Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPHILLIPS - FS #2GAS DISPOSITION FILES
Field ~~
Ph.II;Ps
2000
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILIrI'Y REPORT OF PRODUCED GAS DISPOSITION
Facility
FLORA STA"LION 2 Operator
ARCO ALASKA, INC. Field(s)
EASTERN OPERATING AREA-PBU Month/Year of Disposifion
Jan 00
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 4,790
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 19,055
6. Used for lease operations Fuel
Assist 830,406
2
7. Other 0
bfficiaiUse bniy F~anng Autharizati,an> I:hr.:
TOTAL items 1 - 7 854,253 1. Safety MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: CGF 392,895
Commissioner Date
11. Transferred to: CCP 24,684,451
ote: vo umes must e correcte to
Remarks: pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge.
.
Signature: ~,~ 1,~ ~ Title: MANAGER month following the month of dis>~r
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95) ~ ~ V ~ v
01-00 FORM 10-422.x1s/FORM 10-422 ~11 ~+~ QI~ ~ GaS CGC1S. (~i01'CItTi1SS~q[1
lli~QF
Af1C~1C1'1t~C
`i
%~2~1
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS fLARING OR VENTING INCIDENTS
FS-2
January-2000
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
Over 1 Hour/Over 5MM
Less 1 HR/Less 5MM
Total over/under 1 Hr/5MM
Pilot/Purge
Continuous Assist
TOTAL FLARED/VENTED
0
4,790
4,790
19,055
2
23,847
~ ....'J ~ .~ L4`1'~
~1Y~1 VI~ 1~, j~tt1~315f/G'~~ ~i61t131w~V~~6e
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
~cility
FLOW STATION 2 Operator
ARCO ALASKA, INC. Field(s)
EASTERN OPERATING AREA-PBU Month/Year of Disposition
Feb-00
Disposition *Indicate contribution of eachpool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 3,310
4. Flared or vented greater than 1 hour
(Supplemental report requn~ed--See 20 AAC 25.235) 3,080
5. Pilot and Purge 17,788
6. Used for lease operations Fuel
Assist 771,049
1
7. Other 0
bffieal Use Oniy--Flaring: Authgrizatiun > 1 lit.
TOTAL items 1 - 7 795,228 1. Safety ~ ~ ~~ MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas ~~~~ ry O 0 3. Conserv. Purposes MCF
10. Transferred from: CGF ~~+~~~ ~_~ ~L~'cC ~'rQ11S• ~~11[~li~~~~
!~ Qf€~ .362,672
Commissioner Date
11. Transferred to: CCP 23,300,871
ote: vo umes must correcte to
Remarks: pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~ Title: MANAGER month following the month of disposition.
Authority 20 AAC 25.235.
°~1~
~~z~C~-
Form 10-422 (Revised 4/95'"' >~
02-00 FORM 10-422.x1s/FORM 10-422
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
FS-2
February-2000
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
02/02/00 2254-2335 620 Gas transit system overpressure backing FS out
2338-2359
02/04/00 1912-2045 930 Gas transit system overpressure backing FS out
02/04/00 0358-0546
(Intermittent-93 min)
02/08/00 1851-2012
(Intermittent-60 min)
Over 1 Hour/Over 5MM
Less 1 HR/Less 5MM
Total over/under 1 Hr/5MM
Pilot/Purge
Continuous Assist
TOTAL FLARED/VENTED
Rapid rise in ambient temp, -1 OF to 24F
930 Gas transit system overpressure backing FS out
Rapid rise in ambient temp, -1 OF to 24F
600 Gas transit system overpressure backing FS out
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
UNPLANNED Reduced inlet gas rates. Cut 4-1 & 4-30 tc
minimum, cut 4-35 and 4-26.
UNPLANNED Reduced inlet gas rates. S/I 4-3, 4-26,
11-18 to minimum.
UNPLANNED Reduced inlet gas rates. Pinched back
9-32/33, 4-26, 4-30, 4-35, 4-3.
UNPLANNED Reduced inlet gas rates. EOC cut FSI,
reduced chokes to min on 4-1, 4-30, 4-35.
11-38, 11-3, 11-24, 11-18 & 9-35.
3,080
3,310
6,390
17,788
1 ~~~~ ~ ~ Zl~~~
2a,179 F~asica ~7sd ~aa ~c~ns. ~~~~n;s3i~0
~~
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
FLOW STATION 2 Operator
ARCO ALASKA, INC. Field(s)
EASTERN OPERATING AREA-PBU Monih/Year of Disposition
MA s.. ~e1r00
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected ~ 0 PRUDHOE 640150 100
3. Flared or vented less than 1 hour APR ~ 7 200a 2,610
4. Flared or vented greater than 1 hour A~as~a Oii ~ Gas ~~'Sp'~~~'m~~~p~
(Supplemental report required--See 20 AAC 25.235) ~1l1(~~}~ 680
5. Pilot and Purge 19,002
6. Used for lease operations Fuel
Assist 802,575
1
7. Other
0 ................................................................
(3fftoial:Use Otily-:F'iaiylig:Aut]torizatioit:~a lii~ :::::::::::::::::::
TOTAL items 1 - 7 824,868 1. Safety ~~ ~='~i MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: CGF 386,266
Commissioner Date
11. Transferred to: CCP 24,743,859
ote: vo umes must correcte to
Remarks: pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~~. Title: MANAGER month following the month of disposition.
Authority 20 AAC 25.235.
,.j~`~rrJ.y
`~~ ~ ~-
Form 10-422 (Revised 4/95) `~ `~
03-00 FORM 10-422.x1s/FORM 10-422
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
FS-2
March-2000
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
03/09/00 0103-0225 680 Gas transit system backing FS out. CGF lost Booster UNPLANNED Reduced inlet gas rates. Reduced choke
(Intermittent- 68 min) and MI Compressor to minimum on 4-1, 11-18, and 11-38.
Over 1 Hour/Over 5MM 680
Less 1 HR/Less 5MM 2,610
Total over/under 1 Hr/5MM 3,290
Pilot/Purge 19,002
Continuous Assist 1
APR ~ 7 2000
Alaska Gil ~ Gas Cons. Commission
AtI0110~c1C~
TOTAL FLARED/VENTED 22,293
`'° ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
FLOW STATION 2 Operator
PHILLIPS ALASKA, INC. Field(s)
EASTERN OPERATING AREA-PBU Month/Year of Disposition
Apr-00
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 3,599
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 2,090
5. Pilot and Purge 18,438
6. Used for lease operations Fuel
Assist 826,862
209
7. Other 0
OfficialUst;.Only::Fiaring:Authorizauott y L lir. ..
TOTAL items 1 - 7 851,198 1. Safety ~ ri % l7 MCF
8. NGL gas equivalentproduced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: CGF 378,767
Commissioner Date
11. Transferred to: CCP 23,431,235
ore: vo umes must a correcte to
Remarks: pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: Title: MANAGER month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
.Ary
/' ~2~G2i.
04-00 FORM 10-422.x1s/FORM 10-422
.ti
DATE
TIME VOLUME MCF
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
FS-2
April-2000
PLANNED
DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
04/03/00 1346-1449 730 Excessive inlet gas rates into facility. UNPLANNED Reduced inlet gas rates. Cut 4-49, 11-9,
1455-1505 3-22m11-38, 11-3, 11-13 to min choke.
EOC cutting at FSI, FS3.
