe operations. One time event to check oil line for leaks. ne time event following pressure test of oil Tines. Report Date: 10/12/2001. Page: 7 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit October 2001 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 26,279y~ 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 1,918 5. Pilot and Purge 186 6. Used for lease operations 124,018 7. *Other (Shrinkage) 71,551 TOTAL items 1-7 223,952 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TsPF 60,214 11. Transferred to: Coves to TBPF 4,300 Remarks: ere y cern y t at t e oregomg is true an correct tote est o my owe ge. Signature: Title: Acct. Super: Date: 16-Nov-O1 *Indicate contribution of each pool to total. Pool Name Code Percent Hemlock 520120 80.36% GGS - 520550 0.00% G Zone 520150 18.98% W/F 520190 0.67% Official Use Only -Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use ~ ~ ~ d MCF d 3. Conserv. Purposes MCF `~~WL ~~1 g b y Commissi r \ Date -, Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 Facility Name: KING SALMON PLATFORM Excess Flare Log Report Month/Year: October 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 10/6/01 0:15 10!8/01 7:30 407 N High pressure shut down on girder OPERATIONAL OTHER: SEE DESC OF EVEN High pressure alarm caused Pipeline inspection will ehlp L-PM-0670 tank platform shutdown, immediately insure continued safe responsed to stablize production operetions. and retumed faciltiy to normal operetions asap. 10/1/01 0:00 10/31/01 24:00 3312 Planned COV's Flared for October OPERATIONAL SCHEDULED MAINTENANCE Shut in production to reduce Pipeling inspection will help flaring, flared all sales gas to bleed insure continued safe down piepline for inspection. Pre- operations. palnning activity ensured a smooth and minimal shut-down of faciltiy. 10!13101 0:01 10/13/01 23:59 769.27 Y Production shut dawn for piepline OPERATIONAL SCHEDULED MAINTENANCE Shut in production to reduce Solar York Annual Inspection inspection. flaring, flared all sales gas to bleed down piepline for inspection. Pre- palnning activity ensured a smooth and minimal shut-down of faclltiy. 10/19/01 9:30 10/19/01 16:30 367.21 N shut down due to stuck discharge OPERATIONAL OTHER: SEE DESC OF EVEN Immediately diagnosed problem, Repaired canto/ valve. L-PM-0670 scrubber dump valve repaired control valve, cleaned lines of condensate and retumed t normal operations. Report Date: 11/19/01 Page: 1 of 2 ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit November 2001 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected ~ 3. Flared or vented less than 1 hour `22;267 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 5,872 5. Pilot and Purge 174 6. Used for lease operations 100,566 7. *Other (Shrinkage) 64,013 TOTAL items 1-7 192,892 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBFF 51,319 11. Transferred to: COV~s to TBFF 4,817 Remarks: ere y certr y t e orego g isJ-t~ru~e an correct tote est o my owe ge. Signature: '~~"~./ Title: Acct. Suyer. Date: 11-Dec-O1 *Indicate contribution of each pool to total.. Pool Name Code Percent Hemlock 520120 83.16% GGS ~ 520550 0.00% G Zone 520150 16.32% W/F 520190 0.53% Official Use Only -Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use ~ ~•~ Z MCF 3. Conserv. Purposes MCF ~~" ~ I X110 ~- Commissio r Date ~w Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: KING SALMON PLATFORM Month/Year: November 2001 Date & Time- Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 11/21/01 0:00 11/21/01 18:00 222.83 N Platform shutdown for loss of AC OPERATIONAL UNSCHEDULED MAINTENAN epair generator using parts on Repair generator. power. Unplanned event -Repair platform, return facility to normal generator.. operation as soon as possible. 