Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutARCO - CGF
: ;1 ;1',:: :1::::11;' ~ ~ ';'~'~'~":-~1'~ ~rt;;I~;.r.: :C~~J.~'~<i!~~~~::d!~':;fiiI/;;'¡('~ :aI~A"'/.A~:¡,,~;ø:.;[rr..I~..i&l :~~, ~'~il~~,J.I~~í:C': ~r,~t,~.;¡ '%'.11~ ~ I %.11~..;(,': :III ~~i;'r'~ L'>:id~ 'í::1:'/~IJ~;~II?'":íØ''/..-;:,,~::;a';~{¡I-y,ø;~~,/,I;~'';~~/''''''/''' ~.AJ~~~'~"/"«~d"/',:.J~~~.I/"d/,ð):í.~~,r.~I1~.-:ítJ7.A"~~I:r'~4i I: ~11~:·:¡'~~il':~IØ!;:.1' .~ iI:' I : I"
-----
R~C() -C9F-
~;aS ])i$~~O$i~ioIÅ ~?neS
~i9 9 5
AGoee
II !,~ U~;'I ~;'f:!~;'11 %:'11 :~~!'!~1~~lr:;~~~{f::":~'~''';~,'Ø''4j''~~~''''}o'..iII~;WA'';;'''';~lfI/'''AI.t:j¡¡þ:~;ø:~.j~iI"/..dI~~~~,~i~ffi~~~WM~~"~If~t'~~:~~ :&tI~I,-~tIY..1dllí: f',%"/.-«'W4¡P:;.#/.Ø~~YI/~...~/~.~::::ø~J"/"'~IIt;WYIA""/Þ~4~j¡d,y","~I~I~~,~~"'~I'.:~'~::;W~~I(f:~:~I~::~I'~:;IU_~.~~:~"'%II!:~ II ~:;III:,: :11'::;
ALASKA OIL AND (;AS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL GAS FACILITY
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
?~")
Operator
ARCO ALASKA., INC.
4. Flared or vented j!reater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purj!e
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL j!as eQuivalent produced
~.
9. Purchased j!as
10. Transferred from: CCP
11. Transferred to: FS 1. FS2. FS3
Rem;:¡rks:
Fuel
Assist
~
CJ'
~~
!))
9
~
)?Q
ð~
-:;r ()
So
Q)::}
'i~
o
3
3.
ø
~.
::J
,. ..
~-
}..
r·-
!:
,.
\,..
r(
.-."
<:
rr;
o
2.963.958
14.682.067
11.961
63.982
24.471
3.220.112
58.173
o
21.024.724
2.963.958
22.710.367
1.685.643
T herehv eertifv th;:¡t the foregoing is tnJe ;:¡nrl c.orreet to the rest of mv know1erlge.
Signature~ _ Title: SUPERVISOR
:Þ
Z
.~
-tJ
tQ
4~
F
!
Field(s) MonthlY ear of Disposition
EASTERN OPERATING AREA-PBU Dec-95
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100
Official Use Only--Aaring Authorization> 1 hr.
1. Safety
MCF
2. Lease Use
MCF
o
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
DATE
llME
VOLUME MCF
FLARING EVENTS LESS THAN 1 HOUR
12/10/95 1116-1121 860
1355-1400
12/17/95 0005-0045 5,051
-,
12/24/95 1754-1838 5,650
12/27/95 1718-1745 400
TOTAL UNDER 1 HOUR
11 ,961
FLARING EVENTS GREATER THAN 1 HOUR
1 2/1 1/95
0824-0900 1,044
(Intermittent 108 min.)
~,2;.'1--9J~
1037-2339 62,938
I I _
J _ N 1~·.JU"\ ¡7(G., f\~ r
.!;; ~T~,l.:~, ~ ~~_
à ~1':,,-.'/; ¡:;¿~
~.~-:<!. ' -~J~v-~
','>,J \J ~"'~ ~. ,,~
12/19/95
~-
TOTAL OVER 1 HOUR
63,982
Flared
Pilot/Purge
Continuous Assist
TOTAL FLARED
75,943
24,471
H....1..ll
158,587
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
DECEMBER 1995
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED
1833 shutdown on high vibration.
UNPLANNED
Shutdown 1804 due to electrical malfunction.
UNPLANNED
Power blip at CPS caused CCP 1876 & 1878 to shutdown.
UNPLANNED
Shut down T/C 1883 due to high stage leak on blind flange.
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
Compressor depressured. Reduced inlet
gas rates.
Restarted 1805.
CCP restarted 1876/78.
Repaired equipment difficuhies with 1883
discharge piping.
\¡J 14J.,T '/
\ \
Instrumentation malfunction. Process upset in MI.
)~ -eJùJr z...1\}.b }
/ \ -- ~\Ief'~/- ~(~ <!:>ifEß- HI--
UNPLANNED
2- .:sf.?, Mé. 7'¿Q,.,S . 0.. 2-S'--~ J N U ðff:../,yr .s
T/C 1805 shutdown due to oil leak. Facility upset throughout
time frame. Phase III white out conditions. UNPLANNED
........
1:~r-~~
MA ,.. ... Ò
~lIN~
'-- ~ i\ tJi P~D 5f)"
b~ MIl,r-Jl,}lh....-
, ......
~ 8ð,.~
~ "', ;ð t-' 1lÎ Vtz~
2 ~ n ~'''1,,$ S «-:.,;.
5' ~ z. c, ~~:ú/,~~·,,,·C;l.!
%~ -'" ~<~~
~~ -J <
(tI·o ë:Q.
