ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL GAS FACII,TI'Y ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Dec-96
Disposition *Indicate contribution of each pool to total.
1. Sold 3,482,179 Pool Name Code Percent
2. Reinjected 17,047,612 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 6,550
4. Flared or vented Qreater than 1 hour 46,320
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Pure 22,700
6. Used for lease ot~erations Fuel 3,193,636
Assist 45 792
11. Transferred to: FS1, FS2, FS3 1,591,979
7.Other 0
TOTAL items 1- 7 23,844,789
8. NGL Qas equivalent produced 3,482,179
9. Purchased ~as 0
10. Transferred from: CCP 25,436,768
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
~9~9t
Remarks:
I hereby certify that th forettoin~ is true and correct to the best of my knowledge.
Signature: ~-~l. z~ Title: SUPERVISOR
i ~
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
DECEMBER 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
12/01/96 1020-1022 22 Process upset in stabilizer section of facility. UNPLANNED Stabilized facil'dy process and operation.
12/09!96 1020-1055 4,300
12!13!96 520
16
1
-
00 178
12/14/96 1300-1330 700
12/17/96 1640-1655 400
12/26/96 1500-1503 30
12/27/96 0130-0140 400
12/27/96 0900-0915 430
12/27/96 1730-1732 10
12/31/96 0330-0335 80
TOTALUNDERiHOUR 6,550
Corrected E&I fluctuation/failure.
Emergency shutdown on T/C 1803 for nozzle leak. UNPLANNED Gas nozzle Isak repaired and started T/C 1803.
TJC 1856 shutdown due to instrumentation malfunction. UNPLANNED Corrected problem & restarted 1856.
Cleaning out flare lines; flare system testing. PLANNED Completed flare testing.
T/C 1886 shutdown due to instrumentation maffunction. UNPLANNED Restarted 1886.
Process upset in LTS-3. Lost pumparound pumps. UNPLANNED Stabilized facility process and operation.
Restarted pumps.
T/C shut down due to high exhaust temperature. Excessive UNPLANNED Started T/C 1885.
inlet gas rates into facility.
Shut down T/C 1886 for maintenance. Unit shut down to UNPLANNED Compressodtrain depressured
repair recycle valve E-185AV.
Process upset in Stabilizer section of facility. UNPLANNED Stabilized facility process and operation.
Process upset in Stabilizer section of facility. Derime LTS-3. UNPLANNED Reduced inlet gas rates. Stabilized facility
process and operation.
FLARING EVENTS GREATER THAN 1 HOUR
12/29/96 0850-1100 46,320 CCP 1811 shut down on high vibration.
TOTAL OVER 1 HOUR 48,320 LH/~y 5~6E,
Flared 52,870
Pllot/Purge 22,700
Continuous Assist 45.792
TOTAL FLARED 121, 362
UNPLANNED Reduced inlet gas rates.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL. GAS FACII,iTY ARCO AI..ASKA, INC. I:ASTFiRN OPERATING ARI'.A-PBil Nov-96
Disposition *Indicate contribution of each pool to total.
1. Sold 3,320,271. Pool Name Code Percent
2. Reinjected 16,838,481 1'RUI?H()E 640150 100
3. Flared or vented less than 1 hour 2.,470
4. Flared or vented greater than 1 hour 57,11.2
(Su plemental report r aired--See 20 AAC 25.235)
5. Pilot and Purge 20,739
6. Used for lease operations Fuel 3,074,8].9
Assist 42.469
Official Use Onl --Flavin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
11. Transferred to: FS1, FS2, FS3 1580 071
7.Other 0
TOTAL items 1- 7 23,356>361.
8. NGL gas equivalent produced 3,320,271
9. Purchased gas 0
10. Transferred from: CCP 24,936,432
Remarks:
I hereby certify that the regoing is true and correct to the best of my knowledge.
Signature: ~~~ Title: SUPERVISOR
ote: vo umes must correcte to
pressure of 14.65 Asia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
,. ARCO ALASKA, INC.
