Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutARCO - FS #3_. _. __~. ~vei~/~'/~'/~A . ~ ~.. ~ ~ _:.%~/.~"/.~/.~/~/.~/d.~/®Y~'~"/.~S~Y.~/~ . - _: '/.~/~'/.~/.~/.~l!/~/®/~/•B/J/fieBYO/N/f/.p%.0%d7.~'/.N/Y/B'/I~/~/~7B/.~/.A/.~/~/N/®/W/®'/~'~/.~/~/.~"~.'9'.'/s~S~Y~'Y. AGOCC GAS Disposition Files 1996 A~ECO - FS 3 o . _: e W~a~~snrr~iaz~'i~'rwr~i~rr®ewr®i~~~i.~r~~®rsr~~ri~;~r~rm;:edrw*r„~r~i~i.~r~i~i~i,~i,~e~rria~wi~i~r~ri~r~i.~~s~~i~rrrr~rimi~imirrriare~r~r~ri.~~.ni~~~~~+arnirim~~ia~ias~r~~~~~~~i~~.~i. v.;aree ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition FLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Dec-96 i Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 3 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 5,248 5. Pilot and Purge 19,986 6. Used for lease operations Fuel Assist 922,242 10 7.Oti-er 0 TOTAL items 1 - 7 947,489 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: CGF 942,159 11. Transferred to: CCP 47,289,897 Remarks: T herehv certify that t , fnmg~ing is trne and correct. to the hest ~f my knnwlP.dQe. Signature: Title: SUPERVISOR orm evi 1 `y. `T ~" *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 Note: All volumes must be correctecLto pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS FLOW STATION 1t3 DECEMBER 1998 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 12/05/96 1300-1310 3 1801 T!C normal shutdown. Unit placed in standby mode. PLANNED Normal shutdown. TOTAL UNDER 1 HOUR FLARING EVENTS GREATER THAN 1 HOUR 12/11/96 0015-0135 12/16/96 1430-7000 TOTAL OVER 1 HOUR ~Flarsd Pilot/Purge Continuous Assist TOTAL FLARED 3 5,087 T/C 1806 shutdown on high inlet differential pressure. 161 14 B/C commonline developed a leak near FS3. 5,251 19,988 LQ 25,247 5,248 UNPLANNED Reduced inlet gas rates & restarted 11106. UNPLANNED Shut in 14 B/C C/L, swept, & depressured. ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition F[.,OW STATION 3 ARCO AI..ASKA, INC. F:;ASTF.,RN OPERATING ARF..A-PBiJ Nov-96 i Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 3 4. Flared or vented greater than 1 hour (Sup lemental re rtrequirwi--See 20 AAC 25.235) 0 5. Pilot and Purge 19,070 6. Used for lease operations Fuel Assist 906,941 184 7.Other 0 TOTAL items 1 - 7 926,198 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: CGF 926,011 11. Transferred to: CCP 45,639,259 Remarks: T herehv certify that. th fore¢oin¢ is tn~e and correct. to the hest of my knowledge. Signature: /~~ ~ Title: SUPERVISOR orm evtse *Indicate contribution of each pool to total. Pool Name Code Percent PRiJDIiOE 64015U 100 Official Use Onl --Flarin Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235, ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS FLOW STATION #3 NOVEMBER 1996 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 11/27/96 2038-2043 r1 I~ TOTAL UNDER 1 HOUR FLARING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR Flared Pilot/Purge Continuous Assist 0 3 3 T/C 1802 shutdown for maintenance inspection. 