§ ~ rr,
3 0
"iJ/
~.
~
Started T/C 1885.
(Bypass plant. Bumped blare periodically
throughout down time. ?
N t-\ tf\.J -.,
( c37Æ' )
Gr ~/G/y
...... tV?' ? ..}....
~ <: ""-'0
r"T <I/! r
'~.,..... 'J)Ò ~
'/.::' /'1 / '~)Ò
, '"
v~
'.J~-,
,/1.1
~
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL GAS FACILITY
Operator
ARCO ALAS~ INC.
Disposition
1. Sold
2.962.219
2. Reinjected
16.159.550
3. Flared or vented less than 1 hour
13.006
.--...
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
26.040
5. Pilot and PurJ?;e
22.653
6. Used for lease operations
3.103.490
48.092
o
Fuel
Assist
7. Other
TOTAL items 1 - 7
22.335.050
8. NGL J?;as eQuivalent produced
2.962.219
9. Purchased J?;as
RECEIVEU
10. Transferred from: CCP
OEe 1 8 1995
23.886.075
Alaska Oil & Gas Cons. ~ssion
11. Transferred to: FS 1. FS2. FS3 Anchorage
1.551.025
R em~rks:
T herehv cert.ifv t.h~t the fore~oimT is tme ~nò COTTf'.Ct. to the hest of mv know1ectue.
S¡gnatUf/, .,- £~. C",",___._ Title: SUPERVISOR
Field(s) MonthlY ear of Disposition
EASTERN OPERATING AREA-PBU Nov-95
*Indicate contribution of each pool to total
Pool Name
Code
Percent
PRUDHOE
640150
100
. .
Official uS(; Qßl~~Flaring Authorization> I hr.
1. Safety
MCF
2. Lease Use
MCF
o
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
DATE
TIME
FLARING EVENTS LESS THAN 1 HOUR
11/12/95 1428-1512
11/12/95 1500-1519
(Intermittent 7 min.)
'-"
11/18/95 0070-0755
11/24/95 2042-2045
TOTAL UNDER 1 HOUR
13,006
FLARING EVENTS GREATER THAN 1 HOUR
11/11/95
1531-1757
11/14/95
1856-2046
/-.
TOTAL OVER 1 HOUR
26,040
Flared
Pilot/Purge
Continuous Assist
TOTAL FLARED
VOLUME MCF
5,270
7,700
35
16,080
9,960
39,046
22,653
48.092
109,791
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL GAS FACIUTY
NOVEMBER 1995
DESCRIPTION OF INCIDENTS & CAUSE
CCP TIC 1803 shutdown for lube oil problems.
Instrumentation malfunction. Reflux flow transmitter
problems.
CCP 1809 TIC shutdown while changing lube oil filers.
Process upset in stabilizer section of facility.
TIC 1805 shutdown due to seal oil system difficuhies and
electrical malfunction.
CCP's TIC 1804 emergency shutdown.
PLANNED
UNPLANNED
UNPLANNED
UNPLANNED
UNPLANNED
UNPLANNED
UNPLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
Reduced inlet gas rates.
Transmitters equalized & blowdown then
returned to normal operations.
Reduced inlet gas rates.
Stabilized facility process & operation.
Started TIC 1805. Corrected malfunction.
Restarted CCP's TIC 1804.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL GAS FACILITY
Operator
ARCO ALASKA, INC.
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
,-..-.
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
Fuel
Assist
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
~-
t-
'."
;'.
; ~
~ ~..
t: ~)
9. Purchased gas
10. Transferred from: CCP
NOV 09 1395
A1?ska Oil & Gas Cons Commission
11. Transferred to: FSl, FS2, FS3 AnchoragE
Remarks:
2,805,315
15,255,440
13,730
139,710
23,386
3,056,477
69.259
o
21,363,317
2,805,315
22,927,828
1,564,511
Signature:
I herebv certify that the forei!oim! is true and correct to the best of mv knowledi!e.
,.T
//
;' Title:
J /è_-l.// )_~_~__~______
SUPERVISOR
Field(s) MonthlY ear of Disposition
EASTERN OPERATING AREA-PBU Oct-95
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100
,Official Use Only-FlarinR Authorization> 1 hr.
1. Safety
MCF
2. Lease Use
MCF
o
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL GAS FACIUTY
OCTOBER 1995
DATE
TlME
VOLUME MCF
DESCRIPTION OF INCIDENTS & CAUSE
FLARING EVENTS LESS THAN 1 HOUR
10/15/95
1723-1815
11,800
Excessive inlet gas rates into facility. CCP shutdown 1809.
10/29/95
1,930
TIC 1802 shutdown at the CCP.
1505-1525
,~
TOTAL UNDER 1 HOUR
13,730
FLARING EVENTS GREATER THAN 1 HOUR
10/17/95 2115-2245 10,720 Instrumentation malfunction, shutdown 1805 TIC.
10/18/95 0405-2400 68,430 Instrumentation malfunction, shutdown 1805 TIC.
(Intermittent 4BB mln)
10/19/95 0000-1518 60,560 Instrumentation malfunction, shutdown 1805 TIC.
(Intermittent 4B 1 mln)
TOTAL OVER 1 HOUR
139,710
Flared
Pilot/Purge
Continuous Assist
153,440
23,386
ü....2.9
TOTAL FLARED
246,085
PLANNED
UNPLANNED
UNPLANNED
UNPLANNED
UNPLANNED
UNPLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
Reduced inlet gas rates.
TC 1802 restarted at the CCP.
Restarted TIC 1805.
Restarted TIC 1805.
