ALASKA OII. AND GAS CONSERVATION COMMISSION
' ~ `' ' FACILITY REPORT OF PRODUCED GAS DISPOSITION
r~
Facility Operator Field(s) Month/Year of Disposition
CENTRAL GAS FACILITY ARCO ALASKA, INC. EASTERN OPERATING AREA-PB Dec-97
Disposition
1. Sold 3,454,520
2. Reinjected 17,164,980
3. Flared or vented less than 1 hour 15,486
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 185,361
5. Pilot and Purge 29,603
6. Used for lease operations Fuel
Assist 3,214,608
42,450
7.Other 0
TOTAL items 1 - 7 24,107,008
8. NGL gas equivalent produced 3,454,520
9. Purchased gas 0
10. Transferred from: CCP 25,781,806
11. Transferred to: FS1, FS2, FS3 1,674,798
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~ I ~- Title: SUPERVISOR
-~~
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
OfHciai`Use OnI --Flavin Authorization > 1 tir:
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
' s
.H
1
• ~
,«
ARCO ALASKA, INC.
~, CONSERVATION ORDER N0.219
;
,,t3M'~ GAS FLARING INCIDENTS
~
, s{ 3 ~ , CENTRAL GAS FACILITY
:.
: ~ -~~~ DECEMBER 1997
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8: CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN OR EQUAL TO 1 HOUR
12/ 14/97 0220-0235 1,320 T/C 1885 shutdown due to instrumentation problem. UNPLANNED Repaired equipment and restarted 1885
• 0500-0515
12/15/97 1220-1245 5,994 Flared for CCP white 1805 TC taken to idle for repairs. UNPLANNED CCP loaded 1805; repairs completed.
1305-1317
12/18/97 1655-1750 5,150 CCP shutdown 1810 for repairs. UNPLANNED CCP loaded 1810; repairs completed.
12/16/97 0730-0737 585 Flared to maintain FSiM while CCP swapped 1878-LTS3. UNPLANNED Completed swap over.
12/22/97 1510-1523 2A37 CCP unloaded 1804 to adjust fuel gas valve. UNPLANNED CCP repairs completed.
TOTAL • 1 HOUR 15,486
FLARING EVENTS GREATER THAN 1 HOUR
ISSS
12/09/97 0704-0948 19,900 Facility Maintenance. Problems w/MI 1'895 required PLANNED Adjusted LTS process/warmed chillers
a shutdown and gas generater waterwash. and LTS bottoms to minimize Flare
12/11/97 1625-2125 s,y~~ 47,900 1805 shutdown on governor failure. UNPLANNED Repaired equipment and restarted 1805
12/12/97 T405-2050 6"- 55,969 1805 shutdown on instrumentation malfunction. UNPLANNED Repaired equipment and restarted 1805
~
S
12/13/97 0940-13303 .-s 32,990 T/C 1805 shutdown on seal oil difficulties. UNPLANNED Repaired equipment and restarted 1805
0
12/14/97 1645-1950; ~~ 28,602 1805 shutdown on instrumentation malfunction. UNPLANNED Repaired equipment and restarted 1805
TOTAL > 1 HOUR
185,361 ~..
(6S ~ ~ 6 I
Flared 200,847
Pilot/Purge 29,603
Continuous Assist 42,450
TOTAL FLARED 272,900
ALASSA OIL A1~TD GAS
COI~TSERQATIOI~T COMI~IISSIOI~T
December 10, 1998
Frank V. Roach
EOA Production Superintendent
Prudhoe Bay Operations
ARCO Alaska, Inc.
P.O. Box 196105
Anchorage, AK 99~ 19-610
Re: CGF MI 180 Flaring Incident, December 11-14, 1997
Dear Mr. Roach:
~J
TONY KNOWLES, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
The Commission has reviewed the CGF flaring event, which occurred between December 11-14,
1997, for a determination of whether waste occurred and whether penalties under AS 31.0~.1~0
should be imposed. ARCO Alaska, Inc. ("AAI") reported approximately 165,461 Mscf of gas
flared during four extended episodes. On May 26, 1998, the Commission expressed its concern
that AAI may have prolonged the flaring event by not acting more aggressively to resolve the
problem. We invited AAI to submit additional information for the Commission to consider
before rendering a final decision. AAI submitted additional information on June 23, 1998 and
July 24, 1998, and met with us on July 9, 1998.
Under the Commission"s regulations, an operator is required to take action in accordance with
good oil field engineering practices and conservation purposes to minimize the volume of gas
released, burned, or permitted to escape into the air. 20 AAC 25.235(c). The flaring of gas is
deemed to be waste unless authorized under ZO AAC 25.23.
After reviewing the additional information, including copies of the actual control room log for the
days in question, the Commission concludes that AAI undertook appropriate steps to minimize
the amount of gas flared and acted in accordance with good oil field engineering practices in
pursuing facility repairs to stop flaring. For these reasons, the Commission believes the flaring
on December 11-14, 1997 was unavoidable because of an emergency that threatened life or
property and necessary because of subsequent facility repairs (20 AAC 25.235(d)(5)(A)& (B)).
