Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutARCO - FLOW STATION #3,. :er:~~ri~r.®°rs.~,rei.~i~i~i.~iw~~i~~.~~wisisiriri.~i~~iri~imis~r~ir~wi~r.~r~i.~i~~~i,~~.~r.®~.mr~i~i~~~imierir~sisr~rmrrr~rrrsi.®iaimiwis~rm~~~rrrimiri.~iszrimis~~w~ri~~~irr~aaw,:~i~ z~-„ ,.
AGoCC
...,, 3 a~ ac.e a~r~wi.~rp~mi.®i~~~c~sr:~z®rarierr~aeiwi.~a~riss~i~~~rmi~ri~zmW~~i~~~~rie~~~~.~irirzeriwi.~i~irrwrrioia®~•ri.~:~i~~.m~~i~i®~wc®iwi.~rrr~~w~®i~ir~ri.®i~i.~~®~~..ari~ri.~c~iri.~~*. w:~iw;zsia ;a;sr.a . ~.
~~~.' ~~ u
r = ~ n r:
:_
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
(Facility FLOW STATION 3 IARCOtALASKA, INC. IEASd(TERN OPERATING AREA-PBL1IMonth/Year of Dim 97 n
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 21
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 21,316
6. Used for lease operations Fuel
Assist 992,844
12
7.Other 0
TOTAL items 1 - 7 1,014,193
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 1,014,049
11. Transferred to: CCP 48,064,829
Remarks:
I hereby certify that the fo egoing is true and correct to the best of my knowledge.
.-'
Signature: '~,~,'~-~_~- ~,~,~,.~^,_, ~/ l ir~~v' Title:
SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Onl --Flarir- Authorization >`<1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, IWC.
CONSERVATION ORDER N0.219
GAS FLARING INgDENTS
FLOW STATION #3
DECEMBER 1997
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS ~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN OR EGIUAL TO i HOUR
12/06/97 1940-1945 3 Repair bearing seal repair T/C 1802. PLANNED Completed normal shutdown.
• 12/08/97 0830-0835 3 T/C 1802 shutdown for maintenance. PLANNED Compressor depressured.
12/08/97 1430-1435 3 T/C 1801 shutdown for maintenance. PLANNED Compressor depressured.
12/12/97 1315-1318 3 T/C 1802 shutdown for maintenance. PLANNED Compressor depressured.
12/14/97 1630-1635 3 T/C 1801 shutdown for maintenance. PLANNED Compressor depressured.
12/21/97 1300-1305 3 T/C 1802 shutdown for maintenance. PLANNED Compressor depressured.
12/21/97 1400-1405 3 T/C 1801 shutdown for maintenance. PLANNED Compressor depressured.
TOTAL • 1 HOUR 21
~LARING EVENTS GREATER THAN 1 HOUR
TOTAL > 1 HOUR 0
Flared 21
PNot/Purge 21,316
C~tinuous Assist 12
TOTAL FLARED 21,349
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
u
Facility
FLOW STATION 3 Operator
ARCO ALASKA, INC. Field(s)
EASTERN OPERATING AREA-PB Month/Year of Disposition
Nov-97
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 116
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 19,990
6. Used for lease operations Fuel
Assist 899,442
16
7.Other 0 > ;'
Official Use OnI .,-Flarin Authorization > l hr.
TOTAL items 1 - 7 919,564 1. Safety MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: CGF 919,432
Commissioner Date
11. Transferred to: CCP 42,867,390
Note: All volumes must be corrected to
Remarks: pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certify that the fore oing is true and correct to the best of my knowledge.
~/~
Signature: ~~l ~ `"~~' Z Title: SUPERVISOR month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION •3
NOVEMBER 1997
PLANNED
DATE TIME. VOLUME MCF DESCRIPTION OF INCIDENTS tk CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
11 /10/97 1300-1310 3 Shut down T/C 1801 for maintenance. PLANNED Normal shutdown. 1802 brought on Line.
11 /15/97 7205-2215 3 Shut down T/C 1802 for maintenance. PLANNED Completed depressuring.
• 11 /16/97 1745-1815 104 ExcessNe inlet gas rates Into facility. UNPLANNED Reduced IMet gas rates.
11 /26/97 1655-1705 3 Shut down T/C 1801 for maintenance. PUNNED Compressor depressured.
