Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ARCO - LISBURNE
State of Alaska Alaska Oil & Gas Conservation Commission ;~ ~ _. 1999 Facility Report Files File Names Gas Disposition Facility Opp LISBURNE PRODUCTION CENTER #1 AR Disposition 1. Sold 2. Reinjected • 3. Flared or vented less than 1 hour 4. Flared or vented greater than 1 hour Su lemental re rt re wired--See 20 AAC 5. Pilot and Purge ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION x Field(s) ALASKA, INC. PRUDHOE BAY/PT 6. Used for lease operations Fuel Assist 7.Other Lift Gas, Off Feld TOTAL Rems 1 - 7 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby certify that/the foregoing is true and correct to the best of my Signature: ~~~T.G~-~--~-1 Title: Form 10-422 (Revised 4/95) ime MCF' 162,267 8,1'.48,490 0 0 12,088 846,369 2,751 232,069 9,404,034 162,267 0 0 0 Date: ~ /~ Month/Year of fisposition 1 /99 'Indicate contribution of each pool to total. Pool Name Code Percent LISBURNE NIAKUK 640144 640148 28.83% 6.95% NORTH PRUDHOE BAY 640152 0.00% POINT MCINTYRE WEST BEACH NIAKUK 666100 640186 640148 61.37% 0.00% 2.85% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF ^ Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of dspositbn. Authority 20 AAC 25.235. • ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JANUARY 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS A CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare rr 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared O Measured Safety Pilot 3,486 Continuous Assist 793 TOTAL FLARED 4,279 ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JANUARY 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS d~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE • Total Flare <- 1 Hour 0 • Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 7,416 Continuous Assist 1,700 TOTAL FLARED 9,116 ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JANUARY 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE • Total Flare ~ 1 Hour 0 • Total Flare > 1 Hour 0 Volume Flanjd 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 ARCO ALASKA, INC, ': CONSERVATION ORDER N0.219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JANUARY 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE • Total Flare N 1 Hour 0 • Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED BP EXPLORATION, INC. CONSERVATION ORDER N0.219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JANUARY 1999 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS d~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flaro r_ 1 Hour 0 • Total Flare > 1 How 0 Volume FlanxJ 0 Measured Safety Pilot 842 Continuous Assist 179 TOTAL FLARED 1,021 ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JANUARY 1999 VOLUME PLANNED DATE TIME (Mscfl DESCRIPTION OF INCIDENTS d~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE • Total Flare ~ 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 344 Continuous Assist 79 TOTAL FLARED 423 Disposition Volume MCF* 1. Sold 138,673 2. Reinjected 7,083,231 3. Flared or vented less than 1 hour .495 4. Flared or vented greater than 1 hour Su lemental re ort r aired--See 20 AAC 25.235 0 5. Pilot and Purge 10,896 6. Used for lease operations Fuel Assist 780,431 7,296 7. Other Lift Gas, Off Field 244,435 TOTAL items 1 - 7 8,265,457 8. NGL gas equivalent produced 138,673 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that th foregoing is true and correct to the best of my knowledge. ~ Signature: ` , __ Title: ~-r~ Date: ~" ~~// Form 10-422 (Revised. 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent LISBURNE NIAKUK 640144. 640148 36.27% 6.86% NORTH PRUDHOE BAY 640152 0.20% POINT MCINTYRE WEST BEACH NIAKUK 666100 640186 640148 52.17% 1.79% 2.71% Official Use Onl --Flavin Authorization ~ 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Consenr. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS FEBRUARY 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 2/12/99 1036-1053 273 Process upset in the oil section caused compressors 1800 and UNPLANNED Stabilized facility process and restarted 1100-1114 1801 to shut down. compressors. • Tofa/ Flare <= 1 Hour .273 Total Flare > 1 Hour 0 Volume Flared 273 Measured Safety Pilot 3,997 Continuous Assist 3,288 TOTAL FLARED 7,558 ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS FEBRUARY 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 2/12/99 1036-1053 177 Process upset in the oil section caused compressors 1800 and UNPLANNED Stabilized facility process and restarted 1100-1114 1801 to shut down. compressors. • Total Flare <= i Hour 177 Total Flare > 1 Hour 0 Volume Flared 177 Measured Safety Pilot 5,641 Continuous Assist 3,304 TOTAL FLARED 9,122 ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS FEBRUARY 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 2/12/99 1036-1053 Process upset in the oit section caused compressors 1800 and UNPLANNED Stabilized facility process and restarted 1100-1114 1801 to shut down. compressors. • Total Flare <= 1 Hour 0 • Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot .190 Continuous Assist 10 TOTAL FLARED 200 ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS FEBRUARY 1999 VOLUME PLANNED DATE TIME (MSC DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 2/12/99 1036-1053 Process upset in the oil section caused compressors 1800 and UNPLANNED Stabilized facility process and restarted 1100-1114 1801 to shut down. compressors. • Total Flare <- 1 Hour 0 i Total Flare > i Hour 0 Volume Flared 0 Measured Safety Pilot 21 Continuous Assist 1 TOTAL FLARED 22 BP EXPLORATION, INC. CONSERVATION ORDER N0.219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS FEBRUARY 1999 • ~~ J VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 2/12/99 1036-1053. 31 1100-1114 Total Flare <- 1 Hour 31 Total Flare > 1 Hour 0 Volume Flared 31 Measured Safety Pilot 749 Continuous Assist 490 TOTAL FLARED 1,270 Process upset. in the oil section caused compressors 1800 and UNPLANNED Stabilized facility process and restarted 1801 to shut down. compressors. ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS FEBRUARY 1999 VOLUME PLANNED DATE TIME Msc DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 2/12/99 1036-1053 14 Process upset in the oil section caused compressors 1800 and UNPLANNED Stabilized facility process and restarted 1100-1114 1801 to shut down: compressors. Total Flare <- 1 Hour 14 • Tofal Flare > 1 Hour 0 Volume Flared 14 Measured Safety Pilot 298 Continuous Assist 203 TOTAL FLARED 515 w ~ _ ~, . ;~ ~. ~, ~ r a~ 4~ ALASKA OIL AND GAS CONSERVATION COMMISSh .,".'~ as ~ ,~,v~? FACILITY REPORT OF PRODUCED GAS DISPOSITIC Facility Operator Field(s) ~ rw.""' "'"° 1S8(7RIVEPRCI~('J`Z~ION CENTER #1 ARCO ALASKA, INC. PRUDHOE E Disposition Volume MCF` 1. Sold 160,418 2. Reinjected 7,845,974 • 3. Flared or vented less than 1 hour p 4. Flared or vented greater than 1 hour Su lemental re ort re wired--See 20 AAC 25.235 0 5. Pilot and Purge 11,766 6. Used for lease operations Fuel Assisi 861,524 2,900 7. Other Lift Gas, Off Field 364,275 TOTAL items 1 - 7 9,246,857 8. NGL gas equivalent produced 160,418 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: ~C L~ Title:. ~~Z~~`~"~'"''z2fY .Date: ~ `~ Form 10-422 (Revised 4/95) )N iN 3AY/PT MCINTYRE Month/Year of Disposition 3/99 *Indicate contribution of each pool to total. .Pool Name Code Per LISBURNE NIAKUK 640144 640148 33.( 6.~ NORTH PRUDHOE BAY 640152 0.( POINT MCINTYRE WEST BEACH NIAKUK 666100 640186 640148 55.( 2.E 2.: >~:1: tit:~::~:~:~: Commissioner Date .Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS MARCH 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <- 1 Hour. 0 • Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 3,919 Continuous Assist 950 TOTAL FLARED 4,869 ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS MARCH 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE .UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE • Total Flare <=1 Hour 0 • Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 6,474 Continuous Assist- 1,612 TOTAL FLARED 8,086 ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER. ', GAS FLARING INCIDENTS MARCH 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE • Total Flare <- 1 Hour 0 • Total Flare > 1 Hour 0 Volume Flared ~ Measured Safety Pilot 314 Continuous Assist 73 TOTAL FLARED 387 ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS MARCH 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE • Total Flare <- 1 Hour 0 • Total flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 1 Continuous Assist 0 TOTAL FLARED 1 BP EXPLORATION, INC. CONSERVATION ORDER N0.219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS MARCH 1999 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE • Total Flare <- 1 Haur 0 • Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 762 Continuous Assist 188 TOTAL FLARED 950 ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS MARCH 1999 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE • Total Flare <=1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 4 . Measured Safety Pilot 296 Continuous Assist 77 TOTAL FLARED 373 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) LISBURNE PRODUCTION CENTER #1 ARCO ALASKA INC. PRUDHOE BAS Disposition Volume MCF* 1. Sold 137,517 2. Reinjected 7,068,733 3. Flared or vented less than 1 hour 1,679 4. Flared or vented greater than 1 hour 3,039 Su lemental re ort re wired--See 20 AAC 25.235 5. Pilot and Purge 11,330 6. Used for lease operations Fuel 797,499 Assist 15,299 7. Other Lift Gas, Off Field 486,683 TOTAL items 1 - 7 8,521,779 8. NGL gas equivalent produced 137,517 9. Purchased gas ~ 10. Transferred from: 0 11. Transferred to: 0 Remarks: foregoing is true and correct to the best of my knowledge. e that th I hereby certify ~ / ~ ,, Signature: ti )~ ., Title: ~, c~•-.. Dater 5~/ `7• y Form 10-422 (Revised 4/a5) r of Disposition *Indicate contribution of each pool to total. Pool Name Code Percent LISBURNE NIAKUK 640144 640148 35.12% 5.60% NORTH PRUDHOE BAY 640152 0.00% POINTMCINTYRE WEST BEACH NIAKUK 666100 640186 640148 54.11% 2.79% 2.38% official ~ 17se:c3,~I~~==~lai9ti ~ ~: ~Authi7rization~> ~ 1::hr: ~::~:~:~:~: 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the ,.~ month following the month of disposition. „_., Authority 20 AAC 25.235. ~~ e ~ ~~ "; + .~t'Ci~:, d~OtYtCf'~l~S1SJ`' • ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS APRIL 1999 VOLUME PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE DATE TIME MSCF DESCRIPTION OF INCIDENTS & CAUSE 4/4/99 0300-0324 188 Shut down compressors 1800 and 1801 due to high levels in the UNPLANNED Stabilized facility process and restarted 0336-0359 suction scrubbers compressors 4/16/99 2213-2233 83 Shut down compressors 1800 and 1801 due to high levels in the UNPLANNED Stabilized facility process and restarted suction scrubbers compressors 4/17/99 2022-2050 141 Shut down compressor 1807 due to instrument malfunction UNPLANNED Compressor down for maintenance; reduced inlet gas rates 4/19/99 0646-0730 237 Shut down compressors 1800 and 1801 due to high levels in the UNPLANNED Stabilized facility process and restarted suction scrubbers compressors 4/25/99 0900-0910 5 Depressured compressor 1800 for planned maintenance PLANNED Completed maintenance and restarted 1130-1140 1450-1500 Total Flare <= 1 Hour 654 4/4/99 0959-1120 1,086 Total Flare> 1 Hour 1,086 Volume Flared 1,740 Shut down compressor 1807 due to high waste heat recovery temperature Measured Safety Pilot 3,963 Continuous Assist. 5,287 TOTAL FLARED 10,990 UNPLANNED Restarted compressor on second attempt ~'aSka {~1~ ~ C~aS COnS. (:OI111T'.eco~; Anchora~a ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS APRIL 1999 VOLUME PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE DATE TIME MSCF DESCRIPTION OF INCIDENTS & CAUSE 4 302 Shut down compressors 1800 and 1801 due to high levels in the UNPLANNED Stabilized facility process and restarted 4/4/99 0300-032 compressors 0336-0359 139 suction scrubbers Shut down compressors 1800 and 1801 due to high levels in the UNPLANNED Stabilized facility process and restarted 4/16/99 2213-2233 suction scrubbers compressors 4/17/99 2022-2050 144 Shut down compressor 1807 due to instrument malfunction UNPLANNED Compressor down for maintenance; reduced inlet gas rates 0 278 Shut down compressors 1800 and 1801 due to high levels in the UNPLANNED Stabilized facility process and restarted 4/19/99 0646-073 compressors 0 7 suction scrubbers ressured