Facility Operator Field(s) Month/Ye:az of Disposition
Granite Point Tank Farm LEX Plant Unocal Oil and Gas Granite Paint January-01
GPTF-LEX
Disposition Volume MCF*
[o C[GGS 43,626
1.$old to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flazed or vented less than 1 hour 712
4. Flared or vented greater than 1 hour 22
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge ~-= r-~, T~ r *'° ,`~.,
z 620
6. Used for lease operations 8,243
O
7. Other (Meter Etror) 14,310
r, s. Con~~I?issior
Ar?chor 4e
TOTAL items 1 - 7 67,533
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 5,353
GPTF-AB 5,943
10. Transferred from: Granite Point Plt. 0
Anna Platform 31,046
Bruce Platfomt 26,348
GPTF-AB 1,157
11. Transferred to: GPTF-GPP 0
Remazks:
I hereby certify that the foregoing is re and correct to the best of my knowledge.
Signature Title: Acct. Supervisor Date: 2/9/01
Form 10-422
Rev. 4/95
*Indicate contribution of each pool [o total.
Pool Name Code Percent
Official Use Only--Flaring Authorization> 1 hr
1. Safety ,~ "L MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
lY>r ~ ~ ~ / `~~l~~a a-
Commissi er Date
Note: All volumes must be coaected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
3%`~~
1
Excess Flare Log Report
Facility Name: GRANITE POINT TANK FARM
Month/Year: January 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
1/3/01 0:00 1/3/01 23:59 14 N SHUTDOWN VRU & 3300 BECAUSE
OF TIE-IN OF NEW FUEWL GAS
LINE TO U/M OPERATIONAL SCHEDULED MAINTENANCE T-H-3420
1/7/01 0:00 1/7/01 23:59 8 N SHUTDOWN VRU FOR INSPECTED
SUCTION & DISCHARGE OPERATIONAL SCHEDULED MAINTENANCE T-H-3420
Report Date: 2/5/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
Granite Point Tank Farm Unocal Oil and Gas Granite Point January-Ol
Anna Bmce GPTF-AB
Disposition Volume MCF*
I. Sold 0
2. Reinjected 0
3. Flazed or vented less than I hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations 1,157
7.Other 0
TOTAL items 1 - 7 1,157
8. NGL gas equivalent produced 0
GPTF-GPP
9. Purchased gas from: GPTF-LEX 0
0
10. Transferred from: GPTF-LEX 1,157
11. Transferred [o: GPTF-LEX 5,943
Remazks:
I hereby certify tha to foregoing is tme nd cerred to the best of my knowledge.
Signature ., Title: Acct. Supervisor Date: 2/9101
*Indicate contribution of each pool to total.
Pool Name Code Percent
OfFcial Use Only -- Flaring Authorization > I hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25,235
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSTION
Facility Operator Field(s) Month/Year of Disposition
Granite Point Tank Famr Uuocal Oil and Gas Granite Poiut January-Ol
Granite Point Platform GPTF-GPP
Disposition Volume MCF*
1. Sold to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared of vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations 6,206
7. Other 0 .
TOTAL items 1 - 7 6,206
8. NGL gas equivalent produced 0
9. Purchased gas 0
Granite Poin[ Plt.
10. Transferted from: GPTF-LEX 6,206
0
11. Transferred to: GPTF-LEX 5,353
Remarks: '
I hereby certify n the foregoing is and correct to the best of my knowledge.
Signature ~ Title: Acct. Supervisor Date: 2/9/01
*Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only -- Flaring Audtorization > I hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 70-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Granite Point Tank Farm LEX Plant Unocal Oil and Gas Granite Point February-Ol
GPTF-LEX
Disposition Volume MCF*
to CIGGS 35,584
1. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than I hour 676
4. Flared or vented greater than 1 hour 0
(Su plemental re ort re aired--See 20 AAC 25.235)
5. Pilot and Purge 560
6. Used for lease operations 7,492
:,
7. Other (Meter Error) ~
1,155
TOTAL items (- 7
_... ter: 45,467
-ca
:>
8. NGL gas equivalent produced 0
9. Purchased gas 0
2,389
2,739
0
23,366
18,120
1,147
0
acct. Supervisor Date: 3/20/0(
'Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only -- Flaring Authorization > I hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
.month following the month of disposition.
