Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPHILLIPS - FS #1GAS DISPOSITION FILES Field ~h~ IL'f5 2000 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility FLOW STATION 1 Operator ARCO ALASKA, INC. Field(s) EASTERN OPERATING AREA-PBU Month/Year of Disposition Jan-00 Disposition *Indicate contribution of each pool to total. 1. Sold 0 Pool Name Code Percent 2. Reinjected 0 PRUDHOE 640150 100 3. Flared or vented less than 1 hour 14,537 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 45,816 5. Pilot and Purge 23,054 6. Used fox lease operations Fuel Assist 773,904 43 7. Other 0 ......................... ... .... .............................. ...................... . . ... ................................. Official Use Oni --Flaring: Autlia~ tization > l: hr.. . TOTAL items 1 - 7 857,354 1. Safety ~ s,-) ~ t ~, MCF 8. NGL gas equivalent produced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: CGF 319,406 Commissioner Date 11. Transferred to: CCP 61,528,767 Note: All volumes must be corrected to Remarks: pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. . Signature: ~~~ (_~ ~~~, Title: MANAGER month following the month of disposition. Authority 20 AAC 25.235. __ Form 10-422 {Revised 4/95) 01-00 FORM 10-422.x1s/FORM 10-422 ~ r. n; fT:r:~ ~ ~~ ~~;~ ~h~~ j/~1 aL ,~I~Sk3 {~1~ ~$c Ga3 ~Q11Sa ~'i06ti~i $S~ifl!t! AnChoCaga ARCO ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS FS-1 January-2000 DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM Ol /10/00 1310-1420 10,014 Gas transit system backing FS out. Flared off Annex. UNPLANNED Reduced inlet gas rates. Reduced gas CGF Tandem 1886 went down. CF tried 2 starts. rates: 1-19,5-2,5-7,2-23,1-4,5-28,18-30, 15-31,18-18,18-31,14-47-8, 7-25, b- l , 4- l . Cut at other facilities. Ol /11 /00 0818-0958 642 Gas transit system backing FS out. Excessive inlet gas UNPLANNED Reduced inlet gas rates. Reduced & S/I rates into facility. Flared off Annex due to CGF Booster rate. See attached list of wells shut in. 1802 going down. ~ Ol /11 /00 ~,I, 0705-0905 22,917 Gas transit system backing FS out. Excessive inlet gas UNPLANNED rates into facility. Flared off Annex due to CGF Booster Reduced inlet gas rates. Reduced & S/I rate. See attached list of wells shut in. k 1802 going down, a G~ _f~01/14/00 1410-1450 6,028 Gas transit system backing FS out. Excessive inlet gas UNPLANNED Reduced inlet gas rates. ~/ rates into facility. Flared off Annex due to CGF Booster Pinched chokes back on 17 wells. Wells ~ 1801 and 1802 going down. cut: 1-b,1-20,2-1,7-7,7-9,7-26,18-8,18-33, 5-7,5-2,18-30, 5-b, 5-23, 221, 2-2, 2-4,2-7,12-9 Ol /25/00 1256-1422 12,243 Problem with TC 1803 inlet D/P and high exhaust temp. UNPLANNED Reduced inlet gas rate. Restarted T/C due to heavy fog. Flared off the Slugcatchers, Attempted Shut in Wells 18-13,18-11,1-29,5-22,24, to load TC 1803 at 1325 hrs and it shut down. 5-33. TC 1803 back on line at 14:22 hrs. (See detail sheet attached,) Over 1 Hour/Over 5MM 51,844 ~ " Less 1 HR/Less 5MM 8,509 Total over/under 1 Hr/5MM 60,353 qqq "~'~`~' Tf1 y ~ '/ ~~"510 Pilot/Purge 23,054 S C~llb c(} Continuous Assist 43 X11 ~ Ga GhGTa~Ji; ~~a ~~ TOTAL FLARED/VENTED 83,450 Feb-18-00 08:29 ,, ~~. `"`r (7~@ of A[xerrtrit>toe: From-PRB OPERATIONS 907-659-5061 T-453 P.02/03 F-378 BLARE taAS VEN1'tNG REF`4RT FACtuTlr•: Fs1 • `DI~pClSITtOt 1l~5100 (l FIDre d vest (mmldaryy) (Cnec~c ueTecTGtan) PERII~T 1iW. X73 AA0y9 I~°f~ ~e°ae: J From: 7~:5E To: i+tC~ = 01:26 Flcom: To: ~ oa~pp From: _ _ TD: ~~ ~ oa:oD -_^ ~°„ Flour. ~~. To: - . 044 - „~_____,~ _-- From: .,.~- Ta: _-. OO:DD - Frain; `~ T0: R_~ ' ~ ^--r- a 01~a dod bar smoke. Vora! Volume [Flared: 7~„ARSCF ~_813LS r NQI: 171) ( F$oifl 0 P~msed ~ (Check selecdan) (tisbcutlb Cny-bas oanad was lrsun A upiOa~m ~ dsw~eam (crraok one ar7LG cn~tor meterar t~ A. Pascri'll~aof taoldant and Causaa (4hectt Oi tnmry as needed to fully deseribe the i " ~':"` ~ ~ for SJD'rigF ~'"T X ~ ~ ` TIC Sa due to nigh exhaust te~mp~wre ~ e S all sy R ~uld s ~ S d2i st 1 / y ~~ ~ ` ~ ~ / 1~ / ~} . y li7ecttiwi / InsvulriersaGoss magitnsaon ~T-~ ~~,~ l.~rr./..~~IU~GIial11lB~Y1Ww.. ~,..,~~ ~~~Tbf~l ~~~-s '^ Gee transit systea+ o~Pn:9suce EargUn9 CPFIFTpw Sreuon alt _~ _ @x~easalsra ! InytAflcieM inlet 909 ~,,.~ rotes usro I ... ~' ~~ rR 1 ~adup FaaGty mr3drstensncA -- Hiph atrlCi9fllT~+pst~r~. "'~ $lp ors high vipratigA ~K~ c l er. ProaTem wish TC 7803 ttlTet C?JP ~T'IiE~t1 exhau3t temR. d~ to h4 fi~oQlFiated o1`Fthe catc:hexs. att~to -oad T~,,,C'1803 ar 73Z6 hrs; S!D ,~ 9- Aetlon Talasn to oppMaw Canso and oa: ICtrec>c arW ds~rtgo as appllcaWe) ~^ StrrtSed aterttd TIC 71;43 3tatHTrzed imoSity proms acrd ap~eration ~- deprossure '~~ FLepeirea equipmerd drfliwiCies `-' x echoed creased btk~ gas rates " w~ --~" any tas~g Ftici<lty mam~nence comp sled' ~~ GDmaaCed ~ $uotuelton 1~ure ~ Cihex~ Shut In wags 78-78, 78.1'1,7-28 "~' CarrpCied F~l lhrcb.~fiDn / fa-lytr9 522,2,4.5-33. at otharSaa'igr (T100) G ism tsa~ic on ~ ati4:22 hrs ~_ --- Did Iricidsflt cages blasdc Olnotce? Yes: ^ Na: D (K Yes, roeltlnue snid'r this secliari) C>>d 7scident praserrt a paletdiat threat oD human health of 6~q1? Yes; A Na: ^ lK Yeas r~opork io FEC as soon as pasttbla. K No, report tv AAEC with ~4 hours. eruer tag number arut Beeai 4vla) 81ack snwiia etru'kfed (loin sDUrce: { P Nptllfpl! AIaEC blr Faxon: pram: me: lfiefipAarAne lnfarrnaooa raAOEC Tn selsoura av~6o7~s-sa29): i]ate and tlms aT black smeica everR: From: To= Vohrme flmrrd which perleratod Wac1[ smoke (d dttfererl" carom above : ~~ F _ $9t-S Ciesglp6on of steps to tnllim7rra elrilsaiorts: Se• t3actian ~. aesova. , Type of materials twrned: Gas: NGts: Qth~: - - - Gafierdl111h1-Qli7er: Air Temperaturo: Name ar-d phone T1i,irnber of petean ttldldn9 ~ rePoti: pisone No. Name an ilifom'i:atiati b®' race a llscl~r'!-,1 at dte $ta rns Arid ' tradari in 0ras aaachad to Due s;foarrcfent ere ptfe, a Gaoili~r Supero~ar ~~'.. s~ EOC Supsrvlsor, t3REt B ptero gas and bladr stnake inadenls) . ` Reid ionnsentai Comp>fance Cflol~dlnatara, P1~F3 7 (t3tack smoke Inr:idents ani~ ,,,,~ {'BLIiCPIVTA Field Irtartagers, (>BTack 9rnoTUa incidents otdY1 GPMA QpsroCwns ~ineeAng Tschnreai Asde, (GPMA repbrZS vrtly - ATCy 4'77) Kuparuk: Field E.nvirottr'twslcal Compiianoe Caardinators, NSK Bi ~Aara gas and T91ack smoke incidaras) ' PaGro+>pstErsWranment+>AFvrms upd~+ea: f6c eras ~ rtapaYno FsamstiT9mpi~ 4n t,Nus ~ Tc 1903 i~.ooo Feb-16-00 08:29 ~; ~... r'- '~,: ,, ~~ From-PRB OPERATIONS 9OT-659-5061 T-453 P.O3/O3 F-378 flaw Station iarle F{wring i=v~nt /i~~{JQ ~~~ ~ 12:56 hours: 98Q3 Turbinel~ompressor shut dawn, indiaating high exhaust g~IS temperature and high inlet alr differential pressure; flaring off SIuS~catohers. 13:05: 1803 Turbine~ompressor started. 13:25: While 1805 Turbine/compressor was being loaded, it shut down, again Qn high exhaus# gas temperature, instrumentation technicians diagnosed a problem with the exhaus# gas temperature indication system. 13:25: Began to shut in wel{s 1-29, 8-2, 5-22, 5-24, 5-33, 98-11 and 98-13. 14:A5: Started 1603 TurbinelCompressor. 14:20: 1803 TurpinelCompressvr {waded. 74.22: Call flare. Jan-1s-00 10:31~am From-FS 1 FACILITY: 659-6732 T-118 P.02/03 F-173 ARCO ALASKA, INC, • Pi~UDHOE BAY/GPMA/KUPARUK FS1 PERMIT NO. 8273•AA017 Date of Occurrence: 1/14/00 O Flare ^ vent (mm/dd/yy) (Check Selection) Total Volume Flared: 6.028 MSCF BBLS Meter No.: 194 (ay Faelllty) ^ P~ ~ unplanned (Check Selection) (LisAume Only -Gas llareo was rrom D upstream ~ ttoNmsveam (Chats one) o/ 7EG contactor meter at LPC) Time of Oteurtencg; 00_00 2~ Minutes Frpm: ta:1o To: 1a:t-o = oo:ao From' To: = Oa:00 From: To: = oo:oo From: To: = oo:ao From: To: ~ oo:oo From: To: - 00:00 Tonal Minutes flared: = OO:aO (Includes volume ftar®d rvhrcR generated black smoke. if applicable) A. Descrlptlon of Incident and Cause: (Check as many as neodad to fully describe the Incident) S!D TiCfe for ~ T!C SD due to high exhaust tempereture Seal oil system difficulties EMERGENCY SHUTDOWN Elearical I Inswmemapon malfunction Electrical I Inswmentadon malfunction ~,~~~~~ at other f2glity (TB~D) ,;~~ ='~ Gas transit system overpressure X 4 ` ' ,,~~ ^":I X backing CPF/flow Statbn out - . :,,y ,,:) s " Excessive !insufficient inlet pas ,_ i rates into faaliry +' - '~B. AedOit'Faken to Elim inate Cause and Prevent Reeurronca: (Chock and describe ea applieable) ~;; ~ "`a~ Started !restarted TIC # X ~ 2,;~ 11 s c~~ _ X ~~ ~ / ~~.3~ ~ ~ ,~ -~2 3 ~ Z - r / ~ Did Inddenr cause black resent a poi Did inddent ., GJ~ 2 p (If Yos, report to FEC! ,. L ~ 2 ! ~ ' `~ ~ - ~ ( 2 - r Black smoke emitted fron Notified ADEC by Fax onl Reportthe following Inforn Date and time of black sn Volume flared which genE Description of steps to m Type of materials bumed% General Weather: ,Name and phone number rvame Based on information and belief formed after reasonable Inquiry, t document are true, accurate a omp Facility Supervisor Process upset in section of (stinky Flaring for dritlslte shutdown / stamp Flare system tasting Faulty shutdown on Facilii~l maintenance High ambient temperatures, S/D on high vibration Other: Flared off the Annex. CGF Booster 1601. 