Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutARCO - CCP
';¡'~/~@.::;(f%:4<~~J%d~~i!%IØI?Ár~_~W~@/I/I/I/I/A'/I/I/Æ;.~:4Y.WW/.M:ar/6"%Ø'/I/I~4Y/I/14¥4W/4W-'/N/,&o/AW;;jJ'71/H/..ØX.ø"/I/I/I/ØX#'I/I,w/4':I/N,w/I/I/N/I/N/N/AI"i~tWN/IYÆ'I/I/I/IXØßWA/'I/..ø>k\P/"ørAE%tm:'4I0;¡r;
AI"CO -CCP
.995
I
GaS DiS10SitioIl Fles
-
W.;~1%)V.«f/.&W,,:,,¡¡WI/H..{Ø'"/Ø/#'I/'/H/A¡r"/I/I/I/I/A7AFYI/iØ/,~:I/I/I/N/'/H/I/.ØV~WI/I/I4W'6~1/1/4I'i:$W..ø7H/I/~IYIY.lW/I/E'Iat"7N/IAV,w/I/I/I/I/IMlJlVI/I/H/I,w/#'..dfi7..wI,w/6/AWI/ÁP'4~~.w'4@~Aff~~ !!!;¥V
IGOCC
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Facility
CENTRAL COMPRESSOR PLANT
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
--
I Operator
ARCO ALASKA, INC.
4. Flared or vented ~reater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Pur~e
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL ~as equivalent produced
-
9. Purchased gas
10. Transferred from: FS 1. FS2. FS3.
Gel. Ge2. GC3
11. Transferred to: CGF
Remarks:
Fuel
Assist
1:-
î.'\}
H)
~K'"
\:¡;.
o
;.--
>'I"
!;~
º_ rft
õU
-, 0
~:;::¡
(>..'1 UI
(tI'
o
.:.>
:3
-::4
ft¡.
~.
g
t' _
)::>
Z
,
r~
(
n
n!~'
1.087.220
218.478.729
32.764
6,541.011
o
o
226.139.724
....
~'Gtl!
rL
o
182.233.666
.->
-.I
<:Q.
6<'5
(;T)
22.710.367
T herehv œrtifv that the foregoing is tme anrl enrreet to the b>""t ofmv knowlf"nge.
Signature: ~ Title: SUPERVISOR
Form 1O-a-~e~i~~; - ~ -
I Field(s) MOnthIY ear of Disposition
EASTERN OPERATING AREA-PBU Dec-95
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100
o
o
Official Use Only--Flarin~ AutJlOrizalÎolI > ] hr.
1. Safety
MCF
o
2. Lease Use
MCF
o
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
DATE
l1ME
flARING EVENTS LESS THAN 1 HOUR
e
TOTAL UNDER 1 HOUR 0
FLARING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR
e
o
Flared
Pilot/Purge
Continuous Assist
TOTAL FLARED
ARCO ALASKA, INC.
CONSERVA110N ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PLANTIFIELD FUEL GAS UNIT
DECEMBER 1995
VOLUME MCF DESCRIPl10N OF INCIDENlS & CAUSE
o
32,764
Jl
32,764
. _~\.?1Ì-'O
'r\,'C\,jr-~ ¥ ~
JAM 1 ì 1996
. .... l.....'.'iy" Ccm!íl\ssion
to t:,";><.;.~a O~,\ &. vas _~U& ..~.
""'''-'' . Anchorage
PLANNED
UNPLA~ED
ACTION TAKEN TO ELIMINATE CAUSE
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Facility
CENTRAL COMPRESSOR PLANT
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
e
I Operator
ARCO ALASKA. INC.
988.803
200.560.672
4. Flared or vented In"eater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
e
9. Purchased ~as
10. Transferred from: FSI. FS2. FS3.
GCl. GC2. GC3
11. Transferred to: CGF
Remarks:
31.622
Fuel
Assist
5.935,457
o
o
207.517.394
168.033.620
23.886.075
T herehv œrt. if v... t~~tthZ' for ,g,oin.11" is tnJ.e :'Inrl correct to the hest of mv knowleilge,
Signature: ...~ .~) ~Á,<~~itle: SUPERVISOR
Form 10-422 (Revised 4195)
Field(S) I MonthlY ear of Disposition
EASTERN OPERATING AREA-PBU Nov-95
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100
840
o
OfticiallJse Only--Flarin~ Allthorizatinn > 1 hr.
1. Safety
MCF
o
2. Lease Use
MCF
o
3. ConseTV. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
,
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PLANTJFIELD FUEL GAS UNIT
NOVEMBER 1995
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UN'LA,...,ED
ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
11/04/95 0200-0205 135 Shutdown TIC 1804 to repair leak in exhaust system. PLANNED Down for repairs.