04/05/00 2143-2300 740 Gas transit system backing FS out. UNPLANNED CCP to increase speed on T/C. EOC cut
250 MMCFD East/West.
04/14/00 0441-0559 620 Gas transit system overpressure backing Flow Station UNPLANNED Reduced inlet gas rates. Shut in 11-9.
(Intermittent - 62 min.) out. Gas rates swinging due to WOA cycle well swaps. Cut to minimum 9-13 and 3-28.
Over 1 Hour/Over 5MM 2,090
Less 1 HR/Less 5MM 3,599
Total over/under 1 Hr/5MM 5,689
Pilot/Purge 18,438
Continuous Assist 209
TOTAL FLARED/VENTED 24,336
- ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
FLOW STATION 2 Operator
PHILLIPS ALASKA, INC. Field(s)
EASTERN OPERATING AREA-PBU Month/Year of Disposition
May-00
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 3,301
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 630
5. Pilot and Purge 18,991
6. Used for lease operations Fuel
Assist 820,813
4,705
7. Other
0 ................................................................
Offic~la_Tse Only=.-Flarmg:Autlroiizafion:~a hr ::: ':::< ::: >:::::
TOTAL items 1- 7 848,440 1. Safety ~ ~ G~ MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: CGF 388,870
Commissioner Date
11. Transferred to: CCP 23,876,933
ote: vo umes must e correcte to
Remarks: pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge.
-~
Signature: '~,. Title: MANAGER
'; month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
`~`~~
i ~~'~~°~~ z-
05-00 FORM 10-422.x15/FORM 70-422
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
FS-2
May-2000
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
05/05/00 0507-0557 630 Gas transit system overpressure backing FS out,
0558-0611 Excessive inlet gas rates into facility. CCP 1810 HS S/D
due to leak on fuel ring.
Over 1 Hour/Over 5MM 630
Less 1 HR/Less 5MM 3,301
Total over/under 1 Hr/5MM 3,931
Pilot/Purge 18,991
Continuous Assist 4,705
TOTAL FLARED/VENTED 27,627
UNPLANNED Reduced inlet gas rates. FS2 S/I 11-38,
11-34/5, 11-3. FS1 S/I 18-18, 18-21, 2-l,
18-20, 5-23, 2-7, 5-11, 18-19, 2-19, 2-16.
n
I ;~
~~=~~~ ~~, ALASKA OIL AND GAS CONSERVATION COMMISSION
'"" ""~ FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility ~~ 1 3 ZD~Q
FLOW STATION 2 Operator
PHILLIPS ALASKA, INC. Field(s)
EASTERN OPERATING AREA-PBU Month/Year of Disposition
Tun-00
Ala~ks Oil & Gas •oS, on *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100
3. Flared or vented less than 1 hour ~ ~3~ 4i~ ~ ~ ~1 ~~
4. Flared or vented greater than 1 hour t
(Supplemental report required--See 20 AAC 25.235) /~ .u - (v"'" 4;96§- `~ 7/ `~ ~~
I k?~ ~
5. Pilot and Purge 18,878
6. Used for lease operations Fuel
Assist 739,414
1,234
7. Other
0 ................................................................
OfficjaLUse 0iilp-:-~7aring:Authoiizafion:~a it ::::< ::::::::::::
TOTAL items 1 - 7 814,005 1. Safety MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: CGF 358,208
Commissioner Date
11. Transferred to: CCP 21,542,605
ote: vo umes must e correcte to
Remarks: pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~~ Title: SUPERVISOR month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
06-00 FORM 10-422.x1s/FORM 10-422
~"~~~~
,.~~JL i 3 Z00~
~Iaaka Oit 8~ Gas Cans. Come
~~~~~~e
PHILLIPS ALASKA, INC.
CONSERVATION ORDER NO.219
GAS FLARING OR VENTING INCIDENTS
FS-2
June-2000
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HO UR and/or GREATER THAN 5MM
06/20/00 1945-2227 27,695 T/C SD due to high exhaust temp 1804 UNPLANNED Reduced inlet gas rates, Cut 250 MM at
(Intermittent-165 min) all DS's. See attached list of wells.
06/22/00 1637-1712 6,500 Lost cooling medium causing 1804 SD UNPLANNED Shut in CL 3C, 9E plus numerous well at
other DS
06/22/00 1713-1948 1,150 Flaring for 1804 shutdown attemping to restart UNPLANNED Cutting more wells, 9-1,9-43,9-44,9-45,4-4~
4-40,4-48,4-32,11-22,11-16,4-22,9-9,4-39.
06/22/00 1014-1233 1,220 Gas transit system backing FS out. Ambient temp UNPIANNED Reduced inlet gas rates. S/I 11-24, 11-5/;:
(i ntermittent-122 min) increasing 9-1, 9-43,11-6; Master choke moved to
minimum.
06/28/00 0001-0104 11,000 T/C 1803 SD due to high exhaust temperature UNPLANNED Reduced inlet gas rates. S/I 3-28, 3-29,
3-32, 3-1,3-35,3-2,3-3,4-40,4-32,4-33,4-48,
4-41,4-5,9-4,9-11,9-13,9-5,9-7,9-24,9-23,
9-27,9-32,9-34,9-50,9-49,9-36,9-29,11-4,
11-1,11-5,16-13,16-24,16-17,16-11,16-30
Over 1 Hour/Over 5MM 47,565
Less 1 HR/Less 5MM 6,914
Total over/under 1 Hr/5MM 54,479
Picot/Purge 18,878
Continuous Assist 1,234
TOTAL FLARED/VENTED 74,591
Jul-11-00 16:05 From-PRB OPERATIONS
907-659-5061 T-934 P.01/04 F-105
~~ ~r~. A
FLARE GAS 1/EN' IN6 REPORT
ARC(a ALASKA, INC. - PRUDE' DE BAY/GPMIUKUP
FACILITY= Fiow Sta4lon ~ _
PERMIT NQ. 9473-AA017 ' `~-~
ime Oeeu nce•
•
i~
From: 19:4, 5 To: 21:41 ~ - 01:58
From: 21:48 To: 22:02 T 00.14
~
Fram• To: 22:27 _
22:12 o 5
p
_
_
~ To: 0'D:(f0
From: ~~
~'- -
T°' _
~:~
From: ~_
.-~.- -
To: - (,9Q:00
-
From: ,~ ~,
Total lYlMutes Flared: = p2:25
{Includes volurrn~ Bared which generated black smoke.
tf aprplicabfa)
t~sa upa,Dt M
section dfadlaY
Flar+n9 tvr draisios ahucda~n 1 starwR
~~ Fiore syStept tasting
~~ Faulty 3IMAdntN1 ~
~- Fadlity me~~s
~- Hiyh an-r>~ ~paremres.
--~ SID on h{gh v{br2t{on
~s: re QvQnt
pate of occurrence: 6/20100
(mm/ddlyy) (Che k Seleottort)
27$95 IutscF BBtS
Total Volume Flaretl: - ..---~~-
~PWm1ed ~U~ m~
Meter No.: 272 (fay Facfflty) (Check $eK Mort)
(t.laberme pidy • Gaa r~ered tYa3 titan Qom ~ fCnecx ~ 1
of TEd oontaCtor meter at LPC)
A. pascriptlon of Inr;kse~n ana Cause: (Check as marry a~rteeded to rurlydes4AlSe tYa ink
SrPTJCit
X T!C SD due to high e~wst Wmpereture ~~
~•- Seal OR $Y~ ~ .
