Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutARCO - CCP AGOCC GaS Disposl~ion Files 1996 RICO -CCP o- ~t i+'4.:8'GtW'/,.0s,'SAE"~%N/,®/.~/®/~i~1'/.~/.~~/B~/~Y.9BY.~'6~/6Y/~/.w%I/~/~/.8%/~/~/.~'.':~/.R/~/fY/.~/~/.b%~/~'/~*/.N%~/~,~//.WW/,®`/iI/dr/O/..~/.~%~/~/m/~/®Yp'/.8//B/ID/B/6+'/6P/®'/iI/~/~/~/.Ar/.pr/1D/~/~iB/i&V/..®'/a~.B .i_ i 4'9~<VC 3::;: ~.. T ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GA5 DISPOSITION Facility Operator Fields} Month/Year of Disposition CENTRAL COMPRESSOR PLANT ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Dec-96 i Disposition 1. Sold ~ 997,891 2. Reinjected 209,637,186 3. Flared. or vented less than 1 hour 1,034 4. Flared or vented greater than 1 hour (Su lemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 34,978 6. Used for lease operations Fuel Assist 6,228,333 0 7.Other 0 TOTAL items 1- 7 216,899,422 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: FS1, FS2, FS3, GC1 GC2 GC3 242,067,371 11. Transferred to: CGF 25,436,768 Remarks: T herehv certify that. the fnreg~ing is trne an~i cnrrP,ct to the 11PCt. ~f my )cnnwle.~ige. Signattue:~~j ~, Title: SUPERVISOR .E ' orm evi f 9 I,~ *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC. CONSERVATK)N ORDER N0.219 GAS FLARING MICIDENTS CENTRAL COMPRESSOR PLANTIFIELD FUEL GAS UNIT DECEMBER 1998 PLANNED DATE TBYE VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 12/01 /96 0050-0100 135 T/C 1813 shutdown reason unknown. UNPLANNED Started T/C 1813. 12/13/96 0530-0535 135 T/C 1803 shutdown due to crack in fuel gas line. UNPLANNED Repaired crack & restarted 1803. 12/27/96 0130-0135 141 Shut down TC 1805. Did repair maintenance on T/C 1805 PLANNED Started T/C 1805. while GC#1 was down. 12/27/96 0150-0155 135 Shut down T/C 1808. Did repair maintenance on T/C 1808 PLANNED Started T/C 1808. while GC#1 was down. 12/27/96 0155-0203 156 Shut down T/C 1812. Did repair maintenance on T/C 1812 PLANNED Started T/C 1812. while GC#1 was down. 12/29/96 0855-0910 191 T/C 1811 shut down on high vibration. UNPLANNED Down for repairs. 1330-1343 12!29!96 1940-1945 141 Shut down T/C 1804. Not needed while high stage TiC 181 PLANNED Not need while 1811 down for repairs. down. TOTAL UNDER 1 HOUR 1,034 • FLARING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR 0 Flared 1, 034 Pilot/Purgs 34, 978 Continuous Assist Q TOTAL FLARED 38,012 ~~ w~ ~s~N ~ ~- 197 .~a~k~ ~~ ~~ ~~~~ ~~a=~~;~~~it~rl ~ch~ragl~ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GA5 DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL COMPRESSOR PLANT ARCO ALASKA, INC. EASTERN OPERATING AREA-PBII Nov-96 Disposition 1. Sold 957,954 2. Reinjected 199,982,221 3. Flared or vented less than 1 hour 1,169 4. Flared or vented greater than 1 hour (Su plemental re ort required--See 20 AAC 25.235) 0 5. Pilot and Purge 31,7?2 6. Used for lease operations Fuel Assist 5,904,910 0 7.Other 0 TOTAL items 1- 7 206,878,035 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: FS1, FS2, FS3, GC1 GC2 GC3 231,551,541 11. Transferred to: CGF 24,936,432 Remarks: i herehv certify that. t fare¢oing is tn~e and correct to the hest of my knowledge. Signature: Title: SUPERVISOR orm evise *Indicate contribution of each pool to total. Pool Name Code .Percent PRUVxOE 6aalso I~w Official LJse Onl --Flarin Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC. CONSERVATKNd ORDER N0.219 GAS FLARING MCIDENTS CENTRAL COMPRESSOR PLANTIFIELD FUEL GAS UNR NOVEMBER 1996 ' ~- PLANNED , DATE TINE VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UI~LANNED ACTION TAKEN TO ELIMINATE CAUSE ~., ~ - FLARING EVENTS LESS THAN 1 HOUR ; '°. ' 11/03/96 0755-0800 135 Shutdown 1804 on high vibration due to instrumentation UNPLANNED Compressor depressured. _ -~ malfunction. 