Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutUNOCAL- ANNA/BRUCE TANK FARMALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Form 10-422
Rev. 4/95
Facility Operator Field(s) Month/Yeaz of Disposition
Granite Point Tank Famt Unocal Oil and Gas Granite Point January-Ol
Anna Bmce GPTF-AB
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented Beater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations 1,157
7. O[her 0
TOTAL items 1 - 7 1,157
8. NGL gas equivalent produced 0
GPTF-GPP
9. Purchased gas from: GPTF-LEX 0
0
10. Transferred from: GPTF-LEX 1,157
11. Transferred to: GPTF-LEX 5,943
Remarks:
I hereby certify tha he foregoing is tme nd correct to the best of my knowledge.
Signature Title: Acct. Supervisor Date: 2/9/01
*Indicate contribution of each pool to total.
Pool Name Code Percent
.r'
Official Use Only -- Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use ~' MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Granite Point Tank Farm Unocal Oil and Gas Granite Point February-OI
Anna Bruce GPTF-AB
Disposition Volume MCF*
1. Sold 2,404
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge $ ~ 0
6. Used for lease operations ~ 3,748
7.Other ~ ~ 0
~
TOTAL items 1 - 7 `` } ~ 6,152
u ;v~ ~
co
8: NGL gas equivalent produced ~ 0
GPTF-GPP 0
9. Purchased gas from: GPTF-LEX 0
Anna Platform 2,819
l0. Transferred from: Bruce Platform 2,186
GPTF-LEX 1,147 .
1 L Transferred to: GPTF-LEX 2,739
Remarks:
1 hereby certif .that [he foreg ing is true and correct to [he best of my knowledge.
J t
Signature Title: Acct. Supervisor Datc: 3/20/01
*Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only --Flaring Authorization > 1 hr
L Safety MCF
,^-~
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Datc
Note: AlI volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
3~ ~
Form 70-422
pev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSTION
Facility Operator Field(s) Month/Year of Disposition
Granite Point Tank Farm Unocal Oil and Gas Granite Point February-01
Granite Point Platform GPTF-GPP
Disposition Volume MCF*
I. Sold to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than t hour
(Sapplcmental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations 3,143
7.Othcr 0
TOTAL items 1 - 7 3,143
8. NGL gas equivalent produced 0
9. Purchased gas 2,404
Granite Point Plt.
10. Transferred from: GPTF-LEX 3,143
0
11. Transferred to: GPTF-LEX 2,389
Remarks:
1 hereby certify tat the foregoit is true and correct to the best of my knowledge.
Signature ~ ~ Title: Acct. Supervisor Date: 3/20/01
*Indicatc contribution of each pool to total.
Pool Name Code Percent
Official Usc Only -- Flaring Authorization > I hr
1. Safety MCF
2. lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Granite Point Tank Fann LEX Plant Unocal Oil and Gas Granite Point February-Ol
GPTF-LEX
Disposition Volume MCF*
1. Sold to CIGGS
to GPTF-GPP
to GPTF-AB 35,584
0
0
2. Reinjected 0
3. Flared or vented less than 1 hour 676
4. Flared or vented greater than 1 hour
(Supplemental re ort required--See 20 AAC 25.235) 0
5. Pilot and Purge 560
6. Used for lease operations 7,492
7. Other (Meter Error) 1,155
TOTAL items l - 7 45,467
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: GPTF-GPP
GPTF-AB
Granite Point Plt.
Anna Platform
Bruce Platform 2,389
2,739
0
23,366
] 8,120
1 L Transferred to: GPTF-AB
GPTF-GPP 1,147
0
Remarks:
I hereby certify t e foregoing 's true/a~n correct to the best of my knowledge.