Accordingly, the imposition of penalties is neither appropriate nor warranted.
The Commission is disturbed, however, by the cavalier attitude expressed by AAI in the initial
reporting of this incident. Had AAI submitted complete and accurate information to begin with,
the matter could have been resolved quickly without any wasted of staff time. The Commission
will expect ~f~~te~losure for any and all subsequent events.
David W.~n
Commissioner
C `MSOFFtCE1tVAPNJRD~LDS~FRIIDHDF.CJ±!'~a~np M~
DWI
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
•
Facility I I I
d( Month/Year of Disposi
(
~~~ GAS FACILITY ARCO ALASKA, iNC. EAS
TERN OPERATING AREA-FBLJ Nov-97
Disposition ~ *Indicate contribution of each pool to total.
1. Sold ~ ~ 3,185,409 Pool Name Code Percent
o_
2. Reinjected as
~ ~ r-~
f7 ("'~
16,250,069
PRUDHOE
640150
100
n to ,~
3. Flared or vented less than 1 hour a
~ ~ tJ ,....
~
~
9,964
t
G
~ "tt
4. Flared or vented greater than 1 hour ~ (~ 39,715
(Supplemental report required--See 20 AAC 25.235) 4?'
5. Pilot and Purge 27,995
6. Used for lease operations Fuel 3,066,501
Assist 43,134
Remarks:
.. _..
_.
official Use Onl --Flaariw Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
11. Transferred to: FS1, FS2, FS3 1,545,677
7.Other 0
TOTAL items 1 - 7 22,622,787
8. NGL gas equivalent produced 3,185,409
9. Purchased gas 0
10. Transferred from: CCP 24,168,464
I hereby certify that the foreg ing is true and correct to the be/st of my knowledge.
Signature: ` /l _ ~ C ~ /~(,~~ Title: SUPERVISOR
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following We month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INgDENTS
CENTRAL GAS FAgLITY
NOVEMBER 1997
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS ~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
5/97
• 11 0432-0523 560
2 CCP
n 1805 for re
airs
h
td PLANNED CCP restarted 1805
/0 , p
.
s
u
ow .
11/13/97 1077-1705 1 Skid 50 shutdown caused a rapid overpressure. UNPLANNED Reduced inlet gas rates.
11/18/97 1035-1040 195 Shutdown 1802 to repair leak on discharge p(ping. PLANNED Maintenance completed.
11/20/97 0935-1025 7,187 CCP unloaded 1878 for inverter maintenance. UNPLANNED CCP reloaded 1878.
11/29/97 1903-1906 21 Process upset in stabilizers section of facility. UNPLANNED Stabilized facliity process and operation.
TOTAL UNDER 1 HOUR 9,964
~LARING EVENTS GREATER THAN 1 HOUR
11/07/97 2203-2345
11/11/97 0240-0430
TOTAL OVER 1 HOUR
Flared
Pilot/Purge
Continuous Assist
TOTAL FLARED
39,715
8,746 Emergency shutdown on T/C 1805 fa turbine break. UNPLANNED Replaced broken tubing and restarted 1805.
30,969 CCP T/C 1811 shutdown on high vibration. UNPLANNED CCP restarted T/C 1811.
49,679
27,995
43,134
120,808
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposiflon
CENTRAL GAS FACILrfY ARCO ALASKA, INC. EASTERN OPERATINGAREA-PB Oct-97
•
•
Disposition
m
1. Sold ~, 3,183,851
a
ae O PT1
2. Reinjected = ~ ~ ~ 16,161,259
n vs
cs
o
-P ....
3. Flared or vented less than 1 hour co ~
" .~• ~ 286
~ ti9
"1i
4. Flared or vented greater than 1 hour 3 (~ 8,237
(Supplemental reportrequired--See 20 AAC 25.23 5) ~~
a
5. Pilot and Purge 28,676
6. Used for lease operations Fuel 3,117,546
Assist 59,411
7.Other 0
TOTAL items 1- 7 22,559,266
8. NGL gas equivalent produced 3,183,851
9. Purchased gas 0
10. Transferred from: CCP 24,114,500
11. Transferred to: FS1, FS2, FS3 1,555,234
Remarks:
I hereby certify that the fore
going
is
true
and correct to the best of my knowledge.
g
,
~
~
Signature: ~~. ~~~'~ _ (< ~ ~ ~- Title: SUPERVISOR
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Onl --Flavin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
RE~E~VE
V ~ `t ~~~t
Alaska Oil & Gas Cons. Commissipn
Anchorage
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
OCTOBER 1997
VOLUME PLANNED/
DATE TIME MCF DESCRIPTION OF INCIDENTS ~ CAUSE UNPLANNED ACTK)N TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
• 10/04!97 1628-1651 41 Overpacked stabilizer caused by an Increase inlet gas UNPLANNED StaWNzed facNNy process & operatbn.
rates Into fadNry.
