ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
FLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Dec-96
i
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 3
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 5,248
5. Pilot and Purge 19,986
6. Used for lease operations Fuel
Assist 922,242
10
7.Oti-er 0
TOTAL items 1 - 7 947,489
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 942,159
11. Transferred to: CCP 47,289,897
Remarks:
T herehv certify that t , fnmg~ing is trne and correct. to the hest ~f my knnwlP.dQe.
Signature: Title: SUPERVISOR
orm evi
1 `y. `T ~"
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Note: All volumes must be correctecLto
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION 1t3
DECEMBER 1998
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
12/05/96 1300-1310 3 1801 T!C normal shutdown. Unit placed in standby mode. PLANNED Normal shutdown.
TOTAL UNDER 1 HOUR
FLARING EVENTS GREATER THAN 1 HOUR
12/11/96 0015-0135
12/16/96 1430-7000
TOTAL OVER 1 HOUR
~Flarsd
Pilot/Purge
Continuous Assist
TOTAL FLARED
3
5,087 T/C 1806 shutdown on high inlet differential pressure.
161 14 B/C commonline developed a leak near FS3.
5,251
19,988
LQ
25,247
5,248
UNPLANNED Reduced inlet gas rates & restarted 11106.
UNPLANNED Shut in 14 B/C C/L, swept, & depressured.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
F[.,OW STATION 3 ARCO AI..ASKA, INC. F:;ASTF.,RN OPERATING ARF..A-PBiJ Nov-96
i
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 3
4. Flared or vented greater than 1 hour
(Sup lemental re rtrequirwi--See 20 AAC 25.235) 0
5. Pilot and Purge 19,070
6. Used for lease operations Fuel
Assist 906,941
184
7.Other 0
TOTAL items 1 - 7 926,198
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 926,011
11. Transferred to: CCP 45,639,259
Remarks:
T herehv certify that. th fore¢oin¢ is tn~e and correct. to the hest of my knowledge.
Signature: /~~ ~ Title: SUPERVISOR
orm evtse
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRiJDIiOE 64015U 100
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235,
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION #3
NOVEMBER 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
11/27/96 2038-2043
r1
I~
TOTAL UNDER 1 HOUR
FLARING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR
Flared
Pilot/Purge
Continuous Assist
0
3
3 T/C 1802 shutdown for maintenance inspection.
3
t9,070
L
UNPLANNED Normal compressor b~a'wdown volume
for ~luitdown.
~;,, ~.a~~ ,.
y
TOTAL FLARED 19,257
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
F[.,OW STATInN 3 ARCO ALASKA, INC. F:;ASTF..,RN C)PIRA.TING ARF,A-PBiI OCC-96
n
U
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 662
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 4,950
5. Pilot and Purge 19,011
6. Used for lease operations Fuel
Assist 835,851
6 884
7.OWer 0
TOTAL items 1 - 7 867,358
8. NGL gas equivalent produced _ 0
9. Purchased gas 0
10. Transferred from: CGF , . _. _ 854,499
11. Transferred to: CCP 39,978,896
Remarks:
T herehv certify th .the ~regoing is tnte and correct. to the hest of my knowledge.
Signature: e: SUPERVISOR
orm tse
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDiIOE Ext01 ~0 100
Official Use Onl --Flarin Authorization > i hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
monW following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION ff3
OCTOBER 1996
PLANNED
DATE TIME VOLUME MCF DESCRIP110N OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
10/19/96 0230-0235 3 T/C 1801 shutdown for maintenance. PLANNED Started T/C 1802.
c
0
10/20/96 1330-1335 3 T/C 1801 test run. PLANNED Completed test run.
10/23/96 1330-1408 328 Planned facility maintenance. PLANNED Maintenance complgjg(~ m
10/23/96
1635-1720
328
Planned facilty maintenance.
PLANNED ~
Maintenance complt'~e
d. m
~ ~
~ iy
• ~ J''', c
W r- ~
V y
~
Lu o .
a
~ ~ o
TOTAL UNDER 1 HOUR
662
FLARING EVENTS GREATER THAN 1 HOUR
10/03/96 1030-1130
10/06/96
0515-0545
(Intermittent 140 min.)
3,450 Planned facility shutdown, depressured flow station. PLANNED Facility shutdown.