compressor 1800 for planned maintenance De PLANNED Completed maintenance and restarted 4/25/99 0900-091 p 1130-1140 1450-1500 Total Flare <= 1 Hour 870 4/4/99 0959-1120 1,644 Shut down compressor 1807 due to high waste heat recovery UNPLANNED Restarted compressor on second attempt temperature Total Flare > 1 Hour 1,644 Volume Flared 2,514 Measured Safety Pilot 6,146 Continuous Assist 8,447 TOTAL FLARED 17,107 ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS APRIL 1999 VOLUME PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE DATE TIME MSCF DESCRIPTION OF INCIDENTS & CAUSE 6 Shut down compressors 1800 and 1801 due to high levels in the UNPLANNED Stabilized facility process and restarted 4/4/99 0300-0324 0336-0359 suction scrubbers compressors 7 Shut down compressors 1800 and 1801 due to high levels in the UNPLANNED Stabilized facility process and restarted 4/16/99 2213-2233 suction scrubbers compressors • 9 Shut down compressor 1807 due to instrument malfunction UNPLANNED Compressor down for maintenance; 4/17/99 2022-2050 reduced inlet gas rates 16 Shut down compressors 1800 and 1801 due to high levels in the UNPLANNED Stabilized facility process and restarted 4/19/99 0646-0730 compressors 1 suction scrubbers ressured compressor 1800 for planned maintenance PLANNED Completed maintenance and restarted D 4/25/99 0900-0910 ep 1130-1140 1450-1500 Total Flare <=1 Hour 39 4/4/99 0959-1120 75 Shut down compressor 1807 due to high waste heat recovery UNPLANNED Restarted compressor on second attempt temperature Total Flare > 1 Hour 75 Volume Flared 114 Measured Safety Pilot 321 Continuous Assist 465 TOTAL FLARED 900 ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS APRIL 1999 VOLUME PLANNED DATE TIME MSCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour Tofal Flare > 1 Hour Volume Flared Measured Safety. Pilot 0 Continuous Assist 0 TOTAL FLARED 0 BP EXPLORATION, INC. CONSERVATION ORDER N0.219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS APRIL 1999 J ~~ VOLUME PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE DATE TIME Msc DESCRIPTION OF INCIDENTS & CAUSE 29 Shut down compressors 1800 and 1801 due to high levels in the UNPLANNED Stabilized facility process and restarted 4/4/99 0300-0324 0336-0359 suction scrubbers compressors 15 Shut down compressors 1800 and 1801 due to high levels in the UNPLANNED Stabilized facility process and restarted 4/16/99 2213-2233 suction scrubbers compressors 17 Shut down compressor 1807 due to instrument malfunction UNPLANNED Compressor down for maintenance; 4/17/99 2022-2050 reduced inlet gas rates 25 Shut down compressors 1800 and 1801 due to high levels in the UNPLANNED Stabilized facility process and restarted 4/19/99 0646-0730 suction scrubbers compressors 4/25/99. 0900-0910 1 Depressured compressor 1800 for planned maintenance PLANNED Completed maintenance and restarted 1130-1140 1450-1500 Total Flare <= 1 Hour 87 4/4/99. 0959-1120 153 Total Flare > 1 Hour 153 Volume Flared 240 Measured Safety Pilot 634 Continuous Assist 815 Shut down compressor 1807 due to high waste heat recovery UNPLANNED Restarted compressor on second attempt temperature TOTAL FLARED 1,689 ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS APRIL 1999 • VOLUME PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE DATE TIME Mscf DESCRIPTION OF INCIDENTS & CAUSE ressors 1800 and 1801 due to high levels in the wn com Sh t d UNPLANNED Stabilized facility process and restarted 4/4/99 0300-0324 14 p o u compressors 0336-0359 6 suction scrubbers Shut down compressors 1800 and 1801 due to high levels in the UNPLANNED Stabilized facility process and restarted 4/16/99 2213-2233 compressors 2 suction scrubbers Shut down compressor 1807 due to instrument malfunction aintenance; UNPLANNED o ~ s 4/17/99 2022-2050 es et g s rat n reduced 6 Shut down compressors 1800 and 1801 due to high levels in the UNPLANNED Stabilized facility process and restarted 4/19/99 0646-0730 compressors 1 suction scrubbers ressured compressor 1800 for planned maintenance De PLANNED Completed maintenance and restarted 4/25/99 0900-0910 p 1130-1140 1450-1500 Total Flare <= 1 Hour 29 4/4/99 0959-1120 81 Shut down compressor 1807 due to high waste heat recovery temperature Total Flare > 1 Hour 81 Volume Flared .110 Measured Safety Pilot 266 Continuous Assist 285 TOTAL FLARED 661 UNPLANNED Restarted compressor on second attempt ~~~ ~~~~ ~58a~Cit IJtI ~ ~OS" ~i0itrs. v7tt1(tiS` ;;:~ Aiichora~~: Facility LISBURNE PRODUCTION CENTER +~ ,~:., Disposition ~ 63 cv ~-. . ~ 1. Sold T, ~ ` . ~ . c7 ~ "~ 2. Reinjected 3 c ~ .~ ~p 3. Flared or vented less than 1 hour • 4. Flared or vented greaterthan 1 hou Su lemental re ort re uired--See 5. Pilot and Purge 6. Used for lease operations 7. Other TOTAL items 1 - 7 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator field(s) Month/Year of Disposition ARCO ALASKA, INC. PRUDHOE BAY/PT MCINTYRE 5/99 AAC Fuel Assist Lift Gas, Off Field Volume MCF* 152,343 7,082,959 308 0 11,608 832,004 8,777 399,933 8,487,932 152,343 0 0 0 hereby certify a fo goi 's tru an rrect to the best of my knowledge. Signature: ~ Titl Date: ~ ~~ Form 10-422 (Revised 4/95) ~ *Indicate contribution of each pool to total. Pool Name Code Percent LISBURNE NIAKUK 640144 640148 25.94% 6.15% NORTH PRUDHOE BAY 640152 0.00% POINT MCINTYRE WEST BEACH NIAKUK 666100 640186 640148 62.61% 2.60% 2.70% ..................................................... dfftcial~Use:©MI~~=-eta'riti~':~Autf~rizatian~~~i:~tir:~:~:~:~:~:~:~: 1. Safety MCF 2. Lease Use MCF 3. Consenr. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. _Authority 20 AAC 25.235. v. ~;.~ r+ y¢•F~ ~. g wr. ~ ~~f~ Y~ ~ a , v $ a Facilfity ' "~ " ~"~ Ope L SB RNE R N CENTER #1 AR( I.i"tic? l> AIIChOTg~J Disposition 1: Sold. 2. Reinjected • 3. Flared or vented less than 1 hour 4. Flared or vented greater than 1 hour Su lemental re ort re wired--See 20 AAC 5. Pilot and Purge 6. Used for lease operations Fu A 7. Other Lift ALASKA OIL AND GAS CONSERVATION COMMISSION FACWTY REPORT OF PRODUCED GAS DISPOSITION ~r Field(s) ALASKA. INC. PRUDHOE BAY/ el ssist Gas, Off Field Volume MCF' 141,266 6,964,440 273 0 11,249 779,478 2,839- - 324,868 8 224 413 TOTAL items 1 - 7 • 8. NGL gas equivalent produced 141,266 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify t the forego' is true and correct to the best of my knowledge. '''~~~JJJ Signature:. ~ - Title: ~~ :~-~`~~-"~' Date: Form 10-422 (Revised 4/95) Month/Year of Disposition 3. Conserv. Purposes I MCF I 1 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following 4he month of disposition. Authority 20 AAC 25.235. $~~<.