18D2 wen[ down. Stabilized fadlity process and operation Repaired equipment diffiallties with Fadl'tty maintenance completed Other: Reduced Gas rates: Pinched chokes back on 17 wells. f Yes, continue with this section) Yes: D No: enter tag number and description) MSCF BBLS Other. /inaction: Phone No. pate i~ to EOC Supervisor, PRB 6 (flare gas and black smoke inGdents) Field Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only) PBU/GPMA Field Managers, (Black smoke Incidents only) GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and blade smoke inadems) P:KiroupstErnlralmonWt~Form s~ Upaala0: fEC 8198 Spill-Gas Rvpon~ng Fonnhl•14.2000 ttN CGF Jan-15-00 01:19'pm E • ©c.~~._ --_1~_Q-~ ----~--1.1.._:__?'~.__I8 ^I_8~~. ~ 2-~°~•:~-=z=~j--•-z-~~~ S_Zr_S_~-----•---- .__ o. ; . //_j(J ~ •~ }11 I -. 1r!,.. -.. I..i! e41~~ ,. a:,.. ~!-~I~ ~.t ! ....1+'.4 _. •Q - __• . r :.~._. - _ ~--'~ t'- • - • __ ...- - --•- - -•--• __`' .._L ~_ ~ f `i. a .~ ~ 1 • .~,; --•- `'1,.~~'-.rte.---. '~-~11~__ •f ~ ~,'~~"~~~r;.: ~~t,• r---• _ . 1- -, .. 1 h ~.~. . -. --• ---- - --• - .rte ~~~ a...~ `lEi' • ~ -j -~: ~ _ .,'~~~`y... ^1'1^5 { ! -_~~~:~::~ _~~~,L?~~___--.~-.-_.~'r - -• - -•--_ .. .~I - ..- ~~ C1J'~ ~1 u ~ •.. ..__.__..__. ~ 3HS ~__ 5~.~ I~^13__x__ ~~- "~ •-~= -- -.. __ _..___:.: , _ - -~ ~' ---- - -=--_... .--- .. . _ ._.1~~ ~. ---~_ ... o~.. • s a ~ _ r- _ _ ._.._ -__~--- . .... . ~- . _ -- ~- From-FS 1 659-8732 T-119 P.OZ/03 F-174 Jan-~~-00 Oi:l~pm From-FS 1 659-8732 T-119 P.03/03 F-174 ~5~~~ :~G'. `'`~4rw~ I O-og ~ 'P' ~..: s`~t .~"Zl ~Q`~~~ S-Gf r 1555 `2 °l, r~.~,.c~--c,~ I~' ~ ~ (2- 32 ~o~ a wG,.~« ~~t I~ /0 3fl, ,C~p ~ I- I ~( i - z. ~~- /3 /g ° J' !vG ~ ~E'o~2 9v ~ , ~~t~sa.~ ~'S/' , ~~ mac- . - ~ . ~ a -~ 39 ° Jr 4 s° Jro~ ~c;G. - 4. Z-23 3S° ~ 98 ~ ~~ Fe.. 5. j 2 -7 0>'l.. Pct ~oc~, - ~. ~ 7-24 ~ S ~ ~ SZ ° ~~~ ~e . ~Qa~P G2' crrr~n~ ®5 / . ~j. i So~D ?sue ~r3L5 CRupE 9-21 _ ~o~ 2- J Z fISO GNU ~f/G,~'E ~ GOB-fPLc~ QEI~ES /?.~ 12-17 `Io"b ~U° Fv>C. bls.0 R.EL-EF: ~° su ~ ~ ~o ~ ~ 7v~~o~~ t 3.: F~/LLlt/~ 33 7i~,ic/~ S< = 3 ?~~ ~<s = . ~ ~. ~ . J ~'~~k 6~~ ~i~cT~R~D o n, l ~'hT(~ I b$ !~ ~ ~'LE,Qu~/lw//fr 34 TAB/~ ~lr = ~ 2 ~~ ~~i = ,."..-. ~o . .. IS., 2- 3G, PSO ,~.O,L, ~~ ~G CD•~• R~lE.tt GuT Tv GHOKE~) ._ iy ; 2 -S S~i r~a~ lAS_ /8.~ soLP 2cn Sd~S, c~uv~ rv G-24. l~, ' sQw ? S 8& S. C~ecr,DE T~ ~ - 24. t o, / Z - / I Pi~/GNED 7v`~ ~S ° ~-I: o ~~c. ~~; . FLARE GAS VENTING REPORT ARCO ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: FS1 PERMIT NO. 9273-AA017 ~~ GAS DISPOSITION Date of Occurrence: 1/11/00 O Flare ^ vent Time of Occurrence: ~ ` (mm/dd/yy) (Check Selection) 00:00 24:00 Minutes From: 07:05 To: 09:05 = 02:00 Total Volume Flared: 22,917 MSCF O BBLS From: To: _ From: To: _ Meter No.: 194 (By Facility) ^ Planned ~ unplanned From: To: _ (Check Selection) From: To: _ From: To: _ Total Minutes Flared: = 02:00 (lisbume Only -Gas flared was from ^ upstream ^ downstream (check one) (Includes volume flared which generated black smoke, of TEG contactor meter at LPC) if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) S/D T/C# for Process upset in `~"'""~ T/C SD due to high exhaust temperature section of facility a ~„' Seal oil system difficulties Flaring for drillsite shutdown /startup (, _# ~wa.~~,~ EMERGENCY SHUTDOWN Flare system testing # Electrical /Instrumentation malfunction Faulty shutdown on "_., r `~ ~F Electrical /Instrumentation malfunction Facility maintenance High ambient temperatures. <'„ at other facility R&D) S!D on high vibration k '~ Gas transit system over re X Other: Flared off the Annex due to CGF X ba low Station out Booster 1802 going down. Excessive Insufficient In et gas X o facility B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C # .Stabilized facility process and operation sor /train depressured Repaired equipment difficulties X Reduced increased inlet gas rates with Comp ed flare testing Facility maintenance completed Corrected E&I fluctuation /failure X Other: Reduced & S/I rate: See Corrected E&I fluctuation /failure Attached list of wells that were at other facility (T&D) shut in. Black Smoke Did incident cause black smoke? Yes: ^ No: ~ (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: ^ No: ^ {If Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Date: Time: Report the following information to ADEC within 24 hours BY FAX (907-269-7508): Date and time of black smoke event: From: To: Volume flared which generated black smoke (if different from above): MSCF BBLS Description of steps to minimize emissions: See Section B, above. Type of materials burned: Gas: NGLs: Other. General Weather: Air Temperature: Wind Speed/Direction: Name and phone number of person making the report: Name Phone No. .Based on information and belief formed after reasonable inquiry, I certify that the statements and information in and attached to this document are true, accurate omplete. Facility Supervisor Date ~~~„J~ cc: EOC Supervisor, PRB 6 (flare gas and black smoke incidents) Field Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only) PBU/GPMA Field Managers, (Black smoke incidents only) GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke incidents) Updated: FEC 8/98 P:\Groups\EnvKOnmantallForms\ Spill-Gas Reporting FormsWnnax 1-11-201)0 Flare Calculations Please file a copy of this sheet with the flare report. Rate prior to flare= 275,000 MSCF Flare start time= 7:05:00 Flare stop time= 9:05:00 Total flare time= 2:00 .] Estimated flared gas= 22,917 MSCF Assist Gas Meter 173 rollover into Meter 170= 0 MSCF Total flared gas= 22,917 MSCF Notes: 1. Enter times as shown: 1 PM=01:00 6PM=18:00 2. If flaring event lasted over midnight, include date in flare start and stop times. Example: 12/25/95 22:20 I i t r (-11- !1D - ~~~ d 2 j l-kw b' 4-~ t ~ t ~ ~ e, c,~ w vv ~ t n ~ ~ ~ ~ -~-r Cj'v~ ~G5 L ~ `~~ \G~~ - ~v~ -- c~ 6~'e- i ~ulot l3a BP~L ~.~u~Q -'~,o l~'2~1 ~- , ~°I y--l(P SST ~or o~c.S ogaFs ~ ~~D~P would nod w~ove- $,, Sold `~O ~~1 ~rua~e -l~b is~ ~`~ ~ f _ wG.-r i,,,~ v P ~z~ rG.~.> \ ~ ~--i~. ® t ~ - a "1 ~t Ei o"1~ . a1, I ~~' S ov. \~..c ~r ~ 1.11`~ - .a-1 o-v. 1 ~ ,. e~ a.,-~.~ ~ a-~ O ti l ~ t ~ 3~~ L- ~' ig ~ 5 S~2 ~ nod -v~eedE'..d e,,.s ra.c...~ ~i ~~, h,..ov-~ LLoS~~ ~a. i ~3 s- 11 lg'3~ t i _ ~ - l 4- t8. 33 ~'t5 ~ ~ ~. . tg~av S-1~ '.. 2- t4. 34 ~" 5 I$ ` ~~ Q -- ~ (,,~~~ s-~1s s~ ~toero~ t~ `~~ Via'--51J ~. ~ ~: ~~~ r ~,~~~~ - -- 1 le, i S -4 cri. 1 i .. ~. ~,~--~~e r t G 1 a- q~. ' 4 °t o ~ L oY sc~5 i rr~- c.~c~-~~,`i _ c o u p o-~ ~ ? e c~ I t_. f l'l. V t~P ~vk5+ra~ ! ~~~ 1~:er~,ve1~. ko _1G13 4 ~tL ao3 ~ Jan;1t-2000 04:OYpm From-CENTRAL GAS FACILITY 659-8881 MI Compressor 1855 Flaring on 1/11/00 1.07:OOAM-MI#2 SD on governor failure. 2.07:20AM•MI#2 start. 3.07:20AM-NII#2 SD on incomplete sequence. 4.O8:DOAM-Adjusted process co stop flaring on Stabilizer overhead. S. 08:30AM-0ut of the flare. 6. 11:OOAM-Changed out solenoid valve on F12AV suction valve. 7. 11:35AM-MI#2 start. 8. 11:35AM-MY#2 SD on valve sequencing. . 9. 12aOPM-MI~2 start. 10. 12:lOPM-MI#2 SD on hi exhaust temperature. 11. 13:OOPM-MT#2 start-compressor on idle. 12. 13:45-MI#2 SD on HP suction drum Y~1 HI ]GVel. 13. 14:OOPM-M]#2 start. l4. 14:lOPM-MI#2 SD on HP sucaoa drum HI Hl .level, . 75.15:OOPM-MI#!:2 start-compressor on idle. 16.15 :30PM-MI#2 loaded. .~ T-038 P.004/005 F-066 1/11100 Gas Cuts for 1802 Booster and 1855 MI Compressor Cuts beginning at 07:00 Flowing Rate Final Rate Gas Cut 02-23 17,501 4,620 -12,881 04-01 47,523 11,668 -35,855 05-02 28,989 12,014 -16,975 05-07 40,029 15,000 -25,029 06-01 10,312 5,438 -4,$74 07-25 31,533 6,407 -25,126 09-35 11,093. 