ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276-1215
February 19, 1999
To: Recipients of Kuparuk Producer's Report of Gas Disposition
/~
~/
Enclosed is a copy of a revision to the Gas Disposition Report for the Kuparuk CPF1 Facility
for December 1998. The revision is due to a change in the allocation of volumes between
Kuparuk and West Sak and resulted in a change of percentage contribution of each pool to
the total
If you have any questions, please contact Maureen Dolphin at (907) 263-4629.
Sincerely,
Ed Hendrickson, Supervisor
Production & Revenue Accounting
EH/mad
Enclosures
MAD-K3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator
PROCESSING FACILITY #1 ARCO ALASKA, INC.
Field(s)
KUPARUK RIVER UNIT
Disposition Volume MCF*
1. Sold 16,810
2. Reinjected 3,665,498
3. Flared or vented less than 1 hour 7,362
4. Flared or vented ,greater than 1 hour
Su lemental re rt re wired--See 20 AAC 25.235 797
5. Pilot and Purge 12,187
6. Used for lease operations Fuel
Assist 790,162
10 786
7.Other 0
TOTAL items 1 - 7 4,503,602
8: NGL gas equivalent produced 0
9 Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 272,710
11. Transferred to: CPF 3 357,884
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature__~ Title: ~~ v Dater ,~'~- `/~
REVISE
Month/Year of Disposition
12198
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.85°k
KRU WEST SAK 490150 0.15%
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
C~
Form 10-422 (Revised 4/95)
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CPF #1
December 1998
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS ~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
~2/1 /98 0215-0355 320 Excessive inlet gas rates Into faclltty. High ambient temps. UNPLANNED Reduced inlet gas rates.
12/9/98 1958-2107 245 Excessive inlet gas rates Into fatality. Opening up welh UNPLANNED Reduced Inlet gas rates,
following A8cB GLC maintenance.
12/10/98 2210-2322 232 Excessive Inlet gas rates into facilffy. High ambient temps.
Started up C7.
~TAL OVER 1 HOUR 797
PLANNED EVENTS LESS THAN 1 HOUR
0
Flare or Vent Volumes:
Greater than 1 hour 797
Less than 1 hour 7,362
Continuous Assist 10,786
Pgot and Purge 12.187
UNPLANNED Reduced Inlet gas rates.
TOTAL FLAREDNENTED 31,132
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL PROCESSING FACII.ITY #1 ARCO ALASKA, INC. KUPARUK RIVER UNIT 11/98
Disposition Volume MCF*
1. Sold 16,409
2. Reinjected 3,612,997
3. Flared or vented less than 1 hour 8,176
4. Flared or vented greater than 1 hour
Su lemental re rt r aired--See 20 AAC 25.235 4,505
5. Pilot. and Purge 13,463
6. Used for lease operations Fuel
Assist 769,326
520
7.Other 0
TOTAL items 1 - 7 4,434,396
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 254,951
11. Transferred to: CPF 3 356,987
Remarks: Reinjected yol does not include volumes of PBU NGLS squired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
I hereby certify that the fo egoing is true and correct to the best of my knowledge.
Signature: Title: Date: ~2 ~ P
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.90%
KRU WEST SAK 490150 0.1096
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
..
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CPF #1
November 1998
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS ~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
/17/98 9351751 4,113 Electrical/Instrumentation malfunction. Load shed multiple UNPLANNED Corrected E&I fluctuation/failure. Repaired
pumps and compressors. EPIC-1018 A&C stuck open. equipment difficulties with PIC-1018 ABcC.
Restarted atl equipment.
11/26/98 2344-0044 112 High ambient temperatures. ExcessNe inlet gas rates Into UNPLANNED Reduced inlet gas rates. Stabilized facility
facility. process and operation.
11 /27/98 2210-2310 202 High ambient temperatures. Excessive inlet gas rates Into UNPLANNED Reduced inlet gas rates. Stabilized facllity
facility. process.
11 /29/98 2123-2232 78 Gas transtt system overpressure backing CPF/Flow station o UNPLANNED Stabilized facility process and operation.
Excessive inlet gas rates Into facility. CPF2 bringing back up
a GLC causing tie line to press up.
