ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
rFnt~ ei PR(X`FCCiNC; FA('II iTY #t
4 Operator
ARCO ALASKA INC Field(s)
KUPARUK RIVER UNIT Month/Year of Disposition.
1/99
-
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold 16,930 Pool Name Code Percent
2. Reinjected 3,927,272 KUPARUK RIVER UNIT 490100 99.79%
3. Flared or vented less than 1 hour 7,988 KRU WEST SAK 490150 0.2190
4. Flared or vented Rreater than 1 hour
Su leme¢tal re re aired--See 20 AAC 25.235 0
5. Pilot and Pure 11,977
6. Used for lease operations Fuel
ssist 834,708
11 1
7.Other 0
Official Use Onl --Flarin Authorization > 1 hr.
TOTAL items i - 7 4,809,986 1. Safety MCF
8. NGL has equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: PBU CGF (LSEOR NGLS) 241,122
Commissioner Date
CPF 3
d
n
f 358,318
erre
to:
s
11. Tra Note: All volumes must be corrected to
Remarks: Reinjected vol does not include volumes of PBU NGLS squired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201 pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge.
cc
Title: d /
Signature: ,G~/L.---r r^~''~~ Date: L / 9 month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4l'95)
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACII,ITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL PROCESSING FACILITY #1 ARCO ALASKA, INC. KUPARUK RIVER UNIT 2/99
•
r~
L
Disposition. Volume MCF*
1. Sold 14,745
2. Reinjected 3,141,691
3. Flared or vented less than 1 hour 2,655
4. Flared or vented greater than 1 hour
Su 1eme~tai re R re aired--See 20 AAC 25.235 0
5. PiloE and Purge 9,867
6. Used for lease operations Fuel
ssist 728,133
840
7.Other 0
TOTAL items 1 - 7 3,906,931
8. NGL Qas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLST 208,410
11. Transferred to: CPF 3 326,055
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
I hereby certify that the oregoing is true and correct to the best of my knowledge.
- rI
Signatur . Title:_`- Date: ~ /b ~~
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.68%
KRU WFSTSAK 490150. 0.32
Official Use Onl --Flazin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be convected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
- ~'I ALASKA OIL AND GAS CONSERVATION COMMISSION
DUCED GAS DISPOSITION
•
•
FACILITY REPORT OF PRO
Facility
CENTRAL PROCESSING FACILITY #1 Operator
ARCO ALASKA, INC. Field(s)
KUPARUK RIVER UNiT Montb/Year of Disposition
3/99
Disposiflon Volume MCF* *Indicate contribution of each pool to total.
1. Sold 16,695 Pool Name Code .Percent
2. Reinjected 3,855,442 KUPARUK RIVER UNIT 490100 99.68%
3. Flared or vented l~ss than 1 hour 5,875 KRU WEST SAK 490150 0.32%
4. Flared or vented greater than 1 hour
Sn lemental re rt' fired--See 20 AAC 25.235 10,544
5. Pilot and Purge 12,893
6. Used for lease operafions Fuel
Assist 805,404
11498
7.Other ~ 0
TOTAL items 1- 7 4,718,351
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 154,599
11. Transferred to: CPF 3
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected online 10 or Naptha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature~~ ~.u!"/~rr~~ ~"' ~~~~/ Title' 8^rh-A-~
412,869
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use M~
3. Conserv. Purposes Mme'
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Date: ~ ~d 5'~!
Form 10-422 (Revised 4~
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CPF aRrt
March 1999
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR .
31419 0330.0545 1,305 I NGL plant maintenance and modifications. PSM on on ESD & PLANNED NGL plant depressure and ESD complete.
BD system.
315199 0800.2136 3,810 Facility maintenance. STV compressor down due to electrical PLANNED Restarted TIC NC-0001 AIB. Facility maintenance
tie-in. completed.
316199 .2037.2107 48 Process upset in gas section of facility. 1st stage "C" GLC UNPLANNED Inst tech adjusted vent valve to close properly.
vent to flare leaking by.