~ ~ ~ 6 ,. r'_,.ti '~.- iu, ~ ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JUNE 1999 "~'°~~' PLANNED VOLUME DATE TIME MSCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/1/99 0034-0053 57 Process upset in the oil section caused compressors 1800 and 1801 UNPLANNED Restarted compressors after stabilizing to shut down facility process • Total Flare <= 1 Hour 57 Total Flare > 1 Hour 0 Volume Flared 57 Measured Safety Pilot 3,531 Continuous Assist 850 TOTAL FLARED 4,438 ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JUNE 1999 VOLUME PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE DATE TIME MSC DESCRIPTION OF INCIDENTS & CAUSE 6/1/99 0034-0053 179 Process upset in the oil section caused compressors 1800 and 1801 UNPLANNED Restarted compressors after stabilizing to shut down facility process • Total Flare <= 1 Hour 179 Total Flare > 1 Hour 0 Volume Flared 179 Measured Safety Pilot 6,699 Continuous Assist 1,651 TOTAL FLARED 8,529 ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JUNE 1999 VOLUME PLANNED DATE TIME MSCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/1/99 0034-0053 14 Process upset in the oil section caused compressors 1800 and 1 UNPLANNED faclity processpressors after stabilizing to shut down Total Flare <- i Hour 14 Total Flare > 1 Hour 0 Volume Flared 14 Measured Safety Pilot 180 Continuous Assist 701 TOTAL FLARED 295 ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, NORTH PRUDHOEBAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JUNE 1999 • VOLUME PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAU: DATE TIME MSCF DESCRIPTION OF INCIDENTS & CAUSE 6/1/99 0034-0053 0 Process upset in the oil section caused compressors 1800 and 1 UNPLANNED ac lity processpressors after stabilizing to shut down Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 BP EXPLORATION, INC. CONSERVATION ORDER N0.219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JUNE 1999 VOLUME PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE DATE TIME Msc DESCRIPTION OF INCIDENTS & CAUSE 6/1/99 0034-0053 16 Process upset in the oil section caused compressors 1800 and 1801 UNPLANNED fac lily pro esspressors after stabilizing to shut down Total Flare <- 1 Hour 16 r1 I~ Total Flare > 1 Hour Volume Flared 0 16 Measured Safety Pilot 585 Continuous Assist .173 TOTAL FLARED T74 ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JUNE 1999 VOLUME PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE DATE TIME Mscf DESCRIPTION OF INCIDENTS & CAUSE 6/1/99 0034-0053 7 Process upset in the oil section caused compressors 1800 and 1801 UNPLANNED ac lily p ocesspressors after stabilizing to shut down Total Flare <= 1 Hour 7 i Total Flare > 1 Hour 0 Volume Flared ~ Measured Safety Pilot 254 Continuous Assist 64 TOTAL FLARED 325 u Facility nl F #1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Field(s) Month/Year of Disposition 1 ~~ wwn inirr IPRUDHOE BAY/PT MCINTYRE ~ 7/99 ~ 'Indicate contribution of each pool to total. Pool Name Code ;Percent LISBURNE NIAKUK 640144 640148 26.44% 5.78% NORTH PRUDHOE BAY 640152 0.00% POINT MCINTYRE WEST BEACH NIAKUK 666100 640186 640148 60.52% 4.62% 2.64% dfi`icial~l;Jse:©rtl~'==~laifii`:~At~iF~oi52atiort >~is~ti>::~:~:~:~:~:~>:~ 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. r Authority 20 AAC 25.235. ~:n ;~~ " ~ ~~ crs ~ ~ ~g ~t ,` '~ c n Form 10-422 (Revised 4/95) ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) JUCTION CENTER #1 ARCO ALASKA INC. PRUDHOE BA` t,rovvnwa.. ~ ~ Disposition Volume MCF' 'Indicate contribution of each pool to total. 1. Sold 2. Reinjected 3. Flared or vented less than 1 hour 4. Flared or vented greater than 1 hour Su lemental re ort re wired--See 20 AAC 25.235 5. Pilot and Purge 6. Used for lease operations Fuel Assist 7.Other Lift Gas, Off Field TOTAL items 1 - 7 • 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: I hereby certi a the fore Signature: Form 10-422 (Revised 4/95) 92,746 7,691,731 1,107 0 12,506 814,157 15,125 236,213 8,863,585 92,746 0 0 0 is t and correct to the ,b~e/s/t of my knowledge. Title: /'/~~ .~-~ _ Date: Month/Year of Disposition MCINTYRE 8/99 Pool Name Code Percent LISBURNE NIAKUK 640144 640148 15.67% 7.23% NORTH PRUDHOE BAY 640152 0.00% POINT MCINTYRE WEST BEACH NIAKUK 666100 640186 640148 65.27% 9.20% 2.63% Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC, CONSERVATION ORDER N0.219 • • PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS AUGUST 1999 VOLUME PLANNED DATE TIME MSC DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE `: 8/12/99 1210-1220 32 Process upset in the oil section caused compressor 1800 to UNPLANNED Restarted compressor after stabilizing shut down facility process 8/17/99 < 1 hr 130 Compressor 1800 shutdown on high exhaust temperature UNPLANNED Restarted compressor Total Flare <- 1 Hour 162 Total Flare > 1 Hour 0 ,Volume Flared 162 i ;Measured Safety Pilot 1,964 iContinuous Assist 1,914 1TOTAL FLARED 4,040 r ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS AUGUST 1999 • VOLUME PLANNED DATE TIME MSCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/12/99 1210-1220 191 Process upset in the oil section caused compressor 1800 to UNPLANNED Restarted compressor after stabilizing shut down facility process 8/17/99 < 1 hr 535 Compressor 1800 shutdown on high exhaust temperature UNPLANNED Restarted compressor Total Flare <= 1 Hour 726 • Total Flare ~ 1 Hour 0 Volume Flared 726 Measured Safety Pilot 8,157 Continuous Assist 10,227 TOTAL FLARED 19,110 ARCO ALASKA, INC, CONSERVATION ORDER N0.219 i PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS AUGUST 1999 VOLUME PLANNED DATE TIME MSCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/12/99 1210-1220 25 Process upset in the oil section caused compressor 1800 to UNPLANNED Restarted compressor after stabilizing shut down facility process 8/17/99 < 1 hr 77 Compressor 1800 shutdown on high exhaust temperature