T ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GA5 DISPOSITION
Facility Operator Fields} Month/Year of Disposition
CENTRAL COMPRESSOR PLANT ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Dec-96
i
Disposition
1. Sold ~ 997,891
2. Reinjected 209,637,186
3. Flared. or vented less than 1 hour 1,034
4. Flared or vented greater than 1 hour
(Su lemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 34,978
6. Used for lease operations Fuel
Assist 6,228,333
0
7.Other 0
TOTAL items 1- 7 216,899,422
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: FS1, FS2, FS3,
GC1 GC2 GC3 242,067,371
11. Transferred to: CGF 25,436,768
Remarks:
T herehv certify that. the fnreg~ing is trne an~i cnrrP,ct to the 11PCt. ~f my )cnnwle.~ige.
Signattue:~~j ~, Title: SUPERVISOR
.E '
orm
evi f
9 I,~
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATK)N ORDER N0.219
GAS FLARING MICIDENTS
CENTRAL COMPRESSOR PLANTIFIELD FUEL GAS UNIT
DECEMBER 1998
PLANNED
DATE TBYE VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
12/01 /96 0050-0100 135 T/C 1813 shutdown reason unknown. UNPLANNED Started T/C 1813.
12/13/96 0530-0535 135 T/C 1803 shutdown due to crack in fuel gas line. UNPLANNED Repaired crack & restarted 1803.
12/27/96 0130-0135 141 Shut down TC 1805. Did repair maintenance on T/C 1805 PLANNED Started T/C 1805.
while GC#1 was down.
12/27/96 0150-0155 135 Shut down T/C 1808. Did repair maintenance on T/C 1808 PLANNED Started T/C 1808.
while GC#1 was down.
12/27/96 0155-0203 156 Shut down T/C 1812. Did repair maintenance on T/C 1812 PLANNED Started T/C 1812.
while GC#1 was down.
12/29/96 0855-0910 191 T/C 1811 shut down on high vibration. UNPLANNED Down for repairs.
1330-1343
12!29!96 1940-1945 141 Shut down T/C 1804. Not needed while high stage TiC 181 PLANNED Not need while 1811 down for repairs.
down.
TOTAL UNDER 1 HOUR 1,034
•
FLARING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR
0
Flared 1, 034
Pilot/Purgs 34, 978
Continuous Assist Q
TOTAL FLARED 38,012
~~ w~
~s~N ~ ~- 197
.~a~k~ ~~ ~~ ~~~~ ~~a=~~;~~~it~rl
~ch~ragl~
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GA5 DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL COMPRESSOR PLANT ARCO ALASKA, INC. EASTERN OPERATING AREA-PBII Nov-96
Disposition
1. Sold 957,954
2. Reinjected 199,982,221
3. Flared or vented less than 1 hour 1,169
4. Flared or vented greater than 1 hour
(Su plemental re ort required--See 20 AAC 25.235) 0
5. Pilot and Purge 31,7?2
6. Used for lease operations Fuel
Assist 5,904,910
0
7.Other 0
TOTAL items 1- 7 206,878,035
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: FS1, FS2, FS3,
GC1 GC2 GC3 231,551,541
11. Transferred to: CGF 24,936,432
Remarks:
i herehv certify that. t fare¢oing is tn~e and correct to the hest of my knowledge.
Signature: Title: SUPERVISOR
orm evise
*Indicate contribution of each pool to total.
Pool Name Code .Percent
PRUVxOE 6aalso I~w
Official LJse Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATKNd ORDER N0.219
GAS FLARING MCIDENTS
CENTRAL COMPRESSOR PLANTIFIELD FUEL GAS UNR
NOVEMBER 1996 ' ~-
PLANNED ,
DATE TINE VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UI~LANNED ACTION TAKEN TO ELIMINATE CAUSE ~.,
~
-
FLARING EVENTS LESS THAN 1 HOUR ;
'°. '
11/03/96 0755-0800 135 Shutdown 1804 on high vibration due to instrumentation UNPLANNED Compressor depressured. _ -~
malfunction.
11/03/96 0800-0810 159 Shutdown 1812 due to instrumentation malfunction. UNPLANNED Compressordepressured. `'
•
11110/96 0920-0922 597 Shutdown 1804 for fuel control problems. Ut~LANPED Compressor/train depressured. Started
T/C 1804.