5,754 -5,339 11-18 30,472 8,984 -21,488 11-34 49,495 0 -49,495 11-38 30,160 .10,773 -19,387 14-04 29,374 0 -29,374 18-18 13,807 0 -13,807 18-31 25,398 2,942 -22,456 -282,086 Cuts be ginning at 07:53 Flowing Rate Min Choke Gas Cut 02-03 19,893 11,779 -8;114 02-11 .25,162 4,753 -20,409 02-34 19,383 12,642 -6,741 02-35 37,734 10,266 -27,468 05-15 41,254 7,513 -33,741 05-28 29,195 5,689 -23,506 06-01 5,438 0 -5,438 07-20 17,757 2,366 -15,391 07-25 32,108 0 -32,108 15-21 5,871 0 -5,871 15-22 33,254 0 -33,254 15-29 36,146 5,436 -30,710 15-31 15,596 6,564 -9,032 15-44 38,200 0 -38,200 18-02 21,854 4,646 -17,208 18-33 19,610 9,519 -10,091 -317,282 Cuts beginning at 08:23 Flowing Rate Min Choke Gas Cut 02-02 21,042 0 -21,042 02-14 20,117 12,958 -7,159 03-22 35,853 13,735 -22,118 07-20 2,366 0 -2,366 07-26 59,075 9,213 -49,862 11-03 16,390 3,849 -12,541 11-09 34,095 22,131 -11,964 11-24 32,292 17,158 -15,134 Action Choke to minimum Choke to minimum Choke to minimum Choke to minimum Choke to minimum Choke to minimum Choke to minimum Choke to minimum Shut-in Choke to minimum Shut-in Choke to minimum - no flow Choke to minimum MSCF Action Choke to minimum Choke to minimum Choke to minimum Choke to minimum Choke to minimum Choke to minimum Shut-in Choke to minimum Shut-in Shut-in Shut-in Choke to minimum Choke to minimum Shut-in Choke to minimum Choke to minimum Action Choke to minimum - no flow Choke to minimum Choke to minimum Shut-in Choke to minimum Choke to minimum Choke to minimum Choke to minimum f C7 • 1/11/00 Gas Cuts for 1802 Booster and 1855 MI Compressor 15-16 13,548 1,368 -12,180 18-20 17,131 6,051. -11,080 18-26 21,264 12,055 -9,209 18-30 27,901 5,348 -22,553 -197,208 Cuts beginning at 09:09 Flowing Rate Min Choke 01-20 85,078 77,046 02-05 40,855 24,578 02-16 20,234. 11,552 02-16 11,552 0 04-01 11,668 0 05-02 12,014 0 05-06 39,738 0 05-11 27,932 15,000 05-15 7,513 0 07-07 18,679 5,210 11-18 32,254 22,005 15-28 24,510 0 15.28 24, 510 0 18-19 17,937 1,450 18-34 23,587 5,953 05-07 15,000 0 02-23 4,620 0 02-14 12,958 0 02-03 11,779 0 Cuts made at 09:55 Rec Choke 01-20 77,046 02-03 19,893 02-14 19,194 02-16 20,234 02-23 4620 05-02 12,014 05-15 41,254 Gas Cut -8,032 -16,277. -8,682 -11,552 -11,668 -12,014 -39,738 -12,932 -7,513 -13,469 -10,249 -24,510 -24,510 -16,487 -17,634 -15,000 -4,620 -12,958 -11.779 -L /~J- ,bL4 Min Choke Gas Cut 70,256 -6,790 5,889 -14,004 9,763 -9,431 11,552 -8,682 0 -4,620 0 -12,014 7,513 -33,741 -89,282 Total Gas Cut -1,165,482 Choke to minimum Choke to minimum Choke to minimum Choke to minimum Action. Lowered Choke Choke to minimum Choke to minimum Shut-in Shut-in Shut-in Shut-in Choke to minimum Shut-in Choke to minimum Choke to minimum Shut-in Choke to minimum Choke to minimum Choke to minimum Choke to minimum Shut-in .Shut-in Shut-in Choke to minimum Choke to minimum Choke to minimum Choke to minimum Shut-in Shut-in Choke to minimum MSCF MSCF • F.# FLARE GAS VENTING REPORT ARCO ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK ;w FACILITY: FS1 PERMIT NO. 9273-AA017 GAS DISPOSITION Date of Occurrence: 1/11/00. ~ Flare ^ vent Time of Occurrence: (mm/dd/yy) (Check Selection) 00:00 24:00 Minutes From: 08:18 To: .09:58 = 01:40 Total Volume Flared: 642 MSCF 0 BBLS From: To: _ From: To: _ Meter No.: 170 (By Facility) ^ Planned O unplanned From: ~ To: _ (Check Selection) From: To: _ From: To: _ Total Minutes Flared: = 01:40 (Lisburne Only -Gas flared was from ^ upstream ^ downstream (Check One) (Includes volume flared which generated black smoke, of TEG contactor meter at LPC) if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) S/D T/C# for Process upset in T/C SD due to high exhaust temperature section of facility Seal oil system difficulties Flaring for drillsite shutdown /startup EMERGENCY SHUTDOWN Flare system testing Electrical /Instrumentation malfunction Faulty shutdown on Electrical /Instrumentation malfunction Facility maintenance High ambient temperatures. at other facility (T&D) S!D on high vibration Gas transit sys _ ssure X Other: Flared off the Annex due to CGF X b ~ P Flow Station out Booster 1802 going down. Excessive / msu ici et gas X ra es m o facility B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C # Stabilized facility process and operation ssor /train depressured Repaired equipment difficulties X Reduced increased inlet gas rates with Competed flare testing Facility maintenance completed Corrected E&I fluctuation /.failure X Other: Reduced & S/I rate: See Corrected E&I fluctuation /failure Attached list of wells that were at other facility (T&D) shut in. Dld Incdent present a potenha t rea o uma y. (If Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Date: Time: Report the following information to ADEC within 24 hours BY FAX (907-269-7508): Date and time of black smoke event: From: To: Volume flared which generated black smoke (if different from above): MSCF Description of steps to minimize emissions: See Section B, above. Type of materials burned: Gas:. NGLs: Other: General Weather: Air Temperature: Wind SpeedlDirection: Name and phone number of person making the report: Name Did incident cause black smoke? Yes: ^ No: O (If Yes, continue with this section) ' I h t t h n health or safet ~ Yes: ^ No: ^ Phone No. Based on information and belief med after reasonable inquiry, I certify that the statements and information in and attached to this document are true, accurate d ompiete. Facility Supervisor Date /~,~~ ,~~~ cc: EOC Supervisor, PRB 6 (flare gas and black smoke incidents) Field Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only) PBU/GPMA Field Managers, (Black smoke incidents only) GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke incidents) BBLS P:1Groups\EnvironmentallFarms\ Updated: FEC 8198 Spill-Gas Reporting Fonns\S C 'C' 1-11-2000 Flare Calculations Please file a copy of this sheet with the flare report. Rate prior to flare= 8,455 MSCF Flare start time= 8:18:00 • Flare stop time= 9:58:00 Total flare time= 1:40 Estimated flared gas= 587 MSCF Assist Gas Meter 173 rollover into Meter 170= 55 MSCF Total flared gas= 642 MSCF Notes: 1. Enter times as shown: 1 PM=01:00 6PM=18:00 2. If flaring event lasted over midnight, include date in flare start and stop times. Example: 12/25/95 22:20 • * -. i - i ~~ a. ~ -E-r p-~,.. CGS V ~ S~ ~G'f 1 c3~ - c~ 6~,~ ~kw ~ ~~t~, ~te~~ W~~~ ~~ . 3, ~. 3 ~'1 S ~ Z ~S--v6- c y ~~ Q-~ ~ ~ 03~ ~. g ~L ~~ u~ e ~o ~ t~' a"l ~u1o~ t3~ S,I .-CD ~s . O '~s ~ S~~ w~i~^ ~-~ ~ CQ-. y..(lv S(Z ~~ ~c~S o9a8' ~ G(~o~P world no~ wwve- `1 ~ ~ P 4 ~ 4 a ~- u-~ of ~ ~" ' S o v~ \ ~ r. t -~-o r wa.,r w~ v P ~ v ~['G-~-J 1 ~ '~-~ O ~ $' 2 -1 ~.l D b1~ ~O . n, ~ ~~ ~1~~~~ \ B - g p~a-Lk oy. t ~ .tip ~-~t~' 1. i$ - .a-1 c~-r. 1.., e.. a.,~~ ~-a j- O~ ~ ~ ~ ~ 3<.~ l- P 5 1a-.i \4 5 5IS ~ nod - v~eede.~ G,-S raw ~ i ~~, h,.,or~e. ~1,055~ ~3 s- ~~ sly ~ '~D ~ ~~ a-~~ \~ W~~~,S -~-a rv~~t n i vim" ~~S ; ~ ~~ - 3a-_ 5 - a. a - 3S ~ S - ag '~ - '~ ~~--~.3.-_ S'a8 a- ~~ t~~ i~ ~- l4 14 - 3 3 S'" l 5 a~ 3 _ l4- a•U_ S- 1~ '~' ~ ~' Y - a-a ~' t ~- - 1¢ - 3 4 ~' _5 14'Ioi. t~~-1ts 5/~ ~rr . ~~S ~ ~ ..1 ~ ~. a °j 3 Sr ~ 5 - °~ ~,,, t o v'n~ l 4 ' ~ ~ ~.. D 'ct S'1 ~a~t 5-..15 ~~~~iSZ. 1 +av~ ~ ~ _ ~~ _ .. . • o ~~~•- v-.ruct~-- ~ S`t1• ~~, 5-c~ . 1~ ~t ~. o ~ G o-r~os tv~~. ~ ~- ca u p o-,~, . ~ Z C ~ l f.,. .. V.u~P_ ..~~~~ , _ .._ _ IB. _lal 3 ~ ~ ~ ao 3 ~cti..1 Scrams ~~~~- s~ ~ ~ar~"~~ a ~ 5`j- ~~~1 Jan-12-2000 04:OYpm From-CENTRAL GAS FACILITY 650-H687 ~ T-086 P.004/006 F-068 MI Compressor l 8SS Flaring on 1/11/00 • 1.07:OOAM-MI#2 SD an governor failure. 2.07:2OAM•MI#2 start. 3.07:2OAM-MI#2 SD on iACOmplete sequznce. 4.O8:QOAM-Adjusted process co stop flaring on Stabilizer overhead. S. O8:3OAM-0ut of the flare. 6. 11:OOAM-Chttnged out solenoid valve on F12AV suction valve. 7. 11;3SAM-MI#2 start. 8.11:3SAM-Ml#f2 SD on valve sequencing. . 9. 12:lOPM•MI#2 start. 10. 12:lOFM-MI#2 SD on lii exhaust temperature. 11. 13:OOPM-MI#2 start-compressor on idle. 12. 13:45-Mi#2 SD on HP suction drum YET HI ICVeI. 13. 14:OOPM-MI#2 Sian. • 14. 14aOPM--MI#2 SD on HP suctioa drum HI Hl level, . ]5.15:OOPM-MI4i2 start-compressor on idle. 16. 