UNPLANNED Restarted compressor Total Flare <= 1 Hour 102 • Total Flare > 1 Hour 0 Volume Flared 102 Measured Safety Pilot 1,152 Continuous Assist 1,450 TOTAL FLARED 2,704 ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS AUGUST 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE ~J Total Flare <= 1 Hour 0 • Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 BP EXPLORATION, INC. CONSERVATION ORDER NO. 219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS AUGUST 1999 • VOLUME PLANNED DATE TIME Mscf DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/12/99 1210-1220 21 Process upset in the oil section caused compressor 1800 to UNPLANNED Restarted compressor after stabilizing shut down facility process g/17/99 < 1 hr 65 Compressor 1800 shutdown on high exhaust temperature UNPLANNED Restarted compressor Total Flare <- 1 Hour 86 • Total Flare > 1 Hour 0 Volume Flared 86 'Measured Safety Pilot 904 Continuous Assist 1,134 :TOTAL FLARED 2,124 ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS AUGUST 1999 • VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/12/99 1210-1220 8 Process upset in the oil section caused compressor 1800 to UNPLANNED Restarted compressor after stabilizing shut down facility process 8/17/99 < 1 hr 23 Compressor 1800 shutdown on high exhaust temperature UNPLANNED Restarted compressor Total Ffare r- 1 Hour 31 Total Flare > 1 Hour 0 Volume Flared 31 Measured Safety Pilot 329 Continuous Assist 400 ': TOTAL FLARED 760 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION • ~n a '~ © fp C3 rT~ ~ ~ ~ o _ ~~ c.p ...... w ~ n ^'' c.C~ 3 v~ i"T'f N• ` o Facility LISBURNE PRODUCTION CENTER #1 Operator ARCO ALASKA, INC. Field(s) PRUDHOE BAY/PT MCINTYRE MonthNear of Disposition 9/99 Disposition Volume MCF' 'Indicate contribution of each pool to total. 1. Sold 124,179 Pool Name Code Percent 2. Reinjected 7,046,772 LISBURNE NIAKUK 640144 640148 20.43% 6.97% NORTH PRUDHOE BAY 640152 0.00'/0 3. Flared or vented less than 1 hour 751 POINT MCINTYRE WEST BEACH 666100 640186 62.17% 7.98% NIAKUK 640148 2.45% 4. Flared or vented greater than 1 hour Su lemental re ort re wired--See 20 AAC 25.235 12,074 5. Pilot and Purge 12,484 6. Used for lease operations Fuel i t A 727,346 596 12 ss s , 7. Other Lift Gas, Off Field 87,745 Off+eel Use:Ori1 ==Kl~rir'i : AutMorizatiorl > isfir::::: >: TOTAL items 1 - 7 8,023,947 1. Safety MCF 8. NGL gas equivalent produced 124,179 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: 0 t D a e Commissioner 0 11. Transferred to: Note: All volumes must be corrected to f t Remarks: ure o pressure of 14.65 psia and to a tempera 60 degrees F. Report due by the 20th of the i I hereby certify t th fore ing is true and correct to the best Signature: Title ,~~' of my knowledge. ~-/ ~ o~I,~~~ Date: c1 (b on. month following the month of disposit Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS SEPTEMBER 1999 • VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/11/99 1242-1322 18 Complete facility shut down to perform modifications and repairs PLANNED Depressured and performed maintenance 1338-1339 to plant, drill site piping and equipment 1440-1442 9/16/99 1313-1330 50 Process upset in the oil section caused compressors 1800 and UNPLANNED Restarted compressors immediately 9/18/99 2158-2216 39 Total Flare <- 1 Hour 107 9/11/99 0039-0410 410 0817-0823 9/12/99 0905-1035 0 Total Flare > 1 Hour 410 Volume Flared 517 Measured Safety Pilot 2,442 Continuous Assist 3,071 TOTAL FLARED 6,030 1801 to shut down Process upset in the oil section caused compressors 1800 and 1801 to shut down Complete facility shut down to perform modifications and repairs to plant, drill site piping and equipment Restarted plant after complete shut down. Gas flared during attempts to start compressor 1807 -unsuccessful UNPLANNED Restarted compressors immediately PLANNED Depressured and performed maintenance UNPLANNED Compressor down for repairs ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS SEPTEMBER 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/11/99 1242-1322 171 Complete facility shut down to perform modifications and repairs PLANNED Depressured and performed maintenance 1338-1339 to plant, drill site piping and equipment 1440-1442 9/16/99 1313-1330 134 Process upset in the oil section caused compressors 1800 and UNPLANNED Restarted compressors immediately 9/18/99 2158-2216 135 Total Flare <- 1 Hour 440 9/11/99 0039-0410 4,074 0817-0823 9/12/99 0905-1035 4,527 Total Flare> 1 Hour 8,601 Volume Flared 9,041 Measured Safety Pilot 7,887 Continuous Assist 7,551 TOTAL FLARED 24,479 1801 to shut down Process upset in the oil section caused compressors 1800 and UNPLANNED Restarted compressors immediately 1801 to shut down Compiete facility shut down to perform modifications and repairs to plant, drill site piping and equipment Restarted plant after complete shut down. Gas flared during attempts to start compressor 1807 -unsuccessful PLANNED Depressured and performed maintenance UNPLANNED Compressor down for repairs ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS SEPTEMBER 1999 DATE TIME VOLUME MSCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/11/99 1242-1322 82 Complete facility shut down to perform modifications and repairs PLANNED Depressured and performed maintenance 1338-1339 to plant, drill site piping and equipment 1440-1442 9/16/99 1313-1330 20 Process upset in the oil section caused compressors 1800 and UNPLANNED Restarted compressors immediately 1801 to shut down 9/18/99 2158-2216 19 Process upset in the oil section caused compressors 1800 and UNPLANNED Restarted compressors immediately 1801 to shut down Tota! Flare <= 1 Hour 121 9/11/99 0039-0410 1,960 Complete facility shut down to perform modifications and repairs PLANNED Depressured and performed maintenance 0817-0823 to plant, drill site piping and equipment 9/12/99 0905-1035 Restarted plant after complete shut down. Gas flared during UNPLANNED Compressor down for repairs attempts to start compressor 1807 -unsuccessful Totat Flare > 1 Hour 1,960 Volume Flared 2,081 Measured Safety Pilot 987 Continuous Assist 574 TOTAL FLARED 3,642 ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS SEPTEMBER 1999 • VOLUME ..~n.+n~nr~~w~ /1G 11ai+mCwITC p. !