Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ARCO - CPF #3
3':°/.~ Y :S?"AY/.21~/,M%~'dr/.B/.~/~'~Y.,~/®Y.~/62/.~/®'/.A*/N~,6/.p/w~/~/~/6Y/~+/~/A"/~~Y.M/~/~/~Y.d/~'/.e-.'/.~/.~/®Y.aU/bP/.~/.~/~!`/.M/~/.A/.~I/O/.~/.~/B///i/.B/~/.a~/,I'///.N/!/®/A/,~/~'YN/~Y.~/~/.I/A/~/.A'/.8~/BY.M/~YdY/~ 7 ~ a~ .. AGOCC GAS ~isposi~ion Files 1996 A~CO -CP~3 - - ~ -~/r~.~ia~i~i~i~c~i.~i.~/m~mi.~i..r~~~.~r~crri~~.~i~iri~ge~.~:me~ai~i~i.~~tr/.e~~~iaiv~.~ca~iari~in~~.~a~i~/sr~iem/,m~mr~z~/.nw/0i.,vas/.~n~~/.ni.~/.~/armdei.~~.min/w/siararir/.~r~.~~r~~~raei~ ,ecs-. r ~.. ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Mon[h/Year of Disposition CENTRAL PROCESSING FACII.ITY #3 ARCO ALASKA, INC. KUPARUK RIVER UNIT 12/96 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold 0 Pool Name Code Percent 2. Reinjected 0 KUPARUK RIVER UNIT 490100 100.00% 3. Flared or vented less than 1 hour 472 4. Flared or vented greater than 1 hour 366 (Su elemental re rt aired--See 20 AAC 25.235) 5. Pilot and Puree 20,320 6. Used for lease operations Fuel 942,268 Assist 0 7.Other 0 TOTAL items 1- 7 963,426 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: Title: Date: Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. orm evt ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CPF #3 DECEMBER 1996 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 12/3/96 0700-1800 12/8/96 1315-1345 1410-1445 1525-1545 TOTAL OVER 1 HOUR Flare or Vent Volumes: Greater than 1 hour Lesa than 1 hour Continuous Assist Pilot and Purge 177 Planned flare due to lean gas injection line for PLANNED No action necessary, this was a planned LSEOR spool piece tie-n. Line was isolated and event. depressurized for repair. 189 Planned flare required to test blowdown system on PLANNED No action necessary, this was a planned NGL pump modification system. Also, depressurized event. and isolated line to repair bad vent valve. 366 366 472 0 20.320 TOTAL FLAREDNENTED 21,158 FROMr ENUIRONMENTpL ,rte- FpX_NQ;:•_907 659 7712 12-11-96 03r41P P.02 FAat1TY: '# Gi->: asPOSrrial Tim - of enea• / 4aG4 2444 Date of Occurrence: /Q~~(~ FLAH or vEPm / 3; ! S To: 3L ~!S - (m /d yy) rn:le Salectiort) 1 H=1D To: / N IS'a~ To: ~~~ YS Total Yolume: ~~ ~ B~.s {lnc><udea Vokrw Fisrad 1M1?riclr Geaterated 8~adr Smat:s. N ADplicabfs.) 148 Motor No. (Flare onty): lenn tJn To: _ To• To• teiaut@a ~_ a0 lennad ircle Selection) T ~A' or Vented: • venting defined as a /eisase m abrrrsphe-e. Fferiny s: qes leaving fhrotph ilaro tip. (For C,sa Venting Irrcidenb, Maas raNana errferod on ties VsrM,irp SpresdrAoer7 YES or NQ (curds orry.) A. Deaoriptlen of IttoidettfV (Check Orra and Ctrde as ApplfpbleJ Compressor Shutdown FJ~FAi3ENG1' SFUiDOAIVN ~ Tie Lin. Pressure _~_ Ftare system testing 9. Deaariptbn of tausec(Ct~sck tlne and Ckole as APP~~) ~ ambient tempsretures Psoker Recip Comprossor Brealt-M Elsctficavinatrumentatlon maifunctkur ~~Faulry shutdown „~_ Equipment ~ Other. C. Acdon Taken to FJinrinala Cause: (Chock One artd Circle as AppYcable) l,6tarted/restarted Compressor Corrected aleotricaUinstrumentation geduCedflncraasetl IMSt pas rates mallunctbn Completed Ilse tasting Stabilised faeillry process and operation ^Faoiliry maintenance completed Repaired equipment diflicukies //ff with ~- Other. 