Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutUNOCAL- GRANITE PT PLATFORMALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JANUARY 2001 Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name Code Percent 1. Sold O MIDDLE KENAI 280150 87.64 2. Reinjected o HEMLOCK UNDEFINED 280152 12.36 3. Flared or vented less than 1 hour 1,767 ~: , , ,r,, ~,,,~ 4. Flared or vented greater than 1 hour 0 ~ ~ ~ ~V ~L.,~ (Supplemental report required- See 20 AAC 25.235) 5. Pilot and Purge 620 6. Used for lease operations 43,955 crs. om ~ssior~ A choracle 7. Other 0 TOTAL items 1 - 7 46 , 342 8. NGL gas equivalent produced o 9. Purchased gas 44 10. Transferred from: 0 11. Transferred to: 6,206 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature /~~~1~ Title ACCOUNTING SUPERVISOR Date 02/14/2001 Form 10-422 Rev. 4/95 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 3/'%"~ Excess Flare Log Report Facility Name: GRANITE POINT PLATFORM Month/Year: January 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken_ Minimize Recurrence MP-2 ID Number Report Date: 2/6/01. Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) onth/Year of Disposition GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD FEBRUARY 2001 Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name Code Percent 1. Sold o MIDDLE KENAI 280150 76.76 2. Reinjected o HEMLOCK UNDEFINED 280152 23.24 3. Flared or vented less than 1 hour 543 4. Flared or vented greater than 1 hour 2,555 (Sapplemeatel report required -See 20 AAC 25.235) 5. Pilot and Purge 560 ,. 6. Used for lease operations - =~ 36,682 7. Other -a~ Q % s o TOTAL items 1- 7 ~ 40,340 8. NGL gas equivalent produced o 9. Purchased gas 1,294 10. Transferred from: o 11. Transferred to: 3,143 nemarxs I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature~~~ ~~s//~) Title ACCOUNTING SUPERVISOR Date 03/19/2001 Form 10-422 Rev, 4/95 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ..i Excess Flare Log Report Facility Name: GRANITE POINT PLATFORM Month/Year: February 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 2/13/01.0:00 .2/13/01 23:59 444 N COMPRESSOR SHUT DOWN FOR HYDRO TESTING SAFETY UNSCHEDULED MAINTENANCE COMPRESSOR SHUT DOWN FOR HYDRO TESTING Z/14/01 0:01 .2/14/01 4:00 278 N MAKEUP GAS VALVE 1091 LEAKING BY OPERATIONAL UNSCHEDULED MAINTENANCE MANUALLY BLOCKED 1091 HYDRO TEST PIPELINE 2/15/01 12:00 2/15/01 23:59 867 N CENTAUR SHUT-IN FOR HYDROTEST OPERATIONAL UNSCHEDULED MAINTENANCE CENTAUR SHUT-IN FOR HYDROTEST 2/16/01 1:00 2/16!01 22:00 866 N BRINGING ALL WELLS ON AFTER SHUT-IN OPERATIONAL BLOW DOWN WELL STABILIZE PRODUCTION Report Date: 3/8/01 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD MARCH 2001 Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name Code Percent 1. Sold 0 MIDDLE KENAI 280150 65.36 Z. Reinjected 0 HEMLOCK UNDEFINED 280152 34.64 3. Flared or vented less than 1 hour 119 4. Flared or vented greater than 1 hour 560 (Supplemental report required- See 20 AAC 25.235) 5. Pilot and Purge 620 6. Used for lease operations 42,831 7 Oth r 0 e TOTAL items 1 - 7 44,130 S. NGL gas equivalent produced o 9. Purchased gas 436 10. Transferred from: 0 11. Transferred to: 4,234 xemarxs: Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 I hereby certify that the foregoing is true and correct to the best of my knowledge. 1 .. Signature ~~ %~k ~ y, `~~~ Title ACCOUNTING SUPERVISOR Date 04/06/2001 ~3 /~vv Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: GRANITE POINT PLATFORM Month/Year: March 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 3/23/01 3:30 3/23/01 4:35 328 N SHUT DOWN CENTAUR COP TO REBOOT THE PLC OPERATIONAL SCHEDULED MAINTENANCE REBOOTED PLC AND BROUGHT CENTAUR AND WELLS BACK ON P-PM-1270 3/24/01 0:00 3/24/01 7:00 232 N GAS BACK FROM TANK FARM DUE TO CENTAUR SHUT DOWN TO REBOOT PLC OPERATIONAL SCHEDULED MAINTENANCE SHUT DOWN GAS BUY BACK WHEN WELLS STABILIZED P-PM-1270 Report Date: 4/6/01 Page: 1 of 1 i ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD APRIL 2001 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour 190 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) 64 5. Pilot and Purge 600 6. Used for lease operations 40.994 7.Other o TOTAL items 1- 7 41,84s 8. NGL gas equivalent produced o 9. Purchased gas o 10. Transferred from: o 11. Transferred to: 6,144 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~!