Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPHILLIPS - CPF #1GAS DISPOSITION FILES Field 2000 1°h;! I; PS RECEIVED - ~-3 i 8 2000 Ala~ca Oil 1. Sold 2. Reinjected Disposition ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) FACILITY # 1 ARCO ALASKA, INC. KUPARUK RIVER UNIT _ 3. Flared or vented less than 1 hour Flared or vented greater than 1 hour Bunnlemental report reouired--See 20 AAC 25. Pilot and Purge Used for lease operations Other TOTAL items 1 - 7 NGL has equivalent produced Purchased gas 10. Transferred from: PBU CGF (LSEOR NGLS) Fuel Volume MCF* 16,018 3,525,624 9,740 1,840 11,605 629,500 6.800 0 4,201,127 0 0 217,064 11. Transferred to: CPF 3 316,774 CPF2 1,438,932 Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR reflected on line 10 or Naptha used in SSEOR meter #201 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: ~ ~ c=7 Title: c.f ~~;,.z, ~ , ,,t ti ~r Date: ~ -1 ~ - d ~ ear of Disposition 1/00 *Indicate contribution of each pool to total. Pool Nanle Code Percent KUPARUK RIVER UNIT 490100 99.77% KRU WEST SAK 490150 0.23% Official Use Only--Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) R~C~I ~/ ~~ .CONSERVATION ORDER NO. 219 ` • ~~ ~ H ZOOp GAS FLARING OC fE# TING INCIDENTS ~~lk8 011 ~ Geg ~NtS. January 2000 err ~i'fl~tOfa1~@ PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 1/15/00 1005-1128 464 Faulty electrical EDS relay. UNPLANNED Started facility after repairs were made. 1 /31 /00 0754-0907 1,376 Instrumentation malfunction. C2-1 Ol C gas liff compressor UNPLANNED Reduced inlet gas rates. Corrected instrumentati~ shut down. failure. TOTAL OVER 1 HOUR 1,840 PLANNED EVENTS LESS THAN 1 HOUR 0 Flare or Vent Volumes: Greater than 1 hour 1,840 Less than 1 hour 9,740 Continuous Assist 6,800 Pilot and Purge 11.605 TOTAL FLARED/VENTED 29,985 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator CENTRAL PILOCL-'SS[NC~ FACILITY #1 ARCO ALASKA, INC. Disposition Volume MCF* 1. Sold 12,689 2. Reinjected 3,859,676 3. Flared or vented less than 1 hour 4.442 4. Flared or vented greater than 1 hour Su ~lemea~tal re rt re uired--See 20 AAC 25.235) 0 5. Pilot and Purge 14,241 6. Used for lease operations Fuel Assist 628,970 6 230 7. Other 0 TOTAL items 1 - 7 ~ 4,526,248 8. NGL gas equivalent produced ~AR Z ~ 0 9. Purchased gas ~aS~~ ~'E~ ~t ~~~+~~~~~ ~Il?fg91lQI~ 0 10. Transferred from: PBU CGF (LSEOR NGLS) 206,955 11. Transferred to: CPF 3 CPF2, 333,307 1,616,853 Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR reflected on line 10 or Naptha used in SSEOR meter #201 I hereby certify that the foregoin is true and correct to the best of my knowledge. Signature: - Title: ~~, Date: ~ - ~ ~ -da Month/Year of Disposition 2/(~~ i Field(s) KUPARUK RIVER UNIT' *Indicate contribution of each pool to total. Pool Nanie Code Percent KUPARUK RIVER iJNIT 490100 99.80% KRU WEST SAK 490150 0.20% Official Use Only--Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/yJ) ARCO ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #1 February 2000 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR 0 ', PLANNED EVENTS LESS THAN i HOUR Flare or Vent Volumes: Greater than 1 hour 0 Less than 1 hour 4,442 Continuous Assisi 6,230 Pilot and Purge 14.241 ~~ ~ t,~~~~R 2 ~ ~~u~ ~~k~ ~~ t,~~a ~;`e11S> C~t's11T1~E~~ ~~~ TOTAL FLARED/VENTED 24,913 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION PROCESSING FACILTfY #1 Disposition Volume MCF* 1. Sold 12,132 2. Reinjected. 