~- EMERGEr+ICY Slilri'DDWN _ t1~ai
"-'- E;I ! fnat+urnrntaelon methm ~, ° - ~ 4 ~ a ~- ~ ~ y~~ 6~
~~ Eledllaai! Inbn rtxtlf~ V;~ ~ w
~-- ~ °~~ ~I J L 13 ?.000
p>tq~y CPF1Fbw Siaibn out
ExeesaHo ! Est rat 9~Iaeke Oil ~ Gas Cons. Commissi~~E~a
rotas iM4 raciritlr A r,; l-nr~ge
t3. gcgen Taken ~ ~Il~ni~a Gauge end FYewent Recur+f'enee: (Ct-~k and deaeride a ~ ~1PPtleabkl
5tsrtad ! restaAed T!C 5 ~-
"- Compressor ! train depressured
jc Reduced ! inu+eased inlet gas rates
Comp{e~ad flare testing
-^-- Corfeded Eel t'-uctuaiion !failure
Conacted E$1 fluctuation /failure
at other faaCrgr [~8D)
~_
B act' Sett S,ke
Yes: No: ~ (If Yes, continue with this sectwn)
Did incident cause black smoke? Yes_ No:
Did incident present a potential threat to human health ar safe ~fC w~ ~ furs.)
(if Yes, report to FEC ati goon a6 Poss{bla. M N0. reP°1't ~~ ( Sad number and das~P~n)
aladt smoke eminad from source: Time:
Notified AD)rC by Fax on >~: eon 269-7bo>0.
Report the rollewrn9 Infpnrtatlon oa ADF.G w{gtrn 24 hours B' 1 To:
Ddte and time of blade smoke event: From: M~ _ BBL$
Volume flared which generated black smoke (if different from above)- .-~-~^-
Description 4i steps io minimize emissions: See ;3edian R, above. NGI s:
Type of materials burned: Gas: y~~ rgctlon:
General Weather: Air Temperature:
Name and phone rwmeer of person maKing the report: Nor e
~~ - ~! ..~_ _._,_..-..k ~.,.t ~.,retrmation i0 and BttdCt
Based Ott ihtarmat~an ar~u u~a=~ ,
tlowmant are true. acous8te and
Facility 8upervlsor _,~-
Phone No.
ts;: EOC Supervisor. PRB~ (flare gas and blade sntoi :incidents)
Field Olvironmental Cariplianca CpoNmetors, PF 3 7 ($Isdc Sn1cKe inaf>ents or>!~
PBtJIGPMA Field Managers, (Black sntoKe incid C ~ reports onb - ATO 477)
Gpp~A Cperegats Engineerng Technical Aide. (' NSK 61 (Aare gas and blade smoke incidents)
}(trparuK: Field Environmental Compliance trgpMi tarots,
Updatetl: FS2 9198
P:1Groupal£rnrfronmentatlForms~5 alhCtias ~Portin9 Fam~lTemplate On Line Flare Qas Venting FOrm &881 xts
Stabilized facility process and operation
-~ Repaired equipment diMlcu{tles
with
~- Fac-lity maintenance completed
t7rther. Gut 250 MM AT ALL pS's
~~ ~ ~ ~ t_ta`r a v+1t~t.t~
Ju1-11-00 16:05 From-PRB OPERATIONS
907-659-5061 T-934 P-02/04 F-105
f
74: HOC Supervisflr PR~AAl1ARCO~ARCO
cc: FS2 Su~-~r1AA1/ARCC~~CO
Supject: DS's 511
Paul, t was handed the fo8owing list of drill sites that we •e shut in last night and asked to e-rr-ai1 to you -
so - here ya 9Q~ s/1 the fallowing wells:
612010U 1945 hours 1804 shutdovm
9-13, 9-43, 9-01,9-32
4-32, 4-44.4-16, 4-45.431
3-1, 3-29.3-28
16-30,18-13, 16-1 T, 16-20,16-1$,16-19
17-2,17-5
2p45 hours (approx.) $/I the following wells:
612o/ao
16-12, 3-34,1 is-21, 3-35, 3-31, 3-3, 9-24,11-1,11 ~
have a good one.
jmk
_).
~~ ~„,
~~ ~.~~;~
~,Ut1\t~iS"~y~''
~ia~sal ~Gas''"~ ~~
f ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
FLOW STATION 2 PHILLIPS ALASKA, INC. EASTERN OPERATING AREA-PBU Jul-00
Disposition _,~ .~ *Indicate contribution of each pool to total.
~~~ y
1. Sold 0 Pool Name Code Percent
2. Reinjected
` 0 PRUDHOE 640150 100
gg ~~pp r~ ~
J SAsr'
s ~,iY{~~. 43~?i?Ii~Jvwsi~5
C Y4ZiiiG ~k:7 4 R
~
A
e`L~ i yS 1`~~~~
3. Flared or vented less than 1 hour 33,908
4. Flared or vented greater than 1 hour 37,581
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 19,870
6. Used for lease operations Fuel 720,516
Assist 38
7. Other
0 ................................................................
Official:Us:e:~~lp;=Pla~ing:AutlYOriz~tioii:~:~ iYi: :::::::::::::::::~:'>::
TOTAL items 1- 7 811,913 1. Safety ~ ~ / ~'.~ ~ MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: CGF 662,580
Commissioner Date
1 L Transferred to: CCP 21,314,809
ote: vo umes must e correcte to
Remarks: pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition.
Authority 20 AAC 25.235.
Signature: ~ ~~ ~ ~%~„ ~r,.~~! Title: SUPERVISOR
t
Forrn 10-422 (Revised 4/95)
~~"'
07-00 FORM 10-422.x1s/FORM 10-422
BP AMOCO
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
FS-2
July-2000
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
07/12/00 0005-0142 18,861 Emergency shutdown TC 1804 because of an oil leak. UNPLANNED Reduced inlet gas rates. (See attached
(See attached addendum) addendum)
07/15/00 1624-1737 18,720 TC 1804 shutdown due to high exhaust temperature UNPLANNED Started/restarted TC 1804. Cut gas 350M
(See attached addendum) (See attached addendum)
N~-~ 07/16/00 0642-0736 10,574 TC 1804 shutdown due to high temperature cabinet
oy.~„ problem. UNPLANNED Cut 350MM gas and restarted.
HR-- 07/22/00 2034-2126 9,776 TC 1804 shutdown due to high exhaust temperature. UNPLANNED Restarted TC 1804.
07/29/00 1243-1340 11,870 TC 1803 shutdown due to compressor check valve
----" problems. UNPLANNED Shutin enough LPS production to get out
of flare - 280 mmscf/d.
