ALASKA OIL AND GAS CONSERVATION COMMISSION
-~ FACILITY REPORT OF PRODUCED GAS DISPOSITION
~~
i
Facility
FLOW STATION 2 Operator
ARCO ALASKA, INC. Field(s)
EASTERN OPERA
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 1, l70
4. Flared or vented greater than I hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 19,038
6. Used for lease operations Fuel
Assist 750,024
0
7.Other 0
TOTAL items 1 - 7 770,232
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 358,940
11. Transferred to: CCP 22,363,755
Remarks:
I hereby certify that the foregoing is true and co'r~rect~to the byesgt of my knowledge.
Signature: 2g„~~.~"~ % ' p/ G / Title:
SUPERVISOR
Fotm 10-422 (Revised 4/95)
~Month/Year of Disposition
TING AREA-PBU Jan-99
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Onl --Plano Authocization> I hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psis and to a temperature of
60 degrees F. Repott due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
9901 FORM t4422.~ds/FORM 14422
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
FS-2
January-1999
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS ~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN SMM
Over 1 Hour/Over 5MM 0
less 1 HR/Less SMM 1,170
Tofa/ over/under 1 Hr/5MM ~,17~
Pilot/Purge 19,038
Continuous Assist 0
• TOTAL FLAREDNENTED 20,20b
ALASKA OIL AND GA5 CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
FLOW STATION 2 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Feb-99
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 6,595
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 630
5. Pilot and Purge 17,484
6. Used for lease operations Fuel
Assist 665,576
2
7.Other 0
TOTAL items 1 - 7 690,287
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 319,331
11. Transferred to: CCP 20,030,673
Remarks:
I hereby certify that the fore ing is true and correct to the best of my knowledge.
Signature: ~~"'~1 ~ f Title: SUPERVISOR
Form 10-422 (Revised 4/95) ,.- ,
~~ ~~~_~
,,
l~ ;:~
9902 FORM 1Od22.~ds/FORM 10-422
obit""'<
s,°?~;,~l~cl ~ ~ <x ~,d; a`~iii~ 5 ~t ~a;~l;~vk~eai~:
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Only--Flann¢ Authorization. > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
FS-2
February-1999
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
02/19/99 0258-0323 630 Shut down 1803 due to defective instrumentation. UNPLANNED Reduced inlet gas rates. Replaced
• 0328-0406 Gas transit system overpressure backing Flow Station out. defective limit switch on Waste Heat
EOC made cuts, shut in 5-8, 7-37, 11-b to min. Recovery Bypass. Recalibrated the
positioner for the Wast eHeat Recovery
inlet louvers
Over 1 Hour/Over SMM 630
Less 1 HR/Less 5MM 6,595
Total over/under 1 Hr/5MM 7,225
Pilot/Purge 17,484
Continuous Assist 2
TOTAL FLAREDNENTED 24,711
..
CJ
•
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
FLOW STATION 2 Operator
ARCO ALASKA, INC. Field(s) Month/Year of Disposition
EASTERN OPERATING AREA-PBU Mar-99
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 1,760
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 11,235
5. Pilot and Purge 19,056
6. Used for lease operations Fuel
Assist 758,208
60
. Other
0 ........................................................
........................................................
........................................................
Offici81 Use t?~ay;ka~tg A;u~iot~2-dt~Jl.~ I to ' :::
TOTAL items 1 - 7 790,319 1. Safety MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: CGF 351,510
Commissioner Date
11. Transferred to: CCP 24,043,095
ote: vo umes must a correct to
Remarks: pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to e best of my knowledge.
Signature: ~ c.. ~ ~ Title: MANAGER month following the month of disposition
Authority 20 AAC 25.235.
Form 10-422 (Revised 4 )
9903 FORM 10-422.bs/FORM 10-422
,.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
FS-2
March-1999
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
03/07/99 0739-1745 6,047 Electrical Instrumentation malfunction. TC 1802 S/D on UNPLANNED
• HH Discharge Alarm. TC 1801 was unavailable due to
18,000 maintenance inspection. (Additional detailed
information is attached to the flare report,)
03/16/99
03/17/99
03/17/99
03/19/99
Over 1 Hour/Over 5MM
Less 1 HR/Less 5MM
Total over/under 1 Hr/5MM
Pilot/Purge
Continuous Assist
Series of repairs were done including
jumpering the speed switch, replacing tt•
speed switch, adjusting the IGVS, replacii
the speed probe) and calibration of all
pertinent items. 1802 was restarted.