CONSERVATION ORDER N0.218
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
NOVEMBER 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8 CAUSE UNPUWNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
1 1 /26/96 1337-1357 2,470 Verified Flare operating properly due to suspected PLANNED Thawed plugged candles verified others thawed.
pluggin in some candles.
~J
TOTALUNDERIHOUR 2;470
FLARING EVENTS GREATER THAN 1 HOUR
11!11!96 1337-1530 17,064 MI compressor 1805 shutdown due to instrumentation
malfunction.
11!24/96 0924-1334 40,048 MV compressor 1805 shutdown due to instrumentation
malfunction.
TOTAL OVER 1 HOUR 57,112
Flared 59, 582
PIIoUPurga 20,739
Continuous Asa(st 42.469
TOTAL FLARED 12 2, 790
UNPLANNED Corrected problem 8 restarted MI 1805.
UNPLANNED Corrected problem & restarted MI 1805.
r ALASKA OIL AND GAS CONSERVATION COMMISSION
~~
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
Facility Operator Field(s) Month/Year of Disposition
CENTRAL GAS FACILITY ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Oct-96
Disposition
1. Sold 3,349,418
2. Reinjected 16,578,597
3. Flared or vented less than 1 hour 17.143
4. Flared or vented greater than 1 hour
(Su plemental repot required--See 20 AAC 25.235) 1,850
5. Pilot and Purge 22,375
6. Used for lease operations Fuel
Assist 3.098,896
40 607
7.Other 0
TOTAL items 1- 7 23,108,886
8. NGL gas equivalent produced 3,349,418
9. Purchased ~as 0
10. Transferred from: CCP 24,652,218
11. Transferred to: FS1, FS2, FS3 1,543,332
Remarks:
I hereby certifi+~[6at e r going is true and correct to the best of my knowledge.
Signature: '~ ~:' SUPERVISOR
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
OCTOBER 1996
DATE
TIME
VOLUME MCF
DESCRIPTION OF INCIDENTS 8 CAUSE PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
10/02/98 0050-0110 390 Shut down T/C #1802 for governor failure. UNPLANNED Restarted T/C 1802.
0213-0235
10/03/96 0445-0515 328 Shut down T/C 1805 for Maintenance (GG Hydr. Pump). PLANNED Compressor depressured.
•
10/04/96 0009-0058 45 Process upset in stabilizer. UNPLANNED Stabilized facility process and operation.
10/07!86 1610.1850 1,700 Thawed flare leg HP6 for safety purposed. PLANNED Completed thaw on HP8 flare leg.
10/12/98 0945-1035 2,100 CCP shutdown T/C 1813 due to instrumentation problem. UNPLANNED Reduced inlet gas rates.
10/21/98 0403-0435 8,200 Shutdown T/C 1810 to repair leak. UNPLANNED Reduced inlet gas rates.
10/21 /96 2000-2020 430 Shutdown T/C 1883 for maintenance. PLANNED Compressor depressured.
10/31/98 1557-1824 3,950 CCP 1807 off line for recycle repair. UNPLANNED Repaired equipment difficulties with 1807
at CCP.
TOTALUNDERIHOUR 17,143
FLARING EVENTS GREATER THAN 1 HOUR
10/03!96 1900-2125
10/13/96 2050-2147
2255-2325
10/29/98 0857-1615
(Intermittent t08 min.)
TOTAL OVER 1 HOUR -1,850
300 T/C 1 ti05 1GV Calibration
1,000 Shut down T/C 1813 due to instrumentation problems.
Faulty shutdown on CCP 1813.
550 T!C 1883 shutdown for valve ver'rfication. Check sealing
& operation of pressurizing valve, requiring partial blowdown.
PLANNED Facility maintenance completed.
UNPLANNED Reduced inlet gas rates.
UNPLANNED Testing completed.