Over 1 Hour/Over 5MM
Less 1 HR/Less 5MM 69,801
1,688
~ ~ ~ ~~
Total over/under 1 Hr/5MM 71,489
Pilot/Purge 720,516 ~#,~j~ ~ ~ ~~~
Continuous Assist 38
2 F ~rr .C• 7^~h~ vah ~t ~e~~~
~9scti~~-~ E,.iS ~ ka~La ~: ••.6~. L'di: S:l e~~65iNI~E
TOTAL FLARED/VENTED 792,043 ~'~~~~~~~
AuQ-01-00 07:37 From-PRB OPERATIONS
907-659-5061 7-000 P.10/17 F-Z09
FlARE GAS V cNTING REPORT ~~~ -
ARCO ALASKA, INC. • PRl DNOE BAY1GpMAlICUPARUK
FACII'ITY= _Rtrn- Station 2
PERMff N0. 9473-AA091
~1SP_OSI_ TION
Date of DoCUrrenCe: ~~ ' ]Rare ~ vent
s~~ QQ~~ //{m tl/yy) (t heck Selection)
Total VolUms Flared: ~~J,L~I luISCF BBLS
Meter No.: Faeil ~ ~ ~~"1etl ~ ~"
(Check ;election)
(tlsburna ~ -Gas Hared was from ^ upatneem ^ as f ~
of 7EG rotttact~mOtelat L.PC)
A, pescrEption of Incident and Causo: (t:McK a$ many tt9 needed to fUfly deacril a 11te incider~
gIp T~ for
~"~ T!C SD sue to nigh exhaust temperature
Seaf oil sYStem difficulties
~~ EMERGENCY $Ntrf001M~t
Electrical ! InStNMdhtatlort rllattlgltXl0r1
Electrical / 1nsG~urnentatwn rr~alttmcticn
to other faciGq+ Rip)
--'°"'^ caa rranstt system overpressure
becKirtg CPF/Fkrw station out
~"~- Eitcesslvelinsulfitdetttinletgas
rates into facility
B. Action TaKen to Eltminate Cause and Pra~ert Racurt~: (Ct,eck and doses >s ss appliraws)
5larted !restarted TIC ~
or f train depressured
aced mereased inlet gas rates
.flare testing
- ---- Corrected 8AI fluctuation t failure
!'T Corrected E81 fluttuation /failure
at other fat~lfty (Z'&D)
Time-_Qf Occurrence-
00:00 2400
From: : • To: ~' -
From: -
To:
From: To:
• Totial Irilnutra+s Flared:
(Includes volume fi'ared -+~~ Senerated black smoke,
;f appJicabfe)
Process upset in
section of faeiUgr
Flaring for drillsita shutdown /startup
"~~ Flare system testlrig
~- Faulty SnutdowA on
- Fadifty tnaintenar-ce
~- Hign ambieet ttxnperatlxes.
'--- S!D on high vittr •
-~- .~ f
l
c. ..
'/ ral~
Stabilized facility process and operatlon
~- Repair+ed equipment drfflwlties
wit11
~- Facility maintenance. completed
t]ttter.
~-
k Smoke
Did intident cause black smoke? Yes: No ~ (lf Yes, continue with this section)
Yes: No:
pid mpgent presettt a potential ((treat to human health or Salary?
(If YeB, report to FEC as soon as possibb. tf #!o, report to ADEC wiY i 24 hours.) (enter tag number and destxiption)
131adc smoke emikled from source: _. Time'
Notified ADEC by Fax on Date: _
Report the roilowing IrrtormaNOn to ADEC winttn 24 hours sr FAX [9D7~68-Y5f 1}: To'
Date and time of blade smoke event:. From: MSCF ~~~$
Volume flared whiCtt generated black Smoke (if dlfierent from a~ bove~ ___ --~
Description of steps to minimize emissions: See Section B, above. ~~
Type of materials burned: Gas: NC `s:
General YVeather Air Temperature: Wind Speed/0in~ction:
Name and phone number of person making the repoR: Na tie F'h4rie No.
..~.,~--
Based on informaflon and bQlief fortTied after reasonable ingttiry, Certify th t the statements antl information in and attached to this
document are true, accurate and complete rtA -.~ ,~ Data ~ O G
Facility Supervisor ~,^_~ ,¢
ca EOC Supervisor. PRB 6 (flare gas and blade smol a irtddents)
Field Emrironmental Compfianod CportiiftatCf3, PF 3 9 (BIatK Smoke: indtlents only)
PBU/GPMA Field Managers. (Blade smoke incidei is ordy)
CvPMA C)perations Fsfgineering Technical Aide. (G 3MA reports ony - ATO 477)
Kuparuk: Field Errvirortmetttal Compiianoe Cogrtti 1atQrS, NSK t39 (flare gas and f>lads smoke inddertts}
FS2 8/88
C~
as Reporting FormslTemplate t]n Lute Flare Gas Venting Form $-881.ids
Auk-01-00 07:38 Fiom-PRB DPERATIONS 907-659-5061 T-000 P.11/17 F-209
~
...~ Catculat ic-ns Chap
~ R ~' d `~
shoot numoer
pE
Subject
gate
FUe 8y
L/
~ ~
.1~ ~~s~
~
/`~~ ~ ! ~o y
~
~ ~
9'9'~
9' ~y~ ~s ~ ~~ . .
^~ ~ Y ti /~'
~~
..
.a~l..~ ~ s:-z'• ~ '~
~~ >~ . .
Q
2. ~ ~---
.~ l
-. y ~
~' .,..,-. w..
Jr~ ~~' S ti.,. -,-,
,~,
~l ~ ~ ~ ~"
~~ ~~ ~ ~~
~~~~ ~~~
1 ~~
i ~ -za 9 ... ~., ~ ~
~ ~'~ ~ ~ „. ~o~i`~L
~v~`' 1~C-C . ~ ~~
~' S .
Auf<-01-00 07:35 From-PRB OPERATIONS
907-659-5061 T-OD0 P.05/17 F-209
Pt~-RE GAS VE hITtNG REPORT
~tU1, INC. ~ PRLl~ -Ht7E t3AY1GPMA~KUPAFtUK
Flew S!altQn 2 PFRMff Nt7. X78-AAer1~
.~.
9~.i ALP
~ C 1'i~e ^ vats
'ate of Occurrence: ' / ( lddNY) (C edi SB~N
Taal V4luttti Plated: ! ~~~ trISCF B6LS
90.: A t~antieo ~'t
(Cht~K $ ~~gion)
fLlspteme t]-t~r- 6a<s Aarad s+aa bom ~ ~ (Chord t ~
at7~G OSmetarai a,P'CJ
A, p~t+~ of mcldslR turd a~w.: (Croak ss ns~~ naeavd ro fug dseone - tths inddesa~
SIC 7lC1F --
1yR Sb dne to IM9h etglce~ least
i a5 nysmm dl~ioulitas
~""'!"" fillAdl ;~II(pp4VN
~~ i:~®1/ tr~strtsnenlet+on madht+tc~h
•t palter fesiliry ([8Ch
try tfif19i1 tlYatata ~
becarq CPF/PIDW StaUat ott
"!^ t?xr:esaire ~ irs~dfit~ettC hues gas
tales Ito ta~i4-
D. Action YeKen to F~Iminsrtr Caatii and t'w•+in Recurrence: lt~k i detioTl M an t~<sabiel
t:wttptesasor 1 train dt~nessiaeq
Rpe(tn+sd / htp:resed inbet gas t~
-"-- Ccmple{ed'ltefe taisllnp
~'"'" Cpnietttd EJA1 lkuleatipn / failure
~"- lone~d ~3t Ihttxtmtion 1 failuts
Time of t]ceumsntm~
8 ~
Froth: ~,., 70: r ~~7 . =
From: Ta: ,~,~ ' ~~
Resit:
n
~..7a
From: Ttr. ~-- , ~"'r~
___~-..--
FtattT. Ta ~i , ~~
'foptt ittNatms Fiend: ~'
(lAdudB,9 voJrlRlo hatred Which yeneraQ9q Dl~s
dappf~bls)
process upeat in
sec:Aatt of txab
for EMA9he BFwYda.r~ ! staAUP
.~...- FIB a
FauUY ahuoadMR~ cat
F>idNgt tt~t+att~ane~
~- 1'II~:- S tEftsperso pigh vt~tatktit
.~~
~__ ,
Stab~ised itstaAgr pt$ acrd ~~°D
--` egtt~ant di15a
~-
'-"-'-! Fac~ly malttse rase cart +~ ~
~- a
at od1pP 18o1ty/ (Tt6p)
,~~
Lid ~~ blade xmtdce? Vass: ~ rFa ~ pf Yea, mntiean wah this se ~•
a 1a human hedRh ar safety Yom`
Did it>sicttutt pry ~teAt'~ Ih~ lpN, !< No. rePoR ~° AofC wit: ~ ~ ltrn~.)
