Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutW McArthur River / Forest Oil Corp STATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2008 FACILITY: W McArthur River OPERATOR: FOREST OIL CORP STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 1330000027 West McArthur River West McArthur River Unit Forest Oil Corporation —Dee:47r .Q,,r�, :L.49 1�2( Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 6,747 Pool Name Pool Code Percent West McArthur River 930148 100% 7. Reinjected 8. Flared or vented 1 hour or less 85 9. Flared or vented more than 1 hour (see instr.) 10. Pilot and Purge 37 11. Used for lease operations (specify 2,248 s p (p fy in Remarks) 12. Other (see instructions) Official Use Only Authorization >1 hr: MCF 9,117 le_. w, / Safety 13. TOTAL VOLUME (ITEMS 6 - 12) MCF Lease Use 14. NGL Gas Equivalent Conservation MCF 15. Purchased gas Waste: MCF 16. Transferred from: KPF Commissioner Date 17. Transferred to: (Express as a negative #) 18. Remarks: Sold to TBPF I hereby certify that the fore.oing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature "Orb ° al,' Title Petroleum Technician to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Rebekah J. Haynes Phone 868 -2133 Date AAC25.235. Form 10-422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate - - PACIFIC ENERGY RESOURCES Excess Flare Log Facility Name West McArthur Production Facility Date & Time Event Gas Steps Taken to I Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment 1 -13 -08 1 -13 -08 0700 hrs 1400 hrs 85 Yes Planned shut down PLC up grade New flare project N/A N/A K -200 Flare_Log.xls Page 1 s — STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Feb -08 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 5,951 Pool Name Pool Code Percent West McArthur River 930148 100% 7. Reinjected 8. Flared or vented 1 hour or less 12 9. Flared or vented more than 1 hour (see instr.) 35 10. Pilot and Purge 1,803 11. Used for lease operations (specify in Remarks) 12. Other (see instructions) Official Use Only Authorization >1 hr: MCF 7,801 Safety /a 13. TOTAL VOLUME (ITEMS 6 -12) MCF Lease Use 14. NGL Gas Equivalent MCF Conservation 15. Purchased gas Waste: MCF 16. Transferred from: KPF / P 4 7 OS Commissioner Date 17. Transferred to: (Express as a negative #) 18. Remarks: Sold to TBPF I hereby certify that the foregoing is true and correct to the best of my knowledge. —7 /IA' Note: All volumes must be corrected Signature ` ` Title Alaska Operations Manager to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name David Hall Phone 868 -2133 Date ` " 3 u AAC25.235. Form 10-422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate PACIFIC ENERGY RESOURCES Excess Flare Log Facility Name West McArthur Production Facility Date & Time Event Gas Steps Taken to Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment Started 02 -25 -08 02 -25 -08 everything K -200 Gas 0415 hrs 0520 hrs 12 NO Power failure Production KPF Lost Turbine back up NONE Compressor Flare_Log.xls Page 1 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Mar -08 Revised Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 6,525 Pool Name Pool Code Percent West McArthur River 930148 100% 7. Reinjected 8. Flared or vented 1 hour or less 300 9. Flared or vented more than 1 hour (see instr.) 30 10. Pilot and Purge 892 11. Used for lease operations (specify in Remarks) Official Use Only 12. Other (see instructions) Authorization >1 hr: MCF 7 747 Safety 13. TOTAL VOLUME (ITEMS 6 -12) MCF ' Lease Use 14. NGL Gas Equivalent MCF Conservation 15. Purchased gas Waste: MCF 16. Transferred from: KPF D S CCCJJJ Commissioner Date 17. Transferred to: (Express as a negative #) 18. Remarks: Sold to TBPF I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature % i ! Title Alaska Operations Manager to pressure of 14.65 psia and to a SZ temperature of 60o F. Authority 20 Printed Name David Hall Phone 868 -2133 Date c2 s AAC25.235. Form 10-422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate PACIFIC ENERGY RESOURCES Excess Flare Log Facility Name West McArthur Production Facility Date & Time Event Gas Steps Taken to Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment Still 3/5/2008 down at Production shut down New flare system K -200 gas 0800 midnight 100 Yes for piping changes Maintenance tie in N/A N/A compressor Down from 3/6/2008 3/6/2008 Production shut down New flare system K -200 gas 0001 1600 200 Yes for piping changes Maintenance tie in N/A N/A compressor Flare_Log.xls Page 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Apr -08 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 8,134 Pool Name Pool Code Percent West McArthur River 930148 100% 7. Reinjected 8. Flared or vented 1 hour or less 27 9. Flared or vented more than 1 hour (see instr.) 24 10. Pilot and Purge 1,589 11. Used for lease operations (specify in Re a - -.... , ^,, `....y- 1 ' 12. Other (see instructions) Authorization >1 hr: MCF 9 774 Safety 13. TOTAL VOLUME (ITEMS 6 -12) MAY 2 3 2008 P a MCF ?/ e, Lease Use ! 