Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutARCO - LISBURNE
~ [ .%~Y~/.61/B/,N"~/.Y//Y.A°/iB/./Y///.~/.~/A/~.~/~/M/@~/N/.://.~/.~%M/M////.~/~/..'.8'/ri.M%/.~V."/~/A0%~%~"/.6 ......i
AGOCC
Approved
GaS Dlsposi~lon Files
1998
A~'CO - Lis~u,2~vE
3 ." 0 A./8!/Nr~/.e3/6Y/iP%qd/~9/~'~/~/.~/.M/®/~:®/~/.arY~/~/.~~~Y./~/d9/.~/O/,~/~/~/~/~/aC. _. %~ ~ 9/i~/.~Y.~/.rfl`/.~/.R/aM/~/~/.N/B//"/.~/.~/~'/~.'A'/.~/®Y6+/.e~/~YJ'/.~/~Y.~/.///~/L'/~/AYE/~/.~/~/.~/.~/A'~ ~i~' .C'Y.A" . ~. .
GPMA PRODUCERS REPORT
OF GAS DISPOSITION
BP EXPLORATION, INC.
Attn: Mr. R, H. Wilks
P.O. Box 196612
Anchorage, Alaska 99519-6612
EXXON COMPANY, JNC.
Alaska Interest Organization
Financial Services, Rm 3073G
P.O. Box 2180
Houston, Texas 77252-2180
EXXON COMPANY, INC.
Attn: Prudhoe Bay 91-025
P.O. Box 2180
Topping Plant
Houston, Texas. 77252
ALASKA OIL & GAS CONS. COMM.
Attn: Wendy Mahan gg ~,,{
`
~
3001 Porcupine Drive 1 ~
Anchorage, Alaska 99501
STATE OF ALASKA ~~~~
`'~.:4~ ~` ~~~~
Petroleum Reserve Division
'h
'h
Comt~y~siAt~
Cif ~ Gas ~otts
k
floor
550 W. 7
Avenue, 5 a
°
~iaS
Anchorage, Alaska 99501 Rr~C~orar~~
K. A Kerns ATO 740
H. G. Limb ATO 496
S. Edwards ATO 748
D. Vanderbilt ATO 430
Hanson PRB 7
9pma
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
F
r
t
t
ws
~.~
~~
<r.:
c.;.r
~s3
( Facility (
LISBURNE PRODUCTION CENTER #1 Operator (
ARCO ALASKA, INC. Field(s)
PRUDHOE
Disposition Volume MCF`
1. Soid 161,978
2. Reinjected 8,860,243
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
Su lemental re rt re wired--See 20 AAC 25.235 0
5. Pilot and Purge 12,034
6. Used for lease operations Fuel
Assist 947,340
3,878
7.Other Lift Gas, Off Field 235,205
TOTAL items 1 - 7 10,120,678
8. NGL gas equivalent produced 161,978
..Purchased gas 0
- 0. Transferred from: 0
Transferred to: 0
Remarks:
I hereby certify that th foregoing is true and correct to the best of my knowledge.
Signature: Title; v Date: r ~ n `
Form 10-422 (Revised 4/95)
of Disposition
`Indicate contribution of each pool to total.
Pool Name Code Percent
LISBURNE
NIAKUK 640144
640148 30.66%
5.07%
NORTH PRUDHOE BAY 640152 0.00%
POINT MCINTYRE
WEST BEACH
NIAKUK 666100
640186
640148 61.39%
0.00%
2.88%
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
DECEMBER 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS d~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
•
Total Flare <= 1 Hour 0
•
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 3,646.
Continuous Assist 1,258
TOTAL FLARED 4,904
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
DECEMBER 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
•
Total Flare <= 1 Hour 0
•
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 7,423
Continuous Assist 2,309
TOTAL FLARED 9,732
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
DECEMBER 1998_
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <- 1 Hour 0
•
~"
c.<
~ ~~
zv
O ~ r
^~ S7 ; "'" T.~...~
Total Flare > 1 Hour 0 ~ ~"
' ~;
'
c
c:s
c.;.:: .
~ ~„~
Volume Flared 0 ~
` 4^n~
~
u:
~
Measured Safety Pilot 0 ~
Continuous Assist 0
TOTAL FLARED 0
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
DECEMBER 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN 70 ELIMINATE CAUSE
r~
L J
Total Flare <- 1 Hour 0
r1
LJ
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION, INC.
CONSERVATION ORDER N0.219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
DECEMBER 1998
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
•
Total Flare <= 1 Hour 0
•
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 617
Continuous Assist 201
TOTAL FLARED 818
~ a
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
DECEMBER 1998
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
•
Total Flare <- 1 Hour 0
•
Total Flare > i Hour 0
Volume Flared 0
Measured Satety Pilot 348
Continuous Assist 110
TOTAL FLARED 458
GPMA PRODUCERS REPORT
OF GAS DISPOSITION
BP EXPLORATION, INC.
Attn: Mr. R, H. Wilks
P.O. Box 196612
Anchorage, Alaska 99519-6612
EXXON COMPANY, INC.
Alaska Interest Organization
Financial Services, Rm 3073G
P.O. Box 2180
Houston, Texas 77252-2180
EXXON COMPANY, INC.
Attn: Prudhoe Bay 91-025
P.O. Box 2180
Topping Plant
Houston, Texas 77252
ALASKA OIL & GAS CONS. COMM.
Attn: Wendy Mahan
3001 Porcupine Drive
Anchorage, Alaska 99501
STATE OF ALASKA
Petroleum Reserve Division
550 W. 7`h Avenue, 5`h floor
Anchorage, Alaska 99501
K. A Kerns ATO 740
H. G. Limb ATO 496
S. Edwards ATO 748
D. Vanderbilt ATO 430
Hanson PRB 7
gpma
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
(Facility (Operator (Field(s) IMonth/Yearof Disposition
LISBURNE PRODUCTION CENTER #1 ARCO ALASKA, INC. PRUDHOE BAY/PT MCINTYRE 11/98
Disposition Volume MCF'
1. Sold 156,344
2. Reinjected 7,971,468
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
Su lemental re ort re uired--See 20 AAC 25.235
5. Pilot and Purge 11,641
6. Used for lease operations Fuel 785,305
Assist 6,578
7. Other Lift Gas, Off Field 288,704
TOTAL items 1 - 7 9,220,040
8. NGL gas equivalent produced ~ ~ ~ 156,344
~,; a~:
~:
9. Purchased gas """ ~ n ~ 0
f.~ ~~
.~...
10. Transferred from: ' ' `~ 0
''_,' ~,e
11. Transferred to: 0
Remarks:
I hereby certify that the f egoing is true and correct to the best of my knowledge.
Signature: ~' ~`"-"' Title: ~~.,,/ Date: ~ « T~
Form 10-422 (Revised 4/95)
'Indicate contribution of each pool to total.
Pool Name Code Percent
LISBURNE
NIAKUK 640144
640148 27.94%
5.92%
NORTH PRUDHOE BAY 640152 0.00%
POINT MCINTYRE
WEST BEACH
NIAKUK 666100
640186
640148 63.01
0.00%
3.13%
Official Use Onl --Flavin Authorizations 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: Ali volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
NOVEMBER 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
u
Total Flare <- 1 Hour 0
•
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot 3,252
Continuous Assist 1,933
TOTAL FLARED 5,185
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
NOVEMBER 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
•
Total Flare <= 1 Hour
•
Total Flare > 1 Hour 0
Volume Flared
Measured Safety Pilot 7,333
Continuous Assist 4,034
TOTAL FLARED 11,367
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
NOVEMBER 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
•
Total Flare <- 1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED 0
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
NOVEMBER 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
•
Total Flare <- 1 Hour 0
•
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION, INC.
CONSERVATION ORDER N0.219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
NOVEMBER 1998
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <- 1 Hour
•
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 691
Continuous Assist 409
TOTAL FLARED 1,100
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
NOVEMBER 1998
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
•
Total Flare <- 1 Hour
Total Flare > i Hour 0
Volume Flared 0
Measured Safety Pilot 365
Continuous Assist 202
TOTAL FLARED 567
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
~~
~~ C
--
T;, „_,,, .rte
Facility
Operator
CENTER #1 ARCO AI
RUDHOE BAY/PT MCINTYRE
Disposition Volume MCF`
1. Sold 163,044
2. Reinjected 8,531,686
3. Flared or vented less than 1 hour 132
4. Flared or vented greater than 1 hour
Su lemental re ort re wired--See 20 AAC 25.235 0
5. Pilot and Purge 11,516
6. Used for lease operations Fuel
Assist 811,873
14,698
7.Other Lift Gas, Off Field 411,543
TOTAL items 1 - 7 9,944,492
8. NGL gas equivalent produced 163,044
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the regoing is true and correct to the best of my knowledge.
