Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PHILLIPS - LISBURNE
GAS DISPOSITION FILES Field 1 n;,~s 2000 t r-~--^-- ON CENTER #1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION ~r Field(s) ALASKA, INC. PRUDHOE BA' Disposition Volume MCF` 1. Sold 149,070 2. Reinjected 9,901,132 3. Flared or vented less than 1 hour 4,906 4. Flared or vented greater than 1 hour Su lemental re ort re uired--See 20 AAC 25.235 0 5. Pilot and Purge 12,340 6. Used for lease operations Fuel Assist 887;078 5,086 7. Other Lift Gas, Off Field 217,121 TOTAL items 1 -7 11,176,733 8. NGL gas equivalent produced 149,070 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is~.tyrue and correct to the (best of my knowledge. Signature: ~~~'~°1~"' ~'"`'`~ Title:d~yt~-aY" Date:-~ ~7 Form 10-422 (Revised 4/95) Month/Year of Disposition INTYRE 1 /00 `Indicate contribution of each pool to total. Pool Name Code Percent LISBURNE NIAKUK 640144 640148 43.84% 2.33% NORTH PRUDHOE BAY 640152 0.00% POINT MCINTYRE WEST BEACH NIAKUK 666100 640186 640148 48.18% 3.87% 1.78% <]ff~al Use:c~r~l~'==Flaii+i ':`•Autkori~atioir> is tir: >:~:~>::~: 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes .MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of ~ 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Y ,~ f ~))Y ALASKA OIL AND GAS CONSERVATION COMMISSION • FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition LISBURNE PRODUCTION CENTER #1 ARCO ALASKA, INC. PRUDHOE BAY/PT MCINTYRE 2/00 Disposition Volume MCF* 1. Sold 155,524 2. Reinjected 9,374,935 3. Flared or vented less than 1 hour 746 4. Flared or vented greater than 1 hour Su lemental re ort re wired--See 20 AAC 25.235 0 5. Pilot and Purge 11,581 6. Used for lease operations Fuel Assist .844,668 4,649 7. Other Lift Gas, Off Field .74,609 TOTAL items 1 - 7 1.0,466,712 8. NGL gas equivalent produced 155,524 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true,,,,appnd~~correct to the best of my knowledge. Signature:~~tXe Lel.~3'nr~ d~~~•""~ Title:°~' ~~ Date:3 ~(7 UO *Indicate contribution of each pool to total, Pool Name Code Percent LISBURNE NIAKUK 640144 640148 42.38% 2.53% NORTH PRUDHOE BAY 640152 0.47% POINT MCINTYRE WEST BEACH NIAKUK 666100 640186 640148 49.35% 3.67% 1.60% Offciai kfse:o~sl~'==Ktariri~': ArJih~siizatioit > 1:~tir::~::~::~::~ 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: Alf volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. O N 1 ~j ~ ~~ t I Form 10-422 (Revised 4/95) ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility LISBURNE PRODUCTION CENTER #1 Operator ARCO ALASKA INC Field(s) PRUDHOE BAY/PT MCINTYRE Month/Year of Disposition 3/00 Disposition Volume MCF' 'Indicate contribution of each pool to total 1. Sold 163,481 Pool Name Code Percent 2. Reinjected 10,052,375 LISBURNE NIAKUK 640144 640148 46.46% 2.50% NORTH PRUDHOE BAY 640152 0.00% 3. Flared or vented less than 1 hour 1,122 POINT MCINTYRE WEST BEACH 666100 640186 45.59% 3.75% NIAKUK 640148 1.70% 4. Flared or vented greater than 1 hour Su lemental re ort re wired--See 20 AAC 25.235 0 5. Pilot and Purge 12,866 6. Used for lease operations Fuel Assist 916,720 10,094 7. Other. Lift Gas, Off Field 596 ~:~:~:~:~:~:~:~:~:~:~:~:~:~:~::~:~:~:~:~:~:;:::~:~:~:~:~:::~ :::::::::::::::::~:::~::::::::::::::::::: dffieial ~ liae:C3ril~"=-~laifti ~ ~: ~Atitlisi5~zatioit~>~ i:~fti~: ~: ~:~:~:~:~:~:~ TOTAL items 1 - 7 11,157,254 1. Saf MCF 8. NGL gas equivalent produced 163,481 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: 0 Commissioner Date d t T f 0 erre o: rans 11. Note: All volumes must be corrected to Remarks: pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the hereby certify tl~e reg i g is tru nd correct to the best of my knowledge. c7 Signature: 2 Title:c:.• <~: ,,~..--'~` Date: 7 ~ I month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) t' ~- e ~ i ~~''` ~~ ~~ ~~ ~. ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION M,.., `~',; 4,.., s Facility LISBURNE PRODUCTION CENTER #1 Operator ARCO ALASKA, INC Field(s) PRUDHOE BAY/PT MCINTYRE Month/Year of Disposition 4/00 Disposition Volume MCF` `indicate contribution of each pool to total. 1. Sold 152,526 Pool Name Code Percent 2. Reinjected 9,667,548 LISBURNE NIAKUK 640144 640148 45.94% 2.66% NORTH PRUDHOE BAY 640152 0.00% 3. Flared orvented less than 1 hour 1,100 POINT MCINTYRE WEST BEACH 666100 640186 43.97% 5.85% NIAKUK 640148 1.58% 4. Flared orvented greater than 1 hour 235 20 AAC 25 S i d 0 . ee re -- Su lemental re ort re w 5. Pilot and Purge 10,650 6. Used for lease operations Fuel t A i 889,726 17 247 ss s , 7.Other Lift Gas, Off Field 72,241 :~>:~:~:~:~>: >'•:;>:~:~:< >:::~:~:::::::::`:::::::::::~:~>:~:~>:~:~~~:~'»::>.'•:;:::::: dff~efai~ Use:OMI~'==PlaiSii~ ~~ ~A4ftf3~srrtation~>~ i:~lir: ~::~:<~:~: ~:~ TOTAL items 1 - 7 10,811,038 1. Safety MCF 8. NGL gas equivalent produced 152,526 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: 0 D ate Commissioner 0 ~, ' 11. Transferred to: Note: All volumes must be corrected to f t Remarks: ure o pressure of 14.65 psia and to a tempera 60 degrees F. Report due by the 20th of the iti f di 1 hereby certify that the foregoing is true and correct to the best of my knowledge. . f~ Title: Date: ~ ~ Signature~.~o o~.<.v'r~~ on. spos month following the month o Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) 1 ~ ~~ n~'~ C~ ~~~ .~ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION ity Operator Field(s) ILISBURNE PRODUCTION CENTER #1 ( PHILLIPS ALASKA INC. I Nr~uuhut Disposition Volume MCF` 1. Sold 143,186 2. Reinjected 9,617,970 3. Flared or vented less than 1 hour 658 4. Flared or vented greater than 1 hour Su lemental re ort re wired--See 20 AAC 25.235 0 5. Pilot and Purge 12,581 6. Used for lease operations Fuel Assist 881,576 17,073 7. Other Lift Gas, Off Field 189,700 TOTAL items 1 - 7 10,882,744 8. NGL gas equivalent produced 143,186 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoi~ is true and correct to the best of my knowledge. Signature: Title: ~ n-~ .Date: 'd`~ 3AY/PT MCINTYRE Month/Year of Disposition 5 W00 'Indicate contribution of each pool to total. Pool Name Code Percent LISBURNE NIAKUK 640144 640148 44.39% 2.54% NORTH PRUDHOE BAY 640152 0.00% POINT MCINTYRE WEST BEACH NIAKUK 666100 640186 640148 45.52°k 6.20% 1.35% dffcial Use:C3><sl~'=-~tariii':~AtatM~sif~~ation~~ l:~tir>:~':~»:<~ 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. .; ~~~ cif - ~ r i~•~G~ t~ 4 Form 10-422 (Revised 4/95) ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility LISBURNE PRODUCTION CENTER #1 Operator PHILLIPS ALASKA INC Field(s) PRUDHOE BAY/PT MCINTYRE Month/Year of Disposition ~' 5100 Disposition Volume MCF` `Indicate contribution of each pool to total. 1. Sold 137,683 Pool Name Code Percent 2. Reinjected 7,539,082 ~ LISBURNE NIAKUK 640144 640148 36.92% 2.91% NORTH PRUDHOE BAY 640152 0.00% 3. Flared or vented less than. l hour 1,693 POINT MCINTYRE WEST BEACH 666100 640186 53.06% 5.20% NIAKUK 640148 1.91 4. Flared or vented greater than 1 hour 235 Su lemental re rt re wired--See 20 AAC 25 1,867 . 5. Pilot and Purge 12,102 6. Used for lease operations Fuel Assist 802,583 66,801. 7. Other Lift Gas, Off Field 176,085 :~:~:~::~:~:~•~ ~~~:~:~:~ ~•~ ~ ~:~:~~~~~:~::~ :~~~•~:~~~~~:~:~:~:~:~:~:~:~:~:~~~: •~:~:~:::::::~::~: C1fi;raal~lise:C~rtl `.-~laiin~~:~Atithorization >~1: tir:~:< :•:~»: TOTAL items 1 - 7 8,737,896 1. Safety j ~ MCF f f~, ~ ~~ 8. NGL gas equivalent produced 137,683 2. Lease Use MCF ' 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: 0 Commissioner Date 0 11. Transferred to: Note: All volumes must be corrected to f Rema-ks: pressure of 14.65 psia and to a temperature o 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: Title:..S~oCI'dis0r-RcJ•AC~f.~ Date: 7 if Ld month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) ~~~/ /w'"~~~ PHILLIPS ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JUNE 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/2/00 1316-1336 127 Process upset in the gas section caused compressor 1801 to UNPLANNED Stabilized facility process and restarted compressor shutdown 6/8/00 0955-1015 106 Process upset in the gas section caused compressor 1801 to UNPLANNED Stabilized facility process and restarted compressor shutdown 6/10/00 1125-1200 306 Compressor 1801 was inadvertently shut down during routine UNPLANNED Restarted compressor maintenance 6/19/00 1455-1515 8i Process upset in the oil section caused compressor 1801 to UNPLANNED Stabilized facility process and restarted compressor shutdown Total Flare r 1 Hour 620 6/7/00 1528-1615 694 Instrumentation malfunction caused compressor 1867 to shut down UNPLANNED Restarted compressor after several attempts 1748-1850 2346-2359 Total Flare > 1 Hour 694 Volume Flared 1,314 Measured Safety Pilot 4,455 Continuous Assist 25,013 TOTAL FLARED 30,782 PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JUNE 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/2/00 1316-1336 150 Process upset in the gas section caused compressor 1801 to UNPLANNED Stabilized facility process and restarted compressor. shutdown 6/8/00 0955-1015 166 Process upset in the gas section caused compressor 1801 to UNPLANNED Stabilized facility process and restarted compressor shutdown 6/10/00 1125-1200 447 Compressor 1801 was inadvertently shut down during routine UNPLANNED Restarted compressor maintenance 6/19/00 1455-1515 132 Process upset in the oil section caused compressor 1801 to UNPLANNED Stabilized facility process and restarted compressor shutdown Total Fare <= 1 Hour 895 6/7/00 1528-1615 949 Instrumentation malfunction caused compressor 1867 to shut down UNPLANNED Restarted compressor after several attempts 1748-1850 2346-2359 Total Flare > 1 Hour. 949 Volume Flared 1,844 .Measured Safety Pilot 6,430 Continuous Assist 34,687 TOTAL FLARED 42,961 ,. ~ ~.. ~.., PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JUNE 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/2/00 1316-1336 17 Process upset in the gas section caused compressor 1801 to UNPLANNED Stabilized facility process and restarted compressor shutdown 6/8/00 0955-1015 23 Process upset in the gas section caused compressor 1801 to UNPLANNED Stabilized facility process and restarted compressor shutdown 6/10/00 1125-1200 51 Compressor 1801 was inadvertently shut down during routine UNPLANNED Restarted compressor maintenance 6/19/00. 1455-1515 10 Process upset in the oil section caused compressor 1801 to UNPLANNED Stabilized facility process and restarted compressor shutdown Total Flare <= 1 Hour 101 6/7/00 1528-1615 131 Instrumentation malfunction caused compressor 1867 to shut do UNPLANNED Restarted compressor after several attempts 1748-1850 2346-2359 Total Flare > 1 Hour 131 Volume Flared 232 Measured Safety Pilot 630 Continuous Assist 3,937 TOTAL FLARED .4,799 t ... ~. PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JUNE 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <- 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot Continuous Assist TOTAL FLARED 0 r -s BP EXPLORATION, INC. CONSERVATION ORDER N0.219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JUNE 2000 VOLUME PLANNED DATE TIME Msc DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/2/00 1316-1336 8 Process upset in the gas section caused compressor 1801 to UNPLANNED Stabilized facility process and restarted compressor shutdown 6/8/00 0955-1015 9 Process upset in the gas section caused compressor 1801 to UNPLANNED Stabilized facility process and restarted compressor shutdown 6/10/00 1125-1200 24 Compressor 1801 was inadvertently shut down during routine UNPLANNED Restarted compressor maintenance 6/19/00 1455-1515 7 Process upset in the oil section caused compressor 1801 to UNPLANNED Stabilized facility process and restarted compressor shutdown Total Flare <= 1 Hour 48 6/7/00 1528-1615 50 Instrumentation malfunction caused compressor 1867 to shut down UNPLANNED Restarted compressor after several attempts 1748-1850 2346-2359 Total Flare > 1 Hour 50 Volume Flared 98 Measured Safety Pilot .354 Continuous Assist 1,865 TOTAL FLARED 2,320 r ~` PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JUNE 2000 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/2/00 1316-1336 4 Process upset in the gas section caused compressor 1801 to UNPLANNED Stabilized facility process and restarted compressor shutdown. 6/8100. 0955-1015 6 Process upset in the gas section caused compressor 1801 to UNPLANNED Stabilized facility process and restarted compressor. shutdown 6/10/00 1125-1200 14 Compressor 1801 was inadvertently shut down during routine UNPLANNED Restarted compressor maintenance 6/19/00 .1455-1515 5 Process upset in the oil section caused compressor 1801 to UNPLANNED Stabilized facility process and restarted compressor shutdown Total Flare <- 1 Hour 29 6/7/00. 1528-1615 43 1748-1850 2346-2359 Total Flare > 1 Hour 43 Volume Flared 72 Measured Safety Pllot 233 . Continuous Assist 1,296 TOTAL FLARED 1,601 Instrumentation malfunction caused compressor 1867 to shut down UNPLANNED Restarted compressor after several attempts i N ~ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility LISBURNE PRODUCTION CENTER #1 Operator PHILLIPS ALASKA INC Field(s) PRUDHOE BAY/PT MCINTYRE Month/Year of Disposition '~ `S[00 Disposition Volume MCF* *Indicate contribution of each pool to total 1. Sold 127,829 Pool Name Code Percent 2. Reinjected 7,534,127 LISBURNE NIAKUK 840144 640148 41.13% 3.05% NORTH PRUDHOE BAY 640152 0.00% 3. Flared or vented less than 1 hour 786 POINT MCINTYRE WEST BEACH 666100 640186 49.01 4.85% NIAKUK 640148 1.96% 4. Flared or vented greater than 1 hour 235 ort re wired--See 20 AAC 25 t l l S 15,443 "` . emen a re u 5. Pilot and Purge 11,840 6. Used for lease operations Fuel Assist 808,052 32,604 7. Other Lift Gas, Off Field 205,377 ~:~:~:~:~:~:~:~:~::::::~:;:::::~:~~~~~~~:~:~ :~ ~~~:~~~~~:~:~:~:~:~:~:~:~:~:~~~: ~:~:~:::~:~:~::~: G1ft`efal 1Jse:c3rsl '==Ktariii~';Authori~atien >~i;tir'>:~:~:~::~:~> TOTAL items 1 - 7 8,736,058 1. Safety ~ 5 . y~ `~ 3 MCF 8. NGL gas equivalent produced ~ 127,829 2. Lease Use MCF 9. Purchased gas ~~~ '~ ~ ~~~~ 0 3. Conserv. Purposes. MCF x~88~~ 4%1"i ~c x-+88 ~: l 10. Transferred from: AgG$~Q '. (i011~tf°u~'~21. ~' 0 Commissioner Date 0 11. Transferred to Note: All volumes must be corrected to Remarks: pressure of 14.65 psia and to a temperature of 60 degrees F. ,Report due by the 20th of the 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: ~ - / ~ Titie: ~U ~~J! S 0 ~ Date: & / 7 ~ month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) `fix .., ~/ l ~/~x'2, ,/DY.' PHILLIPS ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JULY 2000 VOLUME PLANNED DATE TIME MSCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 7/5/00 1328-1348 68 Electricalrnstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I failure and restarted compressor to shut down 7/5/00 1751-1803. 54 Electrical/instrumentation malfunction caused compressor 1801 Unplanned. Corrected E & I failure and restarted compressor to shut down 7/18/00 1242-1250 108 Electricalrnstrumentation malfunction caused compressor 1801 Planned Corrected E & I failure and restarted compressor to shut down 7/30/00 1131-1150 84 Electrical~nstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I failure and restarted compressor to shut down Total Flare <= 1 Hour 314 7/17/00 1933-0053 6,132 Seal oil system difficulties caused compressor 1808 to shut down Total Flare > 1 Hour 6,132 Volume Flared 6,446 Measured Safety Pilot 4,851 Continuous Assist 12,920 TOTAL FLARED 24,217 Unplanned Corrected seal system difficulty and restarted compressor ~~ AGG i ~~ ~;?0~ PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, .POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JULY 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF tNCtDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 7/5/00 1328-1348 86 Electrical~nstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I failure and restarted compressor to shut down 7/5/00 1751-1803 69 Electricalrnstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I failure and restarted compressor to shut down 7/18/00 1242-1250 132 Electrical/instrumentation malfunction caused compressor 1801 Planned Corrected E & I failure and restarted compressor to shut down 7/30/00 1131-1150 88 ElectricaUnstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I failure and restarted compressor to shut down Total Flare <~ 1 Hour 375 7/17/00 1933-0053 7,689 Seal oil system difficulties caused compressor 1808 to shut down Total Flare > 1 Hour 7,689 Volume Flared 8,064 Measured Safety Pilot 5,805 Continuous Assist 16,108 TOTAL FLARED 29,977 Unplanned Corrected seal system difficulty and restarted compressor ~':~ ~x!1> r101°3~~ PHILLIPS ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JULY 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 7/5/00. 1328-1348 8 Electricalrnstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I failure and restarted compressor to shut down 715/00 1751-1803 7 Electrical/instrumentation malfunction caused compressor 1801 Unplanned Corrected E & I failure and restarted compressor to shut down 7/18/00 1242-1250 24 Electricalrnstrumentation malfunction caused compressor 1801 Planned Corrected E & I failure and restarted compressor to shut down 7/30/00 1131-1150 9 ElectricaVinstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I failure and restarted compressor to shut down . Total Flare r 1 Hour 48 7/17/00 1933-0053 803. Seal oil system difficulties caused compressor 1808 to shut dowr Unplanned Corrected seal system difficulty. and restarted compressor Total Flare > 1 Hour 803 Volume Flared 851 Measured Safety Pilot 581 Continuous Assist 1,768 TOTAL FLARED 3,200 ~~17 ~ C1 2?0~ ~38~8 (.."kt ~ ~ti1 'vv:?s'~', ;,,ttt~~ 113e90fi r~el;C~i01;a~S PHILLIPS ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JULY 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <- 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 .Measured Safety Pilot Continuous Assist TOTAL FLARED 0 ~. ~ti ~01"d€3~? a. BP EXPLORATION, INC. CONSERVATION ORDER N0.219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JULY 2000 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 7/5/00 1328-1348 5 Electricallnstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I failure and restarted compressor to shut down 7/5/00 1751-1803 4 Electrica~nstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I failure and restarted compressor to shut down 7/18/00 1242-1250 15 Electricallnstrumentation malfunction caused compressor 1801 Planned Corrected E & I failure and restarted compressor to shut down 7/30/00. 1131-1150 5 Electricallnstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I failure and restarted compressor to shut down Total Flare <= 1 Hour 29 7/17/00 1933-0053 503 Seal oil system difficulties caused compressor 1808 to shut down Total Flare ~ f Hour 503 Volume Flared 532 Measured Safety Pilot 367 Continuous Assist 1,099 TOTAL FLARED 1,998 Unplanned Corrected seal system difficulty and restarted compressor ~~ ~,t;G!!~~C~ ~ 2i~~~Na~~ry ~y '~Aa"a~,~~_1i d,.pil i`.X ~36ci7 h.'Y~v`. ti~'::i?ti?~v~f? ~11u~#Cf!'BG~~ PHILLIPS ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JULY 2000 DATE TIME VOLUME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 7/5/00 1328-1348 4 Electrical/instrumentation malfunction caused compressor 1801 Unplanned Corrected E & I failure and restarted compressor to shut down 7/5/00 1751-1803 3 Electrical~nstrumentation.malfunction caused compressor 1801 Unplanned Corrected E & I failure and restarted compressor to shut down 7/18/00 1242-1250 10 Electrical/instrumentation malfunction caused compressor 1801 Planned Corrected E & I failure and restarted compressor to shut down 7/30/00 1131-1150 3 Electrical~nstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I failure and restarted compressor to shut down Total Flare <= 1 Hour 20 7/17/00 1933-0053 316 Seal oil system difficulties caused compressor 1808 to shut down Total Flare > 1 Hour 316 Volume Flared 336. Measured Safety Pilot 236 . Continuous Assist 709 TOTAL FLARED 1,281 Unplanned Corrected seal system difficulty and restarted compressor ~..m.~ ~~ ~lj~ i v c.~~ E`:'t r: '"q.y e. Y~r!°4P° pro d~' ~rP EFii"e ~~~~ t,.'~i d`i. ~3U:s G,fa.!::ik. '.,;'F:.I?~fil,~3+v~. s`~ftt~~lt~i e~~~ To: Wendy Mahan, (AOGCC) Subject: LPC Flare Events From: Bruce W Robinson, (BP Alaska Operations Team Lead at LPC) July 17 Flare Event At approximately 19:31, turbine-driven Reinjection Compressor 1808 shut down due to high level in the high-stage Seal Oil Overhead Tank. Initial trouble-shooting by operators suggested a faulty switch. When Seal Oil Reservoir levels could not be readily re-established in the normal operating range, electrical and instrument technicians joined in the trouble-shooting. The first production well was called to be shut in at approximately 20:10 PM, and was shut-in at 20:30. Production was curtailed from an additional twelve wells over the next four and one half hours until a total of 184.5 MMSCFD of gas and 21,320 BOPD of oil had been shut-in at wellhead. Wells shut in for this event were: L5-23, L5-8, L5-36, NK-14, NK-26, P1-4, P1-6, P1-13, P2- 24, P2-56, P2-57, and WB-4 August 7 Flare Event On 8/7/00 at 04:00 AM operations experienced a process upset that caused the Crude Oif Surge Drum to high level and carry liquid over to the Suction Scrubber (42-1206) for the STV Compressors. This vessel could not handle the volume and in turn carried over to the Low Pressure Flare Knock Out Drum (42-1221). The pump off the Knock Out Drum could not handle all the liquid. The liquid level got high enough to carry out to the Liquid Flare. This caused a black smoke event. An early estimate of 100 gals of crude was carried into the pit. The cause of the process upset was an automation communication problem in LPC. Operations was having problems controlling the produced water pumps in module 4923. This caused the water to stop dropping out of the HP Separator and start building levels in all the vessels. Operations realized that a process ESD could not be avoided and chose to go ahead and SESD the facility. This allowed the plant to stabilize and stop flaring. At approximately 08:00 systems were checked out and the process of starting up LPC began. More testing of the control system for the produced water pumps is ongoing. Note: A SESD of the facility shuts in all the wells that flow into LPC at the Drill Sites. During this event before the flaring started all the wells on the East side of the field (At L3, L4, L5, And Niakuk) were shut in to cut rate. This was done to try and slow down the process and avoid having a flare event. August 29 Flare Event On August 27 LPC Operations started having surge control problems with turbine-driven Reinjection Compressor 1807. Operations and Maintenance personnel started trouble-shooting the problem. They replaced control cards and fire eyes. This did not fix the surging problems it was determined that the power supply for the surge control system needed to be replaced. To do this work the Compressor had to be shut down. On the morning of August 29 wells were shut in to cut rate and the compressor was shut down and the power supply was changed out. There was 195 MM of gas cut. Wells shut in for this event were: L4-10, L5-5, L5-18, L5-23, P1-4, P1-5, P1-6, P1-13, P2- 56, P1-57, and WB-4. Information on LPC Flare Events Subject: Information on LPC Flare Events Date: Fri, 13 Oct 2000 09:54:34 -0900 From: "Barnes&Robinson" <P1466@ppco.com> To: Wendy Mahan <Wendy_Mahan@admin.state.ak.us> CC: PBUOperMgr@BP.com Wendy Attached to this note is more information on the three flare events that you had questions on at LPC. If you need more information on these events please let us know. We will make sure in the future that this information gets to you with the flare report. Thanks Bruce W Robinson (907) 659-8641 (See attached file: LPC Flare Events.doc) Name: LPC Flare Events.doc LPC Flare Events.doc Type: Microsoft Word Document (application/msword) Encoding: base64 Description: Mac Word 3.0 1 of 1 10/13/00 10:13 AM ALASKA OIL AND GAS CONSERVATION COMMISSION FACWTY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition LISBURNE PRODUCTION CENTER #1 PHILLIPS ALASKA INC. PRUDHOE BAY/PT MCINTYRE 8/00. sus `~- ~ ~' r ' - k U ~ 4 ~ ~: } - ~ c~, E : ~- ~J ~ a.s "S~ n,,y r'~ ~ ~ ` c~ ~~? ~.~' a~ ° ~ ~~ Disposition Volume MCF* " 1 Sold 125,887 .Reinjected 8,937,918 r ,~. Flared or vented less than 1 hour 450 f f 4 ~ Flared or vented greater than 1 hour 9,003 Su lemental re rt re wired--See 20 AAC 25.235 5. Pilot and Purge 11,751 6. Used for lease operations Fuel 776,281 Assist 38,872 7.Other Lift Gas, Off Field 241,260 i TOTAL items 1 - 7 8,141,202 8. NGL gas equivalent produced 125,667 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. ~~'k'1"' Title: S~ ('E ~ v i Srnz Date: /4 Oil N Signature: Form 10-422 (Revised 4/95) Indicate contribution of each pool to total. Pool Name Code Percent ISBURNE NIAKUK 840144 640148 34.84% 3.02% NORTH PRUDHOE BAY 840152 0.00% POINT MCINTYRE WEST BEACH IAKUK 666100 640186 640148 L 54.83% 5.31 2.00% Sffii~al~lise~c~ri('~~~laiiii~~~~i4t~fliir~~atii~ii~>~i:~ti~:~:~:~:=:~:~:~:~ } . Safety ~ Pt~~~ MCF ~~ ,if^' ; i `~ ~! (~ ~. Lease Use MCF 3. Consenr. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.85 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235... PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS AUGUST 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/1/00. 0949-1005 148 ElectricaUnstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I fluctuationffailure and restarted 1440-1500 to shut down compressor 8/30100 0801-1914 23 Process FOR module startup and functional check out. Intermittent Unplanned Startup FCO completed for the day flaring for 26 minutes 8/31/00 0815-1704 11 Process FOR module startup and functional check out. Intermittent Unplanned Startup FCO completed for the day flaring for 7 minutes Total Flare <=1 Hour 182 8/7/00 0401-0919 581 8/29/00 0843-1405 2,686 Total Flare ~ 1 Hour 3,267 Volume Flared 3,449 Measured Safety Pilot 4,090 Continuous Assist 14,578 TOTAL FLARED 22,117 Automation communication caused a process upset Unplanned Systems checked out and restarted LPC. ElectricaUnsttumentation malfunction caused compressor 1801 Unplanned Corrected E & I fluctuation/failure and restarted to shut down compressor - ~ ~ TE TIME OLUME (MSCF) PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.218 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS AUGUST 2000 DESCRIPTION OF INCIDENTS & CAUSE LANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/1/00 0949-1005 .177 ElectricaUnstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I fluctuation/failure and restarted 1440-1500 to shut down compressor 8/30/00 0801-1914 32 Process FOR module startup and functional check out. Intermittent Unplanned .Startup FCO completed for the day flaring for 26 minutes 8/31/00 0815-1704 17 Process FOR module startup and functional check out. Intermittent Unplanned Startup FCO completed for the day flaring for 7 minutes Total Flare <= 1 Hour 226 817/00 0401-0919 738 Automation communication caused a process upset Unplanned Systems checked out and restarted LPC. 8/29/00 0843-1405 4,010 Electrica~nstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I fluctuation/failure and restarted to shut down compressor TotalF/are> 1 Hour 4,748 Volume Flared 4,974 Measured Safety Pilot 6,447 Continuous Assist 20,494 TOTAL FLARED 31,915 ,' PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS AUGUST 2000 VOLUME PLANNED DATE .TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/1/00 0949-1005 17 ElectricaUnstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I fluctuation/failure and restarted 1440-1500 to shut down compressor 8/30/00 0801-1914 2 Process FOR module startup and functional check out. Intermitt Unplanned Startup FCO completed for the day flaring for 26 minutes 8/31/00 0815-1704 1 Process FOR module startup and functional check out. Intermitt Unplanned Startup FCO completed for the day flaring for 7 minutes Total Flare <- 1 Hour 20 8/7/00 0401-0919 68 Automation communication caused a process upset Unplanned Systems checked out and restarted LPC. 8/29/00 0843-1405 443 ElectricaUnstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I fluctuation/failure and restarted to shut down compressor Total Flare > 1 Hour 511 Volume Flared 531 .Measured Safety Pilot 626 Continuous Assist 1,956 TOTAL FLARED 3,113 PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS AUGUST 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured SaTety Pilot Continuous Assist TOTAL FLARED 0 BP EXPLORATION, INC. CONSERVATION ORDER NO. 219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS AUGUST 2000 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/1/00 0949-1005 10 ElectricaUnstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I fluctuation/failure and restarted 1440-1500 to shut down compressor 8/30/00 0801-1914 2 .Process FOR module startup and functional check out. Intermittent Unplanned Startup FCO completed for the day flaring for 26 minutes 8/31/00 0815-1704 1 Process FOR module startup and functional check out. Intermittent Unplanned Startup FCO completed for the day flaring for 7 minutes Total Flare <=1 Hour 13 8/7/00 0401-0919 41 Automation communication caused a process upset 8/29/00 0843-1405 239 ElectricaUnstrumentation malfunction caused compressor 1801 to shut down Total Flare > 1 Hour 280 Volume Flared 293 Measured Safety Ptlot 352 Continuous Assist 1,098 TOTAL FLARED 1,743 Unplanned Systems checked out and restarted LPC. Unplanned Corrected E & I fluctuation/failure and restarted compressor A i PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS AUGUST 2000 VOLUME PLANNED DATE TIME (Msct7 DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/1/00 0949-1005 7 Electrica~nstrumentation malfunction caused compressor 1801 Unplanned Corrected E & 1 fluctuation/failure and restarted 1440-1500 to shut down compressor 8/30/00 0801-1914 1 Process FOR module startup and functional check out. Intermittent Unplanned Startup FCO completed for the day flaring for 26 minutes 8/31/00 0815-1704 1 Process FOR module startup and functional check out. Intermittent Unplanned Startup FCO completed for the day flaring for 7 minutes Total Flare <= 1 Nour 9 8/7/00 0401-0919 26 Automation communication caused a process upset Unplanned Systems checked out and restarted LPC. 8/29/00 0843-1405 171 Electrica~nstrumentation malfunction caused compressor 1801 Unplanned Corrected E & I fluctuationffailure and restarted to shut down compressor Total Flare > 1 Hour 197 Volume Flared 206 Measured Safety Pilot 236 Continuous Assist 746 TOTAL FLARED 1,188 JPEG image 640x480 pixels Subject: OOP's Date: Mon, 07 Aug 2000 07:52:56 -0800 From: Lou Grimaldi <lou_grimaldi@admin.state.ak.us> Internal Organization: State of Alaska, Dept of Admin, AOGCC To: Blair Wondzell <Blair_wondzell@admin.state.ak.us> Blair I screwed up my ds-13 SVS report, I am sending a good one. Please discard the old one thanks. Also is a picture of the Lisburne flare. I will call you in a few minutes. Name: SVS PBU DS-13 8-6-00 LG.doc SVS PBU DS-13 ~-6-00 LG.doc~ Type: Microsoft Word Document (application/msword) Encoding: base64 Louis Grimaldi <luugrimaldi a`admin.state.ak.us> 1 of 2 8/7/00 8:29 AM Aug-11-00 15:32 From-ARCO ENVIRONMENTAL PB 659-6226 ~''tiUUMV~ I~AY, ALA~1'~A EASTERN OPERATING AREA _ FIELD ENVIRONMENTAL COMPLIANCE Fax Transmittal Cover Sheet DATE: ~ , ~ ~ ~ ©~ TO: Blair Wondzt~ll, AOGCG 276-7542 T-492 P.O1/02 F-510 1911L49~b, r r FROM: L. Allen/M. Stewman Environmental Technician ARCO Field Environmental Compliance Prudhoe Bay, Alaska Phone 659-8270 Fax 659-8228 NOTES: P° o~-~ (,,, ~ C.. A-., actcl 1 ~ l a~r~ ~ ~.5 ga~lok s ,.,_ i ~~ ~,~ c.R.li i ~ ~a cam. ~~ c~,v, ~wc5-~ ~orS . ~~C~ t~l S~ e,w~~ ~~~ ~ `~2~ PAGES TO FOLLOW: (Does Not Include Cover Sheet) Aua-11-00 15:32 Fram-ARCO ENVIRONMENTAL PB 659-8228 r_S1'.,pischarge Phillips Alaslta lnc. Eastern Operating Area Printed: 08/11/2000 Prudhoe Bay/GP1VIAi,lPhone: {9(17) 659-8270 Page: 1 Interim Agency Report LOCATJON OF DISCI-iARGE: LPC ADDITIONAL LOCATION INFO, LPC liquid Flare Pit TIME OBSERVED: 5:00:00 AM 08/0'7/2000 R>"PORTlwA BY: MICHAEL ST'EWMAN TO: ADEC: 8/7/00 interim AANR: b/7/OU In[zrim NRC: 8/7/00 NSB: 8l7/UO Interim Other: AOGCC 8/7 RI35PONS16LE GROUP: BP 1?XPI_ORATION TYPE AND AMOUNT: 52S.O Total Gallon(s) 0.1 Gallon(s) Unto Tundra, coveting 100.0 area QU Gallon(s) Tnto Water, coveting 0,0 aren 0.0 Gallon(s) Insido Secandaty Containment 0.0 Gallon(s) Into Building loo ~;~ cRUAr T-492 P. 02/02 F-510 Dlce~u6ffi ., t~~~ S tOyl CAUS13 OF DISCIiARGE: EQUIPMENT DIFFICULTY Carryover ftom the STVIP suction sctubbcr during LPC plant upset, the carryover wen[ to the 1P flare KO drum. Thz carryover was too great for the pump to keep up with, so tha crude diverted to ttte liquid tare pit. ENVIRONMENTAL DAMAGE: Thtre was approximately 1/2 gist (8 ounces) of crude tho lightly misted off- pad onto the tundra. CLEANUP ACTIONS: 817!00 -The spill rasponse roam was notitied and will begin cleanup on the spill as arson as possible. 8/8100 -The cleanup work has Matted at the spill site. CLEANUP VERIFICATION: VISUAL PREVENTIVE ACTION: There was a communication proglem that caused the 1PC plant apse[. At this timt: we have not dctartnincd what the causa of tha communication faiIute was, Testing is in progress. DISPOSAL/RL'CYCLH LOCATION: *s"~ No Disposal Locations Assigned *~* COMMENTS: 8/7/00 - TIIE TOTAL AMOUNT TI~AT SPTT_1r1rA OFF-PAD WAS APPROXIMATELY L/2 T'iNT (8 OUNCES). 8!8100 -PER THE REVISED ESTIMATE IROM THE SRI, THE SPILL VOLUME NAS INCREASER TROM 100 TO 500 GALLONS. 8/]O/00 -PER AN UPAATE FROl~1 THE SPILL RESPONSE TEAM, AN ADDI'1"IONAL AMOUNT OF ATSC.1-tARGED CRUDE PROM THIS TNGIAI?NT WAS DISCOVERED INSIDE A SECONI] FLARE PIT AT LPC. T3PX HAS RLCC[VED APPROVAL FROM ADEC TO INCLUDE THIS AMOUNT WITH THE CURR>wNT SPILL. TOTAL. BRINGING THE ESTIMATED SP1Ll VOLUME TO 525 GALLONS. Attts-15-00 23:24 From-ARCO ENVIRONMENTAL PB 659-8228 r_SP Discharge $P ESrploration, Inc. Eastern UperaNng Area Printed: 08/15/2000 Prudhoe Bay/GPMA, Phone: (907) 659-8270 Page: 1 Interim Agency )(tePort LOCATION OF DISCHARGJ3: LPC ADDITIONAL LOCATION TNFO. LPC Liquid Flare Pit TIME OBSERVED: 9:00:00 AM 08/15/2000 R13PORTBD BY: MICHAEL STI3WMAN TO: ADEC: interim 8/JS/00 ADNR: interim 8!15/00 NSB: Interim S/i 5/OU Other: AOGCC interim 8/15 RESPONSI13L1R QROUP: BP EXPLORATION TYPE AND AMOUNT: ' i3.q To[al Gallon(s) 0.0 Gallon(s) Un[o Tundra, covering 0.0 area 0.0 Gallon(s) Into Water, co~~crinb 0.0 area O.U Gallon(s) inside Secondary Containment 0.0 Gallon(s) Into Building 5U %n CRUDE 50 % FRESH WAT>R T-533 P.03/03 F-561 v1 - •• •• l CAUSE OP DISCI3ARGE: EQUIPMENT DiFF1CULTY Valve X002V wss found -caking through to thz liquid flare pi[. I^ order to ready X002V for feartown main[enance, the line was blown down to the liquid pi[ [o disperse the hydrocarbons frvm the lino. Liquids from this line escaped a containment drum sa[ up [o Ca[eh [hd fluids, ' 13NVIRONMI3NTAL DAMAGE: None. CLEANUP ACTIONS: Tha SRT is cun'en[ly in the process of cleaning up the spill. CLEANUP V13R1F1CATION: VISUAL PRJSVENT1vE ACTION: X002V is being repaired [n prevetu to prevent further leakage into the liquid line. A secondary contxinmcnr box will be ins[alied in [he liquid flare pit to fI catch and con[ain small liquicl releases to the flare pit that may occur in thn t'uture. DISPOSAi./RECYCLE LOCATION: *~'" No Disposal Locations AssJgnzd ~`** COMMENTS: NOTE: THIS IS TIIJ? FOURTH REPOR'I'ABL1? SPILL TO TI-IE LIQUID FLARE PiT FOR THE YEAR 2000. A:NQ-0~-00 20:10 From-ARCO ENVIRONMENTAL PB 659-8228 PRUDHOE BAY, ALASKA EASTERN OPERATING AREA _ . FIELO ENVIRQNMENTAL COMPLIANCE Fax Transmittal Cover Sheet DATE: gU ~'~~ TO: Blair Wondzell, AOGCC 276-7542 T-461 P.OIl02 F-458 ~~~ ~~ FROM: L. AI[en/[N. Stewman Environmental Technician ARCO Field Environmental Comlp[lance Prudhoe Bay, Alaska Phone 658-8270 Fax 659-8228 NOTES: ~,~.r..,n~ Q~--P~r~ t are ~P~... ~=tc~-e. ~'~ ~ yl~.~An~ S~ev.,wq,~ PAGES TO FOLL4W: ~ (Do®s Not Include Cover Sheet) ~. t~ ~~~~~ ar Aut;-07-00 20:10 From-ARCO ENVIRONMENTAL PB 659-8228 T-461 P.02/02 F-458 ~, r,~P,,,~.lischarge Phillips Alaska Inc. pastern Operating Area nova Printed: 08/07/2000 Prudhoe Bay/GPMA, Phone: (9117) b59-8270 Page: 1 Interim Agency Report LOCATION OF AISC}IAIiGE LPC ADDITIONAL LOCATION INFO. LPC Liquid Flare Pit TIM); Oi3SERVED: 5:00;00 AM 08/07/2000 REPORTI?D BY: MICHAEL STEWMAN TO: AA&G:8/71DOlnterim ADNR: $/7/00lnterim NRC: 8/'I/00 NS]3; B/7/00lnterim Other: AOGGC 8/7 RESPONSIBLE GROUP: IMP $XPLORATION TYPE AND AMOUNT: 100.0. Total Gallon(s) O.l Gallon(s) Unto Tundra, covering 600.0 area 0,0 Gallon(s) Into Water, covering 0.0 area 0.0 Gallon(s) Inside Secondary Containment 0.0 Gallon(s) Into Euitding 100 3b CRUDE CAUS13 OF DISCHARGE: EQUiPMBNT DIFFICULTY Carryover from the STViP auction scrubber luting LPC plant upset, the Carryover wens to the LP tlaro KO drum. The carsyovcr was too EReat for the pump to keep up with, ~o the crude diverted to the liquid flare pit. ENVIRONMENTAL AAMAGE: There wAS approximately ll2 (pint (K ounces) of crude the lightly misted off- pad onto the tundra. CLEANUP ACTIONS: The spill response team was notitied and will begin cleanup on the spill as arson as possible- CLEANUP VERII'ICATION: VISUAL PREVENTIVI3 AGT10N: Thcrc was a conununication problem that caused the LPC plane upset. Al [his time we have not detormined what the Cause of the ¢ommunicatlon failure was. Testing is in progress. DISPOSAURECYCLE LOCATION: *** No Disposal lACa[lUn6 Assigned "'~•* CQMMENTS: THE TOTAL AMOUNT T1iAT SPlLL13I) OFF-PAA WAS ApPROXIMA'T1=LY 1I2 PINT (8 OUNCES). r~.~,s`'~:f tom) ~~ ~.