{[fYas~ ttspoetto {~C Ipl:wan a4 pe~stt (~+Gr mp,wrrt~er and ddset~tion}
t9lack strtoke omitfid irasts sostr+ee: • ~; -
Notifie4 AAEC bYF~x on Italg- 769 75t ii:
ftope+t ttnl taNa'wNtp lnbrtntNbu co Af>~ pigUq ~1 RYF9~tso To:
Oa~e sued tints= of ? atnalte event Rant:. ..r.- ~~,
Vebtrpe fisted whlctl9~~ itttoke (sf ddtettant itmn atsav+e~: ~ -~--~
peacr4p~on of steps tat mirtb~l>:e e_: See Se~tiast W, atao~- ~ ~ ~Jftset:
'Fps of trvAtetials burned: ~,~~~ ~__ y~p~8aaed/Gkeceiosx
General Vllsather: ~ fr+ tnoidn9
Natno ar>ta pesor~e tree r+p~'t N2 tN Phgau~ IVo.
n ttte statements attd infarmatian ~ antl ~
t3owed ott iufurtnattiost and after rassanaple inquiry. t
rrtaue tnta. ~ t~tr /~ ~
Fad eu~t ~"~ -~ --
ea EC~C S++P~ F328 6 (!lace s eau! bbtck stno'. e httadt:nt6
Fief ,~~ CpmpRaftot: t:oa'tlinatota. Pl e 7 (Biagi
~, Fidd Mme, (~i~ _ ittadde -~ onh~ . aTO am
GPNW f~petatioha ~ TecFxti~t Aide. t~ PNtp- tePotte oNSt erttl bleak smoke lrtddert;s)
Kupetulc Field Frnta~ Complis~ Coord rsatare, itiSK lit
...,..___._...~_..L.......-.~Anxerms~,o~= ies Rtt>c+-tH1B For~ts~Y~ttp~ ~t Lkts! Flare ~.,. es NerAa=e FOB ~"e$S~to
Aus-01-00 07:36 From-PRB OPERATIONS 907-659-5061 T-000 P.06/17 F-209
FLARE YNt~EN1' OF 7-l: -00
At I624 hours F52'~ 1804 turbine shuuiawn far an u ~aown reason. Yt is ttsttaliy a sitatatioh
whexe within S to 6 minutes Lhe turbine will get a rei dy to start ligb-t again and takes
approximately 1 S minutes for. it to purge, fire and as ne to idly speed wbare we can load the
machine again-
___
__
~~ t]j~ "~BaC~j-" hg$t dad eat 111Lttgtnal air. the n ~°5'waR i~lG GaUs~ ~u~
ogesatar searched to find tf~e teas=. A ence was aceedutg
repaired, giving us a ready to start tight, A start w~: given and the Pr
as should, when the turbine failed to continue m the ~xt sequence- There was no known
reason for this sa a shutdown signal was given so wi d staff aver,
'Y'be insmunent Lechniciart was called is cast n 1eGded and ~ ~urbiue waa3d Iran. ~y
Since eVcrythiai; was going smoothly this tune 1~
17?.2 houus it was apparent that something was carat g with the starting tuxbinc sa we started
shutting is wells- AL 1737 hears we wem out of flay ~.
The probl8ut was repaired with the starang turbine ~ ad' 1804 wss at idle speed at 1 X30. At that
point grcaductiaa was started back to the facility.
FS2 starts nutting gas after 30 minutes to get out of 1~ with in,an bear, whether it is being
ar losing a ttuhin~ ~ Z his ~ au>c P°~aY Fill be (allowed
~ 'b&cked nut an discharge pressure,
as such in the future to eliminate ~y more ~.ares of rtaarc tttaa 60 minutes.
'the following wells were shut iu of eliminate the fly a~e.
DS3-l,,$,3~,~~ and 29
l~Sq-16,~b,32,3~,34 and 40
riS9-5,11,3~,~S,A~ and S1
D311-4 and lfi
DS1~-2~4 and ~Q
DS17-1,5,9 and. 3 ~
~_
. ~ -
PS2Lead ppexatos
Mark Hill
~~
y
. ~;
BP AMOCO
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
FS-2
July-2000
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVE NTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
07/12/00 0005-0142 18,861 Emergency shutdown TC 1804 because of an oil leak. UNPLANNED Reduced inlet gas rates. (See attached
(See attached addendum) addendum)
07/15/00 1624-1737 18,720 TC 1804 shutdown due to high exhaust temperature UNPLANNED Started/restarted TC 1804. Cut gas 350M
(See attached addendum) (See attached addendum)
07/16/00 0642-0736 10,574 TC 1804 shutdown due to high temperature cabinet
problem. UNPLANNED Cut 350MM gas and restarted.
07/22/00 2034-2126 9,776 TC 1804 shutdown due to high exhaust temperature. UNPLANNED Restarted TC 1804.
07/29/00 1243-1340 11,870 TC 1803 shutdown due to compressor check valve
problems. UNPLANNED Shutin enough LPS production to get out
of flare - 280 mmscf/d.
Over 1 Hour/Over 5MM 69,801
Less 1 HR/Less 5MM 1,688
Total over/under 1 Hr/5MM 71,489
Pilot/Purge 19,870
Continuous Assist 38
TOTAL FLARED/VENTED 91,397
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
FLOW STATION 2 Operator
PHILLIPS ALASKA, INC. Field(s)
EASTERN OPERATING AREA-PBU Month/Year of Disposition
Aug-00
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 1,188
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 1,294
5. Pilot and Purge 19,074
6. Used for lease operations Fuel
Assist 758,248
31
7. Other
0 ................................................................
Official use:0i>Iy;=1~'l~ing:Authoiizalioii:~a iii:>::::::`:::::::::: >:::
....... .
TOTAL items 1 - 7 779,835 1. Safety MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: CGF 366,255
Commissioner Date
11. Transferred to: CCP 21,035,556
ote: vo umes must a correcte to
Remarks: pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: (~ ~ ~,,v ~ Title: SUPERVISOR month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
08-00 FORM 10-422.x1s/FORM 10-422
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
FS-2
August-2000
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
08/06/00 1755-2037 1,294 1802 IR Shutdown on Low Lube oil pressure, Lost suctior UNPLANNED Tried restarts on 1802 plus starts on 1801.
(See attached explanation.) 1802 finally got restarted.