Signature: ~'~~--- Title: Date: i
Form 10-422 (Revised 4/95)
Month/Yearof Disposition
`Indicate contribution of each pool to total.
Pool Name Code Percent
LISBURNE
NIAKUK 640144
640148 22.94%
5.17%
NORTH PRUDHOE BAY 640152 0.00%
POINT MCINTYRE
WEST BEACH
NIAKUK 666100
640186
640148 68.87%
0.00%
3.02%
_. _ _.
Official' Use On --Flarin: AuthorEZatlon > 1 hr. ''
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
OCTOBER 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/7/98 1513-1522 27 Depressured 18' production tine from L3 to HP flare for planned PSV PLANNED Completed facility maintenance
maintenance. (Ref permission letter dtd 9/1/98)
Total Flare <= 1 Hour 27
Total Flare > 1 Hour 0
Volume Flared 27
Measured Safety Pilot 2,638
Continuous Assist 3,112
TOTAL FLARED 5,777
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
OCTOBER 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/7/98 1513-1522 93 Depressured 18" production line from L3 to HP flare for planned PSV PLANNED Completed facility maintenance
maintenance. (Ref permission letter dtd 9/1/98)
•
Total Flare <= 1 Hour 93
Total Flare > 1 Hour 0
Volume Flared 93
Measured Safety Pilot 7,934
Continuous Assist 10,336
TOTAL FLARED 18,363
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
OCTOBER 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare r_ 1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Satety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
OCTOBER 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS ~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE_
Total Flare <- 1 Hour
•
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION, INC.
CONSERVATION ORDER N0.219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
OCTOBER 1998
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS ~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/7/98 .1513-1522
Depressured 18' production line from L3 to HP flare for planned PSV PLANNED Completed facility maintenance
maintenance. (Ref permission letter dtd 9/1/98)
Total Flare <= 1 Hour 7
•
Tota! Flare > 1 Hour
Volume Flared 7
Measured Safety Pilot 598
Continuous Assist 771
TOTAL FLARED 1,376
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
OCTOBER 1998
VOLUME PLANNED
DATE TIME (Meet) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/7/98 1513-1522 5 Depressured 18" production line from L3 to HP flare for planned PSV PLANNED Completed facility maintenance
maintenance. (Ref permission letter dtd 9/1/98)
•
Total Flare <- 1 Hour 5
•
Total Flare > 1 Hour 0
Volume Flared 5
Measured Safety Pilot 346
Continuous Assist 479
TOTAL FLARED 830
•
r:'s .~'
n r
c c-=r
n C ''._..
_..~.
u -~ ~°'"
~. 't"i
~ ;
ir`
v>
a
ALASKA OIL ANb GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s)
LISBURNE PRODUCTION CENTER #1 ARCO ALASKA, INC. PRUDHOE BAY/PT MCI
Disposition Volume MCF*
1. Sold 133,242
2. Reinjected 7,282,167
3. Flared or vented less than 1 hour 640
4. Flared or vented greater than 1 hour
Su lemental re ort re aired--See 20 AAC 25.235 14,457
5. Pilot and Purge 11,095
6. Used for lease operations Fuel
Assist 750,303
62,486
7. Other 362,325
TOTAL items 1 - 7 8,616,715
8. NGL gas equivalent produced 133,242
9. Purchased gas A
10. Transferred from: 0
11. Transferred to: 0
Remarks: oTH~-Q.: t,-~ G~5 Paor1D~.~ 'ro l~~c~Q}~o~ Lu~~-c.5 . wM
I hereby certify that the foregoing is true anld~correct to the best of my knowledge.
Signature: ~ --~~~~v '~ Title: ~~~-!~ Date: ~0 Ir; g~
Form 10-422 (Revised 4/95)
Month/Year of Disposition
9/98
'Indicate contribution of each pool to total.
Pool Name Code Percent
LISBURNE
NIAKUK 640144
640148 26.63%
4.86%
NORTH PRUDHOE BAY 640152 0.03%
POINT MCINTYRE
WEST BEACH
NIAKUK 666100
640186
640148 64.62%
0.38%
3.48%
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
SEPTEMBER 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/25/98 0000-0017 199 Event continued from 9/24, Waste Heat Recovery Unit bypass UNPLANNED Left compressor down for TAPS slowdown. Cut
failed on compressor 1807 gas production immediately
• 9/26/98 1018-1025 154 Depressured compressor 1808 to change out seal oil filters UNPLANNED Restarted compressor after maintenance
completed
9/27/98 1955-2023 92 Compressors 1800 and 1801 shut down during the process UNPLANNED Stabilized facility process and restarted
upset in the oil section compressors
Total Flare <~ 1 Hour 445
9/5/98 2030-2320 438
9/8/98 0808-1525 385
9/24/98 2016-2128 703
• 2337-2400
9/25/98 0325-0836 7,301
1405-1950
9/27/98 0815-0930 2
Total Flare > 1 Hour 8,829
Volume Flared 9,274
Measured Safety Pilot 3,142
Continuous Assist 34,151
TOTAL FLARED 46,567
Planned venting of 24' production line from L3 to perform
required maintenance
Unplanned venting of 24' production line from L3. Required to
repair gas leak on inlet ESD
Waste Heat Recovery Unit bypass failed on compressor 1807
Planned depressuring of 24' line from Point Mclniyre to HP flare
for maintenance
Bled down suction of propane pump to blowcase in order to
prime pump
PLANNED Performed and completed maintenance
UNPLANNED Performed and completed maintenance
UNPLANNED Left compressor down for TAPS slowdown.
Cut gas production immediately
PLANNED Performed and completed maintenance
UNPLANNED Completed bleed
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
SEPTEMBER 1998
DATE
TIME VOLUME
(MSCF)
DESCRIPTION OF INCIDENTS & CAUSE .PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/25/98 0000-0017 0 Event continued from 9/24, Waste Heat Recovery Unit bypass UNPLANNED Left compressor down for TAPS slowdown. Ci
failed on compressor 1807 gas production immediately
• 9/26/98 1018-1025 36 Depressured compressor 1808 to change out seal oil filters UNPLANNED Restarted compressor after maintenance
completed
9/27/98 1955-2023 108 Compressors 1800 and 1801 shut down during the process UNPLANNED Stabilized facility process and restarted
upset in the oil section compressors
Total Flare c- 1 Hour 144
9/5/98 2030-2320 1,308
9/8/98 0808-1525 1,363
9/24/98 2016-2128 2,024
2337-2400
9/25/98 0325-0836 0
1405-1950
9/27/98 0815-0930 3
Planned venting of 24' production line from L3 to perform
required maintenance
Unplanned venting of 24' production line from L3. Required to
repair gas leak on inlet ESD
Waste Heat Recovery Unit bypass failed on compressor 1807
Planned depressuring of 24' line from Point McIntyre to HP flare
for maintenance
Bled down suction of propane pump to blowcase in order to
prime pump
.PLANNED Performed and completed maintenance
UNPLANNED Performed and completed maintenance
UNPLANNED Left compressor down for TAPS slowdown.