3 t9,070 L UNPLANNED Normal compressor b~a'wdown volume for ~luitdown. ~;,, ~.a~~ ,. y TOTAL FLARED 19,257 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition F[.,OW STATInN 3 ARCO ALASKA, INC. F:;ASTF..,RN C)PIRA.TING ARF,A-PBiI OCC-96 n U Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 662 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 4,950 5. Pilot and Purge 19,011 6. Used for lease operations Fuel Assist 835,851 6 884 7.OWer 0 TOTAL items 1 - 7 867,358 8. NGL gas equivalent produced _ 0 9. Purchased gas 0 10. Transferred from: CGF , . _. _ 854,499 11. Transferred to: CCP 39,978,896 Remarks: T herehv certify th .the ~regoing is tnte and correct. to the hest of my knowledge. Signature: e: SUPERVISOR orm tse *Indicate contribution of each pool to total. Pool Name Code Percent PRUDiIOE Ext01 ~0 100 Official Use Onl --Flarin Authorization > i hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the monW following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS FLOW STATION ff3 OCTOBER 1996 PLANNED DATE TIME VOLUME MCF DESCRIP110N OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 10/19/96 0230-0235 3 T/C 1801 shutdown for maintenance. PLANNED Started T/C 1802. c 0 10/20/96 1330-1335 3 T/C 1801 test run. PLANNED Completed test run. 10/23/96 1330-1408 328 Planned facility maintenance. PLANNED Maintenance complgjg(~ m 10/23/96 1635-1720 328 Planned facilty maintenance. PLANNED ~ Maintenance complt'~e d. m ~ ~ ~ iy • ~ J''', c W r- ~ V y ~ Lu o . a ~ ~ o TOTAL UNDER 1 HOUR 662 FLARING EVENTS GREATER THAN 1 HOUR 10/03/96 1030-1130 10/06/96 0515-0545 (Intermittent 140 min.) 3,450 Planned facility shutdown, depressured flow station. PLANNED Facility shutdown. (Black Smoke) 1,500 Flow Station start up after planned facility shutdown. PLANNED All compressors on line. TOTAL OVER 1 HOUR Flared Piiot/Purge Continuous Asaiet 4,950 5,612 19,011 6.884 31,507 TOTAL FLARED ALASKA. OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT 4F PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition I7..OW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING ARFA-PBU Se -96 Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 6 4. Flared or vented greater than 1 hour (Sup lemental re rt required--See 20 AAC 25.235) 665 5. Pilot and Purge 19,471 6. Used for lease operations Fuel Assist 895,233 45 7.Other 0 TOTAL items 1- 7 915,420 8. NGL has equivalent produced 0 9. Purchased >;as 0 10. Transferred from: CGF 914,704 11. Transferred to: CCP 41,124,605 Remarks: T herehv certify that. the cmegoing is trne and correct. to the hest of my knowledge. Signature: ~ Title: SUPERVISOR orm evise *Indicate contribution of each pool to total. Pool Name Cade Percent PR.I7I7Ii0E 640150 100 Official Use Onl --Flarin Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ` ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING NVCIDENTS FLOW STATION 113 SEPTEMBER 1996 .PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 3 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 09/20/96 1425-1428 3 Shutdown T/C 1802 for maintenance. PLANNED Started T/C 1801. 09/22/96 1325-1329 3 T/C 1802 maintenance run test after 1000 hr inspection. PLANNED Depressuring completed. • TOTAL UNDER 1 HOUR 6 FLARING EVENTS GREATER THAN 1 HOUR 09/12/96 0942-1100 497 6C/138 & 13D commonlines depressured to enable PLANNED maintenance on DS 13 test divert valves. 09/13/96 1310-1430 168 6B & 6D commonline depressured to enable valve maintenance. PLANNED 1810-1830 TOTAL OVER 1 HOUR 6S 5 Flared 6 71 • Pilot/Purga 19,471 Contlnuous Asslst ~ TOTAL FLARED 20,187 Completed depressuring of 6C/138 and 13D. Completed depressuring. ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition FLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Au -96 • Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 918 4. Flared or vented greater than 1 hour (Sup lemental report required--See 20 AAC 25.235) 1,552 5. Pilot and Purge 19,433 6. Used for lease operations Fuel Assist 881,541 129 7.Other 0 TOTAL items 1- 7 903,573 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: CGF 900,899 11. Transferred to: CCP 40,569,164 Remarks: T herehv cettifv that. the foregoing is m~e and correct. to the hest of my kn~wied¢e. Signature: G~~Y, A-~~ Title: SUPERVISOR ~~: orm evise *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 Official Use Onl --Flarin Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS FLOW STATION #3 AUGUST 1996 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 08/01/96 0700-0730 54 Flared for drillsite shutdown maintenance work. PLANNED 7D & 7B commonlines depressured. 08/09/96 0845-0850 2 Two failed starts on 1802 T/C due to instrumentation problems. UNPLANNED Normal blowdown for failed starts. 0930-0935 • 08/1 1 /96 0930-0940 3 1801 T/C placed in standby mode during maintenance shutdown PLANNED Normal shutdown. 08/12/96 1105-1155 348 6C/13 8 commonline depressured prior to lifting to enable PLANNED Completed depressuring for work to proceed. sleeve repair installation. 08/15/96 0905-0925 125 148/C commonline depressured to enable lifting to allow PLANNED Completed depressuring to allow line lifting sweep installation repair to proceed. and sleeve repair installation. 08/15/96 1200-1235 232 6C/13B commonline depressured to allow repair of 6C test PLANNED Completed depressuring to allow test return return valve stem leak. valve stem leak repair. 08/15/96 1255-1310 50 148/C commonline depressured residual pressure to allow PLANNED Completed depressuring of residual pressure. continuation of the lifting & installation of the sleeve repair. 08/30/96 1200-1205 104 Gas transit system overpressure backing flow station out. UNPLANNED Stabilized facility process & operation. TOTAL UNDER 1 HOUR 918 FLARING EVENTS GREATER THAN 1 HOUR 08/06/96 0507-0700 1,135 Depressured FS 3 to BP AL line from 500# to 200# fora PLANNED Depressured to desired pressure. sleeve weld. 08/13/96 0440-0700 417 6C/13B CL depressured after gas sweep to remove residual PLANNED Completed sweep gas depressuring. liquids in attempt to enable sleeve repair installation. TOTAL OVER 1 HOUR 1, 552 Flared 2,470 Pilot/Purge 19,433 Continuous Assist ].? @ TOTAL FLARED 22,032 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition FLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Jul-96 • • Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 11,353 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 60,455 5. Pilot and Purge 20,389 6. Used for lease operations Fuel Assist 872,607 3,386 7.Other 0 TOTAL items 1 - 7 968,190 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: CGF 892,837 11. Transferred to: CCP 37,129,213 Remarks: I herehv cert.ifv that. the f~regnine is tn~e and correct. to the hest of my knowledge. Signature: ~~1.t.j~.~`~-i7- ~~~~ `~ ~ ~`n'~ Title: SUPERVISOR orm iu-4~~ ~xevise *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 Official. Use Onl --Flarin« Authorization> 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month .following the month of disposition. Authority 20 AAC 25.235. r ATE IME OLUME MCF ARCO ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING INCIDENTS FLOW STATION k3 JULY 1996 DESCRIPTION OF INCIDENTS & CAUSE LANNED UNPLANNED CTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 07/19/96 0840-0935 11,350 T!C 1803 shutdown on exhaust plenum high pressure due to UNPLANNED T/C 1803 restarted after correcting WHR WHR louver malfunction. louver malfunction. 