January 8, 1998
Alaska Oil & Gas Conservation Commission
ATTN: Wendy Mahan
3001 Porcupine Drive
Anchorage, AK 99501-3192
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10-
422) and Flaring Report covering the Endicott Field for December 1997.
Sincerely,
~~
Paul D. Bly
Manager, Volume, Royalty & Severance
Enclosures
~ ' r
I
''
~.' ~„~
...., ~ ~1
s
t"_~-7 1'7"~
t~ '
C.C7 ~,~F,.,j
~..,~
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Exploration (Alaska) Endicott 10450 December, 1997
Disposition
Volume MCF*
1. Sold Fuel
NGL 16,989
187,955
2. Reinjected 10,433,607
3. Flared or vented less than 1 hour 7,167
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 10,186
6. Used for lease operations Assist
Fuel 36,704
938,836
7. Other
TOTAL items 1-7 11,631,444
8. NGL gas equivalent produced 187,955
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to the best of
~xc~-~Uv~~ ,~ ~
Signature Title '~+. Date /, 7. S
Form 10-422
Rev. 4/95
*Indicate contribution of each pool
Pool Name Code Percent
220100
Official Use Only-Flaring Authoriza
1. Safety MCF
2. Lease MCF
3. Conserv. Purpos MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
Asia and to a temperature of 60
degrees F. Report due by the
20th of the month folowing the
month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
1 /6/98 GAS FLARING INCIDENT REPORT - ENDICOTT Page 1
December, 1997
Unplanned Events less than or equal to 1 hour
DATE' TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 7,176 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE ' '' TIME'' !VOLUME ! DESCRIPTION OF INCIDENT & CAUSE ' ACTION'TTAKEN TO ELIMINATE CAUSE
None
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE ' '' TIME'! '' VOLUME DESCRIPTION OF INCIDENT & CAUSE 'ACTION TAKEN TO ELIMINATE CAUSE
None
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
BATE' TIME VOLUME DESCRIPTION OF'INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
None
TOTAL 0
TOTAL SDN ENDICOTT
Volume flared less than 1 hour 7,176 9 7,167
Volume flared greater than 0 0 0
1 hour ~
Pilot Purge 10,199 ~' -- 13 10,186
~"- f~„~
Assist Gas 36.752 0 F 48 36.704
TOTAL FLARED VOLUME 54,127 ~ N ~ ~'~w
~' ~ c`~N~
70 54,057
•
BP EXPLORATION
December 5, 1997
Alaska Oil & Gas Conservation Commission
ATTN: Wendy Mahan
3001 Porcupine Drive
Anchorage, AK 99501-3192
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10-
422) and Flaring Report covering the Endicott Field for November 1997.
Sincerely,
~G;LGr ~'
Paul D. Bly
Manager, Volume, Royalty & Severance
Enclosures
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Exploration (Alaska) Endicott 10450 November, 1997
J
Disposition I Volume MCF*
1. Sold Fuel
NGL 16,122
162,966
2. Reinjected 9,310,253
3. Flared or vented less than 1 hour 5,810
4. Flared or vented greater than 1 hour
(SUpBlemental regort required--See 20 AAC 25.235) 0
5. Pilot and Purge 9,858
6. Used for lease operations Assist
Fuel 34,529
875,519
7. Other
TOTAL items 1-7 10,415,057
8. NGL gas equivalent produced 162,966
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify at the for going is true and correct to the best of
~iZOD.
Signature Title ./J/V/~C%ST Date ~'71
*Indicate contribution of each pool
Pool Name Code Percent
220100
Official Use Only- Flaring Authoriza
1. Safety MCF
2. Lease MCF
3. Conserv. Purpos MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the
20th of the month folowing the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
12/3/97
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
November, 1997
Page 1
Unplanned Events less than or equal to 1 hour
DATE TIME ' VOLUME' DESCRIPTION OFINCIDENT' & CAUSEI' ACTION-TAKEN TO ELIMINATE CAUSE
TOTAL 5,583 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Events greater than 1 hour
DATE TIME VOLUME 'D
. None
TOTAL 0
IPTION OF INCIDENT, & CAUSE ACTION,TAKEN' TO ELIMINATE CAUSE
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME ', VOLUME `DESCRIPTIOiV OF INCIDENT', & CAUSE, ACTION,,TAKEN TO ELIMINATE CAUSE
11/09/97 09:20-09:30 86 Swapping 3-03 for 3-25
11/27/97 19:50-19:50 59 Surged well 2-44, attempting to kick it off.