1552-1733 932 Instrumentation malfunction due to failure of IP ComprE UNPLANNED Repaired IP Recycle Valve Actuator and
Recycle valve actuator positioner arm (an Allen Screw had restarted 1802.
backed out of the arm). (timeline is attached to the flare
report.)
0235-0445 1,228 Instrumentation malfunction. Recurring failure of IP UNPLANNED Repaired IP Recycle Valve Actuator and
Recycle Valve linkage. The Allen Screw backed out of the restarted 1802.
positioner arm. (timeline is attached to the flare report.)
1704-2113 2,358 TC-1802 shut down because of valve positioner malfunc UNPLANNED Dismantled the valve bonnet and did
The positioner rod that connects to the actual valve stem repaired internal valve parts. Restarted
sheared its connecting bolt, (Additional information 1802
attached to flare report.)
1610-1723 670
11,235
1,760
12,995
19,056
60
Shut down 1802 for STV Anti-surge vavle repairs. There is UNPLANNED Added a missing connector and adjuster
no stand-by machine. (Additional information attached to the spring on the IP recycle valve.
flare report.) Restarted 1802.
TOTAL FLARED/VENTED 32,111
' Re: Supplementary Information Check • ~ ,
r
Subject: Re: Supplementary Information Check
Date: Wed, 17 Mar 1999 09:20:07 -0900
From: Wendy Mahan <Wendy_Mahan@admin.state.ak.us>
Organization: doa-aogcc
To: EOC Supervisor PRB <P2013@mail.aai.arco.com>
Hi Paul,
The Flow Station 2 Summary for 3/7/99 looks great. I just have a few
questions, though.
How much flaring was cut by shutting in the two wells and lowering the
Crude Oil Surge Drum's temperature, and when were these actions taken?
Also, you said that "the 1802 unit was found to be in good operational
condition..." Was an inspection performed prior to taking 1801 down?
Thanks, ,o-= CoSdT~M'P <
Wendy ~~fE,c.7'n/5 ~kE'~//- ~~o VOtvM£ ~-~~1'e,.3~~, ~~ ~M~ 6L®
~N t ~, G- u ~.~ ~ ~~ ~ Pj o ~ ~-t ~ C~ e1 ~ ;~'
~~.R.~l~ t i~
~~ ~~~ ~~~~~5
3 /~ ~~~,~
1 of 1 3/18/99 9:07 AM
Supplementary Information Check • •
Subject: Supplementary Information Check
Date: Tue, 16 Mar 1999 18:02:21 -1000
From: "EOC Supervisor PRB" <P2013@mail.aai.arco.com>
To: Wendy_Mahan@admin.state.ak.us
Wendy,
On 3/7 Flow Station Two experienced an unscheduled outage of the LM-1500 driven
STV/IP compressor train 1802 while the 1801 skid was out of service for
scheduled maintenance. As you are aware the only way we get out of flare in
this situation, until the unit is restarted, is to shutdown the entire facility.
We've drafted up this supplemental information for this incident and I wanted to
run it past you before we incorporate it into the monthly report data. I'm just
trying to be a little proactive here so you don't have to ask for better
clarification later.
Please let me know if you feel this is sufficient. If so, then we'll include
this into the report as is.