(Black Smoke)
1,500 Flow Station start up after planned facility shutdown. PLANNED All compressors on line.
TOTAL OVER 1 HOUR
Flared
Piiot/Purge
Continuous Asaiet
4,950
5,612
19,011
6.884
31,507
TOTAL FLARED
ALASKA. OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT 4F PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
I7..OW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING ARFA-PBU Se -96
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 6
4. Flared or vented greater than 1 hour
(Sup lemental re rt required--See 20 AAC 25.235) 665
5. Pilot and Purge 19,471
6. Used for lease operations Fuel
Assist 895,233
45
7.Other 0
TOTAL items 1- 7 915,420
8. NGL has equivalent produced 0
9. Purchased >;as 0
10. Transferred from: CGF 914,704
11. Transferred to: CCP 41,124,605
Remarks:
T herehv certify that. the cmegoing is trne and correct. to the hest of my knowledge.
Signature: ~ Title: SUPERVISOR
orm evise
*Indicate contribution of each pool to total.
Pool Name Cade Percent
PR.I7I7Ii0E 640150 100
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
to
pressure of 14.65 Asia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
` ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING NVCIDENTS
FLOW STATION 113
SEPTEMBER 1996
.PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 3 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
09/20/96 1425-1428 3 Shutdown T/C 1802 for maintenance. PLANNED Started T/C 1801.
09/22/96 1325-1329 3 T/C 1802 maintenance run test after 1000 hr inspection. PLANNED Depressuring completed.
• TOTAL UNDER 1 HOUR 6
FLARING EVENTS GREATER THAN 1 HOUR
09/12/96 0942-1100 497 6C/138 & 13D commonlines depressured to enable PLANNED
maintenance on DS 13 test divert valves.
09/13/96 1310-1430 168 6B & 6D commonline depressured to enable valve maintenance. PLANNED
1810-1830
TOTAL OVER 1 HOUR 6S 5
Flared 6 71
• Pilot/Purga 19,471
Contlnuous Asslst ~
TOTAL FLARED 20,187
Completed depressuring of 6C/138 and 13D.
Completed depressuring.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
FLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Au -96
•
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 918
4. Flared or vented greater than 1 hour
(Sup lemental report required--See 20 AAC 25.235) 1,552
5. Pilot and Purge 19,433
6. Used for lease operations Fuel
Assist 881,541
129
7.Other 0
TOTAL items 1- 7 903,573
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 900,899
11. Transferred to: CCP 40,569,164
Remarks:
T herehv cettifv that. the foregoing is m~e and correct. to the hest of my kn~wied¢e.
Signature: G~~Y, A-~~ Title: SUPERVISOR
~~:
orm evise
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION #3
AUGUST 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
08/01/96 0700-0730 54 Flared for drillsite shutdown maintenance work. PLANNED 7D & 7B commonlines depressured.
08/09/96 0845-0850 2 Two failed starts on 1802 T/C due to instrumentation problems. UNPLANNED Normal blowdown for failed starts.
0930-0935
• 08/1 1 /96 0930-0940 3 1801 T/C placed in standby mode during maintenance shutdown PLANNED Normal shutdown.
08/12/96 1105-1155 348 6C/13 8 commonline depressured prior to lifting to enable PLANNED Completed depressuring for work to proceed.
sleeve repair installation.
08/15/96 0905-0925 125 148/C commonline depressured to enable lifting to allow PLANNED Completed depressuring to allow line lifting
sweep installation repair to proceed. and sleeve repair installation.
08/15/96 1200-1235 232 6C/13B commonline depressured to allow repair of 6C test PLANNED Completed depressuring to allow test return
return valve stem leak. valve stem leak repair.
08/15/96 1255-1310 50 148/C commonline depressured residual pressure to allow PLANNED Completed depressuring of residual pressure.
continuation of the lifting & installation of the sleeve repair.
08/30/96 1200-1205 104 Gas transit system overpressure backing flow station out. UNPLANNED Stabilized facility process & operation.
TOTAL UNDER 1 HOUR 918
FLARING EVENTS GREATER THAN 1 HOUR
08/06/96 0507-0700 1,135 Depressured FS 3 to BP AL line from 500# to 200# fora PLANNED Depressured to desired pressure.
sleeve weld.