07/31 /96 2000-2010 3 T/C 1802 shutdown for 4M hour inspection. PLANNED Started T/C 1801. TOTAL UNDER 1 HOUR 11,353 FLARING EVENTS GREATER THAN i HOUR -07/1 3/96 1630-2015 48,661 T/C 1603 shutdown on high temp on the power supply. UNPLANNED Repaired WHR louver & restarted. 07119!96 0125-0135 10,391 TIC 1804 shutdown for VIGV inspection. PLANNED Completed cooldown. 0150-0445 07/20/96 1920-2023 1,233 Cranking T/C 1804 for FCO and soak water wash. PLANNED Completed FCO and water wash on 1804. 07(28!96 0920-1345 170 Flared to assist AIL tieline to BPX depressuring for smart PLANNED Line depressured. • Pigging. TOTAL OVER 1 HOUR 60,455 Flared 71, 808 Pilot/Purge 20,389 Continuous Assist x.386 TOTAL FLARED 95,583 PLANNING PRUDHOE ID~ ARCO Alaska, Inc. Post omt:e Box loosen Anchorage, Alaska 88510-0360 Telephone 907 2781215 November 7, 1996 Ms. Wendy Mahan Natural Resources Officer Alaska Oil and Gas Consctvation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Ms. Mahan: Subject: Flow Station 3 T/C 1803 SD, July l3, 1966 i~ ~r Pcr your request the following information is provided regarding the subject flaring incident. A low pressure compressor at FS-3 tripped off line at 1630 hours on July 13, 1996 due to a high ten~perattue tndtcation and alarm an the T/C power supply unit This high temperatunr indication largely resulted from the high ambient temperal:ure conditions existhig that day. The turbine was cranked in an effort to rcdttcc the unit's temperature. Several attempts were made to restart the T(C unit, starting as early as 1 S minutes after initial trip. Minor adjustments were ultimately made to the louvers on the waste heat. recovery unit to facilitate and expedite the restart process. In total, six restart attempts were made prior to successful restart at 2000 hrs. By 2015 hours, the snit was fully loaded, and flaring ceased, When tlic T/C went down a prudent decision was rnadc to attempt to restart the tJnit in an expeditious a manner as possthle, thus ending the flare and minimizing the volume of ga<s ultimately flared. It. was anticipated that restart could Ue achieved in less than 30 minuses. 13y contrast, shutting in pmduction to remove the necessity for flare would have taken much longer, requiring shut in of 40 - .50°l0 of the Flow Station watcrflood production, This choice would also have required significant adjustments to gas lift and gas tranhit system operations slid would have placed other Flow Stations and Gathering Centers in significant risk of flaring while the production shut in was initiated and optiinizcd. With restart of the T/C ucut expected every 15 to 45 minutes, it appeared restart of the unit continued to be the most efficient manner of minimizing the volume of gas flared. if you have any questions or concerns, please contact me at 659-5922. .'mil --- - John A. Mini r EOC Supervisor ; ;~ .S + 4 ~ JA1VI/svd AgCO Ahskb Inc. I~ 0 SustFdNry et Atl~ntleRlennsldCompeny NOV 08'96 10 05 No .004 P.01 • • ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition i't.OW STATION 3 ARCO Ai.:ASKA. INC. EiAS'I'ERN C)P. I:RATiNG ARFA-1'BL7 lun-96 • Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 69 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 677 5. Pilot and Purge 19,462 6. Used for lease operations Fuel Assist 893,514 4 843 7.Other 0 TOTAL items 1 - 7 918,565 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: CGF 