11/28/97 09:30-09:50 89 Surged well 2-44, attempting to kick it off.
TOTAL 234
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
,.
DATE TIME ' ' VOLUME '''DESCRIPTION'OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE'
None
TOTAL 0
TOTAL SDN ENDICOIT''
Volume flared less than 1 hour 5,817 7 5,810
Volume flared greater than 0 0 0
1 hour
Pilot Purge 9,870 12 9,858
Assist Gas 34,571 42 34.529
TOTAL FLARED VOLUME 50,258 61 50,197
' ~ ~ ~
BP EXPLORATION
November 7, 1997
Alaska Oil & Gas Conservation Commission
ATrN: Wendy Mahan
3001 Porcupine Drive
Anchorage, AK 99501-3192
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10-
422) and Flaring Report covering the Endicott Field for October 1997.
Sincerely,
~~p ~
Paul D. Bly
Manager, Volume, Royalty & Severance
Enclosures
. _. „~
u
•
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Exploration (Alaska) Endicott 10450 October, 1997
Disposition Volume MCF*
1. Sold Fuel
NGL 16,556
180,981
2. Reinjected 9,621,309
3. Flared or vented less than 1 hour 5,809
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 10,188
6. Used for lease operations Assist
Fuel 33,392
928,136
7. Other
TOTAL items 1-7 10,796,371
8. NGL gas equivalent produced 180,981
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to
/~ ~ ~ ~~
Signature n• Title ~ Date the best of
~( ~j I
Form 10-422
Rev. 4/95
*Indicate contribution of each pool
Pool Name Code Percent
220100
Official Use Only:- Flaring Authoriza
1. Safety MCF
2. Lease MCF
3. Conserv. Purpos MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the
20th of the month folowing the
month of disposition.
Authority 20 AAC 25.235.
11/5/97
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
October, 1997
Page 1
Unplanned Events less than or equal to 1 hour
DATE '' TIME '', ', VOLUME DESCRIPTION OF NCIDENT &' CAUSE ACTION''TAKEN TO ELIMINATE CAUSE
TOTAL 5,430 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME ` VOLUME ' D~SCRIPTf4N OF INCIDENT & CAUSE
...
........... AC710N TAKEN TO ELIMINATE CAUSE
• None
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
:DATE TIME VOLUME ' DESCRIPTION OF INCIDENT & CAUSE ' ACTION TAKEN TO''ELIMINATE CAUSE
10/6197 08:20-08:30 122 Upset while gas lift S/I for corrosion inspection S/I 1-61, 1-63
10/10/97 16:40-17:10 263 Gas Injection Well Washing 1-01 and 1-63 S/I
TOTAL 385
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE !' TIME !! ' VOLUME !!DESCRIPTION OF INCIDENT' & CAUSE ACTION'TAKEN TO ELIMINATE CAUSE
None
TOTAL 0
•
TOTAL SDN ENDICOTT'
Volume flared less than 1 hour 5,815 6 5,809
Volume flared greater than 0 0 0
1 hour
Pilot Purge 10,199 11 10,188
Assist Gas 33.427 35 33.392
TOTAL FLARED VOLUME 49,441 52 49,389
• ~. .
BP EXPLORATION
October 7, 1997
Alaska Oil & Gas Conservation Commission
ATTN: Wendy Mahan
3001 Porcupine Drive
Anchorage, AK 99501-3192
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10-
422) and Flaring Report covering the Endicott Field for September 1997.
Sincerely,
~~ ~.
Paul D. Bly
Manager, Volume, Royalty & Severance
Enclosures
ALASKA OIL AND GAS CONSERVATION CONIl~iISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Exploration (Alaska) Endicott 10450 September, 1997
Disposition ~ Volume MCF*
1. Sold Fuel
NGL 15,648
159,235
2. Reinjected 8,098,451
3. Flared or vented less than 1 hour 5,373
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 aAC 25.235) 0
5. Pilot and Purge 9,858
6. Used for lease operations Assist
Fuel 38,538
828,279
7. Other
TOTAL items 1-7 9,155,382
8. NGL gas equivalent produced 159,235
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to the best of
g NGL. /~C, ~tdY
Si nature Title ~ ~. Date
*Indicate contribution of each pool
Pool Name Code Percent
220100
gfficial Use Only-Flaring Authoriza
1. Safety MCF
2. Lease MCF
3. Conserv. Purpos MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
Asia and to a temperature of 60
degrees F. Report due by the
20th of the month folowing the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
10/3/97 GAS FLARING INCIDENT REPORT - ENDICOTT
September, 1997
Page 1
Unplanned Events less than or equal to 1 hour
BATE ' TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE ACTIONTAKEN'TO ELIMINATE CAUSE
TOTAL 4,824 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE 'TIME ,VOLUME D
• None
TOTAL 0
DN OF INCIDENT' & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME 'DESCRIPTION OF INCIDENT & CAUSE 'ACTION TAKEN TO ELIMINATE CAUSE
9/29/97 21:40-22:10 556 Start-up after we S/D MGC-B to repair gas leak Allowed to gas off while stabilizing plant
in f.g. supply line.