15:3OPM-MI#2 loaded. t • • 1/11/00 Gas Cuts for 1802 Booster and 1855 MI Compressor Cuts beginning at 07:00 Flowing Rate 02-23 17,501 04-01 47,523 05-02 28,989 05-07 40,029 06-01 10,312 07-25 31,533 09-35 11,093 11-18 30,472 11-34 49,495 11-38 30,160 14-04 29,374 18-18 13,807 18-31 25,398 Final Rate Gas Cut 4,620 -12,881 11,668 -35,855 12,014 -16,975 15,000 -25,029 5,438 -4,874 6,407 -25,126 5,754 -5,339 8,984 -21,488 0 -49,495 10,773 -19,387 0 -29,374 0 -13,807 2,942 -22,456 -282,086 Action Choke to minimum Choke to minimum Choke to minimum Choke to minimum Choke to minimum Choke to minimum Choke to minimum Choke to minimum Shut-in Choke to minimum Shut-in Choke to minimum - no flow Choke to minimum MSCF Cuts beginning at 07:53 Flowing Rate Min Choke Gas Cut 02-03 19,893 11,779 -8,114 02-11 25,162 4,753 -20,409 02-34 19,383 12,642 -6,741 02-35 37,734 10,266 -27,468 05-15 41,254 7,513 -33,741 05-28 29,195 5,689 -23,506 06-01 5,438 0 -5,438 07-20 17,757 2,366 -15,391 07-25 32,108 0 -32,108 15-21 5,871 0 -5,871 15-22 33,254 0 -33,254 15-29 36,146 .5,436 -30,710 15-31 15,596 6,564 -9,032 15-44 38,200 0 -38,200 18-02 21,854 4,646 -17,208 18-33 19,610 9,519 -10,091_ -317,282 Cuts beginning at 08:23 Flowing Rate Min Choke Gas Cut 02-02 21,042 0 -21,042 02-14 20,117 12,958 -7,159 03-22 35,853 13,735 -22,118 07-20 2,366 0 -2,366 07-26 59,075 9,213 -49,862 11-03 16,390 3,849 -12,541 11-09 34,095 22,131 -11,964 11-24 32,292 17,158 -15,134 Action Choke to minimum Choke to minimum Choke to minimum Choke to minimum Choke to minimum Choke to minimum Shut-in Choke to minimum Shut-in Shut-in Shut-in Choke to minimum Choke to minimum Shut-in Choke to minimum Choke to minimum Action Choke to minimum - no flow Choke to minimum Choke to minimum Shut-in Choke to minimum Choke to minimum Choke to minimum Choke to minimum r • 1/11/00 Gas Cuts for 1802 Booster and 1855 MI Compressor 15-16 13,548 1,368 -12,180 18-20 17,131 6,051 -11,080 18-26 21,264 12,055 -9,209 18-30 27,901 5,348 -22,553 -197,208 Cuts beginning at 09:09 Flowing Rate Mi n Choke Gas Cut 01-20 85,078 77,046 -8,032 02-05 40,855 24,578 -16,277 02-16 20,234 11,552 -8,682 02-16 11,552 0 -11,552 04-01 11,668 0 -11,668 05-02 12,014 0 -12,014 05-06 39,738 0 -39,738 05-11 27,932 15,000 -12,932 05-15 7,513 0 -7,513 07-07 18,679 5,210 -13,469 11-18 32,254 22,005 -10,249 15-28 24,510 0 -24,510 15-28 24,510 0 -24,510 18-19 17,937 1,450 -16,487 18-34 23,587 5,953 -17,634 05-07 15,000 0 -15,000 02-23 4,620 0 -4,620 02-14 12,958 0 -12,958 02-03 11,779 0 -11,779 Choke to minimum Choke to minimum Choke to minimum Choke to minimum Action Lowered Choke Choke to minimum Choke to minimum Shut-in Shut-in Shut-in Shut-in Choke to minimum Shut-in Choke to minimum Choke to minimum Shut-in Choke to minimum Choke to minimum Choke to minimum Choke to minimum Shut-in Shut-in Shut-in -L /y,6Z4 Cuts made at 09:55 Rec Choke 01-20 77,046 02-03 19,893 02-14 19,194 02-16 20,234 02-23 4620 05-02 12,014 05-15 41,254 Min Choke Gas Cut 70,256 -6,790 5,889 -14,004 9,763 -9,4.31 11,552 -8,682 0 -4,620 0 -12,014 7,513 -33,741 -89,282 Choke to minimum Choke to minimum Choke to minimum Choke to minimum Shut-in Shut-in Choke to minimum MSCF Total Gas Cut -1,165,482 MSCF • _ ~ a FLARE GAS VENTING REPORT '~ ARCO ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: FS1 .PERMIT NO. 9273-AA017 ~~ - GAS DISPOSITION Date of Occurrence: 1/10/00 O Flare ^ vent Time of Occurrence: (mm/dd/yy) (Check Selection) 00`00 2400 Minutes From: 13:10 To: 14:20 = 01:10 Total Volume Flared: 1o,o1a MSCF BBLS From: To: = 00:00 From: To: = 00:00 Meter No.: 194 (By Facility) ^ planned O unplanned From: To: = 00:00 (Check Selection) From: To: = 00:00 From: To: = 00:00 Total Minutes Flared: = 01:10 (Lisburne Onfy -Gas hared was from ^ upstream ^ downstream fcneck one) (Includes volume flared which generated black smoke, of TEG contactor meter at LPC) if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) S/D T/C# for Process upset in T!C SD due to high exhaust temperature section of facility Seal oil system difficulties Flaring for drillsiteshutdown /startup EMERGENCY SHUTDOWN Flare system testing Electrical 1 Instrumentation malfunction Faulty shutdown on Electrical /Instrumentation malfunction Facility maintenance High ambient temperatures. at other facility (T&D) S/D on high vibration Gas transit system overpressure X Other: Flared off the Annex. X backing CPF/Flow Station out CGF Tandem 1886 went down. Excessive /insufficient inlet gas CGF tried 2 starts. One at 1340 and'one rates into facility at 1355. B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C # Stabilized facility process and operation Compressor /train depressured Repaired equipment difficulties X educe f increased inlet gas rates with Comp eted flare testing Facility maintenance completed Corrected E&I fluctuation /failure X Other: educed Gas rates: 1-1.9,5-2,5-7, Corrected E&I fluctuation! failure 2 23,1-4,5-28,18-30,15-31,18-18,18-31. at other facility (T&D) /y_cjr~t$~ ~~-ZS,~-i,~-/ ~~{t ~~' Lk/~ T"!E'3 Black Smoke Did incident cause black smoke? Yes: ^ No: ^ (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: ^ No: ^ (If Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Date: Time: Report the following information to ADEC within 24 hours BY FAX (907-269-7508): Date and time of black smoke event: From: To: Volume flared which generated black smoke (if different from above): MSCF BBLS Description of steps to minimize emissions: See Section B, above. Type of materials burned: Gas: NGLs: Other. General Weather: Air Temperature: Wind Speed/Direction: Name and phone number of person making the report: Name Phone No, Based on information and belief formed after reasonable inquiry, I certify that the statements and information in and attached to this document are true, accurate and plete. Facility Supervisor Date 0 0 cc: EOC Supervisor, PRB 6 (flare gas and black smoke incidents) Field Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only) PBU/GPMA Field Managers, (Black smoke incidents only) GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and blacksmoke incidents) P:\Groups\EnJaonmental\Forrna\ Updated: FEC 8/98 Spill-Gas Reportaig Forms\t-70.2000 for CGF Gas cuts for 1-10-2000 flare event. s ~ ,J All values MSCF/D Well Flowing Rate Final Rate Gas Cut Action 01-04 20,723 12,857 7,866 Reduced choke setting 01-19 24,421 0 24,421 SI Well 02-23 17,501 4,620 12,881 Reduced choke setting 04-01 .48,523 30,202 18,321 Reduced choke setting 05-02 28,989 12,014 16,975 Reduced choke setting 05-07 40,029 20,945 19,084 Reduced choke setting 05-28 29,195 5,689 23,506 Reduced choke setting 06-01 10,312 5,438 4,874 Reduced choke setting 07-08 3,332 0 3,332 SI Well 07-25 33,248 6,407 26,841 Reduced choke setting. 14-04 29,359 11,668 17,691 Reduced choke setting 15-31 16,544 6,564 9,980 Reduced choke setting 18-08 46,115 17,705 28,410 Reduced choke setting 18-18 17,165 12,059 5,106 Reduced choke setting 18-30 27,436 5,348 22,088 Reduced choke setting 18-31 25,398 2,942 22,456 Reduced choke setting Total gas cut: 263,832 MSCF PBU PRODUCER'S REPORT OF GAS DISPOSITION Alaska Oil & Gas Conservation Comm Attn: Ms. Wendy Mahan 3001 Porcupine Drive Anchorage, Alaska 99501 Exxon Company USA Joint Interest Acctg. Tracie Hutzler, Rm 1419-L P. O. Box 4707 Houston, Texas 77210 Forcenergy Attn: Roy Richardson 3838 N. Causeway Blvd., Suite 2300 Metairie, LA 70002 Chevron U.S.A., Inc. Attn: NOVJ Manager P. O. Box 36366 Houston, Texas 77236 Chevron USA, Inc. Attn: Virgil Reyes P. O. Box J, Section 981 Concord, California 94524 Mobil Oil Corporation Hazel Adams Suite 14C8 P. O. Box 650232 Dallas, Texas 75265-0232 Jeff Morvant ATO 1738 State of Alaska Oil and Gas Audit Division 550 W 7th Avenue, Suite 570 Anchorage, Alaska 99501-3557 Exxon Company USA Attn: Prudhoe Bay 91-0250 Topping Plant Houston, Texas 77210-4496 Phillips Petroleum Company Attn: Ms. Carol Kulchinski 1380 Plaza Office Bldg Bartlesville, Oklahoma 74004 Dianna Sommer ATO-1658 Davis/Deveau -PRB 6 Eliana Uribe Dept of Natural Resources Royalty Section 3601 "C" St. Suite 1380 Anchorage, AK 99501- BP Exploration, Inc. Attn: Mr. Gary. Benson P. O. Box 196612 Anchorage, Alaska 99519-6612 Lipchak/Rea PRB 7 EE~V`ED~ i"9 Y! ~:RA Alas~ta ~;~r ~ t~as Cons. Colnm~ssi~n Anchorage ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility FLOW STATION 1 Operatcn~ ARCO ALASKA, INC. Field(s) EAS'CERN OPERATING AREA-PBU Month/Year of Disposition Feb-00 Disposition *Lndicate contribution of each pool to total. 1. Sold 0 Pool Name Code Percent 2. Reinjected 0 PRUDHOE 640150 100 3. Flared or vented less than 1 hoar 34 4. Flared oT vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 26,685 6. Used for lease operations Fuel Assist 738,734 676 7. Other 0 ;.. Official Use Oniy:-Flaring Authaniaticin > 1 lir.: TOTAL items 1 - 7 766,129 1. Safety MCF 8. NGL gas equivalentproduced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: CGF MAR ~ ~ 2ppp 301,054 ~ll~~ Rlt!'!~( Commissioner Date 11. Transferred to: CCP 56,891,752 Note: All volumes must be corrected to Remarks: pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: ~~ Title: MANAGER.. month following the month of disposition. Authority 20 AAC 25.235. ~y ~~ t~~~2~~~ Form 10-422 (Revise~4/95) V ~ 02-00 FORM 10-422.x1s/FORM 10-422 ARCO ALASKA, tNC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS FS-1 February-2000 DATE TIME VOLUME MCF DESCRIPTION Of INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM Over 1 Hour/Over 5MM 0 Less 1 HR/Less 5MM 34 Total over/under 1 Hr/5MM 34 Pilot/Purge 26,685 Continuous Assist 676 TOTAL FLARED/VENTED 27,395 MAC ~ ° zoao f~aSka tad ~ ~~ s?n~< ~4??1!