318199 1653.1756 5,103 Faulty shutdown on electrical leadshed UNPLANNED Restarted TIC facility. "See attached.
3120199 0300.0412 278 Process upset in MI section of facility. Faulty shutdown of UNPLANNED Reduced inlet gas rates. Restarted MI pump
MI pump. SI 1 F-17, 1 R-5,1 C-2 wells to eliminate flare.
TOTAL OVER 1 HOUR 10,544
•
PLANNED EVENTS LESS THAN 1 HOUR
flare or Vent Volumes:
Greater than t hour 10,544
Less than 1 hour 5,875
Continuous Assist 11,498
.Pilot and Purge 12.893
TOTAL FLAREDIVENTED ~ 40,810
r ~
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GA5 DISPOSITION
~J
Facility Operator
CENTRAL PROCESSING FACILITY #1 ARCO ALASKA, INC.
Field(s)
KUPARUK RIVER UNTI'
ear of Disposition
4/99
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNTI' 490100 99.57%
KRU WEST SAK 490150 0.43%
Disposition Volume MCF*
1. Sold 15,043
2. Reinjected 3,533,534.
3. Flared or vented less than 1 hour 6,382
4. Flared or vented greater than 1 hour
Su lemental re it re fired--See 20 AAC 25.235 0
5. Pilot and Purge 11,074
6. Used for lease operations Fuel
Assist 770,729
10 583
7.Other 0
TOTAL items 1 - 7 4,347,345
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 259,687
11. Transferred to: CPF 3 351,744
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected online 10 or Naptha used in SSEOR meter #201
I hereby certi that the forego' 'true and correct to the best of my knowpledgge.
Signature: Title• ~ t,. , f ~e l~+'-~• " } Date: ~~ ~ z /~ ~
Form 10-422 (Revi~Sed 4/95)
Official Use Onl --Flaring Authorization > 1 hr.
1. Safety M~
2. Lease Use M~
3. Conserv. Purposes Mme'
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235. i~
,( ~ 1~~`°
~~~
AI~Sk~~l~~chorage omr~s~~i~~
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
•
(Operator
PROCESSING FACILTi'Y #1 ARCO ALASKA, INC.
RIVER UNTI'
ear of Disposition
5/99
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.55%
KRU WEST SAK 490150 0.45%
Disposition Volume MCF*
1. Sold 16,610
2. Reinjected 3,433,025
3. Flared or vented less than 1 hour 6,970
4. Flared or vented greater than 1 hour
Su lemental re rt r iced--See 20 AAC 25.235 1,474
5. Pilot and Purge 12,049
6. Used for lease operations Fuel
Assist 791,394
10 887
7. Other 0
TOTAL items 1 - 7 4,272,409
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 232,184
11. Transferred to: CPF 3 361,802
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected online 10 or Naptha used in SSEOR meter #201
I hereby certi a fore g is true d correct to the best of my knowledge.
Signature: Title: ~ r ~/ r v Date: ~ /,~ ~
I"OTin lU-4LG ~1CGV1JCl1'+/7J)
::?Jib ~ `~ ~~~~
Official Use Only--Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
'111a_cka (lll ~ [;ac f'nnc d'~mrr~~at~~
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CPF #1
April 1999
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
5/3 99 1530-2345 1,351 Electrical malfunction UNPLANNED Repaired equipment. Found electrical short.
5 ~9 2010-2135 123 Vent to flare valve on "C" GLC 1st stage leaking by. Took UNPLANNED Reduced inlet gas rates
a little while to find problem. Blocked in valve and resealed it,
i
TOTAL OVER 1 HOUR 1,474
•
PLANNED EVENTS LESS THAN 1 HOUR
0
Flare or Vent Volumes:
Greater than 1 hour 1,474
Less than 1 hour 6,970
Continuous Assist 10,887 ~ ``
Pilot and Purge 12,9.44 ., . , ~~
TOTAL FLARED/VENTED 31,380
"A~aska iii ~A1lchora~~ oml' dsssi
f May 04-99 10:35am From-ENVIROMENTAL
907-6597712 T-004 P.02/02 F-006
Attachment to Flare Report of S/3/99, CPF' 1, Kuparuk River Pieid
Flar$ explanation for CPF 1 Flare e~+eflt of 5/3/x9
potation 153ta hrs. to 2345 hl'S. 496 rnlnutes/ 8.26 hrs.