(See attached explanation)
Over 1 Hour/Over 5MM 1,294
Less 1 HR/Less 5MM 1,188
Total over/under i Hr/5MM 2,482
Pilot/Purge 19,074
Continuous Assist 31
TOTAL FLARED/VENTED 21,587
Sep-05-00 05:07 From-PRB OPERATIONS 907-659-5001 T-121 P.04/08 F-392
FLARE GAS vt:NnNG R~PoRT j
• nRC~ nLnSKA. INC. • PRUDHDE BAY/GPMAIKUPARUK 1
~ACI~; Flow Station 2 pERMfT No. 9475-AA011 __
Date of Occurrence: ~' ~/00 ~O1i~ ^ `~
(mMddlyy) (Check Selection)
From:
Total Volume Flared: 1MSCF rast~s From:
From:
Meter No.: 29z (B Facfl ^ f~~ ~~~ From:
(Check Selection} From:
From:
(Cleburne Only - Ge;s Aaretr was horn ^ u ^ dawn~am {Ch~cR onel
oJTEG cantadormetelaf 1Pq
A. Description of 1ncldeM and Luse: (check i6 marry ~ needed /A fully describe the incidang
SID T/Gtr for
TIC SD due ffi high eXhaysi tatrlper9lure
~- seal CII system dl8iwltlas ,
~- F~IIERGENCY SHUTDOWN
Eiecaioal l Ir~suurnerttation malfuntxlon
'-- ElecUieai / 1r19t<1prlerltea0n r:101h:11r.1'fOn
a other tavfny f i'8~
"~'~' Gas trartsn system overpraswro
packing CPFlFIOw Statlon out
Excessive 1 i:sutfidarR inlet gab
rates inpo tealitY
B. Action Taken to Elimirrete Carrse end Prevent Recurrence: (Cfieak and daecriW se eppikeble)
Started /restarted T/Q fe
Compressor J train depnessured
Reduced / Iric~eased inbt gas totes
~- Completed flats testitg .
Corrected ES.I iluctuagon /failure
Corrected E&t fixWaUon / talluro
at other fadlity (TAD)
Time of Occurrence:
00
~----
- -- - - To: _ _.
To:
~-
--- - --- - To: - - -
~0: _
Total Minutes Fared: ° /,
(1ncJud'es volume flar+ad which gerrereted black srnoloe,
~app6cable)
pfpGeSS upstt in
section of
Fletklg rCr dfigsite OhYltlOrrrf / StertuP
Flare system
~~ FatMtll ShttldtSlNrt orl
-~ Fadagr rr~a'stter:arloe
Niph amhiera temperaWres•
-`~" S!D tm high vibration
Outer. ~~• '2- -
d!G /EE*55d~~'
Lrrt~SV~.~'L~lr~
stabiliZea taciuly pr~DCeSS arld oPeratioa
Repaired equipment d'ifficxsnies
with
Faafity rrrairttensrroe cwrrtpleted
ether: _~, l~ 1~L'STI41i<.7"'
- - ...~....,.r _
Did irtcidettt cause black smoke? Yes: No: ~ (N Yes oontirate witl~+ thk section}
Did lnadent prssem a potential threat to tt+unan rleauh or safety{t Yes: ~~ .
{if YeS~ report to FEC as soon as possible. l! No, report to ADC-C with Z4 hours.) (ems ~ amber and descxipuDn)
Rlaok Sn10ke Omitted from rourre: '
Notfied ADEC b7- Faxon (gate: _ _ _ Ttrrte: - - - -
Rapcrtthe fOtloiYrMtg inforenatbn M AdEC wiMln 24 horns Y FAX . i69.7SOB):
Date and tlrrie of biotic smoke event: From: Ta:
V Wume ilar2d whidl genen3ted black tirrtoke (if different from above}: MSCF ~~
~~
p85Cd(?tloA of steps to mktim{ie emisalorls: See Section B, above.
Type Df materials burned: Gas: NGIa_ _ Otllar:
General Weather. Air 7erttpersture- Wrrtd SpeedlDiredion•
Name and phone number Df person making ttte repot
Name Phone NQ-
f3aSed Off tfI1DRn8110n arlla DeI1CI nxrrrcu ancr rccavnau.c ^ry....~, ~ .......y ...-.,.......~......_..- ---- ----- ....... ... . . .
daourtrera are true, aca,~nd ~ ~ ~~--
FaciligtSupervisor
c:~ EOC Supervisor. PRB ii as and feack smoke 'stdderrts) .. ~• _
~Fiaid E~1 Cocrdinat4rs. FRa 7 (Slack Srrwke inaderrts aMy)
' PBU/GPMA Field Managers. (BIa49c sngkE Iltcaderlls DnIY)
• GPMA Qpetatiorts En9n>eerin9 Technical Aide. (t~P'MA reports Doty - ATO 477)
fCuparuk: Field 6lvironmeuttai Camp9alx~s t".oordktators. NSl(gt (Rare gab 8i11d t~tack Smoke iritadertts)
i.irxs Flats Gas
Sep-05-00 05:07 From-PRB OPERATIONS 907-859-5061 T-121 P.05/08 F-392
~ ~' Calculations l=ea
A~~c~ ~ _
- ~~~
_._.~..~. ~ ~...~..-r._,---r-~-.-_ . a
_ ~ _~t?~ _L s? ._.11.1~~v..l ~~~.C_~S/1!~ _Cs~?fid"dJTTc~J 1:~'97~ : ..;~!<?~.-...~A°-~''~~„
Lo
,~~~ rr~~ ~f~ ~} ~~~ ~~/
.~ .... J
i~
'~ ,-.+~.- . w.. ...r __`.~- _..---•-~--!--~-I--~-_• •- ----- ~ - !'.'-'_""" tom"'; "" ~ . ......~-
r
. "' ,G~4.-~12;~ctT'~~J~t~ j~i r~~T_/.Z..~i~ ~..1~...~~''~~ ~2i~~irt_°~!r;.~' ~f!~'~•
_..~ ~..,._..,.. ~- .~._, ...~,.M ,
...
~i~
---~--~-- ~' - ... -~-r-------.......~.._.._~....
----
-- -X237-._...f~~~---/~s~.,z.. ~c~~.-~~~ ~-,fir_~~-...__~r.~ •c~.._~
'~ ~ -_.
..._.~~..._..._._.~.._._.,._.r..,.,...~..-..-..~.~-r
. ~ ~ ~ ? ~
i ~ ~ I
_ ~ i
__
t6 ~ ... .. .._
.. .r~r~~~~ Vv-wiar r~r..
~~ ~ ~
1 ~ ~ ~ ~ _~..... -.
~ ,
. ~
• ~ ~ ---
• 1 i ; ~ ~ ' 1
~ _F_ ~_~.~~~ .r+~.+.~.rrm1~..~. _.~..___. _....~_.r~t.~~~ r~~rw ~~~ ~.-~ , ~rw--on-w+w ~ r.T'-
I
1 ~~
1 ...~ .. ..i.