3,589,687 3. Flared or vented less than 1 hour 6,330 4. Flared or vented greater than 1 hour Su lemental re rt re fired--See 20 AAC 25.235 1,789 5. Pilot and Purge 20,306 6: Used for lease operations Fuel Assist 629,173 6 672 7. Other 0 TOTAL items 1 - 7 4,266,089 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLS) 250,799 11. Transferred to: CPF 3 CPF2 0 1,033,373 Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR reflected online 10 or Naptha used in SSEOR meter #201 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature:. Title: ~ Date: ~ - «" ~ `~ INC. Field(s) KUPARUK RIVER UNTI' ear of Disposition *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNTI' 490100 99.75% KRU WEST SAK 490150 0.25% Official Use Only--Flaring Authorization > 1 hr. 1. Safety Mme' 2. Lease Use M~ 3. Conserv. Purposes M~ Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CPF #1 March 2000 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 3/7/00 1634-1954 273 Excessive inlet gas rates into facility. Facility maintenance. UNPLANNED Reduced inlet gas rates. Shut down facility for primary separator work. Re-started and stabilized gas process. 3/20/00 1420-1524 1,516 Electrical/Instrumentation malfunction. Process upset in gas UNPLANNED Restarted "B" gasliff. section of facility. "B" gasliff compressor shut down affer instal- lation of new petrotech panel. Trouble shooting PLC problems. TOTALOVERI HOUR 1,789 PLANNED EVENTS LESS THAN 1 HOUR 0 Flare or Vent Volumes: Greater than 1 hour Less than 1 hour 1,789 6,330 A~R 1 9 20~a Continuous Assist 6,768 Pilot and Purge 2.210 ?~s~Skr~ ~~ ~ G35 COBS, (;01111T11SSi011 AP1C~1®1'~~ TOTAL FLARED/VENTED 35,097 CENTRAL 1. Sold 2. Reinjected ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) FACILITY #1 ARCO ALASKA INC. KUPARUK RIVER UNTI' Disposition 3. Flared or vented leis than 1 hour 4. Flared or vented $i eater than 1 hour (Supplemental re ost iced--See 20 AAC 5. Pilot and Purge 6. Used for lease ope ations 7.Other TO AL items 1 - 7 8. NGL gas equivale t produced 9. Purchased gas 10. Transferred from: PBU CGF (LSEOR NGLS) 11. Transferred to: CPF 3 CPF2 Remarks: Reinjected vol does not include volumes of PBU NGLS. aquired for LSEOR reflected online 10 o Naptha used in SSEOR meter #201 I hereby certify that a foreg ' g is true and correct to the best of mmy knowledge. Signature: !~ Title: ~Lr~ Volume MCF* 14,295 4,157,583 Fuel 3,994 0 13,064 636,130 6.351 0 4,831,417 0 0 225.740 0 16 --~ narP• S - r t -d~, Month/Year of Disposition 4/00 *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 99.75°l0 KRU WEST SAK 490150 0.25 Official Use Only--Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease LTse MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revise 4/95) DATE TIME FLARING OR VENTING EVENTS TOTAL OVER 1 HOUR PLANNED EVENTS LESS THAN 1 HOUR MCF DESCRI !THAN 1 HOUR ' Flare or Vent Volumes: Greater than 1 hour 0 Less than 1 hour 3,994 Continuous Assist 6,351 ~', Pilot and Purge 13 Q44 ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CPF #1 April 2000 & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE TOTAL FLARED/VENTED ~ 23,409 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION CENTRAL PROCESSING FACII.ITY #1 MARCO IField(s) IMonth/Year of Disposition INC. KUPARUK RIVER UNIT 5/00 Disposition Volume MCF* 1. Sold 11,710 2. Reinjected 4,061,179 3. Flared or vented less than 1 hour 7,340 4. Flared or vented greater than 1 hour Su lemental re ft iced--See 20 AAC 25.235 1,703 5. Pilot and Purge 14,067 6. Used for lease operations Fuel Assist 619,570 5 416 7.Other 0 TOTAL items 1 - 7 4,720,985 8. NGL gas equivalent produced 0 9. Purchased gas 0 l0. Transferred fmm: PBU CGF (LSEOR NGLS) 229,295 11. Transferred to: CPF 3 CPF2 0 1,785,043 Remarks: Reinjected vol does not include volumes of PBU NGLS squired for LSEOR reflected on line 10 or Naptha used in SSEOR meter #201 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature d-wr~l~ Title• Date:6 /S Da *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNTf 490100 99.74% KRU WEST SAK 490150 0.26% Official Use Only--Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the. month following the month of disposition. Authority 20 AAC 25.235. ruuu iu-~+t,~ ~ncvi~cu •ri»~ ARCO ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #1 May 2000 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 5/11 /00 1655-1807 1,703 S/D T/C all for Plant ESD testing. Emergency shutdown. 