Description of incident: The two STV gas compressors which compress low pressure gas from
the secondary separator, electrostatic coaiesCEr, crude surge drum and ether lessor sources
rhutd4wn due to unknown cause at 1530 hrs. oI15/~J9. After several aperatignal restart attempts
maintenance technicians were brought in to troubleshoot the problem. At around 16Q0 hrs. the
cause was Kientified as $ ground fault but thc+ location of the problem was unknown. Overtime
was authorised and personrlal were scheduled tq cane in aft@r mid-night to relieve personnel
wor'k'sng an the problem so the trouialeshaoting could continue on a 24 hr. basis, if deeded. The
gratrnd fault was located, repaired and the compressor was on-line at 2345 hrs.
Action taken to mimmiza the event:
Initial action
^ Crude surge prom pressure was increased tQ 15 psi from 8 psi during the event to increase
the vapor pressure and hold as much iow pressure gas in solution as possible
As soon as it was determined thatthe compressor wouldnY be restarted
• Purge gas sources which normally go to the SN compressor were temporarily reduced
^ Gas liquids off of the seFgnd stage suction scn,bber was vaporised by besting up the gas
and compressing it in gas lift gas in place of lolling them be dumped Deck tq the secondary
separator where they would flash t1p be compressed by the STV compressors
^ +Dvet~mia was authorized end personnel scheduled tq come in mid-shift sa troubleshooting
could be sontinuouS until problem was corrected.
Aftemative action
The only other option was a complete CPF facil"ny shutdawn_ The flaring associated with a facility
shutdown send restart would have been greater than the 1351 macf flared in this event.
!f I can be of further assistance ar answer any questions please Peal fray to oallme at 659-7727
Lindsey Ct~xrk
Lindsey Clark
CPF y C-peretions Supervisor
•
~u~~K
u
•
'~ ~ _`~
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
:~. t '~ "
CESSING FACII.rrY #1
ALASKA, INC.
RIVER UNTI'
ear of Disposition
6/99
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.54%
KRU WEST SAK 490150 0.46%
Disposition Volume MCF*
1. Sold 14,188
2. Reinjected 2,905,118
3. Flared or vented less than 1 hour 2,029
4. Flared or vented Qreater than 1 hour
Su lemental re ozt iced--See 20 AAC 25.235 0
5. Pilot and Pure 8,737
6. Used for lease operations Fuel
Assist 702,388
11 116
7. Other 0
TOTAL items 1 - 7 3,643,576
8. NGL Qas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 231,479
11. Transferred to: CPF 3 316,647
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
I hereby cerfify that the foregoing is true and correct to the best of~~my knowledge.
Signature: ~ ~ r~L Title: c.~v,~e r u i r v r- Date: ~ / 9 ~f
Form 10-422 (Revised 4/95)
Official Use Only--Flaring Authorizafion > 1 hr.
1. Safety MCF
2. Lease Use M~
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and. to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
u
•
Operator
PROCESSING FACILTI'Y #1 ARCO ALASKA, INC.
Field(s)
KUPARUK RIVER UNIT
Disposition Volume MCF*
1. Sold 15,986
2. Reinjected 2,849,039
3. Flared or vented less than 1 hour 4,325
4. Flared or vented greater than 1 hour
Su lemental re rt re fired--See. 20 AAC 25.235 1,843
5. Pilot and Purge 11,186
6. Used for lease operations Fuel
Assist 726,974
9 506
7.Other 0
TOTAL items 1 - 7 3,618,859
8. NGL gas equivalentproduced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 228,803
11. Transferred to: CPF 3
Cpl, 358,633
1,358,412
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~ ~ ~? Title: ~v~e..-/45 n .- Date: ~ /
Form 10-422 (Revised 4/95)
ear of Disposition
7/99_
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.57
KRU WEST SAK 490150 0.43%
Official Use Only--Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition ( ~
Authority 20 AAC 25.235. ~ ~ ~~ ? ~`
L i' ~.~~ YN w~*~
~i~ittiSu,i:Y~JI~Si,,,~:
~~~`~' ~`~ ~ A~chora~4
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CPF #1
July 1999
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED .ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
7/1/99 1421-1424 364 Excessive inlet gas rates into facility. High ambient temps. UNPLANNED Reduced inlet gas rates.