~TAL OVER 1 HOUR 4,505
PLANNED EVENTS LESS THAN 1 HOUR
0
Flare or Vent Volumes:
Greater than i hour 4,505
Less than 1 hour 8,176
Continuous Assist 9,520
Pilot and Purge 13,4
TOTAL FLARED/VENTED .35,664
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276-1215
December 9, 1998
To: Recipients of Kuparuk Producer's Report of Gas Disposition
Enclosed are copies of the Gas Disposition Reports for Kuparuk CPF1, CPF2, and CPF3
Facilities during November 1998 along with Gas Flaring or Venting Incident Reports for
volumes flared over one hour.
If you have any questions, please contact Maureen Dolphin at (907) 263-4629.
Sincerely,
~--Gl
Ed Hendrickson, Supervisor
Production & Revenue Accounting
EH/mad
Enclosures
.._ ~ ~ ~ 199
MAD-K3 ~"' ~ ~~
~a~C(11a~1~~
~85k~ at1 ~ ~~C~OC 9~
•
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276-1215
November 10, 1998
To: Recipients of Kuparuk Producer's Report of Gas Disposition
Enclosed are copies of the Gas Disposition Reports for Kuparuk CPF1, CPF2, and CPF3
Facilities during October 1998 along with Gas Flaring or Venting Incident Reports for
volumes flared over one hour.
If you have any questions, please contact Maureen Dolphin at (907) 263-4629.
Sincerely,
Ed Hendrickson, Supervisor
Production & Revenue Accounting
EH/mad
Enclosures
MAD-K3
•
i
~J
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s)
,I. PROCESSING FACILITY # 1 ARCO ALASKA, INC. KUPARUK RIVER UNIT
Disposition Volume MCF*
1. Sold 16,100
2. Reinjected 3,610,333
3. Flared or vented less than 1 hour 4,792
4. Flared or vented greater than 1 hour
Su lemeatal re r[ re iced-See 20 AAC 25.23 0
5. Pilot and Purge 11,789
6. Used for lease operations Fuel
Assist 776,173
844
7.Other 0
TOTAL items 1 - 7 4,427,628
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 277,566
11. Transferred to: CPF 3 328,813
Remarks: Reinjected vol does not include volumes of PBU NGLS squired for LSEOR
reflected online 10 or Naptha used in SSEOR meter #201
I hereby certify~~th~at the foregoing is true and correct to the best of my knowledge.
Signature: 1'_/Gi Title: Date: 11 c7 ~$
Form 10-422 (Revised 4/95)
ear of Disposition
10/98
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.89%
KRU WEST SAK 490150 0.11%
OfFicial Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be convected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by We 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CPF #1
October 1998
PIANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS ~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR .
~TAL OVER 1 HOUR 0
PLANNED EVENTS LESS THAN 1 HOUR
0
Flare or Vent Volumes:
Greater than 1 hour 0
Less than 1 hour 4,792
Continuous Assist 8,441
Pilot and Purge 11, 89
TOTAL FLAREDNENTED 25,022
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
i
-,, ,,
~-
~;
~;
~'"p"~
='1
6~'1°`
~~"
,.~1 r
PROCESSING FACILITY #1
INC.
Disposition .Volume MCF*
1. Sold 19,326
2. Reinjected 3,035,469
3. Flared or vented less than 1 hour 5,324
4. Flared or vented Rreater than 1 hour
S lemental re rt r iced--See 20 AAC 25.23 7.~
5. Pilot and Purge 13,692
6. Used for lease operations Fuel
sist 719,270
8 4 6
7.Other 0
TOTAL items 1- 7 3,808,981
8. NGL Ras equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 230,315
11. Transferred to: CPF 3 268,009
Remarks: Reinjected vol does not include volumes of PBU NGLS squired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
I hereby certify~,t/h, a~t the regoing is true and correct to the best of my knowledge.
Signature: Z~yl Title: ~ Date: l~ ~ {
RIVER UNIT
'ear of Disposition
9/98
*Indicate contribution of each pool to total
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.92%
KRU WEST SAK 490150 0.0896
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Kevised 4N5)
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CPF #1
September 1998
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE .UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
~8 1411-1635 3,530 Instrumentation Malfunction. (see attached for more info) UNPLANNED Restarted TC2101 A & C. Reduced inlet gas
9/10/98 1757-2055 3,387 Faulty shutdown on glycol pumps. Lost gas Iiff compres-
sor's due to low glycol flow through the KRU. Electric
motor failed and standby pump didn't pick up flow soon
enough.