Flared 18,993
Pllot/Purgs 22,375
Continuous Assist 40.608
TOTAL FLARED 81,978
n
U
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL GAS FACILITY ARCO AI.,ASKA, INC. EASTIsRN OPERATING AREA-PBU Se -96
Disposition *Indicate contribution of each pool to total.
1. Sold 3,073>875 Pool Name Code Percent
2. Reinjected 16,605,366 PRUDxoE 6aot5o ux~
3. Flared or vented less than 1 hour 7,630
4. Flared or vented greater than 1 hour 71, l (~
(Sup lementat report required--See 20 AAC 25.235)
5. Pilot and Pure 21,406
6. Used for lease operations Fuel 3,033,035
Assist 49 323
Official Use Onl --Flarin Authorization > 1 hr.
1.5afety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
11. Transferred to: FS1, FS2, FS3 1,530,844
7.Other 0
TOTAL items 1- 7 22,861,735
8. NGL Ras equivalent produced 3,073,875
9. Purchased gas 0
10. Transferred from: CCP 24,392,579
Remarks:
I hereby certify that th oreQoinR is true and correct to the best of my knowledge.
Signature: • Title: SUPERVISOR
i
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
SEPTEMBER 1996
PLANNED
DATE TINtE VOLUME MCF DESCRIPTION OF INCIDENTS ri CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
09/01/96 1230-1300 400 T/C 1806 shutdown due to instrumentation malfunction. UNPLANNED Corrected problem & restarted 1806.
09/02/96 0727-0735 30 Process upset in stabilizer section of facility. UNPLANNED Stabilized facility process & operation.
• 09/19/96 1715-1800 7,200 CCP T/C 1813 tripped off line. UNPLANNED Reduced inlet gas rates.
TOTAL UNDER 1 HOUR 7; 630
FLARING EVENTS GREATER THAN 1 HOUR
09/07/96 0030-0315
09/08/96 1925-2320
•
TOTAL OVER 1 HOUR
71,100
33,100
38,000
Flared 78, 730
PIIoUPurg~ 21, 406
Continuous Assist 49.323
TOTAL FLARED 149,459
CCP T/C 1813 shutdown due to instrumentation maNunction. UNPLANNED Restarted T/C 1813 at CCP.
CCP T/C 1813 shutdown due to instrumentation maffunction. UNPLANNED Restarted TIC 1813 at CCP.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL GAS FACILITY ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Au -96
L J
Disposition
1, Sold 2,722,146
2. Reinjected 15,524,319
3. Flared or vented less than 1 hour 3,000
4. Flared or vented greater than 1 hour
(Sup lemental repoR required--See 20 AAC 25.235) 530
5. Pilot and Purge 21,018
6. Used for lease operations Fuel
Assist 3,005,072
22 456
7.Other 0
TOTAL items 1 - 7 21,298,541
8. NGL gas equivalent produced 2,722,146
9. Purchased gas 0
10. Transferred from: CCP 22,803,085
11. Transferred to: FS1, FS2, FS3 1,504,544
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: Title: SUPERVISOR
~~ '~lvr l~L .
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
AUGUST 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS rk CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
08/01/96 0500-0515 255 T/C 1t302 shutdown for maintenance. PLANNED Compressordepressured.
08/02/96 1915-1930 195 T/C 1802 shutdown for oil leak repair. UNPLANNED Compressor depressured.
08/05/96 1415-1420 400 T/C 1884 shutdown due to an instrumentation malfunction. UNPLANNED Restarted T/C 1884.
08/05!96 2110-2125 390 T/C 1802 shutdown due to an instrumentation malfunction. UNPLANNED Restarted T/C 1802.
2240-2255
08/08196 1520-1540 20 Process upset in stabilizer/MI section of facility. UNPLANNED Stabilized faality process and operation.
08/10/96 0746-1310 160 Process upset in stabilizer/MI section of facility. UNPLANNED Stabilized facility process and operation.
(Intermittent 2t min)
08/13/96 0400-0415 900 Flare system testing. PLANNED Facility maintenance completed.
08130/96 0100-0130 400 T/C 1885 shutdown for maintenance. PLANNED Compressor depressured.
