HomeMy WebLinkAboutUNOCAL - KING SALMON PLTFRMALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit January 2001
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 9,918
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 159
5. Pilot and Purge 186
6. Used for lease operations 108,298
7. *Other (Shrinkage) 42,427
TOTAL items 1-7 160,988
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TsPF 80,125
11. Transferred to: Cov's to TsPF 1,564
Remarks:
ere y cerh t t e ore om is tru//e//an^ correct to a est o my owe ge.
Signature: U~ Title: Acct Date: 13-Feb-O1
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 76.30%
GGS 520550 0.00%
G Zone 520150 22.89%
W/F 520190 0.81
Official Use Only- Flaring.. Authorization > 1 hr.
1. Safety , " j "l MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
b ,. ~ ~ o y
Commissi er Date
~~
f~~Z
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name:
KING SALMON PLATFORM
Month/Year: January 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
1!5/01 19:00 1/5/01 23:59 121.67 N PRODUCTION S/D CAUSED BY
HIGH LEVEL ON DEAERATOR
TOWER OPERATIONAL OTHER: productlon shutdown on a high
high level on deaerator, cleared
level and started equipment back Cleared alarm and started
platform back up. Repaired
high level alarm. L-PM-0670
1/19/01 15:30 1/19/01 17:00 36.95 N _ EXCESS FLARE, PRODUCTION
SHUTDOWN DUR TO PLC
GLITCH OPERATIONAL UNSCHEDULED MAINTENANCE START PLATFORM CLEARED ALARMS AND
RESTARTED PLATFORM
FIXED PLC
Report Date: 2/6/01 Page: 1 of 1
~~
~..
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GA5 DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Kin Salmon Platform - TBU Unocal Tradin Ba Unit Februar 2001
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 137
4. Flared or vented greater than 1 hour
(Sup lemental report re wired-See 20 AAC 25.235) 7,207
5. Pilot and Purge 168
6. Used for lease operations 108,746
7. *Other (Shrinkage) 39,212
TOTAL items 1-7 155,470
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 84,387
l 1. Transferred to: Cov's to TBPF 1,487
Remarks:
I hereby certify t he for go g is true and correct to the best of my know a ge.
Jtgnature: _ '1'~tle: Acc . , ~her• llate: U2S-Mar-Ul
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 73.07%
GGS 520550 . 0.00%
G Zone 520150 25.60%
W/F 520190 1.33%
Official Use.Only -Flaring Atlthoxizaton > 1 hr.
1. Safety MCF
2. Lease Use ~, ~~ ~ MCF
3. Conserv. Purposes MCF
~:~ 1
v`Vvti ~ ~ li
~ C~ 11 d'
~
Commis' er
~; /~
Date
tvote: Au votumes must de corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
iteport due by the 'LUth of the month Yollowtng the
month of dtsposrtion.
Authortt 'LU AAt; "L5."L'S5.
/~ ~
Form 10-422
Rev. 4/95
,_~
Excess Flare Log Report
Facility Name: KING SALMON PLATFORM
Month/Year: February 2009
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
2/9/01 17:30 2/9/01 19:30 99.67 N solar york shutdown OPERATIONAL UNSCHEDULED MAINTENANCE repaired versa valve, restarted
compressor L-PM-0670
2/11/01 0:00 2/11/01 23:59 37 N SOLAR YORK SHUTDOWN OPERATIONAL UNSCHEDULED MAINTENANCE L-PM-0670
Report Date: 3/9/01 Page: 1 of 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit March 2001
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 8,747
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 1,081
5. Pilot and Purge 186
6. Used for lease operations 143,439
7. *Other (Shrinkage) 32,222
TOTAL items 1-7 185,675
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 108,896
11. Transferred to: Cov's to TBPF 2,698
Remarks:
ere y certt y tf,/t` t e ore mg/'is true an correct tote est o my owe ge.