• 1453-1506 Smokeless flare out of service for repairs
1508-1531
1541-1546
1640-1706
7/8/99 0936-1045 194 Excessive inlet gas rates into facility. High ambient temps. UNPLANNED 9:45 =Started shuting-in wells to reduce inlet gas
Ambient temps increased while Ml pump was down and NGL's
were being sent to the front of the plant. This caused excessive
pressure on the First Stage discharge of the Gas Liff Compressors
7/9/99 2337-0038 279 Excessive inlet gas rates Into facility. High ambient temps. UNPLANNED Reduced inlet gas rates. Shut-in wells to reduce
gas.
7/23/99 2006-2116 44 Excessive inlet gas rates into facility. High ambient temps. UNPLANNED Reduced inlet gas rates. Stabilized facility process
Wells were shut-in to eliminate flare. Also, the 1st stage and operation. Corrected problem with the 1st
discharge flare vent on "C"GLC stuck partially open. Had to Cage flare vent on "C" GLC.
block in and stroke the valve to correct the problem.
7/3~ 1501-1602 962
TOTA VER i HOUR 1,843
PLANNED EVENTS LESS THAN 1 HOUR
0
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
~ Pilot and Purge
TOTAL FLARED/VENTED
High ambient temperatures.
1,843
4,325
9,506
11.186
26,860
UNPLANNED Reduced inlet gas rates.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
CENTRAL PROCESSING FACILTI'Y #1
INC.
KUPARUK RIVER UNIT
Disposition Volume MCF*
1. Sold 14,369
2. Reinjected 3,008,769
3. Flared or vented less than 1 hour 14,503
4. Flared or vented greater than 1 hour
Su lemental re rt fired--See 20 AAC 25.235 1,401
5. Pilot and Purge 16,081
6. Used for lease operations Fuel
Assist 659,055
3 906
7.Other 0
TOTAL items 1 - 7 3,718,084
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 228,560
11. Transferred to: CPF 3
CPF2 318,851
1,497,898
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected online 10 or Naptha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of my knowledge.
GZW~~ ~-z Title Y`LLf' o~ Date: ~ /v 4 g
Signature:
ear of Disposition
8/99
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUKRIVERUNIT 490100 99.61°h
KRU WEST SAK 490150 0.39%
Official Use Only--Flaring Authorization > 1 hr.
1. Safety M~
2. Lease Use M~
3. Conserv. Purposes Mme'
Commissioner Date
Note: All volumes must be cosected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
t+orm lU-4"L'L (xevisea 4iy~~
! ~
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #1
August 1999
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
8/5 1315-1520 904 Electrical/Instrumentation malfunction. High ambient temp: UNPLANNED Reduced inlet gas rates. Corrected E&I fluctuatio
Lost 2 generators on high lube oil temp -load shed. failure. Stabilized facility process and operation.
Restarted recips and SN compressors.
8/6/99 1252-1353 247
8/16/99 0903-1004 250
High ambient temperatures.
Excessive inlet gas rates into facility. High ambient temps.
UNPLANNED Reduced inlet gas rates.
UNPLANNED Reduced inlet gas rates.