11/03/96 0800-0810 159 Shutdown 1812 due to instrumentation malfunction. UNPLANNED Compressordepressured. `' • 11110/96 0920-0922 597 Shutdown 1804 for fuel control problems. Ut~LANPED Compressor/train depressured. Started T/C 1804. 11/11/96 0045-0050 143 Shutdown T/C 1804 for fuel control problems. UNPLANNED Compressor/train depressured. Restarted 0035-0037 T/C 1804. 1 1/23/96 1630-1640 135 T/C 1813 shutdown on high vibration. UNPLANNED Reduced inlet gas rates & compressor depressured. • TOTAL UNDER 1 HOUR 1,169 FLARING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR Flared PiloUPurga Continuous Assist TOTAL FLARED 0 1,169 31,772 4 32,941 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAI< COMPRESSOR PLANT Operator ARCO AI.,ASKA, INC. Field(s) EASTT;RN OPERATING AREr1-PBi1 Month/Year of Disposition OCt-96 Disposition *Indicate contribution of each pool to total. 1. Sold 986,~)6l Pool Name Code Percent 2. Reinjected 201,586,850 PRUDHOE 6gr)150 1EX) 3. Flared or vented less than 1 hour 4,636 • 4. Flared or vented greater than 1 hour (Su lemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 33,1.61 6. Used for lease operations Fuel Assist 6,015,835 0 7.Other 0 TOTAL items 1- 7 208,627,443 8. NGL gas equivalent produced 0 • 9. Purchased gas ,g 0 T ~ , h,g 10. Transferred from: FS 1, FS2, FS3, 233,1L24,714 GC1 GC2 GC3 Official Use Onl --Flarin Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date 11. Transferred to: CGF 24,652,218 Remarks: T hereby certifyhat. the oregoing is tree and correct to the hest of my knowledge. Signature: ~~~ Title: SUPERVISOR pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. t° ®x,~, ~• l,d,d... ~~. >_r, c ~:`.., ,_m. ~~ :~ orm evise ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING HVCIDENTS CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNfT OCTOBER 1996 DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 10/01/96 0005-1710 310 Shutdown T/C 1802 & 1807 for Fall water washes. PLANNED Restarted 1802 & 1807. (Intermittent 40 min.) 10/02/96 0400-0410 296 T/Cs 1806 and 1803 shut down for water wash. PLANNED Started units after water wash completed. • (Intermittent 30 min.) 10/03/96 0235-0245 439 Spin cooling and water washing T/Cs 1812, 1801, and 1803 PLANNED Completed water washing and restarted T/Cs. (Intermittent 35 min.) 10/03!96 1130-1140 191 Shut down T/C 1810 for water wash. PLANNED Restarted T/C 1810. 1600-1605 10/04/96 2040-2045 191 T/C 1810 tripped while in crank mode and T/C 1809 was PLANNED Started T/C 1810. 2200-2210 shut down for water wash. 10/05/96 0040-0045 226 Water washing and pin cooling T/Cs 1809, 1801, & 1811. PLANNED Completed work and restarted. (Intermttent 20 min.) 10/06/96 0550-0600 1,350 Shut down T/Cs 1878 and 1876 for water wash. PLANNED Restarted after water wash was completed. (Intermittent 48 min.) 10/11/96 0445-0455 675 Shut down T/G 1813 due to instrumentation malfunction. UNPLANNED Reduced inlet gas rates & corrected problem. (Intermittent 35 min.) • 10/12/96 0435-0440 135 Sh t d T/C 1813 d t i u own o ue nstrumentation malfunction. UNPLANNED Reduced inlet gas rates. Turbine depressured. 10/ 13/96 0855-9000 270 Shut down T/C 1813 due to instrumentation malfunction. UNPLANNED Reduced inlet gas rates. 1000-1005 10/21/96 0400-0410 318 T/C 1810 emergency shutdown. UNPLANNED Compressordepressured. 1000-1010 10/21/96 1320-1324 135 T/C 1801 tripped due to inverter malfunction. UNPLANNED Corrected problem & restarted. 10/28/96 1545-1932 75 T/C 1806 F-127 valve opened due to ice in instrument UNPLANNED Corrected instrumentation problem. (Intermittent 6 min. ) controls. 