Authority 20 AAC 25.235
rt
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Feld(s) Month/Year of Disposition
Granite point Tank Farts LEX Plant Unocal Oil and Gas Granite Point March-O]
GPTF-LEX
Form -
Rev. 4/95
Disposition Volume MCF*
to CIGGS 39,862
1. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than I hour 887
4. Flared or vented greater than 1 hour 86
(Su lemental report re aired--See 20 AAC 25.235)
5. Pilot and Purge 620
6. Used for lease operations 13,212
7. Other (Meter Error) 5,775
TOTAL items I - 7 60,442
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 2,785
GPTF-AB 3>225
10. Transferred from: Granite Point Plt. 651
Anna Platform 31,970
Bruce Platform 23,040
GPTF-AB 1,229
l L Transferred to: GPTF-GPP 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
t ~ l
t
+
~~
~
~
t
C
Signature
i Title: Acct. S upervisor Date: 4/6/01
*Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only -- Flaring Authorization > 1 hr
1. Safety MCF
2. Lease Use ~ MCF
3. Conserv. Purposes MCF
~-~'"' ~ ~YV
Commissi ~f-~ ~'
r ~, 6 Y
Date
v
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
3/~~~-
Excess Flare Log Report
Facility Name: GRANITE POINT TANK FARM Month/Year: March 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
3/21/01 0:00 3/21/01 23:59 19 N ANNA PLATFORM SHUT-IN
PIGGING GAS LINE OPERATIONAL SCHEDULED MAINTENANCE SHUT DOWN ARIEDL GAS
COMPRESSOR &VRU
3/29/01 0:00 3/29/01 23:59 67 N ANNA PLATFORM SHUT-IN
PIGGING GAS LINE OPERATIONAL SCHEDULED MAINTENANCE SHUT DOWN ARIEL GAS
COMPRESSOR AND VRU
Report Date: 4/5/01 Page: 1 of 1
Anna Flare
Subject: Anna Flare
Date: Thu, 29 Mar 2001 15:34:16 -0800
From: "Bounds, Janet G" <boundsj@unocal.com>
To: "Wendy D Mahan (E-mail)" <Wendy_Mahan@admin.state.ak.us>
CC: "Geeslin, James W (Tray)" <geeslinj@Orion.Unocal.com>,
"Eaton, Harry A" <harry.eaton@Orion.Unocal.com>,
"Dorman, Allen" <DormanA@Orion.Unocal.com>,
"Dimmick, Mike W" <dimmick@Orion.Unocal.com>
Wendy
We are in the process of trying to dislodge a pig stuck in the gas line.
This will result in excess flare off the Anna platform for approximately 4
hours. We estimate that 200 MCF may be flared.
This may also result in increased 200 MCF being flared at GPTF if they do
not have sufficient gas to run the equipment there due to the lack of gas
from Anna.
Janet G. Bounds
Senior Environmental Scientist
Unocal
Phone (907) 263-7694
Fax (907) 263-7901
1 of 1 3/30/01 8:27 AM
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
Granite Point Tank Farm LEX Plant Unocal Oil and Gas Granite Point April-01
GPTF-LEX
Disposition Volume MCF•
to CIGGS
1. Sold to GPTF-GPP
to GPTF-AB 44,650
0
0
2. Reinjected 0
3. Flared or vented less than 1 hour 878
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 43
5. Pilot and Purge 600
6. Used for lease operations 12,691
7.Other (Meter Error) 3,433
TOTAL items 1 - 7 62,295
8. NGL gas equivalent produced 0
9. Purchased gas 0
.GPTF-GPP
GPTF-AB
10. Transferred from: Granite Point Plt.
Anna Platform
Bmce Platfomr 3,105
3,635
2,965
30,311
23,387
GPTF-AB
11. Transferred to: GPTF-GPP 1,108
0
Remazks:
I hereby certify that the foregoing is tme an/d/waect to the best of my knowledge.