TOTAL OVER 1 HOUR 1,401
1
1
PLANNED EVENTS LESS THAN 1 HOUR
0
Flare or Vent Volumes:
Greater than 1 hour 1,401
Less than 1 hout 14,503
Continuous Ass~si 3,906
Pilot and Purge; 16.081
TOTAL FLARED/VENTED 35,891
~~~~~~~
ALASKA OIL AND GAS CONSERVATION COMMISSION
~~T ~ ~ ~~~~` FACILITY REPORT OF PRODUCED GAS DISPOSITION
~~, ~ 01~ ~~~ COt11t111SSlOCt Operator Field(s)
ROCESSING FACILITY #1 ARCO ALASKA, INC. KUPARUK RIVER UNIT
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour
4. Plared or vented greater than 1 hour
Su lemental re rt fired--See 20 AE
5. Pilot and Purge
6. Used for lease operations
7.Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
• 9. Purchased gas
10. Transferred from: PBU CGF (LSEOR NGLS)
Fuel
Volume MCF*
15,488
2,695,856
5,224
5,828
13,299
580,724
3.811
0
3,320,230
0
0
251,345
11. Transferred to: CPP 3 I 302,104
Cpl, 1,381,107
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected online 10 or Naptha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~Z (~ Title: ~~,c ~-~rro ~ Date: / c7 (8 p
Month/Year of Disposition
9/99
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.65%
KRU WEST SAK 490150 0.35%
Official Use Only--Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use Mme'
3. Conserv, Purposes M~
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Forzn 10-422 (Revised 4/95)
~~~~
OAT T ~ 199
Alaska Oil & Gas Gans. Commission
AnchoraCe
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CPF #1
September 1999
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
9/~ 1348-1524 903 High rate of ambient temperature rise. Well cut to eliminate UNPLANNED Reduced inlet gas rates,
flare. 21 degree rise In 2 hours.
9/8/99 1118-1248 2,833 Electrical/instrumentation malfunction. UNPLANNED Reduced/increased inlet gas rates. Corrected E&
fluctuation/failure.
9/25/99 0828-0935 2,092 Electrical power grid voltage interupation caused gas train UNPLANNED Reduced inlet gas rates. Restored power on low
compressors to shut down. voltage bus and restarted gas train.
TOTAL OVER 1 HOUR 5,828
PLANNED EVENTS LESS THAN 1 HOUR
0
Flare or Vent Volumes:
Greater than 1 hour 5,828
Less than 1 hour 5,224
Continuous Assisi 3,811
Pilot and Purge 13.294
TOTAL FLARED/VENTED 28,162
s!
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
Facility Operator
CENTRAL PROCESSING FACILITY #1 ARCO ALASKA, INC.
Field(s)
KUPARUK RIVER UNIT
Disposition Volume MCF*
1. Sold 16,796
2. Reinjected 3,543,665
3. Flared or vented less than 1 hour 2,805
4. Flared or vented greater than 1 hour
Su lemental re ort re sired--See 20 AAC 25.235 3,027
5. Pilot and Purge 10,559
6. Used for lease operations Fuel
Assist 688,313
5 455
7. Other 0
TOTAL items 1 - 7 4,270,620
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 265,925
11. Transferred to: CPF 3
CPF2 382,711
1,732,665
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
.reflected online 10 or Naptha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~ ~t-- ~~.~ Title: ~-~, Date: // ~6 ~
Month/Year of Disposition
10/99
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.76%
KRU WEST SAK 490150 0.24%
Official Use Only--Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/yJ)
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #1
October 1999
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
10/19 0045-0302 1,692 Instrumentation malfunction. 'C' GLC train s/d. Loss of HRU
positioner.
10/29/99 1900-2200 1,133 Loadshed plant after 13 MW generator breaker opened.
10/30/99 0337-0457 202 Bring plant up after plant shut down, plus increase in ambler
temperature.
TOTA• ER 1 HOUR 3,027
PLANNED EVENTS LESS THAN 1 HOUR
0
Flare or Vent Volumes:
Greater than 1 hour 3,027
Less than 1 hour 2,805
Continuous Assist 5,455
.Pilot and Purge 10.559
UNPLANNED Reduced inlet gas rates. Repair instrument.
Restart gas compressor.
UNPLANNED Plant depressurized and started up standby
generators along with plant.
UNPLANNED Reduced inlet gas rates.