11/09/95 0800-0805 135 Shutdown TIC 1802 for mainlenance due to electrical! UN'LA,...,ED Corrected E&I fluctuationlfailure.
instrumentation malfunction. Restarted TIC 1802.
e 11/12/95 1 420-1425 135 Faulty shutdown on TIC 1803. UN'LA,...,ED Maintenance working on TIC 1803.
11/14/95 1 91 0- 191 5 135 Shutdown TIC 1804 for maintenance to repair exhaust leak. UNPLANNED Restarted TIC 1804.
11/18/95 0700-0710 156 TIC 1809 shutdown while switching plugged lube oil filter. UNPLA,...,ED Repaired work com pie led and restarted 1809.
11/20/95 2245-2252 45 Shutdown TIC 1803 for post overhaul gearbox inspection. PLANNED Compressor depressured.
11/21/95 0140-0714 77 TIC 1803 shutdown for maintenance. Cooling TIC's and PLANNED Facility maintenance completed.
(Inlerminenl 23 min.) 1W0 failed starts on 1807.
11/25/95 2130-2135 22 Shutdown 1807 for trip testing. F33AV closed trip. PLANNED Completed testing.
2200-2205 SO overhead tank low level shutdown, trip.
TOTAL UNDER 1 HOUR 840
e
FLARING EVENTS GREATER THAN 1 HOUR
RECEIVEU
OËC 1 8 1995
TOTAL OVER 1 HOUR
o
Alaska 011 & Gtìs LMI:). wmmlssion
Anchorage
Flared
Pilot/Purge
Continuous Assist
840
31,622
.!l
TOTAL FLARED
32,462
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL COMPRESSOR PLANT
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
e
I Operator
ARCO ALASKA, INC.
1,015,929
197,362,893
3,988
4. Flared or vented greater than 1 hour
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
e
9. Purchased gas
10. Transferred from: FSl, FS2, FS3,
Gel. Ge2. GC3
11. Transferred to: CGF
Remarks:
32,872
Fuel
Assist
5,914,606
o
o
204,330,288
163,558,359
22,927,828
I herebv certifv that the forel!oinl! is true and correct to the best of mv lmowledl!e.
/(- ./')
Signature: . I lc:~,.---_.- Title:
Form 10-42~~vised~:5;
SUPERVISOR
Field(S) I MonthlYear of Disposition
EASTERN OPERATING AREA-PBU Oct-95
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100
o
-----
omciaJ Use Only--H1Irinf! Aulhorilaliun > 1 hr.
1. Safety
MCF
o
2. Lease Use
MCF
o
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PLANTIFIELD FUEL GAS UNIT
OCTOBER 1995
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
10/3/95 0250-1125 208 TC 1811 shutdown for water wash and PSV work. PLANNED Stabilized facility process and operation.
(intermittent 20 min)
10/3/95 0030-0040 187 TC 1805 shuldown for water wash and PSV work PLANNED Stabilized facility process and operation.
e (intermittent 55 min) fuel gas valve.
10/3/95 0035-0045 155 TC 1802 shutdown for water wash and PSV work. PLANNED Stabilized facility process and operation.
0545-0550
10/3/95 2250-2255 16 TC 1805 electrical/instrumentation malfunction U~ED Stabilized facility process and operation.
2310-2315
10/4/95 0100-0130 156 TC 1810 shutdown for facility maintenance. ESD Test. PLANNED Down until repaired.
10/4/95 3300-2005 226 TC 1809 shutdown for water wash PLANNED Restarted after water wash complete.
(intermittent 25 min)
10/4/95 0430-0435 8 TC 1805 shutdown. Electricallinstrumentation malfunction. UNPLANNED Started T/C.
10/4/95 1109-1121 135 TC 1803 shutdown for planned maintenance. PLANNED Will restart when job completed.
10/4/95 1900-1910 144 TC 1801 shutdown for waterwash and ESD test. PLANNED Will restart when job completed.
e 10/5/95 0420-0430 141 TC 1806 shutdown for ESD, water wash, & maintenance. PLANNED Will restart when job completed.
10/5/95 2040-2050 141 TC 1806 shutdown for ESD, water wash, & maintenance. PLANNED Will restart when job completed.
10/6/95 0430-0440 156 TC 1812 shutdown for ESD, water wash, & maintenance. PLANNED Will restart when job completed.
10/6/95 1 525-1530 8 TC 1806 shutdown for manual shutdown to test F-33 UNPLANNED Restarted T/C 1806.
valve trip modification - T/C not complete seq.