~~~+~` Point Mac 1/OR start-up Subject: Point Mac FOR start-up Date: 15-Aug-2000 12:38:34 HDT From: "EOC Supervisor PRB" <p2013@ppco.com> To: wendy_mahan@admin.state.ak.us CC: "EOC Engineer" <p1046@ppco.com>, FrenchTL@BP.com, "EOC Specialists PRB" <p1024@ppco.com> Wendy, I wanted to give you a 'heads-up' on some flaring that is going to take place at the LPC. John Cologgi has outlined the activities that will start within the next week or so and the possible flare volumes. If you have any questions please give me, or John, a call. I leave the slope today and Paul Andrews will not be in until Friday, August 18. Jim Mullins 659-5566 ---------------------- Forwarded by EOC Supervisor PRB/AAI/ARCO on 08/15/2000 12:06 PM --------------------------- John R Cologgi 08/14/2000 06:40 PM To: EOC Supervisor PRB/AAI/ARCO@Phillips cc: Barnes&Robinson/AAI/ARCO@Phillips Subject: Point Mac FOR start-up Jim, As we have discussed, we're rapidly (I hope!) approaching start-up on the FOR compressor at LPC. As with any initial compressor start-up, there's a lengthy list of adjustments, controller tuning and testing that needs to be done. This machine will have even more than usual since it is our first package with dry gas seals, active thrust control for the magnetically levitated rotor, and a high frequency/high power variable frequency drive unit for the 10,000 horsepower electric motor. Right now we expect to bring first gas into the module on, or about, 8/19/00. The attached list gives an outline of the steps we will be taking to commission the unit. "Lean gas", as referred to in the attached list, is the residue gas coming out of the NGL plant at LPC (mole weight of a little over 20). The initial clean-up runs will be with lean gas with the machine in full recycle. Due to seal leakage into the machine we will "burp" to the flare to maintain pressure within safe limits. Flaring should be about 4 - 6 MMSCF on a full day basis, but this will consist of "burps", not a continuous stream. This compressor train is designed to blowdown to about atmospheric pressure on any machine trip. The contained volume of the compressor train is small, but the discharge pressure is high. I have estimated a contained volume of about 70 MSCF within the train battery limit valves. (This is based on 4000 psig in the entire train - I will provide a more accurate number later by breaking the train down into its three pressure stages.) It is quite likely that we will experience several trips during initial operation. "MI", as referred to in the attachment, is the the heavy gas coming off the stabilizer tower and the economizer drum in the NGL plant (mole weight of about 30 - 36). During the normal run tests we will be blending lean gas with the MI into the machine suction to get a product with a mole weight of about 27. All of our final tuning and performance testing will be done with this product. There will be at least a couple of intentional trips during this stage, and probably a few unintentional trips as well. Since we will need to move flowrate and discharge pressures around to perform 1 of 2 8/21/00 10:00 AM Point Mac FOR start-up these tests, we intend to run the machine with the discharge valve to the pipeline closed and control our operating point by throttling the discharge to the flare. We cannot operate in full recycle during these tests because the seal leakage into the machine will result in a continuously varying gas composition. Throttling the machine from the other end of the 10 mile long pipeline is not practical. Full machine flow is 42 NII"ISCFD. We believe we can complete our full load/full speed tuning and testing in one shift; resulting in about 20 MMSCF of flaring in the 12 hour period. This low rate of heavy mole weight gas will require significant assist gas to burn smokeless. I do not yet have an estimate of assist gas needed. If you have any questions call me at 659-8667, or page me at 2902. Thanks, JRC (See attached file: FOR Start-up and Testing.xls) _.~.~.. , W ._.._ _y..~. ~ . ,~-_-w. Name: FOR Start-up and Testing.xls FOR Start-up and Testing_xls Type: Microsoft Excel Worksheet (application/vnd.ms-excel) Encoding: base64 Description: Excel 2.x Chart 2 of 2 8/21/00 10:00 AM LPC FOR compressor commissioning steps. 8/14/00 Pre-Run Activities: FCO Activities Verify Stroking of valves Operations to Prepare Energy Isolation list and tags Roll Blinds Purge and leak check Compressor with 80-100 psi N2 Bump motor, check rotation Lean gas leak test Clean-up runs Duration -- 3 days of actual running Debugging start sequence may take 1 to 3 days, expect multiple attempts the first times through Run Compressor on lean gas and full recycle Inspect and clean strainers and recycle valves as indicated by DP. Repeat runs until system is clean Estimate 4-6 MMSCFD flaring during clean up runs due to lean gas seal supply Verify stable operation of VFD and perform any tests necessary. Monitor bearing positions and vibrations during runs Verify functioning of thrust control system during runs Monitor proper functioning of dry gas seal systems during runs Set and check surge control system as follows: Check operating point at 9% offset from calculated surge Set control line at 18% offset from surge During surge controller settings take performance data and gas samples at 4 (or more) discreet operating points across compressor map. On shutdown, trip machine and verify thrust control function, record digital valve movements and record bearing currents. After system clean, shutdown and adjust as follows: Adjust alignments as needed. This will also be checked after mechanical run tests for final adjustments. Adjustments only necessary at this point if alignements have moved substantially. Adjust digital valve failed open port if indicated by thrust controller shutdown recording. Remove clean-up run strainers. Mechanical run tests Duration -- 12 hours Start-up as normal on start gas Bring in MI to achieve about 27 MW Bring to full load by speed increase and throttling to flare (no forward flow to pipeline). This means a hold in start sequence at step 21 Operate steady max load for 2 hours. (Check with Todd White for his requirements) With stable operation test and verify performance of VFD Verify Bearing vibrations and shaft positions Monitor Dry gas seal system fucntion Verfy functioning of thrust control system Reset and check surge control system as follows: Check operating point at 9% offset from calculated surge Set control line at 18% offset from surge a ,.. During surge controller settings take performance data and gas samples at 4 (or more) discreet operating points across compressor map. With operating point at near the surge control line (18% offset), open recycle valve, both stages and verify stabilty of thrust controller. Record parameters during this test. With machine operating at design point, trip the machine while recording the following: On paper recorder- record the digital valve positions and the axial bearing currents. From CCC or DCS record compressor speed, pressures, temperatures and flows (a rate of 10/second desireable.) After Mechanical run test the following may be required: Final adjustment of alignments Adjust digital valve failed open port if indicated by thrust controller recording. Correct any other problems uncovered During Mechanical Run or afterwards: Warm up the pipeline with lean gas from the downstream blend valve. Crossover to production line at the drillsite. Final Start-up Pack line to about 3000 psi with lean gas Start-up compressor through normal sequence Bring on-line and begin compression of MI. Crossover MI pipeline to production line at drillsite, throttle lean gas back to the plant. Prepare well for MI injection. Open well and close crossover when MI reaches the drillsite. To: Wendy Mahan, (AOGCC) Subject: LPC Flare Events From: Bruce W Robinson, (BP Alaska Operations Team Lead at LPC) July 17 Flare Event At approximately 19:31, turbine-driven Reinjection Compressor 1808 shut down due to high level in the high-stage Seal Oil Overhead Tank. Initial trouble-shooting by operators suggested a faulty switch. When Seal Oil Reservoir levels could not be readily re-established in the normal operating range, electrical and instrument technicians joined in the trouble-shooting. The first production well was called to be shut in at approximately 20:10 PM, and was shut-in at 20:30. Production was curtailed from an additional twelve wells over the next four and one half hours until a total of 184.5 MMSCFD of gas and 21,320 BOPD of oil had been shut-in at wellhead. Wells shut in for this event were: L5-23, L5-8, L5-36, NK-14, NK-26, P1-4, P1-6, P1-13, P2- 24, P2-56, P2-57, and WB-4 August 7 Flare Event On 8/7/00 at 04:00 AM operations experienced a process upset that caused the Crude Oil Surge Drum to high level and carry liquid over to the Suction Scrubber (42-1206) for the STV Compressors. This vessel could not handle the volume and in turn carried over to the Low Pressure Flare Knock Out Drum (42-1221). The pump off the Knock Out Drum could not handle all the liquid. The liquid level got high enough to carry out to the Liquid Flare. This caused a black smoke event. An early estimate of 100 gals of crude was carried into the pit. The cause of the process upset was an automation communication problem in LPC. Operations was having problems controlling the produced water pumps in module 4923. This caused the water to stop dropping out of the HP Separator and start building levels in all the vessels. Operations realized that a process ESD could not be avoided and chose to go ahead and SESD the facility. This allowed the plant to stabilize and stop flaring. At approximately 08:00 systems were checked out and the process of starting up LPC began. More testing of the control system for the produced water pumps is ongoing. Note: A SESD of the facility shuts in all the wells that flow into LPC at the Drill Sites. During this event before the flaring started all the wells on the East side of the field (At L3, L4, L5, And Niakuk) were shut in to cut rate. This was done to try and slow down the process and avoid having a flare event. August 29 Flare Event On August 27 LPC Operations started having surge control problems with turbine-driven Reinjection Compressor 1807. Operations and Maintenance personnel started trouble-shooting the problem. They replaced control cards and fire eyes. This did not fix the surging problems it was determined that the power supply for the surge control system needed to be replaced. To do this work the Compressor had to be shut down. On the morning of August 29 wells were shut in to cut rate and the compressor was shut down and the power supply was changed out. There was 195 MM of gas cut. Wells shut in for this event were: L4-10, L5-5, L5-18, L5-23, P1-4, P1-5, P1-6, P1-13, P2- 56, P1-57, and WB-4. Information on LPC Flare Events Subject: Information on LPC Flare Events Date: Fri, 13 Oct 2000 09:54:34 -0900 From: "Barnes&Robinson" <P1466@ppco.com> To: Wendy Mahan <Wendy_Mahan@admin.state.ak.us> CC: PBUOperMgr@BP.com Wendy Attached to this note is more information on the three flare events that you had questions on at LPC. If you need more information on these events please let us know. We will make sure in the future that this information gets to you with the flare report. Thanks Bruce W Robinson (907) 659-8641 (See attached file: LPC Flare Events.doc) Name: LPC Flare Events.doc LPC Flare Events.doc Type: Microsoft Word Document (application/msword) Encoding: base64 Description: Mac Word 3.0 1 of I 10/13/00 4:04 PM To: Wendy Mahan, (AOGCC) Subject: LPC Flare Events From: Bruce W Robinson, (BP Alaska Operations Team Lead at LPC) July 17 Flare Event At approximately 19:31, turbine-driven Reinjection Compressor 1808 shut down due to high level in the high-stage Seal Oil Overhead Tank. Initial trouble-shooting by operators suggested a faulty switch. When Seal Oil Reservoir levels could not be readily re-established in the normal operating range, electrical and instrument technicians joined in the trouble-shooting. The first production well was called to be shut in at approximately 20:10 PM, and was shut-in at 20:30. Production was curtailed from an additional twelve wells over the next four and one half hours until a total of 184.5 MMSCFD of gas and 21,320 BOPD of oil had been shut-in at wellhead. Wells shut in for this event were: L5-23, L5-8, L5-36, NK-14, NK-26, P1-4, P1-6, P1-13, P2- 24, P2-56, P2-57, and WB-4 August 7 Flare Event On 8/7/00 at 04:00 AM operations experienced a process upset that caused the Crude Oil Surge Drum to high level and carry liquid over to the Suction Scrubber (42-1206) for the STV Compressors. This vessel could not handle the volume and in turn carried over to the Low Pressure Flare Knock Out Drum (42-1221). The pump off the Knock Out Drum could not handle all the liquid. The liquid level got high enough to carry out to the Liquid Flare. This caused a black smoke event. An early estimate of 100 gals of crude was carried into the pit. The cause of the process upset was an automation communication problem in LPC. Operations was having problems controlling the produced water pumps in module 4923. This caused the water to stop dropping out of the HP Separator and start building levels in all the vessels. Operations realized that a process ESD could not be avoided and chose to go ahead and SESD the facility. This allowed the plant to stabilize and stop flaring. At approximately 08:00 systems were checked out and the process of starting up LPC began. More testing of the control system for the produced water pumps is ongoing. Note: A SESD of the facility shuts in all the wells that flow into LPC at the Drill Sites. During this event before the flaring started all the wells on the East side of the field (At L3, L4, L5, And Niakuk) were shut in to cut rate. This was done to try and slow down the process and avoid having a flare event. August 29 Flare Event On August 27 LPC Operations started having surge control problems with turbine-driven Reinjection Compressor 1807. Operations and Maintenance personnel started trouble-shooting the problem. They replaced control cards and fire eyes. This did not fix the surging problems it was determined that the power supply for the surge control system needed to be replaced. To do this work the Compressor had to be shut down. On the morning of August 29 wells were shut in to cut rate and the compressor was shut down and the power supply was changed out. There was 195 MM of gas cut. Wells shut in for this event were: L4-10, L5-5, L5-18, L5-23, P1-4, P1-5, P1-6, P1-13, P2- 56, P1-57, and WB-4. i Facility Disposition 1. Sold 2. Reinjected 3. Flared or vented less than 1 hour 4. Flared or vented greater than 1 hour Su lemental re rt re wired--See 2i 5. Pilot and Purge 6. Used for lease operations 7. Other ~perat PHILLIPS ALASKA INC. PRUDHOE BA Volume MCF' 130,526 7,319,296 2,543 AC 25.235 25,233 11,582 Fuel 798,814 047 168 Assist , Lift Gas, Off Field 175,755 8 631 796 TOTAL items 1 - 7 ' 3. NGL gas equivalent produced 130,526 0 9. Purchased gas 10. Transferred from: 0 0 11. Transferred to: Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. L~ r/~~~ ~ Title: ~ 1//~Y I~I Sa/Z Date: ~0 ~~ ~ ~IBignature• _ Form ibaZ22 (Revised 4/95) Note:.. All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the j month following the month of disposition. Authority 20 AAC 25.235. ~ . ,,~7~ j),~~,,f1 N~ ~~~,L ~~ ~' L ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Field(s) Month/Year of Disposition or ilr~T AAl~l0.1TVQr- 900 1-Sep 0813-1715 2_~p 1424-1947 16-Sep 0411-0416 0733-0735 1241-1243 1539-1541 16-Sep 0307-0319. 0432-0438 i 0442-0446 0748-0751 17-Sep 0159-0223 0735-0738 0923-0925 17-Sep 1356-1408 18-Sep 1601-1602 1705-1706 1739-1740 1800-1801 1806-1808 1829-1830 1842-1846 1854-1932 1945-1948 ARCO ALASKA, INC., CONSERVATION ORDER N0.219 LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS September 2000 pLAN/ UNPLAN ACTION TAKEN TO ELIMINATE CAUSE ME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE Unplanned Startup FCO completed for the day 36 FOR Process module startup and functional check out. Unplanned Startup FCO completed for the day 51 FOR Process module startup and functional check out. 449 Shut down compressor 1807 for routine water wash during TAPS slowc Planned Swapped load to compressor 1808 1 q0 Shut down compressor 1801, plant upset due to TAPS proration Unplanned Restarted compressor 1801 ~ Shut down compressor 1808 for routine water wash during TAPS slowc Planned Swapped load to compressor 1807 before shutdown 76 Shut down compressor 1801, plant upset due to TAPS proration Planned Startup FCO complete dor the day 604 FOR Process module startup and functional check out. 10/18/00 ARCO ALASKA, INC., CONSERVATION ORDER N0.219 LISBURNE PRODUCTION CENTER GAS FLARING.INCIDENTS September 2000 PLAN/ ACTION TAKEN TO ELIMINATE CAUS VOLUME (Matt) DESCRIPTION OF INCIDENTS & CAUSE UfJPLAN planned Startup FCO completed for the day DATE TIME FOR Process module startup and functional check out. 2o-~p 0854-0855 67 0911-0913 0928-0929 0933-0934 1017-1018 1032-1033 1046-1047 1050-1051 1054-1055 1200-1201 1340-1341 1425-1426 1607-1608 1646-1647 1054-1055 Planned Startup FCO completed for the day 1720,1721 455 FOR Process module startup and functional check out. 22 Sep 1737-1740 1744-1756 1821-1822 1940-1941 1954-1956 1957-1958 2001-2012 2058-2059. ARCO ALASKA INC., ~ - CONSERVATION ORDER N0.219 LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS September 2000 PLAN/ ACTION TAKEN TO ELIMINATE CAUSE TIME VOLUME (Matt) DESCRIPTION OF INCIDENTS& CAUSE UNPLAN Planned Startup FCO completed. for the day DATE module startup and functional check out. ~, 30-Sep 1353-1354 109 EOf2 Process 1423-1424 1427-1428 1431-1432 1439-1440 1510-1511 1513-1514 1534-1535 1550-1552 1602-1605 .1642-1644 1655-1658 1711-1739 1756-1758 FLARE UNDER 1 HOUR 2543 d Startup FCO completed for the day dule startup and functional check out. m Unplanne 3 ~p 0921.1551 553 o FOR Process 1823-1957 odule startup and functional check out. Planned Startup FCO completed for the day q_~p Og50-Og51 , 3070 FOR Process m 1308-1310 Z 1342-1838 1846-1847 module startup and functional check out. Planned Startup FCO completed for the day ~~p 0826-0827 ~ 9196 FOR Process 0850.0851 ~ 0857-1925 Z ~ 10/18/00 3 I ARCO ALASKA, INC., . CONSERVATION ORDER N0.219 LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS September 2000 PLAN/ ACTION TAKEN TO ELIMINATE CAUSE DATE TIME VOLUME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE t UNPLAN planned Startup FCO completed for the day 0804 l 803 . 620 FOR Process module startup and functional check ou - 6-gep 0 826-0827 ~ 0 1~ 830-083 0 0837-0838 a 0856-0858 z 0901-0902 .i 0915-0930 1 S 0933-0955 ZZ -y ~p M1N (OAR L- 1002-1003 ~ 1306-1307 ) 1312-1313. J 1316-1317 1 1356-1400 ~- 1418-1438 ZQ 1531-1532 i 1550-1608 ~ $ 1632-1633 1 ° odule startup and functional check out. Planned Startup FCO completed for the day 7_~p 0908.OgOq ~ 451 FOR Process m 1049-1051 z 1107-1113 b 1139-1141 Z- 1158-1159 ~ 1212-1213 i 1319-1337 ~8 1354-1355. ~ 1416-1424 8 .1434-1435 1531-1532 •i ~ aZ Y-~/V - ~o?~L_ 1538-1550 i~- 1710-1725 ~ S i 1743-1744 ~ 1810-1825 l S 1837-1838 ~ 1900-1916 / 6 10/18/00 4 ARCO ALASKA, INC., CONSERVATION ORDER N0.219 LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS September 2000 PLAN/ ACTION TAKEN TO ELIMINATE CAUSE TIME VOLUME (Mscf) DESCRIPTION Of INCIDENTS & CAUSE UNPLAN Planned. Startup FCO completed for the day DATE 1029 ~ 369 1028 FOR Process module startup and functional check out. . g_~p - 1050-1051 ~ 1113-1.114 .1 1133-1134 ~ ~ O //tl /U .. 1 1141-1222 41 ~~l{1.-- 1507-1508 1 1528-1529 1548-1549 ~ 1616-1617 1 1639-1640 1655-1708 13 1725-1732 ~ odule startup and functional check out. Planned Startup FCO completed for the day q_$ep .1049-1050 ~ 1825 FOR Process m 1105-1106 ~ 1123-1124- 1134-1135 r 1154-11551 1206-1208 z_ 1339-1340 + 1403-1404 i // "~'~ 7A L. - ~ G r/11,!`l 1417-1418 ~ 1429-1430 ~ 1454-1456 ~ 1527-1528 ~ 1544-1545 1 1558-1559 1 1627-1628 1645-1651 ~ 1836-1837 1845-1846 1 1918-1919 1 1943-2213 3 0 10/18/00 5. ARCO ALASKA, INC., CONSERVATION ORDER N0.219 LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS September 2000 PLAN/ UNPLAN ACTION TAKEN TO ELIMIN/ TIME VOLUME (Matt) DESCRIPTION Of INCIDENTS & CAUSE Planned Startup FCO completed for the day DATE odule startup and functional check out. 10-Sep 0950-0951 ~ 825 FOR Process m 1036-1053 t ~ 1219-1220 + 1239-1240 r 1322-1330 $ ~ ~ -'~ +^'~ - 70 7 q L 1257-1504 6 ~ 1647-1648 t 1918-1919 1 d Startup FCO completed for the day 1925-192•- 6 . t odule startup and functional check out. Planne 1 q_~p 1 31 2 1133 + 1753 FOR Process m 1251-1257. 1305-1321 f L 1323-1324 + 1325-1330 ~ ~ Z 4 M A N= 7~ 7~ L . 1336-1337 + 1400-1401 ~ 1526-1527 ~ 1541-1543 z 3-1723 d ° ~' 15 Planned Startup FCO completed for the day r 5 1550-1551 ~ 1244 FOR Process module startup and functional check out. . 21-Sep 1600-1601 ~ 1607-1608 , 1641-1642 I 1643-1644 1 i649-1650 ~ 1650-1651 1 1652-1654 Z 1702-1703 1 b ~ -~ 1 N = ~a 7q c_ 1712-1715 3 1749-1750 ~ 1812-1833 Z I 1949-1950 1 2011-2034 z3 2044-2045 2107-2132 2 S 2159-2200 1 6 10/18/00 ARCO ALASKA, INC., CONSERVATION ORDER N0.219 LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS September 2000 .PLAN/ UNPLAN ACTION TAKEN TO ELIMINATE CAUSE DATE TIME VOLUME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE Planned Startup FCO completed for the day 4119 FOR Process module startup and functional check out.. 23-Sep Oglb-0717 ~ 0849-0854 0901-0954 1141-1153 1154-1415 an electrical/instrumentation mal Unplanned Recahbrated fuel valve and restarted compressor 1801 t 24-Sep 1822-2030 1208 o Shut down compressor }801 due FLARE OVER 1 HOUR 25233 Volume flared 27776 Flare Assist 168047 Measured Safety Pilot 11582 TOTAL FLARED 207405 rt flied because no ' black smoke resulted, flare was less than 1 hour and flare volume was less than 1 MM. No ADEC emissions repo 10/18/00 7 • FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAYIGPMA/KUPARUK FACILITY: LPC PERMIT NO. 9A73-AA025 .GAS DISPOSITION Date of Occurrence: 9l1/00 ^ Flare ^ vent Time of Occurrence: (mm/ddlyy) (Check Selection) 00:00 24:00 Minutes From: 08:13 Tae 17:15 = 09:02 Total Volume Flared: 36 MSCF BBLS From: To: _ From: To: _ Meter No.: (By Facility) ^ Planned ^ Unplaraied From: To: _ (Check Selection) From: To: _ .From: Tae = Total Minutes Flared: = 09:02 (Cisbume Only -Gas oared was from ^ upstream ^ dowratream (cneca one) (Includes volume Flared which generated black smoke, of TEG contactor meter at l.PC) if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) SID T/C# for Process upset in T/C SD due to high exhaust temperature section of tacility Seal oii system difficulties Flaring for drillsite shutdown /startup EMERGENCY SHUTDOWN Flare system testing Electrical /Instrumentation malfunction Faultyshutdown on Electricel /Instrumentation malfunction Facility maintenance High ambient temperatures. at other faality (T8D) S/D on high vibration Gas transit system overpressure X Other: Process module startup and backing CPF/Flow Station out Functional Check-Out. Intermittent Excessive I insuffirdent inlet gas flaring for a total of 12 minutes. rates into faality B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C # Stabilized faality process and operation Compressor /train depressured Repaired. equipment difficulties Reduced /increased inlet gas rates with Completed flare testing Facility maintenance completed Corrected E&I fluctuation /failure X Other. , Startup FCO completed for the Corrected E81 fluctuation 1 failure day. at other faaligr(T&D) Black Smoke Did incident cause black smoke? Yes: ^ No: ~ (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: ^ No: ^ pf Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Date: Time: Report the following information to ADEC within 24 hours. BY~(907-269-7508): Date and time of-black smoke evert: From: To: Volume flared which generated black smoke (if different from above): MSCF BBLS Description of steps to minimize emissions: See Section B, above. Type of materials burned: Gas: NGLs: Other. General Weather: Air Temperature: Wind SpeedlDirection: Name and phone number of person making the report: Name Phone No. Based on information and belief formed aflerreasonable inquiry, I certify that the statements and information in and attached to this document are true, accurate and co te. M1 Facility Supervisor ~~ Date ~ C~ ce: EOC Supervisor, PRB 6 (flare gas and biadc smoke inadents) - Field Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only) PBUIGPMA Field Managers, (Bladt smoke inadents ony) GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 477) - Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke inadents) P:tGroupslErnironmeMallFonns\ Updated: FEC ar9B SPtI-Gas Reporting Fonnst&Ot-0OFlerersport.xle • ~ FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: LPC PERMIT N0. 9A73-AA025 GAS DISPOSITION Date of Occurrence: 912/00 ~ Flare ^ vent Time of Occurrence: (mMddlyy) (Check Selection) ~ 00:00 24:00 Minutes From: 14:24 Td: 19:47 = 05:23 Total Volume Flared: 51 MSCF BBLS From: To: _ . From:. To: _ Meter No.: (By Facili ^ Planned ^ unplanned From: Tae = (Check Selection) From: Tae = From: To: Total Minutes Flared: = 05:23 {Lisburne Onry -Gas Bared was tram ^ upstream ^ downstream 7cnech one) (Includes volume flared which generated black smoke, of TEG crontactor meter at LPC) if applicable). A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) SID T!C# for Process upset in .TIC SD due to high exhaust temperature seGion of faality Seal oil system difficulties Flaring for drillsite shutdown /startup EMERGENCY SHUTDOWN Flare system testing Electrical /Instrumentation mafunction Faulty shutdown on Electripl /Instrumentation malfunction Faality maintenance High ambient temperatures. at other fadlity (T8D) S/D on high vibration Gas Vansit system overpressure X Other: Process module startup and backing CPFIFIow Station out Functional Check Out. Intermittent Excessive I insuffiaent inlet gas flaring for a total of 16 minutes. rates irrtofadlity B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C # Stabilized faality process and operation. Compressor /train depressured Repaired equipment difficulties Reduced /'increased inlet gas rates ~~ Completed flare testing Facility maintenance.. completed Corrected E&I fluctuation /failure X Other. Startup FCO completed for the Corrected E81 fluctuation /failure day. at other faality R&D) . Black Smoke Did incident cause black smoke? Yes: ^ No: ~ (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: ^ No: ^ (If Yes, report to FEC as soon as possible. if No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag numberand description) Notified ADEC by Fax on: Date: Time: Report the following information to ADEC within 34 hours BY FAX (907-269-7508): Date and time of black smoke event: From: Tae Volume flared which generated black smoke (if different from above): MSCF BBLS Description of steps to minimize emissions: See Section B, above. Type of materials burned: Gas: NGLs: Other. General Weather. Air Temperature: Wind Speed/Direction: Name and phone number of person making the report: Name Phone No. Based on information and belief formed after reasonable inquiry, I certify that the statements and information in and attached to this document are true, accurate and co lete. Facility Supervisor '~ :,Q? ~r~~!• .Date L cc: EOC Supervisor, PRB 6 (flare gas and black smoke inadents) Field Environmental Compliance Coordinators, PRB 7 (Black Smoke inadents only). PBUIGPMA Field Managers, (Black smoke incidents only) GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 47T) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke inadents) P:\Groups\EnvirorxnsntallForme\ Updated: FEC 8198 Spill-Gas Roportinp Forms\J-02-0aFlarerepcrt.xls + FLARE GAS VENTING REPORT ~~'~ ~O PHILLIPS ALASKA, INC. • PRUDHOE BAYIGPMA/KUPARUK FACILITY: LPC . PERMIT N0. 9A73-AA025 GAS DISPOSITION I Date of Occurrence: 9116/00 ^ Flare ^ vent Time of Occurrence: (mm/ddlyy) (Check Selection) 00:00 24:00 Minutes. From: 04:11 To: 04:15 = 00:05 Total Volume Flared: 449 MSCF BBLS From: 07:33 To: 07:35 = 00:02 From: 12:41 To: 12:43 = 00:02 Meter No.: 621 (By Facility) 0 Planned ^ Unplanned From: 15:39 To: 15:41 = 00:02 (Check Selection) From: To: _ From: Ta - Total Minutes Flared: = 00:11 (Lisburne Onty -Gas Bared was from ^ upstream Q downstream (Check one) (Includes volume flared which generated black smoke, of 7PG contactor meter at LPC) if applicable) A. description of Incident and Cause: (Check as many as needed to fully describe the incident) X S!D T/C# 1807 for Process upset in TIC SD due to high exhaust temperature section of facility Seal oil system difBwMies Flaring for drillsfte shutdown I startup EMERGENCY SHUTDOWN Flare system testing Electrical I Instrumentation malfunction Faulty shutdown on Electrical / InsWmentation malfunction Facility maintenance High ambient temperatures. at other faality (f8D) e X Other: S/D for routine water wash during Gas transit system overpressur TAPS slowdown backing CPF/Fkra Station out Excessive I insuffiaeM inlet gas rates into faaliry B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C # Stabilized facility process and operation Compressor /train depressured Repaired equipment difficulties Reduced /increased inlet gas rates wRh Completed flare testing Fadl'dy maintenance completed Corrected E81 fluctuation /failure X Other.. Swapped load to 1808 Corrected E81 fluctuation I failure at other fadl'lty (Tt;<D) Black Smoke Did incident cause blade smoke? Yes: ^ No: 0 (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: ^ No: ^ (If Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Blade smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Date: Time: Report the following information to ADEC within 24 hours BY FAX (907-289-7508): Date and time of blade smoke event: From: To: Volume flared which generated blade smoke (if different from. above): MSCF BBLS. Description of steps to minimize emissions: See Section B, above. Type of materials burned: Gas: NGLs: Other. General Weather: Air Temperature: Wind Speed/Direction: Name and phone number of person making the report: Name Phone No. Based on information and belief formed after reasonable inquiry, I certify that the statements and information in and attached to this document are true, accurate and complete. t Date ~ t~ Facility Supervisor cc: EOC Supervisor, PRB 6 (flare gas and blade smoke inddents) Field Environmental Compliance Coordinators, PRB 7 (Black Smoke inddents only) PBU/GPMA Field Managers, (Black smoke inddents only) GPMA Operations Engineering Technical Aide, (GPMA reports ony - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and blade smoke inddents) p:~,rorrpslErrvirorn,eMallForma\ Updsaed: FEC alga Spill-Gas Rsportirp Forms~9-16-0OFlareraportxls FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: LPC PERMIT NO. 9A73-AA025 GAS DISPOSITION 9116/00 ~ Flare ^ vent Time of Occurrence: .Date of Occurrence: (mmldd/yy) (Check Selection) 00:00 24:00 - Minutes From: 03:07 To: 03:18 00:12 Total Volume Flared: 1ao MSCF BBLS From: 0x:32 To: 04:38 = oo:os oa:a2 To: oa:46 = 00:04 From: : 622 (By Facility) ^ Planned 0 Unplanned Meter No From: 07:48 • To: 07:51 = 00:03 . (Check Selection) From: To: From:. - To: - Total Minutes Flared: = 00:25 ^ upstream 0 downstream (crreci~ one) f (Includes volume. flared which generated bfadc smoke, rom (Lisburne Onty -Gas flared was if applicable) of TEG contactor meter at LPC) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) Process upset in STV/IP X S/D T/C# .1801 for section of facility TIC SD due to high exhaust temperature -. -- - - Flaring for drfllsite shutdown A startup Seal oil system difficulties Flan: system testing EMERGENCY SHUTDOWN . Faulty shutdown on Electrical I Instrumentation malfunction Electricel /Instrumentation malfunction Facility maintenance High ambient temperatures. at other faality (T&D) X Other. Plant up set due to TAPS Gas transit system overpressure proration. backing CPF1Fknnr Station out Excessive ! insutfiaent inlet gas rates into faality B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Stabilized facilityprocess end Operation X Started /restarted T/C # l 8o I Repaired equipment difficulties Compressor /train depressured ~~ • Reduced I increased inlet gas rates Facility maintenance completed Completed flan; testing Other. Corrected E&I fluctuation /failure Corrected E&I fluctuation /failure at other facility (T&D) Black Smoke Did incident cause black smoke? Yes: ^ No: ~ (If Yes, continue with this section) Yes: ^ No: ^ Did incdent present a potential threat to human health or safety? (If Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Date: Time: Report the following Information to ADEC within 24 hours BY~F _X_(907-268-7508): Date and time of black smoke event: From: To: MSCF BBLS Volume flared which generated bladk smoke (if different from above): Description of steps to minimize emissions: See Section B, above. Other: Type of materials burned: Gas: NGLs: General Weather. Air Temperature: Wind Speed/DireGion: Name and phone number of person making the report: Phone No. .Name .Based on information and belief formed after reasonable inquiry, I certify that the statements and information in and attached to this document are true, accurate and mplete. ~ , i E~ ~~' L--~7 ~ Date ~ ~ Facility Supervisor t:c: EOC Supervisor, PRB 6 (flare gas and black smoke inadents) Field Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only)- PBU/GPMA Field Managers, (Black smoke inadents ony) GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke. inadents) P:\Gr W ps\ErrvrorMneMsllForms\ Spat-Gas Reporting Forms\9~06.OnFlarerepat.xb Updated: FEC 8198 . FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: LPC PERMIT NO. 9A73-AA025 GAS DISPOSITION Date of Occurrence: 9117/00 QFlare went Time of Occurrence: (mm/dd/yy) (Check Selection) 00:00 Minutes From: 01:59 To: 02:23 = 00:24 Total Volume Flared: 556 MSCF BBLS From: 07:35 To: 07:38 = 00:03 From:. 09:23 To: 09:25 = 00:02 Meter No.: 621 (B Facili ) ~~anned ^~P~^^~ From: To: 00:00 (Check Selection) From: To: - 00:00 From: To: = 00:00 Tota! Minutes Flared: = 00:29 (Lisburne Only-Gas flared was fron^uvs-ream ~aownsveam (Check One) (Includes volume flared which generated black smoke, of TEG contactor meter at LPC) if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) X SID T/C# 1808 for Process upset in T/C SD due to high exhaust temperature section of facility Seal oil system difficulties - Flaring for drillsite shutdown /startup EMERGENCY SHUTDOWN Flare system testing Electricel /Instrumentation malfunction Faulty shutdown on Electrical /Instrumentation malfunction Facility maintenance High ambient temperatures. at other facility (T8D) X Other. Shutdown for water wash during Gas transit system overpressure TAPS proration. backing CPF/Flow Station out Excessive /insufficient inlet gas rates into facility Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable). B . X Started !restarted T/C # 1808 Stabilized facility process and operation Compressor /train depressured Repaired equipment diffiwities Reduced !increased inlet gas rates with Completed flare testing Facility maintenance completed • Corrected E81 fluctuation /failure X Other: Swapped load. to 1807 before Corrected E8i fluctuation /failure shutdown. at other facility (T8D) OI..~L Cw...La Did incident cause black smoke? Yes: No: ~ (If Yes, continue with. this section) Did incident present a potential threat to human health or safety? Yes: No: (If Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notfied ADEC by Fax on: Date: Time: Report the following information to ADEC within 24 hours BY FAX (907-269-7508): Date and time of black smoke event: From: To: Volume flared which generated black smoke (if different from above): MSCF BBLS Description of steps to minimize emissions: See Section B, above. Type of materials burned: Gas: NGLs: Other. General Weather. Air Te peratur Wind Speed/Direction: Name and phone number of person maki~ the r rt: Name Phone No. Based on information and belief formed ft re na a inquiry, I certify that the statements and informanon m ana aaacnea w una document are true, accurate and comp e. Facility Supervisor Date o9'[~V` y~ cc: EOC Supervisor, 6 (flare gas and black smoke incdents) Field Environme al ompliance Coordinators; PRB 7 (Black Smoke incdents only) PBU/GPMA Fiel a gers, (Black smoke incidents ony) GPMA Operations E ineering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke incidents) • ~ FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: LPC PERMIT NO. 9A73-AA025 GAS DISPOSITION Date of Occurrence: 9/17/00 ~ Flare ^ vent Time of Occurrence: (mm/ddlyy) (Check Selection) 00_00 Minutes From: 13:56 To: 14:08 - 00:12 Total Volume Flared: 76 MSCF BBLS From: To: = 00:00 From:. To: _ ~'~ Meter No.: 622 (B Facili ) ^ Planned ^ unplanned From: To: _ ~~~ (Check Selection) From: To: _ ~:~ From: To: = 00:00 Total Minutes Flared: = 00:12 (Usbume Only -Gas flared was /rom ^ upstream D downstream (Check One) (Includes volume flared which generated black smoke, o/ TEG contactor meter at LPC) if applicable) A. Description o1 Incident and Cause: (Check as many as needed to fully describe the Incident) X S/D T/C# 1801 for Process upset in STV / IP TIC SD due to high exhaust temperature section of facility Seal oil system d'dfieultks Flaring for dri0ake shutdown I startup EMERGENCY SHUTDOWN Flare system testing Electrical I Instrumentation maHunction Faulty shutdown on Electrical I Instrumentation maBunction Facility maintenance High ambient temperatures. a1 other faality (T8D) X OTHER: Gas transit system overpressure backing CPFIFkwv Station out Event occurred during TAPS proration Excessive I insuffiaeM inlet gas rates krio facility B. Acuon Taken to Eliminate Cause and Prevent Reeurronca: (Cheek and desertbe as applicable) X Started /restarted T/C # 1801 X Stabilized fadlity process and operatwn Compressor/train depressured Repaired equipment. difficulties Reduced /increased inlet gas. rates with Completed flare testing Facility maintenance completed Corrected E&I fluctuation /failure Other Corrected E&I fluctuation /failure at other facility (TiiD) Did incident cause black smoke? Yes: No: ~ (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: No: t?f Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notfied ADEC by Fax on: Date: Time: Report the following Information to ADEC within 24 hours f3Y FAX (807-268.7508): Date and time of blade smoke event:. From: To: Volume flared which generated blade smoke (ii different from above): MSCF BBLS Description of steps to minimize emissions: See Section B, above. Type of materials burned: Gas: NGLs: Other. General Weather. Air Temperature: Wind Speed/Direction: Name and phone number of person mal~tg the report: I' / ~ Name Phone No. Based on information and belief 1 document are true, accurate and Facility Supervisor that the statements and information in and attached to Date ~' ~'t?~ cc: EOC Supervi RB 6 (flare gas and black smoke incidents) Field Environ Compliance Coordinators, PRB 7 (Black Smoke inddents only) PBU/GPMA F d Wagers, (Blade smoke inddents only) GPMA Operdtl ns ineering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field nmental Compliance Coordinators, NSK 61 (flare gas and blade smoke incidents) FLARE GAS VENTING REPORT ` PHILLIPS ALASKA, INC. • PRUDHOE BAYlGPMAIKUPARUK FACILITY: !