Signature (%t.~j Title: Acct. Supervisor Date: 5/t5/01
"Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only -- Flaring Authorization > L hr
I. Safety MCF
2. Lease Use ~ "~ MCF
3. Conserv. Purposes MCF
Commissi r Date
Note: All volumes must be coaected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
^~~
~~~~~
Form 10-422
Rev. 4195
.j
Excess Flare Log Report
Facility Name: GRANITE POINT TANK FARM Month/Year: April 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
4/18/01 0:00 4!18!01 11:00 10 Y SCHEDULED MAINTENANCE OF
VRU &ARIEL COMPRESSOR OPERATIONAL SCHEDULED MAINTENANCE SHUT DOWN VRU &ARIEL GAS
COMPRESSOR FOR
MAINTENANCE MAINTENANCE T-H-3420
4/28/01 7:00 4!28101 14:00 13 Y SENDING GAS BACK TO THE ANNA
PLATFORM OPERATIONAL SCHEDULED MAINTENANCE SHUT DOWN ARIEL GAS
COMPRESSOR AND VRU MAINTENANCE
4130101 3:00 4!30!01 23:59 20 Y SHUT DOWN VRU OPERATIONAL SCHEDULED. MAINTENANCE SENT IN RELIEF VALVES FOR
TESTING AND REPAIRS MAINTENACNE
Report Date: 5/15/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator - Field(s) Month/Yeaz of Disposition
Granite Point Tank Farm LEX Plant Unocal Oil and Gas Granite Point May-01
GPTF-LEX
Disposition Volume MCF"
to CIGGS 47,471
1. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flazed or vented less than 1 hour 748
4. Flared or vented greater than 1 hour 92
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 620
6. Used for lease operations 12,600
7.Other (Meter Etror) 2,116
TOTAL items 1 - 7 63,647
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 3,065
GPTF-AB 3,650
10. Transferred from: Granite Point Plt. 3,328
Anna Platform 31,502
Bmce Platform 23,180
GPTF-AB 1,078
11. Transferred to: GPTF-GPP 0
Remarks:
I hereby certify t the foregoing is to the best of my knowledge.
to and corre
ct
~
/
Signature -`-' `' Title: Acct. Supervisor Date: 6/13/01
Form 70-422
Rev. 4185
"Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Qnly-- Flaring Authorizatlon> I hr
1. Safety MCF
2. Lease Use Ci ~ MCF
3. Conserv. Purposes MCF
GMSwIVh/
Commissi ~ a/
r l ~'O~G ~
Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~~ar
Excess Flare Log Report
Facility Name: GRANITE POINT TANK FARM
Month/Year: May 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
5/1/01 0:00 5/1/01 23:59 29 Y SHUT DOWN VRU. SCHEDULED OPERATIONAL SCHEDULED MAINTENANCE SENT IN RELIEF VALVES FOR BOTH RELIEF VALVES WERE T-H-3420
YEARLY MAINTENANCE. TESTING AND REPAIRS. SENT IN FOR REPAIRS AT
THE SAME TIME TO
MINIMIZE FUTURE
DOWNTIME.
5/2/01 0:00 5/2/01 23:59 27 Y SHUT DOWN VRU. SCHEDULED OPERATIONAL SCHEDULED MAINTENANCE SENT IN RELIEF VALVES FOR BOTH RELIEF VALVES WERE T-H-3420
YEARLY MAINTENANCE. TESTING AND REPAIRS. SENT IN FOR REPAIRS AT
THE SAME TIME TO
MINIMZE FUTURE
DOWNTIME.
5/3/01 0:00 5/3/01 17:00 25 Y SHUT DOWN VRU. SCHEDULED OPERATIONAL SCHEDULED MAINTENANCE SENT IN RELIEF VALVES FOR BOTH RELIEF VALVES WERE T-H-3420
YEARLY MAINTENANCE TESTING AND REPAIRS. SENT IN FOR REPAIRS AT
THE SAME TIME TO
~ MINIMIZE FUTURE
DOWNTIME:
5/19/01 0:00 5/19/01 8:45 6 Y ANNA PLATFORM SHUT DOWN IN OPERATIONAL SCHEDULED MAINTENANCE SHUT DOWN COMPRESSSOR ALL NECESSARY PERONNEL T-H-3420
ORDER TO REPLACE DAMAGED AND VRU. SENT GAS BACK TO AND MATERIALS ONBAORD
PIPING. ANNA TO KEEP PLATFOMR ANNA BEFORE SHUTTING
LIGHTS WORKING. DOWN FACILITY. GPTF
RESTARTED ASAP.
