Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutBPX - ENDICOTT
,.. -...t .w:~^/.N/,,y/afoiw.'~/.,~i~/a/~/B/ew/Ba/~~/.~/~'/.M'/s:'~/,~"/.~YaY///~'/.~/~/~/..~/.~i,.9/~~.~'ia/.~'~/~"/~+i~Y,~/.m/.~/M/.s'/Y/.In'B/~YS/.iYr%B/m/,s/®/~/.P/~/p'~/e/m/~/.~/I7.aY/.~/N/m/.M/~'/m/.~/,a~"/r.
AGOCC
GaS DISposi~ion Fll~s
1996
8 PX - ENaiC oTT
a ..... mar'~~:~riairr..wi~iwsSimiro~.~r~~~i.~-:~..®~~io~~rrr~r~.w~.~am~,ri.~~®r~~i,~iarir~~rw~i~;ri~iaim.~i~i~ia»insesiri.~cmiruiei~iai.~.;-ierisieai~~.rir~s~mi~-i.®ir~i~riw~si~isus~r~aoi.®ir~ ~s~imr.~ ~ ...
s
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
January 7, 1997
Alaska Oil & Gas Conservation Commission
ATTN: Wendy Mahan
3001 Porcupine Drive
Anchorage, AK 99501-3192
RECElV~D
JA~t ~ 199?'
Alaska Qil & Gas Cons. Commission
Anchorage
Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10-
422) and Flaring Report covering the Endicott Field for December 1996.
Sincerely,
~~
Paul D. Bly
Manager, Volume, Royalty & Severance
Enclosures
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Ex loration (Alaska) Inc. Endicott 10450 December, 1996
Disposition ~ Volume MCF*
1. Sold Fuel
NGL 14,144
194,807
2. Reinjected 10,573,493
3. Flared or vented less than 1 hour 3,382
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 2 3 2
5. Pilot and Purge 10,199
6. Used for lease operations Assist
Fuel 29,882
919 013
7. Other
TOTAL items 1-7 11,745,152
8. NGL gas equivalent produced 194,807
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that the
Signature
is true and correct to the best of my knowledge.
Title
ate
*Indicate contribution of each pool to total.
Pool Name Code Percent
220100
Ofii~~al l'se Only-Flaring Authorization> l hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
1 /6/97 BP EXPLORATION (ALASKA) INC. Page 1
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
December, 1996
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 3,382 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/21/96 11:40-12:40 232 Ambients rose 7°F over the hour Well 1-25 and well 1-27 were S/I to eliminate
flaring.
TOTAL 232
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
None I I
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
None
TOTAL 0
TOTAL SDN ENDICOTT''
Volume flared less than 1 hour 3,382 0 3,382
Volume flared greater than 232 0 232
1 hour
Pilot Purge 10,199 0 10,199
Assist Gas 29.882 0 29.882
TOTAL FLARED VOLUME 43,695 0 43,695
BP EXPLORATION
December 6, 1996
Alaska Oil & Gas Conservation Commission
ATTN: Wendy Mahan
3001 Porcupine Drive
Anchorage, AK 99501-3192
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10-
422) and Flaring Report covering the Endicott Field for November 1996.
Sincerely,
~~~~ ~.
Paul D. Bly
Manager, Volume, Royalty & Severance
~~~ ~ t3 ~ ~ ~~ 1
Y
... _, J
Enclosures
,,
~~!srlf 11,, :. ~ ,r 1~~~~tfSi~:i~F()I~
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Ex loration (Alaska) Inc. Endicott 10450 November, 1996
Disposition
Volume MCF*
1. Sold Fuel
NGL 14,247
171 911
2. Reinjected 10,462,595
3. Flared or vented less than 1 hour 4,734
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 9,867
6. Used for lease operations Assist
Fuel 32,064
893 949
7. Other
TOTAL items 1-7 11,589,367
8. NGL gas equivalent produced 171,911
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify/hat the foregoing is true and correct to the best of my knowledge.
yit /~/~ I / Cam/
Signature / /lily ~• ~,/ Title . V .•L~' Date ~Z•~~Fj
*Indicate contribution of each pool to total.
Pool Name Code Percent
220100
O)Ificial Use l~nly-Nla.ring Auth~n-i~ation>I hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
•
Form 10-422
Rev. 4/95
.~
12/5/96
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
November, 1996
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 4,113 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
> greater
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
None
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/3/96 12:50-13:00 i26 State safety Ball valve testing on row 1 None necessary.
11/16/96 12:30-13:00 275 POP 1-25 and allow to gass off following corrosion None necessary.
inhibitor treatment
11/22/96 09:20-09:30 221 POP wells and allow to gas off after Pump P1802 None necessary.
was restarted
TOTAL 622
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
None
TOTAL 0
Volume flared less than 1 hour
Volume flared greater than
1 hour
Pilot Purge
Assist Gas
TOTAL SDN ENDICOTT
4,735 1 4,734
0 0 0
9,870
32.075
3 9,867
11 32.064
TOTAL FLARED VOLUME 46,680 15
46,665
Page 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Ex loration (Alaska) Inc. Endicott 10450 October, 1996
Disposition
Volume MCF*
1. Sold Fuel
NGL 15,736
168 277
2. Reinjected 10,720,479
3. Flared or vented less than 1 hour 4,207
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 10,196
6. Used for lease operations Assist
Fuel 31,936
909 581
7. Other
-TOTAL items 1-7 11,860,412
8. NGL gas equivalent produced 168,277
9. Purchased gas
~~~."= Transferred from:
.~
11.' Transferred to:
-l,:~ereby certify that the foregoing is true and correct to the best of my knowledge. / ~j
Signature Title ~~ . I Date `~, 6.1G
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
220100
Official Usc UnI~-Flaring Autt~~~ri~ati~ui>I hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
•
BP EXPLORATION (ALASKA) INC.