14. NGL Gas Equivalent c�F,,�e, �4 MCF �" Alaska 011 a Conservation 15. Purchased gas Waste: MCF 16. Transferred from: KPF e / 1 Commissioner Date 17. Transferred to: (Express as a negative #) 18. Remarks: Sold to TBPF I hereby certify that the foregoing is true and correct to the best of my knowledge. /� // 41 Note: All volumes must be corrected Signature °� Title Alaska Operations Manager to pressure of 14.65 psia and to a P temperature of 60o F. Authority 20 Pri ame David Hall Phone 868 -2133 Date -/ '/11 / AAC25.235. Form 10-422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate illV PACIFIC ENERGY RESOURCES Excess Flare Log Facility Name West McArthur Production Facility Date & Time Event Gas Steps Taken to Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment 4 -10 -08 4 -10 -08 Shut down to change 2:10PM 3:30PM 27.3 yes whitch hat 1st stage. k -200 Flare_Log.xls Page 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. May -08 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 7,276 Pool Name Pool Code Percent West McArthur River 930148 100% 7. Reinjected 8. Flared or vented 1 hour or less 9. Flared or vented more than 1 hour (see Instr.) 24 10. Pilot and Purge 1,599 11. Used for lease operations (specify in Remarks) 12. Other (see instructions) Authorization >1 hr: MCF 8,899 Safety 13. TOTAL VOLUME (ITEMS 6 -12) MCF Lease Use 14. NGL Gas Equivalent MCF Conservation 15. Purchased gas Waste: MCF 16. Transferred from: KPF Commissioner Date 17. Transferred to: (Express as a negative #) 18. Remarks: Sold to TBPF I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Alaska Operations Manager to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name David Hall Phone 868 -2133 Date 6 -! 2. — OP AAC25.235. Form 10 -422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4, Operator 5. Month/Year of Disposition 1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Jun -08 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 7,225 Pool Name Pool Code Percent West McArthur River 930148 100% 7. Reinjected 8. Flared or vented 1 hour or less 15 9. Flared or vented more than 1 hour (see instr.) 24 10. Pilot and Purge 1,468 11. Used for lease operations (specify in Remarks) Officitai Use Only 12. Other (see instructions) - Authorization >1 hr: MCF -2,4w 8,732 Safety 13. TOTAL VOLUME (ITEMS 6 -12) MCF Lease Use 14. NGL Gas Equivalent MCF Conservation 15. Purchased gas Waste: MCF 16. Transferred from: KPF � /J pr).0.604.... 'D / Commissioner Date 17. Transferred to: (Express as a negative #) 18. Remarks: Sold to TBPF I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature 7 Title Alaska Operations Manager to pressure of 14.65 psia and to a � temperature of 60o F. Authority 20 Printed Name David Hall Phone 868 -2133 Date 7 — 7 - AAC25.235. Form 10 -422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate S . PACIFIC ENERGY RESOURCES Excess Flare Log Facility Name West McArthur Production Facility Date & Time Event Gas Steps Taken to Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment 6 -24 -08 6 -24 -08 fuel problem at solar checked out 7:40pm 7:45pm 14.83 no power outage incident power generator restart turbine k -200 Flare_Log.xls Page 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 12. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Jul -08 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 7,409 Pool Name Pool Code Percent West McArthur River 930148 100% 7. Reinjected 8. Flared or vented 1 hour or less 9. Flared or vented more than 1 hour (see instr.) 25 10. Pilot and Purge 1,366 11. Used for lease operations (specify in Remarks) 12. Other (see instructions) ;fix - i' "£ Authorization >1 hr: MCF 8,800 Safety 13. TOTAL VOLUME (ITEMS 6 -12) MCF Lease Use 14. NGL Gas Equivalent MCF Conservation 15. Purchased gas Waste: MCF 16. Transferred from: KPF Commissioner Date 17. Transferred to: (Express as a negative #) 18. Remarks: Sold to TBPF I hereby certify that the foregoing is true and correct to the best of my knowledge. n Note: All volumes must be corrected Signature // " ' Title Alaska Operations Manager to pressure of 14.65 psia and to a L/ temperature of 60o F. Authority 20 Printed Name David Hall Phone 868 -2133 Dates 7 0 -O ' AAC25.235. Form 10-422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Aug -08 Revised Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 7,521 Pool Name Pool Code Percent West McArthur River 930148 100% 7. Reinjected 8. Flared or vented 1 hour or less 1,035 9. Flared or vented more than 1 hour (see instr.) 25 10. Pilot and Purge 929 11. Used for lease operations (specify in Remarks) Official Use Oo y 12. Other (see instructions) — Authorization >1 hr: Safety ` ! MCF y�� 9,510 ®- �` `2'��jlV" 13. TOTAL VOLUME (ITEMS 6 -12) MCF Lease Use 14. NGL Gas Equivalent MCF Conservation 15. Purchased gas Waste: MCF 16. Transferred from: KPF l � -W Commissioner Date 17. Transferred to: (Express as a negative #) 18. Remarks: Sold to TBPF I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Alaska Operations Manager to pressure of 14.65 psia and to a _ temperature of 60o F. Authority 20 Printed Name David Hall Phone 868 -2133 Date 9-i F AAC25.235. Form 10 -422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate PACIFIC ENERGY RESOURCES Excess Flare Log Facility Name West McArthur Production Facility Date & Time Event