11/11/96 0045-0050 143 Shutdown T/C 1804 for fuel control problems. UNPLANNED Compressor/train depressured. Restarted
0035-0037 T/C 1804.
1 1/23/96 1630-1640 135 T/C 1813 shutdown on high vibration. UNPLANNED Reduced inlet gas rates & compressor depressured.
• TOTAL UNDER 1 HOUR 1,169
FLARING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR
Flared
PiloUPurga
Continuous Assist
TOTAL FLARED
0
1,169
31,772
4
32,941
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAI< COMPRESSOR PLANT Operator
ARCO AI.,ASKA, INC. Field(s)
EASTT;RN OPERATING AREr1-PBi1 Month/Year of Disposition
OCt-96
Disposition *Indicate contribution of each pool to total.
1. Sold 986,~)6l Pool Name Code Percent
2. Reinjected 201,586,850 PRUDHOE 6gr)150 1EX)
3. Flared or vented less than 1 hour 4,636
• 4. Flared or vented greater than 1 hour
(Su lemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 33,1.61
6. Used for lease operations Fuel
Assist 6,015,835
0
7.Other 0
TOTAL items 1- 7 208,627,443
8. NGL gas equivalent produced 0
• 9. Purchased gas ,g 0
T ~ , h,g
10. Transferred from: FS 1, FS2, FS3, 233,1L24,714
GC1 GC2 GC3
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
11. Transferred to: CGF 24,652,218
Remarks:
T hereby certifyhat. the oregoing is tree and correct to the hest of my knowledge.
Signature: ~~~ Title: SUPERVISOR
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
t°
®x,~,
~•
l,d,d...
~~.
>_r,
c
~:`..,
,_m.
~~
:~
orm evise
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING HVCIDENTS
CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNfT
OCTOBER 1996
DATE
TIME
VOLUME MCF
DESCRIPTION OF INCIDENTS & CAUSE PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
10/01/96 0005-1710 310 Shutdown T/C 1802 & 1807 for Fall water washes. PLANNED Restarted 1802 & 1807.
(Intermittent 40 min.)
10/02/96 0400-0410 296 T/Cs 1806 and 1803 shut down for water wash. PLANNED Started units after water wash completed.
• (Intermittent 30 min.)
10/03/96 0235-0245 439 Spin cooling and water washing T/Cs 1812, 1801, and 1803 PLANNED Completed water washing and restarted T/Cs.
(Intermittent 35 min.)
10/03!96 1130-1140 191 Shut down T/C 1810 for water wash. PLANNED Restarted T/C 1810.
1600-1605
10/04/96 2040-2045 191 T/C 1810 tripped while in crank mode and T/C 1809 was PLANNED Started T/C 1810.
2200-2210 shut down for water wash.
10/05/96 0040-0045 226 Water washing and pin cooling T/Cs 1809, 1801, & 1811. PLANNED Completed work and restarted.
(Intermttent 20 min.)
10/06/96 0550-0600 1,350 Shut down T/Cs 1878 and 1876 for water wash. PLANNED Restarted after water wash was completed.
(Intermittent 48 min.)
10/11/96 0445-0455 675 Shut down T/G 1813 due to instrumentation malfunction. UNPLANNED Reduced inlet gas rates & corrected problem.
(Intermittent 35 min.)
• 10/12/96 0435-0440 135 Sh
t d
T/C 1813 d
t
i
u
own
o
ue
nstrumentation malfunction. UNPLANNED Reduced inlet gas rates. Turbine depressured.
10/ 13/96 0855-9000 270 Shut down T/C 1813 due to instrumentation malfunction. UNPLANNED Reduced inlet gas rates.
1000-1005
10/21/96 0400-0410 318 T/C 1810 emergency shutdown. UNPLANNED Compressordepressured.
1000-1010
10/21/96 1320-1324 135 T/C 1801 tripped due to inverter malfunction. UNPLANNED Corrected problem & restarted.
10/28/96 1545-1932 75 T/C 1806 F-127 valve opened due to ice in instrument UNPLANNED Corrected instrumentation problem.
(Intermittent 6 min. ) controls.