TOTAL 556
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME 'DESCRIPTION OF INCIDENT'& CAUSE 'ACTION TAKEN'TO ELIMINATE CAUSE
None
TOTAL 0
• TOTAL SDN ', ENDICOTT
Volume flared less than 1 hour 5,380 7 5,373
Volume flared greater than 0 0 0
1 hour
Pilot Purge 9,870 12 9,858
Assist Gas 38.584 46 38.538
TOTAL FLARED VOLUME 53,834 65 53,769
•
BP EXPLORATION
September 8, 1997
Alaska Oil & Gas Conservation Commission
ATTN: Wendy Mahan
3001 Porcupine Drive
Anchorage, AK 99501-3192
•
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10-
422) and Flaring Report covering Sag Delta North for August 1997.
Sincerely,
Paul D. Bly
Manager, Volume, Royalty & Severance
r -~ [""h
t~.
Enclosures
N, - .
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Exploration (Alaska) Endicott 10450 August, 1997
•
Disposition ~ Volume MCF*
1. Sold Fuel
NGL 14,301
102,171
2. Reinjected 7,201,727
3. Flared or vented less than 1 hour 17,216
4. Flared or vented greater than 1 hour
(SUPPlemental report required--See 20 AAC 25.235) 8,382
5. Pilot and Purge 10,183
6. Used for lease operations Assis
Fuel 51,154
764,242
7. Other
TOTAL items 1-7 8,169,376
8. NGL gas equivalent produced 102,171
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to the b st of
Signature Title ~~ Date
*Indicate contribution of each pool
Pool Name Code Percent
220100
Official 'Use Only:-Flaring Authoriza
1. Safety MCF
2. Lease MCF
3. Conserv. Purpos MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the
20th of the month folowing the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
•
•
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
9/5/97 August, 1997
Unplanned Events less than or equal to 1 hour
-.DATE ' tIME ' VOLUME- DESCRIPt10N OF INCIDENT & CAUSE____ ACTION tAKENiTO ELIMINATE GAUSE
TOTAL 15,512 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME- VOLUME DESCRIPTION OF INCIDENT &,CAUSE .ACTION TAKEN TO ELIMINATE CAUSE
08/03/97 02:40-03:50 153 POP 2-04, 1.7 rise in ambient temperature and S/I 2-04 at 3:50. Discussed at morning
human delay meetings.
08/10/97 21:40-23:10 631 High Ambient Temperatures and unstable plant Cut 1-63, Cut 4-02 and then S/I 1-63
rates
08/17/97 10:20-11:30 452 POP 1-31 and 2-48 S/I 1-33 and then 1-65
08/20/97 11:30-12:50 5,315 Both compressors tripped offline on low fuel gas Had trouble restarting compressors, cut
temperature and S/I plant 28,600 BO to eliminate flaring
08/21/97 03:30-04:50 1,844 A-Main Compressor Start up problems and Recover from high levels in first stage and
plant S/D restart plant
TOTAL 8,395
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME 'DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
08/08/97 06:10-06:40 316 Alyeska slowdown to 30%, Plant unstable Cut production to 30%
08/08/97 22:10-22:30 372 Restarting plant after Alyeska 30% proration
08/16/97 11:10-11:40 326 POP 1-63 None, allow to gas off.
08/17/97 16:00-16:40 263 POP 4-10 and unstable plant rates Cut 4-02 before POPing 4-10 and cut 1-01
08/22/97 20:50-21:30
08/29/97 04:10-04:10
08/29/97 10:10-10:10
TOTAL
160 POP 1-25
190 POP 1-61
105 POP 1-01
1,732
S/I 3-21
None, allow to gas off.
None, allow to gas off.