10/26/97 1032-1845
(intermktent 25 min)
10/27/97 1500-1545
TOTAL UNDER 1 HOUR 286
FLARING EVENTS GREATER THAN 1 HOUR
10/26/97 1030-2400
(B10 minutes)
10/26/97 1030-2400
(B10 minutes)
• 10/26/97 1030-1320
(200 minutes)
TOTAL OVER 1 HOUR
8,237
28 FaciNty emergency shutdown (SESD) due to UPS
and hot oil problems. (black smoke emitted)
217 Flare off stabiNzer OVHD drum due to excess MI pres.
1,684 Faciity emergency shutdown (SESD) due to UPS
and hot oil problems.
5,343 MI ~mpressor shutdown due to facNtty SESD.
1,210 Facility emergency shutdown (SESD) due to UPS
and hot oil problems.
Flared 8,523
Pilot/Purge 28,676
Continuous Assist 58.411
TOTAL FLARED 96,610
UNPLANNED Stabilized facNity process & operation.
UNPLANNED StabNized facNlty process $ operator.
UNPLANNEp Restarted tacNNy.
UNPLANNED Restarted facNNy.
UNPLANNED Restarted facNNy.
•
•
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL GAS FACILITY ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Se -97
Disposition *Indicate contribution of each pool to total.
1. Sold 2,957,171 Pool Name Code Percent
2. Reinjected 14,874,751 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 79
4. Flared or vented greater Wan 1 hour 34,853
(Su lemental re rtrequjred--See 20 AAC 25.235)
5. Pilot and Purge 22,798
6. Used for lease oDeradons Fuel 2.900.290
Assist 61500
7.OWer
11 Transferred to• FS1 FS2 FS3 1319 507
TOTAL items 1 - 7 20,851,442
8. NGL gas equivalent produced ~ ~ 2,957,171
9. Purchased gas - ~ ~ ~ ' 19~ 7 0
_ ~~~ ~i~ .~ ~a~
10. Transferred from: CCP `°`-~-t.,y.,~ ~~~ r~nso . om
~9~ 22,370,949
Remarks:
I hereby certify that We oregoing is true and correct to We best of my knowledge.
Signature: ~~ Title: SUPERVISOR
Note~olumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Repoli due by We 20W of the
monW following We month of disposition.
AuWority 20 AAC 25.235.
ARCO ALASKA, INC.
r CONSERVATION ORDER N0.219
GAS FLARING INCDENTS
CENTRAL GAS FACILITY
SEPTEMBER 1997
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
09/05/97 1735-1740 30 ElectricaUnstrumentation malfunction at other facilty (T&D). UNPLANNED Corrected E&I fluctuation/failure at other
FS 1 Annex shutdown. facility (T&D). Restarted FS 1 Annex.
09/08/97 0930-0940 42 Process upset in stabilizer section of faality. UNPLANNED Stabilized facility process and operation.
09/17/97 1952-2008 7 Excessive Inlet gas rates into facility. UNPLANNED Reduced Inlet gas rates.
TOTAL UNDER 1 HOUR 79
FLARING EVENTS GREATER THAN 1 HOUR
09/03/97 1636-1904 15,259
(Intermittent-229 min)
09/04/97 1125-1305 40
(Intermittent-115 min)
08/04/97
•
09/04/97
09/09/97
09/13/97
TOTAL OVER 1 HOUR
Flared
PiloUPur~
. Continuow Asslst
TOTAL FLARED
0300-0320
(Intermittent-72 min)
1110-1130
(Intermittent-100 min)
0900-1028
1705-1708
6, 452
34,853
154
12,930
18
34,932
22,799
61. ti00
119,230
~No~-? °~
Eledrical/Insirumentation malfunction. Plant SESD. All UNPLANNED
equipment shut down. `511~~EM
Seal oil difficulties. Total Facility shutdown. Booster UNPLANNED
compressor seal oif leakage in compressor casing. (Black Smoke)
Total facility SESD restart. ~ UNPLANNED
Excessivernsufficient inlet gas rates into facility. UNPLANNED
Shut down T/C 1805 for al leak at chip detector. UNPLANNED
Instrumentation malfunction UNPLANNED
Restarted plant.
Repaired equipment difficulties with booster
compressor. Added assist gas to Bum Ph.
Disposal.
Stabilized facility process and operation.
Stabilized facillty process and operation.
Repaired oil leak. Restarted T/C 1805.
Corrected E81 fluctuation/failure.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
Facility
CENTRAL GAS FACILITY Operator
ARCO ALASKA, INC. Field(s)
EASTERN OPERATING AREA-PBU Month/Year of Disposition
Au -97
Disposition *Indicate contribution of each pool to total.
1. Sold 2,846,352 Pool Name Code Percent
2. Reinjected 13,615,443 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 1,617
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 19,233
5. Pilot and Purge 22,414
6. Used for lease operations Fuel
Assist 2,816,293
85,730
7.Other . ......