10/28/96 2158-2200 25 T/C 1801 F-127 valve opened due to ice in instrument UNPLANNED Corrected instrumentation problem. controls. TOTAL UNDER 1 HOUR 4,636 ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT OCTOBER 1996 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR Flared 4, 636 Pilot/Purge 33,161 Continuous Assist Q TOTAL FLARED 37,797 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL, COMPRESSOR PLANT ARCO ALASKA, INC. EASTERN OPERATING ART.A-PBil Se -96 • n ~.J Disposition 1. Sold 955,954 2. Reinjected 1.87,302,865 3. Flared or vented less than 1 hour 1,351 4. Flared or vented greater than 1 hour (Su elemental re rt aired--See 20 AAC 25.235) 0 5. Pilot and Purge 32,194 6. Used for lease operations Fuel Assist 5,682,962 0 7.Other U TOTAL items 1 - 7 193,975,326 8. NGL gas equivalent produced 0 9. Purchased gas U 10. Transferred from: FS1, FS2, FS3, GC1 GC2 GC3 220,627,954 11. Transferred to: CGF 24,392,579 Remarks: T herehv certify that. th foregoing is tn~e and correct. to the hest of my knowledge- Signature: ,' Title: SUPERVISOR orm evi *Indicate contribution of each pool to total. Pool Name Code Percent I'RUDHOE 64t}150 1t~ Official Use Onl --Flarin Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ` ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARMG gVCIDENTS CENTRAL COMPRESSOR PLANT/FlELD FUEL GAS UNIT SEPTEMBER 1996 PLANNED DATE Tlll~ VOLUME MCF DESCRIPTION OF NVCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 09/04/96 1446-1448 135 Turbine tripped, unknown reason. UNPLANNED Started/restarted T/C 1813. 09/07/96 0025-0029 135 T/C 1813 tripped, unknown reason. UNPLANNED Started/restarted T/C 1813. 09/08/96 1923-1928 135 T/C 1813 tripped, unknown reason. UNPLANNED Started/restarted T/C 1813. . 09/09/96 1930-1934 141 T/C 1805 shutdown for maintenance. PLANNED T!C 1805 planned shutdown for HGP Inspection. 09/12/96 1335-1345 135 T/C 1813 shutdown due to instrumentation mafunction. UNPLANNED Stabilized facility process and Operation.. 09/13/96 2000-2010 8 T/C 1813 shutdown for water wash. PLANNED Completed water wash. 09/15/96 0130-0140 143 T/C 1813 shutdown due to instrumentation malfunction. UNPLANNED CompressorRrain depressured. 0820-0825 09/15/96 1530-1540 114 T/C 1805 shutdown for ESD/OSD FCO testing. PLANNED Started T/C 1805 after completing FCO's. (Intermittent 40 min) 09/19/96 1715-1725 135 T/C 1813 tripped due to instrumentation malfunction UNPLANNED Restarted T/C 1813. 09/28/96 0815-0905 135 T/C 1801 power supply problem. UNPLANNED Restarted T/C 1801. 09/28/96 1620-1715 135 T/C 1801 power supply problem. UNPLANNED Corrected problem & restarted T/C 1801. TOTAL UNDER 1 HOUR 1, 351 FLARING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR 0 Flared 1, 351 PIIoVPurge 32,194 Continuous Asalet Q TOTAL FLARED 93;545 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL COMPRESSOR PLANT ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Au -96 • Disposition 1. Sold 923,983 2. Reinjected 185,455,403 3. Flared or vented less than 1 hour 2,118 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 33,324 6. Used for lease operations Fuel Assist 5,634,523 0 7.Other 0 TOTAL items 1 - 7 192,049,351 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: FS 1, FS2, FS3, GC1 GC2 GC3 214,637,495 11. Transferred to: CGF 22,803,085 Remarks: T herehv certify that. the foregoing is tn,e and correct to the hest of my knowledge. Signature: Title: SUPERVISOR c~ ~.2~.~ ~L~ orm - evtse *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 .Official Use Onl --Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC. ' CONSERVATK)N ORDER N0.219 GAS FLARMG INCIDENTS CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT AUGUST 1998 PLANNED DATE TIME VOLUME MCF DESCRIPTK)N OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 08/06/96 2300-2305 152 Pressure tested T/C 1878 to full suction pressure and then PLANNED Compressor depressured & maintenance complete. 