1853-2103 TOTAL OVER 1 HOUR 1,703 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge TOTAL FLARED/VENTED 0 1,703 7,340 5,416``' 1 d,~67 28,526 UNPLANNED Stabilized facility process and operation ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION PROCESSING FACILITY #1 Disposition Volume MCF* 1. Sold ~ ~ „'~ ~.,; ~! : 9 ..~ .~ 11.,887 , 2. Reinjected ~ ~~ 3,425,811 r,nr~ 3. Flared or vented less than 1 hour ~j~s~~ l.d~'i ~: +~ ~~: ~:~ t;:: ~;te~,1fl8~~>>Ei 13,662 4. Flared or vented greater than 1 hour Su lemental re rt fired--See 20 AAC 25.235 2,577 5. Pilot and Purge 14,892 6. Used for lease operations Fuel Assist 607,593 4 998 7.Other 0 TOTAL items 1 - 7 4,081,420 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLS) 256,504 11, Transferred to: CPF 3 CPF2 0 1,572,798 Remarks: Reinjected vol does not include volumes of PBU NGLS squired for LSEOR reflected online 10 or Naptha used in SSEOR meter #201 I hereby certify that the foregoing i~s4tr~ue and.correct to the best of my knowledge. Signature: ~f.~'~c-~~ ~ Title: GQ.(~ Date: 7 ~ ~ ~ Operator ARCO ALASKA, INC. KUPARUK RIVER UNIT Month/Year of Disposition 6/00 *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 99.66% KRU WEST SAK 490150 0.34% Official Use Only--Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. roan lu-4zL ~xevisea 4iy~~ PHILLIPS ALASKA, INC. • CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CPF #1 June 2000 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 6/12/00 0827-1029 2,085 S/D T/C# C2-101 C FOR 24 V BATTERY LEAK UNPLANNED Started/restarted T/C#C2-101 C Electrical/Instrumentaflon Malfunction Reduced inlet gas rates, Corrected E&I fluctuatior ?ailure 6/21 /00 1204-1304 205 Excessive Inlet gas rates into facility UNPLANNED Reduced Inlet gas rates, Shut in wells High ambient temperatures, Ambient and wind direction swings reduced front end compressor capacity 6/26/00 1843-1945 287 Gas transit system overpressure backing CPF/Flow Station o~ UNPLANNED Reduced Inlet gas rates, GIC restarted CPF2 restarted GLC, CPFI CLC was not operational TOTAL OVER 1 HOUR 2,577 PLANNED EVENTS LESS THAN 1 HOUR 0 Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge ~ TOTAL FLARED/VENTED 2,577 13,662 4,998 t d•8g2 36, i 29 Tf • ~;l ~'sSa~a~3 ~.,° s t'c ~3`i ~ .,i3i.'`•"• ur ~Sil~f~~v°(~l 4.1'1C~lc"~. TS~~° ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) PROCESSING FACILITY #1 INC. ear of Disposition 8/00 *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 99.68% KRU WEST SAK 490150 0.32% KUPARUK RIVER UNIT Disposition Volume MCF* 1. Sold 11.,878 2. Reinjected 3,378,221 3. Flared or vented less than 1 hour 11,053 4. Flared or vented greater than 1 hour Su lemental re tt re fired--See 20 AAC 25.235 0 5. Pilot and Purge 10,192 6. Used for lease operations Fuel Assist 876,034 9 778 7.Other 0 TOTAL items 1- 7 4,297,156 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLS) ' 260,726 11. Transferred to: CPF 3 CPF2 0 1,505,409 Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR reflected online 10 or Naptha used in SSEOR meter #201 I hereby certify that the foregoing is true and. correct to the best of my knowledge. Signature'-~"`~ - Title:/• Date: c~ !'~C~ Form 10-422 (Revised 4/95) Official Use Onl --Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ~?3c~~~~ ~! at ~ ~ € 31~~i, ~Od1 ~C~OI~l~~ PHILLIPS ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CPF #1 July 2000 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE ' FLARING OR VENTING EVENTS GREATER THAN 1 HOUR NO FLARE EVENTS TO REPORT FOR CPF #1 FOR 7/00 i I I~ ' TOTAL OVER 1 HOUR 0 PLANNED EVENTS LESS THAN 1 HOUR '. 0 I Flare or Vent Volumes: '~ ~"'" .,~ V Greater than i hour 0 ~ ~~ Less than 1 hour 11,053 Continuous Assisi 9,778 ~ 1i ~ i ~ `` ti .