11/28/97 1100.1110 3 1801 Startup after 1,000 hour inspection. PUNNED 1801 Compressor depressured.
TOTAL UNDER i HOUR 116
FLARING EVENTS GREATER THAN 1 HOUR
~OTAL OVER 1 HOUR 0
Flared 116
Plot/Purge 19,990
Continuous Assist .16
TOTAL FLARED 20,122
FLOW STATION 3
Disposition
1. Sold
2. Reinjected
. 3. Flared or vented less than 1 hour
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC
Pilot and Purge
Used for lease operafions
Other
TOTAL items 1 - 7
8. NGL gas equivalent produced
•
9. Purchased gas
10. Transferred from: CGF
11. Transferred to: CCP
ALASKA OII, AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
ARCO ALASKA, INC. EASTERN OPERATING AREA-PB Oct-97
O ~i
2
Go ~
~~ rte.
~ ~
o Cy •r.
cp ~
0
0
10,108
1,881
21,064
Fuel
Assist
872,341
539
0
905,933
0
0
893,267
Remarks:
I hereby certify that the fo egoing is true and correct to the best of my knowledge.
Signature: t `,(r~~ ~ Title:
40,537,166
SUPERVISOR
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Only--Flarin Authorization > l hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
-~~~v~~
ARCO ALASKA, INC.
tf ~ ~ ~~~~ CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
COtfltii
(~!~ ~ GdS Cans
a~
~ l FLOW STATION to
.
1$
t~ OCTOBER 1997
Anchorage
VOLUME PLANNED/
DATE TIME MCF DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
10/03/97 1740-1745 3 Shut down T/C 1802 for makttenance PLANNED Compressor depressured.
10/09/97 0800.0803 81 ExcessNe inlet gas rates Into fadlNy. UNPLANNED Reduced inlet. gas rates. Shut in wells 6-8
. and 7-17 to reduce gas rates.
10/12/97 t e3o-2350 1,543 1804 Turbine maintenance completed. Compressor iraln PLANNED Corrected fluctuation. Calibrated faulty
(Intermittent 5o min) shutdowns due to instrumentation malfundlons. Compressor instrumentation Moore card.
discharge `premature" high temp. shutdown.
10/13/97 0045.0055 99 1804 start-up assist gas. PLANNED 1804 successfully brought on Nne.
10/22/97 1215-1225 87 Depressured gas line for leak repair. UNPLANNED Line depressured; repairs completed.
10/26/97 1000-1040 .8,290 Gas transN system overpressure backing FS out. UNPLANNED Cut rates and flared to reduce pressure.
Flared due to CGF ESD 8 transit line overpressure.
10/31/97 1530-1730 5 Shut down T/C 102 for makttentance PLANNED Compressor depresanred. Started 1802
( Intermittent 15 min) otter GG inspedfon.
TOTAL UNDER 1 HOUR 10,108
.FLARING EVENTS GREATER THAN 1 HOUR
10/03/97 0330-0430 410 Flaring for shutdown. PLANNED Commonline deperessuring complete.
10/11/97 1800-2320 564 FaciAty maintenance. 1804 turbine'maJor" HP shari over- PLANNED Completed "inttial' HP shaft overspsed trip
(Intermittent 7a min) speed trip test and cool down cranking for maintenance. test.
10/12!97 0022-0408 907 Facility maintenance. 1804 Turbine 'mar HP and LP shafts PLANNED Completed HP & IP shafts over-speed trip
(Intermittent 119 min) overspeed trip tests and cool down cranking for maintenance, tests.
TOTAL OVER 1 HOUR 1,881
Flared 11,989
PiloVPurge 21,064
Continuous Assist 53.4
TOTAL FLARED 33,592
ALASKA OIL AND GAS CONSERVATION COMMISSION
•
•
FACILITY REPORT OF PRODUCED GAS DISP
(Facility (
FLOW STATION 3 Operator (
ARCO ALASKA, INC. Field(s)
EASTERN OF
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 2,024
4. Flared or vented greater than 1 hour
(Su lemental re rt required--See 20 AAC 25.235) 6,531
5. Pilot and Purge 19,765
6. Used for lease operations Fuel
Assist 865,545
108
7.Other 0
TOTAL items 1 - 7 893,973
8. NGL gas equivalent produced 0
9. Purchased gas I~s~~ ~%1 ~ '~ ~O~iS. _L'9.~1~5tgt~ 0
10. Transferred from: CGF 885,310
11. Transferred to: CCP 41,273,960
Remarks:
T herehv certif~v that. th fcrreg~ing is trne an~i cxirrP,ct. to the hest cf my lrnrtwle.~lge.