10/28/96 2158-2200 25 T/C 1801 F-127 valve opened due to ice in instrument UNPLANNED Corrected instrumentation problem.
controls.
TOTAL UNDER 1 HOUR 4,636
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT
OCTOBER 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR
Flared 4, 636
Pilot/Purge 33,161
Continuous Assist Q
TOTAL FLARED 37,797
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL, COMPRESSOR PLANT ARCO ALASKA, INC. EASTERN OPERATING ART.A-PBil Se -96
•
n
~.J
Disposition
1. Sold 955,954
2. Reinjected 1.87,302,865
3. Flared or vented less than 1 hour 1,351
4. Flared or vented greater than 1 hour
(Su elemental re rt aired--See 20 AAC 25.235) 0
5. Pilot and Purge 32,194
6. Used for lease operations Fuel
Assist 5,682,962
0
7.Other U
TOTAL items 1 - 7 193,975,326
8. NGL gas equivalent produced 0
9. Purchased gas U
10. Transferred from: FS1, FS2, FS3,
GC1 GC2 GC3 220,627,954
11. Transferred to: CGF 24,392,579
Remarks:
T herehv certify that. th foregoing is tn~e and correct. to the hest of my knowledge-
Signature: ,' Title: SUPERVISOR
orm evi
*Indicate contribution of each pool to total.
Pool Name Code Percent
I'RUDHOE 64t}150 1t~
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
` ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARMG gVCIDENTS
CENTRAL COMPRESSOR PLANT/FlELD FUEL GAS UNIT
SEPTEMBER 1996
PLANNED
DATE Tlll~ VOLUME MCF DESCRIPTION OF NVCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
09/04/96 1446-1448 135 Turbine tripped, unknown reason. UNPLANNED Started/restarted T/C 1813.
09/07/96 0025-0029 135 T/C 1813 tripped, unknown reason. UNPLANNED Started/restarted T/C 1813.
09/08/96 1923-1928 135 T/C 1813 tripped, unknown reason. UNPLANNED Started/restarted T/C 1813.
. 09/09/96 1930-1934 141 T/C 1805 shutdown for maintenance. PLANNED T!C 1805 planned shutdown for HGP Inspection.
09/12/96 1335-1345 135 T/C 1813 shutdown due to instrumentation mafunction. UNPLANNED Stabilized facility process and Operation..
09/13/96 2000-2010 8 T/C 1813 shutdown for water wash. PLANNED Completed water wash.
09/15/96 0130-0140 143 T/C 1813 shutdown due to instrumentation malfunction. UNPLANNED CompressorRrain depressured.
0820-0825
09/15/96 1530-1540 114 T/C 1805 shutdown for ESD/OSD FCO testing. PLANNED Started T/C 1805 after completing FCO's.
(Intermittent 40 min)
09/19/96 1715-1725 135 T/C 1813 tripped due to instrumentation malfunction UNPLANNED Restarted T/C 1813.
09/28/96 0815-0905 135 T/C 1801 power supply problem. UNPLANNED Restarted T/C 1801.
09/28/96 1620-1715 135 T/C 1801 power supply problem. UNPLANNED Corrected problem & restarted T/C 1801.
TOTAL UNDER 1 HOUR 1, 351
FLARING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR 0
Flared 1, 351
PIIoVPurge 32,194
Continuous Asalet Q
TOTAL FLARED 93;545
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL COMPRESSOR PLANT ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Au -96
•
Disposition
1. Sold 923,983
2. Reinjected 185,455,403
3. Flared or vented less than 1 hour 2,118
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 33,324
6. Used for lease operations Fuel
Assist 5,634,523
0
7.Other 0
TOTAL items 1 - 7 192,049,351
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: FS 1, FS2, FS3,
GC1 GC2 GC3 214,637,495
11. Transferred to: CGF 22,803,085
Remarks:
T herehv certify that. the foregoing is tn,e and correct to the hest of my knowledge.
Signature: Title: SUPERVISOR
c~ ~.2~.~ ~L~
orm - evtse
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
.Official Use Onl --Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC. '
CONSERVATK)N ORDER N0.219
GAS FLARMG INCIDENTS
CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT
AUGUST 1998
PLANNED
DATE TIME VOLUME MCF DESCRIPTK)N OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
08/06/96 2300-2305 152 Pressure tested T/C 1878 to full suction pressure and then PLANNED Compressor depressured & maintenance complete.