Official Use Onl --Flariti Authorizafion > 1 hr
TOTAL items 1 - 7 19,407,082 1. Safety MCF
8. NGL gas equivalent produced ~ E ~ ~ ~ V E ~ 2,846,352 2. Lease Use MCF
9. Purchased gas (~av ,~ t~. 199` 0 3. Conserv. Purposes MCF
10. Transferred from: CCP AIQBICS ~~~ ~ ~~f ~`fi1118• ~pl11t111s36~0I1
AIiG~Ofd 9 20,901,837
Commissioner Date
11. Transferred to: FS1, FS2, FS3 1,494,755
o vo umes mus conec
Remarks: pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: Title: SUPERVISOR month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
'~
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
AUGUST 1997
PLANNED
DATE Tlt1ilE VOLUME MCF DESCRIPTION OF INCIDENTS A CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
.08/01 /97 2110-2115 72 MI#2 cool stopped due to overpressure suction. UNPLANNED Started T/C 1855.
• 08/01/97 0000-2302 990 Process upset in stabilizer section of facillty. UNPLANNED Stabilized facility process and operation.
(Intermittent 24 min)
08/03/97 1120-1140 328 High ambient temps; insufficient rates into facility. UNPLANNED Started T/C 1805.
08/04/97 1120-1140 3 Black Smoke -False levels in tandem 1st stage suction
drums causing dumps to BPD. UNPLANNED
08/04/97 1723-1730 190 Shutdown 1888 for maintenance. UNPLANNED
08/07/97 2122-2136 8 Process upset in stabilizer UNPLANNED
08/09/97 2142-2146 26 Process upset in stabilizer. UNPLANNED
TOTAL UNDER 1 HOUR 1,817
Forced logic on Mark V control panel to
dose dump valves to BPD.
Compressor depressured.
Stabilized facility process and operation.
Stabilized facility process and operation.
FLARING EVENTS GREATER THAN 1 HOUA
• 08/02/97 0207-0817 4,951 Excessive gas rate to stabilizers for MI compressor startup. UNPLANNED Started T/C 1805.
(Intermittent 156 min) ~ ~-~~
08/02/97 1120-2008 10,122 High ambient temps; insufficient MI gas for compressor bading. UNPLANNED Stabilized facility process and operation.
(Intermittent 156 min)
08/08/97 0346-0715 2,680 Facility maintenance. PLANNED Repaired equipment difficulties with LTS-1.
08/17/97 l)7to-1420 1,500
_. Flaring for drillslte shutdown. UNPLANNED Depressure WOA Ml line to replace valves.
__ ~,
TOTAL OVER 1 HOUR 19,28) ~~ S~
~
~
~
g
~
~
Raced 20,850 C~~
~
Pllot/Purgs
i
A
i 22,414
85
730 ~
`~
~
Cont
nuous
ss
st . ~~
- ~
TOTAL FLARED 128,994 a
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
Facility Operator Field(s) Month/Year of Disposition I
CLiNTRAL, GAS PACD.,iTY ARCO ALASKA, INC. IiAS1TRN t7Pt;RAT1NG AREA-PBIJ Jul-97
Disposition
1. Sold 2,953,238
2. Reinjected 15,333,494
3. Flared or vented less Wan 1 hour 17,103
4. Flared or vented >;reater than 1 hour
(Su lemt:ntal report aired--See 20 AAC 25.235) 19,867
5. Pilot and Purge 20,823
6. Used for lease operations Fuel
Assist 2,933,025
60 338
7.Other
TOTAL items 1- 7 21.,337,888
8. NGL ~¢as equivalent produced 2,953,238
9. Purchased Ras 0
10. Transferred from: CCP .22,870,414
11. Transferred to: FS1, FS2, FS3 1,532,526
Remarks:
I hereby certify that the ore~oinA is true and wrrect to the best of my knowledge.
Signature: ~ ~ ~~ Title: SUPERVISOR
*Indicate contribution of each pool to total.
Pool Name Code Percent
1'RUDHOE 640150 ltx)
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
]vote: All volumes muse oe correc[ea to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
monW following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
JULY 1997
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN OR EQUAL TO 1 HOUR
07/06/97 1618-1628 68 Process upset in stabilizer section of facility. UNPLANNED Stabilized facility process fi operation.
07/07/97 0228.0234 79 Process upset in stabilizer section of facility. UNPLANNED Stabilized facility process & operation.
•
07/09/97 0337-0413 12,630 T/C 1811 shutdown due to instrumentation malfunction. UNPLANNED Restarted T/C 1811.
07/23/97 0913.0918 10 Process upset in refrigeration section of facility. UNPLANNED Stabilized facility process & operation.
07/24/97 1630-1730 3 Process upset in diver) tank section of facility. UNPLANNED Stabilized facility process & operation.
07/25/97 0445.0535 2,853 Process upset in refrigeration section of facility. UNPLANNED Stabilized facility process 8 operation.
07/26/97 1950-2015 139 Process upset in refrigeration section of facility. UNPLANNED Stabilized facility process & operation.
07/27/97 1725-1740 74 Process upset in refrigeration section of facility. UNPLANNED Stabilized facility process & operation.
07/31 /97 2330-2350 387 Shutdown 1805 for maintenace during TAPS shutdown. PLANNED Compressor depresssured.
07/31 /97 2100-2130 430 Shutdown 1884 for maintenace during TAPS shutdown. PLANNED Compressor depresssured.