1 1 /5/96 ADMINISTRATIVE APPROVAL N0.202.4 Page 1
GAS FLARING INCIDENT REPORT - ENDICOTT
October, 1996
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION-OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 3,955 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
... ,
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
None
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/20/96 22:20-22:30 62 PDP 1-31, allow to gas off Cut 1-27
10/21/96 14:10-14:20 94 POP 2-52 Shut-in 1-25
10/30/96 03:10-03:30 97 POP 2-36, allow to gas off None necessary
TOTAL 253
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
None
TOTAL 0
TOTAL SDN ENDICOTT
Volume flared less than 1 hour 4,208 i 4,207
Volume flared greater than 0 0 0
1 hour
Pilot Purge 10,199 3 10,196
Assist Gas 31.945 9 31.936
TOTAL FLARED VOLUME 46,352 13 46,339
~ ~
s
BP EXPLORATION
~~ ~ ~~` ~
~ t~ k ~~~r~77~,
':.:+ sJ v
October 4, 1996
Alaska Oil & Gas Conservation Commission
ATTN: Wendy Mahan
3001 Porcupine Drive
Anchorage, AK 99501-3192
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
i,~~
.!
Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10-
422) and Flaring Report covering the Endicott Field for September 1996.
Sincerely,
~'''O
G~
Paul D. Bly
Manager, Volume, Royalty & Severance
Enclosures
ALASKA OIL AND GAS CONSERVATION COMMISSION ,
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Ex loration (Alaska Inc. Endicott 10450 Se tember, 1996
Disposition
Volume MCF*
1. Sold Fuel
NGL 13,497
32 928
2. Reinjected 9,799,963
3. Flared or vented less than 1 hour 9,001
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 1 1,13 3
5. Pilot and Purge 9,849
6. Used for lease operations Assist
Fuel 29,276
814 183
7. Other
TOTAL items 1-7 10,719,830
8. NGL gas equivalent produced 32,928
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certif that the foregoing is true and correct to the best of my knowledge.
ice- Yl~ ~ ~ .
Signature ~, Title Date ~d
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
220100
OfYicia( L!se Only-Hlarin~ ,~uthorizstion>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
.. s .,
10/4/96
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
September, 1996
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 7,800 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Page 1
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/11/96 10:20-13:20 7,490 Power outage causing total plant shutdown Reset UPS Breaker and begin full plant start-
up
9/17/96 10:20-11:20 2,570 MGC-B tripped off line during WHRU Maintenance S/I row 2 wells to reduce gas
TOTAL 10,060
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE
9/6/96
9/14/96
9/19/96
9/23/96
9/29/96
TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
01:30-01:40 173 Plant upset during slow-down for MGC-A seal
repairs
02:50-03:00 75 POP 2-14
15:10-15:30 214 POP 2-40, allow to gas off
20:30-20:50 162 2-60 flowback following well work
15:20-16:00 597 POP 2-14, allow to gas off
TOTAL 1,221
ACTION TAKEN TO ELIMINATE CAUSE
Cut 12000 BBLS production to eliminate flaring
S/I 1-21
None, necessary activity during wellwork
Cut 1-19, 1-27 to eliminate flaring
Cut 1-19, 1-27 to eliminate flaring
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/2/96 19:10-20:20 472 POP 2-38 and an ambient Temp increase of 9°F Cut then S/I 1-63, 1-19 to eliminate flaring
9/22/96 20:00-21:20 624 Switch to start-up fuel gas system and depressure Necessary activity to tie new NGL Chiller into
TEG contactor to flare service.
TOTAL 1,096
TOTAL SDN ENDICOTT
Volume flared less than 1 hour 9,021 20 9,001
Volume flared greater than 11,156 23 11,133
1 hour
Pilot Purge 9,870 21 9,849
Assist Gas 29.338 62 29.276
TOTAL FLARED VOLUME 59,385 126 59,259
u
BP EXPLORATION
September 5, 1996
Alaska Oil & Gas Conservation Commission
ATTN: Wendy Mahan
3001 Porcupine Drive
Anchorage, AK 99501-3192
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10-
422) and Flaring Report covering the Endicott Field for August 1996.
Sincerely,
~~ ~
~~~~~ ~ ~ ;
1rx
Paul D. Bly
Manager, Volume, Royalty & Severance
Enclosures
- x~,~,
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Ex loration (Alaska) Inc. Endicott 10450 Au ust, 1996
Disposition
Volume MCF*
1. Sold Fuel
NGL 12,882
0
2. Reinjected 9,505,338
3. Flared or vented less than 1 hour 10,527
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 2 1 8
5. Pilot and Purge 10,187
6. Used for lease operations Assist
Fuel 30,831
782 757
7. Other
TOTAL items 1-7 10,352,740
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify .tfiat the foregoing is true and correct to the best of my knowled/(gye.
Signature ~ /~~~~ ~r ~~~ Title t~7t~~. Date r~x?~~~~"
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
220100
Official Use Only-Flariii2 t~uthc~riz^tuon>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
•
9/4/96 BP EXPLORATION (ALASKA) INC. Page 1
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
August, 1996
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 7,884 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
None
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION bF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
8/1/96 04:50-05:20 ~ 523 +TAPS S/D, prorated to 60%, PDP 3-33 for TGLR None, necessary action to reduce rate
8/1 /96 08:40-09:00
8/1/96 20:20-20:30
8/5/96 07:50-08:10
8/7/96 02:50-03:10
8/10/96 00:50-0 i :00
8/10/96 17:50-18:00
8/10/96 21:00-21:50
8/16/96 07:40-08:20
8/16/96 09:30-09:40
8/18/96 09:50-10:30
8/30/96 13:50-14:20
8/30/96 16:10-16:30
TOTAL
183
147
106
211
127
197
166
145
201
168
289
192
2,655
control as reducing rate
POP 1-21, allow to gas off
Bring up plant after TAPS proration ended
POP 2-40, 1-27
POP 2-40, 2-52
POP 2-14
POP 2-14
POP 2-52
POP 1-21
POP 2-14
POP 2-36
POP 1-19, allow to gas off
POP 1-27, allow to gas off
None, more gas was required to operate plant
at low rates
None, necessary to bring plant online
Cut 1-19, Shut in 2-40
Shut in 2-40
Shut in 1-21
Shut in 2-52
Shut in 3-17, 1-31
Shut in 2-14
Cut 3-03
Shut in 2-40
None, necessary activity during wellwork
Shut in 1-21
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN;TO ELIMINATE CAUSE
8/11/96 18:20-19:30 218 POP 1-03 & 1-67 after corrosion inhibition treatment, None, necessary activity during wellwork
allow to gas off
TOTAL 218
•
..