08/07/96 1830-2043
• (Intermittent 9 min)
08/08/96 1242-1245
(Intermittent 23 min)
08/09/96 0900-1047
(IMernittent 11 min)
08/26/96 0215-0220
08/26/96 0945-0950
08/30/96 0935-1635
(Intermittent 55 min)
• TOTAL UNDER 1 HOUR 2,118
FLARING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR 0
vented unit to PSI via ESD.
327 T/C 1878 shutdown for maintenance. Maintenance PLANNED
conducting overspeed testing of turbine.
806 T/C 1878 shutdown for maintenance. Maintenance PLANNED
conducting overspeed testing of turbine.
370 T/C 1878 shutdown for flaring for start-up testing. PLANNED
Compressor depressured & maintenance complete.
Compressor depressured & maintenance complete.
Maintenance completed & restarted 1878.
135 T/C 1813 shutdown due to instrumentation malfunction. UNPiJWNED Restarted T/C 1813
135 T/C 1813 shutdown due to instrumentation malfunction. UNPLANNED Restarted T/C 1813
193 T/C 1808 shutdown for water wash &ESD switch testing; PLANNED Completed water wash & put 1808 back on line.
failed restarts.
Fred 2,118
PiloUPurgs 33,324
Continuous Assist 4
TOTAL FLARED 35,442
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL COMPRESSOR PLANT ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Jul-96
C~
Disposition
1. Sold 899,372
2. Reinjected 178,485,953
3. Flared or vented less than 1 hour 463
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 33>136
6. Used for lease operations Fuel
Assist 5,684,801
0
7. Other 0
TOTAL items 1 - 7 185,103,725
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: FS1, FS2, FS3,
GCl GC2 GC3 207,006,853
11. Transferred to: CGF 20,316,659
Remarks:
i herehv cert.ifv that. the foregoin¢ is tn~e and correct to the hest of my knowledge.
Signature: ~ <<~~ U~ ~~-~~-i`~~ Title: SUPERVISOR
ono iu-4~~ ~xevtse
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT
JULY 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
07/12/96 0205-0211 159 T/C 1804 shutdown for maintenance. PLANNED Normal shutdown.
07/12/96 0201-0205 141 T/C 1813 shutdown for maintenance. PLANNED Normal shutdown.
07/19/96 1220-1230 163 T/C 1805 instrumentation malfunction. UNPLANNED Restarted T/C 1805. Depressured 1805.
TOTAL UNDER 1 HOUR 463
FLARING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR 0
Flared 4 6 3
Pilot/Purge 33,136
Continuous Assist 0
TOTAL FLARED 33,599
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
CBNTRAI. COMPRF...SSC)R PL,ILNT ARCO ALASKA. INC. r.A.STIRN C)PF..RATIN<.i ARF.,A-PBL7 Jun-96
•
•
Disposition
1. Sold 92$,92$
2. Reinjected 179,374,1.14
3. Flazed or vented less than 1 hour l93
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 31,99$
6. Used for lease operations Fuel
Assist 5,554,0$_5
0
7.Other 0
TOTAL items 1 - 7 1$5,$$9,31.$
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: FS1, FS2, FS3,
GC1 GC2 GC3 211,034,151
I1. Transferred to: CGF 22,468,778
Remarks:
i herehv certify at. the foregoing is tn~e and correct to the hest. of my knowledge.
Signature: Title: SUPERVISOR
orm evise
*Indicate contribution of each pool to total.
Pool Name Code Percent
PI2UDH()E 640150 100
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
must
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
AACO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING MJCIDENTS
CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT
JUNE 1996
PLANNED
DATE TMAE VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
06/10/96 0730-1303 163 Performed FCO of T/C 1813's ESD system. PLANNED Completed ESD testing & fully depressurized
(Intermittent 13 min) and isolated T/C 1813.
06/15/96 0235-0239 30 Facility maintenance. Testing and maintenance work on PLANNED Started T/C 1813.
• (Intermittent 1o min) start up of T/C 1813.