-PC PERMIT NO.s 9A73=AA026 . GAS DISPOSITION ' Date of Occurrence: 9/18/00 ~~ ^vent Tima of Occurrence: (mmlddlyy) {Check Selection} 00_00 Minutes From: 16:01 To: 16:02 = 00:01 Total Volume Flared: 604 MSCF BBLS From: 17:05 To: 17:06 = 00:01 From: 12:39 To: 17:40 = 00:01 M1ileter No.:..;::,: ..'621 (B Facil ~ ^~ From: 18:00 To: 18:01 = 00:01 (Check Selection) From: 18:06 To: 18:08 = 00:02 From: 18:29 To: 18:30 00:01 Total Minutes Flared: ~ 00:07 (Lisburne Only -Gas flared was frpn[~upstream Qaownstream (Check One) (InGudes volume flared which generated WBCk smoke, of TEG contactor meter at LPC} if applicable) A. Description of Incident and Cause: {Check as many as needed to fully describe the incident) X S!D TlC6 1830 for Process upset in TIC SD due to high exhaust temperature section of fadflty Seal oil system difficulties Flaring for drilisite shutdown /startup EMERGENCY SHUTDOWN Flare system testing Electrical !.Instrumentation malfunction FauNy shutdown on Electrical / Instrumentation malfunction Facility maintenance High ambient temperatures. at other facility (T&D} Gas transit system overpressure. X theme r FOR process module startup. backing CPF/Flow Station out Functional checkout. Intermittent Excessive /insufficient inlet gas flaring for a total of 52 minutes. rates into faclity Page 1 of 2 B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applteabb) '. Started !restarted TIC # Stabilized facility process and operation ' Compressor !train depressured Repaired equipment difflcutties Reduced !increased inlet gas rates with Completed flan; testing Facility maintenance completed Corrected E81 fluctuation 1 failure X Other. Startup FCO completed Corrected E8~1 fluduatron !failure ~ for the day. at other facility (f&D) . Black Smoke . Did incident cause black smoke? Yes: Na: ~ {If Yes, continue with this section) Did inaderrt present a potential threat to human health or safety? Yes: No: (ff Yes, report to FEC ss soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number aril description) Notified ADEC by Fax on: Date: ~ Time: Report the following information to ADEC within 24 hours BY FAX (907-269-7608): Date and time of black smoke event: From: To: ' Volume flared which generated blade smoke {ff different from above): MSCF BBLS Description of steps to minimize emissions: See Section B, above. Type of materials burned: Gas: NGLs: Other. General Weather. Air mpera Wind SpeedlDireclion: Name and phone number of person m n9 the ort: Name Phone No. Based on information and belief fo a er onab inquiry, i certify that the statements and information in and attached to this document are true, accurate and corn late Facility Supervisor Date ~-~- ~ . r cc: EOC Supervisor B 6 (flare gas and black smoke incdents) F'rekf Environ Compliance Coordinators, PRB 7 (Black Smoke incidents only) PBU/GPNIA Fie alters, (Black smoke incidents only) ' GPMA OpereGo En ineering Technipl Aide, (GPMA reports only - ATO 47T) • Kuparuk: Field Enw mental Compliance Coordinators, NSK 61 (flare gas and. black smoke incidents) FLARE GAS VENTING REPORT r PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: LPC PERMIT N0. 9A73-AA025 GAS DISPOSITION. Date of Occurrence: 9/18/00 ~Plare ^vent Time of Occurrence: (mm/dd/yy) (Check Selection) 00:00 Minutes From: 18:42 To: 18:46 = 00:04 Total Volume Flared: 604 MSCF BBLS From:. 18:54 To: 19:32 = 00:38 From: 19:45 To: 19:48 = • 00:03 Meter No.: 621 (B Facili QPlam~ed ^~^P~nn~ From: To: = 00:00 (Check Selection) From: To: = D0:00 From: To: = 00:00 ' Total Minutes Flared: _ 00:45 (Lisburne Only -Gas flared was fron~]apstream Qdownstream {Check One) (Includes volume flared which generated black smoke, of TEG contactor meter at LPC) ff applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) X S/D T/C# 1830 for Process upset in T/C SD due to high exhaust temperature section of facility Seal oil system difficulties Flaring for driilsite shutdown !startup EMERGENCY SHUTDOWN Flare system testing Electrical /Instrumentation malfunction Faulty shutdown on Electrical /Instrumentation malfunction Faclity maintenance High ambient temperatures. at other facility (T8D) • Gas transit system overpressure X Other: FOR process module startup. backing CPF/Flow Station out Functional checkout. Intermittent Excessive /insufficient inlet gas flaring for a total of 52 minutes. rates into faality Page 2 of 2 Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) B . Started / restarted T/C # Stabilized facility process and operation Compressor /train depressured Repaired equipment difficulties Reduced /increased inlet gas rates with Completed flare testing Facility maintenance completed Corrected E81 fluctuation !failure X Other. Startup FCO completed Corrected E&I fluctuation /failure for the day. at other facility R&D) Did incident cause black smoke? Yes: No: 0 (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: No: pf Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notfied ADEC by Fax on: Date: Time: . Report the following information to ADEC within 24 hours BY FAX (907-269-7508): Date and time of black smoke event From: Tae Volume flared which generated biadt smoke ('d different from above): MSCF BBLS Description of steps to minimize emissions: See Section B, above. Type of materials burned: Gas: NGLs: Other General Weather. Air Temperature:/~~. Wind Speed/Diredion: Name and phone number of person making~e rep6r): ~ ~ ~ Name Phone No. Based on information and belief 1 document are true, accurate and and ~ Date ~-2~- OC Facility Supervisor - cc: EOC Supervisor, P (Aare gas and black smoke incdents) Field Environmen pliance Coordinators, PRB 7 (Black Smoke incidents only) PBU/GPMA Field ana ers, (Black smoke inadents only) GPMA Operations ngi eering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field Envi ental Compliance Coordinators, NSK 61 (flan: gas and black smoke inddents) FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: LPC GAS DISPOSITION Date of Occurrence: 9(20100Flare Ovent (mm/dd/yy) (Check Selection) Total Volume Flared: 67 MSCF BBLS Meter No.: 621 (B Facili ) ^~ Planned ^Unplanned (Check Selection) {Lisburne Only -Gas flared was frpn~]upstreamdownstream (Check One) of TEG contactor meter at LPC) PERMIT NO. 9A73-AA025 Time of Occurrence: 00_00 Minutes From: 08:54 Ta 08:55 = 00:01 From: 09:11 To: 09:13 = 00:02 From: 09:28 To: 09:29 = 00:16 From: 09:33 To: 09:34 = 00:01 From: 10:17 To: 10:18 = 00:01 From: 10:32 To: 10:33 = 00:01 Total Minutes Flared: = 00:22 (Includes volume flared which generated biadc smoke, if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) X S/D T/C# 1830 for Process upset in T/C SD due to high exhaust temperature section of facility Seal oil system difficulties - Flaring. for drtllsite shutdown /startup EMERGENCY SHUTDOWN Flare system testing Electrical /Instrumentation malfunction .Faulty shutdown on Electrical /Instrumentation malfunction Facility maintenance High ambient temperatures. at other facility (T8D) Gas transit system overpressure X Other. FOR process module startup. backing CPF/Flow Station out Functional checkout. Intermittent Excessive /insufficient inlet gas flaring for a total of 31 mina. rates into facility Page 1 of 3 B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C # Stabilized facility process and operation Compressor /train depressured Repaired equipment d~culties Reduced /increased inlet gas rates with Completed flare testing Facility maintenance completed Corrected E81 fluctuation /failure X Other: Startup fC0 completed. Corrected E81 fluctuation / fallure for the day. at other facility (T8D) Did incident cause black smoke? Yes: No: ~ (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: No: Qf Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Date: Time: Report the following information to ADEC within 24 hours BY FAX (907-269-7508): Date and time of black smoke event: From: Tc: Volume flared which generated black smoke (ii different from above): MSCF BBLS. .Description of steps to minimize emissions: See Section B, above. Type of materials burned: Gas: NGLs: Other. General Weather. Air Temperature: Wind Speed/Direction: Name and phone number of person making the report: Name Phone No. Based on information and belief formed after reasonable mgwry, I certify that the statements and information m and attached to trns document are true, accurate and complete. Facility Supervisor Date cc: EOC Supervisor, PRB 6 (flare gas and black smoke incidents) Field Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only) PBU/GPMA Field Managers, (Black smoke inadents only) GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 477) ~ Kuparuk: Field Environmental Compliance Coorclinators, NSK 61 (flare gas and black smoke incidents) 1 FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: LPC Date of Occurrence: 9/20/00Flare ^vent (mm/dd/yy) (Check Selection) Total Volume Flared: 67 MSCF BBLS Meter No.: 621 (B Facili ~' P~~d ^unplanned (Check Selection) PERMIT NO. 9A73-AA025 Time of Occurrence: 00:00 Minutes From: 10:46 To: 10:47 = .00:01 From: 10:50 To: 10:51 = 00:01. From: 10:54 To: 10:55 = 00:01 From: 12:00 To: 12:01 = 00:01 From: 13:40 To: 13:41 = 00:01 From: 14:25 To: 14:26 = 00:01 Total Minutes Flared: - 00:06 (Lisburne Only -Gas Nared was. /rp~f upstream downstream (Check One) (Includes volume. flared which generated black smoke, of TEG contactor meter at LPC) if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) X S/D T/C# 1830 for Process upset in T/C SD due to high exhaust temperature section of facility Seal. oil system difficuRies Flaring for drilisite hutdown /startup EMERGENCY SHUTDOWN Flare system testing Electrical /Instrumentation malfunction Faulty shutdown on Electrical /Instrumentation malfunction Facility maintenance High ambient temperatures. at other facility (Tt;<D) Gas transit system overpressure X Other: FOR process module startup. backing CPF/Flow Station out Functional checkout. Intermittent Excessive /insufficient inlet gas flaring for a total of 31 mins. rates into facility Paget of 3 B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C # Stabilized facility process and operation Compressor /train depressured Repaired equipment difficulties Reduced /increased inlet gas rates with Completed flare testing Facility maintenance completed Corrected E6l fluctuation /failure X Other. Startup FCO completed Corrected E&1 fluctuation /failure for the day. at other facility (T8D) Did incident cause black smoke? Yes: No: 0 (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: No: pi Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description), Notified ADEC by Fax on: Date: Time: RepoK the following information to ADEC within 24 hours BY FAX (907-269-7508): Date and time of black smoke evert: From: To: Volume flared which generated btadc smoke ('rf different from above):. MSCF. BBLS Description of steps to minimize emissions: See Section B, above. Type of materials burned: Gas: NGLs: Other. General Weather. Air Temperature: Wind Speed/Direction: Name and phone number of person making the report: . Name Phone No. Based on information and belief formed after reasonable inquiry, I certify that the statements and information in and attached to this document are true, accurate and complete. Facility Supervisor Date x:: EOC Supervisor, PRB 6 (flare gas and black smoke incidents) Field Environmental Compliance Coordinators, PRB 7 (Bladt Smoke incidents only) PBU/GPMA Field Managers, (Black smoke incidents only) GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas. and black smoke incidents) • Y FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY; LPC Date of Occurrence:. 9/20/00 pFwre ^vent (mmldd/yy) (Check Selection) Total Volume Flared: 67 MSCF BBLS Meter No.: 621 (By Facili OPianned ^unplanned (Check Selection) PERMIT NO. 9A73-AA025 Time of Occurrence: 00:00 Minutes From: 16:07 To: 16:08 = 00:01 From: 16:46 To: 16:47 = 00:01 From: 10:54 To: 10:55 = 00:01 From: To: = 00:00 From: To: = 00:00 From: To: = 00:00 Total Minutes Flared: _ 00:03 (Lisburne Only- Gas flared was fro-~]upstream Qdownstream .(Check One) (Includes volume flared which generated black smoke, of TEG contactor meter at LPC) if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) X S/D T/C# 1830 for Process upset in T/C SD due to high exhaust temperature section of facility Seal oil system difficulties Flaring for drilisite shutdown) startup EMERGENCY SHUTDOWN Flare system testing Electrical /Instrumentation malfunction Faulty shutdown on Electrical /Instrumentation malfunction Facility maintenance High ambient temperatures. at other facility (T8D) Gas. transit system overpressure X Other: FOR process module startup. backing CPF/Flow Station out Functional checkout. Intermittent Excessive /insufficient inlet gas flaring for a total of 31 mina. rates into facility Page3 of 3 B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C # Stabilized facility process and operation Compressor /train depressured Repaired equipment difficulties Reduced /increased inlet gas rates with Completed flare testing Facility maintenance completed Corrected E81 fluctuation /failure X Other. Startup FCO completed 'Con-ected E81 fluctuation /failure for the day. at other facility (T8D) Did incident cause black smoke? Yes: No: ~ (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: No: (If Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Date: Time: Report the following information to ADEC within 24 hours BY FAX (907-269-7508): Date and time ofblack smoke event: From: To: Volume flared which generated Dladc smoke (if different from above):. MSCF BBLS Description of steps to minimize emissions: See Section B, above. Type of materials burned: Gas: NGLs: Other. General Weather. Air Temperature: Wind SpeedlDirection: Name and phone number of person making the report:. Name Phone No. Based on information and belief formed after reasonable inquiry, I document are true, accurate and complete. and information in and attached to Facility Supervisor Date cc: EOC Supervisor, PRB 6 (flare gas and black smoke inadents) Fiekt Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only) PBU/GPMA Field Managers, (Black smoke inadents only) GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke inadents) FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: LPC PERMIT NO. 9A73-AA025 GAS DISPOSITION Date of Occurrence: 9/22/00 QFlare ^vent Time of Occurrence: (mm/ddlyy) (Check Selection) 00:00. Minutes From: 17:20 70: 17:21 00:01 Total Volume Flared: 455 MSCF BBLS From: .17:37 To: 17:40 = 00:03 From: 17:44 To: 17:56 = 00:12 Meter No.: 621 (B Facil' QP~anned ^~~~ From: 18:21 To: 18:22 = 00:01 (Check Selection) From: 19:40 To: 19:41 = 00:01 From: 19:54 To: 19:56 = .00:02 Total Minutes Flared: = 00:20 (Lisburne Only -Gas flared was fron~upso-eam Qdownstream (Check One) (Includes volume flared which generated blade smoke, of TEG contactor meter at LPC) if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) S/D T/C# for Process upset in T/C SD due to high exhaust temperature section of facility Seal oil system difficulties Flaring for drillsite shutdown /startup EMERGENCY SHUTDOWN Flare system testing Electrical /Instrumentation malfunction Faulty shutdown on Electrical /Instrumentation malfunction Facility maintenance High ambient temperatures. at other facility (T8D) Gas transit system overpressure X Other: Process FOR module startup backing CPF/Flow Station. out and functional check out. Intermittent .Excessive ! insufficent inlet gas flaring for a total of 33 minutes. rates into facility Page 1 of 2 B. Aetion Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C ~ Stabilized facility process and operation Compressor /train depressured Repaired equipment difficultes Reduced /increased inlet gas rates with Completed flare testing. Facility maintenance completed Corrected E8,1 fluctuation /failure X Other. Startup FCO completed for the Corrected E81 fluctuation /failure day. at other facility (Tr3<D) Black Smoke Did incdent cause black smoke? ~ Yes: No: ~ (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: No; (If Yes, report to FEC as soon as possible. ff No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Date: Time: Report the following information to ADEC within 24 hours BY FAX (907-269-7508): Date and time of black smoke event: From: To: Volume flared which generated blade smoke ('rf different from above): MSCF BBLS Description of steps to minimize emissions:. See Section B, above. Type of materials burned: Gas: NGLs: Other. General Weather: Air Temperature: Wind Speed/Direction: Name and phone number of person makjng th~r sport: n / I -Name Phone No. Based on information and belief 1 document are true, accurate and the statements :d to Facility Supervisor Date -ZS~O~ ce: EOC Supervisor RB 6 (flare gas and bladk smoke incdents) Field Environm n al Compliance CooMinators, PRB 7 (Black Smoke incdents only) PBU/GPMA F Id anagers, (Blade smoke incidents only) GPMA Opera ' n Engineering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field vironmentai Compliance Coordinators, NSK 61 (flare gas and black smoke incidents) • Oct-16-00 13:28 From-PRB OPERATIONS 90T-659-5061 T-254 P.O1/O1 F-639 .. • ~ . PLI-tir GAS VENTING REFdliif • `.' . ~~ . = py1WAS At.ASKA• •INCa ~ PRUPHA 6AY-GPMA/KIlPARUK • •_ .. ri• .. .. .~SC~~ i`At~l.n'Yt ~' 'a'RG S .',~ ~~;• . . PERM]T >t10. ~ 9ATS'.• 'v • .. ' •, ~ DI9~~ii~jQLON •• •tMY.V of r~rwrrencae • r / . ~• l i L i/ N • ©110QAi Timffof Oeeu[t~iar•~• .• • ••'~~•• i~if~ +i yy w_ ~-' ~Jp ~,. ~-'u `` l y p ~ ~ .7oC • 188 _' OO:D7 . . ' ; .. FronK 'ib:6'R ~otai voluma•P~: 48 ~TNSC1 BBLS From: RD~^! To: r:Da:t '_. OOs1-i ' ~ ' 'From: • ZD:tiO 7a Z0~69 ~ DO:D~ ' star. -'6~l. @ acpl D~rd OL+ngaiorW From: ..~--., T{x -rte ~ 000 • • . ' + TtaW4lYpAiltPS Fhu~adt ~ ' • . M • fuseurne Ony - Oe8 dared arcs iioti~7uptoea+i ptuwreee~i' • ( ones (lnrltrOes vakur-9 trat>~d whkir gene-aemd blsok sr+adae- ` • • . - . ,..,'alT>Gat»taclorrimt+rarL.PC~ ll~j •• ~ • ; ,, - „~ ~ • . ' , ~/-. QescriptfiNt ot Intadem and cause: {Check as ~ at: needsd ~o'tul>y desC~lbe'tlie Inaidon~ .it.•- . ,. ` , ..: ~ . s SIDT/C~ .. .•' tot. . - . •• ... • pcoeasa up$et in ~~~ • a ... +..• :• ::.. TIC S'D flub iFr h exhapst ~, ~ ~ §lt:Hon.of t~ICny, _ • ~ ~ S~si o1 eYbtetn afFllatliks ;Flaring tot dnllsge shutdown / 6t9ttup . + '! .;,_„- ~ ~ ' :' e ` ; ... isiVlt.,FCGENCY SHUTdt7UVN .. - Flans. str~! ~ ' ~ + ' ,.' t a % ; „a_~ • ~ ~ ' Elec4ricel ltastnxr~erdatloa' n-alfinctioa ` FBu~'-;huwown on : . ~~ •;: ' ;'r , .Elecaical / kisttumegtallotl malMrcGon ! ' - F~tyif~•ltioktlortaetce ,.• • .f . •. 'e ~ `_ High >0f11D~!•• ' •'; ' + ~,`t. • .: a ' '„ ~ • , , t oth~taoltit~ m ~p ~ ? •' • : i ,' : `'• was transit 9ysDo ~owo ~ine ~ ' OIt~ Pt+acese BUR•~tiodute ~ ' ~ , • • trxbrt9 cPF/Ftowr saeot+ ad ,end funetioRet dwct'a~rt. tnpa~rnrmerit . " -.-" ~ . ~'Baeesaive•1 inr,~ficien[ Inlet ~s • fla ' tor•a ~s • 1 ' ' '.; ~. t. ~.~ .....~ . ~ -; .. ,.. ,. . ~ .s , ,~ :AetiottTnRea ta:Babrilnste Cauee and'~r~nt Rstoetsnea: (Check and detiioMbi. as a-ppUaablo) • •' • •' • • ; ~ ' • • • _ ' ~' , ` ti • • ' •;i~ Staled / r~eetattetl 71C# ' '• , • . ~' •,_. ;,,~. • Completeiq flare~sstltg;' , ' .,.;..~_ gib nia1~° ~ •;,. ~...; • , _ ,_,~,,,~ •Corteged.E8111utiuatiori / :: X ~ Olg9e:' ; 6taaa~ ~ FCO otti 'lered'I~ths . . I ; . ' Co rro o led ESliadoh/~flWE t ''' 'c- •'. , .: ' • ~• ~ ~;. . " ~• ,~ ~ ~ 6~ • •' , ' • ' ~ ' •: ~ pia;litll t~+se blaek,8tmo1(v~ •,Yes:; • Q •.. . • (1~1fB6, aott~aue~iebii~Ns'se~an) .,t'. • : ; • fAd•indeeniproseritapotenlial•thrrattoliistiarrfie+sltli'•Ot >.'•` +', ,;: , ~•;, :',xes. t-.•;' • No: ~ • .::} • • • • • ~ ~ . ~Oa, -epot: m ~ '(If pEG as coon 8a pnsslbro ; ll Mo. ~pot~ ~o•AAPC wbli Za heu~ ~ • , j ~ . •' . - • • ' • • ' ! " ' . , . w,. • Btecic'st „ •,. 'iokeorriiDad~tOrn•aair~cs:~': ::.~ .• .. .. (~xtaq•ti~i~ermtddsauiptlart) • i. .. w ~ : • ` Nopiiev ~, DyF'ax orit . Dsta: ' ~ ~ . TMr~ • •'' ~ •'+• • ~ • . ' • • ~ . ' y ; • ~ i ; , ~portthstonowlag.lntomuuloti fo ADEC with 84,houtsk,@X„F,~ (909.69-'>•608x • ,• • _ .: • , t3ali' arlil tirtlbbt daaksmoke eYlDrit: .' ~fbla5' •• • ' ; • : r .• ..u . ~~1'p~•4. •'. ~ • ~~; •, • . •.~ i ti V e ' K ' . . ohene.flar d which~ertarated bla~lc.amo e (d u-Yter®rrc romsbotie~: , , _,,. ..~ ~. ' , 8t3i.S.. ~ • •:::. MS ' .~. , , Degcrippan of dteps to minimlze eq~siorta:.5ee 5eetbn !3; ;absva '' ' ~ ;. ' , . v, + • ' ' ~ . .. ~ ' ^ ~ ., u~. - ` .dflBf:' . . ~te B ~Wi1B~. w. ~ T tNl ~p9~+~f n Q86; ~ ~ . ~ i.\ N~a`L4~y y ~ • j / ~ .j ~~ ~ ~ T[~ ~ ~ ~ ,y G9pBiai •.eV1d ~~ ' +• + ' ry~ 18mpP.~: ~ • ` YIIIIY i''1 ., ~~ • M~ ` ' e • • • - ~ + • ~+ •~ • a ~ ~ • Name; aiid phone +iuritber;At perboit mator>a the rEpgr~ . ~ . i. • _ ~ 'n' ~ ` ' ` M• ' ' , ` ~~-NI ~ ertom+agpn lftd Y6~Q a~•I--~.~• dvtaipieTlt•aSefrt+e, aCa~rn~ and ct»pplrt0, ,~ ,. r. ~~' ''~~~~ ,, -- - .- _ - ~ riqur+Y+ 1 osRt+itr tFtet (tIB ana inmrnr+nan b sits tDilaf, r•' , . ,r• ' .: _ ' ei`;1~OCS~v~:PRH`B~Aargeas~+bhGtatpofce.,+tuldefi><s)•; ~ '•J,; , • ~ ` ` ~`' ~ ~ '.pFie~M~~E'rplw~wo+ar~~yi~it~ajl. C~ornP~liar•/wp~e~~~{, oidiwn4a.tac~s~: rP~R~B•?y-tBleLicSlmvke inG_ tl~'1t5 oeM .. '~ ' °' , . - . `~ .,r .:•'.. ~.!-BW{Sr Rn1•~AgM 7A•••.-Y-~r\P9•T,~i,~+q+'11R#i~M/fi V~{•.'' • ' .' ~,h ^ i • ~'• • . ' . . ti ~~~E~~:~eTeclpNeet!t-A'lo'~?rn1 ~' .:. •.' .• , • ~ ' ~ ' ; 3cupar'~'F:i~ia.B+naronniernal•Cat~ar',~e cootdltaror:, tvSlc stti~ gas Drill prac*smalos :~ndaetitsj ~ • • ' • • . ,a • •~ • .1 •'• , . • ' • y • ' • ~ ' . • ~ r . ,' • • • ..d . ., .. ~ . A • . •,: `_ Oct-13-2000 11:16am .From-LISBURNE OPERATIONS 659-9655 T-653 P.002 F-150 J,,,_ t~e~' C eta ~ -- FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMPJKUPARUK FACILITY: LPC PERNpT NO. BATS-AA02b GAS t,)15POSfiION Pate of Occurrence: 9/30/00 ~~ [,avKnt Tlme of Occurron~: (mrTVddiyy) (Check Setectlon) 00:00 Mi~u6e6 From: 13:53 70: X3:54 - 00:01 Total Volume Flared: 109 MSCF BBLS From: 44:23 To: 14:24 ~ 00:01 From: 14:27 To: 14:28 = Op:01 Meter No.: 821 B Facll ) ~tNarnad ~tM0lenrkd From: 7a:ai To: '14:32 00:01 (Chedt Seleci[on) From: 14:38 70: 14:40 = 00:01 From: 15:10 To: 18:11 ~ 00:01 Total Min utes Planed: _ 00:08 (Us4ume Onty -Gas flared was frpr~]upsMe~im Qaowre~eam (Chedr One) (Indudes volume flan3d which yenerafed Iriaak Smoko, of TEG oonlador molar at Lf~CJ it app-icable) A. Description of lnclderrt and Cause: (Check a9 many as needed to fully desarta• the incident) SID TiCR for Platass ais5et Ili TIC SD due to higfi exhaust temperatun: section of fdpfigr 5ae1 op system dlfficulUes Fialirtp for dn'asrle stnabdoartr / startup EMERGENCY SMtJ1DOWN Flare system tastalg ElecMcal / Mstrumentatan maHurxxion Faulty thukfown on Eiectrlcal 1 Instnrnentatan malfuncxion Faa'lily mainmtenanoE FGgh ambient temperatures. art other faa'u'ty (T8D) t;as transtt system overpresatare X Other: Process FOR module starwp baCkin9 CPFfFIaw Staflon out and functional Bieck ouL Intem-tttent i~cCessNa / instrNident iMst gas flaring for a iota) of 48 nunutes. rates into taeK{y Paga 1 of s B. Action Takon to Eliminate Cause and Prrvent Recurroneo: (Cheek and descr-be as applicable) Started /restarted 71C i Stabilized facilib+ process and operation Compressor I train depressured Repaired equipment dlfficuMies , Reduced /increased inlet gas rates with . Completed flare testing Faality maintenance completed Corrected E&t Tk,duatlon / falkra X Other: Startup FCO tamPleted for the Corrected f&I fluwiatlon / failure day. atother /adiRY R~ Black Smoke Did incident Cause tllack smoke? Yes: No: ~ (H Yes. ooriUnue vrith this secCwrt) t]id incitfent present a potential threat to human health or safety? Yes:. No: (If Yea, report W FEC as soon as posslblo. tf No, report tz, AdEC with 24 hours.) Black smoke emitted from souR:e: (enter tag number and desafptlon) Notlfied ADEC ny farx on: Date: Time: Report the following information to AOEC wlthtn 24 hours BY_FAX (807~68.7508k Date and tlme of Wads smoke event: Frain: To: Vok,me earee wttlch generated Wedc snake (rt diflerent from aeova): MscF Bats tJestaiplion of slaps to minsnize emissions: Sea Section B. above. Type of mateAats iMUnsd: ties: NGLB: Omer: General Weather: AirTemporattue: Wind SpeedlD;redion: Name and phone numt~er of person makMg the report: Name Phone No. Based on intonlnaUon and belief tonned after reasonable inquiry, l oertgy tAat the atatemems and Information in and attached to this dorztrnent are true, saxrrate and compU wr1 Factlhy Supervioor tr-C~f~ Dab w ©~ oC: EOC Supervisor, PRB 8 (11aro gas and black smoke indderrts) Field Environmental Comppanoe Cooroinators, PRB 7 (Black Smoke incidents only) PBWGPMA Field Mattagtars, (elatir snake irtcidertls only) GPMA Operations Engineering Tedrrrical Atdcr (Gl'MA reports orrhl - ATO 477) Kuparuk Field Environmental Compliance Coordinators, NSK B1 (Uare gas and black smoke ) ...Oct-13-200 11:16am From-LISBURNE OPERATIONS 659-8655 T-653 P.003 F-150 FIAIiE t3Ag VENTING REPORT PHILLIPS ALASKA. INC. • PRUDHOE BAYIGPMAMUPARtHt FACILITY: LPC PERTYflT NO. 8A73,AA02b Data of Occurrertx• 9I3W00 ~qam ~~ (mm/ddlyy) (Check 5eledion). Total Volume Flared: 148 MSCF BBLS Meter No.: 621 Facil ~~~ ~]iMplarwted (Check Seledlal) (Lisburne Only-Gab flared wda fhortEluvsbeam Daownsaeem (Check One) of TEG contaaor meter of LPC) TimO of t~cco r~enca: U0~0 Nllnutas From: 75:70 To: 15:14 = 00:01 From: 76:34 Tp; 1b:35 ~ Op:g1 From: 15:50 To: 1b:b2 00:02 From: 76:02 To: i6:dS = 00:03 From: 16:42 Ta: 16:44 = 00:02 From: 16:6ti To: 16:58.. = 00:03 Total Mhtutaa Flared: ~ 00:12 ~e (lnciudas volume flared WAldf ge»srated black smoke, !f applkwble) A. Dosk:ription of Incident and Causo: (Check as many as needod to fully doscride tt-e incident) SID T/Cb for Process upset in -TIC SD due to high exhaust temperature section of faality_ Seal ofl system drtflculGes Flaring for drilist~ shutdown /Startup EMERGENCY SHt7TDOVIAV Flare system IesTmg Electrical /Instrumentation mal(imcdon Faulty shutdown on F~ectrical I Inswmerrtatlon malfundipn Faa'6gr maintenance fi'igh ambient ternperattms. at other faeGky (Td.D) .Gas bransk system overprr3ssura X Other. Process FOR module starhgr backing CPF/Fiow Station aul and fundiarral check ouL Intennilteitl Exoess~lre I InsutfiGent inbt gas flaring for a total of aH minutes. rates into facer Page 2 of_3 . B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as appltcabls) Started /restarted TIC f Stabilized fadilty procet~ and operation ~~ Compressor l train tlepressured Repaired equipment difRatltieS Reduced l incr6ase4 inlet Aes rates with t;,omplstetl flare lasting Faaligr malntenar-ce completed Correcta0 Ed.l flucp,ation /tailors X Other. Startup FCO completed for the Comeoted E81 fluctuation l faflure day. _ al o0ter faQlily (Ttip) Slack S Did Intddent cause btadk smolke7 Yes: No: moke ~ (If Yes, candnue wNh this section) Did intddent present a potentiai tttteat to human health or sategr7 Yes: No: pf Yos, report to FEC as soon as posslb{e. N N0. report to ADEC whh 24 hours.) 81ack Smoke emitted from souroe: (enter tag number arltl tle6CriPliOrt) Notifled ADEC by Fax on: Date: Timo: Report tho follcwiny irdormatton bo ADEC withie 24 hours BY FAX (807,8-TSt18): Date and time of black smoke evenk Fin: To: Volume flared which generated black Sn10ke (F d'Iffererd from above): MSCF B81_S Deskxip6on of steps to minimize emissions: See Section 6. above. Type of ma~rlals burned: Gas: NGIs: Other. General weather: Air Temperaure: VJg1q SpeetllDiredlon: Name and phone number o(person making the repotx Name Phpna Hb. Based on information and belief formed after reasonable inquiry, I certify that the statements and irfomratbn in antl attached bD this document are Uue, sok:wate and complete. FacHity Supet~or Oda txw EOC Supervusoi', PRB b (flare yes and bMdk smoke irtciderts) Field Enviraramernal Compliance Coordinatoes, PRR 7 (~8d: Smoke kldtlarlt5 png0 PBWGPMA Fleltl Managers, (Blade smoke inaderNs Only) ' GPMA Operations Engineering Technical Aida, (GPMA reports only - ATO 477) Kupardc: Fiekf Environmental Compgance Coofgirtdtors. NSK 61((laro gas dn0 bWCk smoke~irtddertts) 'Oct-13-2000 11:16am .From-LISBURNE OPERATIONS 659-6655 T-653 P.004/021 F-150 FL.AtRE GAS VENTING REPORT -SKA. INC. • PRUDHOE BAY/GPI FACILITY: LPC PERMIT NO. 9A73-AA025 Date of Occurrence: 9/30/00 ~pe,a ©ynK Tlma of Occurref~•. (mmrdM9r) (Check Selection) 00:00 1NIn a From: 17:77 To: 17:39 = 00:28 Total Volume Flared: 109 MSCF BBLS From: 17:56 70: 17:58 - 00:02 From: To: ~ 00:00 Motor 1Jo.• szt s Factlt ) ~pmxveo f~ From: To: = 00.00 (Check Selection) From: To: = D0:00 ' From: 70• = 00.00 Total Minutes Flared: m 00:30 (tisbume Only- Gas flared was flar)riam 1]Ao~YVnvoem (Check One) (lnduaes volume flared whicdr generated DJaCfc smoke, of TEG ccntarsnr merer ~ LPC1 B applkgtva) A t~scriptton of Incident and Cause: (Check as many as needed to fully tloscMbo Iho ir~ctderrt) S!D T/t;~ for Process upset in _ TJC 5D due to high exhaust temperature section of fadlity - Seal oil system difficulties Flaring for drillsrte shutdown J Stdltup EMERGENCY SHUTDOWN Flare system testing ' Electrical /Instrumentation malfunction Faulty shutdown on Electrical / Instrumentatbn malfundlon Fadlity malntenanee FGgh ambient temperatures. at other fadtiry (T&D) . Gas transh system overpressure X Other: Process SOR module stanrtp baddng CPFJFtow Statbn out and functional check out. Imemiittern pccessivr! / insuffioent inlet gas Raring for a total of 48 minutes. rates irdo taaTib Page 3 of 3 8. Action Takon to Eltminato Cause and Provost RACUm9nCri: (Check and describe as appllcabb) Started / r+estartetl 7/C B Stabilized fatiliry process and operation Compressor / traM depressur+etl Repaired equlpmeM tltK Wltias Reduced / harrasetl Mlet gas rates with Completed flare testing Fadtity matntenarroe completed Corrected E&I 1luctuatbn / faHure X Ocher: Startup FCO completed for the Coneded E&I frvauatbn / fa8uro ~_ day_. at other fadliry (T&b) f)Id Incident cause black amok®? Yes: Na: ~ (If Yes, oondnue ev8ir this section) [did irradent present a potertiai threat tD human trealth or safety? Yes: No: (K Yss, report to FEC as soon as possible. if No, report to ADEC with 2t hours.) Black smoke emitted from source: (enter tag number alai description) Notified ADEC by Fax on: Date: Tirtr9: Report the fotbwing tnformatlon to ADEC wBhfn 24 hours BY FAX{907 268-7508): Date and time of blade smoke event: From: Tc: Voume flared which generated blade smoke (ff different from above): MSCF BBtS Description of slaps to mintrrtRe en>is~orts: Sea Secpon B. above. -'"~" Type of matefials burned: f3as: NtaLs: Other. General Weather. Air Temperawte: Wind SpeetllD{mdlpn: Name and phone number of person matting the reporC Name Phone No. Based on information antl barai tomled after reasonable inquiry, I certify that the statements and IMormatton in and altactred to this document are tnre, acpxat8 and compl®tis. Facility Supervisor t7dtf CC: srOC Supervisor. PRB a (Hare gas and black smoke fndderNS) Field Envaonmentat Compliance Coord'aralors, PRB 7 (Bladt 8molre tnddertts only) PBWGPMA Field Managers, (Black smoke inaderrts ortiy) GPMA Operations EngMeering Technics! Aids, (GPMA reports tally - ATO 47~ _ K~aruk Field F.rrvirorunerttal Compliance Coortllnators, NSK 81(flare gas and black sntoiu: incideMS) I FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAYIGPMAfKUPARUK FACILITY: LPC PERMIT NO. 9A73-AA025 GAS DISPOSITION Date of Occurrence: 9/3/00 ~ Hare ^ vent (mmlddlyy) (Check Selection) Total Volume flared: 553 MSCF BBLS Meter No.: (By Facility) ^ ~~ed ^ unplannea (Check Selection) (Lisburne Only -Gas flared was from ^ upstream ~ downstream (Check One) of TEG contactor meter at LPC) Time of Occurrence: 00:00 24:00 Minutes From: 09:21 To: 15:51 = 06:30 From: 18:23 To: 19:57 = 01:34 From: To: _ From: Ta = From: To: _ From: To: _ Total Minutes Flared: - 08:04 (Includes volume flared which generated black smoke, if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) S!D T/C# for T/C SD due to high exhaust temperature Seal oil. system difficulties EMERGENCY SHUTDOWN Electrical !Instrumentation malfunction Electrical /instrumentation malfunction at other faality (T8D) Gas transit system overpressure X backing CPF/Flow Station out Excessive / insuffiaent inlet gas rates into fadlity B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C # Compressor /train depressured Reduced /increased inlet gas rates Completed flare testing Corseted E&I fluctuation /failure X ,Corrected E81 fluctuation /failure ~.at other facility (T8D) Black Smoke Process upset in section of facility Flaring for drillsite shutdown /startup Flare system testing Faulty shutdown on Faality maintenance High ambient temperatures. S/0 on high vibration Other: Process module startup and Functional Check Out. Intermittent flaring for a total of 74 minutes. Stabilized facility process and operation Repaired equipment difficulties with Facility maintenance completed Other. Startup FCO completed for the day.. Did incident cause black smoke? Yes: ^ No: ~ (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: ^ No: ^ (If Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Date: Time: Report the following information to ADEC within 24 hours BY FAX (907-289-7508): Date and time of black smoke event: From: To: Volume flared which generated black smoke (if different from above): MSCF BBLS Description of steps to minimize emissions: See Section B, above. Type of materials burned: Gas; NGLs: Other: General Weather. Air Temperature: Wind Speed/Direction: Name and phone number of person making the report: Name Phone No. Based on information and belief formed after reasonable inquiry, I certify that the statements and information in and attached to this document are true, accurate and ce fete. Facility Supervisor y~ Date ~ cc: EOC Supervisor', PRB 6 (flare gas and blade smoke incdents) Field Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only) PBU/GPMA Field Managers, (Blade smoke incidents only) GPMA Operations Engineering Technical Aide, (GPMA reports ony - ATO 477) ` Kuparuk: Fiek1 Environmental Compliance Coordinators, NSK 61 (flan: gas and blade smoke inddeMs) P:tGmupsttEnvirormsnWlFomrst Updelsd: FEC alga SpAI-Ges Reportin6 Forma~9~i-0OFlarerepon.xls Gct-13-20U0 11:Z5am .From-LISBURNE OPERATIONS 659-9655 T-653 P.021/021 F-150 FLARE GA5 VENT If~lta K~t'vK 1 PHILLIPS ALASKA, INC. - PRUDHOE BAY/GPMAiKUPARUK FACILf1Y: Ll'C PERMIT NtO. 9AT3,AAOZS Data of Occurranes: 9191DQ 0 flee ^ vent (mrnlddlyy) (Check Selegion) Total Volume Flared: Ss9 MSCF SBLS Meter No.: B Facll ~~""~ G D"1'~n1°t • (Check SeleCtioq) (4.iapume Onry - Gas ftaretl was lr0m 1~ up~» ^ dow:-su~odrn (Coed: Cv+e) of T>=G oarrtactarmeterat fl+CJ True of Ocwrrenc~ . OO:t>Q ~~ Mlhllt~. From: 09.21 To: 15:57 ° ~:~ Ffarrt: 18~ To: 187 ° 07:34. From: ~ To: ^, From: ~ To: -~ ._,. From: To: Total Mlradss Flarod: ° ~~ (Includes volume flared rvltlch generated black smoke, e7 appAcaf~le) A, pescriptlon of Irrcldont and Cause: (Check as many as needed tv t<dy doecrlhe 1tw inekienq SID TK.yf ~ _..~- T/G so due a high exhaust ~nperatufe ~+ seal 011 system dMficxtlGas ~..~- EMERGENCYSHUTDOWN ~~~ ~~ .Electrical / l:>Strurr:erriatia~ malturrci;an _,.~_ Electrical / R18trY:r:e:'ltallOn rr:eirunt:ll4n ^~ • ~~ at char taclNty (T$a) X ~+ Gas trar-sit system overp~M's ---- baddtp CPFIFbw Statbn 0:d ~' ~xOBSSive / kauff~d Idea gas rates Ingo fad p. Action Taken m Elkninate Ouse and Prevert Ratdrrenae: (Check and dasCAOe as appticabls) Started / ppstarted 7IC ~ Compressor f tTdin depressured ~i Reduoad ! Inrrettsed inlet gas t ales ^-^ COfnplefed fldfle tes6r~q X ~~ . Corrected F~l fluctuation /failure !, ~~ ,Corrected Ebl fluctuation l failul+e • .at other faally (TB~D) . .~., _ Process v~ ht sadror: of fao7ty FtarinB for efralslta shutdown I startup Flan, system taetir-g Fault s-wtdown on ..,_~ FadNty nrainlenanoe Nigh am»isnt tenrperalu~ ~ ~ vibration Other: Process module stamrp artd -- Fur-dional Check Out. fntertrtr~terrt flaring for a total of 74 n-inules. . : . Stabipxed faality process and operation Repaired equipment d"dficultiea with Faality meiMer:ance completed ether. SiaRu FCO tam Ead for the day pia inciaeru cause black smoke? Yes: ^ No: Q (If Yes, corttktue with title section) Did Incident pt+ssenl a potential threat to human tteaRtt or sew Yes: ^ No: ^ {lf Yea, report W FEC as soon as possible. ff No, report to ADEC with Z4 hours.)e~ ~ number and description) Black smoke emitted from source: ~~; Noticed AGEC by Fax on: Date: Reportttx foilowtn8 Irrformatlon b ADEC w1tltM ?4 hours YB FAE~9ot~ss-7s0e1: Date and hme of black smoke evertlr From: To: BBLS Volume Aarrd rvttictt gent:rafed biadt smoke (d different from above): _,_,MSCF ~„^_ Description of steps to rninimtze emissions: See Section B. al~otra. Ggtar Type of materials burned: Gas: NGI.s: ~_, General Weather: Air Yemperahxe: ~,~ VVirld ~~' Name and phone nturrb~ of person makirtli the repore Phorts No. Name Based on Infarrrtat:on ar-d belief fomted attar peasonable Inquiry. l Celtity that the statements and tniomtation in and document are tn16, accurate and ~ Fadlify Srrpenrisor ~~- ~ sx~ f-OC Supervisor, PRB t3 (gym 9~ and black awake irtciderNs) Field Errviroroner>tial Compliance Coordinators. PRS 7 (812idt Smoke inc~dertts only) P6u/GPMA Field Managers, (Blat* smoke lrrciderdS °dYI ATO 477) GPMA Operations Engineering Tedvucel Arde, (GPMA report only - Kuparuk: Field E.rwirortrrrerdal CompCrdrlce Coordinators. NSK 61(flen+ gas and blade srftD>ce intydertta) -- p;~o~p~rihama:gdlFamet threM.a SEC s-s0 'Oct-13-2'000 11:24am From-LISBURNE OPERATIONS FLARE GAS VENTING REPORT ~SICA. INC. • PRUDHOE BAYIGPMAlKUPAitUK FACIIJTY: LPC pats of Occurrentx• 9!41()0 0 fie ^ 1-e1x (mmlddlyy) (Check Selection) Total Volurria Flared: 3070 MSCF.,( BBLS Meter No.: (i3 Facil' I tW G v"~"'~ (Check Selection) ttlseume oMy - Gas flared was rvrn ^ wsae~- Q downst+am fchect ova of 7EG ovntauor mater at LPCJ that the statements and irttomtation in and attached to A. Deecdpdon of Inckient and Cause: (Chock a6 many as needed to eery describe the tnclderrq StD TlC~ . .. f0~ . 7/C Sp due io tagh eehaust fempeisture Seal oil system ditceultles EMERGENCY SHl1TpOVVf1 ~, EJectnost I Inssumenratlon maltunts;on Eiectrkal I Msannneruagon rnaHuneUa- at other faa'm.Y (Td~D1 X Gas transit system ~P backing CPFIFtow 8~lion ad Exvesstve / Insulfiasrtt iMet gee cafes frno facdtgl Process upset ~ section of faolggr Piecing for ddpsite rrlruttlown ! starurp Flare sYstam>asnng Faulty shufdawn on Facilityr nras~nanos H'~gh ambierK i3emperawras. SIO on high vibration Ourer. Process module startup and Fanetional Check Out. Intemidterd ~-t fla ' for a total of 298 minutes. B. Atxlon Taken to EllmMate Cause and Provost ttecurr9nt:e: (Check and desalbe tw apptlcablei Started 1 restarted T/C i1 Stabilized faallty process and operation Compressor /Vain depressured 12epalred equipment dNfloulttes Reduced / increased Intel gas rates wiut Cpmpletetl (lava testing ~+ Facility maintenance oomple~d Corrected FBI fluctuation / tatiure X ~,_ t ~~+P Ft,"A ~mdeted for the Corrected ESI fkx3uation / fautme d • at outer faeikty (78D) ' Black Smoke Did ktoident cause black smoke? Yes: ^ No: ~ (!f YsY~t Q With this secti~ pfd incident present s potential thrtmt t0 human Health or safety? (tf Yes, report W FEC as soon as possible. If No, repoR to ADI C with ?A hours.) Black smoke emitted from Source: (enter tag number and desGipdori) Notified ADEC by Fax On: Date: T~ Report the followieg 1MoRnatie~l io ADIt: vriMht ?~/ ttour^ BY FAX~807~69a50ak pale and tarts of biadc smoke event: Front: 70: Voknne flared which generated black smoke (it difft:rent from above): MSCF Bl3LS Description of steps is minimize emissions: See Seaton B, above. ~~ Type of materials burned; Gas: NGI.s: Outer: General Weather: Air Temperature: V1fir1G Speed/Dfredi4l+: Name and phone number of person making the report: Name Phone No. Based on irdormatbn and belief formed efts document are true, acauate and complete. Facility Supervisor _+ 659-8655 T-653 P.020/021 F-150 pERMfT NO, 9A73,AA0~5 Tuna of Occurrertott~ ~~ llliDl From: 08:~ To: 08:51 ~ OOb1 From: 1~dla To: 13:10 = 00:02 From: ts:s2 To: ~e:s8 = o4:s4,., From: ~sat6 To: ~s:aT ~ oo•ot From: To: = From: To: ~~ _ Total Minutes t-laved: ~ 04:58 (Includes volume f1ar~BGl vvh~h 9ene-ated DIaCk smoke, if appli~ble) Date oc: EOC Supen~lsor. PRE S (flare gas and ~adc smoke incideftls) Field Ertvirortrrterttal tompliariae Coord'tnattxs, PFlB 7 (eladc Smoke irradents vrt~l) PSII/GPMA FIe1d Managers, (Black smoke ktadertts only) GF'MA Operations Engineering Teritmcal Aide. (GPMA repORs onN - ATO 47~ ICupantlc F~ekd Envirorrrrtental Compi'iancs Coordirrei0rs, NSK 61 (flats Ads and bleCk smoke incidents) - P. Uptletem FEC alas SpIlKies Rapw+irq Feymnt-~04mFY~wepaLxb dct-13-ZO00 11:Z4art From-LISBURNE OPERATIONS 659-8655 T-653 P.019/OZ1 F-150 FLARE GA5 VENTING. REPORT PHILIPS AUISKA, INC, • PRUDHOE BAY/GPAAA/KUPARUK FACiLiT1i': t.PC PERMIT NO. 9A73,AA02S G $ D1SP051T10N Data of Occurrence: 8l5/fl0 (] Hare Q Vent Time of Occurrence: (mm/ddryy) (Check Selection) 00:00 ?