10/7195 0430-0435 188 TC 1812 shutdown due to electricallinstrumentation UNPLANNED Started/Restarted T/C.
0500-0510 malfunction
10/7/95 0600-0610 1,062 TC 1812 shutdown due to electrical/instrumentation UNPLANNED Failed starts after water wash.
Ontermittent 35 min.) malfunction. Failed starts for water wash.
10/7/95 2345-2355 156 TC 1811 shutdown. Manual shutdown to repair leaking UNPLANNED Restarted T/C 1811.
safety valve.
· '
DATE T1ME
10/8/95 0400-0410
10/8/95 1 030-1040
10/9/95 0305-0310
e 0520-0530
10/15/95 1725-1730
10/16/95 0120-1140
(intermittent 30 min,)
10/29/95 1 500-1505
TOTAL UNDER 1 HOUR 3,988
FLARING EVENTS GREATER THAN 1 HOUR
ARCO ALASKA, INC.
CONSERVAT10N ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PLANTJFIELD FUEL GAS UNIT
OCTOBER 1995
PLANNED
UNPLA,..ED
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
e TOTAL OVER 1 HOUR
Flared
Pilot/Purge
Continuous Assist
o
TOTAL FLARED
141
156
149
159
161
135
3,988
32,872
~
36,860
T/C 1804 shutdown for water wash and maintenance PLANNED
T/C 1811 shutdown to repair gas leak on pressure safety UNPLAN'JED
valve.
TC 1804 shutdown due to recycle valve problem after UNPLA,..ED
sequence complete. Electrical/Instrumentation malfunction.
Seal oil system difficulties. Emergency shutdown. Leak UNPLA,..ED
at Kraissl valve.
Emergency Shutdown of T/C 1809 for small gas leak due to UNPLAN'JED
seal oil system difficulties.
TC 1802 shutdown due to high exhaust temp.
UNPLA,..ED
ACTION TAKEN TO ELIMINATE CAUSE
Will restart upon job completion.
Restarted T/C.
Repaired equipment difficulties with 1804
and restarted T/C.
Replace valve. 10/16/95 T.C still shut down to
replace valve.
Started TIC 1809. Compressor depressured.
Facility maintenance completed.
Restarted TC 1802.
e
e
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Facility
CENTRAL COMPRESSOR PLANT
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
Operator
ARCO ALASKA, INC.
917,927
174,173,569
1,512
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
32,119
Fuel
Assist
5,562,771
o
o
180,687,898
F ~, .t~, " [:
~"' "',-
{" L
10. Transferred from: FSl, FS2, :H~ka OU &. GmnmissÎon 204,712,382
Gel. GC2: G"C3 ^:1chGr;.:¡~
11. Transferred to: CGF
Remarks:
21,385,464
-
I berebv cerûfv that the foreszoinsz is 1rue and correct to the best of mv knowledsze.
Signature: () ~
i'oem l~~e~ised 4/95) ~
____ Title:
SUPERVISOR
I Field(s) I MonthlYear of Disposition
EASTERN OPERATING AREA-PBU Sep-95
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100
o
Oflìcial U~ Only--FhlIinl; Aulhori,lalion > ] hr.
1. Safety
MCF
o
2. Lease Use
MCF
o
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 MC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PLANTJFIELD FUEL GAS UNIT
SEPTEMBER 1995
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS. CAUSE
FLARING EVENTS LESS lHAN 1 HOUR
09/10/95 2330-2340 141
09/11/95 0420-0435 816
e 09/17/95 1330-1335 135
09/18/95 0105-0110 420
TOTAL UNDER 1 HOUR 1,512
FLARING EVEN1S GREATER lHAN 1 HOUR
TOTAL OVER 1 HOUR 0
e
A_eel
PllotlPurg.
Continuous Assist
1,512
32,118
~
TOTAL FLARED
33,131
PLANNED
UI'A..ANNED
TC 1808 Shutdown for turbine overhaul PLANNED
Process upset in CGF section of facility. Turbines tripped UftFLANNED
due to SESD at CGF
TC 1808 Shutdown, Testing F-33 Valve out of sequence. PLANNED
TC 1876 Shutdown for turbine maintenance PLANNED
ACTION TAKEN TO ELIMINATE CAUSE
Turbine shut down for schedule maintenance.
Stabilized facility process and operation.
Started TIC.
Reduced process turbine depressed.
ALASKA OIL AND GAS CONSERVATION CpMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
[Facility
CENTRAL COMPRESSOR PLANT
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
e
Operator
ARCO ALASKA, INC.