TOTAL UNDER 1 HOUR 193
FLARING EVENTS GREATER THAN 1 HOUR
•
TOTAL OVER 1 HOUR 0
Flared 19 3
Pllot/Purge 31,998
Continuous Assist Q
TOTAL FLARED 32,191
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CrNTRAi. COMPRFSSCJR PLANT ARCC) ALASKA, INC. EA:STF.,RN OPF.,RATTNG AREA-PBU Ma -96
Disposition
1. Sold 941,386
2. Reinjected 176,688,848
3. Flared or vented less than 1 hour 828
4. Flared or vented Qreater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 32,811
6. Used for lease operations Fuel
Assist 5,91.3,336
0
7.Other 0
TOTAL items 1- 7 1.83,577,209
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: FS 1, FS2, FS3,
GC1 GC2 GC3 203,927,609
11. Transferred to: CGF 20,539,673
Remarks:
T herehv certify at the fore¢oing is m~e and correct to the hest of my knowledee.
Signature: C~~ `~ ~~ Title: SUPERVISOR
orm evi
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUllHC)E 640150 100
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT
MAY 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
05/06/96 0855-0900 141 Shutdown T/C 1802 for combustion inspection. PLANNED Compressor depressured.
05/07/96 2000-2010 51 Emergency shutdown on T/C 1813 when fitting broke on UNPLANNED Repaired machine.
• 05/08/96 1410-1415
1615-1620
05/10/96 1320-1325
05/25/96 0810-0815
0940-0945
1000-1005
F57 sensing line
180 T/C 1813 shutdown on high vibration; bad compressor UNPLANNED
axial probe connection.
135 T/C 1802 shutdown to repair oil leak. PLANNED
321 Shutdown T/C 1813. Electrical malfunction. UNPLANNED
Bad axial probe comp.
Repaired equipment with vibration system.
TOTAL UNDER 1 HOUR 828
FLARING EVENTS GREATER THAN i HOUR
•
TOTAL OVER 1 HOUR £s
Flared 8 28
Pilot/Purge 32,811
Continuous Assfst Q
TOTAL FLARED 33,638
Cut gas rates; restarted 1802.
Compressor depressured.
~n
n
,Q~ -
i++~ 5rr"
~~ ..
.-
~...~ -
-<
~~
c;i.
~~
•
u
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL COMPRESSOR PLANT ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU A r-96
Disposition *Indicate contribution of each pool to total.
1. Sold 961,700 Pool Name Code Percent
2. Reinjected 189,175,544 PRUDHOE 64otso loo
3. Flared or vented less than 1 hour 5,387
4. Flared or vented greater than 1 hour 0
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 31,528
6. Used for lease operations Fuel 5,885,932
Assist 0
11. Transferred to: CGF 23,158,855
7.Other 0
TOTAL items 1 - 7 196,060,091
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: FS1, FS2, FS3, 218,981,524
GCl GC2 GC3
Remarks:
T herehv certify that. the fr,reQning is mie and cnrrect to the heel ~f my kn~wlP.cTge.
Signature: Title: SUPERVISOR
Note: Alt volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT
APRIL 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
04/09/96 0530-0540 t 91 T/C 1811 shutdown for water wash. PLANNED Compressor depressured.
1222-1227
04/09/96 1310-1320 141 T/C 1808 shutdown for maintenance. PLANNED Compressor depressured.
• 04/10/96 0130-0135 182 T/C 1811 shutdown due to instrumentation malfunction. PLANNED Corrected instrumentation failure.
0244-0249
04/10/96 0500-0505 277 T/C 1809 shutdown for water wash. PLANNED Compressor depressured.
(Intermittent 15 min)
04/10/96 2330-2335 159 T/C 1809 emergency shutdown due to valves out of UNPLANNED Restarted T/C 1809. Corrected instrumentation
position during start up. problem with valve sequencing.
04/11/96 0130-0135 156 T/C 1812 shutdown for water wash. PLANNED Turbine depressured.
04/11/96 1650-1645 182 T/C 1812 shutdown for water wash. Starting up turbine PLANNED Started T/C 1812.
after water wash compressor vented down during start
procedures.
04/11/96 2000-2005 141 T/C 1805 shutdown for wafer wash. PLANNED Compressor depressured.