08/07/96 1830-2043 • (Intermittent 9 min) 08/08/96 1242-1245 (Intermittent 23 min) 08/09/96 0900-1047 (IMernittent 11 min) 08/26/96 0215-0220 08/26/96 0945-0950 08/30/96 0935-1635 (Intermittent 55 min) • TOTAL UNDER 1 HOUR 2,118 FLARING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR 0 vented unit to PSI via ESD. 327 T/C 1878 shutdown for maintenance. Maintenance PLANNED conducting overspeed testing of turbine. 806 T/C 1878 shutdown for maintenance. Maintenance PLANNED conducting overspeed testing of turbine. 370 T/C 1878 shutdown for flaring for start-up testing. PLANNED Compressor depressured & maintenance complete. Compressor depressured & maintenance complete. Maintenance completed & restarted 1878. 135 T/C 1813 shutdown due to instrumentation malfunction. UNPiJWNED Restarted T/C 1813 135 T/C 1813 shutdown due to instrumentation malfunction. UNPLANNED Restarted T/C 1813 193 T/C 1808 shutdown for water wash &ESD switch testing; PLANNED Completed water wash & put 1808 back on line. failed restarts. Fred 2,118 PiloUPurgs 33,324 Continuous Assist 4 TOTAL FLARED 35,442 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL COMPRESSOR PLANT ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Jul-96 C~ Disposition 1. Sold 899,372 2. Reinjected 178,485,953 3. Flared or vented less than 1 hour 463 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 33>136 6. Used for lease operations Fuel Assist 5,684,801 0 7. Other 0 TOTAL items 1 - 7 185,103,725 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: FS1, FS2, FS3, GCl GC2 GC3 207,006,853 11. Transferred to: CGF 20,316,659 Remarks: i herehv cert.ifv that. the foregoin¢ is tn~e and correct to the hest of my knowledge. Signature: ~ <<~~ U~ ~~-~~-i`~~ Title: SUPERVISOR ono iu-4~~ ~xevtse *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 Official Use Onl --Flarin Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT JULY 1996 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 07/12/96 0205-0211 159 T/C 1804 shutdown for maintenance. PLANNED Normal shutdown. 07/12/96 0201-0205 141 T/C 1813 shutdown for maintenance. PLANNED Normal shutdown. 07/19/96 1220-1230 163 T/C 1805 instrumentation malfunction. UNPLANNED Restarted T/C 1805. Depressured 1805. TOTAL UNDER 1 HOUR 463 FLARING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR 0 Flared 4 6 3 Pilot/Purge 33,136 Continuous Assist 0 TOTAL FLARED 33,599 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Yeaz of Disposition CBNTRAI. COMPRF...SSC)R PL,ILNT ARCO ALASKA. INC. r.A.STIRN C)PF..RATIN<.i ARF.,A-PBL7 Jun-96 • • Disposition 1. Sold 92$,92$ 2. Reinjected 179,374,1.14 3. Flazed or vented less than 1 hour l93 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 31,99$ 6. Used for lease operations Fuel Assist 5,554,0$_5 0 7.Other 0 TOTAL items 1 - 7 1$5,$$9,31.$ 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: FS1, FS2, FS3, GC1 GC2 GC3 211,034,151 I1. Transferred to: CGF 22,468,778 Remarks: i herehv certify at. the foregoing is tn~e and correct to the hest. of my knowledge. Signature: Title: SUPERVISOR orm evise *Indicate contribution of each pool to total. Pool Name Code Percent PI2UDH()E 640150 100 Official Use Onl --Flarin Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date must pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. AACO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING MJCIDENTS CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT JUNE 1996 PLANNED DATE TMAE VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 06/10/96 0730-1303 163 Performed FCO of T/C 1813's ESD system. PLANNED Completed ESD testing & fully depressurized (Intermittent 13 min) and isolated T/C 1813. 