9/4/96
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
August, 1996
Page 2
Volume flared less than 1 hour
Volume flared greater than
1 hour
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
TOTAL SQN ENDICOTT
10,539 12 10,527
218 0 218
10,199 12 10,187
30.867 36 30.831 •
51,823 60 51,763
•
BP EXPLORATION
August 6, 1996
Alaska Oil & Gas Conservation Commission
ATTN: Wendy Mahan
3001 Porcupine Drive
Anchorage, AK 99501-3192
•
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10-
422) and Flaring Report covering the Endicott Field for July 1996.
Sincerely,
~.Q.
Robert A. Reynolds
Manager, Volume, Royalty & Severance
Enclosures
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Ex loration (Alaska Inc. Endicott 10450 Jul 1996
Disposition
Volume MCF*
1. Sold Fuel
NGL 8,208
0
2. Reinjected 4,297,583
3. Flared or vented less than 1 hour 6,095
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 24,933
5, Pilot and Purge 8,548
6. Used for lease operations Assist
Fuel 29,366
420 551
7. Other
TOTAL items 1-7 4,795,284
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks: Endicott shut down July 16-29 for maintenance and modifications
I hereby certifythat the foregoing is true and correct to the best of my knowledge
Signature , Title /W(,(j y~.tc-t.~+.~ Date
*Indicate contribution of each pool to total.
Pool Name Code Percent
220100
Qfliciul 'tic Otilv-Fl~iring .~uthvriza[iun>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
•
Form 10-422
Rev. 4/95
8/5/96
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202,4
GAS FLARING INCIDENT REPORT - ENDICOTT
July, 1996
Page 1
Events less than or equal to 1
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE .ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 5,983 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Events
DATE
7/8/96
than 1 hour
~~
TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
04:40-05:50 4,179 MGC A tripped to idle.
TOTAL 4,179
CTION TAKEN TO ELIMINATE CAUSE
Shutin wells 1-63, 1-65 and 1-03.
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE
7/3/96
TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
07:40-07:50 116 POP 2-50 after scale inhibitor treatment, allow to gas None, necessary activity during wellwork
off
TOTAL 116
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/14/96 00:00-05:50 102 Vented through PE Flare at SDI to depressure None, necessary for safe plant shutdown
interisland 3 Phase Line in preparation for total activities
facility shutdown.
7/17/96 16:20-18:40 848 Partial hydrate formation in Startup fuel gas heater None, necessary for safe plant shutdown
required bypass of PSV directly to flare to prevent activities
total blockage by hydrates.
7/24/96 08:20-10:10 476 Using gas injection well 1-05 for source gas. None, necessary to run at this rate to prevent
choke from hydrating shut due to Joule-
Thomson effect.
7/24/96 11:40-23:50 1,790 Using gas injection well 1-05 for source gas. None, necessary to run at this rate to prevent
choke from hydrating shut due to Joule-
Thomson effect.
7/25/96 00:00-23:50 4,146 Using gas injection well 1-05 for source gas. None, necessary to run at this rate to prevent
choke from hydrating shut due to Joule-
Thomson effect.
7/26/96 00:00-19:10 1,992 Using gas injection well 1-05 for source gas. None, necessary to run at this rate to prevent
choke from hydrating shut due to Joule-
Thomson effect.
•
•
8/5/96
I
7/26/96 19:40-20:40 I
7/27/96 00:00-19:10 I
7/27/96 19:40-20:40
7/29/96 11:00-23:50
7/30/96 00:40-03:20
TOTAL
Volume flared less than 1 hour
Volume flared greater than
1 hour
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
~ ~
BP EXPLORATION (ALASKA) INC. Page 2
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
July, 1996
102 Using gas injection well 1-05 for source gas. None, necessary to run at this rate to prevent
choke from hydrating shut due to Joule-
Thomson effect.
1,992 Using gas injection well 1-05 for source gas. Calibrated P13111
Questioned P13111 values, so defaulted to 7/26
readings.
102 Using gas injection well 1-05 for source gas. Calibrated P13111
Questioned P13111 values, so defaulted to 7/26
readings.
8,040 Plant startup from total shutdown. None, necessary to use high GOR wells to
deinventory seawater from production lines
1,181 Flared while trying to bring a second MGC online. None, necessary activity during startup.
20,771
TOTAL SDN ENDICOTT
6,099 4 6,095
24, 950 17 24, 933
•
8,554 6 8,548
29.386 20 29.366
68,989 47 68,942
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Ex loration Alaska Inc. Endicott 10450 June, 1996
Disposition
Volume MCF*
1. Sold Fuel
NGL 12,225
0
2. Reinjected 8,802,767
3. Flared or vented less than 1 hour 33,577
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 5 1 8
5. Pilot and Purge 9,859
6. Used for lease operations Assist
Fuel 29,894
764 184
7. Other
TOTAL items 1-7 9,653,024
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby certif th the foregoing is true and correct to the best of my knowledge.