Signature ~ t/~ Title: Acct. Supervisor Date: 3/20/OI
*Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only -- Flaring Authorization > l hr
I. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Da[e
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Granite Point Tank Farm Unocal Oil and Gas Granite Point March-0I
Anna Bruce GPTF-AB
Disposition Volume MCF*
L Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than I hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations 1,229
7.Other 0
TOTAL items I - 7 1,229
8. NGL gas equivalent produced 0'
9. Purchased gas from: GPTF-GPP
GPTF-LEX 0
0
10. Transferred from: Anna Platform
Bruce Platform
GPTF-LEX 0
0
1,229
11. Transferred to: GPTF-LEX 3,225
Remarks:
1 hereby certify tat the foregoing is true and correct to the best of my knowledge.
Signature t~ /~ -t±~ ~ l^. Title: Acct. Supervisor Date: 4/6/01
*Indicate contribution of each pool to total.
PoolNamc Code Percent
Official Use Only -- Flaring Authorization > 1 hr
L Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~~~~~~
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSTION
Facility Operator Field(s) Month/Year of Disposition
Granite Point Tank Farm Unocal Oil and Gas Granite Point March-01
Granite Point Platform GPTF-GPP
Disposition Volume MCF*
1. Sold to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Su plemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations 3,583
7, Other 0
TOTAL items l - 7 3,583
8. NGL gas equivalent produced 0'
9. Purchased gas 0
Granite Point Plt.
10. Transferred from: GPTF-LEX 3,583
0
11. Transferred to: GPTF-LEX 2,785
Remarks:
1 hereby certify tl~~t the foregoing. is true and correct to the best of my knowledge.
Si nature ~ %'i~~f~-~ Title: Acct. Supervisor Date: 4/6/01
g
*Indicate contribution of each pool to total
Pool Name Codc Percent
Official Use Only --Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Datc
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Repori due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Fwm 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Gmnite Point Tank Farm LEX Plant Unocal Oil and Gas Granite Point March-Ol
GPTF-LEX
Disposition Volume MCF*
to CIGGS 39,862
1. Sold [o GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than 1 hour 887
4. Flazed or vented greater than 1 hour 86
(Su lemental report re aired--See 20 AAC 25.235)
5. Pilot and Purge 620
6. Used for lease operations 13,212
7. Other (Meter Error) 5,775
TOTAL items I - 7 60,442
8. NGL gas equivalent produced 0
9, Purchased gas 0
GPTF-GPP 2,785
GPTF-AB 3,225
10. Transferred from: Gmnite Point Plt. 651
Anna Platform 31,970
Bruce Platform 23,040
GPTF-AB 1,229
l 1. Transferred to: GPTF-GPP 0
Remarks:
[ hereby certify that the foregoin is true and correct to the best of my knowledge.
?
f~,
~~,
~ C ~
i
S
4/6/01
i
/
Signature
: T
tle: Acct. uperv
sor Date:
i
*Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only -- Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note; All volumes must be corrected to
pressttre of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form -
Rev:4/95
Excess Flare Log Report
Facility Name: GRANITE POINT TANK FARM Month/Year: March 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
3/21/01 0:00 3/21/01 23:59 19 N ANNA PLATFORM SHUT-IN
PIGGING GAS LINE OPERATIONAL SCHEDULED MAINTENANCE SHUT DOWN ARIEDL GAS
COMPRESSOR &VRU
3/29/01 0:00 3/29/01 23:59 67 N ANNA PLATFORM SHUT-IN
PIGGING GAS LINE OPERATIONAL SCHEDULED MAINTENANCE SHUT DOWN ARIEL GAS
COMPRESSOR AND VRU
Report Date: 4/5/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION. COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
Granite Point Tank Farm Unocal Oil and Gas Granite Point April-Ol
Anna Bruce GPTF-AB
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations 1,108
7. Other 0
TOTAL items l - 7 1,108
8. NGL gas equivalent produced 0
GPTF-GPP
9. Purchased gas from: GPTF-LEX 0
0
Anna Platform
10. Transferred from: Bruce Platform
GPTF-LEX 0
0
1,108
1 t. Transferced to: GPTF-LEX 3,635
Remazks:
I hereby certify that the foregoing is tme and cooed to the best of my knowledge.