Thanks for your time,
Paul Andrews
(See attached file: Flow Two Flare 3.7.99.doc)
_~~ ~ ._.~_. ~ __. ~ _ ..._ ~~ _ __._... ~ _~~. _~_ ._.... ~.. _..v .. __~~ ~ _ ~ _,._~
Name: Flow Two Flare 3.7.99.doc
Flow Two Flare 3.7.99.doc' Type: Download File (application/msword)
Encoding: base64
Description: Mac Word 3.0
i
I of I 3/18/99 9:08 AM
Summary of Flow Station Two Flaring Event on 3-7-99
At 07:39 hours the Flow Station Two STV/IP compressor, tag #1802, tripped unexpectedly. This upset
resulted in one continuous flaring event during the following 10.1 hours. Due to unavailability of the spare
compressor train and the increased flaring consequence of shutting down the entire facility to eliminate
the relatively low flare rate, the station was forced to flare the process while the unit was troubleshot and
restarted. The total duration of the flare was 606 minutes and a total flare volume of 6,047 Mscf.
General Information
At 07:39 hours the 1802 STV/IP compressor train shutdown on what appeared to be a High Discharge
Temperature alarm. The restart was unsuccessful and the Instrumentation Department was called,
whereupon a protracted series of repairs began. These included jumpering the speed switch, replacing
the speed switch, adjusting the IGV's, replacing the speed probe, and calibration of all pertinent items.
These activities covered a time period from 08:15 to 17:45 hours. The entire troubleshooting effort
covered nine start attempts during this period.
It is important to note that there is normally an available spare compressor train for this process. In this
instance, unit 1801 would serve this function. However, the gas generator for this unit had been
previously removed for a scheduled 18,000-hour maintenance inspection and had not been reinstalled
prior to the 3/7 event. Prior to removing the 1801 gas generator and thus preventing the 1801 unit from
acting as a spare, the 1802 unit was found to be in good operational condition and expected to perform
satisfactory during the 1801 maintenance duration. This is considered normal practice and due to the
high reliability of the STV/IP units does not frequently result in extended flare durations.
It is also important to note that two wells were shut into help reduce the flaring at Flow Two. Also the
Crude Oil Surge Drum's temperature was lowered and the pressure raised to reduce the flare volumes.
3/16/99 PWA
FACILITY:
~ 11" ~ 3 ~l$
FLARE GAS VENTING REPORT
ARCO ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK
Flow Station 2
PERMIT NO. 9473-AA011
Date of Occurrence: ~ ~ dare ^ vent
(m /dd/yy) (Check Selection)
Total Volume Flared: ~~~MSCF BBLS
Meter NO.: (ey Facility) ^ Planned Unplanned
(Check Selection)
Time of Occurrence:
00_00 2400 Mi
From:
From: ~7~'39' To: ~c~
To: _
6O
From: To:
From: To:
From:. To:
From: To:
Total Minutes Flared: ~j
(Lisburne Only -Gas flared was from ^ upstream O downstream (cneck one! (Includes volume flared which generated black smoke ~ ~
o/ TEG contactor meter at LPC) if applicable)
A. Description of Incident and Cause: (Check as many as needed to fully describe the incident)
SID T/C~ for
TIC SD due to high exhaust temperature
Seal oil system difficulties
EMERGENCY SHUTDOWN
Elecvical / tnstrumentation malfunction
Electrical /Instrumentation malfunction
at other facility (T8D)
Gas transit system overpressure
backing CPF/Flow Station out
Excessive /insufficient inlet gas
rates into facility
Process upset in
section of facility
Flaring for tlnllsite shutdown /startup
Flare system testing
Faulty shutdown ort
Facility maintehance
High ambient temperatures.
S/D on high vibration
Other: ~
a .r ^c
c
B. Action Taken to Eliminate Cause a ent Recurrence: (Checl and d tribe as applicable)
_~ Started / staue /C # _
Compress rain depressured Stabilized facility process and operation
Reduced /increased inlet gas rates Repaired equipment difficulties
Completed flare testing with
Facility maintenance completed
Corrected E&I fluctuation /failure Other
Corrected E&I fluctuation /failure .
at other facility (T8D)
Black Sm
o
ke
~/
+
Did incident cause black smoke? Yes: No: kQ (If Yes, continue with this section)
.Did incident present a potential threat to human health or safety? / \ Yes:
(tf Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) No:
Black smoke emitted from source: (enter tag number and description)
Notified ADEC by-Fax o Date: Time:
Report the following information to ADEC within 24 hours BY FAX (907-269-7508):
Date and time of black smoke event: From: To:
Volume flared which generated black smoke (if different from above): MSCF
Description of steps to minimize emissions: See Section 8, above. BBLS
Type of materials burned: Gas: NGLs: Other
.