9/26/98 1953-2120 527 High gas tiellne from CPF3. Restart and CPF2 GLC
restart.
TC~OVER 1 HOUR 7,444
PLANNED EVENTS LESS THAN 1 HOUR
9/25/98 1058-1107 10 Facility Maintenance
9/30/98 1400-1454 434 .Facility Maintenance. (see attached for more Info)
444
flare or Vent Volumes:
Greater than 1 hour 7,444
Less than 1 hour 5,324
Continuous Assist 8,456
Pilot and Purge 13,692
TOTAL FLAREDNENTED 34,916
rates. Corrected E8cl failure.
UNPLANNED Stabilized facility process and operation.
UNPLANNED Started TC (2) GLC's C2-104 A76. Reduced
inlet gas rates.
PLANNED Quit venting.
PLANNED Facility maintenance completed.
l FROM: ENVIRONMENTNL FRX NO.: 907 659 7712 09-06-98 12:41P P.02
CPF 1lKuparuk Flare Deport fox 9/4!98
A,itacbtznent to repork
z.t 1 P1V1 TC 2101A, sh,u[dvwn when the rrst strxge anti-surge valve failed to open
from a control signal causing the TC to shutdown. ,A.xa istrtlzne~nt tech wa.~
called arld upon eva~luatiozl of the problem estimated to require 1.5 hrs. to
Izpair. $aaI•d operator starter! cutlitag inlet rates.
2:301~M TC 2101 C chutdgwxt while Ilse operator was adjusting the HRU to balance
the procoss heating joad between the remaining TC'S. This ;;hutdowrt
caused a high high-Qressure shutdown on the Prirnaty Separator. which
closed the Facility inlet valve,
2:45 PM TC 2101.C could not get a proper valve sequence to allow for a restart.
Instrument techs. revilewed Cause and started to repair prohlcm.
Operations personnel were Shuttat~$ ~ drill sites.
3:05 P'M Staxted bxlztgirlg production back into the plant for a restart of op~r~tions
with TC 210113 oziliAe_
3: 50PM Initiated state sequence on TC Z 1010. Continued to bring on well
S:4S 1'M TnldsttC stal-t sequence on TC 2i01 A. Continue to bring on wellti.
• •
FROM: ENVIRONMENTRL FRX NO.: 987 659 7712 18-02-98 12:45P P.82
Summary of events for EDi testing on CPF 1 GIC's and associated flarcing for 9I3Q1'9$
Chronology of cvegts:
l l l5 tins. ~ E-2.4 shut-itt
1130 hrs. IC-!,7 do 8 reduced to minimums. no diesel available for rc5tartwarm-up
~,Z-5 & ] 0 shut-ill
l 145 S!D 'A' GIC
1330 1G-13 shut-tn
]345 ]A-I? dt 14 shut-ist
S1D '13' GIG
]405 5117 `C' CIC
1420 l A-8.18 ~ 20 shut-Ift
1440 5!U `C'. '>~' ~'C' GIC
ls2ii start brining on wells
C+ur gepersl plan was tq cut late apd try t}tc data collecgon on A-GIC ,this didn't give us tttc quality of duia
nactiad. Cut additional rate and Slp 13-GIC, this to didn't allow Far adequate quality of data. SID C-G[C
and cut addiiipr~al rate.
J..indscy Glark
lams
ARCO Alaska, -Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276-1215
September 15, 1998
To: Recipients of Kuparuk Producer's Report of Gas Disposition
Enclosed are copies of .the Gas Disposition Reports for Kuparuk CPF1, CPF2, and CPF3
Facilities during August 1998 along with Gas Flaring or Venting Incident Reports for volumes
flared over one hour.
If you have any questions, please contact Maureen Dolphin at (907) 263-4629.
Sincerely,
Ed Hendrickson, Supervisor
Production & Revenue Accounting
EH/mad
Enclosures
MAD-K3
~~
-~~ ~ a4
S
.._ ~,rm~~issio~;
~,}iu54t~ ~i ~. ~ask~~ ~~K
•
. P
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL PROCESSING FACILITY tIl ARCO ALASKA, INC. KUPARUK RIVER UMT 8/98
Disposition Volume MCF* *Indicate contribution of each pool to total.
