Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutBPXA - ENDICOTTGAS DISPOSITION FILES Field 2000 ~~xq ~ ` ~' P`"'~ ~ '~ ~ ALASKA OIL AND GAS CONSERVATION CONII~lISSION ~;-~.-, ~ n~A FACILITY REPORT OF PRODUCED GAS DISPOSITION ( - ;~ Facility Operator Field(s) Month/Year of Disposition '9~t~~3~~~~=~~~u'~=o~~~+~~=;~'b-"~''~ BP Exploration (Alaska) Endicott 10450 Jan-00 Disposition Volume MCF* 1. Sold To Fuel NGL Badami 14,330 128,375 0 2. Reinjected 9,983,471 3. Flared or vented less than 1 hour 2,947 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 57,505 5. Pilot and Purge 10,191 6. Used for lease operations Assist Fuel 24,026 962,189 7. Other TOTAL items 1-7 11,183,034 8. NGL gas equivalent produced 128,375 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify t at the foregoing is true rnaJnd correct to the best of Signature Title M'~I~.+ ~~SC Date Z U *Indicate contribution of each pool Pool Name Code Percent 220100 Official Use Only-Flaring Authoriza 1. Safety MCF 2. Lease MCF 3. Conserv. Purpos MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 2/4/2000 Page 1 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Jan-2000 Un lanned Events less than ore ual to 1 hour DATE TIME' VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 2,949 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Un lanned Events reater than 1 hour DATE-- TIME' VOLUME DESCRIPTION OF INCIDENT &'CAUSE ACTION TAKEN TO ELIMINATE CAUSE N1ain gas compressor inlet air filters plugged up with snow during blizzard Crews working to clear MGC inlet air filters were unable to forcing shutdown of entire field, Gas injection well back-flowed into plant keep up with blizzard. Waiting on weather to abate. Ol /Ol /00 00:00-23:59 3,473 to provide fuel as. Ol /02/00 00:00-20:21 37,716 SEE ADDENDUM SEE ADDENDUM An attempt to restart the MI compressor was unsuccessful. Flare volume The MI compressor operating parameters were adjusted due to purging, pressurization, depressurization, of MI compressor, Assist slightly for a greater chance of success on the next re-start gas was used for the duration of this event to mitigate flare emission attempt, Assist gas use was eliminated as soon as permitted 01./07/00 16:00-18:50 163 opacity. by flare emission opacity. A leak was discovered on the SDI 3-phase flowline, In order to safe of the Crews worked to repair 3-phase line and bring the field back line for repair it was necessary to shut-down the entire field, depressurize on line ASAP. Review of line integrity initiated. the entire gas train and 3-phase header to flare, A GI well was flowed to 01/22/00 05:10-23:59 3,575 the plant for fuel. A leak was discovered on the SDI 3-phase flowline. In order to safe of the Crews worked to repair 3-phase line and bring the field back line for repair it was necessary to shut-down the entire field and on line ASAP. Review of line integrity initiated. depressurize the entire gas train and 3-phase header to flare. A Gf well O1 /23/00 00:00-23:59 780 was flowed to the plant for fuel. While attempting to re-start the field after an unplanned shut-down the Adjusted MGC controls several time and were eventually able Main Gas Compressors (MGC) starting sequence experienced several to restart machines. Ol /24/00 13;00-15:00 843 failure, resultin in the depressurization of the entire as-train to flare, While attempting to re-start the field after an unplanned shut-down the Adjusted MGC controls several time and were eventually able Main Gas Compressors (MGC) starting sequence experienced several to restart machines. O1 /24/00 15:20-16:20 497 failure, resultin in the depressurization of the entire as-train to flare. While attempting to re-start the field after an unplanned shut-down the Adjusted MGC controls several times and were eventually Main Gas Compressors (MGC) starting sequence experienced several able to restart machines. O1 /24/00 18:10-21:50 4,957 failures, resultin in the depressurization of the entire as-train to flare. The only operational booster compressor shutdown and would not re-start, The controls system on the booster compressor was repaired as sending high MW gas to flare and requiring assist gas to keep below quickly as possible. The spare booster compressor is currently 01/25/00 18:10-23:59 1,257 opacit minimums undergoing overhaul. The only operational booster compressor shutdown and would not re-start, The controls system on the booster compressor was repaired as sending high MW gas to flare and requiring assist gas to keep below quickly as possible. The spare booster compressor is currently Ol /26/00 01:20-00:00 3,413 opacity minimums undergoing overhaul. The only operational booster compressor shutdown and would not re-start, The controls system on the booster compressor was repaired as sending high MW gas to flare and requiring assist gas to keep below quickly as possible. The spare booster compressor is currently Ol /27/00 00:00-05:40 452 o aci minimums under oin overhaul. 