994,369
183,103,124
4. Flared or vented greater than I hour
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items I - 7
8. NGL gas equivalent produced
e
9. Purchased gas
10. Transferred from: FSl, FS2, FS3,
GCl. GC2. GC3
11. Transferred to: CGF
Remarks:
33,161
Fuel
Assisl
5,764,107
o
o
189,895,410
212,941,962
23,046,550
I herebv certify that the forel!Oimr is true and correct to the best of mv knowledge.
Signature: ~. _ Title: SUPERVISOR
f<orm lO~(~e:i=~)
I Field(s) I MonthlYear of Disposition
~ASTERN OPERATING AREA-PHU Aug-95
*Indicate contribution of each pool to LOla!.
Pool Name
Code
Percent
PRUDHOE
640150
100
649
o
:::::::<::-:;<::::::-:::.<.-- ';...-:.:.:.;: ;",".:-.:;...;-,:;,;,::-:::-:-,:-::,..::.-:.;:..'.;.. :',." "-.
.. .. . "." - ',. " - ..
ÒtfìcialUsd Ollly:~Flaring AUlhorization:> 1 hr.
1. Safety
MCF
','
o
2. Lease Use
MCF
o
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psi a and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
DATE
llME
FLARING EVENTS LESS THAN 1 HOUR
0630-0635
08/05/95
08/06/95
e
2015-2040
TOTAL UNDER 1 HOUR 649
FLARING EVENTS GREATER THAN 1 HOUR
e
TOTAL OVER 1 HOUR
Flared
PllotfPurge
Continuous Assist
TOTAL FLARED
o
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PLANTIFIELD FUEL GAS UNIT
AUGUST 1995
VOLUME MCF DESCRIPll0N OF INCIDENTS & CAUSE
135
514
649
33,161
º-
33,810
T/C 1801 shutdown due to electrical malfunction.
Electrical disruption/malfunction.
PLANNED
UNPLANNED
UNPLANNED
UNPLANNED
ACll0N TAKEN TO ELIMINATE CAUSE
Restarted 1801 T/C.
Corrected problem.
".
.
e
,
.-,
e
K .~lvEu
ÀLAskÁOIL AND GAS.CONSERVATION COMMISSIb~ AUG 1 8 1995
. , ¡ ,',',', . j . -I ".
FACILITY REPORT OF PRODUCED GAS DISPOSITION Alas~~~ &,Gas Cons. Commission
Facility Operator Field(S) MOntb/Year OfDiSpoSiti~'foragG
CENTRAL COMPRESSOR PLANT ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Jul-95
Disposition
*Indicate contribution of each pool to total.
1. Sold
952,534
Pool Name
Code
Percent
2. Reinjected
PRUDHOE
178,490,669
640150
100
3. Flared or vented less than 1 hour
o
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
o
5. Pilot and Purge
33,091
6. Used for lease operations
Fuel
Assist
5,498,603
o
o
Official Use Only--Flaring AuthorÏ7.aùon > 1 hr.
7. Other
TOTAL items 1 - 7
184,974,897
1. Safety
MCF
8. NGL gas equivalent produced
2. Lease Use
MCF
9. Purchased gas
3. Conserv. Purposes
MCF
10. Transferred from: FSl, FS2, FS3,
Gel. GC2. Ge3
204,652,572
Commissioner
Date
11. Transferred to: CGF
19,677,674
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
I herebv certifv that the forel!oimr is true and correct to the best of mv knowledl!e.
Signature: «~ -
Form lO-4~~e~iSed 4195)
Title:
SUPERVISOR
DATE
TIME
FLARING EVENTS LESS THAN 1 HOUR
e
TOTAL UNDER 1 HOUR 0
FLARING EVENTS GREATER THAN 1 HOUR
e
TOTAL OVER 1 HOUR
o
Flared
Pilot/Purge
Continuous Assist
TOTAL FLARED
j ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PlANTIfIELD FUEL GAS UNIT
JULY 1995
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
o
33,091
D.
33,091
PLANNED
UNPLANNED
ACT10N TAKEN TO ELIMINATE CAUSE
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Facility
CENTRAL COMPRESSOR PLANT
Disposition
1. Sold
2. Reinjected
e
3. Flared or vented less than 1 hour
Operator
ARCO ALASKA, INC.
996.900
179,215,864
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25,235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
e
9. Purchased gas
10. Transferred from: FSl, FS2, FS3,
GC I. GC2. GC3
11. Transferred to: CGF
Remarks:
32,021
Fuel
Assist
5,778,877
7J
I I ï
()
rn
186,024,222
_.-..'""
y,<' c:
;!:. ø t
~. f\ '\
f~ ~
.' <:::>
:::J
;n
-',
cd)
(q
G~
<
rn
o
207,768,689
t':":?