~11 _': ~ . PBU PRODUCER'S REPORT OF GAS DISPOSITION Alaska Oil & Gas Conservation Comm Exxon Company USA Attn: M~:1ndy Martian Joint Interest Acctg. Forcenergy 3001 Porcupine Drive Tracie Hutzler, Rm 1419-L Attn: Roy Richardson Anchorage, Alaska 99501 P. O. Box 4707 3838 N. Causeway Blvd., Suite 2300 Houston, Texas 77210 Metairie, LA 70002 State of Alaska Chevron U.S.A., Inc. Oil and Gas Audit Division Attn: NOVJ Manager 550 W 7th Avenue, Suite 570 Davis/Deveau - PRB 6 P. O. Box 36366 Anchorage, Alaska 99501-3557 Houston, Texas 77236 Chevron USA, Inc. Exxon Company USA Eliana Uribe Attn: Virgil Reyes Attn: Prudhoe Bay 91-0250 Dept of Natural Resources P. O. Box J, Section 981 To in Plant Royalty Section pp g 3601 "C" St. Suite 1380 Concord, California 94524 Houston, Texas 77210-4496 Anchorage, AK 99501- Mobil Oil Corporation Phillips Petroleum Company BP Exploration, inc. Hazel Adams Attn: Ms. Carol Kulchinski Attn: Mr. Gary Benson Suite 14C8 1380 Plaza Office Bldg P. O. Box 196612 P. O. Box 650232 Bartlesville, Oklahoma 74004 Anchorage, Alaska 99519-6612 Dallas, Texas 75265-0232 Jeff Morvant ATO 1738 Dianna Sommer ATO-1658 r~AR ~ o Zoo ~" ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility FLOW STATION 1 Operator ARCO ALASKA, INC. Field(s) EASTERN OPERATING AREA-PBU Month/Year of Disposition MA 0.- Feb-00 Disposition *Indicate contribution of each pool to total. 1. Sold 0 Pool Name Code Percent 2. Reinjected 0 PRUDHOE 640150 100 3. Flared or vented less than 1 hour 4. Flared or vented greater than 1 hour ~a~~ ~! ~ ~~~ +~~ ~+Om~ll$ (Supplemental report required--See 20 AAC 25.235) ~ ..-8-' 5. Pilot and Purge ~ 28,738 6. Used for lease operations Fuel Assist 762,052 153 7. Other 0 ................................................................ ................................................................ Offici~l:Usc:Only-:Fiafilig Aiitliorization:~a lir ::::::::::::::::::: TOTAL items 1 - 7 815,546 1. Safety ~- MCF 8. NGL gas equivalent produced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: CGF 318,337 Commissioner Date 11. Transferred to: CCP 64,752,611 Note: All volumes must be corrected to Remarks: pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the I hereby certify that the forego' is true and correct to the best of my knowledge. Signature: - Title: MANAGER month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) u C/ i ~,~~~~ r ) / ~,i /~ V ~~ 03-00 FORM 10-422.xis/FORM 10-422 ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS FS-1 March-2000 DATE TIME VOLUME MCF PLANNED DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM a~~ 03/15/00 1610-1635 5,243 Gas transit system overpressure backing flow station ou UNPLANNED Reduced inlet gas rates. Shut in wells ~ ~, CGF lost Booster 1801 oil leak. Flared off the annex. 18-6,2-20,7-3,2-1,7-26,5-7,1-21,1-23,1-34. ~~~, Braided house under gas generator leaking. Changed oil yam'' lines and restarted compressor. 03/30/00 1610-1710 11,250 Electrical malfunction at other facility backing Flow Sta1 UNPLANNED Reduced inlet gas rates. CGF restarted Over 1 Hour/Over 5MM 16,493 Less 1 HR/Less 5MM 8,110 Total over/under 1 Hr/5MM 24,603 Pilot/Purge 28,738 Continuous Assist 153 TOTAL FLARED/VENTED 53,494 out. Flared off the Annex. CGF 1883 Tandem Shutdown. 1883. Reduced choke on well 1-20. ~~ ASR ~ 7 2000 A1~~C~ Q! & Gas Cons. Carnmissivrl Anchorage ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility FLOW STATION 1 Operator PHILLIPS ALASKA, INC. Field(s) EASTERN OPERATING AREA-PBU Month/Year of Disposition a,~ir-00 Disposition *Indicate contribution of eachpooLto total. 1. Sold 0 Pool Name Code Percent 2. Reinjected 0 PRUDHOE 640150 100 3. Flared or vented less than 1 hour 23,953 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 32,150 6. Used for lease operations Fuel Assist 690,068 227 7. Other 0 ................................................................ ................................................................ Official:Use:Oitly=:Flaiiii Aiithorizatioii:~a lir ::::::::::::: >:: »: TOTAL items 1 - 7 746,398 1. Safety MCF 8. NGL gas equivalent produced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from CGF 307,045 Commissioner Date 11. Transferred to: CCP 61,033,217 Note: All volumes must be corrected to Remarks: pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: ` ~ ~ Title: MANAGER month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) ~ -' ~~1~¢ ~~2~~J°~ 04-00 FORM 10-422.x1s/FORM 10-422 ARCO ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS FS-1 April-2000 DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM ~~\ 04/20/00 2015-2052 6,368 Gas transit system overpressure backing CPF/Flow V, ~ (Intermittent) Station out due to CGF Boosters dropping off line. ~t 04/23/00 1400-1451 10,625 Gas transit system overpressure backing CPF/Flow Station out. Over 1 Hour/Over 5MM 16,993 Less 1 HR/Less 5MM 6,960 Total over/under 1 Hr/5MM 23,953 Pilot/Purge 32,150 Continuous Assist 227 UNPLANNED Reduced inlet gas rates. Shut in or pinched back wells 2-9/18-26/2-1 /7-9/5-1 5-15/ 18-21 /7-77-15/ 12-33/ 18-18. UNPLANNED Reduced inlet gas rates. Pinched back < wells 1-19, 2-l, 2-5, 2-7, 2-9, 2-18, 2-19, 5-3, 5-15, 7-7, 7-26, 18-26, TOTAL FLARED/VENTED 56,330 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility FLOW STATION 1 Operator PHII.LIPS ALASKA, INC. Field(s) EASTERN OPERATING AREA-PBU Month/Year of Disposition Mav-0O Disposition *Indicate contribution of each pool to total. 1. Sold 0 Pool Name Code Percent 2. Reinjected 0 PRUDHOE 640150 100 3. Flared or vented less than 1 hour ~~ 4 ~ .~ -'7 :'1.- I ~t ~ ~ jV~ ~ ~~ - ,j, 4. Flared or vented greater than 1 hour ''~ `~Z ~ (Supplemental report required--See 20 AAC 25.235) ~'' ._8- '~ 5. Pilot and Purge 34,301 6. Used for lease operations Fuel Assist 714,488 375 7.Other 0 .......................... ..................................... ................................................................ Official:IJse Oi~T --Flafin :Authorizatioii:~a hr :::::::::::::::::: TOTAL items 1 - 7 756,383 1. Safety ~ MCF 8. NGL gas equivalent produced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: CGF 307,692 Commissioner Date 11. Transferred to: CCP 59,753,628 Note: All volumes must be corrected to Remarks: pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is tru and correct to the best of my knowledge. Signature: ~'" Title: MANAGER month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) ,-~ i j'~ 05-00 FORM 10-422.x1s/FORM 10-422 ARCO ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS FS-1 May-2000 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM s~ 05/07/00 0316-0347 6,522 Gas transit system overpressurebacking FS out. CGF UNPLANNED Reduced inlet gas rates. Pinched back c lost 1802 Booster wells 7-28, 7-15, 2-29, 5-7, 15-32, 2-33, ~~ ;~,~ 5-32, 2-28, 12-12, 7-9, 2-35. Over 1 Hour/Over 5MM 6,522 Less 1 HR/Less 5MM 697 Total over/under 1 Hr/5MM 7,219 Pilot/Purge Continuous Assist 34,301 375 TOTAL FLARED/VENTED 41,895 PBU PRODUCER'S REPORT OF GAS DISPOSITION Alaska Oil & Gas Conservation Comm Attn: Ms. Wendy Mahan 3001 Porcupine Drive Anchorage, Alaska 99501 Exxon Company USA Joint Interest Acctg. Tracie Hutzler, Rm 1419-L P. O. Box 4707 Houston, Texas 77210 Forcenergy Attn: Roy Richardson 3838 N. Causeway Blvd., Suite 2300 Metairie, LA 70002 Chevron U.S.A., Inc. Attn: NOVJ Manager P. O. Box 36366 Houston, Texas 77236 Chevron USA, Inc. Attn: Virgil Reyes P. O. Box J, Section 981 Concord, California 94524 Exxon/Mobil Oil Corporation Hazel Adams Suite 14C8 P. O. Box 650232 Dallas, Texas 75265-0232 State of Alaska Oil and Gas Audit Division 550 W 7th Avenue, Suite 570 Anchorage, Alaska 99501-3557 Exxon Company USA Attn: Prudhoe Bay 91-0250 Topping Plant Houston, Texas 77210-4496 Phillips Petroleum Company Attn: Ms. Carol Kulchinski 1380 Plaza Office Bldg Bartlesville, Oklahoma 74004 Davis/Deveau - PRB 6 Eliana Uribe Dept of Natural Resources Royalty Section 3601 "C" St. Suite 1380 Anchorage, AK 99501- BP Exploration, Inc. Attn: Mr. Gary Benson P. O. Box 196612 Anchorage, Alaska 99519-6612 Jeff Morvant ATO 1738 Dianna Sommer ATO-1658 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility FLOW STATION 1 Operator PHILLIPS ALASKA, INC. Field(s) EASTERN OPERATING AREA-PBU Montb/Year of Disposition Jutl-OQ Disposition *Indicate contribution of each pool to total. 