Signature: ~"'( Title: SUPERVISOR
orm iu~c~ ~xevi
OSITION
Month/Year of Disposition
FRAYING AREA-PBU Sep-97
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
R ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION fKi
SEPTEMBER 1997
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 3 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
09/08/97 1235-1240 3 Shut down T/C 1802 for maintenance. PLANNED Started T/C 1801.
09/09/97 1350-1355 3 Shut down T/C 1801 for stand by. PLANNED Compressor depressured.
• 09/12/97 1025-1050 2,018 Gas transd system overpressure backing Flow Station out. BPX
"J" Pad brou
ht on line UNPLANNED Reduced inlet gas rates. FS 3 cut/shut in
4 wells totalin
126
OOOM
as rate
g
. g
,
g
.
TOTAL UNDER 1 HOUR 2, 024
FLARING EVENTS GREATER THAN 1 HOUR ,rR.~ N gNZ !5s? ~ I`~ ~ J~/STRt ;~~ ~.J~1 ~ t!
I
09/03/97 1655-1845 4,965 Electrica~nstrumentation malfunction at other facility (T&D). UNPLANNED Field reduced gas rates.
Gas transit system overpressure backing fbw station out.
09/30/97 0030-0410 1,566 S/D T/C # 1804 for Hot Gas Path. Cranking 1804 to cool down PLANNED Normal depressure of compressor, coolers,
the gas generator for maintenance. and suction scrubber.
u
TOTAL OVER 1 HOUR
Flared
PIIoUPurg~
Continuous Asalat
TOTAL FLARED
8, 531
8,558
19, 76 S
].9
28,428
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
FLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Au -97
•
•
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 1,832
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.23 5,543
5. Pilot and Purge 20,903
6. Used for lease operations Fuel 868,434
7.Other 0
TOTAL items 1 - 7 903,693
8. NGL gas equivalent produced ~ 0
9. Purchased gas ~ ~QG, ~~ 0
10. Transferred from: CGF ''~G+'p~~ j`~9~' 889,311
11. Transferred to: CCP r~~' 4~~ j~~
4n 35,270,643
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*lndicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
_.... _
_......
Official Use On1 --Flarin Authorization ~ 1>hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Conunissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
~J
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION ff3
AUGUST 1997
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INGDENTS 8~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
08/01/97 2100-2225 120 1803 shutdown on high exhaust temp; 3 failed starts. UNPLANNED Restarted 1803.
(Intermittent 30 min)
08/04/97 0207-0215 240 1806 instrumentation malfunction. UNPLANNED Compressor depn~sured.
08/09/97 0150-0200 80 1803 start up after maintenance. PLANNED Compressor start up complete.
08/11/97 1700-1715 1,380 High ambient temperature. UNPLANNED Reduced inlet gas rates.
08/13/97 1600-1610 3 Shut down T/C 1802 for maintenanos. 1,000 hr. inspection. PLANNED Normal shutdown.
08/14/97 1500-1510 3 Shut down T/C 1801 for maintenance. Repair combustion can PLANNED__ - Normal shutdown.
retainer pin.
08/14/97 2030.2040 3 Shut down T/C 1802 for maintenance. 1,000 hr. inspection. PLANNED Normal shutdown.
08/16/97 1000-1010 3 Shut down T/C 1801 and returned to standby status. PLANNED Normal shutdown.
TOTAL UNDER 1 HOUR 1,832
FLARING EVENTS GREATER THAN 1 HOUR
• 08/01/97 0110-1050 4,513 Shutdown 1806 for maintenance.
(Intermittent 310 min)
08/04/97 0600-0700 380 Cold cranked 1806 to prepared for start after replacing
logic card.
08/08/97 0500-0800 850 Shut down T/C 1803 fa maintenance. Flaring for drillsite
shutdown.
TOTAL OVER 1 HOUR 5,543
Flared 7,375
Pllot/Purge 20, 903
t,'.ontirx~ous Assist 8.981
TOTAL FLARED 35, 2 S9
PLANNED Maintenance completed.