<.)
d
S
S·
~..
....
;;::I
21,744,468
I hereby certify that the forel!:oiDlz is true and correct to the best of mv knowledl!:e.
Signature: ;('~ __ _ .I - Title: SUPERVISOR
i'oem 104~e~iSed 4195)
I Field(s) I MonthlY ear of Disposition
EASTERN OPERATING AREA-PBU Jun-95
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100
560
o
o
orficiallJsc Only--Flaring AUlhorization > I hL
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
DATE
TIME
FLARING EVENTS LESS THAN 1 HOUR
06/29/95
0300-0310
06/29/95
0831-0840
e
TOTAL UNDER 1 HOUR 560
FLARING EVENTS GREATER THAN 1 HOUR
e
TOTAL OVER 1 HOUR
o
Flared
PllotlPurge
Continuous Assist
TOTAL FLARED
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PLANTIFIELD FUEL GAS UNIT
JUNE 1995
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
152
TIC 1876 SID for maintenance work.
408
TIC 1876 SID spin cooling for maintenance work.
560
32,021
º-
32,581
fr:~ c,
,
-
-,......,j
r-n
f')
I""i'
<
M'1
o
PLANNED
UNPLANNED
PLANNED
PLANNED
ACTION TAKEN TO ELIMINATE CAUSE
Depressured TIC.
Facility maintenance completed.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
REVISED
I Facility
CENTRAL COMPRESSOR PLANT
Disposition
1. Sold
2. Reinjected
e
3. Flared or vented less than 1 hour
I Operator
ARCO ALASKA, INC.
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
e
9. Purchased gas
10. Transferred from: FSl, FS2, FS3,
Gel. GC2. GC3
11. Transferred to: CGF
Remarks:
Fuel
1:.1" C',"""'-I
(""')
m
"'-..;
~~:::
m
1,069,026
191,503.661
32,989
6,115,207
198,721,138
223,263,776
24,542,633
I herebv certifv that the forel!oinl! is true and correct to the best of mv knowledl!e.
Signature: ~~
Form 10-422 (ÆZ:~ 4195) ,.. - ¿#
'''''¡
J'-"'--".
:~..¡
Title:
SUPERVISOR
I Field(s) I Month/Year of Disposition
EASTERN OPERATING AREA-PBU May-95
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100
255
o
o
Orricial Use Only--FIaring Alllhorizalion > 1 hr.
1. Safely
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
·
"
..
DATE
FLARING EVEN1S LESS THAN 1 HOUR
l1ME
OS/23/95
e
OS/26/95
0001-0010
0255-0300
0740-0745
1100-1105
TOTAL UNDER 1 HOUR 255
FLARING EVENTS GREATER THAN 1 HOUR
e
TOTAL OVER 1 HOUR
Flared
Pilot/Purge
Continuous Assist
TOTAL FLARED
o
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INClDEN1S
CENTRAL COMPRESSOR PLANTIFIELD FUEL GAS UNIT
MAY 1995
VOLUME MCF DESCRIPllON OF INCIDENTS & CAUSE
165
90
255
32,989
SL
33,244
Shutdown T/C #1803 for Maintenance
Shutdown T/C 1803 for maintenance. Water wash and
logic modification
RECEIVED
UN 2 1 1995
Oil & Gas Cons. Commission
Anchor~
PLANNED
UNPLANNED
PLANNED
PLANNED
AC110N TAKEN TO ELIMINATE CAUSE
Scheduled maintenance shutdown
Work completed and restarted 1803.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL COMPRESSOR PLANT
operator
ARCO ALASKA INC
Field(S)
EASTERN OPERATING AREA - PBU
MonthlYear of Disposition
Apr-95
Disposition
Volume MCF·
·If production comes from multiple pools,
indicate contribution of each pool to total.
Pool
Percent
1. Sold
1,038,495
2. Reinjected
-e
3. Flared or vented less than 1 hour
186,614,261
{~C¡{ì / ~-Cì
/(ì()
3,366
4. Flared or vented greater than 1 hour
(S.ppl....DLII rcpan rcqujrcd--S.. 20 AAC 25.235)
305
5. Pilot and Purge
31.613
Ollicilll IIsc Only Fhlring 1\lIthUlilluiun>l hr
6. Used for lease operations
4,144,937
1. Safety
MCF
7. Other
740,857
2, Lease
MCF
TOTAL
192,573,834
3. Conserv. Purposes
MCF
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month
aing the month of disposition. Authority 20 AAC 25.253
rks:
I hereby certify that the foregoing is true
S',."." ð-J:t::..~ - ~
and correct to the best of my knowledge.