General Weather: Air Temperature: Wind Speed/Direction:-
Name and phone number of person making the report:
Name Phone No.
Based on Information and belief formed after reasonable inquiry, I certify that the statements and information in and attached to this
document are true, accurst nd tom let~e „ v ~ ~~~~
Facility Supervisor / ~ Date
cc: EOC Supervisor, PRB 6 (flare gas and black smoke incidents)
Field Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only)
PBU/GPMA Field Managers, (Black smoke incidents only)
GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 477)
Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke incidents)
Updated: FS2 9/98 P:\Grouns\Fnvirnnmonf~nF~~,,,~tc.,:u_r~.... o........:..., c..,_,t___._._ ., .. _. _
. ~ •
Summary of Flow Station Two Flaring Event on 3-7-99
At 07:39 hours the Flow Station Two STV/IP compressor, tag #1802, tripped unexpectedly. This upset
resulted in one continuous flaring event during the following 10.1 hours. Due to unavailability of the spare
compressor train and the increased flaring consequence of shutting down the entire facility to eliminate
the relatively low flare rate, the station was forced to flare the process while the unit was troubleshot and
restarted. The total duration of the flare was 606 minutes and a total flare volume of 6,047 Mscf.
General Information
At 07:39 hours the 1802 STV/IP compressor train shutdown on what appeared to be a High Discharge
Temperature alarm. The restart was unsuccessful and the Instrumentation Department was called,
whereupon a protracted series of repairs began. These included jumpering the speed switch, replacing
the speed switch, adjusting the IGV's, replacing the speed probe, and calibration of all pertinent items.
These activities covered a time period from 08:15 to 17:45 hours. The entire troubleshooting effort
covered nine start attempts during this period.
It is important to note that there is normally an available spare compressor train for this process. In this
instance, unit 1801 would serve this function. However, the gas generator for this unit had been
previously removed for a scheduled 18,000-hour maintenance inspection and had not been reinstalled
prior to the 3/7 event. Prior to removing the 1801 gas generator and thus preventing the 1801 unit from
acting as a spare, the 1802 unit was found to be in good operational condition and expected to perform
satisfactory during the 1801 maintenance duration. This is considered normal practice and due to the
high reliability of the STV/IP units does not frequently result in extended flare durations.
It is also important to note that two wells were shut in to help reduce the flaring at Flow Two. Also the
Crude Oil Surge Drum's temperature was lowered and the pressure raised to reduce the flare volumes.
3/16/99 PWA
;.
•
Flare Event-3/10/99
To:EOC
On 3/10/99 at approximately 7:45 a.m. the IR-
1802 s/d on what appeared to be a High Discharge,
Temperature alarm. The, restart was unsuccessful and
instrumentation was called,whereupon aprotracted
series of repairs began. These included. jumpering the
speed switch,replacing the speed switch,adjusting the
IGV's,replacing the speed probe,and calibration of all
pertinent items.These activities covered a time period
from 8:15 a.m. to 17:45 p.m. Please note that the
spire compressor IR-1801 was unavailable due to a
k hour inspection. The entire flaring event covered
~~._--
some 9 starts and 626 minutes.
ARCO ~~
File
Calculations Char
Date
...
R-~.`~
t'1TR# ---HU,.a~u~ I HtsLt---
O~ OIJI~F~EMT ---BLOT RAt~OE---
P~'ia MAME DESOI~iPTiOM ~t~LUE MiMiMOM M~~IMDM
CD249 1~10F2~iL FS2 IP COMP 102 NET DISCH D.DD Q.00 0.@0
14490.
1242D.
~ 1~3SO.
F1
2 E2E0.
1
L
6E1O.
414.
270.
~@ .