// ~
Signature Q. (/~ Title: Acd. Supervisor Date: 5/15/01
*Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only- Flaring 9uthorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes ` MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20dt of the
month following the month of disposition.
Authority 20 AAC 25.235
~~ / ~
Form 10-022
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSTION
Facility Operator Field(s) Month/Year of Disposition
Granite Point Tank Farm Unocal Oil and Gas Granite Point April-01
Granite Point Platform GPTF-GPP
Disposition Volume MCF*
1. Sold to GPTF-AB 0
2. Reinjected 0
3. Flazed or vented less than I hour 0
4. Flazed or vented greater than I hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations 3,179
7. Other 0
TOTAL items 1 - 7 3,179
8. NGL gas equivalent produced 0
9. Purchased gas 0
Granite Point Plt.
10. Transferred from: GPTF-LEX 3,179
0
l1. Transferred to: GPTF-LEX 3,105
Remarks:
I hereby certify that the foregoing is re an/dJcorrect to the best of my knowledge.
Signature U,~ Title: Acct. Supervisor Date: 5/15/01
*Indicate contribution of each pool to total
Pool Name Code Percent
Official Use Only -- Flaring Authorization> l ht
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner" Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4195
ALASKA OIL AND GAS .CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
Granite Point Tank Farm LEX Plant Unocal Oil and Gas Granite Point April-01
GPTF-LEX
Disposition Volume MCF*
to CIGGS
1. Sold to GPTF-GPP
to GPTF-AB 44,650
0
0
2. Reinjected 0
3. Flazed or vented less than 1 hour 878
4. Flared or vented Beater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 43
5. Pilot and Purge 600
6. Used for lease operations 12,691
7.Other (Meter Error) 3,433
TOTAL items I - 7 62,295
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP
GPTF-AB
10. Transferred from: Granite Point Plt.
Anna Platform
Bruce Platform 3,105
3,635
2,965
30,311
23,387
GPTF-AB
11. Transferred to: GPTF-GPP 1,108
0
Remazks:
I hereby certify that the foregoing is tore and correct to the best of my knowledge.
Signature ~~ Title: Acct. Supervisor Date: 5/15/O2
Form 10422
Rev. 4/95
*Indicate contribution of each pool to total.
Pooi Name Code Percent
Official Use Only -- Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name: GRANITE POINT TANK FARM Month/Year: April 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
4/18/01 0:00 4/18101 11:00 10 Y SCHEDULED MAINTENANCE OF
VRU 8 ARIEL COMPRESSOR OPERATIONAL SCHEDULED MAINTENANCE SHUT DOWN VRU &ARIEL GAS
COMPRESSOR FOR
MAINTENANCE MAINTENANCE T-H-3420
4/28/01 7:00 4/28/01 14:00 13 Y SENDING GAS BACK TO THE ANNA
PLATFORM OPERATIONAL SCHEDULED MAINTENANCE SHUT DOWN ARIEL GAS
COMPRESSOR AND VRU MAINTENANCE
4/30/01 3:00 4/30/01 23:59 20 Y SHUT DOWN VRU OPERATIONAL SCHEDULED MAINTENANCE SENT IN RELIEF VALVES FOR
TESTING AND REPAIRS MP;INTENACNE
Report Date: 5/15/01 Page: 1 of 1
c,
ALASKA OIL AND GAS CONSERVATION .COMMISSION
FACILITY REPORT OF PRODUCED GAS DLSPOSITION
Fom, ro~azz
Rev. 4/95
Facility Operator Field(s) Month/Year of Disposition
Granite Point Tank Farm Unocal Oil and Gas Granite Point May-Ol
Anna Bruce GPTF-AB
Disposition Volume MCF'
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge ~ . 0
6. Used for lease operations 1,078
7.Other 0
TOTAL items 1 - 7 1,078
8. NGL gas equivalent produced 0
GPTF-GPP
9. Purchased gas from:. GPTF-LEX 0
0
Anna Platform
10. Transferred from: Bmce Platform
GPTF-LEX 0
0
1,078
1 I. Transferred to: GPTF-LEX 3,650
Remarks:
I hereby certify that the foregoing is tm/e/a7nd~ c~orrJect to the best of my lmowledga
Signature Q L/wJG/ Title: Acct. Supervisor Date: 6/13/01
'Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only - FLuing Autltorization> 1 hr
t. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~"~dl~~,
V ~®
zoos
Alaska Oil & Gas Cons. Commission
Anchorage
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DCSPOSTION
Facility Operator Field(s) Month/Year of Disposition
Granite Point Tank Faun Unocal Oil and Gas Granite Point May-Ol
Granite Poin[ Platform GPTF-GPP
Disposition Volume MCF'
1. Sold to GPTF-AB 0
2. Reinjected 0
3. Flazed or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental reportrequired--See 20 AAC 25.235) 0
5. Pilot and Purge. 0
6. Used for lease operations 3,085
7. Other 0
TOTAL items 1- 7 3,085
8. NGL gas equivalent produced 0
9. Purchased gas 0
Granite Point Plt.
