Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutW McArthur River / Forest Oil Corp STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2008
FACILITY: W McArthur River
OPERATOR: FOREST OIL CORP
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000027 West McArthur River West McArthur River Unit Forest Oil Corporation —Dee:47r .Q,,r�, :L.49 1�2(
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
6,747 Pool Name Pool Code Percent
West McArthur River 930148 100%
7. Reinjected
8. Flared or vented 1 hour or less
85
9. Flared or vented more than 1 hour (see instr.)
10. Pilot and Purge 37
11. Used for lease operations (specify 2,248
s
p (p fy in Remarks)
12. Other (see instructions)
Official Use Only
Authorization >1 hr: MCF
9,117 le_. w, / Safety
13. TOTAL VOLUME (ITEMS 6 - 12) MCF
Lease Use
14. NGL Gas Equivalent
Conservation MCF
15. Purchased gas
Waste: MCF
16. Transferred from: KPF
Commissioner Date
17. Transferred to: (Express as a negative #)
18. Remarks: Sold to TBPF
I hereby certify that the fore.oing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature "Orb ° al,' Title Petroleum Technician to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Rebekah J. Haynes Phone 868 -2133 Date AAC25.235.
Form 10-422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
- -
PACIFIC ENERGY RESOURCES
Excess Flare Log
Facility Name West McArthur Production Facility
Date & Time Event Gas Steps Taken to
I
Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment
1 -13 -08 1 -13 -08
0700 hrs 1400 hrs 85 Yes Planned shut down PLC up grade New flare project N/A N/A K -200
Flare_Log.xls Page 1
s —
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Feb -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
5,951 Pool Name Pool Code Percent
West McArthur River 930148 100%
7. Reinjected
8. Flared or vented 1 hour or less
12
9. Flared or vented more than 1 hour (see instr.)
35
10. Pilot and Purge
1,803
11. Used for lease operations (specify in Remarks)
12. Other (see instructions) Official Use Only
Authorization >1 hr: MCF
7,801 Safety /a
13. TOTAL VOLUME (ITEMS 6 -12)
MCF
Lease Use
14. NGL Gas Equivalent
MCF
Conservation
15. Purchased gas Waste: MCF
16. Transferred from: KPF / P 4 7 OS
Commissioner Date
17. Transferred to: (Express as a negative #)
18. Remarks: Sold to TBPF
I hereby certify that the foregoing is true and correct to the best of my knowledge.
—7
/IA' Note: All volumes must be corrected
Signature ` ` Title Alaska Operations Manager to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name David Hall Phone 868 -2133 Date ` " 3 u AAC25.235.
Form 10-422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
PACIFIC ENERGY RESOURCES
Excess Flare Log
Facility Name West McArthur Production Facility
Date & Time Event Gas Steps Taken to
Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment
Started
02 -25 -08 02 -25 -08 everything K -200 Gas
0415 hrs 0520 hrs 12 NO Power failure Production KPF Lost Turbine back up NONE Compressor
Flare_Log.xls Page 1
1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Mar -08 Revised
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
6,525 Pool Name Pool Code Percent
West McArthur River 930148 100%
7. Reinjected
8. Flared or vented 1 hour or less
300
9. Flared or vented more than 1 hour (see instr.)
30
10. Pilot and Purge
892
11. Used for lease operations (specify in Remarks)
Official Use Only
12. Other (see instructions)
Authorization >1 hr: MCF
7 747 Safety
13. TOTAL VOLUME (ITEMS 6 -12) MCF '
Lease Use
14. NGL Gas Equivalent
MCF
Conservation
15. Purchased gas
Waste: MCF
16. Transferred from: KPF D S
CCCJJJ
Commissioner Date
17. Transferred to: (Express as a negative #)
18. Remarks: Sold to TBPF
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature % i ! Title Alaska Operations Manager to pressure of 14.65 psia and to a
SZ temperature of 60o F. Authority 20
Printed Name David Hall Phone 868 -2133 Date c2 s AAC25.235.