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME ' VOLUME ' DESCRIPTION'OF INCIDENT& CAUSE ACTION7AKEN TO ELIMINATE CAUSE
None ~~
TOTAL 0
TOTAL SDN ENDICOTT
Volume flared less than I hour 17,244 28 17,216
Volume flared greater than 8,395 13 8,382
1 hour
Pilot Purge 10,199 16 10,183
Assist Gas 51.235 81 51.154
TOTAL FLARED VOLUME 87,073 138 86,935
Page 1
u
BP EXPLORATION
August 7, 1997
Alaska Oil & Gas Conservation Commission
ATTN: Wendy Mahan
3001 Porcupine Drive
Anchorage, AK 99501-3192
•
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10-
422) and Flaring Report covering the Endicott Field for July 1997.
Sincerely,
(. k.
Paul D. Bly ~~~
Manager, Volume, Royalty & Severance
Enclosures
ALASKA OIL AND GAS CONSERVATION CONIl~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Exploration (Alaska) Endicott 10450 July, 1997
•
•
Disposition ~ Volume MCF*
1. Sold Fuel 13,313
NGL 147,587
2. Reinjected 7,449,565
3. Flared or vented less than 1 hour 19,335
4. Flared or vented greater than 1 hour 4,367
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 10,183
6. Used for lease operations Assist 43,150
Fuel 795 230
7. Other
Ai
TOTAL items 1-7 p ~-.," 8,482,730
b ~ ~~
8. NGL gas equivalent produc~iv 147,587
~- "' t ~F
N .'S ~ ~R
9. Purchased gas ~ u' *~
C7
CL?
10. Transferred from: ~•
11. Transferred to: ..-
I hereby certify that the foregoing is true and correct to the best of
y~l6dK~, `t/CY.~ ~Y ~~l
Signature ~ Title R --~Ci~ Date
Form 10-422
Rev. 4/95
*Indicate contribution of each pool
Pool Name Code Percent
220100
Official Use Only-Flaring Authorizes
1. Safety MCF
2. Lease MCF
3. Conserv. Purpos MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the
20th of the month folowing the
month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
8/5/97 GAS FLARING INCIDENT REPORT - ENDICOTT
July, 1997
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION-0FJNCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 18,127 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME `'' VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/1/97 14:40-15:30 3,807 A-Main Gas Compressor Shutdown Troubleshoot, restart MGC. Shut in wells 1-
27 & 1-65
• 7/11/97 00:20-01:50 479 Well 1-65 unloading, and Plant Gas Rates
cycling Cut 1-63, Cut 2-48
7/11/97 03:20-04:30 88 Plant Gas Rates cycling Cut 1-01 at 4:00 and cut 1-01 more at 4:50
TOTAL 4,374
Planned Events Less Than or E qual 1 Hour AND Not Exceeding 5000 Mcf
DATE' TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/9/97 20:20-21:10 253 POP 4-02 Shut-in 1-67 while 4-02 gas bled off
7/12/97 08:30-08:50 207 POP 1-63 None, allow to gas off.
7/13/97 02:20-03:00 238 Shut in gas lift line to inspect external corrosion Restart gas lift when corossion found to be
found superficial. S/I 1-65.
7/23/97 12:50-13:30 540 POP 1-01 and Plant rates unstable Allow 1-01 to gas off. Working on gas lift
press control
TOTAL 1,238
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE: TIME VOLUME, DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE'CAUSE
None
TOTAL 0
TOTAL SDN ENDICOTT
Volume flared less than 1 hour 19,365 N ~ 30 19,335
x
Volume flared greater than 4,374 ~? °~ -;
' ~ 7 4,367
1 hour ~
a ~ ~ `
~'+ ~..~
Ca 4~
'
° j ~k
Pilot Purge 10,199 , 4
v ~7 •~ 16 10,183
s
`•s'
Assist Gas 43.216 ~' ,~„~ ['~ 66 43.150
TOTAL FLARED VOLUME 77,154 "c
'
` 119 77,035
c
Page 1
•
BP EXPLORATION
July 8, 1997
Alaska Oil & Gas Conservation Commission
ATTN: Wendy Mahan
3001 Porcupine Drive
Anchorage, AK 99501-3192
•
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10-
422) and Flaring Report covering the Endicott Field for June 1997.