Title s:
Date:
S"ftA.r-
Form 10-422
Rev. 11194
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INClDENlS
CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT
APRIL 1995
PLANNED
DATE T1ME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACT10N TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
04/01/95 1930-1935 45 SID TIC 1813 due to instrumentation malfunction. UNPLANNED Compressor train depressured. Corrected
Ell failure.
e 04/01/95 1 500-1 530 24 SID TIC 1805 due to instrumentation malfunction. UNPLANNED Compressor train depressured. Corrected
Three aborted re-start attempts Ell failure.
04/11/95 11 30-11 40 192 SID TIC 1808 for repair due to instrumentation UNPLANNED Compressor train depressured.
1155-1200 malfunction.
04/13/95 0230-0240 194 TIC 1810 shutdown for water wash. PLANNED Compressor train depressured.
0600-0605
04/13/95 0230-0240 155 TIC 1807 shutdown for water wash. PLANNED Compressor train depressured.
0925-0930
04/13/95 0000-1645 149 TIC 1804 shutdown for water wash. PLANNED Compressor train depressured.
2000-2005
04/14/95 1000-1010 155 TIC 1802 shutdown for water wash. PLANNED Stabilized facility process & operations.
1310-1315
04/14/95 1250-1300 155 TIC 1806 shutdown for water wash. PLANNED Stabilized facility process & operations.
e 1755-1800
04/15/95 0230-0240 204 TIC 1806 pressure up and ESD to check out valve PLANNED Restarted 1806.
0340-0350 response.
04/15/95 1650-1705 572 TIC 1878 shutdown for water wash. PLANNED Stabilized facility process & operations.
2145-2155
04/16/95 0610-0620 135 TIC 1803 shutdown due to high exhaust temp. UNPLANNED TIC 1803 depressured & restarted.
04/18/95 0625-0635 420 TIC 1878 shutdown due to gas leak F-36. UNPLANNED Restarted 1878.
04/21/95 0002-0012 408 TIC 1876 shutdown for maintenance. PLANNED Compressor train depressured.
04/23/95 1325-1335 156 1812 shutdown on high vibration UNPLANNED Restarted TIC 1812.
· .
DATE
04/29/95
e
TIME
0520-0525
0745-0750
0950-0955
1015-1020
1030-1035
TOTAL UNDER 1 HOUR 3,366
04/08/95
FLARING EVENlS GREATER THAN 1 HOUR
0800-1000
TOTAL OVER 1 HOUR 305
Volume Flared
e_SUred Safety Pilot
TOTAL FLARED
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INClDENlS
CENTRAL COMPRESSOR PlANTIFIELD FUEL GAS UNIT
APRIL 1995
402
VOLUME MCF DESCRIPT10N OF INClDENlS 8. CAUSE
Shutdown on TIC 1812 for Maintenance
305
3,671
ll..§.ll
35,284
Flare system testing.
41 ð 8 - -Ä¡ù'l
I.u '-~ c./ B _
PLANNED
UNPLANNED
PLANNED
UNPLANNED
AC110N TAKEN TO ELIMINATE CAUSE
Facility Maintenance completed.
Completed flare testing.
.
.
.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL COMPRESSOR PLANT
operator
ARCO ALASKA INC
Field(S)
EASTERN OPERATING AREA - PBU
Disposition
Volume MCF*
*If production comes from multiple pools,
indicate contribution of each pool to total.
Pool
1. Sold
1,131,467
2. Reinjected
190,658,713
.ed or vented less than 1 hour
2,901
4. Flared or vented greater than 1 hour
(SupplemeDIaI report required--S.. 20 AAC 25.23S)
0
32,907 Ollicial Use Only-FhuinG ^ IIthorit.alioll> 1 hr.
4.386.727 1. Safety
r ~~~
1.896.064 2. Lease
.
198,108,779 3. Conserv. Purposes
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL
MonthlY ear of Disposition
Mar-95
Percent
MCF
MCF
MCF
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month
following the month of disposition. Authority 20 AAC 25.253
R.rks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature f{jLJIÍ.i3(,'¥\-Õ~'L- hI<) Jtt{,Yr'L.A:.o AL-I Title HA..JJ1::J(/'L.j ~cLr~ ~'ð-
Form 10-422
Rev. 11/94
t<~" <~. ~:Z';~,'·'
Date: '-t {f 2...( 'i F
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PLANTIFIELD FUEL GAS UNIT
MARCH 1995
PLANNED
DATE l1ME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED AC110N TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
3/11/95 1730-1735 135 TIC 1804 shudown due to high vibration. UNPLANNED Stabilized fac. process & operation &
rep. equip.