Signature Title irn'G~. 1~(lt-. Date
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
220100
Olficial l7sc Only-Flaring r3uthoriza(ion>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
a r
Note: All volumes must be corrected to ~
pressure of 14.65 psia and to a temperatures
of 60 degrees F. Report due by the 20th of ~
the month folowing the month of m ,
disposition. Authority 20 AAC 25.235.
a
•
t:
C f'1°1
r ~
O r'19
ca
rn
v
7/2/96 BP EXPLORATION (ALASKA) INC. Page 1
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
June, 1996
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EGMINATE CAUSE
TOTAL 30,443 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
.~~.. ~-
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
None this month
TOTAL 0 •
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/1/96 18:50-19:20 544 POP gas injection well 2-06 following setting None, problems controlling process pressures
I (repaired SSSV as Gas lift header pressure varied causing GL
6/3/96 12:40-13:20
6/3/96 14:00-14:20
6/6/96 21:00-21:30
6/7/96 20:30-21:10
6/16/96 08:20-08:50
6/16/96 20:20-21:00
6/28/96 01:00-01:20
6/29/96 22:10-22:40
TOTAL
399
598
278
248
470
174
189
270
3,170
wells to become unstable
Start MGCB following essential repairs, POP wells to None essential activity
Uoad compressor
Start MGCB following essential repairs, POP wells to None essential activity
load compressor
POP well 2-52 as ambient temp began to drop
SI Gas injection well 1-15 to repair well head leak
Flowback 3-25 post well work nd bleed pressure
from 1-67 prior to well work
POP well 1-39 after flowline repair
POP well 1-25
PO~ well 3-23, would not gas off
o ~ ~
n• c rn
~~ ~ n
~~ ~ rn
~~ ~ ~
~° r-n
~~ D
None allow to gas off
SI well 1-19 to eliminate flaring at 21:10
None, necessary activity during wellwork
None, allow to gas off •
SI well 4-02 to eliminate flaring
SI well 3-23
7/2/96 BP EXPLORATION (ALASKA) INC. Page 2
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
June, 1996
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF'INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
6/1/96 16:00-17:10 392 POP gas injection well 2-06 following setting None,. problems controlling process pressures
repaired SSSV as Gas lift header pressure varied causing GL
wells to become unstable
6/15-6/18/96 lasted 72 hrs 127 3500 gallons of propane vented to the flare as part None, venting necessary for safe out of system
of procedure to safe out NGL system prior to it's removal from service. New Chiller
will be installed during summer shutdown
TOTAL 519
TOTAL SDN EN DICOTT
Volume flared less than 1 hour 33,613 36 33,577
Volume flared greater than 519 1 518
1 hour
Pilot Purge 9,870 11 9,859
Assist Gas 29.926 32 29.894
TOTAL FLARED VOLUME 73,928 80 73,848
sn
0
a: ~
a ,~
~~ ~
a ~
~° c O
m°~° ~
3 coo
~ n'[
a a
•
•
BP EXPLORATION
June 14, 1996
Wendy Mahan
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501-3192
BP Expbration (Alaska) Inc.
Endicott-Prudhoe Bay
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519.6612
(907) 561-5111
RECEIVED
JUN 1 g 1996
Subject: 1996 Endicott Shutdown Notification
Dear Ms. Mahan:
Alaska Oi! & Gas Cons. Commisala~
Anchorage
This letter is intended to provide you with advance notification of a planned full plant
shutdown at BP's Endicott facility next month.
We understand that no regulation exists for advanced notification /permitting of flaring
events, however, we hope that you will find this information useful both in responding
to public inquiry and for later review of our July /August gas disposition reports. As in
the past with our regular operations, it is our intent to accurately record and report the
duration, cause and remedial actions taken to minimize flaring.
The full facility shutdown is planned to commence on July 15, 1996, and is scheduled
to last 18 days, field ramp down will begin before this time. The main drivers for the
shutdown are twofold:
1. Shutdown O&M Scope:
This includes repairs/maintenance requiring a full plant shutdown, the main items
being:
• 10 year vessel inspections on 20 vessels.
• Replacement of our flare tip
• Replacing/rebuilding several valves.
• Replacing eroded/corroded pipework.
• Essential maintenance and upgrade of our main compressors, turbines and
auxiliaries
• Perform PSV certifications
• Inspection and possible repair of our waste water collection tank.
2. Projects Scope:
This work includes significant modifications and upgrades to our produced water
handling process. As above this work can only be performed while the facility is
shut down. The major activities will be:
• Modifying the internals of our 1st and 2nd stage separators.
• Installation of additional crude heaters
• Modifications to our UHM/PHM systems
June 14, 1996
Page 2
As the process plant is ramped down and safed out it will be necessary to
depressurize the whole system. In order to achieve this in a safe and efficient manner
the associated gas will be flared either through our existing HP / LP flare system or
through a small temporary flare. All equipment to be used is covered by air quality
permit AQC 9373-AA007, and an existing request for modification. In all cases the
volumes of gas flared will be recorded and reported on the gas disposition reports for
July /August. As per our normal operating practices we will take all possible steps to
limit the volume of gas flared.
Should you have any questions regarding the above, please do not hesitate to call us
(907 659 6544).
Sincerely,
~ ~'!. ~~~
r.~. o-~--- S
Simon Merrett/B.J.Strong/David. Tillotson
Endicott Production Coordinators
RECEIVED
`t1i1:~& Gas ~c~ns +~lflifill'
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Ex loration (Alaska) Inc. Endicott 10450 Ma 1996
•
a
m
cA
m
0
- c..
