HomeMy WebLinkAboutUNOCAL- GRANITE PT PLATFORMALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JANUARY 2001
Disposition Volume MCF* *Indicate contribution of each pool to total.
Pool Name Code Percent
1. Sold O
MIDDLE KENAI 280150 87.64
2. Reinjected o
HEMLOCK UNDEFINED 280152 12.36
3. Flared or vented less than 1 hour 1,767
~: , , ,r,, ~,,,~
4. Flared or vented greater than 1 hour 0 ~ ~ ~ ~V ~L.,~
(Supplemental report required- See 20 AAC 25.235)
5. Pilot and Purge 620
6. Used for lease operations 43,955 crs. om ~ssior~
A choracle
7. Other 0
TOTAL items 1 - 7 46 , 342
8. NGL gas equivalent produced o
9. Purchased gas 44
10. Transferred from: 0
11. Transferred to: 6,206
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature /~~~1~ Title ACCOUNTING SUPERVISOR Date 02/14/2001
Form 10-422
Rev. 4/95
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
3/'%"~
Excess Flare Log Report
Facility Name: GRANITE POINT PLATFORM
Month/Year: January 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken_ Minimize Recurrence MP-2 ID Number
Report Date: 2/6/01. Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) onth/Year of Disposition
GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD FEBRUARY 2001
Disposition Volume MCF* *Indicate contribution of each pool to total.
Pool Name Code Percent
1. Sold o
MIDDLE KENAI 280150 76.76
2. Reinjected o
HEMLOCK UNDEFINED 280152 23.24
3. Flared or vented less than 1 hour 543
4. Flared or vented greater than 1 hour 2,555
(Sapplemeatel report required -See 20 AAC 25.235)
5. Pilot and Purge 560
,.
6. Used for lease operations - =~ 36,682
7. Other -a~ Q % s o
TOTAL items 1- 7 ~ 40,340
8. NGL gas equivalent produced o
9. Purchased gas 1,294
10. Transferred from: o
11. Transferred to: 3,143
nemarxs
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature~~~ ~~s//~) Title ACCOUNTING SUPERVISOR Date 03/19/2001
Form 10-422
Rev, 4/95
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
..i
Excess Flare Log Report
Facility Name: GRANITE POINT PLATFORM
Month/Year: February 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
2/13/01.0:00 .2/13/01 23:59 444 N COMPRESSOR SHUT DOWN FOR
HYDRO TESTING SAFETY UNSCHEDULED MAINTENANCE COMPRESSOR SHUT DOWN
FOR HYDRO TESTING
Z/14/01 0:01 .2/14/01 4:00 278 N MAKEUP GAS VALVE 1091
LEAKING BY OPERATIONAL UNSCHEDULED MAINTENANCE MANUALLY BLOCKED 1091 HYDRO TEST PIPELINE
2/15/01 12:00 2/15/01 23:59 867 N CENTAUR SHUT-IN FOR
HYDROTEST OPERATIONAL UNSCHEDULED MAINTENANCE CENTAUR SHUT-IN FOR
HYDROTEST
2/16/01 1:00 2/16!01 22:00 866 N BRINGING ALL WELLS ON AFTER
SHUT-IN OPERATIONAL BLOW DOWN WELL STABILIZE PRODUCTION
Report Date: 3/8/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD MARCH 2001
Disposition Volume MCF* *Indicate contribution of each pool to total.
Pool Name Code Percent
1. Sold 0
MIDDLE KENAI 280150 65.36
Z. Reinjected 0
HEMLOCK UNDEFINED 280152 34.64
3. Flared or vented less than 1 hour 119
4. Flared or vented greater than 1 hour 560
(Supplemental report required- See 20 AAC 25.235)
5. Pilot and Purge 620
6. Used for lease operations 42,831
7 Oth r 0
e
TOTAL items 1 - 7 44,130
S. NGL gas equivalent produced o
9. Purchased gas 436
10. Transferred from: 0
11. Transferred to: 4,234
xemarxs:
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
I hereby certify that the foregoing is true and correct to the best of my knowledge.
1 ..