2/4/2000 +i w!z ; q ~, gq s e ~ _#j'- Page 2 t - -< `- S '~.: , BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 ~~ ,~. GAS FLARING INCIDENT REPORT- ENDICOTT ' - ~" ,r,-: ''"` ..~ ~ Jan-2000 O1 /27/00 12:20-13:20 423 The only operational booster compressor shutdown and would not re-start, sending high MW gas to flare and requiring assist gas to keep below opacity minimums The booster compressor was restarted as quickly as possible. The spare booster compressor is currently undergoing overhaul. TOTAL 57,549 Planned Events Less Than or Equal 1 Hour A ND Not Exceedin 5000 Mcf DATEf TIME VOLUME DESCRIPTION OF INCIDENT &'CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceedin 1 Hour OR Exceedin 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT &".CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 TOTAL EIDR SDN ENDICOTT Volume flared less than 1 2,949 0 2 2,947 Volume flared greater tha 57,549 0 44 57,505 1 hr Pilot Purge 10,199 0 8 10,191 Assist Gas 24.044 0 18 24,026 TOTAL FLARED VOLUME 94,741 0 72 94,669 ary 2000 Endicott Flare Report Addendum Description of January 2, 2000 Flaring Incident: On December 29, 1999 a severe winter storm, the magnitude of which has not been observed in 10 years, impacted the entire Eastern Alaskan Arctic Coast. At the Endicott Main Production Facility, beginning at approximately 7:00 PM on the 29th, the inlet filters to the main gas compressor (MGC) and water injection turbines began to clog up with blowing snow. Work crews were dispatched to manually clear the intakes but despite continuous efforts were not able to keep up with the rate of plugging. By 4:00 PM on December 3ah both MGCs and water injection pumps were forced to shut down and the Endicott field effectively went to a warm shut-in. Work crews concentrated their efforts on keeping the inlet filters to the power generation turbines clear during the Phase III weather which continued until January 2, 2000. With considerable fewer turbines, the Badami field was able to be maintained in operation and exporting oil to the Endicott pipeline during this period. With ambient temperatures averaging -15°F there was a risk of plugging the Endicott pipeline if the 11 °F Badami crude was not displaced to Pump Station One before reaching its gel point at about 0°F. As a direct result of this risk, a reduced Endicott export rate of approximately 8,000 bopd was re-initiated at 8:30 AM on January 2~d. Associated produced gas was minimized and sent to flare. That same morning the storm tapered off enough for effective filter clearing to commence. After much intensive work removing and replacing filters both MGCs were restarted during the afternoon of the ~d and the flaring eliminated. On the 3~d of January Pump Station One reported observing temperatures on the incoming Endicott pipeline only a few degrees above 0'F. As of mid-day on January 4th Endicott was back up to 90% rate. Action taken to eliminate cause: Evaluation of new turbine intake filters and/or automatic filter cleaning system currently under way. ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Endicott 10450 Feb-00 Disposition Volume MCF* 1. Sold To Fuel NGL Badami 13,741 139,701 0 2. Reinjected 10,892,492 3. Flared or vented less than 1 hour 4,025 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 11,846 5. Pilot and Purge 9,536 6. Used for lease operations Assist Fuel 22,592 992,883 7. Other TOTAL items 1-7 12,086,816 8. NGL gas equivalent produced 139,701 9. Purchased gas 10. Transferred from: 11. Transferred to: *Indicate contribution of each pool Pool Name Code Percent 220100 Official Use Only-Flaring Authoriza 1. Safety MCF 2. Lease MCF 3. Conserv. Purpos MCF Commissioner Date I hereby certify hat the foregoing is true and correct to the best of Signature Title ~/Ii(~(~-Tf~~ Date 3 ~ Ctc~ Form 10-422 Rev. 4/95 3/6/2000 BP EXPLORATION (ALASKA) INC. Page 1 ADMINISTRATIVE APPROVAL N0.202,4 GAS FLARING INCIDENT REPORT - ENDICOTT Feb-2000 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 4,027 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE The booster compressors were constantly dropping off line due to control Crews worked continuously to fix the instrumentation/controls problems. Additional assist gas was also necessary to keep below problem. In addition, the overhaul of "A" booster is opacity minimums. anticipated to help eliminate much of the booster 02/02/00 10:40-15:20 1,107 compressor associated flaring in the future. MI compressor shutdown due to unknown cause and depressurized to MI compressor restarted, notified control system engineer of flare. Multiple attempts to restart were attempted before final success problem 02/03/00 09:21-12:01 667 02/18/00 03:50-09:50 923 02/18/00 16:50-00:00 1,215 02/19/00 00:00-23:59 4,646 02/20/00 00:00-19:40 3,215 02/25/00 10:40-12:00 79 TOTAL 11,852 was achieved. Length of flaring event is due to multiple back-to-back start attempts. See Addendum See Addendum See Addendum See Addendum The only operational booster compressor periodically tripping to flare, sending high MW gas to flare and requiring assist gas to keep below opacity minimums. See Addendum See Addendum See Addendum See Addendum The controls system on the booster compressor was adjusted to help prevent further events. Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL TOTAL EIDR SDN ENDICOTT Volume flared less than 1 r 4,027 0 2 4,025 Volume flared greater tha 11,852 0 6 11,846 1 hr Pilot Purge 9,541 0 5 9,536 Assist Gas 22.603 0 11 22,592 TOTAL FLARED VOLUME 48,023 0 24 47,999 Endicott Flaring Incidents Addendum for February 18, 19 and 20 From 3:50 AM on February 18th to 7:40 PM on February 20th the Endicott field was flaring almost continuously when both booster compressors were off line. The booster compressors allow for the reintroduction of various low pressure gas plant streams back into the main gas compression system for eventual re-injection into the Endicott reservoir. Booster compressor under-performance has been a major contributing factor to Endicott upset flare volumes in recent months. Therefore, at the beginning of the this year it was decided to undertake a thorough overhaul of one of the two booster compressors at Endicott. On January 28, 2000 "A" booster compressor was taken off line for overhaul, leaving "B" booster as the sole unit capable of boosting low pressure gas back into the main gas process system. On February 18th at 3:50 AM "B" booster was manually shut down when it failed to respond to the controls system and reached dangerously high amp loads. With neither booster compressor on line the low pressure gas streams in the plant were routed to flare for safety reasons. To eliminate these gas streams, and the consequent flaring, would have required a full plant shutdown. However, in order to keep power and heat systems running during a shutdown it is necessary to back-flow a gas injection well into the plant. This normally results in an even greater amount of flaring and so the decision was made to keep the plant operating while repairs were made to "B" booster compressor as rapidly as possible. Due to the nature and extent of the repairs required it was not until 7:40 PM on February 20th before "B" booster was back on line and flaring ceased. Note: On February 28, 2000 "A" booster compressor was restarted after completing overhaul and is running strong. ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Endicott 10450 Mar-00 Disposition Volume MCF* 1. Sold To Fuel NGL Badami 14,683 161,575 0 2. Reinjected 11,561,336 3. Flared or vented less than 1 hour 2,537 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 aaC 25.235) 0 5. Pilot and Purge 10,193 6. Used for lease operations Assist Fuel 23,418 L, 162,237 7. Other TOTAL items 1-7 12,935,979 8. NGL gas equivalent produced 161,575 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby ce ify t at the foregoing is true and correct to Signature Title ~~„ (7t'~{ Date the best of C~!/ Form 10-422 Rev. 4/95 *Indicate contribution of each pool Pool Name Code Percent 220100 Official Use Only-Flaring P.uthoriza 1. Safety MCF 2. Lease MCF 3. Conserv. Purpos MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. `~- 4 ~~ fn 3 `DQ !V ,~ a o Q 4/6/2000 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Mar-2000 Page 1 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 2,538 Not required for unplanned events which Not required for unplanned events which aro loss than nr equal l0 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour . III DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Evante Lase Than or Equol 1 Hour AND Not Exceeding b000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT 8 CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Excoeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 TOTAL EiDR SDN ENDICOTT Volume flared less than i hr 2,538 0 1 2,537 Volume flared greater than 0 0 0 0 1 hr Pilot Purge 10,199 0 6 10,193 Assist Gas 23.431 Q ~ 23.418 TOTAL FLARED VOLUME 36,168 0 20 36,148 F~1~'E~ APR ~ 2 2000 Alaska ~s & ~a~ ~~r~s ~.r~~ ri-~l;~sior Arlrhflr~ ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Endicott 10450 Apr-00 Disposition ~ Volume MCF* 1. Sold Fuel NGL To Badami 14,141 148,190 0 2. Reinjected 10,400,688 3. Flared or vented less than 1 hour 3,207 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 17 5. Pilot and Purge 9,865 6. Used for lease operations Assist Fuel 23,269 1,027,626 7. Other TOTAL items 1-7 11,627,003 8. NGL gas equivalent produced 148,190 9. Purchased gas 10. Transferred from: 11. Transferred to: ng is true and correct to