5/21/01 0:00 5/21/01 14:00 5 Y BRUCE SCHEDULED OPERATIONAL SCHEDULED MAINTENANCE SHUT DOWN COMPRESSOR PERSONNEL AND T-H-3420
MAINTENANCE. QUARTERLY AND VRU DUE TO LOW GAS EQUIPMENT ONBOARD
MAINTENANCE ON BRUCE VOLUMES. PLATFOMRS TO ENSURE
PLATFORM GAS COMPRESSOR. MAINIMAL DOWNTIME.
ANNA UNSCHEDULED GPTF RESTART ASAP.
MAINTENANCE. ANNA PLATFORM
FWKO VRU HAD MECHANICAL
VIBRATION PROBLEM; UNIT
CHANGED OUT WITH ONBOARD
BACKUP UNIT.
Report Date: 6/14/01 Page: 1 of 1
Re: Dillon excess flare
Subject: Re: Dillon excess flare
Date: Wed, 17 May 2000 11:11:27 -0800
From: Wendy Mahan <Wendy_Mahan@admin.state.ak.us>
Organization: doa-aogcc
To: "Bounds, Janet G" <boundsj@unocal.com>
Janet,
How long do you expect the compressor to be down? Is Unocal taking any
steps to minimize the amount of gas flared? Are you sure that volume is
correct? 250,000 MCF over what time period?
Thanks,
Wendy
"Bounds, Janet G" wrote:
> Wendy
> We will be shutting down the gas compressor on the Dillon platform today for
> maintenance in order to determine the source of an oil leak. Casing head gas
> from oil wells will result in approximately 250,000 MCF of flared gas.
> Thank you,
> Janet G. Bounds
> Environmental Scientist
> Unocal
> (907) 263-7694 (office)
> (907) 263-7901 (fax)
1 of 1 5/17/00 11:11 AM
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Granite Point Tank Farm LEX Plant Unocal Oil and Gas Granite Point June-01
GPTF-LEX
Disposition Volume MCF'
1. Sold to CIGGS
to GPTF-GPP
to GPTF-AB 49,637
0
0
2. Reinjected 0
3. Flared or vented less than 1 hour 849
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 84
5. Pilot and Purge 600
6. Used for lease operations ~ 10,968
7. Other (Meter Error) 2,560
TOTAL items 1- 7 64,698
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: GPTF-GPP
GPTF-AB
Granite Point Plt.
Anna Platform
Bmce Platform 3,614
4,321
5,062
27,812
24,711
t 1. Transferred to: GPTF-AB
GPTF-GPP 822
0
Remarks:
I hereby certify a the foregoing is and corrgct to the best of my Imowledge.
Signature ~/ Title: Acct. Supervisor Date: 7/17/01
~D
JUL 2 ~ ?00 ~
it & Cas C s. Comm'ssio
Anchor 9E n
•Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only -- Flaring Authorization > 1 hr
1. Safety 7~- (~/% MCF
(f l1
2. Lease Use MCF
3. Conserv. Purposes MCF
~~
R ~ ~ ~ .yb o ~--
Commissio Date
Note: All volumes must be corrected to
pressure of 14.65 psis sad to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
.~~ d~
Form 16422
Rev. 4/95
Excess Flare Log Report
Facility Name: GRANITE POINT TANK FARM Month/Year: June 2001
Date 8 Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
6/15/01 0:00 6/15/01 23:59 25 N High ambient temps shutdown
AdeWRU compressor OPERATIONAL UNSCHEDULED MAINTENANCE T-H-3420
6/17/01 0:00 6/17/01 23:59 41 N L.P. FLARE LINE SHUT DOWN OPERATIONAL UNSCHEDULED MAINTENANCE
6/26/01 0:00 6/26101 23:59 12 N High ambienttemps shutdown
Ariel/VRU compressor OPERATIONAL UNSCHEDULED MAINTENANCE T-H-3420
6/27/01 0:00 6/27/01 23:59 6 N High ambient temps shut down Ariel
compressor OPERATIONAL UNSCHEDULED MAINTENANCE
Report Date: 7/18/01 Page: 1 of 1
ALASKA OiL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Granite Point Tank Farm LEX Plant Unocal Oil and Gas Granite Point July-Ol
GPTF-LEX
Disposition Volume MCF*
1. Sold to CIGGS
to GPTF-GPP
to GPTF-AB 49,874
0
0
2. Reinjected 0
3. Flared or vented less than 1 hour 1,164
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 43
5. Pilot and Purge 620
6. Used for lease operations 9,608
7. Other (Meter Error) 8,360
TOTAL items 1 - 7 69,669
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: GPTF-GPP
GPTF-AB
Granite Point Plt.