06/15/96 0235-0239 30 Facility maintenance. Testing and maintenance work on PLANNED Started T/C 1813. • (Intermittent 1o min) start up of T/C 1813. TOTAL UNDER 1 HOUR 193 FLARING EVENTS GREATER THAN 1 HOUR • TOTAL OVER 1 HOUR 0 Flared 19 3 Pllot/Purge 31,998 Continuous Assist Q TOTAL FLARED 32,191 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CrNTRAi. COMPRFSSCJR PLANT ARCC) ALASKA, INC. EA:STF.,RN OPF.,RATTNG AREA-PBU Ma -96 Disposition 1. Sold 941,386 2. Reinjected 176,688,848 3. Flared or vented less than 1 hour 828 4. Flared or vented Qreater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 32,811 6. Used for lease operations Fuel Assist 5,91.3,336 0 7.Other 0 TOTAL items 1- 7 1.83,577,209 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: FS 1, FS2, FS3, GC1 GC2 GC3 203,927,609 11. Transferred to: CGF 20,539,673 Remarks: T herehv certify at the fore¢oing is m~e and correct to the hest of my knowledee. Signature: C~~ `~ ~~ Title: SUPERVISOR orm evi *Indicate contribution of each pool to total. Pool Name Code Percent PRUllHC)E 640150 100 Official Use Onl --Flarin Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT MAY 1996 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 05/06/96 0855-0900 141 Shutdown T/C 1802 for combustion inspection. PLANNED Compressor depressured. 05/07/96 2000-2010 51 Emergency shutdown on T/C 1813 when fitting broke on UNPLANNED Repaired machine. • 05/08/96 1410-1415 1615-1620 05/10/96 1320-1325 05/25/96 0810-0815 0940-0945 1000-1005 F57 sensing line 180 T/C 1813 shutdown on high vibration; bad compressor UNPLANNED axial probe connection. 135 T/C 1802 shutdown to repair oil leak. PLANNED 321 Shutdown T/C 1813. Electrical malfunction. UNPLANNED Bad axial probe comp. Repaired equipment with vibration system. TOTAL UNDER 1 HOUR 828 FLARING EVENTS GREATER THAN i HOUR • TOTAL OVER 1 HOUR £s Flared 8 28 Pilot/Purge 32,811 Continuous Assfst Q TOTAL FLARED 33,638 Cut gas rates; restarted 1802. Compressor depressured. ~n n ,Q~ - i++~ 5rr" ~~ .. .- ~...~ - -< ~~ c;i. ~~ • u ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL COMPRESSOR PLANT ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU A r-96 Disposition *Indicate contribution of each pool to total. 1. Sold 961,700 Pool Name Code Percent 2. Reinjected 189,175,544 PRUDHOE 64otso loo 3. Flared or vented less than 1 hour 5,387 4. Flared or vented greater than 1 hour 0 (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purge 31,528 6. Used for lease operations Fuel 5,885,932 Assist 0 11. Transferred to: CGF 23,158,855 7.Other 0 TOTAL items 1 - 7 196,060,091 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: FS1, FS2, FS3, 218,981,524 GCl GC2 GC3 Remarks: T herehv certify that. the fr,reQning is mie and cnrrect to the heel ~f my kn~wlP.cTge. Signature: Title: SUPERVISOR Note: Alt volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT APRIL 1996 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 04/09/96 0530-0540 t 91 T/C 1811 shutdown for water wash. PLANNED Compressor depressured. 1222-1227 04/09/96 1310-1320 141 T/C 1808 shutdown for maintenance. PLANNED Compressor depressured. • 04/10/96 0130-0135 182 T/C 1811 shutdown due to instrumentation malfunction. PLANNED Corrected instrumentation failure. 0244-0249 04/10/96 0500-0505 277 T/C 1809 shutdown for water wash. PLANNED Compressor depressured. (Intermittent 15 min) 04/10/96 2330-2335 159 T/C 1809 emergency shutdown due to valves out of UNPLANNED Restarted T/C 1809. Corrected instrumentation position during start up. problem with valve sequencing. 04/11/96 0130-0135 156 T/C 1812 shutdown for water wash. PLANNED Turbine depressured. 04/11/96 1650-1645 182 T/C 1812 shutdown for water wash. Starting up turbine PLANNED Started T/C 1812. after water wash compressor vented down during start procedures. 04/11/96 2000-2005 141 T/C 1805 shutdown for wafer wash. PLANNED Compressor depressured. 