08/31/96 1415-1445 280 Process upset in stabilizer section of facility. UNPLANNED Stabilized facility process and operation.
TOTAL UNDER 1 HOUR 3, 000
FLARING EVENTS GREATER THAN 1 HOUR
08/09/96 1030-1130 530 Excessive inlet gas rates into facility. UNPLANNED Reduced inlet gas rates.
TOTAL OVER 1 HOUR 530
Flared 3, 53 0
PiloVPurge 21, 018
Continuous Assist 22.458
TOTAL FLARED 47,004
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL GAS FACILITY ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Jul-96
-~ J
•
Disposition
1. Sold 2,631,079
2. Reinjected 13,227,361
3. Flared or vented less than 1 hour 5,114
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 18,415
5. Pilot and Purge 23,377
6. Used for lease operations Fuel
Assist 2,791,537
61.908
7. Other 0
TOTAL items 1 - 7 18,758,791
8. NGL gas equivalent produced 2,631,079
9. Purchased gas 0
10. Transferred from: CCP 20,316,659
11. Transferred to: FS1, FS2, FS3 1,557,86$
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature:~:}1.,}y.~, ~c~- ~ ~ :J ~rnw.J Title: SUPERVISOR
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use On1 =-Flarine Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
ote: vo umes must correcte to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.249
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
JULY 1998
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
07/04/96 0615-0700 61 Process upset in stabilizer section of facility due to ambients. UNPLANNED Stabilized facility process & operation.
07/06/96 2013-2027 390 T/C 1801 shutdown for fuel control problem. UNPLANNED Corrected problem & restarted 1801.
• 07/07/96 0344-0433 297 Process upset in stabilizer section of facility. Booster 1802 UNPLANNED Stabiiizied facility process 8 operation.
start and loading.
07/1 7196 1730-1735 63 Excessive inlet gas rates into facility due to high ambient temps. UNPLANNED Reduced inlet gas rates.
07/1 8/96 1057-1127 141 Excessive inlet gas rates into facility due to high ambient temps. UNPLANNED Reduced inlet gas rates.
07/19/96 0030-0120 3,000 CCP T/C 1805 shutdown due to electrical malfunction. UNPLANNED Reduced inlet gas rates.
07/25/96 1725-1731 262 1884 8 1805 shutdown due to high ambient temps. UNPLANNED Restarted 1884 8 1805.
1547-1551
07/28/96 1602-1611 900 LT5-2 P-10 blowdown valve failed open. UNPLANNED Blocked in valve.
TOTAL UNDER 1 HOUR 5,114
• FLARING EVENTS GREATER THAN 1 HOUR
07!12196 0728.0908
07/19/96 0230-0830
TOTAL OVER 1 HOUR
Flared
PiloUPurge
Continuous Assist
TOTAL FLARED
18,415
1,580 T/C 1855 shutdown for water wash. UNPLANNED Stabilizied facility process & operation.
~jtb1_ tGN~0 b£T. ~IGkI H IG~+ LE~lE~-
16,835 Faulty shudown on RTD failure/HHL HP suc drum. UNPLANNED Corrected problem & restarted T/C 1805. `
Additional delay due to B~ changeout. ~M/
~P
~~~~~
~1LV~
23,529
23,377
¢,2.908
108,814
i
U
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CINTRAi.. GAS FACII.,ITY Operator
ARCC) AT.:ASKA, I13C:. Field(s)
EA.STIRN O
Disposition
1. Sold 2,731,246
2. Reinjected 15,199,099
3. Flared or vented less than 1 hour 1,262
4. Flared or vented greater than 1 hour
(Supplemental report r uired--See 20 AAC 25.235) 1.8,320
5. Pilot and Purge 21,746
6. Used for lease operations Fuel
Assist 2,837,631
SS 004
7.Other U
TOTAL items 1 - 7 20,867,308
8. NGL gas equivalent produced 2,731.,?46
9. Purchased gas U
10. Transferred from: CCP 22,468,778
11. Transferred to: FS1, FS2, FS3 1,601,470
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: Title: SUPERVISOR
IMonth/Year of Disposition
PIRATING AREA-PBi.1 Jun-96
*Indicate contribution of each pool to total.