08/13/96 0440-0700 417 6C/13B CL depressured after gas sweep to remove residual PLANNED Completed sweep gas depressuring.
liquids in attempt to enable sleeve repair installation.
TOTAL OVER 1 HOUR 1, 552
Flared 2,470
Pilot/Purge 19,433
Continuous Assist ].? @
TOTAL FLARED 22,032
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
FLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Jul-96
•
•
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 11,353
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 60,455
5. Pilot and Purge 20,389
6. Used for lease operations Fuel
Assist 872,607
3,386
7.Other 0
TOTAL items 1 - 7 968,190
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 892,837
11. Transferred to: CCP 37,129,213
Remarks:
I herehv cert.ifv that. the f~regnine is tn~e and correct. to the hest of my knowledge.
Signature: ~~1.t.j~.~`~-i7- ~~~~ `~ ~ ~`n'~ Title: SUPERVISOR
orm iu-4~~ ~xevise
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
Official. Use Onl --Flarin« Authorization> 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month .following the month of disposition.
Authority 20 AAC 25.235.
r
ATE
IME
OLUME MCF ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING INCIDENTS
FLOW STATION k3
JULY 1996
DESCRIPTION OF INCIDENTS & CAUSE
LANNED
UNPLANNED
CTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
07/19/96 0840-0935 11,350 T!C 1803 shutdown on exhaust plenum high pressure due to UNPLANNED T/C 1803 restarted after correcting WHR
WHR louver malfunction. louver malfunction.
07/31 /96 2000-2010 3 T/C 1802 shutdown for 4M hour inspection. PLANNED Started T/C 1801.
TOTAL UNDER 1 HOUR 11,353
FLARING EVENTS GREATER THAN i HOUR
-07/1 3/96 1630-2015 48,661 T/C 1603 shutdown on high temp on the power supply. UNPLANNED Repaired WHR louver & restarted.
07119!96 0125-0135 10,391 TIC 1804 shutdown for VIGV inspection. PLANNED Completed cooldown.
0150-0445
07/20/96 1920-2023 1,233 Cranking T/C 1804 for FCO and soak water wash. PLANNED Completed FCO and water wash on 1804.
07(28!96 0920-1345 170 Flared to assist AIL tieline to BPX depressuring for smart PLANNED Line depressured.
• Pigging.
TOTAL OVER 1 HOUR 60,455
Flared 71, 808
Pilot/Purge 20,389
Continuous Assist x.386
TOTAL FLARED 95,583
PLANNING PRUDHOE ID~
ARCO Alaska, Inc.
Post omt:e Box loosen
Anchorage, Alaska 88510-0360
Telephone 907 2781215
November 7, 1996
Ms. Wendy Mahan
Natural Resources Officer
Alaska Oil and Gas Consctvation Commission
3001 Porcupine Drive
Anchorage, AK 99501
Dear Ms. Mahan:
Subject: Flow Station 3 T/C 1803 SD, July l3, 1966
i~
~r
Pcr your request the following information is provided regarding the subject flaring
incident. A low pressure compressor at FS-3 tripped off line at 1630 hours on July 13,
1996 due to a high ten~perattue tndtcation and alarm an the T/C power supply unit This
high temperatunr indication largely resulted from the high ambient temperal:ure conditions
existhig that day.
The turbine was cranked in an effort to rcdttcc the unit's temperature. Several attempts
were made to restart the T(C unit, starting as early as 1 S minutes after initial trip. Minor
adjustments were ultimately made to the louvers on the waste heat. recovery unit to
facilitate and expedite the restart process. In total, six restart attempts were made prior to
successful restart at 2000 hrs. By 2015 hours, the snit was fully loaded, and flaring
ceased,
When tlic T/C went down a prudent decision was rnadc to attempt to restart the tJnit in an
expeditious a manner as possthle, thus ending the flare and minimizing the volume of ga<s
ultimately flared. It. was anticipated that restart could Ue achieved in less than 30 minuses.