Signature: ; L~-c: 'L~~~%! Title: Acct. Super. Date: 10-Apr-O1
*Indicate contribution of each. pool to total.
Pool Name Code Percent
Hemlock 520120 73.10%
GGS 520550 0.00%
G Zone 520150 25.40%
W/F 520190 1.50%
'Official Use Only -Flaring Authorization> 1 hr.
!-
1. Safety f~
t ~ ~ ~ MCF >-~v~„'
2. Lease Use "~'~ ~ MCF
3. Conserv. Purposes MCF
Commissi er Date
~~~~
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: KING SALMON PLATFORM
Month/Year: March 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
3/5/01 11:01 3/5/01 13:25 44 N SN shut down for 90 day
maintenance OPERATIONAL SCHEDULED MAINTENANCE Scheduled Mainfanince Performed maintenance and
returned to service L-PM-0670
3/7/01 10:00 3!7101 12:00 1037 N Instrumentation malfunction, high
pressure flare controller SAFETY OTHER: Repaired insturrnent
Report Date: 4/6/01 Page: 1 of 3
ALASKA OIL AND GA5 CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit Apri12001
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 5,488
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 180
6. Used for lease operations 123,755
7. *Other (Shrinkage) 29,589
TOTAL items 1-7 159,012
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 94,323
1 L Transferred to: Cov's to TBPF 2,410
Remarks:
ere y certt t t t e oregom is tr~uef an correct tote est o my owe ge.
Signature: ~//~ Title: Acct. Super. Date: 14-May-O1
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 74.99%
GGS 520550 0.00%
G Zone 520150 23.20%
W/F 520190 1.81
Official Use Only -Flaring Authorization > 1 hr.
1. Safety „ 1VICF
2. Lease Use .r
t .''
'~,r~'
MCF
i
3. Conserv. Purposes
MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit May 2001
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected p
3. Flared or vented less than 1 hour 5,297
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge ` 186
6. Used for lease operations 127,580
7. *Other (Shrinkage) 56,075
TOTALitems 1-7 189,138
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 91,233
11. Transferred to: Cov's to TBPF 2,114
Remarks:
ere y cerh t t e oregomg is true an correc tote est o my owe ge.
Signature: ~ -~~~ f1 ~ ~ ~- ~ ~~~'~ Title: Acct. Steer. Date: 11-Jun-O1
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 72.37%
GGS 520550 0.00%
G Zone 520150 26.07%
W/F 520190 1.56%
Official Use Only -Flaring Authorization ~ l hr.
1. Safety -'MCF
2. Lease Use ~!~l MCF
3. Conserv. Purposes MCF
Commissioner .Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS. CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit June 2001
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 10,717
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 180
6. Used for lease operations ~ 121,969
7. *Other (Shrinkage) 50,430
TOTAL items 1-7 183,296
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 84,346
11. Transferred to: COV's to TBPF 2,161
Remarks:
ere y cem t at t e oregq ng i~s~true an correct tote est o my owe ge.
Signature: !/. Title; Acct. Super. Date: 10-Jul-O1
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 69.08%
GGS 520550 0.00%
G Zone 520150 30.60%
W/F 520190 0.32%
Official Use Only -Flaring Authorization> 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit July 2001
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 24,694
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 861
5. Pilot and Purge 186
6. Used for lease operations 111,351
7. *Other (Shrinkage) 91,881
TOTAL items 1-7 228,973
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 52,575
11. Transferred to: Cov's to TBPF 3,775
Remarks:
ere y cerh t t e oregot is true an correct tote est o my owe ge.
Signature: Title: Acct. Surer. Date: 13-Aug-O1
*Indicate contribution of each pool to total.