07/31 /97 2330-2359 430 Shutdown 1883 for maintenace during TAPS shutdown. PLANNED Compressor depresssured.
• TOTAL _< 1 HOUR 17,103
FLARING EVENTS GREATER THAN 1 HOUR
07/15/97 0830-1215 18,370 T/C 1855 shutdown due to instrument malfunction.
07!31/97 0515-2400 1,497 Process upset in stabilizer section of facility.
(Intermittent 131 min)
TOTAL>1 HOUR 19,867
Flared 36, 970
PiloUPurge 20, 823
Continuous Assist f0 3~8_
TOTAL FLARED 118,131
UNPLANNED Corrected bad card and restarted 1855 TlC.
UNPLANNED Stabilized facility process and operation.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODIfCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL GAS FACILITY ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Jun-97
•
Disposition
1. Sold 2,815,418
2. Reinjected 15,549,869
3. Flared or vented less than 1 hour 1,510
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 74,525
5. Pilot and Purge 20,214
6. Used for lease operations Fuel
Assist 2,951,178
56 038
7.Other
TOTAL items 1 - 7 21,468,752
8. NGL Qas equivalent produced 2,815,418
9. Purchased gas 0
10. Transferred from: CCP 22,994,225
11. Transferred to: FS1, FS2, FS3 1,525,473
Remarks:
I hereby certify that the ore~oing is tru/e correct to the best of my knowledge.
Si nature: ~/ 9~~Title: SUPERVISOR
g ~~
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Note: All volumes must be corrected to
pressure of 14.65 Asia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
~:.
~~,~
~,,
`~
o~ '
>~~.
~,...
~,
~wsaxre~i ~
~
Y.•«
}` '~
yx~
~~ W
_.
..5
.~
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
JUNE 1997
DATE
TIME VOLUME MCF
DESCRIPTION OF INCIDENTS & CAUSE PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN OR EQUAL TO 1 HOUR
06/12/97 1747-1755 80 Switching CCP tandem T/C 1876 to LTS 1 & 2. UNPLANNED Switch completed.
• 08/13/97 0120-0205 1,331 CCP 1811 shutdown. UNPLANNED CCP restarted 1811.
06/17/97 0254-0324 99 Process upset in LTS III. UNPLANNED Stabilized facility process and operation.
Repaired equipment difficulties with LTS Ill.
TOTAL 5 1 HOUR 1, 510
FLARING EVENTS GREATER THAN 1 HOUR
06/02/97 1240-1455 44,740
06/13/97 0000-2000 5,003
06/13/97 0258.0345 _ ~% ~
0453-0515 1,200
08/19/97 0107-0118 23,315
(Intermittent-179 min.}.
06/22/97 1247-1252 36
08/26/97 1740-1800 215
06/27/97 0940-0944 16
0951-0954
TOTAL> 1 HOUR 74,525
CCP T/C 1811 shutdown; reason unkrwwn. UNPLANNED
Proecess upset in stabilizer section of facility. Shut down PLANNED
and depressured LTS 3 for maintenance.
Faulty shutdown on 1885 $ 1888 compressors UNPLANNED
L?S PL~q Nn~,za 5 /~ . l- p i !„,.oi4~ C?~~ m,) 6ai'~.
f'~ r.;,y r, !» +, ~~ ~. s.~.~~,, ~, .
Shutdown T/C 1801 for CCP due to electricaU'nstrumentation UNPLANNED
malfunction. ,~~~~.~°~ >'~.tc~G~s~ 4.~r~~f~~m~r~~,s'~~ ~%
Process upset in stabs. I k ~ ' I ~ ~ ~ ~ /~ ~ r.I , UNPLANNED
6ccessive/Insufficient inlet gas rates into facility. UNPLANNED
Excessive/Insuffiicient inlet gas rates into faallty. UNPLANNED
Reduced inlet gas rates; CCP restarted 1811.
Stabilized facility preocess. Unit depressured
assist gas added.
Restarted T/C 1885 and 1886.
Restarted T/C.1801 at CCP '~ ~ ~ ~` ~~~' -
fr . t ~.~ ;
s . ~~ ~ ~ ..
Stabilized facility process and operation.
Stabilized facility process and operation.
Reduced/Increased inlet gas rates.
Flared 78,035
Pllot/Purgs 20,214
Continuous Assist 56.038
TOTAL FLARED 152,287
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL GAS FACILITY ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Ma -97
•
•
Disposition
1. Sold 3,105,312
2. Reinjected 16,136,618
3. Flared or ventedless than 1 hour 1,030
4. Flared or vented greater than 1 hour 160,351
(Supplemental report r aired--See 20 AAC 25.235)
5. Pilot and Purge 26,396
6. Used for lease operations Fuel 3,061,840
Assist 59 789
7.Other
TOTAL items 1- 7 22,551,336
8. NGL gas equivalent produced 3,105,312
9. Purchased gas 0
10. Transferred from: CCP 24,140,157
11. Transferred to: FS1, FS2, FS3 1,588,821
Remarks:
I hereby certify that foregoing is true an correct to the best of my knowledge.