the best of TitleM,(s2rA~x Date *Indicate contribution of each pool Pool Name Code Percent 220100 Official Use Only-Flaring Authoriza 1. Safety MCF 2. Lease MCF 3. Conserv. Purpos MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. n n;,, 1 1 ~~~'a. Form 10-422 Rev. 4/95 5/4/2000 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Apr-2000 Page 1 Unplanned Events less than or equal to 1 hour DATE TIME VOLUrtAE DESCRIPTION OF INCIDENT &"CAUSE ACTION TAKEN TO' ELIMINATE CAUSE TOTAL 3,209 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT &'CAUSE ' ACTION TAKEN TO'ELIMINATE'CAUSE Assist gas added to reduce opacity on flare. Troubleshooting in plant TEG system gas pressure reduced, control valve closed, assist gas found the TEG system gas pressure operating above control valve limits, reduced to normal. resulting in minor leak through of wet gas to flare and need for additional 4/16/2000 0950-1330 17 assist aas. TOTAL 17 Planned Events Less Than or Equal 1 hour AND Not Exceeding 5000 Mcf '.'DATE TIME... VOLUME DESCRIPTION OF INCIDENT &'CAUSE ACTION TAKEN TO ELIMINATE CAUSE, TOTAL 0 Planned Events Exceeding 1 Hour OR Exceedin g 5000 Mcf 'DATE TIME-' VOLUME DESCRIPTION OF'INCIDENT'&!CAUSE - ACTION'TAKEN TO!ELIMINATE CAUSE TOTAL 0 TOTAL fIDR Volume flared less than 1 hr Volume flared greater than 1 hr Pilot Purge Assist Gas TOTAL FLARED VOLUME 3,209 0 17 0 9,870 0 ~ Q 36,378 0 '.° '~ ~ ~- SDN ENDICOTT 2 3,207 p 17 5 9,865 1~ ~~ 20 36,358 ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Endicott 10450 May-00 Disposition Volume MCF* 1. Sold Fuel NGL To Badami 14,142 151,700 0 2. Reinjected 10,881,331 3. Flared or vented less than 1 hour 5,399 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 3,640 5. Pilot and Purge 10,191 6. Used for lease operations Assist Fuel 24,141 1,048,897 7. Other TOTAL items 1-7 12,139,441 8. NGL gas equivalent produced 151,700 9. Purchased gas 10. Transferred from: 11. Transferred to: I riereby certsLy txlat the Toregoing is true ano correct to the best of Signature ~~ ~, ~~../~~ll'~~"~^'a, Title fj,(,G/(.7 ~ Date (o cb r _- *Indicate contribution of each pool Pool Name 220100 Code Percent Official Use Only- Flaring Au*_horiza 1. Safety MCF 2. Lease MCF 3. Conserv. Purpos MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 6/6/2000 BP EXPLORATION (ALASKA) INC. Page 1 ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT May-2000 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT 8 CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 5,403 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour _ DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTIONTAKEN TO ELIMINATE CAUSE Ufi/f)3/f)U 1 tt, l9 19.?0 ?f13 MI r~stari attempt - unsllUrassful, Assist gas ne@ded for pppGlty Restart of MI comer©ssor LaboriQd until further work on system 05/06/00 18:40-20;50 39 MI restart attempt -unsuccessful. Assist gas needed for opacity Restart eventuoity successful on MI compressor. The power supply to the booster compressor controls failed and the back Crews worked as quickly as possible to replace power supply and up booster would not start. Assist gas was noe~ded to keep below bring booster oomprassor back an Ilne, 05/07/00 12:00-16:50 982 opacity minimums while booster was off Ilne. Booster compressor dumped to flare when NGL overloaded system. NGL system slowly brought back under control, greater upset to (14/14/r)U 14:2U-16;QQ 4fi nrocass land hlahar flora volumal avoided, U5/ 14/UU 1L4U-UU:UU 81 Attempted multiple restarts on MI compressor Restart eventually successful on MI compressor, MI compressor shut down on high suction drum liquid level, restart Llquld level was reduced In suction drum and unsuccessful restart 05/18/00 07;10-08:10 109 attempt was unsuccessful. Assist gos used for opacity reduction. quickly attempted. Ot,/ I t1/00 OLi;30-09;30 37 MI restart nltumpt -unsuccessful, Assist gas needed for opacity Restart or MI compressor aborted until further work on system 05/18/00 13;00-14:00 38 Attempted multiple restarts on MI compressor Restart eventually successful on MI compressor. AftQr start of MSC turbine post-water wash, swings In ih© plant fr©m Plant Instabltlilos wore br®ughi and@r control as qulekly as possible. POPing unstable wells caused periodic brief flare releases. Assist gas was 05/26/00 21;40-23;00 37 used to prevent flare opacity excursions during this period. "ti" InUlll SUS CUI111JWSSPI IIQIn sI ILII down due 10 an InShUlTlenlallon 611 a(, Crc)WS WOfkUl1 IU rind the COU5e at the ShU1dOWn and dISCOVBfed a The resulting plant upsets (Including shut down of MI compressor) caused burned out wire In the turbine which was qulekly reploced and the 05/27/UO 02:00-06:00 317 sporadic flare releases which required assist gas to maintain opacity turbine restarted, 05/27/00 14;50-16:30 233 MI restart attempt -unsuccessful, Assist gas