13y contrast, shutting in pmduction to remove the necessity for flare would have taken
much longer, requiring shut in of 40 - .50°l0 of the Flow Station watcrflood production,
This choice would also have required significant adjustments to gas lift and gas tranhit
system operations slid would have placed other Flow Stations and Gathering Centers in
significant risk of flaring while the production shut in was initiated and optiinizcd. With
restart of the T/C ucut expected every 15 to 45 minutes, it appeared restart of the unit
continued to be the most efficient manner of minimizing the volume of gas flared.
if you have any questions or concerns, please contact me at 659-5922.
.'mil --- -
John A. Mini r
EOC Supervisor ;
;~
.S + 4 ~
JA1VI/svd
AgCO Ahskb Inc. I~ 0 SustFdNry et Atl~ntleRlennsldCompeny
NOV 08'96 10 05 No .004 P.01
• •
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
i't.OW STATION 3 ARCO Ai.:ASKA. INC. EiAS'I'ERN C)P. I:RATiNG ARFA-1'BL7 lun-96
•
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 69
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 677
5. Pilot and Purge 19,462
6. Used for lease operations Fuel
Assist 893,514
4 843
7.Other 0
TOTAL items 1 - 7 918,565
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 912,976
11. Transferred to: CCP 39,440,620
Remarks:
i herehv certify that. the fore¢oin¢ is taste and correct to the hest of my knowledee.
Signature: Title: SUPERVISOR
,
orm
evtse
*Indicate contribution of each pool to total.
Pool Name Code Percent
I'RI?DIIOEs 640150 100
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION #3
JUNE 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
06/20/96 1345-1355 3 Shut down T/C 1802 for mains. Normal shutdown to perform PLANNED None -Normal shutdown.
1 M hour inspection.
06/21/96 11.10-1120 60 Shut down T/C 1804 on high exhaust temperature. UNPLANNED
06/24/96 1230-1240 3 Shut down T/C 1802 for maintenance. Changed damaged speed UNPLANNED
• pickup, normal stop.
06/24/96 1630-1640 3 1801 T/C Normal Shutdown PLANNED
TOTAL UNDER 1 HOUR 89
FLARING EVENTS GREATER THAN 1 HOUR
06/21/96 1045-1150 677
• TOTAL OVER 1 HOUR
Flared
PIIoUPurgs
Contl~uous Assist
TOTAL FLARED
677
746
19,462
4.843
2s,o51
Shut down T/C 1801 due to turbine lute oil low pressure UNPLANNED
problems
Restarted 1804.
Loaded 1801 T/C back up.
Normal shutdown-1801 put into standby
mode.
Corrected tube oil problem. Unit brought
back on line.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
iT.OW STATION 3 ARCO ALASKA. INC. F.,ASTERN OPT;RATING ARF.,A-PBT.J Ma -95
•
•
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 7,027
4. Flared or vented Qreater than 1 hour
(Supplemental re rt required--See 20 AAC 25.235) 13,725
5. Pilot and Pure 20,105
6. Used for lease operations Fuel
Assist $51,850
5 505
7.Other 0
TOTAL items 1 - 7 898,223
8. NGL gas equivalent produced 0
9. Purchased Etas 0
10. Transferred from: CGF 871,966
11. Transferred to: CCP 37,671,019
Remarks:
i herehv certify th .the frn~e¢oin¢ is tnte and correct. to the hest of my knowled¢e.
Signature: . ~~~ Title: SUPERVISOR
orm evt
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRtJDIIOE fr'400150 10()
Official LJse Onl ' --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION #3
MAY 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
05/10/96 1415-1420 3 Shutdown T/C 1801 for normal stop. PLANNED Compressor depressured.
05/15/96 2210-2220 240 Shutdown T/C 1606 for Borescope/PSM Testing PLANNED Normal Shutdown.
05/18/96 0055-0155 1,239 Excessive inlet gas rates into facility UNPLANNED Reduced inlet gas rates.
(Intermittent 23 mIn)
• 05/18/96 2020-2035 808 Gas transit system overpressure backing Flow Station out. UNPLANNED Reduced gas transit system pressure.
05/20/96 0630-0640 20 Facility maintenance. Fully depressured 1806 compressor PLANNED Compressor case depressured.
case for maintenance
05/22/96 1720-1730 3 1802 Turbine Shutdown to perform maintenance on STV PLANNED
suction pressure transmitter sensing line.