Sincerely,
~~
Paul D. Bly
Manager, Volume, Royalty & Severance
Enclosures
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Exploration (Alaska) Endicott 10450 June, 1997
•
•
Disposition ~ Volume MCF*
1. Sold Fuel
NGL 13,516
151,236
2. Reinjected 8,129,746
3. Flared or vented less than 1 hour 11,423
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 410
5. Pilot and Purge 9,856
6. Used for lease operations Assist
Fuel 38,657
790,505
7. Other
TOTAL items 1-7 9,145,349
8. NGL gas equivalent produced 151,236
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to the best o
~(6~c. ~r
Signature ~ Title X207 ~ ~ Date 7 8
Form 10-422
Rev. 4/95
*Indicate contribution of each pool
Pool Name Code Percent
220100
o~fzcial Use Only- Flaring Authorize
1. Safety MCF
2. Lease MCF
3. Conserv. Purpos MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the
20th of the month folowing the
month of disposition.
Authority 20 AAC 25.235.
ex
an
:xx'
~.-
S'"' ..
! "~"
v~;
o ,,- _
su
`~ __
f- ~,r_;,
E,L
° "'•,5
V.
G) ~..<
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
7/7/97 GAS FLARING INCIDENT REPORT - ENDICOTT
June, 1997
Unplanned Events less than or equal to 1 hour
.DATE ..TIME VOLUME DESCRIPTION OF1NCiDENT & CAUSE ACTION TAKEN!TO ELIMINATE,CAUSE
TOTAL 11,440 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCFtIPT10N`OF INCIDENT &,CAUSE ACTION TAKEN TO ELIMINATE CAUSE';
6/24/97 14:10-15:10 284 Bringing on wells as temp dropped 1-01 and 1- Shut in well 4-06, 1-65, cut 1-01
65
• 6/28/97 06:50-07:50 127 Rising Ambient Temperature Shut in well 2-58
TOTAL 411
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
:DATE TLME VOLUME DESCRIPTION OFiNCIDENT & CAUSE
..... ~~~
ACTION TAKEN TO ELIMINATE CAUSE
None
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
=DATE TIME `.VOLUME DESCRIPTION''OE INCIDENT & CAUSE ``ACTION TAKEN TO ELIMINATE'CAUSE
::None.
TOTAL 0
TOtAL ' SDN ENpICO1T
Volume flared less than 1 hour 11,440 17 11,423
•
Volume flared greater than 411 1 410
1 hour
Pilot Purge 9,870 14 9,856
Assist Gas 38.713 56 38.657
TOTAL FLARED VOLUME 60,434 88 60,346
Page 1
i
r
BP EXPLORATION BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
June 6, 1997
Alaska Oil & Gas Conservation Commission
ATTN: Wendy Mahan
3001 Porcupine Drive
Anchorage, AK 99501-3192
Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10-
422) and Flaring Report covering the Endicott Field for May 1997.
Sincerely,
~~~
Paul D. Bly
Manager, Volume, Royalty & Severance
Enclosures ~ ~ ~ ~ ~ V
t~ ~ ~- ~~~
Alaska QH & Gas Goes. Cammissiocc
Anchorage
•
O ~
~ ~
~ ~
~,~ 1
I~ y~
~ ~ f.Cy
o tG
~ "yt
N
O
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Exploration (Alaska) Endicott 10450 May, 1997
Disposition ~ Volume MCF*
1. Sold Fuel
NGL 14,934
175,051
2. Reinjected 9,538,751
3. Flared or vented less than 1 hour 9,589
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 7,872
5. Pilot and Purge 10,186
6. Used for lease operations Assist
Fuel 38,126
875,962
7. Other
TOTAL items 1-7 10,670,471
8. NGL gas equivalent produced 175,051
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to the best of
Si nature Title ~ ~i(~ Date
*Indicate contribution of each pool
Pool Name Code Percent
220100
Official Use Only:- Flaring Authorizes
1. Safety MCF
2. Lease MCF
3. Conserv. Purpos MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the
20th of the month folowing the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
b/5/97 GAS FLARING INCIDENT REPORT - ENDICOTT Page 1
May, 1997
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OFJNCIDENT;& CAUSE ACTION TAKEN TO ELIMINATE CAUSE'..