~.J
•
a
1. Sold 16.570 Pool Name Code Percent
2. Reinjected 3,187,042 KUPARUK RIVER UNIT 490100 99.79%
3. Flared or vented less than 1 hour 6,652 KRU WEST SAK 490150 0.2196
4. Flared or vented erecter than 1 hour 743.
Su lemental re ort iced-wee 20 AAC 25.23
5. Pilot and Puree 15.827
6. Used for lease operations Fuel 738.197
7.Other 0
TOTAL items 1 - 7 3.973.414
8. NGL eas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLSI 269.814
11. Transferred to: CPF 3 I 172,537
Remarks: Reinjected vol does not include volumes of PBU NGLS squired for LSEOR
reflected on line 10 or Na tha used in SSEOR meter #201
I hereby certif that foregoing is true and correct to the best of my knowledge.
Signature: '~"~ Title: d~-~-~ ~ Date: (~'~/ !v
Form 10-422 (Revised
Official Use Onl --Florin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CPF t1
August 1998
DATE TIME
VOLUME MCF DESCRIPTK)N OF INCIDENTS 8 CAUSE PLANNED
UNPLANNED
ACTK)N TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
0329-0432 345 Compressor shutdown. High ambient temperatures and UNPLANNED Reduced inlet gas rates. Cold water washed
ll
ti
d
south wind caused gasfift compressor to quit pumping on we
s.
uc
turbines and cut pro
8/19158 1456-1626 398 Process upset in gas section of taciliiy. High ambient UNPLANNED Reduced'mlet gas rates.
temperatures. Excessive inlet gas rates. Buick rise
of ambient with shift to south wind into turbine inlets
TOTAL OVER 1 HOUR 749
PLANNED EVENTS LESS THAN 1 HOUR
0
Fllire or Vent Volumes:
Greaterthan 1 hour 749
Less than 1 hour 5,~2
Continuous Assist 8,383
Plbt and Purge ]8.822
TOTAL FLAREDNENTED 91,605
{ y~ y
'~ rT f'~
~11ask~ ti ~ t:aa Cans:. Cpmmissian
R '~~~~~
J
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
L J
o
Qo G d'T9
n~ ~ n
u' -.' x'7'1
~~ ~
~ °''
~
'C`
~ co
cc
P'7'7
(Operator
PROCESSING FACII.ITY Sl ARCO ALASKA, INC.
Field(s) Month/Yeaz of Disposition
KUPARUK RIVER UNIT 7/98
Disposition Volume MCF*
1. Sold 16.261
2. Reinjected 3,100,328
3. Flazed or vented less than 1 hour 7,355
4. Flared or vented erecter than 1 hour
Su lemental re ort re aired--See 20 AAC 25.235 5.082
5. Pilot and Puree 11.673
6. Used for lease operations Fuel 744.935
7.Other 0
TOTAL items 1- 7 3.893.980
8. NGL eas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLSI 205.115
I1. Transferred to: CPF 3 74,453
Remarks: Reinjected vol does not include volumes of PBU NGLS squired for LSEOR
reflected on line 10 or Na tha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature:~~~~~ -~^~ Title: ~~-•_.,c.--:.~-~ Date• ~` ~..,
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.773'0
KRU WEST SAK 490150 0.233'0
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CPF N1
July 1998
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
/10/98 2000-2114 172 Excessive inlet gas rates. UNPLANNED Reduced inlet gas rates.
7(11/98 1800-1927 161 High ambient temperatures. Excessive inlet gas rates. UNPLANNED Reduced inlet gas rates. Stabilized facility
process and operations.
7/15/98 1611-1941 2,281 Compressor shutdown. B GLC tripped due to surge
condition causing excess gas pressure to flare.
7/30/98 1827.2354 2,468 Process upset in gas section of facility. Flaring for
drillsite shutdownlstartup. See attached for more into.
TOTAL OVER 1 HOUR 5,082
PLANNED EVENTS LESS THAN 1 HOUR
0
are or Vent Volumes:
Greater than 1 hour 5,~2
Less than 1 hour 7,355
Continuous Assist 8,346
Pilot and Purge ]1,673
UNPLANNED Restarted compressor.