Signature ~~ %~k ~ y, `~~~ Title ACCOUNTING SUPERVISOR Date 04/06/2001
~3 /~vv
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: GRANITE POINT PLATFORM Month/Year: March 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
3/23/01 3:30 3/23/01 4:35 328 N SHUT DOWN CENTAUR COP TO
REBOOT THE PLC OPERATIONAL SCHEDULED MAINTENANCE REBOOTED PLC AND BROUGHT
CENTAUR AND WELLS BACK
ON P-PM-1270
3/24/01 0:00 3/24/01 7:00 232 N GAS BACK FROM TANK FARM DUE
TO CENTAUR SHUT DOWN TO
REBOOT PLC OPERATIONAL SCHEDULED MAINTENANCE SHUT DOWN GAS BUY BACK
WHEN WELLS STABILIZED P-PM-1270
Report Date: 4/6/01 Page: 1 of 1
i
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD APRIL 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour 190
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) 64
5. Pilot and Purge 600
6. Used for lease operations 40.994
7.Other o
TOTAL items 1- 7 41,84s
8. NGL gas equivalent produced o
9. Purchased gas o
10. Transferred from: o
11. Transferred to: 6,144
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~!/~ Title ACCOUNTING SUPERVISOR Date 05/15/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 81.94
HEMLOCK UNDEFINED 280152 18.06
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
'~(~,`%
Excess Flare Log Report
Facility Name: GRANITE POINT PLATFORM Month/Year: April 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
4/28/01 9:30 4/28/01 15:30 64 Y SHUT DOWN WATER INJECTION
PUMPS OPERATIONAL SCFIEDULED MAINTENANCE WATER FLOOD DOWN,
FLARING EXCESS FUEL GAS
Report Date: 5/9/01 Page: 1 of 1
-- _ _ -- p ~
~~~ V ~~
ALASKA OIL AND GAS CONSERVATION COMMISSION SUN 19 2001
FACILITY REPORT OF PRODUCED GAS DISPOSITION Alaska Oii & Gas Cons. Cammission
Anchorage
Facility Operator Field(s) Month/Year of Disposition
GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD MAY 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour 19s
4. Flared or vented greater than 1 hour
(Supplemental report rcquire~! -See 20 AAC 25.235) 5,166
5. Pilot and Purge 620
6. Used for lease operations 44,056
7. Other o
TOTAL items 1- 7 50, 040
8. NGL gas equivalent produced o
9. Purchased gas 7.678
10. Transferred from: o
11. Transferred to: 6,413
Remarks:
I hereby certify that the forego~in/g~is true and correct to the best of my knowledge.
Signature ~~~,~~~ ,~~,~`v Title ACCOUNTING SUPERVISOR Date 06/07/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI ~ 280150 81.99
HEMLOCK UNDEFINED 280152 18.01
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~~
3~~~`
Excess Flare Log Report
Facility Name: GRANITE POINT PLATFORM
Month/Year: May 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
5/10/01 12:00 5/10/01 17:00 143 Y A.O.G.C. inspection. Scheduled OPERATIONAL SCHEDULED MAINTENANCE Completed inspection with State Completed inspection with State
maintenance of surface and inspector; returend to normal inspector and took opportunity to
subsurface safety valves. operations. check safety alarms while
equipment was down. Retumed to
normal operations.
5/19/01 0:00 5/19/01 4:00 387 Y GAS COMPRESSOR SHUT DOWN. OPERATIONAL SCHEDULED MAINTENANCE Checked combusition chamber, Completed inspection with State
4000 HR. SCHEDULED presuure washed the interstage inspector and took opportunity to
MAINTENANCE. coolers, changed filters. Used check safety alarms while
down time to conduct safety alarms equipment was down. Returned to
checks. normal operations.
5/21/01 12:00 5/21/01 23:59 281 Y PRESSURING UP AND BLOWING OPERATIONAL BLOW DOWN WELL Wellhead production valves were CONFIRMED WELLS WERE
DOWN WELLS shut to reserve gas for compressor STABILIZED BEFORE BRINGING
start-up. Gas was released from ONLINE, CONTINUED
well at start-up. MONITORING TO ENSURE
WELLS CONTRINED TO BE
STABLE.
5122/01 21:30 5122/01 22:45 448 N GAS COMPRESSOR DOWN FOR 1 OPERATIONAL BLOW DOWN WELL Wellhead production valves were CONFIRMED WELLS WERE P-PM-1270
HOUR AND 15 MIN. shut to reserve gas for compressor STABILIZED BEFORE BRINGING
start-up. Gas was released from ONLINE, CONTINUED
well at start-up. MONITORING TO ENSURE
WELLS CONTRNED TO BE
STABLE.