TOTAL 9,601 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF.INCIDENT.& CAUSE ACTION TAKEN TO ELIMINATE CAUSE;
5/25/97 17:30-18:30 257 Anti surge control problems, "A" Main Shut in well 1-65, cut wellsl-03 & 2-36
TOTAL 257
•
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION`OF INCIDENT &cCAUSE
.... ACTION TAKEN TO ELIMINATE CAUSE
None
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME- DESCRIPTION OF INCIDENT & CAUSE ; ACTION TAKEN-TO ELIMINATE`CAUSE
5/1/97 09:10-21:10 7,625 Water wash A and B Main Compressors. None, operational requirement for efficient
operation
TOTAL 7,625
TOTAL SDN ENDICOTT
Volume flared less than 1 hour 9,601 12 9,589
• Volume flared greater than 7,882 10 7,872
1 hour
Pilot Purge 10,199 ~ 13 10,186
Assist Gas 38.174 0 ~- ~ 48 38.126
a c z r'1'i -
TOTAL FLARED VOLUME 65,856 c ~ I ~ 83 65,773
w~ ~
~ :n --'
tD ~ cc
3 ~ rr1't
0
c
•
BP EXPLORATION
May 7, 1997
Alaska Oil & Gas Conservation Commission
ATTN: Wendy Mahan
3001 Porcupine Drive
Anchorage, AK 99501-3192
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
fi~ ,
""-•*+4f3-Siti~t ~7a$ ~C+it~. x,ua~~EISP'~:
~~ ~nchar~~oi
Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10-
422) and Flaring Report covering the Endicott Field for April 1997.
Sincerely,
~~o ~i
Paul D. Bly
Manager, Volume, Royalty & Severance
Enclosures
ALASKA OIL AND GAS CONSERVATION CONIl~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Exploration (Alaska) Endicott 10450 April, 1997
•
•
Disposition ~ Volume MCF*
1. Sold Fuel
NGL 13,241
172,408
2. Reinjected 9,424,000
3. Flared or vented less than 1 hour 11,474
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 11,561
5. Pilot and Purge 9,858
6. Used for lease operations Assist
Fuel 35,955
847,395
7. Other
TOTAL items 1-7 10,525,892
8. NGL gas equivalent produced 172,408
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to the best of
g M6C !lam, COp~
Si nature Title X371. th~G_ Date
*Indicate contribution of each pool
Pool Name Code Percent
220100
Official Use Only-Flaring Authorize
1. Safety MCF
2. Lease MCF
3. Conserv. Purpos MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
Asia and to a temperature of 60
degrees F. Report due by the
20th of the month folowing the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
5/6/97 GAS FLARING INCIDENT REPORT - ENDICOTT
April, 1997
Unplanned Events less than or equal to 1 hour
DATE ` TIME VOLUME DESCRIPTION OF INCIDENT& CAUSEc '..ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 10,411 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
~. .
DATE ((
_TIME
VOLUME
DESCRIPTION OF INCIDENT & CAUSE .
ACTION TAKEN TO ELIMINATE CAUSE
4/4/97 09:50-13:00 10,534 Gas leak on 3rd stage PSV, depressured to Shut in wells on MPI
• repair
4/6/97 07:50-09:00 420 Anti-surge valve control problems Shut in well 1-63 & 2-48, troubleshoot &
repair
4/25/97 03:30-04:30 239 Flaring due to increase in ambient Shut in well 2-36, cut wells-03
4/25/97 18:00-19:50 382 Flaring due to increase in ambient Shut in well 1-17, cut well 1-61
TOTAL 11,575
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
..~.~
DATE 'TIME - VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE'CAUSE
4/10/97 09:00-09:10 15 Water wash and repair Gas injector well 2-06 None, necessary operation
4/10/97 09:30-10:10 101 Water wash and repair Gas injector well 2-06 None, necessary operation
4/10/97 10:30-11:20 925 Water wash and repair Gas injector well 2-06 None, necessary operation
4/10/97 13:30-13:30 35 Water wash and repair Gas injector well 2-12 None, necessary operation
TOTAL 1,076
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION Of INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE£AUSE'
None
TOTAL 0
TOTAL ` SDN ENDICOTT
Volume flared less than 1 hour 11,487 13 11,474
Volume flared greater than 11,575 14 11,561
1 hour
Pilot Purge 9,870 12 9,858
Assist Gas 35.998 43 35.955
TOTAL FLARED VOLUME 68,930 82 68,848
Page 1
a t
C~
BP EXPLORATION
April 7, 1997
Alaska Oil & Gas Conservation Commission
ATTN: Wendy Mahan
3001 Porcupine Drive
Anchorage, AK 99501-3192
n
I~
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10-
422) and Flaring Report covering the Endicott Field for March 1997.