`AIICF PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour Total Flare > 1 Hour Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 BP EXPLORATION, INC. CONSERVATION ORDER NO. 219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS SEPTEMBER 1999 VOLUME re~~~fi nFSC^RIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/11/99 1242-1322 39 1338-1339 1440-1442 9/16/99 1313-1330 14 9/18/99 2158-2216 14 Total Flare <= 1 Hour 67 9/11/99 0039-0410 934 0817-0823 9/12/99 0905-1035 ~~ Total Flare > 1 Hour 934 Volume Flared 1,001 Measured Safety Pilot 868 Continuous Assist 1,009 TOTAL FLARED 2,878 Complete facility shut down to perform modifications and repairs PLANNED Depressured and performed maintenance to plant, drill site piping and equipment Process upset in the oil section caused compressors 1800 and UNPLANNED Restarted compressors immediately 1801 to shut down Process upset in the oil section caused compressors 1800 and UNPLANNED Restarted compressors immediately 1801 to shut down Complete facility shut down to perform modifications and repairs PLANNED Depressured and performed maintenance to plant, drill site piping and equipment Restarted plant after complete shut down. Gas flared during UNPLANNED Compressor down for repairs attempts to start compressor 1807 -unsuccessful ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS SEPTEMBER 1999 L_J VOLUME PLANNED DATE TIME Mscf DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/11/99 1242-1322 6 Complete facility shut down to perform modifications and repairs PLANNED Depressured and performed maintenance 1338-1339 to plant, drill site piping and equipment 1440-1442 9/16/99 1313-1330 5 Process upset in the oil section caused compressors 1800 and UNPLANNED Restarted compressors immediately 1801 to shut down 9/18/99 2158-2216 5 Process upset in the oil section caused compressors 1800 and UNPLANNED Restarted compressors immediately 1801 to shut down Total Flare <= 1 Hour 16 9/11/99 0039-0410 162 0817-0823 9/12/99 0905-1035 7 Complete facility shut down to perform modifications and repairs to plant, drill site piping and equipment Restarted plant after complete shut down. Gas flared during attempts to start compressor 1807 -unsuccessful PLANNED Depressured and performed maintenance UNPLANNED Compressor down for repairs Total Flare > 1 Hour 169 Volume Flared 185 Measured Safety Pilot 300 Continuous Assist 391 TOTAL FLARED 876 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION • • Facility Operator Field(s) Month/Year of Disposition LISBURNE PRODUCTION CENTER #1 ARCO ALASKA, INC. PRUDHOE BAY/PT MCINTYRE 10/99 Form 10-422 (Revised 4/95) Disposition Volume MCF' 1. Sold 161,483 2. Reinjected 8,805,333 3. Flared or vented less than 1 hour 515 4. Flared or vented greater than 1 hour Su lemental re ort re wired--See 20 AAC 25.235 0 5. Pilot and Purge 12,260 6. Used for lease operations Fuel Assist 858,646 2,525 7: Other Lift Gas, Off Field 142,145 TOTAL items 1 - 7 9,982,907 8. NGL gas equivalent produced 161,483 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 .Remarks: I hereby certify that the forego' . g is true and correct to the best of my knowledge. Signature: Title: ~ ~~-v~1a r ~ Date: l/ ~ "Indicate contribution of each pool to total Pool Name Code Percent LISBURNE NIAKUK 640144 640148 30.47% 4.00% NORTH PRUDHOE BAY 640152 0.00% POINT MCINTYRE WEST BEACH NIAKUK 666100 640186 640148 57.59% 5.89% 2.05% official Use:Or~l =>Kl~ri~ : Authe~rzetion ~ is lir:::: »: 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS OCTOBER 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF iNCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10!7/99 -0537-0550 51 Process upset in the oil section caused the shutdown of UNPLANNED Stabilized facility process and restarted compressors 1800 and 1801 compressors (information only) 10/9/99 0300-0325 80 Process upset in the oil section caused the shutdown of UNPLANNED Stabilized facility process and restarted • compressors 1800 and 1801 compressors (caused black smoke) Total Flare <= 1 Hour 131 • Total Flare > 1 Hour 0 Volume Flared 131 Measured Safety Pilot. 3,678 Continuous Assist 623 TOTAL FLARED 4,432 ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS ..OCTOBER 1999 VOLUME. DATE TIME MSCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/7/99 0537-0550 123 Process upset in the oil section caused the shutdown of UNPLANNED Stabilized facility process and restarted compressors 1800 and 1801 compressors (information only) 10/9/99 0300-0325 200 Process upset in the oil section caused the shutdown of UNPLANNED Stabilized facility process and restarted compressors 1800 and 1801 compressors (caused black smoke) Total Flare > 1 Hour 0 Volume Flared 323 Measured Safety Pilot 7,111 Continuous Assist 1,567 TOTAL FLARED 9,001 • ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS OCTOBER 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/7/99 0537-0550 18 Process upset in the oil section caused the shutdown of UNPLANNED Stabilized facility process and restarted compressors 1800 and 1801 compressors (information only) 10/9/99 0300-0325 29 Process upset in the oil section caused the shutdown of UNPLANNED Stabilized facility process and restarted compressors 1800 and 1801 compressors (caused black smoke) Total Flare <= 1 Hour 47 • Total Flare > 1 Nour 0 Volume Flared 47 Measured Safety Pilot 733 Continuous Assist 191 TOTAL FLARED 971 ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS OCTOBER 1999 VOLUME PLANNED DATE TIME MSCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE r~ I` J Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 4 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 BP EXPLORATION, INC. CONSERVATION ORDER NO. 219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS OCTOBER 1999 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Process upset in the oil section caused the shutdown of 10/7/99 0537-0550 4 UNPLANNED Stabilized facility process and restarted . compressors 1800 and 1801 compressors (information only) 10/9/99 0300-0325 6 Process upset in the oil section caused the shutdown of UNPLANNED Stabilized facility process and restarted compressors 1800 and 1801 compressors (caused black smoke) Total Flare <= 1 Hour 10 i Total Flare > 1 Hour 0 Volume Flared 10 Measured Safety Pilot 486 Continuous Assist 102 TOTAL FLARED 598 ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS OCTOBER 1999 VOLUME PLANNED DATE TIME Mscf DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/7/99 0537-0550 2 Process upset in the oil section caused the shutdown of UNPLANNED Stabilized facility process and restarted compressors 1800 and 1801 compressors (information only) 10/9/99. 