1. Sold ~ ~ ~ 0 Pool Name Code Percent 2. Reinjected JtJ~ 13 2000 0 PRUDHOE 640150 100 Alas1(~1 I S s. nUS3t0i1 3. Flared or vented less than 1 hour 4C10hOf~8 6,747 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 11,667 5. Pilot and Purge 31,309 6. Used for lease operations Fuel Assist 661,544 4,470 7.Other 0 ................................................................ ................................................................ Official:~sz OirT ==Fla~iri :Ailthoriaatioii:~a i>r;::::« ::::::::::: TOTAL items 1- 7 715,737 1. Safety MCF 8. NGL gas equivalent produced 0 2. Lease Use ~' r~ ~ ~ ~ MCF 9. Purchased gas 0 3. Conserv. Proposes MCF 10. Transferred from: CGF 262,425 Commissioner Date 11. Transferred to: CCP 50,166,742 Note: All volumes must be corrected to Remarks: pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: ,,.~.,~' ,`~ ~~~, Title: SUPERVISOR month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) ~~z I/zZ%~. 06-00 FORM 10-422.x1s/FORM 10-422 ~~~~~~ ,lJL 13 20~~ Alaska Oi! ~ Gas Cotls.Commtssian PHILLIPS ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS FS-1 June-2000 AC1~Ola~B PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM 06/24/00 1248-0000 11,667 S/D T/C 1801 for maintenance; electrical/instrumentaticONPLANNED Instrumentation still working on problem. malfunction. Problems w/STV, IP recycle valve limit switch Standby compressor train found to be inoperable after troubleshooting. Replac ment parts for recycle valve unavailable and parts swap from standby unit requirE much time. Over 1 Hour/Over 5MM 11,667 Less 1 HR/Less 5MM 6,747 Total over/under 1 Hr/5MM 18,414 Pilot/Purge 31,309 Continuous Assist 4,470 TOTAL FLARED/VENTED 54,193 PBU PRODUCER'S REPORT OF GAS DISPOSITION Alaska Oil & Gas Conservation Comm Attn: Ms. Wendy Mahan 3001 Porcupine Drive Anchorage, Alaska 99501 Exxon Company USA Joint Interest Acctg. Tracie Hutzler, Rm 1419-L P. O. Box 4707 Houston, Texas 77210 Forcenergy Attn: Roy Richardson 3838 N. Causeway Blvd., Suite 2300 Metairie, LA 70002 Chevron U.S.A., Inc. Attn: NOVJ Manager P. O. Box 36366 Houston, Texas 77236 Chevron USA, Inc. Attn: Virgil Reyes P. O. Box J, Section 981 Concord, California 94524 Exxon/Mobil Oil Corporation Hazel Adams Suite 14C8 P. O. Box 650232 Dallas, Texas 75265-0232 Jeff Morvant ATO 1738 State of Alaska Oil and Gas Audit Division 550 W 7th Avenue, Suite 570 Anchorage, Alaska 99501-3557 Exxon Company USA Attn: Prudhoe Bay 91-0250 Topping Plant Houston, Texas 77210-4496 Phillips Petroleum Company Attn: Ms. Carol Kulchinski 1380 Plaza Office Bldg Bartlesville, Oklahoma 74004 Dianna Sommer ATO-1658 Davis/Deveau - PRB 6 Eliana Uribe Dept of Natural Resources Royalty Section 3601 "C" St. Suite 1380 Anchorage, AK 99501- BP Exploration, Inc. Attn: Mr. Gary Benson P. O. Box 196612 Anchorage, Alaska 99519-6612 ~~ ~1JL 13 2000 AlaNcal Oil d Gas Cons. Commission <~~aage _ ALASKA OIL AND GAS CONSERVATION COMMISSION ~~ ' FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility PLOW STATION 1 Operator PHILLIPS ALASKA, INC. Field(s) EASTERN OPERATING AREA-PBU Month/Year of Disposition ' 7u1'-(l~ Disposition *Indicate contribution of each pool to total. 1. Sold 0 Pool Name Code Percent 2. Reinjected 0 PRUDHOE 640150 100 pP ff^~ E's~1 ~7 s i.: i ~,i, 3. Flared or vented less than 1 hour 5,354 ~'3 W;1t7?"~ati 4. Flared or vented greater than 1 hour (Supplemental reponregmred--See 20 AAC 25.235) 20,077 5. Pilot and Purge 34,363 6. Used for lease operations Fuel Assist 564,377 5,616 7.Other 0 ................................................................ ................................................................ Offical:~Jse Qi~T =::=Fl~in :Aul~oi~iaatioii:~a iia::::::: >::::< ::::: TOTAL items 1 - 7 629,787 1. Safety ~ w~ ~ ~~ MCF 8. NGL gas equivalent produced 0 2. Lease Use ~~ ~ ~ MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: CGF 260,339 Commissioner Date 11. Transferred to: CCP 44,808,829 Note: All volumes must be corrected to Remarks: pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. r /~ ~~..~~/~'" F ~~--- Title: SUPERVISOR Signature: ~ ~ / month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revise 4/95) -;~~j~`j~, ~b ~v ~ ~ //~~~~- ~~ /~- 07-00 FORM 10-422.x1s/FORM 10-422 BP AMOCO CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS FS-1 July-2000 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM 7/10/00 0048-0150 242 Facility maintenance. Depressured the slugcatcher, PLANNED Completed the flaring. (See attached treater, IP separator for shut down work. See attached addendum) addendum) 7/13/00 0505-0650 19688 Process upset in Annex section of facility due to Annex UNPLANNED Shut in 2-1, 2-13, 2-19, 2-28, 2-34, 5-7, reboiler shutdown. Flare for CGF. (See attached 18-2 & 18-19 for Annex gas cut. addendum) (See attached addendum) 7/16/00 0711-0825 147 Startup affer combustion can inspection. PLANNED Facility maintenance completed. Starter (See attached addendum) TC 1803. (See attached addendum) Over 1 Hour/Over 5MM 20,077 ~ Less l HR/Less 5MM 5,354 ~ ~~~` ~' Total over/under 1 Hr/5MM 25,431 ~,. ^. ~ ~ ~~'~ Pilot/Purge 564,377 Continuous Assist 5,616 ppy~ ~~pp 3~~ ~ ~~~Y ~~~ ~•~~~ISS'°~~ c V .~:. G$1 ~~E+7 ~itq ~ '.-1 R~ '"4 ii . c ! ~ ( 9, ry TOTAL FLARED/VENTED 595,424 Aua-O1-00 07:38 From-PRB OPERATIONS 907-659-5061 ~ w oats e t e P rts_ ANC.. PRUD. ~Ot: f.3AYlGPNIA-M .~ Y FACtUTY: F81 iSate ~ Oootmenae: 711 nano Q Bore O vent (nnnl dyy) cc.~`ed` letecuon) Tata1 Volume FleraOa Y42 M$GF ~~ O BBL5 Mpt9r o.t FaaFfi m ^ ~°"'~ ~ (Ctieric Select u1? ~ per. paa llatgd waa pnrri A upstroan- ^ Aown~ern t ~'~) of Tffic~ eonmonor merer ar ~ T-000 P.12/17 F-209 Pbli~ NO. g-ARp~li t Tmre of OcccrrV~QACB' i ~:Od ~ i Front; aa~oa Ta: o~~ ~ m-a2 „ -- Pram: ~ ~ To: From: Ta: ..,,..--. _ ~_~ Front: ~~ To: .__r.. ®.~.~ From: ~~ To: .,_,~,_,,.~. Fes; _ To: ,_.~...,.. -- - Tgtn) Mlntltes Flared: ~ o~~, (/rs VGrltlit6 !-ansd V4d-1~ ge-n9rated bler~ sr»Wrm, if spp1 A. Cesaripllon of Irteldotn and (Cheek as ~tl1 as trooded 1b tuAy gcser ~e the lncidenq S!Q Tlt~ ~„~~~ ~ ~^ "-'""T"'°~ Y~ $D due w hi6h exhanabt ~~ -- ,~ oil a ~~~- ~-' EMERGEIdI:Y 5liLiTDOWN ~""-' Eft t lnstrumenleike+ enalkat~t -~'- Eteobic+t / f~tian maMUnedon ~ ~-- at other isaiittl (T~C1) -'-- trtddng CPFlPICMt 8mdan out -'- prceaslvalinsulli~antinlalgaS ~DSS kKa 1'ACJllgl 8. Acgpn Taken llto E nfG++•te Gam etul i'rbve~ ReaA1®nce: (Check and dead iba as ipp) restatt~ T/C ~ -- - ~ ---1- ---- ~~ssoYlifB'r~depn~sul+ed ~~' Redtaced 1 hsoreased inlet !)ss rates ~~~. Completed Aare r.~....~.---. `-'-'- Cgry+sated E8d fluduation / faaure X ~"" Carretted E8i lktduat9ort I t~ure , at other fadflgr i'i~) ,~ Pfd inttioetK cause bleak smoke? Yes: ^ No: ~ (If Yes, cbralrtue vrtltt triis seotl~+n) Yes: ^ No: [] Did irtcitiertt present a po0andsl throat to hlsttan health ar saf®ty't lff Yes, DgPors !o FEC ss soon as posslk>~.1~ ~ ropoR to ADEC w) h ?4 trotus.) lfla~ ~itaks emitted from ~ (entertag rnlm~r and descriptlan) Nopf~i ACItrC by Fax an: .~tt8 76 ~1 1~ie rtaport tiro #ofloteln8 Information to ADC 24 hoofs ~1-.E9_.i~ pate and time of blsclc smoke svern: Frain: To: - - 6BL& Vowme flared vVitlch generated blas~c sincke tIf d)fi'el~ ram above): TJISirF pmt of srops to minirti~e emf&sions= i3oe Saakion.i3. dbaitr9- • ~ J 'type of materials burned: des: NGLs: _ __,__,___ ~~ Ger-eralVYeaUler! AlrTemperadata: ~fndSpe- _ - i•tarrrA and phone rp~mber of pe~+ making the roP~ _-. F'horta Na. Name - ~ ~. ~ ee~..h. ~n at the statemerns and irfiormatian in and attached to this. dtxwmettt are Mrs, Facil[ty sWpervlaor ~,pMq gyrations F1tg Tetdgtlt'~1 Aide. Kuparula Field Enlardai Compfianoe Cc+i Rfinators. N5K B1 {flare pas and ptaaK ~rioloa irtr~dt) Process upset in ,~ - 6ett{oR Of l Flaring for tldMEita ShtNdOUNi ~ tuartup t'd9re sYa9mn i~ng Faulty €Iten on l~tlllq- ~ High ambient {~„p,~aunes. SID on high vibration Gttrer: tined ltt® SI r• Treater. IP :;;anaratar r shut doom "" vwaic $tab~d isciUiY prtx:ess ~ aPera[ion Repaied equipment dliflcUfdee ttlldt Facrlity maintenanw e,om"' p ~ CoRtpletsd the goring .,~ - - -- ~OC sor, PRB B ~ t~ ~ ~~ sr bke Inddent~ Fick! Envlranmentat Comp~ianee Geerdlns:are, 'RS 7 (Bleak t3moke irtcidettts ot8y) PBUlGPMR FOald Managers. (81adt smoke into Isms only) ATO 47'7) (t3t'MA ropes ~Y eimal r swm-aas szewxew •e ua °~zooo upaaao~ FEC eiae Au~01-OD 07:38 From-PRB OPERATIONS 907-659-5061 T-000 P.13/17 F-209 • - ~~ f evel before Before After Volume r Veal Name Flare (9i;) F grins (Ps~B? Flaring (P~i9) MscF; Glycol Contactor 0 0.0 ~tesidue Gas Scrubber Q 0.0 Glycol KO Drum p o•Q Glycol Contactor p 0.0 Residue Gas Scrubber 0 0.0 I II Sucfiion Scrubber o 0.0 STw SuC#~c~n Scrubber o 0.0 Glycol K© Drum ~ Q Q.p ~ ~ Fuel Gas KO Drum 0 O.tl HP Separator 0 p Q D.0 HP has Scrubber Hp Scrubber Liq. Pot Q 0 Q Q.Q 0 0 0 0.