04/1 1/96 2100-2105 420 T/C 1876 shutdown for water wash. PLANNED Compressor depressured. • 04/12/96 0450-0455 152 T/C 1876 shutdown to test ESD switch after spin cool. PLANNED Compressor depressured. 04/13/96 0545-0550 152 T/C 1876 shutdown to repair gas leak P-14 valve. UNPLANNED Compressor depressured. 04/13/96 0545-0550 310 T/C 1813 shutdown for water wash, spin cool and ESD PLANNED Compressor depressured. (Intermittent 20 min) check. 04/13/96 2045-2050 141 T/C 1801 shutdown for water wash. PLANNED Compressor depressured. 04/14/96 1245-1250 284 T/C f80f shutdown for ESD check. PLANNED Compressor depressured. (Intermittent 15 min) 04/14/96 0715-0720 332 T/C 1803 shutdown for water wash and ESD check. PLANNED Compressor depressured. (Intermittent 30 min) 04/15/96 1205-1210 445 T/C 1807 shutdown for water wash and ESD check. PLANNED Compressor depressured. (Intermittent 25 min) ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT APRIL 1998 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 04!15/96 2340-2345 141 T/C 1804 shutdown for water wash and ESD check. PLANNED Compressor depressured. 04!16/96 0315-0320 14 T/C 1804 shutdown for water wash. PLANNED Compressor depressured. 04/16/96 1820-1825 188 T/C 1812 shutdown due to electrical malfunction. UNPLANNED Restarted T/C 1812. • 1920-1925 04/20/96 2130-2140 141 T/C 1806 shutdown for maintenance. PLANNED Compressor depressured. 04/21 /96 0815-0825 856 T/Cs 1803, 1806, 1810, 1878 and 1812 shutdown PLANNED Compressors depressured. (Intermittent 45 min) for maintenance. 04/21 /96 0625-0655 130 Unplanned venting of gas at Well #WGI#4 due to failed UNPLANNED Repaired check valve. check valve bonnet flange. Volume includes blowdown to repair the check valve bonnet flange. 04/22/96 0825-0835 159 T/C 1810 shutdown for maintenance. PLANNED Compressor depressured. 04/23/96 1420-1430 93 T/C 1810 shutdown for maintenance. PLANNED Repair fuel gas supply ring leak. TOTAL UNDER 1 HOUR 5,387 • FLARING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR 0 Flared 5,387 Pilot/Purg~ 31,528 Continuous Assist Q TOTAL FLARED 38,915 RECEIVED MAY ~ 6 1996 Alaska Oil & Anct~oaageCornmission • • ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL COMPRESSOR PLANT ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Mar-96 Disposition *Indicate contribution of each pool to total. 1. Sold 1,064,499 Pool Name Code Percent 2. Reinjected 206,545,070 PRUDHOE 640150 100 3. Flared or vented less than 1 hour 0 4. Flared or vented greater than 1 hour 0 (Sup lemental report required--See 20 AAC 25.235) 5. Pilot and Purge 32,711 6. Used for lease operations Fuel 6,372,771 Assist 0 11. Transferred to: CGF 25,319,831 7.Other 0 TOTAL items 1 - 7 ~ ~~ ~,~ ~..~ h ~ .~ ~ ,~ 214,015,051 8. NGL Qas equivalent produced ~ [ : ~~ , :; ;; ~~ 0 r~ a r~-~z ~ , ~ , ~~ ;" - . 9. Purchased gas ~ 0 10. Transferred from: FS1, FS2, FS3, 239,086,566 GC1 GC2 GC3 Remarks: T herehv certify that the f~reQninQ is mie and correct to the beet. of my knnwlP.~iQe. Signattue: Title: SUPERVISOR Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT MARCH 1996 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR TOTAL UNDER 1 HOUR 0 FLARING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR 0 Flared PI IoUPurge Continuous Assist `1 i;~ ~'~ ~° r ~'~i ~~ ~ ~~i~t~ ~ ,.., b 0 32,711 Q TOTAL FLARED 32,711 ALASKA OIL AND GAS CONSERVATION COMMISSION n u • FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL COMPRESSOR PLANT ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Feb-96 Disposition 1. Sold 1,024,567 2. Reinjected 195,034,450 3. Flared or vented less than 1 hour 1,361 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 30,668 6. Used for lease operations Fuel Assist 5,822,008 0 7.Other 0 TOTAL items 1 - 7 201,913,054 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: FS1, FS2, FS3, GC1 GC2 GC3 161,693,289 11. Transferred to: CGF 23,600,095 Remarks: 1 herehv certify that. the fC1rP.9(11n9 is mie an(t cnrrert to the hP,Ct of my kn~wlP.dge. Signature: J = ~_ Title: SUPERVISOR ornt evtse *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 Official Use Onl -=Flariir ...