0300-0325 2 Process upset in the oil section caused the shutdown of UNPLANNED Stabilized facility process and restarted compressors 1800 and 1801 compressors (caused black smoke) Total Flare <= 1 Hour 4 Total Flare > 1 Hour 0 Volume Flared 4 Measured Safety Pilot 252 Continuous Assist 42 TOTAL FLARED 298 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition ON CENTER #1 ARCO ALASKA INC. PRUDHOE BAY/PT MCINTYRE 11/99 Disposition Volume MCF* 1. Sold 153,492 2. Reinjected 8,916,509 3. Flared or vented less than 1 hour 213 4. Flared or vented greater than 1 hour Su lemental re ort re uired--See 20 AAC 25.235 11,739 5. Pilot and Purge 12,028 6. Used for lease operations Fuel Assist 844,415 4,447 7. Other Lift Gas, Off Field 228,103 TOTAL itemsi -7 10,170,946 8. NGL gas equivalent produced 153,492 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby ceprt,~ify~that the for/egoing is true and correct to the best of my knowledge. SignatureyQ-~c~~''t"^` /(~~~v''`'`-~ Title:~~~?~~'Pr~"'~'t~~' Dater ~6 9~i Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent LISBURNE NIAKUK 640144 640148 36.80% 2.37% NORTH PRUDHOE BAY 640152 0.95% POINT MCINTYRE WEST BEACH NIAKUK 666100 640186 640148 54.39% 3.67% 1.82% ~ 0 _~ ~ rn rn ~ -~ ~ ..~ ~~ ~ <,p >rlrl ~ v ~" Glffcial L1se:©rij~ ;Klarii ~: AufFi~sra~ation > :~tir::~::~::~:~: 1. Safety MCF ~2. Lease Use ~ MC ~3. Conserv. Purposes Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235: ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS NOVEMBER 1999 • \J VOLUME PLANNED DATE TIME MSCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/26/99 0849-0907 85 Process upset in the oil section caused the shutdown of UNPLANNED Stabilized facility process and restarted compressors 1800 and 1801 compressors (information only) Total Flare <= 1 Hour 85 11/6/99 1132-1252 3,500 Total Flare > 1 Hour 3,500 Volume Flared 3,585 Measured Safety Pilot 4,383 Continuous Assist 1,561 TOTAL FLARED 9,529 Process upset in the gas section of the LPC caused the shutdown UNPLANNED Stabilized facility process and restarted of compressors 1807 and 1808. compressors ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS NOVEMBER 1999 VOLUME PLANNED DATE TIME MSCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/26/99 0849-0907 104 Process upset in the oil section caused the shutdown of UNPLANNED Stabilized facility process and restarted compressors 1800 and 1801 compressors (information only) • Total Flare <= 1 Hour 1.04 11/6/99 1132-1252 7,211 Process upset in the gas section of the LPC caused the shutdown UNPLANNED Stabilized facility process and restarted of compressors 1807 and 1808. compressors • Total Flare ~ f Hour 7,21.1 Volume Flared 7,315 Measured Safety Pilot 6,592 Continuous Assist 2,456 TOTAL FLARED 16,363 ARCO ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS NOVEMBER 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/26/99 0849-0907 8 Process upset in the oil section caused the shutdown of UNPLANNED Stabilized facility process and restarted compressors 1800 and 1801 compressors (information only) • Total Flare <= 1 Hour 8 11/6/99 1132-1252 474 Process upset in the gas section of the LPC caused the shutdowUNPLANNEDStabilized facility process and restarted of compressors 1807 and 1808. compressors Total Flare > 1 Hour 474 Volume Flared 482 Measured Safety. Pilot 442 Continuous Assist .165 TOTAL FLARED 1,089 ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS NOVEMBER 1999 VOLUME DATE TIME MSCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/26/99 0849-0907 8 Process upset in the oil section caused the shutdown of UNPLANNED Stabilized facility process and restarted compressors 1800 and 1801 compressors (information only) Total Flare <= 1 Hour 8 11/6/99 1132-1252 Process upset in the gas section of the LPC caused the shutdow UNPLANNED Stabilized facility process and restarted of compressors 1807 and 1808. compressors • Total Flare > 1 Hour 0 Volume Flared 8 Measured Safety Pilot 10fi Continuous Assist 76 TOTAL FLARED 190 BP EXPLORATION, INC. CONSERVATION ORDER NO. 219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS NOVEMBER 1999 VOLUME PLANNED DATE TIME Mscf DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/26/99 0849-0907 4 Process upset in the oil section caused the shutdown of UNPLANNED Stabilized facility process and restarted compressors 1800 and 1801 compressors .(information only) • Total Flare <= 1 Hour 4 11/6/99. 1132-1252 315 Process upset in the gas section of the LPC caused the shutdown UNPLANNED Stabilized facility process and restarted of compressors 1807 and 1808. compressors Total Flare > 1 Hour 315 Volume Flared 319 Measured Safety Pilot 288 Continuous Assist 105 TOTAL FLARED 712 ARCO ALASKA, WC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS NOVEMBER 1999 VOLUME PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE DATE TIME Msc DESCRIPTION OF INCIDENTS & CAUSE 11/26/99 0849-0907 4 Process upset in the oil section caused the shutdown of UNPLANNED Stabilized facility process and restarted compressors 1800 and 1801 compressors (information only) Total Flare <= i Hour 4 11/6/99 1132-1252 239 Process upset in the gas section of the LPC caused the shutdown UNPLANNED Stabilized facility process and restarted of compressors 1807 and 1808. compressors Total Flare > 1 Hour 239 Volume Flared 243 Measured Safety Pilot 217 Continuous Assist 84 TOTAL FLARED 544 ~...