05!22!96 1930-1940 3 Normal stopped 1801 after maintenance. PLANNED
05/24/96 1321-1406 4,711 Electrical malfunction. 1804 T/C shutdown due to 25 volt UNPLANNED
power supply surge/spike
TOTAL UNDER 1 HOUR 7,027
FLARING EVENTS GREATER THAN 1 HOUR
05/03/96 1158-1323
• 05/15/96
05/16/96
OS! 16!96
2205-2215
(Intermittent 70 min)
0050-0505
0050-0505
05/17/96
TOTAL OVER 1 HOUR
Flared
PiloUPurge
Continuous Assist
TOTAL FLARED
1230-1330
13,725
2,265 T/C 1801 shutdown due to high balance line D/P. UNPLANNED
Assist gas to prevent black smoke on STV flare.
4,706 Excessive inlet gas rates into facility. PLANNED
2,880 1806 Cooldown cranking to enable maint. Boroscope inspection. PLANNED
2,934 Assist gas volume distributed to 1806 Cooldown cranking PLANNED
operation to enable horoscope inspection.
940 Facility maintenance. Cranking 1806 Turbine for waterwash PLANNED
20,752
20,106
5.505
46,363
Normal shutdown.
Normal stop. ~
0
.
Restarted T/C 1804. Reset
~6.arolt power y
supply. L..,.)
l
l
J m
d
.
.
+
,,,~ =
~.._. t~,._ to .
=-
`
14,1 .-, ~ :,
c
'
_ t: s
.
~:
¢.; _..
.
L.3,.1, ~ ~-
Stabilized facility process 8 opOr~tion --~
and started 1802 T/C. ~. ~'`
vs
Reduced inlet gas rates.
Completed Cooldown cranking.
Completed Cooldown cranking.
Facility Maintenance.
ALASKA OIL AND GAS CONSERVATION COMMISSION
•
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
FLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU A r-96
Disposition
1. Sold p
2. Reiniected 0
3. Ftared or vented less than 1 hour 1,369
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 1,211
s. Pilot and Purge 20,989
6. Used for lease operations Fuel
Assist 9s2,906
3 712
7.Other 0
TOTAL items 1- 7 9$0,187
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 973,830
11. Transferred to: CCP 39,864,884
Remarks:
T herehv cert.ifv that the. fnreQninQ is trne an~i cnrrert to the beet of my knnwlP.~1Qe.
Signature: ~, Title: SUPERVISOR
orm evtse
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
to
pressure of 14.6s psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 2s.23s.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION #t3
APRIL 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
04/04/96 1530-1535 3 Shutdown T/C 1802 for maintenance. PLANNED Normal compressor shutdown blowdown.
04/08/96 1645-1650 3 Shutdown T/C 1802 for return to standby. PLANNED Normal compressor shutdown blowdown.
04/21 /96 2145-2210 493 Depressured B train HP separator and gas scrubber for PLANNED Blowdown volume for HP vessels.
valve replacement and maintenance.
• 04/21/96 2230-2400 626 Depressured 7C/15C Commonline for ihermowell PLANNED Commonline blowdown volume.
replacement and facility maintenance.
04122!96 0230-0300 24 Depressure B train IP separator for valve replacement PLANNED Normal vessel blowdown volume.
and facility maintenance.
04/23/96 1020-1030 220 Shutdown T/C 1804 for maintenance. 4 failed starts on 1804 UNPLANNED Normal vessel blowdown volume.
(Intermittent 50 min) turbine.
RECEIVED
TOTAL UNDER 1 HOUR 1,389
FLARING EVENTS GREATER THAN 1 HOUR
04!23!96 0900-0930 1,211
• 1430-1730
TOTAL OVER 1 HOUR
Flared
Pllot/Purga
Continuous Assist
TOTAL FLARED
1,211
2,580
20,989
3.712
27,281
Facility maintenance. Replaced 15D P3507BSV upstream PLANNED
block valve depressured Commonline 15D.