912,976 11. Transferred to: CCP 39,440,620 Remarks: i herehv certify that. the fore¢oin¢ is taste and correct to the hest of my knowledee. Signature: Title: SUPERVISOR , orm evtse *Indicate contribution of each pool to total. Pool Name Code Percent I'RI?DIIOEs 640150 100 Official Use Onl --Flarin Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS FLOW STATION #3 JUNE 1996 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 06/20/96 1345-1355 3 Shut down T/C 1802 for mains. Normal shutdown to perform PLANNED None -Normal shutdown. 1 M hour inspection. 06/21/96 11.10-1120 60 Shut down T/C 1804 on high exhaust temperature. UNPLANNED 06/24/96 1230-1240 3 Shut down T/C 1802 for maintenance. Changed damaged speed UNPLANNED • pickup, normal stop. 06/24/96 1630-1640 3 1801 T/C Normal Shutdown PLANNED TOTAL UNDER 1 HOUR 89 FLARING EVENTS GREATER THAN 1 HOUR 06/21/96 1045-1150 677 • TOTAL OVER 1 HOUR Flared PIIoUPurgs Contl~uous Assist TOTAL FLARED 677 746 19,462 4.843 2s,o51 Shut down T/C 1801 due to turbine lute oil low pressure UNPLANNED problems Restarted 1804. Loaded 1801 T/C back up. Normal shutdown-1801 put into standby mode. Corrected tube oil problem. Unit brought back on line. ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition iT.OW STATION 3 ARCO ALASKA. INC. F.,ASTERN OPT;RATING ARF.,A-PBT.J Ma -95 • • Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 7,027 4. Flared or vented Qreater than 1 hour (Supplemental re rt required--See 20 AAC 25.235) 13,725 5. Pilot and Pure 20,105 6. Used for lease operations Fuel Assist $51,850 5 505 7.Other 0 TOTAL items 1 - 7 898,223 8. NGL gas equivalent produced 0 9. Purchased Etas 0 10. Transferred from: CGF 871,966 11. Transferred to: CCP 37,671,019 Remarks: i herehv certify th .the frn~e¢oin¢ is tnte and correct. to the hest of my knowled¢e. Signature: . ~~~ Title: SUPERVISOR orm evt *Indicate contribution of each pool to total. Pool Name Code Percent PRtJDIIOE fr'400150 10() Official LJse Onl ' --Flarin Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS FLOW STATION #3 MAY 1996 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 05/10/96 1415-1420 3 Shutdown T/C 1801 for normal stop. PLANNED Compressor depressured. 05/15/96 2210-2220 240 Shutdown T/C 1606 for Borescope/PSM Testing PLANNED Normal Shutdown. 05/18/96 0055-0155 1,239 Excessive inlet gas rates into facility UNPLANNED Reduced inlet gas rates. (Intermittent 23 mIn) • 05/18/96 2020-2035 808 Gas transit system overpressure backing Flow Station out. UNPLANNED Reduced gas transit system pressure. 05/20/96 0630-0640 20 Facility maintenance. Fully depressured 1806 compressor PLANNED Compressor case depressured. case for maintenance 05/22/96 1720-1730 3 1802 Turbine Shutdown to perform maintenance on STV PLANNED suction pressure transmitter sensing line. 05!22!96 1930-1940 3 Normal stopped 1801 after maintenance. PLANNED 05/24/96 1321-1406 4,711 Electrical malfunction. 1804 T/C shutdown due to 25 volt UNPLANNED power supply surge/spike TOTAL UNDER 1 HOUR 7,027 FLARING EVENTS GREATER THAN 1 HOUR 05/03/96 1158-1323 • 05/15/96 05/16/96 OS! 16!96 2205-2215 (Intermittent 70 min) 0050-0505 0050-0505 05/17/96 TOTAL OVER 1 HOUR Flared PiloUPurge Continuous Assist TOTAL FLARED 1230-1330 13,725 2,265 T/C 1801 shutdown due to high balance line D/P. UNPLANNED Assist gas to prevent black smoke on STV flare. 