5/23/01 13:30 5/23/01 23:59 1594 N GAS COMP. TROUBLE, DOWN OPERATIONAL BLOW DOWN WELL Wellhead production valves were CONFIRMED WELLS WERE P-PM-1270
TWICE . TRYING TO PRESSURE shut to reserve gas for compressor STABILIZED BEFORE BRINGING
UP AND BLOW DOWN WELLS start-up. Gas was released from ONLINE, CONTINUED
well at start-up. MONITORING TO ENSURE
WELLS CONTRINED TO BE
STABLE.
5/24/01 4:00 5124/01 6:00 1409 N Gas Comp. trouble, pressuring up OPERATIONAL BLOW DOWN WELL Wellhead production valves were CONFIRMED WELLS WERE P-PM-1270
and blowing down wells shut to reserve gas for compressor STABILIZED BEFORE BRINGING
start-up. Gas was released from ONLINE, CONTINUED
well at start-up. MONITORING TO ENSURE
WELLS CONTRINED TO BE
STABLE.
5/25/01 4:00 5125/01 20:30 687 N BLOWING DOWN WELLS, WELL OPERATIONAL BLOW DOWN WELL Wellhead production valves were CONFIRMED WELLS WERE
SPIKES shut to reserve gas for compressor STABILIZED BEFORE BRINGING
start-up. Gas was released from ONLINE, CONTINUED
well at start-up. MONITORING TO ENSURE
WELLS CONTRINED TO BE
STABLE.
5/26/01 7:00 5/26/01 12:30 216 N UNSTABLE WELLS, WELL SPIKES OPERATIONAL WELL SPIKES ADJUSTED GAS INJECTION TO CONFIRMED WELLS WERE
MINIMIZE WELL'S TENDENCY TO STABILIZED BEFORE BRINGING
LOAD WITH WATER AND "SPIKE". ONLINE, CONTINUED
MONITORING TO ENSURE
WELLS CONTRNED TO BE
STABLE.
Report Date: 6/14/01 Page: 1 of 1
K~C%EtV~D
JUL 2 0 2001
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION Alaska Oil & Gas Cons. Commission
Anchorage
Facility Operator Field(s) Month/Year of Disposition
GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JUNE 2001
Disposition Volume MCF*
1.5o1d o
2. Reinjected o
3. Flared or vented less than 1 hour 252
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) o
5. Pilot and Purge 600
6. Used for lease operations 40,946
7. Other O
TOTAL items 1- 7 41, 79s
8. NGL gas equivalent produced o
9. Purchased gas 247
10. Transferred from: o
11. Transferred to: 7,762
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature~ye~~~v~ Title ACCOUNTING SUPERVISOR Date 07/17/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 85.43
HEMLOCK UNDEFINED 280152 14.57
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
3~1~r1z
Excess Flare Log Report
Facility Name: GRANITE POINT PLATFORM
Month/Year: June 2001
- -- --
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
Report Date: 7/18/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD JULY 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour 234
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) o
5. Pilot and Purge 620
6. Used for lease operations 53.494
7. Other 0
TOTAL items 1- 7 54.348
8. NGL gas equivalent produced o
9. Purchased gas 433
10. Transferred from: o
11. Transferred to: 7,492
Remarks:
I hereby certify that the fore oing is true and correct to the best of my knowledge.
Signature /~~,y~~ D,/~~ Title ACCOUNTING SUPERVISOR Date 08/09/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 87.52
HEMLOCK UNDEFINED 280152 12.48
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~~
Excess Flare Log Report
Facility Name: GRANITE POINT PLATFORM Month/Year: July 2001
Date & Time Event Gas Steps Taken to Equipment Down
Be in End MCF Planned? Descri lion of Incident Cate or Reason Actions Taken Minimize Recurrence MP-2 ID Number
Report Date: 8/2/2001 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD AUGUST 2001
Disposition Volume MCF*
1. Sold 0
2. Reinjected o
3. Flared or vented less than 1 hour 681
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) o
5. Pilot and Purge 620
6. Used for lease operations 40,179
7. Other o
TOTAL items 1- 7 41.480
8. NGL gas equivalent produced 0
9. Purchased gas 3,570
10. Transferred from: o
11. Transferred to: 6.026
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge. .