~ „~ '_. ~ ~ '_ "°° ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION . k Faality `` ` ' Operator Field(s) Month/Year of Disposition LI BUR TION CENTER #1 ARCO ALASKA, INC. PRUDHOE BAY/PT MCINTYRE 12/99 ~~~a:~ ~I~ % ~';,` f~~ ~it0a3..nt~ Disposition Volume MCF* *Indicate contribution of each pool to total 1. Sold 145,939 Pool Name Code Percent 2. Reinjected 9,226,786 LISBURNE NIAKUK 640144 640148 42.13% 2.41% NORTH PRUDHOE BAY 640152 0.00% 3. Flared or vented less than 1 hour 712 POINT MCINTYRE WEST BEACH 666100 .640186 47.60% 5.98% NIAKUK 640148 1.88% 4. Flared or vented greater than 1 hour Su lemental re ort re wired--See 20 AAC 25.235 27,892 5. Pilot and Purge 12,392 6. Used for lease operations Fuel Assist 880,700 6,020 7. Other Lift Gas, Off Field 199,807 TOTAL items 1 - 7 10,500,348 8. NGL gas equivalent produced 145,939 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the f going i true and correct to the b~,e/s/t of my knowledge. .Signature: Title: /~i Date: /-/~U~ Form 10-422 (Revised 4/95) Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. -.. . ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS DECEMBER 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/11/99 .0742-0807 226 Vented pressure off high pressure separator to perform maintenance PLANNED Performed maintenance (Info only -does not require formal report) 12/11/99 .0842-0907 96 Shut down turbine/compressor 1808 to repair fuel gas valve PLANNED Performed maintenance (Info only -does not require formal report) Total Flare <= 1 Hour 322 12/29/99 0615-1447 12,423 Turbine/compressor 1808 shut down on spurious temperature UNPLANNED Shut in high gas wells, repaired and restarted 1605-1516 reading. Troubleshooting indicated parts would have to be compressor replaced. , Total Flare > 1 Hour 12,423 Volume Flared 12,745. Measured Safety Pilot 5,242 Continuous Assist 2,634 TOTAL FLARED 20,621 I .~ ~ ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS DECEMBER 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/1 t/99 0742-0807 240 Vented pressure off high pressure separator to perform maintenance PLANNED Performed maintenance (Info only -does not require formal report) 12/11/99 0842-0907 102 Shut down turbine/compressor 1808 to repair fuel gas valve PLANNED Performed maintenance (Info only -does not require formal report) Total Flare <= 1 Hour 342 12/29/99 0615-1447 12,045 Turbine/compressor 1808 shut down on spurious temperature UNPLANNED Shut in high gas wells, repaired and restarted. 1605-1516 reading. Troubleshooting indicated parts would have to be compressor replaced.. • Total Flare> 1 Hour 12,045 Volume Flared 12,387 Measured Safety Pilot. 5,882 Continuous Assist 2,787 TOTAL FLARED 21,056 ARCO ALASKA, WC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS DECEMBER 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/11/99 0742-0807 20 Vented pressure off high pressure separator to perform mainten~ PLANNED Performed maintenance (Info only -does not require formal report). 12/11/99 .0842-0907 9 Shut down turbine/compressor 1808 to repair fuel gas valve PLANNED Performed maintenance (Info only -does not require formal report) Total Flare <= 1 Hour 29 12/29/99 0615-1447 2,183 Turbine/compressor 1808 shut down on spurious temperature UNPLANNED Shut in high gas wells, repaired and restarted 1605-1516 reading. Troubleshooting indicated parts would have to be compressor replaced. • Total Flare > 1 Hour 2,183 Volume Flared 2,212 Measured Safety Pilot 742 Continuous Assist 372 TOTAL FLARED i 3,326 i ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE f3AY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS DECEMBER 1999 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot Continuous Assist TOTAL FLARED ~ BP EXPLORATION, INC. w CONSERVATION ORDER NO. 219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS DECEMBER 1999 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/11/99 0742-0807 8 Vented pressure off high pressure separator to perform maintenance PLANNED Performed maintenance (Info only-does not require formal report) 12/11/99 0842-0907 3 Shut down turbine/compressor 1808 to repair fuel gas valve PLANNED Performed maintenance (Info only -does not require formal report) Total Flare <= 1 Hour 11 12/29/99 0615-1447. 748 Turbine/compressor 1808 shut down on spurious temperature UNPLANNED Shut in high-gas wells, repaired and restarted 1605-1516 reading. Troubleshooting indicated parts would have to be compressor replaced. Total.Flare> 1 Hour 748 Volume Flared 759 Measured Safety Pilot 297 Continuous Assist 128 TOTAL FLARED 1,184 ..» ~ , ARCO ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS DECEMBER 1999 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/11/99 0742-0807 6 Vented pressure off high pressure separator to perform maintenance PLANNED Performed maintenance (Info only -does not require formal report) 12/11/99 0842-0907 2 .Shut down turbine/compressor1808 to repair fuel gas valve PLANNED Performed maintenance (Info only.- does not require formal report) Total Flare <= 1 Hour. 8 - 12/29/99 0615-1447 593 Turbine/compressor 1808 shut down on spurious temperature UNPLANNED Shut in high gas wells, repaired and restarted 1605-1516 reading. Troubleshooting indicated parts would have to be' compressor replaced. • I Total Flare > 1 Hour 593 Volume Flared 601 i~ Measured Safety Pilot 229 Continuous Assist 99 TOTAL FLARED 929 i Apr-07-2000 10:23am From-LISBURNE OPERATIONS ~. 659-8655 T-587 P.002/002 F-740 Events Summary --12/Z9199 Flare Gas Venting Report The following summary describes the events and subsequent action taken on Dec. 29, 1999 during the flare event caused by the loss of Turbine-Compressor 1808 (Residue Gas Compression) at the Lisburne Production Center. • 06:09 Turbine-Compressor 1808 shutdown on spurious low-stage high-high discharge temperature. Trouble-shooting by technicians indicated parts would be required to be replaced and mare than an hour would likely elapse before machine could be restarted. 06:45 Called lrillsite Operators to shut-in 200 MMSCFD gas production. Nate that all production cuts (by shut-in at wellhead) were slowed due to Phase II weather conditions which required convoy of two or more vehicles at-a-time. • 07:30 Called Drillsite Operators to shut-in additional 20 MMSCFp gas production. • 09:20 First start attempt was unsuccessful; trouble-shooting continued. • 12:00 Called Drillsite Operators to shut-in additional 20 MMSCFD gas production. • 13:00 Second start attempt was successful. • 14:47 Compressor loading began; (shut-in) wells started to be brought back to production. • 16:05 Additional 10-minute flare event occurred due to difficulty to load compressor completely. • .