Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutBPX - ENDICOTT8/,®/~/~/~/~~~/~/~'Y~/Nl®/O/O/aV//1'/.!'Yf/~Y®/®/aI/N/B/.0'/~/A/A/~/®/.Y/.A'/i/f/~Y®/®/.~/~/®/6F~'~7b~.:~/L"~nl AGOCC GAS DIsposi~ion Files 1997 $?~X -EN.DiCOTT ~ ~ BP EXPLORATION January 8, 1998 Alaska Oil & Gas Conservation Commission ATTN: Wendy Mahan 3001 Porcupine Drive Anchorage, AK 99501-3192 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10- 422) and Flaring Report covering the Endicott Field for December 1997. Sincerely, ~~ Paul D. Bly Manager, Volume, Royalty & Severance Enclosures ~ ' r I '' ~.' ~„~ ...., ~ ~1 s t"_~-7 1'7"~ t~ ' C.C7 ~,~F,.,j ~..,~ ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Endicott 10450 December, 1997 Disposition Volume MCF* 1. Sold Fuel NGL 16,989 187,955 2. Reinjected 10,433,607 3. Flared or vented less than 1 hour 7,167 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 10,186 6. Used for lease operations Assist Fuel 36,704 938,836 7. Other TOTAL items 1-7 11,631,444 8. NGL gas equivalent produced 187,955 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify that the foregoing is true and correct to the best of ~xc~-~Uv~~ ,~ ~ Signature Title '~+. Date /, 7. S Form 10-422 Rev. 4/95 *Indicate contribution of each pool Pool Name Code Percent 220100 Official Use Only-Flaring Authoriza 1. Safety MCF 2. Lease MCF 3. Conserv. Purpos MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 1 /6/98 GAS FLARING INCIDENT REPORT - ENDICOTT Page 1 December, 1997 Unplanned Events less than or equal to 1 hour DATE' TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 7,176 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE ' '' TIME'' !VOLUME ! DESCRIPTION OF INCIDENT & CAUSE ' ACTION'TTAKEN TO ELIMINATE CAUSE None TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE ' '' TIME'! '' VOLUME DESCRIPTION OF INCIDENT & CAUSE 'ACTION TAKEN TO ELIMINATE CAUSE None TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf BATE' TIME VOLUME DESCRIPTION OF'INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE None TOTAL 0 TOTAL SDN ENDICOTT Volume flared less than 1 hour 7,176 9 7,167 Volume flared greater than 0 0 0 1 hour ~ Pilot Purge 10,199 ~' -- 13 10,186 ~"- f~„~ Assist Gas 36.752 0 F 48 36.704 TOTAL FLARED VOLUME 54,127 ~ N ~ ~'~w ~' ~ c`~N~ 70 54,057 • BP EXPLORATION December 5, 1997 Alaska Oil & Gas Conservation Commission ATTN: Wendy Mahan 3001 Porcupine Drive Anchorage, AK 99501-3192 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10- 422) and Flaring Report covering the Endicott Field for November 1997. Sincerely, ~G;LGr ~' Paul D. Bly Manager, Volume, Royalty & Severance Enclosures ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Endicott 10450 November, 1997 J Disposition I Volume MCF* 1. Sold Fuel NGL 16,122 162,966 2. Reinjected 9,310,253 3. Flared or vented less than 1 hour 5,810 4. Flared or vented greater than 1 hour (SUpBlemental regort required--See 20 AAC 25.235) 0 5. Pilot and Purge 9,858 6. Used for lease operations Assist Fuel 34,529 875,519 7. Other TOTAL items 1-7 10,415,057 8. NGL gas equivalent produced 162,966 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify at the for going is true and correct to the best of ~iZOD. Signature Title ./J/V/~C%ST Date ~'71 *Indicate contribution of each pool Pool Name Code Percent 220100 Official Use Only- Flaring Authoriza 1. Safety MCF 2. Lease MCF 3. Conserv. Purpos MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 12/3/97 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT November, 1997 Page 1 Unplanned Events less than or equal to 1 hour DATE TIME ' VOLUME' DESCRIPTION OFINCIDENT' & CAUSEI' ACTION-TAKEN TO ELIMINATE CAUSE TOTAL 5,583 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Events