iYf~! 1 Cy ~~~~
`Alaska Oit ~ Gas Cons. Commission
Anchorage
Facility maintenance complete. Completed
valve replacement
•
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
PLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Maz-96
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 12,455
4. Flared or vented Qrea[er than 1 hour 3,002
(Supplemental report required--See 20 AAC 25.235}
5. Pilot and Purge 25,205
6. Used for lease operations Fuel 899,423
Assist 1 295
11. Transferred to: CCP r~yr^;~~U 39,828,058
7.Other 0
TOTAL items 1- 7 941,380
8. NGL Qas equivalent produced 0
~~ ~~ ~~
9. Purchased gas ~ ,~ ~ a. 1 s '~rr `~ ~ 0
10. Transferred from: CGF ~'~ ~' ~ ~ ~ ~ ~ ~ ~~
it 924,628
r+~ :~:`s y'E ~ ~ 1',.~. p~.~e..-~ a .mss. r?rr
L. V.f (z 7 l,, :;~. ~:t c. ,c.Jaly
Remarks:
T herehv certify that. the fnre.QOinQ is erne and correct to the, hest. of my knowlP.dge.
Signature: ~ Title: SUPERVISOR
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION tl`3
MARCH 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
03/03/96 1730.1758 4,596 T/C 1803 shutdown from high turbine exhaust temp. UNPLANNED Restarted T/C 7803.
03/04/96 1030-1105 6,927 T/C 1803 shutdown from high turbine exhaust temp. UNPLANNED Restarted T/C 1803.
03lC4/96 1520-1525 3 TJC 1801 shutdown for engine stop. PLANNED Started T/C 1802.
03/05/96 0100-0120 60 T/C 1803 shutdown for combustion inspection. PLANNED Completed depressuring.
03/05/96 1700-1730 12 Test running 1801 after maintenance repaired slide valve PLANNED Compressor depressured. Repair 1801
(Intermittent 15 min} compressor bleed air. seal oil level control.
03/06/96 0415-0515 421 Depressure 6C 8 13 8 commonline from slugcatcher pressure PLANNED Completed depressuring 6C 8 13B CIL.
for DS discharge check valve repair (after gas sweep)
03/07/96 1115-1120 6 T/C 1801 shutdown due to high exhaust temp during start PLANNED Completed depressuring.
1140-1145 for test run aher maintenance.
03/07/96 1550-1555 3 Shutdown T!C 1801 for routing slop. PLANNED Completed depressuring.
03/13/96 2225-2400 180 T1C 1803 tripped during star) sequence after maintenance. PLANNED Completed depressuring.
(Intermittent 30 m(n)
03/15/96 1535-1539 56 Depresssure 1803 compression ~ suction scrubber for PLANNED Completed depressuring.
discharge gasket change.
03/15/96 2245-2305 191 Swept piping then depressured 1803 T/C and piping in PLANNED Completed depressuring.
• preparation of maintenance activity.
TOTAL UNDER 1 HOUR 12,455
FLARING EVENTS GREATER THAN 1 HOUR
03/05/96 0130-0345 1,490 Assist gas used to prevent black smoke during crank cool down PLANNED Cool down completed.
of 1803 for maintenance.
03/13/96 1743-2350 1,512 Facility maintenance on 1803. Condensed liquids in line PLANNED Assist gas used to prevent "black smoke"
(Intermittent tt4 min) when flow first started to STU flare header. (Black Smoke) during maintenance cranking activity.
Facility maintenance completed.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION 113
MARCH 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
TOTAL OVER 1 HOUR 3,002
Flared 15,457
Pllot/Purge 25,205
Continuous Assist 1.295
. TOTAL FLARED 41,957
•
•
•
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
FLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Feb-96
Disposition
1. Sold 0
2. Reinjected p
3. Flared or vented less than 1 hour 9
4. Flared or vented greater than 1 hour
(Su elemental report required--See 20 AAC 25.235) 760
5. Pilot and Purge 23,476
6. Used for lease operations Fuel
Assist 8$1,256
1 300
7.Other 0
TOTAL items 1 - 7 906,801
8. NGL Qas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 904,732
11. Transferred to: CCP 41,349,788
Remarks:
1 hP,rP,hV CP.rf1fV that fhP, f~regninn 1C tri1P. Arid C.(1ttP.t'f kl the; hest f1f mV krinWlP,(19P,.