~ N;"ute~ From: 08:2s To: 087 = 00:01 Total Volume Flared: 9198 MSCF BBLS From: 08:50 Ta: 08:51 = 00:01 From: oa:5! To: 1925 = fa:28 Meter No.: (BY Facil' ~ ^ tlrtplanrted From: To: _ (Check Selection) From: To: _ From: To: • Tobl irlinalea Flaretk - .10:90. (l~sbume O»ty-Gas 1raroC was hem ^ ~am-t ^ tlarrratreerrr (Cdrar~ Ona! (lnCludes volume flan9d Which generated black slnolre, o171:G tontactarmeteraf LPGy if ePP-K~blb1 A. Description of IncWOnt antl Cause: fChack as many as needed to filly describe the wtcldant) SID TIC# far Process upast K - ~ TIC SD ekrs b Mph exhaust tampa~,rs sattion of fap6gr Seal di system diHlarltles FlaAng for dralsrle 5htlbdown ! etarNp EMERGENCY SHt1TDt)VWd Flare system testing F_lectrical / Instrurbentatktn mal[urtGion FauHy shuttlown on Electrical l Instrumentation malfunction Faatity maintenance ' Fliph amMer-t temperaeurari at other taa7xy (f8D) Sld on high vibration Gas transit sye~m overpressure X Other. Process module startup arld DaciGfNj CPFiFktw sta8or- out Fur-ctiortal Check OuL MtermilGrn Exoesahre / irrsutfiaertt inlet gas flaring for a total of 690 minutes. rates kNO f~ , B. Action Taken to EOminab Canso ana Ptrovont Rownnnco: (Check ono assalbe as applica0ls) Started ! rbstaAed T/C * Stabilized fap'frgr process and operation Compressor l train depresstued Repaired egtripment diffiWitles Reduced / rlcreased {tiler gas ratan w1tF1 Completed flare testing Factliiy maintenance completed Comacted 1;81 fluctuation I failure X Other: Slariup FCO completed for the Corrected E&I fluctuation / far~ue ~ day. at other faalibr (Td~p) Black Smoke pid 'Incident cause blade smoke? Yes: ^ No: 0 (If Yes. continue wish ibis section) Did incident presern a potential threat to txrman hsaltit or safety? Yes: C] No: ~ (11 Yes, report to FEC as soon as possible. M No, report to ADEC vtrith ?A hours.) Blade smoke emitted from sotuoe: (erset tag number and desCr~tion) Notifletl ADEC by Faxon: pats: .Tarts: Report the following lnfonnadon Dc At]EC wlthln ? 4 fronts aY FAX (907.69.7508): Date and time of black smoke evert: From: To: Volume flared which generated blade smoke (rf different from above): MSCF BBLS Description of steps to minimize emissions: Sea Soctioa t3, above. Type of msierials tturrtetl: Gas: NGLs: father. General Weather: AAii Temperature: Wlnd.Spesd-D{I+saion: , Name and phone number of person rrtakirtp the report Name Phone No. l3ased on {nfom-at{on and belief fofrrted after reasonable inquiry, l eertity that the statemerns and informatioq in and attachetl to th6 documerX are true. accurate and complete. Fadllty 8ttpervpor Date ea EOC Supervisor, PRB 8 (Aare gas and blade smoke inadents) Field Environmernat Compliance CooNinabrs. PRB 7 (Blade Smoke ktddeMs ar PBWGPMA Field Managers, (Blade smoke irtddertts fury) ~ b $ -- GPMAOperations Ertg'rrteering Tecfuticad Aftle, (GPMA rep0A6 OMy -~+-'iC~~ Kuparuk: Field F~nrirortrrterttal Comptisnoe Coordinators, N5K 61(flare gas and blacJc smoke inciderus) FEC itlati 'Oct-13-2000 11:22am From-LISBURNE OPERATIONS 659-8655 T-653 P.016/021 F-150 f FiJ-RE GAS VENTING REPORT 151CA.1NC. • PRUDHOE BAY/GPMA/KUPARUK FACILJTY: LPC PERIYIIT NO. 9A73-AA025 _I Date of Occurrence: 016100 ~Fmre ^vent (mrrYdd/yy) (Check Selet~on) Total Volterra Flared: 620 MSCF BBLS Meter No:: 621 F8c11 ~~+-~ Clunpa^^m (Check Selection) (lJsbume Only -Gas flArttd was rrpnE]upstraem QOaMn9owarn (Check One) of 7FG contactor meter at tPq Time of Oec urrence• 00:00 l From: 06:07 To: 08:04 = 00:01 From: 08:26 To: 08:57 00:07 From: 080 To; 081 •_ 00:01 From: 08:57 To: 08:58 = 001 From: 08:66 To: 08:b8 = 00:02 From: 09:07 To: 09:02 ^ 00:01 Tote{ NOrlutes Flared: a 00:07 (includes volume flared wltiWr ge»erated Alddc smata®. Il applka6lo) A. pescriptbn of Incident arrd Cause: (Check as many as needed to fully describe the inddar~ ;olD TICS for --- Process upset in _ T/C Sp due ~ high exhaust temperature section of fsaliq- Seal oa system dif6cxrlties ~~ Flarlrtg for drillsite shutdown /startup EMERGENCY SHUTDOWN Flare system testing Elecbicel / Instnmientatxxr malfunction ~~ Faulty shutdown on Elechical / inatr~ur-entation malkuxbOn ~ Fadlky mafnlenance High amtuent ~mperaturea. at other faallry Q8D) Gas b'ans8 system overpresawe backirq CPF/Flow Steffan out Excessive / insufflclent inlet gas rates into tadl~ ~~- ~_ Other. Process module: startup and . Funcxional Chec* Out. Intem-ittertt flaring for a total of 92 mirwtaa. Page 1 of 3 B. Action Taken to Ellmfnate Cause and Prevent Recurrenco: (Check and describe as pppllcabla) Started /restarted TIC B Siabilicied fsaTigr prvoesa and operation Compressor 1 train depreasured itepaired equipment difficulties Reduced / inerraased inlet gas rates wi1t1 Comp1e~d {~ ~br~ FaciNty maintenariw completed CorretAed Ebt ftuctue6on / failrxie X Other. Startup FCO completed for the_ Correrfed E81 fluctuation /failure daY. _.- at other fadety (TB.D) Did Incident cause aleck smoke? Yes: No: ~ (K Ye6, continue wkh the sedum) Did Incdent preserri a poterslal threat to human health orsafeaR Yes: No: (M Yos, report to FEC as soon as poa8lWe. K No, report to ADEC with 24 hours.) Btadc smoke emitted from sounx: (enter lag number t+rtd descriptlort) Nogf{ed ADEC by Fax on: Date: 1`wria: Report the following information to ADEC within Z4 hours BY FAX (80769.7608): pate and time of black smoke aver>b From: 70: VOlume flared which generated bloat smoke (rf different from above): MSCF 'BLS Description of steps to minimae emissiorts: See Section !3, abavs. Type of materials burned: Gas: Nets: Ctfllar. General Weather: Air Temperature: 1Mnd SpeedlDirecti0rx Name and phone number of person making the repoR Name Phone No. Based on Ntfortnation and bHiaf fomnetl after reasonable inquiry, l document are true. aotaaata and oonipiste. and FacHhy SupervMOr ~e tx~ EOC Supervisor, PRB B (Aare gas and black smoke ktaderits) Field Environmental Compliance Coordinators. PfiB 7 (Blade Snake inciderds only) PBU/GPMA Fisld Managers, (Bleat snfoka ktcidertM oN~) GPMA Operations EriOitteering Total Abe. (C•,PMA reports ofbl - A'PO 477) iWparuk Field Errvironmerttal Compriance Coordinators, NSK 61(>tare gas and Dlack smoke incideMS) ' Oct-13-2000 i1:23am From-tIS811RNE OPERATIONS 659-8655 FLARE GAS VENTING REPQRT PHILLIPS ALASKA, INC. • PRUDHOE BAYIGPNU T-653 P.017/021 F-150 FAGIt1TY: lpC PERMIT NO. 9ATS~1A02S Data of Occurrence: 916100 ~ Rrre ^ Vp1t {mmlddlyy) (Ctreck Seledlon) Total Volume Flared: 620 pASCF BBLS' Meter No.: fi29 (6 Facil" ) ~ ~'~ ~' (Check Selection) NsDurre Only- Gas flared wasim-r, Q up6veam ~ dowrrseeam tCaed:Or+e) or7E'G camaaormeterar~l Time o f_Occ urronca' oo•o0 2a•oo ~~ From: a9•is To: 0a•s0 = 00.75 - ~; From: o9:SS To: 09xi6 Oo:2Z From: 1a~s _ To: 1:0.1 s otxat From: ~s:oe To: ts~ = 00:01 From: ~s:fz To; u:~a = oaot prom: 1S•f6 To: tS.M7 = 00:01 Total NHnutes Flared: = ~% pncludes volume flared which generated bJsdc srrtpke, tY appNcable) A pescriptlon of ir-ciderR and Cause: (Check as many as needed to }tNly derc'tbe the Ittckisttt) S-D T/Cf _ _ . _ ~ Process upset k1 _ _- --_ _ -^~ _ __ 7JC SD due to high exhaust temperature ___._ . .section oriadfib __- _ Seal a'I system d'dfi:a~lGes Flaring for drMbloe shuklown / starerp EMERGENCY SMBTGUWN ~~ Flare ~~ t~0 ~.__. Elecsrtcat 1 Instrumentation trtalfurrction Faulty shutdown Cn ^~- Faecatcal! hrstn:rricntation rreNunWort Fadlity meurttananoe High ambient temperahrre` at outer faciRly ~) Xi sID on high ~ibralial Other: Process module starttrP _attd ,_ • Gee trenslt system wetpressiNO Ftatya-onal Check Out. lerit.rrruttertt ~~ t3tation ~ flaring for a tot81 of 92 minutes. E~essive ! Insuutllicie:d lruet gas Page z of 3 .rates kmotac~ty B.1~tlon Taken to E'liminste Cause and Pro1-ont Recurf+CnGO: (Check stxi de4cribe ss appllcebM) Stabilized fdaTtty process and operation Slatted I rr3started T!C # _..~.- Cpntpressor !train depressured Repaired. egritprrtent diifia~ies ~- Reduced /increased inlet gas. tabEts ~'~ vet FaaTtty mairttertatvae completed Completed Aare testlng X Other: Ste FCO ro area far tite Corrected E8i fluduation / faikme day. Corrected ESd Aucdmtion / fdiltme at other fBGli[y (fS~Q) Black Smoke Did incident cause bleat smoker Yes: ^ No: ~ (If Ye Y~ntia whh this sediwl~ a pia incident present a potorttiai tttteai to human health or saw (K Yea, roport to FFC as soon ?s possible. N No, report to ADEC with u hours.) (erder tag number and desCriptlorl} Black smoke emitted from sotm:a: Notified ApEC by l=ax on: Oats: Tame: Report the following IMomtatton to gpEC wllhin T4 hours BY FAX (807.169.760ti~ Dam and time of black Smoke event FrortiC To: MSCF BBL$ Volume flared which generated tNadt smoke (it different from above): ~_ Descaiption of steps to min'urd¢e emrssians: See Section 8, above. Type of materials blurted: Gas: NGLs: _J Otfte~ General Weather: Air TemperahM+e: Ihfmd SpeedlDiretxlon• - Nams and phone number of pew making the report Nartte Phone No. Based on ltttorrtlatton arc ceite- rarrneu arm doaurtettt ar6 cue, sawraoe and oontpettt. Ftttdiity Supervisor and Daily crt EOC Supen+laor. PRB 6 {Aare gas and b~k smoke RtGidertts) Field mental Compfianoe Coordinatore, PRB 7' (Bleat Stroke inddsrtts txtq-} PBU/GPMA Ftold Managers. (Black ttnwke ktadertts ~ GPMA OperaAons Engirteerutg Technit~l Ai08, (GPNIA tttpotls atq- ~ ATO 477) Kupatuk Field EnVlrotnttetds) COmP~iarloe COON'utaiots, NSK t1(Aare gas iu>r0 black smoke irtciaerNs) trpdauet Fec s*se Spiced Repavew Farm 2ttk ..Oct-13-2000. 11:23am From-LISBURNE OPERATIONS 659-8655 T-653. P.01i1/021 F-150 FLARI* GAS yf=NTING RRPORT PN1111PS ALASKA, INC. • PRUDHOE BAYlGPMA-K,UPARUK FACIWTY: L~PC PERNflT NO. 9A7S-AA025 GAS DISPOSITION Dats'of Occurrence: 9I6I00 ~ flee 0 vent Into of tJccurrence: (miNdd/yy) (Check Station) 00:00 24:00 iglu From: 7s•56 Ta: 18.00 = 00:04 Total Volume Flared: 620 MSCF B6laS From: 7a:18 70: 14:58. _ 00:20 • From: 161 TO: 15~ = 00:01 : 621 {s Facil" ^ ~~ 0 unWaiw:eo From: Meter NO dS:50 To: 76:08 a 00:78 _ (Check Selection) From: 16s2 To: 18•.53 ~ 00:01 From: To: Total Minutes Flared: = OO:M ~~ (I.isbume Only -Gas flares was rrom ^ upstream ~ oowrlStrp2Ri (t:Aed~ on°) (Utcludes volume flared which generated black SlgOdfe. pI TEG contactor meter ~ tPC~ rf appl>cablej A. Dsscrlptkxr of Incident and Cause: {Clwck as malgr ss needed to fully doscWCe the Irraidenq SID TKse tar Process uyset in rrC sD due to hips, axr+aust oerrlperature setae: of fsctNgi ^~ 5~l oU system difficulties Flaring far driusiie shutdown / stalh~l EMERGENCY SHUTDOWN Flare system testlng !-+ Eleaic~l / Insb-srier:tatlon rrialkvratipn. Faulty 6huldown on Eledrkel / InsUUmentaiion manunction Facility rl'teintenarke High euribient ~rrlparalures- SJD on hgh vibratbn atother facRib R~ X module starnip and Pracess Other: Gas Vansh system overpressure _ , Functional Check Out. Intemuttern bsekirrg CpF/Flow Stattat ad --~ - flaring for a total of 92 minule5. - ~~~ / ~ foist ~ Page3 of 3 noes IrKo faGf~r ~~~ Aetlon Taken to EOmirseto Cause and Prevent Racurron~: fClleck and deseAbe as appilcal:lr) B . Started /restarted TIC # Stabii'rzed facifiry process and Operation Compressor /train depre56ured Repaired epufpmertt dlHiculties • Reduced /increased inlet gas rates with __..-~ ppmpleted flare testing - Fadfly maintenance completed CarretAed E&1 fluctuation !failure ~ Other. Startup FCO completed for the COtre~d F81 fluctuation / fdUUte dam' at outer iaciUq- R~ ~~ Black Smoke pfd incident cause black smoke? Yes: ~ No: ~ (If Yes, carttirtue wRh fllis sedbN ^ ~= ^ Did incident present a potential threat b twman heaall or safely? Yes: report fo FEC as soon as possiba. if No, report to ApSC wMh T/l hotars. ~ {H Yos , ` ~ rsnribet and desaiptiort) 81ack smoke emitted from source: Notrfled ADEC by Faxon: Dale: Tarte• Report the tonowing Inforrri9aan to ADEC vrhhln 24 Irorrrs BY FAX 1907,Z68.7S081: Date and time of black smoke event Front: To: ~, S BBL MSCF Volume flared which generated Dladt smoke (E diBerent from abova~ . .^„~ Desaipdon o1 seeps to minimize emissions: Sets Seotion B, above. Yype of materials bumsd: Gas: NGLs: ~_ General Weather. ~ Air TeniperatlRe: Wind Speed: Name and phone nurrd~er of pe+son making the report Nanla Phone No. t38sed on IrlfOmteDOn arto De114T Wmreu Hoer rrwcnK.w~v ary••••~, . ••••••••~ •••-• -,-• ---..._..° ---- ------ dowmentera true, aocurafe and complete. Factiky strpervi~of' ~ oa i.OC Supervisor. PRB 6 (flare gas and black smoke incidents) Field Envw+nnmental CompGanm Coordinates. PR6 7 (~dt Smoke incidenNs Ofly) PBUlGPMA Fle1d Managers, (Bieck smoke incidents oNy) GF'MA Operations Engineefktg Technical Aide. (GPMR faports oNy - ATO 4Tn Kuparuk: Field Entnrnnrr~tal Compliarioe COOrdlnatnrs. N5K 81(flaro gas and bladt smoke incideflb) trr+as~a ~ ~ spa•Ca+>t•pontw fa,nsv9.paco a.:ds Oct-13-2000 11 :21 am from-IISBURNE OPERATIONS 659-8655 T-653 P.013/021 F-150 FLARE GAS VENTING REPORT PHILLIPS ALASKA. INC. - PRUDH~E BAYiGPMAlKUPARUK FACILITY: LPC Date of Occurrenao: 91X00 C! Iaare ~ vent {mMddlyy) (Check Selecfiorl) Total Volume Flared: 461 MSCF 1361.S Mater No.: 621 B Facill ~> Q Unptamed (Check Selection) PERMIT NO. 9A7S-AA025 Time_ of Occurrence• 00:00 240 !] From: o8:g8 To: os:os = 00:07 From: 1o-.49 To: 10:51 = 00:02 From: 77:07 To: 71:13 = 00:08 From: 979 To: 77:47 = _ OO:IYl ~ From: 77:58 To: 97:69 = 00:07 From: 12:72 To: 1Y:13 = 00:01 Total Nnnutes Fk+red: = 00:19 (LisDume O»ly -Gas pored was hom ^ upon ~ aorvre0leM fC+wc* on~d of T>=G oDntaclnr meter a1 t.PC) (lndudea volume flared which generated bladc.sntoke, r7appla:able) A. Dosctlptlon of IncMent and Canso: ( ss many as needed to fully describe the inddwq S/D T/CM for T1C SD duE to high Exhaust temperature __ ;..Seat oll system diffiwdties __ _ EMERGENCY SHUTDOWN Elec4lcat / Itisirturtentstion meN-x:mon Elec:hid 1 ktsvumenfation matt~ndlon Process upset In section of tastily Fiarutg for erinsaa Shutdowfl !startup.. _ _ _ _: Flare system testing Faulty SMrttlHaMt On Feca7i4r maintenance Ff~h areetEnt temperatun-t:. at other taoTily (TRD) ' Gas transk system overpresswe X Other: Protrss mootae startup and hacking CPF/Flow ssaron out Functional Check Out. Intermlaertt Excessive ! Ntstfificlerrt Ndet gas flaring for a total of 102 minutes. rates ~ tatty Page 7 of S B. wcUOn Taken tao Eliminate Cause and Prnvatt FtoWrrrrrce: (Clreck and desulba are app{Irahle) StaRetl 1 roSWrted TIC E ~ Stabil'ttetl facility process antl operation ~_ Compressor / train depreasur~aA Repaired equipment difficulties Reduced /increased inlet gas Hues with Completed flare te6tutg ~ Facdfiy maintenance compte~d Con7~d Edd fluctuation / fafiure X OtltEr: Startt~t FCO cah'lpmted for the Corrected E81 fluduaGon / faUtrra day. at outer faa'Idy (raD) - Did iritidenl cause DIeCk smoke? Yes: Q No: ~ (If Yes, corflirtua vrrttt this aegian) Did Incident prsseru a potential threat to human health ~ safety? Yes: ^ No: ~] pf Ytls, report to FEC as soon as possibb. ff No, report to ADEC with Z4 hours.) Black smoke emitted from source: ' (enter tag rsrrritrer and descriptiat) Notified ADEC by Fsx ort: Qate: Tnrre: Report rho Tpllvrvtng fMamafton to ADEC within 24 hours 8Y FAtCf907,~9ASOtk Date and th7te of black smoke event From: To: Volume flared which generated Mack strtoke (tf different from above): hASCF BBL8 Destxiption of steps to mktim¢e emissions: See SecEion B, above. ~YPs of matwt~als btrrrred: Grit: NCLs: Olhtt: General Weather. Air Terriperahue: VYrrM SpeedlpireCtbn: Name and phone rarmber of person making Ute report Hama I°tl0rte N0. Based on information and belief fomted after reasonable inquiry, l certify that Ufa staternerds acrd iniomtation in a~ docun7ent acs true. accurate end oompitte. Facility Suporvitof [late t~ C-OC Supervisor, PRS 6 (flare gas and black smoke irtcidertls) Field Environmental CompNartce Cooroinators, P128 7 (Blanc Smoke irtetidertts.only) PBUlGPMA Field Managers, (Slack smoke inadertb ally) GPMA Operatwns F~igir>eeririg Tetiutic~l Aida, (GPMA repoAa sty - ATO 47th Kuparulc Field Ernrironnterttal Compliar-oa Coor++cl'rnators, N3K 61 (Aare gas and black smoke irtadertta) l~wd~CalBa $p~1•Gksl~or+arjnp><arrrA9-7-0a 7~Ia Oct-13-.000 11 :21 am From-LISBURNE OPERATIONS 659-8655 T-653 P.014/021 F-150 FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAYIGPMAlKUPARUK FACILITI(: L.PC PER1IAIT NO. 9A7~-AA025 GAS DISPOSITION Date of Ocwrrenca: 9/7100 0 Fire ^ voce (mmlddlyy) (Check Selection) Total Volume Flared: 451 MSCF BBLS Motor No : 521 {B Facll ) ^ Punned Q ttrrp~rrre~l (Check Selection) (LlSDUme Ony -Gas RalaO was aom ~ upst~n ~ 0owruaBara (C+»ck ~1 of 71G corrtactw matsoratlPia Zijna of Ocwrrenca: ~ 2a:00 ~Inu e,E, From: tsag To: ~a»rr = o0:1s From: 1x:54 To: 1a:ss = oo:oy From: 74:11: To: 14:24 = 00:08 From: tas4 To: ups = oOAt From: 15:91 To: ia:3z = 00:01 From: 15:7s To: 15:50 = 00:12 Total Minutes Fluad: - 00:41 (Ir-cludes volume tiered which gensrated black 8rtlohe, rT applicable) A. Description of lrxlderrt and Cat>9e: (Check as marry as needed to fatly describe the IncldonQ SID TIrrS fOr --- T!C SO due fo high N.XTIaDSt ~ 3ea1 oil system ditfiaupies EMERGENCY SHUTDOWN Elecsical / knstrwrrentation rrralfurwlion Electrical / Mstrumantatlon malmncson at other fad9a (~D) Gas serail asrecem overprassws X hacking CPF/Flow Statlari Out. Excaseive ! irnoNtflQent Irdet gas rates Mto taeEgr e. Action Takon to t.tlminsta Cause and Provost Recurrence: Ilk and daeorfbo ss applkabN) Started /restarted TIC i Compressor / train tlepressured Reduced /increased inlet gas rates Compk:ted flare testing Conreaed E8d 1uauation /fedora C~- Corre~ted F-dd fluctuation /tenure at other fatdfity {T&~ Black Smoke Process upaetin saC50n of fata'diy Flaring Por tlr11191tB shutodern / starpip Aar6 system tO8tin8 Fauna shutoaNm an FadGty rria'nbenanoe High amtrient tnarnparastros. Other: Prboess module siertr~ and Fnmctional Check 0n,1~ MtamritJent flaring for a total of 10Z minutes. Page 2 of 9 StaWlized faa'Gty process acid Operaflof~ 128paireQ equipment difiicultiea with f"salibr mairttetuirnce comp Other: .Startup FCO ocrrtP~ted for ilia dsy. pid Irle~dent cause blatJt smoke? Yes: ^ No: ^ (K Yes, nxntinue with this section) Did inddent presets a potential thredt to trailer hearth or safeyrt Yes: ^ No: ^ (tt Yas, report to FEC as soon as possiblo. K No, report >ao ADEC with 2+t hours.) Black smoke emitted from >touros: (erlNr tag number and deserlpNon) Notified ApEC b5- Fax on: Dates .Time: RepoK the fonowing fnformatlon to ADEC rvahin 24 hours BY FAX (907,ZS9-7SOdk Dale antl tints OF black smoke evenR Front: To: . Voltrrrie flared which generated blade smoke {A different irom above): MSCF B8L3 Desaipticn of steps to minimrze emis,iortlf: tees SoGtiOr1 B, above. 'type of malerial6 twmea: Gas: NC31s: Other: General Weather: Air Temperature: Wind Speedrarection: Name and phone number of person making flte report Name Phone Np. Based on information and bedef formed after reasnulatrle inquiry, l certify that the statements and irdorrrratiorr in 8rtd attached m tftia document are true, accurate and oompleM. Facility Suporvvbor Dab t:~ EOC Supervisor. PRB 6 (Aare gas acrd block snwlaa irrddarrb) Fialtl Enviroranarntal Compdanca Coordktators. PRB 7 (&adc Stndca Ine~derils ony) PBWGPMA Field Managers, (91aok smoke hianerNS only) GPMA Operations Engineering Tecfwtical Aide. {GPMA reports only - ATO 4Tl) Kupanilc F~Id Envkorxnental Compdartoe Coordnstors, Ni31C 61 (flare pas and blsdt arnoke inddsrNs) LJpONOe F~ e18e a ReaordrB Paaret8a-OD II.rds bet-l3-ib00 11:22am .From-LISBURNE OPERATIONS 659-8655 T-653 P.015/021 F-150 FLARE GAS VENTING REPORT IPHiLLIpS ALASKA, INC. • pRUDHOE BAYIGPMA/KUPARUK ' FACILITY: LPC PERMIT NQ. 9AT3-AA025 Date of Occurrence: 9/7/00 ~ Flans ^ Vent {mmldd/yy) (Check Selection) Total Votutne Flared: 4s1 MSGF BBLs Meter No.: 821 If3 Facil' ) ^ PhnncA ~ tlriptannetl (Check Selection) (t.lsDUrtre Onb -Gas flared was hem (~ Q aore~stream (Check Onet1 or 7EC oontsaormeterat LPC) Tim6 of OCCUrrance• 00:00. 24:00 Nlnutes From: 17:70 To: ti:2S = 00:15 From; 17:AS To: 17:44 ~ _ _Oaoi -- From: 18~o To: isxs owls From: iea7 To: tesa _ oaot Froth: 19~D To: 19:16 = 00:18 From: To: Total aAlnubsFland: = 00718 (Mdudea volume flared whidr generated black smoliaa, !f appNoable) A. Deacrlption of Mc1doM antl Cause: (CAeck as many as neadetl to n,ly dASCriAa the tnctdaef~ &D TlCA foF T!C SD dug ~ hiBtl exhaust Seal on system dlfKwlties EMERGENCY SHUTD~NVN Ekth'Ital ! Instnlmentation malfunction F_legbiral / kwtrument:-tion malA1nc60t1 at ad+e~T (t'8PI Gas banak system overpn'asuna X beddng CPFIFkwv Statron out Excessive ! inadricssnt total ya~s rates Iron tedibr S. Aegon Taken b fiaminah Cause atNl Prevent Recurrence: (Check and descrlhe as applicable) S'tarteA / rostarted TIC tr Compressor 1 tout depressured Reduced / ina+eased inlet gas rates . Completed flare testing • Corrected Fall Aucttration / facture X Cortected E,Bd fluctuation 1 iaNlsrs at otherfadligr (Tdl]) Process upset in aectlon of faellky _ - Flaring for drnleioe shulo~wrl ! smr4rp Flare system tasting Featly stlutdovm on FadNgr malntenanoa ~ ambient tamperauues. Othor: Process module startup and Functional Check Qut, Intermhtaflt fearing for a total of 102 minutes. Page S of S statairaed faa7rty process end operanort Repaired equipment aitr;a,giea vvdlt FadNty maintenance completed Ottte?: Startup FCO completed for the daY. Did inddent cause blade smoke? Yes: ^ No: ~ (it Yes. continue v+ilh this section) pld inddent present a potentid threat to human heaNtt or safety? Yes: ^ iVO: ^ (If Yes. report by FEC as soon as poasslbis. K No, report to ADEC vrid~ Za hours.) Blade smoke emdted from aautx: (enter tag rwmber arld desaiptiolt) Notirred ADEC by Pax oft: Date: Tlfll~ Repeat the following Informatlorl m ADEC vritlrin ft4 Twins Y@~X_(t107.268.750h: Date and tune of black smoke event Front: To: Volume flared which generated bmdt smoke (If dMFerent irorrt above): MSCF BBLS Oescxiptbn of steps to minimize emissions:. 80o Bacdon B, abowi. Type of materials bantetl: Gas: NGLS: OUtef: General tNeatiter. Air Temperature: Wind SpeedlGirectlont Name and phone number of person making the report: Name Phone No. Based on klromiateon ana bevel rorrnea atta document et+e trite. su:aurate surd complete. statemsrns and i Facilibl9uperrssor Dato ' oo: EOC Supeniaor, t?RB B (flare gas ana black smoke klddelns) Field Enukonmerual cornpUartce Coordinators, PRB 7 (Blade Smoke itlCiderlts Only) PslllGhMA Fold Manager, (61adc sunoke ktdderNS only) GPMA Operations Engineering Ted~nc~al Akre. (CiPMA reports otlb- - ATO 477) • Kupaattlc Field F.rnnrorxrterdel CompKartce Coordinators, WSIC S7 (flats gals and blade srtlolte irtoidergs) ttpdsrsa FfiC e19Y spas,.. l'~pwritp raarr~.o0 a~aa -Oct-13-2000 11:20am .From-LISBURNE OPERATIONS 659-8655 T-653 P.O11/021 F-15t1 v s Ft.ARE GAS VENTING REPORT 1SKA, ING. • PRUDHOE BAYlGP! FACILIiY: LPC PERNAT NO. 9A73-AA02S Gj~yS D1sPOSiT10N Date of Occunertco: 918Jt1~ _ ~FL,e weiu Ttn>0 of t]ccnrsenea: _ _ - - (mmltldlyy) (Check Selection) ODbQ Minutes Frain: 10:28 To: 10:29 ~ 00:01 Total Volume Flared: 369 Iu1SCF BBIS From: 10:50 To: 10:61 00:01 From: 11:71 To: 71:14 G 00:01 Meter No.• 821 B Facii ~~~ ~~°""°d From: 11:33 To: 11:34 = 00:01 (Check Sektcti0rt) From: 11:41 To: 12:22 ' 00:41 From; 15:07 To: 16:08 - .00:01 Total Minutes Flared: = (Lisburne Only -Gas flared was fron~u~m ~nowrr~a (Check One) (Includes vnlrrnte flared which generated blear smoloe. of TEG cartaaor mater at LP(a ~ apW~ae1 A. Description of Incident and Cause: (Check as marry ae needed to fully .describe the ineldsrtt) SiD Ti(~ for Process upset in TIC 3D due to high exhaust temperahrre Beaton of fadlity _- Seal oR system diRiaddes Flaring for ddllsite Shutdown !startup EMERGENCY SHUTDOtAM Flare system teslirtp FJecMcal /Instrumentation malfunction Faulty shutdown ors Eledrfeal / Instrutnerxatron rrtalfurrrxiott Fadllty maintenance Hlyh ambiartt terr-peratun35. at otl-er fadtity (rbD) Gas transk system ovarprassrs+e X Other.. Process module startup artq_ - badthtg CPF/F1ow Station out Functional f~tedc Out. tr-tamlitdtnt . Excesshrs / Insuftidertt inlet gsS flaring for a total of 70 mirwtas. rates into fadpty Page 1 of 2 S. Action Takon to Eilminate Cause and Proverrt Recurrence: (Check and describe as applkable) SWRad / respAsd T!C S Stabilized fadlky prooass and opere6on Compressor / traM depresswed Repaired equtpmertt dM1iw51as Reduced ! inuessed kdet yes rates wbh Completed Aare testing Facility maintenance completed CorraUad E81 iluauation i fagttra X Oiher: Startup FCO completed far the Corrected E&I fluctuation / farlura d~`• at other fadflty (Tii~ 81ack Smoke Did incident cause Olaok arr-oke4 Yas: No: ~ (K Yes. contlnus vrlgt this ssglon) Pia tnddent present a potenthl threat to human heafllt or safety? Yes: Mo: fK Yas~ roport to FEC as soon as possible. K No, report eo ADEC with 24 hours.) Nbak smoke errtltted from soul+cx (solar tag raYnber and descrlpNon) NodfieQ ADPG by Pax on: Dale: Tkrta: Report fire following irdon~natlon to ADEC within 24 hours Y FAX (ep7~59 7508k Date and time of bleat smoke evertb Front Ta Volume flared which yer>erated blear smoke (d d'dferent from above): MSCF 13131.4 Descripdort of steps to mlrAmlze artissions: See Section B. above. Type ~ materials burned: Gas: NGLs: Other: General YYeather: Ak Tamperautrik Wind ~: Name era phone number of persor- malting the repast . Name Phone No. Based on ktform9lbn ano De6e! formed after ressonaDle inquiry. I certify. that the statemerKS atxl krfartrtatlon In and attadtad to aria . doctanerrt are tote, atxxrrua and eomplole. Fadlhy Supervbor Data , o~ EOC Supervisor. PRB tf (~ gas and black smoke inridettii) Fadd ErnirorwrterKai Compliance Coordinators, F1i8 7 i;Blaak Smoke ind~ts only) PBUIGPMA Field Managers, (Bleat smoke irtddenta tntq-) operations ~n0lneegn9 7entrdcal Akla, (GPNV- reports aMyf- - ATO 4T37 Kupandt: FIe1d Errrkorurterttal Compgartoe Coordinators, NSK 81(flana pas and Dladt smoke irtCida11t5) Oct-13-P000 11:20am From-IISBURNE OPERATIONS 659-9655 T-653 P.012/021 F-150 Fl.A1tE c,~-s v~Nrlt>l~ RF~OR1 1S1CA, INC. • pRUDHOE BAYlGPI FACILITY: I.PC PERMIT NO. 6A7S-AA026 Dam of Occurrence: B/8/00 Q~ Qvene (mmlddlyy) {Check Selection) ~TotalYoiume Flared: 368 MSCF @@LS Meier No.: 82i B Fadl OPrennoa Q~DIMNY00 (Check Selection) Time of Oc curronr:ox; 00:00 lYUnutes From: 16-.28 TO: 18:29 ~ 00:01 From: 16:48 To: ib:49 00:01 From: i6a9 To: 16:17 = 00:01 From: 1BS99 To: 16:10 = 00:01 From: 16:35 To: 17:08 ~ 00:15 From: 17:28 To: 17:32 = 00217 Total Mlnubas Flarod: ~ 00:24 .~ (I.isbume Only -Gas flared was firm©uvsaeen- 0 (GreCk Orre) of Tl=ta' coniac~meterat LPq (Indud'es vdwna hared whi~Gr genaraded black amour, ~ eppGcable) A. Doscrlpdon of tnddent and Causo: (Check es marry ss needed fo fully describe the lnCldsr~ SID TIC! for Process upset to TIC SD due to hlgh exhaust temperawre sedlon of fadgty __ _ _ _ Seal og systerti d9ficutties _ _ _ ._ __ _ _ . _ _ . __ FlaMnp for tlrNisNe attuDdown / Starhry , _ _ EMERGENCY SHllfDOWN Flare systsrn testMg ' Eledriral / lnstrumentadon rrralhurcdon Faulty shutdown On Elsctrkal / Instrumentatlon matfandlon Fadtily mairttenarloe High ambient temperatures. at other fatty (T8~ Gas tr3hSit sys~nn ovarpressupe X Q019r Process module atar~and baddn0 CPF/Flow Statioh out Functional Check Out. Intennitirrrrt Dccasaiire J insuttlderrt Intel gas flaring for a total of 70 minuets. rates into fad>ky Page 2 of 2 S. Action Taken ~ Eiiminato Canso and PrevoM Rrcurronce: {Check and doacribo as appugts~ - Staretd / restarted TI'C 8 StabNlzed fadtily proaass and operaGah Compressor / tram depressured ftepa6~ed egtclptgent diffiCUlBes keduoed / irra~sased Inlet gas rates wUl Completed Harr etstbg FaaAly malMonanoe t~mmpletod Comseted E&1 fluctuation / falkire X OIMr: Startup FCQ GampletaA for Ure Coneeted ESI fluctuation / faNrre daY. at other fadAty (Tai Black Smoko Did incident cau6o Mack smoke? Yes: No: ~ (If YOS. contincre with tiffs sst3ion) Did irrcident present a potential threat to human hoaRh Or safapr4 Yes: NO: (If Yes. report to FEC as soon as posslbto. tf Na report m AtiEC wMtr Zs hocrra.) Black smoke emitted from s0unoe: (enter tag nrtmDer and aestafption) Notified ADEC b!- Faxon: Data Tarty: Report the following lydomration to ADC-C withM Z4lroural~J~~C (807 Z6'9.7W9k Duet and time of Mack smoke evartt From: Ta vplume flared vrhkh generated blade smoke (d diFferem from above): MSCF BBIB . Description of steps to minimfza emlaslons: Soa 8actlon 8. above. Typo of nreterials Duftted: Gas: NGts: Otfrer: General Weather: Air 7emperaWro: wail Sgtet110irediort Name and phone number of person making the report Name Phone No. Based on intorrtra4on act belief fomrod after tr;asonabis inquiry. l ceNy that a-o statements and Information h arrd attac~ad to this document arv true. acaaate snd oompkte. Faculty 8upenisor De1a ca Eoe supervisor, PRB 0 (Aare gas arrd Made smoke incidettb) Field Envirorer-erttsl CompAsrx:e Coor~rratas, PRB 7 (Black bhrroke k+etdartls on~r) t'BIuGPMA Fleur Nlat>aQ~, (S~k smoke MrGdetNS Bbl GPMA Cperatlorra EngMeering Tsduri~ Aldo, (GPW-lapoltR otny - ATQ 477) Kuganik: Field ~ Corrrpuanea Coadkratora, NSK 81 ~ gas ant Made smoke kloidellts) Oct-13-2000 11:16am From-LISBURNE OPERATIONS 659-8655 T-853 P.007/021 F-150 Y FLARE GAS VENTING REPORT ~SKA. INC. • PRIiDHOE BAY/GPI FACILITY: I.PC PERNg7 NO. 9A73-AA028 Adtta of Occurranoet 9/ero0 (]hare ©va,t Tlmo of OccuanBnce~ (mmldd/yy) (Check Selec~ort) 00:00 6Alnutas Ftbnl: 106 To: 10:00 = 00:01 Total Volume Flared: 1825 MSCF BBL.S From: 11276 To: ~ 11:06 s 00:01 Motor Nor: 821 B Facll ~M.nea ~unpdnnea From: 11:21 To: 11:2L 00:01 From:. 11:54 Tor. 11:36 o t>0~. 1 (Check Selection) From: 11e64 Ta 11ttT6 ~ 00:01 From: 12:06 To: 1 ~ _ 00-'02 Total Minutes Flarado = 00:07 (LiBDarne only -Gas tiarea was t~l as l o-,e~ ~mat,~ voru~rra narea arJ>;dr yerra~rad trlacdc ~t+aa~. ~ 7>:G contactor meter at t.PC1 if applicable) A Doscriptlon of incident amd Cause. (Check a6 merry as needed eo fully dost:dbo rho Ntddoag SID T/Cif for Pp0o9ss upastfn TIC SD due to high exhaust temperature . sedton of tataldy ._ _ _ Seal ol< system d -- - _ _ _ __ Flanrig for drillsl~ shutdatm - stdrtup EMERGENCY SHUTD0IAM Firers system testhtp ____•,_ Eleebieal / Instrumentatbn maNundbn Fauliy strtrtdoMm on EJeGtricM / lnstnrmerrtation rgaKundl0lt Fadfigi maintenance Fflgh smtirard iarrrperaturea at other fadigt R~ Gds transh system overpresstans X Other: Process FOR rrrnQtrle Startup iNW Dadtin9 t",PF/Row Station out Functional Check Out, IrltenYlilt911t ExCeSSRre / Imst1(~iemt inlet gas fladnlt for a total of 177 mimrtes. rates into btltlyr Page 7 fyf 4 B. Aetlon Taken to Elirnl>.ate Cause and Provsrri R•currenoes (Ctleok dnd describe 8s apptlodele) Started / restarted T/C d t3labaized fdalitr process and operation ComPresaor /tram depressur~ed Rapaiaad equipment dilbwlties Reduced i increased filet gas rats wllh Completed flare tesdrtg FacSty maintenance completed Corrected E31 flutarration / iafhua X Other Statue FCO completed for the Correcxed te31 flrtctuadon / faflrae QaY. at other faaT~r (TB~D) Did 'mordent cause bledl smoke4 Yes: No: ~ (If Yes. P,ortlNlue wish this section) Did Mordent preserd a pot9nflal proedt to human tleaflh Or safety? Yes: No: (K Yss, report to FEC as soon as poasitslo. If Nar report to At7EC tMth S,it trouts.? Blaek smoke emitted irrorn souno~r. (onler tap number and deaaiptiart) Notified ADEC by Fact OfC Da1x Time: Roport tho folbwMg iMomratlon to ApEC within Z4 Iwurs,~SY FAX (807,266-7th Date dmd time of t9sdt smoke event From: To: . volume flared whkh generated black smoke (d ditferexrt from above MSCF 861.$ Destxiptivn Of steps to minlmlze emissions: See Soedon B, abotee. . Typo of materials Dumetl: Gas: Wfate: Gtttsr General Weaflrer: Ale Temperature' 1Kirrd SpeadlDiret~on: Nartre and phone number of person mekfip the report: Name Poona No. Based an informalon anp befiat loaned after r+sasonahle inquiry. I certify that the stalemet~s and information in and sttactted ~ title dotatnrerrt are true. saarrgte artd oonlplel9. Facility Supervisor Dale txw C-OC 5upenisor, PRB 8 (Iltne gas and bltdt smolte inddertts) Field ErrvaortrrraMsl Compl'~anoe Coo~natorsr PRB 7 (Bledt Smoke irddergs a~ PBW6PAM Field Msrtagets, (Bleat srtoks ort~ • GPMA Operations Eng'meerirg TecMtiral Aido, (GPIdU- reports only - ATO 47~ Kttpartdc Field Ernirortroereal Comppartee t,,axrlMatots. NSK fM (liars gas 61it1 bleat Sti10109 iltoi0ettb) 'Oct-13-2000 11:18am From-LISBURNE OPERATIONS 659-8655 ' FLARE GAS VENTING REPORT PHIUaPS ALASKA. INC. • PRUDHOE BAYIGt'MA . FACIU7Y: ~hC PERNMT HQ. 9A73-AA0~6 Date of Occurrence: 919IC0 ^ ~ ^ v~ (nxrlddlyy) (l:hedc Selectiw'r) Total Volume Flared: 18?5 „_MSCF Bt3l.S Mater No,: b21 B Facll ) ^ PFamad ~ ,CI+, u+Wamiee • (Check Selet2ion) Tirnr of Oco urrpnwl, ~~ ~,.~ mtOtal~ FrOtrt: ia~r Ta: is:ao 0o•ot Ftvltt: ia•oa To: ia~a = 00:01 Fran: ia:77 To: 14:1! _ tttroi._ From: 14:2! To: 74:le : T Oo:Ot Frortr: t4~5a To: .14~'e6 = 00:02 Fran; tear To: iaatt _ ~_ Total Mlnubs Flaradr t)D:07 - ~.~a fLi3Dunte t~nry-Gas trarad was borA ^ waoe~rn Q dovmsbeam (C~au~ 0r»l orT~G OdNaQOrm9te-arLPC~ (Indudas trolunt9 9ar+9d wPrirlr gerreraled bladr 8x»0109, if eppN~ble) A. Doscripdrxr of tacidant and Cause: (CMd< ss marry as naodad m tula- desrdbe the Mcldattq SID TfCi for Process upse<In ae~ar of faaai~r _. _ _ _. _ _ TlC SC due tin hgh exhaust tampe:atune _ __ __ __ _ _ ttx drMlelle etNmloYVn / stara~ Seal oY system ~ ~_ ~9 EMERGENCY SFIUTDOWN Rate sysi6rn taserip EIe:Xriosl / InsWmentation malNncdon Fatdgr shutdown an Etacttieat / Irletnsr~srnstlorr rrraUurw~at Fri rtnOs artotnertsalipr frees Gee tram system ove:p:asaxe Uaddrlg CPF1Flow S'ta9ort out Exassstre / Instrrrcard Inla pei rates ineo ~~ ltiptt amblertt temperakaee. ~~ X Olhet: Pr00eSe FOR module startup an ~- Functional Check Out. Irttertnftlartt flaring for a toter of 777 mirwtes. _ P 2ot4 B. Action Taken to Eaminate Cstwa and Prcverrt Reoorrante: (Cbook curd daaarba as applkabNl Started /restarted T1C • ^_ Compressor / train deprasstued ~~ Reduced 1 ina+eased irrl9l gds rates Completed flare testlrg CorteClBd E81 ftudustion / fadune X t;,crrected 1:dd Attcxuatiat/ failure at other Fauliy Biro) T-653 P.008/021 F-150 StablCRad faciligr process antt operdtlan Repaired equipment dMflcultles trdCt Faa'ligr maintenance completed outer: Startup FCO completed far the day Did inadent cause brads smoker Yes: ^ Flo:. 0 (K Ys ~a ~ wrlA this 6edlort) a Did int~dent present a pptet,bal fitreat m tttxrtan tteaNh or safety? • (lf Yes, report to FEC as Soon as possible. H No, report b AQBC twltlt ?wt houta.) Stack smoke emRted horn source: {enter tap number and desapliart) Notified ADEC try. Fax otK DaM: TNrtm Report tiro following inforrrradon 1SD ADEC 1N1tr11n 24 lours Yt3 FAX 1907~m9-7509r t~ artd time of bladt artrOke etrPatk From: Ta: Volume flared which generated bldCk smoke (d different from above): BB~S pesuiption of steps to mirrimite emisaiorta: See $ectlon e, abtrre. Type of matt:rials btptwd: taB6: NG~ ~_ Qlher: General Weather. Air Temperahae: ~ 1At'md SpeedlDiredion: Noma and phone rnNrlber of person rrlaldrtfl the.report: - • Nsttte F'ttorte No. Based on information and beflef formed after reasonable inqury, I certiy that ttte etaterrterds stxf iMorrnation in and attadted to trtis doagnertt are flue, ao:x•'ste arld oprttpleta. Faeifity Sr~tperv~ Didi9 tx~ EOC Supervisor, PRB 6 (flare sas and block errtolae hddertls) Field Eltvttipnrrterrtal Cor»pfi9r-a3 Coordlrtatora, PRB 7 (Black t3ttwtte itcidenls onyj • t'BU/GPMA Field Managers. (Bls~k smoke indderlte ttrll~ GPMA dperelions Elteineering Tctex>ical Aloe. (GPMA reports onlf- - ATO 47>~ . Kttpsrtrlc Field 6tvironntental CompGanoe Coord'stat0r8. FISK 61(fiarr gas and bladr smoke ixidet'MS) ttndrt Fmc arx opal.. R.portir~ Faint Z.rds 6ct-13-2000 11:19am F road I SBURNE OPERAT I OPIS pHILLiPS 659-8655 Fl-ARE GAS VENTING REPORT ,SKA, INC. • PRUDHOE BAYlGPI T-653. P.009/021 F-150 ' FAGLCrYt LPC PERMIT N10. 9A73-AAt125 GAS DISPOSITION Pam of occurrence: 9I9lt)0 0 (tare ^ vex (mnYddyy) (Check Se{ection) Total Volume Flared: .1825 MSCF BBLS Meter No.: 6z7 {B Facili ) O ita~ 0 t (Check Seledian) ysbume Onh -Gas frerad was corn ~ up~deam (7 dowraoaan ic+,ocl< or+a! of 77=ty aoMacror rooter at LPp Time o! Oeourrencs~ oo:o0 2a• M~r~r From: ts:zt To: ts:xa _ oo•ot From: 15:44 TO: 11:45. a 00:01 From: t6.6a To: 16~ _ 00:07 From: 167 To: 16:28 = 00:07 From: ~s:4s To: test ~ ooze From; tee To: 167 ~~ 00.07 Total Minutes t=lantl: c 00.17. (lrrGudes volume fared whim generated blade smnlra, if appliceblia) A, t]ascripaon of Intldertt and pose: (Check as many as needed to fuNy descdba the inCidarty SlO TKid 10r ___ ___ _ TIC SD cue m high erdmust temperature Seal oA system dr18ad8es ~'-~ EJiAERGFJ~iCY SHUTDOWN Electrical / Instnxr~entadon mallurrc6on -,-,..-~ l.ladtirai / Irrstrurrlaltati0li rt-elhRletlon ~~~ at other taciN4- R~ Gas transit system overpreawre X CPFIFIOw Stepan out E~caesslve / ir-euiratem inlet gas reties kdD fa~gl 8. Aglar~ Taken to EOminste Caua. and Pro~erK Recurrence: (Check and describe s eppUtable) Started / restarted TJC ilE Compressor /train depressured Reduced !increased iNet gas rates Completed bare ' Corrected E8J fluctuation - facture X Corrected B&I fluctuation / faWre at other taal~- R~ Process ttprdtt in secfian a tsdply Fiarlr-g for drfilsite shutdcwrr /startup Flare system testing Faulgr ehutdvrm an Fer,7ity woe tilgh anrtrient lerrrparaaaRS. otfrer. Process FOR module atara~ and Functional C~heclc 0-d. Intermittertt tiarirtg i0r a total of 177 mu1_-~te_ s- Page 3 of 4 $tabBized fsaTity process acrd operation Repaired equlpmerrt dflbcttNiee wqh Faa~igr maMtenar>ce romptated Other: Startup Ft,A oompletad for the day. Black Smoke Did inddent cause b1aC1c stndre? Yeas ^ No: © (N Yes, a> ~ witll ties seCiioit) a pfd irrddertt presets a potenfisl titr+eat to human health or safety? • (if Yes, report ~o FEC as soon as possible. M No, report to ApEC with Z4 bows.) Blade smoke emoted from sotuoe: (ether tag rttanber and description) Notified ADEC by Fax an: bate: ~. Report the foilowlna lydorrnation W ApEC wltlrgl R4 hours B F~907 ZB~liOtk pale and time of blade smoke event: Frcrrt: To: Volume flared which generdled blade smoke (It dfflerent from aWVe ' M BBLB Description of steps tD mMtrriRe en>issiotts: Sae Section Br ebaw. Type of materials Atttited: Oas: NtsLs: Other: General Weather: AirTemperaUMe' Wind Sp~dlDirec~fk.... _ Name and phone number of person making Lire reporb Namb Phone Na Based on Nlformatron and belief fomted after reasonable inquiry.) certiy that the statemerSs aril krfortnation in and attached to this document are hue, arxurate and complete. FacNily Stpervitt~ ~ taw EOC Supervaor, PR13 8 (Aare gas end block arnoko inddertls) Feld ~nvirarunerftal Compierrce Cooroinators. PRB 7 (81ack Snicks irtaoettts ortgt) . PSUIGPMA Field Marragas, t8lack smoke inddents artly) GPMA Operations F.ng'rrteering TecMtirrall Aide. (GPMA repDAS oAul - ATO 4717 Kupantlc Field F.nvirortmeMal ~ Coordatetora, NSK 81(11me gas and blade tzirtok4 ir-ddaus) uaa.r.a FEc eras apps tipertYrs faeeiM9~ are.. Oct-13-2000 11:19am From-LISBURNE OPERATIONS 659-9655 • FLARE GAS VENTING REPORT PHILLIPS ALASKA. INC. • PRUDHO1r BAY/GPMA T-658 P.010/021 F-150 ` FACtIJTY: LPC PERMIT Np. ftA73-AA025 Date of f3caurrenee: 9/9/GO Q Pure ^ Hatt {rrttrt-ddlyy) {check Selec~on) Total Volume Flared: 1825 MSCF BBLS Meter Na: 621 { Facil' ^ 1'IanneO ~ unpian~ed (Check Selection) R~sar,<rre arty - ~~ ~~ ~ awrr ^ D dim f ~, of Tf=G cattaetor meter at t~ ate of oe eurrerxe~ Fran: 18x45 To: 18:16 ~ 04:07 From: 19:t8 To: 19:19 = 00:01 Fran: 79:43 To: 2z.Y9 = 02:90 From: To: _~ From: To: .From: ~ To: _ Total Minutes Flank: = 02:52 (lrtdtcbs volume flared whk~r generetad blade smoke, ~~~ A. peacription of Incident antl Cause: (Check tq marpr ~ paerlad m Puny describe the kaidany , SID TlC1I for Process upset M - - '-~- TIC SO save to hLgh exhaust _. . sactbn ar radn4- Seal dl system d~lias FMrkrg for drdisfte shuklvwn / skr6uP ~~ pJIERGENCy SHUTDOWN Flans system tesunp EleetrlCal / trrstrumerttation won Fautpr shtrtdosrrr at Electrical ! kt~fiumentabon rrtatturrction Padlity rr~3rM6f15rtea Nigh amttlertt temperanrra7w. at other (TaD) ~ X ~- ~~ ~~ ~~ Outer: Process mgdul8_startup and beCWrlp CPF/Flow Tstatblr Otlt Functional Chec* Out. tnterrnrnent --i ~~ l ~~;~ strict ~ flaring for s tntst of 177 minuses. rates into tseiay Page a of a_ 9. Action Taken>A Eliminate Wusa aria Prcverrt Rocurrenca: (Chage and descries os appllcaWe) Staged / restarted TI'C e !