Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutColville River/Con Phil-Revised STATE OF ALASKA AOGCC REVISED GAS DISPOSITION FILES YEAR: 2000 FACILITY: Colville River Unit OPERATOR: CONOCOPHILLIPS ALASKA INC Lf71 .... ;;..¡ .. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 1030000017 ALPINE PROCESSING FACILITY Disposition 3. Field ALPINE Volume MCF 4. Operator 5. MonthlYear of Disposition CONOCOPHILLlPS ALASKA, INC. December-OO 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Pool Name Pool Code Percent 100% 7. Reinjected 889,620 ALPINE 8. Flared or vented 1 hour or less 934 9. Flared or vented more than 1 hour (see instL) 412,539 10. Pilot and Purge 15,488 11. Used for lease operations (specify in Remarks) 196,504 12. Other (see instructions) Authorization> 1 hr: Safety MCF 13. TOTAL VOLUME (ITEMS 6-12) 1,515,085 Lease Use MCF 14. NGL Gas Equivalent 15. Purchased gas 252,587 Conservation MCF Waste: MCF 16. Transferred from: 17. Transferred to: (Express as a negative #) Commissioner Date 18. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature 7)mA ~ Me! 4/Cf Title ~~ Printed Name Phone o2":r 'Ii, Date II ()-¡ OS Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 600 F. Authority 20 Form 10-422 Rev. 4/2004 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate é¡tp CONOCOPHILLIPS ALASKA, INC, CONSERVATION ORDER NO.443 ALPINE ALPINE PROCESSING FACILITY GAS FLARING INCIDENTS Dee-OO VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/1/2000 00:00-24:00 36,700 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going Initial S/U of Alpine facility & drillsite 12/2/2000 00:00-24:00 36,600 Flaring for drillsite shutdown/startup Planned Commissioning of gas train on going Initial S/U of Alpine facility & drillsite 12/3/2000 00:00-24:00 38,700 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going Initial S/U of Alpine facility & drillsite 12/4/2000 00:00-24:00 36,800 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going Initial S/U of Alpine facility & drillsite 12/5/2000 00:00-24:00 37,800 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going Initial S/U of Alpine facility & drillsite 12/6/2000 00:00-24:00 36,900 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going Initial S/U of Alpine facility & drillsite 12/7/2000 00:00-24:00 31,200 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going Initial S/U of Alpine facility & drillsite 12/8/2000 00:00-24:00 33,300 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going Initial S/U of Alpine facility & drillsite 12/9/2000 00:00-24:00 18,000 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going Initial S/U of Alpine facility & drillsite 12/10/2000 00:00-24:00 16,400 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going Initial S/U of Alpine facility & drillsite 12/11/2000 00:00-24:00 1,953 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going Initial S/U of Alpine facility & drillsite 12/12/2000 03:00-20:00 16,455 Flaring for drillsite shutdown/startup Unplanned Reduced/increased inlet gas rates Gas transit system overpressure Replaced equipment difficulties with drillsite 12/13/2000 00:08-04:32 8,950 SID T/C# C-33012 for high vibration Unplanned Restarted T/C# C-33012 12/16/2000 00:00-24:00 12,471 Electrical/instrumentation malfunction. Gas Unplanned Corrected E&I fluctuation/failure transit system overpressure. Flaring for drillsite shutdown/startup. Black smoke noted and reported from HP and LP flare tips. ,.,. .... 12/17/2000 07:30-16:15 19: 15-24:00 04:37-20:18 12/18/2000 12/22/2000 14:39-24:00 12/23/2000 00:00-03:28 12/24/2000 19:51-21 :21 16,400 Process upset in gas Unplanned Stabilized facility process and operation 16,100 Emergency shutdown Unplanned Corrected E&I fluctuation/failure Electrical/instrumentation malfunction Repaired equipment difficulties with L.P. (Bad Breaker) com/MI mixing manifold MI mixing manifold Facility maintenance 15,400 Process upset in gas train Unplanned Repaired equipment difficulties with gas train 2,300 Alpine facility & drill site start up Planned Gas train startup on going 110 Process upset in power generator Unplanned Repaired equipment difficulties with power generator Total Flare> 1 Hour 412,539 Total Flare <= 1 Hour 934 Pilot and Purge 15,488 Total Flare 428,961