Pool Name Code Percent
1'12UDH01 640150 100
.Official tJse Onl --H7arin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
0
.
d ~
W G°
m
o
I m
.-- c~
a~
~.~
~ ~~
~ is
U Q
LLJ C.~
V ~_
~ a
W ~ ~
~ ~ co
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
JUNE 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
06/01/96 1730-1745 154 Process upset in refrigeration stabilizer section of facility. UNPLANNED Stabilized facility process and operation.
06/02/96 1040-1057 158 Process upset in refrigeration stabilizer section of facility. UNPLANNED Stabilized facility process and operation.
• 06/15/96 2144.2140 450 Process upset in MI section of facility. Ambient temperature UNPLANNED Stabilized facility process and operation.
(Intermittent 29 m(n) increase upset facility process.
06/19/96 0100-0110 500 PSV 136C failed open when starting 1856 Refrig Comp. UNPLANNED {solaced PSV with upstream block.
(Black smoke)
TOTAL UNDER 1 HOUR 1, 262
FLARING EVENTS GREATER THAN 1 HOUR
06!11!96 0920-1340
•
TOTAL OVER 1 HOUR
16,320
18,320
Flared 19, 582
PiloVPurga 21, 746
Continuous Assist 56.004
TOTAL FLARED 99,332
Process upset in Utility sedon of facility. Lost CM fans TC 1805 UNPLANNED Restarted TC 1805. Stabilized facility process
shut down on high bearings temp. and operation.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL. GAS FACII..ITY ARCO ALASKA, INC. EASTERN C3PERATiNG AREA-PBL7 Ma -96
C~
Disposition
1. Sold 2,657,121
2. Reinjected 13,447,634
3. Flared or vented less than 1 hour 4,046
4. Flared or vented greater than 1 hour
(Supplemental re rtcequired--See 20 AAC 25.235) 1.0,883
5. Pilot and Purge 23,631.
6. Used for lease operations Fuel
Assist 2,739>489
72 394
7.Other 0
TOTAL items 1 - 7 18,95.5,198
8. NGL gas equivalent produced 2,657>12]
9. Purchased gas 0
10. Transferred from: CCP 20,539,673
11. Transferred to: FS1, FS2, FS3 1,584,475
Remarks:
I hereby certif. t the foregoing is true and correct to the best of my knowledge.
Signature: ,~~ Title: SUPERVISOR
*Indicate contribution of each pool to total.
Pool Name Code Percent
1'RUDHC)E b40150 100
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILfTY
MAY 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
05!05!96 2000-2030 840 Shutdown TIC 1883 8 1886 due to pipeline slowdown. PLANNED Depressured compressor.
~_
05/06/96 .0140-0150 387 Shutdown T/C 1805 due to pipeline slowdown. PLANNED Depressured compressor. ~"
05/06/96 1049-1134 190 Shutdown T!C 1855 for maintenance. PLANNED Maintenance com leted. t~'
j
p
L
G`
,,
05/07/96
0850-0920
430
Shutdown T/C 1884 for maintenance.
PLANNED r
.~
,
../ ~.
Depressured compressor. r..,
_ _~~
~"~~ '~
05/07/96 1015-1100 5 Starting up T/C 1805 (black smoke). PLANNED Started compressor. "-
~-..} -
05/09/96 1630-1700 430 T/C 1885 shutdown for gas leak. UNPLANNED Depressured compressor. ~~
~
~'~
05/09/96 2320-2340 190 Fauely shutdown on 1885 TIC. UNPLANNED Restarted 1885 TIC.
-;
05/10/96 1615-1620 190 T/C 1884 shutdown due to instrument problem. UNPLANNED Corrected problem. ~"'
05/17/96 1138-1140 50 Process upset in stabilizer section of facility. Upset occurred UNPLANNED Stabilized facility process and operation.