Sincerely,
~~
Paul D. Bly
Managers. Volume, Royalty & Severance
Enclosures
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Exploration (Alaska) Endicott 10450 March, 1997
•
Disposition I Volume MCF*
1. Sold Fuel
NGL 14,413
191,937
2. Reinjected 11,121,506
3. Flared or vented less than 1 hour 4,480
4. Flared or vented greater than 1 hour
ISUpplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 10,185
6. Used for lease operations Assist
Fuel 36,328
947,176
7. Other
TOTAL items 1-7 12,326,025
8. NGL gas equivalent produced 191,937
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certif that the foregoing is t/r~ue and correct to the best of
/~'t~i~. ,.V~a"~~-~
Signature ~ Title ~xy. Date ~ ? ~ I
*Indicate contribution of each pool
Pool Name Code Percent
220100
Official Use Only:-Flaring Authorizes
1. Safety MCF
2. Lease MCF
3. Conserv. Purpos MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the
20th of the month folowing the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
4/3/97
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
March, 1997
Unplanned Events less than or equal to 1 hour
~ ~I
.DATE TIME' VOLUME '! DESCRIPTION!OF INCIDENT:.& CAUSE ACTION TAKEN TO! ELIMINATE CAUSE
TOTAL 2,015 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
---
DATE ! TIME:! VOLUME D
• None
TOTAL 0
OFINCIDENT &' CAUSE ACTION',
CAUSE
Planned Events Less Than o r E
','DATE TIME'
3/10/97 19:40-19:50
3/13/97 14:10-14:30
3/13/97 14:50-15:00
3/13/97 15:40-16:20
3/13/97 16:40-17:00
3/14/97 01:30-01:30
3/14/97 06:00-06:10
3/14/97 09:40-09:40
3/14/97 10:00-10:20
• 3/14/97 10:50-10:50
3/14/97 12:50-12:50
3/14/97 13:10-13:30
3/14/97 15:10-15:20
3/14/97 16:00-16:00
3/14197 20:10-20:10
3/15/97 09:30-10:00
TOTAL
ual 1 Hour AND Not Exceeding 5000 Mcf
OLUME DESCRIPT4AN OF!INCIDENT &"CAU:
1119 Flare Test
246 NGL Chiller back puffing
94 NGL Chiller back puffing
131 NGL Chiller back puffing
154 NGL Chiller back puffing
42 Thawing Cooler Bays
73 Thawing Cooler Bays
2 Thawing Cooler Bays
129 Thawing Cooler Bays
7 Thawing Cooler Bays
5 Thawing Cooler Bays
196 Thawing Cooler Bays
45 Thawing Cooler Bays
11 Thawing Cooler Bays
18 Thawing Cooler Bays
199 Thawing Cooler Bays
2,471
ACTION'TAKEN TO ELIMINAT#
None, Necessary operation
None, Necessary operation
None, Necessary operation
None, Necessary operation
None, Necessary operation
None, Necessary operation
None, Necessary operation
None, Necessary operation
None, Necessary operation
None, Necessary operation
None, Necessary operation
None, Necessary operation
None, Necessary operation
None, Necessary operation
None, Necessary operation
None, Necessary operation
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE' ' ' TIME ' VOLUME DESCRIPTION[ OR INCIDENT & CAUSE ! ACTION TAKEN TO ELIMINATE CAUSE
None
TOTAL 0
Page 1
•
4/3/97
Volume flared less than 1 hour
Volume flared greater than
1 hour
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT Page 2
March, 1997
TOTAL SDN ' fNDICOTT
4,486 6 4,480
0 0 0
10,199 14 10,185
36.379 51 36.328
51,064 71 50,993
BP EXPLORATION
March 7, 1997
Alaska Oil & Gas Conservation Commission
ATTN: Wendy Mahan
3001 Porcupine Drive
Anchorage, AK 99501-3192
•
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10-
422) and Flaring Report covering the Endicott Field for February 1997.