/~ Title ACCOUNTING SUPERVISOR Date 05/15/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 81.94 HEMLOCK UNDEFINED 280152 18.06 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 '~(~,`% Excess Flare Log Report Facility Name: GRANITE POINT PLATFORM Month/Year: April 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 4/28/01 9:30 4/28/01 15:30 64 Y SHUT DOWN WATER INJECTION PUMPS OPERATIONAL SCFIEDULED MAINTENANCE WATER FLOOD DOWN, FLARING EXCESS FUEL GAS Report Date: 5/9/01 Page: 1 of 1 -- _ _ -- p ~ ~~~ V ~~ ALASKA OIL AND GAS CONSERVATION COMMISSION SUN 19 2001 FACILITY REPORT OF PRODUCED GAS DISPOSITION Alaska Oii & Gas Cons. Cammission Anchorage Facility Operator Field(s) Month/Year of Disposition GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD MAY 2001 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour 19s 4. Flared or vented greater than 1 hour (Supplemental report rcquire~! -See 20 AAC 25.235) 5,166 5. Pilot and Purge 620 6. Used for lease operations 44,056 7. Other o TOTAL items 1- 7 50, 040 8. NGL gas equivalent produced o 9. Purchased gas 7.678 10. Transferred from: o 11. Transferred to: 6,413 Remarks: I hereby certify that the forego~in/g~is true and correct to the best of my knowledge. Signature ~~~,~~~ ,~~,~`v Title ACCOUNTING SUPERVISOR Date 06/07/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI ~ 280150 81.99 HEMLOCK UNDEFINED 280152 18.01 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ~~ 3~~~` Excess Flare Log Report Facility Name: GRANITE POINT PLATFORM Month/Year: May 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 5/10/01 12:00 5/10/01 17:00 143 Y A.O.G.C. inspection. Scheduled OPERATIONAL SCHEDULED MAINTENANCE Completed inspection with State Completed inspection with State maintenance of surface and inspector; returend to normal inspector and took opportunity to subsurface safety valves. operations. check safety alarms while equipment was down. Retumed to normal operations. 5/19/01 0:00 5/19/01 4:00 387 Y GAS COMPRESSOR SHUT DOWN. OPERATIONAL SCHEDULED MAINTENANCE Checked combusition chamber, Completed inspection with State 4000 HR. SCHEDULED presuure washed the interstage inspector and took opportunity to MAINTENANCE. coolers, changed filters. Used check safety alarms while down time to conduct safety alarms equipment was down. Returned to checks. normal operations. 5/21/01 12:00 5/21/01 23:59 281 Y PRESSURING UP AND BLOWING OPERATIONAL BLOW DOWN WELL Wellhead production valves were CONFIRMED WELLS WERE DOWN WELLS shut to reserve gas for compressor STABILIZED BEFORE BRINGING start-up. Gas was released from ONLINE, CONTINUED well at start-up. MONITORING TO ENSURE WELLS CONTRINED TO BE STABLE. 5122/01 21:30 5122/01 22:45 448 N GAS COMPRESSOR DOWN FOR 1 OPERATIONAL BLOW DOWN WELL Wellhead production valves were CONFIRMED WELLS WERE P-PM-1270 HOUR AND 15 MIN. shut to reserve gas for compressor STABILIZED BEFORE BRINGING start-up. Gas was released from ONLINE, CONTINUED well at start-up. MONITORING TO ENSURE WELLS CONTRNED TO BE STABLE. 5/23/01 13:30 5/23/01 23:59 1594 N GAS COMP. TROUBLE, DOWN OPERATIONAL BLOW DOWN WELL Wellhead production valves were CONFIRMED WELLS WERE P-PM-1270 TWICE . TRYING TO PRESSURE shut to reserve gas for compressor STABILIZED BEFORE BRINGING UP AND BLOW DOWN WELLS start-up. Gas was released from ONLINE, CONTINUED well at start-up. MONITORING TO ENSURE WELLS CONTRINED TO BE STABLE. 