13locf/dd n ~ n.r~~~P.-~ Did Incident Gauss 61aok Smoks~ Yec: Notified ADEC. (Date) (Time) (ALASKA DEPT. OF ENVR. OONSEFlVATION Rep.) Report the lollowurp inMrrnatlen to ADEC within 24 hours by telephone (007) Oii,0i00 and 1+ur. tYritfen report to ADEC . fart. (007) IsifiZY Date and Time of blade smoke went: From: Vo~me Flared VMdoh Generated Black Smoke (If Different Faun Above): ~_MS~F l3BLS Typ• of Materials Burned: (Check One) GAS: NGIs: _ Other. Sea information from Se0tie0ns A, 8, and G above (Cause and Corrective Action). General Weather, Alt Temperature: ~,, Wind SpeeaVDirectian: ~` ~ Facility Supe sot FOR~ASIFaare Incident 8N4D6 Version DEC 11 '96 13 44 Process upset in section of facility Flaring for drillske shutdownlstartup Other. `Te '~t~ 1~1o~~dul>•+ 5vS'~eMn o.J 'i'k2 ..s.~ NfsL A.«~~, MSG o sTs{tM, /~150~ els~ress~.et.~ ai in to ~lgrft sysk>r• -1'0 r~E,Plact ,jo,~ ~~~+ ~A~tJ4, Excessive inlet yes rate. Faoilltttl maintenance Flora vatws ops+ned to relieve systom ovefpnsaure l L " 9 `g~ oc: Environmental. t+ISK-81 odglnal and tsoc Date Signed (Eftvlranmetnal Use OnIY) Fax: Patricia Proffer. na. cc N9K Env. File: 9.7 Env Falc t35~7112 997 659 7712 15tbt3 G p~v ~~ac.C a s -,~ ~~ ~r r~ a. ~ e.~~ a~~ r., ' I L 3,, ;, .992 .;~; t FROMs ENUIRONMENTpL FpX NO.: 987 659 7712 12-09-96 08s36p P.02 1=Aaurr: c P ~ - 3 csi~s ofsi+osirtoN Dab of dcourrenee: / ~ _ 3 • %' 6 or VENT' (mm/dd/ri) ( • 8electbn) Total Volutrw. -~'~ ~_ ~,g (lnoa~dts vdrttr R,s.d tvieioh Gerasrrtsal errotr q,tp„r,,.~.1 ldXaS Tim. of Orscurrrrsee~ 9~~4 ~ Ftner: 0 7~ To: ~ ~ ; a D Fnertt To: From: ~, To: From: 70: Frerst To: From: ~^ To• Maur No (Flsere only)• ~ .~ / 5 ~l L ____ ~out~ . G,bb i Planned tJln hn>ted e +) Totel Mitasrs Fired a Vanled: Q t~anting d.A'nrd e: a nt/eese b ssrw~ ~nfnp Ar gets /M1tFiD rrptgN Alra Epp. (For Gas t/antirrp JnGdsnd4 rea t!o/Wlte entered on Qas VifrNiq 5pntedgl~et? YFS a NO (olrt>b ans),) A. Oeecription of Irt~Jdett>: (Chedt One and Ctrote u Aopgoabie) `-Compressor Shutdown Prooea upset h sectlon of 9Y~GYtei110DMVr~ fadlity ^,i~igh Tte lane Pressure Fleritep for driYsiite sfwtdown/starttlp Flare system tasting Qtlter. ,,, C.a N Li ~+ s. OesOriptlafl Of GYne:(Cheek t7M and Grote ee Applbable) High ambient temperetura Exe:eseive inlet 9u retetes Packer Reap Compressor @teak-In ~~ Fly ~e `~ EteotrioaYinswmentatan maYunction Flare valves aperted to relieve system Faulty shutdown overpnswn Egttipmant drtfioultles with vibration ~Gther: C. Action YaRen to ENminate Pa{tse: (Chaalt One ttttd Clrtde as AppaoaMe) 3tsrted/nstarted Compressor _~Correoted NeetrkeJllnstrumengtlon AaducedAttcreased Inlet 1~ rates ntallunotlon _~Completed flare teWnq t3fabiized fadlNy praoess turd opsragon FaciNty maintentv+ae oompieted -~Rep~r~ ~~t Wti~ulttes /Other: with Did Incident Cause 81sdc 5rttokeT Yes: (If 3 or more mirwtes h an hour. oonerwo) Notified AOEC. (Datej (Tmej (Ai.lISK110EPt. tJF ENMRONMAEPRALCONS@iVATION Rep-) Rsport the /dbwin~ (nlenneNon to ADEC within ~a Aeurs 6y phar>. (?71~f~fq or I-AX (?7~.pia0~ Owe and Time of Waok smoke event: FttxltV To: Volume Flared WMOh Generated Bledt Bmolta (If OiNerent From Abave): Nf~ B8~ Type of Materials Bumed: (Ghsck One) t3AS: Nf3L,s: Ott~ter; SN information from Sections A. B, and C above (Caua and Correctlve Action). ~GeaerM WeatMn Air Tempenture• Wind SpeadfDirectbn- iNatne and phone number of person mekine th. ~.