MSCF~'D
INST. 06=1142 MINUTES
Ev ~ r ~ ~a ~;. i i .., _.. ~.r ~ ~~ d t a~~i~0 4 ~, u. $ ~~_,R 8 ~~ ~ 1 ~.~. t t...~ ~ sI x1 r i k -~ i s.~.. r
.•
.:
{ d~'y
~~a~~
X11
~- I ~ b
~~
',\.,.,,,l. r, ~.t~J
~: ~
---`
?.,~ ..!
'~i ~
_ '~i~
~'
~i~'
~,
~K
k
~.
~:
.~
SENT BY=
._
3-18-88 ; 8~15AM ;
r J
FLOW STATION 2~
807 658 5061;# 4/ 5
FLARE GAS VENTING REPORT
ARCO ALASKA, INC. ~ PRUONOE gAY1GPMAlKUpARUK
FAC1LfTY: Flow Station 2 PCRMIT NO. 9473-AAO~~
OAS DISPOSITION ~~
Data of Occurrence: ~ I 9 ~fWre C7 varrc Timo of Occumanw:
( /dd-yy) (Check Selection) oo_oo a~ Minutes
From: O~~s To: o yys = _! 3D
• Total Volumes Flxrod: /~-C_.,O Mscr• BBLS From: To: _
From: To:
Meter No.: 8 Facil' 1 . _ _ ~ ~~ From: Ta =
a rlo (Cheek Solwetion) From: TA: =
From: To: a
Total Minutaw Fla,wd: ~ 130
(Licbumo Ony _ Gaa parod wsa from ^ uvcowrn ^ downsoea+n lCMaefr Ugal (Induces volume oared wNdl sieneretes olads smOKe.
a rl:c wnractw meter al LPCi if app/ieable~
A. Description of Incloont and Cawa= (Check as marry as needed to fully descn0e site Incident)
:i~0 T/t;fF fore vrocess u0set In
TJC SO due ro nigh exhaust temperature sectron or (aan1V
Seal oil 6yswm olmeulaas Flaring for dnllsitQ shutdown r aeorwp
EMERGENCY 61•IUTDOV1rN Flare sVStem teetlnp
Etachical! lnxtrumemstron meltunWon Foully shutdown on
EI@ctntal / Instrumentanon malnrncaon FaONty marmenenoe
High am0isnt temperatures
et atha+r fadlity (rao) 5/D on high uleraUOn
t,~as lransN system overpressure ~'' r:
backlog GPFlFIOw SlaUOn out ~'G'.ll 21 wt U (L U
Exoeaoi,ra 1 inaufFCent inlet gee
r-+Erao into fadary /J
8. Action Taken to Ellminaro GiYee ar10 Frevam Racurrenta: (enack and deerriba •^ rappltceDN)
j( StOROd / reslaned T/C # O ~- Stabilized facility prooexs and operetion
Co-rO-r+assor / trair- depressured Repaired equipment almculnes
Reduces /Increases Inlet gab rates r.iNr
Completed Aare teaung Y~ KacYlty malntenanr~ completed
Corroetod E81 Auetuation /failure Olt+er:
Corrected E8J fluctuation / ftgiltue
al other fat9lity (T8D)
• Black Smokes
Did incident cause tNadt smoke? Yas: No: ~ (If Yee, cor><inue with this ser~ton)
Did irutiderd r-resent a pptelttial Threat to human AealVl or satery? Yes; No:
(if Yes, report to FEC as goon as possible. if Na report to ADEC wkh Ii4 hour.)
61edt smoke cm'xtcd from couree: (antwr tag number and deu:criplian)
Notifiwd ADEC by Fax o D#to: Time:
RaOOrt the folbwkt0 ktfotmatbrt to ADEC within 2411oufs BY FAX 1'807-269 75091:
Date and time of blank smoke arerre Frvm: To:
Volume flared which generated blade smoke (if diHerer+t from Above): MSGF 13845
Description o(ateps to minimize emrs6lons: Sao Section H. eDOYe.
Type Of metenera DurnAd: Gas: NOLa: Other:
t3eneral Weather: Air Temperature: Wind Spe4d/Dlrwetion:
Name and phone number of p4rreon making the reporL-
Name Phone No.