Cut gas production immediately
PLANNED Performed and completed maintenance
UNPLANNED Completed bleed
Total Flare > 1 Hour 4,698
Volume Flared 4,842
Measured Safety Pilot 6,984
Continuous Assist 23,236
TOTAL FLARED 35,062
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
SEPTEMBER 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/25/98 0000-0017 0 Event continued from 9/24, Waste Heat Recovery Unit bypass UNPLANNED Left compressor down for TAPS slowdown. Ci
failed on compressor 1807 gas production immediately
• 9/26/98 1018-1025. 0 Depressured compressor 1808 to change out seal oil filters UNPLANNED Restarted compressor after maintenance
completed
9/27/98 1955-2023 0 Compressors 1800 and 1801 shut down during the process UNPLANNED Stabilized facility process and restarted
upset in the oil section compressors
Total Flare ~ 1 Hour 0
9/5/98 2030-2320 0
9/8/98 0808-1525 39
9/24198 2016-2128 0
• 2337-2400
9/25/98 0325-0836 0
1405-1950
9/27/98 0815-0930 0
Total Flare > 1 Hour 39
Volume Flared 39
Measured Safety Pilot 41
Continuous Asstst 131
Planned venting of 24' production line from L3 to perform PLANNED Perforated and completed maintenance
required maintenance
Unplanned venting of 24' production line from L3. Required to UNPLANNED Performed and completed maintenance
repair gas leak on inlet ESD
Waste Heat Recovery Unit bypass failed on compressor 1807 UNPLANNED Left compressor down for TAPS slowdown.
Cut gas production immediately
Planned depressuring of 24" line from Pant McIntyre to HP flare PLANNED Performed and completed maintenance
for maintenance
Bled down suction of propane pump to blowcase in order to UNPLANNED Completed bleed
prime pump
TOTAL FLARED 211
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
SEPTEMBER 1998
•
DATE
TIME. VOLUME
(MSCF)
DESCRIPTION OF INCIDENTS 6 CAUSE PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/25/98 0000-0017 0 Event continued from 9/24, Waste Heat Recovery Unit bypass UNPLANNED Left compressor down for TAPS slowdown. C.
failed on compressor 1807 gas production immediately
9/26/98 1018-1025 0 Depressured compressor 1808 to change out seal oil filters UNPLANNED Restarted compressor after maintenance
completed
9/27/98 1955-2023 0 Compressors 1800 and 1801 shut down during the process UNPLANNED Stabilized facility process and restarted
upsetin the oil section compressors
Total Flare <= 1 Hour 0
9/5/98 2030-2320 15 Planned venting of 24" production line from L3 to perform PLANNED Performed and completed maintenance
required maintenance
9/8/98 0808-1525 0 Unplanned venting of 24" production line from L3. Required to UNPLANNED Performed and completed maintenance
repair gas leak on inlet ESD
9/24/98 2016-2128 0 Waste Heat Recovery Unit bypass failed on compressor 1807 UNPLANNED Left compressor down for TAPS slowdown.
2337 2400 Cut gas production immediately
9/25/98 0325-0836 0 Planned depressuring of 24' line from Point McIntyre to HP flare PLANNED Performed and completed maintenance
1405-1950 for maintenance
9/27/98 0815-0930 0 Bled down suction of propane pump to blowcase in order to UNPLANNED Completed bleed
prime pump
Total Flare > 1 Hour 15
Volume Flared 15
Measured Safety Pllot 3
Continuous Asslat 24
TOTAL FLARED 42
BP EXPLORATION, INC.
CONSERVATION ORDER N0.219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
SEPTEMBER 1998
DATE
TIME VOLUME
(Matt)
DESCRIPTION OF INCIDENTS & CAUSE PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/25/98 0000-0017 3 Event continued from 9/24, Waste Heat Recovery Unit bypass UNPLANNED Left compressor down for TAPS slowdown. C~
failed on compressor 1807 gas production immediately
• 9/26/98 1018-1025 9 Depressured compressor 1808 to change out seal oil filters UNPLANNED Restarted compressor after maintenance
completed
9/27/98 1955-2023 12 Compressors 1800 and 1801 shut down during the process UNPLANNED Stabilized facility process and restarted
upset in the oil section compressors
Total Flare ~ 1 Hour 24
9/5/98 2030-2320 75 Planned venting of 24" production line from L3 to perform
required maintenance
9/8/98 0808-1525 64 Unplanned venting of 24" production line from L3. Required to
repair gas leak on inlet ESD
9/24/98 2016-2128 106 Waste Heat Recovery Unit bypass failed on compressor 1807
2337-2400
9/25/98 0325-0836 196 Planned depressuring of 24' line from Point McIntyre to HP flare
1405-1950 for maintenance
9/27/98 0815-0930 0 Bled down suction of propane pump to blowcase in order to
prime pump
Total Flare > 1 Hour 441
Volume Flared 465
Measured Safety Pilot 534
Continuous Assist 2,592
PLANNED Performed and completed maintenance
UNPLANNED Performed and completed maintenance
UNPLANNED Leftcompressordown for TAPS slowdown.
Cut gas production immediately
PLANNED Performed and completed maintenance
UNPLANNED Completed bleed
TOTAL FLARED 3,591
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
SEPTEMBER 1998
•
•
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/25/98 0000-0017 3 Event continued from 9/24, Waste Heat Recovery Unit bypass UNPLANNED Left compressor down for TAPS slowdown. C~
failed on compressor 1807 gas production immediately
9/26/98 1018-1025 13 Depressured compressor 1808 to change out seal oil filters UNPLANNED Restarted compressor after maintenance
completed
9/27/98 1955-2023 11 Compressors 1800 and 1801 shut down during the process UNPLANNED Stabilized facility process and restarted
upset in the oil section compressors
Total Flare t= 1 Hour
9/5198 2030-2320
9/8/98 0808-1525
27
64
49
119
203
0
Planned venting of 24' productioi line from L3 to perform
required maintenance
Unplanned venting of 24' production line from L3. Required to
repair gas leak on inlet ESD
Waste Heat Recovery Unit bypass failed on compressor 1807
Planned depressuring of 24' line from Point McIntyre to HP flare
for maintenance
Bled down suction of propane pump to blowcase in order to
prime pump
PLANNED Performed and completed maintenance
UNPLANNED Performed and completed maintenance
UNPLANNED Left compressor down for TAPS slowdown.
Cut gas production immediately
PLANNED Performed and completed maintenance
UNPLANNED Completed bleed
9/24/98 2016-2128
2337-2400
9/25/98 0325-0836
1405-1950
9/27/98 0815-0930
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
435
462
391
2,352
3,205
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s)
LISBURNE PRODUCTION CENTER #1 ARCO ALASKA, INC. PRUDHOE BAl
Disposition Volume MCF'
1. Sold 111,745
2. Reinjected 7,749,963
3. Flared orvented less than 1 hour 829
4. Flared orvented greater than 1 hour
Su lemental re rt re wired--See 20 AAC 25.235 0
5. Pilot and Purge 11,492
6. Used for lease operations Fuel
Assist 774,751
9,946
7.Other 96,858
TOTAL items 1 - 7 8,755,584
8. NGL gas equivalent produced 111,745
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that a foregoing is true and correct to the best of my knowledge.
Signature: Title: v _ Date: ~ ~ ~®
Form 10-422 (Revised 4/95)
Month/Year of Disposition
'Indicate conMbution of each pool to total.
Pool Name Code Percent
LISBURNE
NIAKUK 640144
..640148 20.27%
3.93%
NORTH PRUDHOE BAY 640152 0.00%
POINT MCINTYRE
WEST BEACH
NIAKUK 666100
640186
640148 71.10%
0.80%
3.90%
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
ATE TIME
OLUME
(MSCF) PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
AUGUST 1998
DESCRIPTION OF INCIDENTS d~ CAUSE
LANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/18/98 0822-0827 27 Compressor 1800 shut down due to high exhaust temperature. UNPLANNED Restarted compressor
1149-1158
1308-1312
1424-1427
1625-1638
8/31/98 1137-1201 154 Compressor 1808 shut down due to mechanical failure. UNPLANNED Reduced inlet gas rates
Total Flare r_ i Hour 181
•
Total Flare > 1 Hour 0
Volume Flared 181
Measured Safety Pilot 2,327
Continuous Assist 1,907
TOTAL FLARED 4,415
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
AUGUST 1998
•
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/18/98 0822-0827
1149-1158
1308-1312
1424-1427
1625-1638
8/31/98 1137-1201
92 Compressor 1800 shut down due to high exhaust temperature.
483 Compressor 1808 shut down due to mechanical failure
UNPLANNED Restarted compressor
UNPLANNED Reduced inlet gas rates
Total Flare <= 1 Hour 575
Total Flare > 1 Hour
Volume Flared 575
Measured Safety Pilot 8,175
Continuous Assist 7,107
TOTAL FLARED 15,857
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
AUGUST 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/18/98 0822-0827
1149-1158
• 1308-1312
1424-1427
1625-1638
8/31/98 1137-1201
Total Flare <= 1 Hour 0
•
Total Flare > i Hour 0
Volume Flared 0
Measured Safety Pilot 89
Continuous Assiat 58
TOTAL FLARED 147
Compressor 1800 shut down due to high exhaust temperature. UNPLANNED Restarted compressor
Compressor 1808 shut down due to mechanical failure. UNPLANNED Reduced inlet gas rates
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
AUGUST 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS d~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare r 1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot
Continuous Assist
TOTAL FLARED 0
BP EXPLORATION, INC.