~~
0
o ~ `'
r~ ~ Q
c~ m
,-:~ ~.
h cp
0
~ m
Disposition
Volume MCF*
1. Sold Fuel
NGL 13,365
50 205
2. Reinjected 8,378,325
3. Flared or vented less than 1 hour 21,255
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 8 3 3
5. Pilot and Purge 10,190
6. Used for lease operations Assist
Fuel 29,925
842 200
7. Other
TOTAL items 1-7 9,346,298
. NGL gas equivalent produced 50,205
. Purchased gas
0. Transferred from:
11. Transferred to:
Remarks:
I hereby certif that the foregoing is true and correct to the best of my knowledge.
Signature Title ~G2, l/(X~C.~y~ Date ~, ~ ¢
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
220100
Official C?se Only-Fl,irin~~ ;~u[hori~ation>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
6/5/96 BP EXPLORATION (ALASKA) INC. Page 1
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
May, 1996
Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 17,393 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TQ'ELIMINATE CAUSE
5/4/96 12:00-13:00 193 Ambient increased during CIT flowbacks Cut 1-27 at 12:20 and 1-31 at 12:40, then SI 1-
• 31 at 12:50 to eliminate flaring
5/13/96 20:10-21:10 125 Well 2-52 trend indicates gas rate coming up SI 2-52 at 20:30 and POP 1-31 at 20:40, then
cut 1-31 as flaring continued
TOTAL 318
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
5/5/96 07:10-07:50 188 Bleedin pressure off 3-29 to set plug
5/8/96 07:00-07:20 161 POP wells following TAPS restriction
5/8/96 17:00-17:30 362 POP well 1-27 after CIT
5/15/96 05:40-06:10 132 POP 1-21
5/15/96 16:50-17:10 209 POP well 2-14 post wellhead repair
5/17/96 23:20-23:40 150 POP well 2-40
5/20/96 14:40-15:10 167 POP 1-27 and 3-25 as NGL start up commenced
5/23/96 19:40-20:10 336 SI well 1-29 for well work, POP 1-25
• 5/25/96 20:20-20:40 382 POP well 2-40
5/28/96 17:20-17:40 184 SI well 2-06 gas injector for state test
5/28/96 18:20-19:00 224 POP well 3-15 following flowline repair
5/29/96 11:40-11:50 198 POP well 2-14 following flowline repair
5/29/96 14:30-14:50 167 POP well 2-36 following flowline repair
5/30/96 16:10-16:50 236 POP well 3-09 following flowline repair
5/31/96 10:20-11:00 356 POP well 4-38 to warm up for State test
5/31/96 14:30-14:50 128 POP wells 1-21 and 1-27 to load test compressors
5/31/96 20:30-20:50 300 POP well 2-18
TOTAL 3,880
ACTION TAKEN TO ELIMINATE CAUSE
None, essential activity
None, allow to gas off as plant stabilized
None allow to gas off
SI well 1-21
None, allow to gas off ~~:
SI well 2-40 as flaring continued c
SI 1-27 and 3-25 again
SI 1-25, POP 1-29 again
SI well 2-40 as flaring continued o ~
SI 3-15 for flowline repair
None, allow to gas off 3
None, allow to gas off ~
None, allow to gas off N
None, allow to gas off °
S! 4-38 after test
SI well 1-21 as flaring continued
Allow to gas off
~.-~
_i r..i.i
o
C
rn
Q
6/5/96
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
May, 1996
Page 2
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
5/8/96 14:20-15:20 515 POP High GOR well i-25 after CIT
TOTAL 515
ACTION TAKEN TO ELIMINATE CAUSE
SI 1-49 at 15:00, 1-31 at15:08 then 2-40 at
15:12 to get out of flare
TOTAL SDN ENDICOTT
Volume flared less than 1 hour 21,273 18 21,255
Volume flared greater than 833 0 833
1 hour
Pilot Purge 10,199 9 10,190
Assist Gas 29.950 25 29.925
TOTAL FLARED VOLUME 62,255 52 62,203
•
a_
~
~. s'C7
c rn
T~ z t1
~ rn
A7 3
m~ Q
~
C
3 0-,
rr
3
ors
0
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Ex loration (Alaska Inc. Endicott 10450 Aril, 1996
•
•
Disposition
Volume MCF*
1. Sold Fuel 13,685
NGL 171 500
2. Reinjected 9,027,617
3. Flared or vented less than 1 hour 16,431
4. Flared or vented greater than 1 hour 5,042
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 9,863
6. Used for lease operations Assist 25,641
Fuel 910 872
7. Other ~
O
TOTAL items 1-7 ~. ~ 10,180,651
-t
w O
8. NGL gas equivalent produced o m 171,500
9. Purchased gas n
~ ~
~
3
10. Transferred from:
11. Transferred to:
Remarks:
I hereby certif th t the fore oing is true and correct to the best of my knowledge.
Signature Title ~~2. l/Ul. Date J (o
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
220100
Official ~'~~e Only--Flariil s' ;~uth~~rtzation>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC. 9
5/3/96 ADMINISTRATIVE APPROVAL N0.202.4 Pa e 1
GAS FLARING INCIDENT REPORT - ENDICOTT
April, 1996
Unplanned Events less than or equal to 1 hour
TE TIME
TOTAL
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO'ELIMINATE CAUSE
14,817 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Events greater than 1 hour
DATE TIME
4/4/96 09:20-10:20
4/9/96 09:50-10:50
4/17/96 11:50-13:00
4/19/96 09:00-10:00
4/20/96 11:00-12:00
4/28/96 15:40-16:40
TOTAL
VOLUME DESCRIPTION OF INCIDENT & CAUSE
131 Ambient temp increased
760 Ambient temp increase concurrent with well work
615 Ambient temp increased 3F
349 POP 1-27, ambient then increased
375 Ambient temp increase 2F
306 TAPS proration to 50%, reduced rates.
ACTION TAKEN TO ELIMINATE CAUSE
Cut 1-01 and 1-27 at 09:30, then SI 1-21 at
10:20 to eliminate flaring
Cut 1-27 and 1-31 at 10:40
Cut 1-27 to 100b at 12:20 then SI at 12:50
SI well 1-31 at 09:50
SI 1-39 at 11:15 then SI 1-29 at 12:00
Allowed plant to stabilize following rapid rate
reduction, cut 1-27 to 100b at 16:30
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CADS ACTION TAKEN TO ELIMINATE CAUSE
4/2/96 18:40-19:10 166 POP 1-19 following flowline repair None, allow to gas off
4/6/96 21:20-21:50 505 POP well 1-21 ~ ~ Allowed to gas off but SI again at 21:50.