greater than 1 hour DATE TIME VOLUME 'D . None TOTAL 0 IPTION OF INCIDENT, & CAUSE ACTION,TAKEN' TO ELIMINATE CAUSE Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME ', VOLUME `DESCRIPTIOiV OF INCIDENT', & CAUSE, ACTION,,TAKEN TO ELIMINATE CAUSE 11/09/97 09:20-09:30 86 Swapping 3-03 for 3-25 11/27/97 19:50-19:50 59 Surged well 2-44, attempting to kick it off. 11/28/97 09:30-09:50 89 Surged well 2-44, attempting to kick it off. TOTAL 234 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ,. DATE TIME ' ' VOLUME '''DESCRIPTION'OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE' None TOTAL 0 TOTAL SDN ENDICOIT'' Volume flared less than 1 hour 5,817 7 5,810 Volume flared greater than 0 0 0 1 hour Pilot Purge 9,870 12 9,858 Assist Gas 34,571 42 34.529 TOTAL FLARED VOLUME 50,258 61 50,197 ' ~ ~ ~ BP EXPLORATION November 7, 1997 Alaska Oil & Gas Conservation Commission ATrN: Wendy Mahan 3001 Porcupine Drive Anchorage, AK 99501-3192 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10- 422) and Flaring Report covering the Endicott Field for October 1997. Sincerely, ~~p ~ Paul D. Bly Manager, Volume, Royalty & Severance Enclosures . _. „~ u • ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Endicott 10450 October, 1997 Disposition Volume MCF* 1. Sold Fuel NGL 16,556 180,981 2. Reinjected 9,621,309 3. Flared or vented less than 1 hour 5,809 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 10,188 6. Used for lease operations Assist Fuel 33,392 928,136 7. Other TOTAL items 1-7 10,796,371 8. NGL gas equivalent produced 180,981 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify that the foregoing is true and correct to /~ ~ ~ ~~ Signature n• Title ~ Date the best of ~( ~j I Form 10-422 Rev. 4/95 *Indicate contribution of each pool Pool Name Code Percent 220100 Official Use Only:- Flaring Authoriza 1. Safety MCF 2. Lease MCF 3. Conserv. Purpos MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. 11/5/97 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT October, 1997 Page 1 Unplanned Events less than or equal to 1 hour DATE '' TIME '', ', VOLUME DESCRIPTION OF NCIDENT &' CAUSE ACTION''TAKEN TO ELIMINATE CAUSE TOTAL 5,430 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME ` VOLUME ' D~SCRIPTf4N OF INCIDENT & CAUSE ... ........... AC710N TAKEN TO ELIMINATE CAUSE • None TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf :DATE TIME VOLUME ' DESCRIPTION OF INCIDENT & CAUSE ' ACTION TAKEN TO''ELIMINATE CAUSE 10/6197 08:20-08:30 122 Upset while gas lift S/I for corrosion inspection S/I 1-61, 1-63 10/10/97 16:40-17:10 263 Gas Injection Well Washing 1-01 and 1-63 S/I TOTAL 385 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE !' TIME !! ' VOLUME !!DESCRIPTION OF INCIDENT' & CAUSE ACTION'TAKEN TO ELIMINATE CAUSE None TOTAL 0 • TOTAL SDN ENDICOTT' Volume flared less than 1 hour 5,815 6 5,809 Volume flared greater than 0 0 0 1 hour Pilot Purge 10,199 11 10,188 Assist Gas 33.427 35 33.392 TOTAL FLARED VOLUME 49,441 52 49,389 • ~. . BP EXPLORATION October 7, 1997 Alaska Oil & Gas Conservation Commission ATTN: Wendy Mahan 3001 Porcupine Drive Anchorage, AK 99501-3192 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10- 422) and Flaring Report covering the Endicott Field for September 1997. Sincerely, ~~ ~. Paul D. Bly Manager, Volume, Royalty & Severance Enclosures ALASKA OIL AND GAS CONSERVATION CONIl~iISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Endicott 10450 September, 1997 Disposition ~ Volume MCF* 1. Sold Fuel NGL 15,648 159,235 2. Reinjected 8,098,451 3. Flared or vented less than 1 hour 5,373 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 aAC 25.235) 0 5. Pilot and Purge 9,858 6. Used for lease operations Assist