Form 10-422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
PACIFIC ENERGY RESOURCES
Excess Flare Log
Facility Name West McArthur Production Facility
Date & Time Event Gas Steps Taken to
Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment
Still
3/5/2008 down at Production shut down New flare system K -200 gas
0800 midnight 100 Yes for piping changes Maintenance tie in N/A N/A compressor
Down
from
3/6/2008 3/6/2008 Production shut down New flare system K -200 gas
0001 1600 200 Yes for piping changes Maintenance tie in N/A N/A compressor
Flare_Log.xls Page 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Apr -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
8,134 Pool Name Pool Code Percent
West McArthur River 930148 100%
7. Reinjected
8. Flared or vented 1 hour or less
27
9. Flared or vented more than 1 hour (see instr.)
24
10. Pilot and Purge
1,589
11. Used for lease operations (specify in Re a - -.... , ^,, `....y- 1 '
12. Other (see instructions)
Authorization >1 hr: MCF
9 774 Safety
13. TOTAL VOLUME (ITEMS 6 -12) MAY 2 3 2008
P a
MCF ?/ e,
Lease Use !
14. NGL Gas Equivalent c�F,,�e, �4 MCF �"
Alaska 011 a Conservation
15. Purchased gas
Waste: MCF
16. Transferred from: KPF e / 1
Commissioner Date
17. Transferred to: (Express as a negative #)
18. Remarks: Sold to TBPF
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/� // 41 Note: All volumes must be corrected
Signature °� Title Alaska Operations Manager to pressure of 14.65 psia and to a
P temperature of 60o F. Authority 20
Pri ame David Hall Phone 868 -2133 Date -/ '/11 / AAC25.235.
Form 10-422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
illV
PACIFIC ENERGY RESOURCES
Excess Flare Log
Facility Name West McArthur Production Facility
Date & Time Event Gas Steps Taken to
Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment
4 -10 -08 4 -10 -08 Shut down to change
2:10PM 3:30PM 27.3 yes whitch hat 1st stage. k -200
Flare_Log.xls Page 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. May -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
7,276 Pool Name Pool Code Percent
West McArthur River 930148 100%
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see Instr.)
24
10. Pilot and Purge
1,599
11. Used for lease operations (specify in Remarks)
12. Other (see instructions)
Authorization >1 hr: MCF
8,899 Safety
13. TOTAL VOLUME (ITEMS 6 -12) MCF
Lease Use
14. NGL Gas Equivalent
MCF
Conservation
15. Purchased gas
Waste: MCF
16. Transferred from: KPF
Commissioner Date
17. Transferred to: (Express as a negative #)
18. Remarks: Sold to TBPF
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Alaska Operations Manager to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name David Hall Phone 868 -2133 Date 6 -! 2. — OP AAC25.235.
Form 10 -422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4, Operator 5. Month/Year of Disposition
1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Jun -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
7,225 Pool Name Pool Code Percent
West McArthur River 930148 100%
7. Reinjected
8. Flared or vented 1 hour or less
15
9. Flared or vented more than 1 hour (see instr.)
24
10. Pilot and Purge
1,468
11. Used for lease operations (specify in Remarks)
Officitai Use Only
12. Other (see instructions) -
Authorization >1 hr: MCF -2,4w
8,732
Safety
13. TOTAL VOLUME (ITEMS 6 -12) MCF
Lease Use
14. NGL Gas Equivalent MCF
Conservation
15. Purchased gas
Waste: MCF
16. Transferred from: KPF � /J pr).0.604.... 'D
/ Commissioner Date
17. Transferred to: (Express as a negative #)
18. Remarks: Sold to TBPF
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature 7 Title Alaska Operations Manager to pressure of 14.65 psia and to a
� temperature of 60o F. Authority 20
Printed Name David Hall Phone 868 -2133 Date 7 — 7 - AAC25.235.
Form 10 -422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
S .
PACIFIC ENERGY RESOURCES
Excess Flare Log
Facility Name West McArthur Production Facility
Date & Time Event Gas Steps Taken to
Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment
6 -24 -08 6 -24 -08 fuel problem at solar checked out
7:40pm 7:45pm 14.83 no power outage incident power generator restart turbine k -200
Flare_Log.xls Page 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 12. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Jul -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
7,409 Pool Name Pool Code Percent
West McArthur River 930148 100%
7. Reinjected
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr.)
25
10. Pilot and Purge
1,366
11. Used for lease operations (specify in Remarks)
12. Other (see instructions) ;fix - i' "£
Authorization >1 hr: MCF
8,800 Safety
13. TOTAL VOLUME (ITEMS 6 -12) MCF
Lease Use
14. NGL Gas Equivalent
MCF
Conservation
15. Purchased gas
Waste: MCF
16. Transferred from: KPF
Commissioner Date
17. Transferred to: (Express as a negative #)
18. Remarks: Sold to TBPF
I hereby certify that the foregoing is true and correct to the best of my knowledge.
n Note: All volumes must be corrected
Signature // " ' Title Alaska Operations Manager to pressure of 14.65 psia and to a
L/ temperature of 60o F. Authority 20
Printed Name David Hall Phone 868 -2133 Dates 7 0 -O ' AAC25.235.