1245-1250 while starting LTS 3.
05/25/96 0000-0005 1,290 Process upset in MI section of facility. UNPLANNED Stabilized facility process and operation.
05/29/96 1553-1602 44 Process upset in refrigeration section of facility. UNPLANNED Stabilized facility process and operation.
TOTAL UNDER 1 HOUR 4,048
FLARING EVENTS GREATER THAN 1 HOUR
• 05/06/96 0830-1220 688 Process upset in stabilizer section of facility (black smoke). UNPLANNED Stabilized facility process and operation.
(Intermlttent 62 min)
05/07/96 0300-2400 1,650 Process upset in MI section of facilely. UNPLANNED Stabilized facility process and operation.
(Intermlttent 75 min)
05108!96 0022-0224 1,835 Starting 1855 MI compressor (black smoke). PLANNED Started 1855 T/C.
05/24/96 2256-2400 6,710 Process upset in Refrigeration Section of facility. UNPLANNED Stabilized facility process and operation.
TOTAL OVER 1 HOUR 10,883
Flared 14, 929
PIIoUPurge 2 3, 631
Continuous Assist 72.394
TOTAL FLARED 110, 9 54
n
U
n
U
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL GAS FACII,ITY Operator
ARCO ALASKA, INC. Field(s)
EASTERN OPERATING AREA-PBU Month/Year of Disposition
A r-96
Disposition *Indicate contribution of each pool to total.
1. Sold 2,996,396 Pool Name Code Percent
2. Reiniected 15,380,656 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 17,170
4. Flazed or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 35,920 E ~ E ~ E D
5. Pilot and Purge 23,211 AY 1 ~ 1996
6. Used for lease operations Fuel
Assist
2,977,167
47 265 Alaska Q I & Gas Con
ant;horag Commissia
11. Transferred to: FS 1. FS2, FS3 1,681,070
7.Other 0
TOTAL items 1 - 7 21,477,785
8. NGL gas equivalent produced 2,996,396
9. Purchased >tas 0
10. Transferred from: CCP 23.158,855
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
I hereby certify that the fore>;oinQ is true and correct to the best of my knowled>;e.
Signattue: Title: SUPERVISOR
--
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
APRIL 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS BCAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
04/07/96 0147-0150 30 Process upset in stabilizer section of facility. UNPLANNED Stabilized facility process & operation.
04/09/96 0610-0635 9,200 T/C 1802 shutdown for maintenance. Excessive inlet UNPLANNED Reduced inlet gas rates.
• gas rates into facility.
04/12/96 Ot 15-0136 255 T/C 1801 shutdown for horoscope and facility maintenance. PLANNED Compressor depressured.
04/17/96 0215-0226 2,110 Flared due to CCP's high stage T/C 1812 unloading. UNPLANNED CCP reloaded high stage.
04/19/96 0036-0046 340 T/C 1802 shutdown due to GG tube oil leak. UNPLANNED Restarted T/C 1802.
0118-0128
04/20/96 1010-1015 1 0 T/C 1805 high suction pressure unloaded. UNPLANNED Flare valve closed when pressure returned
to normal.
04/21 /96 1250-1315 6 Leaky PSV valve on NGL recycle pump. UNPLANNED Blocked in PSV valve for maintenance.
04/21/96 1542-1600 2,471 Flare valves opened to relieve overpressure during UNPLANNED Stabilized facilky process 8 operation.
derime of LTS1.
04/22/96 0135-0145 728 T/C 1805 shutdown after start failure. 1886 Tandem 4 UNPLANNED Started 1886 and 1805.
0405-0420 shutdown, valve out of position.
04/22/96 0916-0919 1,060 Process upset in stabilizer/MI UNPLANNED Started T/C 1805.