CONSERVATION ORDER N0.219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
AUGUST 1998
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/18/98 0822-0827 10 Compressor 1800 shut dawn due to high exhaust temperature. UNPLANNED Restarted compressor
1149-1158
. 1308-1312
1424-1427
1625-1638
8/31/98 1137-1201 38 Compressor 1808 shut down due to mechanical failure. UNPLANNED Reduced inlet gas rates
Total Flare r: 1 Hour 48
i
Total Flare > 1 Hour 0
Volume Flared 48
Measured Safety Pllot 455
Continuous Assist 518
TOTAL FLARED 1,021
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
AUGUST 1998
•
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS ~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/18/98 0822-0827 4 Compressor 1800 shut down due to high exhaust temperature. UNPLANNED Restarted compressor
1149-1158
1308-1312
1424-1427
1625-1638
8/31/98 1137-1201
21 Compressor 1808 shut down due to mechanical failure. .UNPLANNED Reduced inlet gas rates
Total Flare N 1 Hour 25
Total Flare > 1 Hour 0
Votume Flared 25
Measured Safety Pilot 446
Continuous Asslat 358
TOTAL FLARED 827
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
#1
INC.
Month/Year of Disposition
BAY/PT MCINTYRE 7/98 Revision 1
'Indicate ¢onMbution of each pool to total.
Pool Name Code Percent
LISBURNE
NIAKUK 640144
640148 25.61
3.80%
NORTH PRUDHOE BAY 640152 0.00%
POINT MCINTYRE
WEST BEACH
NIAKUK 666100
640186
640148 67.63°k
0.00%
2.96%
Disposition Volume MCF'
t .Sold 132,343
2. Reinjected 8,427,132
3. Flared orvented less than 1 hour 288
4. Flared orvented greater than 1 hour
Su lemental re rt re wired--See 20 AAC 25.235 0
5. Pilot and Purge 11,512
6. Used for lease operations Fuel
Assist 793,927
5,398
7.Other 252,638
TOTAL items 1 - 7 9,623,238
e. NGL gas equivalent produced 132,343
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
1 hereby certi tha the~regoing is true and correct to the best of my knowledge.
Si nature. ~ IG Title: ~ ~ ~ u Date: ~/'~ /~~
g c"`~"" .lam
Fom1 10-422 (Revised 4/95)
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
JULY 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS do CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
7/3/98 0830-0915 43 Process upset in fhe depropanizer plant caused compressor 1855 UNPLANNED Restarted compressor
• to shut down
7/13x98 0025-0047 28 Process upset in the depropanizer plant caused compressor 1855 UNPLANNED Restarted compressor
to shut down
Total Flare <= 1 Hour 71
•
Total Flare > 1 Hour 0
Volume Flared 71
Measured Safety Pliot 2,942
Continuous Assist 1,360
TOTAL FLARED 4,373
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
JULY 1898
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
7/3/98 0830-0915 135 Process upset in the depropanizer plant caused compressor 1855 UNPLANNED Restarted compressor
to shut down
• 7/13/98 0025-0047 64 Process upset in the depropanizer plant caused compressor 1855 UNPLANNED Restarted compressor
to shut down
Total Flare ~ 1 Hour 199
•
Total Flare > 1 Hour 0
Volume Flared 199
Measured Safety Pilot 7,769
Continuous Assist 3,677
TOTAL FLARED 11,665
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
JULY 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 6 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
•
Total Flaro rr 1 Hour 0
•
Total Flare > 1 Hour 0
Volume Flared O
Measured Safety Pilot
Continuous Assist
TOTAL FLARED 0
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
JULY 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 6 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
r1
I~
Total Flare ~ 1 Hour 0
r1
U
Total Flara > 1 Hour 0
Volume Flared 0
Measured Safety Pilot
Continuous Assist
TOTAL FLARED 0
.
e
BP EXPLORATION, INC.
CONSERVATION ORDER N0.219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
JULY 1998
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
7/3/98 0830-0915 7 Process upset in the depropanizer plant caused compressor 1855 UNPLANNED Restarted compressor
to shut down
• 7/13/98 0025-0047 4 Process upset in the depropenizer plant caused compressor 1855 UNPLANNED Restarted compressor
to shut down
Total Flare > 1 Hour 0
Volume Flared 11
Measured Safety Pllot 438
Continuous Assist 208
TOTAL FLARED 657
e f /
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
JULY 1998
VOLUME PLANNED
DATE TIME (Mscn DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
7/3/58 0830-0915 5 Process upset in the depropanizer plant caused compressor 1855 UNPLANNED Restarted carr-pressor
to shut down
• 7/13198 0025-0047. 2 Process upset in the depropanizer plant caused compressor 1855 UNPLANNED Restarted compressor
to shut down
Total Flare ~ 1 Hour 7
Total Flare > 1 Hour 0
Volume Flared 7
Measured Safety Pilot 343
Continuous Assist 153
TOTAL FLARED 503
FROM: RRCO gLgSKR FqX NO.: 9072651566 07-27-98 09:00q P.02
C
m
~~
0
ml
UI
Z
~I
Z
~_
H
U
a
W
Z
~~
m
LL ..J
O
C
m
a 3E e1°
h.
~ 4) ~
O
O ~ c N
N Q O
~ O CV
m ~~ vNi nbao0ov
Q ~ ~~ ~ ~~~
S
Q
O }
m
o ,W.,
~ w
~
~ ° zv
~ Z w a V~
m S
D ~ Y ~ ~ m Y
`-' . m~ ~ z~Y
c ~ g
~ O
~ ~ w _<
j "
J ~
LL LL ~
U U V
6
t
w
,,~
~
.m.
:G
,o o
;''
c
'~
~
~ »
o
m
p ° d o
a
i
~
~;~ ~ c
t~
~
C~ ~
.. V
r N ~y
m m
~ ~
~Io~~~
~~
~ ~m~~
O
~,8 ~~~
~ C j «
R ~ C
N C E y-
~ ~i $_ ~ N
~~
=~LL g~
o ~s~
a ~' ~ ~ ~
~~'°~SoO
® N ~ r' i
m o
z° a$ E a'
1
U w ~ ~ N ai ep ~ ~ '~ ~' a o O
~ ~ ~ .n o~ - ao o a `0
~ ~ OO N l0
Of
3 m ^ ~
O
~ m
Cf
m
COC
Y
C ~
`o
m
m
t m
s
N ~
V
N _ N
a ~` a $
v
o ~
V N
~ r N b
7
qqq e C
~ ~ ^ m
W ~ .~o C S ~
_ R A 'j
~ ~ ~ w ~
e C ~ ~ a~i H ~ ~ ~ Q ~
~, > ; m a m a ~ ~ ~ ~ '~' N
~ N
'fl ~ ~ l6 ~ ` ~ !11 N N aj ~ m
b C ~ ~ ~ ~ ~ J ~ l0 l4 '~ ~ i~
fn D: ~ LL ~ n' ~ S Z ~ ~ ~ ~ m ~
cti ri v ui m r ~ of ~ CC L ~ t~
~~i~~v
JUL 27 )998
• ~ Alaska Oii & GasCats. Commission
Anchorage
FROM: RRCO RLRSKR FRX NO.: 9072651566 07-27-98 09:008 P.03
`-" ._.