Fuel 38,538 828,279 7. Other TOTAL items 1-7 9,155,382 8. NGL gas equivalent produced 159,235 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify that the foregoing is true and correct to the best of g NGL. /~C, ~tdY Si nature Title ~ ~. Date *Indicate contribution of each pool Pool Name Code Percent 220100 gfficial Use Only-Flaring Authoriza 1. Safety MCF 2. Lease MCF 3. Conserv. Purpos MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 10/3/97 GAS FLARING INCIDENT REPORT - ENDICOTT September, 1997 Page 1 Unplanned Events less than or equal to 1 hour BATE ' TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE ACTIONTAKEN'TO ELIMINATE CAUSE TOTAL 4,824 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE 'TIME ,VOLUME D • None TOTAL 0 DN OF INCIDENT' & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME 'DESCRIPTION OF INCIDENT & CAUSE 'ACTION TAKEN TO ELIMINATE CAUSE 9/29/97 21:40-22:10 556 Start-up after we S/D MGC-B to repair gas leak Allowed to gas off while stabilizing plant in f.g. supply line. TOTAL 556 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME 'DESCRIPTION OF INCIDENT'& CAUSE 'ACTION TAKEN'TO ELIMINATE CAUSE None TOTAL 0 • TOTAL SDN ', ENDICOTT Volume flared less than 1 hour 5,380 7 5,373 Volume flared greater than 0 0 0 1 hour Pilot Purge 9,870 12 9,858 Assist Gas 38.584 46 38.538 TOTAL FLARED VOLUME 53,834 65 53,769 • BP EXPLORATION September 8, 1997 Alaska Oil & Gas Conservation Commission ATTN: Wendy Mahan 3001 Porcupine Drive Anchorage, AK 99501-3192 • BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10- 422) and Flaring Report covering Sag Delta North for August 1997. Sincerely, Paul D. Bly Manager, Volume, Royalty & Severance r -~ [""h t~. Enclosures N, - . ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Endicott 10450 August, 1997 • Disposition ~ Volume MCF* 1. Sold Fuel NGL 14,301 102,171 2. Reinjected 7,201,727 3. Flared or vented less than 1 hour 17,216 4. Flared or vented greater than 1 hour (SUPPlemental report required--See 20 AAC 25.235) 8,382 5. Pilot and Purge 10,183 6. Used for lease operations Assis Fuel 51,154 764,242 7. Other TOTAL items 1-7 8,169,376 8. NGL gas equivalent produced 102,171 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify that the foregoing is true and correct to the b st of Signature Title ~~ Date *Indicate contribution of each pool Pool Name Code Percent 220100 Official 'Use Only:-Flaring Authoriza 1. Safety MCF 2. Lease MCF 3. Conserv. Purpos MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 • • BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT 9/5/97 August, 1997 Unplanned Events less than or equal to 1 hour -.DATE ' tIME ' VOLUME- DESCRIPt10N OF INCIDENT & CAUSE____ ACTION tAKENiTO ELIMINATE GAUSE TOTAL 15,512 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME- VOLUME DESCRIPTION OF INCIDENT &,CAUSE .ACTION TAKEN TO ELIMINATE CAUSE 08/03/97 02:40-03:50 153 POP 2-04, 1.7 rise in ambient temperature and S/I 2-04 at 3:50. Discussed at morning human delay meetings. 08/10/97 21:40-23:10 631 High Ambient Temperatures and unstable plant Cut 1-63, Cut 4-02 and then S/I 1-63 rates 08/17/97 10:20-11:30 452 POP 1-31 and 2-48 S/I 1-33 and then 1-65 08/20/97 11:30-12:50 5,315 Both compressors tripped offline on low fuel gas Had trouble restarting compressors, cut temperature and S/I plant 28,600 BO to eliminate flaring 08/21/97 03:30-04:50 1,844 A-Main Compressor Start up problems and Recover from high levels in first stage and plant S/D restart plant TOTAL 8,395 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME 'DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 08/08/97 06:10-06:40 316 Alyeska slowdown to 30%, Plant unstable Cut production to 30% 08/08/97 22:10-22:30 372 Restarting plant after Alyeska 30% proration 08/16/97 11:10-11:40 326 POP 1-63 None, allow to gas off. 08/17/97 16:00-16:40 263 POP 4-10 and unstable plant rates Cut 4-02 before POPing 4-10 and cut 1-01 08/22/97 20:50-21:30 08/29/97 04:10-04:10 08/29/97 10:10-10:10 TOTAL 160 POP 1-25 190 POP 1-61 105 POP 1-01 1,732 S/I 3-21 None, allow to gas off. None, allow to gas off. Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME ' VOLUME ' DESCRIPTION'OF INCIDENT& CAUSE ACTION7AKEN TO ELIMINATE CAUSE None ~~ TOTAL 0 TOTAL SDN ENDICOTT Volume flared less than I hour 17,244 28 17,216 Volume flared greater than 8,395 13 8,382 1 hour Pilot Purge 10,199 16 10,183 Assist Gas 51.235 81 51.154 TOTAL FLARED VOLUME 87,073 138 86,935 Page 1 u BP EXPLORATION August 7, 1997 Alaska Oil & Gas Conservation Commission ATTN: Wendy Mahan 3001 Porcupine Drive Anchorage, AK 99501-3192 • BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10- 422) and Flaring Report covering the Endicott Field for July 1997. Sincerely, (. k. Paul D. Bly ~~~ Manager, Volume, Royalty & Severance Enclosures ALASKA OIL AND GAS CONSERVATION CONIl~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Endicott 10450 July, 1997 • • Disposition ~ Volume MCF* 1. Sold Fuel 13,313 NGL 147,587 2. Reinjected 7,449,565 3. Flared or vented less than 1 hour 19,335 4. Flared or vented greater than 1 hour 4,367 (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purge 10,183 6. Used for lease operations Assist 43,150 Fuel 795 230 7. Other Ai TOTAL items 1-7 p ~-.," 8,482,730 b ~ ~~ 8. NGL gas equivalent produc~iv 147,587 ~- "' t ~F N .'S ~ ~R 9. Purchased gas ~ u' *~ C7 CL? 10. Transferred from: ~• 11. Transferred to: ..- I hereby certify that the foregoing is true and correct to the best of y~l6dK~, `t/CY.~ ~Y ~~l Signature ~ Title R --~Ci~ Date Form 10-422 Rev. 4/95 *Indicate contribution of each pool Pool Name Code Percent 220100 Official Use Only-Flaring Authorizes 1. Safety MCF 2. Lease MCF 3. Conserv. Purpos MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 8/5/97 GAS FLARING INCIDENT REPORT - ENDICOTT July, 1997 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION-0FJNCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 18,127 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME `'' VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/1/97 14:40-15:30 3,807 A-Main Gas Compressor Shutdown Troubleshoot, restart MGC. Shut in wells 1- 27 & 1-65 • 7/11/97 00:20-01:50 479 Well 1-65 unloading, and Plant Gas Rates cycling Cut 1-63, Cut 2-48 7/11/97 03:20-04:30 88 Plant Gas Rates cycling Cut 1-01 at 4:00 and cut 1-01 more at 4:50 TOTAL 4,374 Planned Events Less Than or E qual 1 Hour AND Not Exceeding 5000 Mcf DATE' TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/9/97 20:20-21:10 253 POP 4-02 Shut-in 1-67 while 4-02 gas bled off 7/12/97 08:30-08:50 207 POP 1-63 None, allow to gas off. 7/13/97 02:20-03:00 238 Shut in gas lift line to inspect external corrosion Restart gas lift when corossion found to be found superficial. S/I 1-65. 7/23/97 12:50-13:30 540 POP 1-01 and Plant rates unstable Allow 1-01 to gas off. Working on gas lift press control TOTAL 1,238 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE: TIME VOLUME, DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE'CAUSE None TOTAL 0 TOTAL SDN ENDICOTT Volume flared less than 1 hour 19,365 N ~ 30 19,335 x Volume flared greater than 4,374 ~? °~ -; ' ~ 7 4,367 1 hour ~ a ~ ~ ` ~'+ ~..