• 0918-0931
04124/96 1605-1649 960 Process upset LTS/Stabilizer section of faciUly (Black Smoke) UNPLANNED Repaired equipment difficuRies with 15203
micro pump
TOTAL UNDER 1 HOUR 17,170
r
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
APRIL 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS ~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS GREATER THAN 1 HOUR ' bpi ~~ ~ I Zoo ~~c p
04/16/96 1820-1953 24,190 CCP's T/C 1812 shutdown due to inverter failure. UNPLANNED CCP restarted T/C 1812. {i~At 5~1 `~~ M"~ct
1`t'
~t~~f~r
• 04/18/96 0715-0830 11,730 CCP's T/C 1812 unloaded due to inverter failure. UNPLANNED CCP reloaded T/C 1812.
~.In1P1 ~ ~. t~SL.il~.~j'~
w~~7,~j ~ie~V'E 7¢~ rf~~~"~ft~s~
RECEIVED
TOTAL OVER 1 HOUR 35,920
Flared S 3, 090
PiloUPurge 23,211
Continuous Assist 42.265
TOTAL FLARED 123,566
MAY 1 ~ 1996
Alaska Oi4 & Gas Cans. Commission
Anchorage
•
•
•
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSTTION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL GAS FACILITY ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Mar-96
Disposition *Indicate contribution of each pool to total.
1. Sold 3,240,085 Pool Name Code Percent
2. Reinjected 17,227,253 PRUDxoE 640150 100
3. Flared or vented less than 1 hour 2,440
4. Flared or vented greater than 1 hour 0
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 24,665
6. Used for lease operations Fuel 3,122,082
Assist 44 885
Offctal UseOnl --Flarin Authorization > l ,hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
11. Transferred to: FS1, FS2, FS3 1,658,421
7.Other 0
TOTAL items 1 - 7 23,661,410
8. NGL gas equivalent produced 3,240,085
9. Purchased gas 0
10. Transferred from: CCP 25,319.831
Remarks:
I hereby cetifv that the foregoing is true and correct to the best of my knowledge.
Signature: ~ Title: SUPERVISOR
ote: 1 vo umes must correcte to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
MARCH 1996
PLANNED
DATE TIME VOLUME MGF DESCRIPTION OF INCIDENTS fiCAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
03!11 /96 1915-1925 1,900 Hared to relieve field pressure while swapping CCP tandems. PLANNED Completed swap as rapidly as possible.
03!20/96 1816-1820 70 :ikid 50 lost power caused stabilizer upset. UNPLANNED Stabilized facility process and operation.
1840-1845
•
03/26/96 1030-1050 430 Shutdown T/C 1884 for F93 Bonnet leak. UNPLANNED Restarted T!C 1884. Compressor depressured.
03/29/96 1640-1644 40 Process upset in Stabilizer condensers UNPLANNED Stabilized facility process and operations.
TOTAL UNDER 1 HOUR 2,440
FLARING EVENTS GREATER THAN 1 HOUR
•
TOTAL OVER 1 HOUR 0
Flared 2,440
PIIoUPurge 24,665
Continuous Asslat 44.885
TOTAL FLARED 71,990
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
n
\J
Facility
CENTRAL GAS
Operator
ARCO ALASKA, INC.
OPERATING AREA-PBU
ear of Disposition
Feb-96
Disposition
1. Sold 3,008,817
2. Reinjected 15,972,432
3. Flared or vented less than 1 hour 1,553
4. Flared or vented greater than 1 hour
(Sup lemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 28,008
6. Used for lease operations Fuel
Assist 2,953,846
45 619
7.Other 0
TOTAL items 1 - 7 22,010,275
8. NGL gas equivalent produced 3,008,817
9. Purchased Qas 0
10. Transferred from: CCP 23,600,095
11. Transferred to: FS1, FS2, FS3 1,589,820
Remarks:
1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: i~~-~--~-~.~ Title: SUPERVISOR
Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Officbtl Use Onl --Flarin' Authorization> 1 hr.
1. Safeiv MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Cottunissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
FEBRUARY 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
02/06/96 0050-0100 450 T/C 1884 shutdown for maintenance. PLANNED Depressuring completed.