UNPLANNED Restarted 1806.
PLANNED Common Gne depressure complete.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
rLOW STATION 3 ARCO ALASKA, INC. IiASTFRN OPfsRATING ARF,A-PIIU 7u1-97
•
Disposition
1. Sold 0
2. Reinjected 0
3. Flared oc vented less than 1 hour 196
4. Flared or vented Rreater than 1 hour
(Su lemental re rt aired--See 20 AAC 25.235) 0
5. Pilot and Purge 20,543
6. Used for lease operations Fuel
Assist 875,220
2 301
7.Other 0
TOTAL items 1- 7 898,260
8. NGL Ras equivalent produced 0
9. Purchased Ras 0
10. Transferred from: CGF 895,76.3
11. Transferred to: CCP 37,604,940
Remazks:
T herehv certify that the f regoing is tn~e and correct. to the best of my knowledge.
Signature: ~~~ Title: SUPI?RVISOR
ornn tu~c~ ~xevise
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRiIDti01 640150 100
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 Asia and to a temperature of
60 degrees F. Report due by the 20th of We
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
FLOW STATION #3
JULY 1997
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LES$ THAN OR EQUAL TO 1 HOUR
07/01 /97 0440-0540 96 Depressure C/L 78 & 7D for maintenance. PLANNED Depressuring completed.
07/02/97 1600.1610 3 T/C 1802 shutdown for maintenance. PLANNED Compressor depressured.
07/07/97 1100-1108 88 1801 T/C unloaded due to speed control problems. UNPLANNED Started T!C 1802 & repaired equipment.
• 0 3 wn for maintenance
1801 T/C
h
td PLANNED Started T/C 1802
07/07/97 1155-120 .
s
u
o .
07/31/97 1015-1025 6 Shutdown 1801 for maintenance during TAPS shutdown. PLANNED Started T/C 1802.
1230-1240
TOTAL <_ 1 HOUR 1 96
FLARING EVENTS GREATER THAN 1 HOUR
TOTAL > 1 HOUR 0
Flared 1 9 6
Pilot/Purge 20, 543
Continuous Assist 2.301
TOTAL FLARED 23,040
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
FLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Jun-97
•
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 10,933
4. Flared or vented Qreater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 30,556
5. Pilot and Pure 19,730
6. Used for lease oneradons Fuel
Assist 881,626
720
7.Other 0
TOTAL items 1- 7 943,565
8. NGL Qas equivalent produced 0
9. Purchased Qas 0
10. Transferred from: CGF 901,356
11. Transferred to: CCP 39,256,144
Remarks:
T herehv certify that. the fore~olnP is trne an(1 correct. to the, hest. of my knowlet[ge.
Signature• ~~~~ Title: SUPERVISOR
orm tu~~~ ~xevtse
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Note: All volumes must be corrected to
pressure of 14.65 Asia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
~
` t
`
•
~
~:~~
~ ~
,e^s
~,,,,
., h,~a: ~--- ,,;
.. r.~,
k'~ Y
~ ~ U
pp~ 6~
;°~~`
vy
ns
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION ff3
JUNE 1997
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN OR EQUAL TO 1 HOUR
06/25/97 1350-1355 3 Shutdown T/C 1802 for maintenance. Normal depressure of UNPLANNED Started T/C 1801.
1802, 2000 HR inspection.
06/25/97 2200-2230 239 ElectricaVlnstrumentation malfunction. 1801 CCC antisurge UNPLANNED Corrected E 8 I fluctuatioNtailure. CCC
•
06/26/97 0100-0130 287
06/26/97 0300-0305 3
06/26/97 2305-2400 9,366
06/27/97 0230-0300 677
06/29/97 1500-1508 358
TOTAL 51 HOUR 10,933
FLARING EVENTS GREATER THAN 1 HOUR
06/24/97 1630-2010 30,556
.
TOTAL> 1 HOUR 30,556
Flared 41, 489
PIIo17Purgo 19,730
Continuous Asslat ]~Q
TOTAL FLARED 61,939
controller controlled erratically -idled 1801
ElectricaUlnstrumentation maNunction. 1801 fuel control UNPLANNED
problem caused machine to ramp down.