UNPLANNED Restarted compressor. Reduced inlet gas rates.
Stabilized facility process and operations. See
attached for more info.
TOTAL FLAREDNENTED 32,456
FROM: ENUIRONMENTRL FRX NO.: 907 659 7712 08-02-98 92:88P P~02
CPF1 7-80-98 Bare event
Initial flaring due to -apid ambient temperaturQ rise. Began cutting weNs immediately. As the
cuts began to take effect, wind swung around from the south, significantly warming the
turbine inlets and necessitating another round of cuts.
• Lost the SNs at 1745 hrs due to high scrubber levels caused by #lare header pressure.
Scn,~bber dumps to CHD which rides on flare header pressure.
• CGF wens dawn at 1815, necessitating afield-wide shutdown of NGLlEOF;IMI_
• twat BTVs up far a short time, then trl~ped again on high scrubber level due to CMD pressure.
~ By the #ime the STVs were up the second time, the tempQrature had stabilized and the cuts
had al[ arrived. Atlhet time we were stiq flaring 4MMSCFD anti reat~zeCt that ii was from an
int8mal plant problem. Began a plant wide cheClc of potential sources. Due to ongoing
tspset/shutdown cond'~ions with the STVs and NGI. plant. only one operator available to
search for source of the flaring most of the time.
!Witte! search did not discover the source. A second. sean;h was initiated with additional
personnel. Near the end of the second search, one 2"d stage case drain on "C" Gi_C was
disCpVered to bs fully open. Nobody opened the drain. How an8 when it carne to be open is
unkr-bwn.
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276-1215
July 7, 1998
To: Recipients of Kuparuk Producer's Report of Gas Disposition
Enclosed are copies of the Gas Disposition Reports for Kuparuk CPF1, CPF2, and CPF3
Facilities during June 1998 along with Gas Flaring or Venting Incident Reports for volumes
flared over one hour.
If you have any questions, please contact Maureen Dolphin at (907) 263-4629.
Sincerely,
Ed Hendrickson, Supervisor
Production & Revenue Accounting
EH/mad
Enclosures
MAD-K3
RECEIVED
JUL ~ ~ 1998
~ Oii ~ Gas Cons. Commission
Anchorage
•
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
• ~
a ~. s, •
~~
~ C
t-° m
~
~~ ~
~ ~,
oa ~
a
~ ~ I't'1
~a'
`
'
®
ICE thNTRAL PROCESSING FACILITY #1 I ARCO tALASKA, INC. I KtUPARUK I
Disposition Volume MCF*
1. Sold 15.718
2. Reinjected 2,688,059
3. Flared or vented less than 1 hour 5,427
4. Flared or vented erecter than 1 hour
Su lementa] re oR re uired--See 20 AAC 25.235 1,706
5. Pilot and Puree 15.473
6. Used for lease operations Fuel 724,454
7.Other 0
TOTAL items 1 - 7 3.458.435
8. NGL eas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLSI 220.682
11. Transferred to: CPF 3 260,349
Remarks: Reinjected vol does not include volumes of PBU NGLS squired for LSEOR
reflected on line 10 or Na tha used in SSEOR meter #201
I hereby cergtif~y that the foregoing is true and correct tno the best of my knowledge.
Signature: ,Q,i~•~~-T--~-.~-~- Title:.~c~~-~-~+f Date: 7 /~ ~~
Form 10-422 (Revised 4/95)
Month/Year of Disposition
LIVER UMT 6/98
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER 490100 99.74~Yo
KRU WEST SAK 490150 0.26g'o
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report dne by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CPF 81
June 1998
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS ~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
LARING OR VENTING EVENTS GREATER THAN 1 HOUR
6/15/98 2035-2134 1,420 High tie Gne pressure. Faulty shutdown. CPF2 lost all UNPLANNED Restarted compressor. Reduced inlet gas
3 RICIP comp on faulty electrical shutdown and could rates. Corrected electrical mal(unc6on. Reset
not reset after multiple attempts
6/22/98 0155-0310 288
TOTAL OVER 1 HOUR 1,706
PLANNED EVENTS LESS THAN 1 HOUR
0
re or Vent Volumes:
ater than 1 hour 1,706
Less than 1 hour 5,427
Contlnuous Assist 7,598
Pilot and Purge 15.473
Compressor shutdown. Instrumentation maHunction. UNPLANNED Reduced inlet gas rates.