Form 10-422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Aug -08 Revised
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
7,521 Pool Name Pool Code Percent
West McArthur River 930148 100%
7. Reinjected
8. Flared or vented 1 hour or less
1,035
9. Flared or vented more than 1 hour (see instr.)
25
10. Pilot and Purge
929
11. Used for lease operations (specify in Remarks)
Official Use Oo y
12. Other (see instructions) — Authorization >1 hr: Safety
` ! MCF y��
9,510 ®- �` `2'��jlV"
13. TOTAL VOLUME (ITEMS 6 -12) MCF
Lease Use
14. NGL Gas Equivalent MCF
Conservation
15. Purchased gas
Waste: MCF
16. Transferred from: KPF l � -W
Commissioner Date
17. Transferred to: (Express as a negative #)
18. Remarks: Sold to TBPF
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Alaska Operations Manager to pressure of 14.65 psia and to a
_ temperature of 60o F. Authority 20
Printed Name David Hall Phone 868 -2133 Date 9-i F AAC25.235.
Form 10 -422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
PACIFIC ENERGY RESOURCES
Excess Flare Log
Facility Name West McArthur Production Facility
Date & Time Event Gas Steps Taken to
Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment
Troubleshooting p i Pigging gas
pelines with dry
8 -3 -08 8 -3 -08 K -200 gas compressor solution gas dew well head gas, Management K -200 gas
1230 hrs 2400 hrs 156.7 Yes shut down point. adjusting temps. reviewing compressor
8 -04 -08 8 -04 -08
0100 2330 K -200 gas compressor Repair Dessicant Performing
HRS HRS 288.5 Yes shut down Towers Repairs
8 -4 -05 8 -5 -05
2400 2400 K -200 gas compressor Repair Dessicant Performing Management K -200 gas
HRS HRS 261 YES shut down Towers Repairs reviewing compressor
8 -5 -08 8 -6 -06 K -200 gas compressor Repair Dessicant Performing Management K -200 gas
2400 hrs 2100 hrs 233.6 Yes shut down Towers Repairs reviewing compressor
8 -14 -08 8 -14 -08 Restart K -200 gas
17:15hrs 18:45hrs 26.2 NO Turbine power failure Power loss turbine KPF compressor
8 -23 -08 8 -23 -08 Power loss\ PQM Restart K -200 gas
09:10hrs 12:45hrs 68.8 NO Turbine power failure meter bad. turbine KPF compressor
Flare_Log.xls Page 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Aug -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
8,337 Pool Name Pool Code Percent
West McArthur River 930148 100%
7. Reinjected
8. Flared or vented 1 hour or less
1
9. Flared or vented more than 1 hour (see instr.)
25
10. Pilot and Purge
510
11. Used for lease operations (specify in Remarks)
Official Use Only. . '
12. Other (see instructions)
Authorization >1 hr: MCF
8,873 Safety
13. TOTAL VOLUME (ITEMS 6 -12) MCF
Lease Use
14. NGL Gas Equivalent MCF
Conservation
15. Purchased gas
Waste: MCF
16. Transferred from: KPF
Commissioner Date
17. Transferred to: (Express as a negative #)
18. Remarks: Sold to TBPF
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/� Note: All volumes must be corrected
Signature // ° Title Alaska Operations Manager to pressure of 14.65 psia and to a
—/ p tem of 60o F. Authority 20
Printed Name David Hall Phone 868 -2133 Date d `lo -o, AA C25.235.
Form 10 -422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Sep -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
6,744 Pool Name Pool Code Percent
West McArthur River 930148 100%
7. Reinjected
8. Flared or vented 1 hour or less
1,764
9. Flared or vented more than 1 hour (see instr.)
24
10. Pilot and Purge
582
11. Used for lease operations (specify in Remarks) Only
12. Other (see instructions) L3ifidel
Authorization >1 hr: MCF ..2,4
9,114 Safety /7 / iL
13. TOTAL VOLUME (ITEMS 6 -12) ! l0 'T
MCF
Lease Use
14. NGL Gas Equivalent
MCF
Conservation
15. Purchased gas
Waste: MCF
16. Transferred from: KPF /
Commissioner Date
17. Transferred to: (Express as a negative #)
18. Remarks: Sold to TBPF
I hereby certify that the foregoing is true and correct to the best of my knowledge.
l✓ - -a Note: All volumes must be corrected
Signature Title Alaska Operations Manager to pressure of 14.65 psia and to a
�„ temperature of 60o F. Authority 20
/L
Printed Name David Hall Phone 868 -2133 Date A1/411 AAC25.235.