Poo] Name Code Percent
Hemlock 520120 75.38%
GGS 520550 0.00%
G Zone 520150 24.02%
W/F 520190 0.60%
Official Use Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use ~~ ~ MCF
3. Conserv. Purposes MCF
P
7
Commis i ner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
3,~~~m-
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: KING SALMON PLATFORM Month/Year: July 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
7/7/01 12:30 7/7/01 14:00 66.06 N Solar York load shed caused by
unexpedted shutdown Air Compressor
#1. OPERATIONAL OTHER: SEE DESC OF EVENT Immediately respond to shutdown
of AC#1, restart unit and return
faclllty to normal operation as soon
as possible. Maintenance work on AC#1. L-PM-0670
7/13/01 9:50 7/13/01 17:00 271.5 N Solar York shutdown for scheduled
maintenance. OPERATIONAL SCHEDULED MAINTENANCE Planned water wash of Solar York,
conduct pre-work meeting with
work crew, ensure all personnel,
equipment and tools to perform
maintenance work are on-site.
Warer wash unit and return facility
to normal operations ASAP. Planned maintenance work.
7/1/01 0:00 7/31/01 23:59 3204 Y COV's to Flare for July OPERATIONAL UNSCHEDULED MAINTENANCE Immediately repair controller,
return facility to normal operations
as aeon as possible. Clean controller.
Report Date: 8/15101 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit August 2001
Disposition Total Volumes MCF
1. Sold p
2. Reinjected p
3. Flared or vented less than 1 hour 16,357
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 186
6. Used for lease operations 107,178
7. *Other (Shrinkage) 91,173
TOTAL items 1-7 214,894
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 41,665
11. Transferred to: cov's to TBPF 4,841
Remarks:
ere y cem y t e oregoi g is a an correct tote est o my owe ge.
Signature: ~ Title: Acct. Surer. Date: 12-Sep-01
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 75.51
GGS 520550 0.00%
G Zone 520150 23.89%
W/F 520190 0.60%
Official. Use Only -Flaring. Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit September 2001
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour ~ ~ - 27,187
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 947
5. Pilot and Purge 180
6. Used for lease operations 99,119
7. *Other (Shrinkage) 82,873
TOTAL items 1-7 210,306
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 51,604
11. Transferred to: Cov's to TBPF 2,632
Remarks:
ere y certt tat a oregom is true an correct tote est o my owe ge.
Signature: ~ - ~~ Title: Acct. Surer. Date: 16-Oct-01
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 73.95%
GGS 520550 0.00%
G Zone 520150 25.15%
W/F 520190 0.90%
Official Use Only -Flaring Authorization > 1 hr.
1. Safety Gj, (~ MCF
1
2. Lease Use MCF
3. Conserv. Purposes MCF
~i'~.~,~., ~cz,~i~` ~ o~ o
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: KING SALMON PLATFORM Month/Year: September 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-21D Number
9/9/2001 4:00
/13/2001 17:30
/15/2001 0:01 9/9/2001 11:00
/13/2001 23:59
/15/2001 15:00 287
04.47
56 N
N
N Testing Procedures, platform
shutdown. Testing Shut Down
Procedures.
Platform shut down. Pressure test
pipeline.
Y.
Platform startup. Pressure test
pipeline. OPERATIONAL
PERATIONAL
PERATIONAL UNSCHEDULED MAINTENANCE
NSCHEDULED MAINTENANCE
NSCHEDULED MAINTENANCE Platform shut down for 4 hour; to
test procedures, plarform returned
to normal operations as soon as
possible.
Platform Shut down to pressure
test oil line. All production shut-in,
flaring limited to gas volume in
system.
Production brought back on line,
spiking wells, excess gas flared
until production system stabilizes, Training event to ensure safe
operations.
One time event to check oil
line for leaks.
ne time event following
pressure test of oil Tines.
Report Date: 10/12/2001. Page: 7 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit October 2001
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 26,279y~
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 1,918
5. Pilot and Purge 186
6. Used for lease operations 124,018
7. *Other (Shrinkage) 71,551
TOTAL items 1-7 223,952
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TsPF 60,214
11. Transferred to: Coves to TBPF 4,300
Remarks:
ere y cern y t at t e oregomg is true an correct tote est o my owe ge.