4,706 Excessive inlet gas rates into facility. PLANNED 2,880 1806 Cooldown cranking to enable maint. Boroscope inspection. PLANNED 2,934 Assist gas volume distributed to 1806 Cooldown cranking PLANNED operation to enable horoscope inspection. 940 Facility maintenance. Cranking 1806 Turbine for waterwash PLANNED 20,752 20,106 5.505 46,363 Normal shutdown. Normal stop. ~ 0 . Restarted T/C 1804. Reset ~6.arolt power y supply. L..,.) l l J m d . . + ,,,~ = ~.._. t~,._ to . =- ` 14,1 .-, ~ :, c ' _ t: s . ~: ¢.; _.. . L.3,.1, ~ ~- Stabilized facility process 8 opOr~tion --~ and started 1802 T/C. ~. ~'` vs Reduced inlet gas rates. Completed Cooldown cranking. Completed Cooldown cranking. Facility Maintenance. ALASKA OIL AND GAS CONSERVATION COMMISSION • FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition FLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU A r-96 Disposition 1. Sold p 2. Reiniected 0 3. Ftared or vented less than 1 hour 1,369 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 1,211 s. Pilot and Purge 20,989 6. Used for lease operations Fuel Assist 9s2,906 3 712 7.Other 0 TOTAL items 1- 7 9$0,187 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: CGF 973,830 11. Transferred to: CCP 39,864,884 Remarks: T herehv cert.ifv that the. fnreQninQ is trne an~i cnrrert to the beet of my knnwlP.~1Qe. Signature: ~, Title: SUPERVISOR orm evtse *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 to pressure of 14.6s psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 2s.23s. ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS FLOW STATION #t3 APRIL 1996 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 04/04/96 1530-1535 3 Shutdown T/C 1802 for maintenance. PLANNED Normal compressor shutdown blowdown. 04/08/96 1645-1650 3 Shutdown T/C 1802 for return to standby. PLANNED Normal compressor shutdown blowdown. 04/21 /96 2145-2210 493 Depressured B train HP separator and gas scrubber for PLANNED Blowdown volume for HP vessels. valve replacement and maintenance. • 04/21/96 2230-2400 626 Depressured 7C/15C Commonline for ihermowell PLANNED Commonline blowdown volume. replacement and facility maintenance. 04122!96 0230-0300 24 Depressure B train IP separator for valve replacement PLANNED Normal vessel blowdown volume. and facility maintenance. 04/23/96 1020-1030 220 Shutdown T/C 1804 for maintenance. 4 failed starts on 1804 UNPLANNED Normal vessel blowdown volume. (Intermittent 50 min) turbine. RECEIVED TOTAL UNDER 1 HOUR 1,389 FLARING EVENTS GREATER THAN 1 HOUR 04!23!96 0900-0930 1,211 • 1430-1730 TOTAL OVER 1 HOUR Flared Pllot/Purga Continuous Assist TOTAL FLARED 1,211 2,580 20,989 3.712 27,281 Facility maintenance. Replaced 15D P3507BSV upstream PLANNED block valve depressured Commonline 15D. iYf~! 1 Cy ~~~~ `Alaska Oit ~ Gas Cons. Commission Anchorage Facility maintenance complete. Completed valve replacement • ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition PLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Maz-96 Disposition *Indicate contribution of each pool to total. 1. Sold 0 Pool Name Code Percent 2. Reinjected 0 PRUDHOE 640150 100 3. Flared or vented less than 1 hour 12,455 4. Flared or vented Qrea[er than 1 hour 3,002 (Supplemental report required--See 20 AAC 25.235} 5. Pilot and Purge 25,205 6. Used for lease operations Fuel 899,423 Assist 1 295 11. Transferred to: CCP r~yr^;~~U 39,828,058 7.Other 0 TOTAL items 1- 7 941,380 8. NGL Qas equivalent produced 0 ~~ ~~ ~~ 9. Purchased gas ~ ,~ ~ a. 1 s '~rr `~ ~ 0 10. Transferred from: CGF ~'~ ~' ~ ~ ~ ~ ~ ~ ~~ it 924,628 r+~ :~:`s y'E ~ ~ 1',.