Form 10 -422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
PACIFIC ENERGY RESOURCES
Excess Flare Log
Facility Name West McArthur Production Facility
Date & Time Event Gas Steps Taken to
Begin End MCF Planned _ Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment
9 -08 -08 9 -08 -08 174 Replaced 2090 recycle packed off with Replaced reclycle
0830hrs 1830hrs yes line scale Line K -200
9 -09-
2008 9 -9 -08 469 Replaced reclycle
02:30am 1700hrs yes Leak in desi inlet line leaking gas Line K -200
9 -11 -08 9 -11 -08 470 1st and 2nd cylinders bad suction and replaced K -200
12am 2pm NO overheated discharge valves valves
9 -28 -08 9 -28 -08 134 K -200
12:OOhr 23:59hrs yes wet gas
9 -29 -08 9 -29 -08 264 K -200
00:01 hr 23:59hrs Yes Desi Maint.
9 -30 -08 9 -30 -08 253 Yes K -200
00:01 hr 23:59hrs Desi Maint.
Flare_Log.xls Page 1
I
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Oct -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
2,651 Pool Name Pool Code Percent
West McArthur River 930148 100%
7. Reinjected
8. Flared or vented 1 hour or less
4,446
9. Flared or vented more than 1 hour (see instr.)
25
10. Pilot and Purge
582
11. Used for lease operations (specify in Remarks)
12. Other (see instructions) ,. OfOcl t is
Authorization >1 hr: MCF
111
7,704 Safety 14
13. TOTAL VOLUME (ITEMS 6 -12) MCF
Lease Use
14. NGL Gas Equivalent MCF
Conservation
15. Purchased gas MCF
Waste:
16. Transferred from: KPF
al1147- — y
Commissioner Dat
17. Transferred to: (Express as a negative #)
18. Remarks: Sold to TBPF
I hereby certify that the foregoing 4.true and correct to the best of my knowledge.
/ �` Note: All volumes must be corrected
Signature Title Alaska Operations Manager to pressure of 14.65 psia and to a
� . temperature of 60o F. Authority 20
Printed Name David Hall Phone 868 -2133 Date /7 - 8 ®J AAC25.235.
Form 10 -422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
PACIFIC ENERGY RESOURCES
Excess Flare Log
Facility Name West McArthur Production Facility Oct -08
1
Date & Time Event Gas Steps Taken to
Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment
10/1/08 10/1/08
00:01 hrs 23:59hrs 252 Yes Desi Maint. K -200
10/2/08 10/2/08
00:01 hrs 23:59hrs 247 Yes Desi Maint. .
K -200
10/3/08 10/3/08
00:01 hrs 23:59hrs 247 Yes Desi Maint. K -200
10/4/08 10/4/08
00:01 hrs 23:59hrs 125 Yes Desi Maint. K -200
10/5/08 10/5/08
00:01 hrs 23:59hrs 180 Yes Desi Maint. K -200
10/6/08 10/6/08
00:01 hrs 23:59hrs 152 Yes Desi Maint. K -200
plan not to operate
10/15/2008 10/15/2008 K -200 down waiting for flaring solution until cooler
19:00hrs 23:59hrs 163 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200
plan not to operate
10/16/2008 10/16/2008 K -200 down waiting for flaring solution until cooler
19:00hrs 23:59hrs 230 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200
plan not to operate
10/17/2008 10/17/2008 K -200 down waiting for flaring solution until cooler
19:00hrs 23:59hrs 226 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200
plan not to operate
10/18/2008 10/18/2008 K -200 down waiting for flaring solution until cooler
19:00hrs 23:59hrs 224 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200
plan not to operate
10/19/2008 10/19/2008 K -200 down waiting for flaring solution until cooler
19:00hrs 23:59hrs 233 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200
plan not to operate
10/20/2008 10/20/2008 K -200 down waiting for flaring solution until cooler
19:00hrs 23:59hrs 240 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200
Flare_Log.xls Page 1
plan not to operate
10/21/2008 10/21/2008 K -200 down waiting for flaring solution until cooler
00:00hrs 23:59hrs 220 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200
plan not to operate
10/22/2008 10/22/2008 K -200 down waiting for flaring solution until cooler
00:00hrs 23:59hrs 186 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200
plan not to operate
10/23/2008 10/23/2008 K -200 down waiting for flaring solution until cooler
00:00hrs 21:10hrs 152.58 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200
plan not to operate
10/24/2008 10/24/2008 K -200 down waiting for flaring solution until cooler
00:00hrs 23:59hrs 178 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200
plan not to operate
10/25/2008 10/25/2008 K -200 down waiting for flaring solution until cooler
00:00hrs 20:00hrs 148.3 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200
plan not to operate
10/26/2008 10/26/2008 K -200 down waiting for flaring solution until cooler
00:00hrs 23:59hrs 185 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200
plan not to operate
10/27/2008 10/27/2008 K -200 down waiting for flaring solution until cooler
00:00hrs 20:30hrs 153.75 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200
plan not to operate
10/28/2008 10/28/2008 K -200 down waiting for flaring solution until cooler
00:00hrs 21:00hrs 171.5 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200
plan not to operate
10/29/2008 10/29/2008 K -200 down waiting for flaring solution until cooler
00:00hrs 24:00hrs 193 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200
plan not to operate
10/30/2008 10/30/2008 K -200 down waiting for flaring solution until cooler
00:00hrs 16:30hrs 140.3 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200
plan not to operate
10/31/2008 10/31/2008 K -200 down waiting for flaring solution until cooler
00:00hrs 24:00hrs 199 Yes gas cooler upgrade. upgrade liquids elimination gas instalation K -200
Flare_Log.xls Page 2
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of Disposition
1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Nov -08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
Pool Name Pool Code Percent
