YEAR: 2000
FACILITY: Colville River Unit
OPERATOR: CONOCOPHILLIPS
ALASKA INC
Lf71
.... ;;..¡
..
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
1030000017 ALPINE PROCESSING FACILITY
Disposition
3. Field
ALPINE
Volume MCF
4. Operator 5. MonthlYear of Disposition
CONOCOPHILLlPS ALASKA, INC. December-OO
20. For production from multiple pools, list contribution of each pool as a percent of Total
Volume.
6. Sold
Pool Name
Pool Code
Percent
100%
7. Reinjected
889,620
ALPINE
8. Flared or vented 1 hour or less
934
9. Flared or vented more than 1 hour (see instL)
412,539
10. Pilot and Purge
15,488
11. Used for lease operations (specify in Remarks)
196,504
12. Other (see instructions)
Authorization> 1 hr:
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
1,515,085
Lease Use
MCF
14. NGL Gas Equivalent
15. Purchased gas
252,587
Conservation
MCF
Waste:
MCF
16. Transferred from:
17. Transferred to: (Express as a negative #)
Commissioner
Date
18. Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature
7)mA ~
Me! 4/Cf
Title ~~
Printed Name
Phone o2":r 'Ii,
Date II ()-¡ OS
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 600 F. Authority 20
Form 10-422 Rev. 4/2004
INSTRUCTIONS ON REVERSE SIDE
Submit in Duplicate
é¡tp
CONOCOPHILLIPS ALASKA, INC,
CONSERVATION ORDER NO.443
ALPINE
ALPINE PROCESSING FACILITY
GAS FLARING INCIDENTS
Dee-OO
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/1/2000 00:00-24:00 36,700 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going
Initial S/U of Alpine facility & drillsite
12/2/2000 00:00-24:00 36,600 Flaring for drillsite shutdown/startup Planned Commissioning of gas train on going
Initial S/U of Alpine facility & drillsite
12/3/2000 00:00-24:00 38,700 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going
Initial S/U of Alpine facility & drillsite
12/4/2000 00:00-24:00 36,800 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going
Initial S/U of Alpine facility & drillsite
12/5/2000 00:00-24:00 37,800 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going
Initial S/U of Alpine facility & drillsite
12/6/2000 00:00-24:00 36,900 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going
Initial S/U of Alpine facility & drillsite
12/7/2000 00:00-24:00 31,200 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going
Initial S/U of Alpine facility & drillsite
12/8/2000 00:00-24:00 33,300 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going
Initial S/U of Alpine facility & drillsite
12/9/2000 00:00-24:00 18,000 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going
Initial S/U of Alpine facility & drillsite
12/10/2000 00:00-24:00 16,400 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going
Initial S/U of Alpine facility & drillsite
12/11/2000 00:00-24:00 1,953 Flaring for drillsite shutdown/startup Planned S/U & commissioning of gas train on going
Initial S/U of Alpine facility & drillsite
12/12/2000 03:00-20:00 16,455 Flaring for drillsite shutdown/startup Unplanned Reduced/increased inlet gas rates
Gas transit system overpressure Replaced equipment difficulties with drillsite
12/13/2000 00:08-04:32 8,950 SID T/C# C-33012 for high vibration Unplanned Restarted T/C# C-33012
12/16/2000 00:00-24:00 12,471 Electrical/instrumentation malfunction. Gas Unplanned Corrected E&I fluctuation/failure
transit system overpressure. Flaring for
drillsite shutdown/startup. Black smoke
noted and reported from HP and LP flare
tips.
,.,. ....
12/17/2000
07:30-16:15
19: 15-24:00
04:37-20:18
12/18/2000
12/22/2000 14:39-24:00
12/23/2000 00:00-03:28
12/24/2000 19:51-21 :21
16,400 Process upset in gas Unplanned Stabilized facility process and operation
16,100 Emergency shutdown Unplanned Corrected E&I fluctuation/failure
Electrical/instrumentation malfunction Repaired equipment difficulties with L.P.
(Bad Breaker) com/MI mixing manifold
MI mixing manifold
Facility maintenance
15,400 Process upset in gas train Unplanned Repaired equipment difficulties with gas train
2,300 Alpine facility & drill site start up Planned Gas train startup on going
110 Process upset in power generator Unplanned Repaired equipment difficulties with power
generator
Total Flare> 1 Hour 412,539
Total Flare <= 1 Hour 934
Pilot and Purge 15,488
Total Flare 428,961