Lcab lr~, Gon~~rt~~~'G'- S1p flr'rE~.
WATEP- WASF- - No ExfY . , Rbs7arsrt~
NAw ~ ~-~. - p6o. 8112 ~q8 Conv~,as,a-tF on1
w~M~KE- ~~EN
TOTAL FLAREDNENTED 30,204
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276-1215
December 15, 1998
To: Recipients of Kuparuk Producer's Report of Gas Disposition
/~
~/
Enclosed is a copy of a revision to the Gas Disposition Report for the Kuparuk CPF1 Facility
for May 1998. The revision is due to an overstatement of total flare and total gas produced
for the month. Flare greater than one hour was not changed.
If you have any questions, please contact Maureen Dolphin at (907) 263-4629.
Sincerely,
Ed Hendrickson, Supervisor .~'~~''~~`
Production & Revenue Accounting ~ :~ ~~, ~~~~-.
~M,.~ 'ad' ,~e~a
~;~
EH/mad ~ ~"~°
Enclosures ~;~'*~r~,ti"~'
~~~
MAD-K3 $~~~'
~~
•
ALASKA OIL AND GAS CONSERVATION COMMISSION ~~~
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL PROCESSING FACILITY #1 ARCO ALASKA, INC. KUPARUK RIVER UNIT 5/98
•
•
Disposition Volume MCF*
1. Sold 15,898
2. Reinjected 3,249,391
3. Flared or vented less than 1 hour 8,690
4. Flared or vented greater than 1 hour 15,800
Su lemeatal re rt re uired--See 20 AAC 25.235
5. Pilot and Purge 18,416
6. Used for lease operations Fuel 777,050
Assist 4997
7.Other 0
TOTAL items 1 - 7 "in
~'
"~
4,090,242
~_<
8. NGL gas equivalent produced ~
~ ~° ~ ~~~
0
~•,
9. Purchased gas r ~
~
` ~Y Y3 0
~*_ ~:~
10. Transferred from: PBU CGF (LSEOR NGLS) ~ 247,043
;:~
...
~,:
i
11. Transferred to: CPF 3 291,972
Remarks: Reinjected vol does not include volumes of PBU NGLS squired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
I hereby certify that the fore oing is true and correct to the best of my knowledge.
Signature: ~L !S/! Title: Date: / ~U
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.75%
KRU WEST SAK 490150 0.25°k
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
i -
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CPF t1
May 1998
DATE
T1ME
VOLUME MCF
DESCRIPTK)N OF INCIDENTS 8 CAUSE PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
5J1/98 748-1234 1,440 Getting high pressure override on 1 sU2nd stage recycle UNPLANNED Reduced inlet gas rates. Facility maintain-
valves. Rapid rise in ambient ~mperetures abng with once completed. Shut in wells. Fnished
starting A-GL compressor otter being overhauled. working on recycle valve calibrations.
tNhile setting recycle valves on A-GLC after new panel
installation ambient temperatures rose also causing
flare.
5J5/98 1828-1928 61 Exceeding gas compressor capacity. Excessive inlet UNPLANNED Reduced inlet gas rates
gas rates.
5J6/98 832.941 930 Compressor shutdown. Faulty shutdown. P~E testing UNPLANNED Restarted Compressor
onantisurgevalve. "wu~~'~ oNt
5/9!98 1731-1908 2,210 Compressor shutdown. Instrumentation mal~tion.
y13/98 1150-1505 3,258
5115/98 1741-2004 311
5/2W98 1514-1712 2,940
5J25198 1930-2400 1,650
Compressor shutdown. Instrumentation malfunction.
High ambient temperatures. Excessive inlet gas rates
Compressor shutdown. Faulty relief valve on hydraulic
pump.
Compressor shutdown. Emergency shutdown. 'B' GLC
compressor tripped @ 1930. Main plant trip and restart
@2230. Restarted with some difficulty. Shut in att watts.
ElectricaVnstrumentationmalfunction.