n W
W
Z
~
2 ~ ~ ~ W
m ~ ~
~0 ~ ~
~O
t Z ~~ .«
4~ff t7 W
4
w
a~
W ~Wf~
i ~ ~ dl
4
4 m ~
O
U ~
J
4
V
e~
az
a4
~~
d z
r
a
E
m
E
C
~ a
0 0
:., ~,
z z
3 3
a a
~ ~
~ ~
a
r
~ 2
W g ~
Q
V
~ ~
M
r ~
Z ib
~ E ~
Q~~ ~
Z
Q
F
~ a
Q
U
~ 5 ~
D f~ N
v
~
~
a
c
a ~,
E ~' ~
~ ~
~ ~
~~
a
a~
~ ~~~~
a o 0
w W W
z a z
3 3 g
z z z
~ >
m o
$ ~
g i
~ p o
•
-
~ ;t o
~ ~
E ~ ~
o
U ~
a $
~ ~
u g ~
~ ~ ~
.~ 3
mV L
4 y
~ 000
~ ~ m G
~ A
a o
~ N
~ o,
~S
a
"~i ~ c ° ~
F
m t
U h g ~,
a 3
'7 .g V
a~ °j~S~
° t
8~
~~ ®
a
W
N
~
~ ~ ~ ~ Nh7 CbO ~
W '_' r
N N
H ~~ N
co p
v ~
r w N N
~
~ ~ ~ O m
~
~
~
~ ~ _ +
N;
GD fD
~~~~~ ~ ~
JUL 2 7 X998
~Aiaska0i18:GasCons.Commissinn S
Anchor~g~
~~yy Nm
V IQ l'9 N a
g
n a ~
o a
~ i C
~ i o
V J
~ ~ ~ ~
ii ~
J
~ r
C ~
N
O
~ V
FROM: RRCO RLRSKR
H
Z
W
Y
C
F-
Z
O
pu
W ~
Z'
Zb
d$
N W
W
~
H
Z
V V W
Z!C
s ~ZC
~Q~
i z_
~ Z
fA 0
J Z ~
r
~
W
v ~ a
~
a
~ ; Q«y
d~
m d ...7
Q S
4
y~
H
2
~ m ~
H
a~
~C
G
E
a o.
m
~ ~
K Q
o ~
W W
a z
~ z
a z
~ ~
3
y
a
c
0
B
0
O
0
W
~ N
~ u, ~'
a~
6f (n ~D
~r J ~
W ~ ~
r
h ^ W
~ ~ W
~ ~_ t~
Q
O ~ ~
J
FRX NO.: 9072651566
`~
m
C
y C
R
n y
4 ~
8 ~
.~ Gdr
Q E~E
t~ U
CC u
~
w O
W O
W
z Z
3 5 5
~ >
'[f
Q
N V
O~
0
m
y
0. y
y
~
Cs4
~ ~
7
V
v
m
$
0
w a C
m ~ ~
~ a ~ C
~
no ~
' ~
r
-~
m 7 m
~ C a
E y
O
r0 J
d
A p ~ w ~
~ ~ ~ ~
~; ~ ~
O
x N M cp ~
< ~ c~li n
A ~ N N ~ N
4 ~ ~ ~ ~
~V M .- ,-
~ ~Qml~
1 ~S ~ 0~
s~
07-27-98 09:008 P.04
~
~ ~ ~ m
x
ti
~ .~
a ~ ~ W
d! aA Q
~
~ 4
E ~
= u~
J
o a
i
~ o d
p
> 3 V F-
~~~.'~~~
JUL 2 7 ~~98
Alaska 0ii& C~asC~ns. Commission
Anchot~ga
FROM: RRCO RLRSKA FpX NO.: 9072651566 07-27-98 09:00F7 P.05
Ci
~ -°
~
m
W
4 ~ ~ ~
~
2 ~
m e
$
E ~
~
W
~ 'o k
~
~ ~
a ~
JJ~~
a m
o
~ ~ ~
c
~ ~ $ E
c~ ~
$
~ _
'C v
m l~
~j ~ N
8 ~ d ~
Q ¢ Q m ~ E m p E
~ ~ V It S
O
w°~ p
~ p
i
°w °w u°i
as z
~ ~
3 ~ z z
z ~
5
<~
~
da z z
O ~ ~ j ~ ~
~ ~
~
~ o
~
~ ~
c ~ m
4
~ y a
0
0 ~ ~ g
~
N Z ~ ~
N ~ 7 +O
~ ~
Q
~ ~ ~ ~ ~ ~ N
Z m~ W N Q Q
b ~ u ~
Q O yj F V~ Q ~ '30 ~ ro v
VJO
Q ~ V ~
O V
~ o
~ ~
W U ~ ~
a O
~i
'
" ~
~ W
~~ Q~ ~ ~
~
Q
V>
LL W
O
L H
L ~
L
~ -°-
~ n
~~ O W
Z y
~~
U
Z
~
EaE ,
a,
'~ a P C
~
~ q 0 3 t a
C
~ ~
C cc~ ® h q ~ V
~
'S O %
W t t ~ O ~ a~
v v~ cn ~~ a~-'--~
W
O
O ~ ~ `" ~ ~
~ N c9 u'l ~
~ T ~ T
r.
'; N
~ ~ ~
^T
~ ~ ~ NN
tb V N
Q
a ~ ~ ~ ~ a
O ~ ~ tit t~ c~
i ~ ~ \~F ~ b ~I ins cif
• `. •'
JUL 2 7 198
Alaska Uil & Gas Cans. Cammis~~c~r~
~ncho~ag~
M N a N
O
Z
ti .g
~ a a
,
~
c
w
~
w
~
LL
C ~
M
~ 0
~ ~
FROM: RRCO RLRSKR FAX NO.: 9072651566 07-27-98 09:00A P.06
~ m W
N
Z Q H
2
DV Z
~j S
xoc
C O ao
~ C v m
di0 Fva$^,
~ o c z z
~
Q ~ Z R ~ ~
i„ 6 ~ ~
~ ~
~
~ W Q 4
Z
O
m
~ ' ~
V ~
p:
6.
a
W ~
a m
a '~
~ E
~ E
W ~
O
a
W ~
Y o
Q ~
O
< ~
C] W W
zz z
z~ 5
ga ~
~ ~
e
a
C
O
a
Ili) g
N
~ -°
~ ~o
z
W
Q
V °
z ~
0
O ~
o_ ~_
F C
d
o ~
yV~~
O 3
~ r~ m
W .~-
F ~ ~ m
r T
r ~
W ~ y~
Q ? ca
r
~ ~
N ~
` pN
j
Q
-[ T'i
~
C
E
s
.~
m ` c a
~ m
'
~'
~ .
~
~
~ ~ ~ ~
~ ~ ~ ~ ~
W W W
z z a
5 5 ~
z Z ~
~ o m
~
g w .~
~ d
N
O ~ N
p~ "1tp7
tl! G
N
a ~ n
7
~ ~ 8
a c
'S ~
J
~
v
+! y
;
;' `O
~
G
~
~ 3
3 _
~ E
_ V
a -°•
~ ~ o r
~ y
}- .- a ~ ~ m
0
~ aodr ~crn ~
~ N ~ ~ m
0
~ N N
,'`
`
,
~
~~, W
~ ~~1
c~ c3
p o ut ut
~ ~ N
~
N 111
~ Q ~
1~
9! $
`~ ~
~ ~
J
E q
l0 C Q
i~
~
q .Tt V
•
FROM: RRCO RLRSKR FAX NO.: 9072651566 07-27-98 09:018 P.07
! ~ ~,
W
N
~
'~
~ '~ ~ N
a
~ ~
~ ~ M ~ %
W
Q ~ p
~ ~ x
Q
Z y ~
E d ~~
~ ~ ~ 'u m
~ w ~ ~~ a
~ ~ a
e
~ @ a
~ ~ m
Q Q ~ ~ ~ v tY ~+
~ ~ ~ W W W
za z z ~ z z
~a ~ z ~ z z
~ > > > ~ ~
~ ~
N h
~ ?
H ~ m
~ ~ o ~ 'O
~
W ~@@ ~
~ ~ g
G
N
o
~~~ E
2 a
g
v tv
v c
Z z Y V W ~ ~ g ~ O
~ '
~~ sui ~ ~ ~ ,
~„, ~
OO e0oz~ ~ ~ ~ v ~
J
~
o yy
m ~
°
F-
~ d O ¢
a
-
= ~- ~ M°
z
~
~
~ - ~
•~ ~
61.I~N ~z ~ ~ a n •~ h d_~
m m d m~ Z ~ E ~ ~ ~~
2
Q
~
~ 0
1 0
V w
~ a 2;~~
~ W V
Q 7 7 ~ ~ m
y
~
c
d
g
o }
am
}
~
y $ C
~
b
a o
~ 3~
W
t
t
-~
3~ 1
~ o
„~ E
i i
d x z z a z a
Nf
..