Based on infonnatlon and belief formed after reasonable Inquiry. 1 certify Thai tt+e slalerr~nts and information in and attal~ted to this
doeumont ere we, eccura~~nd complete.
Faelllly Supervisor G/h ~ 1 rnt'~Q/V~~ oar 3 ~~8~~99
rx: EOC Suporviaor. PRB a (Aaro gas and black smoko incidents)
Field Environrnorrtal Compliance Coordinators. PR9 7 (81a0k Smoke incidents only)
PBIJ/GPMA F'lels Managers. (BIaCk smoke intxdeMS Dray)
GPMA Operations Engineerivlg Technical Aide, (CPMA reptxts only - ATO 477)
Kuparvk: Field Environmental Compliance Coordinators. N5K 61 (hare Qas and black smoke incidents)
•
Flare Event Summary
FS2 1802 IR Turbine/Compressor
3/17/99 02:35 Hours
The following summary is a timeline of 1802 T/C shutdown which occurred on3/16/99:
Note: There is no spare Turbine/Compressor available at this time.
TIME EVENT
0235 1802 Turbine /Compressor shutdown on similar
indications of 3/16 shutdown, IP Compressor High
temperature.
Suspecting an IP Recycle recurring failure, operator
immediately found the valve to have the Allen screw
backed out of the positioner arm of the valve actuator.
0245 Instrument technicians called out to the facility to repair
the valve.
0420 First start of 1802 successful.
0445 1802 on line and off flare
The total duration of the flare was 130 minutes and the total flare volume of 1,228 Mscf.
SENT BY~
Date of Occurrence:
3-18-99 9~13AM ;
y
Ft.ARE GAS VENTING REPORT
ARCO ALASKA, INC. ~ PRUDH~E BAYIGPMA/KUPARUK
FACILITY: Flow Station 2 1j~ PERMIT NO.
GAS DISPOSITION
o;3llcs ~~ ~ ^~r
(mmlaoryy) (Check Sdcation)
Total Volume Flsrod: ~j3Z MSCF BB~S
Meter No.: B Faclll ~ ~~
70 (ChQCk Swlaction)
From:
Frpm:
From:
From:
From:
From:
Total Mlnubu Flarwd: ~
(L.iaDymc Only - Gac Nnrad rvOS nom ^ upsacarn ^ aowncawam !L'haok Oxl
of TEG eonaeror meter at ~C)
A. Description of Ilttldent end Gauss: (Cneck a9 marry ea nesdad to fully describe the Inclderrt)
S1D T1C>Y iar
TIC SD Out to hign exhaust Iamperalure
seal system oitr„ylliax
EMERGENCY SHUTOt)wIV
^~- E:IaCVrcel I Inatrumenranon rrwduncaion
Eloctriwl f Irolnrnonterlon malfunction
al pth.r IsaliW (T&D)
Gas transrc sYslem overpressure
batldnq CPFIFIow Stollen art
Exosunre I insufficient inlet qas
rates alto taalily
(lndudes vorume Qared wnlcn r7enerared DIaCJr smoKe.
if 6AAi~ableJ
Pt~ESS upset m
seaiat of faciiiy
Flaring rot annsrca snutaown / slartuo
Flew atratsrn tenting
Faulty shutdown on
Fatality mamt9nenee
High ambient temperatures.
~-' S1D on high v~rofion
~~ Other: ~-1~tj?~=`-°~=~~R..
'Psi ~. r .!` ~ / ~ ~ At++ sarrd~-
'F~cS ~ ~r-r ~~ au. ~~
907 659 5061;# 1/ 5
w . ~Y~ 3r~~~~/
9473-AA01 ~
Time of Occurnence•
00_00 2600 MI~tt3
1 S : ~Z To: ~~- _ ! a t
T0: -
To: _
_ ~-
To: _
To: _
~,
B. Acaon Tukon m Eaminato Coosa aria Prevent Raeurronee: IC1+aelr. and doseriDe ss sppilcabls)
~ Started !restarted T!C a _1hg - IS3o2-
Ctunbrassar /train deprescured
Reduced / incrcaxd inlet 9aL rstea
Completed stare testing
Corrected E81 fluetuauon / failure
Gorractea E81 nutxuaaon ~ railurz
at odtcrfacility (T80)
Did incident cause blade smoke? Yes: No: l~
Die incident present a potential Ihrvat to human healtli or ~afcty?