~. p~.~e..-~ a .mss. r?rr L. V.f (z 7 l,, :;~. ~:t c. ,c.Jaly Remarks: T herehv certify that. the fnre.QOinQ is erne and correct to the, hest. of my knowlP.dge. Signature: ~ Title: SUPERVISOR pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS FLOW STATION tl`3 MARCH 1996 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 03/03/96 1730.1758 4,596 T/C 1803 shutdown from high turbine exhaust temp. UNPLANNED Restarted T/C 7803. 03/04/96 1030-1105 6,927 T/C 1803 shutdown from high turbine exhaust temp. UNPLANNED Restarted T/C 1803. 03lC4/96 1520-1525 3 TJC 1801 shutdown for engine stop. PLANNED Started T/C 1802. 03/05/96 0100-0120 60 T/C 1803 shutdown for combustion inspection. PLANNED Completed depressuring. 03/05/96 1700-1730 12 Test running 1801 after maintenance repaired slide valve PLANNED Compressor depressured. Repair 1801 (Intermittent 15 min} compressor bleed air. seal oil level control. 03/06/96 0415-0515 421 Depressure 6C 8 13 8 commonline from slugcatcher pressure PLANNED Completed depressuring 6C 8 13B CIL. for DS discharge check valve repair (after gas sweep) 03/07/96 1115-1120 6 T/C 1801 shutdown due to high exhaust temp during start PLANNED Completed depressuring. 1140-1145 for test run aher maintenance. 03/07/96 1550-1555 3 Shutdown T!C 1801 for routing slop. PLANNED Completed depressuring. 03/13/96 2225-2400 180 T1C 1803 tripped during star) sequence after maintenance. PLANNED Completed depressuring. (Intermittent 30 m(n) 03/15/96 1535-1539 56 Depresssure 1803 compression ~ suction scrubber for PLANNED Completed depressuring. discharge gasket change. 03/15/96 2245-2305 191 Swept piping then depressured 1803 T/C and piping in PLANNED Completed depressuring. • preparation of maintenance activity. TOTAL UNDER 1 HOUR 12,455 FLARING EVENTS GREATER THAN 1 HOUR 03/05/96 0130-0345 1,490 Assist gas used to prevent black smoke during crank cool down PLANNED Cool down completed. of 1803 for maintenance. 03/13/96 1743-2350 1,512 Facility maintenance on 1803. Condensed liquids in line PLANNED Assist gas used to prevent "black smoke" (Intermittent tt4 min) when flow first started to STU flare header. (Black Smoke) during maintenance cranking activity. Facility maintenance completed. ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS FLOW STATION 113 MARCH 1996 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE TOTAL OVER 1 HOUR 3,002 Flared 15,457 Pllot/Purge 25,205 Continuous Assist 1.295 . TOTAL FLARED 41,957 • • • ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition FLOW STATION 3 ARCO ALASKA, INC. EASTERN OPERATING AREA-PBU Feb-96 Disposition 1. Sold 0 2. Reinjected p 3. Flared or vented less than 1 hour 9 4. Flared or vented greater than 1 hour (Su elemental report required--See 20 AAC 25.235) 760 5. Pilot and Purge 23,476 6. Used for lease operations Fuel Assist 8$1,256 1 300 7.Other 0 TOTAL items 1 - 7 906,801 8. NGL Qas equivalent produced 0 9. Purchased gas 0 10. Transferred from: CGF 904,732 11. Transferred to: CCP 41,349,788 Remarks: 1 hP,rP,hV CP.rf1fV that fhP, f~regninn 1C tri1P. Arid C.(1ttP.t'f kl the; hest f1f mV krinWlP,(19P,. Signature: ~~~,..,~--~- Title: SUPERVISOR orm evtse *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 OfCi;ial Use Onl -=Flarv~ Autltorixation> 1 hr, 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS FLOW STATION ~3 FEBRUARY 1996 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS A CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 02!21196 1930-1935 3 Shut down T/C 18ot for maintenance inspection PLANNED Normal compressor blowdown volume. 