~ ComPt~sOr /train dapresswed Reduced /increased inlet gas rates '~ Completed flans testing Ctxreexed E81 fiuctuati0et I fetira~e ~ x _ Corrected Fdl Attr~uratiort I faikae at other faa'fdy (T~ ' ~~- Stabuized faalily proe:ess ar-d oparaUat Repaired equipment difficulties wish FaaTny maintenance oornpleted ' Other: Startup FCO completed for the day. Black Smoke Did kxYderN cause black smoke? Yes: ~ No: Q pf Y ~ ~ with this seCtl~ ~ Die ine:Jdent present a potential threat to htKnart health tx satety7 [R Yes, report to FEC as soon as possible. If No, r+port to ADEC with ?at hours.) Black smoke emitted room source: (enter tag number and descrfptiar) Notified ADEC by Fax on: pale: Tine: Report rile tolMwing irdarmatlexi to ADEC rvithla Z4 hoWS @Y FAX (907,Za9-750h: Date and torte of blade smoke evettC Frortw T0: ~ -- Vdume flared whidi generated blbtit smoke (if diflereM from above): MSCF ~~BBLS Desexlption o(steps to miremae emis~ats: See Section B, abav+•. Type of materials btimed: Gas: NOLa: Other: General Weather: Air Temperature: -11fnd SPeedNit~O°n: Name and phone number of person making the report: Name Ptror>a ~ Based on kttormation and beuei formed afler reasonable ingtHry, I certify Thal the stabemarns and irtfamation in arttJ attached t0 tftie document aro errs, aoeurdb atxt,complate. Facgigl $uparvisor D~ oa BOC StrpeMsor, PR8 6 (Aare gas and bladt smoke irtddcrtts) Flee Enhrwrnreraal COmpNarlcs Coordkiators, PfiB 7 (cleric f3rrioKe kte~dertls aMY) - PBUIGPMA Field Managers. (Bladt slf-olca ktddertD only) GPMA- Operations Er~gMeermg Tedtrticel Aide, (GPMA repons only - ATO 477) KupalulC Field Ertvkaartental tampliartoe Goadmatas. NSK 81(waro gas dr1t1 black smoke (nadertb) ~~ , epN-Gas Raporr~g FornMts-0e~ 4,xM Oct-13-2000 11:17za Froa-LISBURNE OPERATIONS 659-8655 T-653 P.005/021 F-150 FlJ1RE GAS VENTING REPORT ,. PHILLIPS Al.ASt{A, INC. • PRUDHOE BAYIGPMAIKUPARIiK ' FAgtJTY: L.trC PERMR NO. 9A73~1A026 Data of Occurrence: 9/10/00 Flare ~ved (mMddlyy) (Check Selection) Total Volume Flared: 825 M5CF Bt3LS Meter No.: 821 FaNI ~~~ ^' ~~ (Chedt Seter~iott) (Lisbuma Only - lies !tared wee fion©wa~ Q+ dowmme~m (Chedr One) of TEG contactor meter at LPCj Tuns of Occurrenrm: 00:00 M~ From: 09:90 To: 08:61 = 00:07 From: 10:36 To: i-O•.6~ 00:17 Frorrt; 12:19 To: iT:zo _ 00:01 From: 12:59 To: iZ:40 ~ 001 From: 13:22 T0: i s~30 = 00:08 From: i2:67 To: 15:04 = _02:07 Total Minutes Flared: ~ ~~ (Inductee volume flared wnicN generated black smoke. Hepplleable) A. DaanrlpTton of tncldstrt and Catrso: (gtsek ss many as nsoded to fully dascrtpst pta lnoiderty StD T/C9 for Process upset in _T1C Sa dlle t0 hiDA exhaust temperature section of iadtity Seal Od system dlffia8tles Flaring for drdistte staltdpwn 1 aWtb+p • EMF~GF-NCY SMUTt)DMYN •T,~ Flare system test6tg EledriCal! InstntmeMation malfunction Faulty standown on Eiactriot0 /Instrumentation maHundiat ~^ Faatily mairrtananos Migh ambient temperatuiliss. at other ~raTigr (Td~D) Gas tonsil system overpressure X t~ Process module startup acrd baddrg CPFfFIow Station etA - Functional CHectc Out. lntertratterrt Excessive f insulAoient inlet gas flarklg for a total of 158 mirwtes. _ . ~, ~p ~'ja PaOe 7 of 2 B. Aetion Taken to Etimfnete Canso acrd Prevent Recurrence: (Check and destaibe as appifeabM) Started ! restarted TIC sit ~_ StabAaed fadUry Process aM OperdliDn Canpressor /train depressurad Repaired e4uipmerrc d1°a Reduoad / kareased krlet ties rates . FectTigr maurtenanoe completed Completed flare tasting • Corrected 1=8tfluokration / iailtMe X Outer: Startup FCO completed for the Corrected Eit,l tluduaflOn / fa8ure daY. at outer faaTigr tTd~D) 17id irx5dent cause eladt smoke4 Yes: No: ~ (If Yes, oorninue wqh this seeYlory qid incident present a poterttlal threat to human fteakh or safety? Yes: No: (tt Yes, report to FEC as soon as possible. ff No. report m ADEC vritlt Z4 hottra.) Slack smoke emkted from sourr:e: (~ m9 ^ old N NoflAed ApEC by Fax oft: Date: TYrte: Report tho folldwing Intorrrtation is ADEC vultltin 24 hours t3Y FAX (907 Za9-7508]: Data and time of Mack smoke eltertt: Front T0. Volume flared wtiah generated. black Smoke (f different from apovex MSCF BBLB Ilion of steps to minimize emissions: Sea Seethxt i3, abona; Type of materials homed: r3as: NGLs: ___ Outer: General Weapter: Air Temperatwe: tMmd SpeedlDkectiart: Name amt phone nunitleP of person Rrakkt9 the report: Nettle Phone • t Based Orl mtormsaon era tt2ltet lorlnad alter retlsonaote inquiry, 1 4YfAty loaf rr,e aw,cn,c„w a,w n„w n,ow„ a, a.ti aus.w.n.. -, ..-~ doctartent are true. aeaaste end oorttpleta. Paci9ly SOpertrisor pate c~ twOC Supervisor, Ply D (Aare gas and bladt smoke irtcideltis) Field Envirorwrtanted Compliance Coordinators, PRB 7 ( Smoke incidents only) PBU/GPMA Field Martageta, (Black smoke kxddertts txiy) GPME- Operations Ert9irteerkt9 Ter3inical Aide, (GPMA reports onh- - ATO 477) Kupan>tc Flaw F~irortrrtenWl Compliance Coold'inators, NSK 61 (flare t)as artd ttlack smoke tndderMS) 8ct-13-2b00 tl:lTam from-LISBURNE OPERATIONS 659-8655 T-653 P.006/021 F-150 FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. + PRUDHOE BAY/GPI FACILITY: LpC PERMIT NO. 9AT3-AA4~6 SrAS DISPOSITION Date of Occurrence: 9/f0100 ~ttxe ~~ Tlme of Occurrence: (mmklu-yy) (Check Selection) D0:00 Minutes From: 16:47 Tot 96:48. _ 00:01 Total Volumo Flar~od: 825 MSCF Bt9LS Front: 79:78 To: 94:79 00:01 From: 19:26 To: 19tY6 ~ 001 Meter Na: 621 Facll ~~~ ~ From: T0: . 00:00 • (Check Salec~on) From: To: ^ 00:00 • From: To: ~ 00.00 Total Minutes Flared: ~ 00:03 rc.~satme onry-Gas Aarea was ~w~m C~a {c2recJc w,e) nrrdudss valunre Waned yene,~ed black srno/as, of TEG Contactor' mer+ar at fPC) if apptica~ble) A Desulptlon of Incident and Cause: (Check as many as needed to fully doscrlbe the Inddont) SID TlC6 for Process upset h __. _ _ . _ .TIC SD due to high exhaust temperature .__ _ -_: _ , _ _ - __ - section of fadtity_ Seal oil syste~ri d'rrficulfies Flarlrtg for erlNsN+! shutdown /startup • EMERGENCY SHUTDOWN Flaro system teatlrtg Elecbfcal / Instrumentatron malfunction Faulty shutdown orl Eldctrlcal / Inswmentation malfuncxon Facility maktterlarloe High ambient temperatures. _ dt Qtnc- facUkY Rte) Gas lransk system oveYptessrxa X Ottxr. Process FOR module startup and uatltletg CPFIFbw Station out Functional Check Out. Intennittartt Excessive / fisufficient filet gas flaring ~ a total of 158 nlint~os. rates fito farality Page 2 of z -- - _ - B. Action Takon to Etlminate Causo and Prevent Recurrence: (Check and dsscrlbo as applkabb) . Steeled !restarted TIC ~ Stabitlzed fadtity process and operation Compressor / train depressured Repaked etl~P~nt dlfllouttip~ F2eoueed / fitxeased inter gas retea wMh Completed flare testing Fadtity mairnananoe carrrpletOd Corrected Etta fluctuation / faAtae X Odter: ' Stamrp FOO torrlpteted far lt-s Corteded E8d iluauation / faBn day. at other iacSgr (rd.D) 61ack Smoke Did fiade~t cause black smoke? Yss: No: o (h Yes, eontlnue anal this ssctipu Did incident present a potential threat m human health or sated? .Yes: N0: (If Yes, report to FEC as soon as posslbN. N No, report tD ADEC v+Aat m4 hours.) Black smoke emitted from aouroo: (eMar tap nrrnpar drW daspiptiorl) Notified ADEC by Fax an: Dates Tana: Roport rho following hrformatJon to ADEC within ,T4 hour+i ~ FAX (!07,268-7608k Date and time M blaeyc smoke event: From: Ttx Volume flared which generated Hladt smoke (d different from above): BBIB Description of steps to mitnra~ze enrlssions: Sae 8eetlon B, above. Type of materials homed: Gas: NGts: Odter: General Wt:ather: AkTemparaturs: VvinQ S ireCilon: Name antl ptrone number of person rnekirtp the repork Name Phone Plc. Based on information ane belief Conned affir reasonable figtary, I certiy that the statements aril NMormation M arw attaehad to thli dacsanertt ate irtre, at:derdte and compote. Fatlifty Supervisor Dula cc EOC Supervisor, PRB t3 (80re gas and Walt amdre intidertts) Field t=ltvironrnertital Compliance Coordinators, PRB T (Boat t3moks ittt:idartis only) PBWGPMA Field tNanagsfs, (Black smoke klpdenli on4-) GPr+W Operatbns Enpirteeirfrrg Technlad Aide, IGf'MA reports ony - A'nD ~i7r} Kuparuk: Field Ernironnterrtal Ctxnptianoe Coordinatore, NSK 81 ('Usra gas and bheh smoke ittcid9ltli) e FLARE GAS VENTING REPORT . PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: LPC PERMIT NO. 9A73-AA025 GAS DISPOSITION Date of Occurrence: 9/19/00Rare ^vent Time of Occurrence: (mm/dd/yy) (Check Selection) 00:00 Minutes From: 11:32 To: 11:33 = 00:01 Total Volume Flared: 1753 MSCF BBLS From: 12:51 To: 12:57 = 00:06 From: 13:05 To: 13:21 = 00:16 Meter No.: 621 (B Facili ^~am~ed ^~ From: 13:23 Tae 13:24 = 00:01 (Check Selection) From: 13:25 To: 13:30 = 00:05 From: 13:36 To: .13:37 = 00:01 Total Minutes Flared: = 00:30 (Lisburne Only -Gas flared was fron^upsveam ^aownstream (Check One) (Includes volume flared which generated black smoke,. of TEG contactor meter at LPC) if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the Incident) X S/D T/C# 1830 for Process upset in TIC SD due to high exhaust temperature section of facility -- - ---Seal oil system difficulties - .- - - - - Flaring for driilsite shutdown /. startup... EMERGENCY SHUTDOWN Flare system testing Electrical /Instrumentation malfunction Faulty shutdown on Electrical /Instrumentation malfunction Facility maintenance High ambient temperatures. at other faciity (T&D) Gas transit system overpressure X Other. FOR process module startup. backing CPF/Flow Station out Functional checkout. Intermittent Excessive / insufficent inlet gas flaring for a total of 2 hrs. 8 2 mans. rates into fadlity B. Actfon Taken to Eliminate Cause and Prevent Recurrence: (Check and descrtbe as applicable) Started /restarted T/C #/ Stabilized faclity process and operation Compressor /train depressured Repaired equipment difficulties Reduk~d /increased inlet gas rates with Completed flare testing Facility maintenance completed Corrected E81 fluctuation /failure X Other. Startup FCO completed Corrected E81 fluctuation /failure for the day. at other faclity (T8D) Black Smoke Did inddent cause black smoke? Yes: No: ~ (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: No: pi Yes, report to FEC as soon as possible, Ii No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Date: Time: Report the following Information to ADEC within,24 hours BY FAX (907-269-7508): Date and time of black smoke event: From: ~ To; Volume flared which generated black smoke (if different horn above): MSCF BBLS Description of steps to minimize emissions: ,See Section B, above. Type of materials burned: Gas: NGLs: Othee General Weather. Air Te ereture Wind Speed/Direction: Name and phone number of person maki the re o Name Phone No. Based on information .and belief formed fte rea o ab inquiry, I certify that the statements and information in and attached to this document are true, accurate and comp e. Facility Supervisor Date ~'Z ~ - cc: EOC Supervisor, P 6 (flare gas and blade smoke incidents) Field Environment mpliance Coordinators, PRB 7 (Blade Smoke incidents ony) PBU/GPMA Field an gars, (Blade smoke inddeMs ordy) GPMA Operations ng Bring Technical Afde, (GPMA reports only - ATO 477) Kuparuk: Field Envi mental Compliance Coordinators, NSK tit (flare gas and blade smoke inddents) • r • FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: LPC PERMIT NO. 9A73-AA025 GAS DISPOSITION Date of Occurrence: 9/19!00 QRare ^vent Time of Occurrence: (mMdd/yy) (Check Selection) Minutes From: 14:00 To: 14:01 = 00:01 Total Volume Flared: 1753 MSCF BBLS From: 15:26 To: 15:27 = 00:01 From: 15:41 To: 15:43 = 00:00 Meter No.: 621 B Facili ^O Planned ^unganned From: 15:53 To: 17:23 = 01:30 (Check Selection) From: To: = 00:00 From: To: = 00.00 Total Minutes Flared: = 01:32 (Lisburne Only -Gas flared was fron^uP~~n ^d~+ns~m (Check One) (InGudes volume flared which generated black smoke, of TEG contactor meter at LPC) if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) X S/D T/C# 1830 for Process upset in T/C SD due to high exhaust temperature section of facility Seal oil system difficulties Flaring for drillsite shutdown /startup EMERGENCY SHUTDOWN Flare system testing Electrical /Instrumentation malfunction Faulty shutdown on Electrical /Instrumentation malfunction Facility maintenance High ambient temperatures. at other facility (T8D) Gas transit system overyressure X Other. FOR process module startup. backing CPF/Flow Station out Functional checkout Intermittent Excessive / insufficientinlet gas flaring for a total of 2 hrs. 8 2 mina. rates into facility B. Aeton Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C # Stabilized facility process and operation Compressor /train depressured Repaired equipment difficulties Reduced !increased inlet gas rates with Completed flare testing Facility maintenance completed Corrected E&I fluctuation /failure X Other. Startup FCO completed. .Corrected E81 fluctuation /failure for the day. at other facility (T&D) Black Smoke Did inddeM cause blade smoke? Yes:. No: ~ (If Yes, continue with this section) Did inddent present a potential threat to human health or safety? Yes: No; (If Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: •(enter tag number and description) Notfied ADEC by Fax on: Date: Time: Report the following information to ADEC within 24 hours BY FAX (807-269-7508): Date and time of blade smoke evert: From: To: Volume flared which, generated blade smoke (if different from above): MSCF BBLS Description of steps to minimize emissions: See Sec ion B, above. Type of materials burned: Gas: NGLs: Other. General Weather.. Air Tem nature: Wind Speed/Diredion: Name and phone number of person makin re Name Phone No. Based on information and belief formed aft r r as ble quirt', I certify that the statements and information in and attached to this document are true, acxurete and complete • Facility Supervisor Date ~Z~ _~ cc: EOC Supervisor, PRB flare gas and blade smoke inddents) Field Environmental !lance Coordinators, PRB 7 (Blade Smoke inddents only) PBU/GPMA Field Ma g , (Blade smoke inddents ony) GPMA Operations E ine ring Technical Aide, (GPMA reports only - ATO 477) Kupatuk: Field Environ tai Compliance Coordinators, NSK 61 (flare gas and blade smoke inddents) ,, ~ FLARE GAS VENTING REPORT • PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: LPC PERMIT NO. 9A73-AA025 GAS DISPOSITION Date of Occurrence: 9/21/00 QRare ^vent Time of Occurrence: (mm/dd/yy) (Check Selection) 00:00 Minutes From: 15:50 To: 15:51 = 00:01 Total Volume Flared: 1243.5 MSCF BBLS From: 16:00 To: 16:01 = 00:01 From: 16:07 To: 16:08 = 00:01 Meter No.: 621 (B Facili OPlannea ^unpanned From: 16:41 To: 16:42 = 00:01 (Check Selection) From: 16:43 To: 16:44 = 00:01 From: 16:49 To: 16:50 = 00:01 Total Minutes Flared:. = 00:06 (Lisburne Only -Gas flared was frorlE]upstream Odownstream (Check One) (InGudes volume flared which generated black smoke, of TEG contactor meter at LPC) H applicable) A. Description of incident and Cause: (Check as many as needed to fully describe the incident) S/D T/C# for Process upset in T/C SD due to high exhaust temperature section of facility Seai nii system difficulties -- - -- - - -- Flaring fordrillsite-shutdown /startup- EMERGENCY SHUTDOWN Flare system testing Electrical !Instrumentation malfunction Faulty shutdown on Electrical /Instrumentation malfunction Facility maintenance High ambient temperatures. at other faality (T8D) Gas transit system overpressure X Other: Process FOR module startup backing CPF/Flow Station out and functional check out. Intermittent Excessive / insuffiaent inlet gas flaring for a total of 86 minutes. rates into facility Page 1 of 3 B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C # Stabilized facility process and operation Compressor /train depressured Repaired equipment difficulties Reduced /increased. inlet gas rates wkh Completed flare testing Facility maintenance completed Corrected E81 fluctuation /failure. X Other: Startup FCO'wmpleted for the Corrected E81 fluctuation /failure day. at other facility (T8D) Black Smoke Did incdent cause black smoker Yes: No: 0 (If Yes, continue with this section) Did incdent present a potential threat to human health or safety? Yes: No: (If Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Date: Time: Report the following Information to ADEC within 24. hours BY FAX (907-269-7508):' Date and time of blade smoke event: From: Tx - Volume flared which generated bladt smoke (if different from above):. MSCF BBLS Description of steps to minimize emissions: See Section B, above. Type of materials burned: Gas: NGLs: Other: General Weather: Air mperat Wind Speed/Direction: Name and phone number of person m 'rig the rt: Name Phone No. Based on information and belief forme a er r ona a inquiry, I certify that the statements and information in and attached to this document are true, accurate and corn let Facility Supervisor Date Q~~ZZ~O~ cc: EOC Superviso , RB 6 (flare gas and blade smoke incidents) Field Environ n Compliance Coordinators, PRB 7 (Blade Smoke inddents only) PBU/GPMA Fi d Wagers, (Blade smoke inddents only) GPMA Operatio ineering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 81 (flare gas and blade smoke inddents) FLARE GAS VENTING REPORT • PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK .FACILITY: LPC PERMIT NO. 9A73-AA025 GAS DISPOSITION Date of Occurrence: 9/21/00 Qpyre ^vent Time of Occurrence: ' (mm/dd/yy) (Check Selection) 00:00 Minutes From: 16:50 To: 16:51 = 00:01 Total Volume Flared: 1243.5. MSCF BBLS From: 16:52 To: 16:54 = 00:02 From: 17:02 Ta 17:03 = 00:01 Meter No.: 621 (B Facili O%anned ^Unpanned From: 17:12 To: 17:15 - 00:03 (Check Selection) From: 17:49 To: 17:50 = 00:01 From: 18:12 To: 18:33 = 00:21 Total Minutes Flaredc = 00:29 (Usbume Only -Gas flared was fronE]upstream Qdownstream (Check One) (Includes volume flared which generated black smoke, of TEG contactor meter at LPC). if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) S/D T/C# for Process upset in T/C SD due to high exhaust temperature section of facility Seal oil system d'ifflculties - -- Flaring for drillsite shutdown /startup- EMERGENCY SHUTDOWN Flare system testing Electrical /Instrumentation-malfunction Faulty shutdown on Electrical /Instrumentation malfunction Facility maintenance High ambient temperatures. at other faality (T8D} Gas transit system overpressure. X Other: Process FOR module startup backing CPF/Flow Station out and functional check out. Intermittent Excessive f insufficient inlet gas flaring for a total of 86 minutes. rates into facility Page 2 of 3 8. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C # Stabilized facility process and operation Compressor /train depressured Repaired equipment difficulties Reduced /increased inlet gas rates with Completed flare testing Faclity maintenance completed Correced E81 fluctuation. /failure X Other.. Startup FCO completed for the. Corrected Eiil fluctuation /failure day.. at other faciity (T8D) Black Smoke Did incdent cause black smoke? Yes: No: 0 (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: No: (If Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted trom source:. (enter tag number and description) Notified ADEC by Fax on: Date: Time: Report the following fnformation to ADEC within 24 hours BY FAX (907-269-7508): Date and time of black smoke event: From: To: Volume flared which generated black smoke (if different from above): MSCF BBLS . Description of steps to minimize emissio :.See coon B, above. Type of materials burned: G NGLs: Other. General Weather. _ Air Te era Wind Speed/Diredion: Name and phone number of person maki the ort: Name Phone No. Based on information and belief formed fter ona le inquiry, I certify that the statements and information in and attached to this document are true, accurate and te. Facility Supervisor Date a9-z ~ ~~ cc: EOC Supervisor, R 6 (flare gas and biadk smoke incdents) .Field Environment I ompiiance Coordinators, PRB 7 (Black Smoke incidents only) PBU/GPMA Field M Wagers, (Black smoke incdents only) GPMA Operations Engineering Technical Aide, (GPMA reports ony - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke incdents) < ' ~ w FLARE GAS VENTING REPORT • PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: LPC PERMIT NO. 9A73-AA025 GAS DISPOSITION Date of Occurrence: 9/21/00 D~,e went Time of Occurrence: (mm/dd/yy) (Check Selection) 00:00 Minutes From: 19:49 To: 19:50 = 00:01 Total Volume Flared: 1243.5 MSCF BBLS From: 20:11 To: 20:34 = 00:23 From: 20:44 To: 20:45 = 00:01 Meter No.: 621 B Facili []Planned ^unpwnned From: 21:07. To: 21:32 = 00:25 (Check Selection) From: 21:59 To: 22:00 = 00:01 From: Tot 00:00 Total Minutes Flared: = 00:51 (tisbume Only -Gas flared was fron~APstream ^~ downstream (Check One) (Includes volume flared which generated black smoke, of TEG contactor meter at LPC) if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) S/D T/C# for Process upset in T/C SD due to high exhaust temperature section of facility - SeaFoil system difficulties - - Flaring for_drillsiteahutdown!startup EMERGENCY SHUTDOWN Flare system testing Electrical /Instrumentation malfunction Faulty shutdown on Electrical /Instrumentation malfunction Facility maintenance High ambient temperatures. at other facility (T8D) Gas transit system overpressure X Other: Process FOR module startup backing CPF/Flow Station out and functional check out. Intermittent Excessive /insufficient inlet gas flaring for a total of 86 minutes. rates into facility Page 3 of 3 B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C # Stabilized facility process and operation .Compressor /train depressured Repaired equipment difficulties Reduced /increased inlet. gas rates with Completed flare testing Facility maintenance completed Corrected E81 fluctuation /failure X Other. Startup FCO completed for the Corrected E81 fluctuation/ failure. day. at other fadlity (T8D) Black Smoke Did incident cause black smoke? Yes: No: ~ (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: No; (If Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Date: Time: Report the following information to ADEC within 24 hours BY FAX (907-269-7508): Date and time of blade smoke event: From: To: Volume flared which generated black smoke (if different from. above): MSCF BBLS Description of steps to minimize emissions: See Section B, above. Type of materials burned: G NGLs: Other. General Weather. Air Te peratu Wind Speed/Diredion: .Name and phone number of person maki the r p rt: Name Phone. No. Based on information and belief formed re s na le inquiry, I certify that the statements and information in and attached to this document are true, accurate and comple e. Facility Supervisor. Date 44'ZZ.-' ~ cc: EOC Supervisor, 6 (flare gas and blade smoke inadents) Field Environmen I ompliance Coordinators; PRB 7 (Blade Smoke inddents only) PBU/GPMA Field a agars, (Blade smoke inddents only) GPMA Operations ineering Technipl Aide, (GPMA reports onry - ATO 477) Kuparuk: Field Environmental Compliance Coordinators.. NSK 61 (flare gas and blade smoke inddents) FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAY/GP' I FACILITY: LPC PERMIT NO. 9A73-AA025 I Date of Occurrence: 9/23/00 OFlare ^venc .(mm/dd/yy) (Check Selection) Total Volume Flared: 4119 MSCF BBLS Meter NO.: 621 (B Facili ^~nned ^unplanned (Check Selection) Time of Occurrence: 00:00 Minutes From: 08:16 To: 08:17 = 00:01 From: 08:49 To: 08:54 ` = 00:05 From: 09:01 To: 09:54 = 00:53 From: 11:41 To: 11:b3 = 00:12 From: 11:54 To: 14:15 = 02:21 From: To: _ 00:00 Total Minutes Flared: = 03:32 (Lisburne Only- Gas flared was fron^wsaeam ^downstream (Check One) of TEG contactor meter at LPC) (Includes volume flared which genereted black smoke, if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) SID T/C# for Process upset in perature TIC SD due to high exhaust tem section of facility _ _ _ _ ___ _ Seal oil system difficulties Flaring for drilisite shutdown /startup EMERGENCY SHUTDOWN Flare system testing Electrical /Instrumentation malfunction Faulty shutdown on Electrical /Instrumentation malfunction Facility maintenance High ambient temperatures. at other fadlity (T8D) Gas transit system overpressure X Other. Process FOR module startup backing CPF/Flow Station out and functional check out. Intermittent Excessive /insufficient inlet gas flaring for a total of 3 hrs.32 min. rates into fadlily Page 1 of 1 B. Aetfon Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) ' Started /restarted TIC # Stabilized facility process and operation Compressor /train depressured Repaired equipment difficulties Reduced /increased inlet gas rates .with Completed flare testing Facility maintenance completed Corected E81 fluctuation /failure X Other. Startup FCO completed for the Corrected E81 fluctuation /failure day. at other fadtity (T&D) Did incident cause black smoke? Yes:. No: 0 (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: No: pf Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Biadc smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Date: Time: Report the following information to ADEC within 24 hours BY FAX (907-269 7608): Date and time of blade smoke event: From: To: Volume flared which generated blade smoke (if different from above): MSCF BBLS Description of steps to minimize emissionsr See Seaton B, above. Type of materials burned: Gas: NGLs: Other: General Weather. Air Temperature: Wind Speed/Direction: Name and phone number of person rr)pking tFj~ report: ~I / ' Name Phone No. eased on tntormaoon and oener i document are true, accurate and I cert'~r that the and ~ Date ~4"'~ ~~ Faellity Supervisor. x> EOC Supe o , PRB t3 (flare gas and blade smoke incidents) . Field Emir ntal Compliance Coordinators., PRB 7 (Blade Smoke inddents duly) PBU/GPMA Managers, (Blade smoke incdents only) GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field Environmental. Compliance Coordinators, NSK 81 (flare gas and blade smoke inddertts) FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPI FACILITY: LPC Date of Occurrence: 9124/00 QQ Flare ^vent (mm/dd/yy) (Check Selection) Total Volume Flared: 1208 MSCF BBLS Meter No.: 622 (B Fadli ^Pwnned ~unpanned (Check Selection) (Lisburne Only -Gas flared was frprr~]upstream ^downstream (Check One) of TEG contactor meter at LPC) PERMIT NO. 9A73-AA025 Time of Occurrence: 00:00 Minutes From: 18:22 To: 20:30 = 02:08 From: To: = 00:00 From: To: = 00:00 From: To: = 00:00 From: To: = 00:00 From: To: = 00.00 Total Minutes Flared: _ .02:08 (Includes volume flared which generated black smoke, if applicable) A. Description of Incident and Cause: (Check as many as needed to fully describe the incident) X SID TJC# 1801 for Inst.mafl. Process upset in TIC SD due to high exhaust temperature section of facility _,. _ _ Seal oil system difficulties _ Flaring for drillsite shutdown !startup EMERGENCY SHUTDOWN Flare system testtng X Electrical /Instrumentation malfunction Faulty shutdown oh Electrical !Instrumentation malfunction Facility maintenance High ambient temperatures. at other faality (T8D) Gas transit system overpressure X Other. 1801 T/C shutdown backing CPFlFIow Station out Excessive /insufficient inlet gas rates into facility B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) X Started T/C * 1800 T/C Stabilized facility process and operation Compressor /train depressured Repaired equipment difficulties Reduced /increased inlet gas rates with Completed flare testing Faality maintenance completed Corrected E&I fluctuation !failure Other. Corrected E&I fluctuation /failure at other faality (T8D) Did incident cause black smoke? Yes: No: 0 (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: No: pf Yes, report to FEC as soon as possible. Ii No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Date: ~~~ Report the following Information to ADEC within 24 hours BY FAX (907-269-7508): Date and time of black smoke evert: From: Tae Volume flared which generated black smoke (if different from above): MSCF BBLS Description of steps to minimize emissions: See Section B, above. Type of materials burned: Gas: NGLs: Other General Weather. Air Temperature: Wind Speed/Direction: Name and phone number of person maki~ the r~ort: _ r I Name Phone No. Based on information and belief forme aft r on le inquiry, I certify that the statements and information in and attache' document are true, accurate and corn ete. Facility Supervisor Date ~...Z$'oo cc:. EOC Supervisor, B 8 (flan: gas and black smoke incidents) Field Environnme to Compliance Coordinators, PRB 7 (Black Smoke inddents only) PBU/GPMA Fiel Wagers, (Black smoke incidents ortyj GPMA Operations ngineering Technical Aide, (GPMA reports ony - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke incidents) FLARE EVENT - 09124100 18:22 PM Ruston T/C 1801 (STV / IP Compressor) shutdown for (spurious) high EGT. Attempted one. restart of T/C 1801 unsuccessfully, and one start of standbyT/C 1800 unsuccessfully. 18:35 PM Called out two Instrument Tech's to trouble-shoot and assist restart. Technician's diagnosis suggested calibration and/or repair of fuel valve in each case. Repairs were attempted to each machine simultaneously.. After repairs, two restart attempts on T/C 1801 failed again due to continuing suspected fuel valve malfunction. Recalibration of fuel valve on T/C 1800 was completed, and machine was restarted and loaded to eliminate flare. 20:30 PM Flare eliminated by loading T/C 1800 Election not to shut-in production from entire GPMA field was made for two reasons: 1) it was felt that there was high probability of successful near-term restart of one of the STV/IP Compressors (1800 / 1801), and 2) complete Facility shutdown and restart was expected to cause a much larger flare event,than continued low-pressure flaring while machine repairs were accomplished. (Compressor restart or complete LPC Facility shutdown are the only two actions which would completely eliminate flaring.) 1 Point Mac FOR start-up v Subject: Point Mac FOR start-up Date: 15-Aug-2000 12:38:34 HDT From: "EOC Supervisor PRB" <p2013@ppco.com> To: wendy_mahan@admin.state.ak.us CC: "EOC Engineer" <p1046@ppco.com>, FrenchTL@BP.com, "EOC Specialists PRB" <p1024@ppco.com> Wendy ~ I wanted to give you a 'heads-up' on some flaring that is going to take place at the LPC. John Cologgi has outlined the activities that will start ~ within the next week or so and the ossible flare volumes. If you have any ~ ~ ~~. p ~ ~ questions please give me, or John, a call. I leave the slope today and Paul 'tj ~ Andrews will not be in until Friday, August 18. ~~ ~"~ Jim Mullins ~~ ~ ,~ 659-5566 ---------------------- Forwarded by EOC .Supervisor PRB/AAUARCO on 08/15/2000 12:06 PM --------------------------- John R Cologgi 08/14/2000 06:40 PM To: EOC Supervisor PRB/AAUARCO@Phillips cc: Barnes&Robinson/AAUARCO@Phillips Subject: Point Mac FOR start-up Jim, As we have discussed, we're rapidly (I` hope!) approaching start-up on the FOR compressor at LPC. As with any initial compressor start-up, there's a lengthy list of adjustments, controller tuning and testing that needs to be done. This machine will have even more than usual since it is our first package with dry gas seals, active thrust control :for the magnetically levitated rotor, and a high frequency/high power variable frequency drive unit for the 10,000 horsepower electric motor. Right now we expect to bring first gas into the module on, or about, 8/19/00. The attached list gives an outline of the steps we will be taking to commission the unit. "Lean gas", as referred to in the attached list, is the residue gas coming. out of the NGL plant at LPC (mole weight of a little over 20). The initial clean-up runs will be with lean gas with the machine in full recycle. Due to seal leakage into the machine we will "burp" to the flare to maintain pressure within safe limits. Flaring should be about 4 - 6 MMSCF on a full day basis, but this will consist of "burps", .not a continuous stream. This compressor train is designed to blowdown to about atmospheric pressure on any machine trip. The contained volume of the compressor train is small, but the discharge pressure is high. I have estimated a contained volume of 1 of 2 12/26/00 9:34 AM Pc~,int Mac FOR start-up about 70 MSCF within the train battery limit valves. (This is based on 4000 psig in the. entire train - I will provide a more accurate number later by breaking the train down into its three pressure stages.). It is quite likely that we will experience several trips during initial .operation. "MI", as referred to in the attachment, is the the heavy gas coming off the stabilizer tower and the economizer drum in the NGL plant (mole weight of about. 30 - 36). During the normal run tests we will be blending lean gas with the MI into the machine suction to get a product with. a mole weight of about 27. All of our final tuning and performance testing will be done with this product. There will be at least a couple of intentional trips during this stage, and probably a few unintentional trips as well.' Since we will need to move flowrate and discharge pressures around to perform these tests, we intend to run the machine with the discharge valve to the pipeline closed and control our operating point by throttling the discharge to the flare.. We cannot operate. in full recycle during these tests because the seal leakage into the machine will result in a continuously varying gas composition. Throttling the machine from the other. end of the l0 mile long pipeline is not practical. Full machine flow is 42 MMSCFD. We believe we can complete our full. load/full speed tuning and testing in one shift; resulting in about 20 MMSCF of flaring in the 12 hour period. This low rate of heavy mole weighf gas will require significant assist gas to burn smokeless. I do not yet have an estimate of assist gas needed. If you have any questions call me at 659-8667, or page me at 2902. Thanks, JRC (See attached file: FOR Start-up and Testing.xls) Name: FOR Start-up and Testing.xls ~EOR Start-up and Testing.xls Type: Microsoft Excel Worksheet (application/vnd.ms-excel Encoding: base64 Description: Excel 2.x Chart 2 of 2 12/26/00 9:34 AM LPC FOR compressor commissioning steps. Pre-Run Activities: FCO Activities Verify Stroking of valves Operations to Prepare Energy Isolation list and tags Roll Blinds Purge and leak check Compressor with 80-100 psi N2 .Bump motor, check rotation Lean gas leak test .8/14/00 Clean-up runs Duration -- 3 days of actual running Debugging start sequence may take 1 to 3 days, expect multiple attempts the first times through Run Compressor on lean gas and full recycle Inspect and clean strainers and recycle valves as indicated by DP. Repeat runs until system is clean Estimate 4-6 MMSCFD flaring during clean up runs due to lean gas seal supply Verify stable operation of VFD and pertorm any tests necessary. Monitor bearing positions and vibrations during runs Verify functioning of thrust control system during runs Monitor proper functioning of dry gas seal systems during runs Set and check surge control system as follows: Check operating point at 9% offset from calculated surge- Set control line at 18% offset from surge During surge controller settings take performance data and .gas samples at 4 (or more) discreet operating points across compressor map... On shutdown, trip machine and verify thrust control function,. record. digital valve movements and record bearing currents. After system clean, shutdown and adjust as follows: Adjust alignments as needed.. This will also be checked after mechanical run tests for final adjustments. Adjustments only .necessary at this point if alignements have moved substantially. Adjust digital valve failed open port if indicated by thrust controller shutdown recording. Remove clean-up run strainers.' Mechanical run tests Duration -- 12 hours Start-up as normal on start gas Bring in MI to achieve about 27 MW Bring to full load by speed increase and throttling to flare (no forward flow to pipeline). This means a hold in start sequence at step 21 Operate steady max load for 2 hours. (Check with Todd White for his requirements) With stable operation test and verify performance of VFD Verify Bearing vibrations and shaft positions Monitor Dry gas seal system fucntion Verty functioning of thrust control system Reset and check surge control system as follows: Check operating point at 9% offset from calculated surge Set control line at 18% offset from surge ~ • During surge controller settings take performance data and gas samples at 4 (or more) discreet operating points across compressor map. With operating point at near. the surge control line (18% offset), open recycle valve, both stages and verify stabilty of thrust controller. Record parameters during. this test. With machine operating at design point, trip the machine while recording the following: On paper recorder- record the digital valve positions and the axial bearing currents. From CCC or DCS record compressor speed, pressures, temperatures and flows (a rate of 10/second desireable.) After Mechanical run test the following may be required: Final adjustment of alignments Adjust digital valve failed open port if indicated by thrust controller recording. Correct any other problems uncovered During Mechanical Run or afterwards: Warm up the pipeline with lean gas from the downstream blend valve. Crossover to production line at the drillsite. Final Start-up Pack line to about 3000 psi with lean gas Start-up compressor through normal sequence Bring on-line and begin compression of ML Crossover MI pipeline to production line at drillsite, throttle lean gas back to the plant. Prepare well for MI injection. Open well and close crossover when MI reaches the drillsite. Note to file: re: Pt. MacIntyre FOR Startup Flaring I spoke to T J Barnes on 1/2/01 regarding BP's data submission for the Pt. MacIntyre FOR startup flaring that spanned several weeks in September and October. I had left a voicemail earlier asking for a more detailed description of the events. He stated that it would be tough to give specific information and that it may not even be available. He described the steps of a typical project startup. He said an operator will plan, build, install and then do a functional checkout (FCO) of the equipment. They try to check with meters to ensure functionality of electrical systems and valves to the best of their ability. This particular FOR project contains complicated, high tech components..The first 12-14 days were spent troubleshooting glitches. They had 5 employees and 5 industry representatives dedicated full time to the FOR startup.. They took a break and sent everyone to town for a few days to regroup in early October. On 10/19/00 they got a successful start and the equipment ran fine until 10/31/00, when a process upset caused a normal shutdown. After 4 failed start. attempts, a ground fault was found in the motor. It was sent to Belgium for repair and isn't expected back until the end of February. by October 31, 2000 Mr. Robert Cannone Alaska Department of Environmental Conservation Division of Air Quality 610 University Avenue Fairbanks, AK 99709-3643 Re: Lisburne Production Center -FOR Start up Emissions Dear Mr. Cannone: BP Exploration (Alaska)Inc. 900 East Benson Boulevard P. O. Box 196612 Anchorage, Alaska 99519f612 (907) 561-5111 Enclosed are the modeling results for the expected flare emissions from the start up of the nevr electric miscible injectant (Mn compressor at the Lisburne Production Center (LPC). The compressor was installed as part of the enhanced oil recovery program for the Pt. McIntyre area. As John Booth discussed with Mehrdad Nadem and Jim Baumgartner in a conference call on August 16, 2000, we were initially unclear as to the specific regulatory or permitting requirements, if any, necessary prior to -parting the new unit. Following our conversation, BPX completed a thorough review of the current air permit for LPC, the Title V application and the state and federal regulations. Based on this review, we determined that the;: were no existing enforceable permit limits for the LPC flares, therefore, the excess emissions provisions under 18 AAC 50.240 were not applicable. In addition, the estimated start up emissions being both temporary and small would not trigger a separate permitting requirement. As a result, we believe that compliance with the National Ambient Air Quality Standards (NAAQS) is the only requirement which must be met. The enclosed modeling results were recently developed by our. Air Quality consultant using parameters provided by the LPC engineers and by using a modeling approach previously approved by ADEC for horizontal flares. As you can see on the summary table, the S02, 3 hour and 24 hour results were 24% and 37% of the NAAQS, respectively, while the 24 hour PM-10 results were approximately 55% of the NAAQS. These numbers are only estimates based upon expected project emissions, but we believe them to be conservative in protecting air quality. 