Anna Platform
Bruce Platform 4,975
5,937
4,586
29,737
25,225
I1. Transferred to: GPTF-AB
GPTF-GPP 791
0
Remarks:
I hereby certif ~ that the foregoin is we and correct to the best of my knowledge.
Signatur ~ Title: Acct. Supervisor Date: 8/9/2001
Form 70422
Rev.4/95
*Indicate contribution of each pool to total.
Pool Natne Code Percent
Official Use Only - Flarn~g Authorization > 1 hr
1. Safety MCF
2. Lease Use ~ ~ MCF
3. Conserv. Purposes MCF
Commissi r Date
Note: All voltunes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~~
~~~~~
Excess Flare Log Report
Facility Name: GRANITE POINT TANK FARM Month/Year: July 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
7!18/01 10:00 7/18/01 13:00 14 Y VRU shut down on Pressure Alarm
Low Load (PALL) interstage. OPERATIONAL UNSCHEDULED MAINTENANCE Immediately repair VRU, return
facility to normal operation as soon
as possible. Repair VRU. T-H~420
7/19/01 13:00 7/19/01 17:00 16 Y Planned Shut down of VRU.
Unscheduled maintenance preformed:
inspected and replaced a suction and
discharge valve. OPERATIONAL SCHEDULED MAINTENANCE Shut down VRU. Inspected and
replaced a suction and discharge
valve.. T-H-3420
7/20/01 13:00 7/20/01 17:00 13 N VRU A 1st and 2nd stg temperatures
high. OPERATIONAL UNSCHEDULED MAINTENANCE Shut down VRU for inspection. T-H-3420
Report Date: 8/15/01 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
Granite Point Tank Farm LEX Plant Unocal Oil and Gas Granite Point August-01
GPTF-LEX
Disposition Volume MCF*
1. Sold [o CIGGS
[o GPTF-GPP
[o GPTF-AB 48,872
0
0
2. Reinjected 0
3. Flared or vented less than I hour 1,196
4. Flazed or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 158
5. Pilot and Purge 620
6. Used for lease operations 8,764
7. Other (Meter Error) 5,300
TOTAL items 1 - 7 64,910
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: GPTF-GPP
GPTF-AB
Granite Point Plt.
Anna Platform
Bmce Platform 3,577
4,385
3,263
30,379
24,017
I1. Transferred to: GPTF-AB
GPTF-GPP 71 I
0
Remarks:
[ hereby certif t foregoing is true an tort [ to the best of my knowledge.
Signatur Title: Acct. Supervisor Date: 9/10/2001
;Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Oiily -- Flaring Authorizapod > 1',hr
1. Safety MCF
2. Lease Use / ~ ~ MCF
111
3. Conserv. Purposes MCF
~tp r ~ ~~ ~o >"
Commissi Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
~~
Form 10422
Rev. 4/95
Excess Flare Log Report
Facility Name: GRANITE POINT TANK FARM Month/Year: August 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 1D Number
8/27/01 9:00 8/27/01 14:00 68 Y SHUTDOWN COMPRESSORS FOR
AURORA-GIGS PIPELINE TIE-IN. OPERATIONAL SCHEDULED MAINTENANCE SCHEDULED SHUTDOWN FOR
CONSTRUCTION. MINIMIZED
DOWN TIME.
8/31/01 9:00 8131/01 17:00 90 Y SHUTDOWN COMPRESSORS FOR
AURORA-CIGGS PIPELINE TIE-IN. OPERATIONAL SCHEDULED MAINTENANCE SCHEDULED SHUTDOWN FOR
CONSTRUCTION. MINIMIZED
DOWN TIME.