04/1 1/96 2100-2105 420 T/C 1876 shutdown for water wash. PLANNED Compressor depressured.
• 04/12/96 0450-0455 152 T/C 1876 shutdown to test ESD switch after spin cool. PLANNED Compressor depressured.
04/13/96 0545-0550 152 T/C 1876 shutdown to repair gas leak P-14 valve. UNPLANNED Compressor depressured.
04/13/96 0545-0550 310 T/C 1813 shutdown for water wash, spin cool and ESD PLANNED Compressor depressured.
(Intermittent 20 min) check.
04/13/96 2045-2050 141 T/C 1801 shutdown for water wash. PLANNED Compressor depressured.
04/14/96 1245-1250 284 T/C f80f shutdown for ESD check. PLANNED Compressor depressured.
(Intermittent 15 min)
04/14/96 0715-0720 332 T/C 1803 shutdown for water wash and ESD check. PLANNED Compressor depressured.
(Intermittent 30 min)
04/15/96 1205-1210 445 T/C 1807 shutdown for water wash and ESD check. PLANNED Compressor depressured.
(Intermittent 25 min)
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT
APRIL 1998
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
04!15/96 2340-2345 141 T/C 1804 shutdown for water wash and ESD check. PLANNED Compressor depressured.
04!16/96 0315-0320 14 T/C 1804 shutdown for water wash. PLANNED Compressor depressured.
04/16/96 1820-1825 188 T/C 1812 shutdown due to electrical malfunction. UNPLANNED Restarted T/C 1812.
• 1920-1925
04/20/96 2130-2140 141 T/C 1806 shutdown for maintenance. PLANNED Compressor depressured.
04/21 /96 0815-0825 856 T/Cs 1803, 1806, 1810, 1878 and 1812 shutdown PLANNED Compressors depressured.
(Intermittent 45 min) for maintenance.
04/21 /96 0625-0655 130 Unplanned venting of gas at Well #WGI#4 due to failed UNPLANNED Repaired check valve.
check valve bonnet flange. Volume includes blowdown to
repair the check valve bonnet flange.
04/22/96 0825-0835 159 T/C 1810 shutdown for maintenance. PLANNED Compressor depressured.
04/23/96 1420-1430 93 T/C 1810 shutdown for maintenance. PLANNED Repair fuel gas supply ring leak.
TOTAL UNDER 1 HOUR 5,387
• FLARING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR
0
Flared 5,387
Pilot/Purg~ 31,528
Continuous Assist Q
TOTAL FLARED 38,915
RECEIVED
MAY ~ 6 1996
Alaska Oil & Anct~oaageCornmission
•
•
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL COMPRESSOR PLANT ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Mar-96
Disposition *Indicate contribution of each pool to total.
1. Sold 1,064,499 Pool Name Code Percent
2. Reinjected 206,545,070 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Sup lemental report required--See 20 AAC 25.235)
5. Pilot and Purge 32,711
6. Used for lease operations Fuel 6,372,771
Assist 0
11. Transferred to: CGF 25,319,831
7.Other 0
TOTAL items 1 - 7 ~ ~~ ~,~ ~..~ h ~ .~ ~ ,~ 214,015,051
8. NGL Qas equivalent produced ~ [ : ~~ , :; ;; ~~ 0
r~ a r~-~z ~ , ~ , ~~ ;" - .
9. Purchased gas ~ 0
10. Transferred from: FS1, FS2, FS3, 239,086,566
GC1 GC2 GC3
Remarks:
T herehv certify that the f~reQninQ is mie and correct to the beet. of my knnwlP.~iQe.
Signattue: Title: SUPERVISOR
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT
MARCH 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
TOTAL UNDER 1 HOUR 0
FLARING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR 0
Flared
PI IoUPurge
Continuous Assist
`1 i;~ ~'~ ~° r
~'~i ~~ ~ ~~i~t~
~ ,.., b
0
32,711
Q
TOTAL FLARED 32,711
ALASKA OIL AND GAS CONSERVATION COMMISSION
n
u
•
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL COMPRESSOR PLANT ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Feb-96
Disposition
1. Sold 1,024,567
2. Reinjected 195,034,450
3. Flared or vented less than 1 hour 1,361
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 30,668
6. Used for lease operations Fuel
Assist 5,822,008
0
7.Other 0
TOTAL items 1 - 7 201,913,054
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: FS1, FS2, FS3,
GC1 GC2 GC3 161,693,289
11. Transferred to: CGF 23,600,095
Remarks:
1 herehv certify that. the fC1rP.9(11n9 is mie an(t cnrrert to the hP,Ct of my kn~wlP.dge.