1fyou have any additional questions or would like more information, please call Greater Prudhoe Bay Environmental Team leaders, John Booth or Mike McDaniel at 659-4789. Sincerely, ~~ ,~ -L~ ) -- ~ net D. Platt nvironmental Business Assurance Manager Greater Prudhoe Bay cc: Jim Baumgartner -ADEC Juneau Wendy Mahan - AOGCC Attachment: Table listed as Attachment 1 n~ . R .a ., ~ '. i ~~5~~ ~!9 X35 ~. Artr,~t~t ~3t'#ittT~,~Qr Part of the BP Amoco Group Mr. Robert Cannone ADEC October 31, 2000 Bcc: Mike McDanieUJohn Booth MB2-6 F. Roach/M. Werner PRB-10 T.J. Barnes/B. Robinson PRB-37 File - LPC -Air E.C. C:\Documents and Settings\plattjd\Desktop\ADEC FOR Startup 8-OO.doc ~~a~~ ~ Modeling Results for All LPC Sources Start-up Flare Emissions Maximum Impact from Impact from Impact LPC 8c PBU Off-site Background Total AAA95 Percent of Location Sources Sources Concentration Impact NAA$S A~$S ollutant Period (gg/m') (Hg/m') (Hg/m3) (Bg/m') (eg/m3) NAA S SO2 3-hr (h2h) 453475, 7803075 423.7 7.9 55.0 486.6 1300 37 24-hr (h2h) 446034, 7798149 86.1 2.0 10.0 98.1 365 27 PM10 24-hr (h6h) 446000 7798150 24.4 0.9 57.3 82.6 150 55 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION. Facility Operator Field(s) Month/Year of Disposition LISBURNE PRODUCTION CENTER #1 PHILLIPS ALASKA, INC. __ PRUDHOE BAY/PT MCINTYRE 10/00 Disposition 1. Sold 2. Reinjected Ahe4~ (1il 3. Flared or vented less than 1 hour 4. Flared or vented greater than 1 hour (Supplemental 7eport required--See 20 AAC 5 Pilot and Purge Volume MCF' 141,034 8,732,712. Comm ion Anchorage 3,743 14,391 5.235 41,455. 6. Used forlease operations Fuel Assist 871,151 89,564 7. Other Lift Gas, Off Fieid 123,878 TOTAL items 1 - 7 10,017,728 8. NGL gas equivalent produced 141,034 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: ~~ Title: ~ U ~V Date: Form 10-422 (Revised 4/95) 'Indicate contribution of each pool to total Pool Name Code Percent LISBURNE NIAKUK 840144 640148 46.32% 2.55% NORTH PRUDHOE BAY 840152 0.00% POINT MCINTYRE WEST BEACH NIAKUK 688100 840186 840148 45.41% .4.29% 1.43% Glffical~Use:C3iiI~'=a~tgtfri~~.~Atitliirfratinri~ ~~ 1:.nr: ~: ~: ~: ~:~: ~: ~: 1. Safety I ~ ~j g I MCF r 2. Lease Use MCF 3.-0onserv. Purposes MCF 1'V ~r, sv Commission ~~o ~d ~- Date Note: All volumes must be corrected to pressure of 14.65 psla and to a temperature of 80 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ~* ~ t ~~ .1 ~ ,L yG ~? PHILLIPS ALASKA, INC., CONSERVATION ORDER NO. 219 LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS October 2000 PLAN/ DATE TIME VOLUME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLAN ACTION TAKEN TO ELIMINATE CAUSE 3-Oct 1934-1945 168 Compressor 1800 shutdown,for high EGTprocess upset. Unplanned Stabilized facility process and restarted compressor 5-Oct l 153-1154 147 FOR Process module startup and functional check out. Planned Startup FCO completed for the day 1316-1320 1511-1516 1557-1558 1811-1813 6-Oct 1824-1825 0810-0811 207 FOR Process module startup and functional check out. Planned Startup FCO completed for the day 0840-0844 0859-0900 0929-0934 0948-0949 0952-0953 1008-1009 1048-1056 1249-1251 1315-1319 1327-1329 1641-1643 14-Oct 0913-0915 1518 FOR Process module startup and functional check out. Planned Startup FCO completed for the day 0939-1027 1719-1720 15-Oct 0834-0835 584 FOR Process module startup and functional check out. Planned Startup FCO completed for the day 0904-0912 1417-1419 1529-.1530 1554-1610 ..1838-1841 .1859-1901 16-Oct 0644-0645 207 FOR Process module startup and functional check out. Planned Startup FCO completed for the day 0807-0808 1002-1005 .. 1023-1024 . ..:.1112-11,3 1811-1812 RECEIVED 1831-1832 1849-1850 ,920-1922 Nov 2 ~ ~ooo 1924-1925 1943-1944 AI2Ska OII & GaS Cons. Commission 2023-2026 Anchorage 2027-2030 e 11 /15/00 10-OOMASTERMNTHND_SETCIM.xIs PHILLIPS ALASKA, INC., 1 CONSERVATION ORDER N0.219 USBURNE PRODUCTION CENTER GAS FLARING INCIDENTS .October 2000 PIAN/ DATE TIME VOLUME (MSCf) DESCRIPTION OF INCIDENTS do CAUSE ' UNPLAN ACTION TAKEN 70 ELIMINATE CAUSE 17.Oct 1301-1303 313. FOR Process module startup and functional check out. Planned Startup FCO completed for the day 1328-1330 1357-1359 1538-1540 1630-1631 1657-1703 1805-1806 24-Oct 1837-.1843 2120-2134 108 Faulty shutdown on 1800 SN/IP T/C, electrical/Insturmetation malfuntb Unplanned Started Compressor 1801 SN/IP 30-Oct 0055-0102 478 Shutdown compressor 1830 during plant upset, cause unknown Unplonned Started compressor 1855 until 1830 con be repaired/restar 0200-0201 0244-0248 0302-0304 0326-0327 0428-0437 31-Oct 1005-1006 13 Compressor 1830 MI complete, restart. Unplanned Compressor/troln depressured 1429-1431 - 1457-1458 1517-1518 FLARE UNDER 1 HOUR 3743 RECEIVED NOV 2 1 2000 Alaska Oil & Gas Cons. Commissidl Anchorage 11 /15/00 10-OOMASTERMNTHND_SETCIM.xIs PHILLIPS ALASKA, INC., CONSERVATION ORDER N0.219 LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS October 2000 PLAN/ VOLUME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLAN ACTION TAKEN TO ELIMINATE CAUSE DATE TIME 17 ' 1340 - FOR Process module startup and functional check out. Planned Storfup FCO completed for the day 08 1-Oct 0816 0840-0841 ' 0854-0855 ~ 0901-0902 0928-0930 z 1000-1002 z 1013-1014 1023-1025 L 1238-1239. I ~ Z M'N = 7a ?A L-- 1308-1309 + 1321.1330 °I 1420-1422 Z . 1500-1501 ! 1516-1517 1 1615-1616 1 1635-1637 Z 1652-1653 1 1727-1728 ~ 1743-1744 1 1807-1906 $`~ ____1917-19113_!_-_._._..-- r ~._.;-, 4-Oct 0804-0805 ~ 693 FOR Process module startup and functional check out. Plonned Startup FCO completed for the day 0832-0834 z 0858-0859 I 0914-0915 ~ 1014-1020 6 1132-1133 r 1222-1223 I 1239-1240..1 1313-1317..'4, ~-j q M r ti _ (d~'l ~ L-- - Z 1400-1402 1426-1439 J,3 1454-1506 I Z.. 1508-1515 ~ 1550-1552 'Z. ...:1614.162632 } 641-1 b44 RECEIVED NOV 2 1 2000 Alaska Oil & Gas Cons. Commission 11 /15/00 10-OOMASTERMNTHND_SETCIM,xIs Anchorage PHILLIPS ALASKA, INC., CONSERVATION ORDER NO.219 LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS October 2000 PLAN/ DATE TIME VOLUME (MsCq DESCRIPTION OF INCIDENTS & CAUSE UNPLAN ACTION?AKEN TO ELIMINATE CAUSE 12-Oct 0746-0747 ~ 9478 FOR Process module startup and functional check out. Planned Startup FCO completed for the day 0853.0854 r 0807-0809 z 0832-08375 0840-0842 2 0845-0846 t 0849-0926 3'~ 0938-0940 2 1029-1032 3 3S ~ M1~ ~ ~O?~ L, 1107-1108 ~ 1130-1131 ~ 1153-1154 ~ 1241-12432 1250-1259 9 1314-1315 ~ 1340-1353 i 3 .1417-1418 ~ 1439-1512 3 '~ 1546-1547 ~ 1604-1605 ~ 1608-1609 ~ i'' 1631-2023 23 z ~ ~ 13-Oct 1703-1704 r ~ 1765 FOR Process module startup and functional check out. Planned Startup: FCO completed for the day 1729-1731 Z- 1743-1807 Z4 707AL- ~ ~Z M. ~ N 1822-1823 i 1854-1928 39 18-Oct 135;1=T555--z "" 1115 - FOR Process module startup and functional check out. Planned Startup FCO completed for the day 1612-1613 r 1633-1639 ~ 1655-1656 r 1715-1726 ~ r 1745-1746 ~ 1 1 _ t 8 6 1829 3 -1 ~o7~lL = TZ nnlN 1844-1845 1905-1908 3 1923-1925 L ~ 1943-1948 cj 1 \ ~ ~' V ~ D 2003-2004 ~ 2023-2029 G, 2o4a-2o5o ~.. NOU 2 1 2000 2126-2131 `J 2230-2233 ~3 Alaska Oil & Gas Cons. Comrnissi~ 2247-2248 1 Anci-orage 11 /15/00 10-OOMASTERMNTHND SETCIM.xIs 2310-2314 ~ _ 2346-2350 s+- PHILLIPS ALASKA, INC., CONSERVATION ORDER N0.219 LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS October 2000 PLAN/ DATE TIME VOLUME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLAN ACTION TAKEN TO ELIMINATE CAUSE FLARE OVER 1 HOUR 14391 Volume Flared 18134 Flare Assist 89564 Measured Safety Pilot 41455 TOTAL FLARED 149153 ' No ADEC emissions report filed because no black smoke resulted, flare was less than 1 hour and flare volume was less than 1 MM. RECEIVED NOV 2 1 2000 Alaska Oil & Gas Cons. Cotnmiss1011 ~' 11 /15/00 10-OOMASTERMNTHND_SETCIM.xIs Oct-04-2000 02:lOpm Frorn-LISBURNE OPERATIONS 658-9655. T-592 P.-001/001 F-078 ' FLARE GAS VENTING REPORT PHILLIPS ALASK~A•,ppIN~~C... • PRUDHOE BAY/GPMA/KUPARUK ' fACltlill: ~a%:T~:%~: PERMIT NO. '~~~'T:~~• •~~ GAS DISPOSITION Date of Occurrence: ~~ '03' ~ ~~ ^ vent Time o ccurrerrce: (mMddyy) (Chedc;2Plection) Q0,9Q T4~! Minutes . From: ~ •_~ To: 19i1~S = OOi fl Total Volume Flared: ~ ~~ MSCF t3BLS From:: To: _ ~/ Frorn: To: - e r o':::•:•:::: ~•:'::; . `.F.adl ^ Plnra-ed hQ unpanrKo Frain To: _ (Check Selection) From: To: _ From: To: - Total Minaret Flared: = (l~sburrro Ony • Gee Aered mina r,~^ upsErear ^ downsamrgCl:eok one) (lrrGudes volume fla-ed wludr generated Wade srrake, of7FG aarrtaGarmetetat LPC) if applicable) A. t~acripoon of )ncident Intl Cauee: (Check ss ma as beedetl !o fu011 deaerlbe the incident) ~/ SID T/C1F1~_ for ~T ~ `Process upset M 0~6 TIC SO due to huh exhauu temperaWro section of facility Seal dl system diffiwtties Flaring for driBsite shutdown / swlup EMERGENCY SHUTDOWN Flare system testglg Electrical / krswmerdaGon maMunNon Faulty shutdown a Eterdrical I Instrurr:entation maffunetion Faciligr maintenance F6gh ambient temPentures. at other tadllty (T8A) ~ ~ N8h v>bratron Gas transit system overpressure Other: bFdGrg CPF/Flow Station out E~ccessive I i~dant inlet gas r+ros brio fadlity 8. AeUon Teksn to Eliminate Cause end Present ReWrronee: (ChoeNasnd.deacribe ae applicable) ~/ Started /restarted TIC II ~ ~L Stabilized facility process and operation Compressor I train depressured Repaired equipment difficulties Reduced /increased shat gas rates with Completed flare testing Faq'lity maintenance completed Comectad E&I fluauation / falure Other. CorreGad 1:81 fluctuation /failure at other faci6ry lTBD) Black Slnoke Did inadeM cause blade smoke? Yes: ~ No: ^ (tf Yes, continue r~ith t1~ section) Did incdent present a poterldal thrt:at to human health or safety? Yes: ^ No: ~ . (If Yes, report to FEC as soon as possible. M No, report m ADEC with 2a Iroprs.) Biadc smoke emitted from source: ~PIaI M Y~ Aeeo~ (enter tag number and descrtptbn) Notified ADEC by Fax Date: /OIO Time: )V':/5 Reportthe following irdormadon to ADEC within 2s hours er FAX (907,268.7506): Date and time of blade smoke event:. From .SA W E To: Volume flared which generated. blxk smoke (rf different from above): MSCF Ei9lS Dascriptlon of steps to minimize emissions: Sea Section El, above. Type of materisis burned: Gas: / NGLs: Other. General Weather. Air Te rature• ~ ~p(jn~, _~p, ract+on: tOr/l~~ ~~ ~~ Name and phone number of pars kin report: _/~J ~I Name - Phone No. Based on information and belief sonebk~ inquiry, I certify that the statements and infomraGon in grad $~~I dowment are true, atxurate a pl + : • _ I FadlltySupervr5or Date ro~~ •~ cc EOC Supe , PRB t3 (flare gas and black smoke inadeMs) N ~ U 2 Field Emriro Comprianee Coordarators, Pfit3 7 (Black SmoKe {nddenis only) PBWGPINA (e Managers, (Blade smoke incidents onq~ Alaska 011 & Gas Con GPMA Opar Enginearing Tedtnkal Aide, (GPMA reports ony - ATO 4i~ Kupanlle: Fie rnironmental Cortrpfianee Coorclinators, NSK 61 (flare gas and blade smoke irxaden3s)' Updated: FE.C a~eB &3iFW aprrdialFamralnkiUwagnrlNn-ds FLARE GAS VENTING RETWtT ~SKa_ INC. • PRUDHO~ gAYtGp1 FApUTY: LPC a: 1015100 ~~ Ovet ~q~ rrnorrca: Data of Occumanc `y prom: 11:65 To: 11:54 = 00:01 MSCF BBLS Total Volunw Flared: 1 From: 13:16 To: 130 = x:04 From: 15:11 To: 15:16 = 00:05 Mater Noa 627 pact dPlamed 0 From: 15:57 To: 16:68. _ 00:01 IGrerdr Selegion) From: 18:17 TO: 18:13 = 00:02 From: 18:24 to: 18:25 = 00.0'1 fetal lAktutss Flaf'ed: : Qp;74 (usbu-fre OMY- Gas !fared ++~ rronD+a~ ~~~ (t~reck On@~ ~rfcltrolume whia-t gen~rad trtadc srno>re. of Ti=G eontador meter at l.~) A. DeacNpdon of lnddent and causo: lc ~ marry as needed to fr,uy daserlbe tyre Process t+Oset ~ 5/D TJCt (t7r s~pn of faP'6aI TIC SD tlue to high exhaust tenrperaase Seal op system diffiaA6es Flaring for dnllstte shutdown /startup EMERGENCY SHUTDOVITI -! Flare sn~ . t7ectrioal ! trrsuunrstdatlon rr~athrrtdlon Foully stwldorm on Elechical J InsVUrr~erKatlon rrtaMtettilon Fadtllly ~ ~~~ ~ smbiertt ~- at other tadpty R~'1 cos 7rsnslt hadcutg cPFlFlow Station out Fxtxssine 1 irrrtltriderrt irMet gas rates kelp faotty B. Actlon Taken to EWnlrrate Guso and Prvrent Racurranae: {Chock and dosMbo ss app8cablf) Started ! restarted TJC • ~abidZed ~~ ~00~ and Cpmpreoeorttrsin dePressttr'ed ~ i Wired ogrdpmetrt di~rlUes Reduced 1 inppased Wet gas rates Fad ~e Cornpteted tiara testlng Carcrded E31 fludtratlott / falkne X ~ Other: ~ark~ FCO e~n'aP~ed Mr the Corrected 1=&1 tiuelttatlon J talkie dam' at ocher facility Cry PERNNT NO. 9A73-AAO2.5 X -'-~ OU+er. Process module startup and -'~~' Funceonat t~adc an. lnterrrrilterrt tlaring for a total of 14 mlrxrtee- pid~ipodant t~ttse blade smoke? Yes: plc: O (H Yea, conWwe vrglr this section) bld•tnadent present a poter>Cigl threat to tnsnan treslth or safeQr? Yex Na ~M Yes. roport bo FEG >n Boon as possibM. N No, report to ADt-C vrtitlt 24 hours.) Blast smoke emoted trap san+ca: feeder tag rrun~er and desatptiort) Notltled ADEC by Fat on: Date: ~~ deport ttre fopor++irrg tMorrrntJon to ApEC wltlrlrr 24 hours BY FAX (907,Z59.760~: Date and tirrre 4F B18e'k Smoke eYerrt Flom: TO: voktme flared rrhidr generated black smoke i+r a~lferent from above): _ _.~ MSCp t3t3LS oesolption of steps M nee err~tsslons: see Sectlott s, abevo. Type of materrsts awned: Gas: N~-s: t7t1>ee General vveaater. A~ wn`speedlo: lVatrre and phone rurrrber of person Phtx+a Iao. rl~ne eases on srromrauon a~ veaer doaxrrent are true. saaarste seed FaeHlgr Supervbor w~.,,r~ RECEIVED ~ iroe . RB s i+lare l~ and blast smoke irraderMS) N O V 2 1 2 00 0 FidO Corrrpiiance Coorrfetatas. PfiB 7 il3lack Smoke inadeNs only) pgWGPtdA . (Black smoke indderds only) GPMA Operetia>r ~g8 Tedyrical Aide. iGPMA ~ - ATO 477) Alaska Oil & Gas Cons. Commission Kupartrk: F'~eld EtnfxoixtreNal CorrrpNartae Coord'u+alnrs. t~tSK 61 tgare gas and trlaCk tstrake r7pdargs) Anchorage 508-d ll/80'd 096-1 1909-999-t08 SNOIlYa3d0 t~d~o~~ IY~EI 00-B1-~N r .'.~ FLAhE GAS VEM71~1G REPORT PHILUP3 ALASKA, ING. • PRUDHOE SAY/GpMAIKUPARtlK ~„~ FACILITY: LPC Pt-RaItlT N0. BATS AA02S GAS DiSpOSITION Data of Occurcortco: 1016100 OFae ~ ~ Thee of OccurrAnes: (mcnldryry) tCtreck Seteetion) Mltwtes ~ - From: 08:10 To: 06:11 - 00:04 TotatYolurtwflared: .~!O r MSCF Bt3LS From: 08:40 to: 08:44 = 00:04 Flom: 08:69 To: 090 = 00:01 Mater No.• 621 B Faclt ~~~ ~ From: 08:28 to: o9:d4 _ OO:OS (Check SslecUon) From: 09:46 To: - 00:01 From: 09••52 To: 09ai3 = Total NHnutas Flared: = e1~ (Usbrrme On-y - G69 Aarad was /rpA~]upsEr®m ~ (Char:Jc One) ~Indvdcnge fl~ YYhkA generated bledc smoke. d 7>=G certcaetor meter at Lp07 A. aescrtptia- of incident and Canso: (C.heck ae many as treaded to fully doseribe the ~ ~S ~ sID T/C8 for TIC SD due to (rlgh exhaust tamparahxa sedron of taelNfy Seal oN system d'r~iaMties Fiarh-9 for drNlsMe sttutdOwn / ataitup EMERGENCY SHUTDOWN Fliup lestlng t~laCirlcal / Instrurr~erdaaon rtralRrnCtion Fatiky shtttdavrn on / Instrurnerdatlon rrlattvr+ctio~ Fadtibr maintenertea ~- Hgh ar+W~ teMPer~s' at othertac~llty ffE~ X per; pays module startup and Gas transft system overpressure bacddrlg CPF/Flpw Smtion out Funetlorlal Check Out. Ihbemritpent Excessive 1 insttifiaent lnltt gas flaring for a total of 32 rrwnttes. Page 1 of 2 - rat~s irNO faa'Iky B. Actlott Taken to Elkrtlrtate Caws and P.e~rent Raourronce: (Chock and deseribo as applicable) Sts+ted / restarted TIC * Stab~ized iadllh process end open9ti0n Cvmprassor / train dapressured R ~ equ~+lent drtA~es EZeduoed J increaser! inlet gas rates flats ~~ facRity tnairrtenatrce completed . Cocrraelad E81.tktcflrtatfat /failure X Oorer: Startup FCb contDle~d for the Corrected Fit fktcluatiat / taaure _ may' m otl+ar faa'Nh- lTd~ Stack Smoke Did inddant cause black srrake7 Yes: No: ~ (If Yes. oorMirtua with this tlecilort) Did hrcident present a potential threat to human health or safely? Yas: fVo: (If Yos, report to t=EC w soon as possible. H No. roPert b AdEC with z4 hours.~c tag number and ddm+) Stack smoke emitted UOtn sotrroa: ( Notified ADEC by Fax on: Date: Tina: Report the fa0ortring inforrnatlotl to ADEC within 2t lwura BY FAX (~f,289.7508): Date and time of black smoke event: From: To: YolWne flared which generated bisok smoke (rt ditler~ent from above): >tASGF t3BLS Description M steps m mintnt~e emissions: Sea Section t3. abovo. Type of rnatartals burned: Gas; NGts: OlRrer. C,eneraf Weather: AicTernpersture: Wind SpeedlDaediotl: Name and phone number of peeson ma ttte t~anre phone No. Based on intornurtion and belef forrrred irrpuiry. I certlfy that the statements and inlOrmeti0ft in and attactled to this do~rmer><aretrue.$~taan~ 'RECEIVED t~ 14- Facility Supervisor a: Eoe supervisor. 6 (flare gas and black smoke Indderds) N O U 2 1 Z 000 Field Eml Sarlne Coondhatars. PRt3 7 ( smoke irtcidanls only)' • PBU/GPMA F (Black smoke trtctderlts Only) GPMA Opera irreering TeehniealAlda. (GPMA reports orrty - ATO 4T7) Alaska Otl & Cads COrIS. COrI1r111SSIAfI lctrparttk: Field Envkorrmental Compliance CooMhtators, fVS1C 84 (flare gas and bleat smoke Irlctderrts) AnChOragC 909-d ll/80'd 05£-1 1905-699-108 Si~IlYa3d0 sold-~~d lti~£l 00-£t-~N FLARE GAS VEMING REPORT vrar ~ ids ac dctce_ tuc_ . aauewet= taevlGai FACIt.ITY: Lac ~ PEltMfi' tro. swT3 AAOas I bate of Occurrence: 1018/00 ~~e west Time at occurrence: (mrNddlyy) (Check Selactiort) .00 Nilnutsa From: 10:08 To: 10:08 = 00:01 TotalVolumeflar~d: 207.16 AASt;F BBLS From: 10:A8 To: 10:66 = 00:08 Fran:. 1ZM9 To: 1:61 = 00:02 Meter tyo.: 621 Fa ~ ~~~ From: 13:14 To: 13:19 _ 00:04 (Check Seledbn) From: 13.27 70: 15:29 ^ 00:02 - B:41 To: 1643 = 00:02 ' From: 1 Total INlrtutrs Ftared• a 00:19 (lisburne only- Gee Hared was horr~uasT<e3m ~do.~wm lCr-edr Onto) (fnd~ vauRre fla+ed vidrrCft ganaralgd brads smoke. of TEG oontectcr meter at LPC) if ePpA~cable) A. Description of tncldent and Cause: (Chock as marry as needed to fu0y describe rho Inddptt) S1D TJCr for Process upset in T/C 5b due ~ high exhaust temperatun: section of iaplibr Sad 08 system dBflat{tles Elating for dry shutdown / slar4up EMERGENC1f SiflJTaOVUN Flare systertr testing Electrical l Instnurrentstivn rnattunCtion Feulq- ihutdoem on ElectrkMl / InstrwrrertE~on malAe~diori FaPTbr malneBrtaneo l-Lgtt amttitant tan+per• at other tsarity {rte Gas iran6it systarn overpressure x other: Process module startup and badun9 t~F/Flow Station out Frurc:tlonal Check Out Interrn4tent Excessive I insrrk'edent Inlet gas flaring for a total of 32 trantrtes. sates irtlo taeBty Page 2 of 2 B. Aalon Taken 1o Ellndrrats Couse and Provont Rccurronce: (Check and d9aCtlbB ae appltabM) Started /restarted T/C f StablRzed htooesa end operatbn Compressor / balm depreasla<ed Repauved equipment ddfiad6sa Reduced / Inaessed foist giis rates +~ Completed flare testing Fae~y makpananoe oompleled Cont~d E3111uctuaUon f 4alkie X Other: Startup t=CO completed for the Corrected C~G1 fluetuatlon / taUure day. m ottrar fadifly R~ Dki incident cause bledt smoke? Yes: A{o: ~ (if Yes. corrtlrwe +~ this section) Dld incident present a pomntlal threat to humeri health oC safety? Yes: ~: {IE Yes, report to FEC as soon as possible. H No, report t0 ADEC with 2+1 hortrs.) 81ad: smdce emitted from source: { ~9 rxlrtrber acrd ~) iJotlfiad ADEC by Faxon:... Date: Tme: ftgpatt the toilorrMg informstlon to aDEC vrltltln 24 hours BY FAX (907~268.7608h Date and time of black smoke pvatt: From: Te: Volume flared which gerreratetl blade smoke M dlflarent iron above):. AASCF BBLS t~eserlptkxr of steps to mitirntite enussiens: Soo Seetloa B, above. Type of materials homed'. Gas: NGLs: ~: General YVbather. Air Temperature: Vlrard Speed/bireetlon: Name and phone rrunrber of person t-rakalg tom' mP~ seance PhOnE No. nasaa on imomrauon ana oeeer iwrrreo arrr dOCUmert are true. atxanate and oornpletE. ~EIVED FadilgrSupervi~or Dam NOV 2 i 2000 oa race srrpen+isor, wtk3 B {dare gas and black smoke incider+ts) Field Emkonmerrtal Compianoe COOrdinotors. PRB 7 {Black smoke:rradtnrs ariy) PBt1/GPMA Field Managers. (Bradt smoke :rodents only) Alaska Oil & Gas Cons. COmmiSSiOn Gt'MA Operdiions Englneertrlg Technical Aide. {GPINA repoNs only.- ATO 477) )Cupatulc t=~eld F~,norurrental Comprtanoe Coordinators. NISK 61 {flare gss and bled: smoke indderds) ~ 908-d ll/Ol'd 09£-1 1905-699-108. SNOIlYa3d0 ~d-~~d lti~£l 00-£t-~~N 1~, Oat~15-2000 09:11 FroaNLiSBUttNE OPERATIONS 669-8655 T-8B$ P.OOZ/002 F•161 :~'~~ . '. , •-~ -: ~ PLARB OAS Ylo~lTW6 #IRpOt~'r I ~ ems ~ iba et wsre: ~N~ • ARUDN~A A1V/[i61S~/ICltpr{iltl[ - fbAS dSPD~iWN Dap oR oeoutnnca: ltutaroo )i3~ifAe Q~ (t~aaiyy>! t sa~apliat) ?oral Velulne Fla/bd: 7b18 i~ABCF,,,^,.„~„ -t3BLs (CItAd:N Time at Dante ~ F~a1x 70: OBaS = Frgftx W~ To: 1027 Rom ~7 9 To: 17d8D t1oA1 FCafn '-~ Ta ~ ~ ~ Ta a flD700 ~.~_ pfom: e Ta ..a: ' . ~- Tool tdtiubs Flftla~ s ~, ~ (CrieokO~ • ~ JlarodMd~Ich gsnarffiedb~adcsa~oM+a, h T~ ar~ia®or tFCj • A ovspripder+ of lnddset ane Cauca: t as axny ars neodad m stilly doscr1b.71-a Incident sN TA'aF for ~ • . .~ T/t: ffib due m ~ otba~l mnparatVld sa ..,~:.,....~.• -- ~„`_ 9~1 aU apatemdi(Aotd69s ~ • : E11FA~FaICY SWUTDOWhi ta ~ ~A ~„~..~ • ~ . i'' ~ ~_ ~'i~. ~ ~ , 9edri~al / trle[nmMnta>ia1 tnallutw~on o:t .;,:~,.~ . .. B6C1rim1 / NfMitiall ---rte ~ ~ ' telr~fera4M~B6. arl~lent ~~, • N ~ ~~~ ~ {~I C s~ p and dA statu ~ C h aa kats ~ e o l e~ ~ F.~, ~I ~ P • I ~ r~~~ ~~wi ~~ ~y~1lw..w.~ .. ~.. y ~~ ~ ~yy~,,..~ ~ {~ C/Mi06at~ ~ NrJ1~Yf W.A ~ T~ ~{ 8 ~ ~i1 ~ l y I1c11an Taksn to Elfmin~e Ci~~o and prewet~t aeaasenwc tt;t~cit and doa~Yl~ as apl~liorble~ B. ~ swtotl! t~t®d TIC d ~ ~ ~~ sneermd f~91 proass and ~\ COrt:pn~nr/traNdapn7s,ltlnid ~ R~ ~Ni~-~ ~ R ; ~..:. ~ ~ ~~ R~n+ad! itKaa~ed ~ gas ntees _ - Cortv~ied Eit ptxWe0be1 / ate gHer S~utuP FCO oorrolMad iDr ti5e ~G _ ~ ~ .. -~~ ' Co1f'aded 6dJ luCluatiDn !ldluai ~-• ~~ +~ Oli~ar taeitlq- ('fdd~ Did t estino t+ladf 3tnot~9 Yea Noc 8 jIE Yes. ooidwtue wih thLs eeefloal Dtd inotdent a poLnpAl tlr:aat to tw~rraat had!!1 ar sahgl>' Y~ No: 81t Yss, report m ~ a9 coon ss possible. R Na cgaat Oa AD6'C r1M~ a4 hats. f~1aG: smoloe eieaded twm aoubs: faniartag numttar and ea®g1pGoN NotiDeO AD6C by fp: an: Dep• Titrtx Report ttis iolb~ring b1>dDrltmtlon m eruph to ~ ~ Cote and fine of t-tadc snsotoa evar~ Fnomc Ta vowtr flared tel~kt~ ger~natad t+ladc staat®tR ditiarart bom owr '~lEtB1s, `I~POor- of b ~iipna dnds6io~ sae sa~~aon B. ahpY~a. Type of m tied !~ Nth Odtaf: cyane~ai vraedwr: Ak Temperew~ sMM~+ Nanis and pttorte nuriAbaC' or pen:on rnak+ng tiw tapper Platte one nw. ~~, and ~ .~ t~»-~d~~a~.CEIVED are~o~~ ~.ana a~etr>~r t». Bo .... .. _, NOU 2 1 ?~00 ~ EoG 8upatsimr~ PR9 s glare gas ane tdaolc srnolm 9ta4 F-tield EnWranmantel nompisnoa Coadr+atot~ PAB 7 Ertnloa inadanta anl~ • ~ F>.10 ~'~°~ smoi~ i~irienb °A~ Alaska Oil & Gas Cons. Commission @pAAA Oporairons E~neerbq TicMical tide. (GPMIA roport; oM- = Alb 47r- Anchorage - Knpe+uic field ~ririm Carr4fte~o. Coordnelots. MSIC 6'1(Ilmt gas and bNxlt smoloa nddonts~ . eft: ~ • .~ ,`s'!; • • 508-d ll/it'd 0$E-1 1909-869-1OB _ SI~IlYa3d0 98d-~~d Z~'6l 00-E1-~oN ' Oct-19-00 10:53 From-Ptffi OPERATIONS 90T-659-5061.. T-265 P.02 F-660 "' _ ~' FLARE CAS V7]ItTING REPORT PHILLIPS ALJISKA, INC. - PRUDNOE BAY/GPMAACUPARttK F/tChfl'Y: ... •a.PC': ... PERMRNO .~ ~ ~ 4a9~IfA0Z5:~ - _-- AS DISPDS1170N Date of Occurrence: f 0/'15J00 B vane p van Time of o«~Re~e: (mrMsidryy) (cnedc Selection) ~ lmtrwtss Frsxn; 08~f To: oe:d5 00:07 ..Total Volume Flarod: 584 AASCF BBLS From 09:04 To: 08:12 = 00:06> Rom: 14:17 70: 1A:79 OOZE IAeter:No3:: •' -. t321•::> ~ ®Ptanned O~~ From: 769 To; 150 - 00:07 (Ctreck5election) Frsxn: 154 To: 16:10. _ ooaB Frain: 1E:38 To: 7tt:47 • 00:08 i Total ftllrrutea Flarod: 0 007 ~~ ...~..~ (tom ~ - c,~+s bared was bamC app 0 aan.sasan (cxr~a o-+e) rains wbane earee wNd, generaimahmdc smarab, or r~ corm rreoor ar tpc~ ~~ A. Oassafptlon of lnefdorrt and Cause: (Chock ~ rnerry as nsoned to fully dessxibe the frtddattt Slp T/C6 for Process upset in TIC SD slue tv high exhauq uro section d iaaTity sam as systtefl <fit6a>ttias Fktrfrrg for ~sde shutdown /startup EMER(i~1CY ~1UTDOVVN Flare system testing Elactiicat I hstri:rrrerrlallon rra~on FAY 5hut4owq on 0edrical / krstnrnrenttgian malrurrs4ion Fas~Bly nrakrtenanoe H~~ at outer fad6ty (T8D) Gas transit system overpressure X other: Prods moca,le startup and baddrtg CPF/Flow Station out Frxrsxiorrel Cfreck Out. Interrruttem E>a~ive / ar•ArlfiCent inlet gas ftarkkt for a total of 33 mina. rates irao facrlsy aaae 1 s>fd• B. Action Taloen io Eliminate Cause and Provost: Roasrrenoa: (Chock and dascrtbe as appUoabla) Smrted /restarted TIC # StabiWxeQ taciity process and operation Compressor / trakt dapresb~rsid Rs~ired egrriprnerK sbtGctrltiae Reduced /increased inlet qas rates wNh Carnplotad Mare testing Fasaliy maintenance completed Corretxed F~l 1uc~ration / ietlure X Ogrer: Startup FCQ wrriplefa4 far the Corrected E8l flucu,abon / faqure daY. at caner faceYy (l3D) 13~ck Smofae Did kraderrt caves black smoke? Yes: No: 0 (rt Yes, corrdrrre with thi4 section) Qid inddetlT present a paergial ifreat to human hsdth a safetYt YES: No: M Yea. reports to FEC as soon as possible. E ifa, report >4 ApEC ai4r 24 hours. 81aci: smotre srrsfsd from soutoo: (enter tag rarfnber and des~iplion) Natifiod ADEC by Fit an: Rata: Tina: Report the fdlowing irMorntation m ADEC within 24 ftosaeB FAx (907.267900): Date and time of bfadt smoke averq: Fran Tar. Vdume ilred which generated smoke {d sfitferent from above): tuISCF BBLs DesctlPtlon M steps to rnirrlrrdrs erri~ssiorl~ flee tlteellon e. above. Type srf materials homed: Gam NGLs: Other: - General Weather. Aa T tilrttwa SpeedrDirecliort: Name and phone number of person the Name Phone No. an ~, anabel ffortateq ~ rr~,y.l~fyt~,h~tdk,~r,,~,~d~a~red C E I VE D eoaar~em aretrue. e~,rate era ct: eoc supervisor. P (flats gas era block srrwloe inaderrts) N O U 2 1 2 0 0 0 FiekJ coordinators. tie 7 (elect: smoke incidents ally) PBWGPMA Fieta (BFadc smoke incidents orrfy+) Alaska Oil & Gas Cons. Corrxniss+art GPMA oparatiorrs TeCMk~l Atae, (GPtW- reports only ~ ATO ~I KuPawk Fite10 Envlronrr~ntal Comp®ance Coordinators. NSK 87 (flare gas and Wadtsmoke krcidrxts) Anchorage ' Oct-19-00 10:53 FroarPl~ OPERATIONS 90T-659-5061 T-Z65 P.03/i2 F-fifi0 FLARE GAS VENTWG REPORT PHILLIPS ALASKA, q~iC. • PRUDHOE BAY/GPMAACUPARUK FACfIJTY: •:II+C~. P[3tteil~. .:fuira.AA~. ' ! GAS DI8f~9SITIGN Date of Occurrence: 70/t 51b0 Q Flare [t Vast Time of t)ccurreno9: ~ imm-dd/yy) (Check Selec7ion) 0000 ml0lili~ From: 76:58 To: 79:01 - 0002 ..Total Volume Flared: 584 MSCF t3BLS From: To: . OObO From To: - 00:00 AAettpr=No;:.•.•.' •627 '. •.. ~fl ~ O Front; To: = 00:00 (Ctreck Sa{a~tion) From: To: = 0000 Fror-t To: - 0000 j i Tota111llnutes Flared: _ ~~ { ltisn,.,na aby - ~~ trans lrornp w~ C~d don~nrnear- (G~er1c ao~ . = (brclridbs vWurrs Adrtid rrlt+cn eene~ramd>~ck srrwloss of TEG oor-tactarmeterst LPC) baPP~~1 A. Description of lrrciderR acrd Csuse: (Chick ss many as needed b ltdiy describe fns htddenf 310 TICII for.. Process upset TJC SD 4us io high erQratrst temperature section of fadfNy Seal ad Clem Flaring br drisite slwldown ! P EMERGENCY SFIUTDOWN Flare snlem testing ' Electrical / Irrsfnrrnerria6on malfurxr6on Faulty shutdown on ' Elegrical t klstrurnentatlon rrralhrnc6on Fad"~r rrrairuenartce High amblerK iemporaxures. et Ottler (TB.~) Gas tr~ system overpressure X Other: PtOOess module startup and badtinp CPF1Ftow Statbn ova Func7iorrel Check Out. Intenrtinertt F~oceoeive / insulficielN inlet gas ~ for a total of 33 mirrs. rates trMO faddy '-~ page 2 of 8 _ _ i B. Aotlor- Yaresrt fo Eflrrtlnate Luse and Provent Rawrreaca: (Clrack and deacn"ba acs applioablo) Started / restarted T/C # StabrTmed sat~ly Prooe~s and trarrpressor / trait- dePad R ~ od equtpmant d Reduosd / irra'aased inlet gas rates Facilky maintenance completed Camplated Dare tesfarg Carteded t:dd Audu2tioft / failure X Other. Startup FCO completed for the Corrected Eakl flutsrtation / fatlme dav. . at ocher faralMy tTd.D) ~rcK Srrrolet ' bid incitfenr cease Wacit smotro? Yes: No: 0 (If Yes. cot~tinus w~tl tti's ssetlon) Did incident pn99ent a polenaal prrear to twrttan heaBh or safety? Yes: tdo: Y to FEC with ~4 Irorrrs. as swon as iWa. K ~ ADEC (tt es, report goes No. report I amen rrrarrlrer and Biackarrolca enrttee from souroe: ( tag daswiplion) Natifled ADEC by Faxon: oale• rene• Report the following information sp ADEC within ?rt t1wN'at3Y FAX (9D7~79tt6): Date and lane of black 4rrroio9 ewsrlt: Front To: ~ Vohmo flared which generated Wadt srnoka {rf ddfererrt from above): MSCF BBLS j Description of steps m miniria~e embarorrs: See Seehlon B. above. f Type of rrmterials burned: (lean NtaLs` Otttar. f t&erreral VYealher. Alf Terrlperafure: wnd 3peed-Direction: Name and phone tpunber ai person makwg the report: I Name Phone No. Based on infonrration and barrel tomrad slier reasonable inerrify.l h that tree sta2srrlards and intorrrraoon in-and salacr>ad to aria doaar,en- ar,e tnrre, aowrafe attd oomplsfo. RECEIVE D ra~uw- St~orvleor Dre• eoc sr,perri~r,Pees (care gasand t~arrrowa r-dderds) N O V 2 i ?000 Field t3arirartrrrerdal comptiatroe Coord<rators, aR6 7 (Black smoke accidents ongr) PBIVGPMA Field Mana9el'9. (Blade stnaee inoklerds only) GPMA Operations Engineering Todmical Aide. (GPMA reports crdlr - ATO 477) Alaska Oil 8 Gas Cons. Commission Kup•ucdc Field Envkorrrnerrtal CortrpYar~ Coordinators, NSK Bt (flare ~ and Walt snroks incidents) ~ • Oct-19-00 10:54 From-PRB OPERATIONS 90T-659-5061 T-265 P.06/12 F-660 ~~_~ ~ ~ , _ FLARE QAS v~iTMG REPORT PNl1.UPS ALAS INC. • PgUDHOE BAY/GPMAMUPpgUIC FAatJT11: _ ~ : ttrt: ; PHtI~ N0. '.9AT~%AAD2 - • " "~ ~ ~ GAS DISPOSiT10~1 Data of Occurrence: 10/16/00 Qflue ion Trrtre of Oea:rrence: (~~YY) {Check Selacrron) ~o Frortx 06:44 To: 09A5 = 00:01 Total Volume Flared: 207 MSCF BBLS From 08:07 To: 098 = 001 From: 10:02 To: 10:05 - OOa79 Meter Na.:••' ' • {i21. It . I 0 Ovnor.Mea From 70:2.9 To: to:24 = 00:01 (Check SeKexion) From: 11:12 To: 71:18 = 001 From 19:71 To: 78:12 - 00:07 Total Minutes Flar~otl: = 008 (1.isbume Crt~ - Gds Jidred was ¢+ornp 0 (ttfecK One) (krdudae vokrrrra tldrmd wide: gsnoratsd biagt snrofce, of 7FG ooruacxarmeter~lPCJ ~-a~~-A1 0. Description oT InClrlorlt and Causes. (Chedt as many as neetlod m tally dsstxibe the itrclderrt SID TIC# for Process upset in TiC SD due to hi~r e:ofaust temperature section of fartifAy seal W syatam e~na,alas 1~rirg for drdlsice etrutcbvrn / startup EMERGB~CY SHUTDOWN Rare system tam l3etlrlcal 1 Irrstnunerriagion rrreHarction Faulty stwtdown on Electrical / hrarurtr9ntation malfunction Fac5lty rnairrterEarroe High ambient temperatwes. N other taoddy tT~ Gas lrarrsit system overpreestue X Other: Process rrrodule stmuro arrd ekiddnp CPFiAow Slatlon out Funa'ronat Chetlc ore. lrrtenr4ltem Etooessiw! ireM irrfet gas 1larirrg far a total of 20 rms. iete6:MMo carte 1 of 3 B. Action Taken to EGminsts Cayce and Pnwnt Recurronce: (Check and describe .o appOOablo) Started /restarted 7!C ii 3tabr7ized facEity process afld Operd110t1 trawl eepressuree Repexed equipment diQaalies Red~xead / increased inlet gas rates whir Completed dare tearing tnaiiarertance conrpletert Correaed E81 fluctuation / taBtrs X Other: Startup FOO r:omplated for the Corrected E.BJ lauauraion / tailrrre dav. at other fadtlry (1'd~D) D•rd inraUent Cauca t>tactt snlolre? Yes: No: D (tf Yes, CorNkNle wRh 1hlS section) Did irtident present a polerMial thredf to fkurran health of Safety? Yefi No: pf roe, roport to FEC as soon as possibb. ff No, roport /o AAA rl1tl124 hourr. Blade srndoe en~tart frvrrr sourom teller tag tMrlrlbar and des<xlption) Notined ADEC by Faxon: Data• 'lima: Report rho lodowin9 krtormation Eo ADEC within 24 C~-~78oe): pace and time of 1rladt sorolae errerrt: From: To: VoNsrre ilaretl whits generated trtadt srtglt9 Cd dr(fererq frtxn above): MSCF BBLS pescrlption of steps to rrinYnize em~ssiorrs: See Seaton B. wdova. Type of mffierials bumect Gas: NCisr Ottrar: Gerrard! vVeaahar: 1 \m ~~~ wma speea+pirecron: Name and phone number of person Name Ptrone No. tsasee on mtortrrarron era oeaer ttquay. l ceruty true the aatemants arw mtornraaon m ana aeacnea I \ L ( ~ ~ v L.. document are true. aowrale and L <J ~- Dam jc-_ ~a'~° NOV 2 l 2000 ~ EOC Supervisor. B 6 (tears gas ante blaedt srrrolce Frolderrls) Feld Envh Coertfinators, PRB 7 lBiack Smoece irrraaorrts only) PBWC,PMA {eladtsrrrotae inaderas only) Alaska Oil & Gas Cons. Commission GPfdA Tedxricsl Aide. tGPMA reports ony - ATO 4Th Anchorage tcttpanac Flea 1 CornlrFarroe coordrtators, NSK 01 (oars gas and btaClC snrdre irrGderNS) • Oct-19-00 10:55. From-PILE OPERATIONS 90T-659-5061 T-265 P.OT/12 F-660 FLARE GAS VBif~IC. REPORT i i PMLLIPS AU-SKA, INC - PRUD}i0E BAY/GPhAAACUPARIflf ; FACMY: : 33K."........ PERYfT N0: :9AT~A110Q6 GAS DISPOSlT10N Date of Occruratsca~ 1t)/'16~b0 O Fwe (wmt Tiara efOetumente: I (rrlnr-dNyir) ( Seledionl 00:00 Minutes I Fr 181 To• 1f1;~2 - 00^01 Total Volume Flateek 207 MSCF BBi.S tNetw;NO.:.•. ~ •.~1:••: f'alal Bpaube pl,npa,~a (Ctleck SelegioTr) om From: 18:19 To: 18:50 - 001 From: 19.'0 To: 192 = 002 From 194 Ta. 1915 ~ 001 Frain: 19:43 To: 18-.44 - 00:01 Fran 203 To: 206 . 009 Tonl flilnutos Flared: _ 008 (Lisbema onp~ - c~ Bared »~ f-~rr0 &] a~e>m (Cbscironrj ( voGrme Bald rvltich gertertued bferlcartrorre, of TEG cov~ctor meterai LPC) i1 appBaablej A. DescHptfon of Mefdent and Luse: {Check as many as treaded ~ tumor describe tlra inoldenl S/O TliCrt for Process upset rr T/C SD due Dv hi9t1 iardTdtgSt oemQaratrue section of f Seal 09 system Fkltirlg for drr~le sfwwowrr / stararp EMERGENCY SHlfl'QOVYM Flare systemtes6rg Electrical / irretnrrTlerTta6on malfunction Faumy shuteiawn on Ekrgrical ! grstrunrerrtaficxl rf~lhxrcaal Fat~l'py maintenance • amulant temperatures. at ottrar tacd'dy (fitD) '' Gas transit system overpressla~e X Ottler: Process module staraw and. baddng CPFJI•loar Station out Fund'ICrt'al C:fret:K Chet. IflterrTMllent Excessive l inroltAdent kMat gas flaring for a total of 20 rms. tames into taciliyr rata 2 of 3 8. Jlctiwn Taken to f3mttseme Cause and Pretest Recurrence: {CNOOk arw daserlba as applkabta) Started / restarted TIC 9 Stabr~ed TacBity prooaes and operation Co-rlpressor / train deptes6lrred Repaired equlprrterlt difbatltles Reduced / krcreased irlfat sae taros v~ CorTrpletetl ttar6 tebtir-g Facr'6ly rtraintenarlce con~leted Carretxed E&1 ihtcttt~ort J faikrre _ X f7ltler: Startup FCO onrnptemeti for the _ Corrected EdJ 9rx:a:alion l fairrre t~'- at abet facRtY (Tff~ Blatt srneloa Aitl "alcida0l cause bledc smotm? Yes: No: ® (!f Yes. continua tTrimtt th's sec4ion) Did incident present a potential thream to tarrtrnl tleaflh or safety? Yes: No: pf Yea, report m FEC as Boor, as possible tf nto, sport m ADEC with z4 hours Black smoke emitted from source: (enter tai nrxr>tier aoa msraipdon) Notified ADEC ~ Fax on: Dame: Time: Report ttta follaNing krRomutfon m C wlgrirl tt4 AoursHY FAX {9077508): Date and time of blade arrroke event: Front: To: Vokrme flared whidl ganeraterf tNadc smolm W ef~erarri from above): tutSCF SSLS DeSiaiptiorl of 91aps W rmirli:e enrisWOns Sea Sactiorr far apors. Type d matefgls puroed: Gas:. NC>!