Signature: ~~ ~ Title: SUPERVISOR
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
presstue of 14.65 Asia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
~" ~Y
dA
~: ~ `I
~~
- ,~ ~.:
i
~~~
s,:
r=
~~~
f'
~~
~-, . _~
~~ .__,
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
MAY 1997
DATE TIME VOLUME MCF
FLARING EVENTS LESS THAN OR EQUAL TO 1 HOUR
05/08/97 1140-1150 890
05/11/97 1700-1735 140
DESCRIPTION OF INCIDENTS & CAUSE
T/C 1805 shutdown at the CCP.
Instrumentation malfunction; ccc controller problems.
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
UNPLANNED CCP restarted 1805 T/C.
UNPLANNED Repaired equipment.
TOTAL 5 1 HOUR 1,030
FLARING EVENTS GREATER THAN 1 HOUR
05/01/97 0110-1700 1,560 Process upset in M.1. UNPLANNED Stabilized facility process and operation.
(Intermittent 220 min)
05/02/97 0153-0400 100 T/C#185 ~u~own for maintenance. ~~> Gv PLANNED Stabilized facility process and operation.
Grill !ni /w~a.-E CN~,n1GE,fXS7 ~ ~~9rtit > w,<< Loo,C /v>o r'' ~eT~''/E'~
05/03/97 0650-2035 62,310 T/C #1805 shutdown for instrumentation malfunction; process UNPLANNED Started/restarted T/C #1805; stabilized
----~ _
(Intermittent 467 min) upse in M.I. `~~ Lv~, facility process and operation.
CANT,~u2C>E- Zer.~ qr
rA1 LUG- ~'r'NN>ft~ ~oT 6~RJ`
05/04097 1440-1545 13,170 ~KM-Gr~O•rbhuB~V for CCP, ? J~53 Jr~/ _ ~¢ '~VPLANNED Started/restarted T/C.
05/15/97 0538-0640 62,300 CCP T/C 1810, unknown cause for event. ^-~ UNPLANNED Restarted T/C 1810.
0857-1113
• 05/17/87 1016-1126 21 CCP T!C 1811 tripped, cause unknown. - ~ UNPLANNED Restarted T/C 1811 at CCP.
05/23/97 0520-0608 400 T/C 1886 shutdown due to instrumentation malfunction. UNPLANNED Restarted T/C 1886.
05/24/97 21.16-2148 400 T/C 1885 shutdown due to instrumentation malfun or~~~ UNPLANNED Restarted T/C 1885.
05/30/97 0600.0645 20,090 CCP T/C 1811 tripped, cause unknown. Flared to prevent UNPLANNED Restarted T/C 1811 at CCP.
overpressure. ~ ~
i
I
TOTAL > 1 HOUR 160,351 .: `~'
Flared 161,381 ~; °""
PiloVPurge 26,396 ~„ ',
Continuous Assist Ss.78s c? ~; 7,Q.7 ~!{,ST . rf
TOTAL FLARED 247,566 ~" ~ - ~ ~ ~ ~~.- ~ 1~ ~ ~ ~ ~,~ `
5l /S - ~St>gaz7~~C~-~"~ - ND .[yZS ~ T M)N . L~-l'c~l~-~
w1i" Z° oS1A~1E.~1 ~'~ - iNs>evrn . ~oI~E: - CAB. tom ~~"~'><z-~' ~ l o' 3 ~
rniN _~'`~' f --~ ~,~ 5~1 l SQ MM ' ~0' /o • /ti' S?Acz7 ,~~/~N?` 5~} f~Ggln~~ ~c'~' ZO ~,~'7H£R.. J?+Qca..~ -° ~jc R~rP.>~ } ~~~ ~ ~ `
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
CENTRAL GAS FACILITY ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU A r-97
•
Disposition
1. Sold 3,157,247
2. Reinjected 16,353,401
3. Flazed or vented less than 1 hour 2,020
4. Flared or vented Qreater than 1 hour
(Sup lemental report required--See 20 AAC 25.235) 43,130
5. Pilot and Pure 20,627
6. Used for lease operations Fuel
Assist 3,050,889
45 617
7.Other 0
TOTAL items 1- 7 22,672,931
8. NGL Qas equivalent produced 3,157,247
9. Purchased ~as 0
10. Transferred from: CCP 24,229,169
11. Transferred to: FS1. FS2, FS3 1,556,238
Remarks:
I hereby certify that the ore~oin~ is true and correct to the best of my knowledge.
Signature: ~~~~'fitle: SUPERVISOR
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO al.asKa, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
APRIL 1997
DATE
TIME VOLUME MCF
DESCRIPTION OF INCIDENTS & CAUSE PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN OR EOUAL TO 1 HOUR
04/01/97 1818-1831 139 Electrical malfunction. UNPLANNED Corrected problem.
• 04/08/97 2255-2302 400 Flare system testing. PLANNED Completed flare testing.
04/15/97 0430.0440 200 Flare system testing. PLANNED Completed flare testing.
04/16/97 2300-2330 400 Shut down TC 1884 for water wash. PLANNED Compressor/train depressured.