Gas Steps Taken to Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment Troubleshooting p i Pigging gas pelines with dry 8 -3 -08 8 -3 -08 K -200 gas compressor solution gas dew well head gas, Management K -200 gas 1230 hrs 2400 hrs 156.7 Yes shut down point. adjusting temps. reviewing compressor 8 -04 -08 8 -04 -08 0100 2330 K -200 gas compressor Repair Dessicant Performing HRS HRS 288.5 Yes shut down Towers Repairs 8 -4 -05 8 -5 -05 2400 2400 K -200 gas compressor Repair Dessicant Performing Management K -200 gas HRS HRS 261 YES shut down Towers Repairs reviewing compressor 8 -5 -08 8 -6 -06 K -200 gas compressor Repair Dessicant Performing Management K -200 gas 2400 hrs 2100 hrs 233.6 Yes shut down Towers Repairs reviewing compressor 8 -14 -08 8 -14 -08 Restart K -200 gas 17:15hrs 18:45hrs 26.2 NO Turbine power failure Power loss turbine KPF compressor 8 -23 -08 8 -23 -08 Power loss\ PQM Restart K -200 gas 09:10hrs 12:45hrs 68.8 NO Turbine power failure meter bad. turbine KPF compressor Flare_Log.xls Page 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Aug -08 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 8,337 Pool Name Pool Code Percent West McArthur River 930148 100% 7. Reinjected 8. Flared or vented 1 hour or less 1 9. Flared or vented more than 1 hour (see instr.) 25 10. Pilot and Purge 510 11. Used for lease operations (specify in Remarks) Official Use Only. . ' 12. Other (see instructions) Authorization >1 hr: MCF 8,873 Safety 13. TOTAL VOLUME (ITEMS 6 -12) MCF Lease Use 14. NGL Gas Equivalent MCF Conservation 15. Purchased gas Waste: MCF 16. Transferred from: KPF Commissioner Date 17. Transferred to: (Express as a negative #) 18. Remarks: Sold to TBPF I hereby certify that the foregoing is true and correct to the best of my knowledge. /� Note: All volumes must be corrected Signature // ° Title Alaska Operations Manager to pressure of 14.65 psia and to a —/ p tem of 60o F. Authority 20 Printed Name David Hall Phone 868 -2133 Date d `lo -o, AA C25.235. Form 10 -422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Sep -08 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 6,744 Pool Name Pool Code Percent West McArthur River 930148 100% 7. Reinjected 8. Flared or vented 1 hour or less 1,764 9. Flared or vented more than 1 hour (see instr.) 24 10. Pilot and Purge 582 11. Used for lease operations (specify in Remarks) Only 12. Other (see instructions) L3ifidel Authorization >1 hr: MCF ..2,4 9,114 Safety /7 / iL 13. TOTAL VOLUME (ITEMS 6 -12) ! l0 'T MCF Lease Use 14. NGL Gas Equivalent MCF Conservation 15. Purchased gas Waste: MCF 16. Transferred from: KPF / Commissioner Date 17. Transferred to: (Express as a negative #) 18. Remarks: Sold to TBPF I hereby certify that the foregoing is true and correct to the best of my knowledge. l✓ - -a Note: All volumes must be corrected Signature Title Alaska Operations Manager to pressure of 14.65 psia and to a �„ temperature of 60o F. Authority 20 /L Printed Name David Hall Phone 868 -2133 Date A1/411 AAC25.235. Form 10 -422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate PACIFIC ENERGY RESOURCES Excess Flare Log Facility Name West McArthur Production Facility Date & Time Event Gas Steps Taken to Begin End MCF Planned _ Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment 9 -08 -08 9 -08 -08 174 Replaced 2090 recycle packed off with Replaced reclycle 0830hrs 1830hrs yes line scale Line K -200 9 -09- 2008 9 -9 -08 469 Replaced reclycle 02:30am 1700hrs yes Leak in desi inlet line leaking gas Line K -200 9 -11 -08 9 -11 -08 470 1st and 2nd cylinders bad suction and replaced K -200 12am 2pm NO overheated discharge valves valves 9 -28 -08 9 -28 -08 134 K -200 12:OOhr 23:59hrs yes wet gas 9 -29 -08 9 -29 -08 264 K -200 00:01 hr 23:59hrs Yes Desi Maint. 9 -30 -08 9 -30 -08 253 Yes K -200 00:01 hr 23:59hrs Desi Maint. Flare_Log.xls Page 1 I STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Oct -08 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 2,651 Pool Name Pool Code Percent West McArthur River 930148 100% 7. Reinjected 8. Flared or vented 1 hour or less 4,446 9. Flared or vented more than 1 hour (see instr.) 25 10. Pilot and Purge 582 11. Used for lease operations (specify in Remarks) 12. Other (see instructions) ,. OfOcl t is Authorization >1 hr: MCF 111 7,704 Safety 14 13. TOTAL VOLUME (ITEMS 6 -12) MCF Lease Use 14. NGL Gas Equivalent MCF Conservation 15. Purchased gas MCF Waste: 16. Transferred from: KPF al1147- — y Commissioner Dat 17. Transferred to: (Express as a negative #) 18. Remarks: Sold to TBPF I hereby certify that the foregoing 4.true and correct to the best of my knowledge. / �` Note: All volumes must be corrected Signature Title Alaska Operations Manager to pressure of 14.65 psia and to a � . temperature of 60o F. Authority 20 Printed Name David Hall Phone 868 -2133 Date /7 - 8 ®J AAC25.235. Form 10 -422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate PACIFIC ENERGY RESOURCES Excess Flare Log Facility Name West McArthur Production Facility Oct -08 1 Date & Time Event Gas Steps Taken to Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment 10/1/08 10/1/08 00:01 hrs 23:59hrs 252 Yes Desi Maint. K -200 10/2/08 