Shutdown T/C 1802 for maintenance. Normal stop 1802. UNPLANNED
Gas transit system overpressure backing Flow Station out. Over UNPLANNED
Over pressure during ramp up after TAPS proration.
Electrical/Instrumentation maNunction. Continued governon UNPLANNED
flue) control problems.
Goverrror control problems wkh 1801 compressor. UNPLANNED
Shutdown T/C 1803, instrumentation malfunction.
\~
`~'~
antisurge controller started functioning properly.
Corrected E & I Huduation. Corrected fuel
control problem.
Corrected E&I fluctuation/failure. 1801 fuel
control problem stabilized.
Stabilized facility process and operation.
Repaired equipment difficulties with 1801.
Corrected governor control problems.
UNPLANNED Reduced inlet gas rates.
- - ARCO Alaska, Inc. •
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 2761215
Keith Blackburn
EOC Supervisor
PRB Operations
PRB-6
Phone (907) 659-5566
Fax (907) 659-5061
October 1, 1997
Wendy Mahan
Natural Resource Officer
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501-3192
RE: Flow Station 3 T/C 1803 Shutdown June 24, 1997
Dear Ms. Mahan:
•
RECEIVEt3
OCT - 6 i~7
~lasia0il&Anchorage tnlSSlaR
This letter is in response to your September 12, 1997 correspondence requesting more
information regarding actions taken to mitigate flaring at Flow Station 3 (FS3) on June
24, 1997 during the Low Pressures System (LPS) T/C 1803 operation upset. The
process upset occurred when FS3 1803 LPS Compressor tripped off-line due to failure
of over temperature protection micro-processing logic card.
It was reported that this upset flared 30,556 MCF and your letter referenced the flaring
incident occurring from 4:30 p.m. until 8:10 p.m. From our operations logs, the FS3
Compressor was down from 4:50 p.m. through 10:40 p.m., nearly 6 hours. The FS3
Flare event occurred from 4:50 p.m. through 8:10 p.m., approximately 3 hours and 20
minutes. This is 20 minutes shorter than what was referenced in your letter (The
handwritten flare report copy was hard to read and may have been interpreted as
1630 hrs. vs. 1650 hrs.)
Corrective action ~n~as taken immediately to mitigate the process upset. Withi.r_ the
first 40 minutes of the event, FS3 Operations attempted two restarts on the machine.
The turbine nearly ramped up to full speed during the first attempt before tripping
off-line. This lead the FS3 operator to focus attention toward performing a second
attempt to restart the compressor since the first attempt was nearly successful.
After the second attempt to restart the compressor failed, the Eastern Offtake
Specialist provided FS3 a list of wells to shut-in in order to reduce gas volume at FS3
and mitigate the flare event. The well list was sent to FS3 at approximately 5:30 p.m.
From this time, FS3 Operations began to shut in and pinch back wells to reduce the
flare volume while FS3 Maintenance and Operation continued to work on the machine.
A total of 6 wells were shut in and 9 wells were pinched back during this upset to
alleviate the flare event. Also note that this upset was handled during operator
personnel shift. changeout. From 5:30 p.m. to 6:15 p.m., wells 6-2, 15-47, 7-23, 6-3,
15-42, 14-2, 14-19, 15-41, and 15-28 were pinched back to minimum flow for an
estimated 255 MMSCFD gas cut. From 6:15 p.m. to 8:10 p.m., wells 15-21, 15-44, 15-
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
• •
Page 2
46, 7-17, 7-25, and 7-20 were shut in for an estimated 45 MMSCFD gas cut. The
attached production graphs show how FS3 oil rate and field gas rate were cut during
the upset event.
As these low pressure wells are cut back from the system, the dynamics of the system
causes the pressure in the inlet vessels handling the low pressure production well to
decrease. The decrease in pressure will in turn cause a momentary surge in production
from the wells left on-line. This can make it difficult to realize the effects of the
corrective action taken to alleviate the FS3 flare incident. However, as these wells
were shut in/pinched back and the dynamics of the system stabilized, flared gas
volume decreased.
The Flow Station 3 flare event ended at 8:10 p.m. Flow Station 3 Maintenance
continued to troubleshoot and work on the machine until 10:30 p.m. when personnel
replaced the over temperature micro-processing card which was found to be the cause
of the shutdown. The compressor was returned back to normal operation at 10:40
p.m. The wells that were previously shut in and pinched back were brought back to
normal service shortly thereafter.