TOTAL FLARED/VENTED 21,846
~~~~1~~~
ALASKA9A OIL AND GAS CONSERVATION COMMISSION
~~A(r~~PORT OF PRODUCED GAS DISPOSITION
Facility Q~~ ~ ~ -(+~, Field(s) Month/Year of Disposition
CENTRAL PROCESSING FA~.~#1 nMFldl^9AA ARCO ALASKA, INC. KUPARUK RIVER UNTI' 11/99
1. Sold
Reinjected
Disposition
3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
Su lemental re rt r iced--See 20 AE
5. Pilot and Purge
6. Used for lease operations
7.Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from: PBU CGF (LSEOR NGLS)
Fuel
Volume MCF*
16,250
3,777,639
7,332
2,313
15,219
692,794
6.804
0
4,518,351
0
0
242,386
11. Transferred to: CPF 3 390,215
CPF2 1,775,138
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~ Title: ~....-@-~--~ Date: ~2- -1~ r~,
Y ~
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.79%
KRU WEST SAK 490150 0.21
Official Use Only--Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Fotrn 10-422 (Revised 4/95)
V
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #1
November 1999
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
11/14 99 1511-1711
11/19/99 0315-0425
11/24/99 2315-0044
11725/99 0056-0220
'~ TOTA~VER 1 HOUR
1,847 Instrumentation malfunction. Faulty shutdown on "R" gasliff UNPLANNED Reduced inlet gas rates.
compression.
71 High ambient temperatures. Excessive inlet gas rates into UNPLANNED Reduced inlet gas rates.
facility.
87
308
2,313
PLANNED EVENTS LESS THAN 1 HOUR
0
Flare or Vent Volumes:
Greater than 1 hour 2,313
Less than 1 hour 3,519
Continuous Assisf 5,503
Pilot and Purge 10.511
Excessive inlet gas rates into facility. High ambient tempera- UNPLANNED Reduced inlet gas rates. Reduced rate into faciliy
Lures. 20 degree temperature swing. Small PSV leak. PSV block in for repairs.
~~
~~ ~ ~~
~~, ~~
TOTAL FLARED/VENTED 21,846
~, t. .._, :.:
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GA5 DISPOSITION
Operator Pield(s)
FACILITY #1 MARCO ALASKA, INC.
RIVER UNIT
Month/Yeal• of Disposition
12/99
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 99.80%
KRU WEST SAK 490150 0.20%
Disposition Volume MCF*
1. Sofa 16,805
2. Reinjected 4,157,123
3. Flared or vented less than 1 hour 7,427
4. Flared or vented greater than 1 hour
Su lemental re od re fired--See 20 AAC 25.235) 655
5. Pilot and Purge 15,369
6. Used for lease operations Fuel
Assist 690,795
6 953
7. Other 0
TOTAL items 1 - 7 4,895,127
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 215,772
11. Transferred to: CPF 3
CPF2 376,431
1,521,032
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected online 10 or Naptha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of^my knowledge.
Signature: ~ ~...~~ Title: J"~„~ ~ /Jo / Date: I ~ /~ - 0 t7
Form 10-422 (Revised 4/95)
Official Use Only--Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #1
December 1999
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
12/26/99 0730-0844 447 Excessive inlet gas rates into facility. Process upset in MI UNPLANNED Reduced inlet gas rates. Reduced wells 1-A3,
pump section of facility. 1-Cl, & 1Y-27 to minimum choke. Repaired pumK
and restarted pump.
12/30/99 1432-1533 208 Electrical/instrumentation malfunction. Frame 6 turbine on UNPLANNED Reduced inlet gas rates. Corrected E&I failure.
power generation service tripped causing shutdown of Restarted Frame 6 and additional power generati
several gas handling equipment. units.
TOTA'C~VER 1 HOUR 655
PLANNED EVENTS LESS THAN 1 HOUR
0
Flare or Vent Volumes:
Greater than 1 hour 655
Less than 1 hour 7,427
Continuous Assist 6,953
Pilot and Purge 15.369
TOTAL FLARED/VENTED 30,404