Restarted TIC 1805.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL GAS FACILITY
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
Operator
ARCO ALASKA, INC.
2,585,620
14,682,177
2,388
4. flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from: CCP
11. Transferred to: FS 1, FS2, FS3
Remarks:
27,855
21,853
Fuel
Assist
2,780,000
63.372
o
20,163,265
2,585,620
21,385,464
1,222,199
I hereby certify that the fore2oin2 is true and correct to the best ofmv knowledsze.
Signalurec/rz;: .-.
Title:
SUPERVISOR
Field(s) MonthN ear of Disposition
EASTERN OPERATING AREA-PBU Sep-95
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100
,OfticiaJ Use Only--Aaring. Authorization> 1 hr.
1. Safety
MCF
2. Lease Use
MCF
o
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
DATE
llME
VOLUME MCF
FLARING EVENTS LESS THAN 1 HOUR
09/01/95
0730-0750
0915-0930
400
09/13/95
43
1718-1728
--~~
09/14/95
1245-1250
09/17/95
106
2305-2310
09/18/95
302
0153-0155
0235-0236
1412-1447
09/21/95
81
2008-2030
09/22/95
0950-0951
1538-1540
241
09/27/95
2122-2134
54
09/30/95
1000-1025
560
09/30/95
1805-1808
600
TOTAL UNDER 1 HOUR
2,388
FLARING EVENTS GREATER THAN 1 HOUR
09/11/95 0110-0125 7,173
(Intermittent 99 min.)
- 09/12/95 0100-0500 370
- 09/28/95 1138-1608 2.720
-- 09/28/95 1643-1830 8,175
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
SEPTEMBER 1995
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED, ACTION TAKEN TO ELIMINATE CAUSE
Process upset in stabilizer section of facility.
UNPLANNED
Stabilizer section over-pressure due to major wind shift
during high ambient temperature.
UNPLANNED
Facility Maintenance. Manual blowdown of stabilizer
reflux flow transmitters. (Black Smoke)
UNPLANNED
I
Process upset in MI due to high ambient temperatures. UNPLANNED
Process upset in MI due to large ambient temperature swings UNPLANNED
and wind shift.
Process upset in stabilizer section of facility. UNPLANNED
Process upset in L TS 3 section of facility. UNPLANNED.
Process upset in L T5 3 section of facility. UNPLANNED
Raring caused by process adjustments made during MI UNPLANNED
compressor loading T/C 1855.
Flared residue gas to cross light flare finger pilot burners. PLANNED
Planned pipeline shutdown. Shut down T/Cs 1801, 1855, 1883, PLANNED
1884,1885, and 1886. Process upset in MI section of facility.
Process upset in stabilizer.
UNPLANNED
L T83 depressure. Coalescer filter removal and change.
PLANNED
Shutdown 1855 due to fire & gas panel malfunction.
(Black Smoke)
UNPLANNED
Stabilized facility process & operation.
Stabilized facility process & operation.
Transmitters placed back in service.
Stabilized facility process and operation.
Stabilized facility process and operation.
Wanned up outlet to chiller #3.
Stabilized facility process and operation.
Stabilized facility process and operation.
Stabilized facility process and operation.
Restarted TIC 1855.
Achieved light off of flare pilot burners.
Facility maintenance completed.
Stabilized facility process and operation.
Maintenance & depressure completed.
Replaced capacitor in Halon dump station.
Restarted TIC 1855.
DATE
09/29/95
09/29/95
TOTAL OVER 1 HOUR
--
A.red
Pilot/Purge
Contlnuoua A..lat
TOTAL FLARED
TIME
0840-0945
2015-2145
27,855
VOLUME MCF
5,987
3,430
30,243
21 ,853
äll2.
115,468
ARCO ALASKA. INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
SEPTEMBER 1995
PLANNED
DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED
TIC 1805 shutdown due to bad RTD. Shutdown on false high UNPLANNED
UO temp.
TIC 1855 shutdown due to bad electronic speed card. UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
Replaced RTD & restarted 1805.
Replaced speed card.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facilily
CENTRAL GAS FACILITY
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
Operator
ARCO ALASKA, INC.
4. Rared or vented greater than 1 hour
(Supplcmenlal report rcquircd--Sec 20 MC 25.235)
5. Pi lot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from: CCP
11. Transferred to: FS 1, FS2, FS3
Remarks:
Fuel
Assist
2,778,775
15,781,3 II
5,531
23,804
2,922,258
58.443
o
21,570,122
2,778,775
23,046,550
1,476,428
I hereby certify that the foregoing is true and correct to the best of mv knowledge.
Sjgnalur~._ .. Title: SUPERVISOR
Field(s) MonthlY ear of Disposition
EASTERN OPERATING AREA-PBU Aug-95
*Indicatc contribution of each pool to total.
Pool Name
Code
Percen t
PRUDHOE
640 I 50
]00
o
- '.. - - . . . - . .
. . - . .. - --- --... -- ..
.-- - -. -. -.
- . -
. . .
othèiaÎ tJsêþhìy?~FjåíingÂUihöHzåtiòi1>i hc>
o
1. Safety MCF
'..
,
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
~....
DATE
Tl~
FLARING EVENTS LESS THAN 1 HOUR
08/05/95 0649-0710
08/13/95 0745-0825
08/21/95 2153-2205
2258-2313
08/28/95 1450-1 505
1600-1610
1950-2010
TOTAL UNDER 1 HOUR
5,531
FLARING EVENTS GREATER THAN 1 HOUR
TOT AL OVER 1 HOUR
o
Flared
Pilot/Purge
Continuous Assist
TOT AL FLARED
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
AUGUST 1995
VOLUME MCF
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
4,100 CCP T/C 1801 shutdown due to electrical malfunction. UNPLANNED CCP restarted 1801 TIC.