Report Date: 9/6/2001 Page: 1 of 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Granite Point Tank Farm Unocal Oil and Gas .Granite Point August-01
Anna Bruce GPTF-AB
Disposition Volutne MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations 711
7. Other 0
TOTAL items 1 - 7 711
8. NGL gas equivalent produced 0
GPTF-GPP
9. Purchased gas from: GPTF-LEX 0
0
Anna Platform
10. Transferred from: Bruce Platform
GPTF-LEX 0
0
711
I1. Transferred to: .GPTF-LEX 4,385
Remarks:
I hereby certif to 'ongoing is rue and correct [o the best of my knowledge.
Signature ~ Title: Acct. Supervisor Date: 9/10/2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only--Flaring Authbriza6on > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month. following the month of disposition.
Authority 20 AAC 25.235
Form 10-022
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSTION
Facility Operator Field(s) Month/Yeaz of Disposition
Granite Point Tank Fazm Unocal Oil aad Gas Granite Point August-01
Granite Point Platform GPTF-GPP
Disposition Volume MCF*
1. Sold to GPTF-AB p
2. Reinjected p
3. Flazed or vented less than 1 hour 0
4. Flazed or vented greater than I hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations 2,763
7. Other 0
TOTAL items 1 - 7 2,763
8. NGL gas equivalent produced 0
9. Purchased gas 0
Granite Point Plt.
10. Transferred from: GPTF-LEX 2,763
0
11. Transferred to: GPTF-LEX 3,577
Remarks:
I hereby certify at e f egoing is we and orre~ct/to the best of my knowledge.
Signatur / !/~ Title: Acct. Supervisor Date: 9/10/2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
Otlicial Use Only -Flaring Authorization > 1 hr
1~. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Comtnissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
momh following the month of disposition.
Authority 20 AAC 25.235
Form ta422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
.FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
Granite Point Tank Farm LEX Plant Unocal Oil and Gas Granite Point. September-01
GPTF-LEX
Disposition Volume MCF'
to CIGGS 43,896
1. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
1.
~
3. Flared or vented less than 1 hour 1,347
4. Flazed or vemed greater than 1 hour 0
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 600
6. Used for lease operations 9,347
7. Other (Meter Error) 8,929
TOTAL items 1 - 7 64, 119
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 4,699
GPTF-AB 5,733
10. Transferred from: Granite Poim Plt. 1,036
Anna Platform 30,264
Bruce Platform 23,105
GPTF-AB 718
11. Transferred to: GPTF-GPP 0
Remarks:
I hereby certify that the foregoing i true and correct to the best of my knowledge.
f
Signature '~ ~ / Title: Acct. Supervisor Date: 10/5/2001
Form 10-422
Rev. !/95
•Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only -Flaring Authorization > 1 hr
1. Safety CF
2. Lease Use '' l MCF
V
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Granite Point Tank Faun LEX Plant Unocal Oil and Gas Granite Point October-Ol
GPTF-LEX
Disposition Volume MCF*
to CIGGS 34,087
I. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flazed or vented less than 1 hour 1,265
~, a
4. Flazed or vented greater than t hour 186 "
(Supplemental report requved--See 20 AAC 25 .235)
5. Pilot and Purge 620
6. Used for lease operations 9,372
7. Other (Meter Error) 6,761
TOTAL items 1 - 7 52,291
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 2,902
GPTF-AB 3,450
10. Ttansferred from: Granite Point Plt. 516
Anna Platform 24,943
Bmce Platform 20,495
GPTF-AB 15
I L Transferred to: GPTF-GPP 0
Remarks:
1 hereby certify th
the foregoing is we and correct to the best of my knowledge.
a
t
//
/
/
Si
~ Ti
l
A
S i
D
11/9/01
gnature .4y t
e:
cct. uperv
sor
ate:
Form 10.422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
~. 'Av-s: ~:.... {:.
X11: !,' ~' ~ q '_ -
L1t ~If ~t ~7~ Vhf . ir01!r!19iit`?%~..