~,.r• Faciily Supervisor Date SlQtsd •- cc: Fuld Envtronmerttszl Coordktators~ NSK-61 Fer Environmental Use Only; (Central FlN o.~ Ca Patrk9a ga1tK. ATt7.744 DEC 9 '96 08x59 907 659 ?712 PAGE.O@2 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION \J racuuy (>pera[or Field(s) (Month/Yeaz of Disposition CENTRAL PROCESSING FACILITY #3 ARCO ALASKA, INC. KUPARUK RIVER UNIT 11/96 Disposition Volume MCF* 1. Sold p 2. Reinjected p 3. Flazed or vented less than 1 hour 2,194 4. Flazed or vented ,;realer than 1 hour (Su lemental re rt aired--See 20 AAC 25.235) 0 5. Pilot and Purge 16,645 6. Used for lease operations Fuel Assist 890,638 0 7.Other p TOTAL items 1 - 7 909,477 8. NGL gas equivalent produced 0 9. Purchased gas p 10. Transferred from: p 11. Transferred to: p Remarks: I hereby certi~jc.that foregoing is true and correct the best of my knowledge. ..~,:._ Signature: Title: r ~(~ Date: l ~~ y~ orm evtse *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 JOO.OORo Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by We 20th of the month following the month of disposition. Authority 20 AAC 25.235. f a • b m m a ~ ~ a' ~, ~ ~ ~ ~m nw ~ ~ .^.~ ~ ,~ ~ r3 .~ m~ O CO o' iT'1 Q 0 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL PROCESSING FACILITY #3 ARCO ALASKA, INC. KUPARiJK RIVER UNIT 10/96 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 275 4. Flared or vented greater than 1 hour (Su lemental re rt required--See 20 AAC 25.235) 3,194 5. Pilot and Purge 17,146 6. Used for lease ocerations Fuel Assist 891,693 0 7.Other 0 TOTAL items 1 - 7 912,308 8. NGL >;as equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that a foregoing is true and correct [o the best of my knowledge. Signature: Title: c~..~,~.v Date: ~ ~ '"~ orm evi *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 100.00g'o official Use Onl --Flarin Authorization > 1 hr. 1. Safety MCP 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ' FROMs ENUIRONMENTRL FAX NO.: 907 659 7712 10-23-96 05r51R P.02 FAgLJ7Y: G'~j~ cAS olt:v~rtwl 1]IIl!_ 4t Oonirronr.~ !~ 2aoa idiota~[ Gate of Oecuaenoe: /d ~ .~(p BLARE r V6rT' Frottc ~ To: l ca3C (7b {mm/dd/yy) Seteotbn) From: To- From: To: ToW Volume: 3194 , t~ ~d,g From: To: (Nwkidse Vaturla Rased YMahh Cswnrarsd Blraok S7r-oke, If From: ~~ To• ~~ From: To: Meter No. (Flan onlyr __ Punned lJn Ismed {Grow Tarial AtimAes Fiord a Ventsd• ' Vinehp dYned es • release b eeraarpihsw~. Fbrrp b eras IrsririsV uph Lira 40. lFa~- Oas iw srrfwad on Gee Spreerifrseq YFB a NO (ainoAr ore).) A. Deeoriptbn of Inaldentx (Check One end grde u AppUeeWe~ ~~ Shuktown Process upset In sottian of B~VI.Y$HlfDOIM~ facility ~~Hi~h Tie tine Pressure ~^Fq~rp for dAtlaita anutdowNctartup ~__Flen system tesunq Qther. 8. Detaipflen of Caue~(Cher3lt Ona and Code ae AppikraHla) ~ antbierM tsrr~rerafttns _ Excesdw IMat qes rates Packet Hemp Compressor 8rsekin FacMity rr1q dectrlcsYMstrumentetion malfunction Flare valves openW b reileve system Foully shutdown overpnswn `__Equipment dillicuities wllh vibration ~ _Othar. J~Qe3~®w c~.