11/26/01 4:45 11/27/01 22:30 1064 N Shut down platform for pipeline OPERATIONAL SCHEDULED MAINTENANCE Plalforn shut-down planned for Returned to operations ASAP. conversion of service with K-13 conversion of services. Flared all producing. sales gas to bleed down pipeline. Pre-planned activity; ensure proper personnel/equipment on site, conducted pipeline inspection. 11/26/01 4:45 11/27/01 22:30 .1223 N Shut down plalforn for pipeline OPERATIONAL SCHEDULED MAINTENANCE Platform shut-down planned for Returned to operations ASAP. conversion of service with K-13 conversion of services. Flared all producing. salesgas to bleed down pipeline. Pre-planned activity; ensure proper personnel/equipment on site, conducted pipeline inspection. 11/29/01 0:00 11/29/01 23:59 628 N Platdoml shut down for pipeline OPERATIONAL SCHEDULED MAINTENANCE Scheduled maintenance -Shut One time event. conversion of services with K-13 down platform for service producng. conversion. Preplanning activityes to ensure proper personnel and equipment on site to accomplish job. Report Date: 12/12/01 Page: 1 of 2 Excess Flare Log Report 11/30/01 0:00 11/30101 23:59 2534 N Platform shut in for Pipeline Conversion OPERATIONAL SCHEDULED MAINTENANCE Scheduled maintenance -Shut down platform for service conversion. Preplanning activityes to ensure proper personnel and equipment on site to accomplish job. One time event. Report Date: 12/12/01 Page: 2 of 2 . 6/ _ ___ __ - _ _ _ - _ _ ~~-- "o••. 1 . f ~, ~~ ~+ ' ~ I -= y .~ ~ • ` ~ Q a i -'~' ' i ~ ; ~ ~ ~ ~ ~ L~ _ ~ ~ - ~m ~ -- ,~ `~ J ~ ~' 1 it }• ~ e ,- ,,~ ~ r ,• ' , ,iii ~ \ ~ ! ,,\ /r , ". ~~ % ;.~ . _ - ~. ~A t , '~_~~ ~ - - •! •••• •• ,, - o - - ~/ • e.. - ~W~3 • ., . - biz ' d X696 ' ON ~` ~ ~ ' ' ~' ' ~~ Wd I 0 : 9 -~ z00z ' 0z 'Sad' ' ALASKA OIL AND GAS CONSERVATION COMMISSION PRODUCER'S REPORT OF GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition King Salmon Platform - TBU Unocal Trading Bay Unit December 2001 Disposition Total Volumes MCF 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 30,903 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 4,746 5. Pilot and Purge 186 6. Used for lease operations 116,010 7. *Other (Shrinkage) 51,661 TOTAL items 1-7 203,506 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: TBPF 69,253 11. Transferred to: COV's to TBPF 5,288 Remarks: ere y certt t e oregomg s tru/e an correct o e est o my owe ge. Signature: :Ea -~ {~G°~'- Title: Acct. Super., Date: 15-Jan-02 *Indicate contribution of each pool to total. Pool Name Coda Percent Hemlock 520120 82.77% GGS 520550 0.00% G Zone 520150 17.04% W/F 520190 0.19% Off cial Use Only -Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use ~ ~ y~ MCF 3. Conserv. Purposes MCF l~S D ~ Commission Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4195 ~~~ / ~~ U" Excess Flare Log Report Facility Name KING SALMON PLATFORM Month/Year: December 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 12/1/2001 0:00 12/1/2001 23:59 2351 Y Pipeline conversion. Planned Maintenance. Conversion of service on oil/gas pipelines. OPERATIONAL SCHEDULED MAINTENANCE Convert gas line to oil svc & ofl line to gas svc.To minimize vol to flare prod. SI except K-13 to prevent damage to reservoir 8 loss of ultimate recovery. Plan work to ensure personnel & equip onsite, blowdn line, convert lines, return normal operation One time event 12/2/2001 0:00 12/2/2001 23:30 2395 N Pipeline conversion. Planned Maintenance. Conversion of service on oil/gas pipelines. OPERATIONAL SCHEDULED MAINTENANCE Convert gas line to oil svc & oil line to gas svc.To minimize vol to flare prod. SI except K-13 to prevent damage to reservoir 8 Toss of ultimate recovery. Plan work to ensure personnel & equip onsite, blowdn line, convert lines, return nommal operation One time event. Report Date: 1/15/2002 Page: 1 of 1