' , ~.;~~~ • ..1. ~.. ~. .. .~~__. ..~~ .vim... - .....~~
:~
,,
~._.._
---- ~_
~~~
~~ ~ ~ ~~ ~~ASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
:~, ~__
Facility ~ O~a~S4 ~~~ ~ ~ Operator Field(s) Month/Year of Disposition
CENTRAL PROCESSING F17,CII,ITY #2 PH1I.LIPS ALASKA, INC. KUPARUK RIVER UNIT 8/00
Disposition Volume MCF*
1. Sold 25,099
2. Reinjected 4,282,975
3. Flared or vented less than 1 hour 16,661
4. Flared or vented greater than 1 hour
Su lemental r ort r uired--See 20 AAC 25.235 0
5. Pilot and Purge 21,923
6. Used for lease operafions Fuel 738,843
0
7.Other 0
TOTAL items 1- 7 5,085,501
8. NGL Qas equivalentvmduced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS)
CPFl 851,568
1,632,012
11. Transferred to: 0
Remarks: Reinjected vol does not include volumes of PBU NGLS squired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: r--/`'~'- ~ P' ~~'~-~-~" Title: ~ ~J ~'~ ~ ~ ~~C~~- Date: eJ /~" ~~
*Indicate contribution of each pool to total
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 82.40%
KUPARUK RIVER UNIT TABASCO 490160 0.15%
KUPARUK RIVER UNIT TARN 490165 17.45%
Official Use Onl --Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date.
Note: All volumes must be corrected to
pressure of 14.65 psis and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
PHILLIPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #2
August 2000
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
NO FLARE EVENTS TO REPORT FOR CPF #2 FOR 8/00
TOTAL OVER 1 HOUR
PLANNED EVENTS LESS THAN 1 HOUR
flare or Vent Volumes:
Greater than 1 hour 0
Less than 1 hour 16,661
Continuous Assist 0
Pilot and Purge 21.423
TOTAL FLARED/VENTED 38,584
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
FLOW STATION 2 Operator
PHII.LIPS ALASKA, INC. Field(s)
EASTERN OPERATING AREA-PBU Month/Year of Disposition
Sep-00
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 4,072
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 1,930
5. Pilot and Purge 19,022
6. Used for lease operations Fuel
Assist 658,702
110
7. Other
0 ................................................................
Official:Use anl~-:-Flaring:Authorizafion:~:~ ~ :::::::::::::::::
TOTAL items 1 - 7 683,836 1. Safety ~ ~ ~ ~ MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Proposes MCF
10. Transferred from: CGF 316,701
Commissioner Date
11. Transferred to: CCP 18,049,256
ote: vo umes must e correcte to
Remarks: pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/o~tll ~
Signature: ~ ~'--- Q~-~C~~ Title: SUPERVISOR month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
A
09-00 FORM 10-422.x1s/FORM 10-422
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
FS-2
September-2000
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
09/15/00 1130-1240 700 1886 tandem shutdown
09/16/00 0103-0255 393 Depressured common line 3D
09/16/00 0103-0255 837 Depressured common line 3C
Over 1 Hour/Over 5MM 1,930
Less 1 HR/Less 5MM 4,072
Total over/under 1 Hr/5MM 6,002
Pilot/Purge 19,022
Continuous Assist 110
Unplanned EOC cut gas rates fieldwide; cut 4-49
and 11-13 chokes to minimum
Planned Stabilized facility process & operation
Planned Stabilized facility process & operation
TOTAL FLARED/VENTED 25,134
8/31/00 DS9 Venting Incident Report
Subject: 8/31/00 DS9 Venting Incident Report
Date: Sat, 2 Sep 2000 15:23:00 -0900
From: "EOC Supervisor PRB" <P2013@ppco.com>
To: Wendy_Mahan@admin.state.ak.us
CC: "FS2 Supervisor" <P1285@ppco.com>, "James C Coburn" <JCOBURN@ppco.com>
Wendy,
This note serves as the written report required under 20 AAC 25.235 (b) for the
August 31, 2000 gas venting that took place at Prudhoe Bay near the Sag River
bridge The situation was that a gas leak was found 8/30 on the 12" Artificial
Lift line going from FS2 to Drillsite 9. That same day the line was isolated
and depressured from its normal operating pressure of 2000# down to 200# via
the low pressure commonline back to the flow station. The following day on the
31st the line was vented locally at the Sag River bridge from 200# to 0# to
isolate for blinding and repairs. The time of this event was from 1500-1800 hrs
and the estimated volume was 1500 MSCF.
If any further information is required, please feel free to contact me at
659-5566.
Paul Andrews
Production Coordination Supervisor
1 of 1 9/3/00 8:56 AM
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
FLOW STATION 2 Operator
PHILLIPS ALASKA, INC. Field(s)
EASTERN OPERATING AREA-PBU Month/Year of Disposition
Oct-00
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 1,128
4. Flared or vented greater than 1 hoar
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 19,281
6. Used for lease operations Fuel
Assist 767,216
188
7. Other 0
OfficialaJse Oirly;=Flaring:Authorizafion:~:1 ir.:
TOTAL items 1 - 7 787,813 1. Safety MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: CGF 376,234 /J/ ~ j
Commission. ~~~~~-+%L~~r~"~Bate ,/ ~~' Q2o
11. Transferred to: CCP 22,038,343
ote: vo umes must e correcte to
Remarks: pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby cerfify that the foregoing is true and correct to the best of my knowledge.
! [/ ~ 3 /~-~
Signature: ~ ~ ~•eJ' ~ Title: SUPERVISOR month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
~~ ,z
~~--~~~
10-00 FORM 10-422.x1s/FORM 10-422
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
DATE
TIME VOLUME MCF
GAS FLARING OR VENTING INCIDENTS
FS-2
October-2000
PLANNED
DESCRIPTION OF INCIDENTS 8c CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
Over 1 Hour/Over 5MM 0
Less 1 HR/Less 5MM 1,128
Total over/under 1 Hr/5MM 1,128
Pilot/Purge 19,281
Continuous Assist 188
TOTAL FLARED/VENTED 20,597
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
FLOW STATION 2 Operator
PHILLIPS ALASKA, INC. Field(s)
EASTERN OPERATING AREA-PBU Month/Year of Disposition
Nov-00
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100
3. Flared or vented less than 1 hour 2,344
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 16,016
5. Pilot and Purge 19,401
6. Used for lease operations Fuel
ASSlst 745,527
3
7. Other 0
TOTAL items 1 - 7 783,291
8. NGL gas equivalent produced x 0
m
9. Purchased gas a ~ /'rj ~ 0
~~ n
10
T
f
d f
CGF
~ ~ /`~
'
.
rans
erre
rom: y Cb „
~'
~ 360,686
c~ ~
~ °
Official Use Only--Flariue Au~hori~atiou > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
11. Transferred to: CCP ~_~ ° ~ 21,431,361
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: ~~~s;~/ Title: SUPERVISOR
~~- rr ~
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
11-00 FORM 10-422.xis/FORM 10-422
PHILLIPS PHILLIPS Alaska, Inc.
~ ~ A Subsidiary of PHILLIPS PETROLEUM COMPANY
December 20, 2000
Alaska Oil & Gas Conservation Comm
Attn: Ms. Wendy Mahan
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Ms. Mahan:
Post Office Box 100360
Anchorage, AK 99510-0360
Telephone 907-276-1215
Please find enclosed original signed copies of the November 2000 "Facility Report for
Produced Gas Disposition". I inadvertently sent unsigned copies of all but Flow Station
1 in my original mailing. I apologize for any inconvenience this may have caused.
Sincerely,
~~
~~~~~
G~`~"`"
ames C. Coburn
` Production Revenue & Accounting
cc: D. L. Perala w/o attach:
R~~~' V
~~~ 2 8 2000
AID Oil & Gas Cons.