200 Process upset in hot oil heater section of facility. UNPLANNED Stabilized facility process and operation.
430 Electrical/Instrumentation malfunction. UNPLANNED Compressor/train depressure.
801 T /C 1884 shutdown on high vibration (black smoke). UNPLANNED Restarted T/C 1884
5,531
23,904
58.443
87,778
ÁLASkA,OIL AND. GASCONSERV:~ TION,COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL GAS FACILITY
Operator
ARCO ALASKA. INC.
Disposition
1. Sold
2,373,207
2. Reinjected
13,000,651
3. Flared or vented less than I hour
22,532
'-~
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
20,246
I ,,,
5. Pilot and Purge
23,227
6. Used for lease operations
Fuel
Assist
2,684,250
59.773
o
7. Other
TOTAL items I - 7
18,183,886
8. NGL gas equivalent produced
2,373,207
9. Purchased gas
10. Transferred from: CCP
19,677,674
11. Transferred to: FS 1, FS2, FS3
1,493,788
Remarks:
I herebv certifv that the foresroinsr is true and correct to the best of mv knowledsre.
s¡gnature/ YL-
Title:
SUPERVISOR
Field(s) MonthlY ear of Disposition
EASTERN OPERATING AREA-PBU Jul-95
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640 150
100
. ... .,... .. .
,., ...,.. .. ...., ,
. .., ... ... ....,
. ........ .. ..,. .... ........, .. .....
. ,.... . . .......... .
. ... . ...... .
ötfidå1. Üsê: ~ÎY;LF1árihg<AhttiôriiäH6íi':;':Fhir:.
. .
1. Safety
MCF
2. Lease Use
MCF
o
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
DATE
TIfÆ
FLARING EVENTS LESS THAN 1 HOUR
07/05/95 1140-1155
07/07/95 1538-1608
07/08/95 1024-1056
--~
07/08/95 1150-11 54
1200-1220
07/16/95 1950-2030
~ ,'.
07/19/95 0330-0335
07/22/95 0703-0725
07/26/95 1509-1513
07/27/95
0458-0513
07/31/95
1649-1655
(intermittent 36 min)
TOTAL UNDER 1 HOUR
22,532
c--~_LARING EVENTS GREATER THAN 1 HOUR
07/07/95
0010-0125
0412-0425
07/14/95
0055-0520
07/21/95
0000-0115
TOT AL OVER 1 HOUR
20,246
Flared
Pilot/Purge
Continuous Assist
TOT AL FLARED
ARoo ALASKA, INC.
CONSERVATION ORDER NO. 219
" ---~ ¡
v t u
L ~-
r', Lv
. i- I
GAS R.AR-.G INCIDENTS
CENTRAL GAS FACIUTY
JULY 1995
AUG 1 8 1995
~ OU & Gas Cons. Commission
''-I ~cboraga
VOLUME MCF
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
DESCRIPTION OF ~CÐENTS & CAUSE
430 T /C 1886 shutdown due to instrumentation malfunction. UNPLANNED Restarted T/C 1886 after correction problem.
400 T/C 1883 shutdown due to high system temp. UNPLANNED Restarted T/C 1883 after correction problem.
230 Excessive inlet gas due to high ambient temps. UNPLANNED Reduced inlet gas rates.
2,700 Reduced inlet gas rates to assist CCP in bog down conditions. PLANNED Field rates decreased.
255 Shutdown T/C 1802 due to suspected gas leak in module. UNPLANNED Restarted T /C 1802.
112 Process upset in stabilization section of facility. UNPLANNED Stabilized facility process and operation.
400 Electrical/Instrumentation malfunction. UNPLANNED Stabilized facility process and operation.
140 Compressor NOX testing. Speed reduction caused stabilizer UNPLANNED Completed testing.
high psig condition.
305 Shutdown T/C 1865 for water wash. PLANNED Stabilized facility process and operation.
17,560 Process upset in refrigeration section of facility UNPLANNED Started T/C 1806 & 1856.
2,506
T/C 1805 oil leak.
Replaced cracked tubing & restarted 1805 T/C.
UNPLANNED
15,020
Shutdown T/C 1855 due to instrumentation malfunction
Corrected problem and restarted T/C 1855.
UNPLANNED
2,720
L TS 3 shutdown for demister repair.
Compressor depressured.
PLANNED
42,778
23,227
llJll
125,778
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL GAS FACILITY
Operator
ARCa ALASKA, INC.
Disposition
1. Sold
2,495,697
2. Reinjected
14,881,736
3. Flared or vented less than 1 hour
'~~r
4. Flared or vented greater than 1 hour
(Supplemental report rcquircd--Sec 20 AAC 25.235)
33,529
5. Pilot and Purge
22,353
6. Used for lease operations
Fuel
Assist
2,781,268
56,018
o
7. Other
TOTAL items 1 - 7
20,271,192
8. NGL gas equivalent produced
~r,-_"","",,--
9. Purchased gas
10. Transferred from: CCP
21,744,468
11. Transferred to: FS I, FS2, FS3
1,473,276
Remarks:
I hereby :erti!:%at the fore~oin~ is true and correct to the best of mv knowIed~e.
Signature~. ~. _ , Title: SUPERVISOR
Field(s) MonthlY ear of Disposition
EASTERN OPERATING AREA-PBU Jun-95
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100
591
, , ..,
Official Use Only-"-Flaring Authorization> I hr.