4/18/96 08:40-09:10 302 POP 2-14 to clean up Q. ~
~ P1'! Allow to gas off, SI 1-27 at 09:00
4/19/96 17:30-18:10 393 POP 3-23 Post static survey '~ "''~ (`1 None, allow to gas off
4/25/96 01:30-02:10 97 POP 3-03 n Q Pit SI 3-03 at 02:10
•
4/26/96 16:20-17:00 162 POP 2-28 ,~ ~ °O
a ~ SI 3-23 to eliminate flaring at 18:45
TOTAL 1,625 ~ ~a Pi'1
~ °' r-~f
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf P, '
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/8/96 09:20-10:40 1,118 POP well 1-01 for well work Cut 1-39 to 35b and 1-27 to 90b at 09:40, SI
° well 2-14 at 10:30
4/8/96 16:10-17:20 154 SI 3-11 for well work while 1-01 work ongoing POP 3-03, SI 1-25 and 2-14 again
4/15/96 13:00-14:00 944 POP 2-14 following remedial well work Well gassed of 1-27 SI at 13:20, 2-14 SI again
at 14:00
4/17/96 08:40-09:40 294 POP 1-35 and 4-26 Cut 1-39 to 60b at 09:10, SI 3-25 at 09:30
TOTAL 2,510
r a
5/3/96
Volume flared less than 1 hour
Volume flared greater than
1 hour
Pilot Purge
• Assist Gas
TOTAL FLARED VOLUME
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
April, 1996
Page 2
TOTAL SDN ENDICOTT
16,442 11 16,431
5,046 4 5,042
9,870 7 9,863
25.659 18 25.641
57,017 40 56,977
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Ex loration (Alaska) Inc. Endicott 10450 March, 1996
Disposition
Volume MCF*
1. Sold Fuel
NGL 14,232
158,312
2. Reinjected 10,236,253
3. Flared or vented less than 1 hour 21,037
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 6,419
5. Pilot and Purge 10,193
6. Used for lease operations Assist
Fuel 28,653
976 077
7. Other
TOTAL items 1-7 11,451,176
8. NGL gas equivalent produced 158,312
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks: AnChOrage
I hereby certif th the foreg ing is true and correct to the best of my knowledge.
Signature ~ ~i't~n~ Title M.(~(L Vo(.y//yE Date ~(I`{' 4(_
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
220100
Official U~~~ Only-Flaring ,aalh~~rization>l hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
4/4/96 ADMINISTRATIVE APPROVAL N0.202.4 Page 1
GAS FLARING INCIDENT REPORT - ENDICOTT
March, 1996
•
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 20,406 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME
j3/22/96 11:00-12:00 355 DESCRIPTION OF INCIDENT & CAUSE
Ambient temps rose 5F in 30 minutes ACTION TAKEN TO ELIMINATE CAUSE
SI well 2-18 at 11:15, Sl well 1-25 at 12:00.
V 3/26/96 04:50-06:40 497 Ambient temp rose during white out conditions Limited access to wells due to poor weather.
Cut well 1-29 from 110b to 70b at 4.20am, then
SI at 6.35am.
TOTAL 852
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
3/23/96 15:40-16:30 315 POP well 1-01 after choke repair, allow to gas off SI well 1-01 again.
3/23/96 20:10-21:00 327 POP well 1-01 SI well 2-18
TOTAL 642
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE
I/ 3/3/96
• 3/3/96
p~3/19/96
3/20/96
03/24/96
//3/24/96
TIME VOLUME
13:40-15:20 1,243
18:50-19:50 2,633
14:50-16:30 296
04:40-05:40 506
02:50-03:50 472
19:50-21:40 420
TOTAL 5,570
DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO-ELIMINATE CAUSE
Plant s/down and depresurization for injection quit None, had to depressure plant
replacement
Restarting plant after emer ency shutdown. ~ None, I&E technicians were called out but
Loading compressors which suffere Initial antisurge problem only occurred twice.
problems
POP well 1-35 and allow to gas off None initially, then cut 1-01 to 60b and 2-36 to
POP 2-26 and allow to gas off
POP well 2-36 as ambient cooled
POP well 3-05 after setting new Lift gas valves,
allow to gas off RECEi~'ED
APR 0 9 1995
Alaska Oil & Gas Cons. Cammisslort
Anchorage
45b to eliminate flaring at 16:30
None initially, well was SI again at 05:35
Cut well 2-36 to 30b (from 54b) to eliminate
flaring.
St welll-35 at 19:50 to limit flare, SI well 2-18
at 20:54, SI wells 1-39 and 4-26 at 21:40 to
eliminate flare.
BP EXPLORATION (ALASKA) INC. g
4/4/96 ADMINISTRATIVE APPROVAL N0.202.4 Pa e 2
GAS FLARING INCIDENT REPORT - ENDICOTT
March, 1996
Volume flared less than 1 hour
Volume flared greater than
1 hour
Pilot Purge
• Assist Gas
TOTAL FLARED VOLUME
u
TOTAL SDN ENDICOTT
21, 048 11 21, 037
6,422 3 6,419
10,199 6 10,193
28.669 16 28.653
66,338 36 66,302
~~c~~v~~
APR d 9 1996
Alaska Oil & Gas Cons. Commission
Anchorage
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Ex loration (Alaska) Inc. Endicott 10450 Februar 1996
u
•
Disposition
Volume MCF*
1. Sold Fuel
NGL 14,145
175 687
2. Reinjected 9,712,716
3. Flared or vented less than 1 hour 21,048
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 18,082
5. Pilot and Purge 9 , 5 3 3
6. Used for lease operations Assist
Fuel 24,184
919 739
7. Other
TOTAL items 1-7 10,895,134
8. NGL gas equivalent produced 175,687
9. Purchased gas
10. Transferred from: }}
4 pi! .~ .~
1 S ,,~~, ,ti
i',i ~,y yi..!