Signature: Title: Acct. Super: Date: 16-Nov-O1
*Indicate contribution of each pool to total.
Pool Name Code Percent
Hemlock 520120 80.36%
GGS - 520550 0.00%
G Zone 520150 18.98%
W/F 520190 0.67%
Official Use Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use ~ ~ ~ d MCF
d
3. Conserv. Purposes MCF
`~~WL ~~1 g b y
Commissi r \ Date
-,
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Facility Name:
KING SALMON PLATFORM
Excess Flare Log Report
Month/Year: October 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
10/6/01 0:15 10!8/01 7:30 407 N High pressure shut down on girder OPERATIONAL OTHER: SEE DESC OF EVEN High pressure alarm caused Pipeline inspection will ehlp L-PM-0670
tank platform shutdown, immediately insure continued safe
responsed to stablize production operetions.
and retumed faciltiy to normal
operetions asap.
10/1/01 0:00 10/31/01 24:00 3312 Planned COV's Flared for October OPERATIONAL SCHEDULED MAINTENANCE Shut in production to reduce Pipeling inspection will help
flaring, flared all sales gas to bleed insure continued safe
down piepline for inspection. Pre- operations.
palnning activity ensured a smooth
and minimal shut-down of faciltiy.
10!13101 0:01 10/13/01 23:59 769.27 Y Production shut dawn for piepline OPERATIONAL SCHEDULED MAINTENANCE Shut in production to reduce Solar York Annual Inspection
inspection. flaring, flared all sales gas to bleed
down piepline for inspection. Pre-
palnning activity ensured a smooth
and minimal shut-down of faclltiy.
10/19/01 9:30 10/19/01 16:30 367.21 N shut down due to stuck discharge OPERATIONAL OTHER: SEE DESC OF EVEN Immediately diagnosed problem, Repaired canto/ valve. L-PM-0670
scrubber dump valve repaired control valve, cleaned
lines of condensate and retumed t
normal operations.
Report Date: 11/19/01 Page: 1 of 2
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit November 2001
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected ~
3. Flared or vented less than 1 hour `22;267
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 5,872
5. Pilot and Purge 174
6. Used for lease operations 100,566
7. *Other (Shrinkage) 64,013
TOTAL items 1-7 192,892
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBFF 51,319
11. Transferred to: COV~s to TBFF 4,817
Remarks:
ere y certr y t e orego g isJ-t~ru~e an correct tote est o my owe ge.
Signature: '~~"~./ Title: Acct. Suyer. Date: 11-Dec-O1
*Indicate contribution of each pool to total..
Pool Name Code Percent
Hemlock 520120 83.16%
GGS ~ 520550 0.00%
G Zone 520150 16.32%
W/F 520190 0.53%
Official Use Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use ~ ~•~ Z MCF
3. Conserv. Purposes MCF
~~" ~ I X110 ~-
Commissio r Date
~w
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: KING SALMON PLATFORM Month/Year: November 2001
Date & Time- Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
11/21/01 0:00 11/21/01 18:00 222.83 N Platform shutdown for loss of AC OPERATIONAL UNSCHEDULED MAINTENAN epair generator using parts on Repair generator.
power. Unplanned event -Repair platform, return facility to normal
generator.. operation as soon as possible.
11/26/01 4:45 11/27/01 22:30 1064 N Shut down platform for pipeline OPERATIONAL SCHEDULED MAINTENANCE Plalforn shut-down planned for Returned to operations ASAP.
conversion of service with K-13 conversion of services. Flared all
producing. sales gas to bleed down pipeline.
Pre-planned activity; ensure proper
personnel/equipment on site,
conducted pipeline inspection.
11/26/01 4:45 11/27/01 22:30 .1223 N Shut down plalforn for pipeline OPERATIONAL SCHEDULED MAINTENANCE Platform shut-down planned for Returned to operations ASAP.
conversion of service with K-13 conversion of services. Flared all
producing. salesgas to bleed down pipeline.