Official Use Only.-- Flaring Authorization> 1 hr
1. Safety MCF
2. Lease Use ' ~ ~ MCF
U
3. Conserv. Purposes MCF
~{ O :Y
Commissi Date
L
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Excess Flare Log Report
Facility Name: GRANITE POINT TANK FARM Month/Year: October 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
.10/3/2001 6:30 10/3/2001 17:30 13 N Gas line SI for inspection of Chak OPERATIONAL SCHEDULED MAINTENANCE Shut down compressors for P/L Pipeline inspection will help
pipeline, gas flared to bleed line. inspection, flare all sales gas to insure continued safe
Scheduled maintenance - P/L ' bleed down pipeline. Pre-plan operations.
inspection work. activities on plalforms, ensure
10!6/2001 7:00 10/12/2001 11:00 37 N Gas line SI for inspection of Chak OPERATIONAL SCHEDULED MAINTENANCE but down compressors for P/L Pipeline inspection will help
pipeline, gas flared to bleed line. inspection, flare all sales gas to insure continued safe
Scheduled maintenance - P/L bleed down pipeline. Pre-plan operations.
inspection work. activities on platforms, ensure
10/6!2001 7:00 10/12/2001 11:00 34 N Gas line SI for inspection of Chak OPERATIONAL SCHEDULED MAINTENANCE but down compressors for P/L Pipeline inspection will help
pipeline, gas flared to bleed line. inspection, flare all sales gas to insure continued safe
Scheduled maintenance - P/L bleed down pipeline. Pre-plan operations.
inspection work. activities on platforms, ensure
10/6/2001 7:00 10/12/2001 11:00 25 N Gas line SI for inspection of Chak OPERATIONAL SCHEDULED MAINTENANCE but down compressors for P/L Pipeline inspection will help
pipeline, gas flared to bleed line. inspection, flare all sales gas to insure continued safe
Scheduled maintenance - P/L bleed down pipeline. Pre-plan operations.
inspection work. activities on platforms, ensure
10/6/2001 7:00 10/12/2001 11:00 26 N Gas line SI for inspection of Chak OPERATIONAL SCHEDULED MAINTENANCE but down compressors for P/L Pipeline inspection will help
pipeline, gas flared to bleed line. inspection, flare all sales gas to insure continued safe
Scheduled maintenance - P/L bleed down pipeline. Pre-plan operations.
inspection work. activities on platforms, ensure
10/6/2001 7:00 10/12/2001 11:00 16 N Gas line SI for inspection of Chak OPERATIONAL SCHEDULED MAINTENANCE but down compressors for P/L Pipeline inspection will help
pipeline, gas flared to bleed line. inspection, flare all sales gas to insure continued safe
Scheduled maintenance - P/L bleed down pipeline. Pre-plan operations.
inspection work. activities on platforms, ensure
10!6/2001 7:00 10112/2001 11:00 24 N Gas line SI for inspection of Chak OPERATIONAL SCHEDULED MAINTENANCE but down compressors for P/L Pipeline inspection will help
pipeline, gas flared to bleed line. inspection, flare all sales gas to insure continued safe
Scheduled maintenance - P/L bleed down pipeline. Pre-plan operations.
inspection work. activities on platforms, ensure
10/6/2001 7:00 10/12/2001 11:00 11 N Gas line SI for inspection of Chak OPERATIONAL SCHEDULED MAINTENANCE but down compressors for P/L Pipeline inspection will help
pipeline, gas flared to bleed line. inspection, flare all sales gas to insure continued safe
Scheduled maintenance - P/L bleed down pipeline. Pre-plan operations.
inspection work. activities on platforms, ensure
Report Date: 11/9/2001 Page: 1 of 1
02/20/2002 17:02 FA% ~ 008/008
' '--- -
__ ... _
• -- _ -
_ :.. .
:,~
.•`..'
• 2. ••••~. _- 1 ___ _ w
. .., . ~~:
~,
y~`y •,.....,~,.
.' ,r %~
~• M1~ y ,.
y r/ ~•ti
i
. .. '.
• ;.•, rte, - - __ ``,,
.,r •, .•~-•.~4
., ;; .~
+' _
.;' „ .'
J, _
~;
r. \ /...
„"~•~
', .
~. ..••iJ
•. r •!>
~ ~ .. ., _ •
_ "•~•I,
: i . i'~.,
~~'~`..
•" -
.. ., ~,.
{{{ v .° t
. ,
.:.~ _
.1
.; 'Z. :~
•...
:.:. ._•_ :•::'.:I.':.~,....• /.. ~~ ,cr ~•• •.~.,,••?tip .j.
,.
~..
.1'.'..,, x.33.•,• •" .~
. 1•• ~i:
i..
f
..... _
~. _ _
y •,
Y ....•,..;.