04/18/97 0145-0200 400 TC 1884 shut down on a false high discharge pressure due to UNPLANNED Started/restarted T/C 1884.
bad switch
04/28/97 1722-1750 400 T/C shutdown due to high exhaust temperature due to UNPLANNED Started/restarted T/C 1886.
electricalfinstrumentation malfunction.
04/28/97 2016-2020 81 MI upset due to wet gas. UNPLANNED Stabilized facility process.
TOTAL 51 HOUR 2,020
FLARING EVENTS GREATER THAN 1 HOUR
• 04/26/97 0716-0922 27,520
04/26/97 1025-1333 15,810
TOTAL> 1 HOUR 43,130
Flared 45,150
PiloVPurge 20,627
Contlnuoua Aselet 45.617
TOTAL FLARED 111,394
Ob N1UC~
~~.s ~
~1 H
Process upset in MI 1 & 2 due to instrumentation malfunction. UNPLANNED Corrected E&I failure. Restarted T/C 1805
and 1855. -~ioS?E,i~. 31 l~ -~pt~ J~'! L~ ~~1~ f~,
Shut down T/C 1885 for FV 185 AV repair PLANNED FV1852nd stage recycle.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL GAS FACILITY ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Mar-97
•
Disposition
1. Sold 3.295,924
2. Reiniected 16,277,541
3. Flared or vented less than 1 hour 3,237
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 83,590
5. Pilot and Purge 20,933
6. Used for lease operations Fuel
Assist 3,058,538
47 473
7.Other 0
TOTAL items 1 - 7 22,787,236
8. NGL gas equivalent produced 3,295,924
9. Purchased gas 0
10. Transferred from: CCP 24,382,382
11. Transferred to: FS1, FS2, FS3 1,595,146
Remarks:
I hereby certify that forei;oinQ is a and correct to the best of my knowledge.
Signature: ~~/~~Title: SUPERVISOR
*Indicate contribution of each pool to tot<11,
Pool Name Code Percent
PRUDHOE 640150 100
_....
Official Use Unl --Fl<~irin~T``Autlrorizati<m > 1 hr. ,
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
MARCH 1997
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS A CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
03/06/97 0145-0210 620 T/C 1883 shutdown due to broken IGM ram. UNPLANNED Repaired IGV ram & restarted 1883.
1450-1520
03/18/97 0030-0055 685 Planned shutdown and depressure 1801 & 1883. PLANNED Compressor depressured.
03/18/97 1445-1515
1938-1950 230 Burping flare during derime operations. UNPLANNED Stabilized derime operation.
03/19/97 1755-1825 1,600 Flared to light pilots. UNPLANNED Pilots lit.
03/21/97 0740-0750 100 Flare system testing. PLANNED Testing successfully completed.
03/29/97 0635-0710 2 L77AV leaking through to burn pit. Black Smoke. UNPLANNED Manually blocked in L77AV for repair.
TOTAL UNDER 1 HOUR 3,237 ~ ~L~
M t ~ ~~ES
FLARING EVENTS GREATER THAN 1 HOUR 1~~
03/02/97 1545-1900 53,440
03/07/97
03/30/97
03/20/97
03/23/97
TOTAL OVER 1 HOUR
Flared
PiloUPurge
Continuous Assist
TOTAL FLARED
1715-1745
2345-0030
0920-1030
0330-0340
(intermittent 90 min)
1400-1415
(intermittent 80 min)
83,590
450
16,710
~ 4 S (~ 011 Gt.TI' ~ ~-~ d , , ~~~o~~ ~ H L ~ ~,F1-T ~t ~ p_ p,~5-
+/~r ~z v,~s dN ~o~~ 3 ~ ~-
Shut down T/C 1884 due to instrumentation malfunction. UNPLANNED Corrected E&I Failure. Restarted T/C 1884.
P275 ASV failed open on LTS #1. AN~ /~rto,p Blocked in PSV -redundancy in place.
r'
sA~~~y ~q~,% ~ StsP~~-r/o~ "
T/C 1801 shutdown due to power supply failure. TO wtz..~ UNPLANNED Reduced inlet gas rates & stabilized facility
process and operation.
CCP 1811 T/C shutdown due to a faulty card sending a bad sign, UNPLANNED Reduced inlet gas rates.
to fuel ratio valve.
12,800 T/C 1883 shutdown for maintenance and flare system testing. PLANNED Completed flare testing. Flare pilots lit.
Trying to light flare pilots. Purge and started gas 1883 startup. Restarted T!C 1883.
190 Turbine purges and start up attempts. PLANNED 1886 & 1801 T/Cs back on line.
86,827
20,933
47.473
155,233
n
u
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL GAS FACILITY ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Feb-97
Disposition *Indicate contribution of each pool to total.
1. Sold 3,253,997 Pool Name Code Percent
2. Reinjected 15,483,150 PRUDHOE 640150 100
3. Flared or vented less than I hour 645
4. Flared or vented greater than 1 hour 57,360
(Su elemental re rtrcquired--See 20 AAC 25.235}
5. Pilot and Pure 18,798
6. Used for lease operations Fuel 2,899,164
Assist 36 855
7.Other 0
TOTAL items 1 - 7 21,749,969
8. NGL gas equivalent produced 3,253,997
9. Purchased Qas 0
10. Transferred from: CCP 23,242,958
Remarks:.