I hope this letter provides you with additional information you need regarding the June
24, 1997 FS3 LPS compressor upset and the actions taken to mitigate the associated
flare event.
Sincerely,
~~~~t~~
Keith L. Blackburn
EOC Supervisor
Attachments
cc: Steve Massey/Frank Roach
Marty Lemon
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
MBBL
a~
m
~ ~ ~ ~
Q Q ~ 0 ~ ~ Q
100
200
300
400
500
600
700
800
900
1000
1100
~ 1200
3
m 1300
1400
1500
1600
1700.
1800
1900
2000
2100
2200
2300
0
r
O
D
~_
O
z
O
r
T TI TI
W N (~
~ ~ ~
r r r
T
0
•
MBBL
v
100
200
300
400
500
600
700
800
900
1000
1100
~ 1200
m 1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
0
O N ~ ~ 000 O N ~P
O O O O O O O O
• •
2
'~
m
v
O
a
z
v
a
O
D
r
0
D
000 O N0P ~ 000 O N
O O O O O O O O
MMSCF
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
L J
FLOW STATION 3
INC.
OPERATING
Month/Year of Disposition
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 252
4. Flared or vented Qreater than 1 hour
(Sup lemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 19,443
6. Used for lease operations Fuel
Assist 908,953
2 387
7.Other 0
TOTAL items 1 - 7 931,035
8. NGL tas equivalent produced 0
9. Purchased Ras 0
10. Transferred from: CGF 928,396
11. Transferred to: CCP 38,683,223
Remarks:
T berehv certify that. th , fciregmng is rrn , and cnrrP,ct. to the, hPCt. of my kn~wle~ige.
~~ G~~ ~
Signature: ~-~'( ~eti,c~y.-- Title: SUPERVISOR
orm evise
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Note: All volumes must be corrected to
pressure of 14.65 Asia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
DATE TIME VOLUME MCF
FLARING EVENTS LESS THAN OR EQUAL TO 1 HOUR
05/03/97 1410-1705 9
(Intermittent 25 min)
05!06/97 1430-1435 3
• 05/23/97 1 t 05-11 t 5 240
TOTAL <_ 1 HOUR 252
FLARING EVENTS GREATER THAN 1 HOUR
•
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION #3
MAY 1997
PLANNED
DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED
T/C 1802 shutdown for maintenance; 3 failed attempts to PLANNED
start 1801 and a normal shutdown of 1802 after start on 1801.
T/C 1801 shutdown for maintenance. PLANNED
T/C 1806 shutdown due to instrumentation malfunction. UNPLANNED
TOTAL > 1 HOUR 0
Flared 2 5 2
Pilot/Purge 19,443
Continuous Assist 2.387 t
Imo'
.
TOTAL FLARED 22,082 ,.-`
~'
..~
.€_` e . _.
`-'=
~> -,;
r.
~,
:~
...
~.~
ACTION TAKEN TO ELIMINATE CAUSE
Restarted T/C 1805; stabilized facility.
Started 1802.
Restarted T/C 1806. Replaced 2 suspected
bad instrument cards.
- ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
FLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU A r-97
•
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 2,968
4. Flared or vented greater than 1 hour
(Supplemental re rt required--See 20 AAC 25.235) 26,936
5. Pilot and Purge 19,904
6. Used for lease operations Fuel
Assist 884,797
4 561
7.Other 0
TOTAL items 1- 7 939,166
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 904,637
11. Transferred to: CCP 41,230,403
Remarks:
T herehv certify that. th , f~renning is t/rne anti c~rmct. to the hc„ct. ~f my knnwlecTge.
Signature: ~ s! ~~ Title: SUPERVISOR
orm evt
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION #3
APRIL 1997
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN OR EQUAL TO1 HOUR
04/22/97 2303-2359 2,968 Shut down T/C 1806 due to electricaUinstrumentation UNPLANNED Started/restarted 1806.
malfunction.