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS RARING INCIDENTS
CENTRAL GAS FACILITY
JUNE 1995
DATE
llPÆ
VOLUME MCF
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
06/10/95 1758-1800 40 Process upset in L TS 3. UNPLANNED Stabilized facility process & operation.
1945-1949
06/12/95 1800-1825 Burn pit started to smoke, unable to determine cause. Suspect UNPLANNED Black smoke.
--_õ-~ burn pit tail pipe was frozen and warm ambients caused
thawing. Black Smoke.
06/16/95 1830-1832 40 Process upset in L TS #3 UNPLANNED Stabilized facility process & operation.
06/21/95 2130-2140 248 Excessive inlet gas rates into facility UNPLANNED Stabilized facility process and operation.
06/22/95 1150-1155 262 Excessive inlet gas rates into facility UNPLANNED Stabilized facility process and operation.
TOTAL UNDER 1 HOUR
591
FLARING EVENTS GREATER THAN 1 HOUR
06/11/95
1110-1630
33,529
T/C 1855 shutdown to repair lube oil leaks.
PLANNED
Repairs completed & restarted 1855.
.~.......-
Flared
Pilot/Purge
Continuous Assist
34,120
22,353
56 018
Þ
i0
!f:!.
S
§ C- ;.;u
fÞ c: m
¿ Ci) r n
£ £u
CIJ .....¿ m
F C">
r-.' 0 --.....J -
::J
J. !D -<
C') <-D
t.j <'.0 m
S (~Ji
3 0
ro~
(.1)
õ'
:J
TOT AL OVER 1 HOUR
33,529
TOT AL FLARED
112,491
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
REVISED
Facility
CENTRAL GAS FACILITY
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
-~
Operator
ARCO ALASKA, INC.
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from: CCP
11. Transferred to: FS 1, FS2, FS3
Remarks:
Fuel
Assist
"'"-
,--i--"~
~
C:f)
t:.'
~: C-_
~ c:
~- f~
'? tlJ
b ~
~ g -.j
:-'>
J ~
t-:-} (_.0
!2 Os
~-'{
j
ë::"
en
g'
,..."..~~
;rõ
m
n
m
-=-
<
rFt
C
2,660,066
17,160,688
9,728
23,310
23,467
3,035,678
58,600
o
22,971,537
24,542,633
1,571,096
I hereby certify that the foregoing is true and correct to the best of mv knowledge.
Signature/ }L,..- _ Title: SUPERVISOR
(..3":-'
Field(s) MonthlY ear of Disposition
EASTERN OPERATING AREA-PBU May-95
*Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100
dffic ial:Us~ 'ÖhtYLFJ~rigtt\mhÖtïi~Ù¿n :;:::LHr::-:,:'
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENmAL GAS FACIUTY
MAY 1995
PLANNED
DATE llfÆ VOLUME MCF DESCRIPTION OF INCIDEtfTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
05/03/95 0230-0245 159 Process upset in MI section of facility. UNPLANNED Completed startup of L TS #2.
05/21/95 1010-1030 430 S/DL 1883 and depressured to repair leak & fuel valve. UNPLANNED Unit depressured.
c_
05/24/95 2325-2400 8,730 CCP unloaded 1812 to repair gas leak UNPLANNED Gas leak repaired, loaded CCP 1812.
05/29/95 1307-1312 19 Process upset in stab/MI due field rate cut to 30% UNPLANNED Stabilized facility process and operation.
05130/95 2030-2035 390 Emergency shutdown of TIC 1801. UNPLANNED ALttempted restart of 1801 TIC.
2120-2125
TOTAL UNDER 1 HOUR
9,728
FLARING EVEtfTS GREATER THAN 1 HOUR
05/22/95
0045-0345
23,310
1855 MI Compressor went down due to bad fuse and solenoid UNPLANNED
on fuel gas
Maintenance changed solenoid and fuse.
Flared
Pilot/Purge
Continuous Assist
33,038
23,467
~
~
~ ¿-~
~~ .....Lv
~~
" '-3"
, <;""'(,<3
C0A
TOTAL OVER 1 HOUR
23,310
TOTAL FLARED
115,105
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL GAS FACll..ITY
Operator
ARCO ALASKA INC
Disposition
1. Sold (Natural Gas Liquids)
2. Reinjected
'~~
3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Slipplcmenlal report required-oSee 2.0 AAC 2S.23S)
5. Pilot and Purge
6. Used for lease operations
7. Other
TOTAL
Field(s)
EASTERN OPERATING AREA - PBU
Volume MCF.
2.480.737
15.229.646
5.903
26.428
82.789
2.958.856
o
20.784.359
·U production comes from multiple pools.
indicate contribution of each pool to total.
Pool
c~ ý! C) /. 'Sy
qffi~ar .~~ 9njy-~!~ti~~,: ~u~h~~~·~~n>l.: ,hr.
1. Safety
2. Lease
3. Conserv. Purposes
MonthlY ear of Disposition
. Apr-95
Note: All volumes must be corrected to pressure of 14.65 psi a and to a temperature of 60 degrees F. Report due by the 20th of the month
! wing the month of disposition. Authority 20 AAC 25.253
R-en1arks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signa'ure J ~ - .
Form 10-422
Rev. 11/94
Title
s- ~...
--')
Date:
Percent
/ C~C'
MCF
MCF
MCF
0~-
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS RARING INCIDENTS
CENTRAL GAS FAClUTY
APRIL 1995
PLANNED
DATE TIÆ VOLUME MCF DESCRIPTION OF f,lCDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
04/23/95 0540-0555 206 1802 TIC shut down for planned maintenance work. PLANNED Completed maintenance.