TOTAL OVER 1 HOUR 15,800
PLANNED EVENTS LESS THAN 1 HOUR
O
Flare or Yerrt Volumes:
Greaterthan 1 hour
Less than 1 hour
CoMlnuous Assist
Pilot and Purge
15,800
12,739
4,997
18.416
TOTAL FLAREDNENTED 51,962
•
UNPLANNED Restarted compressor Reduced inlet gas
reds. Corrected instrumentation malfunction
UNPLANNED Reduced inlet gas rates.
UNPLANNED Reduced inlet gas rates.
UNPLANNED Restarted compressor. Reduced inlet gas
rates.
UNPLANNED Restarted compressor. Reduced inlet gas
rates. Cortected electriceVnstrumentation
malfunction.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
~~~,
r., ~,~
ky,u ~
.,~,~.. s
.,.
.:Y
(Facility (Operator (Field(s) IMonth/Year of Disposition
CENTRAL PROCESSING FACII.ITY #1 ARCO ALASKA, INC. KUPARUK RIVER UNIT 4/98
Disposition Volume MCF*
1. Sold 14.913
2. Reinjected 2,554,012
3. Flared or vented less than 1 hour 6,075
4. Flared or vented treater than 1 hour
Su lemental re ort to aired--See 20 AAC 25.235 0
5. Pilot and Purte 9.902
6. Used for lease operations Fuel 678.271
7.Other 0
TOTAL items 1 - 7 3.269.032
8. NGL tas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLSI 248.302
11. Transferred to: CPF 3 309,043
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected on line 10 or Na tha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~~j~..f`- Title: ~-y-~~v v Date: ~ 3
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UM 490100 99.78'Yo
KRU WEST SAK 490150 0.22'x'0
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCP
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
i
._:
~
~'
tp
~
~ ~: ,;
~
~;r.
~~ ~
~~
c
,:
9~
~ ~,.
Facility Operator Field(s) Month/Year of Disposition
CENTRAL PROCESSING FACILITY #1 ARCO ALASKA INC. KUPARUK RIVER UN[T 3/98
Disposition Volume MCF*
1. Sold 16,515
2. Reinjected 2,708,944
3. Flared or vented less than 1 hour 2,646
4. Flared or vented erecter than 1 hour
Su lemental re ort re wired--See 20 AAC 25.235 2.357
5. Pilot and Puree 11.652
6. Used for lease operations Fuel 781,443
7.Other 0
TOTAL items 1 - 7 3.530.102
8. NGL acs equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS1 213.409
11. Transferred to: CPF 3 355,493
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected on line 10 or Na tha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~~ /~._,.,L-_. Title: Date: ~ $
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UM 490100 99.778'0
KRU WEST SAK 490150 0.238'0
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CPF t1
March 1998
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS d~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
~ARING OR VENTING EVENTS GREATER THAN 1 HOUR
3/5/98 1453-1652 242 High tie Gne pressure. High ambient temeratures UNPLANNED Reduced inlet gas rates
3/7/98 1200-1316 326 Brought on a high TGOR well. Excessive inlet gas rates UNPLANNED Reduced inlet gas rates
3/8/98 0311.0447 822 Compressor shutdown. Excessive inlet gas rates UNPLANNED Reduced inlet gas rates
3/13/98 0518-0644 342 Compressor shutdown. Flare valves opened to releive UNPLANNED Reduced inlet gas rates
system overpressure
3/21/98 0725-0845 179 Process upset in gas section of facility. High ambient UNPLANNED Reduced inlet gas rates. Cut 3 large gas
temperatures. Rapid rise in ambient temperatures and produang weds through the event, just not
shift in wind direction from the south, putting fin fan heat fast enough.
into the turbine inlets
3/24/98 1312-1443 446 Compressor shutdown. Waterflood turbines shutdown UNPLANNED Restarted compressor.
• causing CHD to pressure up from dumping vessels.
Compressor shutdown on high suction scrubber level
TOTAL OVER 1 HOUR 2,357
PLANNED EVENTS LESS THAN 1 HOUR
0
Flare or Vent Volumes:
Greater than 1 hour 2,357
Less than 1 hour 2,646
Continuous Assist 6,545
Pilot and Purge 11,852
~~~ R~ ~ !
~~C.~9 ~ ~Ort~. ~Oftl~itt~'":
~t3Gj1016~A~? J .