>
> >
o >
~
~ m
°~
>
~ W Q-
~ i
~
r ~ a -°
tix ~c~
~~ m
~ ~ ~ ~ ~
Z W .
~
C Q $ ~
g
V Z~ N
V
+$
$ m
y
~ m
'6
~ O
'~ Z W
~ D Z Z .!I ~
a°p ~ n
~' .S
O
V~ m a~' ~ ~
V
~ o a
aW Oz~ c a ~ ai ~ o.~
i o
m C7
Z
~ ~
v -°~
m e
v a ~ p ~ ~ m
c
Z ~ ~ ~ 3
~ ~ a
O N ~
~~ ~
~ U
~
~~
Y
S.
.
W
O = 7
to aI O p ~
F~ m a y{ O
~ ~ m
W
~ ~ ~ ~ m ~ ~ b ~ ~ n a~
0 r ~ r N ~ N H
OI M t0
~ (7 h O 1~~y tC~D V'
~ !'r
C <
7
~
W
~ )
! ~ ~
tV x
..
g
N m
N
W ~
~ o~oN
N ~ IA pO~
O~
^ a -~
p
~ ~
~ ^
N N E ~
N
,Z C ~
W
y ~
~
~g
a
~ ~ 3 ~ 3 3 2
~ 0 ~
o
~
~ v 0
r-
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
LISBURNE PRODUCTION CENTER #1 ARCO ALASKA INC. PRUDHOE BAY/PT MCINTYRE 5/98
~~
_. ~~f
s ?tea"~
,~,,
~z~
cP
•
Disposition Volume MCF`
1. Sold 172,819
2. Reinjected 9,240,428
3. Flared or vented less than 1 hour 712
4. Flared or vented greater than 1 hour
Su lemental re rt re wired--See 20 AAC 25.235 0
5. Pilot and Purge 11,539
6. Used for lease operations Fuel
Assist 837,521
1,627
7.Other 0
TOTAL items 1 - 7 10,264,646
8. NGL gas equivalent produced 172,819
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
1 hereby certify that a foregang is true and correct to the best of my knowledge. / ~~~
Signatur . Title: V. Date: {v_~L"! ~,.~y
Fonn 10-422 (Revised 4/95)
'Indicate contribution of each pool to total.
Pool Name Code Percent
LISBURNE
NIAKUK 640144
640148 36.29%
4.35%
NORTH PRUDHOE BAY 640152 0.11
POINT MCINTYRE
WEST BEACH
NIAKUK 666100
640186
640148 57.17%
0.20%
1.88%
Official Use On --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folbwing the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
MAY 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 6 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/1/98 1136-1205 264 Process upset in the oil section caused both of fhe SNAP UNPLANNED Stabilized process and restarted compressors.
compressors to shut down.
. s 'f
;_
};
~,~ria~'..! '.~ r;,~ _ _
,.
Total Flare ~ i Hour 264
Total Flare > i Hour 0
Volume Flared 264
Measured Safety Pilot 4,186
Continuous Assist 599
TOTAL FLARED 5,049
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
MAY 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 6 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/1/98 1136-1205 396 Process upset in the oil section caused both of the STV/IP
compressors to shut down.
Total Flare <= 1 Hour 396
•
Total Flare > 1 Hour 0
Volume Flared 396
Measured Safety Pilot 6,597
Continuous Assist 918
UNPLANNED Stabilized process and restarted compressors.
TOTAL FLARED 7,911
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDNOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
MAY 1998
•
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/1/98 1136-1205
Total Flare ~ 1 Hour
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
23
11
42
Process upset in the oil section caused both of the STV/IP UNPLANNED Stabilized process and restarted compressors.
compressors to shut down.
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
MAY 1998
•
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 6 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/1/98 1136-1205 Process upset in the oil section caused both of the STV/IP
compressors to shut down.
UNPLANNED Stabilized process and restarted compressors.
Tota/ Flare ~ 1 Hour 0
•
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pllot 12
Continuous Assist o
TOTAL FLARED
BP EXPLORATION, INC.
CONSERVATION ORDER N0.219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
MAY 1998
VOLUME PLANNED
DATE TIME (Mscn DESCRIPTION OF INCIDENTS ~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/1/98 1136-1205 32 Process upset in the oil section caused both of the STV/IP UNPLANNED Stabilized process and restarted compressors.
. compressors to shut down.
Total Flare ~ 1 Hour 32
•
Total Flare > 1 Hour 0
Volume Flared 32
Measured Safety Pilot 502
Continuous Asstst 70
TOTAL FLARED 604
~~
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WESTERN NIAKUK
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
MAY 1998
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS 6 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/1/98 1136-1205 12 Process upset in the oil section caused both of the SNAP ~ UNPLANNED Stabilized process and restarted compressors.
• compressors to shut down.
Total Flare c.1 Hour 12
•
Total Flare > 1 Hour o
Volume Flared 12
Measured Satety Pilot 219
Continuous Assist 29
TOTAL FLARED
•
•
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSI710N
>r Field(s)
INC.
OE BA
Disposition Volume MCF'
1. Sold 172,031
2. Reinjected 9,089,717
3. Flared orvented less than 1 hour 0
4. Flared orvented greater than 1 hour
Su lemental re rt re wired-See 20 AAC 25.235 0
5. Pilot and Purge 11,127
6. Used for lease operations Fuel
Assist 809,676
4,747
7. otner 0
TOTAL items 1 - 7 10,087,298
8. NGL gas equivalent produced 172,031
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certity that foregoing is true and correct to the<best of my knowledge.
Signature: ~ Title: U~v J • Date: `~ ~
Form 10-422 (Revised 4/95)
of Disposition
4/98
'Indicate contribution of each pool to total.
Pool Name Code Percent
LISBURNE
NIAKUK 640144
640148 32.80%
4.55%
NORTH PRUDHOE BAY 640152 0.00%
POINT MCINTYRE
WEST BEACH
NIAKUK 666100
640186
640148 57.90%
2.89%
1.86%
Official'Use On --Flan Authorization > 1 hr
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folbwing the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
APRIL 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS A CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a~ 1 Hour 0
•
Total Flare > 1 Hour 0
Volume Flared 0
Measun~d Safety Pltot 3,644
Continuous Asslat 1,618
TOTAL FLARED 5,262
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, POINT MCINTYRE;
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
APRIL 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS ~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
•
Total Flaro ~ 1 Hour 0
C~
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 6,445
Continuous Assist 2,742
TOTAL FLARED 9,187
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
APRIL 1998
VOLUME PLANNED
DATE TIME (MSCFl DESCRIPTION OF INCIDENTS 6 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
•
Total Flaro c: 1 Hour 0
\J
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 326
Continuous Assist 75
TOTAL FLARED 401
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
APRIL 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS i CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
•
Total Flare c~ 1 Hour 0
Total Flare > 1 How 0
Volume Flared
MeasunxJ Safety Pilot 0
Continuous Assist 0
TOTAL FLARED
BP EXPLORATION, INC.
CONSERVATION ORDER N0.219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
APRIL 1998
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS A CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
•
Total Flare ~ 1 Hour 0
•
Total Flare > 1 Hour 0
Volume Flared
Measured Safety Pllot 505
Continuous Assist 222
TOTAL FLARED 727
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
APRIL 1998
VOLUME PLANNED
DATE TIME (Mscn DESCRIPTION OF INCIDENTS 6 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
•
Total Flare ~ 1 Hour
C~
Total Flare > 1 Hour 0
Volume Flared
Measured Safety Pliot 2oT
Continuous Assist 90
TOTAL FLARED 297
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
•
~ ~
~.
cw
0 _,
__.
~ .~
n ~ ~,
'
,~
LFacility
LISBURNE PRODUCTION CENTER #1 (Operator I
ARCO ALASKA, INC. Field(s)
PRUDHOE
Disposition Volume MCF'
1. Sold 161,386
2. Reinjected 7,990,382
3. Flared or vented less than 1 hour 661
4. Flared or vented greater than 1 hour
Su lemental re rt re uired--See 20 AAC 25.235 5,184
5. Pilot and Purge 11,582
6. Used for lease operations Fuel
Assist 757,859
23,042
7.Other 0
TOTAL items 1 - 7 8,950,096
8. NGL gas equivalent produced 161,386
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the f egoing is true and correct to the best of my knowledge.
c
Signature: Title: ~Z`~~`/ Date: 7 ~~SJ
Form 10-422 (Revised 4/95)
ear of Disposition
"Indicate contribution of each pool to total.