11. Transferred to:
Remarks:
I hereby certif that the foregoing is true and correct to the best of my knowledge.
Signature Title 1~/L(,(t- VOlilNbt Date 17 Q(o
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
220100
Offici:a U~r O~~I~-Flaring Authorizati~~n>I hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
3/5/96 ADMINISTRATIVE APPROVAL N0.202.4 Page 1
GAS FLARING INCIDENT REPORT - ENDICOTT
February, 1996
Events less than or equal to 1 hour
TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 15,591 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
DATE
2/10/96
•
2/14/96
n
LJ
Events greater than 1 hour
TIME VOLUME
18:50-20:50 698
04:10-08:00 8,701
2/15/96 22:50-23:50 492
2/16/96 01:30-04:30 1,194
2/23/96 06:40-08:00 3,241
2/25/96 09:20-10:20 359
2/26/96 18:10-19:10 580
TOTAL 15,26
DESCRIPTION OF INCIDENT & CAUSE
Production from SDI was slugging during downhole
corrosion inhibition treatments. During this upset,
the corrosion crew also returned well 2-18 to
production following a downhole treatment.
MGC-B exhaust temperature rose to the alarm point.
MGC-B was slowed to troubleshoot the cause of the
high exhaust temperature. Flaring continued at
=130 mmscfd for 40 minutes until the cause was
found (PHM temperature control valve was closed
but indicated open). This valve was then opened
and flaring was reduced to =20 mmscfd at which
time the plant was shutdown on high 1st stage level
(valve logic failure). Flaring continued as wells were
brought back on line and the process restabilized.
ACTION TAKEN TO ELIMINATE CAUSE
Increased gas lift rates at SDI to change flow
regime from slug to stratified flow, which
successfully stabilized the process.
MGC-B was sped back up as exhaust
temperature fell once the indicated position
problem on the PHM temperature control valve
was corrected. The plant was restabilized
following the subsequent plant shutdowns.
(flaring was down to an intermittent =4 mscfd). The The logic failure on the 1st stage level control
plant was then shutdown a final time resulting from a valve has subsequently been fixed.
liquid slug and subsequent high 1st stage level.
Ambient temperature increased 3.7°F in 30 minutes. Shut-in well 1-35.
Ambient temperature increased 1.5°F in 10 minutes, Production rates were sequentially reduced in
then 3.4°F in 10 minutes, then 5°F in 30 minutes. response to each temperature increase in an
Flaring was intermittent during this time. attempt to close the flare valve.
MGC-B shut down on high exhaust temperature. Reduced production rates to eliminate flaring.
Ambient temperature increased 10.5°F during the Three wells were shut-in to eliminate flaring.
hour. Flaring was intermittent over this period.
Ambient temperature increased 4.8°F in 30 minutes. Reduced production rates to eliminate flaring.
•
3/5/96 BP EXPLORATION (ALASKA) INC.
Page 2
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
February, 1996
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
2/1/96 13:00-13:50 265 Put well 2-52 on production. Reduce rates on wells 1-25 and 1-27.
2/1/96 20:20-21:10 458 Put well 1-25 on production. Reduce production rates to close flare valve.
2/5/96 18:40-19:00 118 Attempting to flow 1-01 following rig workover; well
slugging.
2/5/96 20:30-21:00 233 Attempting to flow 1-01 following rig workover; well
slugging.
2/5/96 21:20-21:30 118 Attempting to flow 1-01 following rig workover; well
slugging.
2/9/96 20:00-20:20 173 POP 1-33 following gas lift installation. Well Increase lift gas and line out well.
slugging.
2/9/96 22:10-22:30 70 Put well 1-31 on production. Shut-in well 1-25.
2/13/96 11:40-12:10 220 MGC dewpoint testing (open recycle valves to raise
gas temp as required for sampling).
2/13/96 14:30-15:20 740 MGC dewpoint testing (open recycle valves to raise
gas temp as required for sampling).
2/13/96 15:50-16:30 1094 MGC dewpoint testing (open recycle valves to raise
gas temp as required for sampling).
2/14/96 20:40-21:00 245 Put well 1-27 on production. Allow well to gas off at reduced choke.
2/18/96 21:10-22:00 421 Put well 1-27 on production. Shut in well 1-27.
2/23/96 19:50-20:10 378 Put well 2-36 on production. Reduce production rates until flare valve
closed.
2/26/96 08:50-09:30 627 Put well 2-36 on production. Shut-in well 2-36.
2/27/96 05:20-05:30 107 Put well 1-35 on production. Shut-in well 1-35.
2/27/96 13:40-13:50 59 Bleeding 2-60 inner annulus down prior to rig move.
2/27/96 15:20-15:20 71 Put well 2-42 on production. Allow to gas off at reduced choke setting.
2/29/96 20:20-20:20 78 Put well 2-40 on production. Shut-in well 2-40.
TOTAL 5,475
•
3/5/96
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
February; 1996
Page 3
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME
2/1/96 22:00-23:20
2/5/96 08:20-09:30
2/6/96 22:00-23:00
2/14/96 15:20-17:00
2/17/96 18:00-19:00
TOTAL
Volume flared less than 1 hour
Volume flared greater than
1 hour
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
281 Running maximum production rates, resulting in Reduced production rate on well 1-27
intermittent flaring
156 Put well 1-01 on production Allow well to gas off at reduced choke setting
281 Put well 2-18 on production Shut in well 1-31; reduce choke on well 1-27
1,497 Put well 2-14 on production. Flaring was intermittent Reduce rates on wells 1-61, 1-63, 1-65, 2-18
over the last 30 minutes of this event. and 2-48 until flare valve closed.