02/07/96 0753-1714 1,018 T/C 1805 shutdown due to NGL skid shutdown on high LVL. UNPLANNED Reduced inlet gas rates & restarted 1805.
(Intermittent 58 min.)
02!15/96 1753-1812 85 Upset occurred during swapping 7876 from LTS3 to LTS2. UNPLANNED Stabilized facility & operation.
TOTAL UNDER 1 HOUR 1, 553
FLARING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR 0
Flared 1, 553
Pllot/Purge 28,008
Continuous Assist 45.818
TOTAL FLARED 75,180
•
•
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL GAS FACILITY ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Jan-96
Disposition *Indicate contribution of each pool to total.
1. Sold 3,011,788 Pool Name Code Percent
2. Reinjected 15,985,943 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 14,108
4. Flared or vented greater than 1 hour 153,355
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 24,862
6. Used for lease operations Fuel 3,150,966
Assist 57447
official Use On1 --Flarin: Ai~the-nzatton:> 1. hr.:::
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
11. Transferred to: FS1, FS2, FS3 1,690,580
7.Other 0
TOTAL items 1 - 7 22,398,469
8. NGL gas equivalent produced - ~ ~, ~ ~ ~ ~ ~ 3,011,788
9. Purchased gas ~ ~"' '~ , ~+'~ ~, 0
_ra ~~ ~;~
10. Transferred from: CCP ~ 24,089,049
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~ Title: SUPERVISOR
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
JANUARY 1998
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
01/03196 1229-1234 1 60" portaiest separator level valve LV-77 leak through. UNPLANNED LV-77 valve seated.
01 /04/96
•
01/06/96
01!09196
01 /25/96
01/26/96
TOTAL UNDER 1 HOUR
0130-0134
0445-0450
1050-1110
1400-1410
0938-0943
1735-1750
0227-0230
(Intermittent 12 min.)
14,108
Black Smoke)
5,000 SESD/BESD testing for LTS 3 tandem shutdown for filter PLANNED
replacement in coalescer.
387 Shutdown T/C #1855 for SESD/BESD testing. PLANNED
7,910 Switching CCP's tandem compressor from LTS 1&2 to LTS 3 PLANNED
ancf then switching back to LTS 1&2.
625 Sh~~t down T/C 1802 for bad speed probe. T/C 1884 shut down UNPLANNED
not needed.
185 Insufficient inlet gas rates into facility. UNPLANNED
FLARING EVENTS GREATER THAN 1 HOUR
01/06/96 0900-1230 48,003
• 01/08/96 1850-2220 40,470
01/14/96 0650-0750 195
01/28/96 0045-0245 23,100
01/29/96 0815-1115 41,587
TOTAL OVER 1 HOUR 153,355
Flared 187, 483
PiloUPurge 24,882
Continuous Assist 57.447
TOTAL FLARED 249,772
~r{SZ~, ~~X~
Farility Maintenance _ W HAT ~ ~~ ' ("v ~ ~ UNPLANNED
ElectricaUinstrumentation malfunction. UNPLANNED
1802 booster shutdown due to an elec/inst problem. UNPLANNED
t w'cJAT a
ElectricaUinstrumentation malfunction at other facility UNPLANNED
18'12 at CCP went down on power supply failure. ~ u~oS ~
L~5 ~
~5 shut down at 0815 for a turbine oil leak then after UNPLANNED
restart an oil leak on the starter required a second shutdown
~~
Verified ESD valves -completed test.
Compressor depressured & completed testing.
Completed switching compressors.
Compressor/train depressured.
Stabilized facility process and operation.
le~~~s3`
Started T/C 1805. ay~.
MI T/C 1805 shut down due to UPS malfunction.
Corrected E&1 problem and let unit blow
down and restarted.
Reduced inlet gas rates.
Restarted 1855.
~ ~`°=,~ ~y,U
'~~~ ~ ~
~, ~~
.,`