1655-1705
04/24/95 0550-0605 217 Shut down T/C 1801 for planned maintenance. PLANNED Completed maintenance.
1130-1135 Restart on second attempt.
1200-1205
04/25/95 1945-2015 2,500 Tested HP flare stages to check operation of candles PLANNED Completed flare testing.
problem with HP 4B.
04/26/95 0115-0130 2,980 Flare system testing PLANNED Attempted to clear flare stage HP 4 by popping
it open with high header pressure.
TOTAL UNDER 1 HOUR
5,903
FLARING EVENTS GREATER THAN 1 HOUR
04/08/95 0635-1157
04/23/95 1330-1430
04/27/95 2100-2140
2240-2340
04/28/95 0420-0500
0804-0824
04/29/95 1045-1200
TOTAL OVER 1 HOUR 26,428
Volume Aared
Measured Safety Pilot
TOTAL FLARED
6,310
Process upset in MI section of facility. MI compressor UNPLANNED
1855 shutdown.
Stabilized facility process and operation.
Restarted T/C 1855.
16,300
1812 T/C at CCP shut down. UNPLANNED
CCP Restarted 1812.
2,671
LTS #2 turnaround de inventory gas and liquids (Black Smoke) PLANNED
Deinventory complete
557
Shutdown TIC 1855 for Boroscope and water wash. PLANNED
Stabilized facility process and operation.
590
Started T/C 1855. PLANNED
Stabilized facility process and operation.
4/ o~· wHY s" t.oo,J~ -
32,331
82.789
"¡')!.3 - wH~ Tc:...IßJ2 6)D
~Jz--:¡ - ¿lyi-AÑ
115,120
4iZ.3
.f / zp¡
- I'
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENlRAL GAS FACILITY
Operator
ARCa ALASKA INC
Field(s)
~S~NOP~TING~-PBU
Disposition
Volume MCF·
"'If production comes from multiple pools,
indicate contribution of each pool to total.
Pool
1. Sold (Natural Gas Liquids)
2,535,493
2. Reinjected
16,494,062
?
ared or vented less than 1 hour
5,328
."ç-~
4. Flared or vented greater than 1 hour
(SupplemeDtal report requlR4--Soe 20 AAC 2.5.23S)
42,519
5. Pilot and Purge
Otocial Use Only-Flaring Authorization> 1 hr.
77,418
6. Used for lease operations
2,939,872
1. Safety
7. Other
o
2. Lease
TOTAL
22,094,692
3. Conserv. Purposes
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month
following the month of disposition. Authority 20 AAC 25.253
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature fqwJ3{/~-bt.'\., 8"JJ~~ Itl.--i Title S,~.Sð\....1 ~.tuJ,¿'l--Y ~ ¿~
Form 10-422
Rev. 11/94
.-__~_____o. _
MonthlY ear of Disposition
Mar-95
Percent
MCF
MCF
MCF
Date: Y(I L( '7,)--
DATE
TH
FLARING EVENTS LESS THAN 1 HOUR
1845-1915
03/20/95
03/21/95
03/22/95
03/24/95
03/25/95
TOTAL UNDER 1 HOUR
0130-0150
2130-2150
2150-2205
2230-2240
2345-2355
2300-2310
2330-2340
2350-2400
0030-0045
0145-0200
0390-0355
5,328
03/23/95
FLARING EVENTS GREATER THAN 1 HOUR
03/24/95
03/27/95
03/27/95
0100-0115
0230-0245
0330-0345
0515-0530
0615-0630
1100-1115
2000-2050
2110-2140
2215-2330
1130-1200
1700-1730
1700-1740
1900-1940
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL GAS FACILITY
MARCH 1995
PLANNED
VOLUfÆ MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
3,600 CCP back off tanem compressor for an emmisions test. PLANNED Test completed.
255 Shutdown TIC 1801. PLANNED Compressor train depressured.
365 Purge and blowdown after 3 start attempts on 1801 UNPLANNED Restarted TIC.
490
Two failed start attempts on 1801.
UNPLANNED
Trying to start 1801.
618
Startup and 2 failed start attempts and blowdown of 1801
booster compressor.
UNPLANNED
Started TIC 1801
R ECIE IVED
APR 1 7 1995
Alaska OH & Gas Cons. Commission
Anchorage
1,030
6 failed start attempts and partial blowdown on 1801.
PLANNED
Started 1801
6,436 Shutdown of tandem compressor L TS 3 and 4938 inlet PLANNED Shutdown TIC.
module for planned maintenance and blowdown. (Black Smoke)
835 Shutdown TIC 1805. UNPLANNED Started TIC 1805
1,940 Purge and start up of TIC 1885 and 1886 PLANNED Started TIC 1885 and 1886.
DATE
03/28/95
TOTAL OVER 1 HOUR
---~
Volume Flered
Measured Safety Pilot
TOTAL FLARED
TWE
0830-0915
1\0'<' - 13-'to
)~oo- 1,510
Z'Z., 0 - -¿'Z:ZD
42,519
VOLUfÆ MCF
32.278
47,847
ZL.!11
125,265
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
CENTRAL GAS FACIUTY
MARCH 1995
DESCRIPTION OF INCÐENTS & CAUSE
Shutdown of TIC 1805
PLANNED
UNPLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
Restarted TIC 1805
FLARE INCIDENT AND UNPLANNED AIR EMISSION REPORT
AReO ALASKA. INC. · PRUDHOE SA YIGPMA
e~~
FACLITY:
Daæ of OCcuITence:
GAS ct5POS(nON
~~. l_.