West McArthur River 930148 100%
7. Reinjected
8. Flared or vented 1 hour or less
6,123
9. Flared or vented more than 1 hour (see instr.)
24
10. Pilot and Purge
337
11. Used for lease operations (specify in Remarks)
12. Other (see instructions) MCF
Authorization >1 hr:
Safety
6,484
13. TOTAL VOLUME (ITEMS 6 -12) MCF
Lease Use
14. NGL Gas Equivalent ,
MCF
Conservation ,-,,-V..4 ,
15. Purchased gas Waste: MCF
16. Transferred from: KPF / Z'! q �- 0v/
ii..s /
ommissioner Date
17. Transferred to: (Express as a negative #)
18. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
��J // Note: All volumes must be corrected
Signature Q✓ Title Alaska Operations Manager to pressure of 14.65 psia and to a
,.................. temperature of 60o F. Authority 20
Printed Name David Hall Phone 868 -2133 Date a — ! l-- 0 g AAC25.235.
Form 10-422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
PACIFIC ENERGY RESOURCES
Excess Flare Log
Facility Name West McArthur Production Facility Nov -08
Date & Time Event Gas Steps Taken to
Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment
plan not to operate
11/1/08 11/1/08 K -200 down waiting for flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 184 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/2/08 11/2/08 K -200 down waiting for flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 201 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/3/08 11/3/08 K -200 down waiting for flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 182 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/4/08 11/4/08 K -200 down waiting for flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 197 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/5/09 11/5/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 193 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/6/09 11/6/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 211 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/7/09 11/7/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 237 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/8/09 11/8/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 242 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/9/09 11/9/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 238 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/10/09 11/10/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 248 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/11/09 11/11/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 240 Yes solution gas. upgrade liquids elimination gas instalation Compressor
Flare_Log.xls Page 1
Date & Time Event Gas Steps Taken to
Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment
plan not to operate
11/12/09 11/12/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 217 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/13/09 11/13/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 226 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/14/09 11/14/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 99 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/15/09 11/15/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 110 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not tooperate
pl p
11/16/09 11/16/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 118 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/17/09 11/17/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 135 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/18/09 11/18/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 102 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/19/09 11/19/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 95 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/20/09 11/20/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 121 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/21/09 11/21/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 131 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/22/09 11/22/08 K -200 down waiting for flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 137 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/23/09 11/23/08 K -200 down waiting for flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 157 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/24/09 11/24/08 K -200 down waiting for flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 265 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor
Flare_Log.xls Page 2
Date & Time Event Gas Steps Taken to
Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment
plan not to operate
11/25/09 11/25/08 K -200 down waiting for flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 305 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/26/09 11/26/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 313 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
11/27/09 11/27/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 304 Yes solution gas. upgrade liquids elimination gas instalation Compressor
liquids plan not to operate
11/28/09 11/28/08 K -200 ONLINE, flaring elimination, 2nd flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 368 Yes solution gas. upgrade stage crank seal gas instalation Compressor
liquids plan not to operate
11/29/09 11/29/08 K -200 ONLINE, flaring elimination, 2nd flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 322 Yes solution gas. upgrade stage crank seal gas instalation Compressor
plan not to operate
11/30/09 11/30/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 225 Yes solution gas. upgrade liquids elimination gas instalation Compressor
6,123
Flare_Log.xls Page 3
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3. Field '4. Operator 5. Month/Year of Disposition