needed for opacity Restart eventually successful on MI compressor. TOTAL 2,201 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE .TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceedin g 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE, The power turbine to B - Mafn Gas Compressor was shut down to do a The Inspection was completed and wash commenced. water wash. Affer shutdown the copus unit was run (venting to flare) in order to spin the turbine and search for an air leak In the turbine 05/26/00 07:20-13:10 1,308 enclosure before initiating the wash. The B-main copus was run (venting to flare) to rotate the power turbine The water wash was completed and the policy of wash during a water wash In order to Increase the effectiveness of the frequency reviewed, cleaning. Turbine appeared to be dirtier than usual and wash time was 05/26/00 17:40-19:00 134 extended. TOTAL 1,442 6/6/2000 Volume flared less than 1 hr Volume flared greater than 1 hr Pilot Purge Assist Gas TOTAL FLARED VOLUME BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT May-2000 TOTAL -°EIDR SDN 5,403 0 4 3,643 0 3 10,199 0 8 ~~ Q 43,404 0 33 Page 2 ENQICOTT' 5,399 3,640 10,191 24.141 43,371 r{; ~' :.- ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Endicott 10450 Jun-00 Disposition Volume MCF* 1. Sold Fuel NGL To Badami 12,571 146,642 0 2. Reinjected 10,289,844 3. Flared or vented less than 1 hour 6,465 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 3,739 5. Pilot and Purge 9,785 6. Used for lease operations Assist Fuel 23,167 955,175 7. Other TOTAL items 1-7 11,447,388 8. NGL gas equivalent produced 146,642 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify at the foregoing is true and correct to the best of Signature Title I7tiV~V ~ /aCl~ Date '~ pp *Indicate contribution of each pool Pool Name Code Percent 220100 Official Use Only-Flaring Authorize 1, Safety MCF 2. Lease MCF 3. Conserv. Purpos MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 7/7/2000 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Jun-2000 ;~~°~C& ~ ;:: Page 1 Events less than or equal to - TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE' ACTION TAKENTO ELIMINATE CAUSE TOTAL 6,520 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF' INCIDENT & CAUSE:. ACTION TAKEN TO ELIMINATE CAUSE Assist gas added continually to control black smoke during long period of Controls procedure reviewed with board operators to better handle Ob/O1 /00 06:20-00:00 721 process upset due to severe ambient temperature swings. flare usage during prolonged upset periods. Assist gas added continually to control black smoke during long period of Controls procedure reviewed with board operators to better hahdle 06/02/00 00:00-01:30 53 process upset due to severe ambient temperature swings, flare usage during prolonged upset periods. Start-up attempt on MI compressor -unsuccessful. Additional assist gas Restart of MI compressor aborted until further work on system 06/02/00 19:20-20:40 183 needed for opacity control completed, Booster compressor sporadically "burping" to flare, small amount of assist Controls procedure reviewed with board operators to better handle 06/07/00 18:50-19:50 3 gas added to control opacity. flare usage during sporadic upset events. Multiple MI compressor restart attempts. Additional assist gas needed for Restart eventually successful on MI compressor. 06/14/00 02;00-03:30 661 opacity control, MI compressor shut-down, then successfully restarted, then shutdown Restart eventually successful on MI compressor. again followed by multiple restart attempts which were ultimately 06/15/00 18:00-23:30 361 successful. Additional assist gas needed for opacity control, MI compressor shut-down, then successfully restarted, then shutdown Restart of MI compressor aborted until further work on system again followed by multiple restart attempts which were ultimately completed. 06/16/00 06:00-10:50 650 unsuccessful. Additional assist gas needed for opacity control. Start-up attempt on MI compressor -successful. Additional assist gas Restart eventually successful on MI compressor. 06/18/00 10:20-11:20 266 needed for opacity control. Start-up attempt on MI compressor -unsuccessful, Additional assist gas Restart of Ml compressor aborted until further work on system 06/19/00 16:50-17:50 271 needed for opacity control. completed. Start-up attempt on MI compressor -successful. Additional assist gas Restart eventually successful on MI compressor. 06/19/00 21:20-22:20 274 needed for opacity control. Booster compressor shut-down when the main gas compressors recycle Crews repaired controls to booster compressor ASAP and brought tripped. Back-up booster compressor would not start, Additional assist gas back on line. 06/25/00 19:00-20:30 328 needed for opacity control TOTAL 3,771 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TR~1E" VOLUME DESCRIPTION OFrdNCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 1 Hour OR Exceeding 5000 Mcf 4TE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE;, N TAKEN TO ELIMINATE CAUSE TOTAL ~ni2ooo Volume flared less than 1 hr Volume flared greater than 1 hr Pilot Purge Assist Gas TOTAL FLARED VOLUME BP EXPLORATION (ALASKA) INC. ,. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Jun-2000 Page 2 TOTAL EIDR SDN ENDICOTT 6,520 51 4 6,465 3,771 30 2 3,739 9,870 78 7 9,785 23.366 184 15 23.167 43,527 343 28 43,156 r ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Inc. Endicott 10450 Jul-00 Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name o e Percent 220100 1. Sold Fuel NGL To Badami 12,973 161,427 0 2. Reinjected 10,428,573 3. Flared or vented less than 1 hour 2,465 4. Flared or vented greater than 1 hour (Supplemental report required-Sea 20 AAC 25.235) 541 5. Pilot and Purge 9,902 6. Used for lease operations Assist Fuel 23,196 961,724 7. Other TOTAL items 1-7 11,600,801 8. NGL gas equivalent produced 161,427 9. Purchased gas 10. Transferred from; 11. Transferred to; I hereby ce ' that a foregoing is true and correct to the best of my knowledge. Signature Title vf~td~(L 77°ttC Date ~f 0~ Official Use Only=Flaring Authorization>l hr, 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. R Form 10-422 Rev. 4/95 8/3/2000 BP EXPLORATION (ALASKA) INC. Page 1 ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Jul-2000 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF.INCIDENT&:CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 2,539 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Un tanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Booster compressor shut-down when a power generation unit expectedly Crews repaired controls to booster compressor ASAP and brought shut down. Back-up booster compressor would not start. Additional assist back on Tine. 7/4/2000 13:40-17:30 223 gas needed for opacity control. MI compressor shut down due to power card failure. Restart attempts Restart eventually successful on MI compressor. 7/12/2000 20:10-21:20 184 were not immediately successful Booster compressor shut-down when a leak in the fire water system Crews repaired the leak and restarted the booster compressor as sprayed onto electrical components of the booster. Additional assist gas soon as it was safe to do so. 7/16/2000 10:10-11:30 129 needed for opacity control. Booster compressor shut-down due to a process upset caused by a rapid Crews restarted booster compressor ASAP. rise in ambient temperature. Additional assist gas needed for opacity 7/23/2000 10:00-11:00 21 control. TOTAL 557 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE` ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL Volume flared less than 1 hr Volume flared greater than 1 hr Pilot Purge Assist Gas TOTAL FLARED VOLUME 0 TOTAL EIDR SDN ENDICOTT 2,539 72 2 2,465 557 16 0 541 10,199 289 8 9,902 23,$2 Si2Z 1;3 196 23 , 37,187 1,054 29 36,104 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration Alaska) Inc. Endicott 10450 Au -00 Disposition Volume MCF* 1. Sold Fuel NGL To Badami 12,766 168,177 0 2. Reinjected 9,968,499 3, Flared or vented less than 1 hour 517 4, Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 0 5. Pilot and Purge 9,867 6. Used for lease operations Assist Fuel 23,095 909, 397 7. Other TOTAL items 1-7 11,092,318 8. NGL gas equivalent produced 168,177 9. Purchased gas 10. Transferred from; 11. Transferred to: I hereby certify that the foregoing is true and correct to the best of my knowledge, Signature ~ ,~L{~~L ~t, Title ~ ~+~ . ~~a-~". Date ~ ~s ~'Cr' Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total, Pool Name ode Percent 220100 Official Use Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease MCF 3. Conserv, Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F, Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. c~ r_~ Cv r tl W C!~ .~? .~ ;~: ~9 ar 9/6/2000 BP EXPLORATION (ALASKA) INC. Page 1 \ ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCiOENT REPORT - ENDICOTT Aug-2000 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTON OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 534 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 TOTAL EIDR SDN ENDICOTT Volume flared Less than t hr 534 17 0 517 Volume flared greater than 0 0 0 0 1 hr PIIotPurge 10,199 325 7 9,867 Assist Gas 23,873 7~1. 