10/2/08 00:01 hrs 23:59hrs 247 Yes Desi Maint. . K -200 10/3/08 10/3/08 00:01 hrs 23:59hrs 247 Yes Desi Maint. K -200 10/4/08 10/4/08 00:01 hrs 23:59hrs 125 Yes Desi Maint. K -200 10/5/08 10/5/08 00:01 hrs 23:59hrs 180 Yes Desi Maint. K -200 10/6/08 10/6/08 00:01 hrs 23:59hrs 152 Yes Desi Maint. K -200 plan not to operate 10/15/2008 10/15/2008 K -200 down waiting for flaring solution until cooler 19:00hrs 23:59hrs 163 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200 plan not to operate 10/16/2008 10/16/2008 K -200 down waiting for flaring solution until cooler 19:00hrs 23:59hrs 230 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200 plan not to operate 10/17/2008 10/17/2008 K -200 down waiting for flaring solution until cooler 19:00hrs 23:59hrs 226 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200 plan not to operate 10/18/2008 10/18/2008 K -200 down waiting for flaring solution until cooler 19:00hrs 23:59hrs 224 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200 plan not to operate 10/19/2008 10/19/2008 K -200 down waiting for flaring solution until cooler 19:00hrs 23:59hrs 233 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200 plan not to operate 10/20/2008 10/20/2008 K -200 down waiting for flaring solution until cooler 19:00hrs 23:59hrs 240 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200 Flare_Log.xls Page 1 plan not to operate 10/21/2008 10/21/2008 K -200 down waiting for flaring solution until cooler 00:00hrs 23:59hrs 220 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200 plan not to operate 10/22/2008 10/22/2008 K -200 down waiting for flaring solution until cooler 00:00hrs 23:59hrs 186 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200 plan not to operate 10/23/2008 10/23/2008 K -200 down waiting for flaring solution until cooler 00:00hrs 21:10hrs 152.58 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200 plan not to operate 10/24/2008 10/24/2008 K -200 down waiting for flaring solution until cooler 00:00hrs 23:59hrs 178 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200 plan not to operate 10/25/2008 10/25/2008 K -200 down waiting for flaring solution until cooler 00:00hrs 20:00hrs 148.3 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200 plan not to operate 10/26/2008 10/26/2008 K -200 down waiting for flaring solution until cooler 00:00hrs 23:59hrs 185 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200 plan not to operate 10/27/2008 10/27/2008 K -200 down waiting for flaring solution until cooler 00:00hrs 20:30hrs 153.75 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200 plan not to operate 10/28/2008 10/28/2008 K -200 down waiting for flaring solution until cooler 00:00hrs 21:00hrs 171.5 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200 plan not to operate 10/29/2008 10/29/2008 K -200 down waiting for flaring solution until cooler 00:00hrs 24:00hrs 193 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200 plan not to operate 10/30/2008 10/30/2008 K -200 down waiting for flaring solution until cooler 00:00hrs 16:30hrs 140.3 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200 plan not to operate 10/31/2008 10/31/2008 K -200 down waiting for flaring solution until cooler 00:00hrs 24:00hrs 199 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200 Flare_Log.xls Page 2 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition 1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Nov -08 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Pool Name Pool Code Percent West McArthur River 930148 100% 7. Reinjected 8. Flared or vented 1 hour or less 6,123 9. Flared or vented more than 1 hour (see instr.) 24 10. Pilot and Purge 337 11. Used for lease operations (specify in Remarks) 12. Other (see instructions) MCF Authorization >1 hr: Safety 6,484 13. TOTAL VOLUME (ITEMS 6 -12) MCF Lease Use 14. NGL Gas Equivalent , MCF Conservation ,-,,-V..4 , 15. Purchased gas Waste: MCF 16. Transferred from: KPF / Z'! q �- 0v/ ii..s / ommissioner Date 17. Transferred to: (Express as a negative #) 18. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. ��J // Note: All volumes must be corrected Signature Q✓ Title Alaska Operations Manager to pressure of 14.65 psia and to a ,.................. temperature of 60o F. Authority 20 Printed Name David Hall Phone 868 -2133 Date a — ! l-- 0 g AAC25.235. Form 10-422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate PACIFIC ENERGY RESOURCES Excess Flare Log Facility Name West McArthur Production Facility Nov -08 Date & Time Event Gas Steps Taken to Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment plan not to operate 11/1/08 11/1/08 K -200 down waiting for flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 184 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor plan not to operate 11/2/08 11/2/08 K -200 down waiting for flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 201 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor plan not to operate 11/3/08 11/3/08 K -200 down waiting for flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 182 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor plan not to operate 11/4/08 11/4/08 K -200 down waiting for flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 197 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor plan not to operate 11/5/09 11/5/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 193 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 11/6/09 11/6/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 211 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 11/7/09 11/7/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 237 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 11/8/09 11/8/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 242 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 11/9/09 11/9/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 238 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 11/10/09 11/10/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 248 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 11/11/09 11/11/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 240 Yes solution gas. upgrade liquids elimination gas instalation Compressor Flare_Log.xls Page 1 Date & Time Event Gas Steps Taken to Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment plan not to operate 11/12/09 11/12/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 217 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 11/13/09 11/13/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 226 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 11/14/09 11/14/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 99 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 11/15/09 11/15/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 110 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not tooperate pl p 11/16/09 11/16/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 118 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 11/17/09 11/17/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 135 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 11/18/09 11/18/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 102 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 11/19/09 11/19/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 95 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 11/20/09 11/20/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 121 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 11/21/09 11/21/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 131 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 11/22/09 11/22/08 K -200 down waiting for flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 137 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor plan not to operate 11/23/09 11/23/08 K -200 down waiting for flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 157 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor plan not to operate 11/24/09 11/24/08 K -200 down waiting for flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 265 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor Flare_Log.xls Page 2 Date & Time Event Gas Steps Taken to Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment plan not to operate 11/25/09 11/25/08 K -200 down waiting for flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 305 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor plan not to operate 11/26/09 11/26/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 313 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 11/27/09 11/27/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 304 Yes solution gas. upgrade liquids elimination gas instalation Compressor liquids plan not to operate 11/28/09 11/28/08 K -200 ONLINE, flaring elimination, 2nd flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 368 Yes solution gas. upgrade stage crank seal gas instalation Compressor liquids plan not to operate 11/29/09 11/29/08 K -200 ONLINE, flaring elimination, 2nd flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 322 Yes solution gas. upgrade stage crank seal gas instalation Compressor plan not to operate 11/30/09 11/30/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 225 Yes solution gas. upgrade liquids elimination gas instalation Compressor 6,123 Flare_Log.xls Page 3 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field '4. Operator 5. Month/Year of Disposition 1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Dec-08 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of 6. Sold Total Volume. Pool Name Pool Code Percent 7. Reinjected West McArthur River 930148 100% 8. Flared or vented 1 hour or less 9. Flared or vented more than 1 hour (see instr.) 