• TOTAL 5 1 HOUR 2,968
FLARING EVENTS GREATER THAN 1 HOUR
04/15/97 1745-2120 5,600 T/C#1806 shutdown;seal oil system difficukies;4 failed start UNPLANNED Started/restarted T/C#1806; reduced inlet
(Intermittent 105 .min) attempts. gas rates
04/21 /97 2104-2250 5,618 Shut down T/C 1806 due to electricaUnstrumentation UNPLANNED Started/restarted T/C 1806.
malfunction. 3 S~PA~''~ ~~~ R-"T'~~~S1AR-'75 _
ZZ ' Zp = ~ `~ s7~t ~T
04/22/97 0001-0240 8,427 Shut down T/C 1806 due to electricaUinstrumentaCwn UNPLANNED Started/restarted T/C 1806.
malfunction. A~pv • To Cil1 G a S ~' ®u~ oT ~"~.,a,c.~ ~NyAla~p.~
A 9 ®O~ SS~ Wiit/N CS~M>NCj $~qG~ U~A tn)t-,P~:E, ~,°.?O ~ H CJ ~' "'fb ~f~ `r.•
04/23/97 1815-1915 7,291 Shut down T/C 1806 due to instrumentation malfunction. UNPLANNED Replaced suspected bad card and installed
monitoring device (Glitch catcher). Restarted
T/C 1806. ` To ~~
/ ~ Aye 0 s1t~ (~ J: ~~
TOTAL > 1 HOUR 26,936 ~ ~~~~ ~v~ , '~~3Rar_
.Flared 29,9oa Ci~9 ~ ~~` ~~C ~ ~'~1/~S ~~~,~,~.~ ' '°-
PiloUPurge 19,904 ~!} --~,®,, (, ~' ~ ?-
Continuous Assist 4.561 ~~ " ~y: /~' .~ ~ '~ '~p~ ~ j~•~~
TOTAL FLARED 54,369 ~'~ ~.~ ~ ~~ '~~ C(~j. .J ~ ~~
7
~ ~
,p ,
~ ~~~ st~
C~
•
- ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Yeaz of Disposition
FLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Maz-97
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reiniected O PRUDHOE 640150 100
3. Flared or vented less than 1 hour 2,363
4. Flared or vented Greater than 1 hour 480
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Puree 20,202
6. Used for lease operations Fuel 907,94b
Assist 5 606
Ufticial LJse Unl ~-`Flarin~'Auth~riratioi%,> I hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
11. Transferred to: CCP ~~ 43,177,157
7.Other 0
TOTAL items 1- 7 936,597
i
8. NGL Gas equivalent produced '~ ~ 0
'°'
~" ~ "'.-'
9. Purchased Gas ~. ~ _~ I=-1 1 0
ca e; ~~;
`~~
.~:
N ._...
10. Transferred from: CGF ~ ^
;
~ ~~
928,115
®
, J
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
orm evtsed
Remarks:
T herehv certify that. the oregning is mtP an~i crrrect. to the hest of my knnwlP.dge_
Signature: ~/~~ Title: SUPERVISOR
~~~
' ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION #3
MARCH 1997
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
03/02/97 1545-1620 361 Flaring for drill site shutdown. UNPLANNED Completed partial depressuring of DS 6/13
artificial lift line.
03/08/97 1430-1745 1,099 T/C 1802 shutdown to repair controller problems. UNPLANNED Swapped load to T/C 1801.
• (Intermittent 35 min)
03/17/97 1225-1234 576 P5001SV HP cooler relief valve failed open. UNPLANNED Blocked in PSV.
03/21/97 0300-0305 60 Shutdown T/C 1803 for maintenance. UNPLANNED Normal compressor blowdown volume.
03/21 /97 1900-1905 3 Shut down T/C 1802 for maintenance. UNPLANNED Normal compressor blowdown volume upon
shutdown.
03/21/97 2150-2155 120 Instrumentation malfunction. 3 aborted starts on TC 1803. UNPLANNED Normal compressor blowdown volume for
(intermittent 20 min) failed start.
03/22/97 0155-0200 40 Instrumentation malfunction. Failed start attempt on T/C 1803. UNPLANNED Normal compressor blowdown volume for
failed start.
03/22/97 1400-1405 2 Two failed starts on T/C 1802. UNPLANNED Normal blowdown volumes for failed starts.
1410-1415
03/22/97 1815-1820 80 Two failed starts on T/C 1803. UNPLANNED Normal blowdown volumes for failed starts.
1900-1905
• 03/23/97 1000.1005 5 5 failed starts on T/C 1802. UNPLANNED Normal compressor blowdown volumes for
(intermittent 25 min) failed starts.