I hereby certify that a foref¢oin~¢ is true and correct to the best of my knowledge.
Signature: ~,~.. ,/r6~y ~itle: SUPERVISOR
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
FEBRUARY 1997
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
02/04/97 0950-0954 120 Trouble shoot flare IigM-off problem on HP-5. UNPLANNED Completed.
,,
~
~
:.~,~
02/08/97 0950-1030 195 T/C 1801 shutdown due to instrumentation maNunction. UNPLANNED Corrected problem. ~ I•-~.
• ~:. ~
02/10/97 1433-1500 330 Flare system testing. PLANNED Completed flare testing. ~~~~
.~ C\'
~.~ c-^
~,
~
~ `~
TOTAL UNDER 1 HOUR 648 "
'-
S~ Qf... 1.~:
rt ~
FLARING EVENTS GREATER THAN 1 HOUR
02/01 /97 1440-1548 430 Process upset in stabilizer section of facility. UNPLANNED Stabilized facility process and operation.
02/03/97 0140-1730 16,250 Flared for CCP to swap 1878 to LTS3 & thawed out HP flare leg. PLANNED Completed swap and thawed out flare leg.
(Intermittent 130 min.)
02/06/97 0850-1010 15,990 CCP 1810 shutdown for seal oil control valve repairs &CCP UNPLANNED CCP restarted T/C 1810 ~ 1812.
1812 recycle valve MI cable failure.
02!26/97 0110-0220 10,380 1805 seal oil system difficulties. UNPLANNED Started T/C 1805.
02/27/97 0230-0410 14,310 Seal oil difficulties. UNPLANNED Started T/C 1805. Blue ref. gas supply tubing
and drained seal oil overhead tanks to check
if had entrained NGL causing high level alarm/
shutdown on seal oil overhead.
TOTAL OVER 1 HOUR 57,360
Flared 58,005
PiloUPurgs 18,798
Continuous Asstat 36.855
TOTAL FLARED 113,858
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL GAS FACILITY ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Jan-97
~~
Disposition
1. Sold 3,455,792
2. Reiniected 17,553,975
3. Flared or vented less than 1 hour ~ 2,147
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25:?35) 73.491
5. Pilot and Purge 22,999
6. Used for lease oneradons Fuel
Assist 3,196,504
43 348
7.Other 0
TOTAL items 1 - 7
s ~~ ~ 24,348.256
8. NGL gas equivalent produced ~~ g~ 3,455,792
9. Purchased gas F S ~~gt\159`a~ 0
10. Transferred from: CCP 26,017,398
11. Transferred to: FS1, FS2, FS3 1,669,142
.Remarks:
I hereby certify that e foregoing is,~true and correct to the best of my knowledge.
Signature. ~ '~~~-fir "~~~TTitIe: SUPERVISOR
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Ofticial Llse'Onl --Fl<uimtlAuthorization> lhr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Pumoses MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 1.4.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
JANUARY 1997
•
PLANNED
71ME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
r~Nrsirvu ~v~rITS LESS THAN 1 HOUR
01 / 12/97 1640-1700 400 T/C 1883 shutdown due to low stage discharge hi hi temp. UNPLANNED Restarted T/C 1883.
01/12/97 2250-2310 400 T/C 1885 shutdown due to exhaust temp spread. UNPLANNED Restarted T/C 1885.
O1 /20/97 1100-1140 790 Process upset in LTS 3; pump around pump shutdown. UNPLANNED Restarted pump around pump.
01 /26/97 0850-0900 157 Process upset in 4939. UNPLANNED Stabilized facility process and operation.
01 /26/97 1430-1445 400 Instrumentation malfunction. UNPLANNED Started T/C 1886.
TOTAL UNDER 1 HOUR 2,147
FLARING EVENTS GREATER THAN 1 HOUR
01/07/97 0750-0915
01/13/97 0235-0455
• (intermittent 60 min)
01/14/97 0900-1000
Ot/23/97 1615-2025
01/26/97 1020-1120
TOTAL OVER 1 HOUR 73,491
Flared
Pilot/Purge
Continuous Assist
TOTAL FLARED
11,698 T/C 1805 shutdown due to a false seal oil alarm; inst. problem. UNPLANNED Repaired equipment instrumentation problem.
1,200 T/C 1885 shutdown due to high exhaust temps. UNPLANNED Corrected problem & restarted 1855.
9,392 T/C 1855 shutdwon for PSM test due to faulty pres. switch. UNPLANNED Campfeted test & restarted 1855.
38,701 1805 shut down due to an electrical/instrumentation UNPLANNED Started T/C 1805.
malfunction.
12,500 CCP T/C 1808 tripped off line. UNPLANNED CCP restart T/C 1808.
~~~~~ Y ~~
75,838 ~ ~ ~ ~ 1
22,998 1997
43.348
~iaska ®i8 & Gas Cons. Commissian
141, 985 AnChOragB