~ Ca 4~ ' ° j ~k Pilot Purge 10,199 , 4 v ~7 •~ 16 10,183 s `•s' Assist Gas 43.216 ~' ,~„~ ['~ 66 43.150 TOTAL FLARED VOLUME 77,154 "c ' ` 119 77,035 c Page 1 • BP EXPLORATION July 8, 1997 Alaska Oil & Gas Conservation Commission ATTN: Wendy Mahan 3001 Porcupine Drive Anchorage, AK 99501-3192 • BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10- 422) and Flaring Report covering the Endicott Field for June 1997. Sincerely, ~~ Paul D. Bly Manager, Volume, Royalty & Severance Enclosures ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Endicott 10450 June, 1997 • • Disposition ~ Volume MCF* 1. Sold Fuel NGL 13,516 151,236 2. Reinjected 8,129,746 3. Flared or vented less than 1 hour 11,423 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 410 5. Pilot and Purge 9,856 6. Used for lease operations Assist Fuel 38,657 790,505 7. Other TOTAL items 1-7 9,145,349 8. NGL gas equivalent produced 151,236 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify that the foregoing is true and correct to the best o ~(6~c. ~r Signature ~ Title X207 ~ ~ Date 7 8 Form 10-422 Rev. 4/95 *Indicate contribution of each pool Pool Name Code Percent 220100 o~fzcial Use Only- Flaring Authorize 1. Safety MCF 2. Lease MCF 3. Conserv. Purpos MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. ex an :xx' ~.- S'"' .. ! "~" v~; o ,,- _ su `~ __ f- ~,r_;, E,L ° "'•,5 V. G) ~..< BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 7/7/97 GAS FLARING INCIDENT REPORT - ENDICOTT June, 1997 Unplanned Events less than or equal to 1 hour .DATE ..TIME VOLUME DESCRIPTION OF1NCiDENT & CAUSE ACTION TAKEN!TO ELIMINATE,CAUSE TOTAL 11,440 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCFtIPT10N`OF INCIDENT &,CAUSE ACTION TAKEN TO ELIMINATE CAUSE'; 6/24/97 14:10-15:10 284 Bringing on wells as temp dropped 1-01 and 1- Shut in well 4-06, 1-65, cut 1-01 65 • 6/28/97 06:50-07:50 127 Rising Ambient Temperature Shut in well 2-58 TOTAL 411 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf :DATE TLME VOLUME DESCRIPTION OFiNCIDENT & CAUSE ..... ~~~ ACTION TAKEN TO ELIMINATE CAUSE None TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf =DATE TIME `.VOLUME DESCRIPTION''OE INCIDENT & CAUSE ``ACTION TAKEN TO ELIMINATE'CAUSE ::None. TOTAL 0 TOtAL ' SDN ENpICO1T Volume flared less than 1 hour 11,440 17 11,423 • Volume flared greater than 411 1 410 1 hour Pilot Purge 9,870 14 9,856 Assist Gas 38.713 56 38.657 TOTAL FLARED VOLUME 60,434 88 60,346 Page 1 i r BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 June 6, 1997 Alaska Oil & Gas Conservation Commission ATTN: Wendy Mahan 3001 Porcupine Drive Anchorage, AK 99501-3192 Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10- 422) and Flaring Report covering the Endicott Field for May 1997. Sincerely, ~~~ Paul D. Bly Manager, Volume, Royalty & Severance Enclosures ~ ~ ~ ~ ~ V t~ ~ ~- ~~~ Alaska QH & Gas Goes. Cammissiocc Anchorage • O ~ ~ ~ ~ ~ ~,~ 1 I~ y~ ~ ~ f.Cy o tG ~ "yt N O ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Endicott 10450 May, 1997 Disposition ~ Volume MCF* 1. Sold Fuel NGL 14,934 175,051 2. Reinjected 9,538,751 3. Flared or vented less than 1 hour 9,589 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 7,872 5. Pilot and Purge 10,186 6. Used for lease operations Assist Fuel 38,126 875,962 7. Other TOTAL items 1-7 10,670,471 8. NGL gas equivalent produced 175,051 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify that the foregoing is true and correct to the best of Si nature Title ~ ~i(~ Date *Indicate contribution of each pool Pool Name Code Percent 220100 Official Use Only:- Flaring Authorizes 1. Safety MCF 2. Lease MCF 3. Conserv. Purpos MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 b/5/97 GAS FLARING INCIDENT REPORT - ENDICOTT Page 1 May, 1997 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OFJNCIDENT;& CAUSE ACTION TAKEN TO ELIMINATE CAUSE'.. TOTAL 9,601 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF.INCIDENT.