03/24/97 1005-1010 8 8 failed starts for T/C 1802. UNPLANNED Normal blowdown volumes for compressor.
(intermittent 40 min)
03/25/97 0905-0910 6 6 failed starts on T/C 1802. UNPLANNED Normal compressor blowdown volumes for
failed start.
03/25/97 2010-2015 3 Shut down T/C 1801 for return to standby. UNPLANNED T/C 1802 on line; returned to standby.
Normal bowdown volume.
TOTAL UNDER 1 HOUR 2,363
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION #3
MARCH 1997
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS GREATER THAN 1 HOUR
03/19/97
0030-0045 480 Shut down T/C 1806 for inspection. Depressured suction and PLANNED
(intermittent 60 min) discharge piping.
• TOTAL OVER 1 HOUR 480
Flared
PiloUPurge
Continuous Assist
TOTAL FLARED
2,843
20,202
5.808
28,851
Completed depressuring.
C~
\J
n
u
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
FLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Feb-97
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Sup lemental re rt aired--See 20 AAC 25.235)
5. Pilot and Purge 18,289
6. Used for lease operations Fuel 836,904
Assist 516
11. Transferred to: CCP 41,055,589
7.Other 0
TOTAL items 1 - 7 855,709
8. NGL gas equivalent produced 0
9. Purchased ~as 0
10. Transferred from: CGF 855,193
Note: All volumes must be corrected to
pressure of 14.65 Asia and to a temperature of
60 degrees F. Report due by the 20th of the
month following We monW of disposition.
Authority 20 AAC 25.235.
orm evt
Remarks:
I herehv certify that. the c-reQ~ing is trne an~i ect. to the hest of my kn~wledQe.
Signature: j~o ~itle: SUPERVISOR
~~
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION ~3
FEBRUARY 1997
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
•
i ~--~
,
~
?
~-a~41
~~. _
isfiN ~° _.
•
:~4 ~ i„
i
$
TOTAL UNDER 1 HOUR 0 ~~„~
~ T3
"'"`
~-.' ~r
~,<
",
FLARING EVENTS GREATER THAN 1 HOUR ~"``
• TOTAL OVER 1 HOUR
Flared 0
PIIoUPurge 18,289
Continuous Assist ~
TOTAL FLARED 18,805
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
FLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Jan-97
u
•
Disposition
1. Sold 0
2. Reiniected 0
3. Flared or vented less than 1 hour 1,275
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 20,473
6. Used for lease operations Fuel
Assist 947,365
121
7.Other 0
TOTAL items 1 - 7 969,234
8. NGL gas equivalent produced 0
9. Purchased gas
a Con 0
.Commission
Anchors
10. Transferred from: CGF e
967,753
11. Transferred to: CCP 46,135,588
Remarks:
1 herehv certifv that t , fnre~nin~ is true anrt c~rrert to the heel ~f my knnwle~~i~e.
Si nature: ~ Z. Title: SUPERVISOR
orm tu-4~~ t_xevtse
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Uflicial tJse Onl --Fhrin __
Authorization > I hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
ote: 11 volumes must be corrected to
pressure of 14.65 Asia and to a temperawre of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
DATE TIME
FLARING EVENTS LESS THAN 1 HOUR
01/12/97 1250-1320
01/14/97 1415-1500
• 01/15!97 0922-0952
01/22/97 0730-0740
01/24/97 1400-1410
TOTAL UNDER 1 HOUR 1,275
FLARING EVENTS GREATER THAN 1 HOUR
•
TOTAL OVER 1 HOUR
Flared
PiloUPurge
Continuous Assist
TOTAL FLARED
0
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION #3
JANUARY 1997
PLANNED
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
3 Electrical malfunction due to BESD valve failing open. UNPLANNED Relatched BESD valve.
863 Fitting leak on commonline 1313: depressured commonline. UNPLANNED Completed depressuring.
403 T/C 1806 taken out of service for inlet filter cleaning. PLANNED Reduced inlet gas rates.
3 Shut down 1802 for 1,000 hour inspection. PLANNED Started T/C 1801.
3 Shut down 1801, put compressor in stand by. PLANNED Started T/C 1802.
1,275 I~C~h~11O~
20,473
121 FED 21 X997
21 ,669
Alaska iii ~ Gas Cons. Commissian
Anchorage