10. Transfemd from: GPTF-LEX 3,085
0
11. Transferred to: GPTF-LEX 3,065
Remarks:
I hereby certify that the foregoing s tm//eand coned to the best of my Imowledge.
Signature (!lGV~ Title: Acct. Supervisor Date: 6/13/01
'Indicate contribution of each pool to total
Pool Name Code Percent
t
Official Use Only -Flaring Authorization> 1 lu
i. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 1P422
Rev. 4195
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Granite Point Tank Farm LEX Plant Unocal Oil and Gas Granite Point May-Ol
GPTF-LEX
Disposition Volume MCF"
to CIGGS 47,471
1. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than 1 hour 748
4. Flared or vented greater than 1 hour 92
(Supplemental reportrequired-See 20 AAC 25.235)
t
5. Pilot and Purge 620
6. Used for lease operations 12,600
7.Other (Meter Error) 2,116
TOTAL items 1- 7 63,647
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 3,065
GPTF-AB 3,650
10. Transferred from: Granite Point Plt. 3,328
Anna Platforrrt 31,502
Brace Platform 23,180
GPTF-AB 1,078
11. Transferred to: GPTF-GPP 0
Remarks:
I hereby certify t t the foregoing is ctto the best of my lmowledge.
re and c
orr
e
~ y
'
p
$igaature "-' `-' Title: Acct. Supervisor Date: 6/13/01
"Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only -- Flaring Authorization > l hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following dte month of disposition.
Authority 20 AAC 25.235
Form t0-422
Rev. 4195
Excess Flare Log Report
Facility Name: GRANITE POINT TANK FARM Month/Year: May 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
5/1/01 0:00 5/1/01 23:59 29 Y SHUT DOWN VRU. SCHEDULED OPERATIONAL SCHEDULED MAINTENANCE SENT IN RELIEF VALVES FOR BOTH RELIEF VALVES WERE T-H-3420
YEARLY MAINTENANCE. TESTING AND REPAIRS. SENT IN FOR REPAIRS AT
THE SAME TIME TO
MINIMIZE FUTURE
DOWNTIME.
5/2/01 0:00 5/2/01 23:59 27 Y SHUT DOWN VRU. SCHEDULED OPERATIONAL SCHEDULED MAINTENANCE SENT IN RELIEF VALVES FOR BOTH RELIEF VALVES WERE T-H-3420
YEARLY MAINTENANCE. TESTING AND REPAIRS. SENT IN FOR REPAIRS AT
THE SAME TIME TO
MINIMIZE FUTURE
DOWNTIME.
5/3/01 0:00 5/3/01 17:00 25 Y SHUT DOWN VRU. SCHEDULED OPERATIONAL SCHEDULED MAINTENANCE SENT IN RELIEF VALVES FOR BOTH RELIEF VALVES WERE T-H-3420
YEARLY MAINTENANCE TESTING AND REPAIRS. SENT IN FOR REPAIRS AT
THE SAME TIME TO
~ MINIMIZE FUTURE
DOWNTIME.