~ ~t ~ ' ~ ' Cx ~i.~ ~. r c•~- ~. ~.~~i~ _ ~~ C. Adlon Taken to fllminama Cause: (Check OM and C4ele ae Applbable) ~,~ Startedhestarted Compressor ~_Cotrettad eleotAtWinstrumsntation ~ inlet Oes ratu malfunctbn Completed flan testfrq ~__StabiYzed facility protest and operation FaciWy maintenance oomplstsd ~_R•paired equipment diffiCUiti•s Olher: with ,~ ~o~aryx~ ryG~.~1P G+C~~'Cr!" l"LYi, Ino~dsnt Cauca Black Smoke? Yes•.~~ pf 3 or more minutes in an trour. contirwe) Bed ADEC. .ter. (Date) (Time) (rV.ABKI-DEPT. OF EIVViRC>nMEfYTALCOfVSEAVATIONRep.) art Hrar Ias+llvvMp Mforaregoe ro ADLiC edtMn ss Aowt bI ptroee (T71~ite) er FAX (Z7?-OftPD/. 1 and T1me of blade smoke event: From: Ta srta Fhnd Which t3enerated Btadr Smoke (M Different Fran Abow): MBLF BHLS s of MtturWa f3umed: {vnolt Ore) taAB: fdQLs: Other. intarrnatlen from Sections A, 6. end C above (Cause and Corrective Action). ~- ~eral Yyeatlbr: Air Temperelure: SAfIRd 8peedlDireotion: ._ _~ _.~_ ~.r~-- -• ------ ---u-- LL-- ----~ M Facility Supsrvitor ~0/2i/9~ oat. ~~ cc: Field Environmental Coordinators, NSK-61 For Erwiron~+entN use ~~ Alask Oil & Gas l;ons. rorrrmission (Central F1e o.~j Anchorage oo: Patricia Rafter, ATC-?44 RECEIVED , ~'~v ? ~ 1996 OCT 23 ' 96 0552 907 659 ?712 PAGE. 002 • ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION • • PROCESSING FACII..ITY #3 INC. RIVER UNIT Month/Yeaz 9/'96 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 280 4. Flared or vented greater than 1 hour (Supplemental re rt aired--See 20 AAC 25.235) 0 5. Pilot and Purge 10,292 6. Used for lease operations Fuel Assist 666,216 0 7.Other 0 TOTAL items 1- 7 676,788 8. NGL gas equivalent produced 0 9. Purchased gas p 10. Transferred from: p 11. Transferred to: 0 Remazks: I hereby certi~ that the foregoing is true and correct to the best of my knowledge. Signature:~~~ ~Ip~~~- Title• rd ~~~ ~ Date: ~a ~ i orm I~~~l (xev~se *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 100.00% Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ~~~~+13r~~ 4.t4 tit, a ~~~,a~~~ fir'; l~.1a~.k ALASKA,OIL AND; Gt~SCONSERVATION. COMMISSI01~1' FACILITY REPORT OF PRODUCED GAS. DISPOSITION Facility ; Operator Field(s) „ Month/Year of Disposition CENTRAL PROCESSING FACiL1TY #3 ARCO ALASKA, INC. KUPARUK RIVER UNIT 8/'96 U • Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 812 4. Flared or vented (treater than 1 hour (Sup lemental re rt aired--See 20 AAC 25.235) 0 5. Pilot and Purtte 5,586 6. Used for lease operations Fuel Assist 483,988 0 7.Other 0 TOTAL items 1- 7 490,386 8. NGL Aas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct W the best of my knowledge. Signature: Title: ~ Date: ~ orm evise *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 100.00% Official Use Onl' --Flarin Authoriiation > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. 1~ 0 .~ .~ cas ~ ~ .-- ~, ~~ © ~ ;= °~ U CV ~~ a_ ~ ~ ~ ~ cn 0 Y cC Q ~~.