617 Put well 3-09 on production. Shut in well 1-27.
TOTAL SDN ENDlCOTT
21,066 18 21,048
18,097 15 18,082
9,541 8 9,533
24.204 20 24.184
72,908 61 72,847
} s .'fYf
+i i "t :~ ~j
I spoke to Dave Van Tuyl on March 18, 1996 about the following events that were
reported for February:
2/ 14/96 B main high exhaust temperature
The plant was s/d 4 times over 4 hours. They flared continuously but sometimes the valve
was closed. Over a 10 minute average they were flaring, though. The B main exhaust got
hot and slowed B main down. They flared for 1 hr 20 minutes total. 40 minutes at 130
mmscfd. It was caused by the exhaust gas used to heat the glycol, seawater, etc.If they
lose a heat sink, the temperature will rise. The temp. control valve for the crude heater
was closed, although it said it was open in the control room. When B main was loaded the
flare was down to 20 mmscfd. 50-60 mmscfd is the minimum average throughput. Next,
flaring was caused by a high 1st stage level control valve. The logic failed for the 2nd
flaring interval, and the level kept going up, which caused the 3rd shutdown. The 2nd and
3rd shutdowns lasted 1 hr 40 minutes. During the 3rd shutdown, an operator had to hand
control a manual valve, and wasn't fast enough, causing 50 minutes of the flaring. A 4th
shutdown was caused by a slug. This flaring lasted 1 hr 10 minutes. Total flared was 8.7
mmscf.
2/23/96 B Main high exhaust temperature
B main s/d on high exhaust temp. and was down 1 hr and 20 minutes. Cause of shutdown
was a position indicator on the WHRU dampers. 3 mmscf were flared
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Ex loration (Alaska) Inc. Endicott 10450 Januar 1996
•
Disposition
Volume MCF*
1. Sold Fuel
NGL 15,869
193 652
2. Reinjected 10,098,236
3. Flared or vented less than 1 hour 22,023
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 7,178
5. Pilot and Purge 10,188
6. Used for lease operations Assist
Fuel 26,267
1 005 244
7. Other
TOTAL items 1-7 11,378,657
8. NGL gas equivalent produced 193,652
9. Purchased gas
~~ _
;°"!~
10. Transferred from:
11. Transferred to:
Remarks:
I hereby certi at the foregoing is true and correct to the best of my knowledge.
Signature ~ Title 7i Date /bl.(~(L 1/Ot..
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
220100
Offici;tl Use Only-Flarinb Authoriia~ion>1 Lr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
2/5/96 BP EXPLORATION (ALASKA) INC.
Pa e 1
8
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
January, 1996
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 20,832 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN-TO ELIMINATE CAUSE
1/4/96 16:00-18:40 4,312 Solenoid failed on MGC-A turbine axial compressor Replaced failed solenoid valve.
~~ air bleed valve, resulting in bleed valve staying open.
,~~®u ~' MGC-A horsepower reduced si nificantly as a result.
M
-
~
'
~
> OU,
~ Dort
w Wli
5~.
e.
vu1
1/12/96 06:20-08:50 848 Intermittent flaring resulted from SD! slugs as well 3- Shut-in well 1-25 and well 2-40.
15 tripped shut multiple times, and well adjustments
were being made to compensate.
1/25/96 09:30-10:30 817 Reduce rates leaving plant to 35% as requested by Adjusted wells to correspond to Alyeska rate
Alyeska due to high Valdez inventory; preparing to cut (included opening some high gas rate wells
shut down MGC-B. to maintain plant gas pressure at this reduced
nomination).
1/29/96 01:10-02:10 192 Ambient temperature increased 3°F in 50 minutes. Shut-in well 1-25.
1/30/96 16:10-17:10 345 Ambient temperature increased 6°F in 60 minutes. Reduced choke setting on well 1-27
TOTAL 6,514
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE , TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
•
1/13/96 20:50-21:00 190 Put well 2-i8 on production. Shut-in well 2-52.
1/14/96 08:40-09:00 188 Put well 2-52 on production for cycle test. Shut-in well 1-25.
1/15/96 12:30-13:20 375 Put wells 3-33 and 4-42 on production. Shut-in well 3-11 while 3-33 and 4-42 gas oft.
1/23/96 18:10-18:30 109 Put well 1-31 on production Shut-in well 2-52
1/27/96 15:40-15:40 165 MGC-B start-up
1/30/96 13:10-13:20 188 Put well 1-63 on production Shut-in well 1-25 while 1-63 gassed off.
TOTAL 1,215
2/5/96 BP EXPLORATION (ALASKA) INC.
Page 2
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
January, 1996
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
~~~
DATE
TIME
VOLUME .,.
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
1/8/96 07:30-08:30 205 Put well 2-52 on production. Allow well to gas off.
1/9/96 18:40-19:50 202 Return well 2-18 to production following removal of Adjust chokes on wells 2-52 and 2-40; reduce
downhole screen gas lift rates on wells 1-35 and 2-08
1/20/96 18:10-19:10 265 Put well 4-42 on production; resulted in modest slug Allow well to gas off and process to restabilize
from SDI.
TOTAL 672
•
TOTAL SDN ENDICOTT
Volume flared less than 1 hour 22,047 24 22,023
Volume flared greater than 7,186 8 7,178
1 hour
Pilot Purge 10,199 11 10,188
Assist Gas 26.296 29 26.267
TOTAL FLARED VOLUME 65,728 72 65,656
•