5/24/01 4:00 5124/01 6:00 1409 N Gas Comp. trouble, pressuring up OPERATIONAL BLOW DOWN WELL Wellhead production valves were CONFIRMED WELLS WERE P-PM-1270 and blowing down wells shut to reserve gas for compressor STABILIZED BEFORE BRINGING start-up. Gas was released from ONLINE, CONTINUED well at start-up. MONITORING TO ENSURE WELLS CONTRINED TO BE STABLE. 5/25/01 4:00 5125/01 20:30 687 N BLOWING DOWN WELLS, WELL OPERATIONAL BLOW DOWN WELL Wellhead production valves were CONFIRMED WELLS WERE SPIKES shut to reserve gas for compressor STABILIZED BEFORE BRINGING start-up. Gas was released from ONLINE, CONTINUED well at start-up. MONITORING TO ENSURE WELLS CONTRINED TO BE STABLE. 5/26/01 7:00 5/26/01 12:30 216 N UNSTABLE WELLS, WELL SPIKES OPERATIONAL WELL SPIKES ADJUSTED GAS INJECTION TO CONFIRMED WELLS WERE MINIMIZE WELL'S TENDENCY TO STABILIZED BEFORE BRINGING LOAD WITH WATER AND "SPIKE". ONLINE, CONTINUED MONITORING TO ENSURE WELLS CONTRNED TO BE STABLE. Report Date: 6/14/01 Page: 1 of 1 K~C%EtV~D JUL 2 0 2001 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Alaska Oil & Gas Cons. Commission Anchorage Facility Operator Field(s) Month/Year of Disposition GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JUNE 2001 Disposition Volume MCF* 1.5o1d o 2. Reinjected o 3. Flared or vented less than 1 hour 252 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) o 5. Pilot and Purge 600 6. Used for lease operations 40,946 7. Other O TOTAL items 1- 7 41, 79s 8. NGL gas equivalent produced o 9. Purchased gas 247 10. Transferred from: o 11. Transferred to: 7,762 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature~ye~~~v~ Title ACCOUNTING SUPERVISOR Date 07/17/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 85.43 HEMLOCK UNDEFINED 280152 14.57 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 3~1~r1z Excess Flare Log Report Facility Name: GRANITE POINT PLATFORM Month/Year: June 2001 - -- -- Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number Report Date: 7/18/01 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JULY 2001 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour 234 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) o 5. Pilot and Purge 620 6. Used for lease operations 53.494 7. Other 0 TOTAL items 1- 7 54.348 8. NGL gas equivalent produced o 9. Purchased gas 433 10. Transferred from: o 11. Transferred to: 7,492 Remarks: I hereby certify that the fore oing is true and correct to the best of my knowledge. Signature /~~,y~~ D,/~~ Title ACCOUNTING SUPERVISOR Date 08/09/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 87.52 HEMLOCK UNDEFINED 280152 12.48 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ~~ Excess Flare Log Report Facility Name: GRANITE POINT PLATFORM Month/Year: July 2001 Date & Time Event Gas Steps Taken to Equipment Down Be in End MCF Planned? Descri lion of Incident Cate or Reason Actions Taken Minimize Recurrence MP-2 ID Number Report Date: 8/2/2001 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD AUGUST 2001 Disposition Volume MCF* 1. Sold 0 2. Reinjected o 3. Flared or vented less than 1 hour 681 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) o 5. Pilot and Purge 620 6. Used for lease operations 40,179 7. Other o TOTAL items 1- 7 41.480 8. NGL gas equivalent produced 0 9. Purchased gas 3,570 10. Transferred from: o 11. Transferred to: 6.026 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. . Signature ~~~ ~ ~~~ Title ACCOUNTING SUPERVISOR Date 09/10/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. .Pool Name Code Percent MIDDLE KENAI 280150 87.96 HEMLOCK UNDEFINED 280152 12.04 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 ~~ ALASKA OIL AND GAS CONSERVATION COMMISSION. FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD SEPTEM8ER2001 Disposition Volume MCF* 1. Sold o 2. Reinjected ~x. 0 3. Flared or vented less than 1 hour 1,585 4. Flared or vented greater than 1 hour (Supplemental report required- See 20 AAC 25.235) o 5. Pilot and Purge 600 6. Used for lease operations 39,942 7.Other o TOTAL items 1- 7 42.127 8. NGL gas equivalent produced o 9. Purchased gas 903 10. Transferred from: o 11. Transferred to: 4,050 Remarks: I hereby certify.that the foregoing is true and correct to the best of my knowledge. Signature ~~~ f L ~!