~ Treater 4Q ~5 Q 22.5 IP Separa#or ~5 ~ 1~5 0 Z2.1 Treater Flash []rum 0 Q•Q CHD Flash Drum D Q-0 Cnade Surge Drum 0 0.0 Produced Water Drum Q Q•0 Heat Medium Exp. Drum 0 p'p pul~I Gas Mixing Drum o 0.0 LPS Fuel Gas KO Drum Waste Neat Med. Surge Dru Bldg, Heat Med. Surge Dru LPS Suction Scrubber 0 p.0 m p•p m Q,0 p p'p 5lugcatcher 24 . , 1 ap Q ~ g~,3 'i-B Commonline p 0 0.0 1-D Commonline p 0 p'p 'l~-C Commonline 0 p ~ O.o 2-~ Commonline o o p.p 0 2-D Commonline 0 0 0' ~ a 0 2-C Commonline p 0 ' ~-E Commonline D 0 0.0 ~B Commonline p o 0.0 5-D Commonline 0 0 D.0 12-8 GommQnline 0 0 Q 0 12~C Commonline . 0 Q 0 0 "f S-B Commonline . Q 0 0 0 16-D Commonline . p 0 Q 0 Tie-L'me(Total) Q 0 . Total ZA~2.ID ., Aur<-01-DO 07:96 From-PRB OPERATIONS p ARCO• 907-659-5061 t tdl{~V VAV •41 {{t~Y {u.~ r~~• IKA, INC. • PROD ~IQE? BAYIGPMAIF FACIt.17'Y: FS1 T-000 P.07/17 F-209 PERMIT M0. 9279-AA07T 71i3r~ ~ ~re Q ~ paw of Occurrence: (mmldd/yy) (check ;efectiorr) Total Volume Flared: 18,88$ MSCF BBLS Meter No.: 19a 8 Facility) Q PiarrK+d 1] uepmr>n A (Check Sales an) ~,~umQ pnly- t;as flared was from ^ upstteadl ^ tlowns<rean fG,xk or+e) ,~TEG ~,taceormererat LPCI Tlmo of Occurrence: °°:o0 2aoo MinlriQt: From: 05:05 To: 06:W = g1:4s From: To: = oo:oa From: To: = go;oo ~ From: 70: ~- .•oa = oo From: To: -- _ _ oo:oo .-- : F .., ~= To: = qq:~ rom ~~ Total tflinutes Flared: - 01.45 (Includes volume flared wnkh generated bieGk s-no-ce, if applk~bla) A. pescrlptlon ~ InciderR aed Cause: (Check as marry as ne6ded to fully descr so pre lncidert) SIP TH;it for _ ~_-_ TIC SD due SQ high exhaust temperature Seal dl system difficulties -.--~-- ~"'^ EM@RGENCY SHUTDOWN "'-- Etearlcai ! inetrurnen#ation malfunction _---.-. -'-'~ E1ertrical / InsMUmeritatlon maifuncUcn - .,.~-~- at other iaCinhr fr&~? jt - -- Gas transit ouerpiess-n'e - bacltlry CPF/Flo~w Statia- cut -'"""~ sive ! kfsutllMdent Inlet gas rates Into facility ~..r- B. Amon Taken to Ellminates~~ /restarted T~ #~~ (Check sect deed ~ ~ applicable) Compressor 1 train delirassured "'~'- Reduced !increased irdei gas rates __- ---"" Gompisted flare testing -- ---- Corrected E$~I fluctuagOn / fallure ~ -"-^- Corrected E8:1 fluctuation ! failure ~- at other facility (T8;D) Process upset in Annex section of faduty Fig for dAnsiteshutdown /stamp Flare system testing Faulty shutdown ot1 Facility mairrterrarwe High art~,lent temperatures. S/p on high vibration Other: Amrex Reboiler shutdown- Flare for CGF. Stabilized fddlUy process and operation Repaired equipment difficulties with Facility maintenance completed Other. Shut in 2-i, 2-13, 2-19, 2-28. 2-34 5-7 q 8,2 & 'I &19 for Annex gas cut. Dk@ pld inaderri cause black smoke? Yes: ^ No: ^ (If YeYeCorlti~ with ih:S ~N4: ^ Did inddent print a potential quest to human health or safet~i (If Yes, report to FEC as soon as possible. tf No, repaR to ADEC wh : ~ hOY~ eAt9r tag nrtn-ber and description) Black smoke emitted tram source: ;Rme, Notified ApEC by Fax on: t7ate: 907 Z69 751 8 . Report the following iaforrrfafJon to ApEC within Z4 hours BY FAX ( }. 70: Date and dine of black smoke event: From: M$CF BBLS Volume flared which generated blast smoke (N ditMrent from above): ~,.....__ -- Descriptian of steps to minimize emissions: See Section B, above- ~~ Type of materials berried: Gas: NGLs: General Weather. Air Temperature: 1 find SpeedlDireotiorl: Name and phar~ number of Person makhtg the report: Name Phone No. , d the statements Arid iMormation in and attached io this Bases on mrvrmausn~ d,ti w documem are true, secure complete: Facility Supervisor Pain ~ y rr F.OC Supervisor, PRB 6 (flare gas and black err eke Inddents) Feld F~rvitonmental Compliance Coordinators, I ~IRB 9 (Blast Smoke incidents only) P fil,UCaPMA Field Managers, (Black smoke inac ants only) GPMA Operagons Engineering Technical Aide, GPMA reports ony - ATO ~F77) ituparuk: Field Environmental Compliance Coo tlinatgr8, NSK 81 (flare gas and black smoke inrkterrts) P:u3rouPslEmirorKn°~F°r"'e~ SpiIF~ f F~7-A-06.sW dlsf< Lrrfdeted fEC 8198 Aug-01-00 07:37 _~ From-PRB OPERATIONS 907-659-5061 Flow Station On :Flaring Event T-000 P.09/17 F-209 7/'i 3/00 FS9 03:'I 5 hours: Annex Reboiler shutdown. Wa, dd not restart. Caked out Instrument techs. 05.05: Started flaring off the Annex per E.O.+ :. for C.G.F. pg:00: Shut in wells 2-1, 2-13, 2-19, 2-28, 2-~ +4, 5-7, 98-2 and 18-"t9 for Annex gas cut. ~ a1 p6:50: Off flare. 1107/13/00 1 Q Auk-01-00 07:37 ; From-PRB OPERATIONS 907-659-5061 T-000 P.09/17 F-209 ~'~-'~ Calcufa#i~~ns Chap ARCU ~ Shoat flumtfer Subject File By Date ~~ '~~ .~ a~~~ .~ ~..~ , ~---1~ r. ~ 7 ~ ~- ~.. ~~ ~~ - .. ~~ w~ •• w r+~ .. r ~ W~" .rte ... . ~~ r.... ~"r' ... . . ~~ /~ "`~ 2~~ ~ •--~ .. . ~7:~~ G~ Gar QUALITY LR}l0 PAIMIN~3, /1{VCFIDRA0E AK (~ per, 4749 ~: $ ~ ~ ~. p-°~ ~,~i~ry i ~i ~~~~ ~;~~~ ~F1+ Vii. ;+t'-` - ~'~. ~.ede.~;a S~a:u~Et • ~ . ,ss~se~i Auk-16-00 09:03 From-PR8 OPERATIpNS 907-659-5061 T-084 P.02102 F-320 _.~ ~~ Flaw Station Qn :Flaring Event 71'I 6100 FS1 07:11 hours: 1803 Turbine Compressor gives ~ a start command fallowing hot gas path inspection. Night shift tried to start 1803 the ~reviaus shift, but it would nQt complete the cycle due to limit switch problems with P- ?1~V, pressurizing valve. 1803 Turbine Compressor went into fuN purg : c cie as the compressor case was below minimum pressure. Full purge cycle continue s for 45 minutes, actual time for purge valve opening, plus time during the purge see luence when the valves are closed, but the flare header is still pressured-up and we ire still flaring. During the purge cycle, instrumentation technicians repaired P-21 1/, extending the time of the normal purge cycle. 08:25: 1803 Turbine Compressor completed Mart-up purge cycle; flare header de- pressured and we were off flare. r ~ ~~ r BP AMOCO CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS FS-1 July-2000 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM 7/10/00 0048-0150 242 Facility maintenance. Depressured the slugcatcher, PLANNED Completed the flaring. (See attached treater, IP separator for shut down work. See attached addendum) addendum) 7/13/00 0505-0650 19688 Process upset in Annex section of facility due to Annex UNPLANNED Shut in 2-1, 2-13, 2-19, 2-28, 2-34, 5-7, reboiler shutdown. Flare for CGF. (See attached 18-2 & 18-19 for Annex gas cut. addendum) (See attached addendum) 7/16/00 0711-0825 147 Startup after combustion can inspection, PLANNED Facility maintenance completed. Starter (See attached addendum) TC 1803, (See attached addendum) Over 1 Hour/Over 5MM 20,077 Less 1 HR/Less 5MM 5,354 Total over/under 1 Hr/5MM 25,431 Pilot/Purge 34,363 Continuous Assist 5,616 TOTAL FLARED/VENTED 65,410 PHILLIPS PHILLIPS Alaska, Inc. ~ ~ A Subsidiary of PHILLIPS PETROLEUM COMPANY September 14, 2000 Post Office Box 100360 Anchorage, AK 99510-0360 Telephone 907-276-1215 To: Recipients of the Producer's Report of Gas Disposition The July `Gas Flaring or Venting Incidences Report', for The Central Gas Facility and Flow Stations 1, 2, and 3 which were attached to the Gas Disposition Report had incorrect Pilot/Purge amounts. Please substitute this copy for that report. I apologize for any inconvenience this may have caused. If you have any questions, please contact me at (907) 265-6065. Sincerely, ~~ _ ... ~..~.~ . ,;;~~,~Gi-- p:.. F- , Jim Coburn Production and Revenue Accounting ~~ ~F~ ~ 9 ~ooa ,~~~~~~ ~` ~ .~ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility FLOW STATION 1 Operator PHII.LIPS ALASKA, INC. Field(s) EASTERN OPERATING AREA-PBU Month/Year of Disposition Aug-00 Disposition *Indicate contribution of each pool to total. 1. Sold 0 Pool Name Code Percent 2. Reinjected 0 PRUDHOE 640150 100 3. Flared or vented less than 1 hour 2,063 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 6,535 5. Pilot and Purge 34,921 6. Used for lease operations Fuel Assist 654,488 1,382 7.Other 0 ................................................................ nffcial:Us:~ Qi>1 =::=Flavin :Au~oriaafioii:~:~~iu:?< ::::::: >:::::: TOTAL items 1- 7 699,389 1. Safety MCF 8. NGL gas equivalent produced 0 2. Lease Use ~1 a~ j ~ ~ j~ MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: CGF 267,248 Commissioner Date 11. Transferred to: CCP 46,897,897 Note: All volumes must be corrected to Remarks: pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: J~~~ ~/ ~ Title: SUPERVISOR month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 wed 4/95) ~~ ~~~~~z. 08-00 FORM 10-422.x1s/FORM 10-422 ~ r ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS FS-1 August-2000 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM 08/03/00 1215-1615 3,167 T/C 1801 shutdown to high exhaust temperature. UNPLANNED Instrumentation calibrted T/C 1801 exhaust high temp switch, 1802 problem with IP seal oil DP switch. 