+ Pilot and Purge 10.192 a ~uc~S~~ ~~~ s~ t3~'u is'~g1S ~~'~;';w113~a°OC~ ~ TOTAL FLARED/VENTED 31,023 ~i1C~Ofd~ I I ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION IPaci~~L PROCESSING FACILITY #1 _ __ ~PFIILLtIPS ALASKA, INC._ ___ _ IK1UPARUK RIVER UNIT IMonth/Year of 8 ~ sition Disposition .Volume MCF* 1. Sold 12,419 2. Reinjected 3,561,005 3. Flared or vented less than 1 hour 3,980 4. Flared or vented greater than 1 hour Su lemental re n iced--See 20 AAC 25.235 0 5. Pilot and Purge 8,092 6. Used for lease operations Fuel s' t 857,404 7 5 7.Other 0 TOTAL items 1- 7 4,450,497 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLS) 288,684 11. Transferred to: CPF 3 CPF2 0 1,632,012 Remarks: Reinjected vol does not include volumes of PBU NGLS squired for LSEOR reflected online 10 or Naptha used in SSEOR meter #201 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: .,~ ~ ~ ~c'~'"Q~-~ Title: J~~~-~~!5a'e Date: 9 /~~ Form 10-422 (Revised 4~5) *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUKRIVERUNIT 490100 99.58°b KRU WEST SAK 490150 0.42 Official Use Onl --Flarin Authorization > 1 hr. 1. Safety _ 0 _ MCF 2. Lease Use - 0 - MCF 3. Conserv. Purposes _ 0 _ MCF 1~..~ e~- .Commission - o O O Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. SEP 19 2000 ~la~ka Oti & has Calls.t:~lnmi~sion Artd~orage ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #1 INC. Month/Year of Disposition RIVER UNTI' 9/00 Disposition Volume MCF* 1. Sold 11,875 2. Reinjected 3,475,837 3. Flared or vented less than 1 hour 2,253 4. Flared or vented greater than 1 hour Su lemental re rt re fired--See 20 AAC 25.235 1,157 5. Pilot and Purge 11,441 6. Used for lease operations Fuel Assist 824,632 4 309 7.Other 0 TOTAL items 1 - 7 4,331,504 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLS) 248,098 11. Transferred to: CPF 3 CPF2 0 1,551,654 Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR reflected online 10 or Naptha used in SSEOR meter #201 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: ~~ ~~G-~C~ Title: rQJlr U~a~ Date: ! ~ ~ ~~°~ *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 99.57% KRU WEST SAK 490150 0.43% Official Use Only--Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) PHILLIPS ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CPF #1 September 2000 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 9/24/00 0805 - 0931 1,157 Electrical /Instrumentation malfunction unplanned Reduced/ Increased Inlet gas rates Process upset in Gas section of the facility Stabilized facility process and operations TOTAL OVER 1 HOUR 1,157 PLANNED EVENTS LESS THAN 1 HOUR 0 flare or Vent Volumes: Greater than 1 hour 1,157 Less than 1 hour 2,253 Continuous Assisi 4,309 Pilot and Purge 11.441 TOTAL FLARED/VENTED 19,160 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) PROCESSING FACILITY #1 ALASKA, INC. ARUK RIVER UNIT Disposition Volume MCF* 1. Sold 12,527 2. Reinjected 3,960,689 3. Flared or vented less than 1 hour 4,351 4. Flared or vented greater than 1 hour Su lemental re rt r fired--See 20 AAC 25.235 78 5. Pilot and Purge 14,500 6. Used for lease operations Fuel Assist 834,125 4 497 7.Other 0 TOTAL items 1 - 7 4,830,767 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLS) 268,084 11. Transferred to: CPF 3 CPF2 0 1,887,893 Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR reflected on line 10 or Naptha used in SSEOR meter #201 I hereby certify that the foregoing is true and correct to the best of my knowledge. /~,~ ~_ ,S v~~ Signature: ~ '~ ~ / " Title: Date: ~~ // ~ -~ Month/Year of Disposition 10/00 *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 99.50% KRU WEST SAK 490150 0.50% Official Use Only--Flaring Authorization > 1 hr. 1. Safety ~.