1Z 23 095 TOTAL FLARED VOLUME 34,606 1,103 24 33,479 ~~ask~ ~:i ~ Cas Cads. Cam~li~~ Ancha~ga ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska Inc. Endicott 10450 Sep-00 Disposition Volume MCF" 1. Sold Fuel NGL To Badami 12,474 149,882 0 2. Reinjected 9,727,754 3, Flared or vented less than 1 hour 2,511 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 2,769 5. Pilot and Purge 9,527 6. Used for lease operations Assist Fuel 22,662 872,243 7. Other TOTALitems 1-7 10,799,822 8, NGL qas equivalent produced 149,882 9, Purchased qas 10. Transferred from: 11. Transferred to: I hereby ce ' y that t e foregoing is true and correct to the best of my knowledge. Signature Title ~t~`C~Date ~ ~~ "Indicate contribution of each pool to total. Pool Name o e Percent 220100 Official Use Only-Flaring Authorization>1 hr, 1. Safety MCF 2. Lease MCF 3, Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14,65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 8P EXPLORATION (ALASKA) iNC. ADMINISTRATIVE APPROVAL N0.202.4 10/5/2000 fiAS FLARING INCIDENT REPORT - ENDICOTT Poge 1 sep-aooo Unplanned Events less than or equal to 1 hour _ DATE TIME VOLUME DESCRIPTKN OF INCIDENT do CAUSE ACTK)N TAKEN TO ELIMINATE CAUSE TOTAL 2,601 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Propane compressor went down on a controls error, lost NGL's and Repairs made to propane compressor contols as quickly as 09/01 /00 18:20-22:10 561 booster compressor. Assist gas needed to control opaciiy. possible. A-booster compressor recycle valve problems caused frequent spurts to Recycle valve controls on A-booster were repaired os soon as 09/08/00 08:00-15:50 274 flare. Continuous assist gas needed to maintain opacity minimums. possible. Starr-up of °B° main gas compressor after shutdown and water wash of Booster controls repaired and compressor restarted as quickly as 09/17/00 22:50-00:00 36 turbine. Difficulty encountered in keeping A-booster compressor running. possible. Contlnuatfon of plant upsets from 9/17 MGC-B restart and booster Booster conhois repaired and compressor restarted as quickly as 09/18/00 00:00-01:00 32 problems. possible• Performance testing of MI compressor recently returned to service after Controls od)ustments continue to be made to the overhauled major ovefiaul. Performance testing of machine took considerably system. 09/24/00 20:40-00:00 537 longer than anticipated. Performance tesflng of MI compressor recently returned to service after Controls ad)ustments continue to be made to me overhauled major ovefiaul. Performance testing of machine took considerably system. 09/25/00 00:00-03:50 643 longer than ant~ipated. 09/25/00 13:50-15:00 785 MI header Isolation valve controls malfunction. Faulty system bypassed as soon as was possible. TOTAL 2,868 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf - DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 TOTAL EIDR SDN ENDICOTT Volume flared less than 1 hr 2,601 88 2 2,511 Volume flared greater than 2,868 97 2 2,769 1 hr Pilot Purge 9,870 335 8 9,527 Assist Gas 23,480 Z;)$ 2Q 22Si62 TOTAL FLARED VOLUME 38,819 1,318 32 37,469 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration Alaska) Inc, Endicott 10450 Oct-00 Disposition Volume MCF' 1, Sold Fuel NGL To Badami 13,753 176,172 0 2, Reinjected 10,829,122 3, Flared or vented less than 1 hour 1,859 4. Flared or vented greater than 1 hour (Supplemental reporT required-See 20 AAC 25.235) 1,271 5. Pilot and Purge 9,863 6, Used for lease operations Assist Fuel 23,166 968,871 7, Other TOTALitems 1-7 12,024,077 8. NGL gas equivalent produced 176,172 9. Purchased gas 10. Transferred from: 11, Transferred to: I hereby certify that e foregoing is true and correct to the best of my knowledge, Signature Title WW 2 't"Y~eSS Date ~ W Form 10-422 Rev, 4/95 *Indicate contribution of each pool to total. Pool Name ode Percent 220100 Official Use Only-Flaring Authorizdtion>1 hr. 1. Safety ~" ~ ^~ l MCF 2, Lease MCF 3, Conserv. Purposes MCF ~/ ~' a ~~- Commissio r , Date Note: All volumes must be corrected to pressure of 14,65 psia and to a temperature of 60 degrees F, Report due by the 20th of the month folowing the month of disposition, Authority 20 AAC 25.235. `P,~ ~~ f}7^ 11/6/2000 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT OCt-2000 Page 1 Unplanned Events less than or equal to 1 hour DATE TIME' VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 1,922 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE ACTION TAKEN t0 ELIMINATE""CAUSE Plant shut down due to unexpected power generation unit(s) failure. Booster compressor started as soon as possible after upset. Shut down main gas and booster compressor. Difficulty in re-starting Power generation unit(s) preventative maintenance to be 10/12/00 05:50:-09:10 1051 booster compressor. Multiple attempts necessary before startup. reviewed. Re-start of main compressor, Took longer to stabilize due to process Booster compressor started as soon as possible after upset. upsets. Assist gas required for opacity reduction. Power generation unit(s) preventative maintenance to be 10/12/00 11:10:-12:20 40 reviewed. Booster pump shut down due to process instability during plant startup Shut in NGL system to retleve booster compressor. sequence. Difficulty re-starting