(If Yos, report to FEC as soon as posslbla. M No. report to ADEC with 24 hours.)
Blade smoke emitted from nourCA:
Stabilized radliry process and opertltion
Repaired equipment difficulties
with
Fagllty matntenanCe completed
(If Yes, cont~tue with this section)
Yes: No:
(enter tag number aria oescrtpaon)
Notified ADEC by FaY o Gate: Time:
Report trio bllawlrrg bdom,rtlon a ADEG M,Ifhin as hours yt3 FAX 19o7ase-7606):
Det®and iim® of blook smoke event: From: To:
volumes flared uriiich generated blade smoke (If dlRerent frortt above): MSCF BBLS
OeSCnoUon or steps to miMmlze emissions: See »eCtlon B, aboro.
Type of materials boned: Gas: NGLs: Other:
Gonorol tNeadrer. Air Temperature: YVII10 Soeed/Direction:
Name and phone number of person tttiaking ute report.
Nartw
Phone No.
Based on infomwlion and belief formed after reasonable Inqurt/. 1 cerpty that the stafemems ens mtormauon m ono aaat:neo to l
document are true. accura ertd COmplets,.... ~ p/q
~- o.~ 3 ~ O
Facility Supervisor s'
cc: EOC Supervisor, PRB 6 (flare gas ono b cK smoke mudents)
Flelo Environmental Compliance Goordinacoco. PR9 7 (Black Srrwke incidents onty)
P8U/t3PMA Field Monagorc. (Blade amok¢ incidents only)
CGPfW4 Operallons Englnaering Technir~t Aide. (GPMA reports only - ATO 477)
Kuperuk: Field Environmental GomptlanCe Coorainatorts•, NSK 61 (flare gas and block smoke incident9)
FLOW STAT l ON 2-'
Upaale0: F82 9l9B P:-Group6-EnvironmenlahFermx~kll.Gaa RepoAing Fonts\Templabe pn Line Flare Gag Vengttg Form 11-861.1U6
.. • •
Flare Event Summary
FS2 1802 IR Turbine/Compressor
3/16/99 15:52 Hours
The following summary is a timeline of 1802 T/C shutdown which occurred on 3/16/99:
Note: There is no spare Turbine/Compressor available at this time.
TIME EVENT
1552 1802 shutdown on IP Compressor Discharge High
Temperature.
Subsequent operator response and investigation found
that an Allen screw had backed out of the positioner arm
of the valve actuator for the IP recycle valve.
Instrument technicians were called and the part was
repaired.
1700 First start attempt failed due to STV Thrust Bearing High
vibration.
1730 Second start successful and 1802 T/C came up to idle
speed.
1733 1802 fully loaded and off flare.
The total duration of the flare was101 minutes and a total flare volume of 932 Mscf.
SENT BY~ r3-18-89 8~14AM FLOW STATION 2~ 807 659 5061;# r3/ 5
..-
FLARE GAS VENTING REPORT
ARCO ALASKA, INC. ~ PRUONOE BAYIGPMAIKUPARUK
FACILITY: Flow Station 2 PERMIT N0. 94i3-AA011
GA9 DISP031TION
Date of Oeeurr't,nw: -~-- L~ Flare n vvx Tlme of Occurrence:
(rnm/d IYyI (Check Selecdon) ~ O~o:00~j~ 2aao Illtl_ nub
~~~~'~~'QQ From: ~~-"~~ To: '..11 13 =
Total Volume Flared: /Sr1rZ~MSCF BBLS From: To: _
From: To:
Motor No.: (ey Facility) 4 plero+eo Unplanned From: To: _
~~ - ~_
(Check .SeleGion) From: To:
• From: To: =
Total Mlrwres Flpred: v .l X17
(LISPUme Only - Qaa Hared wee loom ^ upvnim Cl dam,csoarn fOrwc~ oral (Includes volume tlarod which gonerated black RniOI[e, +--•r
o/ TEG conraeror meter al LPC~ if applrcaLle)
A. t]eacriptlon of Incldont an0 Cause: ICheck as marry as needed to tully deacrlba rho Incident)
Sn7 7lCil for Procelu~upxelin
TIC SD due to high exhaust l9mperature section or fagllty
Seal ail system ElfltcUllles Flaring for enllaite shutdown r sOerWp
EMEROENC7 3t1UTpOWN Ylaro eriiem ue9ung
~oekieal / Inat-umentsaon meliunation Feulry shutdown on
EIeeVICAI ! Inst-umenwtion maHUnttlon Fadllty mamleranta!