Pool Name Code Percent
LISBURNE
NIAKUK 640144
640148 26.72%
6.83%
NORTH PRUDHOE BAY 640152 0.00%
POINT MCINTYRE
WEST BEACH
NIAKUK 666100
640186
640148 63.16%
0.98%
2.31%
Official Use On --Flarin Authorization > 1 hr:
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
MARCH 1998
DATE
TIME VOLUME
(MSCF)
DESCRIPTION OF INCIDENTS !~ CAUSE PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
• 3/17/98 0148-0203 71 Flared while depressurizing compressor 1808 in order to seal oil UNPLAN Replaced compressor seals
system.
3/29/98 1108-1136 96 The level transmitter on the LPC produced water drum, malfunctioned UNPLAN Corrected fluctuation and restarted compressors
causing a high level shut down. In tum, this caused the liquid in the
cnxJe oil surge drum to overflow into the suction scrubber on the
STV/IP compressors (1800 & 1801), shutting them down also.
Total Flare c. 1 Hour 167
• 3113/98 1611-1622
1633-1726 1,567 Process upset in the oil section caused compressor 1807 and 1808
to shut down. UNPLAN Stabilized process and restarted compressors
Total Flare > 1 Hour 1,567
Volume Flared 1,734
Measured Safety Pilot 2,922
Continuous Asslat 6,095
TOTAL FLARED 10,751
ARCO ALASKA, WC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
MARCH 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
3/17/98 0148-0203 170 Flared while depressurizing compressor 1808 in order to seal oil UNPLAN Replaced compressor seals
• system.
3/29/98 1108-1136 238 The level transmitter on the LPC produced water drum, malfunctioned UNPLAN Corrected fluctuation and restarted compresso
causing a high level shut down. In tum, this caused the liquid in the
crude oil surge drum to overflow into the suction scrubber on the
STV/IP compressors (1800 & 1801), shutting them down also.
Total Flare ~ 1 Hour 408
3J13/98 1611-1622 3,020 Process upset in the oil section caused compressor 1807 and 1808 UNPLAN Stabilized process and restarted compressors
• 1633-1726 to shut down.
Total Flare > 1 Hour 3,020
Volume Flared 3,428
Measured Safety Pilot 7,441
Continuous Asslat 13,934
TOTAL FLARED 24,803
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
MARCH 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS A CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
• 3/17/98 0148-0203 Flared while depressurizing compressor 1808 in order to seal oil UNPLAN Replaced compressor seals
system.
3/29/98 1108-1136 15 The level transmitter on the LPC produced water drum, malfuncti UNPLAN Corrected fluctuation and restarted compresso
causing a high level shut down. In tum, this caused the liquid in the
crude oil surge drum to overflow into the suction scrubber on the
STV/IP compressors (1800 8 1801), shutting them down also.
Total Flare ~ 1 Hour 15
• 3/13/98 1611-1622
1633-1726
Total Flare > 1 Hour 0
Volume Flared 15
Measured Safety Pilot 110
Continuous Asslat 96
Process upset in the oil section caused compressor 1807 and 18 UNPLAN Stabilized process and restarted compressors
to shut down.
TOTAL FLARED 221
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
MARCH 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS A CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
r 1
\_J
Total Flare ~ 1 Hour 0
•
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist O
TOTAL FLARED 0
BP EXPLORATION, INC.
CONSERVATION ORDER N0.219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
MARCH 1998
DATE
TIME VOLUME
(Mscf) PLANNED
DESCRIPTION OF INCIDENTS 6 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
3/17/98 0148-0203 36 Flared while depressurizing compressor 1808 in order to seat oil UNPLAN Replaced compressor seals
• system.
3/29/98 1108-1136 19 The level transmitter on the LPC produced water drum, malfunctioned UNPLAN Corrected fluctuation and restarted compresso
causing a high level shut down. In tum, this caused the liquid in the
crude oil surge drum to overflow into the suction scrubber on the
STV/IP compressors (1800 & 1801), shutting them down also.
Total Flaro t: 1 Hour 55
• 3/13/98 1611-1622
1633-1726 492 Process upset in the oil section caused compressor 1807 and 1808
t
h
t d UNPLAN Stabilized process and restarted compressors
o s
u
own.
Total Flaro > 1 Hour 492
Volume Flared 547
Measured Safety Pilot 826
Continuous Assist 2,331.
TOTAL FLARED 3,704
s
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
MARCH 1998
VOLUME PLANNED
DATE TIME (Msct1 DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
• 3/17/98 0148-0203 8 Flared while depressurizing compressor 1808 in order to seal oil UNPLAN Replaced compressor seals
system.
3/29/98 1108-1136 8 The level transmitter on the LPC produced water drum, malfunctioned UNPLAN Corrected fluctuation and restarted compresso
causing a high level shut down. In tum, this caused the liquid in the
crude oil surge drum to overflow into the suction scrubber on the
STV/IP compressors (1800 & 1801), shutting them down also.
Total Flare ~ 1 Hour 16
3/13/98 1611-1622 105
1633-1726
Total Flare > 1 How 105
Volume Flared 121
Measured Satety Pilot 283
Continuous Assist 586
Process upset in the oil section caused compressor 1807 and 1808 UNPLAN Stabilized process and restarted compressors
to shut down.
TOTAL FLARED 990
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
•
jLISBURNE PRODUCTION CENTER #1 M ARCO ALASKA, INC. ~ PRUDHOE
Disposition Volume MCF'
1. Sold 161,407
2. Reinjected 8,524,846
3. Flared or vented less than 1 hour 829
4. Flared or vented greater than 1 hour
Su lemental re rt re uired--See 20 AAC 25.235 0
5. Pilot and Purge 10,438
6. Used for lease operations Fuel
Assist 757,478
1,781
7.Other 0
TOTAL items 1 - 7 9,456,779
8. NGL gas equivalent produced 161,407
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the regoing is true and correct to the best of my knowledge.
Signature: Title: ~j~•-fir. Dater r,
Form 10-422 (Revised 4/95)
BAY/PT MCINTYRE Month/Year of Disposition
2/98
'Indicate contribution of each pool to total.
Pool Name Code Percent
LISBURNE
NIAKUK 640144
640148 34.73%
4.31%
NORTH PRUDHOE BAY 640152 0.00%
POINT MCINTYRE
WEST BEACH
NIAKUK 666100
640186
640148 59.44%
0.00%
1.52%
Official Use On --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folbwing the month of disposition.
Authority 20 AAC 25.235.
~.
_~
~~
6D
3
i3'
D
t'.~
r-.
...+
tit
bb
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
FEBRUARY 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 6 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
I 2/20J98 2135-2150 275 Instrumentation malfunction on compressor 1808 caused flare UNPLANNED Corrected instrumentation failure
valve to open.
Total Flare ~ 1 Hour 275
Total Flare > 1 Hour 0
Volume Flared 2T5
Measured Safety Pilot 3,625
Continuous Assist 654
TOTAL FLARED 4,554
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
FEBRUARY 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
I 2/20J98 2135-2150 501
•
Total Flare c~ f Hour 501
L_~
Total Flare > 1 Hour 0
Volume Flared 501
Measured Satety Pilot 6,205
Continuous Assist 1,030
TOTAL FLARED 7,736
Instrumentation malfunction on compressor 1808 caused flare UNPLANNED Corrected instrumentation failure
valve to open.
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
FEBRUARY 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 6 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
~.
•
Total Flare ~ 1 Hour 0
•
Total Flare > 1 Hour
Volume Flared
Measured Safety Pllot
Continuous Asslst
TOTAL FLARED 0
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
FEBRUARY 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS A CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare ~ 1 Hour
i
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED 0
BP EXPLORATION, INC.
CONSERVATION ORDER N0.219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
FEBRUARY 1998
VOLUME PLANNED
DATE TIME (Mscn DESCRIPTION OF INCIDENTS 6 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
I 2/20/98 2135-2150 38 Instrumentation malfunction on compressor 1808 caused flare
• valve to open.