2, 846 10. Pilot and Purge 25 11. Used for lease operations (specify in Remarks) ..... ,.s " O ffctal "WI 4 12. Other (see instructions) f ,y Authorization >1 hr: Safety / MCF 13. TOTAL VOLUME (ITEMS 6 -12) 2,871 ` 5/ MCF Lease Use 14. NGL Gas Equivalent Conservation MCF 15. - Purchased gas Waste: MCF 1,456 16. Transferred from: KPF _ — _ r / ( d 17. Transferred to: (Express as a negative #) Commissioner Date 18. Remarks: Actual used for lease operations: 1,456 mcf I hereby certify that the foregoing is true and correct to the best of my knowledge. / Note: All volumes must be corrected Signature G Title Alaska Operations Manager to pressure of 14.65 psia and to a temperature of 60o Printe� AAC25.235. F. Authority 20 me David Hall Phone 868 -2133 Date � — — C9 5.235. Form 10 -422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate PACIFIC ENERGY RESOURCES Excess Flare Log Facility Name West McArthur Production Facility Dec -08 Date & Time Event Gas Steps Taken to Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment plan not to operate 12/1/08 12/1/08 K -200 down waiting for flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 162 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor plan not to operate 12/2/08 12/2/08 K -200 down waiting for flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 155 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor plan not to operate 12/3/08 12/3/08 K -200 down waiting for flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 164 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor plan not to operate 12/4/08 12/4/08 K -200 down waiting for flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 150 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor plan not to operate 12/5/08 12/5/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 167 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/6/08 12/6/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 140 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/7/08 12/7/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 25 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/8/08 12/8/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 13 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/9/08 12/9/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 23 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/10/08 12/10/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 25 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/11/08 12/11/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01hrs 23:59hrs 29 Yes solution gas. upgrade liquids elimination gas instalation Compressor Flare_Log.xls Page 1 Date & Time Event Gas Steps Taken to Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment plan not to operate 12/12/08 12/12/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 21 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/13/08 12/13/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 21 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/14/08 12/14/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 25 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/15/08 12/15/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 19 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/16/08 12/16/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 20 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/17/08 12/17/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 23 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/18/08 12/18/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 14 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/19/08 12/19/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 92 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/20/08 12/20/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 108 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/21/08 12/21/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 144 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/22/08 12/22/08 K -200 down waiting for flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 152 Yes gas cooler upgrade. upgrade _liquids elimination gas instalation Compressor plan not to operate 12/23/08 12/23/08 K -200 down waiting for flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 147 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor plan not to operate 12/24/08 12/24/08 K -200 down waiting for flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 133 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor Flare_Log.xls Page 2 i Date & Time Event Gas Steps Taken to Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment plan not to operate 12/25/08 12/25/08 K -200 down waiting for flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 147 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor plan not to operate 12/26/08 12/26/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 145 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/27/08 12/27/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 142 Yes solution gas. upgrade liquids elimination gas instalation Compressor flaring solution plan not to operate 12/28/08 12/28/08 K -200 ONLINE, flaring gas VRU down until cooler K -200 Gas 00:01 hrs 23:59hrs 99 Yes solution gas. upgrade liquids elimination 6hrs. instalation Compressor plan not to operate 12/29/08 12/29/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 100 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/30/08 12/30/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 129 Yes solution gas. upgrade liquids elimination gas instalation Compressor plan not to operate 12/31/08 12/31/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas 00:01 hrs 23:59hrs 112 Yes solution gas. upgrade liquids elimination gas instalation Compressor Flare_Log.xls Page 3