& CAUSE ACTION TAKEN TO ELIMINATE CAUSE; 5/25/97 17:30-18:30 257 Anti surge control problems, "A" Main Shut in well 1-65, cut wellsl-03 & 2-36 TOTAL 257 • Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION`OF INCIDENT &cCAUSE .... ACTION TAKEN TO ELIMINATE CAUSE None TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME- DESCRIPTION OF INCIDENT & CAUSE ; ACTION TAKEN-TO ELIMINATE`CAUSE 5/1/97 09:10-21:10 7,625 Water wash A and B Main Compressors. None, operational requirement for efficient operation TOTAL 7,625 TOTAL SDN ENDICOTT Volume flared less than 1 hour 9,601 12 9,589 • Volume flared greater than 7,882 10 7,872 1 hour Pilot Purge 10,199 ~ 13 10,186 Assist Gas 38.174 0 ~- ~ 48 38.126 a c z r'1'i - TOTAL FLARED VOLUME 65,856 c ~ I ~ 83 65,773 w~ ~ ~ :n --' tD ~ cc 3 ~ rr1't 0 c • BP EXPLORATION May 7, 1997 Alaska Oil & Gas Conservation Commission ATTN: Wendy Mahan 3001 Porcupine Drive Anchorage, AK 99501-3192 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 fi~ , ""-•*+4f3-Siti~t ~7a$ ~C+it~. x,ua~~EISP'~: ~~ ~nchar~~oi Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10- 422) and Flaring Report covering the Endicott Field for April 1997. Sincerely, ~~o ~i Paul D. Bly Manager, Volume, Royalty & Severance Enclosures ALASKA OIL AND GAS CONSERVATION CONIl~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Endicott 10450 April, 1997 • • Disposition ~ Volume MCF* 1. Sold Fuel NGL 13,241 172,408 2. Reinjected 9,424,000 3. Flared or vented less than 1 hour 11,474 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 11,561 5. Pilot and Purge 9,858 6. Used for lease operations Assist Fuel 35,955 847,395 7. Other TOTAL items 1-7 10,525,892 8. NGL gas equivalent produced 172,408 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify that the foregoing is true and correct to the best of g M6C !lam, COp~ Si nature Title X371. th~G_ Date *Indicate contribution of each pool Pool Name Code Percent 220100 Official Use Only-Flaring Authorize 1. Safety MCF 2. Lease MCF 3. Conserv. Purpos MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 5/6/97 GAS FLARING INCIDENT REPORT - ENDICOTT April, 1997 Unplanned Events less than or equal to 1 hour DATE ` TIME VOLUME DESCRIPTION OF INCIDENT& CAUSEc '..ACTION TAKEN TO ELIMINATE CAUSE TOTAL 10,411 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour ~. . DATE (( _TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE . ACTION TAKEN TO ELIMINATE CAUSE 4/4/97 09:50-13:00 10,534 Gas leak on 3rd stage PSV, depressured to Shut in wells on MPI • repair 4/6/97 07:50-09:00 420 Anti-surge valve control problems Shut in well 1-63 & 2-48, troubleshoot & repair 4/25/97 03:30-04:30 239 Flaring due to increase in ambient Shut in well 2-36, cut wells-03 4/25/97 18:00-19:50 382 Flaring due to increase in ambient Shut in well 1-17, cut well 1-61 TOTAL 11,575 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ..~.~ DATE 'TIME - VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE'CAUSE 4/10/97 09:00-09:10 15 Water wash and repair Gas injector well 2-06 None, necessary operation 4/10/97 09:30-10:10 101 Water wash and repair Gas injector well 2-06 None, necessary operation 4/10/97 10:30-11:20 925 Water wash and repair Gas injector well 2-06 None, necessary operation 4/10/97 13:30-13:30 35 Water wash and repair Gas injector well 2-12 None, necessary operation TOTAL 1,076 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION Of INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE£AUSE' None TOTAL 0 TOTAL ` SDN ENDICOTT Volume flared less than 1 hour 11,487 13 11,474 Volume flared greater than 11,575 14 11,561 1 hour Pilot Purge 9,870 12 9,858 Assist Gas 35.998 43 35.955 TOTAL FLARED VOLUME 68,930 82 68,848 Page 1 a t C~ BP EXPLORATION April 7, 1997 Alaska Oil & Gas Conservation