1330000027 West McArthur River West McArthur River Unit Pacific Energy Resources Ltd. Dec-08
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
6. Sold Total Volume.
Pool Name Pool Code Percent
7. Reinjected West McArthur River 930148 100%
8. Flared or vented 1 hour or less
9. Flared or vented more than 1 hour (see instr.)
2, 846
10. Pilot and Purge 25
11. Used for lease operations (specify in Remarks)
..... ,.s " O ffctal "WI 4
12. Other (see instructions)
f ,y
Authorization >1 hr: Safety / MCF
13. TOTAL VOLUME (ITEMS 6 -12)
2,871 ` 5/
MCF
Lease Use
14. NGL Gas Equivalent
Conservation MCF
15. - Purchased gas
Waste: MCF
1,456
16. Transferred from: KPF _ — _ r / ( d
17. Transferred to: (Express as a negative #)
Commissioner Date
18. Remarks: Actual used for lease operations: 1,456 mcf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/ Note: All volumes must be corrected
Signature G Title Alaska Operations Manager to pressure of 14.65 psia and to a
temperature of 60o
Printe� AAC25.235.
F. Authority 20
me David Hall Phone 868 -2133 Date � — — C9 5.235.
Form 10 -422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
PACIFIC ENERGY RESOURCES
Excess Flare Log
Facility Name West McArthur Production Facility Dec -08
Date & Time Event Gas Steps Taken to
Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment
plan not to operate
12/1/08 12/1/08 K -200 down waiting for flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 162 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/2/08 12/2/08 K -200 down waiting for flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 155 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/3/08 12/3/08 K -200 down waiting for flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 164 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/4/08 12/4/08 K -200 down waiting for flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 150 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/5/08 12/5/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 167 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/6/08 12/6/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 140 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/7/08 12/7/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 25 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/8/08 12/8/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 13 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/9/08 12/9/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 23 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/10/08 12/10/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 25 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/11/08 12/11/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01hrs 23:59hrs 29 Yes solution gas. upgrade liquids elimination gas instalation Compressor
Flare_Log.xls Page 1
Date & Time Event Gas Steps Taken to
Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment
plan not to operate
12/12/08 12/12/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 21 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/13/08 12/13/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 21 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/14/08 12/14/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 25 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/15/08 12/15/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 19 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/16/08 12/16/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 20 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/17/08 12/17/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 23 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/18/08 12/18/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 14 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/19/08 12/19/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 92 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/20/08 12/20/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 108 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/21/08 12/21/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 144 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/22/08 12/22/08 K -200 down waiting for flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 152 Yes gas cooler upgrade. upgrade _liquids elimination gas instalation Compressor
plan not to operate
12/23/08 12/23/08 K -200 down waiting for flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 147 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/24/08 12/24/08 K -200 down waiting for flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 133 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor
Flare_Log.xls Page 2
i
Date & Time Event Gas Steps Taken to
Begin End MCF Planned Description of Incident Category Reason Actions Taken Minimize Recurrence Equipment
plan not to operate
12/25/08 12/25/08 K -200 down waiting for flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 147 Yes gas cooler upgrade. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/26/08 12/26/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 145 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/27/08 12/27/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 142 Yes solution gas. upgrade liquids elimination gas instalation Compressor
flaring solution plan not to operate
12/28/08 12/28/08 K -200 ONLINE, flaring gas VRU down until cooler K -200 Gas
00:01 hrs 23:59hrs 99 Yes solution gas. upgrade liquids elimination 6hrs. instalation Compressor
plan not to operate
12/29/08 12/29/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 100 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/30/08 12/30/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 129 Yes solution gas. upgrade liquids elimination gas instalation Compressor
plan not to operate
12/31/08 12/31/08 K -200 ONLINE, flaring flaring solution until cooler K -200 Gas
00:01 hrs 23:59hrs 112 Yes solution gas. upgrade liquids elimination gas instalation Compressor
Flare_Log.xls Page 3