08/06/00 0853-1134 3,368 High ambient temperatures. Flared off the Slugcatcher UNPLANNED Pinch the choke on wells 5-9,18-28,5-24, (Intermittent-87 min.) 1-6,1-3, Shut inn wells 1-3, 12-13 Over 1 Hour/Over 5MM 6,535 Less 1 HR/Less 5MM 2,063 Total over/under 1 Hr/5MM 8,598 Pilot/Purge 34,921 Continuous Assist 1,382 TOTAL FLARED/VENTED 44,901 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility FLOW STATION 1 Operator PHILLIPS ALASKA, INC. Field(s) EASTERN OPERATING AREA-PBU Month/Year of Disposition Se ~-00 Disposition *Indicate contribution of each pool to total. 1. Sold 0 Pool Name Code Percent 2. Reinjected 0 ~;t~? PRUDHOE 640150 100 3. Flared or vented less than 1 hour o ~4.1~-T 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) -&--- i `~+ 5. Pilot and Purge 33,302 6. Used for lease operations Fuel Assist 657,333 91 7. Other 0 ................................................................ ................................................................ OfficaL~s:e 0ii1~=::=FL-ii'ii :Auilio~iaatio~:>:f ir; ::::::::::::::::: TOTAL items 1 - 7 697,153 1. Safety MCF 8. NGL gas equivalent produced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: CGF 259,412 Commissioner Date 11. Transferred to: CCP 51,504,246 Note: All volumes must be corrected to Remarks: pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. ` /%t/O° Signature: _~o~~ ~``~ Title: SUPERVISOR month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) ~1 ~~ f1 ~ 09-00 FORM 10-422.x1s/FORM 10-422 ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS FS-1 September-2000 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM 09/30/00 2000-2038 5,278 CGF Tandem 1885 went down. Gas transit system UNPAANNED Restarted TC 1885 Tandem. overpressure backing Flow Station out. Flared off the annex. Over 1 Hour/Over 5MM 5,278 Less 1 HR/Less 5MM 1,149 Total over/under 1 Hr/5MM 6,427 Pilot/Purge 33,302 Continuous Assist 91 TOTAL FLARED/VENTED 39,820 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility FLOW STATION 1 Operator PHILLIPS ALASKA, INC. Field(s) EASTERN OPERATING AREA-PBU Month/Year of Disposition (pct-~U Disposition *Indicate contribution of each pool to total. 1. Sold 0 Pool Name Code Percent 2. Reinjected 0 PRUDHOE 640150 100 3. Flared or vented less than 1 hour 6,017 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 5,072 5. Pilot and Purge 32,552 6. Used for lease operations Fuel Assist 711,673 32 7. Other 0 ................................................................ ................................................................ Official.Us:e Onl .-:=Flaring:Authorizafioh ~:l iir.>:: TOTAL items 1 - 7 755,346 1. Safety ~ ~ ~ ~ MCF 8. NGL gas equivalent produced 0 2. Lease Use y MCF ~`~~ 9. Purchased gas 0 3. Conserv. Purposes MCF l0. Transferred from: CGF 280,925 ~ ~~ ~~i~~o'~- ` mmissi Date Co 11. Transferred to: CCP 59,736,976 Note: All volumes must be corrected to Remarks: pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. n / ~/// g~CTr- Signature: ~~~.U~Y.~ Title: SUPERVISOR month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) /l~~~Q 'L 10-00 FORM 10-422.x15/FORM 10-422 ARCO ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS FS-1 October-2000 DATE TIME VOLUME MCF PLANNED DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM 10/2//00 0620-0806 3,663 Gas transit system overpressure backing CPF/Flow UNPLANNED Completed Flaring affer CGF restarted Station out. Flared off the Annex due to 1885 Tandem 1885 Tandem. shutdown at CGF, per EOC request. 10/07/00 0440-0545 617 Facility maintenance. Depressured 18D for maintenanc PLANNED Facility maintenance completed. at drill site. 10/07/00 1005-1212 792 Facility maintenace. Depressured 12C for maintenancE PLANNED Facility maintenance completed. flow station. Over 1 Hour/Over 5MM 5,072 Less 1 HR/Less 5MM 6,017 Total over/under 1 Hr/5MM 11,089 Pilot/Purge 32,552 Continuous Assist 32 TOTAL FLARED/VENTED 43,673 J ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition FLOW STATION 1 PHILLIPS ALASKA, INC. EASTERN OPERATING AREA-PBU Nov-00 Disposition 1. sold o 2. Reinjected 0 3. Flared or vented less than 1 hour 560 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 6,778 5. Pilot and Purge 30,040 6. Used for lease operations Fuel Assist 730,811 0 7. Other 0 TOTAL items 1 - 7 768,189 8. NGL gas equivalent produced 0 9. Purchased gas p 10. Transferred from: CGF 282,235 11. Transferred to: CCP 56,920,075 Remarks: Thereby certify that the foregoing is true/and correct to ,the/best of my knowledge. Signature: P~'G%! -~'t''~"~ Title: SUPERVISOR Form 10-422 (Revised 4/95) ~Z// ~ 11-00 FORM 10-422.x1s/FORM 10-422 *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150. 100 Olficial Use Only--Flaring Authurii.ation > I hr. 1. Safety % -~ ~ ~~ MCF Y 2. Lease Use MCF 3. Conserv. Purposes MCF 1..~. '~ f Commissione~ r v ~ ~`f l S'~o }- ~ Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of ~' 60 degrees F. Report due by the 20th of the 0 =~ ~ month following the month of disposition. ~ ~ ~ Authority 20 AAC 25.235. ~ ~ o cy -+ QU /!/p..' C 3 n"~ Gi ARCO ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS FS-1 November-2000 DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM 11/11/00 1730-1850 5,494 CGF lost booster 1857 (automation problem) Unplanned Restarted turbine; first start 1730 hrs.; second start 1815 hrs. 11/17/00 1244-1402 1,284 1802 T/C shutdown due to high inlet air differential press Unplanned Restarted 1802 on second try. Over 1 Hour/Over 5MM 6,778 Less 1 HR/Less 5MM 560 Total over/under 1 Hr/5MM 7,338 Pilot/Purge 30,040 Continuous Assist TOTAL FLARED/VENTED 37,378 a k co ~, ~ 4 "' iL7 r'7' ~ ~ t ) I ~~ n y r'V O ~ Q ~~ 3 ca y~ ~• PBU PRODUCER'S REPORT OF GAS DISPOSITION Alaska Oil & Gas Conservation Comm Attn: Ms. Wendy Mahan 3001 Porcupine Drive Anchorage, Alaska 99501 Exxon Company USA Joint Interest Acctg. Tracie Hutzler, Rm 1419-L P. O. Box 4707 Houston, Texas 77210 Forcenergy Attn: Roy Richardson 3838 N. Causeway Blvd., Suite 2300 Metairie, LA 70002 Chevron U.S.A., Inc. Attn: NOVJ Manager P. O. Box 36366 Houston, Texas 77236 Chevron USA, Inc. Attn: Virgil Reyes P. O. Box J, Section 981 Concord, California 94524 BP Exploration, Inc. Attn: Dianna Sommer MB7-2 P. O. Box 196612 Anchorage, Alaska 99519-6612 Jeff Morvant PD 807 State of Alaska Oil and Gas Audit Division 550 W 7th Avenue, Suite 570 Anchorage, Alaska 99501-3557 Exxon Company USA Attn: Prudhoe Bay 91-0250 Topping Plant Houston, Texas 77210-4496 Phillips Petroleum Company Attn: Ms. Carol Kulchinski 1380 Plaza Office Bldg Bartlesville, Oklahoma 74004 Davis/Deveau - PRB 6 Eliana Uribe Dept of Natural Resources Royalty Section 3601 "C" St. Suite 1380 Anchorage, AK 99501- BP Exploration, Inc. Attn: Mr. Gary Benson P. O. Box 196612 Anchorage, Alaska 99519-6612 RECEIVED pEC ~ ~ 24p~ Alaska Oil ~ Gas Cons. Commission Anchorage - _ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) ' ' Month/Year of Disposition FLOW STATION 1 PHILLIPS ALASKA, INC. EASTERN OPERATING AREA-PBU I~ec -OQ Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour 1,246 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 23,887 6. Used for lease operations Fuel Assist 782,809 71 7.Other 0 TOTAL items 1 - 7 808,013 8. NGL gas equivalent produced 0 9. Purchased gas p 10. Transferred from: CGF 296,203 11. Transferred to: CCP 61,450,156 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: ~~~~~/(,~y.G"'^~ Title: SUPERVISOR Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100 Official Use Only Flaring Authgrization > l hr. 1. Safety ,/ MCF 2. Lease Use MCF 3. Conserv. Purposes MCF D. Commissioner Date ,~ ~~~ , ~~~.~`~v x Note: All volumes must be corrected to ~ ~ '~"' pressure of 14.65 psia and to a temperature of ~ ~ ~ 60 degrees F. Report due by the 20th of the o n >-~ month following the month of disposition ~ y ~ ~ Authority 20 AAC 25.235. o rv ' o o' 12-00 FORM 10-422.x1s/FORM 10-422 ARCO ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS FS-1 December-2000 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM Over 1 Hour/Over 5MM 0 Less 1 HR/less 5MM 1,246 Total over/under 1 Hr/5MM 1,246 Pilot/Purge 23,887 Continuous Assist 71 TOTAL FLARED/VENTED 25,204 b n~ y N °'~7 O iJV~ n ~~ n y Z O n d d f..,~ c~D ti OO +.r,.., O n3 _~_ ~ ~. ~ y O