A~~~ Commission
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
FLOW STATION 2 PHILLIPS ALASKA, INC. EASTERN OPERATING AREA-PBU Dec-00
Disposition *Indicate contribution of each pool to total.
1. Sold 0 Pool Name Code Percent
2. Reinjected 0 PRUDHOE 640150 100
3. Flared or vented less than 1 hour
1,151 D
~;
m
a_ ~
4. Flared or vented greater than 1 hour 12,153 R° J~
(Supplemental report required--See 20 AAC 25.235) ~ ~ Z
~„
5. Pilot and Purge
19,744 0 0
~ ~ c'O
~ rv
~ o
6. Used for lease operations Fuel 802,559 N
Assist 3
7.Other 0
TOTAL items 1 - 7 835,610
8. NGL gas equivalent produced 0
9. Purchased gas ~ `0
10. Transferred from: CGF 391,774
Ofticial Use Only --Irlaiin~ Authorization > 1 hr;'
1. Safety f ~ j ~ 3 MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
,,
~`
Commissione`
~~
1~ 'J ~
'
ate ~,~~ ~ ~'
1 L Transferred to: CCP 23,315,025
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature: C~~r~~~""' _ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
12-00 FORM 10-422.x1s/FORM 10-422
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
o~ ,
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
FS-2
December-2000
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
12/23/00 0834-1039 12153 1804 Seal Oil system difficulties; see attached addendu Unplanned Reduced inlet gas rates
n
v
N
iU
O ~ ~ ^ ~
7 ~
n y
O C~
~
Over 1 Hour/OverSMM 12,153 `~ ~ °O
Less 1 HR/Less 5MM 1,151 0 0
Total over/under 1 Hr/5MM 13,304 ~ °
Pilot/Purge 19,744
Continuous Assist 3
TOTAL FLARED/VENTED 33,051
Jan-02-O1 11:19 From-PRB OPERATIONS 907-659-5061 T-462 P.04/05 F-9T3
`..i
FLARING iNCIDENT
Flow Station Two
December 23, 2000
18041.PS COMPRESSOR SHi(JTDOWN
A.t approximately 0834 hrs LPS compressor 1804 shut down on low seal oil pressure.
The Gas Section Operator was in the local conuol room changing lamps on the valve
indicator mimic panel. A start was given to the machine at 0850 hrs and the machine was
running at 0915 hrs, but at a gas generator speed insufficient to complete the start-up
sequencing (4520 RPM vs 4650 RPM required). Production cuts were not initiated at
this time as completion of the start-up sequence seemed probable and the unit would be
available for service.
Instrumentation techs attempted to increase the speed to allow for loading but were
unsuccessful. Production cuts were initiated at 0933 hrs. The unit was tripped off line
at 0947 hrs and restarted at 1003 hrs. The unit was running at 1020 hrs but again was
lacking only a few RPM to complete the start sequence. Recycle through the compressor
was reduced and the speed increased sufficiently to complete sequencing.
The compressor was loaded at 1036 hrs and the flow station was offflare at 1039 hrs.
Production cuts made for the event totaled 21 wells. for a combined gas rate of 186
~ MMSCF/D.
JAN 1 8 2001
Alaska Oil & Gas Cons. Commission
Anchorage
~~
Jan-02-O1 11:18 From-PR13 OPERATIONS
~..
907-659-5061 T-462 P.03/05 F-973
JAN -~- ~ ~;.;i,-;
FLARE GAS VENTING R~PURT
1PXA • GREATER PRUpHOE BAY
r rr~r~ission Flow Station 2
„~ ~ t Anrr;OC3~e .
PERMff NO. 9473-AA011
Data of Occurrence: Ism ~1 vent
---~3~ddlyy) {Check Selecxion)
Total Volume Flared: MSCF ~_SBLS
Mater No.: 272 B Faeill ^ Plamea [} gp~ined
{Cnedt Selection)
(Lisburne Only -Gas Aerecr was hoar ^ upstream ^ dowrrcusam {C+a~c Orin)
of7EGCOntdctormeteratiPCJ •
A. oescnpdon of Incident and Cause: (CNCCK as many as needed to fully tlest:ribe Lire inciderrq
slD TlCif for
TIC SC due to high exhaust ismperamre
Seal ail system tlifficuhies w -•
FaNERGENCY SHUTDQWN '
. ~ 'Electrical ! Instrumentation rrralfurletiorl
~tectriCdl I ig4trumeotatwn tnatfutrCbon
at omen facility (T8D) '
Gas transit system oveyxessute
tradrirtp CPFlFIOw Station out
F~rtcBSSive / insuffiaeM inlet gas
rates In6o facilib
!3. Action Taken to Eliminate Catase and Prevent Rotun'enCe: {Cltet:k acrd de~arrbe as epplicabla)
' • ' 1! S{r>rted~/restarted TIC ~ f $ O y
~~r!_train eepressuretl
• ,/ ed rt4r'eased inlet gas rates ~ ,~~ /s~ ~
ompletetl flare testing bu6l~S
Carcected E&I fluctuation /failure
Corrected E&! fluctuation ! failure
at other facility (T&D)
imo of t]ccurrene9•
no•ao aaoo
From: O~ ~/ 70: /03 4 ~ _~~
From: To:
From; - To:
From: - To:
From• To:
~rorrt:• ~ . To: _
Tofsl Minutes Flared: _ _ ~?
(rAGlllde3 VOIIrRIe fldlBt~ WltlGli gBrfBrated b(aC(r SrrlOlrB,
if applicable)
Process upset in
section or faclugr
Flarin94or atilititte shutdown /startup
Flare system testing
Faulty Slruttlohvrl Orl r/f~ ~~~
Ftuility rnaintenattce
High ambient temperatures.
S/p on high vibration
other.
• Stabilized faafity process and operation
Repaired equipment difficulGeS
• ~ wit11
Facility maintenance completed
~~ Other. ~ d L~P~
Did incident cause black smoke? Yes: ^ Na: ~ {If Yes, cwninue with this section)
Qid inddent present a potential threat io twman health or safety? Yes: ^ No: (~
(If Yes, report to FEC as soon as possible. ff No, report m ADEC with 24 hours.)
Black smoke emitted from saur+ce: (enter tag number and destaiption)
Notified ADEC fly Faxon Date: Time:
Reptxt the following infortnstlort to ApEC within 2a Aours 9Y FAX (807 ZG9-750:
Date antl time of blade smoke event: From: Ta:
Volume flared which generated blade Smoke (if d'ifletent from air.o~e): MSCF BBLS
Desct'iption of steps to minimi~ emissions: Sea Section f3. above.
Type 4f materials btuned: .Gas: NGLS: Outer:
General Weather. Air Temperature: Wind SpeedlDiredion:
Name and phone number of person making dte repot
Name
tsasett on intarmaaon ana oeuer tormecl aver r onaoie inqur 1 cerury tnat the slatrsmrsnrs anu mrwnrarnitr rrr dr., muau~
document are true, accurate and oampi~te.
Facility $upenrisor . Date /~ fa~l~o _
t:c: EOC $tepervlsor, PRB (flare gab and bladt smoke incidents)
Field Environmental Complian+~ Coordinators, PRB 7 (Biadt Smoke intidertis only)
GP6 Field Managers, (Black smoke inddents only)
Phone No_
- upae~a: Fs2 ~2roo S:u7r4ductiontFS21PAl h prives1P128131FS2-FormslFlare Gas Venlirtg Form F$21 PAGE 12-OO.xls