Sincerely,
~`~~
Paul D. Bly
Manager, Volume, Royalty & Severance
s
~~~~~
r.:~;~;,~ i ~~ 1~ ~~
Enclosures
ALASKA OIL AND GAS CONSERVATION CONII~lISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Exploration (Alaska) Endicott 10450 February, 1997
•
Disposition I Volume MCF*
1. Sold Fuel
NGL 14,197
183,027
2. Reinjected 10,133,340
3. Flared or vented less than 1 hour 3,135
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 9,201
6. Used for lease operations Assist
Fuel 31,582
842,157
7. Other
TOTAL items 1-7 11,216,639
8. NGL gas equivalent produced 183,027
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby cer >_fy that the foregoing is true and correct to the best of
~~.~I/~
Signature Title ~• Date ~~
*Indicate contribution of each pool
Pool Name Code Percent
220100
Official Use Only- Flaring Authpriza
1. Safety MCF
2. Lease MCF
3. Conserv. Purpos MCF
Commissioner Date
Note: All volumes must be
corrected to pressure of 14.65
psia and to a temperature of 60
degrees F. Report due by the
20th of the month folowing the
month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
BP EXPLORATION (ALASKA) INC. s ~ -
ADMINISTRATIVE APPROVAL N0.202.4
3/6/97 GAS FLARING INCIDENT REPORT - ENDICOTT Page 1
February, 1997
Unplanned Events less than or equal to 1 hour
DATE 'TIME'' ' VOLUME DESCRIPTION OF WCIDENT & CAUSE . .ACTION TAKEN TO'ELIMINATE CAUSE"
TOTAL 1,957 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
~~i ~i i~ww~~inm i ~i i i~n~i~~iw~
~~~~ i~i~io~~~
DATE 'TIME ' VOLUME DESCRIPTION OF'JNCIDENT & CAUSE ACTION TAKEN TO ELIMINATE'CAUSE
None
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
'DATE 'TIME 'VOLUME 'DESCRiPT10N'OF INCIDENT'& CAUSE ACTION TAKEN'TO ELIMINATE CAUSE''
2/11/97 16:00-16:10 1181 Filter change on MGC-B hydraulics None Necessary
TOTAL 1,181
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE 'TIME ' VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO'ELIMINATE CAUSE
None
TOTAL 0
TOTAI. SDN ENDICOTf
• Volume flared less than 1 hour 3,138 3 3,135
Volume flared greater than 0 _ 0 0
~_.
1 hour
_.
Pilot Purge 9,212 =~ ~I 11 9,201
s ._
~,~ c..
Assist Gas 31.620 w ~ ~;: 38
31.582
~-~ ~=
~~ ~s
TOTAL FLARED VOLUME 43,970 a~. 52 43,918
•
BP EXPLORATION
February 6, 1997
Alaska Oil & Gas Conservation Commission
ATTN: Wendy Mahan
3001 Porcupine Drive
Anchorage, AK 99501-3192
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Enclosed, in duplicate, is the Producer's Report of Gas Disposition (Form 10-
422) and Flaring Report covering the Endicott Field for January 1997.
Sincerely,
~~~
Paul D. Bly
Manager, Volume, Royalty & Severance
Enclosures
~~ ~ ~~.
~~
~ ~`~,y~'
Al~~~~ C1i/ tar ~,
A~~~ a~~~ ~t~rlt~r~i~siur;
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Endicott BP Ex loration (Alaska Inc. Endicott 10450 Januar 1997
•
Disposition
Volume MCF*
1. Sold Fuel
NGL 16,086
200 873
2. Reinjected 10,997,076
3. Flared or vented less than 1 hour 3,257
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 10,190
6. Used for lease operations Assist
Fuel 32,191
942 870
7. Other
TOTAL items 1-7 12,202,543
8. NGL gas equivalent produced 200,873
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
IM1~G~=• ~a'r
Signature ~~ Title Gi~/• Date Z~7~
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name Code Percent
220100
Official Use Only-Flari~~e Authorization>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of
disposition. Authority 20 AAC 25.235.
2/5/97 BP EXPLORATION (ALASKA) INC. Pa e 1
ADMINISTRATIVE APPROVAL N0.202.4 g
GAS FLARING INCIDENT REPORT - ENDICOTT
January, 1997
its less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 2,941 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
None
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/13/97 13:00-13:20 103 PDP 1-25 then S/I 1-25 S/I 1-25
1/14/97 18:50-19:10 194 POP 2-58 Allowed to gas-off
1/16/97 07:30-07:50 22 POP 2-58 Allowed to gas-off
TOTAL 319
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
None
TOTAL 0
TOTAL SDN ENDICOTT
• Volume flared less than 1 hour 3,260 3 3,257
Volume flared greater than 0
"
' ~ 0 0
1 hour T
t
~
rn
~
Pilot Purge 10,199 ~ ,,
~ 9 10,190
...~-
Assist Gas 32.221 ~ ~ ~ 2 91
~ t"C"l
TOTAL FLARED VOLUME 45,680 Q 42 45,638