booster compressor, Assist gas required 10/12/00 13:20:-17:20 224 for opacity reduction. TOTAL 1,315 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME bESCRIPTIONDFINCIDENT'&OAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 TOTAL EIDR SDN ENDICOTT Volume flared less than 1 hr 1,922 62 1 1,859 Volume flared greater man 1,315 43 1 1,271 1 hr Pilot Purge 10,199 330 6 9,863 Assist Gas 23,956 ZZf 14 23.166 TOTAL FLARED VOLUME 37,392 1,211 22 36,159 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Inc. Endicott 10450 Nov-00 Disposition Volume MCF' 'Indicate contribution of each pool to total. Pool Name ode Percent 220100 1. Sold Fuel NGL To Badami 13,956 170,072 0 2. Reinjected 10,871,723 3. Flared or vented less than 1 hour 1,044 4, Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 3,814 5. Pilot and Purge 9,548 6. Used for lease operations Assist Fuel 23,802 957,696 7. Other TOTAL items 1-7 12,051,655 8, NGL gas equivalent produced 170,072 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby ce~y that t e foregoing is true and correct to the best of my knowledge, Signature Title ~~, T/~cX Date t O Official Use Only-Flaring Authorization~l hr. 1, Safety '~ ~ MCF .Jll~' 2. Lease MCF 3, Conserv. Purposes MCF ~ ~ ®~ Commissi er Date Note; All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition, Authority 20 AAC 25.235, Form 10-422 Rev, 4/95 f~ ~'?/ r j "'~/ ~~. fii~ ~ ~ ~ y t^-i '-a ~- ~ 12/6/2000 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Nov-2000 Page 1 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 1,080 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Plant shut down due to unexpected power generation unit(s) failure. Booster compressor started as soon as possible offer upset. Shut down main gas and booster compressor. Difflculty in re-starring Power generation unit(s) preventive maintenance to be 11/18/00 07:50-09:30 2882 booster compressor, Multiple attempts necessary before startup. reviewed. Booster compressor 2nd stage flare relief valve opened unexpectedly. Gas source was identified and the flare relief valve was Took rime to find where extra flare gas was coming from. Assist gas was repaired. 11 /25/00 12:10-13:30 236 required to control opacity during this period. TOTAL 3,118 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceedin g 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Startup attempt on MI compressor -successful. Additional assist gas Restart eventually successful on MI compressor. 11 /27/00 15:20-16:40 824 needed for opacfty control. TOTAL 824 TOTAL EIDR SDN ENDICOTT Volume flared less than i hr 1,080 35 1 1,044 Volume flared greater than 3,942 126 2 3,814 1 hr Pilot Purge 9,870 317 5 ~ 9,548 _ w Assist Gas 24 605 Z2Q ~ ~ © ~ 23.8Q2 a~ n g' TOTAL FLARED VOLUME 39,497 1,268 21 H 38,208 a v pp~~~-~ ~ ~ l o !? ~ ~ ~ y aaa~~~"' ~~~ p ... ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska Inc, Endicott 10450 Dec-00 Disposition Volume MCF* 1. Sold Fuel NGL To Badami 13,531 165,312 0 2. Reinjected 10,565,924 3, Flared or vented less than 1 hour 6,236 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 278 5. Pilot and Purge 9,816 6, Used for lease operations Assist Fuel 22,476 972,406 7. Other TOTAL Items 1-7 11,755,979 8. NGL gas equivalent produced 165,312 9. Purchased gas 10. Transferred from; 11. Transferred to: I hereby certify thaiy the foregoing is true and correct to the best of my knowledge. Signature ~„l.f . t1~1.~yru~~l~, Title M~i~(L`~Pck Date ~ Form 10-422 Rev, 4/95 *Indicate contribution of each pool to total. Pool Name ode Percent 220100 Official Use Only-Flaring Authorization>1 hr. 1. Safety ~ ~ ~ MCF 2. Lease MCF 3, Conserv. Purposes MCF o ~- Commissio r Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition, Authority 20 AAC 25.235, ~ ''~ `~ /yv~ ~ ;l i A N N^ Y ~ ~ ~~ 0 ~ to n 0 n z f--~ N O C7 I~ I~ 1/8/2001 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Dec-2000 Page 1 Unplanned Events less than or equal to 1 hour DATE` TIME VOLUME` -DESCRIPTION`OFiNCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE' TOTAL 6,479 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour BATE ' TIME" VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKENTO ELIMINATE CAUSE Start-up attempt on MI compressor -unsuccessful. Additional assist gas Restart of MI compressor aborted until further work on system 12/25/2000 15:40-16:40 289 needed for opacity control. completed. TOTAL 289 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME': VOLUME `cDESCRIPTION OF'iNCIDENT &"CAUSE ACTION TAKEN TO ELIMINATE CAUSE 70TAL 0 TOTAL EIDR Volume flared less than 1 hr 6,479 238 Volume flared greater than 289 11 1 hr Pilot Purge 10,199 375 Assist Gas ?3,~ $5,Q TOTAL FLARED VOLUME 40,319 1,483 SDN ENDICOTT 5 6,236 0 278 8 9,816 1Z 22,-4Zf 30 n 38,806 ;v a o ~ ~~ ~ ~ ~ ~ y ~ }~ ~ ~ ~ N ~~ rV mrc O G ~y N ~ ~ ! In