Signature ~~~ ~ ~~~ Title ACCOUNTING SUPERVISOR Date 09/10/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
.Pool Name Code Percent
MIDDLE KENAI 280150 87.96
HEMLOCK UNDEFINED 280152 12.04
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~~
ALASKA OIL AND GAS CONSERVATION COMMISSION.
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD SEPTEM8ER2001
Disposition Volume MCF*
1. Sold o
2. Reinjected
~x. 0
3. Flared or vented less than 1 hour 1,585
4. Flared or vented greater than 1 hour
(Supplemental report required- See 20 AAC 25.235) o
5. Pilot and Purge 600
6. Used for lease operations 39,942
7.Other o
TOTAL items 1- 7 42.127
8. NGL gas equivalent produced o
9. Purchased gas 903
10. Transferred from: o
11. Transferred to: 4,050
Remarks:
I hereby certify.that the foregoing is true and correct to the best of my knowledge.
Signature ~~~ f L ~!~/~iC.o% Title ACCOUNTING SUPERVISOR Date 10/05/2001
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 87.91
HEMLOCK UNDEFINED 280152 12.09
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name: GRANITE POINT PLATFORM
Month/Year: September 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 1D Number
Report Date: 10/4/2001 Page: 1 of 1
ALASKA- OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
GRANITE POINT PLATFORM
UNOCAL ALASKA RESOURCES I GRANITE POINT FIELD
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour 84 '
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 337
5. Pilot and Purge 620
6. Used for lease operations 54.921
7. Other o
TOTAL items 1 - 7 55 962
8. NGL gas equivalent produced o
9. Purchased gas 17s
10. Transferred from: 0
11. Transferred to: 4 , 056
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~~~ /~ ~C~~ Title ACCOUNTING SUPERVISOR Date 11/09/2001
Form 10-422
Rev. 4/95
'ear of Dispo
OCTOBER 2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI - 280150 89.20
HEMLOCK UNDEFINED 280152 10.80
4 ~.ri~
. ~w
Ar~i^h~r~
1. Safety MCF
2. Lease Use 33~- MCF
3. Conserv. Purposes MCF
Commissi er Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name:. GRANITE POINT PLATFORM Month/Year: October 2001
Date 8 Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
10/1/2001 0:39 10/1/2001 22:40 261 N Gas compressor shut down on low
suction pressure; unload gas
compressor; suspend gas sales.
Unscheduled maintenance. OPERATIONAL UNSCHEDULED MAINTENANCE Immediately commence work to
bring compressor back on line,
flush line to clean out distillates,
reload wells, and bring facility back
to nomtal operations ASAP. Normal oil field operation. P-PM-1270
10/10/2001 0:01 10/10/2001 23:59 60 Y GP Tank Farm unable to accept gas
because of inspection work on Chak
pipeline, gas flared pending
completion of work. Scheduled
maintenance - P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Pre-planned pipeline inspection
work, Chak pipeline returned to
normal operation ASAP.
_ Pipeline inspection will help
insure continued safe
operations.
10/11/2001 0:01 10/11/2001 23:59 16 Y GP Tank Farm unable to accept gas
because of inspection work on Chak
pipeline, gas flared pending
completion of work. Scheduled
maintenance - P/L inspection work. OPERATIONAL SCHEDULED MAINTENANCE Pre-planned pipeline inspection
work, Chak pipeline returned to
normal operation ASAP. Pipeline inspection will help
insure continued safe
operations.
Report Date: 11/9/2001 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
GRANITE POINT PLATFORM Operator
UNOCAL ALASKA RESOURCES Field(s)
GRANITE POINT FIELD Month/Year of Disposition
NOVEMBER 2001
Disposition Volume MCF* *Indicate contribution of each pool to total.
Sold
1
o Pool Name Code Percent
.
MIDDLE KENAI - 280150 90.44
2. Reinjected D
HEMLOCK UNDEFINED
280152
9.56
3. Flared or vented less than 1 hour 81
4. Flared or vented greater than 1 hour
20 AAC 25
235
l
t
l
t
i
d
S
S 230 ,~ ~ x. ,~,'
.
)
emen
a
repor
requ
re
-
ee
(
upp
.~ ~ ;~~~
5. Pilot and Pnrge 500
!
6. Used for lease operations 40,954 "~ .y `"
~'stbz t1{,rdC~+= °`
7
Other o
.