Commission ATTN: Wendy Mahan 3001 Porcupine Drive Anchorage, AK 99501-3192 n I~ BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10- 422) and Flaring Report covering the Endicott Field for March 1997. Sincerely, ~~ Paul D. Bly Managers. Volume, Royalty & Severance Enclosures ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Endicott 10450 March, 1997 • Disposition I Volume MCF* 1. Sold Fuel NGL 14,413 191,937 2. Reinjected 11,121,506 3. Flared or vented less than 1 hour 4,480 4. Flared or vented greater than 1 hour ISUpplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 10,185 6. Used for lease operations Assist Fuel 36,328 947,176 7. Other TOTAL items 1-7 12,326,025 8. NGL gas equivalent produced 191,937 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certif that the foregoing is t/r~ue and correct to the best of /~'t~i~. ,.V~a"~~-~ Signature ~ Title ~xy. Date ~ ? ~ I *Indicate contribution of each pool Pool Name Code Percent 220100 Official Use Only:-Flaring Authorizes 1. Safety MCF 2. Lease MCF 3. Conserv. Purpos MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 4/3/97 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT March, 1997 Unplanned Events less than or equal to 1 hour ~ ~I .DATE TIME' VOLUME '! DESCRIPTION!OF INCIDENT:.& CAUSE ACTION TAKEN TO! ELIMINATE CAUSE TOTAL 2,015 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour --- DATE ! TIME:! VOLUME D • None TOTAL 0 OFINCIDENT &' CAUSE ACTION', CAUSE Planned Events Less Than o r E ','DATE TIME' 3/10/97 19:40-19:50 3/13/97 14:10-14:30 3/13/97 14:50-15:00 3/13/97 15:40-16:20 3/13/97 16:40-17:00 3/14/97 01:30-01:30 3/14/97 06:00-06:10 3/14/97 09:40-09:40 3/14/97 10:00-10:20 • 3/14/97 10:50-10:50 3/14/97 12:50-12:50 3/14/97 13:10-13:30 3/14/97 15:10-15:20 3/14/97 16:00-16:00 3/14197 20:10-20:10 3/15/97 09:30-10:00 TOTAL ual 1 Hour AND Not Exceeding 5000 Mcf OLUME DESCRIPT4AN OF!INCIDENT &"CAU: 1119 Flare Test 246 NGL Chiller back puffing 94 NGL Chiller back puffing 131 NGL Chiller back puffing 154 NGL Chiller back puffing 42 Thawing Cooler Bays 73 Thawing Cooler Bays 2 Thawing Cooler Bays 129 Thawing Cooler Bays 7 Thawing Cooler Bays 5 Thawing Cooler Bays 196 Thawing Cooler Bays 45 Thawing Cooler Bays 11 Thawing Cooler Bays 18 Thawing Cooler Bays 199 Thawing Cooler Bays 2,471 ACTION'TAKEN TO ELIMINAT# None, Necessary operation None, Necessary operation None, Necessary operation None, Necessary operation None, Necessary operation None, Necessary operation None, Necessary operation None, Necessary operation None, Necessary operation None, Necessary operation None, Necessary operation None, Necessary operation None, Necessary operation None, Necessary operation None, Necessary operation None, Necessary operation Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE' ' ' TIME ' VOLUME DESCRIPTION[ OR INCIDENT & CAUSE ! ACTION TAKEN TO ELIMINATE CAUSE None TOTAL 0 Page 1 • 4/3/97 Volume flared less than 1 hour Volume flared greater than 1 hour Pilot Purge Assist Gas TOTAL FLARED VOLUME BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Page 2 March, 1997 TOTAL SDN ' fNDICOTT 4,486 6 4,480 0 0 0 10,199 14 10,185 36.379 51 36.328 51,064 71 50,993 BP EXPLORATION March 7, 1997 Alaska Oil & Gas Conservation Commission ATTN: Wendy Mahan 3001 Porcupine Drive Anchorage, AK 99501-3192 • BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10- 422) and Flaring Report covering the Endicott Field for February 1997. Sincerely, ~`~~ Paul D. Bly Manager, Volume, Royalty & Severance s ~~~~~ r.:~;~;,~ i ~~ 1~ ~~ Enclosures ALASKA OIL AND GAS CONSERVATION CONII~lISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Exploration (Alaska) Endicott 10450 February, 1997 • Disposition I Volume MCF* 1. Sold Fuel NGL 14,197 183,027 2. Reinjected 10,133,340 3. Flared or vented less than 1 hour 3,135 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 9,201 6. Used for lease operations Assist Fuel 31,582 842,157 7. Other TOTAL items 1-7 11,216,639 8. NGL gas equivalent produced 183,027 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby cer >_fy that the foregoing is true and correct to the best of ~~.