~/~iC.o% Title ACCOUNTING SUPERVISOR Date 10/05/2001 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 87.91 HEMLOCK UNDEFINED 280152 12.09 Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Excess Flare Log Report Facility Name: GRANITE POINT PLATFORM Month/Year: September 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 1D Number Report Date: 10/4/2001 Page: 1 of 1 ALASKA- OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES I GRANITE POINT FIELD Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour 84 ' 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 337 5. Pilot and Purge 620 6. Used for lease operations 54.921 7. Other o TOTAL items 1 - 7 55 962 8. NGL gas equivalent produced o 9. Purchased gas 17s 10. Transferred from: 0 11. Transferred to: 4 , 056 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~~~~ /~ ~C~~ Title ACCOUNTING SUPERVISOR Date 11/09/2001 Form 10-422 Rev. 4/95 'ear of Dispo OCTOBER 2001 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI - 280150 89.20 HEMLOCK UNDEFINED 280152 10.80 4 ~.ri~ . ~w Ar~i^h~r~ 1. Safety MCF 2. Lease Use 33~- MCF 3. Conserv. Purposes MCF Commissi er Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 Excess Flare Log Report Facility Name:. GRANITE POINT PLATFORM Month/Year: October 2001 Date 8 Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 10/1/2001 0:39 10/1/2001 22:40 261 N Gas compressor shut down on low suction pressure; unload gas compressor; suspend gas sales. Unscheduled maintenance. OPERATIONAL UNSCHEDULED MAINTENANCE Immediately commence work to bring compressor back on line, flush line to clean out distillates, reload wells, and bring facility back to nomtal operations ASAP. Normal oil field operation. P-PM-1270 10/10/2001 0:01 10/10/2001 23:59 60 Y GP Tank Farm unable to accept gas because of inspection work on Chak pipeline, gas flared pending completion of work. Scheduled maintenance - P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Pre-planned pipeline inspection work, Chak pipeline returned to normal operation ASAP. _ Pipeline inspection will help insure continued safe operations. 10/11/2001 0:01 10/11/2001 23:59 16 Y GP Tank Farm unable to accept gas because of inspection work on Chak pipeline, gas flared pending completion of work. Scheduled maintenance - P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Pre-planned pipeline inspection work, Chak pipeline returned to normal operation ASAP. Pipeline inspection will help insure continued safe operations. Report Date: 11/9/2001 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility GRANITE POINT PLATFORM Operator UNOCAL ALASKA RESOURCES Field(s) GRANITE POINT FIELD Month/Year of Disposition NOVEMBER 2001 Disposition Volume MCF* *Indicate contribution of each pool to total. Sold 1 o Pool Name Code Percent . MIDDLE KENAI - 280150 90.44 2. Reinjected D HEMLOCK UNDEFINED 280152 9.56 3. Flared or vented less than 1 hour 81 4. Flared or vented greater than 1 hour 20 AAC 25 235 l t l t i d S S 230 ,~ ~ x. ,~,' . ) emen a repor requ re - ee ( upp .~ ~ ;~~~ 5. Pilot and Pnrge 500 ! 6. Used for lease operations 40,954 "~ .y `" ~'stbz t1{,rdC~+= °` 7 Other o . TOT i m 1-7 AL to s 41 865 1 Safet MCF . y 8. NGL gas equivalent produced o 2. Lease Use a 3 (~ MCF 9. Purchased gas 32 3. Conserv. P os s MCF 10. Transferred from: o ~ 11. Transferred to: 2.920 ~ ommissi er Date Remarks: Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of I hereby certify that the foregoing is true and correct to the best of my knowledge. 