;¿ ?$"
- rnM'dd'~
l ~ ~.~
(Lisburne Only· Gas flared was 'rom IIPstresmiCfOlJl'lSlream(ClrclG Oneo) nncludes Volume AsftKj Which GensraleC1 B'acJc Smokø.)
ð! Tl"O ðð,,'.cktr mote, Qf L.r1c.) ( II A/Jp(lc:øblfJ.)
A. DQICflptlon of Ineldom and eau.e: (Clulck O~ andßrcle I. AppIlC.blfl'
. .;C"... Shutdown ¡/Ci /8/1"5
. . TIC 5D due to high exhaust temperature,
SeAl oil ~y!dêm difficulties.
EMERßENCY SH.JTPQV\/N.
EleotrlcaVlnstrumentatlon ma~funct¡on.
Elcatdoo iii n3tru mo ntâtion moL). If U r'IOtlon
at otner taCI"'Y (I &0).
Gas mansit ;y;, Qverpressure
backing Fluw Sh:ltiul1 lJul.
F.~r.ft!tRivp./lrn=:tlffk:¡p.nt ¡",lei gas
rat.. into taçility.
. ...:: f¡lIY;eØC)¡:~~.:·~:I
PtF1~
PI.nned (UnJII..;..n.. )
(O;n:/o )..'.....Ion) :/
Total Mln~t.. Flar.d:
¡-rom:
From:
From;
Frnm:
r-rcm:
From:
Time of occurrence:
t1>~,.,., To: tf?~S- =
//tØð To: ../."34~-
/.,y~f'7 Tu: /~lIIIc; =
-:¡"/o To: .2~=
T~;
To;
II.~·
,:S-
/'¥ ,fI'j
~.
J~t!!)
Tot.t Vðlum@ FI.,.ed~....š'2 ?,~
/
MMef·Nð.:
-
P rMP.~~ IJpset In
~ttt,;!.iUII ul ló",mty.
Flarinr:t for drills!te shutdown/startup.
Flare 3yatom tC3ttng.
faUlty s!lutdown on __"
:Mllliy mgintQnQnCQ,
SID on tl!yh V iLIIØtiC1fI.
Oth¡;¡¡': .
Ð. Aollon r,,~vn 'Q ~","I_" Clllt~~.~. Md Clr~"'h:.")
~'K slane estaned IC # ..L, ,~ .
1'" -- . . _...-..,_.._._~
Comþttt.eor train dtpresslIred
R~úCedIIl't'''E:llfs€:d Inlet ga$ rates.
Completed flare te~ting.
OorrlJcted Ë&I tlucul1tionlfoiltJrc.
Corrected E&I tlucuatiOnltðil\Jre
at athør fa[:iiity {T&C).
Stai.)iH""IJ fdr.:iliiy µrut;~ ~md operatlClrl.
RApaired ElQuÎpment difficult'9a
with ______...___.......---.
Fal;Ì"tv maintenance completed.
Other;
Did Incid$nt Cause Black Smoke?
Notified ,~DEC
Yet:
S IftCJ.. !i\mo.K8 Section
No: ...,~X'
(It Yes, continua wltn 1hls seu110n)
(Date) (Time) ...... ~A~ CEPT. OF eNV'RONMENTAL'COOSE~VAT¡ON Rap.;'
RilfIlJrt the 'o'lowinø intormlJfíøR to ADEC will'ñn 24 1tD1Jt, by 11ft"". (271·4345).
D¡sl. 111.\.1 iilllt1 uf l1Iaç~ $fnQ~E:- evel't. Fro"" Tò~
Volume Flared Which Generated Black Smoke (If Different From Above):
Type Qf Material:. Burned: (ChOCk Ono) GAS: _ NGI.G:
InlOfmatlon trom ~8ct1Ons A aoo' ti abOve {I.;Buse and Corrective ActiO").
General Wl}~th81' Air TGmpr;r:¡JItur~: Wind SpeedJDiret.!tion·
Nama and phone number of person milking the r~~t'rt,
Name
M:U-
8BlS
Cth&':';"
. ..
Phone No.
- -. .~"."' ". --., .,
F acilitv Supervisor
~.~.~-
cc: EOC Supervisor ~ P~B 5 ('mdhœ Rpl.Ioi·e~l,:k & rl(,JlI·ei~c..-k Smuku Ftt:lµu'l::I)
FÌP.lci ~nvìrnnmP.ntJ\1 rnmf)Aance Directors. PRB 7 (Black Smoke Incidents OnlY)
PDUfGPMA Field ManaeOrat pnc 10 (D1C!.;k Smoke Incldento Only~
Lioburnð C(lmp~ø.n(o ø.nd RovQr1uG Accountant, ATO 80-1 (Lioburne Roport; Only-Fa,,)
Prudhoe ø~y Compli2nt~a and RluaßUi Accountint. A TO B02 (Prudhoe R@t)ort~ nnty·Fav)
LisbUrne operatlQnS Englneellng Technical Aide, ATO 471 (Li~L.",tll1'tf RI:tf.H.Jll:s Only- MaR}
I Jr(1~tRrI: ~OCS ;VA/q!ij
I /1 #~30HanMd DNINNVld
'""..\1 ( 1 ! JV d SYD lVèll.N3J ~ I~dl.G: E:
!38-1~-L
: AS: 1.N3S
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL GAS FACll..ITY
Operator
ARCO ALASKA, INC
Field(s)
EASTERN OPERATING AREA - PBU
MonthlY ear of Disposition
Feb-95
Disposition
Volume MCF*
*If production comes from multiple pools,
indicate contribution of each pool to total.