TOT i m 1-7
AL to s
41 865
1
Safet MCF
.
y
8. NGL gas equivalent produced o
2. Lease Use
a 3 (~ MCF
9. Purchased gas 32
3. Conserv. P os s
MCF
10. Transferred from: o
~
11. Transferred to: 2.920 ~
ommissi er Date
Remarks:
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
I hereby certify that the foregoing is true and correct to the best of my knowledge. 60 degrees F. Report due by the 20th of the
~ Title ACCOUNTING SUPERVISOR Date 12/07/2001 month following the month of disposition.
Signature ~~L~~~g;~~~ Authority 20 AAC 25.235
Form 10-422
Rev. 4/95
Excess Flare Log Report
Facility Name: GRANITE POINT PLATFORM
Month/Year: November 2007
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category .Reason Actions Taken Minimize Recurrence MP-2 1D Number
11/28/2001 0:00 11/28/2001 4:00 102 N Unstable production due to upset
condition in several wells. Suspend
gas sales. Well spikes. OPERATIONAL WELL SPIKES Gas. injection to trouble wells
increased in order to lift wells more
efficiently and stabilize production.
Bring fadlity bads to normal
operations as soon as possible. Normal oil field operation.
11/29/2001 0:00 11/29/2001 2:00 50 N Unstable production due to upset
condition in several wells. Suspend
gas sales. Well spikes. OPERATIONAL WELL SPIKES Gas injection to trouble wells
increased in order to liftwells more
efficiently and stabilize production.
Bring facility back to normal
operations as soon as possible. Normal oil field operation.
11/30/2001 0:00 11/30/2001 2:30 70 N Unstable production due to upset
condition in several wells. Suspend
gas sales. Well spikes. OPERATIONAL WELL SPIKES Gas injection to trouble wells
increased in order to lift wells more
efficiently and stabilize production.
Bring facility back to normal
operations as soon as possible. Normal oil field operation.
Report Date: 12/12/2001 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION. COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
GRANITE POINT PLATFORM UNOCAL ALASKA RESOURCES GRANITE POINT FIELD DECEMBER 2001
Disposition Volume MCF*
1. Sold o
2. Reinjected o
3. Flared or vented less than 1 hour 850
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 866
5. Pilot and Purge 620
6. Used for lease operations 41,326
7.Other o
TOTAL i m 1 - 7
to s 43 662
8. NGL gas equivalent produced o
9. Purchased gas 862
10. Transferred from: o
11. Transferred to: 3 , 909
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~ c~~.~~i Title ACCOUNTING SUPERVISOR Date 01/14/2002
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
MIDDLE KENAI 280150 86.47
HEMLOCK UNDEFINED 280152 13.53
d f F
...............................
.
.
:::1..Safety:::::::. ::::::
.~~ ::::MCF:.
2. Lease Use MCF
3. Conserv. Purposes MCF
~'i~ ~ 0 y
Commissi er Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
i~(/
Excess Flare Log Report
Facility Name: GRANITE POINT PLATFORM Month/Year: December 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
1211/2001 0:00 12/1/2001 2:15 64 N Unstable production from upset
condition in several wells. Suspend
gas sales. OPERATIONAL WELL SPIKES Volume of gas lift gas routed to
trouble wells increased to unload
wells and lift them more efficently
to stabilize production. Normal oil
field operation.
12/2/2001 0:00 12/2/2001 2:00 59 N Unstable production from upset
conditon in several wells. Suspend
gas sales. OPERATIONAL WELL SPIKES Volume of gas lift gas routed to
trouble wells increased to unload
wells and 1'dt them more efficiently
to stabilize production. Normal oil
field operation.
12/27/2001 17:30 12!28/2001 12:30 312 N Solar Centaur turbine shutdown.
Unplanned event-turbine shutdown. OPERATIONAL OTHER: SEE DESC OF EVENT Replace clogged pre-filter on 1st
stage separator, low pressure
shutdown. Mechanic immediately
diagnoses problem, initiates filter
replacement w/parts in inventory,
returns facility to normal operation
asap. Replace filter.
12/27/2001 17:30 12/28/2001 12:30 431 N Solar Centaurturbine shutdown.
Unplanned event-turbine shutdown. OPERATIONAL OTHER: SEE DESC OF EVENT Replace clogged pre-filter on 1st
stage separator, low pressure
shutdown. Mechanic immediately
diagnoses problem, initiates filter
replacement w/parts in inventory,
returns facility to normal operation
asap. Replace filter.
Report Date: 1/15/2002 Page: 1 of 1