TOTAL FLAREDNENTED 23,200
~VIS~ .
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL PROCESSING FACILITY Ml ARCO ALASKA INC. KUPARUK RIVER UNIT 2/98
Disposition
1. Sold
2. Reinjected
• 3. Flared or vented less than 1 hour
Flared or vented erecter than 1 hour
. Pilot and Puree
. Used for lease operations
. Other
TOTAL items 1 - 7
NGL ¢as eouivalent produced
• 9. Purchased gas
Fuel
10. Transferred from: PBU CGF (LSEOR NGLSI
Volume MCF*
14.488
2,694,649
5,635
1.943
16.165
717.993
6.007
0
3.456.880
0
0
232.548
11. Transferred to: CPF 3 I 250,070
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
I hereby certify that foregoing is true and correct tco the best of my knowledge.
Signature: Title: C7~jN-• ~ . Date: ~ L
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER 490100 99.85%
KRU WFST SAK 490150 0.15%
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of i
60 degrees F. Report due by the 20th of the i
month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CPF ff1
February 1998
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS d~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
~ARING OR VENTING EVENTS GREATER THAN 1 HOUR
2/3/98 1840-2041 913 Compressor shutdown. ElectricaUnstrumentation UNPLANNED Started/restarted compressor. Corrected
malfunction. Partial power failure loadshed compressors electricaUnstrumentation malfunction
2!1198 1919-2038 173 Process upset in gas section of facility. Excessive UNPLANNED Reduced inlet gas rates
inlet gas rates.
2/12/98 1327-1439 171 Process upset in waterflood section of faality. Faulty UNPLANNED Stabilized facility process and operation
shutdown waterflood turbines.
2/21/98 2030-2300 686 Bringing on high GOR well. Excessive inlet gas rates UNPLANNED Reducedrncreased inlet gas rates
TOTAL OVER 1 HOUR 1,943
~LANNED EVENTS LESS THAN 1 HOUR
0
Flare or Vent Volumes:
Greater than 1 hour 1,943
Less than 1 hour 5,635
Continuous Assist 6,007
Pilot and Purge 16.165
TOTAL FLAREDNENTED 29,750
=:,.j
•
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276-1215
March 6, 1998
To: Recipients of Kuparuk Producer's Report of Gas Disposition
/~
~/
Enclosed are copies of the Gas Disposition Reports for Kuparuk CPF1, CPF2, and CPF3
Facilities during February 1998 along with Gas Flaring or Venting Incident Reports for
volumes flared over one hour.
If you have any questions, please contact Maureen Dolphin at (907) 263-4629.
Sincerely,
Ed Hendrickson, Supervisor
Production & Revenue Accounting
EH/mad
Enclosures
CJ
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
PROCESSING FACILITY #1 ARCO ALASKA, INC. KUPARUK RIVER UMT
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
Flared or vented ereater than 1 hour
5. Pilot and Pure
6. Used for lease operations
7.Other
TOTAL items 1 - 7
8. NGL eas equivalent produced
• 9. Purchased gas
Fuel
10. Transferred from: PBU CGF (LSEOR NGLSI
Volume MCF*
15.899
3,061,011
3,357
10.534
13.612
78.280
0
3.895.678
0
0
244.808
11. Transferred to: CPF 3 I 333,856
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
I hereby certi~f,yJthat the fo/regoing is true and correct`to the best of my knowledge.
Signature: ~-~'I ~~'~`""''~ Title: O~~J. Date: B ~ ~d
RE41SE0
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UM 490100 99.920
KRU WFST SAK 490150 0.08%
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235. I,
Form 10-422 (Revised 4/95)
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CPF~1
January 1998
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS d~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
1/21/98 0750-1730 10,534 Compressor emergency shutdown. Inst. Work on
1731-2129 SN cascaded power supply valve loss to NGL plant
21St-2319 and inlet block
TOTAL OVER 1 HOUR 10,534
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour 10,534
ess than 1 hour 3,357
~onUnuous Assist 13,612
Pilot and Purge 6,2Q0
UNPLANNED Restarted compressor, reduced inlet gas
rates, facility maintenance completed, cor-
rectedmalfunction, stabilized faality process
and operation, repaired equipment difficulties
with power supply
TOTAL FLAREDNENTED 33,783