~,:• ..
•~ h
,.
__..~
~ ^
~. 'r'
..::'r
1.
.: ~ ..
:'
-~' - ~ T '.
' "'
r ~ '•. .. '. ~' 1•.•
W~' r•'f.~ J ,F•
•'
. ..:
.~ •` ` ~,~,,~~
.. ,;..,
,'t
1. .
:. .. '• -
1';
....
.J-- :~
:~. ,_ •• _
.r'. •. . • .. 4 - '~ .
,A•
~ _ _
.~.
~.-
~...
.'.'i _
• •.. ~.._
..~.
..
~~..
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Granite Point Tank Farm LEX Plant Unocal Oil and Gas Granite Point November-Ol
GPTF-LEX
Disposition Volume MCF*
to CIGGS 36,967
I. Sold to GPTF-GPP 0
to GPTF-AB 0
2. Reinjected 0
3. Flared or vented less than 1 hour 1,421 ~
'7 `
° 4. Flazed or vented greater than 1 hour 13
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 600
6. Used for lease operations 11,963
7. Other (Me[er Error) 3,509
TOTAL i
I
7 473
~ 54
tems
- ,
8. NGL gas equivalent produced 0
9. Purchased gas 0
GPTF-GPP 2,726
GPTF-AB 3,179
10. Transferred from: Granite Point Plt. 0
Anna Platform 27,239
Bruce Platform 22,425
GPTF-AB 1,096
11. Transferred to: GPTF-GPP 0
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
,/) s
Signature _, G- L C~~ ' ~"'~ Title: Acct. Supervisor Date:
12/7/2001
*Indicate contribution of each pool to total.
Pool Name Code Percent
°s.,eD
n
'~~SK~ ~1(.~ av~~"viXiS. ~(j"
Official Use Only -- Flazing Authorization > 1 hr
1. Safety / (/ ~/ MCF
` (
2. Lease Use MCF
3. Conserv. Purposes MCF
~ ~ 02
ssioner ate
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235
Form 10-422
Rev. 4195
Excess Flare Log Report
Facility Name: GRANITE POINT TANK FARM
Month/Year: November 2001
Date & Time Event Gas Steps Taken to Equipment Down
Begin End MCF Planned? Description of Incident Category Reason Actions Taken Minimize Recurrence MP-2 ID Number
11/14/2001 17:00 11/14/2001 22:00 13 N Shutdown compressors for Chak Gas
Pipeline pigging operation, flared gas
to bleed line. Unplanned event,
liquids in line. OPERATIONAL UNSCHEDULED MAINTENANCE Chak line shutdown due to
liquids in line, shut dawn
compressors for pigging
operation to clear liquids, flare
all sales gas to bleed down
pipeline, retdeve pig for ~
pipeline. Retum all facility to
normal operation as soon as
possible. Normal procedure.
Report Date: 12/12/2001 Page: 1 of 1
ALASKA OIL AND GAS. CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
Granite Point Tank Farm LEX Plant Unocal Oil and Gas Granite Point December-Ol
GPTF-LEX
Disposition Volume MCF*
1. Sold to CIGGS
to GPTF-GPP
to GPTF-AB 32,371
0
0
2. Reinjected 0
3. Flared or vented less than 1 how 1,450
4. Flared or vented greater than 1 how
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Pwge 620
6. Used for lease operations 14,330
7. Other (Meter Error) 743
TOTAL items 1 - 7 49,514
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: GPTF-GPP
GPTF-AB
Granite Poim Plt.
Anna Platform
Bruce Platform 1,373
1,613
0
28,046
20,075
11. Transferred to: GPTF-AB
GPTF-GPP 1,593
0
Remarks:
I herebycertify t the,foregoing is and correct to the best of my knowledge.
~/ r
Signatwe t~ ~ Title: Acct. Supervisor Date: 1/15/2002
Form 76422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Nattte Code Percent
~,,,.; .;
Official Use Only -Flaring Authorizazion > I bt
I. Safety - MCF
2. Lease Use ~ MCF
3. Conserv. Pwposes ~ MCF
~'~ C ~~~~~r:_~~ ~3 r o
Co ssioner Date ~
Note: All vol»mes must be corrected to
pressure of 14.65 psia and to a temperatwe of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235