60 degrees F. Report due by the 20th of the ~ Title ACCOUNTING SUPERVISOR Date 12/07/2001 month following the month of disposition. Signature ~~L~~~g;~~~ Authority 20 AAC 25.235 Form 10-422 Rev. 4/95 Excess Flare Log Report Facility Name: GRANITE POINT PLATFORM Month/Year: November 2007 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category .Reason Actions Taken Minimize Recurrence MP-2 1D Number 11/28/2001 0:00 11/28/2001 4:00 102 N Unstable production due to upset condition in several wells. Suspend gas sales. Well spikes. OPERATIONAL WELL SPIKES Gas. injection to trouble wells increased in order to lift wells more efficiently and stabilize production. Bring fadlity bads to normal operations as soon as possible. Normal oil field operation. 11/29/2001 0:00 11/29/2001 2:00 50 N Unstable production due to upset condition in several wells. Suspend gas sales. Well spikes. OPERATIONAL WELL SPIKES Gas injection to trouble wells increased in order to liftwells more efficiently and stabilize production. Bring facility back to normal operations as soon as possible. Normal oil field operation. 11/30/2001 0:00 11/30/2001 2:30 70 N Unstable production due to upset condition in several wells. Suspend gas sales. Well spikes. OPERATIONAL WELL SPIKES Gas injection to trouble wells increased in order to lift wells more efficiently and stabilize production. Bring facility back to normal operations as soon as possible. Normal oil field operation. Report Date: 12/12/2001 Page: 1 of 1 ALASKA OIL AND GAS CONSERVATION. COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD DECEMBER 2001 Disposition Volume MCF* 1. Sold o 2. Reinjected o 3. Flared or vented less than 1 hour 850 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 866 5. Pilot and Purge 620 6. Used for lease operations 41,326 7.Other o TOTAL i m 1 - 7 to s 43 662 8. NGL gas equivalent produced o 9. Purchased gas 862 10. Transferred from: o 11. Transferred to: 3 , 909 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature ~~ c~~.~~i Title ACCOUNTING SUPERVISOR Date 01/14/2002 Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent MIDDLE KENAI 280150 86.47 HEMLOCK UNDEFINED 280152 13.53 d f F ............................... . . :::1..Safety:::::::. :::::: .~~ ::::MCF:. 2. Lease Use MCF 3. Conserv. Purposes MCF ~'i~ ~ 0 y Commissi er Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235 i~(/ Excess Flare Log Report Facility Name: GRANITE POINT PLATFORM Month/Year: December 2001 Date & Time Event Gas Steps Taken to Equipment Down Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number 1211/2001 0:00 12/1/2001 2:15 64 N Unstable production from upset condition in several wells. Suspend gas sales. OPERATIONAL WELL SPIKES Volume of gas lift gas routed to trouble wells increased to unload wells and lift them more efficently to stabilize production. Normal oil field operation. 12/2/2001 0:00 12/2/2001 2:00 59 N Unstable production from upset conditon in several wells. Suspend gas sales. OPERATIONAL WELL SPIKES Volume of gas lift gas routed to trouble wells increased to unload wells and 1'dt them more efficiently to stabilize production. Normal oil field operation. 12/27/2001 17:30 12!28/2001 12:30 312 N Solar Centaur turbine shutdown. Unplanned event-turbine shutdown. OPERATIONAL OTHER: SEE DESC OF EVENT Replace clogged pre-filter on 1st stage separator, low pressure shutdown. Mechanic immediately diagnoses problem, initiates filter replacement w/parts in inventory, returns facility to normal operation asap. Replace filter. 12/27/2001 17:30 12/28/2001 12:30 431 N Solar Centaurturbine shutdown. Unplanned event-turbine shutdown. OPERATIONAL OTHER: SEE DESC OF EVENT Replace clogged pre-filter on 1st stage separator, low pressure shutdown. Mechanic immediately diagnoses problem, initiates filter replacement w/parts in inventory, returns facility to normal operation asap. Replace filter. Report Date: 1/15/2002 Page: 1 of 1