~I/~ Signature Title ~• Date ~~ *Indicate contribution of each pool Pool Name Code Percent 220100 Official Use Only- Flaring Authpriza 1. Safety MCF 2. Lease MCF 3. Conserv. Purpos MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 BP EXPLORATION (ALASKA) INC. s ~ - ADMINISTRATIVE APPROVAL N0.202.4 3/6/97 GAS FLARING INCIDENT REPORT - ENDICOTT Page 1 February, 1997 Unplanned Events less than or equal to 1 hour DATE 'TIME'' ' VOLUME DESCRIPTION OF WCIDENT & CAUSE . .ACTION TAKEN TO'ELIMINATE CAUSE" TOTAL 1,957 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour ~~i ~i i~ww~~inm i ~i i i~n~i~~iw~ ~~~~ i~i~io~~~ DATE 'TIME ' VOLUME DESCRIPTION OF'JNCIDENT & CAUSE ACTION TAKEN TO ELIMINATE'CAUSE None TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 'DATE 'TIME 'VOLUME 'DESCRiPT10N'OF INCIDENT'& CAUSE ACTION TAKEN'TO ELIMINATE CAUSE'' 2/11/97 16:00-16:10 1181 Filter change on MGC-B hydraulics None Necessary TOTAL 1,181 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE 'TIME ' VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO'ELIMINATE CAUSE None TOTAL 0 TOTAI. SDN ENDICOTf • Volume flared less than 1 hour 3,138 3 3,135 Volume flared greater than 0 _ 0 0 ~_. 1 hour _. Pilot Purge 9,212 =~ ~I 11 9,201 s ._ ~,~ c.. Assist Gas 31.620 w ~ ~;: 38 31.582 ~-~ ~= ~~ ~s TOTAL FLARED VOLUME 43,970 a~. 52 43,918 • BP EXPLORATION February 6, 1997 Alaska Oil & Gas Conservation Commission ATTN: Wendy Mahan 3001 Porcupine Drive Anchorage, AK 99501-3192 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10- 422) and Flaring Report covering the Endicott Field for January 1997. Sincerely, ~~~ Paul D. Bly Manager, Volume, Royalty & Severance Enclosures ~~ ~ ~~. ~~ ~ ~`~,y~' Al~~~~ C1i/ tar ~, A~~~ a~~~ ~t~rlt~r~i~siur; ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Endicott BP Ex loration (Alaska Inc. Endicott 10450 Januar 1997 • Disposition Volume MCF* 1. Sold Fuel NGL 16,086 200 873 2. Reinjected 10,997,076 3. Flared or vented less than 1 hour 3,257 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 10,190 6. Used for lease operations Assist Fuel 32,191 942 870 7. Other TOTAL items 1-7 12,202,543 8. NGL gas equivalent produced 200,873 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify that the foregoing is true and correct to the best of my knowledge. IM1~G~=• ~a'r Signature ~~ Title Gi~/• Date Z~7~ Form 10-422 Rev. 4/95 *Indicate contribution of each pool to total. Pool Name Code Percent 220100 Official Use Only-Flari~~e Authorization>1 hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. 2/5/97 BP EXPLORATION (ALASKA) INC. Pa e 1 ADMINISTRATIVE APPROVAL N0.202.4 g GAS FLARING INCIDENT REPORT - ENDICOTT January, 1997 its less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 2,941 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE None TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/13/97 13:00-13:20 103 PDP 1-25 then S/I 1-25 S/I 1-25 1/14/97 18:50-19:10 194 POP 2-58 Allowed to gas-off 1/16/97 07:30-07:50 22 POP 2-58 Allowed to gas-off TOTAL 319 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE None TOTAL 0 TOTAL SDN ENDICOTT • Volume flared less than 1 hour 3,260 3 3,257 Volume flared greater than 0 " ' ~ 0 0 1 hour T t ~ rn ~ Pilot Purge 10,199 ~ ,, ~ 9 10,190 ...~- Assist Gas 32.221 ~ ~ ~ 2 91 ~ t"C"l TOTAL FLARED VOLUME 45,680 Q 42 45,638