Signature: ~~~,..,~--~- Title: SUPERVISOR
orm evtse
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
OfCi;ial Use Onl -=Flarv~ Autltorixation> 1 hr,
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION ~3
FEBRUARY 1996
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS A CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
02!21196 1930-1935 3 Shut down T/C 18ot for maintenance inspection PLANNED Normal compressor blowdown volume.
02/22/96 1935-1940 3 Shut down T/G 1801 for maintenance inspection PLANNED Normal compressor blowdown volume.
02/24/96 0930-0940 3 Shut down T/C 1802 for maintenance. PLANNED Normal compressor blowdown.
•
TOTAL UNDER 1 HOUR
FLARING EVENTS GREATER THAN 1 HOUR
02/19/96 0210-0430
TOTAL OVER 1 HOUR
• Flared
PIIoUPurge
Continuous Assist
TOTAL FLARED
9
760 Flaring for shutdown startup. Shutdown 13D commonline
for scheduled tie-in work at drillsite.
769
23,476
1.300
25,545
760
PLANNED 158 commonline depressured for
scheduled valve replacement & tie in work.
ALASKA OIL AND (iAS CONSERVATION COMMISSION
FACILITY F:EPOF:T OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
FLOW STATION 3 ARCO ALASKr~, INC. EASTERN OPERATING AREA-PBU Jan-96
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 16
4. Flared or vented greater than l hour
(Supplemental report r aired--See 20 AAC 25.235) 3,921
5. Pilot and Purge 25,468
6. Used for lease operations Fuel
Assist 962,682
437
7.Other 0
TOTAL items 1 - 7 992,524
8. NGL Qas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 988,052
11. Transferred to: CCP 39,017,286
Remarks:
T herehv certify that the foregoing is trne and c.~rrect to the hest. of my knnwlerige.
Signature: ~ Title: SUPERVISOR
orm evtse
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100
_ .._ _..
~~f~tal iJse.4`htl ~lau~t-1 €Authoit`ization ~ 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING INCIDENTS
FLOW STATION tf3
JANUARY 1996
PLANNED
DATE TIME VOLUME MCF DESCRIP71ON OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING EVENTS LESS THAN 1 HOUR
01/20/96 0745-0755 4 1802 shutdown for instrumentation malfunction. UNPLANNED Facility maintenance completed.
01/24/96 1655-1705 3 1801 T/C test started then normal shutdown to troubleshoot PLANNED Completed troubleshooting-normal shutdown.
fuel gas system maHunction.
01/25/96 1100-1110 3 1802 T/C shut down to repair #1 bearing seal leak on turbine. PLANNED Normal shutdown.
i 01/30/96 1100-1110 3 1802 T/G normal shutdown after
aint
na
t
t PLANNED N
l
h
nce
m
e
es
run. orma
s
utdown.
01130!96 1300-1310 3 1802 T/C normal shutdown after second test run. PLANNED Normal shutdown.
TOTAL UNDER 1 HOUR 1 6
FLARING EVENTS GREATER THAN 1 HOUR
01/05/96 1325-1430
01/08/96 0707-0830
01/18/96
01/2o/ss
01/24/96
TOTAL OVER 1 HOUR
1550-1800
0530-0615
0755-0840
1350-1630
3,821
386 Depressure tieline to remove stuck corrosion coupon.
51 US 7 common lines (78 8 7D) depressured to perform the
f~~llowing tasks: Replace 3 under-rated nipples, replace 2
k:aky divert valves, replace 1 leaky drain header valve.
2,759 1802 shutdown when starting 1801 due to starting gas
7 ~7 problem (high) fuel gas problem (low) and high vibrations.
~ >y~cA ~~
157 Depressured 14D & 14 commonline for drillsite shutdown.
PLANNED Completed depressuring tieline.
PLANNED Complete depressuring to enable completion
of tasks.
UNPLANNED
PLANNED
568 DS 6 and DS 13 commonlines (6B, 6D/13B, 13D) depressured PLANNED
~ to perform the following tasks: replace 30 under-rated nipples,
/~2 replace 3 drain header valves.
~~
Flared 3, 937
PiloUPurge 25,488
Continuous Assist g„~
TOTAL FLARED 29,842
Adjusted fuel gas problems 8 restarted t801.
Completed depressuring C/L for drillsite
divert valve repair and nipple replacement.
Completed depressuring to enable completion
of the tasks.