~ tither: General Weather: Air Tenlpera36trre: YvirTd Speedfpiedion: Name and phone number of perm nrtak4r0 the rapoK: Name f'tane No. tf3SeO Oft InTOrm81rOr1 ana beaBT rorrrraO attar r+easonebre nglary, 1 t:erury II~ me s18o<errraras erro mTtJrrTl®Orl Tn arrv :mr~reu av ues document are true. amaxame and wnrplete. Fawrty Supervisor Da~o tx^ EOC Supervisor. PRB 8 (flare gas and black smoloa arcidargs) Feld Ptrvironrrrerrial Gomprlarroa Coortfr:atora• PRB 7 (81ad: Smolm krclderks ony) PBwQPMA Field Manapars, (elsda rerrplm inctdar116 oMy) GPMa Operations Eng'noefng Todxrk:at Aide. (GfaMA reports ony - ATO 477) Kt>pattAc: Raid Envirortrtterrtal GotrlpGatlce C.oordnporfs. NSK 61 (flare f#'a ~ Oladt strloKe Via) RECEIVED NOV 2 i X000 Alaska flit & Gas Cons. Commission. ' Oct-19-00 10:55 From-PRB OPERATIONS 907-659-5061 T-265. P.08/12 F-660 .. - FLARE GAS VENTWG REPORT . • PWt11PS ALASKA, MIC. • PRUDHOE BAY/GPeItAIKUPARUK FI-taUrY: •`t,P4 PERtiIRNQ .. QA7ffi-KJ10~5' . S DISPOSITION Date of Ooatarence: 10/16Itt0 ©taare ~~ (~~yY) (Check Selection) Total Yoltame Flared: 207 MSCF f361S Weter•Nor •'ffif • 8 F OPtaNNK4 C)enP~~ (Crack Selection) (tisDurm7 Orly -Gas IIarad taws 6amL7 ECI ( ~r+aJ d 71:G ocrrractorrrreterat I.PiC) Time of Occurrence: 000 From 207 Tot 200 OOHS From: Ta 000 From To: = 000 From: To: = 000 ' From: To: - 000 i From: 70: - - aoao ~_ Total lrGrtutaa farad: 00:03 (Nxaludbs va~hone !farad ~ gene~etlbladtarrnrolaa !f app6cabla} A. peecriptian of InckJertt and Cauca: (Chxk as many ae hooded b t~lY deecriba fbe M'roldant SdD Tfi~f for Process upset in TJ~C SD due ro high eodttlirst tsrrlparatura section of Y Seat Oi 6YWern ~ Rarift9 ~ drlNsite staBdown / startup EM~lGf7~CY SttllTD0lftltJ tie system testing Eletarical J Ylstnrrrtaritation fr181hRlction r-aony biradoti-a ~ Elearical / Irtatristterttation malluridior- FaaTiry mainrertattoe _ F~t arnblent temperatisres. at atfter facTitY (Tt~ Cos trarisp system overpra~ura X Process modals stardlp and t-atdtitip CPFrFIorlr Statist out - Fimetiorel Check Out kMerrrwdont EStceeslt-e / irisul6derit irdet gas flartna for a total of 20 Inlns rates into laciity t)a99 3 of 3 S. Moon Taken to ENmlrota Catase and Prevent Rowrrerwe: (Check and descry as appgeat>te) i Started 1 restarted T/C 5 Stabt'Ccted aria opera>fon E Corrlpre9sor / trams dapresetired H9p8i-Ad 6Ql~IrIBrN dd(GIkIBS i Reek~cad J increased knew gas rates wtm Comptated flare» Y ~r~ Corrected f:.al >luctuatibn / falkire X 4tltet: 3tartw FCt7 corrpleled for the Corrected EdJ tluautrtiort / failure day. ~ other faa7at- (T1T~D1 • t -Braok_Sm211e Did incidarit came Mach smoloe? Yes: No: IB (If Yes. continua viddh this section) Did 'riciderit present a pderpiel throat to ttimimt ltealUi or 9afetlr! - Yes Nix (If Yee. -eport to FEC ae soon ns poaslWa K tHe, trport b ADEC vniBt 24 6touro. Blade srrwke emirted from sotmoo: (ewer tag raanber and descx46ixt) Nati6ed AOEC by Fact tint [Jere: Trne: Report ills following irtforrrtatlart b ADEC thin 2a noarsB~~( (tf07.2s8.750!): . Date and fame of blast snidaa event: Franc To: Vohmta Bared whicdt 9erterated black srrglre (rf ddlerertt Iron1 above): M SCF BBL3 Descripaiort of steps to rrimirime enrssaris: See Section 8, above. Type of materials burned: Cias NGLS: aftter: General Weather: Air Temperature: Wind SpeedrDirection: Name and phone rturnber of person trtaltit9 the report: ! _ ~ Name Phone No. i Based on intartitation and beFe ~ fo r reaaonaDio inquiry, i certly ihffi the staterrterus and inforrrimion in and attaGted to flits doearrrtern are true. aota,rate a~ co let d , b y FaalltY sups.visor t7a~e 1 l ar S PRB a {flare gas and black antoke irttaderRS) Fuld Compfiartoe Coony'rtators. PtaB 7 (Blade Sntolae p-dderr<s ardy) Pi3ta/CiPMA Feld Managers, ( smoke inciderres only) GPl~1A Opetatlons Eng'neerin9 Tedirtic~sl Aide. (GPMA reports tiny - AT~D 4T7) Kt>partrft; Field Emiuonrneraal Compliance Coordrtaror&, NSK 6'l (ilana QaS and bMatsc smoke Indoertts} - -- - ~ - -- RECEIVED NOV 2 ~ ?.nn0 Alaska Oil & Gas Cons. Commission Anchora9t; • Oct-19-00 10:53 From-PRB OPERATIONS 90T-659-5061 T-265 P.04/12 F-660 _ FLJIRE GAS Vt~1'1"ING REPORT PHILLIPS ALASKA, INC. • P>;uOHOE BAY/GPMAACUPARUK FAI'.It111F. ~ c'i!'KK'ic : .. PERMR N0. .. . ~': flJi7f~llltdlS . •' rAS utsposmoa Date orooarrertoo: 1On7100 B r~.re 0~ Tltt~of om,renae: (mNddyy) {ChecK selectron) oo:oo ~llpf~ •Totat Volume Bared: s12 MSCF f38LS Fiorrt From: 78.bf To: 19:03 00:02 198 To: 1a~0 . 002 taetRr se'27E: .• B F 1 BPlamwd ~uno~al Ftarrr: Fronx 18 v7 To: fs:~ OOfl2 ts^!B To: 15:40 ~. OOb2 (Check Setednn) From: 180 Yo: 161 ~ 007 From: 1Be67 To: 17:08 ~ 00:06 Toth Ytnutee Flared: _ 00:15 ..os~ (t.isburrx+ Orrty- Gas >ta~ was >roa~ uvraeem 0downmedm (Chaclt Gnaj (bx~ss volume flared which generated snnrce of 7EG aanractormarer av Lf'CJ ~~~ , A. Deacrtptfon of Inotdent and Cause; (Check as many as rreedaa fs tally desulbe the irecidorq S!D TICII for p ~l in _,,.,,,,,,_, T1C t3D due to high euthatrst terrper~Wre seAion of Y Seal oa system ~ FladraA for driflslte stugdonm /startup ~„ EMER(iENC1f 3NU1"DOVIfld Flare system testatg _~_ Elsreficat 1 InstrumerNation rrralfrtrrgion Faulty shtadown on ElecNical / hsaurttetflaport trtdltundion f~ty rnaintanalloe Righ ambiaM temporaLp~as. at otfrer kidl'iq- (Td~R) Gas Uansit ~~ X OUier: PrCCass mnase srarGrP and baddrre CPF1Row Station om Functional Check Out. traermittent Ezoessive / nsrrlficient inlet g~ flarln~tor a total of 22 miss. rates. irMO sacihly paste t of 2 8. Aotlon Taken to f7iminats Cause and Prevent Raxtrrence: (Chock and aesorlbo as applfcsbb) ___ Started / restarted T/C d S,abOizetl fac~ty fXOCess and operation C~Presaor J train degressureq Repaked equiprrrent d~CUpiea ~_ Reduce0 / k+creaaed ir>Im gas rates y~ Corrrpleted hale tastnl6 FaaTgr mai~rtenanpa Completed _,_ Corrected EdJ fluGUation / laiure x Other:. StaAuP FCO oomplatad fix the Corroded EdJ fkrduamlop / fd4trre dav. _,_,_,_ at Other r(Td~D) ~ BIaeY Smoke Did inadartl ~ hragt smoire? Yes: No: ® (B Yes, oordirare wdh this sactlory Did fnadent prsserrt a paeraiat tlxoat to human health or safety? Yes: No: Qf Yea, report to FEC as soon ao posslWa K No. ropoR >p ADEC with Z4 troara. Black srrrolse emitted from source: (enter tag nrmihar and descriptiort) Naaified ADEC by Faa on: faata: rune: ReP~ ~ following irrformstfon to ADEC within 24 tlouraBY FAX (907,ZB9•Tt~ Date and fame of eladc spaloa everm: Front To: Valu-ne flared which generated black smoke fd diperent bom ahara): MSCF BBLS Description of steps to minkrima ernissiort~ SaWon B. abvvs, Type of materials homed: Gas PIGLs: Ong; General Weather: T re: wr+tl speetl-Dirediort Name and pitons rwmbsr of persat 1rg 1 ` _ N~ t'tane No. on bn antl betlef atgtuy, I certify that ttte tsatemetrts and ir110rrrfatiort in agtl to mis dOCLRrIBrR ale tr11e, aCCYra'le dnd ~ a~ A. f ~, I FaoligrSuparvis°r forte jU-(8-00 cC EOC S , PRB B (Nate gas and black smoke inddents) Field E Compliance Coo-drwlorZ;, f'!~ 7 lQladc Smolm krcldanta arty) P6tuGPMA lBladc srnolaa inadents any) GSA ~ Ergineervtg TeeArtical Aitle, (GPtwt reports orNy . ATO 477 Kupardc Fuld ~1 Compliance Coordrrators. NSK 61 tflar~e gds artd blddC Smoke irfdderrts) RECEIVED NOV. 2 ?000 Alaska Oil & Gas Cons. Corttmission Anchorage 4 1 1 I i I 1 Oct-19-00 10:54 From-PRB OPERATIONS 907-659-5061 T-265 P.05/12 F-660 FLARE GAS VENTING REPORT • PHILLIPS ALASKA, INC. • PRU~HOE SAYIGPMAIKUPARIiK FAGUiY: : •:• •: i•,pC c .: > ~ P~ifAf N0. ~ `sA73:AA0R9 GAS DISPOSR'ION t)ate of Oecurronoo: 10/17/n0 QFtare Ova,r Time of Ocarrrenco: (mrvddryy) (Check Seteaian) ~ > Frwsz 18:06 T0: t8~6 t)o:Ot Tout Volume Flared: S12 MSCF f3Bl.S 1-rorrt 18::17 To: 18:48 = 00:06 From: To: - 00:00 IaatsT o:. • •. •s t3@t -•.• s •F ~+ olarorad ~unWanaO From To: - t10~0 (Check Seteaion) Frorrc To• = 000 • Front To: .' 000 Total Mutates bared: (L>sbume ~Y -Gas b'arsd eras lrorr~ upaaeam ~,{]do~neam (Cr:eck One) (Includes volume kiarsd Mrit:h Se»erated DJadc smak~. o/7EG oaoxaaar•meterffi i-~ ~1 A. Description of lrrctdertt and Cause: (Check as many as needed to fupy deeaibe the incident SID TICi for process upset in TIC Sd due to nlgn maraust temperature eedNior- of taffy Seal od system difbrallties F7ering for d'n7site slrutdowrt / ~rtup EM~tGENCY StillTDOWN F~dre ~rstemtestirrg Electrical / hsaumargador: rrlaltund'a4 Pettily shutdown on taacpricat / krstnur:entatlon mathtnction Fac~gr rrraiMenance ~ a ~• at other ~Y (T~) f3as transit system overpte~ura X Qatar: f~rocess module stardtp acrd ~0 CPF/Fbw Station out Funatonal Check Out Intarnatant Etrce6Ri+re / Nt~ttPiCiAQt 4MBR gas baring for a total d 22 mils. _ -- __ tares uqo fap'liy t-aAa 2 of 2 $. Ao1lorl Taksrt to Eliminate Cause and Prevartt Recurrence: (Check acrd deectide as applloable) • Started! restarted TIC. • StiabrTized faa7irq prowls and operation Compressor/train deptessured Repaired aquipmsru dies Reduoad / inwed5atl inlet gas rates with Completed flats tasting Faa'lity rrrairttanartoe oompletae Correded EdJ puduatiott / fddure - X Otttar. Startup F{:O completed for the Corrected El.1 fuduation / faiure dsv. ar abet y f r~ i Blast smote -- - Old ktclderu otutseblack smoke? Yes: t8o: 1~ (If Yes,. ooNtnue with this sectlon) pid incident present a potenUat ttraar to tnrrrwt heath or safety? Yes: No: pf Yoe. tt3port to FEC as soon as posa+'ble. >< No, report >n ADt~ with 2a hours. Btadc smoke emNted from source: {erNer tae number and de6aip6at) Plotibed ADEC by FaoCOn: Date: Tlrrta• Report the folbwing infottrattion to ADEC within Z4 hptrraBY FAX (9t17~2ti9.7508): .Date and tirna d black srnok~e event: fYOm: To= Volume fla-ed wltit:h generated blade stroke fd diQererR from above): MSC.F BBt.S DascrlpCbn of steps m rrrrtYNze err~aiotrs: See Section B. above. Type of rnffierials homed (ias; NGL~ Cl11ar. General tlYeatAaG Air Temperature: Wind 3pesdlDirection: Marne and phone number d parson malting the report; Marne Phone No. Based on irtforrnason and begaf formed after reasonable inquay. I oertily tltdt the statenvanis and alronr-ation in arts •"'°~`^' to ttt doGtrfrtertt dre true. acattaae ar10 oortp>leta FacNl>S- Suporvtoor Dam ~ EOC Supervisor. PRB 6 Glare ya5 and t>fadt smoke krdder~l Reid ErnrirorKnantit CompGanw Coordrtatora, PRB 7 (Blttdt Smotae incidents attly) PBWGPMA Feld bMnager5, (Blade smolae incidents ~ GPMA Operations Engineerutg Todmical Aida. (GPMA reports ordy - ATO ~ Kupan,Ic Field Err,lrororrerdal Comp~nce Coordnators, IJStC 81 (bare gas and blade smoke irtddartts? • RECEfVED NO V 2 1 ?~00 Alaska Oil & Gas Cons.. Commission Anchorage 10-26-00 07:43 From-E~ 9076595917 T-959 P.02/02` F-164 . ~ FLARE tsl~ NEtiTNiG REPORT euu r roc e~ aer[e_ Itdc . PR1]flHeE 80VlGPIAAIKUPARi1K FAC11JTr: LPc pERMR tto. aATS~s Dam ofi p~cprrenro: 10124100 QEPro OWnt Tir11e oT Ooefrrr~ee: From M:lO To: 214 = Total Volrm+e Flared: 108 MSCF eBLS Frain: T0. p0~t1 .. - To: Feonc - ~ ~ Fee{ ova our t4eo.r 62s ~...- -• 0 0~ FrerrC _„~ To: a (CnecK Seleaton) From: T~ = O0'~ """_ To: ~ _ From; Total Mwnutes prod: (Usbwna Onb - L+a& flared was trork7~ odawns~+ (Cheer Qna7 ftne-~des volwne eared wt+loh gerre-~ed bluer woe. Af Tl"G enrrtaca~rmster~LPC) ~1 A. Deeatptton of 1rreWene sad Caueo: as many as needed to IYdty dbscrrlfr+ ttra 81D TICi - tar ~ TIC 8D due tv ItiBh axhsusc d Sea{ Op system drtba~l6ee for tlrlpshe shubdvwn Flaro > sic - ~seel~ I Ic sa<pnm~den tnallurKOO~ X - Faulgr stwmdoWn oR 18W STVRP TIC ~- >aeealcai / haatirr~tation ntalturreZion ~_ Fael6QY ~ Ffigh amblenc terhpOraalraS. ~~ Cis t sYsteln ~_ bada~ CPF1FIow Sprdon out ~ _i , E7oC665iYa 14mdRQent_iNe{ Bas ~..-,..~. rata6 info 1 ~. Acelon Taksa !o E{IrMrrale t~s+ aM Pravsnt i0ocm*aneo: (Chock end aoeoriba as appllea6M) Starla0 77Clt801 STV/lP ~ 5tab{~ed taal~r proaas pnd operadotr _~ ~ ~ C, I Irefrt d Repalrsd oquiPmant _ ' Reduoad ! Inaeesed kNet gas rates ~ r~idt _ ~ -rte Hare Fsa7~1 n1a Isnancs e.OmpleleP ConeCtod E81 ducaia6orl / fad i ~~ ~ • Cow E818ucoadion / ~~ at o~ftar t1te18ty (rdd~ Did IndtlBn< cause bleak altu~kc9 Yes: tdoc © {If Yes. mrffirsro w>m thie p6d ir~leerrt prsaent a poteeutal thraK to hvnrari haaMh or ss~ Y05: Nc: pFYea. raportm FBC as soon as possr'ble. N [~, eraPore m AAEt wr~b 2t Hours.) Blest smolr~ amkted tYan sourrxr (~ ~g ~~' anb IVo13Aed Ap>:C by Faxon: Cato: TrrrnX ts.peR the hltowing Info~ratlon tya nQEC wiodn ~ hours . , FAX t807~780~ Dace and tlrraw oR back smoke everrr Fran: To: Volume oral wtaa+ generated sn~e qt dt{terent tram aha+ier ___,_^_ > ' Do.eripaon of stps to enlednwze ernissior~ s.o see~on s. aaow. arr~ or~are: _,~,~ v"~rou~ ano phone number of paraen metdng the. report: ~o ,~arrre RaSe~l Orl lnrormation and Herter ttxfnea resso~atue uay- ~ aer~y erar me ~wwnerws acq m~rmaww~ w~ wrw. onw»rv..... -~ doGarlOrlt aro we, at>a FacifHy Sapetrisvr Dote Su 'sar. PR M 9~ snd bledtsnwla {rrdderas) Fleld t?rl 1 Oompianee CoD1d{nas0t5, PRB 7 [d>~ Smoke blddOrl~ onb) PBLYtPMA Field Alms, ~ snake intadents olwyl ~PMA pperadans Errgnrecring Technksl AAt0. (C3PAAA roparts only - ATQ siT) Fle1tl Enwonntenta{ ~ t~ordinawrs, NS1(61(IIaR yes and blame emoks ineidenrs~ _ _ -- -- Nov. ~ i zooo Alaska Oil ~ Gas Cons. Carwnission •~1~~~~ Oct-31-00 13:30 From-PRB OPERATI~IS 90T-659-5061 T-Z94 P.02/02 F-T33 FLARE faAS VENTING REPORT ~a.ce iuc . Pr2ll~FiOE BAY-GPI FAGLITY: 13~C pEt~iT NO, 9A7S.AAOYS Pam of Occurr~oe: 10-90J00 OFaie Qven~ (mrtrldd/yy) (Check Selecti0rt) Total Volume Flaretl: ~~ s' MSCF ~ sBLS Meter No.: 62x Fac ~ 1]tk (Check Selection) {1Jsbume OMy - Ges flared was fi~e;e~ Dd~eu~ ( ~7 of T'EG oontdcto~ meterat ~1 Trme of Occu rronca~ Mims From: 00:56 To: 01 ~1 = 00:07 Fran: 02e00 To: 0x01 = 00:01 From: 024 To: 04:48 = _00:04 From:. WIZ To: OS~4 _ 00:02 From: OSr:6 To: 037 ° O A7 From: 046 To: 04:57 = 00:09' Total MMutes Flarark = ~~ (IM'$Ides voka>te !?grad tivl-ir1+ 9 blaCrr snwke i<applicable) a Doscttptlon of Incident and Cause: (Check as many sa needed m fuly descntw the Process upset fn X S!D T/Cf 1890 for TIC SP due m hgh exhaust temperature F for dr9lsite stxdeorrn ~ startup ' ~r Seal O~ system ditfia~liss ^~ Tom- EMERGENCY SHLrrDO1M~ Flare testing X Elul / 1rlsfrtatrerMalfon rtratlunesiort Faulty shutdown ~ EleCric~ I Inabsrrtenta>ion malfunrllon Faowty mairtterwnos F9pn ambieht ~. at other fsaTilt {P&D) Gas transit syatBn+ ovetpressu-e backing CPF/Fivw Stattan otu Exeessiue - inau(Adent irdet eas rates lrtm faaliq- ~^ outer: sr 86 l83~ 04'C.GI~fI D .6r l.1+~1 UP ~ . lluy.,.~ro B. Actlon Takon to Elimiraso Canso ~ Pmvent Ra:urhncx (Check and desorit+o as applk;abtr) Started TIC (1801 SNAP Stabilized fadltty P and o~~ X Compressor / wain depressued ~ d'-tFc+~ Redut~d / htaeaaed ir11Et gas tastes ' wrtlt .~- Ca»P~ bate t~9 Fao'My nra~ettartoe completed corrected E61 flucnratiorr / fa0une ~ outer: ~ . wn. ~ SS Co+~ Pd &'tf v~ t. 83C C,/~/ ~ Corrected Edd fatrcwatlon 1 faiure ~ n.i 54"~+Il^ ~ , at other fadNd- R~ Old trrddeM cause biadc Sn-oke? Yes: No: ~ (If Yes. o0ndrttre wish this Dld inadent present a potemlal ttxeat to human health or safety? Yes: No: (If Yes, report to FEC as soon as posslbls. ff No. roport to ADEC wleh ?A trouts. ~ roxrreer and des~tptbn) Bfadc smoke emlm~ irvm souroe: Nollfied ADEC by Faxon: Date: Time' lispoK the totlowitrg irrtomuefon m ADl'sC wltl-itr ~ hows,~Y F1-X (907 268-75o8h Dare and tine; of hladc smoke evark From: To: Volume flares which gertarated tAack Smoke (d drfiereM tram above): MSCF ~~ Description of steps m rniNmae errrissioris: Ses Section B, above. Octet: Type of materials burned: Gas: Nps: y~ S General Weenier: /4r Turrperaktre' Name and pi+one taanbar of person maKing ute~eport phope No. I` /, Nip dorxrmaM are true. aCaraffi and Faclliq Supervisor Date--~ =~~ - os EOC 6 gas and black smoke irrcidertts) Field CAmpGanoe Coord'mators, PRB 7 (Black Smoke inddents otrty) PBIJIGPMA . (~~ arrrOKe kfCidem6 oM!-) ATO 477) GPMA Opera ohs irtesr'Mtg.TecMricsl Abe, (GPAAA nsporls only' F Compganos coorakrators. N.S1C 61 (tip gas and blade smoke inoiesrfls) C 1 \ NOV. 2 1 2000 Alaska Oil & Gas Cons. Comrnission Anchorage Nov-Ol-00 08:35 From-PRB OPERATIONS 907-659-5061 T-299 P.02/02 F-738 FLAR1= GAS VENTING REPORT ~s~ca_ rsrc. • PRI1DNOt= BAYIGPI FAgL17Y• ~C PERMIT NO. 9A73 IM14Z6 Date of Occurrence: 1tY31/W p~ (]ve~a (mrNddlyy) (Check Selection} Taal Volume Flared: 13 ~,~~ flNetet tdo.• 622 Fac ~ 0 (Check Seletdi011) (Usbume Only -Gas flared wee fion~7 I]downs~m (Check One) of 7'EG oo-uactor meter ai l.PA dime Occ urrence: ~°utas From: .10:05 To: 10:06 = 00:01 From: 1a:29 To: 14:51 = 00--02 From: 14-67 70: 14:68 _ fl0~1 From:. 15M7 To: 15:18 _ 00:01 _~- From: 70: ^, = OO:W From: ^~ To• ^_ ° 0p:0p~ Total M'mrrtes Flar+d: (lndudes volwne Bared which g6nerafed pleat srrtotaa. if appde:aDla) A. Oescriptlon of lnclderrt and Canso: (Clrack as many as needed to fugl- describe tho Indderrt) t i 510 TJCi for m - n Ptooess upse setalorr of fact Peratum TIC SD due to high exhaust te ~ ^- for d~lsite afaddorm! ~P Seal a8 System diffiudties ' ~ ~~ Flare aysb9m tesdttg iDOWN pdIERGF_NCY SHU ~ ^i --- Faulty shutdown on pecniua0 I Insmrrr-errtatwn matfurwtion lf ai -" - ~+- Faa'i1,r on rar i t f lrsstrtrfr~tatiorr ma " "~~. Wgh amdlent .~. at other tadCigt (TaD) "-i- X i~ .Other: 1830 MI com • Restart Gas ttanalt system overpressure attprrrP~S !-ack+ng CPF1Flaw Station out Exosasive 1 ~ k>fet 9es rates into faduy l3. Action Taken to Ellrrrinats Canso and Pretrertt Recurrence: (Chectc and describe as applicablo~~ and operation Started 7iC ('1801 STi/AP _--! ~~~ e9 d'dficvl6as x Compressor /train eepressured ~ wiUt Reduwd I irraedad inlet ~ tatea '- ^~! FaaTity nu~nanoe complemd Completed Hare tetaag Other Corroded Ebl flrxttartion / torture . Cgneated fbl flucRatbion / tarlrrre at ottrer fail (iSD) ~- Did incident cause blatlc smoke? Yes: fyo: ~l' (K Yes. oornirate wqh this section) Did incident peesent a Pow threat to humdtl treaNh or sated Yes: ~: (K Yas. report W FEC as soon as possible.. H No. report to ADEC with Zit hours.) Black smoke emided from sour+ee: (mbar tag number and description) Wotified ADEC by Faxon: Oaba: Tana: Report the toUowing Mfotreration to ADEC wltltin 24 hoors,~Y ~A~( (807~68.7508~ Date and time of black smoke event: From: To: gg~g volume flared wlricit 9eneraled black smoke {d elftererd from above): pescription of steps to minanot emissions: See Suction 8. above. ~-- Type of materials bunted: ~~ ~s:.~------ C~er+erai Weather. Air Temperature: ~~ VYrtrd Speed-Dbection._ Narr-t and phone rxAtieer of gersorr maKlrrg ilta amore ~16nte Pttorre No. A Baoeo an information. and hafief 1 docxnrrent ere true, acarrabe and FaNNty Suparvtsor txw Etx Supan Fiala F.nvira ~~ 1~YpdN1t: F 1 Dubs 1 "'~ 6 (Bate ~ atr0 t>mdc smoke irroidertls) C Coord'mators. PRB 7 3nroke irr~idents aNY) snegges, (Biadc smoke kx aty) ;11~ftf%J'redM11C81 Aldo. (GPNIA rOpoRO only `ATO 477) frotxrrental CompGarloe Coordirrstoes. N5K 61(flate gas and black smoke inCiderds) ._ ..~. r- . ~ ~ NOV. 2 1 ?no0 Alaska Oil & Gas Cons. Commission FLARE GAS VENTING REPORT 4RiCA_ ilit!< ~ PRUDi~iOE BAY/GPI FACILITY: ~ PERMIT NO_ sATd-,AA025 DaEe of Ouarreneo: 1on-~ dFrare pverr n~ oI Ocsurn-nca: (r„mrddlyy) ( seleabn) From: 08:16 To: 09:17 = 00:07 Totsl Volume Flared: 1310 MSCF BBLS From: 08:40 To: 08:41 = 00:01 FrOtrf: 08:54 To: 08•SS = 00:01 Moler tio.: 621 Fae Q' t+raeK4 QU"oderr~ From: 09:07 To: 09:OR = 00:01 ((rAeCk Selatlion) From:- 09:26 T0: 0®:30 = 00:02 from: 10:00 To: 10:02 = 00:02 Tola1 Mltrutob Flared: = 00:08 f[,i~sbwne Only-Gas tiered was fionf~+~e~+ QaeMneeee~n {Clradr Or-e) (Jrrdvdes vahm+e tta,ed whk:h garleret~ed black smoke. of 7EG contactor meter et tpC) ~ 1 /1. Dasufption o! Ineidorrt end Csuso: (Cheek as nany as naoded to fYlfy describe The Incident) StD T/(i9 for Procaas ~ to TIC 5D due tD high etdiaust temperatwe sedbn of iacYftr Sea! ~ yy~ dlfflot4ties Flarkrg for dr~ite ahutdw+n / starbtp EMERGENCY StflJTDO'fM~l Flare system te68rrg i?Jaetrieal 1 ~ ma>Rr~tion Fatdty sMrldwen On Ela~l ! ~ matAascuon FaaSgr ma~er> Hgh amblerd ~- at othsriad~r (T3G) Gas trar~slt system overyresstrre X Other: Process FOR module stmiup and baddng CPF/Flow Station oUt Furrctiarei Check Out. Mtarmkimtt ~ / ~ irMat gay Aarkr9 for a tatai of 7 hr and 22 mhnrtes. rates ir+to ism Page i of 4 B. Adfon Tsken to Elimirmte Cause sad Prevent Recurrence: (Check and. daBCribe as applkabk) Stacied /restarted TIC * Stablyzed fay prOOeGS and operation ~ C.ompressor /train daprassurad RePafred ea~Pmant dit6tarpies Reduced ! irrusased ldet gas rates +~ Fadldy maUdenanoe ownylebed Com(flstad flare testing Corrected f~ i>vr~0lfon / taiune X Otliet: StaAUp FCO oonipletad for the CoRaeied f:.3r I7aata!0 ~- al oCrer tam (Tab) Ofd indderd cause bled smoke? Yes: No: ~ (II Yes. corrtkKre wqh this sec4fon) Dfd ktcident present a Dotentiat threat to humar+ hee4h or safest Yes: Np: M Yoe. report to FEC as soon as poss~le. K N0. eepoK to ADEC with 24 hours.) Brack smoke emitted from sourr~: (eruar tag number and dewiption) Notified ADEC by Fax cn: Dale: Tkrle: Reportlf+s followin6 infonna8on to ADEC within u Irouta BY FAX (907,289.7508): Date end tiarre of ttfaCk smoke evanl; Frprrc To: vownre flsned whidi ganeratBd bhadc srrwke C4 diftar0rti from above): I~ l361.S Oescrlp~ of slaps to mirdmlze = 500. SOrtion 13. above. Type o(n~riels burned: GeS: Nf3ls: Olher. C,eneraf V1Meetlter. AIrTe>~eraf<rp: Wind ~' ' H-stere 9Htl pho<re fMYMat of person making the rflpOtC - Name Phone No. Based on infonrration and be0ef 70Rrled erler reasonaore arquuy, 1 carury IIla[ ure sraa;menrs env a~~r.~w.. ~+ mw. ano.-.a.. w ~.... doarrrrerd are b'tre. soCUrste and RECEIVED. Fsciiky suporvlsor ~ Dais a Z ~ Q oG Eoc superwaor. ~ s tare ~ and Marx amok. irrdderrta) N O U 2 1 2000 Field Environmerdal CompFsrxx Coordinators, PRB 7 (Black Smoke frxadaAs only) pgWGPMA f'iatd Managers, (Black smoke irrciderrt6 ~ GPitAF- pperations Engkreerkrg Teclrrrk:sl Aide, (CPiw- reports arty - ATO 477) Alaska Oil & Gas Cons. G~m~n ICupanrk: Field Envkararrerrtal Compflarroe Coord'r~stors, t~sic Bi (flare gas and. black srrwke r>ddarda) Anchorage 508-d l0'd 09£-1 1909-899-l08 SNOIltla3d0 gad~Id 8£~£l 00-£t-~N PHILLIPS FLARE GAS VENTING REPORT ~SKA. INC. • PRUDHOE BAYIGPI FACIU7Y_ Lt~G PEfuNIT NO. __ PARUK 8A73 ~-- bate of Oocurrencas 10/1PQ0 ~ ~re ^ vart (mmldd/yy) (Check Selection) Total Volume Ftared: 1340 MSCF BBLS Meter No.: 821 8 Faaltl Q ~~ ^ r (Check Seleetion) pJSburne Ordy. Gas fl~ was tray ^ upstreen O aormsba~m ichear Ons) of 7>:G conmdor rrraeer st t.PC) Tlnre of Ocat tcrer)ce~ 00:00 24:00 ! From: 10:15 To: 10:14 = 0011 From: 1oa3 to: 1thz.5 = 00:02 Frorrc 1231 To: 1239 = 00.01 From: 13sOtl To: ~ sus = From: 1331 To: 1330 = 00:09 From: u~o Ta tali = oooa Tots) Al1lrNrlos Flared: = 00:18 . {Includes volurrre flared whidl generated bi2Ck srrrolre, If eIDpII~1e) A. Dasrription of trrctdertt and Causes ICheck as many as seeded ~ tu0y desglbra the Incident, SID TlC1K ~ TIC SD due tD lrglt extrsusi temperature Sea) Od 3Y8tern d~IfiaNliaS EAIIERGEPICY SFiUTpOWw Eleariwt / inatrunrentation erettundlon t3aeUkai / ksab'usrer~tiori rnalkNletlon at other tatty f~ X oae transit syste+n v~erpreastae baCktne t:PF/Fbw Sisdon out F~oevahre ! iderd inlet gas • r~ Mdo tadkty B_ ACtlon Talren to Q~te Cause and Preveat Rscunones: (Cirecir sad desCTlbe as apptksbie? Started I resfer>ed TIC f Compressor / train depresSUrad Redtwed / krcreased inlet gas rates Completed flar~a Msdrtg COQ Elf ! faBure X Corrected EdJ ituduation / few at ottrer faa~itY (T~) Process ups~tkf season d fareaty Flaring for drlNslte iFt,ddowr- l starkrp F18re systelnlesGfg Fatii~r 21MItdOrnr m FedRtt+ ~ High arrrhient ~•~ vr't~reb'On Other: Process .FOR module startup an FtnteUonal Cttedc Out. Intermlttaett flarirt9 fof a toter of 1 ~ oriel 22 rrwattes. P 2pra 516bFiiad facUMr process and OperatiDn Repaired eA diMwlties vr1Ut Fad6ty rt>eNtQerlatrCe cornpiatad ~: g F<;p for the tstawc amw~e 1 Uid incdent caress t>l2dc smolae4 Yes: ^ No: 0 (N Yes, corrtirtue vrr't1t ttrls Saetiart) Did incident preserd a potential ttrreat to trthnan heaNh a salary? Yes: ^ No: ^ (K Yes. report to FEC as soon. as possible. ff N0. rsp~t to ADEC vrfth 24 hwrrs.) $18Ck smoke emrtled bbm source: •(errber tag rxhrtbar and desaiptioh) Notl6ed ADEC by Faxon: Date: Time: Report t9re folbwin9 trdOnnaOar to ADEC wNUn ?~ trorrrs BY FA-X (907,269-T~ Date and time Ot black smoke event. Frpn: To: Voktme flared wtndr generated blade smoke (it ddFerent irom above): MSCF BBIS Desexiptia+ of Steps to amfasiorls: see saetion s, above. f Type of materials tamed: Gas: NGLs: Otltsr; __ IMrnd ~'~ - Genera) Weather- Air Terr~Btt~e: Nerve and phone number of person ~ ~t ~e ~_ Name Based on irrformatiort end better famed after reasonable Inquiry. l ceriity that the statemerds and lrrku~tlon h and docrurrerrt are true. acaaste end - Faclli~y superviisor ~e N O V 2 1 2000 ~ o~ EOC Supervisor. PR8 8 (flare gas and blst~c smoke indderds) • Fk+Ild ErrvKOr~rrrerdai ~ ~• Pt26 7 (Black Smoke ktader>ss ot11y) Alaska Oil & Gas Cons: COmmi~ion PBU/GPAAA Field IJlar~r'b. (81aCh smoke incirler>ts ally)- Anchorage GPMA Operetia+s En9kxerkr9 Tedrricei Aids. (C~~ reports only - ATO 477) Kuperutc: Field F_rrvirorrrrrelttsl Conrpitarrce Cootdirrator6, NSK 61 (Hare gas errd laar9c awake in6dents) ...:..sue. e.....w.. c.r.wa,,.:.+1~n a .~. 508-d ll/ZO•d -09£-1 1909-659-108 SIIOIlYa3d0 9?Jd~o~d 8661 00-61-~cN FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. - PRUDHOE gAYlGPMA1KUPARUK FACILITY: I.PC PERfIAn' NQ. 9A73,AAOZS GAS DISPOSITION ~ Data of Qccurronce: 1011100 ~ Fete ^ vent Tittle of Occurn~nce: imnt/ddlyy) (t~leck Selediort) D0:00 24:00 fillnllt~ Front: 16:00 To: 161 = 00:01 Total Volume Flared: lsoo MSCF BBLS Fria: 15:1a To: 13:17 = oo:o, From: 1sN5 To•. 18M6 = OG:01 Mater N0.: 621 ( Facll ~ Plam~ ^ w+D~ From: 165 To: 167 = ~~ • (Check Selection) From: 16~Z To: 163 _ 00:01 From: 177 To: 17:28 = 00:01 Tool 11 Fhred: ~ 90:D7 e~~ ll,iatwn,a t7niy -Gab flared was Aom ^ uprAeea~ ~ dorrrmresn (Cnedr One) (tndude8 voltirtt9 fTarad Wh1Clr general9d bfadr SlnUlae, of TEG metel'a!l.PC) ~ ~~ 1-. DoscriDtfon of hcidant and Geusa: {Chselt ay many w treotlod m ~ descrNre the lrtcltlartt) SID T1Cit for Prppeas Ups9t in • T/C 5D due tD tdgh eft lamperetttre sacti0n of t9cJItY Seal od syslam ctftlr~es Flain6 for dANslte shutdown ~ stararp ~~ EMERGENCY SHIJTDdyVN Flare system teafinp peel / tiOh matNt>c8al Fattfyr ShtIRtOWn On (etertrkad / lnsfrumee~lon malha~on Fscdky makrtananoe ~ an~blerd ~ h st other facwty (T3~ v~rstion on htg Gss tnur6it m X pMter. Process FOR modttie startup and Dadck+g CPF/Flow Statlon out FUncSonal Ched~ t7Ut. Eve / k~stdrldent kiet gas flaring for a total of 1 to and 22 mintdes. rases Iruo Y Page 3 of d - - Acton Taken to HNminste causo and Prevent Recrmente: (Choek and deserlbe as apptleablai B . Started / rued t1C ~ Stat>oizod t~d>i<y proozes End oparatiort corrtpretsor / train depresstrred Repaired epulpment dilr~ttaes Reduced 1 increased lrtlet gas rates v~ Cvrnple>ad tlsre ~^9 Fec~- maklbenanoe cvn+Weled ~i Corroded F~1 flttdt~tion ! ia>>~ X ~_ OTher. Startup FCO cWnplebed fOrtfte Corroded E81 fktdtta0ort / taqure ~• at other facalfty (Trio) . ~ Black Smolr~ did indderd cause black amoke7 Yes: ^ No: 0 (If Yes, oontirnte vr7Ml this section). Did irxaderM present a potential threat to human h~Mh or safetyt Yee: ^ No: ^ (If Yes, report to FCC as soon as possible. if No, r4port m ADEC uriBl 24 houra.)~ ~ r~n+ber and desaiption) t3ladc smoke ena'lted from source: ( Notified ADEC by Fax OtY Date: Time: Roport the tollowing MioRrarlion b ADEt: vrNMin 24 hours B1f FAX. (so7 z6>~TSa81: Date and dme of black Smoke evenC From: To: Voktme flared whleh gener8fed blade smoke C+l dH(erant from above):.. MSCF BBLS DeSCriptbrt of steps t0 rnirdrnat : Sae Sectiod 8, abovo. ~- Type of materi6lS burned: t3as: WGLs: Other: General YYeather: Air Tertlperahae: lANld Speedlarediorc fVsrrle and phone number of person making the report: NetTre Phone No. t3ased on information and bekef formed after reasor~ble inquiry,) Certify that the statements and trltorrnation ;n and attadted to this docta>tErd are but:, eotxNabe and RECEIVE D Facility Supen-iSOr ~~ -~ ~ i=oc supervisor. Pas a tflare ~ and black smoke ~ N O V 2 1 2000 Field Envirorurrer>t~u c,o coordinators, PRS ~ ( smoke ~ Pt3tuGPMA Field Managers. (Blau smoke hlddenls oriy) I-TO 477) Alaska Oil & Gas Cons. Commission GPMA OPe ~9~m9 Tecirtical Aide. (t3PMA reports ony - Kuparuk: Field Fsv~rxnanfai COOrdklators. NSK tit (flare gas and black smoke incident-~1ChOrage 908-d` ll/60'd 096-1 1909-899-108 SI1011Ya3d0 ~Jd~~d ~• 8£~£t 00-Et-AON FLARE CAS VENTING REPORT PHILLIPS AIASICA, fNC. - PRUDHOE BAYIGPMAIKUPARUK f FACILITY: lPC PERNNT N0. 9A73-AA023 GAS DISPOSITION Date of Dccurrerrce: 10/1100 0 Flare ^ vet Time of Oeeurrenca: (mm/ddlyy) (Check Selection) 00:00. 24.'OD Mlnutee From; 17:43 To: 17:4{ = 00:01 Totai Volume Flared: 1340 MSCF BBLS From: 187 To: 19:06 = 00:59 From: 18:f7 To: 1s:1s = oao~ Meter Now b21 B Facil' Q Dlanaed ^ unDmnnea From: To: - (Ctrec4t Sele~dion) From: To• From: To: _ Tutai 1tNnubas Flared:` - 01:01 (L+sbe-me Only - ras Barad was from ^ upslrean ~ ao~+nsbee~e lGhec* Gal (Irrdudes volrm-e tls-ed whidr ge/>e,zaimd bladr arrfolae, orTEG rrreiarafLfrC) e7apPboabfe) A. oescrlption of Mddert and Cause: (Chock err; rnatry as needed to tuiiy deseMbe the kxidorrq Sf0 TlClt for Prow upset in T!C f5D dna to ~ exhaust temperaUvre saabn of tae~lbr seat on system dMfiarltiea Flaring toran~e sialtdovln ~ stamp EMERGENCY SHUTDOWN Flare yystern testlrg Electrir~l / kmtrrarrPhlatiOn nraitwr~on FauRy shutdown on E19Ctt5Cai f warn rrrelturrdion Farilky mairderaa~e ~ ambient at other tac7igr (Z'~ S1D on high v~raflon t,as t~'srrgM syalem aamreasuR X Other. Process rtwdule startup and ' badchlg CPF/Fbw Strrtbn out. Irrtenra'ttertt Functional Chock Out. Ex~ve ! U>.suekteru kflet gas flaring !or a total of 1 to and 22 mk-. - rates lib tacBty Pie a of a B. Aetlorl Taken to EBrrrirrate Cae6o antl ProwM Recur*enoe: (Check and dasulba as appllabie) . Started / restaffed T!C ff Stablt)zed Process arid operation Compressor / train depr+e6aured hePaired ~ dNRufMifrs Reduced ! ktereased inlets gas rates wNh Completed flare testing Facility mair~rtancs rArrapieted Corteded Ed,l tluduetion 1 taihlre X t7ttrer: Steftttp FOO oontpleted for the Conpded E&I fluctuation ! failure at other fsa'kty ('fSD) o~naw .~nrvnc Did irr04leM pose trlxk smoke? Yes: ^ No: ^' (N Ye6, Continue v~,ttr 1Ms sedkxt) Dld incident present a potenti~ thfeat to human hearth or seiety? Yes: ^ No: ^ (H Yea, report to FEC as soon fis possible. ff No, report to ADEC with 24 frwlrs.) 131adr smoke errMted Mora source: (ender tag number and description) Notified AREC by Faxon: Date: True: ttoport the tollowing Mfornration to ADEC within ?d hours Br FAX (807-359~75W): Date and time of Eladf smoke event From: To: Volume flared vvifich gerrerate0 blade smoke (1f drtfererQ from above): MSCF 6615 Df:scxiption of steps to mirsarrize errussions: Se0 Seoeiorr B, abllrve. Tyne Of 1nalertats boned' Gds: NGL E' Other: .'General Weattfet: Air Temperature: Wind SpeedlDiredion: Name and phone twrnber rtf person making the repoK: Name PhOr+e N0. f31tSe0 On mtorrrration and belief fOrrrf2o stir dorafrfrerlt are true, acafrate and complete. FaciNly suparvktor Data RECEIVED rx: EOC SuDeniisor. PRB ti (liana gas and black smoke irtpderrls) Field Eewirorxrterttal Compliance Coord'a+ators, ~ 7 caladt smoke inadertts only) N O V 2 1 2 0 0 PSIJ/GPMA Field Marragere, (lflddr smoke inrtiderds ony) . GPMA Operations X19 Tachrtiwl Aide. (GPMA reports only - AT0 47T) Ktrparuk: Field Errvironrlrental ConrpGartce Coordhfators, NSK 61 (flare gas and black StrtOke~~ Gas COfis. CAlfifrilSSI0t1 Anchorage enns- 508-d ll/ti0'd 09E-1 1905-899-lO8 SNOIlYa3d0 Odd-~~d 66~Et 00-81-^aN PHILLIPS FACtt.ITY: PERMIT NO. 9A73,AA025 FLARE SAS v~NtING REPORT ~SKA. INC. - PRUDHOE BAYlGPI LpC t)ate of Otxurrones: 1014100 D Flare ^ vent (m~NY) (Check 5electlon) ~~ Total VolumQ Flarod: ~~l' MSCF_.,/ BBLS Motsr No.: tiZ1 (B Facll L`1 r4m+e0 ~~ unD~ed (Check SelecSori) R.iaDtnnc OMy - Gsa ds-ed +vea hen D rvstrearn ~ eorrrrisesre (G,eck a») orTEG contactormettxattP~ .Time of Occurrenee• 00:00 24. Nli~gg From: 08dta T0: 08:05 = 00:01 From: 08:32 To: 08:34 - 00:02 Fmm: oess TO: oe~ - Doan From: ..09:14 To: 09:15 = 00:01 From: 1o:u To: 100 , = oo:os Frpm: 11:32 To: 11.1' = 00:01 Tolal IWnu~a Flartad: m 00:12 (1rtCiudes volume dared adre:alr gertaa(ed Wsdr srrlolse, if applicaeble) R. Deatriptfon or krcldont and Cause: (Cheek as many oB needed to luAy tletCfYta ih6 Iecitlanq SID T/C8 tOr TIC SD due m high e:areuat tetnperatrtre Seal off system EMSRC,Er~1CY SHtJ7'DO'WW t r xtswrrtarttatlar nrygnrt3lOn Eleddwl ~ trrstrranerr~tian meson at ethaeiaa'iy ftBD) Gas transit systenn overpressure X !> CPFit-low Station out E~ooe:atve / insuoldeM ~ 9~ rates u+ro & Action Taken>b Eitminata Cain and Prererrt Recurrerrre: (Check and dsstnbe as app6caWO) Started / tesiarted TlC ~ . Compressor /stain depresstrred Reduced / inaet>sed trdet gas rdt2b Completed flare tcstlrig Corrected X81 flucrisatiort ! ta9tsa X Cont3dad FBI tk~uation / taitre st othertaa'~1(T~a) Process upset M , section vt satyr FlrrrMrg irx drYlaNe ahiNtlo~lp / st81'k1p Flare systtan 1e:Ung Fealty stnneown on Fsdeb rn ~• SID an tt~tt vibration Outer. Process module startup and Functional Check OuG Mtemtittent Raring t'or a 1Ot9) or 68 rnirtt~s. Page 1 of 3 Stabbed fadAty prooess and operatiOrt f2epeired equlprnent difllatltias vrdh Fe~'it)r m0irttertartcs eorr>pleted Other. StauWp FCO oornptared tar the day. old htdderd cause black smoke? Yes: ~ No: 0 (If Yes. oontinue ve'lir this seCdOr+) pid tnddent present a poteritlal threat io humeri health ar Maley? Yes: ~ No: ^ (tf Yos. report to FEC trs soon as posslbt0. tf No, report to RDEC whir ?A hwrr8 81adc smoke arrdtted from source: (enter tag number and deecripdonj Notibed ADEC by Pax olY Date: Time: ttopoll the iollorWrg trdorrnation 1u ADEC vntnln 7R hours Q,~AX (807~69.7508r Date and time od black entpice event From: To: Volume flared which generated bladt smoke (rf diNerent from abotre): MSCF t39LS Description of steps to mirtirtpze enttesiorts: Soo Soetlon Br afxivt:. Type of materieb burned: Gas: NCsl.6' Other: Generalweather. Air Temperenlne: VYind SpeedlDirection: Name and phone manber of person Name Based on irrlormefon end beliell doctunertt ar+e true. emirate and Facr7'igT supenri6ar Dam iaa7-~' Phone No. RECEIVED ca Eoc ~m~ 6 (Ogre gas era seat tsrtotte irtClderds) N O U 2 1 ZOOM Field 1 Corrrptlartee Coord'atabrs. PRB 7 (81adt smoke inadet+ts o~ PBWGPMA Managers. (Bladt smoke inaderlb only) GPMA Operations Engineering 7eohrtK:p1 Aide. (GPMA reports ony - ATO 47>) Alaska Oil 8~ GaS CiOnS. Comm Wiparuk: F'retd Environmental Comp6anos Coordfnattxs, NSK 61 (Dare gas Artd blade tOrtOlce irrcidertts) Al1ChOfage .._ .r.. -.... .a n.. - - - •.n . e~.-....-...~ 508-d ll/90'd 056-1 1905-899-lO8 SNOIlYa3d0 9Z'ld-~~d 66t8t 00-E1-~oN - FLARE GAS VENTING REPORT PHILLIPS ALASKA INC. • PRUDHOE BAYIGPMA/KUPARUK FACILITY: LPC PERtY1R NO. 9A73-AA025 Date of Occurrence: 10l4N0 0 (hare ^ vent (mm,dd,yy) IChed{ Selection) 3 Total volume l fated: ~ t~ASCF agLs Muter No.: 627 (t3y Fadi ^ weraed U' Urpiarned (Check Selection) Tkne of Occuir_e,LC_e_ 00:00 2e. t From: 12-az To: 1z:z3 = o0:of Ftom- 12:39 TO: 12110 a 00:01 From: 13:13 To: 13:17 = 00:04 From: 16:00 Ta 142 - 00:02 From: 14:?6 To: f4~9 - ao:f a Flom: fa~+ Tote) 1arN To: rtas Fla 158 = ndc .00:12 0033 ~u~l,-„e ony- Gas sand was nvm ^ uv~ D dowceoearn ~ ~~ ~,nchldes volume nand which generated sear . d rF~ contadorn>Btar st tpcl d ~I a ooscrltl0on at roadel>t and Cause: t~k as marq- as noadod 10 ~ aexrtbe tale M~citl~ SID 7!(~ for rn sc due io t>igt, exhaust tempelahRe seal off system da9adi>m ErreER~sNCar stfuivaNN FJadrieaf I M~ ~ur~n Eaec~iral / trminxlt8nfa0on nglAsrCtlar at o9rer taetilgr (T6~ Gas trerlsrT system overpressure X tladrklp CPF1FIow Station out E~lot~:sl+/e r rls<rtedent lrll~ gas rates irdo far~gr 8. ACtron Taken to Ellndnato Luse sad Prevent Realtra11C0: idloek and dexrlbe os epptkaWv) Staffed ! testerted TIC ~ .Compressor / train depres9urpd Reduced / utGiaased ktlet gas rates - Conlpleted flare testing Corteded Earl 91x1uation ! tadue X Conacted E81 fluduati0n / taittre at other fac9lty (T8D) PlOeess upsd M eeralon of tatll'ih I for drt98,te +, startup Flare system taStYlg Faulq~ shutdown en N~ rslQ On high vlbratiorl Other. Praoess module startup and Furldlonal Check OuL Irrtennittarlt flaring for a total of 59 mlrn>ks. Page 2 0l 3 Statl~ized laa7ly pto0ess and oparaUon Repaired egtepnlerd ddT v,~h Fader rr>alarloe Completed Qther. Startup FCO wmpleted for the day. Did ir-odent cause glad{ smoke? Yes: ^ No: ~ (Ii Yes. conluxre whh this sedbn) Did indderd present a potential Uxeel to talrrfarl hetlat~lh a saiet)r? Yes: 0 No: ^ (lf Yos, report to FEC as soon as posstb~. tf /ry/ report to ADEC with 24 hour9_) t31ad{ smoke emlmad iron source: (enter tag number and desaipdott) Notified ADEC by Faxon: Hate: t++~e: Repoli the tofloaing Ndormation re AOt:C vrlthln 24 taws BY FAX_(907,Z69.7506): Datc and time of black smoke event From: To: Vohune flared wbid- generated black Smoke Iii ditkrerd from above): MSCF t3BLS besa`~tiorl of steps to a eatrsslats: sea Sat~Iott e. above. Type of materials txmled: cas: tv~.a: oe,er: General Yveadter Air Temperature: VNlrld SpeedlDiredion: Name and phone number of person making ~ report ~ Phone No. t ~ rrffOrnlatlOn g{1d ~~~ formed alter fieaSOnaDis ~U1ry~ 1 ~.raly {rte{ 07e b1~{erllens 3110 urlvrlllawrl a. P•N P.wa. ~.+ w u rte. aoaxrlent are true. accurate and complete. FacNity Supervisor Dab RECEIVE ~' ~ ~ Fi~ekl En ~c a ate. PRe 7 (m B~ ed smoke inadm+ts only) N O U 2 1 2000 - PBUIGPMA Fidd Managers, (Bleat smoke irtcidenb Ony) GPMA operstiorls EnOhle~i{{9 Tee~1 Aide, (GPWIA reports orYy - ATO a77) ka Oil & Gas Cons. Comm' Kuparuk: Field EnvuorwneMal Corllpl'wnoe Coardlnators. NSK 61(flarp gas and black smoke irtdd Anchorage 508-d ll/90'd 056-1 1905-699-t08 SNOIlYa3d0 told-~~d Oti~t;l 00-El-~oN - FLAIRE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHQE BAYIGPMA/KUPARUK FACILITY: LPC PERMIT NO. 9A73,AA025 GAS DISPOSITION Date of OeCUrrenee: `10/4100 ^ ~ ^ vent rune of OtCUrrencec (mmldd/YY) tCtteck Selection) 00'00 24a10 Mlrurbes From: 15~ To: 15;15 = OO:p7 7ota1 Volumo Ftared: 692.97 aASCF SBLS From: 16:50 To: 15-.52 = OO:oZ Prom: 16:14 To: 1s~6 c OO;i2 Meter No.: bzi B Faei! ^ Pleon110 ^ Urtdersred From: 16;41 T0: 16:41 = .00:03 (tic Selection) From To: Prom: To: Tatsi IlBratbea Flarl~ a 004 fLtsbrrn+e oiJh'-Gas Aarad was Ao-n C7 r~psbeam Q doMrnsaarn (G~ Onv) (Includes volu-rre dared lwjtiCtl ye»e>~d t>ladr s molos, otTEG oonrac~rmslarstLPC) ~ePP~ a. posatptlon of inclaerrtatw caustic t ti marry a6 naetletl M tuay doscttbQ the InNde~l1 SRf T1Ci for 1'r'ooess upset in t/C SD due tQ high exheu6t fernparaltre aec~iart ~ y Seel Oi dl6~CU1Z1e3 F'lsrkrg FOr dtdleMe siaddoMtt 1 startup EMERGErrCY SHifiD01111tt Fi1ue sYs~ teStMt9 FJeCUiCaI t ~urrrtydetfan rrmlhirrction Fatdbt aFrrlrlorrn art t3aelrteal - MsutrrereMatlpn rtmlarxilon Fee~gy maYrlenenoe tfiglt antbtalt tentp~glra. at o0+er ~ (T8D) SJD ~ ~ v ~rBbOn cas transit sysxm o~rerpre~re X Otlter: Process module Start up and bsddr~g CPF/Flew SYatlon out Furrctiortel Check out- Intermittent ©cossalve l hwMldent Met gas flaring roc a total of 69 mimes. nrtes kdo ma'Sgr ' Page 3 Of 3 - b. Action Taken to Elhrtinate Cause and Prevent RecrerarKe: (Check anr! Ooscefbe as app8pbk) Started ! teru~ted TIC * Stab~'¢ed isa'MtY proCe$s and opef'a~+ Compressor /train d Repaired equipnlerrl drfrioulties Reduced l increased irilat gas rats trl~h ~~~ flare FacrFty rtuenCe Completed Corrected Ebl fluduatbn / taetrre X Oltter. Slarttlp FCO comple ted far the Corrected E3l fluetttatlon / ta&lne ~• at other taaT1Y (T8~ Did inCidertt cause Mack smOke4 Yes: ^ No: ^ {N Yes, Continue udttt this aettiort) Did ktcidert preserd s Potat>bal threat to human tteeRh or seietir't Yes:. ^ No: ^ pf Yas, report to FEC a9 soon as porsslblo. H No, report bo ADEC with ze hotusj Black smoke er*atted irore somse: (erter isg rxurrbei' and daserlptlon) Notified ADEC by Fax on• Data: Tate: Report the Following infonnatlon to apEC wKhiri Z, hours QYE~f907.~6s-7608): Date and torte a+F bIBCk Smoke event: From To: Volume flared tNFtidt generated black 6mOke {I(ditlerert from above):: MSCF eBLS DesaipMon of steps to m+nim'rte emissions: See Suction B. above. Type of rrret2rtalB bte'ned: Gas: NGLa: OtFrer. General Weather:' Air Tempera4ae' Wind SpeedlDq'adion: Name and phone number of person making the tpporl; Phone No. Name Based on iMomtatlon aril belief tonrted titter reasonable inquiry. l certiry that fire statemer0,s and ktforrrlation h and attached to this docalrrleru are trcle. acctaste and eonro~le. R E C E I V E Fae1IRy supervisor uate ~ Eoc , pR8 s tflonegas anti tttadc Irxaderts) N O U 2 1 ?~00 ~ Field EnvironmerMal CamPilartce Coordinators. t'IiS 7 (lam Smoke inddertfs oMy) PBU/GPMA F'refd Managers. (Blsdc smoke irtrtderds only) GPtJIA Operatiorrl Fr~guteering TeeMleal Aide, (GPFAA reports orrY . ATo 4Tt) Alaska Oil & Gas Cons. C Kvpandc: Field Envirorrrterdal Conlplisnce Coordinators. NSK 61 (flan: gas and bledc smoke ktddards) MCtwrage .~.....- ....,.. e._..,~.,~.,._.x,_.......