Pool
Percent
1. Sold
1,193,022
2. Reinjected
14,726,229
'1 Flared or vented t·less than 1 hour
7,748
4. Flared or vented greater than 1 hour
(Supplemental report requmd--See. 20 AAC lS.23S)
o
5. Pilot and Purge
62,381
Offj~, :U~ Only-Flaring Authorization>1 hr.
6. . Used for lease operations
(includes Gas Lift Gas)
2,812,948
1. Safety
MCF
7. Other
o
2. Lease
MCF
TOTAL
18,802,328
3. Conserv. Purposes
MCF
Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month
-'llowing the month of disposition. Authority 20 AAC 25.253
,.=--emarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signalure c1 ~
Title
S:'/~
Date: .3 ~ò /Þ S-
Form 10-422
Rev. 11/94
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS RARING INCIDENTS
CENTRAL GAS FACILITY
FEBRUARY 1995
PLANNED
DATE DE VOLUME MCF DESCRIPTION OF INCI>ENTS & CAUSE UNPLANNED ACTION TAKEN TO ELlf.lNATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
02/02/95 1036-1106 7.513 MI 1805 and 1855 and Tandem 1885 and 1886 shutdown UNPLANNED Corrected power failure.
due to power failure. Includes 6 bbls burned. (Black Smoke)
02/18/95 1815-1900 190 TC 1883 shutdown due to process upset in Utilities UNPLANNED Stabilized facility process and operation
section of facility and started TIC.
.~~
02/26/95 1052-1059 45 Excessive inlet gas rates and stabilizer overhead to flare. UNPLANNED Reduced inlet gas rates
Flare valves opened to relieve system overpressure.
TOTAL UNDER 1 HOUR
7,748
FLARING EVENTS GREATER THAN 1 HOUR
OT AL OVER 1 HOUR
o
Volume Flared
Measured Safety Pilot
7,748
§..2.....li1
TOTAL FLARED
70,129
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL GAS FACILITY
Operator
ARca ALASKA INC
Field(s)
MS~Nap~TING~-~Btl/
------=~~~ - -="'"-
_~~._~ MonthlY ear of Disposition
~'- Jan-95
Disposition
Volume MCF*
/'
*If p¡~ction comes from multiple pools,
~icate contribution of each pool to total.
/ Pool
I
!
I I
I
I
TOTAL
I 2,593,280
16,663,977
36,248
139,894
72,191
3,137,065
0
22,642,655
~/
_..~
Of(jcia~··U~. .?n1y-Flarl~g AU:~.~!i¥tkirt>í···hr.
.4_.._....__.......~:......~.-:-....;::;"".....;;.-._ p.
PerceÌ1{
)
/
1. Sold
2. Reinjected
r Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(SupplemeDIal report required-·See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
(includes Gas Lift Gas) JJj- ~f(' /¡ .f.~-,- -
1. Safety
MCF
7. Other
2. Lease
MCF
3. Conserv. Purposes
MCF
Note: All volumes must be corrected to pressure of 14,65 psia and to a temperature of 60-degrees F. Report- due by the 20th of the month
. ~ 'lowing the month of disposition. Authority 20 AAC 25.253
_marks:
:i:~:tb:reœrt7;Zrue
and correct to the best of my knowledge.
Title 5~ ,7
-#~
Date:
~~-s-
Form 10-422
Rev. 11/94
DATE
11fÆ
FLARING EVENTS LESS THAN 1 HOUR
01/16/95 0800-0825
01/17/95 0535-0550
01/23/95 2108-2115
01/24/95 0127-0131
01/28/95 1215-1305
01/24/95 0915-1015
TOTAL UNDER 1 HOUR 36,248
FLARING EVENTS GREATER THAN 1 HOUR
01/11/95 1147-2045
01/12/95 2005-2150
01/26/95 1320-1 545
01/29/95 0205-0345
0900-1020
TOTAL OVER 1 HOUR 139,894
Volume Flared
Measured Safety Pilot
TOTAL FLARED
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS RARWG INCIDENTS
CENTRAL GAS FACILITY
JANUARY 1995
PLANNED
VOLUME MCF DESCRIPTION OF r"CI>ENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1,900 Swapped 1887 from L T53 resideue to L TS 1. Flare valves PLANNED Stabilized facility process and operation.
opened to relieve system overpressure.
190 TIC 1885 shutdown for facility maintenance. PLANNED Facility maintenance completed.
4,170 Process upset in L TS secion of facility. Flare valves UNPLANNED Stabilized facility process & operation.
opened to relieve system overpressure.
68 Process upset in L TS secion of facility. Flare valves UNPLANNED Stabilized facility process & operation.
opened to relieve system overpressure.
11,920 Compressor 1812 trip due to eledricallinstrumentation UNPLANNED Started/Restarted T/C.
malfunction
18.000 Flaring for CCP, TIC 1809 Shutdown UNPLANNED Corrected electricallinstr. malfunction
45,870 MI compressors 1855 & 1805 shutdowon due to master UNPLANNED Replaced controller and restarted compressors.
pressure controller failure.
12,680 ~ 1813 shutdown due to instrumentation problems. UNPLANNED CCP restarted 1813.
11,314 TIC 1805 shutdown for IGV Calibration. PLANNED Completed work and restarted unit.
70,030 TC 1812 shutdown at CCP due to elec.linstr. malfunction. UNPLANNED Corrected elec.linstr/malfunction.
176,142
I.2...1i1