5/19/01 0:00 5/19/01 6:45 6 Y ANNA PLATFORM SHUT DOWN IN OPERATIONAL SCHEDULED MAINTENANCE SHUT DOWN COMPRESSSOR ALL NECESSARY PERONNEL T-H-3420
ORDER TO REPLACE DAMAGED AND VRU. SENT GAS BACK TO AND MATERIALS ONBAARD
PIPING. ANNA TO KEEP PLATFOMR ANNA BEFORE SHUTTING
LIGHTS WORKING. DOWN FACILITY. GPTF
RESTARTED ASAP.
5/21/01 0:00 5!21/01 14:00 5 Y BRUCE SCHEDULED OPERATIONAL SCHEDULED MAINTENANCE SHUT DOWN COMPRESSOR PERSONNEL AND T-H-3420
MAINTENANCE. QUARTERLY AND VRU DUE TO LOW GAS EQUIPMENT ONBOARD
MAINTENANCE ON BRUCE VOLUMES. PLATFOMRS TO ENSURE
PLATFORM GAS COMPRESSOR. MAINIMAL DOWNTIME.
ANNA UNSCHEDULED GPTF RESTART ASAR
MAINTENANCE. ANNA PLATFORM
FWKO VRU HAD MECHANICAL
VIBRATION PROBLEM; UNIT
CHANGED OUT WITH ONBOARD
BACKUP UNIT.
Report Date: 6/14/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
Granite Point Tank Fazm Unocal Oil and Gas Granite Point July-01
Atuta Bruce GPTF-AB
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flazed or vented less than 1 hour 0
4. Flazed or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations 791
7. Other 0
TOTAL items 1 - 7 791
8. NGL gas equivalent produced 0
GPTF-GPP
9. Purchased gas from: GPTF-LF.X 0
0
Anna Platform
10. Transferred from: Bmce Platform
GPTF-LEX 0
0
791
11. Transferred to: GPTF-LEX 5,937
Remarks:
I hereby certify at the foregoing is true a~ndJco/rre)ct to the best of my knowledge.
Signature ~/~'C! Title: Acct. Supervisor Date: 8/9/2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only --Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Dau
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
f~~~„
form 10-422
Rev. 4/BS
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSTION
Facility Operator Field(s) Mon[h/Yeaz of Disposition
Granite Point Tank Farm Unocal Oil and Gas Granite Point July-Ol
Granite Point Platform GPTF-GPP
Disposition Volume MCF*
1. Sald to GPTF-AB 0
2. Reinjected 0
3. Flazed or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations 2,906
7. Other 0
TOTAL items 1 - 7 2,906
8. NGL gas equivalent produced 0
9. Purchased gas 0
Granite Point Plt.
10. Transferred from: GPTF-LEX 2,906
0
11. Transferred to: GPTF-LEX 4,975
Remazks:
[ hereby certify at the foregoing ' true aln~d correct to the best of my knowledge.
Signature ~~'~4~`L Title: Acct. Supervisor Date: 8/9/2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only -- Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All voluttu•s must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 1(F422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
Granite Point Tank Farm LEX Plant Unocal Oil and Gas Granite Point July-Ol
GPTF-LEX
Disposition Volume MCF*
1. Sold to CIGGS
to GPTF-GPP
to GPTF-AB 49,874
0
0
2. Reinjected 0
3. Flared or vented less than I hour 1,164
4. Flared or vented greater than 1 hour
(Supplememal report required-See 20 AAC 25.235) 43
5. Pilot and Porge 620
6. Used for lease operations 9,608
7. Other (Meter Error) 8,360
TOTAL items 1 - 7 69,669
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: GPTF-GPP
GPTF-AB
Granite Point Plt.