3/20/95 0001-0005 159 TIC 1812 shutdown for water wash. PLANNED Compressor train depressured.
e 3/21/95 1520-1525 250 TIC 1809 shutdown for water wash. PLANNED Field rates at 70% proration.
1800-1805
3/21/95 0845-0849 35 TIC 1812 shutdown for water wash. PLANNED Field rates at 70% proration.
3/21/95 1330-1335 141 TIC 1801 shutdown for water wash. PLANNED Field rates at 70% proration.
3/22/95 1940-1945 408 TIC 1876 shutdown for water wash. PLANNED Field rates between 83% - 90% proration.
3/23/95 1415-1420 135 T/C1801 shutdown for unknown reason UNPLANNED Restarted TIC.
3/23/95 1925-1930 408 TIC 1876 shutdown for gas leak UNPLANNED Compressor train depressured.
3/24/95 1115-1120 408 Electricallinstrumentation malfunction. Unit tripped UNPLANNED Compressor train depressure. Restarted
during Speedtronics re-programming. TIC 1878
3/25/95 0800-0810 159 Shutdown TIC 1809 for Maintenance. PLANNED To inspect and repair lube oil filter.
e 3/25/95 0840-0850 192 Shutdown TIC 1808 for Maintenace. PLANNED Compressor train depressured.
1230-1235 ESD'd TIC and shutdown and depressured TIC following
spin cool
3/26/95 1300-1310 45 Shutdown TIC 1808 for maintenance to repair stuck UNPLANNED Compressor train depressured and restarted
starter jaws TIC 1808
3/30/95 2045-2050 135 Shutdown TIC 1805 for maintenance. PLANNED Compressor train de pressured and Maintenance
will water wash 1805 in AM on 3/31/95.
3/30/95 2100-2105 156 Shutdown TIC 1811 for maintenance. PLANNED Compressor train de pressured and Maintenance
will water wash 1811 in AM on 3/31/95.
3/31/95 2045-2050 135 Shutdown TIC 1813 for water wash. PLANNED Compressor train depressured and Maintenance
will water wash 1813 In AM on 3/31/95.
DATE
l1ME
TOTAL UNDER 1 HOUR 2,901
FLARING EVENTS GREATER THAN 1 HOUR
e
TOTAL OVER 1 HOUR
o
Volume Flared
Measured Safety Pilot
TOTAL FLARED
e
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PLANTIFIELD FUEL GAS UNIT
MARCH 1995
VOLUME MCF DESCRIP110N OF INCIDENTS & CAUSE
2,901
ll.iU
35,808
PLANNED
UNPLANNED
AC110N TAKEN TO ELIMINATE CAUSE
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I
Facility
CENTRAL COMPRESSOR PLANT
loperator
ARCO ALASKA INC
Disposition
1. Sold
.. Reinjected
l'
3. Flared or vented 'less than 1 hour
4. Flared or vented greater than 1 'hour
(Supplemental report requinldnS.. 20 AAC 2S,23S)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL
Field(S) I
EASTERN OPERATING AREA - PBU
Volume MCF'"
"'If production comes from multiple pools,
indicate contribution of each pool to total.
Pool
1,045,369
186,670,851
1.170
o
29.589
Official Use Only-Flaring Authorization>! hr.
4,117,465
1. Safety
1,895,946
2. Lease
193.760,390
3. Conserv. Purposes
_Note: All volumes must be corrected to pressure of 14.65 psi a and to a temperature of 60 degrees F.
ollowing the month of disposition. Authority 20 AAC 25.253
Remarks:
I hereby certify that the foregoing is true and correct
Si,."." pe~, .
Form 10-422
Rev. 11194
Report due by the 20th of the month
to the best of my knowledge.
Title
s~
MonthlYear of Disposition
Feb-95
Date:
Percent
MCF
MCF
MCF
.5/0 h~-
·
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INClDENlS
CENTRAL COMPRESSOR PLANTIFIELD FUEL GAS UNIT
FEBRUARY 1995
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS a. CAUSE
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
02/02/95 11 00-111 0 156 TIC 1811 shutdown due to BP power failure. UNPLANNED Restarted 1811.
Seal oil difficulties.
e 02/02/95 1100-1110 135 TIC 1806 shutdown due to BP power failure. UNPLANNED Restarted 1806.
Seal oil difficulties.
02/03/95 0655,0705 159 Emergency shutdown due to gas leak - Compo discharge. UNPLANNED Repaired equipment difficulties with gas leak.