Total Flans c~ 1 Hour 38
•
Total Flare > 1 Hour 0
Voiume Flared 36
UNPLANNED Corrected instrumentation failure
Measured Safety Pilot 449
Continuous Assist 79
TOTAL FLARED 566
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
FEBRUARY 1998
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS 6 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
• I 2/20!98 2135-2150 15 Depressured compressor 1800 for maintenance PLAN Compressor depressured, ready for maintenar
Total Flare srs 1 Hour 15
,i
Total Flare > 1 How 0
Volume Flared 15
Measured Safety Pilot 159
Continuous Assist 18
TOTAL FLARED 192
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITIOlo1
r:
I BURNE PRODUCTION CENTER til I ORCO ALASKA, INC. IPRUDHOE BAY/PT MCINTYRE I Month/Year 1~8 isposition
Disposition Volume MCF*
1. Sold 98,036
2. Reinjected 7,541,760
3. Flared or vented less than 1 hotu 4,631
4. Flared or vented greater than 1 hour
(Su Iemental re rt wired--See 20 AAC 25.235) - 1,394
5. Pilot and Purge 11,676
6. Used for lease operations Fuel
Assist 682,981
47 591
7.OWer 0
TOTAL items 1- 7 8,388,069
8. NGL fzas equivalent produced 98,036
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: 0
Remarks:
I hereby certify that the oregoing is true and correct to the best of my knowledge.
Signature• .F/G`-~ Title: ~ , Date: / ~ ~
tmn evl
*Indicate contribution of each pool to total.
Pool Name Code Percent
LISBURNE
NIAKUK 640144
640148 34.73%
4.56%
NIAKUK
NIAKUK
NORTH PRUDHOE BAY 640148
640148
640152 0.13%
0.00%
0.00%
POINT MCINTYRE
WEST BEACH
NIAKUK 666100
640186
640148 59.48%
0.00%
1.10%
Note: Ail volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
}
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
JANUARY 1998
DATE
TIME VOLUME
(MSCF)
DESCRIPTION OF INCIDENTS & CAUSE PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1111/98 2340-2355 78 Depressured compressor 1800 for maintenance PLAN Compressor depressured, ready for maintenance
I
1/12/98 1805-1820 68 Shut down compressor 1800 due to process upset in treater flash UNPLANNED Restarted compressor
• dram section of plant
I 1/13/98 1323-1355 230 Shut down compressor 1800 due to two process upsets in oil section UNPLANNED Restarted compressor
1915-1935
1/22/98 0250-0314 1221 Compressor 1808 was down for maintenance when the emergency UNPLANNED Restarted compressor 1807
shutdown valve was accidentally bumped on compressor 1807,
causing it to shut down also.
Total Flare « 1 Hour 1,597
1/3/98 0445-0615 271 Compressor 1855 shut down on instrumentation malfunction UNPLANNED Repaired malfunction and restarted compressor
1/24/98 2205-2352 247 Compressor 1855 shut down due to process upset in the oil section UNPLANNED Restarted compressor
•
Total Flare > 1 Hour 518
Volume Flared 2,115
Measured Safety Pilot 4,035
Continuous Assist 17,156
TOTAL FLARED 23,306
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
JANUARY 1998
C~
1915-1935
1/22/98 0250-0314 2019 Compressor 1808 was down for maintenance when the emergency UNPLANNED Restarted compressor 1807
shutdown valve was accidentally bumped on compressor 1807,
causing it to shut down also.
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1/11/98 2340-2355 123 Depressured compressor 1800 for maintenance PLAN Compressor depressured, ready for maintenar
I
1/12/98 1805-1820 130 Shut down compressor 1800 due to process upset in treater flash UNPLANNED Restarted compressor
drum section of plant
1/13/98 1323-1355 446 Shut down compressor 1800 due to two process upsets in oil section UNPLANNED Restarted compressor
Total Flare « 1 Hour 2,718
1/3/98 0445-0615 484
1/24/98 2205-2352 308
Total Flare > 1 Hour 792
Volume Flared 3,510
Compressor 1855 shut down on instrumentation malfunction UNPLANNED Repaired malfunction and restarted compressor
Compressor 1855 shut down due to process upset in the oil section UNPLANNED Restarted compressor
Measured Safety Pllot 6,952
Cont(nuous Asstst 27,351
TOTAL FLARED 37,813
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
JANUARY 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS b CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
•
Total Flare <= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared
Measured Satety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
JANUARY 1998
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 6 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
CJ
TOta/ Flare <a 1 HOUr 0
Total Flare > 1 Hour 0
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION, INC.
CONSERVATION ORDER N0.219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
JANUARY 1998
DATE
TIME VOLUME
(Mscf)
DESCRIPTION OF INCIDENTS d~ CAUSE PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
I 1/11/98 2340-2355 8 Depressured compressor 1800 for maintenance PLAN Compressor depressured, ready for maintenar
1/12/98 1805-1820 7 Shut down compressor 1800 due to process upset in treater flash UNPLANNED Restarted compressor
• drum section of plant
I 1/13/98 1323-1355 29 Shut down compressor 1800 due to two process upsets in oil section UNPLANNED Restarted compressor
1915-1935
1!22/98 0250-0314 169 Compressor 1808 was down for maintenance when the emergency UNPLANNED Restarted compressor 1807
shutdown valve was accidentally bumped on compressor 1807,
causing it to shut down also.
Total Flare <=1 Hour 213
I 1/3/98 0445-0615 35 Compressor 1855 shut down on instrumentation malfunction UNPLANNED Repaired malfunction and restarted compressor
1/24/98 2205-2352 28 Compressor 1855 shut down due to process upset in the oil section UNPLANNED Restarted compressor
•
Total Flare > 1 Hour 63
Volume Flared 276
Measured Safety Pilot 533
Continuous Assist 2,245
TOTAL FLARED 3,054
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, NIAKUK 27
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
JANUARY 1998
•
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1/11/98 2340.2355 2 Depressured compressor 1800 for maintenance PLAN Compressor depressured, ready for maintenar
I
1/12/98 1805-1820 2 Shut down compressor 1800 due to process upset in treater (lash UNPLANNED Restarted compressor
drum section of plant
1/13/98 1323-1355 12 Shut down compressor 1800 due to two process upsets in oil section UNPLANNED Restarted compressor
1915-1935
1/22198 0250-0314 67 Compressor 1808 was down for maintenance when the emergency UNPLANNED Restarted compressor 1807
shutdown valve was accidentally bumped on compressor 1807,
causing it to shut down also.
Total Flare <= f Hour 83
C~
1/3/98 0445-0615 8 Compressor 1855 shut down on instrumentation malfunction UNPLANNED Repaired malfunction and restarted compressor
1/24/98 2205-2352 11 Compressor 1855 shut down due to process upset in the oil section UNPLANNED Restarted compressor
Total Flare > 1 Hour 19
Volume Flared 102
Measured Satety Pilot 139
Continuous Assist 782
TOTAL FLARED 1,023
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, NIAKUK 28
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
JANUARY 1998
•
1915-1935
I 1/22/98 0250-0314 19 Compressor 1808 was down for maintenance when the emergency UNPLANNED Restarted compressor 1807
shutdown valve was accidentally bumped on compressor 1807,
causing it to shut down also.
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS ~ CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1/11/98 2340-2355 1 Depressured compressor 1600 for maintenance PLAN Compressor depressured, ready for maintenar
I
1/12/98 1805-1820 0 Shut down compressor 1800 due to process upset in treater flash UNPLANNED Restarted compressor
drum section of plant
1/13/98 1323-1355 0 Shut down compressor 1800 due to two process upsets in oil section UNPLANNED Restarted compressor
Total Flare <= 1 Hou- 20
1/3/98 0445-0615 2
1/24/98 2205-2352 0
Total Flare > 1 Hour 2
Volume Flared 22
Measured Safety Pilot 17
Continuous Ass(st 57
Compressor 1855 shut down on instrumentation malfunction UNPLANNED Repaired malfunction and restarted compressor
Compressor 1855 shut down due to process upset in the oil section UNPLANNED Restarted compressor
TOTAL FLARED 96
ARCO ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE BAY, NIAKUK 29
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
JANUARY 1998
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Nour
Total Flare > 1 Hour 0
Volume Flared
Measured Safety Pilot 0
Continuous Assist o
TOTAL FLARED 0