~.4 ...908-d ll/10'd 056-1 1909-899-106 SWOIlYa3d0 &ld~~d O~~r:l 00-EI-~N ' Oct-16-00 08:37 From-PIS OPERATIONS 907-659-5061 T-252 P.04/O7 F-637 FLARE GAS Vt7iiItNG REPORT Alin 1 IiiS AI Ar;KO_ INC_ • PRUDFI~E BAYIGPI FACIU'tY: LPC PERNIfi' NO. 8A73JIAD25 Date of o«urrertce: 10M2J00 prtare pt~r (mrrMdelyy) (Check Sefectiort) Total Volume Flared: 9478 MSCF BBLS AAetsr lfo~ 621 Facll ~Pmrv~eo (Check Selootion) tuna of Occu rta_nce• MinuEOs From: .07:46 To: OT.a7 = 00:01 Frotn: o7:6S To: 07:54 0 00:01 From: 08:07 To: 089 ra 00:02 From: t18~2 To: 08:37 ~ 005 From: 08:40 To: 08:42 ~ 00:02 From: 06:4ti To: 08:46 ~ 00:01 Totat MinuEo6 F]arode = 00:1x tisb~nre O»ly - Gas dared was frart7w~ Doormt~n (Ghectc Orie) (Indude.4 vdurrle flpred wMce geenarated blddc smnran, of 7>=G contactor meter at LPC) 11 sppGcable) A. Oa6Cr'iPtlOr1 Of tnddertt amt gtreo: (Check as many as nodded to fully describe rho Inddartt) SJQ Tlt~ for Process upset in TIC Sq due to high exhaust tentperatur~e section of tdcFitl- Seal of system dMBct>pies Flaring for dr8lsite shuttlovrn / staraap EMr3~GENCY Sti1JTDOVVN Hare system fos7ing l / IrlstrrArler~ation nlaNrxtcdort Faulty sttutdoarn on Qeaiteal / Insatarterdebiorr r~Uurtcdon ' FaaTey maint3enanoe F•Fgh arnAieM temperabues. at other facaily (T3P) Gas transit system overpressure , X Other. Process module startup arts badcirg CPFIFIOw Station out Funetlonal Check Out. lydemtittent • Excessive ~ irtsuf8dent Inlet gas lacing for a total of 5 t~ and 51 minutes rates kdo raauty Page 1 of 4 t3. Action Taken to Etieninate Carter and Prevent Racurrsrtee: (Check and descAtto as applkmbla] Staroed /restarted T!C * Stat~T¢etl iacGty P ~ ~ ~ Compressor J train depressured F equipment diffiarides Reduced / irtrxt:ased Intlet gas rates with Contpletod flare tesarg Fae~ty nmiruensnoe completed Corrs[4er1 Edd AuCUatbn / fa8lae X Other: Startup FCO mrnpletad for the COrreCed Edd flnCttlSOOn / tslltxe day- at other fadity (T6D) Black Stnelre l]id &tdderlt cerise Wad! smoke? Yt~: No: 0 (If Yea, wntlrtue wish this section) D;e Incident present a poter18a1 fittest to htsrtart health or satettr? Yes;. No: (I(Yes, report ba FEC as soon as po9slblo. if flo, ropoet to ADEC with ?r4 bows.] Black smoke em8ted hem aouroe: (enter tag raarlber and desaiptiort) Notified ADEC by Faxon: Dates Time: tispoK the fo0owing IrtfoRrtatlon to ADEC within 24 hours t3Y FAX (80768-7608): Mete acrd tHne of blaeK stroke event: FY+Orh: To: Volume flared which eenerated bleak smoke (d different from above): iJISCF BBLS of steps to rrunimize ernissiorls: See Sacdor- B. above ~Ype of materials burned: Gas: NGIs: OOter. Genera! V11eatlteG Air Terrlperature: Vlbtxf SpeedtDinectlon• Name and phope rnmtter of person metorlg fho report: NaOte Phone No. Based on infomna0on and tx:aef fonrled after reasortattle Inquky,l certih that tt+e statsmsnts and arforrrtation in and attached i4 this docurttent acs tn,e. accurate and RECEIVE D Facility Supervisor * Data BU' Eoe sue, ~ f3 (two gas are black smoke incidortct) N O V 2 ]. ~ A (l i1 Field F~wirorrrlerrtal Compfiarro9 CoordYtators. PRB 7 (Black Smoke Indderlts ordy) ~~ ~~ ~~re' ~~ smoke ~ ~) Alaska Oil & Gas Cons. Commission GPMA Engktsering Technical Aide, (GPMA reports only - ATO 477) Kupatufc: Fiala Fsvirorunenmi CoinpGanoe Goordinatars, NSK 61(ilare Bas and black alrtoke atadents) .Anchorage ' Oct-16-00 06:38 From-Piffi OPERATIDrIS 907-659-5061 T-25Z P.05/07 F-637 FLARE GAS vi=TTnNG REPORT PML.L.IPS ALASKA. INC. • PR.t1DMOE BAY/GPMAlKUPARUK FACl1.J1Yo LPC PERAIpT NO. 9A7S AA02S GAS tstsposmoN eta or occr+rmnes: 1a12100 pwR pvou Tmre of oe~ytrjenr~: (mmldd/yy) (Check Seler:tion) 00:00 1Ninutos From 06.49 70: 0926 ~ 00:37 Total Volume Flared: 9478 MSCF BBLS From: 096 To: 09M0 = . 00:02 From: 10:29 To: 10:32 = 00:03 reeler No.: 621 Facili 0' Plmw~ea ~ From: 11:07 To: 71:08 - 00:01 (Cfieclc Selec~or-) From: 11:x0 Toc 11 ~7 = 00:01 From: 11:63 To: 11:54 - 001 Total Minutes Flared: _ 00:45 (lieDurns Only -Gas flared vvas frnrl~]ap~awn 0 (Criedc Orre) ~ volwrra flared rrhicH ger~ated black arnok~a, of TEG oonraaor meter at LPLy . a Deacrlptlon of irrctgont and Cause: (Check as many as needed so iu8y tlescrlbo the lncidartt) SID T/pl for Process upset h .. T/C SD due to high e~aust temperature section of tadgtyt Seal od system elfBa,Mks Fsystem testn9 l s» EMERGENCY Stil1TDOWN I / Irrs4tirnen~fort malfunction Faulklr stattdorm on Electrical / Ian maliurtcnon Facr~ty malrttertanoe ~ arnblenf temperabxes. at other facility lT~I Gas transit system overpressure X Other: Process module stanu~arttl backing f2'F/Flow Stadar out FuncOorral Check Out. Irlterrnittsttt 5xt~ve / ir~ttf fiaent inlet 9~ faring for a total of 5 hours one 57 minutes rates Ntto fsCigl Page 2 of A B. Actlwr Taken to latminate Cause arrrf Prevent Roturrence: (Check and describe ss appllcahls) Staffed 1 rostarted TIC 9 stabatee fac0lty process. and operation - Compressor 1 train depressured ~r'ed ~wt~u diffutiltios Reduced / incaeased inlet gas rates ~ Completed flare lestirf9 FadRgr rnamtar-ance Corrected E8d n / falkue X Other. FCO feted for the Corrected E31 fhxmvatiort /failure ~- st oth9t }ddagl lTll~D} Bleak smoke Did incident cause black smoke? Yes: No: ~ (1f Yes, oontkate wqh ihis aed'a~ Did incident present a potential threat to human health of safety? Yes: No: (K Yes. report to FEC as soon ae possible. H Nq report to ADEC wltlr ?4 hours. ~ rx>rr~er srtd ~) f3ladc smoke anuZted from source: ( Nott6ee AI7EC by Faxon: l]a1B: Titus: Report the Mllowing NrForrrration m ADEC wkhln ?A hours l5Y FAX (907-289-7508): Date and time of black smoke evert: - from: To: Vokune flared which generated blade smoke (rf dAferent horn above): ~_ MSCF BBt.S of steps to ntiNmbs emissions: Sae Section B. at~ove. Type of materials bur»ed: Gas: MGLS: General Wasttrer: Ak Temperature: VVsrd SpeedlDiredion: Name and phone number of person nta1~ the repot Phone No. Name Based on iMormation and bekef termed after r~easortabte inquiry. certRy that ttre statemems and information in and atfatl~ myth ~ ~ ~ ~ D document are true. accurate and oorttplste. R ILA (<.J~ FaciG~1 Supervisor ' Oaf ~~ c~ EOC supervisor. PRe t3 (Oars gas one taadc smoke incideMS) N O U 2 1 ? ~ ~'1 Field F.mrironnrerda- Compianee L`oorektators. PRB 7 (Slack Smoke ine~tlertts ontY) PBtI/GPMA Field Manalolsrm' ( smoke ~demus ~) on wTO 477) Alaska Oil & Gas Cons. Commissial GPMA Opera80AS ErtBUteretsg Teararical Aaie. (GPMA reports ry - Mchorage Kuparuk: Field Envirorunentat CompCartoe Coordinators, Nslt. 61 (flar+e gas and black smoke irx~dents) ~ ~ Oct-18-00 08:38 From-Piffi OPERATIONS 907-659-5061 T-252 P-06/OT F-63T . - FLARE GAS VENTING REPORT PHILLIPS ALASKA. INC. ~ PRUDHOE BAYIGh1NAfKtlPARUK FACILITY:' LPC PERIYITf NO. 9A73,AA026 GAS D SPOSmoN Date of Occtrrrance: 10/72!00 QFlare wee lime of QccurromCO: _ (rnrrUddtyy) (Check Selection) 00:00 ~^+~ From: 121 To: 12:43 = 00:02 Toni Volume Flarod: 9478 ><ASCF t361.S From: 12:50 To: 12:59 = 00:08 From: 13:14 To: 13:16 = 00..07 Meter No : 827 FaeU ~ ~ From: 73:40 To: 13:53 = 00:13 . ( L~1aCK Selection) From: 14:17 To: 14:1$ = 00:01 Frorrr: 14:39 To: 15:12 = 00:33 Total IAln uees Flaraa: = 00:58 rti Oety - t"-,as flares was n>x,~7 0- ( one) nru~uaes volume nmea whirl, ~ btacyr s~nt~, of TEG co+rtactor roster at l~ if aPAl A. Description of IneMant and Cause: {Check a6 rp~Iy as meedsd to fWty doscribs the irlcideM) Sip 7lC11 tar F+rooess upset m TI'C Sp due ifl Ttigh exhaust temperature seexlai of fay Seal oil system d Fnring for drifisite slwteoMrn / stsrarp EMERGEPICY 3HtliDOWN Rare system testing Efat~fical t Instrunrerrtation matTun~- Faulty shtndotarrt on Eleotrtcal t Instrttrrratdafiom matfmcdon Faa'Bty rrrairttxtarroe Hign arrroierrt taRtperrduas• at outer facTity (T~ Gsa transit system overpressure X Outer. Process module: startup arts badcin0 CPFIFIow Station out FuncUOnat Check Out. rntemmtart Excessive / InauffiCiem inlet tip faring ~r a total of 5 hours an_d 51 minutes rates into Page 3 of 4 B. Action Takon to Efiminats' Cause and Provoru Recurrence: (Check and describe as appLCaDle) Started t restaAed TIC f Stabilized faaTity piss and C.wnprs::orttrein depressureid e4r~mentditTiat>fias Reduced i kfcreased inlet gas rates trtfil Gompkted flare testing Facil'dy ~ Gorracted E&I fltrduafiorl / fatlune X Otlfer: StarUtp FCO for the Con~ted Edd fluctuafion / Eail~xe day.. at otherfad'rgr (TB~D) r3ractc smote Did Inddetd cause bledc smoke? Yes: Not Q (If Yes. oortlirwe wish this section) Pia ineldem present a potenliar ttrreat to lxatrarr nealetr or safety? Yes: ~~ {1f Yes. report to f'EC as soon as p~a'bla. ff No, report to ADEC wip- z4 hours.) Bnd~ smoke entiteed from source: (eater Wg rn,meer and des~ptien) Notified ADEC by Faxon: Data: Tme: Report the fotrawing Information m ADEC wlehlm ?r4 houes~ E~X 1907,269.7509): Dale antl time of black smoke 9vertt Flom: To: Voiwge flared which gemerated ttiaek smoke fd d'riferent from above): ~~ BBLS t]esaiptlon of steps m rtm~imiza emrssiats: Sev Section 13, above. Type of matetisis bumedt Gas: NGIs: Ottrer: General Weather: Air Temperarirre: Wrrrd SpcedlDireetion: Name and ptlone number of persor- making the report ~~ Phons No. Based on iniormaton and belief fortrred after r+easorrtrble irrqusy. t aertiy ttrat the ~ ~ ~ in and ~`~~ E I V E D dotaurrerrt sre true, aorwate and t FaNlity Supervf64r ~ Datb da NOV 2 1 2000 cC EOC Supervisor, PR13 a (Aare gas and btadt srrrOKe inadehts) Field t~nrtrorpnerNat CompNance COOrd'ntatas, PRB 7 (81adt Smoke. inoiderks Only) PBWGPMJI Freki >Vlanagars, (sleds smoke irtcidettts only) Alaska Oil & Gas Cons. Commission J CPnM overatiorrs arln9 Toduiicat Aida, (CPi~iA roporea Doty - ATO 47~ Anchorage 1("" Kupandc; Pistil Errvironmarttal Compl'ranoe Cgordinators. WSK 81 (bare gas and DIaCk stooks Rtcidertts) Oct-18-00 08:38 From-PRB OPERATIONS 907-659-5061 T-252 P.O7/OT F-637 FLARE GAS VENTING REPOKT 1SKA. INC. • PRt1DNOE BAYIGPI FACILRY: LPC Data of occurronee: 70M?!00 ~Fiene ^va~t {~yd~yy) (p~edc Seledart) Totaf Vottans Flared: 9478 MSCF BBI.S Meter No.: 621 Fad Qq"^"m ~~"'8d (Check Selettlon) {LisbuAte On1Y -Gas flared was l~upwamn DOeMSeran (Chedr Ona1 of TEG contactor rrtet6l at L.PC1 A. Description of Mcldeett and Cause: ( ~ marry as heeded m fray describe the Inddertq S!D TJCS for Process upset rn TIC SD due to high exhaust temperature section of iaa'~r Seal oa system difliCtlltieS Flaring for dttllsrta shutdown J startup EMERGENCY SHIlfDW11W Flare system ~~ EtacMcal / Irrstrurr>antation ~~ Faulty sMrtdovm on 4eotrk:al / Irtstrurnertietion malfunction Facdty ~ ~ amblerrt ~• at trtitartac~l- {T~) Gab tram system overpresstne X .other. Process moaule and t ~~ Station ~ Ftrrrdionai t~tedc out. Intemriltent F,toessh~e / klsutt ~rlet ~s larirg for a total of 5 hours and 5t Minutes Page 4 of 4 rates into faaTiOr B. Aatlon Taken m Eliminate Cause and Provost Rewnertco: (Check and doscrlbo ae epp6~abte) Started /restarted TIC • Stabi4zed fadfrty process and Operation Compressor / train depresattred Rapaime e4ro ditfitarlfies tiedtroed / kwraased IrtIM gas rates - vritlt ~ 11~Ne Fadgty rttairttenar-ce completed Corr9oted EdJ l4xtuation / tadtae X Other. FCO ed for the Corrected E&1 flvrdrrtitiort I faikrre a< other faality tT~ Dld inadent CatWe t+latlr =rrtoke? Yac: No: O (K Yes. Cordirxre with t)tis sectlon) Did inaderd present a potential threat to Mxnan treahh or sateq-? Yes: No: (lf Yo6, repoR to FEC as soon as passible. K No. report to ADEC with 2t hoursentar tag rWmDer and desatptiat) Blade smoke erNmed iron source: Notified AOEC AY Faxon: Date~ Tom: ttsport tiro tollowtrtp 1Montratlon to ABC WitlHn 24 houR~ (9pT-~69.7508): Date and tints of tttadc smoke event Pram: To: Volume flared vrltirll generated ttiack stnoka [ti dl(Eaer-t from above): MSCF BSl.S Description of steps to miromize emissions: Boa Seetlon B, above. Type of materials burned: C,as: Nets: Other: General tf-realtter: Air7en+penotre: HAnd SpeedlDireaiorr ' Name and prase number of person nrakktg the report Name Phone No. t3ased on information and heNef fomred atlt+t reasonable InqukY. I certiry that the starAments and infonnatiar to and a document era true. aaaasfe and oorgplets. Faclligr St~parvicor ~ ~ Date ~ a ~ Nov 2 1 ?fl{l0 ~ HOC Supervisor, PRB B (flare ~ and blactt smoke itadettts) Field 6mrirot>tnerasl CompFanoe Coor~dktatas. PRB 7 lam Smoke inddt:nts ony) Alaska pit & Gas Cons. Commission PBUlGPttAA Field Managers. (Bleat snake irtciderns only) Anchorage PMA ' ATO 4TT) PERMIT Nt?. 8AT3^a-~ Tjtne o1 Oc[urrenr°• aninuess From: .15:46 To: 15:47 = ~~ From: 164 70: 16:05 = 00:01 From: 168 To: 1b:08 = 00:01 From: 15:51 To: ?A:25 = ~'~ From:. To: ~_ = 00.00 From: To: = 00:00 Total Minutes Flared: (includes voknne fhtretl which generated blsClr s-ralre, if appbrable) GPMA OperaUOns Engaaermg TCChracal Aldt•~ (Q reports oMy Kupandc: Field Envirorrrrietrtal Compliartae Coor+dmators, NSK 81 (flare gas and black smoke incidetas) ' Oct-lfi-00 08:36 Fran-PRB OPERATIONS. 907-659-5061. T-252 P.02/07 F-637 .. . . - FLARE GAS VB$'1'Q~IG REPORT • PHILLIPS At.AS1CA• {NC. • Pt3UDNOfe BAY/QPMAACUPARtNC FIidLJ1Y: .. :LRC ` Pt3tt~T WO. ' 9A79~JtA0?S Dam oc oecyrrertca 1alaroo ~t~ av~ (ntrn/dd-~y) (Gnecic Selecxian) Total Volume Flared: 1765,9 MSCF ABIS IlAatar' rw! •'.•... 821 ~ I • ~ Dlamea ~ Unplanr:ed (Check Seledion) Tlme of OCCtlr rens~ 00:00 ~tl1>t!~ From: 1y~ft To: 117~R 00:01 From: 179 To: 171 - '00:02 Franc 1718 To: 187 ~ 004 From 182 To: 18:2.9 = 00:01 f=rctsc 18:50 To: 1918 = ` 004 From To: ~ 00:00 Tofal Mintttas Bared: Ot.~c ~~ {tlsDume OnfY - Gas dared t ~ontfl uf+~n ~ oovn:~arn (t7teck Q~e) (Nrrs vohitna Qa-esi tt~frioh black ofTEGoaxadat'iftete-'~lJ~ /fapp~cablEr) A. De~Aptlon of huideittagd reuse: (Check ae cowry as needed to iuNY doseribt+ tfto fneidertt S+'D t~ for Ptooess upset h T/G $Q 4ue to hgh eodtaust temperature ee~tiort of (sd6ly feat od system 4iffia~ies f=laring for drt'1I51te seastdown /startup f:'>y1~FtGEWCY SlitlTDOYYN Rare byatem teasing £{eptfoal ! krskumantatwn trtalksrtaion Faulty stuRdown op EledPflsal / ~ malfurtdiort Fat~t - mamtenartoe t`fi9f t amnlertt tertperatures. ~ either tac~y (T8D) Cps 4ansk syatam ~ x Other. Process module starnrp and badditg CPFIFbw Station aut FtxtctlorN t„hedc Out. ~ Exi;essive / irtauffiCiertt inlet ~ motor a total of B'L rrtitutes. tales into lacigy f3. Action Taloen to EFmina'Ee~ and Prevost Recwrer+ce: (C1tet:k and dsseribo ss applkahle) halted /restarted TIC 1t Stabtl'md fao~r ! and oPa-~ 4ompressor J treat dapressrtrae f3epairred aquiprrtertt ddfiptltfas F1ed~ced / incsaSaed 'Net yes rates with _ Co7npletad Rate 1a6tatg Fdp'Bly mtaattanartoe oorrtpletetl DrAei+eded EaJ >Mrduation / faAtge X Outer:. Siartuo FCO aom~letsd tbrihe Caiireged E811ardrratbr- I faBtrro day. st other f~fay tT~) fi~sea sawas OId iru3derrt tense Wads sxtit~? Yes: No: ® (If Yes. continua wt~tt 11tis sectlort) Old aniderlt presets a pdaraiel ffYeld to hufttert heeNh Or Safety? Yes:. NO: (n Yes, report to F'EC,agsden as possibla~ ff No, report b AoEC with 24 hwaa. slack smoke ematad from >4oitrtt~: carnet teo rturrtbar and desafpfion) Notified ADEC py Fax one ~ 1)ate• Tarts: Report the tolloitring atlornitiilott m ADEG within tt4 Y FAX (907~7598r Date autd time of Dladt srrrofati oven: front To: Vokuna flared rvhiCh t~enerdiat(black smoke ('d ditlarerft from above): MSCF BBLS Description of stew 10 ntinMttlze emissiortA See Section f3, afootro. Type of ntetetiats t-tsned: Gas: NGLs: Outer:' General IAleattter: Ak Temperature: Wmd Speed/D"mactfort Name artd pMrte rxtrrtber 0f Person making the report: t~samta Phone No. Based en mfom+atio-, srtd_beptif formed afteY IDI~ irpuiry. ~ oeeAilr that.-ttiestetertteaks and'mfom~tt in and atadted to "RECEIVE D dorxartent are true, aoarrate ai+e ti ~ fbm ~ ~ c« ~c ~parvlsor, PRB s cease yes and p~cfcsmoke atadents) N O U _2 1 ? ftfi ~? £rwaortmertWl ComPManoe Coordatetas. Pf1B 7 (sfadc Srrefo®irtcitients crtly) ~~' F1O~ ~~~ tfyaeye sato~ atciderns o^b) Alaska Oil ~ Gas Cons. Commission C,FIHR Operations t_rigirteerirtgTachnical Aida. (GPnM- reports only-AT0477) Anchorage 14•iiNBtt~c Field Emnromtetttdi Corrtpllartoe Coordatators, NSIC 61 tilers yes and f>bck tsTttoloo irt4dants) ~/ Oct-19-00 10:56 From-PRB -0PERATIONS 90T-659-5061 T-265, P.09/12 F-660 FLJcRE GAS Vt3lT~lt;, REPORT ' pFpWPS ALASKA. IkIC. • PRUDHOE gAY/Gpt~eAlKUPARUK F1-plliY: :,tatC:= • pER1dTN0. r9A7~CA0~•. •.: - ~.g-POSITION Date oT oocurrerree: 10/18A0 ®t9are Qve~rc (mMdd/yy) ( ) Total Volume Flared: 111a MSCF BBLS faetef Na: • ' •821: ®Pamiee L3 (CI-rcir Selsctionl Tlme AD:00 of Qee ur-ance: l~IOSI$R! Frorrr 1b:68 To: 15.55 = 00:02 Fronk 16.12 To: 16.13 - 00:01 f-rorr~ t6^.13 To: 16:88 = 00:06 Fronk 18:35 To: 78:56 001 Front: 17:75 To: 1726 - 00:11 Rorn: 17:45 To: 17:gCs 00:01 Total Main Ftsr+an: ~ 0022 fr.~ma orry - t3as hared nets frtm~(7 ur~mern 0 (cnecx ore1 ~(,~) n>B parear widdt gsneraled black srnoka, of TE'G wrJador,nater ar LPCJ A. Deecriptivn of l~+olderd ann Cruse: (Chock as tnsny as Deeded to ally noscribr tttr Ineldatt SID T/C# im Process apses in ' T/C SD due in hgh exhaust temperature R)- section of tacd Ftarbrg to- drillsAe stuudown /startup Seal al 6~Stetn- a 1]OERCiENCY SHUTDOWfd flare sy~emtst~rtg t"ladrfcat / tnstnrrrrerttation rtreMra~coon FauMy shutdorm an EleArioal / krstrtarrantatian ~ F'a~Y meintenarCa Nigh amblers tarrrperaturas. at abet fac~ty (T8~0) X module starlu0 and Other: P Gas trarrst system ovetprs9strre ~ Firnctiorrel Check Out. tntemallattt badung CF'F1Flow Station out l~ore6rive! blst:tfldarrt iplat gas flari++o for a total ~ 72 Hans. raotas into trcr~y psget of a B. Anion Taloott fp Eliminate Cause arW Prownt Rreurrance: (Chock and desafbe ae appliaahlr) 3tabrTmed fad process and opecapoll Stared ! restarted TlG s ~~~ Compressor / dale d9pressiaed eQuP~M ~ Fiedr:oad ! irrcreassd irNst gas rates '"~ Completed flare te9tNlg Fadlity maaNenar>ce completed Staf W A FCO C0111p1918d 10f't116 Old ('iOrr4gQd ~)11tICh1at10n 1 tdi~tre X er: COrrerXed F8t1 farCatatiDrtlfaiure ~~ at abet R~ Blank Smoke the inc+deru oausa dlatic smolre? Ysx No: 0 (n Yes. ooMirkre wtth thfs sealon) pia fncldent present s paerrti~ ttrreat to tumrran heahtt a safety? Yoe: No: (lt Yoe, report m FCC ire soon as poostpb. ft No, ropoR b ADEC with tt4 hang Black 6~oke emutae from source: (s:uer tag nunruar and description:) Notitred ADEC by Fare on' Date: ~~ Report tltr tollowlrtg Infomnadon m ADEC wittdn 24 ttotn~~ (9D7-Q6ft-T508r pate and time of black smoke event: Fratk 70: volume flared vJlridl gemarataet Dlatl[ smoke Id ditfererrr from above)t MSCF BBIS Description of peps to rririrrrir~s Sw Srotlon B, above. ~^- Type ~ materials txtrlterx Gas; ~•~ ~' _ General Weather: Air te: ~_ Wind SpeedlDRedion: warms and photre tatrnDer of parson. tt-e Phone No. Name Based on information antl Deist r .1 certify that the staterr-errt9 and information pr ana attacnad to flee aoctnnera aretrue. accurate and RECEIVE D Fromity taup.nrisor t>~. ~ ~~ Eoc - , ' RB a cttare gas and biadc smoloe irtdderas~ N O U 2 1 2000 Field E ~ Coadnat~, PRB 7 (Black Smotoa Mcinents arNyl? PSwGP~ ~ t~ s"10~ °nM Alaska Oii & Gas Cons. Canmission • GPMA Ettyireerirr9 Tectvtiw! Aida. (GF'kAA reports oNy - ATO 4771 Kupank; Fiatd Ertvlrorunerrtai CCmp6ance Cooid'rttatots, NSK 87 (IMue Bas and black snake inadents) Mchorage ` Oct-19-00 10:56 From-PRB OPERATIONS 90T-659-5061 T-265 P.10/12 F-660 FLARE QAS VRiTA~IG >•iEPOFR PHILLIPS ALASKA, INC. ~ PRIJDHOE BAYfGPMAACUPARUK FApUTY: . , .....~LfC:`:~:~ ... PFAIETN0. ~9A73~AI1025::' Date of Qocurronoe: 1Q/78A0 IN7~ ~vena (mrrVddryy) {l7reCK Selection) .Total Volwrw f9aradt 1114 tr4SCF BBLS Weter~NOa ::: •. tII21 : ' .: B fie )~ Planned ~ lJaaplamaeC (Check Sclectiotr) SPOSfIION 77nfa of Oewrrenee• 000 tNlnuteB Frvrre 19:1a To: 198 = f)Da9 Fiomt 18:44 To: 18:45 007 FrorrK 19:05 Toe 19:09 = 009 FrortK 19~ To: 191.8 = OOfl2 Fiam: 19049 T0: 1tr:48 o0b5 From 20:09 To: 9o:oa_ - 001 Tobl flwinutes Flared:. o _ 0015 (Lia6umeOruY-Gas>~reetveslromOa~reem ©aow~reem fC-:ectrOne) of TEG owuacrolmaterat t.Prrj (Hrcafudas voJir»19 llaagtl e9dch g®-Je/atBd b/e::ftstnok+e, Bapp~6t~bJe) A Dsscription of Irroidern and C4aleo: (Chock as many as treaded b tuNytloeodbe the Incident SJD TIC! for Prooe~ ~ TIC SO dueb high a temperature section of tadmy ~ a1 diffi0talfie5 Flarlhg for drBsae shddown / starWp EMERGIIVCY SHUTDOWR~1 Flare system 1e61itlg Electrical / ktstnmtatnation rrtalhn-diorr Fautty sttutolown on Eledfice(/ btstnxirentation rraslfwtction Faaley maintenance FTigh ambiaa'It ter-tperatures. at other faaliy (Taf» Gas traraslt syatarn atrerpre~rae X Other.. Process trwdWe 9tarhay and bado0g CPF/ilow Station oql Functional t2hedc Out. InterrrrhBam Erocesshne i irnarlfiderrt inlet Qas flaring for a tool of 72 ruins. rates kRO fa~Y Pa4te 2 of 4 B. Action Taloert to Eliminate Csuee and Prevent Recurronca: (Chock and deaaxlt~o es applleabM) Started / resteutetl TIC f Sta~Z94 faaTH process and operation Cornpre6sor / Itch depresstared Repeated equipment Reduced / ktaeae9d irN64 gas rates vrktt Completed flare testing Faca~ty mairuenar-oe oorhpletatl Corrected Edd fiuCWalioQ /fdpura X Otttat: staAtrA FC.O aomplated forthe Corrected E81 fluctuation / faiure day,_ a< other faa'Bq- cram, DiQ NrciQent cause Dladc smdre? Yes: tro: ® (If Yes. oontirtue vvah this 5etaiotrl Did iracidartt present a potemial threat t0 human heattit or safatyt Yes No: M Yea, roport to FEC as soon as possible. K No, rapvrt to AAEC vdth 2a hours. Black srrwke erraiaed from eouro9: (erAet bg rKwrr:er and ) Natifled ADEC by Faor ore Date: Tune: Report the folbwing intonnatlon m ADEC eaitttin 24 houroBY, PA7t (1i07~•7909): pate ono time of blade srrwke event: Frain: To: Volurna flared v+hiCh generatetl t>>ack srrataa pf dAlerera from above): MSCF BBLS Description ~ steps ro mirurrtize entissiott~ set saetiat 8, atrore. Type of materials bunaetR Gas: NC•~s: Other: General 1Aleather: Air TerraperaAU+a: t~frtd S Name and ptgge raaertber of person making the reporL• Name Ptwne No. i I i s Bases ore infomastion and belief farmed after reasonable inquiry. I cenif,, that the statemerus and infom~iot, m and atta~ctaed fo~E C E I V E D doraataerit are true, accurate and ooroplete- Faoblfy Supervisor Dab Eoc st>perv~or, PAS a (flare gas era trlaoks~rtelae krdderusl N O U 2 -1 2000 Fietd Nnrirorurrental torrpGaaoe Coordrtatorts, PRa 7 (Blade smoloe iraoidens ordy) ~~~ Fiatd gym' (~` srnoka wtGdanta ~h) Alaska Olt & Gas Cons. Commission taPMA Operations F~gineefrlg TedlAir~1 AbB, tGPMA rcporb only - ATO 477) Anchorage Kupandt ABId ErrvMofatrerttal Cotnpl+anoe Coorderators, NSK 61(118ae qas and Dlaclr srrlace iilCiOetga) Oct-19-00 10:56. Frog-PRB OPERATIDrIS 907-659-5061 T-265 P:11/12 F-660 ~ _ FLARE GAS VEMMIG REPORT I sang ~ fec e~ ec~[e, MIS. QRt1DWDB a-YlGt~eeeJKItPAHUK FAgUr1f: %3FC'~ ~ PERYiT N0. ' aJl7S=k11PlS _ •GAS DtS~St~t~ DateoiOeeurrente: lo/tedDO (~Flme pvw,t (mnVdClNlr) (Check Seletcttiort) Total Volume Klar'od: 1114 MSCf 88LS AAeter:Na:• > .621: _ [+ warmed ~ueplenned (Check Sale[4iprr) (Liabume ~N- Gas Bared was from up:oean+ 0 aewncveern lp~ ~~ of 7FG coror met~r~ ~ 't trle of >Z4~ Mnutw From:. 20:x9 Ta Zo~9 ~ 006 From: 2D:A8 TO: 2-30 00:02 From: 21 ~ To: 2/ ~'1 - 00:05 Frnrrt 220 To: 229 = OO~s From: 22:47 To: s2:4e m 001 From: 29et0 To: 29:14 = 00:04 Tote! NGnut~ Ffatod: ~ 0021 (b~cArdbs vn-rmre lbered which ge+tarated ble+dt srnaKe, IfappficabfB) A. Desaiptlon o1 Ineidetd and Caasa: i ~ t~dY as needed i4 Ml)Y describe 1M Irtddant SID TACK 1;ot Process upset n T/G SG due to nigh erd-aust tenperanue section o! isci'a Seal od systOrn ddficnhies Flaring for drNslte shutdown 1 stargtp EMERGENCY SHUTDOWN Fare system testitg Electrical / Irtslrtrrt-enttttion ~ Fauuy strutaaMm on Elecuiwd / IAdnm+antallon rrtsHurution FacRhy manrtenattoe Higharrtbiertltemperatures. ~ other 1da7ty (TaD) Gas irartsR system overpressure X Other: process trtod~da stararP and batlGng GPF1Fbw Bretton atA Functional Check Oul Irnemtataht F~o~sive / rt~aent inlet gas flaring for a total of 72 mina. rates into tadtly _.~.---PaOa 3 of 4 6. Action Taken to EIInUnsa puss and Prevost $sawrertoe: (Check and tlosorlM as applkabbl Started 1 raslarted TIC 4 Stab9lme factor process and operation Corrpressa ~ treat ~ ed egrnpmeM drfb~9res ReducwtJ ! ifrCne~ad inlet gas tames Completed faro tasting Fea'Ry nteirrtenance carnplated Corrected >:!d /uobrati0n / faAure X .Other:: Startua FCO completed for the Corrected E8J t>uawdlon / tiikrnB deY. _ _ - at ortrer fac9ily f~ Did im3derrt cause black smoke? Yew No: LI {If Yes. contirrtre with th's sac~iart) Did incident presets a poler~at threat to trtrrrart trealth or safatyl Yes; pf Yes, sport to FEC ss soon as possible. N Na report to ADEC wleh 2s hours. Black smoke emlUeq !rom sources (er~mer tag number and dasaiptian) Naufied ADEC by Faxon: Date: Time: Report tlta foikytrlrtg ktfortnatbn m ADEC within 24 ttourea FAX (9077608): Date ant! torte of black smola- avant: Fr+onr Ta Volume Aareo vrhldt generated blade srrtolae {d dm(erant from above): tuISCF ~~ Dasaipticn of steps to minirrNm enr~slorsi ass Saotlon B, above. Type of ntatedats burttao: tomes: NCaLs: Omer: - t3artaral WeattleG AtfTerhperature: Vtfix! SpaedlD'aectiort: Name and Phone rYelyd~ar of peraon Rlatdrtg ~ tepOR: Ptlotre ~ Warne Based On irtforrrrwiotr and belief formed dear taasotk'tble in4ultY. i canny ttrat the statenrems ana nprrrwucrr m arw aaw,s,nw ,., w.w 4oc~KtreM are true. acatrate and complete. FseBlty Supervisor Q~e ce~ EOC Sttperuisor, PRB B (Rare gas and blae;k 5ntoke ineidertts) Field EnvianmerKai Compfiarroe Coord'matora, PRS 7 (Black Smoke 'rrrcidertts an[y) PBU/6PMA Halo Managers. (Black smoke incidents only) CiPMA Operations Engineefirtg TaCAntCel Aide. (C PMA reports only - ATO 417) Kuparttlc Fuld F.nvirn~tlt+srRa1 Corrtpt~rroe Caordstntas. N3K 81 (Rate gas and black smoke + Oct-19-00 10:5T Fran-PRB OPERATIONS 90T-659-5061 T-265 P.12/12 f-660 FLARE rAS VENTING REPORT PHILLIPS ALASKA INC. • PRUDHOE gAY~C,pIf1AACuPARUK FAClLfTT: .13rC • • PER1wrTN0. ~lAT3~AAt12~•= GAS DISPOSIT1011S - - Dste of OceurrorM:o: 10/1 &00 ®Aaa went o Occurrence: (mrNdd/yy) (Chad: Seledton) ~~ Total Volume Bared: 11y4 MSCF I36l.S Metor .. • 874: `• , . B F I 0 Rennes ~ `a'q"*'ea (ChecK Sel~tion) From 7.9:46 To: 29:50 00:0+{ From; To: 000 From To: = 00:00 From To: - 00~ from To: _ 00:00 FtOftt Ta = OObC Tonal Mht~ Flaredc ~ fir, ce. ma1>anedwfricirg~ene~gDtadcsmo (LlstkrmeOny-raasffaredwaslFar>G7ut ~dow~nee" lCheckone). ~, of TEG canracmr meter' at LPC} A. Description oT tncitletd and Luse; (Check as titanY av needed to fWiy desetlbs the itteidettt SJD TIiCII for Process Trpaet in TIiC SD due to hilt erdtavst temperature Flaring for drNsite slxttdown / t~:Attp Seal od trirslem ~ EMERGENCY 3FMD~WN Flare system tesdTtg EMBtAericdl / Irtstnrrrtematlort malfurtc6ort Faulty shutdtrxm on _ Bectrical! Irtstrwr-emation htdlfttnCtloll t^ar.Ety ~~~ i'Ngf- amirfent temperatures. ffi alter fatty (Y&I;~ s moeute starWp and P X (kas transtT systarn atr~etprer$ur+e bad:ing CPFJFIow Station out roces Otter: Furxxiortal Check an. IrrteTrrtaTertt ta~sive / irtwlGaeM iMet gas F ik'ukt9 for a total of 72 mlrw+. . Tales irao feaTRy peas 4 of 4 Action Taken to Ellmirate Caws arxf Prevent t;stxnrenro: (Cheek and describe ss applicable) B . Started / restarted T~ ff 8tabdized facTAY P artd Repairee eq~prrtent dticxthies / bair- depr~s:rred vriNt Reduced / 6tcreased inlet pss TiNe9 ' Completed fI~ testirt0 Corrected FBI fluctuation / failwe X 6ty ~ Faa Other: Startup FCO oompletad for the Cwrect9Q ~J fwduatlonlfalwe ~: at other fsaTay 1T~ l Did ktcidetK cause black smoke? Yes: No: 0 (If Yes, cadinua wxh pti6 sacgon) Did incident presaM a potential ihreaf to ttarrtart heapt w safety? Yes` No: (If Yas~ report to FEC as soon as poe9lble. E No, report 1b AbEC trftlt 24 hours. Black smoke emateq from sauros: (ewer tag rttmber and desa~ion) Wa6fied ADEC by Fax ort: Date: Terre: Mpori ttte folfowin® information m J1DEC wigdn ?.4 (90T~8-T506): Da:e and tmt9 Ot pfack 8f11olra even!: Frbtrc To: Vokrrhe hared vrtdct generated black antolm Ctt efitOareM tram above): MSCF BBLS Oescr{ptlort of steps to nimmas omis9ionx See Section 0. ~~~ Typo of rtrererials homed: Gas: NGIs: alter: Gerterar VYesther: Air Temperature: YYlrte SpeedrDitection: Nance tend phone ttwttber of person Tnaidt9 rte report: Pltorte ~ Name itaseo on mtOrrrwwn ana pepBT tormeo atwr rea.,urwus .~»r. • ••o••••, ~•.....~ _....,•...-•.-----, ----- ~ ~C V G ~ V `v doctuneM are tnre. acarrate and orrmplsle. Facglat3uporvisor ~e NOV `~ 1 2000. r~ EOC Supervisor. PRB 6 plate gas and black smoke inddants) _ Field ErtviranrnerArd Compfisrtoe toorQnators, PRB 7 p3lack Srralm ktcidehts o~ Pf3WGPMA Fled Martagets. (Black smoke incideds oMy) Alssska Oil & Gas Cons. Commissi QPhAA Operdiafs Et>A6+eerin9 Tedutktal Aldo. (GPMA report ony - AT0 477) Anchorage KtQanrlc Field EnvirorerterMal CoTnpfiertce Coorcarasors, t+ISIC Bt (fare gas one black smoke a t Oft i GPMA PRODUCERS REPORT OF GAS DISPOSITION BP EXPLORATION, INC. Attn: Mr. G. Benson P.O. Box 196612 Anchorage, Alaska 99519-6612 EXXON COMPANY, INC. Alaska Interest Group Attn: T. Hutzler, Rm 1419E P.O. Box 2180 Houston, Texas 77252-2180 EXXON COMPANY, INC. Attn: Prudhoe Bay 91-025 P.O. Box 2180 Topping Plant Houston, Texas 77252 EXXON MOBIL CORP. Severance Tax Unit Attn: James F. Smith P. O. Box 2443 Houston, TX 77210-2443 ALASKA OIL & GAS CONS. COMM. Attn: Wendy Mahan 3001 Porcupine Drive Anchorage, Alaska 99501 STATE OF ALASKA Petroleum Reserve Division 550 W. 7"' Avenue, 5~' floor Anchorage, Alaska 99501 K. A Kems . ATO 740 H. G. Limb ATO 496 S. Edwards ATO 748 RECE~VEp NOV 2 1 ?~~~ Alaska Oil & Gas Cons. Commission Anchorage ALASKA OIL AND GAS CONSERVATION COMMISSI FACILITY REPORT OF PRODUCED GAS DISPOSITI( (Facility ( LISBURNE PRODUCTION CENTER #1 Operator ( PHILLIPS ALASKA, INC. Field(s) PRUDHOE I Disposition Volume MCF' 1. Sold 128,698 2. Reinjected 9,484,460 3. Flared or vented less than 1 hour 748 4. Flared or vented greater than 1 hour Su lemental re ort re wired--See 20 AAC 25.235 0 5. Pilot and Purge 12,016 6. Used for lease operations Fuel Assist 857,854 11,145 7. Other Lift Gas, Off Field 191,325 TOTAL items 1 - 7 10,886,244 8. NGL gas equivalent produced 128,698 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: ~~L Title: ~~~~ Date: ~ ~~' cm ON )N 3AY/PT MCINTYRE Month/Year of Disposition 11/00 "Indicate contribution of each pool to total. Pool Name Code Percent LISBURNE NIAKUK 640144 640148 47.88% 2.16% NORTH PRUDHOE BAY 640152 0.00% POINT MCINTYRE WEST BEACH NIAKUK 666100 640186 640148 44.34% 4.23% 1.39% ..................................................... Ctfficial ~ l.lse:e3ri1~ ~==Kiariri ~ ~: ~Autloi~~zatioii~>~ i:~tir::~:~: ~: ~:~:~:~ 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes', MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ~~'~ V': /~~4' ~ z° Form 10-422 (Revised 4/95) ~. ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION (Facility loperator IFie~tl(s) IMOntn~Year of uisposition LISBURNE PRODUCTION CENTER #1 BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE 12/2000 Disposition Volume MCF* 1. Sold 160,927 2. Reinjected 9,666,220 3. Flared or vented less than 1 hour. 1,618 4. Flared or vented greater than 1 hour 9,784 J/' Su lemental re ort re uired--See 20 AA C 25.235 5. Pilot and Purge 12,172 6. Used for lease operations Fuel 899,856 Assist 5,935 7. Other Lift Gas, Off Field 187,016 TOTAL items 1 - 7 10,943,528 a 8. NGL gas equivalent produced ~ 160,927 ~ ~ 9. Purchased gas ~ ~ 'Z 0 ~N ~ 10. Transferred from: c~ m ~ r.: ~ 0 0 0 11. Transferred to: __.. 0 0 Remarks: I hereby certi hat th oregoing is t ue and correct to the best of my knowledge. Signature: d.- Title: ftil~lS2 rAk Date: I f~ 'Indicate contribution of each pool to total. Pool Name Code Percent LISBURNE NIAKUK 640144 640148 46.28% 2.01 NORTH PRUDHOE BAY 640152. 0.00% POINT MCINTYRE WEST BEACH WEST NIAKUK 666100 640186 640149 46.26% 4.07% 1.39% Official Use Onl --Flarin Authorization > 1 hr. 1. Safety / ~~f~ MCF / 2. Lease Use MCF 3, Conserv. Purposes MCF Commissi er a//S o -r, Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. f~2`Zl L ~. Form 10-422 (Revised 4/95) r PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS DECEMBER 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/3/2000 0320-0340 115 Elec/Instru malfunction caused Compressor 1801 to shut down Unplanned Corrected E & I fluctuation/failure and restarted compressor 12/10/2000 1421-1436 66 Elec/Instru malfunction caused Compressor 1801 to shut down Unplanned Corrected E & I fluctuation/failure and restarted compressor 12/15/2000 0031-0038 27 Elec/Instru malfunction caused Compressor 1801 to shut down Unplanned 1801 SD due to a false high exhaust temp. monitor, started comp. 1800 12/20/2000 0629-0649 0 12/20/2000 0651-0707 386 Regulator failed, Compressor 1807 shut down Unplannned Replaced regulator and restarted compressor 12/28/2000 2328-2335 167 MFC malfunction in 4923 module caused gas swings in plant Unplannned Corrected inlet gas rates Total Flare ~= 1 Hour 761 12/4/2000 1738-1855 4,383 Elec/Instru malfunction caused Compressor 1808 to shut down Unplanned Corrected E & I fluctuation/failure and restarted compressor a v Total Flare > 1 Hour 4,383 m d ~ ~ Volume Flared 5,144 R° ~ 3~ ~ ``~ n ° ' Z O~ Measured Safety Pilot 5,629 ° ~ L~ 1 ~ 1 Continuous Assist 2,642 ~ ~ c~a '® TOTAL FLARED 13,415 Q ~ N o '~ o" GB 1/19/2001 1;14 PM PHILLIPS ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS DECEMBER 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/3/2000 0320-0340 121 Elec/Instru malfunction caused Compressor 1801 to shut down Unplanned Corrected E & I fluctuation/failure and restarted compressor 12/10/2000 1421-1436 78 Elec/Instru malfunction caused Compressor 1801 to shut down Unplanned Corrected E & I fluctuation/failure and restarted compressor 12/15/2000 0031-0038 26 Elec/Instru malfunction caused Compressor 1801 to shut down Unplanned 1801 SD due to a false high exhaust temp. monitor, started comp. 1800 12/20/2000 0629-0649 0 12/20/2000 0651-0707 341 Regulator failed, Compressor 1807 shut down Unplannned Replaced regulator and restarted compressor 12/28/2000 2328-2335 170 MFC malfunction in 4923 module caused gas swings in plant Unplannned Corrected inlet gas rates Total Flare <= 1 Hour 736 12/4/2000 1738-1855 4,669 Elec/Instru malfunction caused Compressor 1808 to shut down Unplanned Corrected E & i fluctuation/failure and restarted compressor Total F/are> 1 Hour 4,669 Volume Flared 5,405 Measured Safety Pilot 5,633 _O ~ `' n, Continuous Assist 2,844 ~ ti Z o C1 ~ m TOTAL FLARED 13,882 ~ y C~ ,®1 m N o ~ O O ~ ~ O GB 1/19/2001 1:14 PM PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS DECEMBER 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/3/2000 0320-0340 10 Elec/Instru malfunction caused Compressor 1801 to shut down Unplanned Corrected E & I fluctuation/failure and restarted compressor 12/10/2000 1421-1436 7 Elec/Instru malfunction caused Compressor 1801 to shut down Unplanned Corrected E & I fluctuation/failure and restarted compressor 12/15/2000 0031-0038 3 Elec/Instru malfunction caused Compressor 1801 to shut down Unplanned 1801 SD due to a false high exhaust temp. monitor, started comp. 1800 12120!2000 0629-0649 0 12/20/2000 0651-0707 31 Regulator failed, Compressor 1807 shut down Unplannned Replaced regulator and restarted compressor 12/28/2000 2328-2335 15 MFC malfunction in 4923 module caused gas swings in plant Unplannned Corrected inlet gas rates Total Flare <- 1 Hour 66 12/4/2000 1738-1855 396 Elec/Instru malfunction caused Compressor 1808 to shut down Unplanned Corrected E & I fluctuation/failure and restarted compressor A Total Flare > 1 Hour 396 ~- v Volume Flared 462 0 n ~, D ~ ~"'ti3, Measured Safety Pilot 495 v 0 ~ \ ~ Continuous Assist 244 ~ ,~ ° c~ m ,,,,,o, co 3 TOTAL FLARED 1,201 ~ 0 ~ _ _ o' GB 1/19/2001 1:14 PM PHILLIPS ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS DECEMBER 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/3/2000 0320-0340 0 Elec/Instru malfunction caused Compressor 1801 to shut down Unplanned Corrected E & I fluctuation/failure and restarted compressor 12/10/2000 1421-1436 0 EIecllnstru malfunction caused Compressor 1801 to shut down Unplanned Corrected E & I fluctuation/failure and restarted compressor 12/15/2000 0031-0038 0 Elec/Instru malfunction caused Compressor 1801 to shut down Unplanned 1801 SD due to a false high exhaust temp. monitor, started comp. 1800 12/20/2000 0629-0649 0 12/20/2000 0651-0707 0 Regulator failed, Compressor 1807 shut down Unplannned Replaced regulator and restarted compressor 12/28/2000 2328-2335 0 MFC malfunction in 4923 module caused gas swings in plant Unplannned Corrected inlet gas rates 0 Total Flare <= 1 Hour 12/4/2000 1738-1855 Total Flare > 1 Hour Volume Flared 0 0 Elec/Instru malfunction caused Compressor 1808 to shut down Unplanned Corrected E & I fluctuation/failure and restarted compressor 0 0 v 0 ~ ~ y 0 on CD rn n o' L 2~ Z Z~ ca N 0 0 m Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 GB 1/19/2001 1;14 PM BP EXPLORATION, INC. CONSERVATION ORDER N0.219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS DECEMBER 2000 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/3/2000 0320-0340 5 Elec/Instru malfunction caused Compressor 1801 to shut down Unplanned Corrected E & I fluctuationlfailure and restarted compressor 12/10/2000 1421-1436 3 Elec/Instru malfunction caused Compressor 1801 to shut down Unplanned Corrected E & I fluctuation/failure and restarted compressor 12/15/2000 0031-0038 1 Elec/Instru malfunction caused Compressor 1801 to shut down Unplanned 1801 SD due to a false high exhaust temp. monitor, started comp. 1800 12/20/2000 0629-0649 0 12/20/2000 0651-0707 15 Regulator failed, Compressor 1807 shut down Unplannned Replaced regulator and restarted compressor 12/28/2000 2328-2335 8 MFC malfunction in 4923 module caused gas swings in plant Unplannned Corrected inlet gas rates Total Flare <= 1 Hour 32 12/4/2000 1738-1855 203 Elec/Instru malfunction caused Compressor 1808 to shut down Unplanned Corrected E & I fluctuation/failure and restarted compressor n m Total Flare > 1 Hour 203 0 ~ ~ Volume Flared 235 ~ Z ~"~ ~ m o n T~ Measured Safety Pilot 248 ~ ~ c~ 1 1 Continuous Assist 122 `D O ~ ~ ~ TOTAL FLARED 605 ~_ o' ~~ GB 1/19/2001 1:14 PM PHILLIPS ALASKA, INC, CONSERVATION ORDER N0. 219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS DECEMBER 2000 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/3/2000 0320-0340 4 Elec/Instru malfunction caused Compressor 1801 to shut down Unplanned Corrected E & I fluctuation/failure and restarted compressor 12/10/2000 1421-1436 2 Elec/Instru malfunction caused Compressor 1801 to shut down Unplanned Corrected E & I fluctuation/failure and restarted compressor 12/15/2000 0031-0038 1 Elec/Instru malfunction caused Compressor 1801 to shut down Unplanned 1801 SD due to a false high exhaust temp. monitor, started comp. 1800 12/20/2000 0629-0649 0 12/20/2000 0651-0707 11 Regulator failed, Compressor 1807 shut down Unplannned Replaced regulator and restarted compressor 12/28/2000 2328-2335 5 MFC malfunction in 4923 module caused gas swings in plant Unplannned Corrected inlet gas rates Total Flare <= 1 Hour 23 12/4/2000 1738-1855 133 Elec/Instru malfunction caused Compressor 1808 to shut down Unplanned Corrected E & I fluctuation/failure and restarted compressor ni o Total Flare > 1 Hour 133 _ ~ c"- n n n y Volume Flared 156 o c~ ~ m Measured Safety Pilot 167 o rte, Continuous Assist 83 ~ ° ° nee 'ft 0 TOTAL FLARED 406 GB 1/19/2001 1:14 PM