__ ';< Authorization > I hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date pressure of 14.65 psia and to a temperawre of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ^~ ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT FEBRUARY 1996 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS fk CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 02/12/96 1016-1135 626 T/C 1878 shutdown due to instrumentation problem. UNPLANNED Corrected problem & restarted 1878. (Intermittent 20 min.) 02/15/96 1730-1745 159 T/C 1812 shutdown due to crack in compressor belly drain. UNPLANNED Stabilized facility process & operation. • 02/15/96 1910-1922 135 T/C 1804 shutdown for exhaust tem alibratio UNPLANNED l C t d lib ti & l i p c n. e omp e ca on p ra entum repa r. 02/17/96 1630-1642 22 T/C 1804 shutdown for repairs. One normal stop and UNPLANNED Repaired a gas leak and fixed a false S/D alarm. 1735-1747 one ESD during start sequence w/100 psig in system. 02/18/96 1145-1600 105 3 failed started on T/C 1812. Each event flared gas from UNPLANNED Repaired T/C 1812. (Intermittent 45 min.) 550 psig to 0 psig due to ESDJOSD testing. 02/20/96 0015-0020 155 Shutdown T/C 1806 for Combustion Inspection. PLANNED Compressor depressured. 02/24/96 0610-0617 159 Shutdown T/C 1810 for maintenance. PLANNED Maintenance completed. TOTAL UNDER i HOUR 1, 361 • FLARING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR 0 Flared 1, 361 PIIoUPurge 30,668 Continuous Assist Q TOTAL FLARED 32,029 ALASKA OIL AND (rAS CONSERVATION COMMISSION FACILITY REPOP;T OF PRODUCED GAS DISPOSITION LJ (Facility CENTRAL COMPRESSOR PLANT Operator ARCO ALASKA, INC. Field(s) EASTERN OPERATING AREA-PBU Month/Year of Disposition Jan-96 Disposition *Indicate contribution of each pool to total. 1. Sold 1,061,994 Pool Name Code Percent 2. Reinjected 205,694,543 PRUDHOE 640150 100 3. Flared or vented less than 1 hour 647 4. Flared or vented greater Wan 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 32,796 6. Used for lease operations Fuel Assist 6,303,971 0 7.OWer 0 Qtficial Use: Onl '1~larin :Auihori~tion 5.1 hr. TOTAL items 1 - 7 213,093,951 1. Safety MCF 8. NGL gas equivalent produced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: FS1, FS2, FS3, GC1 GC2 GC3 169,987,142 Commissioner Date 11. Transferred to: CGF 24,089,049 ote: vo umes must correcte to Remarks: pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by We 20W of the T herehv certify that. the fnreQning is rme ant cnrrert rn the hest of my knnwiP~TQe. Signature: Title: SUPERVISOR monW following We monW of disposition. AuWority 20 AAC 25.235. rorm i ~~ txevrsea 4iyo~ ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT JANUARY 1996 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 01/24/96 0025-0035 141 Shut down T/C 1801 for exhaust repairs. PLANNED Down for exhaust repair. 01 /26/96 0235-0245 194 Shut down T/C 1812 for maintenance. PLANNED Facility maintenance completed. 0925-0930 • 01/26/96 1000-1008 156 T/C 1811 shut down, reason unknown at this time. PLANNED Started T/C 1811. 01 /28/96 0045-0055 156 Shut down T/C 1812. Power supply to control panel lost UNPLANNED Repaired power supply problem. power. TOTAL UNDER 1 HOUR 647 FLARING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR 0 Flared 6 47 Pilot/Purge 32,796 Continuous Assist Q TOTAL FLARED 33,443