Signature: J = ~_ Title: SUPERVISOR
ornt evtse
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Onl -=Flariir
...__ ';< Authorization > I hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psia and to a temperawre of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
^~
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT
FEBRUARY 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS fk CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
02/12/96 1016-1135 626 T/C 1878 shutdown due to instrumentation problem. UNPLANNED Corrected problem & restarted 1878.
(Intermittent 20 min.)
02/15/96 1730-1745 159 T/C 1812 shutdown due to crack in compressor belly drain. UNPLANNED Stabilized facility process & operation.
• 02/15/96 1910-1922 135 T/C 1804 shutdown for exhaust tem
alibratio UNPLANNED l
C
t
d
lib
ti
&
l
i
p c
n. e
omp
e
ca
on
p
ra
entum repa
r.
02/17/96 1630-1642 22 T/C 1804 shutdown for repairs. One normal stop and UNPLANNED Repaired a gas leak and fixed a false S/D alarm.
1735-1747 one ESD during start sequence w/100 psig in system.
02/18/96 1145-1600 105 3 failed started on T/C 1812. Each event flared gas from UNPLANNED Repaired T/C 1812.
(Intermittent 45 min.) 550 psig to 0 psig due to ESDJOSD testing.
02/20/96 0015-0020 155 Shutdown T/C 1806 for Combustion Inspection. PLANNED Compressor depressured.
02/24/96 0610-0617 159 Shutdown T/C 1810 for maintenance. PLANNED Maintenance completed.
TOTAL UNDER i HOUR 1, 361
• FLARING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR 0
Flared 1, 361
PIIoUPurge 30,668
Continuous Assist Q
TOTAL FLARED 32,029
ALASKA OIL AND (rAS CONSERVATION COMMISSION
FACILITY REPOP;T OF PRODUCED GAS DISPOSITION
LJ
(Facility
CENTRAL COMPRESSOR PLANT Operator
ARCO ALASKA, INC. Field(s)
EASTERN OPERATING AREA-PBU Month/Year of Disposition
Jan-96
Disposition *Indicate contribution of each pool to total.
1. Sold 1,061,994 Pool Name Code Percent
2. Reinjected 205,694,543 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 647
4. Flared or vented greater Wan 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 32,796
6. Used for lease operations Fuel
Assist 6,303,971
0
7.OWer 0
Qtficial Use: Onl '1~larin :Auihori~tion 5.1 hr.
TOTAL items 1 - 7 213,093,951 1. Safety MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: FS1, FS2, FS3,
GC1 GC2 GC3 169,987,142
Commissioner Date
11. Transferred to: CGF 24,089,049
ote: vo umes must correcte to
Remarks: pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by We 20W of the
T herehv certify that. the fnreQning is rme ant cnrrert rn the hest of my knnwiP~TQe.
Signature: Title: SUPERVISOR monW following We monW of disposition.
AuWority 20 AAC 25.235.
rorm i ~~ txevrsea 4iyo~
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL COMPRESSOR PLANT/FIELD FUEL GAS UNIT
JANUARY 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
01/24/96 0025-0035 141 Shut down T/C 1801 for exhaust repairs. PLANNED Down for exhaust repair.
01 /26/96 0235-0245 194 Shut down T/C 1812 for maintenance. PLANNED Facility maintenance completed.
0925-0930
•
01/26/96 1000-1008 156 T/C 1811 shut down, reason unknown at this time. PLANNED Started T/C 1811.
01 /28/96 0045-0055 156 Shut down T/C 1812. Power supply to control panel lost UNPLANNED Repaired power supply problem.
power.
TOTAL UNDER 1 HOUR 647
FLARING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR 0
Flared 6 47
Pilot/Purge 32,796
Continuous Assist Q
TOTAL FLARED 33,443