Anna Platform
Bruce Platform 4,975
5,937
4,586
29,737
25,225
11. Transferred to: GPTF-AB
GPTF-GPP 791
0
Remarks:
I hereby certify that the foregoin is tme and correct to the best of my knowledge.
Signatur ~ Tide: Acct. Supervisor Date: 8/9/2001
Form 16422
Rev.4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only -- Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissiooer Date
Note; All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name: GRANITE POINT TANK FARM Month/Year: July 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
7118/01 10:00 7/18/01 13:00 14 Y VRU shut down on Pressure Alam
Low Load (PALL) interstage. OPERATIONAL UNSCHEDULED MAINTENANCE Immediately repair VRU, return
facility to normal operation as soon
as possible. Repair VRU. T-H-3420
7/19/01 13:00 7/19/01 17:00 16 Y Planned Shut down of VRU.
Unscheduled maintenance preformed:
inspected and replaced a suction and
discharge valve. OPERATIONAL SCHEDULED MAINTENANCE Shut down VRU. Inspected and
replaced a suction and discharge
valve. T-H-3420
7120/01 13:00 7/20/01 17:00 13 N VRU A 1st and 2nd stg temperatures
h(gh. OPERATIONAL UNSCHEDULED MAINTENANCE Shut down VRU for inspection. T-H-3420
Report Date: 8/15/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
Granite Point Tank Farm Unocal Oil and Gas Granite Point August-Ol
Anna Bruce GPTF-AB
Disposition Volume MCF*
~i. Sold 0
2. Reinjected 0
3. Flazed or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations 711
7. Other 0
TOTAL items 1 - 7 711
8. NGL gas equivalent produced 0
9. Purchased gas from: GPTF-GPP
GPTF-LEX 0
0
10. Transferred from: Anna Platform
Bruce Platform
GPTF-LEX 0
0
711
11. Transferred to: GPTF-LEX 4,385
Remarks:
I hereby certif a otegoing is
Signature a and correct to the best of my knowledge.
~ Title: Acct. Supervisor Date: 9/10/2001
*Indica[e contribution of each pool to total..
Pool Name Code Percent
Official Use Only-- Flaring Authorization > 1 hr
1. Safety ~` MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
-II /~ N
~~ o~
Farm iP422
Rev. 4/95
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility . Operator Field(s) Month/Yeaz of Disposition
Granite Point Tank Farm Unocal Oil and Gas Granite Point September-01
Anna Bruce GPTF-AB
Disposition Volume MCF'
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour ~1.
0
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations 718
7. Other 0
TOTAL items 1 - 7 718
S. NGL gas equivalent produced 0
9. Purchased gas from: GPTF-GPP
GPTF-LEX 0
0
10. Transferred from: Anna Platform
Bruce Platform
GPTF-LEX 0
0
718
11. Transferred to: .GPTF-LEX 5,733
Remarks:
I heretiy certify that the foregoing is tr
Signature a and/co/rrec~t jto the best of my knowledge.
~fr~~ Title: Acct. Supervisor Date: 10/5/2001
•Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use ONy -Flaring Authorizatiod > f hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSTION
Facility Operator Field(s) Month/Yeaz of Disposition
Granite Point Tank Farm Unocal Oil and Gas Granite Point September-01
Granite Point Platform GPTF-GPP
Disposition Volume MCF*
1. Sold to GPTF-AB 0
2. Reinjected 0
,1.
3. Flazed or vented less than 1 hour -
0
4. Flazed or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations 3,014
7. Other 0
TOTAL items 1 - 7 3,014
8. NGL gas equivalent produced 0
9. Purchased gas 0
Granite Point Plt.
10. Transferred from: GPTF-LEX 3,014
0
11. Transferred to: GPTF-LEX 4,699
Remarks:
I hereby certify at the foregoing i true and correct to the best of my knowledge.