02/03/95 1610-1620 408 TIC 1878 shutdown due to electrical/instr. malfunction UNPLANNED Corrected electrical/instr. malfunction
while being backed off during rate cut. and restarted1878.
02/03/95 0920-0930 156 TIC 1810 shutdown due to seal oil system difficulties. UNPLANNED Repaired equipment and restarted 1810.
02/03/95 1200-1210 156 TIC 1810 shutdown due to seal oil system difficulties. UNPLANNED Repaired equipment and restarted 1810.
TOTAL UNDER 1 HOUR
1,170
FLARING EVENTS GREATER THAN 1 HOUR
e,
TOTAL OVER 1 HOUR
o
Volume Flared
Measured Safety Pilot
1,170
ll..UJ
TOTAL FLARED
30,759
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL COMPRESSOR PLANT
loperator
ARCO ALASKA INC
Field(S) I
EASTERN OPERATING AREA - PBU
Disposition
Volume MCF*
*If production comes from multiple pools.
indicate contribution of each pool to total.
...-----~--~
1. Sold
Pool
1,143,874
2. Reinjected
.lared or vented
201,580,707
less than 1 hour
1,261
4. Flared or vented greater than 1 hour
(Supple_Bioi report requireduS.. 20 AAC 25.235)
972
JY()
5, Pilot and Purge
32,607
"' ~
Official Usc Ò;¡Y-C-J¡uillg ~rization>l hr.
6, Used for lease operations
4,382,281
-, . ~ ) -'
Y,.-44~-r.·;:~"" ""r
.-.1-, 1 ì 1,' " I, 0:,.,
'f "~I I i f f.uøct..
1. Safety
:SZÞ1-r to
7. Other'
¡;..;,p f.jp~~j.
~",~'... . f'/ t /¿,.. ( pI.?
TOTAL
3. Conserv. Purposes
2. Lease
209,255,912
I¡ote: All volumes must be corrected to pressure of 14.65 psia and to
f lowing the month of disposition. Authority 20 AAC 25.253
arks:
a temperature of 60 degrees F.
Report :lue by the 20th of the month
I hereby certify that the foregoing is
Si..."" ~_ ...
true and correct to the best of my knowledge.
Title £.?'~
Form 10-422
Rev. 11194
'-:,,^,,,
IMonthlYear of Disposition
Jan-95
Date:
Percent
MCF
MCF
MCF
~ ftr--
DATE
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 21st
GAS FLARING INClDENlS
CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT
JANUARY 19G5
FLARING EVENlS LESS THAN 1 HOUR
llME
VOLUME MCF DESCRIP110N OF INClDENlS & CAUSE
01/19/95
e
01/21/95
01/22/95
01/29/95
Intermittent
25 Minutes Total
Intermittent
30 Minutes Total
Intermittent
40 Minutes Total
TOTALUNDER1HOUR 1,261
0200-0210
01/28/95
FLARING EVENlS GREATER THAN 1 HOUR
1215-1220
0230-0335
1 41 0-1 41 5
TOTAL OVER 1 HOUR 972
e
Volume Flared
Measured Safety Pilot
TOTAL FLARED
582
303
64
312
156
408
408
Field slowdown due to Taps proration high inventory.
Facility Maintenance
Field slowdown due to Taps proration high inventory.
Facility Maintenance
Numerous attempts to start TIC 1802. Elec/lnst
malfunction.
TC 1812 Shudown due to elec.linstr. malfunction.
TC 1812 Shutdown due to an elec/instr. malfunction.
Planned shutdown of TIC 1876 to repair instr. prob.
Planned shutdown of TC 1878 for Maint. repairs.
PLANNED
UNPLANNED
PLANNED
PLANNED
UNPLANNED
UNPLANNED
UNPLANNED
PLANNED
PLANNED
\}.)HAl \^.\~
I
TIc I ß~ 'Ç, Ifò::¡ß
f~~S
If:.- 1 61 G ~
H /6H OIL LDvJ
p~()~ (9Mþ ?
J
2,233
ll...ül
f'r ~r~o
__ tt/V
"!i;c, ¡'--1:8 ') ED
'..)I(à ". c ;J
. UI/ ~ (J. '- 1995'
'élSe,
4nOlo Olls.
. 11()t;~. . COJ>,
q "11»'
"11$8/
10!}
..
ACll0N TAKEN TO ELIMINATE CAUSE
Stabilized facility process & operation.
Completed compressor depressurization.
Stabilized facility process & operation.
Completed compressor depressurization.
Corrected malfunction and restarted TIC 1802.
Corrected power fluctuation failure.
Restarted TIC
Restarted TIC after repair
Restarted TIC