Pre-planned activity; ensure proper
personnel/equipment on site,
conducted pipeline inspection.
11/29/01 0:00 11/29/01 23:59 628 N Platdoml shut down for pipeline OPERATIONAL SCHEDULED MAINTENANCE Scheduled maintenance -Shut One time event.
conversion of services with K-13 down platform for service
producng. conversion. Preplanning activityes
to ensure proper personnel and
equipment on site to accomplish
job.
Report Date: 12/12/01 Page: 1 of 2
Excess Flare Log Report
11/30/01 0:00 11/30101 23:59 2534 N Platform shut in for Pipeline
Conversion OPERATIONAL SCHEDULED MAINTENANCE Scheduled maintenance -Shut
down platform for service
conversion. Preplanning activityes
to ensure proper personnel and
equipment on site to accomplish
job. One time event.
Report Date: 12/12/01 Page: 2 of 2
. 6/ _ ___ __ - _ _ _ - _ _ ~~--
"o••.
1 . f ~, ~~ ~+ ' ~
I -=
y .~ ~ • `
~ Q a i -'~' ' i ~ ;
~ ~ ~ ~ ~ L~
_ ~ ~ - ~m ~ -- ,~ `~ J ~ ~' 1 it }•
~ e ,- ,,~ ~ r ,• ' ,
,iii ~ \ ~
! ,,\ /r ,
".
~~
% ;.~ .
_ -
~.
~A t ,
'~_~~ ~
- -
•! •••• ••
,, -
o - - ~/
• e..
- ~W~3
• ., . -
biz ' d X696 ' ON ~` ~ ~ ' ' ~' ' ~~ Wd I 0 : 9 -~ z00z ' 0z 'Sad' '
ALASKA OIL AND GAS CONSERVATION COMMISSION
PRODUCER'S REPORT OF GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
King Salmon Platform - TBU Unocal Trading Bay Unit December 2001
Disposition Total Volumes MCF
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 30,903
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 4,746
5. Pilot and Purge 186
6. Used for lease operations 116,010
7. *Other (Shrinkage) 51,661
TOTAL items 1-7 203,506
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: TBPF 69,253
11. Transferred to: COV's to TBPF 5,288
Remarks:
ere y certt t e oregomg s tru/e an correct o e est o my owe ge.
Signature: :Ea -~ {~G°~'- Title: Acct. Super., Date: 15-Jan-02
*Indicate contribution of each pool to total.
Pool Name Coda Percent
Hemlock 520120 82.77%
GGS 520550 0.00%
G Zone 520150 17.04%
W/F 520190 0.19%
Off cial Use Only -Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use ~ ~ y~ MCF
3. Conserv. Purposes MCF
l~S D ~
Commission Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees F.
Report due by the 20th of the month following the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4195
~~~ / ~~ U"
Excess Flare Log Report
Facility Name
KING SALMON PLATFORM
Month/Year: December 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
12/1/2001 0:00 12/1/2001 23:59 2351 Y Pipeline conversion. Planned
Maintenance. Conversion of service
on oil/gas pipelines. OPERATIONAL SCHEDULED MAINTENANCE Convert gas line to oil svc & ofl line
to gas svc.To minimize vol to flare
prod. SI except K-13 to prevent
damage to reservoir 8 loss of
ultimate recovery. Plan work to
ensure personnel & equip onsite,
blowdn line, convert lines, return
normal operation One time event
12/2/2001 0:00 12/2/2001 23:30 2395 N Pipeline conversion. Planned
Maintenance. Conversion of service
on oil/gas pipelines. OPERATIONAL SCHEDULED MAINTENANCE Convert gas line to oil svc & oil line
to gas svc.To minimize vol to flare
prod. SI except K-13 to prevent
damage to reservoir 8 Toss of
ultimate recovery. Plan work to
ensure personnel & equip onsite,
blowdn line, convert lines, return
nommal operation One time event.
Report Date: 1/15/2002 Page: 1 of 1