/r
Signature ?(/f.~ Title: Acct. Supervisor Date: 10/5/2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only -- Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a tetnperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10.442
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Granite Poim Tank Farm LEX Plant Unocal Oil and Gas Granite Point September-01
GPTF-LEX
Disposition Volume MCF*
to CIGGS 43,896
1. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
~~~~
-
3. Flared or vented less than 1 hour 1,347
4. Flared or vented greater than 1 hots 0
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 600
6. Used for lease operations 9,347
7. Other (Meter Error) 8,929
TOTAL items 1 - 7 64,119
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 4,699
GPTF-AB 5,733
10. Transferred from: Granite Point Plt. 1,036
Anna Platform 30,264
Bruce Platform 23,105
GPTF-AB 718
11. Transferred to: GPTF-GPP 0
Remarks:
I hereby certify that the foregoing 's we and correct to the best of my knowledge.
Signature ~! - ~ J Title: Acct. Supervisor Date: 10/5/2001
Form to-a22
Rev. U95
*Indirate convibution of each pool to total.
Pool Name Code Percent
Official Use Only -- Flaring Authorizazion > 1 hr
1. Safety MCF
2: Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name: GRANITE POINT TANK FARM Month/Year: September 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
Report Date: 10/4/2001 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
Granite point Tank Farm Unocal Oil and Gas Granite Point October-01
Anna Bmce GPTF-AB
Disposition Volume MCF*
I. Sold 0
2. Reinjected 0
3. Flazed or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations IS
7.Other 0
TOTAL items 1 - 7 15
8. NGL gas equivalent produced 0
9. Purchased gas from: GPTF-GPP
GPTF-LEX 0
0
10. Transferred from: Anna Platform
Bruce Platform
GPTF-LEX 0
0
15
11. Transferred to: GPTF-LEX 3,450
Remarks:
I hereby certify that the foregoing is true and correct to the best of my Imowledge.
Signature ~ '~ Title: Acct. Supervisor Date: 11/9/01
*Indicate conhibution of each pool to total.
Pool Name Code Percent
Official Use Only -- Flazing Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Farm 10-422
Rev. 4/95
ALASKA OIL AND. GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Mon[h/Yeaz of Disposition
Granite Point Tank Farm Unocal Oil and Gas Granite Point November-Ol
Anna Bmce GPTF-AB
Disposition Volume MCF*
1. Sold 704
2. Reinjected 0
3. Flazed or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 2S.23S) 0
S. Pilot and Purge 0
6. Used for lease operations 1,096
7. Other 0
TOTAL items t - 7 1,800
8. NGL gas equivalent produced 0
GPTF-GPP
9. Purchased gas from: GPTF-LEX 0
0
Anna Platform
10. Transferred from: Bruce Platform
GPTF-LEX 0
0
1,800
l 1. Transferred to: GPTF-LEX 3,179
Remazks:
I hereby certify that the foregoing '~ true and correct to the best of my knowledge.
7
/ ~ ~l ~
d
Signature .~'t i• ^~+~'' Title: Acct. Supervisor Date:
2/10/01
*Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only -Flaring Audrorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Granite Point Tank Farm Unocal Oil and Gas Granite Point December-01
Anna Bruce GPTF-AB
Disposition Volume MCF*
1. Sold 454
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations 1,593
7. Other 0
TOTAL items 1 - 7 2,047
8. NGL gas equivalent produced 0
GPTF-GPP
9. Purchased gas from: GPTF-LEX 0
0
Anna Platform
10. Transferred from: Bruce Platform
GPTF-LEX 0
0
2,047
11. Transferred to: GPTF-LEX 1,613
Remarks:
I hereby certify at the foregoin is true//and correct to the best of my knowledge.
Signatur %~ G Title: Acct. Supervisor Date: 1/15/2002
*[ndicate contribution of each pool to total.
Pool Natne Code Percent
Official UsoOnly -- Flaring-Authorization > t he
1. Safety ' _ MCF
2. Lease Use ~~ ~.~ MCF
3. Conserv. Purposes ~~~ MCF
~.
`
~~ ~ ~ ~/, '
Co ssioner
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4/05