02/22/96 1935-1940 3 Shut down T/G 1801 for maintenance inspection PLANNED Normal compressor blowdown volume. 02/24/96 0930-0940 3 Shut down T/C 1802 for maintenance. PLANNED Normal compressor blowdown. • TOTAL UNDER 1 HOUR FLARING EVENTS GREATER THAN 1 HOUR 02/19/96 0210-0430 TOTAL OVER 1 HOUR • Flared PIIoUPurge Continuous Assist TOTAL FLARED 9 760 Flaring for shutdown startup. Shutdown 13D commonline for scheduled tie-in work at drillsite. 769 23,476 1.300 25,545 760 PLANNED 158 commonline depressured for scheduled valve replacement & tie in work. ALASKA OIL AND (iAS CONSERVATION COMMISSION FACILITY F:EPOF:T OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition FLOW STATION 3 ARCO ALASKr~, INC. EASTERN OPERATING AREA-PBU Jan-96 Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 16 4. Flared or vented greater than l hour (Supplemental report r aired--See 20 AAC 25.235) 3,921 5. Pilot and Purge 25,468 6. Used for lease operations Fuel Assist 962,682 437 7.Other 0 TOTAL items 1 - 7 992,524 8. NGL Qas equivalent produced 0 9. Purchased gas 0 10. Transferred from: CGF 988,052 11. Transferred to: CCP 39,017,286 Remarks: T herehv certify that the foregoing is trne and c.~rrect to the hest. of my knnwlerige. Signature: ~ Title: SUPERVISOR orm evtse *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 _ .._ _.. ~~f~tal iJse.4`htl ~lau~t-1 €Authoit`ization ~ 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING INCIDENTS FLOW STATION tf3 JANUARY 1996 PLANNED DATE TIME VOLUME MCF DESCRIP71ON OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING EVENTS LESS THAN 1 HOUR 01/20/96 0745-0755 4 1802 shutdown for instrumentation malfunction. UNPLANNED Facility maintenance completed. 01/24/96 1655-1705 3 1801 T/C test started then normal shutdown to troubleshoot PLANNED Completed troubleshooting-normal shutdown. fuel gas system maHunction. 01/25/96 1100-1110 3 1802 T/C shut down to repair #1 bearing seal leak on turbine. PLANNED Normal shutdown. i 01/30/96 1100-1110 3 1802 T/G normal shutdown after aint na t t PLANNED N l h nce m e es run. orma s utdown. 01130!96 1300-1310 3 1802 T/C normal shutdown after second test run. PLANNED Normal shutdown. TOTAL UNDER 1 HOUR 1 6 FLARING EVENTS GREATER THAN 1 HOUR 01/05/96 1325-1430 01/08/96 0707-0830 01/18/96 01/2o/ss 01/24/96 TOTAL OVER 1 HOUR 1550-1800 0530-0615 0755-0840 1350-1630 3,821 386 Depressure tieline to remove stuck corrosion coupon. 51 US 7 common lines (78 8 7D) depressured to perform the f~~llowing tasks: Replace 3 under-rated nipples, replace 2 k:aky divert valves, replace 1 leaky drain header valve. 2,759 1802 shutdown when starting 1801 due to starting gas 7 ~7 problem (high) fuel gas problem (low) and high vibrations. ~ >y~cA ~~ 157 Depressured 14D & 14 commonline for drillsite shutdown. PLANNED Completed depressuring tieline. PLANNED Complete depressuring to enable completion of tasks. UNPLANNED PLANNED 568 DS 6 and DS 13 commonlines (6B, 6D/13B, 13D) depressured PLANNED ~ to perform the following tasks: replace 30 under-rated nipples, /~2 replace 3 drain header valves. ~~ Flared 3, 937 PiloUPurge 25,488 Continuous Assist g„~ TOTAL FLARED 29,842 Adjusted fuel gas problems 8 restarted t801. Completed depressuring C/L for drillsite divert valve repair and nipple replacement. Completed depressuring to enable completion of the tasks.