High amlaelli tempereturea.
at tnher facility (TB,p) S/D high vibr i
Gaa vensit system overpressure ~ O
oawdn0 cvF/Flow station out
EXt:e9SIVe / InsumcJenl Inlet gas
torso mto iadlrty
B. Action Taken 1D Ellminew Cause aed Prpvenl Recumanee: (Check and dssulDs as itpttllCabM)
Sterteo ! restaRea T/C # StobAizcd faciliy process and eperstian
Compressor / train depreasured Repaired equipment tllfflCUllles
Reduced / inCrylatpd inlwt gas races Vdlffl
Comple[et1118re [eSUng Facility maintentutce wmpleled
Corroded ESI fiuctuaUon ! failure Other.
Corroded E81 fiudusdon /failure
at other faeifily (T&O) .
Black Snooks
Did incident cause black smoke? Yes: No: ~ (II Yea, wnluwa wilts this section)
Did incident present a polentlal ehreat to human health or rafely~ Yes: NO:
(I(Yos, report to FEC as soon as posaiblo. If No, report to ADEG wire 24 hour6.1
Bladt Smt7ke errgtte0 UOm source: (cntcr tog number and dcxription)
Notified AnEC ray Fex o Datc: Time:
Report tl+e foUowing Informwtlon ee AOEC wldrln xa hours BYe a>< (9t17.ZB9.tS08):
Pate and lime of black smoke event From: To:
Volurrle tlaretl wnltxt generated black smoke (i! dHferem from above): MSCF eBLS
Qet:CNption of steps to minimix¢ erniesions: See Section B, a~eve.
Type pf materials ttumed: Gas: NGLS: t]tftar:
General Weather: Air Temperature: Wetct 3peed/Oirection:
Namts artd phone number of person mokirtg the rcpoR:
Name Phone No.
Based on iniomtalit)n an0 belief formed after reasonable inptnry, I certify that the statements and informadon in and attached to ihi9
QoWment ere AUe, aCCUra t>d comp) ~
Fatality Supervisor / , m Dab 3'I 8/99
C~ EOC Supen-faor, PRB 8 (flare gas and b aclc smoke inciderrta)
Find Environmcnial Complianoo Coord'nstor~. PRB 7 (Black Smoke incidents only)
PBU/GPMA Fioki Marlag4rr;. (Black smoke inddents only)
GPMA Operations F.npineerinSf Technidal Aida, (GPMA tepees only - ATO 477)
Kuparuk: Field Envirvnment6l Complierlcc Coordinotora, NSK 81 (flare gsa and black smoke incidents)
Updated: FS2 9/98. P;1GroupslEnvironmentaRFonns15p11hGas ReDOrting ForrttslTemplete On Line Flare Gas YenGng Form 8-Bbl.xls
,. •
Flare Event Summary
FS2 1802 IR Turbine/Compressor
3/17/99 17:04 Hours
At approximately S:OOpm on Wednesday 3/17, the IR Turbine/Compressor 1802 shut
down on an indicated High discharge temperature. Upon inspection by the technicians,
severe valve positioner damage was found on the IP compressor recycle valve. The
positioner rod that connects to the actual valve stem had, this time, sheared it connecting
bolt. This required a dismantling of the valve bonnet and extensive reworking of the
internal valve parts. These repairs required approximately four hours. When complete,
1802 came on line with the first start and we went off flare
The total duration of the flare was 249 minutes an a flare volume of 2,358 Mscf..