~ ~,,- MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. /~~" ~~ -y Form 10-422 (Revised 4/95) PHILLIPS ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CPF #1 October 2000 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 10/4/00 2021:2139 78 Excessive inlet gas rates into facililty B-GLC PSV 1018 B First stage discharge leaking by ~~~~~~~~ NOV 20 2t1~O Alaska off & G~~ TOTAL OVER 1 HOUR 78 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour 78 Less than 1 hour 4,351 Continuous Assist 4,497 Pilot and Purge ]4.,500 unplanned Reduced/ Increased Inlet gas rates TOTAL FLARED/VENTED 23,426 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION (Facility (Operator Field(s) IMonth/Year of Disposition CENTRAL PROCESSING FACILITY #1 PHII_L.II'S ALASKA, INC. KUPARUK RIVER UNIT 11/00 Disposition Volume MCF* 1. Sold 12,942 2. Reinjected 3,735,384 3. Flared or vented less than 1 hour 2,389 4. Flared or vented greater than 1 hour Su lemental re ort r uired--See 20 AAC 25.235 2,674 5. Pilot and Purge 12,780 6. Used for lease operations Fuel ss' 840,791 577 7.Other 0 TOTAL items 1 - 7 4,611;537 8. NGL eas equivalentpmduced 0 9. Purchased gas 0 10. Transferred from PBU CGF (LSEOR NGLS) 257,947 11. Transferred to: CPF 3 CPF2 0 1,810,932 Remarks: Reinjected vol does notinclude volumes of PBU NGLS squired for LSEOR reflected on line 10 or Na tha used in SSEOR meter #201 I hereby certify that the foregoing is true and correct to the best of my knowledge. ~ti C~ . Signature: ~~~~ Title: Supervisor Date: 12/8/000 *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 99.42% KRU WEST SAK 490150 0.58% Official Use Only--Flaring Authorization > 1 hr. 1. Safety ~ ~ ~ ,{ MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Ylti ~ -f Commissio r `~' /J p Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ~~~j /~~~ L Form 10-422 (Revised 4/95) PHILLIPS ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CPF #1 November 2000 PLANNED DATE .TIME VOLUME MCF .DESCRIPTION OF INCIDENTS 8c CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN i HOUR 11 /3/00 2153 - 2353 2,674 S/D T/C # "A" GLC, Instrumentation malfunction TOTAL OVER 1 HOUR 2,674 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour 2,674 Less than 1 hour 2,389 Continuous Assisf 4,577 Pilot and Purge 12.780 unplanned Restarted T/C # "A" GLC, Reduced inlet gas rates TOTAL FLARED/VENTED 22,420 a~ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) PROCESSING FACILITY #1 INC. ARUK RIVER UNIT Disposition Volume MCF* 1. Sold 14,858 2. Reinjected 3,367,001 3. Flared or vented less than 1 hour 2,279 4. Flared or vented greater than 1 hour Su lemental r ort re aired--See 20 AAC 25.235 0 5. Pilot and Puree 12,870 6. Used for lease operations Fuel Assist 870,095 5 Ol 7.Other 0 TOTAL items 1- 7 4,272,119 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLS) 255,347 11. Transferred to: CPF 3 CPP2 0 1,414,736 Remarks: Reinjected vol does notinclude volumes of PBU NGLS aquired for LSEOR reflected on line 10 or Naptha used in SSEOR meter #201 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: ~ ~ ~~~~~ Title: Supervisor Date: 01/12/01 Form 10-422 (Revised 4/95) Month/Year of Disposition 12/00 *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 99.39% KRU WEST SAK 490150 0.61% Official Use Onl --Flaring Authorization > 1 hr. 1. Safety '~ MCF --Gi 2. Lease Use ~ -- MCF 3. Conserv. Purposes ----- ~ -- MCF t Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. -~-~ b a ~ 2 y ~ ~~ ~ - 7 ~ 3 © ~ J y_ ~~ J ~ ~~ J _ L PHILLIPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #1 December 2000 PLANNED DATE iIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR NO EVENTS TO REPORT TOTAL OVER 1 HOUR 0 PLANNED EVENTS LESS THAN 1 HOUR a ~. 0 ~ 4 Flare or Vent Volumes: ~ ~ Greater than 1 hour 0 0 _ ~ less than 1 hour 2,279 ~ ~ ~ ~ Continuous Assisf 5,016 y ~ Pilot and Purge 12.870 3 ^, '~, ~ TOTAL FLARED/VENTED 20,165 ~ y ~ J