~5 b~, t~l~ ~~S ~bNSERV~TION COMMISSION ~ J; a e~ ~ s ~ i+ t e y, y a ~, FACILtT$ REPORT OF PROD~JCED GAS DISPOSITION n U ~~ CENTRAL PROCESSINt3 FACILITY Ik3 IARCO ALASI Disposition Volume MCF* 1. Sold 0 2. Reinjected 218,764 3. Flared or vented less than 1 hour 4,169 4. Flared or vented greater than ~ hour (Su lemental re rt Wted-See 20 AAC 25.235) 21,645 5. Pilot and Purge 12,557 6. Used for lease operations Fuel Assist 775,444 0 7.Other 0 TOTAL items 1- 7 1,032,579 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best off"my knowledge. Signature• Title: , P~ ~ I~rrY Date: ~ (o ~(~ f1Tm Pvfcp ear 7l'96 *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 100.0046 Oft-icia~ Use ~iil'; =- ,~',;,< ~iiboriiation ~ ~ fir. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be cortected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. AuWority 20 AAC 25.235. utli.l~!,^rli~f 3~a~ss~u~u;o~ ~~r.~o~ set ~ ii0 ~~5~1`d ~~~~~~ W ~ c ,a o V ~ c Z E ~ 2 ~~ ~ ~ ~ 0 ~ C Q ~ ~ ~ c f" _ C V w <~ _¢ V E QQ W -W W W Z ~ ^~ '3 ,a r~ m W ~ o O ~ ~ -m ~Z ~ ~ - ~ ~ ~=~ - v ~ ~ _ ~ ~m s~ :~ ~p ~E ~• K ~ .,t~~ ~ '$.so-o ppp~~~,,, . m ~~W y .~ ~-c_m t 2 H ~-g ~-~ $~ `~ ~cm oc -~ ~ g W ~' Oj - r _~~ "~ stp 'KV ~~ ~N ~ 1A Cl r r M r O jr 1 I L. r O n ~ N O y~ O g _Z _Q ~. o Q _ ~ -r N n n N • r ~ ~ ~ ~ O O m m C C m W W .~ '.~ _~ .m .a o m m -~ ~W tOD ID __ s =W s01 „t9 '~~ 1~ a r N a N Oa r O) "r r r 4A r O ~ O n r O r m m o~ w c~ -v N N ~ ~ _t w 3 m ~~ a3 ` ¢{~° •~ ~ ~ n c ~~ g a up ~ Q ~ O m °p _ O C ~ O •' -p ~ L H • -~ ~ m ~ `o 0 W Q T~ ~.W ,~ ~o w~ . m ~.m ~.~ $ c n •- o • m ~ -° ~..~ ~' L W = `~ a ~ ~ ~ i.i ~LL .~m° ._~ ~0-r !4 r°~ ~0 yp °h _ N *O +i0 "~ r0 -0 ~ _A T ~~ o ~n N p p ~ M -C r r N T °~ ~=•EO O ~ a M ~ 7~ r _O G ~ O pt §~ rr _.r ~ r p & ..W « L r m m -iu i c *' W r ~~ ~ ~ N ~ = A • r _~ ~~s~a ~ • ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL PROCESSING FACILITY #3 ARCO ALASKA, INC. KUPARUK RIVER UNIT 6/96 u • Disposition Volume MCF* 1. Sold 0 2. Reinjected 72,964 3. Flared or vented less than 1 hour 525 4. Flared or vented ,;realer than 1 hour (Sup lemental re rt r wired--See 20 AAC 25.235) 0 5. Pilot and Purge 9,112 6. Used for lease operations Fuel Assist 773,576 0 7.Other 0 TOTAL items 1- 7 856,177 8. NGL Aas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: Title: S.•-~a~~r; Date: ~ i/ 6 orm evrse *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT' 490100 100.00% Official Use Onl --Flarin Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. AuWority 20 AAC 25.235. ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION c 0 Q ~~ l.l-1 m o ~r ~ c " ~ 1.,i.1 ~- c v ? > l . _ c~ ~ W ~ ~ (~/ --~ o cd a Disposition Volume MCF* 1. gold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 753 4. Flared or vented greater than 1 hour (Supplemental re rt aired--See 20 AAC 25.235) 0 5. Pilot and Purge 12,590 6. Used for lease operations Fuel Assist 834,848 0 7.Other 0 TOTAL items 1 - 7 848,191 8. iJGL Qas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signattue: Title: ~ Date: ~ ~~ SU *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 100.0096 CENTRAL PROCESSING FACILITY #3 MARCO ALASKA, INC. Month/Year of D RIVER UNIT 5196 u rotor iu-4z~ ~xevisea 4iy~~ Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by We 20th of the month following We month of disposition. Authority 20 AAC 25.235. ALASKA OIL AND GAS CONSERVATION COMMISSION • • FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL PROCESSING FACILITY #3 ARCO ALASKA, INC. PRUDHOE BAY/PT MCINTYRE 4/96 Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 317 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 11,832 6. Used for lease operations Fuel Assist 847,136 0 7.Other 0 TOTAL items 1 - 7 859,285 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from; 0 11. Transferred to: 0 Remarks: I hereby certify tt t the foregoing is true and correct to the best of my knowledge. Signature: Title: ~ Date: '~ 96 orm - evtse *Indicate contribution of each pool to total. Pool Name Code Percent KIJPARUK RIVER UNIT 490100 ]00.0.1 W Official Use'Onl --Fitirin Authorisation > 1 6r.''< 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. .~ N ~E co ~ ~ U o m o~ _~ O O c~ ~ oa {t ~s ~ o a- a n U CJ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL PROCESSING FACILITY #3 ARCO ALASKA, INC. KUPARUK RIVER UNIT 3/x)6 It Disposition Volume MCF* 1. Sold ~ 0 2. Reinjected 0 3. Flared or vented less than. l hour 57 4. Flared or vented greater than 1 hour (Su lemental re rt aired--See 20 AAC 25.235) 0 5. Pilot and Purge 12.040 6. Used for lease operations Fuel Assist 913,056 0 7.Other 0 TOTAL items 1 - 7 925,153 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: Title: .S ~ Date: ~~~~ orm evtse *Indicate contribution of each pool to total. Pool Name Code Pe*rent KUPARUK RIVER UNIT 490100 100.00010 C)fficial Use Unl --Flarin Authgriration > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION • r~ LJ Facility CENTRAL PROCESSING FACII.ITY #3 Operator ARCO ALASKA, INC. Field(s) KUPARUK RIVER UNIT Month/Yeaz of Disposition 2/96 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold 0 Pool Name Code Percent 2. Reinjected 0 KUPARUK RIVER UNIT 490100 100.00% r i 3. Flazed or vented less than 1 hour -, .. E ,' 63 4. Flared or vented Rreater than 1 hotu (Supplemental report aired--See 20 AAC 25.235) 0 5. Pilot and Purge 13,551 6. Used for lease overations Fuel Assist 871,351 0 7.Other 0 Official Use Orl' --Flattn' 13nthonzat~on > ~ hr :' TOTAL items 1 - 7 884,965 1. Safety MCF 8. NGL gas equivalent nrcxiuced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: 0 Couunissioner Date 11. Transferred to: 0 Note: All volumes must be corrected to Remarks: pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is we and correct to the best of my knowledge. Signature: Title: .~ ~ Date: 3 i/ 6 _1~ month following the month of disposition. Authority 20 AAC 25.235. roan to-~~~ ~xevrsea 4iy~~ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL PROCESSING FACILITY #3 ARCO ALASKA, INC. KUPARUK RIVER UNIT 1/96 i ~~ Disposition Volume MCF* 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 155 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 13,724 6. Used for lease operations Fuel Assist 746,638 0 7.Other 0 'TOTAL items 1 - 7~""~ ~~~ ~,~,~ ~ , ~ Y"F $~F~' "' ~ 760.517 8. NGL Qas equivalent produced ~ ~~ ~ ~ ~~ ~T U ~:~ ~ ~''. ~; 9. Purchased gas ".. n, ~~~~ k ~NI4 a yiG'- ~a .. 4ts4~~ s 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of -ny knowledge. ,~y Signature: . / 'Title: ~ Date: ~~~~" ~° ~orm - ev~se *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 100.00% Official Use Onl = Ffarirt' _._. _. Autliortzatron > I hr 1. Safetv MCF 2. [.,ease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235.